Loading...
HomeMy WebLinkAboutAppendix AIR APPENDIX AIR – AIR QUALITY ANALYSIS 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Government (Civic Center)92.00 1000sqft 1.93 92,000.00 0 Government Office Building 44.00 1000sqft 0.92 44,000.00 0 Government Office Building 7.25 1000sqft 1.25 7,250.00 0 Enclosed Parking with Elevator 294.00 Space 2.42 117,600.00 0 Parking Lot 161.00 Space 1.33 64,400.00 0 Parking Lot 15.00 Space 0.95 6,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2019Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) Community Civic Campus San Mateo County, Annual CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 1 of 61 Community Civic Campus - San Mateo County, Annual Project Characteristics - Land Use - Acreage adjusted per project applicant. Construction Phase - Construction, paving, and architectural coating assumed to occur simultaneously. Off-road Equipment - Off-road Equipment - Off-road Equipment - Demolition - Architectural Coating - Vehicle Trips - Adjusted per TIA. Trips and VMT - Construction Off-road Equipment Mitigation - Tier 3 equipment. Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 40 0 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 8.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 12.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 20.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 2 of 61 Community Civic Campus - San Mateo County, Annual tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblLandUse LotAcreage 2.11 1.93 tblLandUse LotAcreage 1.01 0.92 tblLandUse LotAcreage 0.17 1.25 tblLandUse LotAcreage 2.65 2.42 tblLandUse LotAcreage 0.13 0.95 tblLandUse LotAcreage 1.45 1.33 tblProjectCharacteristics OperationalYear 2018 2019 tblVehicleTrips ST_TR 0.00 60.55 tblVehicleTrips SU_TR 0.00 60.55 tblVehicleTrips WD_TR 27.92 60.55 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 3 of 61 Community Civic Campus - San Mateo County, Annual 2.0 Emissions Summary tblVehicleTrips WD_TR 68.93 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 4 of 61 Community Civic Campus - San Mateo County, Annual 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2017 0.9234 4.6643 3.2009 6.0000e- 003 0.2756 0.2543 0.5300 0.1143 0.2374 0.3517 0.0000 553.3337 553.3337 0.1137 0.0000 556.1769 2018 1.3891 6.3203 4.8515 9.4700e- 003 0.3619 0.3298 0.6917 0.1360 0.3083 0.4443 0.0000 865.9319 865.9319 0.1738 0.0000 870.2767 2019 0.7247 2.8146 2.4712 4.9300e- 003 0.1024 0.1426 0.2449 0.0277 0.1335 0.1613 0.0000 447.3619 447.3619 0.0864 0.0000 449.5220 Maximum 1.3891 6.3203 4.8515 9.4700e- 003 0.3619 0.3298 0.6917 0.1360 0.3083 0.4443 0.0000 865.9319 865.9319 0.1738 0.0000 870.2767 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2017 0.5919 2.6523 3.3539 6.0000e- 003 0.2756 0.1266 0.4023 0.1143 0.1264 0.2407 0.0000 553.3333 553.3333 0.1137 0.0000 556.1765 2018 0.9715 4.1242 5.1941 9.4700e- 003 0.3619 0.1976 0.5595 0.1360 0.1973 0.3332 0.0000 865.9312 865.9312 0.1738 0.0000 870.2760 2019 0.5519 2.1152 2.6778 4.9300e- 003 0.1024 0.1032 0.2055 0.0277 0.1030 0.1307 0.0000 447.3616 447.3616 0.0864 0.0000 449.5216 Maximum 0.9715 4.1242 5.1941 9.4700e- 003 0.3619 0.1976 0.5595 0.1360 0.1973 0.3332 0.0000 865.9312 865.9312 0.1738 0.0000 870.2760 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 5 of 61 Community Civic Campus - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 30.36 35.56 -6.67 0.00 0.00 41.19 20.41 0.00 37.19 26.39 0.00 0.00 0.00 0.00 0.00 0.00 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 5-1-2017 7-31-2017 1.7217 0.8365 2 8-1-2017 10-31-2017 2.3299 1.4533 3 11-1-2017 1-31-2018 2.2479 1.4523 4 2-1-2018 4-30-2018 2.0017 1.3861 5 5-1-2018 7-31-2018 1.5912 0.8668 6 8-1-2018 10-31-2018 2.0347 1.4000 7 11-1-2018 1-31-2019 2.0072 1.4296 8 2-1-2019 4-30-2019 1.8150 1.3679 9 5-1-2019 7-31-2019 1.0573 0.7961 Highest 2.3299 1.4533 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 6 of 61 Community Civic Campus - San Mateo County, Annual 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Energy 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 929.2246 929.2246 0.0382 0.0100 933.1661 Mobile 1.4730 4.5244 15.5470 0.0457 3.9475 0.0579 4.0053 1.0608 0.0544 1.1152 0.0000 4,170.286 4 4,170.286 4 0.1655 0.0000 4,174.422 7 Waste 0.0000 0.0000 0.0000 0.0000 116.1230 0.0000 116.1230 6.8627 0.0000 287.6898 Water 0.0000 0.0000 0.0000 0.0000 9.0284 62.5556 71.5841 0.9301 0.0225 101.5367 Total 2.1388 4.6608 15.6672 0.0465 3.9475 0.0682 4.0157 1.0608 0.0648 1.1256 125.1514 5,162.077 6 5,287.229 0 7.9964 0.0325 5,496.827 0 Unmitigated Operational CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 7 of 61 Community Civic Campus - San Mateo County, Annual 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Energy 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 929.2246 929.2246 0.0382 0.0100 933.1661 Mobile 1.4730 4.5244 15.5470 0.0457 3.9475 0.0579 4.0053 1.0608 0.0544 1.1152 0.0000 4,170.286 4 4,170.286 4 0.1655 0.0000 4,174.422 7 Waste 0.0000 0.0000 0.0000 0.0000 116.1230 0.0000 116.1230 6.8627 0.0000 287.6898 Water 0.0000 0.0000 0.0000 0.0000 9.0284 62.5556 71.5841 0.9301 0.0225 101.5367 Total 2.1388 4.6608 15.6672 0.0465 3.9475 0.0682 4.0157 1.0608 0.0648 1.1256 125.1514 5,162.077 6 5,287.229 0 7.9964 0.0325 5,496.827 0 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 8 of 61 Community Civic Campus - San Mateo County, Annual Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Phase 1 Demolition Demolition 5/1/2017 5/26/2017 5 20 2 Phase 1 Site Preparation Site Preparation 5/27/2017 6/9/2017 5 10 3 Phase 1 Grading Grading 6/10/2017 7/7/2017 5 20 4 Phase 1 Building Construction Building Construction 7/8/2017 5/25/2018 5 230 5 Phase 1 Paving Paving 7/8/2017 5/25/2018 5 230 6 Phase 1 Architectural Coating Architectural Coating 7/8/2017 5/25/2018 5 230 7 Phase 2 Demolition Demolition 5/26/2018 6/22/2018 5 20 8 Phase 2 Site Preparation Site Preparation 6/23/2018 7/6/2018 5 10 9 Phase 2 Grading Grading 7/7/2018 8/3/2018 5 20 10 Phase 2 Building Construction Building Construction 8/4/2018 6/21/2019 5 230 11 Phase 2 Paving Paving 8/4/2018 6/21/2019 5 230 12 Phase 2 Architectural Coating Architectural Coating 8/4/2018 6/21/2019 5 230 OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase 1 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 1 Demolition Excavators 3 8.00 158 0.38 Phase 1 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 1 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 214,875; Non-Residential Outdoor: 71,625; Striped Parking Area: 11,280 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.7 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 9 of 61 Community Civic Campus - San Mateo County, Annual Phase 1 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 1 Grading Excavators 1 8.00 158 0.38 Phase 1 Grading Graders 1 8.00 187 0.41 Phase 1 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 1 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 1 Building Construction Cranes 1 7.00 231 0.29 Phase 1 Building Construction Forklifts 3 8.00 89 0.20 Phase 1 Building Construction Generator Sets 1 8.00 84 0.74 Phase 1 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase 1 Building Construction Welders 1 8.00 46 0.45 Phase 1 Paving Pavers 2 8.00 130 0.42 Phase 1 Paving Paving Equipment 2 8.00 132 0.36 Phase 1 Paving Rollers 2 8.00 80 0.38 Phase 1 Architectural Coating Air Compressors 1 6.00 78 0.48 Phase 2 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 2 Demolition Excavators 3 8.00 158 0.38 Phase 2 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 2 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Phase 2 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 2 Grading Excavators 1 8.00 158 0.38 Phase 2 Grading Graders 1 8.00 187 0.41 Phase 2 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 2 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 2 Building Construction Cranes 1 7.00 231 0.29 Phase 2 Building Construction Forklifts 3 8.00 89 0.20 Phase 2 Building Construction Generator Sets 1 8.00 84 0.74 Phase 2 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 10 of 61 Community Civic Campus - San Mateo County, Annual 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Clean Paved Roads Phase 2 Building Construction Welders 1 8.00 46 0.45 Phase 2 Paving Pavers 2 8.00 130 0.42 Phase 2 Paving Paving Equipment 2 8.00 132 0.36 Phase 2 Paving Rollers 2 8.00 80 0.38 Phase 2 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Phase 1 Demolition 6 15.00 0.00 116.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Demolition 6 15.00 0.00 247.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 11 of 61 Community Civic Campus - San Mateo County, Annual 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0126 0.0000 0.0126 1.9000e- 003 0.0000 1.9000e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0410 0.4275 0.2301 3.9000e- 004 0.0219 0.0219 0.0204 0.0204 0.0000 35.6005 35.6005 9.7300e- 003 0.0000 35.8438 Total 0.0410 0.4275 0.2301 3.9000e- 004 0.0126 0.0219 0.0345 1.9000e- 003 0.0204 0.0223 0.0000 35.6005 35.6005 9.7300e- 003 0.0000 35.8438 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 7.3000e- 004 0.0233 7.9700e- 003 5.0000e- 005 9.7000e- 004 1.4000e- 004 1.1100e- 003 2.7000e- 004 1.3000e- 004 4.0000e- 004 0.0000 5.0502 5.0502 5.9000e- 004 0.0000 5.0649 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Total 1.2800e- 003 0.0237 0.0121 6.0000e- 005 2.1500e- 003 1.5000e- 004 2.3000e- 003 5.8000e- 004 1.4000e- 004 7.2000e- 004 0.0000 6.1307 6.1307 6.2000e- 004 0.0000 6.1461 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 12 of 61 Community Civic Campus - San Mateo County, Annual 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0126 0.0000 0.0126 1.9000e- 003 0.0000 1.9000e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.2500e- 003 0.1831 0.2467 3.9000e- 004 8.6300e- 003 8.6300e- 003 8.6300e- 003 8.6300e- 003 0.0000 35.6005 35.6005 9.7300e- 003 0.0000 35.8438 Total 9.2500e- 003 0.1831 0.2467 3.9000e- 004 0.0126 8.6300e- 003 0.0212 1.9000e- 003 8.6300e- 003 0.0105 0.0000 35.6005 35.6005 9.7300e- 003 0.0000 35.8438 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 7.3000e- 004 0.0233 7.9700e- 003 5.0000e- 005 9.7000e- 004 1.4000e- 004 1.1100e- 003 2.7000e- 004 1.3000e- 004 4.0000e- 004 0.0000 5.0502 5.0502 5.9000e- 004 0.0000 5.0649 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Total 1.2800e- 003 0.0237 0.0121 6.0000e- 005 2.1500e- 003 1.5000e- 004 2.3000e- 003 5.8000e- 004 1.4000e- 004 7.2000e- 004 0.0000 6.1307 6.1307 6.2000e- 004 0.0000 6.1461 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 13 of 61 Community Civic Campus - San Mateo County, Annual 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0248 0.2614 0.1173 1.9000e- 004 0.0144 0.0144 0.0132 0.0132 0.0000 17.6672 17.6672 5.4100e- 003 0.0000 17.8025 Total 0.0248 0.2614 0.1173 1.9000e- 004 0.0903 0.0144 0.1047 0.0497 0.0132 0.0629 0.0000 17.6672 17.6672 5.4100e- 003 0.0000 17.8025 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3000e- 004 2.5000e- 004 2.4700e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6483 0.6483 2.0000e- 005 0.0000 0.6487 Total 3.3000e- 004 2.5000e- 004 2.4700e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6483 0.6483 2.0000e- 005 0.0000 0.6487 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 14 of 61 Community Civic Campus - San Mateo County, Annual 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.6600e- 003 0.0953 0.1148 1.9000e- 004 4.7300e- 003 4.7300e- 003 4.7300e- 003 4.7300e- 003 0.0000 17.6672 17.6672 5.4100e- 003 0.0000 17.8025 Total 4.6600e- 003 0.0953 0.1148 1.9000e- 004 0.0903 4.7300e- 003 0.0951 0.0497 4.7300e- 003 0.0544 0.0000 17.6672 17.6672 5.4100e- 003 0.0000 17.8025 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.3000e- 004 2.5000e- 004 2.4700e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6483 0.6483 2.0000e- 005 0.0000 0.6487 Total 3.3000e- 004 2.5000e- 004 2.4700e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6483 0.6483 2.0000e- 005 0.0000 0.6487 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 15 of 61 Community Civic Campus - San Mateo County, Annual 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0307 0.3389 0.1710 3.0000e- 004 0.0178 0.0178 0.0164 0.0164 0.0000 27.5595 27.5595 8.4400e- 003 0.0000 27.7706 Total 0.0307 0.3389 0.1710 3.0000e- 004 0.0655 0.0178 0.0833 0.0337 0.0164 0.0500 0.0000 27.5595 27.5595 8.4400e- 003 0.0000 27.7706 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Total 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 16 of 61 Community Civic Campus - San Mateo County, Annual 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2600e- 003 0.1484 0.1899 3.0000e- 004 7.5600e- 003 7.5600e- 003 7.5600e- 003 7.5600e- 003 0.0000 27.5594 27.5594 8.4400e- 003 0.0000 27.7705 Total 7.2600e- 003 0.1484 0.1899 3.0000e- 004 0.0655 7.5600e- 003 0.0731 0.0337 7.5600e- 003 0.0412 0.0000 27.5594 27.5594 8.4400e- 003 0.0000 27.7705 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Total 5.5000e- 004 4.1000e- 004 4.1100e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0805 1.0805 3.0000e- 005 0.0000 1.0812 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 17 of 61 Community Civic Campus - San Mateo County, Annual 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1947 1.6597 1.1364 1.6800e- 003 0.1117 0.1117 0.1049 0.1049 0.0000 150.3080 150.3080 0.0370 0.0000 151.2338 Total 0.1947 1.6597 1.1364 1.6800e- 003 0.1117 0.1117 0.1049 0.1049 0.0000 150.3080 150.3080 0.0370 0.0000 151.2338 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0209 0.4929 0.1885 9.3000e- 004 0.0220 4.5300e- 003 0.0265 6.3600e- 003 4.3300e- 003 0.0107 0.0000 91.9529 91.9529 8.3200e- 003 0.0000 92.1608 Worker 