HomeMy WebLinkAboutReso RDA 15-2000RESOLUTION NO. 15-2000
REDEVELOPMENT AGENCY, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A RESOLUTION APPROVING AND ADOPTING THE SECOND
AMENDMENT TO THE REDEVELOPMENT PLAN FOR EL CAMINO
CORRIDOR REDEVELOPMENT PROJECT
WHEREAS, the South San Francisco Redevelopment Agency (the "Agency") has
prepared a Second Amendment to the Redevelopment Plan for the El Camino Corridor
Redevelopment Project Area; and
WHEREAS, the Agency has caused to be prepared and has presented to the City Council
the Report to the City Council on the proposed Second Amendment to the El Camino Corridor
Redevelopment Plan as required by Section 33352 of the California Community Redevelopment
Law (Health and Safety Code Section 33000 et seq.); and
WHEREAS, the Agency recommends that the City Council of the City of South San
Francisco adopt the Second Amendment to the E1 Camino Corridor Redevelopment Plan.
NOW, THEREFORE, the Redevelopment Agency of the City of South San Francisco
does hereby resolve as follows:
Section 1. The South San Francisco Redevelopment Agency hereby approves and adopts
the Second Amendment to the Redevelopment Plan, attached hereto by reference and made a part
hereof.
Section 2. The South San Francisco Redevelopment Agency hereby recommends to the
City Council the adoption of an ordinance adopting the Second Amendment to the E1 Camino
Corridor Redevelopment Plan.
I hereby certify that the foregoing Resolution was regularly introduced and adopted by the
Redevelopment Agency of the City of South San Francisco at a Regular meeting held on the 14th
day of June, 2000 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
Boardmembers Pedro Gonzalez, Eugene R. Mullin and John R. Penna,
Vice Chair Joseph A. Femekes and Chair Karyl Matsumoto
None.
None.
None.
ATTEST: ~?~rkt,'-' /~'). ~-~
F:\WPD~Mnrsw~05~01 ~Redevelopment~E1 CaminoXPLAN ADOPT.wpd
SECOND AMENDMENT
to the
REDEVELOPMENT PLAN
for the
EL CAMINO CORRIDOR
REDEVELOPMENT PROJECT
Adopted:
Ordinance No.
THE CITY OF SOUTH SAN FP, ANCISCO, CALIFORNIA
O91599/kes
PREFACE
The Redevelopment Plan for the El Camino Corridor Redevelopment Project was adopted by Ordinance No.
1132-93 of the City Council of the City of South San Francisco on July 14, 1993. On October 26, 1994, the
Redevelopment Plan was amended ("First Amendment") to establish or revise the plan's financial time limits to
bring them into conformity with new Community Redevelopment Law maximums established in AB 1290 (Chap.
942, 1993 Statutes).
This proposed Second Amendment adds territory to the existing Project Area. The added territory is referred to
herein as the "Second Amendment Area" and is shown and described in the amended Redevelopment Plan
Map (Exhibit II to the Plan) and the amended Legal Description of the Project Area (Exhibit IV to the Plan). The
time limit on Redevelopment Plan effectiveness and other time limits prescribed by the Community
Redevelopment Law, which include a debt establishment time limit, a time limit on the receipt of tax increment
and an eminent domain time limit, for the Second Amendment Area will be separate from the time limits for the
existing Project Area. The Second Amendment does not extend any of the time limits applicable to the existing
Project Area. The Second Amendment establishes a single limit bonded indebtedness applicable to both the
existing Project Area and the Second Amendment Area.
8432sol
091599~e;
SECOND AMENDMENT TO THE
REDEVELOPMENT PLAN FOR THE
EL CAMINO CORRIDOR
REDEVELOPMENT PROJECT
AMENDMENT A
That the existing project area be amended to add the area shown on Attachment A, Redevelopment Plan Map -
Second Amendment Area, and described in Attachment B, Project Legal Description - Second Amendment
Area.
AMENDMENT B
That the Redevelopment Plan for the El Camino Corridor Redevelopment Project be amended and restated in
its entirety so as to read as shown in the "Amended and Restated Redevelopment Plan for the El Camino
Corridor Redevelopment Project," attached hereto as Attachment C.
Attachment A
El CAMINO CORRIDOR REDEVELOPMENT PROJECT
Redevelopment Plan Map - Second Amendment Area
El Camino
Addifi
LEGEND
~ High Density Residential
~ Community Commercial
~ Medium Density Residential and
Community Commemial
~'~ Public
~ Park and Recreation
-~- Proposed Added Area Boundary
07/27/99
REDEVELOPMENT PLAN MAP (LAND USE AND
CIRCULATION MAP) - SECOND AMENDMENT AREA
EL. CAMINC CORRIDOR REDEVELOPMENT PROJEC'['
This map was prepared for illustrative purposes only
and is not nocessadly-to scale, nor should it be use
to ascertain precise project ama I:m~nda~/line~.
Source: South San Francisco Red~nt Agency, 1999.
Attachment B
EL CAMINO CORRIDOR REDEVELOPMENT PROJECT
Project Legal Description - Second Amendment Area
This description consists of two parts, as follows:
1. Proposed Willow Gardens Addition
(approximately 9.25 acres)
2. Proposed El Camino Real Addition
(approximately 70.3 acres)
O432sof
091599~e;
24-99016
4/9/99
Rev. 6/23/99
RBP/PRS
I.RGAL DESCRIPTION
Proposed Willow Gardens Addition
All that certain real property situate '..ua the City of South San Francisco, County of San
Mateo, State of California described as follows:
BEGINNING at the intersection of the centerline 0fNora Way and the general
southeasterly line of Willow Avenue as shown on that certain tract map entitled "Willow
Gardens" which map was filed for record in Book 61 of Maps, at Pages 24 and 25, San
Mateo County Records, said general southeasterly line being also the general
northwesterly boundary line of said Map of "Willow Gardens", thence
leaving said POINT OF BEGINNING along the general northwesterly line of said
map of "Willow Gardens" North 16° 17'12"F_ast 719.05 feet to an angle point in
said general northwesterly line, thence:
(2) South 73° 29' 44"Egst 108.88 feet to an angle point in said general northwesterly
line, thence
(3) continuing along said general northwesterly line North 16° 30'16" East 219.38 feet
to the most northerly comer of said "Willow Gardens", thence
(4) along the general northeasterly line of said Willow Gardens South 73° 29' 44"East
293.78 feet to the most e, ms~rly comer of said" Willow Gardens", thence
(5) along the general southeasterly line of said" Willow Gardens' South 16° 30' 16"East
1063.43 feet to the most southerly comer of said Willow Gardens, thence
(6)
along the general southwesterly llne of" Willow Gardens" and the general
southwesterly boundary line of that certain Parcel Map filed for record in Book 41 of
Maps at Pages 32 and 33, San Mateo County Records, North 73° 29' 44"West
399.45 feet to the most westerly comer of said Parcel Map, thence
(7) along the general northwesterly boundary of said Parcel Map and said "Willow
Gardens" North 16017, 12"East 125.00 feet to the POINT OF BEGINNING.
Containing 9.25 acres of land more or less.
9 by
Phillip IL Savid: ~//~'* RCE No. 28231
Expiration Date 03/31/2002. t. ,
si~ o,~ t../'r-.~ ~"~/'~'~
Date
24-99016
6/10/99-
Rev. 6/23/99
RBP/PRS
.LEGAL DESCRIPTION
Proposed E1 Camino Real Addition
All that certain real property Situate in the City of South San Francisco, County of San
Mate, o, State of California described as follows:
BEGINNING at the intersection of the centerline of 1st Street and the general
Northeasterly line of the California State Highway, known as E1 Camino Real, as shown
on that certain map entitled '"Map of Section West of Kailroad in.the Town of Baden",
which map was filed for record in Book "E" of Maps at Page 62, San Mateo County
Records,
(1)
(2)
(3)
(4)
(5)
(6)
leaving said POINT OF BEGINNING along said general northeasterly line of E1
Camino Real, being also the general Southwesterly line of said map, North 24° 47'
46"West 180.00 feet; thence
leaving said general Southwesterly line and continuing along said Northeasterly line
of E1 Camlno Real, South 65° 12' 14"West 18.43 feet, and
fi.om a tangent bearing of North 29o 51' 11" West, along a curve, concave to the left,
with a radius of 3033.00 feet, through a central angle of 14° 16' 42" for an arc length
of 755.84 feet to the intersection thereof with the general Southeasterly boundary
line of the Existing E1 Camino Redevelopment Project Area, thence
leaving said Northeasterly line of E1 Camino Real along said general Southeasterly
boundary line the following courses and distances, North 56° 50'20" East 452.55
feet;
along a tangent curve, concave to the left, with a radius of 841.00 feet through a
central angle of 13° 00'45" for an arc length of 191.00 feet;
North 47° 01' 37" East 97.97 feet;
Nortlx 44° 43' 36" East 226.00 feet;
North 45° 18'24" West 20.00 feet; and
(9)
North 44° 43'36" East 162.57 feet to the most Easterly comer of said Boundary; said
comer lying on the Northwesterly line on parcel designated as Parcel 2 of that
certain Parcel Map filed for record in Book 5 of L.L.S. Maps at Page 103, San
Mateo County records, thence
(10) along said Northwesterly line of Parcel 2, North 44° 43' 36" East 150.34 feet; and
(11) North 16° 41' 36" East 22.74 feet to the most Northerly comer of said Parcel 2;
thence
(12)
along the general Northerly line of said Parcel 2, and the general Northerly line of
that certain map entitled "City Park Addition No. 2" which map was fried for record
in Volume 59 of Maps at Page 39, San Mateo County Records and its Easterly.
prolongation South 73° 18' 24" East 550.00 feet to the most easterly comer of that
certain parcel of land described in the Deed to the City of South San Francisco
recorded in Book 3011 of Official Records at Page 222, San Mateo County Records,
thence
(13)
along the general easterly line of said City of South San Francisco parcel, the general
Easterly line of said City Park Addition No. 2, the general Easterly line of said
Parcel 2 and the general Northerly line of that certain parcel of land designated as
Parcel 1 on that certain Parcel Map 93-300 which map was filed for record in Book
69 of Parcel Maps at Page 57-59, San Mateo County Records South 16° 41' 36"
West 454.60 feet to an angle point in said Northerly line of Parcel 1, thence
(14) continuing along said general Northerly line of Parcel 1 and the general Northerly
and Northeasterly line of Parcel 2 of last descn'bed Parcel Map along the following
courses and distances, fi.om a tangent bearing of North 82° 43'21" East along a curve
concave to the fight with a radius of 1121.00 feet, through a central angle of 12° 38'
53" for an arc length of 247.46 feet;
(15) South 16o 41' 36" West 40.82 feet;
(16)
from a tangem bearing of South 6° 16' 15" West along a curve, concave to the left,
with a radius of 50.00 feet through a central angle of 61° 48' 51" for an arc length'of
53.94 feet; and
(17) South 16° 39' 35" West 50.80 feet; thence
(18) leaving said general Easterly line of Parcel 2 South 23°, 12' 39" West 299.10 feet to
an angle point in the general Westerly line of said Parcel 1; thence
(19)
along said general Westerly line and its Southerly prolongation South 16° 41' 36"
West 745.07 feet to the intersection thereof with the general Southerly line of that
certain parcel of land described as Parcel 6 in the Deed to the City and County of
San Francisco recorded in Volume 1161 of Official Records, San Marco County
Records; thence
(20)
along said general Southerly line North 54° 48' 18"West 842.88 feet to the
intersection thereof with the general Southerly line of "A" Street as shown on said
"Map of Section West of Raikoad in the Town of Baden" said Southerly line be.ing
also the general Northeasterly line of that certain parcel of land designated as Parcel
1 on that certain Parcel Map of Lands of Gigll and Lands of Petrocchi recorded in
Volume 54 of Parcel Maps at Pages 15 and 16 San Mateo County Records; thence
(21) along said general Northeasterly and Southeasterly line of last described Parcel 1
South 24° 58' 46" East 143.54 feet; and
(22) South 65° 01' 14" West 60.22 feet; thence
(23) leaving said Southeasterly line South 24o 58' 46" East 100.00 feet; thence
(24) South 65° 01' 14" West 39.78 feet to the most Northerly comer of Lot 4 in Block 1
as said "Map of Section West of Railroad in the Town of Baden"; thence
(25) along the rear lot lines of the lots in Blocks 1,5,6 and 10 of the last described map
the following courses and distances, South 24° 58' 46" East 970.00 feet;
(26)North 65° 01' 14" East 15.00 feet;
(27) South 24° 58' 46" East 25.00 feet;
(28) South 65° 01' 14" West 15.00 feet; and
(29) South 24° 58' 46" East 560.00 feet to the most Southerly comer of Lot 1 in Block 10
of said "Map of Section West of Railroad in the Town of Baden", said comer lying
in the general Southeasterly line of said map; thence
(30) along said general Southeasterly line North 65° 01' 14" East 420.00 feet to the most
Westerly comer of that certain parcel of land descn'bed in the Deed to the Housing
Authority of the City of South San Francisco recorded in Book 1008 of Official
Records at Page 424, San Mateo County records; thence
(31) along the boundary of said parcel South 24° 58' 46'~ East 584.00 feet; and
(32) North 65° 01' 14" East 662.86 feet to the most Northerly comer of that certain parcel
of land described in the Deed to the South San Francisco Unified School District
· recorded in Book 1329 of Official Records at Page 439 San Mateo County Records;
thence
(33) along the boundary of said parcel the following courses and distances, South 32° 35'
46" East 889.10 feet;
(34)
(35)
South 33° 1~' 46" East 30.90 feet; and
South 65° 0.i'14" West 1213.95 feet more or less to a point on the Northeasterly line
of the Califbmia State Highway, known as El Camino Real; thence
(36) along the Northeasterly line of said E1 Camino Real the following courses and
distances, North 29° 19' 36" West 1019.96 feet;
(37) North 26° 38' 36" West 479.01 feet;
(38) North 25° 07' 46" West 791.81 feet; and
(39) North 24° 47' 46" West 683.20 feet to the POINT OF BEGI2qNING.
