Loading...
HomeMy WebLinkAbout2015-02-25 e-packet PEOPLE OF SOUTH SAN FRANCISCO You are invited to offer your suggestions. In order that you may know our method of conducting Council business, we proceed as follows: The regular meetings of the City Council are held on the second and fourth Wednesday of each month at 7:00 p.m. in the Municipal Services Building, Council Chambers, 33 Arroyo Drive, South San Francisco, California. The City Clerk will read successively the items of business appearing on the Agenda. As she completes reading an item, it will be ready for Council action. RICHARD A. GARBARINO Mayor MARK ADDIEGO Vice Mayor KARYL MATSUMOTO Councilwoman PRADEEP GUPTA Councilman LIZA NORMANDY Councilwoman FRANK RISSO City Treasurer KRISTA MARTINELLI City Clerk MIKE FUTRELL City Manager STEVEN T. MATTAS City Attorney PLEASE SILENCE CELL PHONES AND PAGERS HEARING ASSISTANCE EQUIPMENT AVAILABLE FOR USE BY THE HEARING IMPAIRED AT CITY COUNCIL MEETINGS In accordance with California Government Code Section 54957.5, any writing or document that is a public record, relates to an open session agenda item, and is distributed less than 72 hours prior to a regular meeting will be made available for public inspection in the City Clerk’s Office located at City Hall. If, however, the document or writing is not distributed until the regular meeting to which it relates, then the document or writing will be made available to the public at the location of the meeting, as listed on this agenda. The address of City Hall is 400 Grand Avenue, South San Francisco, California 94080. AGENDA CITY COUNCIL CITY OF SOUTH SAN FRANCISCO REGULAR MEETING MUNICIPAL SERVICES BUILDING COUNCIL CHAMBERS 33 ARROYO DRIVE SOUTH SAN FRANCISCO, CA WEDNESDAY, FEBRUARY 25, 2015 7:00 P.M. REGULAR CITY COUNCIL MEETING FEBRUARY 25, 2015 AGENDA PAGE 2 CALL TO ORDER ROLL CALL PLEDGE OF ALLEGIANCE AGENDA REVIEW PRESENTATIONS  Certificate of Recognition for Citizens Thomas Luciani and David Goff and Certificate of Meritorious Conduct for Officer Sharif Limbada. (Mike Brosnan, Deputy Chief). PUBLIC COMMENTS For those wishing to address the City Council on any Agenda or non-agendized item, please complete a Speaker Card located at the entrance to the Council Chamber’s and submit it to the City Clerk. Please be sure to indicate the Agenda Item # you wish to address or the topic of your public comment. California law prevents the City Council from taking action on any item not on the Agenda (except in emergency circumstances). Your question or problem may be referred to staff for investigation and/or action where appropriate or the matter may be placed on a future Agenda for more comprehensive action or a report. When your name is called, please come to the podium, state your name and address (optional) for the Minutes. COMMENTS ARE LIMITED TO THREE (3) MINUTES PER SPEAKER. Thank you for your cooperation. COUNCIL COMMENTS/REQUESTS CONSENT CALENDAR 1. Motion approving the Minutes of meetings of February 11, 2015. 2. Motion confirming payment registers for February 25, 2015. 3. Resolution authorizing the City Manager to execute a Consulting Services Agreement with EMG Corporation of Walnut Creek, California, in an amount not to exceed $105,066 for services on the South San Francisco Comprehensive Facilities Condition and Needs Assessment Project (Project No. pf1501). (Sam Bautista, Principal Engineer). LEGISLATIVE BUSINESS 4. Motion to waive reading and introduce an Ordinance amending Chapter 11.24 of the South San Francisco Municipal Code to prohibit the intentional obstruction of pedestrian traffic upon sidewalks. (Steve Mattas, City Attorney) REGULAR CITY COUNCIL MEETING FEBRUARY 25, 2015 AGENDA PAGE 3 ADMINISTRATIVE BUSINESS 5. Mid-Year Budget Review and Resolution approving the mid-year 2014-2015 budget amendment changes, amending the City’s 2014-15 Operating Budget in order to adjust revenues and expenditures at mid-year and approving the Salary Schedule for the Recreation Program Manager Position and approving the Salary Schedule for hourly job classifications. (Richard Lee, Finance Director). 6. Resolution supporting the designation of San Bruno Mountain and associated properties within the City of South San Francisco as a Priority Conservation Area. (Susy Kalkin, Chief Planner). PUBLIC HEARING 7. 1256 Mission Subdivision CUNEO ANTONIO/Owner City Ventures/Applicant 1256 Mission RD P14-0081: UP14-0009, DR14-0049, SA14-0001 & AHA14-0001 1256 Mission Subdivision - Design Review, Tentative Subdivision Map and Affordable Housing Agreement to construct a new residential development consisting of up to 36 residential units, with a mix of Townhomes and Single Family Dwellings, and authorize Density Bonus Incentives for the southern portion of the site to allow an increase in allowable building height from 25-feet to 35-feet and to allow the use of one architectural prototype, and Use Permit to allow a 5 foot 2 inch tall fence in the required front yard at 1256 Mission Road in the Transit Village Residential Medium Density (TV-RM) Zoning District in accordance with SSFMC Chapters in accordance with SSFMC Title 19(Subdivisions) and Chapters 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 and 20.490, and determination that the project is categorically exempt from CEQA. (Billy Gross, Senior Planner). CONTINUED TO A DATE CERTAIN, FEBRUARY 25, 2015, FROM THE REGULAR MEETING OF JANUARY 14, 2015. ITEMS FROM COUNCIL – COMMITTEE REPORTS AND ANNOUNCEMENTS ADJOURNMENT Staff Report DATE: February 25, 2015 TO: Mayor and City Council FROM: Richard Lee, Director of Finance SUBJECT: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET I. RECOMMENDATION It is recommended that the City Council approve the attached resolution to amend the 2014-15 budget. II. BACKGROUND/DISCUSSION This Staff Report transmits the mid-year 2014-15 financial results, recommends changes to certain revenues and expenditures in the 2014-15 budget, and establishes the salary schedule for the newly created Recreation Program Manager position. A. Overall Economic Context The following information is provided as a highlight of the local economy, and is sourced from the State of California’s Labor Market Information Division, the Silicon Valley Index (2015) MuniServices Sales Tax Reports (Second and Third Quarters 2014), and the Bay Area Council Economic Institute (January 2015): Silicon Valley, which is defined by many economists as San Mateo and Santa Clara Counties, and selected cities in Alameda and Santa Cruz Counties, is experiencing a job growth rate of 4.1%. This is the highest it has been since 2000, adding nearly 58,000 jobs and exceeding the 2013-2014 job growth rate of the Bay Area as a whole (+3.5%), San Francisco (+3%), California (+2.5%) and the nation (+1.8%). Unemployment in South San Francisco is at 4.4%, compared to the current state average of 7%, and the County of San Mateo rate of 3.5%. The median home sales price in South San Francisco is up 11.8% as of January in comparison to the same period last year. Sales tax cash receipts in the third quarter of 2014 were up 6.7% for Northern California compared to the same quarter the prior year, while South San Francisco receipts increased by 13.6% over the same period. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 2 of 12 B. General Fund Overview The attached General Fund summary compares current year projected revenues to both the amended budget and the prior year actual revenues. While the budget comparison focuses on current year changes, the year-over-year comparison provides a trend line that illustrates the health of the local economy, as well as the overall utilization of City services and performance of departmental functions over time. This year, General Fund revenues are projected to come in $3.9 million higher or 4.7% over budget, with $1.7 million from recurring revenues and $2.2 million from one-time revenues. 1) Positions In late 2014, the Human Resources Department (HR) took the lead reviewing currently filled and vacant positions vs. what the budget document shows as authorized. The budget document is what the Finance Department uses to gauge official positions authorized in the budget process, and is also used to establish a funding budget for those positions. The review HR performed was important, given that over the past decade many positions had been frozen to realize budget savings during the economic downturns, and there was some amount of confusion over what positions were authorized or cut. As a result of HR’s analysis and meeting with operating departments, it was determined that several positions not reflected in the budget document had been hired or had classification changes in the past decade. In order to clean up the position budget, therefore, the City Council is being asked to formally amend the Position listing for 2014-15 to adopt the changes that follow in section D.1 below. 2) Departmental Expenditures Departmental expenditures are expected to be $1.7 million or 2.1 % over the amended budget, with $640,000 coming as a result of Human Resources’ reconciliation of vacant positions vs. budgeted positions and $153,400 in additional expenditures for recommended new positions, both presented in section D.1 below. In addition, staff requests an additional $40,000 to increase hourly employee rates, $339,100 in expenditures that are offset by related revenues, and $527,700 in one-time expenditures recommended in this report. The result of total revenues less total expenditures is projected at a net increase of $2.3 million of the General Fund’s beginning fund balance. Below is a summary of major changes to FY 2014-15 projected revenues and expenditures. General Fund revenues are identified as those that are true economic changes (recurring), and those that are one-time in nature. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 3 of 12 C. Revenues 1) Property Taxes: increase of $505,000 (Recurring; General Fund) The property tax assumption contained in the FY 2014-15 Adopted Budget relied upon the most current estimate of assessed valuation change available from the County Assessor at the time. Since that time, the County Assessor completed all recorded changes to South San Francisco’s assessed value, which resulted in a change from the prior 1.9% increase to 5.3%. As a result, property tax revenues for the year are estimated to be $505,000 more than the adopted budget. 2) Educational Revenue Augmentation Fund (ERAF): increase $1,302,200 (One-time; General Fund) San Mateo County recently amended its reserves policy, which resulted in the City receiving $1.3 million in additional excess ERAF than budgeted. However, the amount of Excess ERAF available for FY 2014-15 has declined due to a change in the State funding methodology for public schools. County officials project that this revenue source will continue to decline, and it is common practice among San Mateo County cities to budget only half of historical amounts on an ongoing basis as a hedge against future uncertainty. 3) Triple Flip: increase of $445,100 (One-time; General Fund) The State of California relies on property taxes collected through the ERAF mechanism to meet its obligations for public school funding, Triple Flip and the Motor Vehicle in Lieu Fee backfill. In FY 2013-14, San Mateo County officials notified staff of a Triple Flip shortfall, primarily due to the large number of Basic Aid school districts in San Mateo County compared to other counties in California. Fortunately, as a result of local legislative efforts, the State included a one-time provision in its 2014-15 budget to address the shortfall. The City’s share of $982,000 for 2013-14 was not included in the adopted budgeted revenue assumptions due to timing. Unfortunately, however, San Mateo County officials recently notified local agencies of another Triple Flip shortfall occurring in FY 2014-15. The City’s estimated impact of the current shortfall is $318,000. Local legislative efforts are being pursued to address the shortfall in the State’s FY 2015-16 budget; the outcome of that is uncertain. This points to the continued wisdom of budgeting conservatively for Triple Flip and ERAF as a hedge against uncertainty. 4) Transient Occupancy Tax (TOT): increase of $750,000 (Recurring; General Fund) TOT receipts through December 2014 were $650,000 more than the same period in the prior year. The adopted budget assumed these revenues had already reached their peak at the time the budget was developed, and would stay at that peak rather than grow further this fiscal year. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 4 of 12 Occupancy and room rental rates continue to remain strong and steady for South San Francisco hoteliers. Staff will keep the Council apprised of any deviation from the projected trend. 5) Building Permits: increase $450,000 (Recurring; General Fund) Revenues from Building Permits are expected to be $450,000 over budget, primarily due to developments East of 101. The number of number of permits issued that were valued at over $100,000 increased from 84 last year at midyear to 104 this year. The aggregate value of these high value permits also increased from $58 million to $65 million, a 12% increase compared to the same period in the prior year. 6) Grants: increase of $264,100 (One-time; General Fund) • In September 2013, the U.S. Department of Justice approved a $7,000 grant for 50% reimbursement of bulletproof vest purchases for the Police Department. • $17,100 in ABAG risk management funds to address hazardous field conditions at Alta Loma Park. • $240,000 from Cal-OES to offset the overtime costs of Fire mutual-aid deployments to large scale fire incidents throughout the State of California. Note that these revenues offset increased departmental expenditures. 7) Reimbursement for state mandated costs: increase of $105,000 (One-time; General Fund) This revenue source has not been budgeted annually by the State; rather, in good years, the State has released these dollars on a one-time basis. The 2014-15 State budget includes a provision to reimburse $100 million to local cities and counties for pre-2004 State mandated costs, of which the City has been allocated $105,000. 8) Fire Ambulance Services: increase of $75,000 (Recurring; General Fund) The increase reflects an accounting change in ambulance services billing procedures. The billing agency’s past practice was to deduct the cost of services from gross revenues. The process was changed to enable payments to go directly to the City, while services are paid to the billing agency through accounts payable, thus the revenue increase is accompanied by a commensurate expenditure increase. This has a net zero impact on the General Fund; more accurately depicts costs of services, and conforms to accounting best practices. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 5 of 12 9) Gas Tax: increase of $221,000 (One-time; Gas Tax Fund) Based on the most recent California Department of Finance (DOF) statewide revenue projections, the City’s estimated Highway User Tax (Gas Tax) revenue for FY 2014-15 is now estimated to be $1.9 million. This represents an increase of approximately $221,000 over the adopted budget, which was based on previous state projections. 10) Supplemental Law Enforcement Services Fund (SLESF): increase of $100,000 (Recurring; SLESF Fund) The annual SLESF grant administered by the State was inadvertently left out of the FY 2014-15 Adopted Budget. Staff estimates that the City will receive $100,000 in grant revenues to fund police services. This increase will be offset by expenditure increases in the SLESF Fund, which can defray formerly General Fund police expenditures. 11) Asset Seizure Funds: increase of $357,700 (One-time; Asset Seizure Fund) The City received a reimbursement from the San Mateo County Sheriff's Office to rectify payments for the Narcotics Task Force that should have been paid out of the General Fund. This is a one-time adjustment, and comes as a result of a change in policy by the Department of Justice. D. Expenditures 1) Position Budget Changes a) Finance – increase $17,200 (General Fund) The Finance Department has identified the need to add 1.0 FTE Financial Services Manager to provide bandwidth to meet the demand for greater internal control, development-related analysis and bolster internal service delivery. b) Fire - increase $560,000 (General Fund) Three (3) Paramedic/Firefighters were previously not recognized in the operating budget but were permitted to be staffed to reduce overtime for short-term vacancies, and Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 6 of 12 overtime caused by attrition. This is due to the long lead time in recruitment, training and anticipated retirements. c) Human Resources - increase $96,000 (General Fund) Due to changes in the Human Resources department structure that occurred after budget adoption, management identified the need for continuing with the Human Resources Manager position to oversee the day-to-day operations of the department while the long- term organizational needs of the department are focused with the Director. An additional Human Resources Technician is needed to meet current demands for recruitment, benefit administration, worker’s compensation and staff development to ensure optimum service delivery to the City’s departments. This position will also provide critical cross-training in the City’s human resources database system for all employee salary changes during the year. Human Resources staff compared the wage rate for hourly employees to the wage rate for the full-time equivalent (FTE) position, and estimated that approximately $40,000 would be needed to bring the wage rate for the hourly positions show below in Table 1 into alignment with its corresponding FTE position. The wage rate alignment would improve recruitment and retention of hourly employees, as the higher wage rate will put South San Francisco in a position to be competitive with other local cities. Staff is analyzing the city-wide impact of higher pay for hourly positions, the implications for related positions and the projected cost impact for the FY 2015-16 budget and beyond. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 7 of 12 Table 1: Hourly Position Proposed Wage Rate Increase CLASS CODE ACCOUNTING ASSISTANT II ‐ HOURLYX10021.1222.1823.2924.4525.6722.6023.7324.9226.1727.48 ADMINISTRATIVE ASSISTANT I ‐ HOURLYX11022.7923.9325.1326.3927.7124.3725.5926.8728.2129.62 ADMINISTRATIVE ASSISTANT II ‐ HOURLYX13024.0025.2026.4627.7829.1725.6726.9528.3029.7231.21 BUILDING INSPECTOR ‐ HOURLY X59532.9134.5636.2938.1040.0135.2236.9838.8340.7742.81 BUILDING MAINTENANCE CUSTODIAN ‐ HOURLYX18517.2518.1119.0219.9720.9718.4519.3720.3421.3622.43 ENGINEER, SENIOR ‐ HOURLY X33047.8150.2052.7155.3558.1252.0954.6957.4260.2963.30 ENVIRONMENTAL COMPLIANCE INSPECTOR ‐ HOURLYX46528.6130.0431.5433.1234.7832.8334.4736.2038.0139.91 EQUIPMENT MECHANIC  ‐ HOURLY X51025.7227.0128.3629.7831.2727.5328.9130.3631.8833.47 HUMAN RESOURCES TECHNICIAN ‐ HOURLY X26523.6224.8026.0427.3428.7125.6726.9528.3029.7231.21 LABORATORY CHEMIST ‐ HOURLY X54532.5434.1735.8837.6739.5535.8637.6639.5441.5243.59 LIBRARIAN I ‐ HOURLY X21023.6724.8526.0927.3928.7625.3226.5927.9229.3230.79 LIBRARIAN II ‐ HOURLY X67026.0127.3128.6830.1131.6227.8629.2530.7132.2533.86 LIBRARY ASSISTANT I ‐ HOURLY X22018.1219.0319.9820.9822.0319.3720.3421.3622.4323.55 LIBRARY ASSISTANT II ‐ HOURLY X22519.9920.9922.0423.1424.3021.3922.4623.5824.7626.00 OFFICE SPECIALIST ‐ HOURLY X41519.9020.9021.9523.0524.2021.2922.3523.4724.6425.87 PARK MAINTENANCE WORKER  ‐ HOURLY X30020.8221.8622.9524.1025.3122.3023.4224.5925.8227.11 PARKING ENFORCEMENT OFFICER ‐ HOURLY X18019.7620.7521.7922.8824.0221.1322.1923.3024.4725.69 PLANNER, ASSOCIATE ‐ HOURLY X12530.6232.1533.7635.4537.2234.0935.7937.5839.4641.43 PLANNER, SENIOR  ‐ HOURLY X33537.9139.8141.8043.8946.0842.2244.3346.5548.8851.32 PLANT ELECTRICIAN I ‐ HOURLY X50026.7628.1029.5130.9932.5432.7934.4336.1537.9639.86 PLANT MECHANIC  ‐ HOURLY X35527.3228.6930.1231.6333.2130.0931.5933.1734.8336.57 PLANT OPERATOR I ‐ CONTRACT FT X14522.0623.1624.3225.5426.8228.1329.5431.0232.5734.19 PLANT OPERATOR I ‐ HOURLY X14023.1824.3425.5626.8328.1828.1329.5431.0232.5734.19 PLANT OPERATOR II ‐ HOURLY X53026.7228.0629.4630.9332.4830.9532.4934.1235.8237.62 PLANT UTILITY WORKER ‐ HOURLY X49019.5720.5521.5822.6623.7924.6425.8727.1628.5229.95 POLICE RECORDS SPECIALIST ‐ HOURLY X19121.1822.2423.3524.5225.7522.6623.7924.9826.2327.54 POLICE SERVICE TECHNICIAN ‐ HOURLY X19221.7822.8724.0125.2126.4723.3124.4825.7026.9928.34 PUBLIC  WORKS MAINTENANCE WORKER ‐ HOURLYX34520.8221.8622.9524.1025.3122.3023.4224.5925.8227.11 RECREATION LEADER IV ‐ HOURLY X37514.5515.2816.0416.8417.6815.5616.3417.1618.0218.92 VAN DRIVER ‐ HOURLY X55512.3412.9613.6114.2915.0013.2213.8814.5715.3016.07 5 Current Salary Schedule Proposed Salary Schedule JOB TITLE 123451234 Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 8 of 12 d) Police - increase $80,000 (General Fund) The budget for 1.0 FTE Police Corporal has been understated in the operating budget for a number of years, and the number of Police Officers was overstated by 1.0 FTE. The salary difference for the fiscal year is a net increase of $14,100. In addition, the Police Department was authorized to hire a Parking Enforcement Officer (PEO) at a cost of $65,900 that needs to be reflected in the official position listing. The third PEO will allow for more consistent enforcement in the previously underserved areas such as near the BART station. e) Parks and Recreation: increase $60,900 (General Fund) Staff recommends restoring the Recreation Program Manager position, which had been frozen upon the former manager's retirement in 2009. This position, which would cost $26,100 for the remainder of the fiscal year, would be upgraded to be parallel with the Parks and Facilities Program Managers. The incumbent will be a Division Head for the Recreation Division which consists of 23.75 FTE of full-time and part-time regular and over 450 hourly staff. This position would replace a vacant Recreation and Community Services Supervisor position, which will be under filled with a coordinator-level position, and will report to an existing Recreation Supervisor. Authorization of a new Facilities Manager is requested and would replace the Building Maintenance Supervisor position upon the incumbent's retirement. This position is recommended to be upgraded to elevate the level of professional qualifications. The desired manager would have experience in overseeing a large campus-type facility maintenance program, and would have a considerable knowledge of construction management, sustainability programs, and architecture. The incumbent will be a Division Head for the Building Maintenance Division, which consists of 12 full-time custodial staff and craftsworkers, as needed part-time hourly staff, and a Building Maintenance Supervisor until that position is eliminated. Having some overlap is desirable to retain the Supervisor's institutional knowledge. The cost is $22,600 for the remainder of the fiscal year. Staff recommends the addition of one (1) Preschool Teacher for licensed preschool programs. As part of this proposal, staff would replace the full-time van driver position with a part-time hourly position, and upgrade one part-time childcare position to full-time Preschool Teacher. The difference in staff costs totals $12,200. f) Public Works: increase $19,300 (General Fund) Staff recommends converting two (2) part-time Maintenance Worker positions to full- time permanent positions. Half of the South San Francisco Clean Team is staffed by part- Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 9 of 12 time hourly employees. Converting the employees to full-time will bolster the team’s efforts and stabilize the Clean Team workforce while providing additional back-up in other Public Works maintenance areas. 2) City Manager: Increase of $75,000 for Pre-election Education and Community Outreach (One-time; General Fund) $75,000 is requested to develop informational materials for outreach efforts to the community to solicit community feedback on budget priorities for facilities and program needs. 3) Fire – Overtime: increase of $240,000 for Mutual Aid response (One-time; General Fund; Offset by increased revenue) This action is needed to account for overtime costs of $240,000 for responding to the mutual aid calls, which are reimbursed by the State. (No net General Fund impact occurs, as revenues offset expenses). 4) Police – Supplies: increase of $7,000 for bulletproof vests (One-time; General Fund; Offset by increased revenue) Staff recommends increasing Police Department appropriations by $7,000 for bulletproof vests, which are 50% funded by a grant from the Department of Justice. The City’s share of the cost is included in the existing Police Department operating budget. 5) Police – Overtime: Increase of $357,700 for Narcotics Task Force Cost Share (One-time; General Fund) This is a one-time payment from the General Fund to the San Mateo County Sheriff’s Office for the City’s cost share for the Narcotics Task Force. Four years of invoices (2011-2014) had previously been paid from the Asset Seizure Fund, as the City had previously received approval to do so from the Department of Justice. However, a review from the U.S. Department of Justice determined that the County erroneously co-mingled City funds with their General Fund, and must be funded from other sources. 6) Public Works – increase $35,000 for Abandoned Boat Removal (One-time; General Fund) Abandoned boats adjacent to the marina create a safety and environmental hazard. The abandoned boats are in the jurisdiction of South San Francisco and the cost of removal may be offset by placing liens on the boat owners. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 10 of 12 7) Library – increase of $60,000 to fund a Library Strategic Plan (One-time; General Fund) The Scope of the proposed South San Francisco Public Library Strategic Plan would include: a thorough look at emerging library service models, space planning and technology for a New Main Library as well as for the completion of a renovated Grand Avenue Branch, implications for staffing such as an expanded service model and for meeting current and prospective resident needs and expectations, and alignment of these goals and objectives with the City’s mission, vision and values. 8) Parks and Recreation – increase of $17,100 for Alta Loma Park field improvements (One-time; General Fund; Offset by revenues) Staff recommends increasing the budget for Parks and Recreation by $17,100 to account for the cost of addressing hazardous field conditions at Alta Loma Park, which are offset by ABAG risk management grant funds, as mentioned in Section C.6 above. 9) Gas Tax – increase of $221,000 for root barrier construction (One-time; Gas Tax Fund) Staff recommends that $221,000 in Gas Tax funds be appropriated to implement a root barrier at Junipero Serra Boulevard and King Drive. The roots from the median trees are encroaching the roadway by protruding through the asphalt, creating unsafe driving conditions, especially for motorcyclists. The project would be put out for bid this spring with construction proposed to be complete before Fall. 10) Supplemental Law Enforcement Services Fund (SLESF) – increase of $100,000 (Recurring; SLESF Fund; Offset by increased revenue) Staff recommends increasing the SLESF expenditure budget by $100,000, offset by the SLESF revenues mentioned in section C.10 above. This will help defray the cost of the Police Department payroll costs, which can be shifted to this fund, thus result in a savings for the General Fund. Staff Report Subject: APPROVAL OF MID-YEAR 2014-15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 2014-15 BUDGET Page 11 of 12 11) Ambulance Billing Administration – increase of $75,000 (Recurring; General Fund; Offset by increased revenue) As mentioned above in section C.8, due to changes in accounting procedures for ambulance billing, staff recommends increasing General Fund appropriations by $75,000. To reiterate, this is a net zero impact on the General Fund. 12) Asset Seizure Fund – increase of $48,000 for Automated License Plate Readers (One-time; Asset Seizure Fund) Staff also recommends that $48,000 be appropriated to implement Automatic License Plate Reading (ALPR) systems on two of the City’s patrol vehicles as a pilot program, to read, capture and upload license plate data into a centralized data repository, and identify any records that may provide the Global Positioning Satellite (GPS) coordinates to locate vehicles and suspects that were involved in reported crimes. The systems would modernize and streamline the Police Department’s investigation efforts, while the funding would have no impact on the General Fund. 13) Self Insurance Fund – increase of $250,000 for litigation settlement costs (One-time; Self Insurance Fund) Staff recommends increasing Self Insurance Fund appropriations by $250,000 to account for litigation settlements that are expected to occur by the end of the fiscal year. It is worthwhile to note that the proposed action does not signify the Council’s approval of claim settlement, but rather to increase appropriations in anticipation of future settlements. Claim settlements will be brought back to the Council for approval at the appropriate time. The Self Insurance Fund has adequate reserves to fund the additional expenses. III. FISCAL IMPACT Staff projects that total General Fund revenues will exceed expenditures by $2.3 million by the end of the fiscal year. The Undesignated Reserve is projected to end the year at $4.8 million, with total General Fund Discretionary Reserves estimated at $18.0 million. General Fund reserves are within the City’s reserve policy of 15 to 20% of General Fund revenues, but the Council may recall that there is no upper limit in the policy to the Undesignated Reserve. A net $2.0 million is recommended to be shifted from the General Fund to the Infrastructure Reserves to partially offset funds set aside earlier this fiscal year for the City’s share of the new Caltrain Station. IV. CONCLUSION Staff Report Subject: APPROVAL OF MID-YEAR 20 14- 15 FINANCIAL REPORT AND RESOLUTION AMENDING THE 20 14- 15 BUDGET Page 12 of 12 The recommended mid-year budget amendments are financially prudent. The projected General Fund reserves conform to the City's Reserves Policy, with 20% set aside for General Fund Reserves, and the City is fiscally sound. Prepared by: Richard Lee Finance Director RESOLUTION NO.______ CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA A RESOLUTION APPROVING THE MID-YEAR 2014- 2015 BUDGET AMENDMENT CHANGES, AMENDING THE CITY’S 2014-15 OPERATING BUDGET IN ORDER TO ADJUST REVENUES AND EXPENDITURES AT MID-YEAR, APPROVING THE SALARY SCHEDULE FOR HOURLY JOB CLASSIFICATIONS, AND APPROVING THE SALARY SCHEDULE FOR THE RECREATION PROGRAM MANAGER POSITION WHEREAS, staff has presented the South San Francisco City Council (“City Council”) with a review of the City of South San Francisco’s (“City”) finances for the Mid-Year of fiscal year 2014-15; and WHEREAS, it is recommended that the City Council review the 2014-15 Mid-Year Financial Report and approve the Mid-Year 2014-15 Budget Amendment Changes as shown in the Mid-Year 2014-15 Budget Update Summary, attached hereto as “Attachment 1” and incorporated into this Resolution by reference; and WHEREAS, it is recommended that the City Council approve the salary schedule for the hourly job classifications as shown in “Attachment 2,” attached hereto and incorporated into this Resolution by reference; and WHEREAS, it is recommended that the City Council approve the salary schedule for the Recreation Program Manager classification as shown in “Attachment 3,” attached hereto and incorporated into this Resolution by reference. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of South San Francisco that the City Council hereby takes the following actions: 1. Approves the Mid-Year 2014-2014 Budget Amendment Changes as shown in the Budget Update Summary, attached hereto as “Attachment 1,” and incorporated into this Resolution by reference; and 2. Amends the City’s 2014-15 Operating Budget consistent with the Mid-Year Budget Update Summary, attached hereto as “Attachment 1” and incorporated into this Resolution by reference; and 3. Approves the salary schedule for the hourly job classifications as shown in “Attachment 2” attached hereto and incorporated into this Resolution by reference; and; and 4. Approves the salary schedule for the Recreation Program Manager position as shown in “Attachment 3,” attached hereto and incorporated into this Resolution by reference. * * * * * * I hereby certify that the foregoing Resolution was regularly introduced and adopted by the City Council of the City of South San Francisco at a regular meeting held on the 25th day of February, 2015 by the following vote: AYES: NOES: ABSTAIN: ABSENT: ATTEST: City Clerk ATTACHMENT 1 MI D  YE A R  20 1 4 ‐15 SU M M A R Y  OF  AL L  BU D G E T  AM E N D M E N T  CH A N G E S FU N D TY P E DE S C R I P T I O N INCREASE / (DECREASE)AMOUNT GA S  TA X RE V E N U E S G A S  TA X 221,000                               GE N E R A L  FU N D RE V E N U E S B U I L D I N G  PE R M I T S 450,000                               GE N E R A L  FU N D RE V E N U E S E R A F  RE F U N D 1,302,200                            GE N E R A L  FU N D RE V E N U E S F I R E  ‐   AM B U L A N C E  BI L L I N G 75,000                                  GE N E R A L  FU N D RE V E N U E S F I R E  ‐   SE R V I C E S 240,000                               GE N E R A L  FU N D RE V E N U E S P R O P E R T Y  TA X 505,000                               GE N E R A L  FU N D RE V E N U E S S T A T E  MA N D A T E  PA Y M E N T S 105,000                               GE N E R A L  FU N D RE V E N U E S T O T  & CO M M E R C I A L  PA R K I N G 750,000                               GE N E R A L  FU N D RE V E N U E S T R I P L E  FL I P 445,100                               GE N E R A L  FU N D RE V E N U E S P A R K S  & RE C R E A T I O N  ‐   GR A N T S 17,100                                  GE N E R A L  FU N D EX P E N D I T U R E S A L T A  LO M A  PA R K  ‐   FI E L D  IM P R O V E M E N T S 17,100                                  GE N E R A L  FU N D RE V E N U E S P O L I C E  ‐   GR A N T S 7,000                                    AS S E T  SE I Z U R E EX P E N D I T U R E S NT F  CO S T  SH A R E  AD J U S T M E N T 357,700                               GA S  TA X EX P E N D I T U R E S J U N I P E R O  SE R R A  ME D I A N  RO O T  BA R R I E R 221,000                               GE N E R A L  FU N D EX P E N D I T U R E S C I T Y  MA N A G E R  ‐   PR E ‐EL E C T I O N  ED U C A T I O N  AN D  OU T R E A C H 75,000                                  GE N E R A L  FU N D EX P E N D I T U R E S F I N A N C E  ‐   PA Y R O L L 17,200                                  GE N E R A L  FU N D EX P E N D I T U R E S F I R E  ‐   AM B U L A N C E  BI L L I N G 75,000                                  GE N E R A L  FU N D EX P E N D I T U R E S F I R E  ‐   PA Y R O L L 560,000                               GE N E R A L  FU N D EX P E N D I T U R E S F I R E  ‐   SE R V I C E S 240,000                               GE N E R A L  FU N D EX P E N D I T U R E S H U M A N  RE S O U R C E S  ‐   PA Y R O L L 96,000                                  GE N E R A L  FU N D EX P E N D I T U R E S L I B R A R Y  ‐   ST R A T E G I C  PL A N 60,000                                  GE N E R A L  FU N D EX P E N D I T U R E S N T F  CO S T  SH A R E  AD J U S T M E N T 357,700                               GE N E R A L  FU N D EX P E N D I T U R E S P A R K S  & RE C R E A T I O N  ‐   PA Y R O L L 60,900                                  AS S E T  SE I Z U R E EX P E N D I T U R E S P O L I C E  ‐   LI C E N S E  PL A T E  RE A D E R S 48,000                                  GE N E R A L  FU N D EX P E N D I T U R E S P O L I C E  ‐   PA Y R O L L 80,000                                  GE N E R A L  FU N D EX P E N D I T U R E S P U B L I C  WO R K S  ‐   AB A N D O N E D  BO A T 35,000                                  GE N E R A L  FU N D EX P E N D I T U R E S P U B L I C  WO R K S  ‐   PA Y R O L L 19,300                                  SL E S F  FU N D EX P E N D I T U R E S P O L I C E  ‐   GR A N T S 100,000                               SE L F ‐IN S U R A N C E EX P E N D I T U R E S L I T I G A T I O N  SE T T T L E M E N T  CO S T S 250,000                               MIDYEAR 2014-15 ATTACHMENT 2 PROPOSED SALARY SCHEDULE HOURLY EMPLOYEES CLASS CODE ACCOUNTING ASSISTANT II ‐ HOURLY X10021.1222.1823.2924.4525.6722.6023.7324.9226.1727.48 ADMINISTRATIVE ASSISTANT  I ‐ HOURLY X11022.7923.9325.1326.3927.7124.3725.5926.8728.2129.62 ADMINISTRATIVE ASSISTANT  II ‐ HOURLY X13024.0025.2026.4627.7829.1725.6726.9528.3029.7231.21 BUILDING INSPECTOR ‐ HOURLY X59532.9134.5636.2938.1040.0135.2236.9838.8340.7742.81 BUILDING MAINTENANCE CUSTODIAN ‐ HOURLYX18517.2518.1119.0219.9720.9718.4519.3720.3421.3622.43 ENGINEER, SENIOR ‐ HOURLY X33047.8150.2052.7155.3558.1252.0954.6957.4260.2963.30 ENVIRONMENTAL COMPLIANCE INSPECTOR ‐ HOURLYX46528.6130.0431.5433.1234.7832.8334.4736.2038.0139.91 EQUIPMENT MECHANIC  ‐ HOURLY X51025.7227.0128.3629.7831.2727.5328.9130.3631.8833.47 HUMAN RESOURCES TECHNICIAN ‐ HOURLY X26523.6224.8026.0427.3428.7125.6726.9528.3029.7231.21 LABORATORY CHEMIST ‐ HOURLY X54532.5434.1735.8837.6739.5535.8637.6639.5441.5243.59 LIBRARIAN I ‐ HOURLY X21023.6724.8526.0927.3928.7625.3226.5927.9229.3230.79 LIBRARIAN II ‐ HOURLY X67026.0127.3128.6830.1131.6227.8629.2530.7132.2533.86 LIBRARY ASSISTANT I ‐ HOURLY X22018.1219.0319.9820.9822.0319.3720.3421.3622.4323.55 LIBRARY ASSISTANT II ‐ HOURLY X22519.9920.9922.0423.1424.3021.3922.4623.5824.7626.00 OFFICE SPECIALIST  ‐ HOURLY X41519.9020.9021.9523.0524.2021.2922.3523.4724.6425.87 PARK MAINTENANCE WORKER ‐ HOURLY X30020.8221.8622.9524.1025.3122.3023.4224.5925.8227.11 PARKING ENFORCEMENT OFFICER ‐ HOURLY X18019.7620.7521.7922.8824.0221.1322.1923.3024.4725.69 PLANNER, ASSOCIATE ‐ HOURLY X12530.6232.1533.7635.4537.2234.0935.7937.5839.4641.43 PLANNER, SENIOR  ‐ HOURLY X33537.9139.8141.8043.8946.0842.2244.3346.5548.8851.32 PLANT ELECTRICIAN I ‐ HOURLY X50026.7628.1029.5130.9932.5432.7934.4336.1537.9639.86 PLANT MECHANIC  ‐ HOURLY X35527.3228.6930.1231.6333.2130.0931.5933.1734.8336.57 PLANT OPERATOR I ‐ CONTRACT FT X14522.0623.1624.3225.5426.8228.1329.5431.0232.5734.19 PLANT OPERATOR I ‐ HOURLY X14023.1824.3425.5626.8328.1828.1329.5431.0232.5734.19 PLANT OPERATOR II ‐ HOURLY X53026.7228.0629.4630.9332.4830.9532.4934.1235.8237.62 PLANT UTILITY WORKER ‐ HOURLY X49019.5720.5521.5822.6623.7924.6425.8727.1628.5229.95 POLICE RECORDS SPECIALIST ‐ HOURLY X19121.1822.2423.3524.5225.7522.6623.7924.9826.2327.54 POLICE SERVICE TECHNICIAN ‐ HOURLY X19221.7822.8724.0125.2126.47 23.3124.4825.7026.9928.34 PUBLIC WORKS MAINTENANCE  WORKER ‐ HOURLYX34520.8221.8622.9524.1025.3122.3023.4224.5925.8227.11 RECREATION LEADER IV ‐ HOURLY X37514.5515.2816.0416.8417.6815.5616.3417.1618.0218.92 VAN DRIVER ‐ HOURLY X55512.3412.9613.6114.2915.0013.2213.8814.5715.3016.07 5 Current Salary Schedule Proposed Salary Schedule JOB TITLE 123451234 2401986.1 MIDYEAR 2014-15 ATTACHMENT 3 PROPOSED SALARY SCHEDULE RECREATION PROGRAM MANAGER RECREATION PROGRAM MANAGER MID  MGMT44.3946.6148.9451.3953.96 345UNITJOB TITLE 12 MIDYEAR 2014‐15 GENERAL FUND SUMMARY ActualAdoptedAmendedProjected Favorable / % Revenues2013‐142014‐152014‐152014‐15(Unfavorable)Change Property Taxes 15,226,702     15,075,006   15,075,006    15,580,006     505,000                3.3% Former RDA Prop Tax Allocation 4,099,697       4,500,000     4,500,000      4,500,000       ‐                        0.0% ERAF Refund from County 2,263,468       1,131,500     1,131,500      2,433,700       1,302,200            115.1% Sales Tax 10,236,897     10,869,488   10,869,488    10,869,488     ‐                        0.0% Triple Flip 2,834,684       3,669,422     3,669,422      4,114,522       445,100                12.1% Transient Occupancy Tax 11,174,017     10,684,772   10,684,772    11,434,772     750,000                7.0% Business License 1,285,652       1,083,000     1,083,000      1,083,000       ‐                        0.0% Commercial Parking Tax 2,993,252       2,746,400     2,746,400      2,746,400       ‐                        0.0% Franchise Fees 3,517,925       3,248,000     3,248,000      3,248,000       ‐                        0.0% Building and Fire Permits 4,366,271       3,296,854     3,296,854      3,746,854       450,000                13.6% Motor Vehicle License & In‐Lieu 5,319,154        5,385,045       5,385,045        5,385,045         ‐                         0.0% Revenue from Other Agencies 1,080,908        732,667          1,627,265        1,996,365         369,100                 22.7% Charges for Services 7,485,429       6,659,675     7,106,337      7,181,337       75,000                  1.1% Administrative Charges 1,325,500       1,365,265     1,365,265      1,365,265       ‐                        0.0% Fines 1,528,319       1,088,500     1,088,500      1,088,500       ‐                        0.0% Interest & Rent 2,955,495       2,931,500     2,931,500      2,931,500       ‐                        0.0% Transfers In & Other 1,699,908       1,588,757     1,811,448      1,811,448       ‐                        0.0% Add Prior Year Committed Reserves N/AN/A4,623,197        4,623,197         ‐                         0.0% Total Revenues 79,393,277     76,055,851   82,242,999    86,139,399     3,896,400            4.7% Actual AdoptedAmendedProjected Favorable / % Budget Expenditures 2013‐142014‐152014‐152014‐15(Unfavorable)Change City Council 195,175           192,249          211,749           211,749             ‐                              0.0% City Clerk 414,430           507,564          508,535           508,535             ‐                              0.0% City Treasurer 115,521           122,094          122,094           122,094             ‐                              0.0% City Attorney 614,879           764,998          764,998           764,998             ‐                              0.0% City Manager 1,017,991        1,048,202       1,048,574        1,123,574         (75,000)                  (7.2%) Finance 1,852,323        1,900,235       1,908,879        1,926,079         (17,200)                  (0.9%) Non‐Departmental 861,003           1,086,315       1,118,315        1,118,315         ‐                              0.0% Human Resources 882,250           1,038,521       1,188,146        1,284,146         (96,000)                  (8.1%) Economic & Community Dev 4,012,535        4,524,355       4,848,393        4,848,393         ‐                              0.0% Fire 20,163,758      19,800,676     19,802,242      20,677,242       (875,000)               (4.4%) Police 22,705,021      22,572,274     22,829,746      23,274,446       (444,700)               (1.9%) Public Works 3,952,693        4,199,327       5,170,239        5,224,539         (54,300)                  (1.1%) Library 3,987,928        4,406,354       4,729,872        4,789,872         (60,000)                  (1.3%) Parks & Recreation 11,552,498      12,145,993     12,324,936      12,402,936       (78,000)                  (0.6%) Transfers Out 12,812,614     1,650,250     5,530,630      5,530,630       ‐                             0.0% Total Expenditures 85,140,619     75,959,408   82,107,348    83,807,548     (1,700,200)            (2.1%) Change from 14‐15 Budget Change from 14‐15 Budget MI D ‐YE A R  FY  20 1 4 ‐15 TR A N S F E R S  OU T  AN D  RE S E R V E S Ad o p t e d A m e n d e d   Ac t u a l B u d g e t B u d g e t P r o j e c t e d Fa v o r a b l e  / %  20 1 3 ‐14 2 0 1 4 ‐15 2 0 1 4 ‐15 2 0 1 4 ‐15 (U n f a v o r a b l e ) C h a n g e To t a l  Re v e n u e s  fr o m  pa g e  1 79 , 3 9 3 , 2 7 7                    76 , 0 5 5 , 8 5 1                    82 , 2 4 2 , 9 9 9                    86 , 1 3 9 , 3 9 9                    3, 8 9 6 , 4 0 0    4.7% To t a l  Ex p e n d i t u r e s  fr o m  pa g e  2 85 , 1 4 0 , 6 1 9                    75 , 9 5 9 , 4 0 8                    82 , 1 0 7 , 3 4 8                    83 , 8 0 7 , 5 4 8                    1, 7 0 0 , 2 0 0    2.1% Ne t  Su r p l u s  / (D e f i c i t ) ( 5 , 7 4 7 , 3 4 2 )                          96 , 4 4 3                                        13 5 , 6 5 1                                    2, 3 3 1 , 8 5 1                            2, 1 9 6 , 2 0 0        1619.0% Ad o p t e d A m e n d e d   Ac t u a l B u d g e t B u d g e t P r o j e c t e d Fa v o r a b l e  / %  20 1 3 ‐14 2 0 1 4 ‐15 2 0 1 4 ‐15 2 0 1 4 ‐15 (U n f a v o r a b l e ) C h a n g e Em e r g e n c i e s   1, 5 6 7 , 0 0 0                          1, 6 0 0 , 0 0 0                          33 , 0 0 0                2.1% Ec o n o m i c  Co n t i n g e n c i e s 9 , 3 9 1 , 0 0 0                          9, 2 8 9 , 6 4 3                          (1 0 1 , 3 5 7 )        ‐ 1.1% Bu d g e t  Co n t i n g e n c y 2 , 3 2 0 , 4 7 7                          2, 3 2 0 , 4 7 7                          ‐                                      0.0% Un d e s i g n a t e d  Re s e r v e 2 , 3 8 9 , 9 4 7                              4, 7 9 0 , 1 5 5                            2, 4 0 0 , 2 0 8        100.4% To t a l  Ge n e r a l  Fu n d  Re s e r v e s 1 5 , 6 6 8 , 4 2 4                        18 , 0 0 0 , 2 7 5                        2, 3 3 1 , 8 5 1        14.9% Pe r  Ci t y ' s  Re s e r v e s  Po l i c y ,  20 %  of  re v e n u e s  = 16 , 0 3 0 , 0 0 0                    Ex c e s s  Ge n e r a l  Fu n d  Re s e r v e s 1, 9 7 0 , 2 7 5                          In f r a s t r u c t u r e  Re s e r v e 11 , 1 6 1 , 0 0 0                    12 , 5 0 9 , 3 2 4                    12 , 5 0 9 , 3 2 4                    5, 2 6 1 , 0 0 0                          Ad d  ex c e s s  re s e r v e s  fr o m  ab o v e 1 , 9 7 0 , 2 7 5                          Pr o j e c t e d  En d i n g  Ba l a n c e 7 , 2 3 1 , 2 7 5                        Ch a n g e  fr o m  2014‐15 Budget Ch a n g e  fr o m  2013‐14 Actual MI D Y E A R  20 1 4 ‐15 GA S  TA X  FU N D  SU M M A R Y Re v e n u e s  Ac t u a l FY  20 1 3 ‐14   Ad o p t e d   FY  20 1 4 ‐15    Am e n d e d FY  20 1 4 ‐15    Pr o j e c t e d FY  20 1 4 ‐15   Ch a n g e   fr o m   Ad o p t e d   %  Ch a n g e Change from Prior Year% Change Ta x  Re v e n u e        HU T A  21 0 3 ‐21 0 7  (G a s  Ta x ) 2, 0 1 9 , 5 7 7    1, 6 5 2 , 4 8 3    1, 6 5 2 , 4 8 3    1, 8 7 3 , 7 3 5      22 1 , 2 5 2          13 . 