0.0288 0.0214 0.2141 6.2000e- 004 0.0615 4.0000e- 004 0.0619 0.0164 3.7000e- 004 0.0167 0.0000 56.2750 56.2750 1.4800e- 003 0.0000 56.3120 Total 0.0496 0.5143 0.4027 1.5500e- 003 0.0835 4.9300e- 003 0.0884 0.0227 4.7000e- 003 0.0274 0.0000 148.2278 148.2278 9.8000e- 003 0.0000 148.4727 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 18 of 61 Community Civic Campus - San Mateo County, Annual 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0421 0.8891 1.1171 1.6800e- 003 0.0565 0.0565 0.0565 0.0565 0.0000 150.3078 150.3078 0.0370 0.0000 151.2336 Total 0.0421 0.8891 1.1171 1.6800e- 003 0.0565 0.0565 0.0565 0.0565 0.0000 150.3078 150.3078 0.0370 0.0000 151.2336 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0209 0.4929 0.1885 9.3000e- 004 0.0220 4.5300e- 003 0.0265 6.3600e- 003 4.3300e- 003 0.0107 0.0000 91.9529 91.9529 8.3200e- 003 0.0000 92.1608 Worker 0.0288 0.0214 0.2141 6.2000e- 004 0.0615 4.0000e- 004 0.0619 0.0164 3.7000e- 004 0.0167 0.0000 56.2750 56.2750 1.4800e- 003 0.0000 56.3120 Total 0.0496 0.5143 0.4027 1.5500e- 003 0.0835 4.9300e- 003 0.0884 0.0227 4.7000e- 003 0.0274 0.0000 148.2278 148.2278 9.8000e- 003 0.0000 148.4727 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 19 of 61 Community Civic Campus - San Mateo County, Annual 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1407 1.2280 0.9230 1.4100e- 003 0.0787 0.0787 0.0740 0.0740 0.0000 124.8278 124.8278 0.0306 0.0000 125.5924 Total 0.1407 1.2280 0.9230 1.4100e- 003 0.0787 0.0787 0.0740 0.0740 0.0000 124.8278 124.8278 0.0306 0.0000 125.5924 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0151 0.3851 0.1469 7.7000e- 004 0.0185 2.9600e- 003 0.0214 5.3400e- 003 2.8300e- 003 8.1700e- 003 0.0000 76.6327 76.6327 6.8200e- 003 0.0000 76.8032 Worker 0.0214 0.0156 0.1575 5.1000e- 004 0.0517 3.3000e- 004 0.0520 0.0138 3.1000e- 004 0.0141 0.0000 45.8579 45.8579 1.0800e- 003 0.0000 45.8849 Total 0.0365 0.4007 0.3045 1.2800e- 003 0.0701 3.2900e- 003 0.0734 0.0191 3.1400e- 003 0.0222 0.0000 122.4905 122.4905 7.9000e- 003 0.0000 122.6881 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 20 of 61 Community Civic Campus - San Mateo County, Annual 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0354 0.7469 0.9384 1.4100e- 003 0.0474 0.0474 0.0474 0.0474 0.0000 124.8277 124.8277 0.0306 0.0000 125.5922 Total 0.0354 0.7469 0.9384 1.4100e- 003 0.0474 0.0474 0.0474 0.0474 0.0000 124.8277 124.8277 0.0306 0.0000 125.5922 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0151 0.3851 0.1469 7.7000e- 004 0.0185 2.9600e- 003 0.0214 5.3400e- 003 2.8300e- 003 8.1700e- 003 0.0000 76.6327 76.6327 6.8200e- 003 0.0000 76.8032 Worker 0.0214 0.0156 0.1575 5.1000e- 004 0.0517 3.3000e- 004 0.0520 0.0138 3.1000e- 004 0.0141 0.0000 45.8579 45.8579 1.0800e- 003 0.0000 45.8849 Total 0.0365 0.4007 0.3045 1.2800e- 003 0.0701 3.2900e- 003 0.0734 0.0191 3.1400e- 003 0.0222 0.0000 122.4905 122.4905 7.9000e- 003 0.0000 122.6881 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 21 of 61 Community Civic Campus - San Mateo County, Annual 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1216 1.2949 0.9395 1.4200e- 003 0.0725 0.0725 0.0667 0.0667 0.0000 132.1454 132.1454 0.0405 0.0000 133.1576 Paving 1.6200e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.1232 1.2949 0.9395 1.4200e- 003 0.0725 0.0725 0.0667 0.0667 0.0000 132.1454 132.1454 0.0405 0.0000 133.1576 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.4500e- 003 2.5700e- 003 0.0257 7.0000e- 005 7.3800e- 003 5.0000e- 005 7.4300e- 003 1.9600e- 003 4.0000e- 005 2.0100e- 003 0.0000 6.7530 6.7530 1.8000e- 004 0.0000 6.7574 Total 3.4500e- 003 2.5700e- 003 0.0257 7.0000e- 005 7.3800e- 003 5.0000e- 005 7.4300e- 003 1.9600e- 003 4.0000e- 005 2.0100e- 003 0.0000 6.7530 6.7530 1.8000e- 004 0.0000 6.7574 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 22 of 61 Community Civic Campus - San Mateo County, Annual 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0351 0.7060 1.0810 1.4200e- 003 0.0381 0.0381 0.0381 0.0381 0.0000 132.1453 132.1453 0.0405 0.0000 133.1575 Paving 1.6200e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0367 0.7060 1.0810 1.4200e- 003 0.0381 0.0381 0.0381 0.0381 0.0000 132.1453 132.1453 0.0405 0.0000 133.1575 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.4500e- 003 2.5700e- 003 0.0257 7.0000e- 005 7.3800e- 003 5.0000e- 005 7.4300e- 003 1.9600e- 003 4.0000e- 005 2.0100e- 003 0.0000 6.7530 6.7530 1.8000e- 004 0.0000 6.7574 Total 3.4500e- 003 2.5700e- 003 0.0257 7.0000e- 005 7.3800e- 003 5.0000e- 005 7.4300e- 003 1.9600e- 003 4.0000e- 005 2.0100e- 003 0.0000 6.7530 6.7530 1.8000e- 004 0.0000 6.7574 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 23 of 61 Community Civic Campus - San Mateo County, Annual 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0863 0.9199 0.7768 1.2000e- 003 0.0502 0.0502 0.0462 0.0462 0.0000 109.2610 109.2610 0.0340 0.0000 110.1114 Paving 1.3600e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0877 0.9199 0.7768 1.2000e- 003 0.0502 0.0502 0.0462 0.0462 0.0000 109.2610 109.2610 0.0340 0.0000 110.1114 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5700e- 003 1.8700e- 003 0.0189 6.0000e- 005 6.2000e- 003 4.0000e- 005 6.2400e- 003 1.6500e- 003 4.0000e- 005 1.6900e- 003 0.0000 5.5029 5.5029 1.3000e- 004 0.0000 5.5062 Total 2.5700e- 003 1.8700e- 003 0.0189 6.0000e- 005 6.2000e- 003 4.0000e- 005 6.2400e- 003 1.6500e- 003 4.0000e- 005 1.6900e- 003 0.0000 5.5029 5.5029 1.3000e- 004 0.0000 5.5062 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 24 of 61 Community Civic Campus - San Mateo County, Annual 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0295 0.5930 0.9080 1.2000e- 003 0.0320 0.0320 0.0320 0.0320 0.0000 109.2609 109.2609 0.0340 0.0000 110.1113 Paving 1.3600e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0308 0.5930 0.9080 1.2000e- 003 0.0320 0.0320 0.0320 0.0320 0.0000 109.2609 109.2609 0.0340 0.0000 110.1113 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5700e- 003 1.8700e- 003 0.0189 6.0000e- 005 6.2000e- 003 4.0000e- 005 6.2400e- 003 1.6500e- 003 4.0000e- 005 1.6900e- 003 0.0000 5.5029 5.5029 1.3000e- 004 0.0000 5.5062 Total 2.5700e- 003 1.8700e- 003 0.0189 6.0000e- 005 6.2000e- 003 4.0000e- 005 6.2400e- 003 1.6500e- 003 4.0000e- 005 1.6900e- 003 0.0000 5.5029 5.5029 1.3000e- 004 0.0000 5.5062 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 25 of 61 Community Civic Campus - San Mateo County, Annual 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4273 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0208 0.1366 0.1168 1.9000e- 004 0.0108 0.0108 0.0108 0.0108 0.0000 15.9578 15.9578 1.6800e- 003 0.0000 16.0000 Total 0.4480 0.1366 0.1168 1.9000e- 004 0.0108 0.0108 0.0108 0.0108 0.0000 15.9578 15.9578 1.6800e- 003 0.0000 16.0000 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.7500e- 003 4.2800e- 003 0.0428 1.2000e- 004 0.0123 8.0000e- 005 0.0124 3.2700e- 003 7.0000e- 005 3.3500e- 003 0.0000 11.2550 11.2550 3.0000e- 004 0.0000 11.2624 Total 5.7500e- 003 4.2800e- 003 0.0428 1.2000e- 004 0.0123 8.0000e- 005 0.0124 3.2700e- 003 7.0000e- 005 3.3500e- 003 0.0000 11.2550 11.2550 3.0000e- 004 0.0000 11.2624 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 26 of 61 Community Civic Campus - San Mateo County, Annual 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4273 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.7100e- 003 0.0848 0.1145 1.9000e- 004 5.9400e- 003 5.9400e- 003 5.9400e- 003 5.9400e- 003 0.0000 15.9578 15.9578 1.6800e- 003 0.0000 15.9999 Total 0.4310 0.0848 0.1145 1.9000e- 004 5.9400e- 003 5.9400e- 003 5.9400e- 003 5.9400e- 003 0.0000 15.9578 15.9578 1.6800e- 003 0.0000 15.9999 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 5.7500e- 003 4.2800e- 003 0.0428 1.2000e- 004 0.0123 8.0000e- 005 0.0124 3.2700e- 003 7.0000e- 005 3.3500e- 003 0.0000 11.2550 11.2550 3.0000e- 004 0.0000 11.2624 Total 5.7500e- 003 4.2800e- 003 0.0428 1.2000e- 004 0.0123 8.0000e- 005 0.0124 3.2700e- 003 7.0000e- 005 3.3500e- 003 0.0000 11.2550 11.2550 3.0000e- 004 0.0000 11.2624 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 27 of 61 Community Civic Campus - San Mateo County, Annual 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.3589 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0157 0.1053 0.0974 1.6000e- 004 7.9000e- 003 7.9000e- 003 7.9000e- 003 7.9000e- 003 0.0000 13.4046 13.4046 1.2700e- 003 0.0000 13.4365 Total 0.3746 0.1053 0.0974 1.6000e- 004 7.9000e- 003 7.9000e- 003 7.9000e- 003 7.9000e- 003 0.0000 13.4046 13.4046 1.2700e- 003 0.0000 13.4365 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.2800e- 003 3.1100e- 003 0.0315 1.0000e- 004 0.0103 7.0000e- 005 0.0104 2.7500e- 003 6.0000e- 005 2.8100e- 003 0.0000 9.1716 9.1716 2.2000e- 004 0.0000 9.1770 Total 4.2800e- 003 3.1100e- 003 0.0315 1.0000e- 004 0.0103 7.0000e- 005 0.0104 2.7500e- 003 6.0000e- 005 2.8100e- 003 0.0000 9.1716 9.1716 2.2000e- 004 0.0000 9.1770 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 28 of 61 Community Civic Campus - San Mateo County, Annual 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.3589 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.1200e- 003 0.0712 0.0962 1.6000e- 004 4.9900e- 003 4.9900e- 003 4.9900e- 003 4.9900e- 003 0.0000 13.4046 13.4046 1.2700e- 003 0.0000 13.4364 Total 0.3620 0.0712 0.0962 1.6000e- 004 4.9900e- 003 4.9900e- 003 4.9900e- 003 4.9900e- 003 0.0000 13.4046 13.4046 1.2700e- 003 0.0000 13.4364 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.2800e- 003 3.1100e- 003 0.0315 1.0000e- 004 0.0103 7.0000e- 005 0.0104 2.7500e- 003 6.0000e- 005 2.8100e- 003 0.0000 9.1716 9.1716 2.2000e- 004 0.0000 9.1770 Total 4.2800e- 003 3.1100e- 003 0.0315 1.0000e- 004 0.0103 7.0000e- 005 0.0104 2.7500e- 003 6.0000e- 005 2.8100e- 003 0.0000 9.1716 9.1716 2.2000e- 004 0.0000 9.1770 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 29 of 61 Community Civic Campus - San Mateo County, Annual 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0267 0.0000 0.0267 4.0400e- 003 0.0000 4.0400e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0372 0.3832 0.2230 3.9000e- 004 0.0194 0.0194 0.0181 0.0181 0.0000 35.1241 35.1241 9.6800e- 003 0.0000 35.3660 Total 0.0372 0.3832 0.2230 3.9000e- 004 0.0267 0.0194 0.0461 4.0400e- 003 0.0181 0.0221 0.0000 35.1241 35.1241 9.6800e- 003 0.0000 35.3660 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 1.3100e- 003 0.0456 0.0165 1.0000e- 004 2.0700e- 003 1.9000e- 004 2.2500e- 003 5.7000e- 004 1.8000e- 004 7.5000e- 004 0.0000 10.6153 10.6153 1.2600e- 003 0.0000 10.6469 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Total 1.8000e- 003 0.0459 0.0201 1.1000e- 004 3.2500e- 003 2.0000e- 004 3.4400e- 003 8.8000e- 004 1.9000e- 004 1.0700e- 003 0.0000 11.6635 11.6635 1.2800e- 003 0.0000 11.6957 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 30 of 61 Community Civic Campus - San Mateo County, Annual 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0267 0.0000 0.0267 4.0400e- 003 0.0000 4.0400e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 9.2500e- 003 0.1831 0.2467 3.9000e- 004 8.6300e- 003 8.6300e- 003 8.6300e- 003 8.6300e- 003 0.0000 35.1240 35.1240 9.6800e- 003 0.0000 35.3660 Total 9.2500e- 003 0.1831 0.2467 3.9000e- 004 0.0267 8.6300e- 003 0.0353 4.0400e- 003 8.6300e- 003 0.0127 0.0000 35.1240 35.1240 9.6800e- 003 0.0000 35.3660 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 1.3100e- 003 0.0456 0.0165 1.0000e- 004 2.0700e- 003 1.9000e- 004 2.2500e- 003 5.7000e- 004 1.8000e- 004 7.5000e- 004 0.0000 10.6153 10.6153 1.2600e- 003 0.0000 10.6469 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Total 1.8000e- 003 0.0459 0.0201 1.1000e- 004 3.2500e- 003 2.0000e- 004 3.4400e- 003 8.8000e- 004 1.9000e- 004 1.0700e- 003 0.0000 11.6635 11.6635 1.2800e- 003 0.0000 11.6957 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 31 of 61 Community Civic Campus - San Mateo County, Annual 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0228 0.2410 0.1124 1.9000e- 004 0.0129 0.0129 0.0119 0.0119 0.0000 17.3800 17.3800 5.4100e- 003 0.0000 17.5152 Total 0.0228 0.2410 0.1124 1.9000e- 004 0.0903 0.0129 0.1032 0.0497 0.0119 0.0615 0.0000 17.3800 17.3800 5.4100e- 003 0.0000 17.5152 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 2.1000e- 004 2.1600e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6289 0.6289 1.0000e- 005 0.0000 0.6293 Total 2.9000e- 004 2.1000e- 004 2.1600e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6289 0.6289 1.0000e- 005 0.0000 0.6293 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 32 of 61 Community Civic Campus - San Mateo County, Annual 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0903 0.0000 0.0903 0.0497 0.0000 0.0497 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 4.6600e- 003 0.0953 0.1148 1.9000e- 004 4.7300e- 003 4.7300e- 003 4.7300e- 003 4.7300e- 003 0.0000 17.3799 17.3799 5.4100e- 003 0.0000 17.5152 Total 4.6600e- 003 0.0953 0.1148 1.9000e- 004 0.0903 4.7300e- 003 0.0951 0.0497 4.7300e- 003 0.0544 0.0000 17.3799 17.3799 5.4100e- 003 0.0000 17.5152 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.9000e- 004 2.1000e- 004 2.1600e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6289 0.6289 1.0000e- 005 0.0000 0.6293 Total 2.9000e- 004 2.1000e- 004 2.1600e- 003 1.0000e- 005 7.1000e- 004 0.0000 7.1000e- 004 1.9000e- 004 0.0000 1.9000e- 004 0.0000 0.6289 0.6289 1.0000e- 005 0.0000 0.6293 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 33 of 61 Community Civic Campus - San Mateo County, Annual 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0277 0.3067 0.1658 3.0000e- 004 0.0155 0.0155 0.0143 0.0143 0.0000 27.1069 27.1069 8.4400e- 003 0.0000 27.3178 Total 0.0277 0.3067 0.1658 3.0000e- 004 0.0655 0.0155 0.0810 0.0337 0.0143 0.0479 0.0000 27.1069 