HomeMy WebLinkAboutReso 4935-1968RESOLUTION NO. 4c~35
CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A RESOLUTION ORDERING UP-85 FOR PLANNED UNIT
"B" (COMMERCIAL) SOUTHEASTERLY CORNER OF
CALLAN BOULEVARD AND KING DRIVE, WEST PARK #3,
TO STAND GRANTED UPON THE COMPLIANCE WITH
CERTAIN CONDITICNS.
BE IT RESOLVED by the City Cour. cil of the City of South
San Francisco that:
WHEREAS, the City Council upon duly noticed hearing on
appeal has considered the report and recommendation of the
City Planner, respective department heads and interested
parties and has considered the order of the Planning Com-
.
mission denying Use Permit application (UP-85) for Planned
Unit Development "B" (Commercial) in the Westborough-West
Park #3 Planned Community District (Parcel A thereof), as
described in Ordinance No. 575, each and all of which have
been considered, evaluated and made a part of the record in
this proceeding.
NOW, THEREFORE:
1. The Council makes the following findings: The use of
the parcel and the establishment, maintenance, operation
·
and use of the buildings for which th~rmit is sought,
which use and s.itm of same is hereinafter described more
particularly, will not, under the circumstances of the
particular case, be detrimental to the health, safety,
peace, morals, comfort and general welfare of persons resid-
ing or working in the neighborhood of such proposed use,
and will not be detrimental or injurious to property and
improvements in the neighborhood or the general welfare of
the City, if the terms and conditions hereinafter set forth
are complied with concurrently With the issuance and exer-
cise of this permit and/or performance of same or adequately
secured as hereinafter set forth.
- 1 -
2. The Council orders that:
A. Use Permit to stand granted in phases: The Use
Permit for Planned Unit Development "B" (Commercial),
UP-85, in the Westborough-West Park #3 Planned Com-
munity District (Parcel A of Ordinance 575) shall
stand granted in the following phases (Phase 1,
Service Station Site, 0.459 acres, and Phase 2,
Food Market and Future Shop Site, 4.219 acres) when
the terms and conditions hereinafter set forth have
been met.
B. Definitions, Descriptions of Items of Work or Acts
To Be Performed and Plans:
The following paragraph sets forth definitions,
descriptions of items of work or acts to be performed
and plans, one or more of which are related to UP-85
and the respective phases thereof, and the same are
specifically made conditions of the respective phases
of said Use Permit as hereinafter set forth.
(1) "Security -Agreement" defined: "Security Agree-
ment'' means the agreement entitled "Agreement -
Securing Performance of Agreement of October 24,
1963, Re' Park-Recreation, Fire Station and
Public Library Sites in Westborough", entered
into between Caesar Callan Homes, Inc., et al,
and the City of South San Francisco on the Sth
day of June, 1967 (recorded in the Office of
the County Recorder, Volume 5322, pages 132
through 200).
(2) Park and Fire Station Sites: Complete the
grading and improvements for Parcel 1, Park-
Recreation Site, and Parcel 3, Fire Station-
Library Site as set forth in the "Security
Agreement" or provide therefor by way of an
- 2 -
executed contract between Permittees and a duly-
licensed contractor and the allocation of funds
for the payment of said work.
( 3 ) Plans:
a. Site Plan, Planned Unit "B", Westborough-West
Park Unit #3, Sheet No. 1, dated 7-2-68.
b. Preliminary Landscape Plan, Planned Unit
"B", Westborough-West Park Unit #3, Sheet
No. 2, dated 7-2-68.
c. Plan Food Market, PLanned Unit "B", Westborough-
West Park Unit #3, Sheet No. 3, dated 7-2-68.
d. Price Sign or Service Sign Sketched by Union,
dated 7-2-68.
e. No. 876 Sphere Sign Elevation.
f. General Arrangement Service Station No. 5841,
King Drive and Callan Boulevard, South San
Francisco, Drawing No. F3-5841-1.1, dated
6-27-68.
g. Building Elevations Service Station No. 5841,
King Drive and Callan Boulevard, South San
Francisco, California, Drawing No. 10F-432-A-1,
dated 6-27-68.
h. 21'-6"x47'-0" Canopy Elevations, Service
Station No. 5841, King Drive and Callan
Bo~ulevard, South San Francisco, California,
Drawing No. 10F-432-A-21, dated 6-27-68.
i. Landscaping Plan, Service Station Site No.
$841, King Drive and Callan Boulevard, South
San Francisco, California, Drawing No.
10F432, Sheet P-l, .~ated 6-~7~68.
(Copies of the aforegoing described plans are on file in the office of the City Planner and City Clerk)
j. Grant of Street and Highway Easement: A
grant of a street ov highway easement over
- 3 -
the parcel described in Exhibit "A" attached
hereto, free and clear of all liens, taxes
and encumbrances except those accepted by
City, and the allocation of funds for the
construction and i~provement of said right-
of-way to the standard of construction of
Callan Boulevard or equivalent security
approved by City.
