HomeMy WebLinkAboutReso RDA 66-1985 RESOLUTION )~0. 66
REDEVELOPblENT A~ENCY OF THE CITY OF SOUTH SAN FRANQISCO,
STATE OF CALIFORNIA
A RESOLUTION SUBMITTING THE PROPOSED REDEVELOPMENT PLAN
TO THE CITY COUNCIL, AND CONSENTING TO AND REQUESTING
CITY COUNCIL TO CALL A JOINT PUBLIC HEARING ON THE PROPOSED
REDEVELOPMENT PLAN FOR THE SOUTH SAN FRANCISCO. U.S. STEEL
PLANT SITE REDEVELOPMENT PROJECT
WHEREAS, the Redevelopment Agency of the City of sou~ch' san Francisco
has prepared a proposed Redevelopment Plan for the South San Francisco U.S.
Steel Plant Site Redevelopment Project; and ~
WHEREAS, the Agency will submit the proposed Redevelopment Plan to the
Planning Commission of the City of South San Francisco for its report and recom-
mendation; and
WHEREAS, pursuant to the California Environmental Quality Act, the
State CEQA guidelines and the local procedures adopted pursuant thereto, the
Agency has prepared and is circulating a Draft Environmental Impact Report for
the Project, and on the basis of comments received, will prepare a final
Environmental Impact Report for the Project; and
WHEREAS, pursuant to Section 33352 of the California Community
Redevelopment Law (Health and Safety Code Section 33000 et seQ.) the Agency has
prepared 'a Report to the City Council on the proposed Redevelopment Plan; and
WHEREAS, Section 33355 of the California Community Redevelopment Law
authorizes a joint public hearing on the proposed Redevelopment Plan with the
consent of the Agency and the City Council of the City of South San Francisco.
NOW, THEREFORE, BE IT RESOLVED by the Redevelopment Agency of the City
of SoUth San Francisco that:
1. The Agency hereby approves its Report to the South San Francisco
City Council on the proposed Redevelopment Plan for the South San Francisco U.S.
Steel Plant Site Redevelopment Project, in the form attached hereto.'
I !
2. The Agency hereby sut~its the proposed Redevelopment Plan for the
South San Francisco U.S. Steel Plant Site Redevelopment Project and the Agency's
Report on the proposed Redevelopment Plan to the City Council in the forms
attached hereto.
3o The Agency hereby consents to a joint public hearing on the pro-
posed Redevelopment Plan for the Project, and requests the City Council to call
a joint public hearing of the Agency and the City Council at such time as it may
determine in the Municipal Services Building, Community Room, 33 Arroyo Drive,
South San Francisco, California, to consider and act upon the proposed
Redevelopment Plan and all documents and evidence 'pertaining thereto.
4. The Executive Director of the Agency shall, in cooperation with the
Clerk of the City of South San Francisco, prepare, publish and mail Such notices
and documents and do all other acts as may be necessary to carry out the pur-
poses of this resolution.
I hereby certify that the foregoing Resolution was regularly introduced
'and adopted by the Redevelopment Agency of the City of South San Francisco at a
regular meeting held on the 12th day of June, 1985 by the following-vote:
'
AYES: Chairman Richard A, Halley; Vice Chairperson Roberta Cerri Teqlia;
Member Mark N, AddiegO; Nember GuS Nicoi°pulos
NOES: NONE
.. ABSEIIT: Member Emanue!e N. Damont6 U~ed~vel~[~le~t
Chairma(n, l~ p rg~q y
of the City of South San ~r~cisco
Redevelopment. Agency of.the
City of South San Francisco
r
O3O885
rdaJNMC5
REDEVELOPHENT PLAN
FOU THE
SOUTH SAN FF~/~CI$CO
U.S. STEEL PLANT SITE
Adopted:
Ordinance No:
SOUTH SAN FRANCISCO REDEVELOPME~ AGENCY
SOUTH SAN.FRANCISCO, CALIFORNIA
__ " TABLE .OF CONTENTS
PAGE
I. [~100] INTRODUCTION .............. 1
II. [§200] PROJECT AREA BOUNDARY AND LEGAL
DESCRIPTION ............... 3
III. [§300] PROPOSED REDEVELOPMENT ACTIVITIES ....
A. [§301] Gemeral ...............
B. [§302] Owner Participation and Business
Re-Entry Preferences ........ 4
1. [~303] Opportunities for Owner
Participation ..... · ..... 4
2. [§304] Preferences for Persons Engaged
in Bustnes.s in the Project Area. 5
3. [§305] Participation Agreements .... 5
4. [§306] Implementing Rules ....... 6
C. [§307] Property Acquisition ........ 6
1. [§308] Acquisition of Real PFoperty . . 6
D. [§309] Property Management ......... 6
E. [§310] Payments to Taxing Agencies to
Alleviate Financial Burden ..... 6
F. [§311] Demolition, Clearance, Public
Improvements, Building and Site
o Preparation ............. 6
1. [§312] Demolition and Clearance .... 6
2. [§313] Public Improvements ....... 7
3. [§314] Preparation of Building Sites.. 7
G. [§315] Real Property Disposition and
Development ............ 7
1. [§316] General ............. 7
2. [§317] Disposition'and Develop-
ment Documents ....... 8
3. '[§318] Development by the Agency
or Other Public Bodies or
Entities .......... 8
4. [§319] Development Plans ........ 9
H. [§320] Cooperation with Public Bodies . . . 9
-i-
PAGE
I. [§321] Low or Moderate Income Housing . . . 10
1. [§322] Authority Generally ....... -10
2. [§323] Increased and Improved Supply· . 10
3. [§324] New or Rehabilitated Dwelling
Units Developed Within Project
Area ............. ._ 11
4. [§325] Duration of Dwelling Unit
Availability '12
IV. [§400] LAND USES AND DEVELOPMENT REQUIREMENTS . 13
A. [§401] Redevelopment Plan Map and Major
Project Area Land Uses ........ 13
B. [§402] Other Land Uses ........... 13
1. [§403] Public Rights-of-Way ....... 13
2. [§404] Other Public, Quasi-Public,
Institutional and Non-Profit
Uses .............. 14
[§405] I ri Us '14
C. rite m es ...... . .....
D. [§406] General Controls and Limitations . . 14
1. [§407] Construction ........... 14
2. [§408] Limitation on the Number
of Buildings .......... 15
3. [§409] Number of Dwelling Units .... 15
4. [§410] Limitations on Type, Size and
Height of Buildings.' ..... · 15
5. [§411] Open Spaces, Landscaping, '
Light, Air and Privacy ..... 15
6. [§412] Signs .............. 15
7 [§413] Utilities 15
8. [§414] Incompatible Uses ........ 15
.. 9. [§415] Non-Discrimination and
Non-Segregation ......... 16
10. [§416] Subdivision of Parcels ..... 16
11. [§417] Building Permits ........ 16
E. [§418] Design Guide · . ........... 16
V. [§500] .METHODS OF FINANCING THE PROJECT .... 17
A. [§501] General Description of the Proposed
Financing Method .......... 17
B. [§502] Tax Increment Funds ......... 17
-ii-
PAGE
[§503]' Age cy'B ds 19
C. ~ on ............
D. [~504] Time Limits on Establishment of
Indebtedness .......... , . 19
E. [~505] Other Loans and Grants ....... 19
VI. [~600] ACTIONS BY THE CITY ........... 20
VII. [§700] ENFORCEMENT ............... 22
VIII. [§800] DURATION OF THIS PLAN .......... 23
IX. [~900] PROCEDURE FOR AMENDMENT ......... 24
EXHIBIT "A" REDEVELOPMENT PLAN MAP
EXHIBIT "B" LEGAL DESCRIPTION OF PROJECT AREA
EXHIBIT "C" PROPOSED PUBLIC IMPROVEMENTS AND FACILITIES PROJECTS
-iii-
REDEVELOPMENT PLAN
FOR THE
SOUTH SAN FRANCISCO
U.S. STEEL PLANT SITE
REDEVELOPMENT PROJECT
I. [§100] INTRODUCTION
This is the Redevelopment Plan (the 'Plan') for the South San Francisco
Redevelopment Project (the "Project") in the City of South San Francisco (the
"City'), County of San Mateo, State of California. This Plan consists of text
(Sections 100 through 900), the Redevelopment Plan Map (Exhibit 7A~), a Legal
Description of the Project Area (Exhibit "B"),. and the Proposed Public
Improvements and Facilities Projects (Exhibit 'C'). This Plan was prepared by
the South San Francisco Redevelopment Agency (the "Agency') pursuant to the
Community Redevelopment Law of the State of Calif.ornia (Health and Safety
Code, Section 33000 et seq.; all statutory references hereinafter shall be to
the Health and Safety Code unless otherwise designated), the California
Constitution, and all applicable local c6des and'ordinances.
The project area (the "Project Area") includes all properties within the
Project boundary shown on the Redevelopment Plan Map and described in the
Legal Description of the Project Area.
The proposed redevelopment of the Project Area as described in this Plan
conforms to the General Plan for the City of South San Francisco, as applied
in accord with local codes and ordinances.
This Redevelopment Plan is based upon the Preliminary Plan formulated and
adopted by the Planning Commission of the City of Sodth San Francisco (the
'Planning Commission") on January 24, 1985.
' This Plan provides the Agency with powers, duties and obligations to
implement and further the program generally formulated in this Plan for the
redevelopment and revitalization of the Project Area. This Plan does not
present a specific plan or establish priorities for specific projects for the
redevelopment and revitalization of any particular area within the Project
Area. Instead, this Plan presents a process and a basic framework within
which specific development plans will be presented, priorities for specific
projects will be established, and specific solutions will be proposed, and by
which tools are provided to the Agency to fashion, develop, and proceed with
such specific plans, projects, and solutions.
In general, the goals and objectives of a redevelopment program in the
Project Area are as follows:
1. The elimination and prevention of blight and deterioration
and the redevelopment of the Project Area in accord with
the General Plan, specific plans, the Redevelopment Plan
and local codes and ordinances.
2. The elimination or amelioration of certain environmental
deficiencies, including substandard vehicular circulation
systems; disposal or handling of hazardous materials;
inadequate water, sewer and storm drainage systems; and
other similar public improvements, facilities and
utilities deficiencies adversely afffecting the Project
Area.
3. The achievement of an environment reflecting a high level
of concern for architectural, open space, landscape, and
urban design and land use principles appropriate for
attainment of the objectives of this Redevelopment Plan.
4. The replanning, redesign and development of undeveloped/
vacant areas which are stagnant or improperly utilized.
5. The encouragement of investment by the private sector in
the development and redevelopment of the Project Area 'by
eliminating impediments to such development and
redevelopment.
6.The creation and development of local job opportunities to
replace the Project Area's defunct employment base.
7. The provision for increased sales, business' license, hotel
occupancy and other fees, taxes and revenues to the City.
8. The establishment of a conference center to serve the
needs of San Mateo County and surrounding areas.
9. The creation of increased cultural and recreation oppor-
tunities for visitors as well as area residents, particu-
. larly maximizing the potential offered by the waterfront.
10. The expansion of the community's supply of housing,
including opportunities for low- and moderate-income
" households.
Redevelopment of the Project Area pursuant to this Plan and the above
goals and objectives will attain the following purposes of the California
Community Redevelopment Law: (1) through' the installation of new or replace-
ment of existing public improvements, facilities and utilities in areas which
are currently inadequately served with regard to such improvements, facilities
and utilities; (2) by the replanning, redesign and/or development of areas
which are stagnant or improperly utilized, and which could not be accomplished
by private enterprise acting alone without public participation and assist-
ance; and (3) by protecting and promoting sound development and redevelopment
of blighted areas and general welfare of the citizens of the City by remedying
such injurious conditions through the employment of appropriate mean~.
-2-
II. [§200] PROJECT AREA BOUNDARY AND LEGAL DESCRIPTION
The boundary of the Project Area is shown on the Redevelopment Plan Map
attached as Exhibit ~A", and is described in the Legal Description of. Project
Area attached as Exhibit "B~.
-3-
III. [§300] PROPOSED REDEVELOPMES~ ACTIVITIES
A. [§301] General
The Agency proposes to eliminate and prevent the spread of blight
and blighting influences, and to strengthen the economic base of the Project
Area and the community by:
(1) Permittin~ participation in the redevelopment process by
owners of properties located in the Project Area, consist-
ent with this Plan and rules adopted by the Agency;
(2) Acquisition of real property;
(3)Management of property under the ownership and control of
the A~ency;
(4) Demolition or removal of buildings and improvements;
(5) Installation, construction, or reconstruction of streets,
utilities, and other public facilities and improvements;
(6) Disposition of property for uses in accordance with this
Plan;
(7)Redevelopment of land by private enterprise and public
agencies for uses in accordance with this Plan;
(8) Development or construction of low and moderate i~come
housing within the Project and/or the City; and.