27.1069 8.4400e- 003 0.0000 27.3178 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Total 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 34 of 61 Community Civic Campus - San Mateo County, Annual 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0655 0.0000 0.0655 0.0337 0.0000 0.0337 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 7.2600e- 003 0.1484 0.1899 3.0000e- 004 7.5600e- 003 7.5600e- 003 7.5600e- 003 7.5600e- 003 0.0000 27.1068 27.1068 8.4400e- 003 0.0000 27.3178 Total 7.2600e- 003 0.1484 0.1899 3.0000e- 004 0.0655 7.5600e- 003 0.0731 0.0337 7.5600e- 003 0.0412 0.0000 27.1068 27.1068 8.4400e- 003 0.0000 27.3178 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Total 4.9000e- 004 3.6000e- 004 3.6000e- 003 1.0000e- 005 1.1800e- 003 1.0000e- 005 1.1900e- 003 3.1000e- 004 1.0000e- 005 3.2000e- 004 0.0000 1.0482 1.0482 2.0000e- 005 0.0000 1.0488 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 35 of 61 Community Civic Campus - San Mateo County, Annual 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1420 1.2397 0.9318 1.4300e- 003 0.0795 0.0795 0.0747 0.0747 0.0000 126.0166 126.0166 0.0309 0.0000 126.7885 Total 0.1420 1.2397 0.9318 1.4300e- 003 0.0795 0.0795 0.0747 0.0747 0.0000 126.0166 126.0166 0.0309 0.0000 126.7885 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0153 0.3888 0.1483 7.8000e- 004 0.0187 2.9900e- 003 0.0216 5.3900e- 003 2.8600e- 003 8.2500e- 003 0.0000 77.3625 77.3625 6.8900e- 003 0.0000 77.5347 Worker 0.0216 0.0157 0.1590 5.1000e- 004 0.0522 3.4000e- 004 0.0525 0.0139 3.1000e- 004 0.0142 0.0000 46.2946 46.2946 1.0900e- 003 0.0000 46.3219 Total 0.0369 0.4045 0.3074 1.2900e- 003 0.0708 3.3300e- 003 0.0741 0.0193 3.1700e- 003 0.0224 0.0000 123.6571 123.6571 7.9800e- 003 0.0000 123.8565 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 36 of 61 Community Civic Campus - San Mateo County, Annual 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0357 0.7540 0.9473 1.4300e- 003 0.0479 0.0479 0.0479 0.0479 0.0000 126.0165 126.0165 0.0309 0.0000 126.7883 Total 0.0357 0.7540 0.9473 1.4300e- 003 0.0479 0.0479 0.0479 0.0479 0.0000 126.0165 126.0165 0.0309 0.0000 126.7883 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0153 0.3888 0.1483 7.8000e- 004 0.0187 2.9900e- 003 0.0216 5.3900e- 003 2.8600e- 003 8.2500e- 003 0.0000 77.3625 77.3625 6.8900e- 003 0.0000 77.5347 Worker 0.0216 0.0157 0.1590 5.1000e- 004 0.0522 3.4000e- 004 0.0525 0.0139 3.1000e- 004 0.0142 0.0000 46.2946 46.2946 1.0900e- 003 0.0000 46.3219 Total 0.0369 0.4045 0.3074 1.2900e- 003 0.0708 3.3300e- 003 0.0741 0.0193 3.1700e- 003 0.0224 0.0000 123.6571 123.6571 7.9800e- 003 0.0000 123.8565 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 37 of 61 Community Civic Campus - San Mateo County, Annual 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.1464 1.3069 1.0642 1.6700e- 003 0.0800 0.0800 0.0752 0.0752 0.0000 145.7646 145.7646 0.0355 0.0000 146.6523 Total 0.1464 1.3069 1.0642 1.6700e- 003 0.0800 0.0800 0.0752 0.0752 0.0000 145.7646 145.7646 0.0355 0.0000 146.6523 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0159 0.4275 0.1642 9.0000e- 004 0.0218 2.9500e- 003 0.0248 6.3100e- 003 2.8200e- 003 9.1400e- 003 0.0000 89.5606 89.5606 7.9100e- 003 0.0000 89.7583 Worker 0.0229 0.0161 0.1663 5.8000e- 004 0.0610 3.9000e- 004 0.0614 0.0162 3.6000e- 004 0.0166 0.0000 52.4700 52.4700 1.1200e- 003 0.0000 52.4981 Total 0.0388 0.4436 0.3305 1.4800e- 003 0.0828 3.3400e- 003 0.0862 0.0226 3.1800e- 003 0.0257 0.0000 142.0306 142.0306 9.0300e- 003 0.0000 142.2564 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 38 of 61 Community Civic Campus - San Mateo County, Annual 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0418 0.8820 1.1082 1.6700e- 003 0.0560 0.0560 0.0560 0.0560 0.0000 145.7644 145.7644 0.0355 0.0000 146.6522 Total 0.0418 0.8820 1.1082 1.6700e- 003 0.0560 0.0560 0.0560 0.0560 0.0000 145.7644 145.7644 0.0355 0.0000 146.6522 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0159 0.4275 0.1642 9.0000e- 004 0.0218 2.9500e- 003 0.0248 6.3100e- 003 2.8200e- 003 9.1400e- 003 0.0000 89.5606 89.5606 7.9100e- 003 0.0000 89.7583 Worker 0.0229 0.0161 0.1663 5.8000e- 004 0.0610 3.9000e- 004 0.0614 0.0162 3.6000e- 004 0.0166 0.0000 52.4700 52.4700 1.1200e- 003 0.0000 52.4981 Total 0.0388 0.4436 0.3305 1.4800e- 003 0.0828 3.3400e- 003 0.0862 0.0226 3.1800e- 003 0.0257 0.0000 142.0306 142.0306 9.0300e- 003 0.0000 142.2564 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 39 of 61 Community Civic Campus - San Mateo County, Annual 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0871 0.9286 0.7842 1.2100e- 003 0.0507 0.0507 0.0466 0.0466 0.0000 110.3016 110.3016 0.0343 0.0000 111.1601 Paving 1.3800e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0885 0.9286 0.7842 1.2100e- 003 0.0507 0.0507 0.0466 0.0466 0.0000 110.3016 110.3016 0.0343 0.0000 111.1601 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.6000e- 003 1.8900e- 003 0.0191 6.0000e- 005 6.2600e- 003 4.0000e- 005 6.3000e- 003 1.6700e- 003 4.0000e- 005 1.7000e- 003 0.0000 5.5554 5.5554 1.3000e- 004 0.0000 5.5586 Total 2.6000e- 003 1.8900e- 003 0.0191 6.0000e- 005 6.2600e- 003 4.0000e- 005 6.3000e- 003 1.6700e- 003 4.0000e- 005 1.7000e- 003 0.0000 5.5554 5.5554 1.3000e- 004 0.0000 5.5586 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 40 of 61 Community Civic Campus - San Mateo County, Annual 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0297 0.5987 0.9167 1.2100e- 003 0.0323 0.0323 0.0323 0.0323 0.0000 110.3015 110.3015 0.0343 0.0000 111.1599 Paving 1.3800e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0311 0.5987 0.9167 1.2100e- 003 0.0323 0.0323 0.0323 0.0323 0.0000 110.3015 110.3015 0.0343 0.0000 111.1599 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.6000e- 003 1.8900e- 003 0.0191 6.0000e- 005 6.2600e- 003 4.0000e- 005 6.3000e- 003 1.6700e- 003 4.0000e- 005 1.7000e- 003 0.0000 5.5554 5.5554 1.3000e- 004 0.0000 5.5586 Total 2.6000e- 003 1.8900e- 003 0.0191 6.0000e- 005 6.2600e- 003 4.0000e- 005 6.3000e- 003 1.6700e- 003 4.0000e- 005 1.7000e- 003 0.0000 5.5554 5.5554 1.3000e- 004 0.0000 5.5586 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 41 of 61 Community Civic Campus - San Mateo County, Annual 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0902 0.9451 0.9092 1.4100e- 003 0.0511 0.0511 0.0470 0.0470 0.0000 126.9461 126.9461 0.0402 0.0000 127.9502 Paving 1.6100e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0918 0.9451 0.9092 1.4100e- 003 0.0511 0.0511 0.0470 0.0470 0.0000 126.9461 126.9461 0.0402 0.0000 127.9502 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.7500e- 003 1.9400e- 003 0.0200 7.0000e- 005 7.3200e- 003 5.0000e- 005 7.3700e- 003 1.9500e- 003 4.0000e- 005 1.9900e- 003 0.0000 6.2964 6.2964 1.3000e- 004 0.0000 6.2998 Total 2.7500e- 003 1.9400e- 003 0.0200 7.0000e- 005 7.3200e- 003 5.0000e- 005 7.3700e- 003 1.9500e- 003 4.0000e- 005 1.9900e- 003 0.0000 6.2964 6.2964 1.3000e- 004 0.0000 6.2998 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 42 of 61 Community Civic Campus - San Mateo County, Annual 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0348 0.7003 1.0723 1.4100e- 003 0.0378 0.0378 0.0378 0.0378 0.0000 126.9460 126.9460 0.0402 0.0000 127.9501 Paving 1.6100e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0364 0.7003 1.0723 1.4100e- 003 0.0378 0.0378 0.0378 0.0378 0.0000 126.9460 126.9460 0.0402 0.0000 127.9501 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.7500e- 003 1.9400e- 003 0.0200 7.0000e- 005 7.3200e- 003 5.0000e- 005 7.3700e- 003 1.9500e- 003 4.0000e- 005 1.9900e- 003 0.0000 6.2964 6.2964 1.3000e- 004 0.0000 6.2998 Total 2.7500e- 003 1.9400e- 003 0.0200 7.0000e- 005 7.3200e- 003 5.0000e- 005 7.3700e- 003 1.9500e- 003 4.0000e- 005 1.9900e- 003 0.0000 6.2964 6.2964 1.3000e- 004 0.0000 6.2998 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 43 of 61 Community Civic Campus - San Mateo County, Annual 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.3623 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0158 0.1063 0.0983 1.6000e- 004 7.9800e- 003 7.9800e- 003 7.9800e- 003 7.9800e- 003 0.0000 13.5323 13.5323 1.2900e- 003 0.0000 13.5644 Total 0.3782 0.1063 0.0983 1.6000e- 004 7.9800e- 003 7.9800e- 003 7.9800e- 003 7.9800e- 003 0.0000 13.5323 13.5323 1.2900e- 003 0.0000 13.5644 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3300e- 003 3.1400e- 003 0.0318 1.0000e- 004 0.0104 7.0000e- 005 0.0105 2.7800e- 003 6.0000e- 005 2.8400e- 003 0.0000 9.2589 9.2589 2.2000e- 004 0.0000 9.2644 Total 4.3300e- 003 3.1400e- 003 0.0318 1.0000e- 004 0.0104 7.0000e- 005 0.0105 2.7800e- 003 6.0000e- 005 2.8400e- 003 0.0000 9.2589 9.2589 2.2000e- 004 0.0000 9.2644 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 44 of 61 Community Civic Campus - San Mateo County, Annual 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.3623 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.1500e- 003 0.0719 0.0971 1.6000e- 004 5.0400e- 003 5.0400e- 003 5.0400e- 003 5.0400e- 003 0.0000 13.5323 13.5323 1.2900e- 003 0.0000 13.5644 Total 0.3655 0.0719 0.0971 1.6000e- 004 5.0400e- 003 5.0400e- 003 5.0400e- 003 5.0400e- 003 0.0000 13.5323 13.5323 1.2900e- 003 0.0000 13.5644 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.3300e- 003 3.1400e- 003 0.0318 1.0000e- 004 0.0104 7.0000e- 005 0.0105 2.7800e- 003 6.0000e- 005 2.8400e- 003 0.0000 9.2589 9.2589 2.2000e- 004 0.0000 9.2644 Total 4.3300e- 003 3.1400e- 003 0.0318 1.0000e- 004 0.0104 7.0000e- 005 0.0105 2.7800e- 003 6.0000e- 005 2.8400e- 003 0.0000 9.2589 9.2589 2.2000e- 004 0.0000 9.2644 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 45 of 61 Community Civic Campus - San Mateo County, Annual 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4239 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0165 0.1138 0.1142 1.8000e- 004 7.9800e- 003 7.9800e- 003 7.9800e- 003 7.9800e- 003 0.0000 15.8302 15.8302 1.3400e- 003 0.0000 15.8636 Total 0.4404 0.1138 0.1142 1.8000e- 004 7.9800e- 003 7.9800e- 003 7.9800e- 003 7.9800e- 003 0.0000 15.8302 15.8302 1.3400e- 003 0.0000 15.8636 Unmitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.5800e- 003 3.2300e- 003 0.0333 1.2000e- 004 0.0122 8.0000e- 005 0.0123 3.2500e- 003 7.0000e- 005 3.3200e- 003 0.0000 10.4940 10.4940 2.2000e- 004 0.0000 10.4996 Total 4.5800e- 003 3.2300e- 003 0.0333 1.2000e- 004 0.0122 8.0000e- 005 0.0123 3.2500e- 003 7.0000e- 005 3.3200e- 003 0.0000 10.4940 10.4940 2.2000e- 004 0.0000 10.4996 Unmitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 46 of 61 Community Civic Campus - San Mateo County, Annual 4.0 Operational Detail - Mobile 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.4239 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 3.6800e- 003 0.0841 0.1136 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.9000e- 003 5.9000e- 003 0.0000 15.8302 15.8302 1.3400e- 003 0.0000 15.8636 Total 0.4275 0.0841 0.1136 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.9000e- 003 5.9000e- 003 0.0000 15.8302 15.8302 1.3400e- 003 0.0000 15.8636 Mitigated Construction On-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 4.5800e- 003 3.2300e- 003 0.0333 1.2000e- 004 0.0122 8.0000e- 005 0.0123 3.2500e- 003 7.0000e- 005 3.3200e- 003 0.0000 10.4940 10.4940 2.2000e- 004 0.0000 10.4996 Total 4.5800e- 003 3.2300e- 003 0.0333 1.2000e- 004 0.0122 8.0000e- 005 0.0123 3.2500e- 003 7.0000e- 005 3.3200e- 003 0.0000 10.4940 10.4940 2.2000e- 004 0.0000 10.4996 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 47 of 61 Community Civic Campus - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 1.4730 4.5244 15.5470 0.0457 3.9475 0.0579 4.0053 1.0608 0.0544 1.1152 0.0000 4,170.286 4 4,170.286 4 0.1655 0.0000 4,174.422 7 Unmitigated 1.4730 4.5244 15.5470 0.0457 3.9475 0.0579 4.0053 1.0608 0.0544 1.1152 0.0000 4,170.286 4 4,170.286 4 0.1655 0.0000 4,174.422 7 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator 0.00 0.00 0.00 Government (Civic Center)5,570.60 5,570.60 5570.60 10,648,965 10,648,965 Government Office Building 0.00 0.00 0.00 Government Office Building 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Total 5,570.60 5,570.60 5,570.60 10,648,965 10,648,965 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 48 of 61 Community Civic Campus - San Mateo County, Annual Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Enclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Government (Civic Center)9.50 7.30 7.30 75.00 20.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Government (Civic Center)0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Enclosed Parking with Elevator 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 49 of 61 Community Civic Campus - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 780.7710 780.7710 0.0353 7.3000e- 003 783.8303 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 780.7710 780.7710 0.0353 7.3000e- 003 783.8303 NaturalGas Mitigated 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 148.4536 148.4536 2.8500e- 003 2.7200e- 003 149.3358 NaturalGas Unmitigated 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 148.4536 148.4536 2.8500e- 003 2.7200e- 003 149.3358 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 50 of 61 Community Civic Campus - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 1.78664e +006 9.6300e- 003 0.0876 0.0736 5.3000e- 004 6.6600e- 003 6.6600e- 003 6.6600e- 003 6.6600e- 003 0.0000 95.3419 95.3419 1.8300e- 003 1.7500e- 003 95.9085 Government Office Building 140795 7.6000e- 004 6.9000e- 003 5.8000e- 003 4.