Containing 70.32acres of land more or less.
Expiration Dar ~ ~'
Date
Attachment C
AMENDED AND RESTATED
REDEVELOPMENT PLAN
FOR THE EL CAMINO CORRIDOR
REDEVELOPMENT PROJECT
Adopted July 14, 1993
Ordinance No. 1.132-93
Amended October 26, 1994
Ordinance No. 1150-94
Amended _,
Ordinance No.
THE CITY OF SOUTH SAN FRANCISCO, CALIFORNIA
8432~:~
Og1599~e,'
TABLE OF CONTENTS
[Section 100] INTRODUCTION ............................................................................................................ 1
A [Section 101] Project History ......................................................................................................... 1
B. [Section 102] General .................................................................................................................... 1
[Section 200]
[Section 300]
A.
B.
PROJECT AREA BOUNDARY AND LEGAL DESCRIPTION ....................................... 4
PROPOSED REDEVELOPMENT ACTIVITIES ............................................................. 5
[Section 301] General .................................................................................................................... 5
[Section 302] Owner Participation and Business Reentry Preferences ......................................... 5
1. [Section 303] Owner Participation ........................................................................................... 5
2. [Section 304] Business Reentry Preferences ......................................................................... 6
3. [Section 305] Participation Agreements .................................................................................. 6
4. [Section 306] Implementing Rules .......................................................................................... 6
[Section 307] Property Acquisition ................................................................................................. 6
1. [Section 308] Acquisition of Real Property .............................................................................. 6
2. [Section 309] Acquisition of Personal Property ....................................................................... 7
[Section 310] Property Management ............................................................................................. 7
[Section 311] Relocation of Occupants Displaced by Agency Acquisition .................................... 8
1. [Section 312] Relocation Housing Requirements .................................................................... 8
2. [Section 313] Replacement Housing Plan ............................................................................... 8
3. [Section 314] Assistance in Finding Other Locations .............................................................. 8
4. [Section 315] Relocation Payments ........................................................................................ 8
[Section 316] Payments to Taxing Agencies in Lieu of Taxes ....................................................... 9
[Section 317] Demolition, Clearance, Public Improvements, Building and Site Preparation ......... 9
1. [Section 318] Demolition and Clearance .......L .................................................... ' ..................... 9
2. [Section 319] Public Improvements ......................................................................................... 9
3. [Section 320] Preparation of Building Sites ............................................................................. 9
[Section 321] Property Disposition and Development ................................................................... 9
1. [Section 322] Real Property Disposition and Development .................................................... 9
a. [Section 323] General .......................................................................................................... 9
b. [Section 324] Disposition and Development Documents ................................................... 10
c. [Section 325] Non-Discrimination Provisions ..................................................................... 10
d. [Section 326] Development by the Agency or Other Public Bodies or Entities .................. 11
e. [Section 327] Development Plans ...................................................................................... 12
2. [Section 328] Personal Property Disposition ......................................................................... 12
[Section 329] Cooperation with Public Bodies ............................................................................. 12
[Section 330] Rehabilitation, Conservation and Moving of Structures ......................................... 12
1. [Section 331] Rehabilitation and Conservation ..................................................................... 12
2. [Section 332] Moving of Structures ....................................................................................... 13
[Section 333] Low or Moderate Income Housing ......................................................................... 13
1. [Section 334] Authority Generally .............................................................. ~ ........................... 13
;_. [Section 335] Replacement Housing ..................................................................................... 13
8432sol
091599~e,-
3. [Section 336]
4. [Section 337]
5. [Section 338]
Increase, Improve and Preserve the Supply ............ ~ ...................................... 14
New or Rehabilitated Dwelling Units Developed Within Project Area ............. 15
Duration of Dwelling Unit Availability and Agency Monitoring ......................... 15
IV.
L. [Section 339] Implementation Plans ............................................................................................ 16
[Section 400] LAND USES AND DEVELOPMENT REQUIREMENTS .............................................. 17
A. [Section 401] Redevelopment Plan Map and Major Project Area Land Uses ............................. 17
B. [Section 402] Major Land Uses ................................................................................................... 17
C. [Section 403] Other Land Uses ................................................................................................... 17
1. [Section 404] Public Rights of Way ....................................................................................... 17
2. [Section 405] Other Public, Semi-Public, Institutional and Non-Profit Uses .......................... 18
E.
F.
G.
[Section 406]
[Section 407]
[Section 408]
[Section 409]
1. [Section 410]
2. [Section 411]
3. [Section 412]
4. [Section 413]
5. [Section 414]
6. [Section 415]
7. [Section 416]
8. [Section 417]
9. [Section 418]
10. [Section 419]
Conforming Properties ........................................................................................... 18
Interim Uses .......................................................................................................... 18
Nonconforming Uses ............................................................................................. 18
General Controls and Limitations .......................................................................... 19
Construction .................................................................................................... 19
Limitation on the Number of Buildings ............................................................ 19
Number of Dwelling Units ................................................................................ 19
Limitations on Type, Size and Height of Buildings .......................................... 19
Open Spaces, Landscaping, Light, Air and Privacy ........................................ 19
Signs ............................................................................................................... 19
Utilities ............................................................................................................. 20
Incompatible Uses ........................................................................................... 20
Subdivision of Parcels ..................................................................................... 20
Minor Variations .............................................................................................. 20
H. [Section420] Design Guide ......................................................................................................... 20
1. [Section 421] Building Permits ..................................................................................................... 21
[Section 500]
A. [Section 501]
B. [Section 502]
C. [Section 503]
D. [Section 504]
E. [Section 505]
F. [Section 506]
G. [Section 507]
METHODS OF FINANCING THE PROJECT .............................................................. 22
General Description of the Proposed Financing Method ....................................... 22
Tax Increment Funds ............................................................................................. 22
Agency Bonds ....................................................................................................... 23
Time Limit on Establishment of Indebtedness ....................................................... 23
Payments to Affected Taxing Entities .................................................................... 24
Time Limit on Receipt of Tax Increment ................................................................ 24
Other Loans and Grants ........................................................................................ 24
VI.
VII.
VIII.
IX.
X.
[Section 600]
[Section 700]
[Section 800]
[Section 900]
[Section 1000]
ACTIONS BY THE CITY .............................................................................................. 25
ENFORCEMENT ......................................................................................................... 26
DURATION OF THIS PLAN ......................................................................................... 26
PROCEDURE FOR AMENDMENT ............................................................................. 26
SEVERABILITY ............................................................................................................ 26
Exhibit I
Exhibit II
Exhibit III
Exhibit IV
Exhibit V
Redevelopment Plan Map (Land Use and Circulation MaP/- Original Project Area
Redevelopment Plan Map (Land Use and Circulation Map) - Second Amendment Area
Project Legal Description - Odginal Project Area
Project Legal Description - Second Amendment Area
Proposed Public Improvements and Facilities Projects
AMENDED AND RESTATED
REDEVELOPMENT PLAN
FOR THE
EL CAMINO CORRIDOR REDEVELOPMENT PROJECT
I. [Section 100] INTRODUCTION
A. [Section 101] Proiect History
The Redevelopment Plan for the El Camino Corridor Redevelopment Project was adopted by
Ordinance No. 1132-93 of the City Council of the City of South San Francisco ("City Council") on July 14, 1993.
The Redevelopment Plan has been amended once.
The first amendment ("First Amendment") was adopted on October 26, 1994, by Ordinance 1150-94, to
bring project time limits into compliance with changes to the Community Redevelopment Law due to the
enactment of AB 1290 (Chap. 942, 1993 Statutes).
A second amendment ("Second Amendment") to the Redevelopment Plan as amended to date was
adopted , ~ , by Ordinance No. ~ The Second Amendment added area
("Second Amendment Area") to the original project area ("Original Project Area"), revised and restated the
Redevelopment Plan as amended to date, and adopted the revised and restated Redevelopment Plan as this
Amended and Restated Redevelopment Plan for the El Camino Corridor Redevelopment Project.
In addition to adding the Second Amendment Area to the Original Project Area, the Second Amendment
established separate time limits for project effectiveness, debt establishment, and receipt of tax increment for
the Second Amendment Area. Although it is not required by law, the Second Amendment extended the existing
bonded indebtedness limit to cover both the Original Project Area and the Second Amendment Area.
B. [Section '102] General
This is the Amended and Restated Redevelopment Plan ("Redevelopment Plan" or "Plan") for the El
Camino Corridor Project ("Project") in the City of South San Francisco ("City"), County of San Mateo, State of
California. This Plan consists of text (Sections 100 through 1000), the Redevelopment Plan Map (Land Use
and Circulation Map) (Exhibits I and II), a Project Legal Description (Exhibits III and IV), and the Proposed
Public Improvements and Facilities Projects (Exhibit V). This Plan was prepared by the Redevelopment Agency
of the City of South San Francisco ("Agency") pursuant to the Community Redevelopment Law of the State of
California (Health and Safety Code, Section 33000 et seq.; all statutory references hereinafter shall be to the
Health and Safety Code unless otherwise designated), the California Constitution, and all applicable local codes
and ordinances.
The definitions of general terms which are contained in the Community Redevelopment Law govem the
construction of this Plan, unless more specific terms and definitions therefor are otherwise provided in this Plan.
Many of the requirements contained in this Plan are necessitated by and in accordance with statutory
provisions in effect at the time of adoption of this Plan. Such statutory provisions may be changed from time to
time. In the event that any such changes affect this Plan's requirements, and would be applicable to the
Agency, the Project, or this Plan whether or not this Plan were formally amended to reflect such changes, then
the requirements of this Plan that are so affected shall be superseded by such changes, to the extent necessary
to be in conformity with such changes.
The project area ("Project Area") includes all properties within the boundaries of the Original Project
Are~ and the Second Amendment Area shown on the Redevelopment Plan Map (Land Use and Circulation
Mapi~ and described in the Project Legal Description.
~ 'to be inserted after adoption of the Second Amendment
8432sol,
O91599/ke~
The proposed redevelopment of the Project Area as described in this Plan conforms to the City of
South San Francisco General Plan, as applied in accordance with local codes and ordinances.
This Redevelopment Plan is based upon the Preliminary Plan formulated and adopted by the City of
South San Francisco Planning Commission ("Planning Commission") on May 6, 1993, and the Preliminary Plan
for the Second Amendment Area adopted on November 5, 1998.
This Plan provides the Agency with powers, duties and obligations to implement and further the
program generally formulated in this Plan for the redevelopment, rehabilitation, and revitalization of the Project
Area. This Plan does not present a specific plan or establish priorities for specific projects for the
redevelopment, rehabilitation, and revitalization of any particular area within the Project Area. Instead, this Plan
presents a process and a basic framework within which specific development plans will be presented, priorities
for specific projects will be established, and specific solutions will be proposed, and by which tools are provided
to the Agency to fashion, develop, and proceed with such specific plans, projects, and solutions.
In general, the goals and objectives of the redevelopment program in the Project Area are as follows:
The elimination and prevention of the spread of blight, non-conforming uses and deterioration and the
conservation, rehabilitation and redevelopment of the Project Area in accord with the General Plan,
.future specific plans, the Plan and local codes and ordinances, as they now exist or may hereafter be
amended.
The achievement of an environment reflecting higher level of concern for architectural, landscape,
urban design and land use principles appropriate for attainment of the objectives of this Plan and the
General Plan, as they may now exist or may hereafter be amended.
The control of unplanned growth by guiding revitalization, rehabilitation and new development in such
fashion as to meet the needs of the Project, the City and its citizens.
The reduction of the City's annual costs for the provision of local services to and within the Project
Area.
5. Increased sales, business licenses and other fees, taxes and revenues for the City.
The promotion of new and continuing private sector investment within the Project Area to prevent the
loss of and to facilitate the increase of commercial sales activity.
The creation and development of local job opportunities and the preservation of the area's existing
employment base.
The development of a spectrum of housing types affordable to various segments of the community in a
manner consistent with the Housing Element of the General Plan and the provisions of the
Redevelopment Law, as they now exist or may hereafter be amended.
The elimination or amelioration of existing substandard conditions, including substandard vehicular
circulation and parking systems; inadequate infrastructure; insufficient off-street parking; and other
similar public deficiencies adversely affecting the Project Area.
10.
The presentation and creation of civic, cultural and educational faculties and amenities as catalysts for
area revitalization.
11. The upgrading and expansion of recreational areas and open space.
12. Assist in the revitalization of the Willow Gardens neighborhood.
Redevelopmen~, of the Project Are-~ pursuant to this Redevelopment Plan and the above goals and
o[~jectives will attain thc purposes of the California Community Redevelopment Law by: (1) elimination of areas
suffering from economic dislocation and disuse; (2) replanning, redesign and/or redevelopment of areas which
are stagnant or improperly utilized, and which could not be accomplished by private enterprise acting alone
without public participation and assistance; (3)protecting and promoting sound development and
redevelopment of blighted areas and the general welfare of the citizens of the City by remedying such injurious
conditions through the employment of appropriate means; (4) installation of new or replacement of existing
public improvements, facilities and utilities in areas which are currently inadequately served with regard to such
improvements, facilities and utilities; and (5) other means as deemed appropriate.