(9) Providing for the retention of controls and establishment
of restrictions or covenants running with the land so that
' property will continue to be used in accordance with this
Plan.
.· In the accomplishment.of these activities, and in the implementation
and furtherance of this Plan, the Agency is authorized to use all the powers
provided in this Plan and all the powers to the extent now or hereafter
permitted by law, which powers are not expressly limited by this Plan.
B. [§302] Owner Participation and Business Re-Entry Preferences
1. [§303] Opportunities for Owner Participation
The Agency is authorized to permit persons who are owners of
commercial and other types of real property in the Project Area to be given
the opportunity to participate in redevelopment by new development by retain-
ing all or a portion of their properties, by acquiring adjacent.properties
from.the Agency or by purchasing other properties in the Project Area.
-4-
Persons and firms who own property within 'the Project Area
shall be afforded the opportunity to retain and redevelop their p~operties
consistent with the objectives and proposals of this Plan and implementation
rules adopted by the A§ency.
In addition to opportunities for participation by. individual
persons and firms, participation to the extent it is feasible shall be avail-
able for two or more persons, firms or institutions, to j6in together in
partnerships, corporations, or other Joint entities.
Participation opportunities shall necessarily be subject to and
limited by factors including but not limited to the following: (1) the elim-
ination and changing of some land uses; (2) the construction, .realignment,
abandonment, widening, opening and/or other alteration or elimination of
rights-of-way; (3) the removal, relocation, and/or installation of public
utilities and public facilities; (4) the ability of participants to finance
the proposed acquisition or development in accordance with the Redevelopment
P%an; (5) the ability and experience of participants to undertake'and complete
the proposed development; (6) any reduction in the total number of individual
parcels in the Project Area; (7) the' construction or expansion of public
improvements and facilities, and the necessity to assemble areas for such; (8)
any change in orientation and character of the Project Area; and (9) the
_ necessity to assemble areas for public and/or private development.
2. [~304] Preferences for Persons Engaged.in Business in the
Project Area
The Agency shall extend reasonable preferences to persons who
are engaged in business in the Project Area to re-enter in business within the
redevelopment area if they otherwise meet the requirements prescribed by this
Plan.
3. [§305] Participation Agreements
The Agency may require that, as a condition to participate in
redevelopment, each participant shall enter into a binding agreement with the
AgencY'by which the participant, agrees to acquire, develop or use the property
in conformance with this Plan and to be subject to provisions hereof. In such
agreements, participants who retain real property may be required to join in
the recordation of such documents as is necessary to make the provisions of
this Plan applicable to their properties~ In the event an owner or partici-
pant fails or refuses to develop, or use and maintain, its real property
pursuant to this Plan and a participation agreement, the real property or any
interest therein may be acquired by the Agency and sold or leased for develop-
ment in accordance with this Plan.
Whether or not a participant enters into a participation agree-
ment with the Agency, the provisions of this Plan are applicable to all public
and private property in the Project Area.
-5-
4. [§306] Implementing Rules
The provisions of Sections 302 through 305 shall be implemented
according to the rules adopted by the Agency prior to the approval of this
Plan, and the same may be from time to time amended by the Agency.
C. [§307] Property Acquisition
1. [§308] Acquisition of Real Property
The Agency may acquire, but is not required to acquire, any
real property located in the Project Area by gift, devise, exchange, lease,
purchase, or any other lawful method including eminent domain. The Agency is
also authorized to acquire any other interest in. real property less than a.
fee. The Agency shall not acquire property to be retained by an owner
pursuant to a participation agreement if the owner fully performs under the
agreement.
D. [§309] Property Management
During such time as property, if any, in the Project Area is owned
by the Agency, such property shall be under the management and control of the
Agency. Such property may be rented or leased by the Agency pending its
disposition for redevelopment, and such rental or lease shall be pursuant to
such policies as the Agency may adopt.
E. [§310] Payments to Taxing Agencies to AlleViate Financial Burden
Subject to the provisions of Section 33401 of the Community Redevel-
opment Law, the Agency may make the payments spe.cifie~ in this Section 310.
In any year during which it owns property in the Project Area, the Agency is
authorized, but not required, to pay directly to any City, County, City and
Couqty, District, including, but not limited to, a School District, or other
public corporation for whose benefit a tax would have been levied upon such
property, had it not been exempt, an amount of money in lieu of taxes. The
Agency may also pay to any taxing agency with territory located within the
Project Area (other than the City), any amounts of money which, in the
A~ency's determination, are appropriate to alleviate any financial burden or
detriment caused to such taxing agency by the Project.
F. [§311] Demolition, Clearance, Public Improvements, Building and
Site Preparation
1. [§312] Demolition and Clearance
The Agency is authorized to demolish and clear buildings,
structures, and other improvements from any real property in the Project Area
as necessary to carry out the purposes of this Plan.
-6-
2. [§313] Public Improvements
The Agency is authorized to install and construct~ or Go cause
to be installed and constructed, the public improvements, facilities and
utilities (within or outside the Project Area) necessary, to carry out this
Plan. Such public improvements, facilities and utilities include, but are not
limited to, the following: (1) over- and under-passes; (2) sewers; (3) storm
drains; (4) electrical, natural gas, telephone and water distrfbution systems;
(5) parks and plazas; (6) playgrounds; (7) parking and transpoytation facili-
ties; (8) landscaped areas; (9) street and circulation improvements; and (10)
flood control improvements and facilities. Specifically, the Agency may pay
for, install, or construct, and may acquire or pay for the land required
therefor,.the facilities, buildings, and structures set forth in Exhibit "C",
Proposed Public Improvements and Facilities Projects, attached hereto and 'made
a part hereof.
3. [§314] Preparation of Building Sites.
The Agency is authorized to prepare, or cause to be prepared,
as building sites any real property in 'the Project Area owned by the Agency.
The Agency is also authorized to construct foundations, platforms, and other
structural forms necessary for the provision or utilization of air rights
sites for buildings to be used for commercial, public, and other uses provided
in this Plan.
Prior consent of the City Council is ~equired for the Agency to
develop sites for commercial or industrial use by providing streets, side-
walks, utilities or other improvements which an owner or operator of the site
would otherwise be obliged to provide.
G. [§315] Real Property Disposition and Development
1. [§316] General
For the purposes of this Plan, the Agency is authorized to
sell, lease, exchange, subdivide, transfer, assign, pledge, encumber by
mortgage or deed of trust, or otherwise dispose of any interest in real
property. The Agency is authorized to dispose of real property by negotiated
lease, sale, or transfer without public bidding but only after public hearing.