4 % (145,842)    -7.2%        Me a s u r e  M 44 3 , 0 6 4            23 0 , 0 0 0          23 0 , 0 0 0          23 7 , 6 1 4              7, 6 1 4                  3. 3 % (205,450)    -46.4% Us e  of  Mo n e y  & Pr o p e r t y 26 , 7 0 0                15 , 0 0 0              15 , 0 0 0              15 , 0 0 0                    ‐                           0. 0 % (11,700)      -43.8% To t a l  Re v e n u e s 2, 4 8 9 , 3 4 1    1, 8 9 7 , 4 8 3    1, 8 9 7 , 4 8 3    2, 1 2 6 , 3 4 9      22 8 , 8 6 6          12 . 1 % ( 3 6 2 , 9 9 2 )     ‐14.6% Ex p e n d i t u r e s Tr a n s f e r  to  Ge n e r a l  Fu n d 92 0 , 1 8 4            1, 1 0 6 , 9 0 9    1, 1 7 0 , 4 8 6    1, 1 7 0 , 4 8 6      63 , 5 7 7              5. 7 % 250,301      27.2% Tr a n s f e r  to  St o r m w a t e r 67 0 , 0 0 0            67 0 , 0 0 0          67 0 , 0 0 0          67 0 , 0 0 0              ‐                           0. 0 % 0                  0.0% Tr a n s f e r  to  Ca p i t a l  Im p r o v e m e n t 10 2 , 0 4 4            2, 0 9 7 , 1 3 3    2, 0 9 7 , 1 3 3    2, 0 9 7 , 1 3 3      ‐                           0. 0 % 1,995,089  1955.1% To t a l  Ex p e n d i t u r e s 1, 6 9 2 , 2 2 8    3, 8 7 4 , 0 4 2    3, 9 3 7 , 6 1 9    3, 9 3 7 , 6 1 9      63 , 5 7 7              1. 6 % 2 , 2 4 5 , 3 9 1   132.7% Su r p l u s / ( D e f i c i t ) 79 7 , 1 1 3            (1 , 9 7 6 , 5 5 9 ) ( 2 , 0 4 0 , 1 3 6 ) ( 1 , 8 1 1 , 2 6 9 )    16 5 , 2 9 0          -8 . 4 % (2,608,382) -327.2% Fu n d  Ba l a n c e 2, 3 0 5 , 8 9 2 3 2 9 , 3 3 3      26 5 , 7 5 7      49 4 , 6 2 3            16 5 , 2 9 0      50 . 2 % ( 1 , 8 1 1 , 2 6 9 )  ‐78.5% MI D Y E A R  20 1 4 ‐15 SU P P L E M E N T A L  LA W  EN F O R C E M E N T  SE R V I C E S  FU N D  (S L E S F ) Re v e n u e s  Ac t u a l FY  20 1 3 ‐14   Ad o p t e d   FY  20 1 4 ‐15    Am e n d e d FY  20 1 4 ‐15    Pr o j e c t e d FY  20 1 4 ‐15   Ch a n g e   fr o m   Ad o p t e d   %   Ch a n g e Ch a n g e  fr o m   Pr i o r  Ye a r %  Ch a n g e Ta x  Re v e n u e Ta x e s 94 , 5 2 3                    ‐                             ‐                             10 0 , 0 0 0          10 0 , 0 0 0      10 0 . 0 % 5, 4 7 7                    5. 8 % Us e  of  Mo n e y  & Pr o p e r t y 25 7                                ‐                             ‐                             ‐                             ‐                       0. 0 % (2 5 7 )                        0. 0 % To t a l  Re v e n u e s 94 , 7 8 0                    ‐                             ‐                             10 0 , 0 0 0          10 0 , 0 0 0    10 0 . 0 % 5, 2 2 0                  5. 5 % Ex p e n d i t u r e s Pa y r o l l 94 , 6 7 8                    ‐                             ‐                             10 0 , 0 0 0          10 0 , 0 0 0      10 0 . 0 % 5, 3 2 2                    5. 6 % To t a l  Ex p e n d i t u r e s 94 , 6 7 8                    ‐                             ‐                             10 0 , 0 0 0          10 0 , 0 0 0    10 0 . 0 % 5, 3 2 2                  5. 6 % Su r p l u s / ( D e f i c i t ) 1 0 2                                ‐                             ‐                             ‐                             ‐                       0. 0 % (1 0 2 )                        ‐ 10 0 % Fu n d  Ba l a n c e 10 2                            10 2                      10 2                      10 2                      ‐                     0. 0 % ‐                                 0. 0 % MI D Y E A R  20 1 4 ‐15 SE L F ‐IN S U R A N C E  FU N D Re v e n u e s  Ac t u a l FY  20 1 3 ‐14   Ad o p t e d   FY  20 1 4 ‐15    Am e n d e d FY  20 1 4 ‐15    Pr o j e c t e d FY  20 1 4 ‐15   Ch a n g e   fr o m   Ad o p t e d   %   Ch a n g e Ch a n g e  fr o m   Pr i o r  Ye a r %  Ch a n g e Ch a r g e s  fo r  Se r v i c e s (4 , 5 1 0 )                      ‐                             ‐                             (3 , 0 2 9 )                (3 , 0 2 9 )              0. 0 % 1, 4 8 1                    -3 2 . 8 % Us e  of  Mo n e y  & Pr o p e r t y 11 9 , 6 0 9                75 , 0 0 0              75 , 0 0 0              75 , 0 0 0              ‐                         0. 0 % (4 4 , 6 0 9 )            -3 7 . 3 % Ot h e r  Re v e n u e s 4, 0 7 2 , 0 9 8        3, 3 8 5 , 2 8 5    3, 3 8 5 , 2 8 5    3, 3 8 5 , 2 8 5    ‐                         0. 0 % (6 8 6 , 8 1 3 )        -1 6 . 9 % To t a l  Re v e n u e s 4, 1 8 7 , 1 9 7        3, 4 6 0 , 2 8 5    3, 4 6 0 , 2 8 5    3, 4 5 7 , 2 5 7    ‐                         0. 0 % (7 2 9 , 9 4 1 )        ‐ 17 . 4 % Ex p e n d i t u r e s Pa y r o l l 50 3 , 1 0 0                65 0 , 0 0 0          65 0 , 0 0 0          65 0 , 0 0 0          ‐                         0. 0 % 14 6 , 9 0 0          29 . 2 % Su p p l i e s  an d  Se r v i c e s 2, 7 3 0 , 3 0 0        2, 4 3 5 , 0 0 0    2, 4 3 5 , 0 0 0    2, 6 8 5 , 0 0 0    25 0 , 0 0 0        10 . 3 % (4 5 , 3 0 0 )            -1 . 7 % To t a l  Ex p e n d i t u r e s 3, 2 3 3 , 4 0 0        3, 0 8 5 , 0 0 0    3, 0 8 5 , 0 0 0    3, 3 3 5 , 0 0 0    25 0 , 0 0 0      8. 1 % 10 1 , 6 0 0          3. 1 % Su r p l u s / ( D e f i c i t ) 9 5 3 , 7 9 7                37 5 , 2 8 5          37 5 , 2 8 5          12 2 , 2 5 7          (2 5 3 , 0 2 9 )    -6 7 . 4 % (8 3 1 , 5 4 1 )        -8 7 . 2 % Fu n d  Ba l a n c e 69 9 , 5 4 6            1, 0 7 4 , 8 3 1 1 , 0 7 4 , 8 3 1 8 2 1 , 8 0 3      (2 5 3 , 0 2 9 ) ‐23 . 5 % 1 2 2 , 2 5 7              17 . 5 % Staff Report Subject: Priority Conservation Area Designation Date: February 25,2015 Page 2 of3 • Urban Greening: Existing and potential green spaces in cities that increase habitat connectivity, improve community health, capture carbon emissions, and address stonnwater. Many existing and likely Urban Greening areas are not within PDAs. • Regional Recreation: Existing and potential regional parks, trails, and other publicly accessible recreation facilities. Process for Priority Conservation Area Designation Jurisdictions or special districts, such as open space and park districts, may submit applications to nominate new PCAs to ABAG through May 30,2015. The nominating agency must send notifications to all of the jurisdictions in which the PCA is located. These jurisdictions will have ninety (90) days from receipt of the notification to adopt a resolution of opposition to the PCA. An adopted resolution of opposition invalidates the nomination. The application requires that new PCA nominations include: 1. An adopted resolution of support from the jurisdiction(s) in which it is located; 2. A map and text describing the general area and boundaries of the PCA; 3. Selection of one or more of the PCA designations, with supporting text and data; and 4. Discussion of the regional and local importance of the PCA. Potential Priority Conservation Areas In mid-2014, San Bruno Mountain Watch (SBMW) received a grant from MTC to aid in their outreach efforts to gather support for designation of San Bruno Mountain and other nearby important open space lands. Since that time, in addition to meeting with Planning and Parks and Recreation staffs, SBMW has been working individually with neighboring jurisdictions, including Daly City, Pacifica, Colma and Brisbane, to coordinate a comprehensive PCA nomination application for northern San Mateo County. As shown on the attached map, staffhas proposed a network of open natural lands, public parks, bayfront and multi-use trails, and bikeways intended to connect the City's two PDAs (Downtown and the EI Camino Corridor) and regional transit hubs to open space amenities as listed below and shown on Exhibit A of the attached Resolution: San Bruno Mountain (Natural Landscape/Regional Recreation) Sign Hill Park (Natural Landscape/Regional Recreation) Orange Park (Regional Recreation) Centennial Way (Regional Recreation) Oyster Point Marina (Regional Recreation) San Francisco Bay Trail (Natural LandscapelRegional Recreation) Connecting Bike TrailslRoutes (Urban Greening): • Lawndale Dr. • Chestnut Avenue • Orange Avenue (EI Camino Real to Sign Hill Park) • Spruce Avenue/School Street • South Linden/Linden Avenue RESOLUTION NOo ___ _ CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA A RESOLUTION SUPPORTING THE DESIGNATION OF SAN BRUNO MOUNTAIN AND ASSOCIATED PROPERTIES WITHIN THE CITY OF SOUTH SAN FRANCISCO AS A PRIORITY CONSERVATION AREA WHEREAS, in 2007 the association for Bay Area Governments (ABAG) in partnership with the Metropolitan Transportation Commission (MTC) and the Bay Area Air Quality Management District (BAAQMD) formed the Focusing Our Vision or "FOCUS" program to strengthen environmental protection and conservation of natural lands in the San Francisco Bay Area; and WHEREAS, the Priority Conservation Areas (PCAs) are areas of regional significance that provide communities and inhabiting wildlife with essential natural resources in addition to scenic, recreational, and ecological values for the area; and WHEREAS, the FOCUS program currently designates seven PCAs in the County of San Mateo County; and WHEREAS, San Bruno Mountain stands as an open-space island surrounded by urban development and its 3,200 acres of mountainous landscapes contain natural environments critical to the ecosystems of wildlife and plants; and WHEREAS, San Bruno Mountain is the repository for three endangered butterflies, rare amphibians and snakes, and numerous local, regional, and national rare plants; and WHEREAS, access to and across San Bruno Mountain is presently limited; and WHEREAS, there is potential for expansion of trails and wildlife corridors connecting San Bruno Mountain to San Francisco Bay, as well as to the Pacific Ocean, other parks, greenways, and open areas from all sides of the Mountain; and WHEREAS, designation of the proposed areas as a Priority Conservation Area would serve to greatly enhance public access to San Bruno Mountain, Sign Hill Park and the San Francisco Bay Trail by providing a corridor of open space and recreational connections that would link directly to the City's Priority Development Areas and major transit stops, including Bay Area Rapid Transit, Caltrain, SamTrans and the San Francisco Bay Perry; and WHEREAS, adoption of a PCA does not change the zoning, general plan, or other land use designations of the geographic area encompassed by the PCA; and WHEREAS, local jurisdictions retain full land use control over designated PCAs. -1- NOW, THEREFORE, BE IT RESOLVED that the City of South San Francisco hereby endorses the following areas to be designated as a Priority Conservation Area, as listed below and mapped as attached as Exhibit A: a. San Bruno Mountain b. Sign Hill Park c. Orange Park d. Centennial Way e. Oyster Point Marina f. San Francisco Bay Trail g. Connecting Bike TrailslRoutes: • LaWndale Dr. • Chestnut Avenue • Orange Avenue (El Camino Real to Sign Hill Park) • Spruce Avenue/School Street • South Linden/Linden A venue • Hillside Boul~vard • Grand/East Grand A venue • Oyster P ointIV eterans/Sister Cities Boulevards * * * * * * * I hereby certify that the foregoing resolution was adopted by the City Council of the City of South San Francisco at a regular meeting held on the 25 th day of February, 2015 by the following Vote: AYES: ______________ ~---------------------------------- NOES: ______ ~ ________________________________________ __ ABSTENTIONS: ________________________________________ ___ ABSENT: ______________________________________________ ___ Exhibit A: Map -Draft Priority Conservation Area -2- Attest: ----------------------Krista Martinelli City Clerk CA Background . ~ Part of ABAG & MTC's Plan Bay Area efforts o Integrated transportation /land use /housing plan o peAs complement PDAs ~ Areas of regional significance that "provide important agricultural, natural resource, historical, scen ic, cu Itu ral, recreational and / or ecological values and ecosystem functions." • Purpose -to protect, preserve and enhance natural lands and resources in the Bay Area Planning Div. 2/25/20 1 5 2 Coordination ~ San Bruno Mtn Watch (SBMW) working with No. San Mateo County jurisdictions to coordinate a comprehensive PCA nomination centered on San Bruno Mtn. ~ SSF portion includes a network of open natural lands, public parks, bayfront and multi-use trails and bikeways. o Connects the City's two PDAs and regional transit hubs to open space amenities Planning Div . 2 /25 /2015 3 Recommendation That the City Council adopt a Resolution supporting the designation of San Bruno Mountain and associated properties within the City of South San Francisco as a PCA Planning Division 2/25/2015 5 Staff Report DATE: February 25, 2015 TO: Mayor and City Council FROM: Alex Greenwood, Director of Economic and Community Development SUBJECT: 1256 MISSION SUBDIVISION - DESIGN REVIEW, TENTATIVE SUBDIVISION MAP AND AFFORDABLE HOUSING AGREEMENT TO CONSTRUCT A NEW RESIDENTIAL DEVELOPMENT CONSISTING OF UP TO 36 RESIDENTIAL UNITS, WITH A MIX OF TOWNHOMES AND SINGLE FAMILY DWELLINGS, AND AUTHORIZE DENSITY BONUS INCENTIVES FOR THE SOUTHERN PORTION OF THE SITE TO ALLOW AN INCREASE IN ALLOWABLE BUILDING HEIGHT FROM 25-FEET TO 35-FEET AND TO ALLOW THE USE OF ONE ARCHITECTURAL PROTOTYPE, AND USE PERMIT TO ALLOW A 5 FOOT 2 INCH TALL FENCE IN THE REQUIRED FRONT YARD AT 1256 MISSION ROAD IN THE TRANSIT VILLAGE RESIDENTIAL MEDIUM DENSITY (TV-RM) AND LOW DENSITY RESIDENTIAL (RL-8) ZONING DISTRICTS IN ACCORDANCE WITH SSFMC TITLE 19 (SUBDIVISIONS) AND CHAPTERS 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 AND 20.490, AND DETERMINATION THAT THE PROJECT IS CATEGORICALLY EXEMPT FROM CEQA. Address: 1256 Mission Road (APNs 011-171-330, 011-171-500 & 011-171-130) Owner: Antonio Cuneo Applicant: City Ventures Case No.: P14-0081: UP14-0009, DR4-0049, SA14-0001 & AHA14-0001 RECOMMENDATION It is recommended that the City Council follow the recommendation of the Planning Commission and adopt Resolution A, making findings and approving Planning Project P14-0081 Alternative A, including UP14-0009, DR14-0049, SA14-0001 and AHA14-0001 subject to the attached draft conditions of approval. BACKGROUND January 14th Staff Report and Discussion The January 14, 2015 City Council Staff Report (without attachments) is attached for background on the project. At that meeting, Council considered a 35-unit development that included access from Mission Road, Edgewood Way and Baywood Ave, as shown in Figure 1 below. Council was supportive of the overall project but was concerned with the proposal to extend Edgewood Way as an access road to the development, and requested that the applicant provide more detailed plans showing how the project would look if the lower portion of the site were accessed from Mission Road only. The Council continued the public hearing to the regularly scheduled meeting of February 25, 2015. Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 2 of 8 Figure 1: Alternative A Site Plan DISCUSSION In response to Council’s request, the applicant prepared an Alternative B site plan that restricts access to the lower portion of the site to Mission Rd only, as indicated in Figure 2 below. Figure 2: Alternative B Site Plan Under this scenario, a total of 36 units are proposed on the site; 29 units would be accessed from Mission Rd, and the remaining 7 units would be accessed from Baywood Ave. This scenario results in one more unit than Alternative A; the additional unit is proposed due to offset the financial impacts of replacing single family homes with townhomes on the upper portion of the site and replacing landscape-based stormwater treatment measures with mechanical treatment measures on the lower portion of the site. The applicant will discuss the financial implications in more detail at the City Council meeting. Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 3 of 8 Alternative B would also be consistent with the general development standards of the Transit Village – Medium Density Residential (TV-RM) Zoning District, but there are a few changes to the overall project site as a result of the revised site plan. Following is a general discussion of these changes: Expansion of Townhomes onto Baywood Ave Portion of Site To allow vehicular access from Mission Road to the third row of townhomes, the proposed pedestrian walkway between buildings would be widened into a central access road with spurs providing vehicular circulation to all three rows of townhome units on the lower portion of the site. In order to continue to meet the minimum density requirements, the 2 units that would be removed due to the road widening would be incorporated into the northern portion of the site, with the replacement of the 3 single-family detached homes at the rear of the northern portion of the site with a row of 6 townhome- style homes. To allow such a configuration, the affordable housing incentives to allow a height increase for a portion of the project site and to allow the use of Architectural Prototype 5 Guidelines for all of the townhome units would have to be extended for the entirety of the parcels within the TV-RM district, as opposed to approximately two-thirds of the TV-RM parcels in Alternative A. This change in site configuration also has two primary aesthetic implications: 1) The inclusion of townhome units on the Baywood Ave portion of the site will result in a development that is more visible to the existing homes on Baywood Ave and the surrounding neighborhood than the single-family dwellings proposed in Alternative A. Following are elevation drawings showing the differences between the building heights in each alternative: Figure 3: Alternative A Elevations Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 4 of 8 Figure 4: Alternative B Elevations As can be seen in Figure 4, the townhomes are more prominent from both Mission Road and Baywood Ave. The townhomes are setback approximately 100 feet from Baywood Ave, and are adjacent to the PG&E easement to the north, and therefore would not be immediately adjacent to any existing residences. However, the general visibility of the entire project would move further back into the surrounding neighborhood than Alternative A. 2) The second aesthetic impact is related to the decrease in overall landscape area and increase in overall paved area on the site. Under Alternative A, 23 percent of the overall site is dedicated to landscape areas and 31 percent is dedicated to streets (not including sidewalks). Under Alternative B, the total landscape area decreases to 16 percent and the total street area increases to 38 percent of the site; this results in a 30 percent loss of usable open space on the site. As shown in the graphic below, the decrease in usable open space removes one of the primary common amenity areas for the project, at the intersection of the pedestrian walkway and the paseo between the second and third row of townhomes. This central spine includes one of the two common open space areas within the project (the other being the children’s playground), as well as the basketball court proposed within the required fire truck turnaround. Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 5 of 8 Figure 5: Alternative A Landscape Close-Up The area shown in red also includes bio-retention areas in close proximity to the pedestrian walkway, which will serve as the stormwater control measures for the majority of the middle one-third of the site, including the second and third rows of townhomes. Under Alternative B, the new central access road connecting to the third row of townhomes removes the pedestrian walkway and the adjoining landscape areas that allow for the installation of the larger bio-retention areas. To accommodate this, smaller flow- through planters are proposed along the outside ends of the second row of townhomes and a larger vault- based treatment system is proposed adjacent to Mission Road. Emergency Vehicle Access from Edgewood Way The Fire and Police Departments have indicated that they will require emergency vehicle access to the project site from Edgewood Way even if residential access is not allowed under Alternative B. To accommodate this, the applicant would construct the Edgewood Way extension in the same way as shown in Alternative A, but would also include a security device such as removable bollards to restrict access. The security device would be configured so that only the Fire and Police Departments and the property owner at 1256 Edgewood Way would be able to access the project site from Edgewood Way. The Conditions of Approval for Alternative B have been updated to reflect the requirement for emergency vehicle access. Public Input/Correspondence As of the date of this staff report, City staff has received correspondence from four members of the public related specifically to Alternative B (see Attachment 6). The primary concern raised in these comment letters is related to additional traffic on Baywood Ave. Currently, there are two existing single-family residences with access from Baywood Ave that are proposed to be removed by this Project. Under Alternative A, Baywood Ave would provide access to four single-family residences. Under Alternative B, Baywood Ave would provide access to one single- family residence and six townhome residences. As stated in the December 4, 2014 Planning Commission staff report, the Institute of Transportation Engineers (“ITE”) Trip Generation Manual, 9 th Edition, states that the average single-family home generates approximately 10 vehicle trips per day, while the average townhome/condominium generates approximately 5 vehicle trips per day. Based on these average trip rates, both Alternative scenarios would result in approximately 40 vehicle trips per day onto Baywood Ave, an increase of 20 vehicle trips over existing conditions. Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 6 of 8 Some of the comment letters imply that access to all of the townhome units would be provided from Baywood Ave. As stated above, only the upper portion of the site would be accessed from Baywood Ave, resulting in a maximum of seven units with four guest parking spaces having direct access. Another concern from the correspondence is related to visual impacts of the townhomes to existing homes on Baywood Ave. The visual impact to the surrounding neighborhood is discussed on page 3 of this staff report. TENTATIVE SUBDIVISION MAP Under Alternative A, a Tentative Subdivision Map is proposed to create two separate lots with a total of 35 residential condominium units; 31 units on Lot 1 and 4 units on Lot 2. The City Engineer has reviewed the proposed map and determined that it complies with the City Standards and the State Subdivision Map Act. Should Alternative B be selected, the map would be altered to create two separate lots with a total of 36 residential condominium units; 29 units on Lot 1 and 7 units on Lot 2. GENERAL PLAN CONSISTENCY The General Plan Land Use Designation for the site is Medium Density Residential. As discussed above in the Background section, the General Plan includes specific policies related to development within the immediate vicinity of the South San Francisco BART Station Area, in an effort to create “a vital pedestrian-oriented center, with intensity and mix of uses that complement the area’s new role as a regional center.” The proposed project will conform to the General Plan Land Use Policies by creating medium-density residential units that emphasize a pedestrian-oriented development along Mission Road in keeping with the development intensity requirements, including residential density. The project also provides a well- articulated and visually engaging development that implements the goals of the Transit Village Plan. The project design is consistent with the City’s Design Guidelines as it relates to building design, form and articulation. Additionally, the proposed project complies with the General Plan Housing Element, which identifies the subject site as a near-term housing opportunity site. ENVIRONMENTAL REVIEW The proposed project has been determined to be categorically exempt from environmental review under the provisions of CEQA (Class 32, Section 15332: In-fill Development Projects), which provides an exemption for in-fill development projects which meet the following conditions: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered, rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. Staff Report Subject: 1256 Mission Road Subdivision Date: February 25, 2015 Page 8 of 8 6. CEQA Categorical Exemption Analysis for 1256 Mission Road Project, dated November 17, 2014 7. Correspondence from the Public MF/AG/JR/SK/bg 2403432.1 Attachment 1 Draft Entitlement Resolution A (Original Proposal)  Exhibit A: Conditions of Approval  Exhibit B: Tentative Subdivision Map  Exhibit C: Affordable Housing Agreement  Exhibit D: 1256 Mission Road Project Plans 1 Resolution A RESOLUTION NO. _______ CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA A RESOLUTION APPROVING A USE PERMIT, DESIGN REVIEW, TENTATIVE SUBDIVISION MAP AND AFFORDABLE HOUSING AGREEMENT, FOR A 35- UNIT RESIDENTIAL DEVELOPMENT AT 1256 MISSION ROAD IN THE TRANSIT VILLAGE MEDIUM DENSITY RESIDENTIAL ZONING DISTRICT. WHEREAS, Anthony Cuneo (“Owner”) and City Ventures (collectively “Applicant”) have submitted an application for development of a 35-unit residential condominium project on an approximately 1.7 acre site located at 1256 Mission Road, South San Francisco, California (“Project”); and, WHEREAS, Applicant seeks approval of a Use Permit, Design Review, Tentative Subdivision Map, and Affordable Housing Agreement for the Project; and, WHEREAS, approval of the Applicant’s proposal is considered a “project” for purposes of the California Environmental Quality Act, Pub. Resources Code § 21000, et seq. (“CEQA”); and, WHEREAS, the Project is categorically exempt under CEQA as a Class 32 Categorical Exemption for projects which are determined to be in-fill development, as set forth in greater detail below, and is consistent with the applicable General Plan and Zoning Ordinance requirements; and, WHEREAS, on December 4, 2014 the Planning Commission for the City of South San Francisco held a lawfully noticed public hearing to solicit public comment and consider the proposed entitlements, take public testimony, and make a recommendation to the City Council on the project, at the conclusion of which, the Planning Commission recommended that the City Council approve the project; and, WHEREAS, the City Council held a duly noticed public hearing on January 14, 2015 which was continued to February 25, 2015 to consider the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement and take public testimony. NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA”) and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco Municipal Code; the Project applications; the 1256 Mission Road Project Plans – Alternative A, as prepared by Hunt Hale Jones Architects, dated revised November 12, 2014; the 1256 Mission Road “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum, as prepared by Urban Planning Partners Inc., dated November 17, 2014, including all appendices thereto; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s meeting held December 4, 2014 meeting; all site plans, and all 2 Resolution A reports, minutes, and public testimony submitted as part of the City Council’s duly notice public hearing on January 14, 2015 which was continued to February 25, 2015, and City Council deliberations; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City of South San Francisco City Council hereby finds as follows: A. General Findings 1. The foregoing recitals are true and correct. 2. The Exhibits attached to this Resolution, including the Conditions of Project Approval (Exhibit A), the Tentative Subdivision Map (attached as Exhibit B), the Affordable Housing Agreement (attached as Exhibit C), and the 1256 Mission Road Project Plans – Alternative A (attached as Exhibit D) are each incorporated by reference and made a part of this Resolution, as if set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of Chief Planner, Susy Kalkin. 4. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the City Council, exercising its independent judgment and analysis, finds that the Project falls within the Categorical Exemption set forth in CEQA Guidelines Section 15332/Class 32, which exempts from the provisions of CEQA the construction of projects characterized as in-fill development, because it meets the following conditions: a. The project is consistent with the applicable General Plan designation (Medium Density Residential) and all applicable General Plan policies as well as with applicable Zoning Ordinance designation (Transit Village – Medium Density Residential) and regulations given that the site is planned and zoned for medium- density residential development within; and, b.The proposed development occurs within city limits on a project site of approximately 1.7 acres, which is less than the five acre maximum, and is surrounded by urban uses; and, c. The project has no value as habitat for endangered, rare or threatened species, which would be negatively impacted given that the site is relatively flat and is surrounded by urban uses; and, d.Approval of the project would not result in any significant effect relating to traffic, noise, air quality, or water quality, given that: a. General Plan Guiding Policy 4.2-G-10 exempts development within ¼ mile of the South San Francisco BART Station from any traffic level of service standards, and therefore no significant traffic level of service operation impacts would result from the proposed project; 3 Resolution A b. The project’s contribution to noise would not be significant subject to meeting the standards of South San Francisco Municipal Code (“SSFMC”) Section 8.32.30 and compliance with the construction noise control plan measures identified in the “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” memorandum; and, c. The project complies with the City’s adopted Climate Action Plan and the Bay Area Air Quality Management District’s significance thresholds screening criteria, and therefore the project would have a less-than-significant impact on air quality and greenhouse gas emissions. e. The site can be adequately served by all required utilities and public services. The City Council finds that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. B. Use Permit 1. The proposed Project is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zone District and the Low Density Residential Zone District. The Project meets or exceeds all of the general development standards of the Transit Village – Medium Density Residential District, with the exception of the maximum building height and the front yard fence height in the Low Density Residential Zone District. However, the exception for the maximum building height is permissible and warranted by the City’s Zoning Ordinance, which allows an applicant to request an incentive to allow a modification to a zoning ordinance standard in return for the provision of certain types of affordable housing, which the applicant is providing. The proposed fence height is allowed per South San Francisco Municipal Code Section 20.300.005, which allows fences taller than three feet in a required front-yard subject to approval of a Minor Use Permit. 2. The proposed Project is consistent with the General Plan by creating a pedestrian- oriented medium-density residential development that emphasizes pedestrian-activity along Mission Road, provides a well-articulated and visually engaging development that implements the goals of the Transit Village Plan, and is consistent with the City’s Design Guidelines as they relate to building design, form and articulation. 3. The proposed use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements, because the proposed use is consistent with the existing uses in the vicinity of the site, including the commercial and residential. The project proposes medium-density residential uses on a site located in the City’s Transit Village Plan district, which is intended for this type of use. The General Plan has analyzed this type of use in the South San Francisco BART Station area, and concluded that such residential uses are not adverse to the public health, safety, or welfare. The proposed fence is designed to be transparent and allow views into and out of the property. As the proposed Project is consistent with 4 Resolution A other medium-density land uses in the Transit Village Plan area, approval of the Project will not be detrimental to the nearby properties. 4. The proposed Project complies with applicable standards and requirements of the City’s Zoning Ordinance, with the exception of the maximum height for a portion of the site and the maximum height of a portion of the fence within the required front-yard. The stated exceptions are permissible and warranted by the City’s Zoning Ordinance. The proposed Project is located in the Transit Village Plan District and, subject to the exception discussed above, meets the minimum standards and requirements for that district. 5. The design, location, size, and operating characteristics of the proposed Project are compatible with the existing and reasonably foreseeable future land uses in the vicinity because the Project proposes medium-density residential uses in the Transit Village Plan district, which is specifically intended for such uses. The proposed fence is in keeping with the aesthetic quality of the buildings on the site and allows views into and out of the property. 6. The site is physically suitable for the type of development and density proposed, as the medium-density residential use will benefit from being located in close proximity to the South San Francisco BART Station within the Transit Village Plan district, and the size and development is appropriate for the location and meets the City’s land use and zoning standards. 7. The Project is consistent with CEQA for the reasons stated in Finding A.4 above. C. Design Review 1. The Project, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because the Project has been designed as a medium-density residential project which will provide a pedestrian-friendly, transit-oriented environment with extensive landscaping and sustainability elements incorporated. 2. The Project, including Design Review, is consistent with the General Plan because the proposed medium-density residential development is consistent with the policies and design direction provided in the South San Francisco General Plan for the Medium-Density Residential land use designation by encouraging the development of a pedestrian-oriented development of a higher intensity within ½ mile of the South San Francisco BART Station. 3. The Project, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Project is consistent with the South San Francisco BART Transit Village Plan Design Guidelines. 5 Resolution A 4. The Project is consistent with the Use Permit for the reasons stated in Section B, above. 5. The Project is consistent with the applicable design review criteria in South San Francisco Municipal Code Section 20.480.006 (“Design Review Criteria”) because the project has been evaluated by the Design Review Board on October 16, 2014, and found to be consistent with each of the eight design review criteria included in the “Design Review Criteria” section of the Ordinance, and the Design Review Board. D. Tentative Subdivision Map 1. The proposed tentative subdivision map, including the proposed designs and improvements, are consistent with the City’s General Plan as set forth in Findings B.2 and C.2 above, and because the tentative subdivision map would facilitate the development of a medium density residential development that would not conflict with the Medium Density Residential Land Use designation. 