I1. [Section 200] PROJECT AREA BOUNDARY AND LEGAL DESCRIPTION
The boundaries of the Project Area are shown on the Redevelopment Plan Map (Land Use and
Circulation Map) attached hereto in two parts as Exhibits I and II, and is described in the Legal Description of
the Project Area attached in two parts as Exhibits III and IV.
III. [Section 300] PROPOSED REDEVELOPMENT ACTIVITIES
A. [Section 301] General
The Agency proposes to eliminate and prevent the spread of blight and blighting influences, and to
strengthen the economic base of the Project Area and the community, by some or all of the following:
Permitting participation in the redevelopment process by owners of properties located in the
Project Area, consistent with this Plan and rules adopted by the Agency;
2. Acquisition of real property;
3. Management of property under the ownership and control of the Agency;
Relocation assistance to persons displaced by Agency activities in the Project Area and a reentry
preference for businesses wishing to reestablish on redeveloped property;
5. Demolition or removal of buildings and improvements owned or acquired by the Agency;
Installation, construction, expansion, addition, extraordinary maintenance or re-construction of
streets, utilities, and other public facilities and improvements;
7. Disposition of property for uses in accordance with this Plan;
Facilitating the Redevelopment of land by private enterprise and public agencies for uses in
accordance with this Plan;
Assisting the rehabilitation of structures and improvements by present owners, their successors,
and the Agency;
10. Rehabilitation, development or construction of Iow and moderate income housing within the
Project and/or the City; and
11. Providing for the retention of controls and establishment of restrictions or covenants running with
land sold or leased by the Agency so that property will continue to be used in accordance with this
Plan.
In the accomplishment of these activities, and in the implementation and furtherance of this Plan, the
Agency is authorized to use all the powers provided in this Plan and all the powers to the extent now or
hereafter permitted by law, which powers are not expressly limited by this Plan.
B. [Section 302] Owner Participation and Business Reentry Preferences
1. [Section 303] Owner Participation
Owners of real property within the Project Area shall be extended reasonable opportunities to
participate in the redevelopment of property in the Project Area if such owners agree to participate in the
redevelopment in conformity with this Redevelopment Plan and owner participation implementation rules
adopted by the Agency.
An owner may participate by retaining all or portions of the property, or by retaining all or portions of
the property.' and purchasing adjacent property or joinin9 with another person or entity for the rehabilitation or
development of the owner's property and, if appropriate, other property.
Participation opportunities shall necessarily be subject to and limited by factors including but not limited tc the
foliowing: (1) the elimination and/or changing of land uses in the Project Area; (2) the construction, realignment,
abandonment, widening,, opening and/or other alteration or elimination of public rights-of-way; (3) the removal,
relocation, and/or installation of public utilities; (4) the construction or expansion of public improvements and
facilities, and the related need to assemble parcels; (5) the need to assemble parcels for private development
projects; (6) specific requirements of the Redevelopment Plan and applicable rules, regulations, and ordinances
of the City of South San Francisco; (7) any Design Guide adopted by the Agency pursuant to Section 420
hereof; and (8) the feasibility of the potential participant's proposal.
2, [Section 304] Business Reentry Preferences
Business occupants engaged in business in the Project Area shall be extended reasonable preferences
to reenter in business within the redeveloped area if they otherwise meet the requirements prescribed by this
Redevelopment Plan and business reentry preferences implementation rules adopted by the Agency.
Reentry preferences shall necessarily be subject to and limited by factors such as the following: (1) the
extent to which suitable relocation or reentry accommodations exist or are rehabilitated or developed within the
Project Area; (2) the extent to which suitable relocation or reentry accommodations are available to displaced
business occupants within an acceptable time period or at rents and other terms that are acceptable to such
displaced business occupants, and within their financial means; and (3) the requirements of this Redevelopment
Plan or any Design Guide adopted by the Agency pursuant to this Redevelopment Plan.
3. [Section 305] Participation A.qreements
The Agency will require that, as a condition to participating in redevelopment of owned property, each
participant shall enter into a written participation agreement with the Agency by which the participant agrees to
rehabilitate, develop, dispose of, or use the property in conformance with this Plan and be subject to provisions
hereof and such other provisions and conditions as the parties may agree. Participants who retain real property
may be required to record such documents as are necessary to make the provisions of this Plan and such
participation agreement binding upon future owners and occupants of the property. If a participant fails or
refuses to develop or use and maintain the real property pursuant to this Plan and the participation agreement,
the Agency may acquire the real property or any interest therein for disposal or development in accordance with
this Plan.
VVhether or not a participant enters into a participation agreement with the Agency, the provisions of this
Plan are applicable to all public and private, property in the Project Area.
4. [Section 305] Implementing Rules
The provisions of Sections 302 through 305 shall be implemented according to the rules adopted by the
Agency prior to the approval of this Plan, and the same may be from time to time amended by the Agency.
VVhere there is a conflict between the participation and re-entry preferences provisions in this Plan and such
rules adopted by the Agency, the rules shall prevail.
C. [Section 307] Property Acquisition
· 1. [Section 308] Acquisition of Real Property
The Agency may acquire, but is not required to acquire, any real property located in the Project Area by
gift, devise, exchange, lease, purchase, eminent domain or any other lawful method. The Agency is authorized
to acquire structures without acquiring the land upon which those structures are located. The Agency is also
authorized to acquire any other interest in real property less than a fee.
Since it is in the public interest and is necessar~~ for the elimination of those conditions requiring
redevelopment, the power of eminent domain may be employed by the Agency to acquire real property in thc
Project Area. The power of eminent domain will not be exercised, however, when the following exists:
a. The property in question is improved with a structure and the Agency has determined that it
conforms to this Plan and in the sole determination of the Agency:
(1) The property is not needed for specific activities permitted by or pursuant to this Plan;
(2) The property is not needed for the development of replacement housing for those
displaced by Agency activity, if any;
(3) The property is not needed for any other public improvement or facility;
(4) The property is not needed to promote historical or architectural preservation;
(5) The property is not needed to remove a blighting influence on surrounding properties
which prevents achievement of the objectives of this Plan;
(6) The property is not needed for the elimination of environmental deficiency including
among other things, inadequate circulation, access or street layout, incompatible and
mixed uses, overcrowding and small parcel size; or
(7) The property is not needed for the removal of impediments to land development and
disposition through assembly of land into appropriately sized and shaped parcels
served by improved circulation and utilities.
b. The property in question is improved with a structure and, although not conforming to the Plan,
the Agency has determined that the property and the structure can so conform pursuant to an
owner participation agreement and that the owner is faithfully performing under the terms of the
owner participation agreement; or
c. The property in question is owned by a public body and that public body has not consented to
the exercise of the power of eminent domain by the Agency.
The Agency must commence eminent domain proceedings with respect to any property which it intends
to acquire by such means within twelve years of the date of adoption of the ordinance that included such
property in the Project Area. This time limit for commencement of eminent domain proceedings may be
extended only by amendment of the Plan.
Prior to any acquisition through eminent domain, the Agency shall follow the procedures required by
law.
The Agency is not authorized to acquire real property owned by public bodies which do not consent to
such acquisition. The Agency is authorized, however, to acquire property devoted to a public use, if it is
transferred to private ownership before the Agency completes land disposition within the Project Area.
2. [Section 309] Acquisition of Personal Property
Generally, personal property shall not be acquired by the Agency. However, where necessary in the
execution of this Plan, the Agency is authorized to acquire personal property in the Project Area by any lawful
means, including eminent domain.
D. [Section 310] Property Mana.qement
Dudng such time as property, if any, in the Project Area is owned by the Agency, such property shall be
under the management and control of the Agency. Such property may be rented or leased by the Agency
pending its disposition for redevelopment, and such rental or lease shall be pursuant to such policies as the
Agency may adopt.
E. [Section 311] Relocation of Occupants Displaced by A_clenc¥ Activity
1. [Section 312] Relocation HousinR Requirements
No persons or families of Iow and moderate income shall be displaced unless and until there is a
suitable housing unit available and ready for occupancy by such displaced person or family at rents comparable
to those at the time of their displacement. Such housing units shall be suitable to the needs of such displaced
persons or families and must be decent, safe, sanitary, and otherwise standard dwellings. The Agency shall not
displace such persons or families until such housing units are available and ready for occupancy.
Permanent housing facilities shall be made available within three years from the time occupants are
displaced. Pending the development of such facilities, there will be available to such displaced occupants
adequate temporary housing facilities at rents comparable to those in the community at the time of their
displacement.
2. [Section 313] Replacement HousinR Plan
Not less than thirty days prior to the execution of an agreement for acquisition of real property, or the
execution of an agreement for the disposition and development of property, or the execution of an owner
participation agreement, which agreement would lead to the destruction or removal of dwelling units from the
Iow and moderate income housing market, the Agency shall adopt by resolution a replacement housing plan.
The replacement housing plan shall include: (1) the general location of housing to be rehabilitated,
developed, or constructed pursuant to Section 33413 of the Community Redevelopment Law; (2) an adequate
means of financing such rehabilitation, development, or construction; (3) a finding that the replacement housing
does not require the approval of the voters pursuant to Article XXXIV of the California Constitution, or that such
approval has been obtained; (4) the number of dwelling units housing persons and families of Iow or moderate
income planned for construction or rehabilitation; and (5) the timetable for meeting the plan's relocation,
rehabilitation, and replacement housing objectives. A dwelling unit whose replacement is required by Section
33413 but for which no replacement housing plan has been prepared, shall not be destroyed or removed from
the Iow and moderate income housing market until the Agency has by resolution adopted a replacement
housing plan.
Nothing in this section shall prevent the Agency from destroying or removing from the Iow and
moderate income housing market a dwelling unit that the Agency owns and which is an immediate danger to
health and safety~ The Agency shall, as soon as practicable, adopt by resolution a replacement-housing plan
with respect to such dwelling unit.
3. [Section 314] Assistance in FindinR Other Locations
The Agency shall assist all persons (including individuals and families), business concerns, and others
displaced by Agency action in the Project Area in finding other locations and facilities. In order to carry out the
Project with a minimum of hardship to persons (including individuals and families), business concerns, and
others, if any, displaced from their respective places of residence or business, the Agency shall assist such
persons, business concerns and others in finding new locations that are decent, safe, sanitary, within their
respective financial means, in reasonably convenient locations, and otherwise suitable to their respective
needs. The Agency may also provide housing inside or outside the Project Area for displaced persons.
4. [Section 315] Relocation Payments
The Agency' shall make all relocation payments required by law to persons (including individuals and
families), business concems, and others displaced by the Agency from property in the Project Area. Such
relocation payments shall be made pursuant to the California Relocation Assistance Law (Govemment Cod6
Section 7260 et seq.) and Agency rules and regulations adopted pursuant thereto as such may be amended
from time to time. The Agency may make such other payments as it may deem appropriat6 and for which funds
are available.
F. [Section 316] Payments to TaxinR A.qencies In Lieu of Taxes
The Agency may in any year during which it owns property in the Project Area pay directly to the City,
County, or other district, including, but not limited to, a school district, or other public corporation for whose
benefit a tax would have been levied upon the Agency-owned property had it not been exempt, an amount of
money in lieu of taxes.
G. [Section 317] Demolition, Clearance, Public Improvements,
Buildin.q and Site Preparation
1. '[Section 318] Demolition and Clearance
The Agency is authorized to demolish and clear buildings, structures, and other improvements from any
real property owned or acquired by it in the Project Area as necessary to carry out the purposes of this Plan.
2. [Section 319] Public Improvements
The Agency is authorized to pay all or part of the cost of land for, or the installation of, the public
improvements, facilities and utilities (within or outside the Project Area) necessary to carry out this Plan. Such
public improvements, facilities and utilities include, but are not limited to, the following: (1) over- and under-
passes; (2) sewers; (3) storm drains; (4) electrical, natural gas, telephone and water distribution systems; (5)
parks and plazas; (6) playgrounds; (7) parking and transportation facilities; (8) landscaped areas; (9) street and
circulation improvements; (10) flood control improvements and facilities; (11) fire stations, school facilities and
community centers; and (12) other public facilities serving the needs of Project Area occupants.
3. [Section 320] Preparation of BuildinR Sites
The Agency is authorized to prepare, or cause to be prepared, as building sites any real property in the
Project Area owned by the Agency. The Agency is also authorized to construct foundations, platforms, and
other structural forms necessary for the provision or utilization of air rights sites for buildings to be used for
commercial, public, and other uses provided in this Plan.
The Agency may take any actions which it determines are necessary and which are consistent with
other state and federal laws to remedy or remove a release of hazardous substances on, under, or from
property in the Project Area in accordance with the requirements of Health and Safety Code Section 33459 et
seq.
H. [Section 321] Property Disposition and Developme.nt
1. [Section 322] Real Property Disposition and Development
a. [Section 323] General
For the purposes of this Plan, the Agency is authorized to sell, lease for a pedod not to exceed 99
years, exchange, subdivide, transfer, assign, pledge, encumber by mortgage or deed of trust, or otherwise
dispose of any interest in real property. The Agency is authorized to dispose of real property by negotiated
lease, sale, or transfer without public bidding but only after public hearing.
