HomeMy WebLinkAboutSSF Large Format Retail FEIR 03-14-14
TABLE OF CONTENTS
Section Page
ACRONYMS / ABBREVIATIONS ...............................................................................................................iii
1INTRODUCTIONANDLISTOFCOMMENTERS.....................................................................................1-1
1.1 Purpose of this Document .......................................................................................................... 1-1
1.2 Background .................................................................................................................................. 1-1
1.3 Organization of the Final EIR ...................................................................................................... 1-2
1.4 Commenters ................................................................................................................................ 1-3
2 REVISIONS TO THE DRAFT EIR ............................................................................................................2-1
2.1 Introduction .................................................................................................................................. 2-1
3 COMMENTS AND RESPONSES ............................................................................................................3-1
3.1 Introduction .................................................................................................................................. 3-1
This page intentionally left blank.
ACRONYMS/ABBREVIATIONS
ABAG Association of BayArea Governments
AIA Airport Influence Area
ARB California Air Resources Board
BAAQMD Bay Area Air Quality Management District
BART Bay Area Rapid Transit
C/CAGCity/County Association of Governments
CAA Clean Air Act
CAA Federal Clean Air Act
CAAQS California ambient air quality standards
Caltraincommuter train service
CaltransCalifornia Department of Transportation
CAP climate action plan
CCAA California Clean Air Act
CCR California Code of Regulations
CEQA California Environmental Quality Act
CH methane
4
CMA community market area
CO carbon monoxide
CO carbon dioxide
2
DEIR Draft environmental impact report
EPA U.S. Environmental Protection Agency
FEIR Final EIR
GHGgreenhouse gas
IS Initial Study
JPB Peninsula Corridor Joint Power Board
LOS level of service
mg/m milligrams per cubic meter
3
MPO Metropolitan Planning Organization
MTCMetropolitan Transportation Commission
NOnitrous oxide
2
NAAQS national ambient air quality standards
NOnitrogen dioxide
2
NOoxides of nitrogen
X
parts per billionppb
parts per million ppm
Plan Bay Area Bay Area 2040 RTP/SCS
PMrespirable particulate matter
10
PM fine particulate matter
2.5
ppm parts per million
PRC Public Resources Code
ROG reactive organic gases
RTAC Regional Targets Advisory Committee
RTPRegional Transportation Plan
s.f.square feet
SamTrans San Mateo County Transit District
SCS Sustainable Communities Strategy
SFBAABSan Francisco Bay Area Air Basin
SOsulfur dioxide
2
superstore large format retail use or store
TACs toxic air contaminants
3 micrograms per cubic meter
VMT vehicle miles traveled
1INTRODUCTION AND LIST OF COMMENTERS
1.1 PURPOSE OF THIS DOCUMENT
The Draft EIR for the Large Format Retail/Superstore Zoning Text
public review on January 8, 2014. A public hearing to receive v
February 6, 2014. This document includes all agency and public comments received on the Draft
Environmental Impact Report (DEIR, SCH #2013112011). Two written comments were received by the City
of South San Francisco during the public comment period held from January 8, 2014 through February 24,
2014. This document includes written responses to the comments received on the DEIR. This document also
includes changes to the DEIR which clarify and amplify text in the DEIR, as appropriate. These changes do
not alter the conclusions of the DEIR.
This Final EIR document has been prepared in accordance with the California Envi Quality Act
(CEQA) and, together with the DEIR (and Appendices), constitutes the EIR for the proposed project that will
be used by the decision makers during project hearings.
1.2 BACKGROUND
The proposed project analyzed in the DEIR would result in text amendments to the City of South San
Francisco Zoning Ordinance to include changes to remove the potential for future grocery store
the East of 101 Area and to prohibit superstore use city-wide.
The East 101 Area (See Exhibit 2-2 in the DEIR) includes no existing or planned residential uses. Because a
retail grocery use generally serves residential neighborhoods, such a u
planning sub-area. The proposed Zoning Amendment would resolve this potential
eliminating potential grocery uses from the East of 101 Area.
