HomeMy WebLinkAboutReso 3522-1962RESOLUTION NO. 3522
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SOUTH SAN FRANCISCO APPROVING REPORT OF THE CITY
OF SOUTH SAN FRANCISCO TO THE SAN FRANCISCO BAY
REGIONAL WATER POLLUTION CONTROL BOARD IN ACCORD-
ANCE WITH SAID BOARD'S RESOLUTIONS NOS. 388 AND 407
BE IT RESOLVED by the City Council of the City of South San Francisco that
the written pro~ress report entitled "REPORT TO REGIONAL WATER POLLUTION CONTROL BOARD -
SOUTH SAN FRANCISCO DUMP" and attached hereto as Exhibit "A", which is required by the
Regional Water Pollution Control Board, San Francisco Bay Re~ion, in accordance with
their Resolutions Nos. 388 and 407, is hereby approved and ordered forwarded to said
Re~onal Board.
I hereby certify that the fore~oiny resolution was
regularly introduced and adopted by the City Council of the
City of South San Francisco at a regular meetin~ held on the
6th day of August, 1962, by the followin~ vote:
Ayes, Councilmen
Noes,
Absent,
Leo J. Ryan, Patrick E. Ahem, Emilio Cortesi,
Andrew Rocca, and G. J. Rozzi
None
None.
ATTEST:
ARTHUR A. RODONDI
City Clerk
EXHIBIT "A"
REPORT TO REGIONAL WATER POLLUTION CONTROL BOARD -
SOUTH SAN FRANCISCO DUMP
In compliance with Resolution #407 of the Regional Water Pollution Board the
followin~ steps have been taken by the City of South San FranciSco, or the South San
Francisco Scavenger Company, operators of the dump:
(1) The area within the perimeter dikes has been~completely de-watered, all
dumpin~ of organic material is bein~ done on dry land and out of contact with bay waters.
(2) The perimeter dike has been faced with mud or dirt except at the northern
tip of the east breakwater. Work of facin~ this small area with imported mud is under
way at this time.
(3) Garbage and organic material has been dredged from between the face of
the dike and the restrainin~ fence. From time to time as the dra~line is workin~ in
the area it will be utilized to remove any material that might accumulate between the
fence and the face.
45 S
RESOLUTION NO. 3522: (Continued)
EXHIBIT "A" (Continued)
(4) Monitorin~ pro~ram as outlined by the Pollution Board is bein~ performed.
Reports are made regularly to the Board.
(5) Test wells within the dump area have been drilled and samples are taken
therefrom accordin~ to schedule.
(6) Areas of the dike, where sulphides appeared to be formin~, have been
du~ out by a large floatin~ dredge and replaced with a bay mud plu~ and the adjacent
area faced with mud to a thickness of five feet or more.