C. Phase 1 of Use Permit 85 - Service Station Site,
0.459 Acres:
Phase 1 of Use Permit 85 for the Service Station Site,
consisting of 0.459 acres, skall stand granted on
the terms and conditions set forth as follows and
when designated conditions set forth below have been
complied with as specified:
(1) Conditions to be complied with before Phase 1
Stands Granted:
a. Parcel Map. A parcel map shall be submitted
and processed in accordance with the Business
and Professions Code of the State of California
and the Subdivision Ordinance of the City
together with a grant of street and highway
easement as set forth in Paragraph B Sub-
section (6)j above. The parcel map upon
meeting the said requirements, including the
submission of said documents and performance
of said acts, shall stand approved concur-
rently with the grar~t of Phase 1 of UP-85.
b. Plans, Final Form. Ail plans, specifications
and drawings shall be in complete and final
form in accordance with requirements of
Ordinance 575 and in particular said plans
shall be amended to include the location of
one fire hydrant as set forth in the inter-
office memorandum dated July 8, 1968, to the
- 4 -
City Planner from t[~e Fire Department,
subject "UP-85", and modification showing
driveway nearest the intersection of King
Drive and Callan Boulevard restricted to
right turn movements only as set forth in
the inter-office me]norandum dated July 9,
1968, to Dan Pass, City Planner, from Chief
of Police, subject "UP-85, West Park #3 -
Commercial."
c. Common Greens or Landscaped Open Areas of
Phase 1 Site. The site of Phase 1 (UP-85)
shall be annexed to the West Park, Parks and
Parkways Maintenance District or the Owners
and the proposed successors in interest shall
provide for same by adequate document and
complete the annexation prior to issuance of
a certificate of occupancy. No certificate
of occupancy shall >e issued by the Building
Department until the annexation has been
completed.
The portions of the parcel composing
the open landscaped areas of the Phase 1 site
shall be maintained in accordance with the
approved landscape plan and concurrently with
the issuance of Phase 1 use permit, owners
shall grant City a revocable permit to enter
upon and maintain the landscape planting in
the designated landscaped open areas of the
site of Phase 1, the purpose of such permit
being to give City sufficient right in said
areas to legally service said areas as part of
the tax obligation of the maintenance district
to which it is being annexed. Revocation may
be exercised by owners filing with City
- $ -
sixty (60) days prior to the date of revoca-
tion a notice to revoke, together with an
agreement and surety bond assuring main-
tenance in accordance with the approved land-
scape plan. The principal sum of the bond
shall not be less than the sum necessary to
so maintain the open landscaped areas for
a period of three (3) years and shall be
renewed each three years thereafter sixty
(60) days prior to vhe expiration thereof.
If revocation is made or for any other
reason City is required to discontinue service
to said open landscaped areas, then City as an
alternate means of insuring such maintenance
may proceed as set forth in Exhibit "B"
attached hereto.
Landscape plans shall be implemented in
form and content as required by the Landscape
Specialist and City Planner pursuant to
Ordinance 575 and Resolution No.4583, passed
the 5th day of December, 1966, and the cost of
construction and installation shall be estab-
lished, which sum sha[i be deposited to secure
and/or fund said construction and installation
and to assure the maintenance of said land-
scape planting for ~he maintenance period of
sixty (60) days after acceptance of
same by City for the West Park, Parks and
Parkways Maintenance District.
d. Park and Fire Station Site. Perform the
work or provide therefor as set forth in
Paragraph 2 Subsection B(2) above.
(2) General Conditions:
a. Compliance with Plans. The location, main-
tenance and use of improvements (including
- 6 -
landscape planting) shall comply with the
applicable plans hereinbefore described except
that (1) the driveway nearest the intersection
of King Drive on CaLlan Boulevard shall be
and is hereby restricted to only right-turn
movements and (2) no towing, and/or storage
of wrecked, impounded or abandoned vehicles
or unrelated service station activities shall
be conducted on said site.
D. Phase 2 of Use Permit 85 - Food Market and Future
Shop Site (4.219 Acres):
Phase 2 of Use Permit 85 for the Food Market and
Future Shop Site (4.219 acres) shall stand granted
when the terms and conditions set forth in (1) below
have been met and then on the terms and conditions
set forth in (2) below.