The proposed superstore definition would include retail establishments that serve as a one-stop shopping
destination by offering a wide variety of goods and merchandise,. Superstores
are distinguished from other retail uses by their size, and by the inclusion of grocery sales (defined in the
proposed zoning code as over 80,000 square feet in sales area wi,000 square feet of the gross
floor area dedicated to full service food/beverage/grocery salesA superstore may also feature various
business centers, such as a bank, pharmacy, vision center, pet c
outlet(s).
Proposed alterations to the Zoning Ordinance will also require r
uses: Convenience Market, Large Format Retail, Grocery Store, Supermarket, and Superstore. The changes
to these definitions are primarily for the purpose of clarificat
superstore use proposed to be prohibited. The proposed zoning amendment does not make any substantive
changes to the permitted uses in these subcategories, other than
grocery uses in the East of 101 Area.
The proposed zoning amendments are intended to implement existiral Plan policies and principles
to promote the Citys existing commercial vitality and economic
the Citys physical and symbolic center as a focus of commercial
encourage mixed-use development along principle corridors, such as El Camino Rea
Avenue and to protect the Citys neighborhood shopping centers as prima
and diverse retail uses. Furthermore, the proposed zoning text amendments seek to minimize negative
impacts on standalone food and beverage retail sales uses in the and promote stable
neighborhoods by protecting neighborhood-level retail uses. The proposed zoning text amendments also
reflect the intent of the Grand Boulevard Initiative for El Camino Real with Smart Gr
which include but are not limited to: maintaining walkable neigh
opportunities for transportation/transit alternatives; and an efvailable infrastructure.
Although the text amendments apply citywide, only specific commercial zoned properties would be affected.
(Refer to Exhibit 2-3 of the DEIR for a map of properties affected by the proposed zoning amendments).
In accordance with PRC Section 21092 and CCR Section 15082, the City issued an NOP on November 6,
2013 to inform agencies and the general public that an EIR was being
the scope and content of the document. The NOP was submitted to the State Clearinghouse; posted on the
Citys website (http://www.ssf.net/index.aspx?NID=367); and made available at the Citys office located at
315 Maple Avenue, South San Francisco. In addition, the NOP was distributed directly to public agencies
(including potential responsible and trustee agencies), interest
circulated for 30 days, through December 6, 2013. A scoping meeting was held on December 5, 2013; no
comments were received at the scoping meeting. The NOP and comment letters on the NOP are included in
Appendix A of the DEIR.
A Notice of Completion (NOC) and copies of the DEIR were filed with the State Clearinghouse on January 8,
2014. An official 45-day public review period for the DEIR was established by the State Clearinghouse,
ending on February 24, 2014. A Notice of Availability (NOA) for the DEIR was posted at the San Mateo
County Clerk Recorders Office, and a public hearing was held on the DEIR on Thursday, February 6, 2014 at
the Citys Municipal Services Building to receive input from agencies and the public on the DEIR. During the
public comment period, written comments from the general public as well as organizations and ag
the DEIRs accuracy and completeness were submitted to the lead agency. The DEIR was also published on
the Citys website (http://www.ssf.net/index.aspx?nid=367). Copies of the DEIR were available for public
review at the following locations:
City of South San Francisco
Planning Division
Economic and Community Development Department
315 Maple Avenue
South San Francisco, CA 94080
South San Francisco Main Library
840 West Orange Avenue
South San Francisco, CA 94080-3125
Grand Avenue Branch Library
306 Walnut Avenue
South San Francisco, CA 94080
City Clerks Office
400 Grand Avenue
South San Francisco, CA 94080
1.3 ORGANIZATION OF THE FINAL EIR
The Final EIR is organized as follows:
Chapter 1 Introduction and List of Commenters: This chapter summarizes the project under consideration
and describes the contents of the Final EIR. This chapter also contains a list of all of the agencies or persons
who submitted comments on the DEIR during the public review period, presented in order by agency,
organization, individual and date received.