2. The proposed tentative subdivision map is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zoning District. 3. The tentative subdivision map complies and meets all of the requirements of Title 19 of the South San Francisco Municipal Code (“Subdivisions”), subject to the Conditions of Approval, and would allow for the granting of an exception for the driveway grade of the property at 1256 Edgewood Ave as discussed below, and is consistent with the requirements of the State Subdivision Map Act. a. The proposed Project would extend Edgewood Avenue onto the subject property as a private street to provide access to a portion of the residential development. In order to extend Edgewood Avenue, the existing driveway of the adjacent parcel at 1256 Edgewood Avenue would be required to be altered. An exception allowing the existing driveway at 1256 Edgewood Ave to be redeveloped at a grade greater than fourteen percent will not constitute a grant of special privilege inconsistent with the limitations upon other properties in the same vicinity because the existing driveway currently exceeds the maximum permitted grade and the proposed change in grade will not constitute a significant increase over the existing conditions. b.The steep slope along the western edge of the property at 1256 Edgewood Avenue creates a special circumstance that would deprive the property of privileges enjoyed by other properties in the vicinity if Title 19 were strictly applied. The existing driveway on the property is at a seventeen percent grade, and the proposed change 6 Resolution A in grade will not constitute a significant increase over the existing conditions. If the standards of Title 19 were strictly applied, it would not be possible to provide a driveway conforming to the maximum grade standards from the existing access easement adjacent to Edgewood Avenue. c. The exception allowing the existing driveway at 1256 Edgewood Avenue to be redeveloped at a grade greater than fourteen percent carries out the spirit and intent of Title 19 by providing a parcel affected by a steep topography that has historically had nonconforming driveway access with continued access that meets all other driveway design standards except the maximum grade. 4. The Project site is physically suitable for the type of development and density proposed, as the medium-density residential development will be located in the Transit Village area, and the size and number of residential units is appropriate for the location and meets the City’s land use and zoning standards. 5. The Project, including the proposed designs and improvements, are not likely to cause substantial environmental damage, or serious public health problems, since the project plans call for management of any hazardous materials that would exist by virtue of it being a former agriculture site, and since such impacts have been thoroughly evaluated as part of the CEQA process and determined not to exceed any stated thresholds of significance. 6. The design and improvements of the tentative subdivision map are not in conflict with any existing public easements. 7. The property is located in a developed, urban setting, and is not subject to a Williamson Act contract, on open space easement, a conservation easement, or an agricultural conservation easement. The surrounding land uses and resulting parcels would not support agricultural uses; the resulting parcels would result in residential development not incidental to commercial agricultural use of the land. NOW, THEREFORE, BE IT FURTHER RESOLVED that subject to the Conditions of Approval, attached as Exhibit A to this resolution, the City Council of the City of South San Francisco hereby makes the findings contained in this Resolution, and approves the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement for the Project. BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption. * * * * * * * 7 Resolution A I hereby certify that the foregoing resolution was adopted by the City Council of the City of South San Francisco at the regular meeting held on the 25th day of February, 2015 by the following vote: AYES:_________________________________________________ NOES: ____________ ABSTENTIONS: ABSENT: Attest: City Clerk 8 Resolution A Exhibit A Conditions of Approval 9 Resolution A DRAFT CONDITIONS OF APPROVAL P14-0081: UP14-0009, DR4-0049, SA14-0001 & AHA14-0001 1256 MISSION ROAD (As recommended by Planning Commission on December 4, 2014) A) Planning Division requirements shall be as follows: 1. The applicant shall comply with the Planning Divisions standard Conditions and Limitations for Commercial, Industrial, Mixed-Use and Multi-Family Residential Projects. 2. The project shall be constructed and operated substantially as indicated on the plan set prepared by Hunt Hale Jones Architects as approved by the City Council at their meeting of February 25, 2014. 3. All equipment (either roof, building, or ground-mounted) shall be screened from view through the use of integral architectural elements, such as enclosures or roof screens, and landscape screening or shall be incorporated inside the exterior building wall. Equipment enclosures and/or roof screens shall be painted to match the building. Prior to issuance of a building permit the applicant shall submit plans showing utility locations, stand-pipes, equipment enclosures, landscape screens, and/or roof screens for review and approval by the Chief Planner or designee. 4. The Final Subdivision Map shall be substantially consistent with the Tentative Subdivision Map entitled “Tentative Map”, dated November 11, 2014, prepared by C2G/ Civil Consultants Group, Inc. 5. The Final Subdivision Map shall comply with all applicable requirements of SSFMC Title 19 (Subdivisions) and Title 20 (Zoning Ordinance). 6. Prior to approval of the Final Map or issuance of a building permit, the applicant shall: a) Prior to the Final Inspection the owner shall pay the fee in-lieu of parkland dedication in accordance with SSFMC Chapter 19.24, subject to review and approval of the City’s Parks and Recreation Director; and, b) Execute and Record an Affordable Housing Agreement consistent with SSFMC Chapter 20.380 Inclusionary Housing Regulations. 7. Prior to issuance of any building or construction permits for the construction of public improvements, the final design for all public improvements shall be reviewed and approved by the City Engineer and Chief Planner. 8. Prior to issuance of any building or construction permits for grading improvements, the applicant shall submit final grading plans for review and approval by the City Engineer and Chief Planner. 9. Prior to issuance of any building or construction permits for landscaping improvements, the applicant shall submit final landscaping and irrigation plans for review and approval 10 Resolution A by the Chief Planner. The plans shall include documentation of compliance with SSFMC § 20.300.007 “Landscaping”, including Water Efficient Landscaping and Irrigation calculations. 10. All parking areas are to be maintained free and clear of litter and storage and shall remain clear for parking at all times. No outdoor storage of materials is allowed. 11. Prior to issuance of any building or construction permits, the developer shall revise the development plans to address the following design related comments, subject to review and approval by the Chief Planner or designee: a) Reduce the total habitable area of Unit 35 to no more than 2,499 square feet. b) Remove the vehicular access gate at the entrance to the Edgewood Avenue extension. 12. Prior to issuance of certificate of occupancy for residential uses, the applicant shall pay any applicable childcare fees in accordance with South San Francisco Municipal Code Chapter 20.115. This fee is subject to annual adjustment, and presently is assessed at $1,858.00 per medium density residential unit. 13. Any modification to the approved plans shall be subject to SSFMC Section 20.450.012 (“Modification”), whereby the Chief Planner may approve minor changes. All exterior design modifications, including any and all utilities, shall be presented to the Chief Planner for a determination. 14. Prior to the recordation of the Covenants Conditions & Restrictions (CC&Rs) with the San Mateo County Recorder, the applicant shall submit the final CC&Rs to the Chief Planner for review and approval. 15. The applicant shall implement all of the construction-related measures identified in the “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum prepared by Urban Planning Partners, Inc., dated November 17, 2014. 16. Prior to issuance of any building or construction permits, the developer shall revise the development plans to include the following Climate Action Plan requirements, subject to review and approval by the Chief Planner or designee: a) Install conduit to accommodate wiring for solar. b) Use of high-albedo surfaces and technologies as appropriate, as identified in the voluntary CALGreen standards. c) Implement the Water Efficient Landscape Ordinance by undertaking the following: (i) Establish a variable-speed pump exchange for water features. (ii) Restrict hours of irrigation to occur between 3:00 a.m. and two hours after sunrise. 11 Resolution A (iii)Install irrigation controllers with rain sensors. (iv) Landscape with native, water-efficient plants. (v) Install drip irrigation systems. (vi) Reduce impervious surfaces to the maximum extent practical. 17. Prior to the issuance of any building or construction permits, the applicant shall contact the South San Francisco Scavenger Company to properly size any required trash enclosures and work with staff to locate the trash enclosure in accordance with the zoning ordinance, SSFMC 20.300.014. An approval letter from South San Francisco Scavenger shall be provided to the Chief Planner. 18. Prior to issuance of any building or construction permits for grading improvements or approval of the Final Subdivision Map, the applicant shall submit to the City for review and approval by the Chief Planner and the City Attorney documentation demonstrating a perfected right to enter and perform work on the existing driveway at 1256 Edgewood Avenue. 19. The applicant, and any successor in interest to the applicant, shall indemnify, defend, and hold harmless the City of South San Francisco and its agents, officers, and employees from any action, claim, or proceeding brought against the City or its agents, officers, or employees which challenges the validity of any approval by the City, its agencies, boards, Commission, or Council with respect to applicant’s project, including but not limited to, issues concerning applicant’s rights of access pursuant to asserted easement rights. Planning Division contact: Billy Gross, Senior Planner (650) 877-8535 B) Fire Department requirements shall be as follows: 1. Prior to issuance of a building permit the applicant shall submit plans showing the following improvements for review and approval by the Fire Marshal or designee: a) Install fire sprinkler system per NFPA 13, NFPA 13D and SSFFD requirements under separate fire plan check and permit for overhead and underground. b) Fire sprinkler system shall be central station monitored per California Fire Code section 1003.3. c) Install exterior listed horn/strobe alarm device, not a bell. d) Fire alarm plans shall be provided per NFPA 72 and the City of South San Francisco Municipal Code. e) All Non parking space curbs to be painted red to local Fire Code Specifications. 12 Resolution A f) Access road shall have all weather driving capabilities and support the imposed load of 75,000 pounds. g) Road gradient and vehicle turning radius shall not exceed maximum allowed. h) Provide fire flow in accordance with California Fire Code Appendix III-A. i) Provide fire hydrants with an average spacing of 450 feet between hydrants; location and number to be determined. The fire hydrants shall have a minimum fire flow of 2000 gpm at 20 psi residual pressure for duration of 4 hours. j) All buildings shall provide premise identification in accordance with SSF municipal code section 15.24.100. k) Provide Knox key box for each building with access keys to entry doors, electrical/mechanical rooms, and others to be determined. l) The minimum road width is 20 feet per the California Fire Code. m) All buildings shall have Emergency Responder Radio Coverage throughout in compliance with Section 510 of the California Fire Code. 2. Prior to issuance of any building or construction permit, the applicant shall pay any applicable Public Safety Impact Fee in accordance with City Council Resolution 97- 2012. This fee is subject to annual adjustment, and presently is assessed at $563.00 per high density residential unit. Fire Prevention contact: Luis DaSilva, Fire Marshal (650) 829-6645 C) Engineering Division requirements shall be as follows: 1. The Owner shall perform a flow study of the City sewer collection system to determine whether flow from this new development can adequately be handled. 2. Prior to recordation of the Final Map, the developer shall comply with all requirements, and pay for all deposits and fees, as described in the City Municipal Code. Engineering Division contact: Eric Evans, Associate Engineer (650) 829-6652 D) Police Department requirements shall be as follows: 1. Municipal Code Compliance. The applicant shall comply with the provisions of Chapter 15.48 of the Municipal Code, "Minimum Building Security Standards" Ordinance revised May 1995. The Police Department reserves the right to make additional security and safety conditions, if necessary, upon receipt of detailed / revised building plans. Police Department contact: Sergeant Bruce McPhillips (650) 877-7248 13 Resolution A E) Water Quality Control Plant requirements shall be as follows: 1. Fire sprinkler test drain must be connected to the sanitary sewer. 2. Condensate drains from HVAC system must be connected to the sanitary sewer. 3. Site is subject to Low impact development requirements; site must treat stormwater prior to it entering the stormwater system. Complete applicable forms for low impact development. 4. Roof leaders cannot be connected directly to the storm drain system. 5. The onsite catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay). 6. Landscaping shall meet the following conditions related to reduction of pesticide use on the project site: a) Where feasible, landscaping shall be designed and operated to treat stormwater runoff by incorporating elements that collect, detain, and infiltrate runoff. In areas that provide detention of water, plants that are tolerant of saturated soil conditions and prolonged exposure to water shall be specified. b) Plant materials selected shall be appropriate to site specific characteristics such as soil type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air movement, patterns of land use, ecological consistency and plant interactions to ensure successful establishment. c) Existing native trees, shrubs, and ground cover shall be retained and incorporated into the landscape plan to the maximum extent practicable. d) Proper maintenance of landscaping, with minimal pesticide use, shall be the responsibility of the property owner. e) Integrated pest management (IPM) principles and techniques shall be encouraged as part of the landscaping design to the maximum extent practicable. Examples of IPM principles and techniques include: i. Select plants that are well adapted to soil conditions at the site. ii. Select plants that are well adapted to sun and shade conditions at the site. In making these selections, consider future conditions when plants reach maturity, as well as seasonal changes. iii. Provide irrigation appropriate to the water requirements of the selected plants. iv. Select pest-resistant and disease-resistant plants. v. Plant a diversity of species to prevent a potential pest infestation from affecting the entire landscaping plan. vi. Use “insectary” plants in the landscaping to attract and keep beneficial insects. 14 Resolution A 7. No decorative bark shall be used in landscaping. 8. A grading and drainage plan must be submitted. 9. An erosion and sediment control plan must be submitted. Water Quality contact: Rob Lecel (650) 877-8555 15 Resolution A Exhibit B Tentative Subdivision Map – Alternative A 16 17 Resolution A Exhibit C Affordable Housing Agreement – Alternative A 18 Affordable Housing Agreement 1 1256 Mission Road RECORDING REQUESTED BY: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SOUTH SAN FRANCISCO 400 GRAND AVENUE SOUTH SAN FRANCISCO, CA 94080 WHEN RECORDED MAIL TO: ECONOMIC AND COMMUNITY DEVELOPMENT CITY OF SOUTH SAN FRANCISCO 400 GRAND AVENUE SOUTH SAN FRANCISCO, CA 94080 Documentary Transfer Tax $ EXEMPT County of San Mateo City of South San Francisco  _____________________________ Right of Way Agent AFFORDABLE HOUSING AGREEMENT FOR BELOW MARKET RATE PROPERTY This Affordable Housing Agreement for Below Market Rate Property (“Agreement”) is entered into as of this _____ day of _____________, 2015, by and between the City of South San Francisco (“City”) and ________________________ (“Developer”). City and Developer are hereinafter collectively referred to as the “Parties.” RECITALS WHEREAS, Chapter 20.380 of the South San Francisco Municipal Code sets forth the requirements for Inclusionary Housing (“Inclusionary Housing Ordinance”); and WHEREAS, the Developer is the fee simple owner of that certain real property (“Property”) located in the City of South San Francisco, State of California, and more particularly described in Exhibit A attached hereto. WHEREAS, the Developer intends to construct thirty-five (35) for-sale housing units on the Property (the “Project”) and has submitted site development plans for the Project; and 19 Affordable Housing Agreement 2 1256 Mission Road WHEREAS, as a condition of development of the Project, Developer must comply with the City of South San Francisco’s housing policies and programs as set forth in the City’s Inclusionary Housing Ordinance first adopted by the City Council on December 12, 2001, as it applies to the provision of affordable housing. WHEREAS, the Developer proposes meeting these requirements by selling the required number of Below Market Rate Units (defined below); and NOW THEREFORE, the City and the Developer agree as follows: AGREEMENT 1. As a condition of developing and constructing thirty-five (35) condominiums on the Property, Developer shall designate seven (7) units as Below Market Rate Units and shall make these units available for sale as Below Market Rate Units (the “Below Market Rate Units”). The number of Below Market Rate Units shall be equal to twenty percent (20%) of the total number of condominiums to be built upon the Property and identified in Exhibit B. The Below Market Rate Units shall be affordable to low- and moderate- income households guaranteed by deed restrictions or other enforceable covenants running with the land. Developer shall sell: (i) One (1) three-bedroom housing unit in the Project to a household whose annual gross income does not exceed sixty percent (60%) of the unadjusted median income (“Low-Income Household”) for a San Mateo County household in the San Francisco Primary Metropolitan Statistical Area, published annually by the Department of Housing and Urban Development (as adjusted annually, the “Base Median Income”); (ii) One (1) three-bedroom unit to a household whose annual gross income does not exceed seventy percent (70%) of the unadjusted median income; (iii) One (1) three-bedroom unit to a household whose annual gross income does not exceed eighty percent (80%) of the unadjusted median income; (iv) One (1) three-bedroom unit to a household whose annual gross income does not exceed ninety percent (90%) of the unadjusted median income; (v) Two (2) three-bedroom units to a household whose annual gross income does not exceed one hundred percent (100%) of the unadjusted median income; and (vi) One (1) three-bedroom unit to a household whose annual gross income does not exceed one hundred ten percent (110%) of the unadjusted median income, (jointly “Low and Moderate-Income Households”). 2. Developer shall sell the Below Market Rate Units at a price that will result in an allowable housing expense for a for-sale unit (as defined in Section 20.380.002 of the 20 Affordable Housing Agreement 3 1256 Mission Road Inclusionary Housing Ordinance) that does not exceed thirty percent (30%) of the gross monthly income for Low- and Moderate-Income Households, adjusted for household size. 3. The Below Market Rate Units shall be located in close proximity to Mission Road. The Developer and the City acknowledge this is an ideal area for such Below Market Rate Units as it is in close proximity to and has access to employment opportunities, urban services and transportation facilities. 4. Occupancy of the Below Market Rate Units shall be established concurrently with occupancy of the market rate units located on the Property. This requirement shall be effective as of the date the first unit is occupied on the Property. This requirement for the Below Market Rate Units shall remain in effect even in the event all market rate units on the Property become unoccupied. 5. Developer shall require the buyer of the Below Market Rate Units to execute a Resale Restriction and Option to Purchase Agreement substantially in the form attached hereto as Exhibit C (“Resale Restriction Agreement”). The Resale Restriction Agreement shall be recorded against the parcel containing the Below Market Rate Units upon close of escrow of sale for such Below Market Rate Units. The Below Market Rate Units shall remain restricted and affordable to Low- and Moderate Income Households for a term of fifty-five (55) years, commencing on the date each Below Market Rate Unit is sold. The restrictions shall apply to all subsequent buyers. 6. Developer shall sell the Below Market Rate Units to eligible Low- and Moderate- Income Household pursuant to Section 2. Developer shall work with the City and/or the City’s First Time Homebuyer Administrator to identify and qualify eligible buyers for said units. At the time of sale, Developer shall pay an administrative fee to reimburse the City for all administrative and processing costs and fees incurred in processing the sale of the Below Market Rate Units, which may include the First Time Homebuyer Administrator fees. 7. The Below Market Rate Units shall remain owner-occupied units. 8. Developer shall indemnify, defend with counsel selected by the City, and hold harmless the City and its officials, officers, employees, agents, and volunteers from and against any and all losses, liability, claims, suits, actions, damages, and causes of action arising or allegedly arising out of or relating in any manner to the Project, the Property, or Developer’s performance or nonperformance under this Agreement, except to the extent arising from the gross negligence or willful misconduct of the City. The provisions of this section shall survive the expiration or other termination of this Agreement or any release of part or all of the Property from the burdens of this Agreement. 9. Developer shall pay an administrative fee to reimburse the City for all administrative/processing costs and fees incurred in processing the Agreement, which may include reasonable attorney’s fees and cost, and implementing the requirements of the Inclusionary Housing Ordinance. 21 Affordable Housing Agreement 4 1256 Mission Road 10. Developer hereby subjects the Property to the covenants, conditions and restrictions set forth in this Agreement. The Parties hereby declare their express intent that all such covenants, conditions and restrictions shall be deemed covenants running with the land and shall pass to and be binding upon Developer’s successors in title to the Property. All covenants without regard to technical classification or designation shall be binding for the benefit of the City, and such covenants shall run in favor of the City. Each and every contract, deed or other instrument hereafter executed applicable to or conveying the Property or any portion thereof shall conclusively be held to have been executed, delivered and accepted subject to such covenants, conditions and restrictions, regardless of whether such covenants, conditions and restrictions are set forth in such contract, deed or other instrument. This Agreement shall be recorded on the Property upon final map recordation or, if a map is not being processed, prior to the issuance of building permits for the Property. 11. Prior to the sale of the Below Market Rate Units to eligible Low- and Moderate- Income Households, the Developer may not transfer the whole or any part of the Property, the Project or this Agreement unless (i) such transfer is to a limited liability company or limited partnership formed by Developer for purposes of carrying out the Project, (ii) the Developer first notifies the City of the proposed transfer or assignment and delivers to the City the organizational documents of the transferee or assignee (the "Transferee"), and (iii) the Developer causes the Transferee to execute an agreement, in form and substance reasonably satisfactory to City, accepting and assuming the obligations of the Developer under this Agreement. Developer shall reimburse City for all City costs, including but not limited to reasonable attorneys’ fees, incurred in reviewing instruments and other legal documents proposed to effect a permitted transfer or assignment under this Agreement within ten (10) days following City’s delivery of an invoice detailing such costs. 12. Provided that Developer has complied with all of the terms and conditions set forth herein, upon the sale by Developer of the Below Market Rate Units, Developer shall be released from, and shall have no further obligations under this Agreement. Such release shall be effective upon the sale and shall not require any further action or documentation by any party to this Agreement. 13. Any amendments to this Agreement shall be processed in the same manner as an original application for approval pursuant to Section 20.380.014 of the South San Francisco Municipal Code. Nothing, however, shall prevent the body granting final approval of the project development, from modifying the location and phasing of the Below Market Rate Units as a condition of approval for the Project. 14. The laws of the State of California shall govern this Agreement without regard to principles of conflicts of laws. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of San Mateo or in the United States District Court for the Northern District of California. 15. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be 22 Affordable Housing Agreement 5 1256 Mission Road entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose. 16. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement. 17. Any notice or demand shall be made by certified or registered mail, return receipt requested, or reliable overnight courier to the address of the respective parties set forth below: Developer: ______________________________ ______________________________ ______________________________ City: City of South San Francisco - City Clerk 400 Grand Avenue South San Francisco, CA 94080 18. Notwithstanding any previous provision of this Agreement, the terms of this Agreement shall be interpreted in accordance with the provisions of Chapter 20.380 of the South San Francisco Municipal Code. IN WITNESS THEREOF, the parties have executed this Agreement as of the date first written above. DEVELOPER : By: ________________________________ Name Printed: _______________________ Its: _________________________________ CITY: CITY OF SOUTH SAN FRANCISCO By: ___________________________ Mike Futrell City Manager APPROVED AS TO FORM: ______________________________ Steven T. Mattas, City Attorney SIGNATURES MUST BE NOTARIZED 23 Affordable Housing Agreement 6 1256 Mission Road Exhibit A Legal Description Exhibit B BMR Units Plan Exhibit C Form of Resale Restriction and Option to Purchase Agreement for Below Market Rate Property 24 1 EXHIBIT A Property (attach legal description) 25 Resolution A Exhibit D 1256 Mission Road Project Plans – Alternative A 2363711.2 26 SO U T H C I T Y S T A T I O N SO U T H S A N F R A N C I S C O , C A L I F O R N I A 27 SO U T H C I T Y S T A T I O N SO U T H S A N F R A N C I S C O , C A L I F O R N I A AP P L I C A N T : CI T Y V EN T U R E S 44 4 S P E A R S T R E E T , S U I T E 2 0 0 SA N F R A N C I S C O , C A 9 4 1 0 5 CO N T A C T : S A M A N T H A R O T S T E I N De v e l o p m e n t A s s o c i a t e PH O N E : 6 4 6 . 5 2 2 . 4 2 6 0 E- M A I L : s a m a n t h a @ c i t y v e n t u r e s . c o m ww w . c i t y v e n t u r e s . c o m AR C H I T E C T : HU N T H A L E J O N E S A R C H I T E C T S 44 4 S P E A R S T R E E T , S U I T E 1 0 5 SA N F R A N C I S C O , C A 9 4 1 0 5 CO N T A C T : D A N H A L E Ar c h i t e c t PH O N E : 4 1 5 . 5 6 8 . 3 8 3 3 E- M A I L : d h a l e @ h h j a . c o m ww w . h h j a . c o m CI V I L E N G I N E E R : C2 G C I V I L C O N S U L T A N T S G R O U P , IN C . 44 4 4 S C O T T S V A L L E Y D R I V E , S U I T E 6 SC O T T S V A L L E Y , C A L I F O R N I A CO N T A C T : D A V E D A U P H I N Pr o j e c t M a n a g e r PH O N E : 8 3 1 - 4 3 8 - 4 4 2 0 E- M A I L : d a v i d @ c 2 g e n g r s . c o m ww w . c i v i l c o n s u l t a n t s g r o u p . c o m LANDSCAPE ARCHITECT:THOMAS BAAK & ASSOCIATES, LLP 1620 NORTH MAIN STREET, SUITE 4 WALNUT CREEK, CALIFORNIA CONTACT: ANDREA SWANSON Project Manager PHONE: 925-933-2583 E-MAIL: aswanson@tbaak.com www.tbaak.com SU B M I T T A L D A T E : SE P T E M B E R 2 3 , 2 0 1 4 RE V I S E D : N O V E M B E R 1 2 , 2 0 1 4 CS 1 - C O V E R S H E E T CS 2 - S H E E T I N D E X CS 3 - P R O J E C T S U M M A R Y CS 4 - P R O J E C T S U M M A R Y ( C O N T . ) SP 1 - C O N C E P T U A L S I T E P L A N SP 2 - A D D I T I O N A L D E S I G N C R I T E R I A A1 . 0 . 1 - M I S S I O N R O A D R E N D E R I N G A1 . 0 . 2 - B A Y W O O D A V E N U E RE N D E R I N G A1 . 1 - S I T E S E C T I O N S A2 . 0 - U N I T P L A N S - P L A N 1 . 0 & 1 . 1 A2 . 1 - U N I T P L A N S - P L A N 1 . 0 & 1 . 1 A2 . 2 - U N I T P L A N S - P L A N 1 . 0 & 1 . 1 A2 . 3 - U N I T P L A N S - P L A N 1 . 0 & 1 . 1 A2 . 4 - U N I T P L A N S - P L A N 1 . 2 . 0 A2 . 5 - U N I T P L A N S - P L A N 1 . 2 . 1 A3.0 - EXT. ELEVATIONS - BLDG. 2 A3.1 - BLDG PLANS - BLDG. 2 A3.2 - BLDG. PLANS - BLDG. 2 A3.3 - ROOF PLAN - BLDG. 2 A4.0 - UNIT PLANS - PLAN 2.0 A4.1 - UNIT PLANS - PLAN 2.0 A4.2 - ROOF PLAN - PLAN 2.0 A5.0 - EXT. ELEVATION - PLAN 2.0 A5.1 - EXT. ELEVATION - PLAN 2.0 A6.0 - UNIT PLANS - PLAN 2.1 A6.1 - UNIT PLAN - PLAN 2.1 A6.2 - ROOF PLAN - UNIT 2.1 A7.0 - EXT. ELEVATIONS - PLAN 2.1 A7.1 - EXT. ELEVATIONS - PLAN 2.1 C0.1 - TENTATIVE MAP C1.0 - EXISTING SITE AND DEMOLITIONPLANC1.1 - PRELIMINARY SITE PLAN C2.1 - PRELIMINARY SITE GRADING PLAN C2.2 - STORM WATER MANAGEMENT PLAN C3.1 - PRELIMINARY UTILITY PLAN C4.1 - PRELIMINARY EROSION CONTROL PLAN C5.1 - CONSTRUCTION DETAILS C5.2 - CONSTRUCTION DETAILS L-1 - LANDSCAPE PLAN L-2 - SITE AMENITIES L-3 - CUT SHEETS, PLANT NOTES AND DETAILS SI T E L O C A T I O N SI T E L O C A T I O N 28 C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036SCALE:PROJECT SUMMARY CS3 1/4" = 1'-0" 29 C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036SCALE:PROJECT SUMMARY (CONT.)CS4 1/4" = 1'-0" 30 31 SO U T H L O T A R E A NO R T H L O T A R E A UN I T T Y P E PL A N 1 . 0 (S H E E T A 2 . 0 & A 2 . 1 ) PL A N 1 . 0 - E N D (S H E E T A 2 . 2 & A 2 . 3 ) PL A N 1 . 1 (S H E E T A 2 . 2 & A 2 . 3 ) PL A N 1 . 2 . 0 (S H E E T A 2 . 4 ) PL A N 1 . 2 . 1 (S H E E T A 2 . 5 ) PL A N 2 . 0 (S H E E T A 4 . 0 & A 4 . 1 ) PL A N 2 . 1 (S H E E T A 6 . 0 & A 6 . 1 ) GR O U N D F L O O R L I V I N G 3 0 6 . 9 S Q . F T . 3 0 6 . 9 S Q . F T . 7 8 . 0 S Q . F T . 7 8 . 1 S Q . F T. 7 8 . 0 S Q . F T . 7 7 7 . 4 S Q . F T . 1, 1 1 6 . 8 S Q . F T . MA I N F L O O R 6 4 7 . 8 S Q . F T . 7 0 1 . 2 S Q . F T . 6 4 7 . 8 S Q . F T . 6 8 0 . 7 S Q . F T . 6 6 0 . 4 S Q . F T . 0 . 0 S Q . F T . 0 . 0 S Q . F T . UP P E R F L O O R 67 2 . 1 S Q . F T . 7 1 6 . 3 S Q . F T . 6 7 2 . 1 S Q . F T . 7 2 0 . 4 S Q . F T . 6 7 7 . 5 S Q . F T . 9 2 8 . 5 S Q . F T . 1, 4 7 4 . 5 S Q . F T . TO T A L 1, 6 2 7 S Q . F T . 1 , 7 2 4 S Q . F T . 1 , 3 9 8 S Q . F T . 1 , 4 7 9 S Q . F T . 14 1 6 S Q . F T . 1, 7 0 6 S Q . F T . 2 , 5 9 1 S Q . F T . GA R A G E A R E A 45 6 S Q . F T . 4 5 6 S Q . F T . 4 7 1 S Q . F T . 5 5 6 S Q . F T . 5 5 5 . 7 S Q . F T . 2 3 0 S Q . F T . 4 6 0 S Q . F T . TO T A L F L O O R A R E A P E R U N I T 2, 0 8 3 S Q . F T . 2 , 1 8 0 S Q . F T . 1 , 8 6 9 S Q . F T . 2 , 0 3 5 S Q . F T . 1 , 9 7 2 S Q . F T . 1 , 9 3 6 S Q . F T . 3 , 0 5 1 S Q . F T . NU M B E R O F U N I T S ( T O T A L : 3 5 U N I T S ) 8 6 14 2 1 3 1 TO T A L F L O O R A R E A B Y U N I T T Y P E 16 , 6 6 2 S Q . F T . 1 3 , 0 8 2 S Q . F T . 2 6 , 1 7 2 S Q . F T . 4 , 0 7 0 S Q . F T . 1 , 9 7 2 S Q . F T . 5 , 8 0 8 S Q . F T . 6 , 1 0 2 S Q . F T . TO T A L F L O O R A R E A B Y L O T S E C T I O N 61 , 9 5 8 S Q . F T . 11 , 9 1 0 S Q . F T . TO T A L F L O O R A R E A 73 , 8 6 8 S Q . F T . TO T A L F L O O R A R E A 73 , 8 6 8 S Q . F T . TO T A L S I T E A R E A ( S E E S H E E T S P 1 ) 75 , 7 7 0 S Q . F T . FL O O R A R E A R A T I O 0. 9 7 NO R T H L O T F L O O R A R E A 11 , 9 1 0 S Q . F T . NO R T H L O T S I T E A R E A 17 , 6 4 2 S Q . F T . NO R T H L O T F L O O R A R E A R A T I O 0. 6 8 SO U T H L O T F L O O R A R E A 61 , 9 5 8 S Q . F T . SO U T H L O T S I T E A R E A 58 , 1 0 9 S Q . F T . SO U T H L O T F L O O R A R E A R A T I O 1. 0 7 VE H I C L E A C C O M O D A T I O N (T A B L E 2 0 . 2 5 0 . 0 0 4 ) RE S I D E N T I A L P A R K I N G TA B L E 2 0 . 2 5 0 . 0 0 4 ( N ) 1 C O V E R E D S P A C E PE R U N I T ( M I N . ) 2 C O V E R E D S P A C E S PE R U N I T ( M A X . ) 2 P E R U N I T GU E S T P A R K I N G 1 S P A C E P E R 4 U N I T S (TA B L E 2 0 . 3 3 0 . 0 0 4 ) MU L T I - F A M I L Y U N I T S 8 S P A C E S ( M I N . ) 13 DE T A C H E D U N I T S 1 S P A C E ( M I N . ) 4 OT H E R R E S T R I C T I O N S SI D E P A R K I N G A L L O W E D Y E S YE S (3 S P A C E S ) DI S T A N C E B E H I N D B U I L D I N G F A C A D E 20 F T . ( M I N . ) 2 9 F T . ( M I N . ) VI S I B L E F R O M S T R E E T N O NO BU I L D I N G F O R M ( R L - 8 ) (TABLE 20.250.004) LO T A R E A 5,000 SQ. FT.7,958 SQ. FT. LO T W I D T H 60 FT.60 FT. LO T D E PT H 80 FT.87 FT. PR I V A T E O P E N S P A C E 150 SQ. FT.450 SQ. FT. BU I L D I N G H E I G H T FI G U R E 2 0 . 2 5 0 . 0 0 4 ( D ) 28 FT.25 FT. FR O N T Y A R D TA B L E 2 0 . 2 5 0 . 0 0 4 ( E ) : C - 1 - 6 0 15 FT.10 FT. SI D E Y A R D 5 FT. (INTERIOR)10 FT. (STREET)5 FT. (MIN) LO T C O VE R A G E (1 , 7 2 4 S Q . F T . B L D G . F O O T P R I N T ) 50%21% BU I L D I N G F O R M ( T V - R M ) (T A B L E 2 0 . 2 5 0 . 0 0 4 ) BU I L D I N G H E I G H T FI G U R E 2 0 . 2 5 0 . 0 0 4 ( D ) 25 F T . ( S F D ) 35 F T . ( M F D ) 25 F T . 35 F T . FR O N T Y A R D TA B L E 2 0 . 2 5 0 . 0 0 4 ( E ): C - 1 - 6 0 10 F T . ( M I N . ) 15 F T . ( M A X . ) 10 F T . SI D E Y A R D 5 F T . ( M I N ) 5 F T . ( M I N ) BU I L D T O L I N E S TA B L E 2 0 . 2 5 0 . 0 0 4 ( E ) : C - 1 - 6 0 60 % 73 % T O 7 4 % (S E E I L L U S T R A T I O N 1 ON T H I S S H E E T ) S T R E E T W A L L S E T A C K R A N G E 1 0 F T . T O 1 5 F T . 13 . 5 F T . LO N G E S T F A C A D E L E N G T H (M I S S I O N R O A D O N L Y ) 25 0 F T . 7 6 F T . BUILDING 1 TOTAL FACADE AREA: 2,084 SF BUILDING 2 TOTAL FACADE AREA: 2,653 SFILLUSTRATION 1:BUILD-TO LINES BUILD-TO LINE AREA:1,542 SF = 73%BUILD-TO LINE AREA:1,968 SF = 74%SCALE:ADDITIONAL DESIGN CRITERIA SP2 1" = 20'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 32 SCALE:MISSION ROAD RENDERING A1.0.1 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 33 SCALE:BAYWOOD AVENUE RENDERING A1.0.2 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 34 SI T E S E C T I O N B - B LO N G I T U D I N A L MI S S I O N R O A D PA S E O ED G E W O O D W A Y 35'-0" MAX. 35'-0" MAX. 35'-0" MAX. 25'-0" MAX. 25'-0"MAX. SI T E S E C T I O N A - A TR A N S V E R S E BU I L DI N G 1 BU I L D I N G 3 BU I L D I N G 5 SINGLE-FAMILY RESIDENCESINGLE-FAMILY RESIDENCE PROPERTY LINE SIDE YARD SETBACK PROPERTY LINE SIDE YARD SETBACK 35'-0" MAX. 35'-0" MAX. BU I L D I N G 5 BU I L D I N G 6 LI N E O F G R A D E BE Y O N D SCALE:SITE SECTIONS A1.1 1/16" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 35 MA I N L E V E L PL A N 1 . 0 ( L E F T S I D E ) LI V I N G A R E A : 6 4 8 S Q . F T . GR O U N D L E V E L PL A N 1 . 0 ( L E F T S I D E ) GARAGE AREA: 456 SQ. FT.LIVING AREA: 307 SQ. FT. T R TR 30 x 2 4 C L R UPUP 6" 6" 6" 6" MA I N L E V E L PL A N 1 . 1 ( R I G H T S I D E ) LI V I NG A R E A : 6 4 8 S Q . F T . GR O U N D L E V E L PL A N 1 . 1 ( R I G H T S I D E ) GARAGE AREA: 471 SQ. FT.LIVING AREA: 78 SQ. FT.10'-9"20'-3"31'-0"43'-1" 15 ' - 5 " 2" 15 ' - 5 " 31 ' - 0 " 46'-0" LI V . 14 ' - 6 " X 1 0 ' - 6 " BT H . 3 5' - 0 " X 8 ' - 0 " DI N . 11 ' - 0 " X 8 ' - 0 " KI T . 8' - 0 " X 1 1 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S BT H . 3 5' - 0 " X 8 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " KI T . 8' - 0 " X 1 1 ' - 0 " LI V . 14 ' - 6 " X 1 0 ' - 6 " DI N . 11 ' - 0 " X 8 ' - 0 " UPDN UPDN 2'-7" 1'-0"45'-0" 11 ' - 1 1 2" 4'-4"2"15'-5"31'-0" 43'-1" 45'-0"1'-0" 31 ' - 0 1 2" DEN 14 ' - 5 " X 1 0 ' - 2 " PD R . 6' - 4 " X 6 ' - 0 " ENT.ENT.2-CAR GARAGE 20'-0"" X 20'-6"TANDEM GAR.10'-0" X 42'-6""2668 2668 26 6 8 2868 308030803068286816080 STEEL PANELS GARAGE DOOR8080 STEEL PANELS GARAGE DOOR STOR.STOR.10' X 40' MIN. CLEARANCE FOR TANDEM GARAGE20' X 20' MIN. CLEARANCE FOR 2-CAR GARAGE SCALE:UNIT PLANS - PLAN 1.0 & 1.1 A2.0 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 36 30 x 2 4 C L R 30x24 CLR UP P E R L E V E L PL A N 1 . 1 ( R I G H T S I D E ) LIVING AREA: 672 SQ. FT.15'-5"2" 15 ' - 5 " 31'-0"45'-0" UP P E R L E V E L PL A N 1 . 0 ( L E F T S I D E ) LIVING AREA: 672 SQ. FT.266826682668 56 6 8 B I - P A S S 21068 2468 2868 3068 3068 4068 BI-PASS 4068 BI-PASS2668266826685668 BI-PASS21068 2468 2868 3068 3068 4068 BI-PASS 4068 BI-PASS BD . 2 8' - 6 " X 1 2 ' - 6 " M. B D . 12 ' - 2 " X 1 4 ' - 1 0 " M. B T H . 6' - 9 " X 6 ' - 3 " BTH. 2 5'-2" X 8'-0" LN D Y . 3' - 6 " X 3 ' - 1 0 " BD. 2 8'-6" X 12'-6"BTH. 2 5'-2" X 8'-0"LNDY.3'-6" X 3'-10"M. BTH. 6'-9" X 6'-3"M. BD. 12'-2" X 14'-10"DNDN 45'-0"1'-0" 46'-0" 1'-0"31'-0" T R DE N 14 ' - 5 " X 1 0 ' - 2 " T R EN T . EN T . 2- C A R G A R A G E 20 ' - 0 " " X 2 0 ' - 6 " TA N D E M G A R . 10 ' - 0 " X 4 2 ' - 6 " " UP UP 26 6 8 2868 3080 3080 2 8 6 8 16 0 8 0 S T E E L P A N E L S GA R A G E D O O R 80 8 0 S T E E L P A N E L S GA R A G E D O O R ST O R . 1/4" 1/4" 1' - 6 " 2' - 0 " 1/4" 3068 PD R 1/ 4 " GR O U N D L E V E L AD A P T A B L E P L A N 1 . 0 ( L E F T S I D E ) GA R A G E A R E A: 4 5 6 S Q . F T . LI V I N G A R E A : 3 0 7 S Q . F T . GR O U N D L E V E L PL A N 1 . 1 ( R I G H T S I D E ) GA R A G E A R E A : 4 7 1 S Q . F T . LI V I N G A R E A : 7 8 S Q . F T . 10 ' X 4 0 ' M I N . C L E A R A N C E FO R T A N D E M G A R A G E 20 ' X 2 0 ' M I N . C L E A R A N C E FO R 2 - C A R G A R A G E SCALE:UNIT PLANS - PLAN 1.0 & 1.1 A2.1 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 37 MA I N L E V E L PL A N 1 . 0 - E N D U N I T ( L E F T S I D E ) LI V I NG A R E A : 7 0 1 S Q . F T . 10'-6"20'-6"31'-0"43'-1" 15 ' - 5 " 2" 16 ' - 5 " 32 ' - 0 " 45'-0" 46'-0" T R TR 30 x 2 4 C L R UPUP 6" 6" 6" 6" UT I L . UT I L . MA I N L E V E L PL A N 1 . 1 ( R I G H T S I D E ) LI V I NG A R E A : 6 4 8 S Q . F T . GR O U N D L E V E L PL A N 1 . 0 - E N D U N I T ( L E F T S I D E ) GARAGE AREA: 456 SQ. FT.LIVING AREA: 307 SQ. FT. GR O U N D L E V E L PL A N 1 . 1 ( R I G H T S I D E ) GARAGE AREA: 471 SQ. FT.LIVING AREA: 78 SQ. FT. 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S LI V . 14 ' - 6 " X 1 0 ' - 6 " BT H . 3 5' - 0 " X 8 ' - 0 " DI N . 11 ' - 0 " X 8 ' - 0 " KI T . 8' - 0 " X 1 1 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " BT H . 3 5' - 0 " X 8 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " KI T . 8' - 0 " X 1 1 ' - 0 " LI V . 14 ' - 6 " X 1 0 ' - 6 " DI N . 11 ' - 0 " X 8 ' - 0 " UPDN UPDN 10'-7"12'-5"11'-0"11'-0" 46'-0" 1'-0" 1'-0" 22'-0"11'-0" 10'-1" 43'-1" 11 ' - 1 " 4'-4"2"11'-1"31'-0" 32 ' - 0 " 4'-4" 1' - 0 1 2" 1' - 0 " 33 ' - 0 " DEN 14 ' - 5 " X 1 0 ' - 2 " PD R . 6' - 4 " X 6 ' - 0 " ENT.ENT.2-CAR GARAGE 20'-0"" X 20'-6"TANDEM GAR.10'-0" X 42'-6""2668 2668 26 6 8 2868 308030803068286816080 STEEL PANELS GARAGE DOOR8080 STEEL PANELS GARAGE DOOR STOR.STOR.10' X 40' MIN. CLEARANCE FOR TANDEM GARAGE20' X 20' MIN. CLEARANCE FOR 2-CAR GARAGE SCALE:UNIT PLANS - PLAN 1.0 & 1.1 A2.2 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 38 15'-5"2" 16 ' - 5 " 32'-0"46'-0" 30 x 2 4 C L R 30x24 CLR UP P E R L E V E L PL A N 1 . 1 - ( R I G H T S I D E ) LIVING AREA: 672 SQ. FT. UP P E R L E V E L PL A N 1 . 