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 7.5134 7.5134 1.4000e- 004 1.4000e- 004 7.5580 Government Office Building 854480 4.6100e- 003 0.0419 0.0352 2.5000e- 004 3.1800e- 003 3.1800e- 003 3.1800e- 003 3.1800e- 003 0.0000 45.5983 45.5983 8.7000e- 004 8.4000e- 004 45.8693 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 148.4536 148.4536 2.8400e- 003 2.7300e- 003 149.3358 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 51 of 61 Community Civic Campus - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 1.78664e +006 9.6300e- 003 0.0876 0.0736 5.3000e- 004 6.6600e- 003 6.6600e- 003 6.6600e- 003 6.6600e- 003 0.0000 95.3419 95.3419 1.8300e- 003 1.7500e- 003 95.9085 Government Office Building 140795 7.6000e- 004 6.9000e- 003 5.8000e- 003 4.0000e- 005 5.2000e- 004 5.2000e- 004 5.2000e- 004 5.2000e- 004 0.0000 7.5134 7.5134 1.4000e- 004 1.4000e- 004 7.5580 Government Office Building 854480 4.6100e- 003 0.0419 0.0352 2.5000e- 004 3.1800e- 003 3.1800e- 003 3.1800e- 003 3.1800e- 003 0.0000 45.5983 45.5983 8.7000e- 004 8.4000e- 004 45.8693 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0150 0.1364 0.1146 8.2000e- 004 0.0104 0.0104 0.0104 0.0104 0.0000 148.4536 148.4536 2.8400e- 003 2.7300e- 003 149.3358 Mitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 52 of 61 Community Civic Campus - San Mateo County, Annual 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Enclosed Parking with Elevator 792624 230.5834 0.0104 2.1600e- 003 231.4869 Government (Civic Center) 1.17484e +006 341.7744 0.0155 3.2000e- 003 343.1136 Government Office Building 561880 163.4573 7.3900e- 003 1.5300e- 003 164.0978 Government Office Building 92582.5 26.9333 1.2200e- 003 2.5000e- 004 27.0388 Parking Lot 5280 1.5360 7.0000e- 005 1.0000e- 005 1.5420 Parking Lot 56672 16.4865 7.5000e- 004 1.5000e- 004 16.5511 Total 780.7710 0.0353 7.3000e- 003 783.8303 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 53 of 61 Community Civic Campus - San Mateo County, Annual 6.1 Mitigation Measures Area 6.0 Area Detail 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Enclosed Parking with Elevator 792624 230.5834 0.0104 2.1600e- 003 231.4869 Government (Civic Center) 1.17484e +006 341.7744 0.0155 3.2000e- 003 343.1136 Government Office Building 561880 163.4573 7.3900e- 003 1.5300e- 003 164.0978 Government Office Building 92582.5 26.9333 1.2200e- 003 2.5000e- 004 27.0388 Parking Lot 5280 1.5360 7.0000e- 005 1.0000e- 005 1.5420 Parking Lot 56672 16.4865 7.5000e- 004 1.5000e- 004 16.5511 Total 780.7710 0.0353 7.3000e- 003 783.8303 Mitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 54 of 61 Community Civic Campus - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Unmitigated 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5716 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.4000e- 004 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Total 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 55 of 61 Community Civic Campus - San Mateo County, Annual 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0786 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5716 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.4000e- 004 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Total 0.6508 5.0000e- 005 5.6900e- 003 0.0000 2.0000e- 005 2.0000e- 005 2.0000e- 005 2.0000e- 005 0.0000 0.0110 0.0110 3.0000e- 005 0.0000 0.0117 Mitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 56 of 61 Community Civic Campus - San Mateo County, Annual Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 71.5841 0.9301 0.0225 101.5367 Unmitigated 71.5841 0.9301 0.0225 101.5367 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Enclosed Parking with Elevator 0 / 0 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 18.2767 / 11.2018 45.9737 0.5974 0.0144 65.2103 Government Office Building 10.1813 / 6.24016 25.6104 0.3328 8.0400e- 003 36.3264 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Total 71.5841 0.9301 0.0225 101.5367 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 57 of 61 Community Civic Campus - San Mateo County, Annual 8.1 Mitigation Measures Waste 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Enclosed Parking with Elevator 0 / 0 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 18.2767 / 11.2018 45.9737 0.5974 0.0144 65.2103 Government Office Building 10.1813 / 6.24016 25.6104 0.3328 8.0400e- 003 36.3264 Parking Lot 0 / 0 0.0000 0.0000 0.0000 0.0000 Total 71.5841 0.9301 0.0225 101.5367 Mitigated 8.0 Waste Detail CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 58 of 61 Community Civic Campus - San Mateo County, Annual Total CO2 CH4 N2O CO2e MT/yr Mitigated 116.1230 6.8627 0.0000 287.6898 Unmitigated 116.1230 6.8627 0.0000 287.6898 Category/Year 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 524.4 106.4485 6.2909 0.0000 263.7216 Government Office Building 47.66 9.6746 0.5718 0.0000 23.9683 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Total 116.1230 6.8627 0.0000 287.6899 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 59 of 61 Community Civic Campus - San Mateo County, Annual 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 524.4 106.4485 6.2909 0.0000 263.7216 Government Office Building 47.66 9.6746 0.5718 0.0000 23.9683 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 Total 116.1230 6.8627 0.0000 287.6899 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 60 of 61 Community Civic Campus - San Mateo County, Annual 11.0 Vegetation Equipment Type Number CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:47 PMPage 61 of 61 Community Civic Campus - San Mateo County, Annual 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Government (Civic Center)92.00 1000sqft 1.93 92,000.00 0 Government Office Building 44.00 1000sqft 0.92 44,000.00 0 Government Office Building 7.25 1000sqft 1.25 7,250.00 0 Enclosed Parking with Elevator 294.00 Space 2.42 117,600.00 0 Parking Lot 161.00 Space 1.33 64,400.00 0 Parking Lot 15.00 Space 0.95 6,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2019Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) Community Civic Campus San Mateo County, Summer CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 1 of 54 Community Civic Campus - San Mateo County, Summer Project Characteristics - Land Use - Acreage adjusted per project applicant. Construction Phase - Construction, paving, and architectural coating assumed to occur simultaneously. Off-road Equipment - Off-road Equipment - Off-road Equipment - Demolition - Architectural Coating - Vehicle Trips - Adjusted per TIA. Trips and VMT - Construction Off-road Equipment Mitigation - Tier 3 equipment. Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 40 0 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 8.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 12.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 20.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 2 of 54 Community Civic Campus - San Mateo County, Summer tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblLandUse LotAcreage 2.11 1.93 tblLandUse LotAcreage 1.01 0.92 tblLandUse LotAcreage 0.17 1.25 tblLandUse LotAcreage 2.65 2.42 tblLandUse LotAcreage 0.13 0.95 tblLandUse LotAcreage 1.45 1.33 tblProjectCharacteristics OperationalYear 2018 2019 tblVehicleTrips ST_TR 0.00 60.55 tblVehicleTrips SU_TR 0.00 60.55 tblVehicleTrips WD_TR 27.92 60.55 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 3 of 54 Community Civic Campus - San Mateo County, Summer 2.0 Emissions Summary tblVehicleTrips WD_TR 68.93 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 4 of 54 Community Civic Campus - San Mateo County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2017 13.1942 57.6022 42.7099 0.0817 18.2141 3.2008 21.0936 9.9699 2.9955 12.6190 0.0000 8,287.096 7 8,287.096 7 1.5773 0.0000 8,326.528 2 2018 12.3098 50.4731 41.0845 0.0811 18.2141 2.6708 20.7920 9.9699 2.5013 12.3415 0.0000 8,166.417 5 8,166.417 5 1.5556 0.0000 8,205.307 5 2019 11.6882 45.2444 39.9558 0.0804 1.7199 2.2987 4.0186 0.4644 2.1529 2.6173 0.0000 8,041.232 5 8,041.232 5 1.5357 0.0000 8,079.626 3 Maximum 13.1942 57.6022 42.7099 0.0817 18.2141 3.2008 21.0936 9.9699 2.9955 12.6190 0.0000 8,287.096 7 8,287.096 7 1.5773 0.0000 8,326.528 2 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2017 9.0964 35.0230 44.6292 0.0817 18.2141 1.6883 19.1612 9.9699 1.6845 10.9169 0.0000 8,287.096 7 8,287.096 7 1.5773 0.0000 8,326.528 2 2018 8.9823 34.4347 43.8554 0.0811 18.2141 1.6722 19.1612 9.9699 1.6691 10.9169 0.0000 8,166.417 5 8,166.417 5 1.5556 0.0000 8,205.307 5 2019 8.9004 33.9644 43.2877 0.0804 1.7199 1.6635 3.3834 0.4644 1.6608 2.1252 0.0000 8,041.232 5 8,041.232 5 1.5357 0.0000 8,079.626 3 Maximum 9.0964 35.0230 44.6292 0.0817 18.2141 1.6883 19.1612 9.9699 1.6845 10.9169 0.0000 8,287.096 7 8,287.096 7 1.5773 0.0000 8,326.528 2 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 5 of 54 Community Civic Campus - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 27.46 32.54 -6.48 0.00 0.00 38.51 9.15 0.00 34.45 13.12 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 6 of 54 Community Civic Campus - San Mateo County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Energy 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mobile 8.9368 23.6549 85.1639 0.2637 22.6166 0.3175 22.9341 6.0559 0.2988 6.3547 26,535.77 86 26,535.77 86 0.9999 26,560.77 65 Total 12.5879 24.4028 85.8548 0.2681 22.6166 0.3745 22.9911 6.0559 0.3558 6.4117 27,432.58 16 27,432.58 16 1.0175 0.0164 27,462.91 71 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Energy 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mobile 8.9368 23.6549 85.1639 0.2637 22.6166 0.3175 22.9341 6.0559 0.2988 6.3547 26,535.77 86 26,535.77 86 0.9999 26,560.77 65 Total 12.5879 24.4028 85.8548 0.2681 22.6166 0.3745 22.9911 6.0559 0.3558 6.4117 27,432.58 16 27,432.58 16 1.0175 0.0164 27,462.91 71 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 7 of 54 Community Civic Campus - San Mateo County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Phase 1 Demolition Demolition 5/1/2017 5/26/2017 5 20 2 Phase 1 Site Preparation Site Preparation 5/27/2017 6/9/2017 5 10 3 Phase 1 Grading Grading 6/10/2017 7/7/2017 5 20 4 Phase 1 Building Construction Building Construction 7/8/2017 5/25/2018 5 230 5 Phase 1 Paving Paving 7/8/2017 5/25/2018 5 230 6 Phase 1 Architectural Coating Architectural Coating 7/8/2017 5/25/2018 5 230 7 Phase 2 Demolition Demolition 5/26/2018 6/22/2018 5 20 8 Phase 2 Site Preparation Site Preparation 6/23/2018 7/6/2018 5 10 9 Phase 2 Grading Grading 7/7/2018 8/3/2018 5 20 10 Phase 2 Building Construction Building Construction 8/4/2018 6/21/2019 5 230 11 Phase 2 Paving Paving 8/4/2018 6/21/2019 5 230 12 Phase 2 Architectural Coating Architectural Coating 8/4/2018 6/21/2019 5 230 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 214,875; Non-Residential Outdoor: 71,625; Striped Parking Area: 11,280 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.7 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 8 of 54 Community Civic Campus - San Mateo County, Summer OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase 1 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 1 Demolition Excavators 3 8.00 158 0.38 Phase 1 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 1 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Phase 1 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 1 Grading Excavators 1 8.00 158 0.38 Phase 1 Grading Graders 1 8.00 187 0.41 Phase 1 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 1 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 1 Building Construction Cranes 1 7.00 231 0.29 Phase 1 Building Construction Forklifts 3 8.00 89 0.20 Phase 1 Building Construction Generator Sets 1 8.00 84 0.74 Phase 1 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase 1 Building Construction Welders 1 8.00 46 0.45 Phase 1 Paving Pavers 2 8.00 130 0.42 Phase 1 Paving Paving Equipment 2 8.00 132 0.36 Phase 1 Paving Rollers 2 8.00 80 0.38 Phase 1 Architectural Coating Air Compressors 1 6.00 78 0.48 Phase 2 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 2 Demolition Excavators 3 8.00 158 0.38 Phase 2 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 2 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Phase 2 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 2 Grading Excavators 1 8.00 158 0.38 Phase 2 Grading Graders 1 8.00 187 0.41 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 9 of 54 Community Civic Campus - San Mateo County, Summer Phase 2 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 2 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 2 Building Construction Cranes 1 7.00 231 0.29 Phase 2 Building Construction Forklifts 3 8.00 89 0.20 Phase 2 Building Construction Generator Sets 1 8.00 84 0.74 Phase 2 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase 2 Building Construction Welders 1 8.00 46 0.45 Phase 2 Paving Pavers 2 8.00 130 0.42 Phase 2 Paving Paving Equipment 2 8.00 132 0.36 Phase 2 Paving Rollers 2 8.00 80 0.38 Phase 2 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Phase 1 Demolition 6 15.00 0.00 116.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Demolition 6 15.00 0.00 247.