Chapter 2 Revisions to the DEIR: This chapter summarizes text changes made to the DEIR in response to
comments made on the DEIR and/or staff--initiated text changes. Changes to the text of the DEIR are shown
by either a line through the text that has been deleted or double underlined where new text has been
inserted. The revisions contain clarification, amplification, and correcti identified since
publication of the DEIR. The text revisions do not result in a change in the analysis and conclusions
presented in the DEIR.
Chapter 3 Comments and Responses: This chapter contains the comment letters received on the DEIR
followed by the responses to the comments.
1.4 COMMENTERS
Two comment letters were received during the DEIR public comment period from the following commenters:
Ken Chiang, P.E., Utilities Engineer at the California Public Ut; and
David Carbone, Staff at City/County Association of Governments o
No comments on the contents of the Draft EIR were received at the pu, although a minor
correction to the address of a business was requested by a Plann. No other comments
were received during or after the comment period (as of the date of this document).
This page intentionally left blank.
2REVISIONS TO THE DRAFT EIR
2.1 INTRODUCTION
This chapter summarizes text changes made to the Draft EIR eithe
initiated by city staff or in response to a modification in the project as proposed by t. New
text is indicated in double underline and text to be deleted is reflected by a strike through. Text changes are
presented in the page order in which they appear in the Draft EIR.
SECTION 2 PROJECT DESCRIPTION
Staff-initiated Change
After release of the DEIR, staff noted a minor inconsistency in
2.3.1 Project Overview (p. 2-4), the Superstore definition identifies 5 percent rather than 5,000 square
feet as correctly indicated throughout the rest of the DEIR. Ther
page 2-4 (third paragraph under Section 2.3.1):
Superstores are distinguished from other retail uses by their si by the inclusion of grocery
sales (defined in the proposed zoning code as over 80,000 square5
percent 5,000 square feet of the gross floor area dedicated to full service food/beverage/
sales).
This text change to the DEIR is a minor clarification and is consistent with the Supersto
throughout the rest of the DEIR. It does not affect the analysis
APPENDIX D OF THE DEIR
The following minor correction has been made on page 8 of the Seifel Memo (Appendix D of the Draft EIR)
based on Planning Commission comments at the Draft EIR hearing o:
&to replace the existing Safeway in the Brentwood Shopping Center on Brentwood Drive located at
170 El Camino Real Drive.
This text change to the DEIR Appendix is minor and for purposes of clari
analysis or conclusions of the DEIR.
3COMMENTS AND RESPONSES
3.1 INTRODUCTION
This section contains the two comment letters that were received on the DEIR. Following each comment
letter is a response.
It should be noted that, during the DEIR hearing, a verbal commePlanning
Commission regarding a minor correction to an address provided i
correction to the DEIR is provided in Section 2 of this Final EI
California Public Utilities Commission
Response Ken Chiang, P.E.
February 6, 2014
As indicated throughout the Draft EIR, the proposed Zoning Amendment does not include any development
proposals. The proposed Zoning Amendment restricts superstore development within the City and grocery
uses within the East of 101 Area. Because the proposed project does not result in any construction
structures, infrastructure, or other facilities and would not in
modes (such as rail), the proposed Zoning Amendment would not affect rail corridors or rail crossings or
public safety associated with these rail facilities. Therefore, no additional text is required in the DEIR to
address rail facilities or rail safety. The comment does not raise any issues that require changes to the
DEIRs analysis or conclusions. The City, however, appreciates the comment and considers rail sa
review of specific development proposals.
City/County Association of Governments of San Mateo County
Response David Carbone
January 22, 2014
This comment letter from the City/County Association of Governme
essentially a re-submittal of the comment letter provided by C/CAG during the NOP
described in the DEIR (p. 1-5), the C/CAG letter relates primarily to airport land use compatibility.
concludes that the proposed action does not affect the airport l
commercial/retail land uses within Area B of the Airport InfluenIA) boundary for SFO and that the
project does not require formal review or action by the Airport
letter does not require any changes to the DEIR.