0 - E N D U N I T ( L E F T S I D E ) LIVING AREA: 716 SQ. FT.266826682668 56 6 8 B I - P A S S 21068 2468 2868 3068 3068 4068 BI-PASS 4068 BI-PASS2668266826685668 BI-PASS21068 2468 2868 3068 3068 4068 BI-PASS 4068 BI-PASS BD . 2 8' - 6 " X 1 2 ' - 6 " M. B D . 12 ' - 2 " X 1 4 ' - 1 0 " M. B T H . 6' - 9 " X 6 ' - 3 " BTH. 2 5'-2" X 8'-0" LN D Y . 3' - 6 " X 3 ' - 1 0 " BD. 2 8'-6" X 12'-6"BTH. 2 5'-2" X 8'-0"LNDY.3'-6" X 3'-10"M. BTH. 6'-9" X 6'-3"M. BD. 12'-2" X 14'-10"DNDN1'-0"45'-0" 1'-0"11'-0"11'-0"9'-111 2"13'-01 2" 46'-0" 33'-0" 2' - 0 " 1' - 0 " 1' - 0 " 16 ' - 4 1 2"212"15'-5"SCALE:UNIT PLANS - PLAN 1.0 & 1.1 A2.3 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 39 30 x 2 4 C L R TRUP6" 6" UTIL.1'-8""x8'-0"UTIL.1'-8""x3'-8"PLAN 1.2.0 GARAGE AREA: 556 SQ. FT.LIVING AREA: 78 SQ. FT. UP P E R L E V E L PL A N 1 . 2 . 0 LI V I NG A R E A : 7 2 0 S Q . F T MA I N L E V E L PL A N 1 . 2 . 0 LI V I NG A R E A : 7 0 1 S Q . F T 26 6 8 26 6 8 2668 56 6 8 B I - P A S S 21 0 6 8 2468 2868 3068 30 6 8 4068 BI-PASS 4068 BI-PASS BD . 2 8' - 6 " X 1 2 ' - 6 " BT H . 2 5' - 2 " X 8 ' - 0 " LN D Y . 3' - 6 " X 3 ' - 1 0 " M. B T H . 6' - 9 " X 6 ' - 3 " M. B D . 12 ' - 2 " X 1 4 ' - 1 0 " DN 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S KI T . 8' - 0 " X 1 1 ' - 0 " BT H . 3 5' - 0 " X 8 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " LI V . 14 ' - 6 " X 1 0 ' - 6 " UPDN 11'-0"11'-0"9'-111 2"13'-01 2" 45'-0" 17 ' - 0 " 45'-0" 16 ' - 0 " 1' - 0 " 17 ' - 0 " 11'-0"11'-0"12'-5"10'-7" 45'-0" 16 ' - 0 " 45'-0" 16 ' - 0 " 1' - 0 " 17 ' - 0 " 9'-0"11'-0"23'-0"43'-0"10'-8"4'-4"15'-0"2'-6"40'-6"43'-0"10' X 40' MIN. CLEARANCE FOR TANDEM GARAGE SCALE:UNIT PLANS - PLAN 1.2.0 A2.4 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 40 PLAN 1.2.1 GARAGE AREA: 556 SQ. FT.LIVING AREA: 78 SQ. FT.43'-0" UP P E R L E V E L PL A N 1 . 2 . 1 LI V I N G A R E A : 6 7 7 S Q . F T . MA I N L E V E L PL A N 1 . 2 . 1 LI V I N G A R E A : 6 6 0 S Q . F T 26 6 8 26 6 8 2668 56 6 8 B I - P A S S 21 0 6 8 2468 2868 3068 30 6 8 4068 BI-PASS 4068 BI-PASS 26 6 8 2668 21 0 6 8 46 6 8 B I - P A S S KI T . 8' - 0 " X 1 1 ' - 0 " BT H . 3 5' - 0 " X 8 ' - 0 " DE N / B D . 3 8' - 6 " X 1 0 ' - 0 " LI V . 14 ' - 6 " X 1 0 ' - 6 " BD . 2 8' - 6 " X 1 2 ' - 6 " BT H . 2 5' - 2 " X 8 ' - 0 " LN D Y . 3' - 6 " X 3 ' - 1 0 " M. B T H . 6' - 9 " X 6 ' - 3 " M. B D . 12 ' - 2 " X 1 4 ' - 1 0 " DN UPDN TRUP6" 6" UTIL.1'-8""x8'-0"UTIL.1'-8""x3'-8" 30 x 2 4 C L R 16 ' - 0 " 1' - 0 " 17 ' - 0 " 11'-0"11'-0"23'-0" 45'-0" 45'-0" 15 ' - 0 " 11'-0"11'-0"23'-0" 45'-0" 11 ' - 8 " 4' - 4 " 16 ' - 0 " 45'-0" 9'-0"11'-0"23'-0"15'-0"40'-6"2'-6"43'-0" 15 ' - 0 " 2' - 0 " 17 ' - 0 " 2' - 0 " 17 ' - 0 " 2'-0"17'-0"10' X 40' MIN. CLEARANCE FOR TANDEM GARAGE C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036SCALE:UNIT PLANS - PLAN 1.2.1 A2.5 1/4" = 1'-0" 41 8' - 7 " 8' - 7 " 8' - 7 " MA I N P L A T E UP P E R S U B F L O O R UP P E R P L A T E LO W E R P L A T E MA I N S U B F L O O R S. O . G . 34'-9" ± 2'-6"3'-6" FR O N T E L E V A T I O N BU I L D I N G 2 : 5 - U N I T 3 - S T O R Y C O N D O M I N I U M LE F T E L E V A T I O N BU I L D I N G 2 : 5 - U N I T 3 - S T O R Y C O N D O M I N I U M 8'-7"8'-7"8'-7" MA I N P L A T E UP P E R S U B F L O O R UP P E R P L A T E LO W E R P L A T E MA I N S U B F L O O R S. O . G . 34'-9" ± 2'-6"3'-6" FF FFFFFFFFFFFFFFFFFFFFFFFFFFFUNIT 6 PLAN 1.1UNIT 7 PLAN 1.0UNIT 8 PLAN 1.1UNIT 9 PLAN 1.2 8'-7"8'-7"8'-7" MA I N P L A T E UP P E R S U B F L O O R UP P E R P L A T E LO W E R P L A T E MA I N S U B F L O O R S. O . G . 34'-9" ± 2'-6"3'-6" RE A R E L E V A T I O N BU I L D I N G 2 : 5 - U N I T 3 - S T O R Y C O N D O M I N I U M FF FFFFFF F F FF F F F FF F F F FF F 8'-7"8'-7"8'-7" MA I N P L A T E UP P E R S U B F L O O R UP P E R P L A T E LO W E R P L A T E MA I N S U B F L O O R S. O . G . 34'-9" ± 2'-6"3'-6" RI G H T E L E V A T I O N BU I L D I N G 2 : 5 - U N I T 3 - S T O R Y C O N D O M I N I U M F FF FF FF F F F FF FF FFF 3'-6" FFUNIT 5 PL A N 1 . 0 63411 9 1213 814 1. CO M P O S I T E S H I N G L E R O O F 2. SO L A R P A N E L S . L O C A T I O N S M A Y V A R Y D E P E N D I N G O N BU I L D I N G O R I E N T A T I O N . R E F E R T O S I T E P L A N A N D R O O F PL A N S 3. 3 C O A T S T U C C O 4. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 4 " E X P O S U R E 5. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 5 " E X P O S U R E 6. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 8 " E X P O S U R E 8. MT L . R O L L - U P G A R A G E D O O R 9. U T I L I T Y C L O S E T 10 . EX T E R I O R L I G H T F I X T U R E ( A N D A D D R E S S S I G N W H E R E SH O W N ) . 11 . DO W N S P O U T ( W I T H S C U P P E R B O X W H E R E S H O W N ) 12 . P A I N T E D W O O D F E N C E 13 . P A I N T E D W O O D G U A R D R A I L 14 . C O N C R E T E E N T R Y S T A I R W I T H P A I N T E D W O O D G U A R D R A I L C1 GO L D E N F L E E C E ( S H E R W I N W I L L I A M S # S W 6 3 8 ) C2 HE R O N P L U M E ( S H E R W I N W I L L I A M S # S W 6 0 7 0 ) C3 FR E N C H R O A S T ( S H E R W I N W I L L I A M S # S W 6 0 6 9 ) C4 SP A L D I N G G R A Y ( S H E R W I N W I L L I A M S # S W 6 0 7 4 ) C5 SH O J I W H I T E ( S H E R W I N W I L L I A M S # S W 7 0 4 2 ) C6 DO R I A N G R A Y ( S H E R W I N W I L L I A M S # S W 7 0 1 7 ) C7 TO A S T Y ( S H E R W I N W I L L I A M S # S W 6 0 9 5 ) RC 1 C E R T A I N T E E D P R E S I D E N T I A L S H A K E - C O U N T R Y G R A Y RC 2 IR O N O R E ( S H E R W I N W I L L I A M S # S W 7 0 6 9 ) SCALE:EXT. ELEVATIONS - BLDG. 2 A3.0 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 42 77'-1012"43'-0" UN I T 5 PL A N 1 . 0 UNIT 4 PLAN 1.1UNIT 3 PLAN 1.0UNIT 2 PLAN 1.1UNIT 1 PLAN 1.2 6" 6" 6" 6" 78 ' - 1 1 " 45'-0" 6" 6" 6" 6" 6" 6" 1'-0" 2' - 0 " 1' - 0 " 2' - 0 " SCALE:BLDG PLANS - BLDG. 2 A3.1 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 43 78'-11"45'-0"SCALE:BLDG. PLANS - BLDG. 2 A3.2 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 44 78 ' - 1 1 " 33 ' - 2 1 2" 2'-0" 6" 6" SCUPPER AND DOWNSPOUT 4'-6" SO L A R A R R A Y AT E A C H U N I T SCALE:ROOF PLAN - BLDG. 2 A3.3 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 45 ENT. GR O U N D L E V E L PL A N 2 . 0 ( S I N G L E F A M I L Y D W E L L I N G U N I T ) GA R A G E A R E A: 2 3 0 S Q . F T . LI V I N G A R E A : 7 5 4 S Q . F T . DI N . 9' - 0 " X 7 ' - 0 " 5'-10" 35 ' - 0 " 15'-81 2"10'-71 2" 16'-0" 26'-4" 10'-4" 8' - 4 " 40 ' - 7 " 54 ' - 9 " 5'-10" DI N . 12 ' - 0 " X 8 ' - 4 " LI V . 13 ' - 0 " X 1 5 ' - 0 " FL E X S P A C E BE D . 4 / G A R . 17 ' - 6 " " X 1 0 ' - 0 " GA R . 22 ' - 0 " X 1 0 ' - 0 " PD R . PATIO 5'-0" X 14'-4" 6" 6" 10' X 20' MIN. CLEARANCE FOR ONE-CAR GARAGE SCALE:UNIT PLANS - PLAN 2.0 A4.0 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 46 UP P E R L E V E L PL A N 2 . 0 ( S I N G L E F A M I L Y D W E L L I N G U N I T ) LI V I NG A R E A : 9 0 5 S Q . F T . 5'-10" 35 ' - 0 " 15'-81 2" 16'-0" 26'-4" 40 ' - 7 " 54 ' - 9 " 5'-10" 10'-71 2" 9' - 3 " 12 ' - 1 1 2" BE D 2 11 ' - 1 0 " X 1 1 ' - 6 " BE D 3 10 ' - 6 " X 1 0 ' - 0 " LN D Y . 6' - 6 " X 1 0 ' - 0 " M. B T H 8' - 0 " X 1 0 ' - 0 " W. I . C . 6' - 6 " X 1 0 ' - 0 " M. B E D 13 ' - 4 " X 1 5 ' - 4 " BT H 2 8' - 0 " X 8 ' - 0 " SCALE:UNIT PLANS - PLAN 2.0 A4.1 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 47 9" 1' - 0 " EA V E 1' - 0 " EA V E 9" EAVE TYP. U.N.O.1'-4"RAKE TYP. U.N.O. 8: 1 2 4:12 8: 1 2 8: 1 2 8: 1 2 4:12 4:12 4:12 RIDGE RI D G E V A L L E Y V A L L E Y H I P HIP H I P HIP H I P RI D G E RO O F P L A N SI N G L E F A M I L Y D W E L L I N G ( U N I T S 3 2 , 3 3 & 3 4 ) 1' - 0 " EA V E 9"RAKE 9" RAKE SO L A R A R R A Y L O C A T I O N 1 SO L A R A R R A Y L O C A T I O N 2 SO L A R A R R A Y S T O B E P O S I T I O N E D A T WH I C H E V E R O F T H E T W O L O C A T I O N S SH O W N H A S T H E M O S T S O U T H E R N EX P O S U R E . S E E S I T E P L A N F O R U N I T OR I E N T A T I O N . 4:12 SCALE:ROOF PLAN - PLAN 2.0 A4.2 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 48 1. C O M P O S I T E S H I N G L E R O O F 2. SO L A R P A N E L S . L O C A T I O N S M A Y V A R Y D E P E N D I N G O N BU I L D I N G O R I E N T A T I O N . R E F E R T O S I T E P L A N A N D R O O F PL A N S 3. 3 C O A T S T U C C O 4. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 4 " E X P O S U R E 5. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 5 " E X P O S U R E 6. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 8 " E X P O S U R E 8. MT L . R O L L - U P G A R A G E D O O R 9. U T I L I T Y C L O S E T 10 . EX T E R I O R L I G H T F I X T U R E ( A N D A D D R E S S S I G N W H E R E SH O W N ) . 11 . DO W N S P O U T ( W I T H S C U P P E R B O X W H E R E S H O W N ) 12 . P A I N T E D W O O D F E N C E 13 . P A I N T E D W O O D G U A R D R A I L 14 . C O N C R E T E E N T R Y S T A I R W I T H P A I N T E D W O O D G U A R D R A I L C1 GO L D E N F L E E C E ( S H E R W I N W I L L I A M S # S W 6 3 8 ) C2 HE R O N P L U M E ( S H E R W I N W I L L I A M S # S W 6 0 7 0 ) C3 FR E N C H R O A S T ( S H E R W I N W I L L I A M S # S W 6 0 6 9 ) C4 SP A L D I N G G R A Y ( S H E R W I N W I L L I A M S # S W 6 0 7 4 ) C5 SH O J I W H I T E ( S H E R W I N W I L L I A M S # S W 7 0 4 2 ) C6 DO R I A N G R A Y ( S H E R W I N W I L L I A M S # S W 7 0 1 7 ) C7 TO A S T Y ( S H E R W I N W I L L I A M S # S W 6 0 9 5 ) RC 1 C E R T A I N T E E D P R E S I D E N T I A L S H A K E - C O U N T R Y G R A Y RC 2 IR O N O R E ( S H E R W I N W I L L I A M S # S W 7 0 6 9 ) 25'-0" 11 SO U T H L O T NO R T H L O T 11 ' - 3 " SCALE:EXT. ELEVATION - PLAN 2.0 A5.0 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 49 1. C O M P O S I T E S H I N G L E R O O F 2. SO L A R P A N E L S . L O C A T I O N S M A Y V A R Y D E P E N D I N G O N BU I L D I N G O R I E N T A T I O N . R E F E R T O S I T E P L A N A N D R O O F PL A N S 3. 3 C O A T S T U C C O 4. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 4 " E X P O S U R E 5. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 5 " E X P O S U R E 6. HA R D I ( O R E Q . ) L A P S I D I N G W I T H 8 " E X P O S U R E 8. M T L . R O L L - U P G A R A G E D O O R 9. U T I L I T Y C L O S E T 10 . EX T E R I O R L I G H T F I X T U R E ( A N D A D D R E S S S I G N W H E R E SH O W N ) . 11 . DO W N S P O U T ( W I T H S C U P P E R B O X W H E R E S H O W N ) 12 . P A I N T E D W O O D F E N C E 13 . P A I N T E D W O O D G U A R D R A I L 14 . C O N C R E T E E N T R Y S T A I R W I T H P A I N T E D W O O D G U A R D R A I L C1 GO L D E N F L E E C E ( S H E R W I N W I L L I A M S # S W 6 3 8 ) C2 HE R O N P L U M E ( S H E R W I N W I L L I A M S # S W 6 0 7 0 ) C3 FR E N C H R O A S T ( S H E R W I N W I L L I A M S # S W 6 0 6 9 ) C4 SP A L D I N G G R A Y ( S H E R W I N W I L L I A M S # S W 6 0 7 4 ) C5 SH O J I W H I T E ( S H E R W I N W I L L I A M S # S W 7 0 4 2 ) C6 DO R I A N G R A Y ( S H E R W I N W I L L I A M S # S W 7 0 1 7 ) C7 TO A S T Y ( S H E R W I N W I L L I A M S # S W 6 0 9 5 ) RC 1 C E R T A I N T E E D P R E S I D E N T I A L S H A K E - C O U N T R Y G R A Y RC 2 IR O N O R E ( S H E R W I N W I L L I A M S # S W 7 0 6 9 ) 24'-10" 11 ' - 3 " SCALE:EXT. ELEVATION - PLAN 2.0 A5.1 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 50 GR O U N D L E V E L PL A N 2 . 1 ( S I N G L E F A M I L Y U N I T ) GA R A G E A R E A: 4 7 0 S Q . F T . LI V I N G A R E A : 1 , 1 1 0 S Q . F T . GA R . 22 ' - 0 " X 2 0 ' - 0 " EN T . UP 22'-212"10'-912" 12 ' - 6 1 2" 4'-0" 14 ' - 6 " 2'-0" 13 ' - 2 " 23 ' - 1 1 2" 6" 6" 6" 6" 12'-8" 24 ' - 1 1 2" 30 x 2 4 C L R LI V . 14 ' - 0 " X 1 8 ' - 0 " KI T . 14 ' - 6 " X 1 1 ' - 6 " KI T . 14 ' - 0 " X 1 0 ' - 0 " BD . 4 12 ' - 0 " X 1 2 ' - 0 " BT H . 3 20' X 20' MIN. CLEARANCE FOR TWO-CAR GARAGE SCALE:UNIT PLANS - PLAN 2.1 A6.0 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 51 14 ' - 6 " 17 ' - 1 1 " 2'-0"16'-0" 13 ' - 5 " 12 ' - 6 1 2" 13 ' - 8 " 23 ' - 7 1 2" 5' - 0 " M. B T H 7' - 0 " X 1 0 ' - 0 " W. I . C . M. B D . 17 ' - 4 " X 1 4 ' - 0 " BD . 2 13 ' - 5 " X 1 2 ' - 1 0 " BD . 3 11 ' - 7 " X 1 5 ' - 2 " BT H . 2 OP T . B D . 5 13 ' - 0 " X 1 1 ' - 6 " LD Y . 6' - 4 " X 1 0 ' - 0 " PD R . UP P E R L E V E L PL A N 2 . 1 ( S I N G L E F A M I L Y U N I T ) LI V I N G A R E A : 1 , 4 7 4 S Q . F T . 12'-8"6'-0"14'-4" 6'-212"10'-912"33'-0" 50 ' - 1 0 " 33'-0" 51 ' - 1 0 " LO F T / SCALE:UNIT PLAN - PLAN 2.1 A6.1 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 52 RO O F P L A N SI N G L E F A M I L Y D W E L L I N G ( U N I T 3 5 ) 5: 1 2 5:12 5:12 5:12 5:12 5:12 5: 1 2 5: 1 2 5: 1 2 5:12 5:12 5:12 5:12 RI D G E RIDGE RI D G E RIDGE RIDGE RIDGE VA L L E Y VALLEY VA L L E Y VA L L E Y VALLEY VA L L E Y VALLEY HIP HI P HIPHI P 3:12 9" EAVE TYP. U.N.O. 1'-4"RAKE TYP. U.N.O. SO L A R A R R A Y SCALE:ROOF PLAN - UNIT 2.1 A6.2 1/8" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 53 1.COMPOSITE SHINGLE ROOF 2.SOLAR PANELS. LOCATIONS MAY VARY DEPENDING ON BUILDING ORIENTATION. REFER TO SITE PLAN AND ROOF PLANS 3.3 COAT STUCCO 4.HARDI (OR EQ.) LAP SIDING WITH 4" EXPOSURE 5.HARDI (OR EQ.) LAP SIDING WITH 5" EXPOSURE 6.HARDI (OR EQ.) LAP SIDING WITH 8" EXPOSURE 8.MTL. ROLL-UP GARAGE DOOR 9.UTILITY CLOSET 10.EXTERIOR LIGHT FIXTURE (AND ADDRESS SIGN WHERE SHOWN).11.DOWNSPOUT (WITH SCUPPER BOX WHERE SHOWN)12.PAINTED WOOD FENCE 13.PAINTED WOOD GUARDRAIL 14.CONCRETE ENTRY STAIR WITH PAINTED WOOD GUARDRAIL C1GOLDEN FLEECE (SHERWIN WILLIAMS #SW638)C2HERON PLUME (SHERWIN WILLIAMS #SW6070)C3FRENCH ROAST (SHERWIN WILLIAMS #SW6069)C4SPALDING GRAY (SHERWIN WILLIAMS #SW6074)C5SHOJI WHITE (SHERWIN WILLIAMS #SW7042)C6DORIAN GRAY (SHERWIN WILLIAMS #SW7017)C7TOASTY (SHERWIN WILLIAMS #SW6095)RC1CERTAINTEED PRESIDENTIAL SHAKE - COUNTRY GRAY RC2IRON ORE (SHERWIN WILLIAMS #SW7069) FR O N T E L E V A T I O N SI N G L E F A M I L Y D W E L L I N G ( U N I T 3 5 ) 10 SCALE:EXT. ELEVATIONS - PLAN 2.1 A7.0 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 54 RE A R E L E V A T I O N SI N G L E F A M I L Y D W E L L I N G ( U N I T 3 5 ) 9'-1" MA I N S . O . G . MA I N P L A T E 1.COMPOSITE SHINGLE ROOF 2.SOLAR PANELS. LOCATIONS MAY VARY DEPENDING ON BUILDING ORIENTATION. REFER TO SITE PLAN AND ROOF PLANS 3.3 COAT STUCCO 4.HARDI (OR EQ.) LAP SIDING WITH 4" EXPOSURE 5.HARDI (OR EQ.) LAP SIDING WITH 5" EXPOSURE 6.HARDI (OR EQ.) LAP SIDING WITH 8" EXPOSURE 8.MTL. ROLL-UP GARAGE DOOR 9.UTILITY CLOSET 10.EXTERIOR LIGHT FIXTURE (AND ADDRESS SIGN WHERE SHOWN).11.DOWNSPOUT (WITH SCUPPER BOX WHERE SHOWN)12.PAINTED WOOD FENCE 13.PAINTED WOOD GUARDRAIL 14.CONCRETE ENTRY STAIR WITH PAINTED WOOD GUARDRAIL C1GOLDEN FLEECE (SHERWIN WILLIAMS #SW638)C2HERON PLUME (SHERWIN WILLIAMS #SW6070)C3FRENCH ROAST (SHERWIN WILLIAMS #SW6069)C4SPALDING GRAY (SHERWIN WILLIAMS #SW6074)C5SHOJI WHITE (SHERWIN WILLIAMS #SW7042)C6DORIAN GRAY (SHERWIN WILLIAMS #SW7017)C7TOASTY (SHERWIN WILLIAMS #SW6095)RC1CERTAINTEED PRESIDENTIAL SHAKE - COUNTRY GRAY RC2IRON ORE (SHERWIN WILLIAMS #SW7069)SCALE:EXT. ELEVATIONS - PLAN 2.1 A7.1 1/4" = 1'-0" C H U N T H A L E J O N E S A R C H I T E C T S 444 Spear Street, Suite 105 San Francisco, CA 94105 www.hunthalejones.com t. 415-512-1300 f. 415-288-0288DATE:PROJECT: SO U T H C I T Y S T A T I O N CI T Y V E N T U R E S SO U T H S A N F R A N C I S C O , C A L I F O R N I A 10.12.2014 317036 55 56 57 64 65 66 67 68 Attachment 2 Draft Entitlement Resolution B (Alternative B Design)  Exhibit A: Conditions of Approval  Exhibit B: Tentative Subdivision Map  Exhibit C: Affordable Housing Agreement  Exhibit D: 1256 Mission Road Project Plans 69 Resolution B RESOLUTION NO. _______ CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA A RESOLUTION APPROVING A USE PERMIT, DESIGN REVIEW, TENTATIVE SUBDIVISION MAP AND AFFORDABLE HOUSING AGREEMENT, FOR A 36- UNIT RESIDENTIAL DEVELOPMENT AT 1256 MISSION ROAD IN THE TRANSIT VILLAGE MEDIUM DENSITY RESIDENTIAL ZONING DISTRICT. WHEREAS, Anthony Cuneo (“Owner”) and City Ventures (collectively “Applicant”) have submitted an application for development of a 36-unit residential condominium project on an approximately 1.7 acre site located at 1256 Mission Road, South San Francisco, California (“Project”); and, WHEREAS, Applicant seeks approval of a Use Permit, Design Review, Tentative Subdivision Map, and Affordable Housing Agreement for the Project; and, WHEREAS, approval of the Applicant’s proposal is considered a “project” for purposes of the California Environmental Quality Act, Pub. Resources Code § 21000, et seq. (“CEQA”); and, WHEREAS, the Project is categorically exempt under CEQA as a Class 32 Categorical Exemption for projects which are determined to be in-fill development, as set forth in greater detail below, and is consistent with the applicable General Plan and Zoning Ordinance requirements; and, WHEREAS, on December 4, 2014 the Planning Commission for the City of South San Francisco held a lawfully noticed public hearing to solicit public comment and consider the proposed entitlements, take public testimony, and make a recommendation to the City Council on the project, at the conclusion of which, the Planning Commission recommended that the City Council approve the project; and, WHEREAS, the City Council held a duly noticed public hearing on January 14, 2015 which was continued to February 25, 2015 to consider the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement and take public testimony. NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA”) and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco Municipal Code; the Project applications; the 1256 Mission Road Project Plans – Alternative B, as prepared by Hunt Hale Jones Architects; the 1256 Mission Road “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum, as prepared by Urban Planning Partners Inc., dated November 17, 2014, including all appendices thereto; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s meeting held December 4, 2014 meeting; all site plans, and all reports, minutes, and 70 Resolution B public testimony submitted as part of the City Council’s duly notice public hearing on January 14, 2015 which was continued to February 25, 2015, and City Council deliberations; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City of South San Francisco City Council hereby finds as follows: A. General Findings 1. The foregoing recitals are true and correct. 2. The Exhibits attached to this Resolution, including the Conditions of Project Approval (Exhibit A), the Tentative Subdivision Map (attached as Exhibit B), the Affordable Housing Agreement (attached as Exhibit C), and the 1256 Mission Road Project Plans – Alternative B (attached as Exhibit D) are each incorporated by reference and made a part of this Resolution, as if set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of Chief Planner, Susy Kalkin. 4. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the City Council, exercising its independent judgment and analysis, finds that the Project falls within the Categorical Exemption set forth in CEQA Guidelines Section 15332/Class 32, which exempts from the provisions of CEQA the construction of projects characterized as in-fill development, because it meets the following conditions: a. The project is consistent with the applicable General Plan designation (Medium Density Residential) and all applicable General Plan policies as well as with applicable Zoning Ordinance designation (Transit Village – Medium Density Residential) and regulations given that the site is planned and zoned for medium- density residential development within; and, b.The proposed development occurs within city limits on a project site of approximately 1.7 acres, which is less than the five acre maximum, and is surrounded by urban uses; and, c. The project has no value as habitat for endangered, rare or threatened species, which would be negatively impacted given that the site is relatively flat and is surrounded by urban uses; and, d.Approval of the project would not result in any significant effect relating to traffic, noise, air quality, or water quality, given that: a. General Plan Guiding Policy 4.2-G-10 exempts development within ¼ mile of the South San Francisco BART Station from any traffic level of service standards, and therefore no significant traffic level of service operation impacts would result from the proposed project; 71 Resolution B b. The project’s contribution to noise would not be significant subject to meeting the standards of South San Francisco Municipal Code (“SSFMC”) Section 8.32.30 and compliance with the construction noise control plan measures identified in the “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” memorandum; and, c. The project complies with the City’s adopted Climate Action Plan and the Bay Area Air Quality Management District’s significance thresholds screening criteria, and therefore the project would have a less-than-significant impact on air quality and greenhouse gas emissions. e. The site can be adequately served by all required utilities and public services. The City Council finds that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. B. Use Permit 1. The proposed Project is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zone District and the Low Density Residential Zone District. The Project meets or exceeds all of the general development standards of the Transit Village – Medium Density Residential District, with the exception of the maximum building height and the front yard fence height in the Low Density Residential Zone District. However, the exception for the maximum building height is permissible and warranted by the City’s Zoning Ordinance, which allows an applicant to request an incentive to allow a modification to a zoning ordinance standard in return for the provision of certain types of affordable housing, which the applicant is providing. The proposed fence height is allowed per South San Francisco Municipal Code Section 20.300.005, which allows fences taller than three feet in a required front-yard subject to approval of a Minor Use Permit. 2. The proposed Project is consistent with the General Plan by creating a pedestrian- oriented medium-density residential development that emphasizes pedestrian-activity along Mission Road, provides a well-articulated and visually engaging development that implements the goals of the Transit Village Plan, and is consistent with the City’s Design Guidelines as they relate to building design, form and articulation. 3. The proposed use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements, because the proposed use is consistent with the existing uses in the vicinity of the site, including the commercial and residential. The project proposes medium-density residential uses on a site located in the City’s Transit Village Plan district, which is intended for this type of use. The General Plan has analyzed this type of use in the South San Francisco BART Station area, and concluded that such residential uses are not adverse to the public health, safety, or welfare. The proposed fence is designed to be transparent and allow views into and out of the property. As the proposed Project is consistent with 72 Resolution B other medium-density land uses in the Transit Village Plan area, approval of the Project will not be detrimental to the nearby properties. 4. The proposed Project complies with applicable standards and requirements of the City’s Zoning Ordinance, with the exception of the maximum height for a portion of the site and the maximum height of a portion of the fence within the required front-yard. The stated exceptions are permissible and warranted by the City’s Zoning Ordinance. The proposed Project is located in the Transit Village Plan District and, subject to the exception discussed above, meets the minimum standards and requirements for that district. 5. The design, location, size, and operating characteristics of the proposed Project are compatible with the existing and reasonably foreseeable future land uses in the vicinity because the Project proposes medium-density residential uses in the Transit Village Plan district, which is specifically intended for such uses. The proposed fence is in keeping with the aesthetic quality of the buildings on the site and allows views into and out of the property. 6. The site is physically suitable for the type of development and density proposed, as the medium-density residential use will benefit from being located in close proximity to the South San Francisco BART Station within the Transit Village Plan district, and the size and development is appropriate for the location and meets the City’s land use and zoning standards. 7. The Project is consistent with CEQA for the reasons stated in Finding A.4 above. C. Design Review 1. The Project, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because the Project has been designed as a medium-density residential project which will provide a pedestrian-friendly, transit-oriented environment with extensive landscaping and sustainability elements incorporated. 2. The Project, including Design Review, is consistent with the General Plan because the proposed medium-density residential development is consistent with the policies and design direction provided in the South San Francisco General Plan for the Medium-Density Residential land use designation by encouraging the development of a pedestrian-oriented development of a higher intensity within ½ mile of the South San Francisco BART Station. 3. The Project, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Project is consistent with the South San Francisco BART Transit Village Plan Design Guidelines. 73 Resolution B 4. The Project is consistent with the Use Permit for the reasons stated in Section B, above. 5. The Project is consistent with the applicable design review criteria in South San Francisco Municipal Code Section 20.480.006 (“Design Review Criteria”) because the project has been found to be consistent with each of the eight design review criteria included in the “Design Review Criteria” section of the Ordinance. D. Tentative Subdivision Map 1. The proposed tentative subdivision map, including the proposed designs and improvements, are consistent with the City’s General Plan as set forth in Findings B.2 and C.2 above, and because the tentative subdivision map would facilitate the development of a medium density residential development that would not conflict with the Medium Density Residential Land Use designation. 2. The proposed tentative subdivision map is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zoning District. 3. The tentative subdivision map complies and meets all of the requirements of Title 19 of the South San Francisco Municipal Code (“Subdivisions”), subject to the Conditions of Approval, and would allow for the granting of an exception for the driveway grade of the property at 1256 Edgewood Ave as discussed below, and is consistent with the requirements of the State Subdivision Map Act. a. The proposed Project would extend Edgewood Avenue onto the subject property as a private street to provide access to a portion of the residential development. In order to extend Edgewood Avenue, the existing driveway of the adjacent parcel at 1256 Edgewood Avenue would be required to be altered. An exception allowing the existing driveway at 1256 Edgewood Ave to be redeveloped at a grade greater than fourteen percent will not constitute a grant of special privilege inconsistent with the limitations upon other properties in the same vicinity because the existing driveway currently exceeds the maximum permitted grade and the proposed change in grade will not constitute a significant increase over the existing conditions. b.The steep slope along the western edge of the property at 1256 Edgewood Avenue creates a special circumstance that would deprive the property of privileges enjoyed by other properties in the vicinity if Title 19 were strictly applied. The existing driveway on the property is at a seventeen percent grade, and the proposed change in grade will not constitute a significant increase over the existing conditions. If the 74 Resolution B standards of Title 19 were strictly applied, it would not be possible to provide a driveway conforming to the maximum grade standards from the existing access easement adjacent to Edgewood Avenue. c. The exception allowing the existing driveway at 1256 Edgewood Avenue to be redeveloped at a grade greater than fourteen percent carries out the spirit and intent of Title 19 by providing a parcel affected by a steep topography that has historically had nonconforming driveway access with continued access that meets all other driveway design standards except the maximum grade. 4. The Project site is physically suitable for the type of development and density proposed, as the medium-density residential development will be located in the Transit Village area, and the size and number of residential units is appropriate for the location and meets the City’s land use and zoning standards. 5. The Project, including the proposed designs and improvements, are not likely to cause substantial environmental damage, or serious public health problems, since the project plans call for management of any hazardous materials that would exist by virtue of it being a former agriculture site, and since such impacts have been thoroughly evaluated as part of the CEQA process and determined not to exceed any stated thresholds of significance. 6. The design and improvements of the tentative subdivision map are not in conflict with any existing public easements. 7. The property is located in a developed, urban setting, and is not subject to a Williamson Act contract, on open space easement, a conservation easement, or an agricultural conservation easement. The surrounding land uses and resulting parcels would not support agricultural uses; the resulting parcels would result in residential development not incidental to commercial agricultural use of the land. NOW, THEREFORE, BE IT FURTHER RESOLVED that subject to the Conditions of Approval, attached as Exhibit A to this resolution, the City Council of the City of South San Francisco hereby makes the findings contained in this Resolution, and approves the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement for the Project. BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption. * * * * * * * I hereby certify that the foregoing resolution was adopted by the City Council of the City of South San Francisco at the regular meeting held on the 25th day of February, 2015 by the following vote: 75 Resolution B AYES:_________________________________________________ NOES: ____________ ABSTENTIONS: ABSENT: Attest: City Clerk 76 Resolution B Exhibit A Conditions of Approval 77 Resolution B DRAFT CONDITIONS OF APPROVAL P14-0081: UP14-0009, DR4-0049, SA14-0001 & AHA14-0001 1256 MISSION ROAD (As recommended by Planning Commission on December 4, 2014) A) Planning Division requirements shall be as follows: 1. The applicant shall comply with the Planning Divisions standard Conditions and Limitations for Commercial, Industrial, Mixed-Use and Multi-Family Residential Projects. 2. The project shall be constructed and operated substantially as indicated on the Alternative B plan set prepared by Hunt Hale Jones Architects as approved by the City Council at their meeting of February 25, 2014. 3. All equipment (either roof, building, or ground-mounted) shall be screened from view through the use of integral architectural elements, such as enclosures or roof screens, and landscape screening or shall be incorporated inside the exterior building wall. Equipment enclosures and/or roof screens shall be painted to match the building. Prior to issuance of a building permit the applicant shall submit plans showing utility locations, stand-pipes, equipment enclosures, landscape screens, and/or roof screens for review and approval by the Chief Planner or designee. 4. The Final Subdivision Map shall be substantially consistent with the Alternative B Tentative Subdivision Map entitled “Tentative Map”, dated January 21, 2015, prepared by C2G/ Civil Consultants Group, Inc. 5. The Final Subdivision Map shall comply with all applicable requirements of SSFMC Title 19 (Subdivisions) and Title 20 (Zoning Ordinance). 6. Prior to approval of the Final Map or issuance of a building permit, the applicant shall: a) Prior to the Final Inspection the owner shall pay the fee in-lieu of parkland dedication in accordance with SSFMC Chapter 19.24, subject to review and approval of the City’s Parks and Recreation Director; and, b) Execute and Record an Affordable Housing Agreement consistent with SSFMC Chapter 20.380 Inclusionary Housing Regulations. 7. Prior to issuance of any building or construction permits for the construction of public improvements, the final design for all public improvements shall be reviewed and approved by the City Engineer and Chief Planner. 8. Prior to issuance of any building or construction permits for grading improvements, the applicant shall submit final grading plans for review and approval by the City Engineer and Chief Planner. 9. Prior to issuance of any building or construction permits for landscaping improvements, the applicant shall submit final landscaping and irrigation plans for review and approval 78 Resolution B by the Chief Planner. The plans shall include documentation of compliance with SSFMC § 20.300.007 “Landscaping”, including Water Efficient Landscaping and Irrigation calculations. 10. All parking areas are to be maintained free and clear of litter and storage and shall remain clear for parking at all times. No outdoor storage of materials is allowed. 11. Prior to issuance of any building or construction permits, the developer shall revise the development plans to address the following design related comments, subject to review and approval by the Chief Planner or designee: a) Reduce the total habitable area of Unit 36 to no more than 2,499 square feet. 12. Prior to issuance of certificate of occupancy for residential uses, the applicant shall pay any applicable childcare fees in accordance with South San Francisco Municipal Code Chapter 20.115. This fee is subject to annual adjustment, and presently is assessed at $1,858.00 per medium density residential unit. 13. Any modification to the approved plans shall be subject to SSFMC Section 20.450.012 (“Modification”), whereby the Chief Planner may approve minor changes. All exterior design modifications, including any and all utilities, shall be presented to the Chief Planner for a determination. 14. Prior to the recordation of the Covenants Conditions & Restrictions (CC&Rs) with the San Mateo County Recorder, the applicant shall submit the final CC&Rs to the Chief Planner for review and approval. 15. The applicant shall implement all of the construction-related measures identified in the “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum prepared by Urban Planning Partners, Inc., dated November 17, 2014. 16. Prior to issuance of any building or construction permits, the developer shall revise the development plans to include the following Climate Action Plan requirements, subject to review and approval by the Chief Planner or designee: a) Install conduit to accommodate wiring for solar. b) Use of high-albedo surfaces and technologies as appropriate, as identified in the voluntary CALGreen standards. c) Implement the Water Efficient Landscape Ordinance by undertaking the following: (i) Establish a variable-speed pump exchange for water features. (ii) Restrict hours of irrigation to occur between 3:00 a.m. and two hours after sunrise. (iii)Install irrigation controllers with rain sensors. (iv) Landscape with native, water-efficient plants. 79 Resolution B (v) Install drip irrigation systems. (vi) Reduce impervious surfaces to the maximum extent practical. 17. Prior to the issuance of any building or construction permits, the applicant shall contact the South San Francisco Scavenger Company to properly size any required trash enclosures and work with staff to locate the trash enclosure in accordance with the zoning ordinance, SSFMC 20.300.014. An approval letter from South San Francisco Scavenger shall be provided to the Chief Planner. 18. Prior to issuance of any building or construction permits for grading improvements or approval of the Final Subdivision Map, the applicant shall submit to the City for review and approval by the Chief Planner and the City Attorney documentation demonstrating a perfected right to enter and perform work on the existing driveway at 1256 Edgewood Avenue. 19. The applicant, and any successor in interest to the applicant, shall indemnify, defend, and hold harmless the City of South San Francisco and its agents, officers, and employees from any action, claim, or proceeding brought against the City or its agents, officers, or employees which challenges the validity of any approval by the City, its agencies, boards, Commission, or Council with respect to applicant’s project, including but not limited to, issues concerning applicant’s rights of access pursuant to asserted easement rights. Planning Division contact: Billy Gross, Senior Planner (650) 877-8535 B) Fire Department requirements shall be as follows: 1. Prior to issuance of a building permit the applicant shall submit plans showing the following improvements for review and approval by the Fire Marshal or designee: a) Install fire sprinkler system per NFPA 13, NFPA 13D and SSFFD requirements under separate fire plan check and permit for overhead and underground. b) Fire sprinkler system shall be central station monitored per California Fire Code section 1003.3. c) Install exterior listed horn/strobe alarm device, not a bell. d) Fire alarm plans shall be provided per NFPA 72 and the City of South San Francisco Municipal Code. e) All Non parking space curbs to be painted red to local Fire Code Specifications. f) Access road shall have all weather driving capabilities and support the imposed load of 75,000 pounds. 80 Resolution B g) Road gradient and vehicle turning radius shall not exceed maximum allowed. h) Provide fire flow in accordance with California Fire Code Appendix III-A. i) Provide fire hydrants with an average spacing of 450 feet between hydrants; location and number to be determined. The fire hydrants shall have a minimum fire flow of 2000 gpm at 20 psi residual pressure for duration of 4 hours. j) All buildings shall provide premise identification in accordance with SSF municipal code section 15.24.100. k) Provide Knox key box for each building with access keys to entry doors, electrical/mechanical rooms, and others to be determined. l) The minimum road width is 20 feet per the California Fire Code. m) All buildings shall have Emergency Responder Radio Coverage throughout in compliance with Section 510 of the California Fire Code. n) Provide emergency vehicle access from Edgewood Way onto the subject property, with a minimum road width of 20 feet and an approved means of access. 2. Prior to issuance of any building or construction permit, the applicant shall pay any applicable Public Safety Impact Fee in accordance with City Council Resolution 97- 2012. This fee is subject to annual adjustment, and presently is assessed at $563.00 per high density residential unit. Fire Prevention contact: Luis DaSilva, Fire Marshal (650) 829-6645 C) Engineering Division requirements shall be as follows: 1. The Owner shall perform a flow study of the City sewer collection system to determine whether flow from this new development can adequately be handled. 2. Prior to recordation of the Final Map, the developer shall comply with all requirements, and pay for all deposits and fees, as described in the City Municipal Code. Engineering Division contact: Eric Evans, Associate Engineer (650) 829-6652 D) Police Department requirements shall be as follows: 1. Municipal Code Compliance. The applicant shall comply with the provisions of Chapter 15.48 of the Municipal Code, "Minimum Building Security Standards" Ordinance revised May 1995. The Police Department reserves the right to make additional security and safety conditions, if necessary, upon receipt of detailed / revised building plans. Police Department contact: Sergeant Bruce McPhillips (650) 877-7248 81 Resolution B E) Water Quality Control Plant requirements shall be as follows: 1. Fire sprinkler test drain must be connected to the sanitary sewer. 2. Condensate drains from HVAC system must be connected to the sanitary sewer. 3. Site is subject to Low impact development requirements; site must treat stormwater prior to it entering the stormwater system. Complete applicable forms for low impact development. 4. Roof leaders cannot be connected directly to the storm drain system. 5. The onsite catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay). 