Before any interest in real property of the Agency acquired in
whole or in part, directly or indirectly, with tax increment moneys is sold,
leased, or otherwise .disposed of for development pursuant to this Plan, such
sale, lease or disposition shall be first approved by the City Council after
public hearing in conformance with .Section 33433 of the Community Redevelop-
ment Law.
All real property acquired by the Agency in the Project Area
shall be sold or leased to public or private persons or entities for develop-
ment for the uses permitted in this Plan. Real property may be 'conveyed by
the A~ency to the City and, where beneficial to the Project Area, to any other
public body without charge or for an amount at less than fair value.
-7-
Ail purchasers or lessees of property from the Agency shall be
made obligated to use the property for the purposes designated in this Plan,
to begin and complete development Of the property within a period of time
which the Agency fixes as reasonable, and to comply with other conditions
which the Agency deems necessary to carry out the purposes of this Plan.
2. [§317] Disposition and Development Documents
The Agency shall reserve powers and controls in disposition and
development documents as may be necessary to prevent transfer, retention, or
use of property for speculative purposes and to insure that development is
expeditiously carried out pursuant to this Plan.
To provide adequate safeguards to ensure that the Provisions of-
this Plan will be carried out and to prevent the recurrence of blight, all
real property sold, leased, or conveyed by the Agency, as well as all property
subject to participation agreements, shall be made .subject to the provisions
of. this Plan by leases, deeds, contracts, agreements, declarations' of restric-
tions, provisions of the zoning ordinance, conditional use permits, or other
means. ~here appropriate, as determined by the Agency, such documents or
portions thereof shall be recorded in the Office of the Recorder of the County.
__ The leases, deeds, contracts, agreements, and declarations of
restrictions may contain restrictions, covenants, covenants running with the
land, rights of reverter, conditions subsequent, equitable servitudes, or any
other provision necessary to carry out this Plan.
All property in the Project Area is hereby subject to the
restriction that there shall be no discrimination or segregation based upon
sex, marital status, race, color, religion, national origin, or ancestry in
the sale, lease, sublease, transfer, use, occupancy, tenure, or enjoyment of
property in 'the Project Area. All property sold, leased, conveyed, or subject
to ~ participation agreement, by or through the Agency, shall be expressly
subject by appropriate documents to the restriction that all deeds, leases, or
contracts .for the sale, lease, sublease, or other transfer of land in the
Project Area shall contain such non-discrimination and non-segregation clauses
as.are' required by law.
3. [§318] Development by the Agency or Other Public Bodies or
Entities
To the extent now or hereafter permitted by law, the Agency
may, with the consent'of the City Council of the City of South San Francisco,
pay all or part of the value of the land for and the cost of the installation
and construction of any building, facility, structure, or other improvement
which is publicly owned either within or outside the Project Area, if the City
-.. Council determines: (1) that such buildings, facilities, structures, or other
improvements are of benefit to the Project Area or the immediate neighborhood
in which the Project is located, regardless of whether such improvement is
within, another project area; and (2) that no other reasonable means of
financing such buildings, facilities, structures, or other improvements are
available to the community. Such determinations by the Agency and the City
Council shall be final and conclusive.
Specifically, the Agency may pay all or part of the value of
the land for and the cost of the installation and construction of a~y build-
ing, facility, structure or other improvement set forth in Section 311 of this
Plan, and in Exhibit "C," Proposed Public Improvements and Facilities'Projects.
When the value of such land or the cost of the installation and
construction of such building, facility, structure, or other_improvement, or
both, has been, or will be paid or provided for initially by the.City or other
public corporation, the Agency may enter into a contract w~th the City or
other public corporation under which is agrees to reimburse the City or other
public corporation for all or part of the value of such land or all or part of
the cost of such building, facility, structure, or other improvement, or both,
by periodic payments over a period of years.
The obligation of the Agency under 'such contract shall consti-
tute an indebtedness of the Agency for the purpose of carrying out the
redevelopment project for the Project Area, which .indebtedness may be made
p~yable out of taxes levied in the Project Area and allocated ~o the Agency
under subdivision (b) of Section 33670 of the California Redevelopment Law and
Section 502 of this Plan, or out of any 6ther available funds.
In a case where such land has been or will be acquired by, or
the cost of the installation and construction of such building, facility,
structure or other improvement has been paid by, a parking authority, joint
powers entity, or other public corporation to provide a building, facility,
structure, or other improvement which has been or will be leased to the City
such contract may be made with, and such reimbursement may be made payable to,
the City.
Before the Agency commits to use .the portion of taxes to be
allocated and paid to the Agency pursuant to subdivisioh (b) of Section 33670
for the purpose of paying all or part of the value of the land for, and the
cost of the installation and construction of, any publicly owned building,
oth%r than parking facilities, the City Council shall hold a public hearing.
4. [§319] Development Plans
All development plans (whether public or private) shall be
processed in the manner provided by applicable City codes as they are or as
they may be amended from time to time. Ail development in the Project Area
must conform to City and Agency design review procedures.
H. [§320] Cooperation with Public Bodies
Certain public bodies are authorized by state law to aid and
cooperate with or without consideration in the planning, undertaking,
construction, or operation of this Project. The Agency may seek the aid and
cooperation of such public bodies and attempt to coordinate this Plan with the
activities of such public bodies in order to accomplish the purposes of
redevelopment and the highest public good.
-9-
The Agency, by law, is not authorized to acquire real property owned
by public bodies without the consent of such public bodies. The Agency,
however, will seek the cooperation Of all public bodies which own or intend to
acquire property in the Project Area. Any public body which owns or leases
property in the Project Area will be afforded all the priv&leges of owner and
tenant participation if such public body is willing to enter into a. participa-
tion agreement with the Agency. Ail plans for development of property in the
Project Area by a public body shall be subject to Agency approval.
The Agency may impose on all public bodies the planning and design
controls contained in this Plan to ensure that present uses and any future
development by public bodies will conform to the requirements of this Plan.
The Agengy is authorized to financially (and otherwise) assist any public
entity in the cost of public land, buildings, facilities, structures, or other
improvements (within or outside the Project Area) which land, buildings,
facilities, structures, or other improvements are of benefit to the Project.
I. [§321] Low or Moderate Income Housing
1.' [§322] Authority Generally
The Agency may, inside or outside the Project Area, acquire
land, improve sites, or construct or rehabilitate structures in order to
provide housing for persons and families of low. or moderate income. The
Agency may also provide subsidies to, or for the benefit of, such persons and
families or households to assist them in obtaining housing. The Agency may
also sell lease, grant, or donate real property 6wned or acquired by the
Agency to the South San Francisco Housing Authority and. may otherwise coop-
erate with the Housing Authority in carrying out the provisions of Section 323
herein below.