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 10 of 54 Community Civic Campus - San Mateo County, Summer 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.2551 0.0000 1.2551 0.1900 0.0000 0.1900 0.0000 0.0000 Off-Road 4.1031 42.7475 23.0122 0.0388 2.1935 2.1935 2.0425 2.0425 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Total 4.1031 42.7475 23.0122 0.0388 1.2551 2.1935 3.4485 0.1900 2.0425 2.2325 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Clean Paved Roads CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 11 of 54 Community Civic Campus - San Mateo County, Summer 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0722 2.2689 0.7839 5.0200e- 003 0.1007 0.0135 0.1142 0.0276 0.0129 0.0405 559.0256 559.0256 0.0644 560.6358 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.1279 2.3051 1.2155 6.2900e- 003 0.2239 0.0143 0.2382 0.0602 0.0136 0.0739 685.4691 685.4691 0.0677 687.1609 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.2551 0.0000 1.2551 0.1900 0.0000 0.1900 0.0000 0.0000 Off-Road 0.9246 18.3130 24.6739 0.0388 0.8627 0.8627 0.8627 0.8627 0.0000 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Total 0.9246 18.3130 24.6739 0.0388 1.2551 0.8627 2.1178 0.1900 0.8627 1.0528 0.0000 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 12 of 54 Community Civic Campus - San Mateo County, Summer 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0722 2.2689 0.7839 5.0200e- 003 0.1007 0.0135 0.1142 0.0276 0.0129 0.0405 559.0256 559.0256 0.0644 560.6358 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.1279 2.3051 1.2155 6.2900e- 003 0.2239 0.0143 0.2382 0.0602 0.0136 0.0739 685.4691 685.4691 0.0677 687.1609 Mitigated Construction Off-Site 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9608 52.2754 23.4554 0.0380 2.8786 2.8786 2.6483 2.6483 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Total 4.9608 52.2754 23.4554 0.0380 18.0663 2.8786 20.9448 9.9307 2.6483 12.5790 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 13 of 54 Community Civic Campus - San Mateo County, Summer 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0668 0.0435 0.5179 1.5200e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 151.7321 151.7321 3.9200e- 003 151.8301 Total 0.0668 0.0435 0.5179 1.5200e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 151.7321 151.7321 3.9200e- 003 151.8301 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 0.9312 19.0656 22.9600 0.0380 0.9462 0.9462 0.9462 0.9462 0.0000 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Total 0.9312 19.0656 22.9600 0.0380 18.0663 0.9462 19.0124 9.9307 0.9462 10.8769 0.0000 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 14 of 54 Community Civic Campus - San Mateo County, Summer 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0668 0.0435 0.5179 1.5200e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 151.7321 151.7321 3.9200e- 003 151.8301 Total 0.0668 0.0435 0.5179 1.5200e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 151.7321 151.7321 3.9200e- 003 151.8301 Mitigated Construction Off-Site 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 3.0705 33.8868 17.1042 0.0297 1.7774 1.7774 1.6352 1.6352 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Total 3.0705 33.8868 17.1042 0.0297 6.5523 1.7774 8.3298 3.3675 1.6352 5.0027 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 15 of 54 Community Civic Campus - San Mateo County, Summer 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 0.7263 14.8397 18.9906 0.0297 0.7555 0.7555 0.7555 0.7555 0.0000 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Total 0.7263 14.8397 18.9906 0.0297 6.5523 0.7555 7.3079 3.3675 0.7555 4.1230 0.0000 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 16 of 54 Community Civic Campus - San Mateo County, Summer 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Mitigated Construction Off-Site 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1149 26.5546 18.1825 0.0269 1.7879 1.7879 1.6791 1.6791 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Total 3.1149 26.5546 18.1825 0.0269 1.7879 1.7879 1.6791 1.6791 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 17 of 54 Community Civic Campus - San Mateo County, Summer 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3272 7.7465 2.8796 0.0150 0.3644 0.0719 0.4363 0.1048 0.0688 0.1736 1,633.144 9 1,633.144 9 0.1444 1,636.754 8 Worker 0.4641 0.3017 3.5968 0.0106 1.0269 6.4100e- 003 1.0333 0.2724 5.9100e- 003 0.2783 1,053.695 4 1,053.695 4 0.0272 1,054.375 6 Total 0.7914 8.0482 6.4764 0.0256 1.3913 0.0783 1.4696 0.3772 0.0747 0.4519 2,686.840 3 2,686.840 3 0.1716 2,691.130 5 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 18 of 54 Community Civic Campus - San Mateo County, Summer 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3272 7.7465 2.8796 0.0150 0.3644 0.0719 0.4363 0.1048 0.0688 0.1736 1,633.144 9 1,633.144 9 0.1444 1,636.754 8 Worker 0.4641 0.3017 3.5968 0.0106 1.0269 6.4100e- 003 1.0333 0.2724 5.9100e- 003 0.2783 1,053.695 4 1,053.695 4 0.0272 1,054.375 6 Total 0.7914 8.0482 6.4764 0.0256 1.3913 0.0783 1.4696 0.3772 0.0747 0.4519 2,686.840 3 2,686.840 3 0.1716 2,691.130 5 Mitigated Construction Off-Site 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 19 of 54 Community Civic Campus - San Mateo County, Summer 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2820 7.2116 2.6739 0.0149 0.3644 0.0558 0.4203 0.1049 0.0534 0.1583 1,620.597 5 1,620.597 5 0.1413 1,624.128 7 Worker 0.4119 0.2613 3.1664 0.0103 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 1,022.233 1 1,022.233 1 0.0237 1,022.825 9 Total 0.6940 7.4729 5.8403 0.0251 1.3913 0.0622 1.4535 0.3772 0.0593 0.4365 2,642.830 5 2,642.830 5 0.1650 2,646.954 6 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 20 of 54 Community Civic Campus - San Mateo County, Summer 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2820 7.2116 2.6739 0.0149 0.3644 0.0558 0.4203 0.1049 0.0534 0.1583 1,620.597 5 1,620.597 5 0.1413 1,624.128 7 Worker 0.4119 0.2613 3.1664 0.0103 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 1,022.233 1 1,022.233 1 0.0237 1,022.825 9 Total 0.6940 7.4729 5.8403 0.0251 1.3913 0.0622 1.4535 0.3772 0.0593 0.4365 2,642.830 5 2,642.830 5 0.1650 2,646.954 6 Mitigated Construction Off-Site 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9449 20.7178 15.0320 0.0228 1.1592 1.1592 1.0665 1.0665 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.9709 20.7178 15.0320 0.0228 1.1592 1.1592 1.0665 1.0665 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 21 of 54 Community Civic Campus - San Mateo County, Summer 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 22 of 54 Community Civic Campus - San Mateo County, Summer 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Total 0.0557 0.0362 0.4316 1.2700e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 126.4435 126.4435 3.2600e- 003 126.5251 Mitigated Construction Off-Site 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.6437 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.6697 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 23 of 54 Community Civic Campus - San Mateo County, Summer 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 24 of 54 Community Civic Campus - San Mateo County, Summer 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Mitigated Construction Off-Site 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.3323 2.1850 1.8681 2.9700e- 003 0.1733 0.1733 0.1733 0.1733 281.4481 281.4481 0.0297 282.1909 Total 7.1686 2.1850 1.8681 2.9700e- 003 0.1733 0.1733 0.1733 0.1733 281.4481 281.4481 0.0297 282.1909 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 25 of 54 Community Civic Campus - San Mateo County, Summer 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0928 0.0603 0.7194 2.1200e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 210.7391 210.7391 5.4400e- 003 210.8751 Total 0.0928 0.0603 0.7194 2.1200e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 210.7391 210.7391 5.4400e- 003 210.8751 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0297 282.1909 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0297 282.1909 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 26 of 54 Community Civic Campus - San Mateo County, Summer 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0928 0.0603 0.7194 2.1200e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 210.7391 210.7391 5.4400e- 003 210.8751 Total 0.0928 0.0603 0.7194 2.1200e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 210.7391 210.7391 5.4400e- 003 210.8751 Mitigated Construction Off-Site 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2986 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Total 7.1349 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 27 of 54 Community Civic Campus - San Mateo County, Summer 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Total 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 28 of 54 Community Civic Campus - San Mateo County, Summer 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Total 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Mitigated Construction Off-Site 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.6701 0.0000 2.6701 0.4043 0.0000 0.4043 0.0000 0.0000 Off-Road 3.7190 38.3225 22.3040 0.0388 1.9386 1.9386 1.8048 1.8048 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Total 3.7190 38.3225 22.3040 0.0388 2.6701 1.9386 4.6086 0.4043 1.8048 2.2091 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 29 of 54 Community Civic Campus - San Mateo County, Summer 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.1300 4.4466 1.6262 0.0105 0.2144 0.0186 0.2330 0.0587 0.0178 0.0764 1,175.203 0 1,175.203 0 0.1385 1,178.665 6 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.1795 4.4780 2.0061 0.0117 0.3376 0.0193 0.3569 0.0914 0.0185 0.1098 1,297.871 0 1,297.871 0 0.1414 1,301.404 7 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.6701 0.0000 2.6701 0.4043 0.0000 0.4043 0.0000 0.0000 Off-Road 0.9246 18.3130 24.6739 0.0388 0.8627 0.8627 0.8627 0.8627 0.0000 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Total 0.9246 18.3130 24.6739 0.0388 2.6701 0.8627 3.5328 0.4043 0.8627 1.2670 0.0000 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 30 of 54 Community Civic Campus - San Mateo County, Summer 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.1300 4.4466 1.6262 0.0105 0.2144 0.0186 0.2330 0.0587 0.0178 0.0764 1,175.203 0 1,175.203 0 0.1385 1,178.665 6 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.1795 4.4780 2.0061 0.0117 0.3376 0.0193 0.3569 0.0914 0.0185 0.1098 1,297.871 0 1,297.871 0 0.1414 1,301.404 7 Mitigated Construction Off-Site 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.5627 48.1988 22.4763 0.0380 2.5769 2.5769 2.3708 2.3708 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Total 4.5627 48.1988 22.4763 0.0380 18.0663 2.5769 20.6432 9.9307 2.3708 12.3014 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 31 of 54 Community Civic Campus - San Mateo County, Summer 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0593 0.0376 0.4560 1.4800e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 147.2016 147.2016 3.4100e- 003 147.2869 Total 0.0593 0.0376 0.4560 1.4800e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 147.2016 147.2016 3.4100e- 003 147.2869 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 0.9312 19.0656 22.9600 0.0380 0.9462 0.9462 0.9462 0.9462 0.0000 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Total 0.9312 19.0656 22.9600 0.0380 18.0663 0.9462 19.0124 9.9307 0.9462 10.8769 0.0000 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 32 of 54 Community Civic Campus - San Mateo County, Summer 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0593 0.0376 0.4560 1.4800e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 147.2016 147.2016 3.4100e- 003 147.2869 Total 0.0593 0.0376 0.4560 1.4800e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 147.2016 147.2016 3.4100e- 003 147.2869 Mitigated Construction Off-Site 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 2.7733 30.6725 16.5770 0.0297 1.5513 1.5513 1.4272 1.4272 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Total 2.7733 30.6725 16.5770 0.0297 6.5523 1.5513 8.1037 3.3675 1.4272 4.7947 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 33 of 54 Community Civic Campus - San Mateo County, Summer 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 0.7263 14.8397 18.9906 0.0297 0.7555 0.7555 0.7555 0.7555 0.0000 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Total 0.7263 14.8397 18.9906 0.0297 6.5523 0.7555 7.3079 3.3675 0.7555 4.1230 0.0000 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 34 of 54 Community Civic Campus - San Mateo County, Summer 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Mitigated Construction Off-Site 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 35 of 54 Community Civic Campus - San Mateo County, Summer 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2820 7.2116 2.6739 0.0149 0.3644 0.0558 0.4203 0.1049 0.0534 0.1583 1,620.597 5 1,620.597 5 0.1413 1,624.128 7 Worker 0.4119 0.2613 3.1664 0.0103 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 1,022.233 1 1,022.233 1 0.0237 1,022.825 9 Total 0.6940 7.4729 5.8403 0.0251 1.3913 0.0622 1.4535 0.3772 0.0593 0.4365 2,642.830 5 2,642.830 5 0.1650 2,646.954 6 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 36 of 54 Community Civic Campus - San Mateo County, Summer 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2820 7.2116 2.6739 0.0149 0.3644 0.0558 0.4203 0.1049 0.0534 0.1583 1,620.597 5 1,620.597 5 0.1413 1,624.128 7 Worker 0.4119 0.2613 3.1664 0.0103 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 1,022.233 1 1,022.233 1 0.0237 1,022.825 9 Total 0.6940 7.4729 5.8403 0.0251 1.3913 0.0622 1.4535 0.3772 0.0593 0.4365 2,642.830 5 2,642.830 5 0.1650 2,646.954 6 Mitigated Construction Off-Site 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3612 21.0788 17.1638 0.0269 1.2899 1.2899 1.2127 1.2127 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Total 2.3612 21.0788 17.1638 0.0269 1.2899 1.2899 1.2127 1.2127 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 37 of 54 Community Civic Campus - San Mateo County, Summer 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2515 6.7833 2.5342 0.0147 0.3644 0.0472 0.4116 0.1049 0.0451 0.1500 1,603.876 9 1,603.876 9 0.1389 1,607.349 2 Worker 0.3731 0.2294 2.8421 9.9300e- 003 1.0269 6.3100e- 003 1.0332 0.2724 5.8100e- 003 