6. Landscaping shall meet the following conditions related to reduction of pesticide use on the project site: a) Where feasible, landscaping shall be designed and operated to treat stormwater runoff by incorporating elements that collect, detain, and infiltrate runoff. In areas that provide detention of water, plants that are tolerant of saturated soil conditions and prolonged exposure to water shall be specified. b) Plant materials selected shall be appropriate to site specific characteristics such as soil type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air movement, patterns of land use, ecological consistency and plant interactions to ensure successful establishment. c) Existing native trees, shrubs, and ground cover shall be retained and incorporated into the landscape plan to the maximum extent practicable. d) Proper maintenance of landscaping, with minimal pesticide use, shall be the responsibility of the property owner. e) Integrated pest management (IPM) principles and techniques shall be encouraged as part of the landscaping design to the maximum extent practicable. Examples of IPM principles and techniques include: i. Select plants that are well adapted to soil conditions at the site. ii. Select plants that are well adapted to sun and shade conditions at the site. In making these selections, consider future conditions when plants reach maturity, as well as seasonal changes. iii. Provide irrigation appropriate to the water requirements of the selected plants. iv. Select pest-resistant and disease-resistant plants. v. Plant a diversity of species to prevent a potential pest infestation from affecting the entire landscaping plan. vi. Use “insectary” plants in the landscaping to attract and keep beneficial insects. 82 Resolution B 7. No decorative bark shall be used in landscaping. 8. A grading and drainage plan must be submitted. 9. An erosion and sediment control plan must be submitted. Water Quality contact: Rob Lecel (650) 877-8555 83 Resolution B Exhibit B Tentative Subdivision Map – Alternative B 84 Resolution B Exhibit C Affordable Housing Agreement – Alternative B 86 Affordable Housing Agreement 1 1256 Mission Road RECORDING REQUESTED BY: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SOUTH SAN FRANCISCO 400 GRAND AVENUE SOUTH SAN FRANCISCO, CA 94080 WHEN RECORDED MAIL TO: ECONOMIC AND COMMUNITY DEVELOPMENT CITY OF SOUTH SAN FRANCISCO 400 GRAND AVENUE SOUTH SAN FRANCISCO, CA 94080 Documentary Transfer Tax $ EXEMPT County of San Mateo City of South San Francisco  _____________________________ Right of Way Agent AFFORDABLE HOUSING AGREEMENT FOR BELOW MARKET RATE PROPERTY This Affordable Housing Agreement for Below Market Rate Property (“Agreement”) is entered into as of this _____ day of _____________, 2015, by and between the City of South San Francisco (“City”) and ________________________ (“Developer”). City and Developer are hereinafter collectively referred to as the “Parties.” RECITALS WHEREAS, Chapter 20.380 of the South San Francisco Municipal Code sets forth the requirements for Inclusionary Housing (“Inclusionary Housing Ordinance”); and WHEREAS, the Developer is the fee simple owner of that certain real property (“Property”) located in the City of South San Francisco, State of California, and more particularly described in Exhibit A attached hereto. WHEREAS, the Developer intends to construct thirty-six (36) for-sale housing units on the Property (the “Project”) and has submitted site development plans for the Project; and 87 Affordable Housing Agreement 2 1256 Mission Road WHEREAS, as a condition of development of the Project, Developer must comply with the City of South San Francisco’s housing policies and programs as set forth in the City’s Inclusionary Housing Ordinance first adopted by the City Council on December 12, 2001, as it applies to the provision of affordable housing. WHEREAS, the Developer proposes meeting these requirements by selling the required number of Below Market Rate Units (defined below); and NOW THEREFORE, the City and the Developer agree as follows: AGREEMENT 1. As a condition of developing and constructing thirty-six (36) condominiums on the Property, Developer shall designate seven (7) units as Below Market Rate Units and shall make these units available for sale as Below Market Rate Units (the “Below Market Rate Units”). The number of Below Market Rate Units shall be equal to twenty percent (20%) of the total number of condominiums to be built upon the Property and identified in Exhibit B. The Below Market Rate Units shall be affordable to low- and moderate- income households guaranteed by deed restrictions or other enforceable covenants running with the land. Developer shall sell: (i) One (1) three-bedroom housing unit in the Project to a household whose annual gross income does not exceed sixty percent (60%) of the unadjusted median income (“Low-Income Household”) for a San Mateo County household in the San Francisco Primary Metropolitan Statistical Area, published annually by the Department of Housing and Urban Development (as adjusted annually, the “Base Median Income”); (ii) One (1) three-bedroom unit to a household whose annual gross income does not exceed seventy percent (70%) of the unadjusted median income; (iii) One (1) three-bedroom unit to a household whose annual gross income does not exceed eighty percent (80%) of the unadjusted median income; (iv) One (1) three-bedroom unit to a household whose annual gross income does not exceed ninety percent (90%) of the unadjusted median income; (v) Two (2) three-bedroom units to a household whose annual gross income does not exceed one hundred percent (100%) of the unadjusted median income; and (vi) One (1) three-bedroom unit to a household whose annual gross income does not exceed one hundred ten percent (110%) of the unadjusted median income, (jointly “Low and Moderate-Income Households”). 2. Developer shall sell the Below Market Rate Units at a price that will result in an allowable housing expense for a for-sale unit (as defined in Section 20.380.002 of the 88 Affordable Housing Agreement 3 1256 Mission Road Inclusionary Housing Ordinance) that does not exceed thirty percent (30%) of the gross monthly income for Low- and Moderate-Income Households, adjusted for household size. 3. The Below Market Rate Units shall be located in close proximity to Mission Road. The Developer and the City acknowledge this is an ideal area for such Below Market Rate Units as it is in close proximity to and has access to employment opportunities, urban services and transportation facilities. 4. Occupancy of the Below Market Rate Units shall be established concurrently with occupancy of the market rate units located on the Property. This requirement shall be effective as of the date the first unit is occupied on the Property. This requirement for the Below Market Rate Units shall remain in effect even in the event all market rate units on the Property become unoccupied. 5. Developer shall require the buyer of the Below Market Rate Units to execute a Resale Restriction and Option to Purchase Agreement substantially in the form attached hereto as Exhibit C (“Resale Restriction Agreement”). The Resale Restriction Agreement shall be recorded against the parcel containing the Below Market Rate Units upon close of escrow of sale for such Below Market Rate Units. The Below Market Rate Units shall remain restricted and affordable to Low- and Moderate Income Households for a term of fifty-five (55) years, commencing on the date each Below Market Rate Unit is sold. The restrictions shall apply to all subsequent buyers. 6. Developer shall sell the Below Market Rate Units to eligible Low- and Moderate- Income Household pursuant to Section 2. Developer shall work with the City and/or the City’s First Time Homebuyer Administrator to identify and qualify eligible buyers for said units. At the time of sale, Developer shall pay an administrative fee to reimburse the City for all administrative and processing costs and fees incurred in processing the sale of the Below Market Rate Units, which may include the First Time Homebuyer Administrator fees. 7. The Below Market Rate Units shall remain owner-occupied units. 8. Developer shall indemnify, defend with counsel selected by the City, and hold harmless the City and its officials, officers, employees, agents, and volunteers from and against any and all losses, liability, claims, suits, actions, damages, and causes of action arising or allegedly arising out of or relating in any manner to the Project, the Property, or Developer’s performance or nonperformance under this Agreement, except to the extent arising from the gross negligence or willful misconduct of the City. The provisions of this section shall survive the expiration or other termination of this Agreement or any release of part or all of the Property from the burdens of this Agreement. 9. Developer shall pay an administrative fee to reimburse the City for all administrative/processing costs and fees incurred in processing the Agreement, which may include reasonable attorney’s fees and cost, and implementing the requirements of the Inclusionary Housing Ordinance. 89 Affordable Housing Agreement 4 1256 Mission Road 10. Developer hereby subjects the Property to the covenants, conditions and restrictions set forth in this Agreement. The Parties hereby declare their express intent that all such covenants, conditions and restrictions shall be deemed covenants running with the land and shall pass to and be binding upon Developer’s successors in title to the Property. All covenants without regard to technical classification or designation shall be binding for the benefit of the City, and such covenants shall run in favor of the City. Each and every contract, deed or other instrument hereafter executed applicable to or conveying the Property or any portion thereof shall conclusively be held to have been executed, delivered and accepted subject to such covenants, conditions and restrictions, regardless of whether such covenants, conditions and restrictions are set forth in such contract, deed or other instrument. This Agreement shall be recorded on the Property upon final map recordation or, if a map is not being processed, prior to the issuance of building permits for the Property. 11. Prior to the sale of the Below Market Rate Units to eligible Low- and Moderate- Income Households, the Developer may not transfer the whole or any part of the Property, the Project or this Agreement unless (i) such transfer is to a limited liability company or limited partnership formed by Developer for purposes of carrying out the Project, (ii) the Developer first notifies the City of the proposed transfer or assignment and delivers to the City the organizational documents of the transferee or assignee (the "Transferee"), and (iii) the Developer causes the Transferee to execute an agreement, in form and substance reasonably satisfactory to City, accepting and assuming the obligations of the Developer under this Agreement. Developer shall reimburse City for all City costs, including but not limited to reasonable attorneys’ fees, incurred in reviewing instruments and other legal documents proposed to effect a permitted transfer or assignment under this Agreement within ten (10) days following City’s delivery of an invoice detailing such costs. 12. Provided that Developer has complied with all of the terms and conditions set forth herein, upon the sale by Developer of the Below Market Rate Units, Developer shall be released from, and shall have no further obligations under this Agreement. Such release shall be effective upon the sale and shall not require any further action or documentation by any party to this Agreement. 13. Any amendments to this Agreement shall be processed in the same manner as an original application for approval pursuant to Section 20.380.014 of the South San Francisco Municipal Code. Nothing, however, shall prevent the body granting final approval of the project development, from modifying the location and phasing of the Below Market Rate Units as a condition of approval for the Project. 14. The laws of the State of California shall govern this Agreement without regard to principles of conflicts of laws. In the event that either party brings any action against the other under this Agreement, the parties agree that trial of such action shall be vested exclusively in the state courts of California in the County of San Mateo or in the United States District Court for the Northern District of California. 15. If a party to this Agreement brings any action, including an action for declaratory relief, to enforce or interpret the provision of this Agreement, the prevailing party shall be 90 Affordable Housing Agreement 5 1256 Mission Road entitled to reasonable attorneys’ fees in addition to any other relief to which that party may be entitled. The court may set such fees in the same action or in a separate action brought for that purpose. 16. If a court of competent jurisdiction finds or rules that any provision of this Agreement is invalid, void, or unenforceable, the provisions of this Agreement not so adjudged shall remain in full force and effect. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement. 17. Any notice or demand shall be made by certified or registered mail, return receipt requested, or reliable overnight courier to the address of the respective parties set forth below: Developer: ______________________________ ______________________________ ______________________________ City: City of South San Francisco - City Clerk 400 Grand Avenue South San Francisco, CA 94080 18. Notwithstanding any previous provision of this Agreement, the terms of this Agreement shall be interpreted in accordance with the provisions of Chapter 20.380 of the South San Francisco Municipal Code. IN WITNESS THEREOF, the parties have executed this Agreement as of the date first written above. DEVELOPER : By: ________________________________ Name Printed: _______________________ Its: _________________________________ CITY: CITY OF SOUTH SAN FRANCISCO By: ___________________________ Mike Futrell City Manager APPROVED AS TO FORM: ______________________________ Steven T. Mattas, City Attorney SIGNATURES MUST BE NOTARIZED 91 Affordable Housing Agreement 6 1256 Mission Road Exhibit A Legal Description Exhibit B BMR Units Plan Exhibit C Form of Resale Restriction and Option to Purchase Agreement for Below Market Rate Property 92 1 EXHIBIT A Property (attach legal description) 2403416.1 93 Resolution B Exhibit D 1256 Mission Road Project Plans – Alternative B 2403411.1 94 95 96 97 98 99 Attachment 3 City Council Staff Report and Draft Minutes – Meeting of January 14, 2015 100 Staff Report DATE: January 14, 2015 TO: Mayor and City Council FROM: Alex Greenwood, Director of Economic and Community Development SUBJECT: 1256 MISSION SUBDIVISION - DESIGN REVIEW, TENTATIVE SUBDIVISION MAP AND AFFORDABLE HOUSING AGREEMENT TO CONSTRUCT A NEW RESIDENTIAL DEVELOPMENT CONSISTING OF 31 TOWNHOMES AND 4 SINGLE FAMILY DWELLINGS, AUTHORIZE DENSITY BONUS INCENTIVES FOR THE SOUTHERN PORTION OF THE SITE TO ALLOW AN INCREASE IN ALLOWABLE BUILDING HEIGHT FROM 25-FEET TO 35-FEET AND TO ALLOW THE USE OF ONE ARCHITECTURAL PROTOTYPE, AND USE PERMIT TO ALLOW A 5 FOOT 2 INCH TALL FENCE IN THE REQUIRED FRONT YARD AT 1256 MISSION ROAD IN THE TRANSIT VILLAGE RESIDENTIAL MEDIUM DENSITY (TV-RM) AND LOW DENSITY RESIDENTIAL (RL-8) ZONING DISTRICTS IN ACCORDANCE WITH SSFMC TITLE 19 (SUBDIVISIONS) AND CHAPTERS 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 AND 20.490, AND DETERMINATION THAT THE PROJECT IS CATEGORICALLY EXEMPT FROM CEQA. Address: 1256 Mission Road (APNs 011-171-330, 011-171-500 & 011-171- 130) Owner: Antonio Cuneo Applicant: City Ventures Case No.: P14-0081: UP14-0009, DR4-0049, SA14-0001 & AHA14-0001 RECOMMENDATION It is recommended that the City Council follow the recommendation of the Planning Commission and adopt a Resolution making findings and approving Planning Project P14- 0081, including UP14-0009, DR14-0049, SA14-0001 and AHA14-0001 subject to the attached draft conditions of approval. BACKGROUND The proposed project is for a medium-density residential development consisting of 31 for-sale townhome-style condominiums and 4 single-family style condominium homes on a largely vacant site in close proximity to the South San Francisco BART Station (“SSF BART”), within the Sunshine Gardens neighborhood. Prior to submitting an application, City Ventures held informal community meetings informing the neighborhood of its plans and presenting the general design. A formal neighborhood meeting was held in November 2014 to introduce the project for which entitlements were being sought. 101 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 2 of 9 The Planning Commission held a public hearing on December 4, 2014, to consider the design of the project and the requested entitlements, which it endorsed by a vote of 5-1. In accordance with City regulations an Affordable Housing Agreement (AHA) and a Tentative Subdivision Map are required for any residential subdivision project. Both the AHA and Tentative Subdivision Map are subject to review and approval by the City Council. DISCUSSION (A complete discussion of Development Policies related to the South San Francisco BART Station Area and the proposed project is contained in the attached Planning Commission staff report dated December 4, 2014.) Figure 1: Neighborhood Aerial Development Policies In the past 15 years, the City Council has established a vision for the SSF BART station area to transform the area into a transit-supportive neighborhood. The General Plan, adopted in 1999, created specific policies related to the development around the SSF BART station, including higher intensity development, with a minimum density of 30 units per net acre within ½ mile of the station. The South San Francisco BART Transit Village Plan, adopted in 2001, envisioned development of a slightly higher intensity than the single family homes that currently exist, to create a visual and physical buffer between Mission Road activity and the Sunshine Gardens neighborhood behind. Finally, the Housing Element of the General Plan, which is required by state law to identify how and where housing needs of the community will be met, identifies the subject site as a near-term housing site. Proposed Project In keeping with the basic policy directions for the site, City Ventures has submitted an application to construct a medium-density residential development with a total of 35 units on the approximately 1.7 acre parcels on Mission Road adjacent to the SSF BART station, within the Sunshine Gardens neighborhood. Historically, the majority of the subject site has been used for agricultural purposes, with farming activity occurring until approximately 15 years ago. Therefore, the majority of the site is undeveloped. In addition to the SSF BART station, 102 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 3 of 9 medical office uses are also located directly across Mission Road to the west, a Pacific Gas & Electric (“PG&E”) utility easement and single-family homes are adjacent to the northwest, Baywood Ave and single-family homes are adjacent to the northeast, and single-family homes and the Edgewood Way cul-de-sac are adjacent to the east. The proposed project has been designed to provide high-quality family housing near a regional transit station, in keeping with the vision pursued by the City for this area over the past 15 years. The building architecture is contemporary, designed with flat roofs to minimize the total apparent height of the buildings. The building massing and design will set a high standard for future redevelopment along Mission Road. Planning Commission Meeting The Planning Commission held a public hearing on the project on December 4, 2014. Eight members of the public spoke on the project, with concerns related to the following:  Opposition to extension of Edgewood Way into project site, with preference that all townhome-style condominium units have vehicular access from Mission Road only.  Proposed townhomes are too tall, not in keeping with surrounding neighborhood  Development should consist of more single-family detached homes, not townhomes  Concerns with access to adjacent residence at 1256 Edgewood Way Edgewood Way Extension Access to the development from Edgewood Way was also the most prominent comment at the November 2014 neighborhood meeting; City Ventures prepared a site-plan that depicts how the overall project would be affected by providing the southern portion of the site with vehicular access only from Mission Rd. A full discussion of this concern is contained on page 11 of 15 of the attached Planning Commission staff report. Planning Commissioners discussed with both Police Department and Fire Department staff whether having a single entrance off of Mission Rd or multiple entrances (from Mission and Edgewood) would be preferable for the purposes of emergency services. Both departments stated that multiple vehicular entrance points would be preferable, but also stated that the alternative with only one entrance from Mission Road would also be a supportable design. Height of Proposed Townhomes The aerial image below shows the proposed site plan overlaid on a Google Earth satellite image. The portion of the image highlighted in red depicts the area where a maximum height of 35 feet is allowed (the depth of the adjacent parcels fronting on Mission Road). The remainder of the subject site where there is no highlighting has a maximum allowable height of 25 feet. 103 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 4 of 9 Figure 2: Proposed Site Plan and 35-foot Height Zone As depicted, half of the second row of proposed townhomes is subject to the 35 foot height limit, while the remainder of the second row and the entire third row of townhomes are subject to the 25 foot height limit. In order to design a project that provides larger units and meets the required residential densities, the applicant has requested an incentive to allow the 35-foot height limit to be applicable to all of the townhome units. As originally noted in the Planning Commission staff report, the height allowance in the surrounding single-family neighborhood is 28 feet, so the proposed height would be seven feet (25%) greater than what is allowed in the surrounding single family neighborhood. Density of Residential Development General Plan Implementing Policy 3.4-I-8 requires any new development/redevelopment within ½ mile of the BART station at a density of no less than 30 units per net acre for residential uses. The Transit Village Plan also envisions medium-density development of a higher intensity than the surrounding single-family neighborhood. In an effort to conform to these standards, the applicant is proposing to construct townhome-style attached residential units rather than single- family detached units. Access to Residence at 1256 Edgewood There is a significant grade change between the portion of the site accessed from Baywood Ave and the portion of the site accessed from Edgewood Way. When the existing buildings adjacent to Baywood Ave on the subject property were developed, easements were created to allow both the subject property and the property at 1256 Edgewood to access Edgewood Way. In the aerial below, the 1256 Edgewood property is highlighted yellow. The area outlined in red shows the basic location of an easement allowing the subject property access through 1256 Edgewood, and the area outlined in green shows the location of an easement allowing the 1256 Edgewood property owner access through the subject property to Edgewood Way. The existing driveway 104 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 5 of 9 from Edgewood Way to the homes was constructed at a grade of approximately seventeen percent, which is greater than the fourteen percent currently allowed by City standards. Figure 3: Easements between subject property and 1256 Edgewood Way In order to extend Edgewood Way into the subject property as part of the proposed project, the existing driveway at 1256 Edgewood Way would be required to be altered. As part of the original application submittal, the applicant proposed to provide a conforming driveway that could be accessed from Baywood Ave through the applicant’s property to the 1256 Edgewood property. However, the 1256 Edgewood property owner wants to maintain his existing access. SSFMC Title 19 – Subdivisions, allows for the granting of exceptions if specific findings can be made. The attached Entitlement Resolution includes specific findings stating that allowing the existing driveway to be redeveloped at a grade greater than fourteen percent will not be a significant increase over existing conditions and will not constitute a special privilege. Based on the adoption of these Tentative Subdivision Map findings, the 1256 Edgewood property owner would be allowed to maintain access from Edgewood Way. Planning Commission Discussion The Planning Commission was generally supportive of the project as it furthered the goals of the Transit Village Plan and fulfilled a need to provide new types of housing throughout the City. The Commissioners also supported having multiple vehicle access points to the development. However, there was some concern with the amount of open space being provided on the project site. As proposed, the development includes a small playground area and meets the applicable yard and walkway development standards, and would also be required to pay a park in lieu fee. The Planning Commission recommended approval of the proposed project by a vote of 5-1. 105 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 6 of 9 AFFORDABLE HOUSING AGREEMENT The proposed development is obligated to provide twenty percent (20%) of the proposed dwellings as affordable to low and moderate income households (SSFMC 20.380 “Inclusionary Housing Regulations”). The applicant is proposing to construct 35 dwellings, and therefore the applicant is required to restrict a minimum of 7 units to fulfill the affordable housing obligation. A Draft Affordable Housing Agreement between the applicant and the City has been prepared and is attached for review. The Affordable Housing Agreement has been drafted to comply with the requirements contained in SSFMC 20.380. City Ventures has requested two incentives for affordable housing: a height increase for a portion of the project site and allowance to use Architectural Prototype 5 Guidelines for all of the townhome units. In accordance with State Density Bonus Law (Govt. Code Section 65915(d)(2)(B), the applicant is entitled to a density bonus and at least two incentives if the project includes a minimum of 20% of the units restricted to lower income households. Accordingly, the city is obligated to grant the requested incentive unless it can find that the incentive is not required in order to provide for affordable housing costs, that the incentive would have a specific adverse impact upon public health and safety or the physical environment or on any real property that is listed in the California Register of Historical Resources, or that the incentive would be contrary to state or federal law. The incentives for a height increase for a portion of the site and the more dense architectural prototype are required to make the project financially feasible, are consistent with the applicable State law requirements, and do not impact any property on the California Register of Historical Resources. Based on this, State Density Bonus Law obligates the City to grant incentives to the project. Incentive 1 – Maximum Height Allowance As discussed above under the “Planning Commission Meeting” section, the portion of the site fronting along Mission Road is allowed a maximum height of 35 feet and the remainder of the site with the TV-RM district is allowed a maximum height of 25 feet. The applicant has requested an exception to allow the 35-foot height limit to be applicable to all of the townhome units. Allowing all of the townhomes to be up to 3-stories in height results in a greater number of 3-bedroom units, better integrating the townhome units with the existing neighborhood. Figure 4 – Proposed Height Limit Areas Incentive 2 – Applicable Architectural Prototypes The Transit Village Plan also includes Architectural Prototype Design Guidelines which identify architectural design and site planning principles that are appropriate for specific areas of the plan 106 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 7 of 9 area. For the subject site, the Mission Road frontage is identified as Architectural Prototype 5, while the remainder of the property is identified as Architectural Prototype 6. Following are the differences between the two prototypes: Architectural Prototype 5 – Townhouse with rear-accessed tuck-under or surface parking accessed from a shared driveway off of Principal Street or private Neighborhood Street. Architectural Prototype 6 – Townhouse facing Principal Street with front loaded parking, or Townhouse in back of large parcel with front loaded parking off of private Neighborhood Street. Prototype 5 results in a denser product-type that requires less total site area, while Prototype 6 is only slightly denser than the surrounding single-family neighborhood. In order to develop a project closer to the minimum density requirements contemplated by the General Plan, including the current Housing Element update, the applicant is requesting an incentive allowing Architectural Prototype 6 to be the applicable design guidelines for the lower portion of the project site where the 21 townhome-style condominium units are proposed to be located. TENTATIVE SUBDIVISION MAP A Tentative Subdivision Map is proposed to create two separate lots with a total of 35 residential condominium units; 31 units on Lot 1 and 4 units on Lot 2. The City Engineer has reviewed the 107 Staff Report Subject: 1256 Mission Road – 35 Unit Subdivision Date: January 14, 2015 Page 8 of 9 proposed map and determined that it complies with the City Standards and the State Subdivision Map Act. GENERAL PLAN CONSISTENCY The General Plan Land Use Designation for the site is Medium Density Residential. As discussed above in the Background section, the General Plan includes specific policies related to development within the immediate vicinity of the SSF BART Station Area, in an effort to create “a vital pedestrian-oriented center, with intensity and mix of uses that complement the area’s new role as a regional center.” The proposed project will conform to the General Plan Land Use Policies by creating medium- density residential units that emphasize a pedestrian-oriented development along Mission Road in keeping with the development intensity requirements, including residential density. The project also provides a well-articulated and visually engaging development that implements the goals of the Transit Village Plan. The project design is consistent with the City’s Design Guidelines as it relates to building design, form and articulation. Additionally, the proposed project complies with the General Plan Housing Element, which identifies the subject site as a near-term housing opportunity site. ENVIRONMENTAL REVIEW The proposed project has been determined to be categorically exempt from environmental review under the provisions of CEQA (Class 32, Section 15332: In-fill Development Projects), which provides an exemption for in-fill development projects which meet the following conditions: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered, rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. e. The site can be adequately served by all required utilities and public services. A “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum analyzing conformance with these conditions was prepared by Urban Planning Partners Inc. and is attached to this staff report (Attachment 4). A public comment at the Planning Commission meeting questioned if the additional traffic along Edgewood Way would result in a significant impact. According to the Institute of Transportation Engineers (“ITE”) Trip Generation Manual, 9th Edition, the average townhome/condominium generates approximately 5 vehicle trips per day and the average single- family home generates approximately 10 vehicle trips per day. Based on this, the overall project would generate less than 200 daily trips, with only approximately 50 additional daily vehicle 108 10 9 PUBLIC HEARING 11. 1256 Mission Subdivision CUNEO ANTONIO/Owner City Ventures/Applicant 1256 Mission RD P14-0081: UP 14-0009, DR 14-0049, SA 14-0001 &AHA 14-0001 1256 Mission Subdivision - Design Review, Tentative Subdivision Map and Affordable HousingAgreement to construct a new residential development consisting of 31 Townhomes and 4 Single Family Dwellings, and authorize Density BonusIncentives for the southern portion of the site to allow an increase inallowable building height from 25- feet to 35-feet and to allow the use of one architectural prototype, and Use Permit to allow a 5 foot 2 inch tall fence in the required front yard at 1256 Mission Road in the Transit Village Residential Medium Density(TV-RM) Zoning District in accordance with SSFMC Chapters in accordance with SSFMC Title 19(Subdivisions) and Chapters 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 and 20.490, and determination that the project is categorically exempt from CEQA. (Tony Rozzi, Senior Planner). Public Hearing opened: 9:25 P.M. AssociatePlanner Gross presented the staff report recommending that Council take actionto approveplans for the 1256 Mission Subdivision submitted by City Ventures. He provided a PowerPoint presentation depicting the project location. He described the location as a unique site in Sunshine Gardens,prime for development around the BART Station. He explained the plans were consistent with the GeneralPlan, SSF BART Transit Village Plan, and the 2010 &2014 Housing Elements. Both the current and draftHousing Elements identified this site as ripe for housing development as a medium density residential site. The Site Plan A proposed 31 townhome style condominium units, and four(4) units of larger, single-family condominium style housing. The inclusionary housing requirement for condominiums is at 20%, yielding seven (7) units for affordable to low and moderate income households. In keeping with the California Density Bonus Lawpermitting incentives for affordable housing, the applicant is requesting two (2) incentives, including an increase in allowable building height from 25-feetto 35-feet and the use of one architectural prototype. Nearby residents have expressed concern over the development and its proximity to their respective properties. Among others,primary resident concerns and suggestions were as follows: (1) disallow the proposed Edgewood Way Extension; (2) the proposedthree (3) story building height was too high for the area; and (3) the development should include more single family homes. Planner Gross addressed concerns as follows: guest parking restrictions and multiple entry access points would ameliorate parking and traffic concerns; and the height incentive was being sought to make the development financially feasible. Planner Gross closed by advising that the PlanningCommissiongenerally supported the project and recommended approval by a vote of six (6) to one (1). The proposed development would be consistent with the City's planning and zoningpolicies. Thesite is categorically exempt from environmental review pursuantto the CEQA analysis memo indicating the property has no value as a habitat for an endangered species. There were no significant impacts to traffic, noise, air quality REGULAR CITY COUNCIL MEETING JANUARY 14,2015 MINUTES PAGE 8110 or water quality. Further, the sitewas accessible for installation of utilities and public services. Accordingly, staff recommended all necessary actions for council approval of the application. ViceMayor Addiego and Councilwoman Matsumoto expressed concerns relatedto parking. Representatives from City Ventures addressed Council and expressed excitement for the project. ViceMayor Addiego advised he met with the developer and resident regarding the project. Councilwoman Matsumoto advised she met with the developer. Jim Scott a 34 year resident of South San Francisco addressed Council. He explained he lived near the proposed development. He welcomeddevelopment of the property,butdid not agree with the proposal. He expressed a preference for Plan B, the plan with one entranceto the area, and opined that he hadn't heardany good reason as to why thisplanshouldn't be the one followed. He believed that one entrance would not impact transit users. Heexplained traffic concerns were already bad in the neighborhood and believed the two entrance proposal would create more traffic through his neighborhood. Michael Yoshida, a Sunshine Gardens resident, took issue with the traffic impact on Edgewood Way. He believed traffic and parking was already badon thestreet and this would further disadvantage existing homeowners. He was also skeptical of this type of high density development in the midst of an established single family neighborhood. Diane Wood spokeon behalf of the Bacciagallupi family. The family did not oppose development of the property,but did not agree with the proposed Edgewood Way extension included in Plan A. They further opposedthe proposed building height, which they believed would take away their privacy and impact the enjoyment of their home. Donald Wood, a resident for over 40 years, disagreed with inclusion of the Edgewood Way Extension in plan A. He requested that Council please consider the existing residents. Adam Ornellis, a longtime resident, disagreed with proposed heights and the Edgewood Way Extension. He was concernedabout shadowing, parking and traffic. He wanted the City to grow, but disagreed with this plan. Resident LauraFanella expressed disapproval of the Edgewood Way Extension and likely traffic impacts. She believed it would negatively impact her neighborhood, where residents tookpride in their homes. She further commented that the proposal was disrespectful to longtime residents who gave their time and money to the City. Public Hearing closed: 10:30 P.M. Councilman Addiego stated that he appreciated development of this site, which had sat empty for so very long. However, he was concernedabout the proposal's interface with the existing community. He preferred a plan that would be more symbiotic with it. Councilman Gupta queried the differences betweenPlan A, the developer's preference and staff's recommendation, and Plan B. REGULAR CITY COUNCIL MEETING JANUARY 14,2015 MINUTES PAGE 9111 Director Greenwood explained Plan A was more in line with the transit oriented zoning in the area. Further the Edgewood Way Extension provided a moredesirable traffic follow option and greater access for Police and Fire vehicles. Plan B loses three (3) units, relates to loss of open space, requires grading changesand would create the need to cut and fill the upper part of site. Councilmembers concluded that the two options needed to be weighed in more detail and continued the hearing to a date certain: The Regular Council meeting of February 25, 2015 at 7:00 P.M. in the Council Chambers located at the Municipal Services building 33 Arroyo Drive, South San Francisco, CA. 12. Special Events Permits/Temporary Uses City of South San Francisco-Owner/Applicant Citywide P07-0136: ZA14-0009 An Ordinance making modification to theSouth San Francisco Municipal Code Chapter 6.48 (SpecialEvents) to clarify event permit regulations and ZoningText Amendment to SSFMC Chapter 20.340 (Temporary Uses) to address overlapping authorities and revise regulations and permittingfor Temporary Uses citywidein accordance with South San Francisco Municipal Code Chapter 20.550. (Tony Rozzi, SeniorPlanner). SeniorPlanner Rozzi presented the staff report recommending that Councilwaive reading and introduce an ordinance making modifications to the South San Francisco Municipal Code Chapter 6.48 (SpecialEvents) to clarify event permit regulations and Zoning Text Amendment to SSFMC Chapter 20.340 (Temporary Uses) to address overlapping authorities and revise regulations and permitting for Temporary Uses citywide in accordance with South San Francisco Municipal Code Chapter 20.550. The suggested modifications weredesignedto minimize the overlap between special events and temporary use permits. Public Hearing opened: 11:09 P.M. Mayor Garbarino announced that Robert Simms, who had to leave the meetingearlier in the evening, wanted to express support for theproposedordinance onthe record. Councilwoman Matsumoto expressed concern over the low fee charged for Special Event permits as well as the omission of language making the proposed fees nonrefundable. In response to a question from Councilwoman Normandy, Finance Director Steel advised the fees for the permits as well as any officers needed for security at special events were contributed to the General Fund. CouncilwomanNormandy requested that staffidentify thecontact person for Special Event permitting. Public Hearing Closed: 11:15 P.M. Motion—Vice Mayor Addiego/Second— CouncilwomanNormandy: to waive reading and introduce an ordinance making modification to the South San Francisco Municipal Code Chapter 6.48 Special Events) to clarify event permit regulations and Zoning TextAmendment to SSFMC REGULAR CITY COUNCIL MEETING JANUARY 14,2015 MINUTES PAGE 10112 Attachment 4 Planning Commission Staff Report and Draft Minutes – Meeting of December 4, 2014 113 Planning Commission Staff Report DATE: December 4, 2014 TO: Planning Commission SUBJECT: 1256 Mission Subdivision Design Review, Tentative Subdivision Map and Affordable Housing Agreement to construct a new residential development consisting of 31 Townhomes and 4 Single Family Dwellings, authorize Density Bonus Incentives for the southern portion of the site to allow an increase in allowable building height from 25-feet to 35-feet and to allow the use of one architectural prototype, and Use Permit to allow a 5 foot 2 inch tall fence in the required front yard at 1256 Mission Road in the Transit Village Residential Medium Density (TV-RM) and Low Density Residential (RL-8) Zoning Districts in accordance with SSFMC Title 19 (Subdivisions) and Chapters 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 and 20.490, and determination that the project is categorically exempt from CEQA. Address: 1256 Mission Road (APNs 011-171-330, 011-171-500 & 011-171-130) Owner: Antonio Cuneo Applicant: City Ventures Case No.: P14-0081: UP14-0009, DR4-0049, SA14-0001 & AHA14-0001 RECOMMENDATION That the Planning Commission conduct a public hearing and adopt a Resolution making findings and recommending that the City Council approve Planning Project P14-0081, including UP14-0009, DR14-0049, SA14-0001 and AHA14-0001 based on the attached draft findings and subject to the attached draft conditions of approval. BACKGROUND Existing Site The Project site is comprised of three separate lots, totaling approximately 1.7 acres in size, within the Sunshine Gardens neighborhood. The site is immediately bounded by Mission Road to the southwest, with medical office uses and the South San Francisco BART Station (“SSF BART”) directly across Mission Road, a Pacific Gas & Electric (“PG&E”) utility easement and single-family homes to the northwest, Baywood Ave and single-family homes to the northeast, and single-family homes and the Edgewood Way cul-de-sac to the east. El Camino High School is approximately one block to the northwest, Sunshine Gardens Elementary School is approximately ¼ mile to the northeast, and Sunshine Gardens Shopping Center is approximately one block to the southeast. 