Before any interest in real property of the Agency acquired in'whole or in part, directly or indirectly, with
tax increment moneys is sold, leased, or otherwise disposed of for development pursuant to this Plan, such
sale, least or disposition shall be first approved by the City Council by resolution after public hearing in
conformance with Section 33433 of the Community Redevelopment Lav,~
All real property acquired by the Agency in the Project Area, except property conVeyed by the Agency
to the City or other public body, shall be sold or leased to public or private persons or entities for development
for the uses permitted in this Plat,. Real property may also be conveyed by the Agency to the City and, where
beneficial to the Project Area, to any other public body without charge or for an amount at less than fair market
value.
All purchasers or lessees of property from the Agency shall be made obligated to use the property for
the purposes designated in this Plan, to begin and complete development of the property within a period of time
which the Agency fixes as reasonable, and to comply with other conditions which the Agency deems necessary
to carry out the purposes of this Plan.
During the period of development in the Project Area, the Agency shall ensure that the provisions of this
Plan and of other documents formulated pursuant to this Plan are being observed, and that development in the
Project Area is proceeding in accordance with development documents and time schedules.
b. [Section 324] Disposition and Development Documents
The Agency shall reserve powers and controls in disposition and development documents as may be
necessary to prevent transfer, retention, or use of property for speculative purposes and to ensure that
development is expeditiously carried out pursuant to this Plan.
To provide adequate safeguards to ensure that the provisions of this Plan will be carried out and to
prevent the recurrence of blight, all real property sold, leased, or conveyed by the Agency, as well as all
property subject to participation agreements, shall be made subject to the provisions of this Plan and any
adopted Design Guide and other conditions imposed by the Agency by leases, deeds, contracts, agreements,
declarations of restrictions, or other means. Where appropriate, as determined by the Agency, such documents
or memoranda evidencing same shall be recorded in the Office of the Recorder of the County.
The leases, deeds, contracts, agreements, and declarations of restrictions may contain restrictions,
covenants, covenants running with the land, rights of reverter, conditions subsequent, equitable servitudes, or
any other provision necessary to carry out this Plan.
c. [Section 325] Non-Discrimination Provisions
As stated in Section 33435:
"Agencies shall obligate lessees and purchasers of real property acquired in redevelopment projects and
owners of property improved as a part of a redevelopment project to refrain from restricting the rental, sale, or
lease of the property on the basis of race, color, religion, sex, marital status, ancestry, or national origin of any
person. All deeds, leases, or contracts for the Sale, lease, sublease, or other transfer of any land in a
redevelopment project shall contain or be subject to the nondiscrimination or nonsegregation clauses hereafter
prescribed."
As stated in Section 33436:
"Express provisions shall be included in all deeds, leases and contracts which the agency proposes to enter into
with respect to the sale, lease, sublease, transfer, use, occupancy, tenure, or enjoyment of any land in a
redevelopment project in substantially the following form:
(a) In deeds the following language shall appear- "The grantee herein covenants by and for himself or herself,
his or her heirs, executors, administrators, and assigns, and all persons claiming under or through them,
that there shall be no discrimination against or segregation of, any person or group of persons on account
of race, color, creed, religion, sex, marital status, national origin, or ancestry in the. sale, lease, sublease,
transfer, use, occupancy, tenure, or enjoyment of the premises herein conveyed, nor shall the grantee or
any person claiming under or through him or her, establish or permit any such practice or practices of
discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants,
lessees, subtenants, sublessees, or vendees ir, the premises herein conveyed. The foregoing covenant-~
shall run with the land."
10
(b) In leases the following language shall appear - "The lessee herein covenants by and for himself or herself,
his or her heirs, executors, administrators, and assigns and all persons claiming under or through him or
her, and this lease is made and accepted upon and subject to the following conditions:
That there shall be no discrimination against or segregation of any person or group of persons, on account
of race, color, creed, religion, sex, marital status, national origin, or ancestry, in the leasing, subleasing,
transferring, use, occupancy, tenure, or enjoyment of the premises herein leased nor shall the lessee
himself, or any person claiming under or through him or her, establish or permit any such practice or
practices of discrimination or segregation with reference to the selection, location, number, use, or
occupancy, of tenants, lesseees, sublessees, subtenants, or vendees in the premises herein leased."
(c) In contracts entered into by the agency relating to the sale, transfer, or leasing of land or any interest
therein acquired by the agency within any survey area or redevelopment project the foregoing provisions in
substantially the forms set forth shall be included and such contracts shall further provide that the foregoing
provisions shall be binding upon and shall obligate the contracting party or parties and any subcontracting
party or parties, or other transferees under the instrument.
d. [Section 326] Public Improvements
To the extent now or hereafter permitted by law, the Agency may, with the consent of the City Council
of the City of South San Francisco, pay all or part of the value of the land for and the cost of the installation and
construction of any building, facility, structure, or other improvement which is publicly owned either within or
outside the Project Area, if the City Council determines: (1) that such buildings, facilities, structures, or other
improvements are of benefit to the Project Area or the immediate neighborhood in which the Project is located,
regardless of whether such improvement is within another project area; (2) that no other reasonable means of
financing such buildings, facilities, structures, or other improvements are available to the community; and (3)
that the payment of funds for the acquisition of land or the cost of buildings, facilities, structures, or other
improvements will assist in the elimination of one or more blighting conditions inside the Project Area or provide
housing for Iow or moderate income persons and is consistent with the implementation plan adopted pursuant
to Section 33352 or 33490 of the Health and Safety Code. Such determinations by the Agency and the City
Council shall be final and conclusive.
Specifically, the Agency may pay all or par[ of the valUe of the land for and the cost of the installation
and construction of any building, facility, structure or other improvement set forth in Section 319 of this Plan,
including, without limitation, those set forth in Exhibit V, Proposed Public Improvements and Facilities Projects.
When the value of such land or the cost of the installation and construction of such building, facility,
structure, or other improvement, or both, has been, or will be paid or provided for initially by the City or other
public corporation, the Agency may enter into a contract with the City or other public corporation under which it
agrees to advance funds to, or reimburse the City or other public corporation for all or part of the value of such
land or all or part of the cost of such building, facility, structure, or other improvement, or both, by pedodic
payments over a period of years.
The obligation of the Agency under such contract shall constitute an indebtedness of the Agency for the
purpose of carrying out the redevelopment of the Project Area, which indebtedness may be made payable out
of taxes levied in the Project Area and allocated to the Agency under subdivision (b) of Section 33670 of the
California Redevelopment Law and Section 502 of this Plan, or out of any other available funds.
In a case where such land has been or will be acquired by, or the cost of the installation and
construction of such building, facility, structure or other improvement has been paid by, a parking authority, joint
powers entity, or other public corporation to provide a buildin.~, facility, structure, or other improvement which
has been or will be leased to the City such contract may be made with, and such reimbursement may be made
payabte to, the City.
Before the Agency commits to use the portion of taxes to be allocated and paid to the Agency pursuant
to subdivision (b) of Section 33670 for the purpose of paying all or part of the value of the land for, and the cost
of the installation and construction of, any publicly owned building, other than parking facilities, the City Council
shall hold a public hearing in accord with the provisions of Section 33679 of the Community Redevelopment
Law.
e. [Section 327] Development Plans
All development plans (whether public or private) shall be processed in the manner provided by
applicable City codes as they are or as they may be amended from time to time. All development in the Project
Area must conform to City and Agency design review procedures, including any Design Guide adopted by the
Agency pursuant to Section 420 hereof.
2. [Section 328] Personal Property Disposition
'For the purposes of this Plan, the Agency is authorized to lease, sell, exchange, transfer, assign,
pledge, encumber, or otherwise dispose of personal property which is acquired by the Agency.
[Section 329] Cooperation with Public Bodies
Certain public bodies are authorized by state law to aid and cooperate with or without consideration in
the planning, undertaking, construction, or operation of this Project. The Agency may seek the aid and
cooperation of such public bodies and attempt to coordinate this Plan with the activities of such public bodies in
order to accomplish the purposes of redevelopment and the highest public good.
The Agency, by law, is not authorized to acquire real property owned by public bodies without the
consent of such public bodies. The Agency, however, will seek the cooperation of all public bodies that own or
intend to acquire property in the Project Area. Any public body that owns or leases property in the Project Area
will be afforded all the privileges of owner participation if such public body is willing to enter into a participation
agreement with the Agency. All plans for development of property in the Project Area by a public body shall be
subject to Agency approval.
The Agency may impose on all public bodies the planning and design controls contained in and
authorized by this Plan to ensure that present uses and any future development by public bodies will conform to
the requirements of this Plan. The Agency is authorized to financially (and otherwise) assist any public entity in
the cost of public land, buildings, facilities, structures, or other improvements (within or outside the Project Area)
which land, buildings, facilities, structures, or other improvements are of benefit to the Project.
j. [Section 330] Rehabilitation, Conservation and Movin.q of Structures
1. [Section 331] Rehabilitation and Conservation
The Agency is authorized to rehabilitate and conserve, or to cause to be rehabilitated and conserved,
any building or structure in the Project Area owned by the Agency. The Agency is also authorized to advise,
encourage, and assist (through a loan program or otherwise) in the rehabilitation and conservation of property
in the Project Area not owned by the Agency. The Agency is also authorized to restore, rehabilitate, move and
conserve buildings of historic or architectural significance acquired by it.
It shall be the purpose of this Plan to allow for the retention of as many existing businesses as
practicable and to add to the economic life of these businesses by a program of voluntary participation in their
conservation and rehabilitation. The Agency is authorized to conduct a program of assistance to encourage
owners of property within the Project Area to upgrade and maintain their property consistent with this Plan and
such standards as may be developed for the Project Area.
The extent of retention, conservation and rehabilitation in the Project Area shall be subject to the
following limitations:
a. The rehabilitation of the structure must be compatible with land uses as provided for in
this Plat,;
12
b. Rehabilitation and conservation activities on a structure must be carried out in an
expeditious manner and in conformance with the requirements of this Plan and such
property rehabilitation standards as may be adopted by the Agency and the City.
c. The expansion of public improvements, facilities and utilities.
d. The assembly and development of areas in accordance with this Plan.
The Agency may adopt property rehabilitation standards for the rehabilitation of properties assisted by
the Agency.
Within the Project Area and as part of an agreement that provides for the development and
rehabilitation of property that will be used for industrial or manufacturing purposes, the Agency may assist with
the financing of facilities or capital equipment, including, but not necessarily limited to, pollution control devices.
The Agency may also establish a program under which it loans funds to owners or tenants for the purpose of
rehabilitating commercial buildings or structures within the Project Area.
The Agency shall not assist in the rehabilitation or conservation of properties which, in its opinion, are
not economically and/or structurally feasible, or which do not further the purposes of this Plan.
2. [Section 332] Movin.q of Structures
As necessary in carrying out this Plan, the Agency is authorized to move or to cause to be moved, any
standard structure or building owned or acquired by it.
K. [Section 333] Low or Moderate Income Housin!;I
1. [Section 334] Authority Generally
The Agency may, inside or outside the Project Area, acquire land, improve sites, or construct or
rehabilitate structures or assist private parties in the performance of such actions in order to provide housing
affordable to persons and families of Iow or moderate income. The Agency may also provide subsidies to, or
for the benefit of, such persons and families or households to assist them in obtaining housing. The Agency
may also sell, lease, grant, or donate real property owned or acquired by the Agency to the Housing Authority of
the City of South San Francisco or the Housing Authority of the County of San Mateo and may otherwise
cooperate with the Housing Authority in carrying out the provisions of Section 335 hereinbelow.
2. [Section 335] Replacement Housing
In accordance with Sections 33334.5 and 33413 of the Community Redevelopment Law, whenever
dwelling units housing persons and families of Iow or moderate income are destroyed or removed from the Iow
and moderate income housing market as part of a redevelopment project which is subject to a written
agreement with the Agency or where financial assistance has been provided by the Agency, the Agency shall,
within four years of such destruction or removal, rehabilitate, develop, or construct, or cause to be rehabilitated,
developed, or constructed, for rental or sale to persons and families of Iow or moderate income, an equal
number of replacement dwelling units which have an equal or greater number of bedrooms as those destroyed
or removed units at affordable housing costs, as defined by Sections 50052.5 and 50053 of the Health and
Safety Code, within the territorial jurisdiction of the Agency, in accordance with all of the provisions of Sections
33413 and 33413.5 of the Community Redevelopment Law. Seventy-five percent (75%) of the replacement
dwelling units shall replace dwelling units available at affordable housing cost in the same income level of very
Iow income households, lower income households, and persons and families of Iow and moderate income, as
the persons displaced from those destroyed or removeo units.
13
3. [Section 336] Increase, Improve and Preserve the Sul~olv
Pursuant to Section 33334.2 of the Community Redevelopment Law, not less than 20 percent of all
taxes which are allocated to the Agency pursuant to subdivision (b) of Section 33670 of the Community
Redevelopment Law and Section 502 of this Plan shall be used by the Agency for the purposes of increasing,
improving and preserving the City's supply of Iow and moderate income housing available at affordable housing
costs, as defined by Sections 50052.5 and 50053 of the Health & Safety Code, to persons and families of Iow or
moderate income, as defined in Section 50093 of the Health & Safety Code, and very Iow income households,
as defined in Section 50105 of the Health & Safety Code, unless one of the findings permitted by Section
33334.2 is made annually by resolution.
In carrying out the purposes of Section 33334.2, the Agency may exercise any or all of its powers,
including, but not limited to, the following:
(1) Acquire real property or building sites subject to the provisions of Section 33334.16 of
the Community Redevelopment Law.