0.2782 990.3977 990.3977 0.0210 990.9216 Total 0.6245 7.0128 5.3764 0.0246 1.3913 0.0535 1.4448 0.3772 0.0509 0.4282 2,594.274 6 2,594.274 6 0.1599 2,598.270 8 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 38 of 54 Community Civic Campus - San Mateo County, Summer 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2515 6.7833 2.5342 0.0147 0.3644 0.0472 0.4116 0.1049 0.0451 0.1500 1,603.876 9 1,603.876 9 0.1389 1,607.349 2 Worker 0.3731 0.2294 2.8421 9.9300e- 003 1.0269 6.3100e- 003 1.0332 0.2724 5.8100e- 003 0.2782 990.3977 990.3977 0.0210 990.9216 Total 0.6245 7.0128 5.3764 0.0246 1.3913 0.0535 1.4448 0.3772 0.0509 0.4282 2,594.274 6 2,594.274 6 0.1599 2,598.270 8 Mitigated Construction Off-Site 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.6437 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.6697 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 39 of 54 Community Civic Campus - San Mateo County, Summer 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 40 of 54 Community Civic Campus - San Mateo County, Summer 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Total 0.0494 0.0314 0.3800 1.2300e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 122.6680 122.6680 2.8500e- 003 122.7391 Mitigated Construction Off-Site 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4544 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.4804 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 41 of 54 Community Civic Campus - San Mateo County, Summer 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0448 0.0275 0.3411 1.1900e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 118.8477 118.8477 2.5100e- 003 118.9106 Total 0.0448 0.0275 0.3411 1.1900e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 118.8477 118.8477 2.5100e- 003 118.9106 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 42 of 54 Community Civic Campus - San Mateo County, Summer 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0448 0.0275 0.3411 1.1900e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 118.8477 118.8477 2.5100e- 003 118.9106 Total 0.0448 0.0275 0.3411 1.1900e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 118.8477 118.8477 2.5100e- 003 118.9106 Mitigated Construction Off-Site 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2986 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Total 7.1349 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 43 of 54 Community Civic Campus - San Mateo County, Summer 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Total 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 44 of 54 Community Civic Campus - San Mateo County, Summer 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Total 0.0824 0.0523 0.6333 2.0500e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 204.4466 204.4466 4.7400e- 003 204.5652 Mitigated Construction Off-Site 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2664 1.8354 1.8413 2.9700e- 003 0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 282.0423 Total 7.1027 1.8354 1.8413 2.9700e- 003 0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 282.0423 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 45 of 54 Community Civic Campus - San Mateo County, Summer 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0746 0.0459 0.5684 1.9900e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 198.0795 198.0795 4.1900e- 003 198.1843 Total 0.0746 0.0459 0.5684 1.9900e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 198.0795 198.0795 4.1900e- 003 198.1843 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0238 282.0423 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0238 282.0423 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 46 of 54 Community Civic Campus - San Mateo County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0746 0.0459 0.5684 1.9900e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 198.0795 198.0795 4.1900e- 003 198.1843 Total 0.0746 0.0459 0.5684 1.9900e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 198.0795 198.0795 4.1900e- 003 198.1843 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 47 of 54 Community Civic Campus - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 8.9368 23.6549 85.1639 0.2637 22.6166 0.3175 22.9341 6.0559 0.2988 6.3547 26,535.77 86 26,535.77 86 0.9999 26,560.77 65 Unmitigated 8.9368 23.6549 85.1639 0.2637 22.6166 0.3175 22.9341 6.0559 0.2988 6.3547 26,535.77 86 26,535.77 86 0.9999 26,560.77 65 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator 0.00 0.00 0.00 Government (Civic Center)5,570.60 5,570.60 5570.60 10,648,965 10,648,965 Government Office Building 0.00 0.00 0.00 Government Office Building 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Total 5,570.60 5,570.60 5,570.60 10,648,965 10,648,965 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 48 of 54 Community Civic Campus - San Mateo County, Summer Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Enclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Government (Civic Center)9.50 7.30 7.30 75.00 20.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Government (Civic Center)0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Enclosed Parking with Elevator 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 49 of 54 Community Civic Campus - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 NaturalGas Unmitigated 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 4894.9 0.0528 0.4799 0.4031 2.8800e- 003 0.0365 0.0365 0.0365 0.0365 575.8711 575.8711 0.0110 0.0106 579.2932 Government Office Building 2341.04 0.0253 0.2295 0.1928 1.3800e- 003 0.0174 0.0174 0.0174 0.0174 275.4166 275.4166 5.2800e- 003 5.0500e- 003 277.0533 Government Office Building 385.74 4.1600e- 003 0.0378 0.0318 2.3000e- 004 2.8700e- 003 2.8700e- 003 2.8700e- 003 2.8700e- 003 45.3811 45.3811 8.7000e- 004 8.3000e- 004 45.6508 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0822 0.7472 0.6277 4.4900e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 50 of 54 Community Civic Campus - San Mateo County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 4.8949 0.0528 0.4799 0.4031 2.8800e- 003 0.0365 0.0365 0.0365 0.0365 575.8711 575.8711 0.0110 0.0106 579.2932 Government Office Building 0.38574 4.1600e- 003 0.0378 0.0318 2.3000e- 004 2.8700e- 003 2.8700e- 003 2.8700e- 003 2.8700e- 003 45.3811 45.3811 8.7000e- 004 8.3000e- 004 45.6508 Government Office Building 2.34104 0.0253 0.2295 0.1928 1.3800e- 003 0.0174 0.0174 0.0174 0.0174 275.4166 275.4166 5.2800e- 003 5.0500e- 003 277.0533 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0822 0.7472 0.6277 4.4900e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 51 of 54 Community Civic Campus - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Unmitigated 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.4308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 3.1321 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.9900e- 003 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Total 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 52 of 54 Community Civic Campus - San Mateo County, Summer 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.4308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 3.1321 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.9900e- 003 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Total 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 53 of 54 Community Civic Campus - San Mateo County, Summer 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:49 PMPage 54 of 54 Community Civic Campus - San Mateo County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Government (Civic Center)92.00 1000sqft 1.93 92,000.00 0 Government Office Building 44.00 1000sqft 0.92 44,000.00 0 Government Office Building 7.25 1000sqft 1.25 7,250.00 0 Enclosed Parking with Elevator 294.00 Space 2.42 117,600.00 0 Parking Lot 161.00 Space 1.33 64,400.00 0 Parking Lot 15.00 Space 0.95 6,000.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2019Operational Year CO2 Intensity (lb/MWhr) 641.35 0.029CH4 Intensity (lb/MWhr) 0.006N2O Intensity (lb/MWhr) Community Civic Campus San Mateo County, Winter CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 1 of 54 Community Civic Campus - San Mateo County, Winter Project Characteristics - Land Use - Acreage adjusted per project applicant. Construction Phase - Construction, paving, and architectural coating assumed to occur simultaneously. Off-road Equipment - Off-road Equipment - Off-road Equipment - Demolition - Architectural Coating - Vehicle Trips - Adjusted per TIA. Trips and VMT - Construction Off-road Equipment Mitigation - Tier 3 equipment. Table Name Column Name Default Value New Value tblConstDustMitigation WaterUnpavedRoadVehicleSpeed 40 0 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 8.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 12.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 20.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 2 of 54 Community Civic Campus - San Mateo County, Winter tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstEquipMitigation Tier No Change Tier 3 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblConstructionPhase NumDays 20.00 230.00 tblLandUse LotAcreage 2.11 1.93 tblLandUse LotAcreage 1.01 0.92 tblLandUse LotAcreage 0.17 1.25 tblLandUse LotAcreage 2.65 2.42 tblLandUse LotAcreage 0.13 0.95 tblLandUse LotAcreage 1.45 1.33 tblProjectCharacteristics OperationalYear 2018 2019 tblVehicleTrips ST_TR 0.00 60.55 tblVehicleTrips SU_TR 0.00 60.55 tblVehicleTrips WD_TR 27.92 60.55 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 3 of 54 Community Civic Campus - San Mateo County, Winter 2.0 Emissions Summary tblVehicleTrips WD_TR 68.93 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 4 of 54 Community Civic Campus - San Mateo County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2017 13.2775 57.8523 42.9375 0.0806 18.2141 3.2021 21.0936 9.9699 2.9968 12.6190 0.0000 8,174.325 6 8,174.325 6 1.5810 0.0000 8,213.852 0 2018 12.3829 50.6881 41.2603 0.0800 18.2141 2.6720 20.7920 9.9699 2.5024 12.3415 0.0000 8,055.651 2 8,055.651 2 1.5588 0.0000 8,094.619 9 2019 11.7543 45.4346 40.0932 0.0794 1.7199 2.2998 4.0197 0.4644 2.1539 2.6183 0.0000 7,933.137 5 7,933.137 5 1.5384 0.0000 7,971.596 5 Maximum 13.2775 57.8523 42.9375 0.0806 18.2141 3.2021 21.0936 9.9699 2.9968 12.6190 0.0000 8,174.325 6 8,174.325 6 1.5810 0.0000 8,213.852 0 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2017 9.1797 35.2731 44.8568 0.0806 18.2141 1.6897 19.1612 9.9699 1.6858 10.9169 0.0000 8,174.325 6 8,174.325 6 1.5810 0.0000 8,213.852 0 2018 9.0554 34.6497 44.0311 0.0800 18.2141 1.6734 19.1612 9.9699 1.6702 10.9169 0.0000 8,055.651 2 8,055.651 2 1.5588 0.0000 8,094.619 9 2019 8.9666 34.1546 43.4251 0.0794 1.7199 1.6645 3.3844 0.4644 1.6618 2.1262 0.0000 7,933.137 5 7,933.137 5 1.5384 0.0000 7,971.596 4 Maximum 9.1797 35.2731 44.8568 0.0806 18.2141 1.6897 19.1612 9.9699 1.6858 10.9169 0.0000 8,174.325 6 8,174.325 6 1.5810 0.0000 8,213.852 0 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 5 of 54 Community Civic Campus - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 27.30 32.41 -6.45 0.00 0.00 38.49 9.15 0.00 34.43 13.12 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 6 of 54 Community Civic Campus - San Mateo County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Energy 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mobile 8.1892 25.5974 90.1632 0.2504 22.6166 0.3192 22.9358 6.0559 0.3004 6.3563 25,189.11 43 25,189.11 43 1.0255 25,214.75 10 Total 11.8403 26.3452 90.8541 0.2548 22.6166 0.3762 22.9928 6.0559 0.3575 6.4134 26,085.91 73 26,085.91 73 1.0430 0.0164 26,116.89 16 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Energy 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mobile 8.1892 25.5974 90.1632 0.2504 22.6166 0.3192 22.9358 6.0559 0.3004 6.3563 25,189.11 43 25,189.11 43 1.0255 25,214.75 10 Total 11.8403 26.3452 90.8541 0.2548 22.6166 0.3762 22.9928 6.0559 0.3575 6.4134 26,085.91 73 26,085.91 73 1.0430 0.0164 26,116.89 16 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 7 of 54 Community Civic Campus - San Mateo County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Phase 1 Demolition Demolition 5/1/2017 5/26/2017 5 20 2 Phase 1 Site Preparation Site Preparation 5/27/2017 6/9/2017 5 10 3 Phase 1 Grading Grading 6/10/2017 7/7/2017 5 20 4 Phase 1 Building Construction Building Construction 7/8/2017 5/25/2018 5 230 5 Phase 1 Paving Paving 7/8/2017 5/25/2018 5 230 6 Phase 1 Architectural Coating Architectural Coating 7/8/2017 5/25/2018 5 230 7 Phase 2 Demolition Demolition 5/26/2018 6/22/2018 5 20 8 Phase 2 Site Preparation Site Preparation 6/23/2018 7/6/2018 5 10 9 Phase 2 Grading Grading 7/7/2018 8/3/2018 5 20 10 Phase 2 Building Construction Building Construction 8/4/2018 6/21/2019 5 230 11 Phase 2 Paving Paving 8/4/2018 6/21/2019 5 230 12 Phase 2 Architectural Coating Architectural Coating 8/4/2018 6/21/2019 5 230 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 214,875; Non-Residential Outdoor: 71,625; Striped Parking Area: 11,280 (Architectural Coating – sqft) Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.7 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 8 of 54 Community Civic Campus - San Mateo County, Winter OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Phase 1 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 1 Demolition Excavators 3 8.00 158 0.38 Phase 1 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 1 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Phase 1 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 1 Grading Excavators 1 8.00 158 0.38 Phase 1 Grading Graders 1 8.00 187 0.41 Phase 1 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 1 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 1 Building Construction Cranes 1 7.00 231 0.29 Phase 1 Building Construction Forklifts 3 8.00 89 0.20 Phase 1 Building Construction Generator Sets 1 8.00 84 0.74 Phase 1 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase 1 Building Construction Welders 1 8.00 46 0.45 Phase 1 Paving Pavers 2 8.00 130 0.42 Phase 1 Paving Paving Equipment 2 8.00 132 0.36 Phase 1 Paving Rollers 2 8.00 80 0.38 Phase 1 Architectural Coating Air Compressors 1 6.00 78 0.48 Phase 2 Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Phase 2 Demolition Excavators 3 8.00 158 0.38 Phase 2 Demolition Rubber Tired Dozers 2 8.00 247 0.40 Phase 2 Site Preparation Rubber Tired Dozers 3 8.00 247 0.40 Phase 2 Site Preparation Tractors/Loaders/Backhoes 4 8.00 97 0.37 Phase 2 Grading Excavators 1 8.00 158 0.38 Phase 2 Grading Graders 1 8.00 187 0.41 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 9 of 54 Community Civic Campus - San Mateo County, Winter Phase 2 Grading Rubber Tired Dozers 1 8.00 247 0.40 Phase 2 Grading Tractors/Loaders/Backhoes 3 8.00 97 0.37 Phase 2 Building Construction Cranes 1 7.00 231 0.29 Phase 2 Building Construction Forklifts 3 8.00 89 0.20 Phase 2 Building Construction Generator Sets 1 8.00 84 0.74 Phase 2 Building Construction Tractors/Loaders/Backhoes 3 7.00 97 0.37 Phase 2 Building Construction Welders 1 8.00 46 0.45 Phase 2 Paving Pavers 2 8.00 130 0.42 Phase 2 Paving Paving Equipment 2 8.00 132 0.36 Phase 2 Paving Rollers 2 8.00 80 0.38 Phase 2 Architectural Coating Air Compressors 1 6.00 78 0.48 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Phase 1 Demolition 6 15.00 0.00 116.