114 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 2 of 15 Figure 1: Neighborhood Aerial Historically, the majority of the subject site has been used for agricultural purposes, with farming activity occurring until approximately 15 years ago. Therefore, the majority of the site is undeveloped, with a vacant residential structure on the southern portion of the site along Mission Road, two occupied residential structures and miscellaneous accessory buildings on the northern portion of the site. Development Policies related to South San Francisco BART Station Area In the past 15 years, the City has developed a vision for the SSF BART area to transform into a transit- supportive neighborhood. Following is a discussion of specific policy documents that create the vision for the subject property, which is an important transitional location between the single-family neighborhood to the south and east and the SSF BART station. 1999 General Plan – BART Station Area The South San Francisco General Plan was adopted in 1999; at this time the SSF BART Station location was known, but construction had not been finalized. The General Plan created specific policies related to the development around the planned station, including: Guiding Policy 3.4-G-3. Develop the South San Francisco BART station area as a vital pedestrian- oriented center, with intensity and mix of uses that complement the area’s new role as a regional center. Implementing Policy 3.4-I-5. Establish transit-supportive development requirements for the approximately eight-acre station area that include:  Designation of the area as a transit-overlay zone, with specific development requirements established in the Zoning Ordinance;  Transit-oriented design and development standards that address pedestrian scale, comfort and safety, including maximum setbacks or “build-to” lines, and building transparency requirements;  Inclusion of child care facilities;  Prohibition on auto-oriented and drive-through establishments; and  Minimum density and development intensity requirements. 115 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 3 of 15 Implementing Policy 3.4-I-8. Require any new development/redevelopment within ½ mile of the BART station at a density of no less than 30 units per net acre for residential uses, or an FAR of 1.5 for non-residential uses, or an appropriate combination of the two. Maintain higher intensities where specified otherwise in the General Plan. South San Francisco BART Transit Village Plan Per the General Plan Implementing policies, the South San Francisco BART Transit Village Plan (“Transit Village Plan”) was adopted in 2001, with an intent to provide a clear set of design regulations for development within about a ½ mile radius from the BART station. The Transit Village Plan envisions Mission Road as a street with wider sidewalks, street trees and lighting similar to other areas of the Transit Village, and with housing fronting the sidewalks that is of a slightly higher intensity than the single family homes that currently exist, to create a visual and physical buffer between Mission Road activity and the Sunshine Gardens neighborhood behind, as well as to reduce the number of conflict points along Mission Road, by reducing the number of curb cuts. Housing Element Opportunity Sites The Housing Element is one of the seven State-mandated Elements of the General Plan. Unlike other elements, the Housing Element must be updated by deadlines set by the State; the City is currently in the process of updating the Housing Element for the housing cycle of 2015-2022. The Housing Element is the blueprint for future housing development in the city and includes goals, policies, and programs that direct residential decision-making. The Housing Element is required by state law to identify how and where the housing needs of each community will be met. For the upcoming housing cycle, the City of South San Francisco has a Regional Housing Needs Allocation (“RHNA”) of 1,835 units. To show that the City has properly zoned land to meet the RHNA numbers, the City is required to identify adequate opportunity sites throughout the jurisdiction. The available site inventory focuses on sites with near-term development potential, typically where the site is currently vacant or highly underutilized. In both the current and draft Housing Elements, the Transit Village Plan area was identified as providing many potential opportunity sites, including the subject site. Assuming a density of 30 dwelling units per acre, consistent with densities allowed within the Transit Village corridor, the site was identified as being able to accommodate up to 47 units. DISCUSSION Project Overview In keeping with the basic policy direction discussed above, the applicant is proposing a medium-density residential development consisting of 31 for-sale townhome-style condominiums on the lower section of the site, accessed from Mission Road and Edgewood Ave, and 4 single-family style condominium homes on the upper section of the site, accessed from Baywood Ave. 116 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 4 of 15 Figure 2: 1256 Mission Road Site Plan On the lower portion of the site, the 21 townhome-style condominiums provide 3 bedrooms and range in size from 1,350 – 1,700 square feet, with a two car garage in either a tandem or side by side configuration. The single family homes on the upper portion of the site provide between 3 and 5 bedrooms and range in size from 1,900 – 2,600 square feet, with a one- or two-car garage and a driveway to provide additional parking area. Building Architecture The townhome-style condominiums are designed as 3-story attached units, with 4-7 units per building. The architecture is contemporary, using massing and material changes to differentiate between separate units and to give cohesion to the overall development. The primary materials include stucco and horizontal hardi- plank siding, with the materials alternating vertically to identify individual units. The buildings are designed with flat roofs to minimize the total apparent height of the buildings. Figure 3. Townhome Architecture 117 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 5 of 15 The single family homes are 2-story detached units, with traditional residential architecture to be in keeping with the surrounding single-family neighborhood. The material palette is consistent with that of the townhome-style condominiums, with stucco and horizontal siding as the primary materials. Sheet CB of the project plans (Exhibit D of the Entitlements Resolution) includes a graphic depiction of the colors and other materials. Figure 4: Single Family Architecture Circulation Vehicular traffic access is provided at three separate locations to minimize new trip generation from any singular access point. The primary access point is Mission Road, which would provide vehicular access to 21 of the townhome units and to 3 guest parking spaces. Edgewood Ave, which currently terminates at the site boundary, is proposed to be extended to provide vehicular access to the remaining 10 townhome units, as well as up to 10 guest parking spaces. The 4 single family units and 4 additional guest parking spaces would be accessed from Baywood Ave. Pedestrian circulation is provided throughout the site to allow easier access to other uses within the development, as well as to the public sidewalks along Mission Road and Edgewood Ave, which in turn allow direct pedestrian access to amenities within close proximity, including the SSF BART Station, neighborhood schools, Centennial Way Linear Park and neighborhood commercial centers. Landscaping/Open Space Landscaping for the site is primarily provided along the Mission Rd frontage and along the pedestrian walkways throughout the project, including the Paseo between the second and third row of townhomes. Each of the townhomes will have a private patio located adjacent to the front entrance stairs, while the single-family homes will have separate yards. The applicant is also proposing a small playground adjacent to the Edgewood Ave extension aisle, which will provide communal open space for the development. Staff has included a condition of approval requiring the landscaping along Mission Rd to be consistent with the Transit Village Plan, which envisions improved streetscape aesthetics and pedestrian circulation throughout the Transit Village corridor, including street trees planted 30-feet on center. 118 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 6 of 15 Southern Live Oaks are proposed as the street trees along Mission Rd, the short frontage on Baywood Ave, and on the Edgewood Ave extension. Other trees proposed within the interior of the site include Strawberry Trees, Hopseed, New Zealand Christmas and Flowering Plum. Path lights, benches and other street furniture would be provided throughout. Sheets L.2-3 of the Project Plans (Exhibit D of the Entitlements Resolution) includes images of the proposed landscape species. AFFORDABLE HOUSING AGREEMENT The proposed development is obligated to provide twenty percent (20%) of the proposed dwellings as affordable to low and moderate income households (SSFMC 20.380 “Inclusionary Housing Regulations”). The applicant is proposing to construct 35 dwellings, and therefore the applicant is required to restrict a minimum of 7 units to fulfill the affordable housing obligation. A Draft Affordable Housing Agreement between the applicant and the City has been prepared and is attached for review. The Affordable Housing Agreement has been drafted to comply with the requirements contained in SSFMC 20.380. City Ventures has requested two incentives for affordable housing: a height increase for a portion of the project site and allowance to use Architectural Prototype 5 Guidelines for all of the townhome units. In accordance with State Density Bonus Law (Govt. Code Section 65915(d)(2)(B), the applicant is entitled to a density bonus and at least two incentives if the project includes a minimum of 20% of the units restricted to lower income households, and if the incentives assist in ensuring the affordability of the project. The applicant is requesting two incentives, and staff supports the requested incentives outlined below, since they are consistent with State law, will assist in ensuring the affordability of the project, and should not result in significant adverse impacts. Incentive 1 – Maximum Height Allowance The Transit Village Plan District includes height zones; for the subject property the maximum height allowed is 35 feet for a depth of approximately 93 feet from Mission Road (which is the depth of existing parcel 011- 171-500, where the vacant residence is located). The remaining portion of the lot within the TV-RM district has a maximum height of 25 feet. It should be noted that the height allowance in the surrounding single- family neighborhood is 28 feet, so while many of the surrounding homes in the area are only one-story, the proposed height would not be significantly greater than what is allowed in the surrounding neighborhood. Allowing all of the townhomes to be up to 3-stories in height results in a greater number of 3-bedroom units, better integrating the townhome units with the existing neighborhood. In order to design a project that provides larger units and meets the required residential densities, the applicant has requested an exception to allow the 35-foot height limit to be applicable to all of the townhome units. Figure 5 – Proposed Height Limit Areas 119 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 7 of 15 Incentive 2 – Applicable Architectural Prototypes The Transit Village Plan also includes Architectural Prototype Design Guidelines which identify architectural design and site planning principles that are appropriate for specific areas of the plan area. For the subject site, the Mission Road frontage is identified as Architectural Prototype 5, while the remainder of the property is identified as Architectural Prototype 6. Following are the differences between the two prototypes: Architectural Prototype 5 – Townhouse with rear-accessed tuck-under or surface parking accessed from a shared driveway off of Principal Street or private Neighborhood Street. Architectural Prototype 6 – Townhouse facing Principal Street with front loaded parking, or Townhouse in back of large parcel with front loaded parking off of private Neighborhood Street. Prototype 5 results in a denser product-type that requires less total site area, while Prototype 6 is only slightly denser than the surrounding single-family neighborhood. In order to develop a project closer to the minimum density requirements contemplated by the General Plan, including the current Housing Element update, the applicant is requesting an incentive allowing Architectural Prototype 6 to be the applicable design guidelines for the lower portion of the project site where the 21 townhome-style condominium units are proposed to be located. 120 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 8 of 15 ZONING CONSISTENCY The existing parcels that are identified as 1256 Mission Road and 1262 Edgewood Way are located in the Transit Village Medium Density Residential (“TV-RM”) Zone District, while the third parcel at 1261-1267 Baywood Ave is located within the Low Density Residential (RL-8) Zone District. The applicant is proposing a Tentative Map that would create two new parcels; Lot 2 would include area that is in both the TV-RM and RL-8 zoning districts. SSFMC Section 20.300.003 “Development on Lots Divided by District Boundaries” includes regulations that would be applicable to Lot 2. Generally, where a lot is divided by a zoning district boundary, the regulations applicable to each district shall be applied to the area within the district; however, the minimum lot area, width, and frontage requirements of the district that covers the greatest portion of the lot area shall apply to the entire lot. The greatest portion of Lot 2 is within the TV-RM district, and therefore the TV-RM minimum lot standards have been applied to all of Lot 2. For the building development standards, the applicant has designed Unit 35, adjacent to Baywood Ave, to meet the standards of the RL-8 zoning district, while Units 32-34 at the rear of Lot 2 meet the standards of the TV-RM zoning district, including the Architectural Prototype 6 Design Guidelines. Upon construction, the proposed project will entail a medium-density residential development that fulfills all of the purpose statements of the TV-RM District: the project will provide medium density housing in close proximity to the SSF BART station; the development would serve as a physical and visual buffer and will provide a transition between the SSF BART station and the existing Sunshine Gardens neighborhood; and the project would assist in supporting additional neighborhood development and/or redevelopment along Mission Road. General Development Standards Subject to the Inclusionary Housing incentives requested by the applicant, the proposed project would meet the development standards of the TV-RM district, as well as the RL-8 district for the applicable portion of the site, as shown below: Development Regulations for Transit Village – Medium Density Residential TV-RM RL-8 Proposed Building Scale – Intensity of Use Min. Lot Area 5,000 sf 5,000sf 58,109sf/17,642 sf Min. Lot Width 50’ Complies Min. Lot Depth 80’ Complies Max. Density (units per acre) 30 8 26.4 Max. Lot Coverage (%) 75% 50% 44%/21% Max. Floor Area Ratio 0.50 Complies Building Form and Location Max. Building Height 35’ 28’ 35’/25’1 Max. # of stories 2 Complies Min. Yards – Front 15’ 15’ Side 5’ 5’ 5’ Rear Yes 20’ Complies Build-to Lines See Figure 20.250.004(E) Complies 121 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 9 of 15 Pedestrian Orientation Building Entries Yes Yes Complies Vehicle Accommodation Driveway Restrictions Yes Yes Pedestrian Walkways Yes Yes Complies Other Standards Bicycle Amenities Yes Complies Trash Enclosures Yes Complies Screening of Mech Equip Yes Yes Complies 1 – Subject to Affordable Housing Incentive 1- Maximum Height Allowance, which allows the maximum height to be 35 feet for the southern portion of the site where the townhome-style condominiums would be located. Parking Standards For all of the residential units within the TV-RM district, SSFMC Table 20.250.004(N) “Required Parking Spaces, TV Districts” requires a minimum of 1 and a maximum of 2 parking spaces per residential unit. The project would provide each unit with a maximum of 2 parking spaces, within the range required. For the unit within the RL-8 district, SSFMC Table 20.330.004 “Required On-Site Parking Spaces” requires 2 spaces per unit for homes up to 2,500 square feet and less than 5 bedrooms. The unit within the RL-8 district is currently proposed to have 2,591 square feet in total area with a 2 car garage. Staff has included a condition of approval (A-11) requiring that the size of the house be reduced to no more than 2,499 square feet prior to issuance of building permits for the project. The Transit Village Plan regulations do not include any specific requirements related to guest parking, but SSFMC Chapter 20.330 “Off-Street Parking” specifies that projects with more than 10 units must provide 1 guest parking space for every 4 units. Based on this ratio, the Project would be required to provide 8 guest parking spaces. During initial community meetings that the applicant held prior to application submittal, the surrounding neighborhood expressed a concern related to providing adequate guest parking. Based on parking concerns from the neighborhood, the applicant proposes to provide significantly more guest parking spaces, with a total of 17 guest parking spaces throughout the site; 3 adjacent to the Mission Road access driveway, four 4 adjacent to the Baywood Ave access driveway, and the remaining 10 located on the north side of the Edgewood Ave extension. Circulation As stated above, the project proposes 3 vehicular access points; Mission Road for 21 of the townhome units, Edgewood Ave for the remaining 10 townhome units, and Baywood Ave for the 4 single-family units. Based on concerns raised by neighbors along Edgewood Ave, the applicant proposes a vehicle entrance gate at the Edgewood Ave entrance. General Plan Implementing Policy 2-I-8 includes language related to gated communities, as follows: 2-I-8 As part of establishment of design guidelines and standards, and design review, improve the community orientation of new development. A community orientation calls for greater attention to the relationship between residences, streets and shared spaces, and does not require sacrifice of privacy or amenities. Specific steps could include: 122 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 10 of 15  Not permitting gated developments;  Allowing sound walls only along freeway or arterial streets, as established in Chapter 4: Transportation; and  Requiring parking in all non-industrial and business and technology park areas to be tucked behind buildings. Per the intent of the first bullet point above, staff has included a condition of approval (A-11) requiring the applicant to remove the Edgewood Ave vehicle entrance gate prior to issuance of building permits. Front Yard Fence Fences and walls located in the front or street-facing side yard are regulated by SSFMC Section 20.300.005(A)(1): “Fences and walls may be a maximum of three feet high within required front or street-facing side yards. Visually transparent and non-opaque fences over three feet high may be allowed in required front and street-facing side yards, subject to approval of a Minor Use Permit.” The applicant is proposing to construct a 5 foot 2 inch tall fence within portions of the front yard setback to separate private patios in front of each unit along Mission Road. To allow a fence taller than the 3 foot height limit within the required front yard, a Minor Use Permit would typically be required; because the Planning Commission is reviewing other aspects of the development application, the fence height application is being processed as a Conditional Use Permit. The fence will consist of a stucco retaining wall for a height of 2 feet and then a horizontal wood fence for the remaining 3 feet 2 inches. The design will provide a non-opaque barrier that is in keeping with the architecture of the buildings and provides adequate visibility for both pedestrians and vehicles entering/exiting the site. DESIGN REVIEW BOARD The Design Review Board reviewed the project at their meeting of October 16, 2014. The Board was supportive of the overall project, with the following general comments: 1. Revise the unit floor plans to meet the minimum interior dimension requirements for garages (10 feet by 20 feet per space). 2. Revise the site plan to include an internal pedestrian connection within the development to connect Mission Road and Baywood. 3. The project is lacking adequate usable open space; consider revising the site plan to provide more usable area (i.e. play structure, amenity building). 4. Revise the building elevations on Sheets A5.0 and A5.1 to have consistent roof shapes. 5. Revise the landscape plan to incorporate species that will survive the SSF climate; avoid Quercus Ilex or Muhlenbergia rigens. Add street trees that will be in scale with the proposed building height along Mission Road frontage. 6. Contact the Fire Department to determine if alternative paving can be used in non-circulation areas (including hammer-head turn). 123 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 11 of 15 The Project Plans attached to this staff report (Exhibit D of the Entitlements Resolution) have been modified in response to comments made by the Design Review Board. Comment 2 above was related to providing a pedestrian connection for children that may live in the development to a neighborhood playground at Sunshine Gardens Elementary school, as the site plan reviewed by the Design Review Board did not include any play areas. Due to the change in elevation between the northern and southern portions of the site, creating an accessible connection from the southern portion of the site to Baywood Ave would not be possible without significant impacts to the overall site plan. Therefore, the applicant has removed two guest parking spaces along the Edgewood Ave extension and provided a small play area for use of tenants of the property. The applicant has also provided direct pedestrian connections from the development to each of the adjacent streets. Staff is of the opinion that the applicant has adequately addressed all of the specific comments. NEIGHBORHOOD MEETING A neighborhood meeting was held on November 5, 2014 in which approximately 20 residents attended. Concerns raised at the meeting included the following:  Strong desire to not allow extension of Edgewood Ave into project site, with preference that all townhome-style condominium units have vehicular access from Mission Road only.  Too many guest parking spaces provided along Edgewood Ave extension.  Questions related to how affordable unit tenants are selected  3-story height allowance will impact privacy of existing residences. Edgewood Ave Extension The most prominent comment at the neighborhood meeting was the concern related to the extension of Edgewood Ave. Subsequent to the meeting, the applicant prepared a site-plan that depicts how the overall project would be affected by providing the southern portion of the site with vehicular access only from Mission Rd. Figure 6 – Alternative Site Plan not extending Edgewood Ave As depicted, the proposed pedestrian walkway between buildings would be widened into a central access road with spurs providing vehicular circulation to the townhome units. The primary visual impacts to the 124 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 12 of 15 southern portion of the site are at the second row of townhomes, where the end townhome units and the landscaped pedestrian walkways are replaced with the central access road, which negatively impacts the appearance of the development from Mission Rd. This configuration also requires more of the site to be graded to meet the required access slopes. In order to continue to meet the minimum density requirements, the 3 units that would be removed due to the road widening would be incorporated into the northern portion of the site, with the replacement of the 3 single-family detached homes at the rear of the northern portion of the site with a row of 6 townhome-style homes. To allow such a configuration, the affordable housing incentives to allow a height increase for a portion of the project site and to allow the use of Architectural Prototype 5 Guidelines for all of the townhome units would have to be extended for the entirety of the parcels within the TV-RM district. Under this scenario, 28 units would be accessed from Mission Rd, and the remaining 7 units would be accessed from Baywood Ave. One alternative that would allow density to be maximized on the southern portion of the site and would minimize the need for traffic access from other neighborhood streets would be to allow residential construction above podium parking; however, this alternative would require a Zoning Amendment and would not be in keeping with the surrounding single-family neighborhood. When the Transit Village Plan was adopted in 2001, it envisioned Edgewood Ave being extended to provide a better vehicular connection to the subject site and neighborhood. To minimize overall vehicular impacts and to provide housing densities that meet the City’s requirements, the applicant is proposing only to extend Edgewood Ave to access the 10 townhome units on this portion of the property. According to the Institute of Transportation Engineers (“ITE”) Trip Generation Manual, 9th Edition, the average single-family home generates approximately 10 vehicle trips per day, while the average townhome/condominium generates approximately 5 vehicle trips per day. Currently, there are 16 single-family homes on the dead-end block of Edgewood, which according to ITE standards would result in approximately 160 vehicle trips per day. The 10 townhomes proposed to have access from Edgewood would result in approximately 50 additional vehicle trips on the impacted block. Staff believes that providing vehicular access for 10 townhome units via the extension of Edgewood Ave results in a project that better conforms to the overall vision for the TV-RM district along Mission Rd than the alternatives mentioned above, with less significant impacts to the overall neighborhood. Guest Parking Spaces In regards to guest parking spaces, it would be possible to revise the configuration of the Edgewood Ave guest parking spaces so that all were parallel rather than perpendicular spaces. This would reduce the overall number of guest spaces to no more than 6 along Edgewood Ave, and 13 for the entire site, which would continue to comply with the overall requirement. Affordable Housing Selection For the project’s affordable units, the applicant will work with the City and the City’s first time homebuyer administrator to broadly announce the availability of the units, prepare a preliminary application, qualify eligible buyers and conduct a lottery to select the buyers. In addition to income requirements, staff will establish other eligibility criteria in consultation with the City Council. 125 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 13 of 15 Existing Development Privacy Impacts The applicant has indicated in the project plans that window locations on the east side of the townhomes were located in such a way as to minimize direct visibility between the new units and existing residences. TENTATIVE SUBDIVISION MAP A Tentative Subdivision Map is proposed to create two separate lots with a total of 35 residential condominium units; 31 units on Lot 1 and 4 units on Lot 2. The City Engineer has reviewed the proposed map and determined that it complies with the City Standards and the State Subdivision Map Act. In conjunction with the Tentative Subdivision Map, the applicant has also submitted Covenants, Conditions and Restrictions (CC&Rs) for the subdivision; these CC&Rs include Use Restrictions for each of the units, including regulations related to window coverings, antenna restrictions, maintenance of animals and other similar items. GENERAL PLAN CONSISTENCY The General Plan Land Use Designation for the site is Medium Density Residential. As discussed above in the Background section, the General Plan includes specific policies related to development within the immediate vicinity of the SSF BART Station Area, in an effort to create “a vital pedestrian-oriented center, with intensity and mix of uses that complement the area’s new role as a regional center.” The proposed project will conform to the General Plan Land Use Policies by creating medium-density residential units that emphasize a pedestrian-oriented development along Mission Road in keeping with the development intensity requirements, including residential density. The project also provides a well- articulated and visually engaging development that implements the goals of the Transit Village Plan. The project design is consistent with the City’s Design Guidelines as it relates to building design, form and articulation. Additionally, the proposed project complies with the General Plan Housing Element, which identifies the subject site as a near-term housing opportunity site. SUSTAINABILITY / CLIMATE ACTION PLAN The proposed project is consistent with recent sustainability regulations that have been adopted at both the State, regional and local levels. Examples include Senate Bill 375, passed in 2008, which aims to lead to more efficient communities that provide residents with alternatives to using single occupancy vehicles. Projects that link higher density development to transit are in keeping with this goal. At the local level, the Transit Village district aims to create a pedestrian-oriented center, with intensity and a mix of uses. The applicant is proposing a medium-density residential project that will be located adjacent to a major transit station and within walking distance of regional and local bus routes, consistent with all of the above mentioned sustainability goals. The applicant has indicated that its projects are designed to be all-electric, with solar-panels installed on all homes. Stated goals of the applicant include garages pre-wired for electric car charging stations, energy efficient appliances, and Smart Home Technology throughout to allow homeowners to understand and be in control of energy usage. 126 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 14 of 15 The City adopted a Climate Action Plan (“CAP”) in February 2014; the CAP serves as South San Francisco’s greenhouse gas reduction strategy. The CAP includes requirements applicable to new development projects; following are the specific requirements applicable to the proposed project.  Require all new development to install conduit to accommodate wiring for solar.  Encourage the use of high-albedo surfaces and technologies as appropriate, as identified in the voluntary CALGreen standards.  Revitalize implementation and enforcement of the Water Efficient Landscape Ordinance by undertaking the following:  Establishing a variable-speed pump exchange for water features.  Restricting hours of irrigation to occur between 3:00 a.m. and two hours after sunrise.  Installing irrigation controllers with rain sensors.  Landscaping with native, water-efficient plants.  Installing drip irrigation systems.  Reducing impervious surfaces. In addition to the requirements listed above, the CAP includes additional measures that are encouraged in order to help with the City’s greenhouse gas reduction efforts:  Integrate higher-density development and mixed-use development near transit facilities and community facilities, and reduce dependence on autos through smart parking practices.  Work with developers of multi-family properties and nonprofit groups to maximize energy efficiency in new construction.  Encourage the use of CALGreen energy efficiency measures as a preferred mitigation for CAP streamlining.  Promote on-site renewable energy or distributed generation energy systems in new and existing residential and nonresidential projects. Encourage developers of multi-family and mixed-use projects to provide options for on-site renewable electricity or install distributed generation energy systems, similar to the statewide Homebuyer Solar program. As currently designed, the proposed project will comply with many of the standards above, and staff will continue to work with the applicant to incorporate as many sustainable features as possible into the project. Staff has included Condition of Approval A-16, which requires the applicant to revise the project drawings to include the CAP requirements stated above subject to Chief Planner review and approval prior to the issuance of a building permit. Subject to the conditions of approval, the project is consistent with the City’s CAP. ENVIRONMENTAL REVIEW The proposed project has been determined to be categorically exempt from environmental review under the provisions of CEQA (Class 32, Section 15332: In-fill Development Projects), which provides an exemption for in-fill development projects which meet the following conditions: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. 127 Staff Report Subject: 1256 Mission Road – Medium Density Residential Development Date: December 4, 2014 Page 15 of 15 b. The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered, rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. e. The site can be adequately served by all required utilities and public services. A “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum analyzing conformance with these conditions was prepared by Urban Planning Partners Inc. and is attached to this staff report (Attachment 2). CONCLUSION The proposed project seeks to transform a largely vacant, underutilized site into a 35-unit high-quality residential development that furthers the City’s vision for transit-oriented development in close proximity to the South San Francisco BART Station, in keeping with the vision of the General Plan, including the Housing Element, and the Transit Village Plan District standards and guidelines. Therefore, staff recommends that the Planning Commission adopt a Resolution recommending that the City Council approve the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement based on the attached draft findings and subject to the attached draft conditions of approval. By: Billy Gross, Senior Planner Attachments: 1. Planning Commission Entitlement Resolution with Exhibits a. Conditions of Approval b. Tentative Subdivision Map c. Affordable Housing Agreement d. 1256 Mission Road Project Plans, dated November 12, 2014 2. CEQA Categorical Exemption Analysis for 1256 Mission Road Project, dated November 17, 2014 3. Design Review Board Minutes – October 21, 2014 2363971.1 128 December 4, 2014 Minutes Page 1 of 5 MINUTES December 4, 2014 CITY OF SOUTH SAN FRANCISCO REGULAR PLANNING COMMISSION CALL TO ORDER / PLEDGE OF ALLEGIANCE PRESENT: Chairperson Martin, Vice Chairperson Wong, Commissioner Giusti, Commissioner Khalfin, Commissioner Ochsenhirt, Commissioner Ruiz and Commissioner Zemke ABSENT: STAFF PRESENT: Chief Planner Kalkin, Senior Planner Gross, Senior Planner Rozzi, Assistant City Attorney Rosenberg, Administrative Assistant Cabano, Principal Engineer Bautista, Lieutenant McPhillips, Sergeant Plank and Fire Marshal DaSilva AGENDA REVIEW Chief Planner Kalkin stated that Item 1 on the Consent Calendar would be continued to the next meeting. ORAL COMMUNICATIONS CONSENT CALENDAR 1. Approval of Regular Meeting Minutes of November 20, 2014. PUBLIC HEARING 2. 1256 Mission Subdivision CUNEO ANTONIO/Owner City Ventures/Applicant 1256 MISSION RD P14-0081: UP14-0009, DR14-0049, SA14-0001 & AHA14-0001 Design Review, Tentative Subdivision Map and Affordable Housing Agreement to construct a new residential development consisting of 31 Townhomes and 4 Single Family Dwellings, authorize Density Bonus Incentives for the southern portion of the site to allow an increase in allowable building height from 25-feet to 35-feet and to allow the use of one architectural prototype, and Use Permit to allow a 5 foot 2 inch tall fence in the required front yard at 1256 Mission Road in the Transit Village Residential Medium Density (TV-RM) and Low Density Residential (RL-8) Zoning Districts in accordance with SSFMC Title 19 (Subdivisions) and Chapters 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 and 20.490, and determination that the project is categorically exempt from CEQA. Design Review, Tentative Subdivision Map and Affordable Housing Agreement to construct a new residential development consisting of 31 Townhomes and 4 Single Family Dwellings, authorize Density Bonus Incentives for the southern portion of the site to allow an increase in allowable building height from 25-feet to 35-feet and to allow the use of one architectural prototype, and Use Permit to allow a 5 foot 2 inch tall fence in the required front yard at 1256 Mission Road in the Transit Village Residential Medium Density (TV-RM) and Low Density Residential (RL-8) Zoning Districts in accordance with SSFMC Title 19 (Subdivisions) and Chapters 20.080, 20.250, 20.300, 20.310, 20.330, 20.380, 20.390, 20.460, 20.480 and 20.490, and determination that the project is categorically exempt from CEQA. ROLL CALL / CHAIR COMMENTS 129 December 4, 2014 Minutes Page 2 of 5 Chairperson Martin opened the public hearing and called for the staff report. Senior Planner Gross informed the Commission of additional correspondence received after the staff report was finalized. Letters from the public were received from Christy Morgan and Gregory Young, commenting on the project. The applicant, City Ventures, also submitted correspondence dated December 3rd and December 4th; copies of all of the additional correspondence was provided to the Commission. He further explained that the City has had a vision related to development near the SSF BART station, including policies in the General Plan, SSF BART Transit Village Plan and the Housing Element. He discussed how the proposed project complied with adopted City policies and development standards, and then discussed specific aspects of the project, including the proposed extension of Edgewood Way into the project site to access 10 townhome units, the affordable housing agreement and requested incentives for additional height and for a change in architectural prototypes, and the concerns with the adjacent property owner at 1256 Edgewood Way related to impacts to an existing driveway. Commission inquired about the requirement for permit parking in the SSF BART station area. Sgt. McPhillips stated that the project is within the permit parking area, and permits can be issued to all registered vehicles for residents within the development. Samantha Rothstein, representing City Ventures, introduced her project team, including Ben Besley with City Ventures, Ron Jones and Scott Lockwood, architects, and Todd Cramer, C2G Civil Engineers. She stated that City Ventures is a green developer that specializes in developing infill sites in neighborhoods and gave a brief presentation informing the Commission that the plan incorporates the feedback from the neighbors, the Design Review Board and staff. Ron Jones, architect, gave a more elaborate explanation of the architecture. The Commission inquired whether City Ventures had any conversations with PG&E regarding their easement to the north; Mrs. Rothstein stated that this site plan does not impinge on the PG&E easement so they have not been in contact. Chairperson Martin asked if there were any speakers on the project. Speaking in opposition:  Michelle Zacione, legal counsel representing Gregory Young, the owner of the adjacent property at1256 Edgewood Way, stated that her client opposes the project because it unreasonably interferes with private use of his property by changing/re-routing the existing driveway access to Baywood Ave, and opposes the requested incentive for increased height.  