2. [§323] Increased and Improved Supply
Pursuant to Section 33334.2 of the Community Redevelopment Law,
not less than 20 percent of all taxes which are allocated to the Agency pur-
suant to subdivision (b) of Section 33670 of the Community Redevelopment Law
and section 502 of this Plan s~all be used by the Agency for the purposes of
increasing and improving the City's supply of housing for persons and families
of very low, iow, or moderate income unless one or more of the following find-
ings are made: (1) that no need exists in the City, the provision of which
would benefit the Project Area to improve or increase the supply of housing
for persons and families of iow or moderate income or very low income house-
holds; or (2) that some stated percentage less than 20 percent of the taxes
which are allocated to the Agency pursuant to Section 502 is sufficient to
meet such housing need; or (3) that a substantial effort to meet iow and
moderate income housing needs in the City is being made and that this effort,
including the obligation of funds currently available for the benefit of the
City from state, local, and federal sources for iow and moderate income
housing alone or in combination with the taxes allocated under Section
33334.2, is equivalent in impact to the funds otherwise required to be set
aside pursuant to said Section.
-10-
In carrying out the purposes of. Section 33334.2, the Agency may
exercise any or all of its powers, including, but not limited .to, the
following:
(1) Acquire land or building sites;
(2) Improve land or building sites with on-site or off-site
improvements;
(3) Donate land to private or public persons or entities;
(4) Construct buildings or structures;
(5) Acquire buildings or structures;
(6) Rehabilitate buildings or structures;
(7) Provide subsidies to or for the benefit of persons or
families of very low, low, or moderate income; and
(8) Develop plans, pay principal and interest on bonds, loans,
advances, or other indebtedness, or pay financing or
-- carrying charges.
The Agency may use these funds inside, or outside the Project
Area provided, however, that funds may be used outside the Project Area only
if findings of benefit to the Project are made as required by said Section
33334.2 of the Community Redevelopment Law.
The funds for this purpose shall be held in a separate Low and
Moderate Income Housing Fund until used. Any interest ~arned by such Low and
Moderate Income Housing Fund shall accrue to the Fund.
3. [§324] New or Rehabilitated Dwelling Units Developed Within
Project Area
At least thirty' percent (30%) of all new or rehabilitated
dwelling units developed within the Project Area by the Agency, if any, shall
be for persons and families of iow or moderate income; and of such thirty
percent, not less than fifty percent (50%) thereof shall be for very Iow
income households. At least fifteen percent (15%) of all new or rehabilitated
units developed within the Project Area by public or private entities or
persons other than the Agency shall be for persons and families of low or
moderate income; and of such fifteen percent, not less than forty percent
(40%) thereof shall be for very. iow income households. The percentage
requirements set forth in this Section shall apply in the aggregate to housing
in the Project Area and not to each individual case of rehabilitation, devel-
opment or construction of dwelling units.
-11-
If all or any portion of the P.oject Area is developed with low
or moderate income housing units, the Agency shall require by contract or
other appropriate means that such' housing be made available for rent or
purchase to the persons and families of low or moderate income displaced by
the project. Such persons and families shall be given pri. rity in renting or
buying such housing; provided, however, failure to give such priority shall
not affect the validity of title to real property.
4. [§325] Duration of Dwelling Unit Availability
The Agency shall require that the aggregate number of dwelling
units rehabilitated, developed or constructed pursuant to Section 324 shall
remain for persons and families of iow or moderate income and very low income
households, respectively, for not less than the period set forth in Section'
800 for the duration of this Plan's development controls.
-12-
IV. [§400] LAND USES AND DEVELOPMENT REQUIREMENTS
A. [~401] Redevelopment Plan'Map and Major Project Area Land Uses
The Redevelopment Plan Map, attached hereto as .Exhibit "Aw, illus-
trates the location of the Project boundary, identifies the major streets
within the Project Area, and designates the major land uses authorized within
the Project Area under the City's current General Plan. The. City will from
time to time update and revise the General Plan. It is the intention of this
Redevelopment Plan that the major and other land uses to be permitted within
the Project Area shall be as provided within the City's General Plan, as it
currently exists or as it may hereafter be upon amendment, and as implemented
and applied by local codes and ordinances.
B. [§402] Other Land Uses
1. [§403] Public Rights-of-Way
Major public streets within the Project Area include Oyster
Point Boulevard and Gateway Boulevard.
Additional public streets, alleys and easements may be created
~'- in the Project Area as needed for proper use and/or development. Existing
streets and alleys may be abandoned, closed or mod£fied as necessary for
proper use and/or development. It is anticipated that Project development
will entail vacation and/or realignment of certain.streets, alleys, freeway
approaches and other rights-of-way.
Any changes in the existing street .layout~ shall be in accord
with the General Plan, the objectives of this Plan, and the City's design
standards, shall be effectuated in the manner prescribed by state and local
law, and Shall be guided by the following criteria:
(1) A balancing of the needs of proposed and potential new
d%velopment for adequate pedestrian and vehicular access,
vehicular parking, and delivery loading docks with'similar
needs of existing d%velopments proposed or potentially
proposed to remain. Such balancing shall take into con-
sideration the rights of existing owners and tenants under
the participation and preferences rules adopted by the
Agency for the Project, and aDy participation agreements
executed thereunder;
(2)The requirements imposed by such factors as topography,
traffic safety and aesthetics;
(3) The potential need to serve not only the Project Area and
new or existing developments, but to also serve areas
outside the Project by providing convenient, efficient
vehicular access and movement; and
-13-
(4) The potential need or desire to accommodate the facilities
and/or equipment of mass transportation modes.
The public rights-of-way may be used for vehicular and/or
pedestrian traffic, as well as for public improvements, public and private
utilities, and activities typically found in public rights-of-way. In
addition, all necessary easements for public uses, public facilities, and
public utilities may be retained or created.
2. [§404] 0tber Public, Quasi-Public, Institutional and
Non-Profit Uses
In any area the Agency is authorized, to permit the maintenance,
establishment or enlargement of public, quasi-public, institutional, or non-
profit uses, including park and recreational facilities, libraries, education-
al, fraternal, employee, philanthropic, religious and charitable institutions,
utilities, railroad rights-of-way, and facilities of other similar associa-
tions or organizations. Ail such uses shall conform so far as possible to the
provisions of this Plan applicable to the uses in the specific area involved.