(2) Improve real property or building sites with onsite or offsite improvements, but only if
either (a) the improvements are made as part of a program which results in the new
construction or rehabilitation of affordable housing units for Iow or moderate income
persons that are directly benefited by the improvements or (b) the Agency finds that
the improvements are necessary to eliminate a specific condition that jeopardizes the
health or safety of existing Iow or moderate income residents.
(3) Donate real property to private or public persons or entities.
(4) Finance insurance premiums pursuant to Section 33136
Redevelopment Law.
of the Community
(5) Construct buildings or structures.
(6) Acquire buildings or structures.
(7)
(8)
(9)
Rehabilitate buildings or structures.
Provide subsidies to, or for the benefit of, very Iow income households, as defined by
Section 50105 of the Health and Safety Code, lower income households, as defined by
Section 50079.5 of the Health and Safety Code, or persons and families of Iow or
moderate income, as defined by Section 50093 of the Health and Safety Code, to the
extent those households cannot obtain housing at affordable costs on the open market.
Housing units available on the open market are those units developed without direct
government subsidies.
Develop plans, pay principal and interest on bonds, loans, advances, or other
indebtedness, or pay financing or carrying charges.
(10)
(11)
Maintain the community's supply of mobilehomes.
Preserve the availability of housing units affordable to lower income households in
housing developments which are assisted or subsidized by public entities and which
are threatened with imminent conversion to market rates.
The Agency may use these funds to meet, in whole or in part, the replacement housing provisions in
Section 334 above. These funds may be used inside or outside the Project Area provided, however, .that such
funds may be used outside the Project Area only if findings of benefit to the Project are made as required by
said Section 33334.2 of the Community Redevelopment Law.
The funds for these purposes shall be held in a separate Low and Moderate Income Housing Fund until
used. Any interest earned by such Low and Moderate Income Housing Fund and any repayments or other
income to the Agency for loans, advances, or grants, of any kind, from such Low and Moderate Income Housing
Fund, shall accrue to and be deposited in, the fund and may only be used in the manner prescribed for the Low
and Moderate Income Housing Fund.
Pursuant to the requirements of Section 33334.12 of the Community Redevelopment Law, upon failure
of the Agency to expend or encumber excess surplus in the Low and Moderate Income Housing Fund within
one year from the date the moneys become excess surplus, within the meaning defined in Section 33334.12 of
the Community Redevelopment Law, the Agency shall either disburse that excess surplus to the South San
Francisco Housing Authority, San Mateo County Housing Authority or to another public agency in accordance
with said Section 33334.12, or expend or encumber the excess surplus within t~o additional years. The
housing authority or other public agency shall utilize the moneys for the purposes of, and subject to, the same
restrictions that are applicable to the Agency under the Community Redevelopment Law, and for that purpose
may exercise all of the powers of a housing authority under the Housing Authorities Law (Sections 34200 et
seq. of the Health and Safety Code) to the extent not inconsistent with these limitations.
4. [Section 337] New or Rehabilitated Dwellin.q Units
Developed Within Proiect Area
At least thirty percent (30%) of all new and substantially rehabilitated dwelling units developed by the
Agency, if any, shall be available at affordable housing cost to persons and families of iow or moderate income.
Not less than fifty percent (50%) of the dwelling units required to be available at affordable housing cost to
persons and families of iow or moderate income shall be available at affordable housing cost to, and occupied
by, very Iow income households.
At least fifteen percent (15%) of all new and substantially rehabilitated dwelling units developed within
the Project Area by public or private entities or persons other than the Agency, if any, shall be available at
affordable housing cost to persons and families of Iow or moderate income. Not less than forty percent (40%)
of the dwelling units required to be available at affordable housing cost to persons and families of Iow or
moderate income shall be available at affordable housing costs to very Iow income households.
The Agency may satisfy the provisions of the above paragraphs, in whole or in part, by any of the
methods described in Community Redevelopment Law Section 33413(b) or any other method permitted by law.
The percentage requirements set forth in this Section 336 shall apply independently of the requirements
of Section 334 and in the aggregate to housing made available pursuant to the first and second paragraphs,
respectively, of this Section 336 and not to each individual case of rehabilitation, development or construction of
dwelling units, unless the Agency determines otherwise.
If all or any portion of the Project Area is developed with Iow or moderate income housing units, the
Agency shall require by contract or other appropriate means that such housing be made available for rent or
purchase to the persons and families of Iow and moderate income displaced by the Project. Such persons and
families shall be given priority in renting or buying such housing; provided, however, failure to give such priority
shall not affect the validity of title to real property.
5. [Section 338] Duration of Dwellin.q Unit Availability and
A~enc¥ Monitoring
The Agency shall require that the aggregate number of replacement dwelling units and other dwelling
units rehabilitated, developed, constructed, or price-restricted pursuant tc Sections 334 and 336 shall remain
available at affordable housing cost to persons and families of Iow income, moderate income and very Iow
income households, respectively, for the longest feasible time, as determined by the Agency, but for not less
than the period set forth in Section 800 for the duration of this Plan's land use controls, except to the extent a
longer or shorter period of time is permitted or required by other provisions of the law.
15
Pursuant to Section 33418 of the Community Redevelopment Law, the Agency shall monitor, on an
ongoing basis, any housing affordable to persons and families of Iow or moderate income developed or
otherwise made available pursuant to the Community Redevelopment Law. As part of this monitoring, the
Agency shall require owners or managers of the housing to submit an annual report to the Agency. The annual
reports shall include for each rental unit the rental rate and the income and family size of the occupants, and for
each owner-occupied unit whether there was a change in ownership from the prior year and, if so, the income
and family size of the new owners. The income information required by this section shall be supplied by the
tenant in a certified statement on a form provided by the Agency.
L. [Section 339] Implementation Plans
In accord with the provisions of Section 33490 of the Community Redevelopment Law, on January,
1995, the Agency adopted an implementation plan for the Project and the three other project areas.in the City of
South San Francisco (Downtown Central, Gateway, and Shearwater). Commencing with the fifth year after the
first implementation plan was adopted, and each five years thereafter, the Agency shall adopt, after a public
hearing, succeeding implementation plans that shall contain the specific goals and objectives of the Agency for
the Project Area, the specific programs, including potential projects, and estimated expenditures proposed to be
made dudng the next five years, and an explanation of how the goals and objectives, programs, and
expenditures will eliminate blight within the Project Area and implement the requirements of Section 33334.2,
33334.4, 33334.6 and 33413 of the Community Redevelopment Law. The Implementation Plan adopted by the
Agency on January, 1995, constitutes the initial implementation plan for the Project. The parts of future
implementation plans that address Sections 33334.2, 33334.4, 332334.6 and 33413 of the Community
Redevelopment Law shall be adopted every five years either in conjunction with the General Plan Housing
Element cycle or the implementation plan cycle. The Agency may adopt implementation plans that include
more than one project area, and may amend the implementation plan after conducting a public hearing on the
proposed amendment.
At least once within the five-year term of each plan adopted by the Agency, no earlier than two years
and no later than three years after adoption of each plan, the Agency shall conduct a public hearing and hear
testimony of all interested parties for the purpose of reviewing this Redevelopment Plan and the implementation
plan and evaluating the progress of the Project. The hearing may be for two or more project areas if those
project areas are included within the same implementation plan.
IV. [Section 400] LAND USES AND DEVELOPMENT REQUIREMENTS
A. [Section 401] Redevelopment Plan Map and Maior Proiect Area Land Uses
The Redevelopment Plan Map (Land Use and Circulation Map) attached hereto illustrates the location
of the Project Area boundaries, identifies the major streets within the Project Area, and designates the major
land uses authorized within the Project Area by the City's current General Plan. The City will from time to time
update and revise the General Plan. It is the intention of this Redevelopment Plan that the major and other land
uses to be permitted within the Project Area shall be as provided within the City's General Plan, as it currently
exists or as it may from time to time be amended, and as implemented and applied by City ordinances,
resolutions and other laws. The major land uses authorized within the Project Area by the General Plan are
described below. Other uses may be authorized from time to time by General Plan amendments.
B. [Section 402] Major Land Uses
Major land uses permitted within the Project Area shall include:
Low Density Residential
Medium Density Residential
High Density Residential
Office
Community Commercial
Public
Park and Recreation
Transportation Center
The areas shown on the Redevelopment Plan Map (Land Use and Circulation Map) for the foregoing
uses may be used for any of the various kinds of uses specified for or permitted within such areas by the
General Plan and City ordinances, resolutions and other laws.
C. [Section 403] Other Land Uses
1. [Section 404] Public Ri.qhts of Way
Major public streets within the Project Area are generally described as follows:
El Camino Real
Mission Road
Chestnut Avenue
Grand Avenue
Orange Avenue
Willow Avenue
Susie Way
Additional public streets, alleys and easements may be created in the Project Area as needed for
proper use and/or development. Existing streets and alleys may be abandoned, closed or modified as
necessary for proper use and/or development. It is anticipated that Project development may entail vacation
and/or realignment of certain streets, alleys, and other rights-of-way.
Any changes in the existing street layout shall be in accord with the General Plan, the objectives of this
Plan, and the City's design standards, shall be effectuated in the manner prescribed by state and local law, and
shall be guided by the following criteria:
A balancing of the needs of proposed and potential new developments for adequate pedestrian
and vehicular access, vehicular parking, and delivery loading docks with similar needs of
existing developments proposed or potentially proposed to remain. Such balancing shall take
into consideration the rights of existing owners under the participation and, preferences rules
adopted by the Agency for the Project, and any participation agreements executed thereunder;,
2. The requirements imposed by such factors as topography, traffic safety and aesthetics;
~7
The potential need to serve not only the Project Area and new or existing developments, but to
also serve areas outside the Project Area by providing convenient, efficient vehicular access
and movement; and
The potential need or desire to accommodate the facilities and/or equipment of mass
transportation modes.
The public rights-of-way may be used for vehicular and/or pedestrian traffic, as well as for public
improvements, public and private utilities, and activities typically found in public rights-of-way. In addition, all
necessary easements for public uses, public facilities, and public utilities may be retained, amended or created.
2. [Section 405] Other Public, Semi-Public, Institutional and Non-Profit Uses
The maintenance, establishment or enlargement of public, semi-public, institutional, or non-profit uses,
including park and recreational facilities, libraries, educational, fraternal, employee, philanthropic, religious and
charitable institutions, utilities, transportation centers, railroad rights-of-way, and facilities of other similar
associations or organizations shall conform so far as possible to the provisions of this Plan applicable to the
uses in the specific area involved. The Agency may impose such other reasonable restrictions as are
necessary to protect the development and uses in the Project Area.
D. [Section 406] Conforming Properties
The Agency may, at its sole and absolute discretion, determine that certain real properties within the
Project Area meet the requirements of this Plan, and the owners of such properties may be permitted to remain
as owners of conforming properties without a participation agreement with the Agency, provided such owners
continue to operate, use, and maintain the real properties within the requirements of this Plan. A certificate of
conformance to this effect may be issued by the Agency and recorded. An owner of a conforming property may
be required by the Agency to enter into a participation agreement with the Agency in the event that such owner
desires to (1) construct any additional improvements or substantially alter or modify existing structures on any of
the real property described above as conforming; or (2) acquire additional property within the Project Area.
Notwithstanding the foregoing, each property in the Project Area shall be considered to conform to this
Plan, until and unless the Agency has determined by resolution that such property does not conform to this
Plan.
E. [Section 407] Interim Uses
Pending the ultimate development of land by developers and participants, such land may be used for
interim uses not in conformity with the uses permitted in this Plan. Such interim use shall conform to all
applicable City codes.
F, , [Section 408] Nonconforming Uses
An existing use may remain in an existing building in good condition, which use does not conform to the
provisions of this Plan, provided that such use is generally compatible with existing and proposed developments
and uses in the Project Area, and abatement of such uses is not required by applicable City codes. The owner
of such a property may be required to enter into a participation agreement, to record a covenant of restrictions
against the property, and agree to the imposition of such reasonable restrictions as may be necessary to protect
the development and uses in the Project Area.
Additions, alterations, repairs or other improvements in the Project Area may be authorized for uses
which do not conform to the provisions of this Plan where such improvements are within a portion of the Project
where such improvements would be compatible with surrounding and Project Area uses and development and
are permitted under applicable City codes.
G. [Section 409] General Controls and Limitations
All real property in the Project Area is hereby made subject to the controls and requirements of this
Plan. No real property shall be developed, rehabilitated, or otherwise changed after the effective date of the
ordinance adopting this Plan, except in conformance with the provisions of this Plan.
1. [Section 410] Construction
All construction in the Project Area shall comply with all applicable state and local laws in effect from
time to time.
In addition to applicable codes, ordinances, or other requirements governing development in the Project
Area, additional specific performance and development standards may be adopted by the Agency to control and
direct redevelopment activities carried out pursuant to an agreement with the Agency, including property
rehabilitation standards adopted pursuant to Section 331 hereof, and one or more Design Guides adopted
pursuant to Section 420 hereof.
2. [Section 411] Limitation on the Number of Buildings
The approximate number of buildings in the Project Area shall not exceed the maximum number
allowed under the densities permitted under the City's General Plan, as implemented and applied by local
codes and ordinances. The number of buildings permitted in the Project Area will be approximately 600.
3. [Section 412] Number of Dwellin.q Units
The number of dwelling units in the Project Area shall not exceed the maximum number allowed under
the densities permitted under the City's General Plan, as implemented and applied by local codes and
ordinances. The number of dwelling units permitted in the Project Area will be approximately 3,900.