Laura Fanella (1236 Edgewood Way) opposes the height concession and would like the City to reconsider allowing access from Edgewood Way.  Jim Scott (1224 Edgewood Way) opposes allowing access from Edgewood Way and would like the development to follow the current style homes (single two-car garage homes) instead of townhomes. He also expressed concern for safety.  Adam & Mary Ornellas (1243 Edgewood Way) expressed safety concerns with opening the access through Edgewood Way.  Joseph Bacigalupi (1237 Edgewood Way) expressed concerns with overflow parking in front of the existing homes on Edgewood Way and opposed allowing access from Edgewood.  Ona Bacigalupi (1237 Edgewood Way) expressed concerns that property values of existing homes on Edgewood Way would decrease with additional development access via Edgewood Way.  Donald Wood opposes opening access to Edgewood Way. 130 December 4, 2014 Minutes Page 3 of 5 Speaker in favor:  Evan Hendrix (103 Rosewood Way) likes the new growth in South San Francisco and supports the proposed development within the Transit Village. There being no more speakers the public hearing was closed. Commission comments/questions:  Commission understands the impact to existing views but stated that the City has to provide additional housing for future generations.  Commission agrees there will be impacts by this decision but there isn't enough housing. The City also needs to meet the housing goals mandated in the Housing Element.  Commission expressed support of housing within the Transit Village, as South San Francisco has produced jobs but not enough housing.  Commission expressed concern with the massing of the structures and the elevations along Mission Rd. Samantha Rothstein responded to the concern regarding the elevated porches along Mission Road, noting that the Transit Village Plan Design Guidelines recommend these features, and the project is attempting to comply.  Commission expressed concerns about the amount of tandem parking, noting that may put more pressure on use of guest parking spaces. Senior Planner Gross stated that the Transit Village Plan allows a minimum of 1 space per unit, but the development will provide more parking to meet market demands. He also stated that tandem parking is allowed by the Zoning Ordinance for all residential development sites. Since the site is within an 1/8 of a mile from BART, the need for parking should be reduced.  Commission asked about the paseo and expressed concern that the project does not provide enough open space for children to play or enough recreational area for the new residents. Ms. Rothstein explained that the paseo is located between the second and third row of townhomes, with a total width of approximately 32 feet. She explained that it is a central walk with landscaping, benches and common space. Additionally, there are patios on all of the homes. City Ventures has tried to intersperse a lot of open space throughout the development. Senior Planner Gross explained that this project is also subject to park in lieu fees which are required to be used within the geographic zone.  Commission inquired if multiple vehicular access points are preferable over a singular access from Mission Rd for public safety purposes. Fire Marshal DaSilva stated that both plans work but expressed that the proposed plan is more effective. Sergeant McPhillips concurred with the Fire Marshal.  Commission expressed concern with only having access from Mission Road from a congestion standpoint.  Commission inquired about the affordable housing. Senior Planner Gross explained there will be 7 affordable units and they will be interspersed throughout the development.  Commission asked if there is a difference in quality for the affordable units. Senior Planner Gross stated there is no difference in quality of the units.  Commission asked about location of satellite dishes and other mechanical equipment. Ms. Rothstein stated that the buildings are designed to screen all mechanical equipment behind the roof parapet.  Commission inquired about the specifics for affordable unit tenant selection. Senior Planner Gross responded that the specific selection criteria will be determined by the City Council.  Commission inquired about the amount of open space. Ms. Rothstein again explained the paseo concept and stated that a small playground area was added based on feedback from the Design Review Board and staff. She further explained that the most stringent requirement in the zoning ordinance is 150 sq. ft. per home and the proposed project exceeded the target. 131 December 4, 2014 Minutes Page 4 of 5  Commission asked about accommodating the older community as well. Ron Jones, architect, responded the development included lower floor units for accessibility and noted that all units also allow access through the garage.  Commission asked the developer about their approach to site design, and specifically about the Edgewood Way extension. Ms. Rothstein explained that the extension provides a more accessible site and better integrates the development as a part of the neighborhood. The extension of Edgewood Way also allows for more open space on the site than would be possible if access were only from Mission Road.  Commission stated that more housing creates more demand for transit. Motion--Commissioner Khalfin/Second--Commissioner Zemke: that the Planning Commission adopt a Resolution making Findings and recommending that the City Council approve P14-0081:UP14-009, DR14-0049, SA14-0001 and AHA14-0001 based on the attached revised draft Findings and subject to the attached revised draft Conditions of Approval. Approved (6-1) by the following roll call vote: Ayes: Commissioners Giusti, Khalflin, Ochsenhirt, Ruiz, Zemke and Vice Chair Wong; Noes: Chairperson Martin. 3. Temporary Use Permits City of South San Francisco- Owner/Applicant Citywide P07-0136: ZA14-0009 Zoning Text Amendment to SSFMC Chapter 20.340 to revise regulations and permitting for Temporary Uses citywide in accordance with South San Francisco Municipal Code Chapter 20.550. Chairperson Martin opened the public hearing and called for the staff report. Senior Planner Rozzi presented a brief staff report explaining that staff has identified a few issues within the Municipal Code that have created overlap between the special events chapter (SSFMC 6.48) and temporary use permit (SSFMC 20.340). Modifying the code will streamline review. Additionally, the current regulations have no allowance for temporary uses lasting longer than 30 days or more than four times per year, and no allowance for uses temporarily relocated or impacted by on-site construction. The benefit of this proposal would be to exempt special events as defined and addressed in Chapter 6.48, allow temporary uses to occur up to 12 times per year with approval of a Minor Use Permit, and allow uses temporarily relocated due to construction to operate in a temporary facility and/or location for up to a maximum of two years to promote economic development. There being no speakers, the public hearing was closed. Commission comments/questions:  Commission asked staff whether the City is responsible for locating areas for food truck events, which could benefit from this ordinance change. Senior Planner Rozzi stated that the City has broad zoning powers for where these types of uses could be located but typically these types of events are established and administered by professional event planning groups.  Commission expressed concern for parking impacts related to any food truck event for any location other than Orange Park. Senior Planner Rozzi stated that the City would want to discuss any type of event like this with downtown restaurants/merchants or potential stakeholders who could also have concerns, but parking would certainly be examined as part of any proposal. Motion--Commissioner Ochsenhirt/Second--Commissioner Giusti: that the Planning Commission make Findings and adopt a Resolution recommending that the City Council adopt an Ordinance amending the Municipal Code related to regulations and permitting for Temporary Uses. Approved by unanimous roll call vote (7-0) 132 December 4, 2014 Minutes Page 5 of 5 ADMINISTRATIVE BUSINESS 4. Re-appointment of Design Review Board Members Chief Planner Kalkin presented a brief staff report noting the Commission is charged with appointing the Design Review Board. She added that a recruitment was undertaken, but the only applications received were from the existing Design Review Board members. Consequently, the recruitment was extended until November 2014, but we still did not receive any applications for the one position that must be filled by a City resident who is also either a design professional, civil engineer or contractor. Noting that staff will continue to recruit for this remaining position, she requested that the Planning Commission consider the re-appointment of the Design Review Board members, noting that the current board provides invaluable design expertise to the City. Chairperson Martin inquired whether there were age restrictions to take this position because his recommendation would be to encourage college students to apply. Chief Planner Kalkin advised the Commission that there are requirements in terms of the minimum qualifications for board members, i.e. professional design people, civil engineers, contractors or someone with similar design expertise. Commissioner Khalfin asked for clarification regarding the South San Francisco resident. Chief Planner Kalkin stated that of the five Design Review Board members, one needs to be a South San Francisco resident. With the re-appointment, the South San Francisco resident position is still vacant. Motion--Commissioner Khalfin/Second--Commissioner Ruiz: that the Planning Commission re-appoint Design Review Board members, William Harris, David Nelson, Michael Nilmeyer and Robert Williams to an additional 4-year term in accordance with the provisions of SSFMC Section 20.440.005. Approved by unanimous roll call vote (7-0). ITEMS FROM STAFF Chairperson Martin inquired whether there would be a December 18, 2014 meeting. Chief Planner Kalkin responded affirmatively and informed the Commission that the Downtown Station Area Specific Plan is scheduled for that meeting. Chief Planner Kalkin advised that she had received a letter of resignation from Commissioner Ochsenhirt, effective December 11th, and thanked Commissioner Ochsenhirt for his services. Chairperson Martin also thanked Commissioner Ochsenhirt for his valuable service contribution to South San Francisco. ITEMS FROM COMMISSION Commissioner Ochsenhirt read his letter of resignation to the Planning Commission. Commissioner Khalfin thanked Commissioner Ochsenhirt for his guidance and stated that he truly benefitted serving with him. Vice Chairperson Wong thanked for his involvement in the community. ITEMS FROM THE PUBLIC ADJOURNMENT Chairperson Martin adjourned the meeting at 9:46 p.m. /s/Susy Kalkin /s/Carlos Martin Susy Kalkin Carlos Martin, Chairperson Secretary to the Planning Commission Planning Commission City of South San Francisco City of South San Francisco SK/pac 133 Attachment 5 Planning Commission Resolution 2754-2014 - Entitlements 134 RESOLUTION NO. 2754-2014 PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA A RESOLUTION RECOMMENDING APPROVAL OF A USE PERMIT, DESIGN REVIEW, TENTATIVE SUBDIVISION MAP AND AFFORDABLE HOUSING AGREEMENT, FOR A 35-UNIT RESIDENTIAL DEVELOPMENT AT 1256 MISSION ROAD IN THE TRANSIT VILLAGE MEDIUM DENSITY RESIDENTIAL ZONING DISTRICT. WHEREAS, Anthony Cuneo (“Owner”) and City Ventures (collectively “Applicant”) have submitted an application for development of a 35-unit residential condominium project on an approximately 1.7 acre site located at 1256 Mission Road, South San Francisco, California (“Project”); and, WHEREAS, Applicant seeks approval of a Use Permit, Design Review, Tentative Subdivision Map, and Affordable Housing Agreement for the Project; and, WHEREAS, approval of the Applicant’s proposal is considered a “project” for purposes of the California Environmental Quality Act, Pub. Resources Code § 21000, et seq. (“CEQA”); and, WHEREAS, the Project is categorically exempt under CEQA as a Class 32 Categorical Exemption for projects which are determined to be in-fill development, as set forth in greater detail below, and is consistent with the applicable General Plan and Zoning Ordinance requirements; and, WHEREAS, on December 4, 2014 the Planning Commission for the City of South San Francisco held a lawfully noticed public hearing to solicit public comment and consider the proposed entitlements, take public testimony, and make a recommendation to the City Council on the project. NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA”) and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco Municipal Code; the Project applications; the 1256 Mission Road Project Plans, as prepared by Hunt Hale Jones Architects, dated revised November 12, 2014; the 1256 Mission Road “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” Memorandum, as prepared by Urban Planning Partners Inc., dated November 17, 2014, including all appendices thereto; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s duly noticed December 4, 2014 meeting; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the Planning Commission of the City of South San Francisco hereby finds as follows: 135 A. General Findings 1. The foregoing recitals are true and correct. 2. The Exhibits attached to this Resolution, including the Conditions of Project Approval (Exhibit A), the Tentative Subdivision Map (attached as Exhibit B), the Affordable Housing Agreement (attached as Exhibit C), and the 1256 Mission Road Project Plans (attached as Exhibit D) are each incorporated by reference and made a part of this Resolution, as if set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of Chief Planner, Susy Kalkin. 4. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the Planning Commission, exercising its independent judgment and analysis, has recommended that the City Council find that the Project falls within the Categorical Exemption set forth in CEQA Guidelines Section 15332/Class 32, which exempts from the provisions of CEQA the construction of projects characterized as in-fill development, because it meets the following conditions: a. The project is consistent with the applicable General Plan designation (Medium Density Residential) and all applicable General Plan policies as well as with applicable Zoning Ordinance designation (Transit Village – Medium Density Residential) and regulations given that the site is planned and zoned for medium- density residential development within; and, b.The proposed development occurs within city limits on a project site of approximately 1.7 acres, which is less than the five acre maximum, and is surrounded by urban uses; and, c. The project has no value as habitat for endangered, rare or threatened species, which would be negatively impacted given that the site is relatively flat and is surrounded by urban uses; and, d.Approval of the project would not result in any significant effect relating to traffic, noise, air quality, or water quality, given that: a. General Plan Guiding Policy 4.2-G-10 exempts development within ¼ mile of the South San Francisco BART Station from any traffic level of service standards, and therefore no significant traffic level of service operation impacts would result from the proposed project; b. The project’s contribution to noise would not be significant subject to meeting the standards of South San Francisco Municipal Code (“SSFMC”) Section 8.32.30 and compliance with the construction noise control plan 136 measures identified in the “CEQA Categorical Exemption Analysis for 1256 Mission Road Project” memorandum; and, c. The project complies with the City’s adopted Climate Action Plan and the Bay Area Air Quality Management District’s significance thresholds screening criteria, and therefore the project would have a less-than-significant impact on air quality and greenhouse gas emissions. e. The site can be adequately served by all required utilities and public services. The Planning Commission also recommends that the City Council find that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. B. Use Permit 1. The proposed Project is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zone District and the Low Density Residential Zone District. The Project meets or exceeds all of the general development standards of the Transit Village – Medium Density Residential District, with the exception of the maximum building height and the front yard fence height in the Low Density Residential Zone District. However, the exception for the maximum building height is permissible and warranted by the City’s Zoning Ordinance, which allows an applicant to request an incentive to allow a modification to a zoning ordinance standard in return for the provision of certain types of affordable housing, which the applicant is providing. The proposed fence height is allowed per South San Francisco Municipal Code Section 20.300.005, which allows fences taller than three feet in a required front-yard subject to approval of a Minor Use Permit. 2. The proposed Project is consistent with the General Plan by creating a pedestrian- oriented medium-density residential development that emphasizes pedestrian-activity along Mission Road, provides a well-articulated and visually engaging development that implements the goals of the Transit Village Plan, and is consistent with the City’s Design Guidelines as they relate to building design, form and articulation. 3. The proposed use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements, because the proposed use is consistent with the existing uses in the vicinity of the site, including the commercial and residential. The project proposes medium-density residential uses on a site located in the City’s Transit Village Plan district, which is intended for this type of use. The General Plan has analyzed this type of use in the South San Francisco BART Station area, and concluded that such residential uses are not adverse to the public health, safety, or welfare. The proposed fence is designed to be transparent and allow views into and out of the property. As the proposed Project is consistent with other medium-density land uses in the Transit Village Plan area, approval of the Project will not be detrimental to the nearby properties. 137 4. The proposed Project complies with applicable standards and requirements of the City’s Zoning Ordinance, with the exception of the maximum height for a portion of the site and the maximum height of a portion of the fence within the required front-yard. The stated exceptions are permissible and warranted by the City’s Zoning Ordinance. The proposed Project is located in the Transit Village Plan District and, subject to the exception discussed above, meets the minimum standards and requirements for that district. 5. The design, location, size, and operating characteristics of the proposed Project are compatible with the existing and reasonably foreseeable future land uses in the vicinity because the Project proposes medium-density residential uses in the Transit Village Plan district, which is specifically intended for such uses. The proposed fence is in keeping with the aesthetic quality of the buildings on the site and allows views into and out of the property. 6. The site is physically suitable for the type of development and density proposed, as the medium-density residential use will benefit from being located in close proximity to the South San Francisco BART Station within the Transit Village Plan district, and the size and development is appropriate for the location and meets the City’s land use and zoning standards. 7. The Project is consistent with CEQA for the reasons stated in Finding A.4 above. C. Design Review 1. The Project, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because the Project has been designed as a medium-density residential project which will provide a pedestrian-friendly, transit-oriented environment with extensive landscaping and sustainability elements incorporated. 2. The Project, including Design Review, is consistent with the General Plan because the proposed medium-density residential development is consistent with the policies and design direction provided in the South San Francisco General Plan for the Medium-Density Residential land use designation by encouraging the development of a pedestrian-oriented development of a higher intensity within ½ mile of the South San Francisco BART Station. 3. The Project, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Project is consistent with the South San Francisco BART Transit Village Plan Design Guidelines. 4. The Project is consistent with the Use Permit for the reasons stated in Section B, above. 138 5. The Project is consistent with the applicable design review criteria in South San Francisco Municipal Code Section 20.480.006 (“Design Review Criteria”) because the project has been evaluated by the Design Review Board on October 16, 2014, and found to be consistent with each of the eight design review criteria included in the “Design Review Criteria” section of the Ordinance, and the Design Review Board. D. Tentative Subdivision Map 1. The proposed tentative subdivision map, including the proposed designs and improvements, are consistent with the City’s General Plan as set forth in Findings B.2 and C.2 above, and because the tentative subdivision map would facilitate the development of a medium density residential development that would not conflict with the Medium Density Residential Land Use designation. 2. The proposed tentative subdivision map is consistent with the standards and requirements of the City’s Zoning Ordinance and with the provisions of the Transit Village – Medium Density Residential Zoning District. 3. The tentative subdivision map complies and meets all of the requirements of Title 19 of the South San Francisco Municipal Code (“Subdivisions”), subject to the Conditions of Approval, and would allow for the granting of an exception for the driveway grade of the property at 1256 Edgewood Ave as discussed below, and is consistent with the requirements of the State Subdivision Map Act. a. The proposed Project would extend Edgewood Avenue onto the subject property as a private street to provide access to a portion of the residential development. In order to extend Edgewood Avenue, the existing driveway of the adjacent parcel at 1256 Edgewood Avenue would be required to be altered. An exception allowing the existing driveway at 1256 Edgewood Ave to be redeveloped at a grade greater than fourteen percent will not constitute a grant of special privilege inconsistent with the limitations upon other properties in the same vicinity because the existing driveway currently exceeds the maximum permitted grade and the proposed change in grade will not constitute a significant increase over the existing conditions. b.The steep slope along the western edge of the property at 1256 Edgewood Avenue creates a special circumstance that would deprive the property of privileges enjoyed by other properties in the vicinity if Title 19 were strictly applied. The existing driveway on the property is at a seventeen percent grade, and the proposed change in grade will not constitute a significant increase over the existing conditions. If the standards of Title 19 were strictly applied, it would not be possible to provide a driveway conforming to the maximum grade standards from the existing access 139 easement adjacent to Edgewood Avenue. c. The exception allowing the existing driveway at 1256 Edgewood Avenue to be redeveloped at a grade greater than fourteen percent carries out the spirit and intent of Title 19 by providing a parcel affected by a steep topography that has historically had nonconforming driveway access with continued access that meets all other driveway design standards except the maximum grade. 4. The Project site is physically suitable for the type of development and density proposed, as the medium-density residential development will be located in the Transit Village area, and the size and number of residential units is appropriate for the location and meets the City’s land use and zoning standards. 5. The Project, including the proposed designs and improvements, are not likely to cause substantial environmental damage, or serious public health problems, since the project plans call for management of any hazardous materials that would exist by virtue of it being a former agriculture site, and since such impacts have been thoroughly evaluated as part of the CEQA process and determined not to exceed any stated thresholds of significance. 6. The design and improvements of the tentative subdivision map are not in conflict with any existing public easements. 7. The property is located in a developed, urban setting, and is not subject to a Williamson Act contract, on open space easement, a conservation easement, or an agricultural conservation easement. The surrounding land uses and resulting parcels would not support agricultural uses; the resulting parcels would result in residential development not incidental to commercial agricultural use of the land. NOW, THEREFORE, BE IT FURTHER RESOLVED that subject to the Conditions of Approval, attached as Exhibit A to this resolution, the Planning Commission of the City of South San Francisco hereby makes the findings contained in this Resolution, and recommends that the City Council adopt a resolution approving the Use Permit, Design Review, Tentative Subdivision Map and Affordable Housing Agreement for the Project. BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption. * * * * * * * I hereby certify that the foregoing resolution was adopted by the Planning Commission of the City of South San Francisco at the regular meeting held on the 4th day of December, 2014 by the following vote: 140 AYES: Vice Chairperson Wong, Commissioner Giusti, Commissioner Khalfin, Commissioner Ochsenhirt, Commissioner Ruiz and Commissioner Zemke NOES: Chairperson Martin ABSTENTIONS: ABSENT: Attest: /s/Susy Kalkin Susy Kalkin Secretary to the Planning Commission 141 Attachment 6 CEQA Categorical Exemption Analysis Memo 142 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx MEMORANDUM DATE: November 21, 2014 TO: FROM: Billy Gross, Senior Planner City of South San Francisco Planning Division 315 Maple Avenue South San Francisco, CA 94080 Lynette Dias, AICP, Principal Hayley Cox, Assistant Planner P. 510.251.8210 E. ldias@up-partners.com RE: CEQA Categorical Exemption Analysis for 1256 Mission Road Project I. INTRODUCTION This document provides a description of the 1256 Mission Road City Ventures Project (project) and evaluates the applicability of a Categorical Exemption to the proposed project in accordance with the California Environmental Quality Act (CEQA). Sections 21080 and 21084 of the California Public Resources Code exempt certain projects from the provisions of CEQA. Section 21084 specifically requires the CEQA Guidelines to include a list of these projects (found in Article 19, Categorical Exemptions), which are not expected to result in a significant effect on the environment. Projects classified as exempt are found in Section 15301 to Section 15333 of the CEQA Guidelines. As described below, the proposed project qualifies for a Categorical Exemption under Section 15332, In- Fill Development Project, in Article 19 of the CEQA Guidelines. Section 15332 states: A Class 32 consists of projects characterized as in-fill development meeting the conditions described in this section. (a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. (b) The proposed development occurs within city limits on a project site of no more than 5 acres substantially surrounded by urban uses. 143 TO: Billy Gross DATE: November 21, 2014 PAGE: 2 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx (c) The project site has no value as habitat for endangered, rare, or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality. (e) The site can be adequately served by all required utilities and public services. The following provides an overview of the proposed project and a discussion as to how the project meets the conditions of an in-fill development. II. PROJECT DESCRIPTION Location and Setting. The project site is located at 1256 Mission Road in the City of South San Francisco (City) in San Mateo County. The site consists of three parcels (APNs 001-171-130, 001-171-330, and 001- 171-500) which encompass approximately 1.7 acres, and is located in a commercial and residential area of South San Francisco. The project site is bounded by a Pacific Gas & Electric (PG&E) utility easement to the west, followed by single-family homes and El Camino High School; Mission Road to the south, along which various commercial properties and offices lie; single-family homes to the east; and Baywood Avenue followed by single-family homes to the north. Edgewood Way forms a cul-de-sac that abuts the site on its eastern side. Additionally, the project site is located less than ¼ mile from the South San Francisco Bay Area Rapid Transit (BART) station, which lies immediately west across Mission Boulevard. Existing Site Conditions. The majority of the project site is undeveloped, with the exception of some residential and vacant structures. The northern portion of the site consists of two occupied residential structures, a detached garage, several small sheds, concrete walkways, and patios. Abandoned cars are located west of the driveway area that connects Baywood Avenue and the two existing residences within the property boundaries. A vacant two-story structure is located on the southern property line along Mission Road, approximately mid-way between the southwest and southeast corners of the property. The central and southwestern portions of the site are mostly undeveloped, and old farming and tractor equipment resides near the southwest corner of the site. Overall, the site is mostly paved and is sparsely vegetated. Project Components. The project includes the development of 31 townhomes and 4 single-family homes for a total of 35 dwelling units (du).The townhomes would be constructed along Mission Road to the south and would cover a majority of the site. The single-family dwellings would be constructed at the northern end of the site along Baywood Avenue, replacing the two existing residential structures. III. EXEMPTION ANALYSIS Class 32 In-Fill Development. As described below, the project qualifies for a Categorical Exemption under Section 15332, In-Fill Development Project, in Article 19 of the CEQA Guidelines. 144 TO: Billy Gross DATE: November 21, 2014 PAGE: 3 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx The following provides a discussion as to how the project meets the conditions of an in-fill development project Categorical Exemption. The conditions are presented in italics, followed by a discussion about how the project meets each condition. (a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. The project is subject to the City’s General Plan, adopted October 1999, and the most recent 2009 Housing Element; the City’s Zoning Ordinance; the South San Francisco BART Transit Village Plan (“Specific Plan”), which was adopted by the City and incorporated into the General Plan in 2001; and the Transit Village Zoning District, which was adopted into the City’s Zoning Ordinance pursuant to the Specific Plan. Residential development on the project site is permitted by right under the Specific Plan, General Plan, and Zoning Ordinance. The project site is designated as Medium Density Residential in the General Plan, and falls into one of the five Transit Village zoning sub-districts established by the Specific Plan and adopted into the Zoning Ordinance—Transit Village Residential, Medium Density (TV-RM). The purpose of the TV-RM sub-district is defined as follows: The Transit Village Residential, Medium Density sub-district is intended to provide sites for medium density housing in close proximity to the BART station. Townhouse and multi-family units on Mission Road will serve as a physical and visual buffer and will provide a transition between the BART station and the existing Sunshine Gardens neighborhood. The TV-RM sub-district supports additional neighborhood development and/or redevelopment along Mission Road.1 The project would add townhome units along Mission Road, which, along with the proposed single family dwellings behind them, would contribute to an improved transition between the BART station and the existing Sunshine Gardens residences that lie directly north of the project site. The project would also contribute to the development and/or redevelopment along Mission Road identified in the zoning sub-district text above. Additionally, the project site is specifically identified as a “Housing Opportunity Site in the Transit Village Area” in the 2009 Housing Element. The project thus complies with the policy-based intentions for the site. Under the General Plan, Specific Plan, and Zoning Ordinance, the maximum density for the project site is capped at 30 units per acre2 unless a project thereon qualifies for a density bonus under the State Density Bonus law, which could increase the maximum density by another 25 percent.3 The 1 City of South San Francisco, 2014. Zoning Ordinance. Chapter 20.250 Transit Village Plan District. 2 While some of the land use maps in the 1999 General Plan show the Property as Medium Density Residential, having a density of 8.1-18 units per acre, the same maps also show the property as within a the one-quarter mile radius of the South San Francisco BART station with a minimum density of 30 units per acre. The Specific Plan and the 2009 Housing Element—both of which are part of the General Plan and expressly note that the project site has a 30 unit per acre maximum density—would supersede the potentially inconsistent maps. 3 City of South San Francisco, 2014. Zoning Ordinance. Section 20.390.003. 145 TO: Billy Gross DATE: November 21, 2014 PAGE: 4 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx project would include a minimum of 20 percent of the total units as restricted and affordable to low-income households, qualifying the project for a density bonus pursuant to section 20.390.003 of the Zoning Ordinance. The density bonus would also allow the project to a fixed number of concessions from development standards (which would not require amendments to the Zoning Ordinance or the General Plan). The development standard for height for the property is a maximum height of 35 feet along Mission Road and a maximum height of 25 feet on the remaining portions of the project site.4 The project would utilize a density bonus concession for building height, as the proposed townhome units would have a height of 35 feet but would extend beyond the area designated with a 35-foot maximum height into the area with a designated 25-foot maximum height. (b) The proposed development occurs within city limits on a project site of no more than 5 acres sub- stantially surrounded by urban uses. The 1.7-acre project site is within the city limits of the South San Francisco and comprises less than 5 acres. The site is surrounded on all sides by urban uses, including single-family homes, the South San Francisco BART Station, small office buildings, and railroad tracks. (c) The project site has no value as habitat for endangered, rare, or threatened species. The project site is currently used for residential purposes, but is mostly undeveloped with a vacant structure, a former greenhouse, tractor storage, several small storage sheds, two occupied multi- tenant residential structures, and a detached garage. The site has been disturbed by development and contains no substantial vegetation. The project site does not fall within any area deemed to contain sensitive species per State or federal legislation. According to the Open Space and Conservation Element of the City’s General Plan, the City contains two types of ecologically sensitive habitat: Habitat Conservation areas and wetlands. The project site falls in neither of these areas and has been explicitly identified as a site which does not require site-specific assessment of biological resources.5 As a result, the site has no value as habitat for endangered, rare, or threatened species. (d) Approval of the project would not result in any significant effects relating to traffic, noise, air qual- ity, or water quality. The project would not result in significant traffic, noise, air quality, or water quality impacts. The less-than-significant impacts of the project in these topical areas are discussed briefly below. Traffic. Policy 4.2-G-10 of the City’s General Plan exempts development within ¼ mile of the BART station from any traffic level of service (LOS) standards. Given the project site is within ¼ mile of the BART station and this policy, a traffic analysis was not completed. This policy allows the City to 4 City of South San Francisco, 2014. Zoning Ordinance. Section 20.250.004(D). 5 City of South San Francisco, 1999. Open Space and Conservation Element, pages 228 - 231. 146 TO: Billy Gross DATE: November 21, 2014 PAGE: 5 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx make a finding that no significant traffic level of service operation impacts would result from the proposed project. Though it is exempt from the City’s LOS thresholds, the project’s trip generation was estimated to provide some context to how traffic may change as a result of the project. With up to 31 town home units and 4 single-family units, the project would generate less than 200 daily trips and 15 AM or PM peak hour trips per the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition. This incremental increase would be negligible and even if the project was subject to the City’s LOS thresholds, the project would n ot likely result in any significant project impacts or contribute significantly to any cumulative impacts. Noise. Construction and operation of the proposed project would incrementally impact noise in the project vicinity. The City certified an EIR for the El Camino Real/Chestnut Avenue (ECR/Chestnut) Area Plan in 2011. This EIR evaluated proposed development of a greater intensity across Mission Road from the project site. The findings of the EIR are summarized below and used to support a conclusion that similar to development proposed as part of the ECR/Chestnut Area Plan, the proposed project would not result in any significant noise impacts. The 2011 EIR found that concurrent implementation of the ECR/Chestnut Area Plan and forecast development of residential and employment land uses in the region (which included development consistent with the General Plan for the project site) could result in increased noise, thereby contributing to increased noise levels in the ECR/Chestnut Area Plan area and its vicinity, including the project site. The 2011 EIR further found that the ECR/Chestnut Area Plan’s contribution was found to be less than considerable as the increase in noise levels with the proposed Plan was less than 3 dB compared to existing conditions, as discussed in greater detail in Section 3.5 of the 2011 EIR. Based on this finding, although the proposed project would also incrementally increase noise, as a result of project operation, the project’s contribution would not be significant. The ECR/Chestnut Area Plan EIR also found that construction activities associated with the Area Plan would be temporary in nature and related noise impacts would be short-term. The EIR acknowledged that since construction activities could substantially increase ambient noise levels at noise-sensitive locations, construction noise could result in potentially significant, albeit temporary, impacts to sensitive receptors. Per Section 8.32.030 of the Municipal Code, it is unlawful for noise to be generated in an area that exceeds the noise level standard for that area’s land use for a cumulative period of more than thirty minutes in any hour. Table 8.32.030, which lists these standards for each applicable land use category, is included below. Given this requirement, the project will prepare and implement a construction noise control plan that specifies the means and methods required to reduce the noise levels generated by construction activities to maximum extent practicable. The control plan will be prepared by a qualified noise professional and approved by the City prior to issuance of a building permit. A qualified professional is defined as a Board Certified Institute of Noise Control Engineering member or other qualified consultant or engineer 147 TO: Billy Gross DATE: November 21, 2014 PAGE: 6 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx Table 8.32.030 NOISE LEVEL STANDARDS Land Use Category Time Period Noise Level (dB) R-E, R-1 and R-2 zones or any single-family or duplex residential in a specific plan district 10 p.m. - 7 a.m. 50 7 a.m. - 10 p.m. 60 approved by the project engineer. The construction noise control plan will include the following measures and such measures will be included on the project building and grading permit plans:  The construction contractor shall designate a “Noise Disturbance Coordinator”, who would be responsible for responding to any local complaints about construction noise. The name and telephone number of the Noise Disturbance Coordinator shall be provided to the City prior to the issuance of the building permit. The Noise Disturbance Coordinator will determine the cause of all noise complaints and will require that reasonable measures warranted to correct the problem be implemented. The Noise Disturbance Coordinator shall record all noise complaints received and actions taken in response, and submit this record to the City.  