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 1 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Demolition 6 15.00 0.00 247.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Site Preparation 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Grading 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Building Construction 9 125.00 54.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Phase 2 Architectural Coating 1 25.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 10 of 54 Community Civic Campus - San Mateo County, Winter 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.2551 0.0000 1.2551 0.1900 0.0000 0.1900 0.0000 0.0000 Off-Road 4.1031 42.7475 23.0122 0.0388 2.1935 2.1935 2.0425 2.0425 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Total 4.1031 42.7475 23.0122 0.0388 1.2551 2.1935 3.4485 0.1900 2.0425 2.2325 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Clean Paved Roads CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 11 of 54 Community Civic Campus - San Mateo County, Winter 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0742 2.3435 0.8175 4.9700e- 003 0.1007 0.0138 0.1144 0.0276 0.0132 0.0407 553.4733 553.4733 0.0653 555.1050 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.1361 2.3882 1.2435 6.1600e- 003 0.2239 0.0145 0.2384 0.0602 0.0139 0.0741 672.1247 672.1247 0.0684 673.8355 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 1.2551 0.0000 1.2551 0.1900 0.0000 0.1900 0.0000 0.0000 Off-Road 0.9246 18.3130 24.6739 0.0388 0.8627 0.8627 0.8627 0.8627 0.0000 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Total 0.9246 18.3130 24.6739 0.0388 1.2551 0.8627 2.1178 0.1900 0.8627 1.0528 0.0000 3,924.283 3 3,924.283 3 1.0730 3,951.107 0 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 12 of 54 Community Civic Campus - San Mateo County, Winter 3.2 Phase 1 Demolition - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0742 2.3435 0.8175 4.9700e- 003 0.1007 0.0138 0.1144 0.0276 0.0132 0.0407 553.4733 553.4733 0.0653 555.1050 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.1361 2.3882 1.2435 6.1600e- 003 0.2239 0.0145 0.2384 0.0602 0.0139 0.0741 672.1247 672.1247 0.0684 673.8355 Mitigated Construction Off-Site 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.9608 52.2754 23.4554 0.0380 2.8786 2.8786 2.6483 2.6483 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Total 4.9608 52.2754 23.4554 0.0380 18.0663 2.8786 20.9448 9.9307 2.6483 12.5790 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 13 of 54 Community Civic Campus - San Mateo County, Winter 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0742 0.0536 0.5112 1.4300e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 142.3817 142.3817 3.8000e- 003 142.4766 Total 0.0742 0.0536 0.5112 1.4300e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 142.3817 142.3817 3.8000e- 003 142.4766 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 0.9312 19.0656 22.9600 0.0380 0.9462 0.9462 0.9462 0.9462 0.0000 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Total 0.9312 19.0656 22.9600 0.0380 18.0663 0.9462 19.0124 9.9307 0.9462 10.8769 0.0000 3,894.950 0 3,894.950 0 1.1934 3,924.785 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 14 of 54 Community Civic Campus - San Mateo County, Winter 3.3 Phase 1 Site Preparation - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0742 0.0536 0.5112 1.4300e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 142.3817 142.3817 3.8000e- 003 142.4766 Total 0.0742 0.0536 0.5112 1.4300e- 003 0.1479 9.2000e- 004 0.1488 0.0392 8.5000e- 004 0.0401 142.3817 142.3817 3.8000e- 003 142.4766 Mitigated Construction Off-Site 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 3.0705 33.8868 17.1042 0.0297 1.7774 1.7774 1.6352 1.6352 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Total 3.0705 33.8868 17.1042 0.0297 6.5523 1.7774 8.3298 3.3675 1.6352 5.0027 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 15 of 54 Community Civic Campus - San Mateo County, Winter 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 0.7263 14.8397 18.9906 0.0297 0.7555 0.7555 0.7555 0.7555 0.0000 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Total 0.7263 14.8397 18.9906 0.0297 6.5523 0.7555 7.3079 3.3675 0.7555 4.1230 0.0000 3,037.910 7 3,037.910 7 0.9308 3,061.180 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 16 of 54 Community Civic Campus - San Mateo County, Winter 3.4 Phase 1 Grading - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Mitigated Construction Off-Site 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.1149 26.5546 18.1825 0.0269 1.7879 1.7879 1.6791 1.6791 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Total 3.1149 26.5546 18.1825 0.0269 1.7879 1.7879 1.6791 1.6791 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 17 of 54 Community Civic Campus - San Mateo County, Winter 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3432 7.9034 3.1688 0.0148 0.3644 0.0733 0.4377 0.1048 0.0701 0.1749 1,606.086 4 1,606.086 4 0.1493 1,609.818 9 Worker 0.5152 0.3723 3.5501 9.9300e- 003 1.0269 6.4100e- 003 1.0333 0.2724 5.9100e- 003 0.2783 988.7616 988.7616 0.0264 989.4209 Total 0.8583 8.2757 6.7189 0.0247 1.3913 0.0797 1.4709 0.3772 0.0760 0.4532 2,594.848 0 2,594.848 0 0.1757 2,599.239 8 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,650.979 7 2,650.979 7 0.6531 2,667.307 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 18 of 54 Community Civic Campus - San Mateo County, Winter 3.5 Phase 1 Building Construction - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.3432 7.9034 3.1688 0.0148 0.3644 0.0733 0.4377 0.1048 0.0701 0.1749 1,606.086 4 1,606.086 4 0.1493 1,609.818 9 Worker 0.5152 0.3723 3.5501 9.9300e- 003 1.0269 6.4100e- 003 1.0333 0.2724 5.9100e- 003 0.2783 988.7616 988.7616 0.0264 989.4209 Total 0.8583 8.2757 6.7189 0.0247 1.3913 0.0797 1.4709 0.3772 0.0760 0.4532 2,594.848 0 2,594.848 0 0.1757 2,599.239 8 Mitigated Construction Off-Site 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 19 of 54 Community Civic Campus - San Mateo County, Winter 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2958 7.3457 2.9358 0.0146 0.3644 0.0570 0.4214 0.1049 0.0545 0.1594 1,593.032 7 1,593.032 7 0.1455 1,596.671 1 Worker 0.4568 0.3225 3.1011 9.6200e- 003 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 959.2016 959.2016 0.0229 959.7728 Total 0.7527 7.6682 6.0369 0.0242 1.3913 0.0634 1.4546 0.3772 0.0604 0.4376 2,552.234 3 2,552.234 3 0.1684 2,556.443 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 20 of 54 Community Civic Campus - San Mateo County, Winter 3.5 Phase 1 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2958 7.3457 2.9358 0.0146 0.3644 0.0570 0.4214 0.1049 0.0545 0.1594 1,593.032 7 1,593.032 7 0.1455 1,596.671 1 Worker 0.4568 0.3225 3.1011 9.6200e- 003 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 959.2016 959.2016 0.0229 959.7728 Total 0.7527 7.6682 6.0369 0.0242 1.3913 0.0634 1.4546 0.3772 0.0604 0.4376 2,552.234 3 2,552.234 3 0.1684 2,556.443 9 Mitigated Construction Off-Site 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.9449 20.7178 15.0320 0.0228 1.1592 1.1592 1.0665 1.0665 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.9709 20.7178 15.0320 0.0228 1.1592 1.1592 1.0665 1.0665 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 21 of 54 Community Civic Campus - San Mateo County, Winter 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,330.646 1 2,330.646 1 0.7141 2,348.498 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 22 of 54 Community Civic Campus - San Mateo County, Winter 3.6 Phase 1 Paving - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Total 0.0618 0.0447 0.4260 1.1900e- 003 0.1232 7.7000e- 004 0.1240 0.0327 7.1000e- 004 0.0334 118.6514 118.6514 3.1600e- 003 118.7305 Mitigated Construction Off-Site 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.6437 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.6697 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 23 of 54 Community Civic Campus - San Mateo County, Winter 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 24 of 54 Community Civic Campus - San Mateo County, Winter 3.6 Phase 1 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Mitigated Construction Off-Site 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.3323 2.1850 1.8681 2.9700e- 003 0.1733 0.1733 0.1733 0.1733 281.4481 281.4481 0.0297 282.1909 Total 7.1686 2.1850 1.8681 2.9700e- 003 0.1733 0.1733 0.1733 0.1733 281.4481 281.4481 0.0297 282.1909 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 25 of 54 Community Civic Campus - San Mateo County, Winter 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1030 0.0745 0.7100 1.9900e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 197.7523 197.7523 5.2700e- 003 197.8842 Total 0.1030 0.0745 0.7100 1.9900e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 197.7523 197.7523 5.2700e- 003 197.8842 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0297 282.1909 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0297 282.1909 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 26 of 54 Community Civic Campus - San Mateo County, Winter 3.7 Phase 1 Architectural Coating - 2017 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.1030 0.0745 0.7100 1.9900e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 197.7523 197.7523 5.2700e- 003 197.8842 Total 0.1030 0.0745 0.7100 1.9900e- 003 0.2054 1.2800e- 003 0.2067 0.0545 1.1800e- 003 0.0557 197.7523 197.7523 5.2700e- 003 197.8842 Mitigated Construction Off-Site 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2986 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Total 7.1349 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 27 of 54 Community Civic Campus - San Mateo County, Winter 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Total 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 28 of 54 Community Civic Campus - San Mateo County, Winter 3.7 Phase 1 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Total 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Mitigated Construction Off-Site 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.6701 0.0000 2.6701 0.4043 0.0000 0.4043 0.0000 0.0000 Off-Road 3.7190 38.3225 22.3040 0.0388 1.9386 1.9386 1.8048 1.8048 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Total 3.7190 38.3225 22.3040 0.0388 2.6701 1.9386 4.6086 0.4043 1.8048 2.2091 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 29 of 54 Community Civic Campus - San Mateo County, Winter 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.1336 4.5883 1.6855 0.0104 0.2144 0.0190 0.2334 0.0587 0.0182 0.0769 1,163.146 9 1,163.146 9 0.1401 1,166.648 8 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.1884 4.6270 2.0576 0.0115 0.3376 0.0198 0.3574 0.0914 0.0189 0.1103 1,278.251 1 1,278.251 1 0.1428 1,281.821 6 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.6701 0.0000 2.6701 0.4043 0.0000 0.4043 0.0000 0.0000 Off-Road 0.9246 18.3130 24.6739 0.0388 0.8627 0.8627 0.8627 0.8627 0.0000 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Total 0.9246 18.3130 24.6739 0.0388 2.6701 0.8627 3.5328 0.4043 0.8627 1.2670 0.0000 3,871.766 5 3,871.766 5 1.0667 3,898.434 4 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 30 of 54 Community Civic Campus - San Mateo County, Winter 3.8 Phase 2 Demolition - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.1336 4.5883 1.6855 0.0104 0.2144 0.0190 0.2334 0.0587 0.0182 0.0769 1,163.146 9 1,163.146 9 0.1401 1,166.648 8 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.1884 4.6270 2.0576 0.0115 0.3376 0.0198 0.3574 0.0914 0.0189 0.1103 1,278.251 1 1,278.251 1 0.1428 1,281.821 6 Mitigated Construction Off-Site 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 4.5627 48.1988 22.4763 0.0380 2.5769 2.5769 2.3708 2.3708 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Total 4.5627 48.1988 22.4763 0.0380 18.0663 2.5769 20.6432 9.9307 2.3708 12.3014 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 31 of 54 Community Civic Campus - San Mateo