By regulation or policy guideline adopted by the Agency from time to time,'the Agency shall ensure compliance
with the provisions of Health and Safety Code Section 33413 requiring that specified percentages of all new or
rehabilitated dwelling units developed in the Project Area be available at affordable housing cost to Iow and
moderate income households (including very Iow income households). Such adopted Agency regulations
and/or policy guidelines shall be applicable and enforceable under this Plan with respect to parcels developed
with new or rehabilitated residential structures in the Project Area regardless of whether such parcels are
developed with Agency assistance or participation.
4. [Section 413] Limitations on Type, Size and Height of Buildin.qs
Except as set forth in other sections of this Plan, the type, size, and height of buildings shall be as
limited by the applicable federal, state and local statutes and ordinances.
5. [Section 414] Open Spaces, Landscal3in.ch Li.clht, Air and Privacy
The. approximate amount of open space to be provided in the Project Area is the total of all area which
will be in the public rights-of-way, the public grounds, spaces around buildings, and all other outdoor areas not
permitted to be covered by buildings. Landscaping shall be developed in the Project Area to ensure optimum
use of living plant material.
In all areas, sufficient space shall be maintained between buildings to provide adequate light, air and
privacy.
6. [Section 415] Signs
All signs shall conform to City requirements. Design of all proposed new signs shall be submitted prior
to installation to the Agency and/or City for review and approval pursuant to the procedures permitted by this
Plan.
19
[Section 416] Utilities
All utilities be placed underground whenever physically possible and economically feasible.
8. [Section 417] Incompatible Uses
No use or structure which would, by reason of appearance, traffic, smoke, glare, noise, odor, or similar
factors, be incompatible with the surrounding areas or structures shall be permitted in any part of the Project
Area.
9. [Section 418] Subdivision of Parcels
No parcels in the Project Area, including any parcel retained by a participant, shall be consolidated,
subdivided or re-subdivided without the approval of the appropriate City body, and, if necessary for purposes of
this Plan, the Agency.
10. [Section 419] Minor Variations
Minor variations from the limits, restrictions and controls established by this Plan may be permitted
when:
The application of certain provisions of the Plan would result in practical difficulties or
unnecessary hardships inconsistent with the general purpose and intent of the Plan.
bo
There are exceptional circumstances or conditions applicable to the property or to the
intended development of the property which do not apply generally to other properties
having the same standards, restrictions, and controls.
Permitting a variation will not be materially detrimental to the public welfare or injurious
to property or improvements in the area.
d. Permitting a variation will not be contrary to the objectives of the Plan.
No such variation shall be granted which permits other than a minor departure from the provisions of
this Plan. In permitting any such variation, such conditions may be imposed as are necessary to protect the
public health, safety, or welfare, and to assure compliance with the purposes of this Plan. Any such variation
permitted by the Agency hereunder shall not supersede any other approval required under City codes and
ordinances.
H. [Section 420] Desi.qn Guide
Within the limits, restrictions, and controls established in this Plan, the Agency is authorized to establish
heights of buildings, land coverage, setback requirements, design and sign criteria, traffic circulation, traffic
access, parking, and other development and design controls necessary for proper development and use of land
sold, leased or transferred by it. These may be established by the approval of specific developments, by the
adoption of general restrictions and controls on such land by resolution of the Agency, or by the adoption of one
or more Design Guides pursuant to this Section.
No new improvement shall be constructed on such land and no existing improvement shall be
substantially modified, altered, repaired, or rehabilitated except in accordance with architectural, landscape, and
site plans submitted to and approved in writing by the Agency unless allowed pursuant to the procedures of
Section 421 hereof. One of the objectives of this Plan is to create an attractive and pleasant environment in the
Project Area. Therefore, such plans shall give consideration to good design, open space, and other amenities
to enhance the aesthetic and architectural quality of the Project Area. 'me Agency shall not approve any plans
that do not comply with this Plan.
20
I. [Section421] Buildinq Permits
No permit shall be issued for the construction of any new building or any addition, construction, moving,
conversion or alteration to an existing building or structure, or preparation of any site, or the installation of any
physical improvement, including grading and landscaping, in the Project Area from the date of adoption of this
Plan until the application for such permit has been made by the owner or his agent and processed in a manner
consistent with all city requirements. Any permit that is issued hereunder must be in conformance with the
provisions of this Plan, any Design Guide adopted by the Agency, any restrictions or controls established by
resolution of the Agency, and any applicable participation or other agreement.
The Agency is authorized to establish permit procedures and approvals ir~ addition to those set forth
above where required for purposes of this Plan. A building permit shall be issue(~ only after the applicant for
same has been granted all approvals required by the City and the Agency at the time of application.
V. [Section 500] METHOD OF FINANCING THE PROJECT
A. [Section 501] General Description of the Proposed Financing Method
The Agency is authorized to finance the Project with tax increment funds; interest income; Agency
bonds; donations; loans from private financial institutions; the lease or sale of Agency-owned property; owner
participant or developer loans; use or transient occupancy taxes; participation in development; or with financial
assistance from the City, State of California, the federal government, or any other available source, public or
private.
The Agency is also authorized to obtain advances, borrow funds, issue bonds, and create indebtedness
in carrying out this Plan. The principal and interest on such indebtedness may be paid from tax increments or
any other funds available to the Agency. Advances and loans for survey and planning and for the operating
capital for administration of the Project may be provided by the City or any other available source, public or
private, until adequate tax increment or other funds are available or sufficiently assured to repay the advances
and loans and to permit borrowing adequate working capital from other sources. The City, as it is able, may
also supply additional assistance through issuance of bonds, loans and grants and in-kind assistance.
The City or any other public agency may expend money to assist the Agency in carrying out the Project.
As available, gas tax funds or other legally available funds from the state and county may be used for street
improvements and public transit facilities. All or a portion of the parking may be installed through a parking
authority or other public or private entities.
Tax increment financing, as authorized by Section 502 of this Plan, is intended as a source of financing
in combination with other sources of financing that may be available for specific Project activities.
B. [Section 502] Tax Increment Funds
All taxes levied upon taxable property within the Project Area each year, by or for the benefit of the
State of California, the County of San Mateo, the City of South San Francisco, any district or any other public
corporation (hereinafter sometimes called "taxing agencies") after the effective date of the ordinance approving
this Plan, shall be divided as follows:
That portion of the taxes which would be produced by the rate upon which the tax is levied
each year by or for each of said taxing agencies upon the total sum of the assessed value of
the taxable property in the Project Area as shown upon the assessment roll used in connection
with the taxation of such property by such taxing agency, last equalized prior to the effective
date of such ordinance, shall be allocated to and when collected shall be paid to the respective
taxing agencies as taxes by or for said taxing agencies on all other property are paid (for the
purpose of allocating taxes levied by or for any taxing agency or agencies which did not include
the territory of the Project on the effective date of such ordinance but to which such territory has
been annexed or otherwise included after such effective date, the assessment roll of the
County of San Mateo last equalized on the effective date of said ordinance shall be used in
determining the assessed valuation of the taxable property in the Project Area on said effective
date); and
Except as provided in subdivision 3 below, that portion of said levied taxes each year in excess
of such amount shall be allocated to and when collected shall be paid into a special fund of the
Agency to pay the principal of and interest on bonds, loans, moneys advanced to, or
indebtedness (whether funded, refunded, assumed or otherwise) incurred by the Agency to
finance or refinance, in whole or in part, the Project. Unless and until the total assessed
valuation of the taxable property in the Project Area exceeds the total assessed value of the
taxable property in the Project Area as shown by the last equalized assessment roll referred to
in subdivision 1 hereof, all of the taxes levied and collected upon the taxable property in the
Project Area shall be paid into the funds of the respective taxing agencies. When said bonds,
loans, advances and indebtedness, if any, an(: interest thereon, have been paid, all moneys
thereafter received from taxes upon the taxable property in the Project Area shall be paid to the
respective taxing agencies as taxes on all other property are paid.
That portion of the taxes in excess of the amount identified in subdivision 1 hereof which are
attributable to a tax rate levied by a taxing agency for the purpose of producing revenues in an
amount sufficient to make annual repayment of the principal of, and the interest on, any bonded
indebtedness for the acquisition or improvement of real property shall be allocated to and when
collected shall be paid into, the fund of that taxing agency. This subdivision 3 shall only apply
to taxes levied to repay bonded indebtedness approved by the voters of the taxing agency on
or after January 1, 1989.
The portion of taxes mentioned in subdivision 2 above is hereby irrevocably pledged for the payment of
the principal of and interest on the advance of moneys, or making of loans, or the incurring of any indebtedness
(whether funded, refunded, assumed or otherwise) by the Agency to finance or refinance the Project, in whole
or in part.
The Agency is authorized to make such pledges as to specific advances, loans and indebtedness as
appropriate in carrying out the Project.
The portion of taxes divided and allocated to the Agency pursuant to subdivision 2 of this Section 502
shall not exceed $300 million exclusive of any payments made pursuant to agreements with taxing agencies in
accordance with Community Redevelopment Law Section 33401 as such section read prior to January 1, 1994.
This limit shall not apply to include or prevent the Agency from incurring debt to be paid from the Iow and
moderate income housing fund established pursuant to Section 33334.3 of the Community Redevelopment
Law, or any other amounts required to fulfill the Agency's obligations under Section 33513 of the Community
Redevelopment Law.
C. [Section 503] Agency Bonds
The Agency is authorized to issue bonds from time to time, if it deems it appropriate to do so, in order to
finance all or any part of the Project.
Neither the members of the Agency nor any persons executing the bonds are liable personally on the
bonds by reason of their issuance.
The bonds and other obligations of the Agency are not a debt of the City, the State, or any of its political
subdivisions and neither the City, the State, nor any of its political subdivisions is liable on them, nor in any
event shall the bonds or obligations be payable out of any funds or properties other than those of the Agency;
and such bonds and other obligations shall so state on their face. The bonds do not constitute an indebtedness
within the meaning of any constitutional or statutory debt limitation or restriction.
The amount of bonded indebtedness to be repaid in whole or part from the allocation of taxes described
in subdivision 2 of Section 502 above which can be outstanding at any one time shall not exceed $50 million in
principal amount, except by amendment of this Plan. This limit, however, shall not prevent the Agency from
issuing additional bonds in order to fulfill the Agency's obligations under Section 33413 of the Health and Safety
Code.
D. [Section 504] Time Limit on Establishment of Indebtedness
The Agency shall not establish or incur loans, advances, or indebtedness to finance in whole or in part
the Project beyond the following dates for the areas indicated:
For loans, advances, or indebtedness to be repaid from any tax increment revenues received
from the Original Project Area: July 14, 2013; and
For loans, advances, or indebtedness to be repaid from any tax increment revenues received
from the Second Amendment Area: 20 years from the effective date of the ordinance adopting
2,3
the Second Amendment to this Plan. This limit may be extended only by amendment of this
Plan.
Loans, advances, or indebtedness may be repaid over a period of time beyond said time limit. Such time
limitation may be extended only by amendment of this Plan. This limit, however, shall not prevent the Agency
from incurring debt to be paid from the Low and Moderate Income Housing Fund established pursuant to
Section 33334.3 of the Community Redevelopment Law and Section 336 of this Plan, or establishing more debt
in order to fulfill the Agency's obligations under Section 33413 of the Community Redevelopment Law and
Section 335 of this Plan. This limit shall not prevent the Agency from refinancing, refunding or restructuring
indebtedness after the time limit if the indebtedness is not increased and the time during which the
indebtedness is to be repaid is not extenaed beyond the time limit contained in this Section 504.
E. [Section 505] Payments to Affected Taxin.q Entities
The Agency may pay to any affected taxing agency with which it has entered into an agreement prior to
December 31, 1993, providing for such payments any amounts of money the Agency has found necessary and
appropriate to alleviate any financial burden or detriment caused by the Project to such affected taxing agency.
In addition, to the extent applicable, and in the amounts and manner provided therein, the Agency shall annually
pay to Project Area affected taxing entities the payments required by Section 33607.5 of the Community
Redevelopment Law.
F. [Section 506] Time Limit on Receipt of Tax Increment
The Agency may not receive and shall not repay indebtedness with the proceeds from property taxes
received pursuant to Section 33670 of the Community Redevelopment Law and Section 502 of this Plan beyond
the following dates for the areas indicated, except to repay debt to be paid from the Low and Moderate Income
Housing Fund established pursuant to Section 33334.3 of the Community Redevelopment Law and Section 336
of this Plan, or debt established in order to fulfill the Agency's obligations under Section 33413 of the
Community Redevelopment Law and Section 335 of this Plan:
For indebtedness to be repaid with any tax increment revenues received from the Original
Project Area: July 14, 2043; and
For indebtedness to be repaid with any tax increment revenues received from the Second
Amendment Area: 15 years following the expiration of this Plan's effectiveness applicable to
the Second Amendment Area, as set forth in Section 800 herein below.
G. [Section 507] Other Loans and Grants
Any other loans, grants, guarantees, or financial assistance from the United States, the State of
California, or any other public or private source will be utilized if available as appropriate in carrying out the
Project. In addition, the Agency may make loans as permitted by law to public or pdvate entities for any of its
redevelopment purposes.
24
VI. [Section 600] ACTIONS BYTHE CITY
The City shall aid and cooperate with the Agency in carrying out this Plan and shall take all actions
necessary to ensure the continued fulfillment of the purposes of this Plan and to prevent the recurrence or
spread in the area of conditions causing blight. Actions by the City may include, but are not limited to, the
following:
Acquisition of any real and personal property inside or outside the Project Area required as
right-of-way for circulation improvements; demolition and removal of structures on such
acquired property; and preparation of such property for construction. The costs to the City of
Such acquisition, demolition, and site preparation may be reimbursed by the Agency from
Project revenues.