The Agency may impose such other reasonable restrictions as are necessary to
protect the development and uses in the Project Area.
C. [§405] Interim Uses
Pending the ultimate development of land by developers and partici-
pants, the Agency is authorized to use or permit th~ use of any land in the
Project Area for interim uses not in conformity with the uses permitted in
this Plan. Such interim use shall conform to all applicable City. Codes.
D. [~406] General Controls and Limitations
Ail real property in the Project Area is hereby made subject to the
controls and requirements of this Plan. No real property shall be developed,
rehabilitated, or otherwise changed after the date of the adoption of this
Plan, except in conformance with the provisions of this Plan.
1. [~407] Construction
Ail construction in the Project Area shall comply with all
applicable state and local laws in effect at such time.
In addition to applicable codes, ordinances, or other require-
ments governing development in the Project Area, additional specific perform-
ance and development standards may be adopted by the Agency to control and
direct redevelopment activities in the Project Area.
-14-
2. [§408] Limitation on the Number of Buildings
The approximate number of buildings in the Project Ar~a shall
not exceed the maximum number allowed under the densities permitted' under the
City's General Plan, as implemented and applied by local codes and ordinances.
3. [§409] Number of Dwelling Units
The approximate number of dwelling units in t~e"Project Area
shall not exceed the maximum number allowed under the densities permitted
under the City's General Plan, as implemented and applied by local codes and
ordinances.
'4. [§410] Limitations on Type, Size and Height of Buildings
Except as set forth in other sections of this Plan, the type,
size, and height of buildings shall be as limited by the applicable federal,
s~ate and local statutes, ordinances and regulations.
5. [§411] Open Spaces, Lan6scaping; Light, Air and Privacy
The approximate amount of open space to be provided in the
Project Area is the total of all area which will be in the public rights-of,
way, the public grounds, the space around the buildings; and all other outdoor
areas not permitted to be covered by buildings. Landscaping shall be devel-
oped in the Project Area to insure optimum use of liviDg plant material.
In all areas, sufficient space shall be maintained between
buildings to provide adequate light, air and privacy.
6. [§412] Signs
All signs shall conform to City requirements. Design of all
proposed new signs shall be submitted prior to installation to the Agency
and/or City for review and approval pursuant to the procedures permitted by
this Plan.
7. [§413] Utilities
The Agency shall require that all utilities be placed under-
ground whenever physically and economically feasible.
8. [§414] Incompatible Uses
No use or structure, which by reason of appearance, traffic,
smoke, glare, noise, odor, or similar factors would be incompatible with the
surrounding areas or structures shall be permitted in any part of the Project
Area.
-15-
9. [§~15] Non-Discrimination and Non-Segregation
There shall be no. discrimination or segre§ation based upon
race, color, creed, sex, marital status, religion, national origin, or
ancestry permitted in the sale, lease, sublease, transfer, use, occupancy,
tenure, or enjoyment of property in the Project Area.
10. [§416] Subdivision of Parcels
No parcels in the Project Area, including any parcel retained
by a participant, shall be consolidated, subdivided or re-subdivided without
the approval of the appropriate City body.
11. [§417] Building Permits
No permit shall be issued for any work pertaining to the erec-
tion, construction, moving, conversion, alteration, demolition, or addition to
any building, structure, or paving until application .for such permit has been
made by the owner or bis agent and processed in accordance with all City
requirements.
E. [§418] Design Guide
Within the limits, restrictions, and controls established in
this Plan, the Agency is authorized to establish heights of buildings, land
coverase, setback requirements, design criteria, traffic circulation, traffic
access, and other development and design controls necessary for proper devel-
op:ent of both private and public areas within the Project Area. These may be
established by the approval of specific developments or by the adoption of
general restrictions and controls by resolution of the A~encY. '-
V. [§500] METHODS OF. FINANCING THE PROJECT .
A. [§501] General Description of the Proposed Financing Method
The Agency is authorized to finance this Project with tax increment
funds, interest income, Agency bonds, donations, loans from private financial
institutions, the lease or sale of Agency-owned property, participation in
development, or with financial assistance from the City, State of California,
the federal government, or any other available source, public or private.
The Agency is also authorized to obtain advances, borrow funds,
issue bonds, and create indebtedness in carrying out this Plan. The principal
and interest on such indebtedness may be paid from tax increments.or any other
funds available to the Agency. Advances and loans .for survey and planning and
for the operating capital for administration of this Project may be provided
by the City until adequate tax increment or other funds are available or
sufficiently assured to repay the advances and loans and to permit borrowing
adequate working capital from sources other than the City. The City, as it is
able, may also supply additional assistance through issuance of bonds, loans
and grants and in-kind assistance.
The City or any other public agency may expend money'to assist the
Agency in carrying out this Project. As available, gas tax funds from the
state and county may be used for street improvements and public transit
facilities. Ail or a portion of the parking may .be installed through a
parking authority or other public or private entities. Where appropriate,
special assessment districts may be used to finance public improvements,
including parking.
Tax increment financing, as authorized by Section 502 of this Plan,
is intended as a source of financing in combination ~ith other sources of
financing that may be available for specific project activities.
' B. [§502] Tax Increment Funds
All taxes levied upon taxable property within the Project Area each
yea~, by or for the benefit ~f the State of California, the County of San
Mateo, the City of South San Francisco, any district or any other public
corporation (hereinafter sometimes called "taxing agencies") after the
effective date of the ordinance approving this Plan, shall be divided as
follows:
(1) That portion of the taxes which would be produced by the
rate upon which the tax is levied each year by or for each
of said taxing agencies upon the total sum of the assessed
value of the taxable property in the Project Area as shown
upon the assessment roll used in connection with the taxa-
tion of such property by such taxing agency, last equal-
ized prior to the effective date of such ordinance, shall
be allocated to and when collected shall be paid to th~
-17-
respective taxing agencies as taxes.by or for said taxing
agencies on all other property are paid (for the purpose
of allocating taxes levied'by or for any taxing agency or
agencies which did not include the territory of the Pro-
ject on the effective date of such ordinance but. to which
such territory has been annexed or otherwise included
after such effective date, the assessment roll of the
County of San Mateo last equalized on the effective date
of said ordinance shall be used in determining the
assessed valuation of the taxable property in the Project
Area on said effective date); and
(2) .That portion of said levied taxes each year in excess of
such amount shall be allocated to and when collected sha~l
be paid into a special fund of the Agency to pay the prin-
cipal of and interest on bonds, loans, monies advanced to,
or indebtedness (whether funded, refunded, assumed or
otherwise) incurred by the Agency to finance or refinance,
in whole or in part, this Project. Unless and until the
total assessed valuation of the taxable property in the
Project Area exceeds, the total assessed value of the
taxable property in the Project Area as shown by the last
equalized assessment roll referred to in subdivision (1)
hereof, all of the taxes levied and collected upon the
taxable property in the Project Area shall be paid into
the funds of the respective taxing agencies. When said
bonds, loans, advances and indebtedness,' if any, and
interest thereon, have been paid, all monies thereafter
received from taxes upon the taxable property in the
Project Area shall be paid to the .respective t~xing
agencies as taxes on all other property are paid.