County, Winter 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0658 0.0464 0.4466 1.3900e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 138.1250 138.1250 3.2900e- 003 138.2073 Total 0.0658 0.0464 0.4466 1.3900e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 138.1250 138.1250 3.2900e- 003 138.2073 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 18.0663 0.0000 18.0663 9.9307 0.0000 9.9307 0.0000 0.0000 Off-Road 0.9312 19.0656 22.9600 0.0380 0.9462 0.9462 0.9462 0.9462 0.0000 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Total 0.9312 19.0656 22.9600 0.0380 18.0663 0.9462 19.0124 9.9307 0.9462 10.8769 0.0000 3,831.623 9 3,831.623 9 1.1928 3,861.444 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 32 of 54 Community Civic Campus - San Mateo County, Winter 3.9 Phase 2 Site Preparation - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0658 0.0464 0.4466 1.3900e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 138.1250 138.1250 3.2900e- 003 138.2073 Total 0.0658 0.0464 0.4466 1.3900e- 003 0.1479 9.1000e- 004 0.1488 0.0392 8.4000e- 004 0.0401 138.1250 138.1250 3.2900e- 003 138.2073 Mitigated Construction Off-Site 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 2.7733 30.6725 16.5770 0.0297 1.5513 1.5513 1.4272 1.4272 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Total 2.7733 30.6725 16.5770 0.0297 6.5523 1.5513 8.1037 3.3675 1.4272 4.7947 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 33 of 54 Community Civic Campus - San Mateo County, Winter 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.5523 0.0000 6.5523 3.3675 0.0000 3.3675 0.0000 0.0000 Off-Road 0.7263 14.8397 18.9906 0.0297 0.7555 0.7555 0.7555 0.7555 0.0000 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Total 0.7263 14.8397 18.9906 0.0297 6.5523 0.7555 7.3079 3.3675 0.7555 4.1230 0.0000 2,988.021 6 2,988.021 6 0.9302 3,011.276 9 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 34 of 54 Community Civic Campus - San Mateo County, Winter 3.10 Phase 2 Grading - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Mitigated Construction Off-Site 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 2.6795 23.3900 17.5804 0.0269 1.4999 1.4999 1.4099 1.4099 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 35 of 54 Community Civic Campus - San Mateo County, Winter 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2958 7.3457 2.9358 0.0146 0.3644 0.0570 0.4214 0.1049 0.0545 0.1594 1,593.032 7 1,593.032 7 0.1455 1,596.671 1 Worker 0.4568 0.3225 3.1011 9.6200e- 003 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 959.2016 959.2016 0.0229 959.7728 Total 0.7527 7.6682 6.0369 0.0242 1.3913 0.0634 1.4546 0.3772 0.0604 0.4376 2,552.234 3 2,552.234 3 0.1684 2,556.443 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,620.935 1 2,620.935 1 0.6421 2,636.988 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 36 of 54 Community Civic Campus - San Mateo County, Winter 3.11 Phase 2 Building Construction - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2958 7.3457 2.9358 0.0146 0.3644 0.0570 0.4214 0.1049 0.0545 0.1594 1,593.032 7 1,593.032 7 0.1455 1,596.671 1 Worker 0.4568 0.3225 3.1011 9.6200e- 003 1.0269 6.3500e- 003 1.0332 0.2724 5.8500e- 003 0.2782 959.2016 959.2016 0.0229 959.7728 Total 0.7527 7.6682 6.0369 0.0242 1.3913 0.0634 1.4546 0.3772 0.0604 0.4376 2,552.234 3 2,552.234 3 0.1684 2,556.443 9 Mitigated Construction Off-Site 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 2.3612 21.0788 17.1638 0.0269 1.2899 1.2899 1.2127 1.2127 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Total 2.3612 21.0788 17.1638 0.0269 1.2899 1.2899 1.2127 1.2127 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 37 of 54 Community Civic Campus - San Mateo County, Winter 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2633 6.9025 2.7721 0.0144 0.3644 0.0482 0.4127 0.1049 0.0461 0.1510 1,576.376 7 1,576.376 7 0.1426 1,579.942 4 Worker 0.4142 0.2832 2.7660 9.3200e- 003 1.0269 6.3100e- 003 1.0332 0.2724 5.8100e- 003 0.2782 929.3410 929.3410 0.0201 929.8436 Total 0.6775 7.1857 5.5382 0.0237 1.3913 0.0546 1.4458 0.3772 0.0520 0.4292 2,505.717 7 2,505.717 7 0.1627 2,509.785 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Total 0.6739 14.2261 17.8738 0.0269 0.9036 0.9036 0.9036 0.9036 0.0000 2,591.580 2 2,591.580 2 0.6313 2,607.363 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 38 of 54 Community Civic Campus - San Mateo County, Winter 3.11 Phase 2 Building Construction - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.2633 6.9025 2.7721 0.0144 0.3644 0.0482 0.4127 0.1049 0.0461 0.1510 1,576.376 7 1,576.376 7 0.1426 1,579.942 4 Worker 0.4142 0.2832 2.7660 9.3200e- 003 1.0269 6.3100e- 003 1.0332 0.2724 5.8100e- 003 0.2782 929.3410 929.3410 0.0201 929.8436 Total 0.6775 7.1857 5.5382 0.0237 1.3913 0.0546 1.4458 0.3772 0.0520 0.4292 2,505.717 7 2,505.717 7 0.1627 2,509.785 9 Mitigated Construction Off-Site 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.6437 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.6697 17.5209 14.7964 0.0228 0.9561 0.9561 0.8797 0.8797 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 39 of 54 Community Civic Campus - San Mateo County, Winter 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,294.088 7 2,294.088 7 0.7142 2,311.943 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 40 of 54 Community Civic Campus - San Mateo County, Winter 3.12 Phase 2 Paving - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Total 0.0548 0.0387 0.3721 1.1500e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 115.1042 115.1042 2.7400e- 003 115.1727 Mitigated Construction Off-Site 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 1.4544 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.4804 15.2441 14.6648 0.0228 0.8246 0.8246 0.7586 0.7586 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 41 of 54 Community Civic Campus - San Mateo County, Winter 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0497 0.0340 0.3319 1.1200e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 111.5209 111.5209 2.4100e- 003 111.5812 Total 0.0497 0.0340 0.3319 1.1200e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 111.5209 111.5209 2.4100e- 003 111.5812 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.5609 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Paving 0.0260 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5869 11.2952 17.2957 0.0228 0.6093 0.6093 0.6093 0.6093 0.0000 2,257.002 5 2,257.002 5 0.7141 2,274.854 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 42 of 54 Community Civic Campus - San Mateo County, Winter 3.12 Phase 2 Paving - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0497 0.0340 0.3319 1.1200e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 111.5209 111.5209 2.4100e- 003 111.5812 Total 0.0497 0.0340 0.3319 1.1200e- 003 0.1232 7.6000e- 004 0.1240 0.0327 7.0000e- 004 0.0334 111.5209 111.5209 2.4100e- 003 111.5812 Mitigated Construction Off-Site 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2986 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Total 7.1349 2.0058 1.8542 2.9700e- 003 0.1506 0.1506 0.1506 0.1506 281.4485 281.4485 0.0267 282.1171 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 43 of 54 Community Civic Campus - San Mateo County, Winter 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Total 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4485 281.4485 0.0267 282.1171 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 44 of 54 Community Civic Campus - San Mateo County, Winter 3.13 Phase 2 Architectural Coating - 2018 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Total 0.0914 0.0645 0.6202 1.9200e- 003 0.2054 1.2700e- 003 0.2066 0.0545 1.1700e- 003 0.0556 191.8403 191.8403 4.5700e- 003 191.9546 Mitigated Construction Off-Site 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2664 1.8354 1.8413 2.9700e- 003 0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 282.0423 Total 7.1027 1.8354 1.8413 2.9700e- 003 0.1288 0.1288 0.1288 0.1288 281.4481 281.4481 0.0238 282.0423 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 45 of 54 Community Civic Campus - San Mateo County, Winter 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0828 0.0567 0.5532 1.8600e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 185.8682 185.8682 4.0200e- 003 185.9687 Total 0.0828 0.0567 0.5532 1.8600e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 185.8682 185.8682 4.0200e- 003 185.9687 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 6.8363 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0594 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0238 282.0423 Total 6.8957 1.3570 1.8324 2.9700e- 003 0.0951 0.0951 0.0951 0.0951 0.0000 281.4481 281.4481 0.0238 282.0423 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 46 of 54 Community Civic Campus - San Mateo County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.13 Phase 2 Architectural Coating - 2019 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0828 0.0567 0.5532 1.8600e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 185.8682 185.8682 4.0200e- 003 185.9687 Total 0.0828 0.0567 0.5532 1.8600e- 003 0.2054 1.2600e- 003 0.2066 0.0545 1.1600e- 003 0.0556 185.8682 185.8682 4.0200e- 003 185.9687 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 47 of 54 Community Civic Campus - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 8.1892 25.5974 90.1632 0.2504 22.6166 0.3192 22.9358 6.0559 0.3004 6.3563 25,189.11 43 25,189.11 43 1.0255 25,214.75 10 Unmitigated 8.1892 25.5974 90.1632 0.2504 22.6166 0.3192 22.9358 6.0559 0.3004 6.3563 25,189.11 43 25,189.11 43 1.0255 25,214.75 10 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator 0.00 0.00 0.00 Government (Civic Center)5,570.60 5,570.60 5570.60 10,648,965 10,648,965 Government Office Building 0.00 0.00 0.00 Government Office Building 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Parking Lot 0.00 0.00 0.00 Total 5,570.60 5,570.60 5,570.60 10,648,965 10,648,965 CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 48 of 54 Community Civic Campus - San Mateo County, Winter Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Enclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Government (Civic Center)9.50 7.30 7.30 75.00 20.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Government Office Building 9.50 7.30 7.30 33.00 62.00 5.00 50 34 16 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 5.0 Energy Detail 5.1 Mitigation Measures Energy 4.4 Fleet Mix Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Government (Civic Center)0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Government Office Building 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Enclosed Parking with Elevator 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Parking Lot 0.498968 0.049513 0.248277 0.134909 0.018184 0.006326 0.020670 0.006254 0.003828 0.003354 0.008577 0.000418 0.000722 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 49 of 54 Community Civic Campus - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 NaturalGas Unmitigated 0.0822 0.7472 0.6277 4.4800e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 4894.9 0.0528 0.4799 0.4031 2.8800e- 003 0.0365 0.0365 0.0365 0.0365 575.8711 575.8711 0.0110 0.0106 579.2932 Government Office Building 2341.04 0.0253 0.2295 0.1928 1.3800e- 003 0.0174 0.0174 0.0174 0.0174 275.4166 275.4166 5.2800e- 003 5.0500e- 003 277.0533 Government Office Building 385.74 4.1600e- 003 0.0378 0.0318 2.3000e- 004 2.8700e- 003 2.8700e- 003 2.8700e- 003 2.8700e- 003 45.3811 45.3811 8.7000e- 004 8.3000e- 004 45.6508 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0822 0.7472 0.6277 4.4900e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 50 of 54 Community Civic Campus - San Mateo County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Enclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Government (Civic Center) 4.8949 0.0528 0.4799 0.4031 2.8800e- 003 0.0365 0.0365 0.0365 0.0365 575.8711 575.8711 0.0110 0.0106 579.2932 Government Office Building 0.38574 4.1600e- 003 0.0378 0.0318 2.3000e- 004 2.8700e- 003 2.8700e- 003 2.8700e- 003 2.8700e- 003 45.3811 45.3811 8.7000e- 004 8.3000e- 004 45.6508 Government Office Building 2.34104 0.0253 0.2295 0.1928 1.3800e- 003 0.0174 0.0174 0.0174 0.0174 275.4166 275.4166 5.2800e- 003 5.0500e- 003 277.0533 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0822 0.7472 0.6277 4.4900e- 003 0.0568 0.0568 0.0568 0.0568 896.6688 896.6688 0.0172 0.0164 901.9973 Mitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 51 of 54 Community Civic Campus - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Unmitigated 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.4308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 3.1321 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.9900e- 003 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Total 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Unmitigated CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 52 of 54 Community Civic Campus - San Mateo County, Winter 8.1 Mitigation Measures Waste 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.4308 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 3.1321 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 5.9900e- 003 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Total 3.5689 5.9000e- 004 0.0632 0.0000 2.3000e- 004 2.3000e- 004 2.3000e- 004 2.3000e- 004 0.1342 0.1342 3.6000e- 004 0.1433 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 53 of 54 Community Civic Campus - San Mateo County, Winter 11.0 Vegetation Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.1 Date: 5/3/2017 4:59 PMPage 54 of 54 Community Civic Campus - San Mateo County, Winter