Construction of any public improvements serving the purposes of this Plan. The costs to the
City of such construction may be reimbursed by the Agency from Project revenues.
Establishment of an assessment district mechanism to collect fees from property developers
within the Project Area for purposes of Project financing.
Initiation and completion of proceedings for opening, closing, vacating, widening, or changing
the grades of streets, alleys, and other public right-of-ways, as appropriate to carry out this
Plan.
Imposition wherever necessary (by subdivision approval, conditional use permits, or other
means) of appropriate controls, within the limits of this Plan, upon parcels in the Project Area to
ensure their proper development and use.
6. Provision for administrative enforcement of this Plan by the City after development.
Performance of the above actions, and of all other functions and services relating to public
health, safety, and physical development normally rendered by the City, in accordance with a
schedule that will permit the redevelopment of the Project Area to be commenced and carried
to completion without unnecessary delays.
The foregoing actions to be taken by the City may involve financial outlays by the City, but do not
constitute a commitment to make such outlays.
2£
Vii. [Section 700] ENFORCEMENT
The administration and enforcement of this Plan, including the preparation and execution of any
documents implementing this Plan, shall be performed by the Agency and/or the City.
The provisions of this Plan or other documents entered into pursuant to this Plan may also be enforced
by court litigation instituted by either the Agency or the City. Such remedies may include, but are not limited to,
specific performance, damages, re-entry, injunctions, or any other remedies appropriate to the purposes of this
Plan. In addition, any recorded provisions which are expressly for the benefit of owners of property in the
Project Area may be enforced by such owners.
VIII. [Section 800] DURATION OF THIS PLAN
'Except for the non-discrimination and non-segregation provisions imposed by the Agency which shall
run in perpetuity, and the affordable housing covenants imposed by the Agency which shall continue in effect for
a period as may be determined and specified by the Agency, the provisions of this Plan shall be effective, and
the provisions of other documents formulated pursuant to this Plan may be made effective until the dates given
below for the areas indicated; provided, however, that, subject to the limitations and exceptions thereto set forth
in Sections 504 and 506 of this Plan, the Agency may issue bonds and incur obligations pursuant to this Plan
which extend beyond the termination date, and in such event, this Plan shall continue in effect for the purpose
of repaying such bonds or other obligations until the date of retirement of such bonds or other obligations. The
provisions of this Plan shall be effective:
1. For the Original Project Area: July 14, 2033; and
For the Second Amendment Area: until 30 years following the effective date of the ordinance
adopting the Second Amendment to this Plan.
iX. [Section 900] PROCEDURE FOR AMENDMENT '
This Plan may be amended by means of the procedure established in the Community Redevelopment
Law, or by any other procedure hereafter established by law.
X. [Section 1000] SEVERABILITY
If any provision, section, subsection, subdivision, sentence, clause or phrase of this Plan is for any
reason held to be invalid, unenforceable, or unconstitutional, such decision shall not affect the validity and
effectiveness of the remaining portion or portions of the Plan. In the event that any portion of the Project Area
shall be determined to have been invalidly or incorrectly included in the Project Area that is the subject of this
Plan, such portion of the Project Area shall be deemed severable from the remainder of the Project Area which
shall remain fully subject to the provisions of this Plan.
26
EXHIBIT I
El Camino Corridor Redevelopment Project
REDEVELOPMENT PLAN MAP (LAND USE AND CIRCULATION MAP) - ORIGINAL PROJECT AREA
8432~of
091599f~es
EXHIBIT II
El C;amino Corridor Redevelopment Project
REDEVELOPMENT PLAN MAP (LAND USE AND C;IRC;ULATION MAP) - SEC;OND AMENDMENT AREA
8432sol
091599flee;
El Camino
Additi
LEGEND
High Density Residential
Community Commercial
Medium Density Residential and
Community Commercial
Public
Park and Recreation
Proposed Added Area Boundary
07/27/99
~DEVELOPMENT PLAN MAP (LAND USE AND
CIRCULATION MAP) - SECOND AMENDMENT AREA
EL CAMINO CORRIDOR REDEVELOPMENT PROJECT
Exhibit ti
This map was prepared for illustmltve purposes only
and is not necessa~ly to scale, nor should it be use
to ascertain precise project ama boundary lines
Sourc-~: South San Francisco Redevelopment Agency, 199c-..
EXHIBIT III
El Camino Corridor Redevelopment Project
PROdECT LEGAL DESCRIPTION - ORIGINAL PROJECT AREA
B432sof
091599~.e~
9ispl'~Y List of Defined Lo~s Drawing: BNDRY.DWG
Boundary Description for EL CAMINO CORRIDOR REDEVELOPMENT MAP
** THIS BOUNDARY MAP WAS DERIVED FROM RECORD INFOP~MATION AND
** DOES NOT REPRESENT AN'ACCURATE FIELD SURVEY.
Bear ing Distance North ing
12473.87
$ 47-48-45 W 312.38
12264.09
S 44-13-45 W 443.78
11946.09
S 12-57-20 E 125.00
11824.27
N 77-02-40 E 377.76
11908.97
Delta: 56-29-30
'Radius: 240.00
Arc: 236.63
Chord: 227.16
Tangent: 128.93
S 12-57-20 E = Radial In
Radius Point:
S 74-42-35 E
11675.08
Easting
6235.07
6003.61
5694.06
5722.09
6090.24
6144.04
N 43-32-10 E = Radial Out
46-27-50 E
41-23-10 E
41-20-20 W'
48-58-00 E
11-16-50 E
41-20-20 W
48-57-40 E
41-20-20 E
38-06-50 E
217.62
507.27
268.33
767.55
908.43
146.00
344.52
1320,01
834.47
Delta: 18-24-35
Radius: 3060.00
Arc: 983.2'1
Chord: 978.99
Tangent: 495.88
11849.06
116.99.16
11318.57
11117 · 11
10613.21
9722.33
9612.71
9386.51
10377.60
9721.05
S 47-19-08 E
6309.36
6467.12
6802.49
6625.26
7204.24
7381.94
7285.51
7545.37
8417.25
8932.31
N 51-53-10 E = Radial In
Radius Point:
11609.76
11339.87
39-28-35 W = Radial Out
"s £
$ 32-12-~6 E
56-21-00 E
460.31
122.35
115.52
Delta: 07-51-01
Radius: 2890.00
Arc: 395.97
Chord: 395.66
Tangent: 198.30
$ 33-39-00 W = Radial In
Radius Point:
N 41-30-01 E = Radial Out
S 48-30-00 E
S 75-04-04 E
S 48-30-00 E
N 57-58-56 E
55.00
111.81
672.06
562.08
Delta: 13-00-45
Radius: 841.00
Arc: 191.00
Chord: 190.59
Tangent: 95.91
N 32-01-04 W = Radial In
Radius Point:
45-01-49 E = Radial Out
N 45-53-01 E
N 43-35-00 E
N 46-27-00 W
N 43-33-00 E
N 68-20-00 W
S 48-31-55 W
N 53-14-30 W
97.97
226.00
20.00
162.57
251.76
237.92
31.14
Delta: 14-02-16
Radius: 791.00
Arc: 193.80
Chord: 193.32
Tangent: 97.39
9057.37
8502.31'
8698.79
8634.78
S 52-25-29 E
6229.03
8393.50
8357.06
8328.25
7882.93
8180.9'4
N 51-28-33 E
8894.01
8299.64
8367.84
8531.55
8545.33
8663.16
8756.11
~598.56
8617.20
N 60-15-39 W
9652.00
t~3~.%8
10100.39
10196.55
8595.15
10510.13
10551.33
10659.36
11162.70
11639.28
11193.40
11788.39
11858.72
12014.53
12000.03
12112.05
11878.07
11699.79
11674.84
S 36-45-29 W = Radial In
Radius Point:
7983.47
N 22-43-13 E = Radial Out
N 67-16-47 W 280.86
Delta: 90-00-42
Radius: 20.00
Arc: 31.42
Chord': .28.29
Tangent: 20.00
8713.09
8821.57
N 22-17-08 W
N 22-42-31 E = Radial In
Radius Point:
N 67-16-47 W = Radial Out
N 22-43-13 E 24.00
Delta: 30-34-54
Radius: 160.00
Arc: 85.40
Chord:
8840.02
8847.74
8869.88
84.39 N 37-57-33 E
Tangent: 43.74
S 67-19-54 E = Radial In
Radius Point:
N 36-45-00 W = Radial Out
53-15-00
36-4 5-OO
53-15-00
36-45-00
53-15-00
36-45-00
53-15-00
36-45-00
74-27-00
15-53-00
74-27-00
192.00
205.06
169.82
205.06
148.60
140.00
100.00
204.20
37.90
639.99
48.20
8808.22
8936.42
9051.30
9215.60
9317.21
9152.90
9241.81
9129.64
9189.47
9025.85
9015.69
9632.26
9645.!9
1-]~-2-0'I/-48
11506.99
11247.92
11255.65
11237.20
11246.47
11298.38
11452.22
11329.52
11465.59
11588.28
11707.35
11791.12
11871.24
11993.42
12029.93
12201.50
12155.07
Delta: 35-00-02
Radius: 160.00
' -Arc: 9777~
Chord: 96.23
Tangent: 50.45
15-33-00 W = Radial In
Radius Point:
N 19-27-02 W = Radial Out
71-19-02 W 159.79
Delta: 27-41-28
Radius: 330.00
Arc: 159.49
Chord: 157.94
Tangent: 81.33
N 13-09-28 W = Radial In
Radius Point:
S 14-32-00 W = Radial Out
75-28-00 W
75-28-00 W
16-17-12 W
75-28-00 W
14 -32-00 W
73-17-38 W
10-30-34 W
33-52-56 W
39-19-40 W
74-45-12 W
42-18-35 W
N 28-56-32 W
N 55-45-08 E
~' 45-3~-5i W
42-21-0~ E
N 43-C;8-5~ W
322.30
190.00
200.00
363.61
90.91
208.49
154.18
87.99
216.96
73.11
252.31
191.74
67.50
72.00
141.37
39.52
$ 88-02-59 W
9491.04
9641.91
9590.73
N 89-18-44 W
9912.06
9592.62
9673.50
9721.18
9529.20
9620.45
9532.45
9592.38
9440.79
9513.83
9681.66
9662.43
9475.84
9~43.64
9681.62
9731.96
9836.43
9865.26
12112.17
12058.89
11907.52
11832.40
11749.59
11437.61
11253.68
11197.60
10845.62
10822.81
10623.12
10595.00
10545.94
10408.44
10337.90
10168.06
10075.28
10131.07
10079.59
10174.83
10147.80
47-'38-52 W
52-48-52 W
42-21-08 W
~9-00-52 W
41-04-52 W
43-01-52 W
42-21-08 E
200.00
---8-0-.-25.