The portion of taxes mentioned in subdivision (2) above is hereby
irrevocably pledged for the payment of the principal of and interest on the
advance .of- monies, or making of loans, or the incurring of any indebtedness
(whether funded, refunded, assumed or otherwise) by the Agency to finance or
refinance the Project, in whole .or in part.
The Agency is authorized to make such pledges as to specific
advances, loans and indebtedness as appropriate in carrying out the Project.
The portion of taxes divided and allocated to the Agency pursuant to
subdivision (2) of ~bis section shall not exceed a cumulative total of
~168,000,000, except by amendment of this Plan. Such limitation is exclusive
of any payments to taxing agencies to alleviate financial burden made by the
Agency pursuant to Section 33401' of the Community Redevelopment Law and
- Section 310 of this Plan.
-18-
C. [§503] A~ency Bonds
The Agency is authorized to issue bonds from time to. time~ if it
deems it appropriate to do so, in order to finance all or any part. of the
Project.
Neither the members of the Agency nor any persons_ executing the
bonds are liable personally on the bonds by reason of their issuance.
The bonds and other obligations of the Agency are not a debt of the
City, or the State, nor are any of its political subdivisions liable for them,
nor in any event shall the bonds or obligations be payable out of any funds or
properties other than those of the Agency; and such bonds and other obliga-
tions shall so state on their face. The bonds do .not constitute an indebted-
ness within the meaning of any constitutional or statutory debt limitation or
restriction.
The amount of bonded indebtedness to be repaid in whole Or part from
the allocation of taxes described in subdivision (2) above which can be
outstanding at any one time shall not ~xceed ~52,650,000 in principal amount,
except by amendment of this Plan. Such limitation is exclusive of any
payments to taxing agencies to alleviate financial burden made .by the Agency
pursuant to Section 33401 of the Community Redevelopment Law and Section 310
of this Plan.
D. [§504] Time Limit on Establishment of Indebtedness
The Agency shall not establish or incur loans, advances, or indebt-
edness to finance in whole or in part the Project beyond 25 years from the
date of adoption of this Plan. Loans, advances, or indebtedness may be repaid
over a period of time beyond said time limit. Such ~ime limitation may be
extended 0nly by amendment of this Plan.
E. [§505] Other Loans and Grants
.. Any other loans, grants, guarantees, or financia} assistance from
the' United States, the State of California, or any other public or private
source will be utilized if available as appropriate in carrying out the
Project.
-19-
VI. [§600] ACTIONS BY.THE CITY
The City shall aid and cooperate with the Agency in carrying out this
Plan and shall take all actions necessary to ensure the continued fulfillment
of the purposes of this Plan and to prevent the recurrence or spread in the
area of conditions causing blight. Actions by the City shall include, but not
be limited to, the following:
(1) Institution and completion of proceedings for opening,
closing, vacating, widening, or changing the grades of
streets and other public rights-of-way, and for other
necessary modifications of the streets, the street layout,
.and other public rights-of-way in the Project Area. Such
action by the City shall include the requirement of
abandonment, removal, and relocation by the public utility
companies of their operations of public rights-of-way as
appropriate to carry out this Plan, provided that nothing
in this Plan shall be construed to require the cost of
such abandonment, removal, and relocation be borne by
others than those legally required to bear such cost.
(2) Institution and completion of proceedings necessary for
changes and improvements in private and publicly-owned
public utilities within or affecting the Project Area.
(3) Revision of zoning (if necessary) within the Project Area
to permit the land uses and development authorized by this
Plan.
(4) Imposition wherever necessary (by covenants .of restric-
tions, conditional use permits or other means) of appro-
priate controls within the limits of this Plan upon
parcels in the Project Area to ensure their proper
development and use.
(5) Provision for administrative enforcement of this Plan by
" the City after development.
(6) Performance of the above actions, and of all other func-
tions and services relating to public health, safety, and
physical development normally rendered in accordance with
a schedule which will permit the redevelopment of the
Project Area' to be commenced and carried to completion
without unnecessary delays.
(7) Provision of services and facilities and the various
__ officials, offices and departments of the City for the
Agency's purposes under this Plan.
-20-
(8) Provision of financial assistance- in accordance with
Section' 500 of this Plan.
(9) The undertaking and completing of any other proceedings.
necessary to carry out the Project.
The foregoing actions to be taken by the City may involve financial
outlays by the City, but do not constitute a commitment to make ~uch outlays.
-21-
KatzHollis
vt[. [§7oo]
The administration and enforcement of this Plan, including the prepara-
tion and execution of any documents implementing this Plan, shall be performed
by the Agency and/or the City.
The provisions of this Plan or other documents entered into pursuant to
this Plan may also be enforced by court litigation instituted by either the
Agency or the City. Such remedies may include, but are not limited to, speci-
fic performance, damages, re-entry, injunctions, or any other remedies appro-
priate to the purposes of this Plan. In addition, any recorded provisions
which are expressly for the benefit of owners of property in the Project Area
may be e~forced by such owners.
-22-
VIII. [§800] DURATION OF THIS PLAN
Except for the non-discrimination and non-segregation provisions which
shall run in perpetuity, the provisions of this Plan shall be effective, and
the provisions of other documents formulated pursuant to this Plan may be made
effective, for 35 years from the effective date of adoption of this Plan by
the City Council; provided, however, that the Agency may issue_bonds and incur
obligations pursuant to this Plan which extend beyond the termination date,
and in such event, this Plan shall continue in effect for the purpose of
repaying such bonds or other obligations until the date of retirement of such
bonds or other obligations, as determined by the City Council.
-23-
IX. [§900] PROCEDURE FOR AHENDHENT
This Plan may be amended by -means of the procedure established in
Sections 33450-33458 of the Community Redevelopment Laws or by any other
procedure hereafter established by law.
-24-
~ . ~ ~ ~- .. -. .