(1) Conditions to be complied with before Phase 2
stands granted.
a. Parcel Map. A parcel map shall be submitted
and processed in accordance with the Business
and Professions Code of the State of California
and the Subdivision Ordinance of the City
together with a grant of easements and the
performance of improvement work necessary to
serve said parcel and the allocation of funds
or security therefor.
b. Plans, Final Form. Ail plans, specifications
and drawings (including but not limited to
landscape plans and architectural plans) shall
be reviewed by the City Planner and be in
complete and final form in accordance with the
requirements of Ordinance 575 and Resolution
No. 4583, passed the 5th day of December,
1966, and in particular said plans shall be
amended to include the location of one fire
- 7 -
hydrant as set fort?, in the inter-office
memorandum dated July 8, 1968, to the City
Planner from the Fire Department, subject
"UP-85", and modification showing driveway
nearest the intersection of King Drive and
Callan Boulevard restricted to right-turn
movements only as set forth in the inter-office
memorandum dated July 9, 1968, to Dan Pass,
City Planner, from Chief of Police, subject
"UP-85, West Park #3 - Commercial."
c. Common Greens or Lar.dscaped Open Areas of
Phase 2 Site. The site of Phase 2 (UP-85)
shall be annexed to the West Park, Parks and
Parkways Maintenance District. No use permit
shall issue until tke annexation has been
completed. The portions of the parcel compris-
ing the open landscaped areas of the Phase 2
site shall be maintained in accordance with
the approved landscape plan and concurrently
with the issuance of the Phase 2 of this use
permit, owners shall grant City a revocable
permit to enter upor. and maintain the land-
scape planting in tke designated landscaped
open areas of the site of Phase 2, the purpose
of such permit being to give City sufficient
right in said areas to legally service said
areas as part of the tax obligation of the
maintenance district to which it is being
annexed. Revocation may be exercised by
owners filing with City sixty (60) days prior
to the date of revocation a notice to revoke,
together with an agreement and surety bond
assuring maintenance in accordance with the
approved landscape plan. The principal sum
- 8 -
of the bond shall not be less than the sum
necessary to so maintain the open landscaped
areas for a period of three (3) years and
shall be renewed eack three years thereafter
sixty (60) days prior to the expiration thereof.
If revocation is made or for any other reason
City is required to discontinue service to
said open landscaped areas, then City, as an
alternate means of assuring such maintenance,
may proceed as set forth in Exhibit "B"
attached hereto.
Landscape plane shall be implemented in
form and content as required by the Landscape
Specialist and City Planner pursuant to
Ordinance 575 and Resolution No. 4583, passed
the Sth day of December, 1966, and the cost
of construction and installation shall be
established, which sum shall be deposited
to secure and/or fund said construction and
installation and to assure the maintenance of
said landscape planting for the maintenance
period of sixty (60) days after acceptance
of same by City for the West Park, Park and
Parkways Maintenance District.
d. Park and Fire Statior. Site. Perform the
work or provide therefor as set forth in
Paragraph 2 Subsecticn B(2) above.
e. Westborough Boulevard Emergency Repairs.
Remit the proportion of costs chargeable
to Caesar Callan Homes, Inc.
f. Parking. Establish the required parking for
said phase by way of a supplemental parking
plan approved by the City Planner.
- 9 -
(2) General Conditions:
a. Compliance with Plans. The location, main-
tenance and use of the improvements (including
landscape planting) shall comply with the
applicable plans hereinbefore described and
amendments thereof ordered by the Planning
Commission, except that (1) the driveway
nearest the intersection of King Drive
(for Phase 1) on Callan Boulevard shall be
and is hereby restricted to only right-turn
movements and (2) no towing, and/or storage
of wrecked, impounded or abandoned vehicles
or unrelated service station activities
shall be conducted on said site.
3. The terms and conditions of this use permit may be revised
or modified by appropriate proceedino=s before the Planning
Commi s s ion.
I hereby certify that the foregoing Resolution was
regularly introduced and adopted by the City Council of the
City of South San Francisco at a regular meeting
held on the 16th day of September , 19 68 , by
the following vote:
AYES, COUNCILMEN ~'~nk J. Bertucelli, Patrick E. A~ern, Andrew Rocca,
and Warren Steinkamp.
NOES, " F. Frank Mammini.
ABSENT, " None.