121.32
147.62
150.00
19.00
103.61
Delta: 04-35-02
Radius: 2000.00
Arc: 160.01
Chord: 159.96
Tangent: 80.05
N 40-15-46 E = Radial In
Radius Point:
10000.00
10048.50
9958.85
10073.54
10186.61
10200.50
10277.07
!0000.00
9936.07
9854.33
9761.41
9662.84
9649.87
9719.67
N 47-26-43 W
11803.25
11012.26
S 44-50-48 W = Radial Out
N 45-09-12 W 207.78
N 41-24-40 W 32.44
Delta: 00-48-00
Radius: 5000.00
Arc: 69.81
chord: 69.81
Tangent: 34.91
N 44-50-48 E = Radial In
Radius Point:
10385.26
10531.78
10556.12
N 44-45-12 W
14101.10
9601.84
9454.52
9433.06
12959.!2
$ 45-38-48 W = Radial Out
N 44-21-12 W
32.95
Delta: 01-47-30
Radius: 5000.00
Arc: 156.35
Chord: 156.34
Tangent: 78.18
10605.69
10629.25
N 41-39-57 W
9383.91
9360.88
S 49-13-48 W = Radial In
Radius Point:
7364.13
5574.19
N 47-26-1~ E = Radial Out
lC746.05
9256.94
42-33-42 W 320.86
$ 43~15,4
N 42-33-42 W
:1-10-43 W
7.02
88.32
165.69
Delta: 01-42-35
Radius: 5759.65
Arc: 171.87
10982.38
11042.32
10917.61
Chord: 171.86
Tangent: 85.94
S 40-12-49 W = Radial In
Radius Point:
N 50-38-28 W
6519.29
9039.92
9~.--1-1
8975.37
8866.27
5147.62
N 38-30-14 E = Radial Out
N 41-10-43 E
N 45-08-42 W
N 49-46-06 W
S 46-43-59 W
N 50'04-52 W
- 37-49-38 W
52-10-22 W
182.13
189.01
603.48
65.25
325.87
297.32
283.63
Delta: 05-14-35
Radius: 2954.53
Arc: 270.36
Chord: 270.27
Tangent: 135.27
11026.60
11163.68
11297.00
11686.77
11642.05
11851.16
11616.32
11790.27
N 49-33-05 W
8733.39
8853.31
8719.32
8258.60
8211.09
7961.17
7778.82
7554.79
N 37-49-38 E = Radial In
Radius Point:
14123.94
9366.75
S 43-04-13 W = Radial Out
Delta: 08-31-41
Radius: 2954.53
Arc: 439.77
Chord: 439.36
Tangent: 220.29
11965.61
N 42-39-57 W
7349.12
N 49-04-13 E = Radial In
Radius Point:
14123.94
9366.75
S 51-~-~-54 W = Radial Out
12288.6~ 7051.36
6-'06-56 W
751.08
42'19-28 W
-1-89;-25
Delta: 48-00-46
Radius: 485.00
Arc: 406.42
Chord: 394.63
Tangent: 216.00
11768.03
11907.95
N 14-13-23 W
6510.03
6382.60
N 51-46-14 E = Radial In
Radius Point:
12208.07
6763.59
N 80-13-00 W = Radial Out
N 80-13-00 W 15.00
N 09-47-00 E 172 . 12
N 80-13-00 W 65 . 99
12290.48
12293.03
12462.65
12473.87
Area = 7725615.6433 square feet, 177.3557 acres
Error North = -0.03
Error East = -0.00
Absolute Error = 0.03
Perimeter = 23793.35
Direction of error = S 03-02-23 W
Precision = 1 in 742873
6285.64
6270.86
6300.11
6235.07
5xce~ting therefrom the fo~_owing:
Lot Description f-er-:--EXC-LUDE~
Bearing Distance
Delta: 23-56-31
Radius: 529.00
Arc: 221.05
Chord: 219.45
Tangent: 112.16
Northing
8476.66
N 21-54-41 W
Easting
11201.81
S 80-03-35 W = Radial In
Radius Point:
8385.34
10680.75
N 56-07-04 E = Radial Out
N 33-52-56 W
45.89
15.04
603.17
112.86
194.00
241.16
N 56-07-04 E
S 59-39-57 E
$ 55-43-53 W
N 33-14-25 W
S 56-45-35 W
Delta: 11-05-59
Radius: 467.00
Arc: 90.47
Chord: 90.33
Tangen%: 45.38
8680.25
8718.35
8726.73
8422.10
8358.56
8520.81
8388.62
N 15-29-26 W
11119.92
11094.34
11106.82
11627.42
11534.15
1!427.81
11226.11
N 68-57-35 E =. Radial In
Radius Point:
8556.29
11661.97
S 80-03-34 W = Radial Out
8475.67
N 09-56-26 W 1.00
8476.66
Area = 55858.4588 square feet, 1.2823 acres
Error North = 0.00
Error East = -0.01
Absolute Error = 0.01
Perimeter = 1523.64
Direction of error = N 59-26-04 W
Precision = i in 226634
11201.98
11201.81
Lot Description for: EXCLUDED LOT 2
Bearing Distance
¢ 19-12-40
100.94
Northing
9872.65
~777.31
Easting
9027.26
9060.48
10207 · 68 9475 · 08
Delta: 01-32-10
Radius: 3729.83
Arc: 100.00
Chord: 100.00
Tangent: 50.00
N 41-53-55 W
48-52-10 W = Radial In
Radius Point:
7754.29
N 47-20-00 E = Radial Out
10282.11
S 42-56-20 W 559.34
9872.63
Area = 54782.1925 square feet, 1.2576 acres
Error North = 0.00
Error East' = -0.00
Absolute Error = 0.00
Perimeter = 1357.87
Direction of error = N 00-16-12 W
Precision .= 1 in 274848
6665.72
9408.30
9027.26
EXHIBIT N
El Camino Corridor Redevelopment Project
PROJECT LEGAL DESCRIPTION - SECOND AMENDMENT AREA
This description consists of two parts, as follows:
1. Proposed Willow Gardens Addition
(approximately 9.25 acres)
Proposed El Camino Real Addition
(approximately 70.3 acres)
84~.sof
Og1599~e~
24-99016
4/9/99
Rev. 6/23/99
RBPfPRS
I,g. GAL DESCRIPTION
Proposed Willow Gardens Addition
All that certain real property situate '_m the City of South San Francisco, County of San
Mateo, State of Califomi'a descnt~l as follows:
BEGINNING at the intersection of the centefline 0fNora Way and the general
southeasterly line of Willow Avenue as shown on that certain tract map entitled "Willow
Gardens" which map was filed for record in Book 61 of Maps, at Pages 24 and 25, San
Mateo County Records, said general southeasterly line being also the general
northwesterly boundary line of said Map of"Willow Gardens", thence
(1)
leaving said POINT OF BEGINNING along the general northwesterly line of said
map of "Willow Gardens" North 16° 17'12"F_ast 719.05 feet to an angle point in
said general northwesterly line, thence:
(2) South 73° 29' 44"East 108.88 feet to an angle point in said general northwesterly
line, thence
(3) continuing along said general northwesterly line North 16° 30' 16" East 219.38 feet
to the most northerly corner of said "Willow Gardens", thence
(4) along the general northeasterly line of said Willow Gardens South 73° 29' 44"East
293.78 feet to the most easterly corner of said" Willow Gardens", thence
(5) along the general southeasterly line of said" Willow Gardens' South 16° 30' 16"F_.ast
1063.43 feet to the most southerly corner of said Willow Gardens, thence
(6)
along the general southwesterly line of" Willow Gardens" and the general
southwesterly boundary line of that certain Parcel Map filed for record in Book 41 of
Maps at Pages 32 and 33, San Mateo County Records, North 73° 29' 44"West
399.45 feet to the most westerly corner of said Parcel Map, thence
24-99016
6/10/99-
Rev. 6/23/99
RBP/PRS
.LEGAL DESCRIPTION
Proposed E1 Camino Real Addition
Ali that certain real property Situate in the City of South San Francisco, County of San
Mateo, State of California described as follows:
BEGINNING at the intersection of the cemerline of 1st Street and the general
Northeasterly line of the California State Highway, kno,am as E1 Cam/no Real, as shown
on that certain map entitled "Map of Section West of Railroad inthe Town of Baden",
which map was filed for record in Book "E" of Maps at Page 62, San Mateo County
Records,
(1)
leaving said POINT OF BEGINNING along said general northeasterly line of E1
Camino Real, being also the general Southwesterly line of said map, North 24° 47'
46"West 180.00 feet; thence
(2) leaving said general Southwesterly line and continuing along said Northeasterly line
of E1 Camino Real, South 65° 12' 14"West 18.43 feet, and
(3)
from a tangent bearing of North 29° 51' 11" West, along a curve, concave to the left,
with a radius of 3033.00 feet, through a central angle of 14° 16' 42" for an arc length
of 755.84 feet to the intersection thereof with the general Southeasterly boundary
line of the Existing E1 Camino Redevelopment Project Area, thence
(4)
leaving said Northeasterly line of E1 Camino Real along said general Southeasterly
boundary line the following courses and distances, North 56° 50'20" East 452.55
feet;
(5) along a tangent curve, concave to the left, with a radius of 841.00 feet through a
central angle of 13° 00'45" for an arc length of 191.00 feet;
(6) North 47° 01' 37" East 97.97 feet;
(7) North 44~' 43' 36" East 226.00 feet;
(8) North 45° 18'24" West 20.00 feet; and
(7) along the general northwesterly boundary of said Parcel Map and said "Willow
Gardens" North 16°17'12"East 125.00 feet to the POINT OF BEGINNING.
Containing 9.25 acres of land more or less.
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
North 44° 43'36" East 162.57 feet to the most Easterly comer of said Boundary; said
comer lying on the Northwesterly line on parcel designated as Parcel 2 of that
certain Parcel Map filed for record in Book 5 of L.L.S. Maps at Page 103, San
Marco County records, thence
along said Northwesterly line of Parcel 2, North 44° 43' 36" East 150.34 feet; and
North 16° 41' 36" East 22.74 feet to the most Northerly comer of said Parcel 2;
thence
along the general Northerly line of said Parcel 2, and the general Northerly line of
that certain map entitled "City Park Addition No. 2" which map was fled for record
in Volume 59 of Maps at Page 39, San Mateo County Records and its Easterly
prolongation South 73° 18' 24" East 550.00 feet to the most easterly comer of that
certain parcel ofland described in the Deed to the City of South San Francisco
recorded m Book 3011 of Official Records at Page 222, San Mateo County Records,
thence
along the general easterly line of said City of South San Francisco parcel, the general
Easterly line of said City Park Addition No. 2, the general Easterly line of said
Parcel 2 and the general Northerly line of that certain parcel of land designated as
Parcel 1 on that certain Parcel Map 93-300 which map was filed for record in Book
69 of Parcel Maps at Page 57-59, San Mateo County Records South 16° 41' 36"
West 454.60 feet to an angle point in said Northerly line of Parcel 1, thence
cominuing along said general Northerly line of Parcel 1 and the general Northerly
and Northeasterly line of Parcel 2 of last described Parcel Map along the following
courses and distances, from a tangent bearing of North 82° 43'21" East along a curve
concave to the right w/th a radius of 1121.00 feet, through a central angle of 12° 38'
53" for an arc length of 247.46 feet;
South 160 41' 36" West 40.82 feet;
from a tangent bearing of South 6° 16' 15" West along a curve, concave to the lef~
with a radius of S0.00 feet through a central angle of 61° 48' 51" for an axe length of
53.94 feet; and
South 16° 39' 35" West 50.80 feet; thence
leaving said general Easterly line of Parcel 2 South 23° 12' 39" West 299.10 feet to
an angle point in the general Westerly line of said Parcel 1; thence
(19) along said general Westerly line and its Southerly prolongation South 16° 41' 36"
West 745.07 feet to the intersection thereof with the general Southerly line of that
certain parcel of land described as Parcel 6 in the Deed to the City and County of
San Francisoo recorded in Volume 1161 of Official Records, San Mateo County
Records; thence
(20) along said general Southerly line North 54° 48' 18"West 842.88 feet to the
intersection thereof with the general Southerly line of "A' Street as shown on said
"Map of Section West of Raikoad in the Town of Baden" said Southerly line be.ing
also the general Northeasterly line of that ce ~.rtain parcel of land designated as Parcel
1 on that certain Parcel Map of Lands of Gigll and Lands of Petrocchi recorded in
Volume 54 of Parcel Maps at Pages 15 and 16 San Mateo County Records; thence
(21) along said general Northeasterly and Southeasterly line of last described Parcel 1
South 24° 58' 46" East 143.54 feet; and
(22) South 65° 01' 14" West 60.22 feet; thence
(23) leaving said Southeasterly line South 24o 58' 46" East 100.00 feet; thence
(24) South 65° 01' 14" West 39.78 feet to the most Northerly comer of Lot 4 in Block 1
as said "Map of Section West of Railroad in the Town of Baden"; thence
(25) along the rear lot lines of the lots in Blocks 1,5,6 and 10 of the last described map
the following courses and d/stances, South 24° 58' 46" East 970.00 feet;
(26) North 65° 01' 14" East 15.00 feet;
(27) South 24° 58' 46" East 25.00 feet;
(28) South 65° 01' 14" West 15.00 feet; and
(29) South 24° 58' 46" East 560.00 feet to the most Southerly comer of Lot 1 in Block 10
of said "Map of Section West of Railroad in the Town of Baden", said comer lying
in the general Southeasterly line of said map; thence
(30) along said general SOutheasterly line North 65° 01' 14" East 420.00 feet to the most
Westerly comer of that certain parcel of land described in the Deed to the Housing
Authority of the City of South San Francisco recorded in Book 1008 of Official
Records at Page 424, San Mateo County records; thence
(31) along the boundary of said parcel South 24° 58' 46" East 584.00 feet; and
(32) North 65° 01' 14" East 662.86 feet to the most Northerly comer of that certain parcel
of land described in the Deed to the South San Francisco Unified School District
recorded in Book 1329 of Official Records at Page 439 San Marco County Records;
thence
(33) along the boundary of said parcel the following courses and distances, South 32° 35'
46" East 889.10 feet;
(34)
(35)
South 33° 1~' 46" East 30.90 feet; and ·
South 65° 01'14" West 1213.95 feet more or less to a point on the Northeasterly line
of the Calif6mia State Highway, known as E1 Camino Real; thence
(36) along the Northeasterly line of said E1 Camino Real the following courses and
distances, North 29° 19' 36" West 1019.96 feet;
(37) North 26° 38' 36" West 479.01 feet;
(38) North 25° 07' 46" West 791.81 feet; and
(39) North 24° 47' 46" West 683.20 feet to the POINT OF BEGINNING.
Containing 70.32acres of land more or less.
· ' ' RCE No. 2823
~ 03/31/2002
Date
EXHIBIT V
El Camino Corridor Redevelopment Project
PROPOSED PUBLIC IMPROVEMENTS AND FACILITIES PROJECTS
ORIGINAL EL CAMINO CORRIDOR REDEVELOPMENT PROJECT ARE?,
· Assistance in the undergrounding of rapid transit facilities
· Relocation, improving and/or covering of existing drainage and creek channels
· Street upgrading including basic street repair and repairing and the addition of new street lights and traffic
cont'rol systems
· Construction of curbs, gutters and sidewalks, as necessary throughout the Project Area
SECOND AMENDMENT AREA
· Construction of a Community Center
· Elimination of parking islands in the Willow Gardens area
· Construction of new sidewalks and sidewalk improvements
· Creation of greenbelt parkway on BART alignment
· Removal of greenhouses in Memorial Park
· Toxic remediation testing at Memorial Park
· Partially fund construction of Fire Station
· Acquire the Chestnut Avenue/El Camino Real right-of-way
· Public improvements and removal of pipes at the CalWater site
Note: This listing of proposed improvements and facilities is set forth for planning purposes, and shall not be
deemed as a limitation on the Agency's authority to implement the Redevelopment Plan.
8432s0~