.~, ~ ,- . · .,..~ .I
~ ., ~ ,r ·
'EXHIBIT "B" ~'
SOUTH SAN FRANCISCO U.S. STEEL PLAIIT SITE REDEVELOPMENT PROJECT
LEGAL DESCRIPTION .
The land herein referred to i~ situated i~ the
State of California~ County of San'Mateo~ City
of South San Francisco and is described as follows:
BEGI)JNI~G' at a point on the ~o~therly line of'the Burl Burl Rancho~'~here same
is intersected by the dividing line between Sections 22 and 23~ of TownshiP 3
South, Range 5 West~ Mount Diablo Base and Meridian~ which point is distant
South 199.8 feet from the corner common to section 14-15-22 and 23 of said
Township and Range; thence along the llne dividing the Tide Lands and the Bur~
Buri Rancho~ South 81~ 45'. East 339.24 fe~t; thence ))orth. 64~'45'. East 2~.40
feet; thence Worth 33° 45' East 277.20 feet; thence' North 18° 15' East 1SB.40
feet; thence ~orth 22° 15' WeSt ~18.80 feet; thence North 12° 30' 'East 184.80
.feet; thence )~orth 15° West 194.70 feet; thence. North 43° 45i East ?5.90 feet;
thence North 63° 15' East 132.00 feet; thence leaving the line of the Buri Bur(
Ranc~o and. running North 485.?6 feet to a point on the Southerly line of Tide
Lands Lot 23 of Section 14, Township 3 South, Range ~ West~ M.D.B. & 14. and the
True Point of Beginning of this description; thence from said true poin{ of
beginning East,' 2,412.30 feet along the Southerly line of Tide Lands Lots
23-22-21 and 20, to the Southeast corner of said Lot 20; thence North 45° West~
1,866.74 feet, across said Lots 20 and 21~ to the Northwest corner of said Lot
21; thence West, 1~980 feet~ along the South San Francisco City Limit line,
being also the )Jortherly Boundary Line of Tide Land Lots 22-23 and 24, to the
-" SOU.TH SA): FRA)1CISCO U.S.--STEEL PLANT SITE REDEVELOPMEI~,PROJECT
DESCRIPTIO)I CO)ITIIIUED:.
Page -2-·
Northwest corner of said Lot 24; thence leaving said City' Limit line~ South
· 1~320 feet, along the Wes~cerly line of said Lot 24. to the corner, comm6n to Tide
Land Lots 24 anJ 25 'of Section 14 an~' Tide Land Lots 17 ~nd 32 of Sec'tion
Township 3 South[ Range 5 West, M.O.B. & 14.; thence West li290.30 feet, along
the Northerly line of Tide Land Lots 32 and 31~ to the Northwest corner of said
Lot 31 of said section 15;. thence Worth' 2* 30'. East 249.57 feet to a point on
· the Easteriy right of way line of the Southern Pacific Transportation Company;
thence South 37* 32r 40" West 2~937.95 feetj along said righ. t of way line;
thence continuing ~.long the Southeasterly line of said right of way, the
following courses and distances: South 52* 27" 20" East 25 feet and South 37
.~__ 32' 40" l~est 104.64 feet to the intersection of said right of way line with the
llortherly line of Oyster Point Boulevard (Formerly.Butler Road); thence Easterly·
along the Northerly line of said Oyster Point Bou-levard[ North 87* 04' East
493.00 feet; )lorth 83° 09' 15" East 366.89 feet; North B7° 04' 'Eas{ 41B.36 feet~
to a point on the )~ortherly prolongation of the Easterly line of Parcel 1 as
sho~n on the Parcel Map recorded in Book 12 of Parcel Maps at Page 29, San Mateo
C~unty Re'co~ds; thence along last said prolongation South 3° 48' 30" East 50.00
feet~ to the intersection of said prolongation with the Southerly line of Oyster
Point Boulevard; thence Easterly along said Southerly line of Oyster Point North
87~ 04' East 345.00 feet; South 3' 48' .30" East 6.00 feet; North B?° 04' East
280 feet; South 3~ 48' 30" East 9.00 feet, North 87° 04' East 457.17 feet to the
intersection of the Sout)~erly line' of Oyster Point Boulevard with the Southerly
prolongation of the l~esterly line of Parcel 4 as shown on the Parcel P, ap
S'~3U. TH SA)~ FF~AIJCI'~CO U.?-' STEEL PLAt(T SITE REDEVELOPMEt'Jz PROJECT
DESCRIPTION CD)ITIIJUED: .
Page -3-
recorded in Book 23 of Parcel llaps at Page 27., San Mateo County P, ecords; thence
leaving the Southerly line of Oyster Point Boulevard, North 65.00 feet inter-
sec,~ng the Northerly line' of Oyster Point Boulevard, thence leaving the
),'o~'therly line of Oyster Point along the Westerly and Northerl'~ lines of said
Parcel ~,; North 1;146.10 feet and North 72° 27' 53" East 1;070.26 feet to the
)Jorthessterly corner of Parcel 4 to the Westerly line of Parcel 1 as shown on
the Parcel Map recorded in Book 52 of Parcel Maps. at Page 58 and 59~ San Mateo
County Records; thence along said Westerly line North 315.75 feet to the
)lorthwesterly corner of said Parcel 1; thence along the Northerly line of Parcel
1, being also the Southerly Bulkhead line (U.S.C.E. 12-5-36) North 72' 26' 32""
East 657.77 feet; thence leaving said Bulkhead line North 51.65 feet to the True
Point of Beginning.
COntaini ng 174.49 Acres more or I ess. ..
EXHIBIT C
South San Francisco Redevelopment Agency.
U.S. Steel Plant Site Redevelopment Project
PROPOSED PUBLIC IMPROVEMENTS AND FACILITIES PROJECTS
1) Conference Center/Theater Complex
Construction of conference center/theater complex includ-
.in§ associated parking and land acquisition
2) Oyster Point Blvd./U.S. 101/SPRR Overcrosstng
Construction of four-lane overcrossing and associated
freeway ramps, including related right-of-way acquisition.
3) Oyster Point Boulevard
Completion of widening and reconstruction of'Oyster Point
Boulevard from Project vicinity to Oyster Point.
NOTES:
1. All projects include any necessary land acquisition, site occupant relo-
catiOn, structural demolition, and grading.
2.' This listing of projects is set forth for planning purposes, and is not
necessarily listed in order of priority, nor should it be construed that
full or even partial funding of any given project is assured by its
listing herein.
3. This listing of projects shall not be deemed as a limitation on the
Agency's authority to implement the Redevelopment Plan.