ATTEST :d~L~. ,~~
City Clerk ~
- 10 -
EXHIBIT A
UP-85
RESOLUTION NO. ~935
Gmant of an easement fom stmeet om highway pumposes ovem
the pamcel descmibed~as follows:
ALL THAT CERTAIN REAL PROPERTY SITUATE IN THE CITY OF SOUTH SAN FRANC[S'~
COUNTY OF SAN MATEDs STATE OF CALIFORNIAs DESCRIBED AS FOLLOWS:
BEGINNING FOR REFERENCE AT THE INTERSECTION OF THE CENTERLINE OF
CARTER DRXVE WITH THE CENTERLINE OF CALLAN BOULEVARD, FORMERLY OAKNONT
DRIVEs AS SAID DRIVES ARE SHOWN ON THAT CERTAIN MAP ENTITLED
"WESTBOROUGH-WEST PARK. UNIT NO. 2s SOUTI~ SAN F~ANCISCOs SAN laATEO
COUNTYs CALIFORNIA"s FILED IN Tile OFFICE OF THE RECORDER OF THE COUNTY
OF SAN MATED· STATE OF CALI=ORNIA ON NOVEMBER 19s 196h· IN BOOK $1 OF
MAPS· AT PAGES 17· 18s AND 19; THENCE ALOMG SAID CENTERLINE OF CALLAN
BOULEVARD NORTH ~0° 10' 25" WEST (NORTH 28° 58' WEST HAP) 197.60 FEET;
LEAVING SAID CENTERLINE AT RIGHT ANGLE NORTH ~9~ hg' ~" EAST; ~2.00
FEET TO THE TRUE POINT OF BEGINNING IN 'HE NORTHEASTERLY L~NE OF SAID
CALLAN BOULEVARD; THENCE FROM SAID TRUE 'POINT OF BEGINNING ALONG SAID
NORTHEASTERLY LINE OF"CALLAN BOULEVARD NORTH ~0° t1~' 25" WEST (NORTH
~8° 58' WEST MAP) 169.~6 FEET TO A POIN- IN THE SOUTHERLY LINE OF THE
1.00 FOOT STRIP OF LAND OF THE CITY OF DALY CITY AS SHOWN ON THAT
·
CERTAIN MAP ENTITLED "SERRAMONTE UNIT NO. 1, DALY CITYs SAN MATED COUNT
CALIFORNIA" FILED IN THE OFFICE OF THE RECORDER OF THE COUNTY OF SAN
MATED, STATE OF CALIFORNIA ON OUNE 17s 1965, IM .BOOK 62 OF MAPS, AT PAG
'- 29· ~0s AND ~l~ SAID LINE BEING ALSO THE SOUTHERLY BOUNDARY LINE OF SA~
..MAP OF' SERRAMONTE· UNIT NO. 1~ THENCE ALONG LAST SAID LINE NORTH-
EASTERLY FROM A TANGENT BEARIMG NORTH 7'~° 21~ 58" EASTs ON THE ARC OF A
'i~. i!. CURVE TO THE RIGHT WITH A RADIUS OF 600.00 FEET· SUBTENDING A CENTRAL
ANGLE OF ~o 50' 18" AN AI%C DISTANCE OF 61 It~ F~ET TO A POINT OF
· ·
COMPOUND CURVATURE; LEAVINC, SAID LINE S:)UTHWESTERLY· SOUTHERLY AND
SOUTHEASTERLY FROM A TANGENT BEARING SOJTH 79e 12' 16" WEST ON THE ARC
OF A CURVE TO THE LEFT WITH A RADIUS OF ~0.00 FEETs SUBTENDING A
CENTRAL ANCLE OF 109° ~1' ~0" AN ARC DISTANCE OF 57 ~5 FEET TO A POIN3
OF COMPOUND CURVATUEEj SOUTHEASTERLY· F{OM A TANGENT BEARING SOUTH
19~ 2~" EAST ON THE ARC OF A CURVE TO T~E LEFT
FEET~ SUBTENDING A CENTRAL ANGLE OF 9° 3[~ 0Z"~ AN ARC D~$TANCE OF
121,72 FEET TO THE TRUE. POINT OF BEG[NN[NG,
Iii
EXHIBIT B
UP'8$
RESOLUTION E0. 4935
'L~ND'SCAPED''~REAS ''F~'I'NTENANCE
The City Planner annually or or before the''l'St'h day'of
January ''' shall inspect the landscaped areas for the
purpose of determining whether said areas are being maintained
to the standards set forth on the approved landscape plan.
The City Planner' upon completing the inspection shall file a
report with the Planning Commission, and the Planning Commission,
·
upon considering said report, shall make a determination as to
whether remedial work is required; and if none is required~
make such an order filing a. copy thereof with the City Planner
and City Clerk; but if remedial work should be required, then
said COmmission shall set a hearing for the determination of the
amount of the remedial work required and the cost thereof,
giving notice of said hearing to the owners. The notice shall
inform the owners that the landscaped areas are deficient or are
being maintained in a manner not consistent with the approved
landscape plan, specifying wherein said areas are deficient
or do not so comply, and said notice shall further require that
the owners perform the remedial work or file a schedule of work
which will remedy the deficiency within thirty days after receipt
of said notice., Should the owners fail to perform the remedial
work or file such a schedule, then Che Planning Commission may,
after closing the hearing, order the.remedial work done and
assess the cost thereof against the property, collecting the
~said sum by way. of an action .in the court with jurisdiction
thereof or filing said charge as a lien against the property.