Signs shall be conspicuously posted at the construction site that include permitted construction days and hours, and the name and telephone number of the Noise Disturbance Coordinator.  All internal combustion engine-driven equipment shall be fitted with intake and exhaust mufflers that are in good condition. Good mufflers shall result in non-impact equipment generating a maximum noise level of 80 dBA when measured at a distance of 50 feet.  Impact tools (e.g. jack hammers, pavement breakers, and rock drills) used for project construction shall be hydraulically or electrically powered wherever possible to avoid noise associated with compressed-air exhaust from pneumatically powered tools. However, where use of pneumatic tools is unavoidable, an exhaust muffler on the compressed-air exhaust shall be used; this muffler can lower noise levels from the exhaust by up to about 10 dBA. External jackets on the tools themselves shall be used where feasible, which could achieve a reduction of 5 dBA.  Construction equipment idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to five minutes.  Temporary noise barriers or partial enclosures shall be constructed to provide acoustical shielding for stationary noise-generating equipment and for outdoor construction areas, if practicable. Compliance with the above would ensure that construction noise impacts are less than significant. As a result, the project would not result in any significant impacts related to noise. Air Quality and GHG. In California, mobile emissions sources (e.g., construction equipment, trucks, and automobiles) are regulated by CARB and stationary emissions sources (e.g., industrial facilities) are regulated by the air quality management districts. The project is located in the San Francisco Bay Area Air Basin (SFBAAB), and is therefore under the jurisdiction of the Bay Area Air Quality 148 TO: Billy Gross DATE: November 21, 2014 PAGE: 7 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx Management District (BAAQMD). BAAQMD has established guidelines for the treatment of criteria air pollutants and greenhouse gases in CEQA analysis. BAAQMD’s CEQA Guidelines, updated in 2011, develop certain screening criteria “to provide lead agencies and project applicants with a conservative indication of whether the proposed project could result in potentially significant air quality impacts.”6 If all of the screening criteria are met by a proposed project, detailed air quality assessment of their project‘s air pollutant emissions need not be performed. Although the BAAQMD’s adoption of significance thresholds for air quality analysis has been subject to judicial actions, the City of South San Francisco has determined that BAAQMD’s Revised Draft Options and Justification Report (October 2009), provide substantial evidence to support the BAAQMD recommended thresholds. Therefore, the City of South San Francisco has determined the BAAQMD recommended thresholds are appropriate for use in this analysis. Additionally, the City adopted a Climate Action Plan (CAP) in 2014 that affirms that these thresholds “can be used to determine that a proposed project’s impact on greenhouse gas (GHG) emissions is less than significant if the project is in compliance with a Qualified Greenhouse Gas Reduction Strategy.” Because the CAP itself is a Qualified Greenhouse Gas Reduction Strategy, a project that is compliant with both the City’s CAP and the BAAQMD screening criteria would require no further analysis.7 Measure 1.3 of the CAP is to “integrate higher-density development and mixed-use development near transit facilities and community facilities…” and lists the completion and implementation of Station Area Plans (specifically the El Camino Real Master Plan and Downtown Station Area Plan) as Actions that enforce the measure.8 These plan areas are directly adjacent to the project site, which itself lies within ¼ mile of the South San Francisco BART station. The higher-density development proposed for this project is thus compliant with the intention of this measure, and meets an overall goal established in the CAP. As the project is a small, up to 35-unit development, it falls below both the operational air quality and GHG emission screening level sizes established by BAAQMD. The applicable screening level sizes for non-high-rise condominiums and townhomes is 451 units for air quality operational criteria pollutants and for GHG criteria it is 78 units. The screening criteria for single-family units is at 325/56 units respectively. Given that the project includes 31 townhomes and 4 single-family dwellings, it falls well below both screening level sizes, including the more conservative 56 single- family unit screening criterion. The applicable screening level sizes for construction criteria pollutants and precursors are as follows: 114 du for single-family dwellings and 240 du for non-high-rise condominiums and townhomes. The project also falls well below both of these screening level sizes at 35 du total. The CEQA Guidelines further state that projects that are mixed-use, infill, and/or proximate to transit 6 Bay Area Air Quality Management District, 2011. CEQA Guidelines, p. 3-1. 7 City of South San Francisco, 2009. Climate Action Plan, p. 25. 8 City of South San Francisco, 2009. Climate Action Plan, p. 47. 149 TO: Billy Gross DATE: November 21, 2014 PAGE: 8 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx service and local services, emissions would be less than greenfield type project on which these screening criteria are based. Although these screening criteria and the relevant significance thresholds are currently the subject of litigation, is it known that they are conservative and thus support a finding that the project would not result in any significant air quality or GHG impacts. The CEQA Guidelines notes that if all of the following Screening Criteria are met, the construction of the proposed project would result in a less-than-significant impact from criteria air pollutant and precursor emissions. 1. The project is below the applicable screening level size shown in Table 3-1; and 2. All Basic Construction Mitigation Measures would be included in the project design and implemented during construction; and 3. Construction-related activities would not include any of the following: a. Demolition inconsistent with District Regulation 11, Rule 2, Asbestos Demolition, Renovation and Manufacturing; b. Simultaneous occurrence of more than two construction phases (e.g., paving and building construction would occur simultaneously); c. Simultaneous construction of more than one land use type (e.g., project would develop residential and commercial uses on the same site) (not applicable to high density infill development); d. Extensive site preparation (i.e., greater than default assumptions used by the Urban Land Use Emissions Model [URBEMIS] for grading, cut/fill, or earth movement); or e. Extensive material transport (e.g., greater than 10,000 cubic yards of soil import/export) requiring a considerable amount of haul truck activity. Given that the project falls below all applicable screening level sizes; that all the above screening criteria would met by the project; and that the project is compliant with the City’s CAP, a Qualified Greenhouse Gas Reduction Strategy; detailed air quality assessment of their project‘s air pollutant emissions is not required. Given these findings, and that the City has determined that BAAQMD recommended thresholds are appropriate for use in this analysis, the project would have a less- than-significant impact on air quality and greenhouse gas emissions which need not be further analyzed here or subsequently. Water Quality. Construction of the project would result in the disturbance of one acre or more of land. As a result, it would be required to comply with the General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activity (Construction General Permit). Under the Construction General Permit, preparation of a Storm Water Pollution Prevention Plan (SWPPP) for the site would be required. The SWPPP would include BMPs for erosion and sediment control, site management/housekeeping/ waste management, management of non-stormwater discharges, runon and runoff controls, and BMP inspection/maintenance/repair activities, as consistent with the most recent version of the California Stormwater Quality Association Stormwater Best Management Handbook-Construction. 150 TO: Billy Gross DATE: November 21, 2014 PAGE: 9 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx Municipal stormwater discharges are regulated under the San Francisco Bay Region Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit (MRP). The MRP is overseen by the San Francisco Regional Water Quality Control Board (Water Board). MRP Because the project would add and/or replace 10,000 square feet or more of impervious area, it would be subject to MRP Provision C.3, which addresses post-construction stormwater management requirements. Provision C.3 requires the City to require incorporation of site design, source control and stormwater treatment measures into development projects, to minimize the discharge of pollutants in stormwater runoff and non-stormwater discharges, and to prevent increases in runoff flows. The MRP requires that Low Impact Development (LID) methods shall be the primary mechanism for implementing such controls. It is anticipated that there would be a net increase in impervious surface area as a result of implementation of the project. However, given that the applicant would have to comply with the Construction General Permit and MRP requirements detailed above, including the preparation of a SWPPP and all Provision C.3 requirements, the impact of the project on water quality would be less than significant. (e) The site can be adequately served by all required utilities and public services. Based on the findings of the ECR/Chestnut Area Plan EIR, which did not find that the ECR/Chestnut Area Plan or forecasted future development would result in or contribute to any significant impacts related to utilities or public services, development of up to 35 units on the project site is not expected to result in a significant impact or undue burden upon services or utilities. Exceptions. CEQA Guidelines Section 15300.2 lists the following project types for which Categorical Exemptions may not apply. The following section discusses whether the project would be subject to any of these exceptions. The exceptions are presented in italics, followed by a discussion about how the project is not subject to each exception. (a) Location. Classes 3,4,5,6, and 11 are qualified by consideration of where the project is to be located – a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply in all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies. Item (a), above, applies to Classes 3, 4, 5, 6, and 11 only. Because the Categorical Exemption that applies to the project is categorized as Class 32 in the CEQA Guidelines, this item does not apply. (b) Cumulative Impact. All exemptions for these classes are inapplicable when the cumulative impact of successive projects of the same type in the same place, over time is significant. 151 TO: Billy Gross DATE: November 21, 2014 PAGE: 10 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx As described in item (a) under Class 32 In-Fill Development above, implementation of the project would result in development consistent with what is proposed is accounted for in the General Plan, Specific Plan, and Zoning Ordinance. The ECR/Chestnut Area Plan EIR evaluated cumulative impacts and although development of the project site was not considered as part of the Area Plan, it was considered in the cumulative analysis since the proposed development is consistent with the General Plan. As discussed above, the project would not result in any significant project impacts or contribute significantly to any significant cumulative impacts related to land use, traffic, noise, air quality, or water quality. The same would be the case for all other environmental topics given the size of the project and the existing conditions on site. Thus, the impact of this project in combination with other projects similarly consistent with the General Plan and any other applicable policy plans would not result in a significant cumulative impact. (c) Significant Effect. A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances. The project site was historically used for agriculture. In the second half of the nineteenth century, South San Francisco, or the unincorporated land that would later comprise the City, was home to many farms, dairies, and other notable agricultural uses.9 Much of the land within the direct vicinity of the project site was used for agricultural purposes similarly to the project site,10 indicating that much of the surrounding area currently developed with residential uses was subject to the similar environmental conditions resultant of historical agricultural use prior to their development. A Phase I and Phase II Environmental Site Assessment (ESA) were conducted for th e project site. While the Phase I identified the need for further environmental exploration around a potential Recognized Environmental Condition (REC), that further exploration conducted in the Phase II ESA concluded that the historical agricultural use of the site did not represent a REC or a human health risk in light of the contemplated residential use of the site, and recommended no further investigation regarding this issue.11 Additionally, all contaminant concentrations identified in the Phase II ESA are acceptable based on the San Francisco Bay Regional Water Quality Control Board’s Environmental Screening Levels (ESLs) for construction workers who have direct contact with soils containing contaminants during construction. Based on these findings, the project— during both construction and operation—will not have a significant effect on the environment due to unusual circumstances. The soil sample analysis performed for the Phase II ESA found, overall, that levels of residual organochlorine pesticides and lead were reported within acceptable California Human Health 9 Page & Turnbull, 2014. Historic Resource Memorandum of Opinion Regarding 1256 Mission Road, South San Francisco, p. 10. October 27. 10 Page & Turnbull, 2014. Historic Resource Memorandum of Opinion Regarding 1256 Mission Road, South San Francisco, p. 17. October 27. 11 Stantec Consulting Services Inc., 2014. Phase II Environmental Site Assessment for 1256 Mission Rd., 1260-1267 Baywood Ave., and 1262-1268 Edgewood Way South San Francisco, California, p. 4-5. July 21. 152 TO: Billy Gross DATE: November 21, 2014 PAGE: 11 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx Screening Levels (CHHSLs) for residential use. Although arsenic was detected in levels above the residential CHHSL of 0.07 mg/kg for all soil samples, the levels recorded for all soil samples fell within the established range of background arsenic concentrations in California soils—between 0.6 and 11.8 mg/kg. The Phase II ESA thus concluded that the detected concentrations of arsenic at the site appear to be well within the range of naturally-occurring regional background levels, with the very similar levels between samples also indicating background levels. Regulatory agencies have not required action where arsenic exists at background levels, even when detected above the CHHSLs. As a result, the Phase II ESA has concluded that arsenic does not represent a REC in light of the contemplated residential use of the site, and recommends no further assessment regarding this issue. Although CHHSLs have not been developed for construction scenarios, the San Francisco Bay Regional Water Quality Control Board has developed Environmental Screening Levels (ESLs) for construction workers who have direct contact with soils containing contaminants during construction.12 These ESLs evaluate potential risks to construction workers due to incidental ingestion, dermal contact, and inhalation due to volatilization and fugitive dust over a shorter period (one year) than for residential scenarios, as most construction exposures are short-term in nature. Since all of the contaminant concentrations identified in the Phase II investigation are below the construction worker ESLs, no significant risks to workers during the construction phase of the project are anticipated. As stated above, the results of the Phase II subsurface investigation confirm that the historical agricultural use of the site does not represent a REC or a human health risk in light of the contemplated residential use of the site, and recommends no further investigation regarding this issue. Additionally, all measured contaminant concentrations fall below construction ESLs, indicating that no significant risks to construction workers during the construction phase of the project are expected. Given that any potential impacts resulting from the former agricultural use of the site have been fully analyzed, and that no other RECs associated with the site were identified, the Phase II ESA concludes that no further investigation of environmental condition of the site is necessary. As a result, no significant effects related to the construction and operational phases of the project are expected to occur. (d) Scenic Highways. A categorical exemption shall not be used for a project which may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway. This does not apply to improvements which are required as mitigation by an adopted negative declaration or certified EIR. 12 San Francisco Bay Regional Water Quality Control Board, 2013, Environmental Screening Levels, Table K-3, Construction/Trench Worker Scenario, updated December. Website: http://www.waterboards.ca.gov/sanfranciscobay/water_issues/programs/esl.shtml 153 TO: Billy Gross DATE: November 21, 2014 PAGE: 12 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx State Route 82 (SR 82) is the only State highway in the vicinity of the project site. No portions of SR 82 within San Mateo County are officially designated scenic highway, nor are any portions eligible. The nearest scenic highway is the Father Junipero Serra Freeway (Interstate 280), which is designated by the State Department of Transportation (Caltrans) as a California Scenic Highway from the Santa Clara County line to the San Bruno city limit.13 The project site is located approximately 4.25 miles from the designated portion of Interstate 280 and is not visible from this highway. Thus, implementation of the project would not result in the damage of trees, rock outcroppings, or historic buildings, or other scenic resources within a state scenic highway. (e) Hazardous Waste Sites. A categorical exemption shall not be used for a project located on a site which is included on any list complied pursuant to Section 65962.5 of the Government Code. The project site is not listed on the Department of Toxic Substances Control’s Hazardous Waste and Substances Site List (Cortese List, compiled pursuant to Section 65962.5 of the Government Code).14 Additionally, no other sites that lie within ½ mile radius of the project site are listed in the EDR report from the CORTESE database.15 (f) Historical Resource. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource. The three parcels that compose the project site contain a total of three buildings and seven small shed structures. 1256 Mission Road (APN 011-171-500) is occupied by a house that appears to have been built in the 1920s or 1930s. 1261-1267 Baywood Avenue (APN 011-171-130) is an empty unpaved lot. 1262 Edgewood Way (APN 011-171-330) is occupied by two houses: the northwest house at 1262 Edgewood Way appears to have been built in the 1910s and the southeast house at 1262 Edgewood Way was built between 1946 and 1956. The respective ages of these structures indicate a potential that they could qualify as historic resources. Page & Turnbull evaluated the site and structures in the attached Memorandum of Opinion, dated September 29, 2014. The memorandum details that the project site as a whole does not appear eligible for listing in the California Register because it lacks significance and integrity, and that the individual buildings do not appear eligible for listing in the California Register because they lack significance under any of the four prescribed criteria (Events, Persons, Architecture, and Information Potential). As a result, neither the individual buildings nor the property as a whole qualify as historical resources pursuant to CEQA. Additionally, no buildings on the project site are included in the City’s local register, a list of Designated and Potential Historic Resources established in 2002 per a Historic Preservation 13 California Department of Transportation, 2014. California Scenic Highway System. Website: http://www.dot.ca.gov/hq/LandArch/scenic_highways/. Accessed August 28, 2014. 14 Department of Toxic Substances Control, 2014. DTSC’s Hazardous Waste and Substances Site List. Website: http://www.dtsc.ca.gov/SiteCleanup/Cortese_List.cfm. Accessed August 28, 2014. 15 Stantec Consulting Services Inc., 2014. Phase I Environmental Site Assessment for APNs 011-171-500; 011-171-330, and 011-171- 130, South San Francisco, California. May 30. 154 TO: Billy Gross DATE: November 21, 2014 PAGE: 13 P:\14-012 CVSSF\PRODUCTS\CEQA\Public\CVSSF_CEQA_Memo_14_1121.docx Survey completed in 1985 and 1986. A categorical exemption for the project therefore would not cause a substantial adverse change in the significance of a historical resource. Conclusion. Based on the above analysis, the project is not anticipated to result in significant environmental impacts. Likewise, the absence of significant environmental impacts that would result from the proposed project would make unnecessary the adoption of mitigation measures. Because the project meets the criteria for categorically exempt infill development projects listed in CEQA Guidelines Section 15332, it is Urban Planning Partners’ recommendation that a notice of exemption for the project be prepared and filed with the County Clerk following project approval. Attachment Historic Resource Memorandum of Opinion 155 Historic Resource Memorandum of Opinion DATE October 27, 2014 PROJECT NO. 14217 TO Hayley Cox Lynette Dias Samantha Rotstein PROJECT 1256 Mission Road, South San Francisco OF City Ventures 444 Spear Street Suite 200 San Francisco CA 94105 & Urban Planning Partners Inc. 505 17th Street, 2nd Floor Oakland, CA 94612 FROM Miriam Aranoff Architectural Historian & Cultural Resources Planner CC VIA E-mail REGARDING: 1256 Mission Road, South San Francisco INTRODUCTION This Memorandum of Opinion was prepared by Page & Turnbull at the request of City Ventures for the properties at 1256 Mission Road (APN #011-171-500), 1261-1267 Baywood Avenue (APN #011-171-130), and 1262 Edgewood Way (APN #011-171-330) in the Sunshine Gardens neighborhood of South San Francisco, CA (Figure 1). There are a total of three buildings and seven small shed structures on the subject site. 1256 Mission Road is occupied by a house that appears to have been built in the 1920s or 1930s, when the Mediterranean Revival style was popular. 1261-1267 Baywood Avenue is an empty unpaved lot. 1262 Edgewood Way is occupied by two houses; the northwest house at 1262 Edgewood Way appears to have been built in the 1910s as a vernacular building with Craftsman style influences; the southeast house at 1262 Edgewood Way was built between 1946 and 1956 and does not exhibit any particular style. Historical research on the site was previously conducted by Stantec Consulting Services and is documented in their Phase I Environmental Site Assessment (May 30, 2014). The document, however, does not include an evaluation of historic significance, and no other Historic Resource Evaluations have been completed for the property. The subject site is not listed in the California Historic Resources Information System (CHRIS) database with any Status Code, indicating that it is not listed 156 on any local, state, or national registers. The subject site is also not included in the City of South San Francisco List of Designated and Potential Historic Resources. This memorandum provides brief background information on the history of 1256 Mission Road, 1261-1267 Baywood Avenue, and 1262 Edgewood Way, a brief physical description, and current images. Page & Turnbull has also provided a preliminary assessment of the property’s potential as a historical resource or cultural landscape under the California Environmental Quality Act (CEQA). This memorandum does not qualify as a full Historic Resource Evaluation report, which would include more exhaustive historic research and an intensive-level survey of the site. Page & Turnbull prepared this memorandum using photographs taken during a site visit on September 16, 2014, and research undertaken at various local repositories, including the South San Francisco Local History collection at the Grand Avenue Public Library and the Building Division of the City of South San Francisco. The historical societies in South San Francisco and Colma were also consulted. Page & Turnbull referred to Past Consultants’ Historic Context Statement for Agricultural Resources in the North County Planning Area, Monterey County (September 2010), listed on the California Office of Historic Preservation website, for guidance on registration requirements for agricultural resources. Summary of Findings The following analysis concludes that there are no historically significant buildings on the subject site. None of the buildings or the property as a whole qualify as historical resources for the purposes of CEQA. 157 Figure 1. Source: San Mateo County Assessor’s Office. Edited by author. 158 BRIEF ARCHITECTURAL DESCRIPTION The approximately two-acre site is located in the Sunshine Gardens neighborhood, which is bounded by Lawndale Boulevard to the northwest, Hillside Boulevard to the northeast, Chestnut Avenue to the southeast, and Mission Road to the southwest (Figure 17). The site itself is bounded by Mission Road to the southwest and Baywood Avenue to the northeast; Edgewood Way forms two dead-ends at the northwest and southeast borders of the property. Residences abut the site to the northwest and southeast (Figure 2). Figure 2. Aerial of subject site. Source: Google Earth. Edited by author. 159 1256 Mission Road The residence at 1256 Mission Road is located at the southwest portion of the site. Though the date of construction is unknown, the Mediterranean Revival style of the building dates it to the 1920s or 1930s (Figure 3). It is a two-story, wood-frame building with a rectangular plan, covered by a flat roof. The building is clad in stucco. The primary entrance is located within a recessed entry on the second floor of the northwest façade and is accessed by a flight of concrete stairs. The primary (southwest) façade features a roll-up garage door and the second floor features multi-faceted bay windows with five windows each, accentuated with blind arches and capped with shed roofs covered in terracotta tile. All of the windows are currently boarded. The primary façade terminated in a stepped and pedimented parapet with decorative coping and a diamond relief at the center. There are angled bay windows on the northwest and southeast side facades. The house is currently unoccupied. Figure 3. 1256 Mission Road, viewed facing northwest. Source: Page & Turnbull, September 2014. 160 1261-1267 Baywood Avenue 1261-1267 Baywood Avenue is an empty unpaved lot. The parcel serves as the entrance to 1262 Edgewood Way and is used for parking cars (Figures 4-5). A small shed, apparently used as a dog house, is located in the west corner of the property. It is not clear whether the shed is on the parcel for Baywood Avenue or the Edgewood Way parcel. Figure 4. 1261-1267 Baywood Avenue, viewed facing southwest. Source: Google Maps. Figure 5. 1261-1267 Baywood Avenue, viewed facing southwest. Source: Page & Turnbull, September 2014. 161 1262 Edgewood Way The parcel addressed as 1262 Edgewood Way occupies the majority of the project site. The southwest border directly fronts onto Mission Road; the northeast border abuts 1261-1267 Baywood Avenue; and Edgewood Way forms two dead-ends at the northwest and southeast borders of the property. Much of the parcel is an empty field that was farmed until approximately five years ago, as recounted by Kathy Kay, Local History Specialist at the South San Francisco Library.1 A tractor is located behind the house at 1256 Mission road, and four sheds are located at the west corner of the 1262 Edgewood Way site (Figure 6). The shed directly fronting Mission Road has a rectangular footprint and is comprised of metal. Further northeast, the next shed is comprised of wood and is covered in a flat roof with projecting eaves. The next shed is a wood frame structure, is partially clad in corrugated metal, and is covered by a gable roof. The fourth shed is also a wood frame structure, is clad in corrugated metal, and is covered by a flat roof. Figure 6. Four sheds located on the parcel encompassing 1262 Edgewood Way, view facing northwest. Source: Page & Turnbull, September 2014. Two single-family residences are located at the northwest corner of the parcel. They are accessed via the parcel addressed as 1261-1267 Baywood Avenue. The southeast house is built in a vernacular style with Craftsman influences (Figure 7). Though no documentation was uncovered for the date of construction, it appears to date to the 1910s. The house is a two-story wood frame building over a concrete foundation. It is rectangular in plan and covered with a gable roof with a flat peak. The house 1 Kathy Kay, in-person conversation with author, 19 September 2014. 162 is clad in channel drop wood siding at the first story and narrow beveled boards at the second story. It features a square bay window and double-hung wood sash windows with arched muntins and ogee lugs. The primary entrance is located on the northeast façade and features a wood door with a multi-lite square panel; the muntins are set in a diamond pattern. The house fronts an unpaved area, and behind the house is a backyard with multiple trees and shrubs. The house is currently occupied. The northwest house was built between 1946 and 1956 according to historic aerial photographs. It contains features commonly used at mid-century but lacks a particular style (Figure 8). The residence is a single-family, two-story over basement, wood frame building, and is clad in stucco. It features a mixture of single-hung, casement, and fixed windows. The primary entrance is located on the northeast façade and features a wood door with a glass panel. The building terminates in a hipped roof with a flat boxed eave. There is a stuccoed wood-frame two-car garage with a hipped roof off the north corner of the building and two small sheds in the backyard. The house is currently occupied. Figure 7. Southeast house at 1262 Edgewood Way, viewed facing south. Source: Page & Turnbull, September 2014. 163 Figure 8. Northwest house at 1262 Edgewood Way, viewed facing southwest. Source: Page & Turnbull, September 2014. HISTORIC CONTEXT Industrial History of South San Francisco South San Francisco developed as an industrial suburb to San Francisco, with meat packing as the first industry beginning in 1854. The city was incorporated in 1908, and in 1909, a Southern Pacific Railroad Station was built on Grand Avenue. In the 1910s, rice mills, chemical plants, marble fabricators, steel foundries, and metal producers located to the area. The slogan “South San Francisco the Industrial City” was etched into Sign Hill in 1923. During World War II, the city’s population doubled in size to 12,722, as shipyard workers sought work in the area. During this time, Western Pipe and Steel, located in South San Francisco, built 45 ships in four years for the Maritime Commission. By 1950, the population was 19,351 and by 1960, the population had risen to 38,762. In the 1960s, industrial production in South San Francisco began to slow down, with major industries such as meat packing and steel production reducing labor and eventually closing the plants. However, new companies such as Woolworth’s, Gallo Sales Inc., and Koret of California came to fill these gaps to take advantage of the city’s proximity to the San Francisco Airport. The 1960s also saw the establishment of Genentech, a biotechnology company and currently the largest employer in South San Francisco.2 3 2 South San Francisco Historical Society, Images of America: South San Francisco (USA: Arcadia Publishing, 2004). 3 City of South San Francisco. Local History Articles. http://www.ssf.net/index.aspx?NID=1215 164 Figure 9. South San Francisco in 1925, aerial view facing northwest. Source: Kauffman, Linda. South San Francisco: A History (1976) 33. Agricultural History In the second half of the nineteenth century, South San Francisco was home to many farms and dairies including Twelve Mile Farm (ca. 1850), J.G. Knowles Farm (1853), Baden Dairy and Farm (1871), Jersey Farm (1875), Howard Telden’s Buri Buri Ranch (1891), Guadalupe Dairy, and the Lepsic Dairy (estimated to be 1895) (Figure 11).4 Kathy Kay, Local History Specialist at the South San Francisco Library, recalls that Twelve Mile Farm, formerly located between Grand and Chestnut avenues, was farmed up until fifteen or twenty years ago.5 Another prominent agricultural enterprise was the Rod McLellan Nursery, which was located at 1450 El Camino Real from 1926 until 1997.6 The nursery was 61 acres in size and was located in the unincorporated area northwest of the city, one-fifth of a mile from the subject site. The land occupied by the nursery was slowly annexed to the city until the last acre was annexed for development in 1998.7 4 Linda Kauffman. South San Francisco: A History (1976). 5 Kathy Kay, in-person conversation with author, 19 September 2014. 6 Bits of History: Exploring San Mateo County Historical Photographs. http://bitsofhistory.plsinfo.org/ 7 South San Francisco Historical Society, Images of America: South San Francisco (USA: Arcadia Publishing, 2004). 165 Figure 10. Queen Ingrid of Denmark’s visit to the Rod McLellan Nursery in the 1950s. Source: Bits of History: Exploring San Mateo County Historical Photographs Much of the farming that existed in what is today South San Francisco was unincorporated land in the earlier twentieth century. The 1910 and 1950 Sanborn Fire Insurance maps show that from the city’s incorporation in 1908 up through 1950, the official borders of South San Francisco excluded the agricultural areas and included only the original residential areas, the downtown commercial core, and the city’s industrial area. Nearby agricultural areas, including the subject property, were not incorporated until these agricultural areas were subdivided for residential development in the second half of the twentieth century (Figures 18-20). The 1910 Sanborn map for the city of South San Francisco shows only one vegetable garden at the fringe of the city and next to residential areas (Figure 12). 166 Figure 11. 12 Mile Farm. Date unknown. Source: Kauffman, Linda. South San Francisco: A History (1976) 3. Figure 12. 1910 Sanborn map. The only farm within the city bounds at the time is highlighted in red. Edited by author. 167 Since historical accounts for the city of South San Francisco generally focus on the incorporated areas, the agricultural history of the subject site can be gleaned from historical narratives of the city of Colma, the border of which is less than a quarter of a mile away from the subject site. Colma had fertile sandy soil and natural drainage that made it ideal for farming.8 It later developed into a site for cemeteries, however, due to its proximity to San Francisco. The Historical Resources Element for the neighboring city of Colma states: In the 1850s a large area in northern San Mateo County was called Colma. This early district extended from the San Francisco County line to parts of today’s Daly City and South San Francisco and from San Bruno Mountain to Pacifica. Immigrant settlers started farming in the area in the mid-1850s growing potatoes, vegetables and grain for the San Francisco market. Later floricultural, hog ranches, and dairies were significant business in the area.9 Cemeteries came to define Colma, but agriculture and flower nurseries still continued in the area (Figure 13). Flower nurseries were the dominant form of agriculture, though vegetable farming also took place. The 1925 Sanborn Fire Insurance map for Colma and the 1945 Sanborn map show many nurseries (Figures 14-15). Figure 13. Vegetable gardens in Colma, 1915. Source: Bits of History: Exploring San Mateo County Historical Photographs 8 Michael Smookler. Images of America: Colma (USA: Arcadia Publishing, 2007). 9 Historic Resources Element (June 1999). http://ohp.parks.ca.gov/pages/1072/files/Colma.pdf 168 Figure 14. Index to the 1926 Colma Sanborn map, showing many agricultural enterprises. 169 Figure 15. 1945 Sanborn map. A sample of the agricultural enterprises in Colma in 1945, highlighted in red. All of the areas are listed as greenhouses. Sanborn maps for other areas in the city also show agricultural uses. Edited by author. 170 In the late 1940s, however, the prospect of commercial and residential development made land too valuable to farm. The owners of cemeteries terminated farm leases and most privately owned farms were sold or leased to real estate developers. The Cerruti vegetable farm, however, operated in Colma from 1920 until 1971, until the farm moved to the Orange Park District in South San Francisco.10 There are remnants of farmstead houses less than half a mile away from the subject site at 1256 Mission Road. At 1431-1437 Mission Road, the city of Colma designated the Old Mission Road Historic District. This district consists of six Neo-Classical style houses that comprise the largest group of residences built in Colma between 1908 and 1918, are the most complete illustration of family farmsteads in Colma, and are from Colma’s last and largest farmstead (Figure 16).11 Figure 16. The Old Mission Road Historic District. Source: Google Maps. 10 Michael Smookler. Images of America: Colma (USA: Arcadia Publishing, 2007). 11 Historic Resources Element (June 1999). http://ohp.parks.ca.gov/pages/1072/files/Colma.pdf 171 The Sunshine Gardens Neighborhood The subject site is located in the Sunshine Gardens neighborhood of South San Francisco. The neighborhood was not part of the original 1908 incorporation of South San Francisco and was annexed to the city at an unknown date after 1950. The neighborhood was subdivided between 1953 and 1957 as part of the increasing demand for housing resulting from returning war veterans, urban flight, and general large-scale migration to California.12 Historic aerial photographs show that Sunshine Gardens was once part of an agricultural area that was increasingly developed into housing in the 1950s and 1960s (Figures 18-20). By 1968, the ratio of open space to built up areas reached the condition it exhibits today (Figure 21). Figure 17. Sunshine Gardens neighborhood outlined in red. Subject property filled in green. Edited by author. Source: City—Data.com 12 City of South San Francisco. Local History Articles. http://www.ssf.net/index.aspx?NID=1215 172 Figure 18. Sunshine Gardens neighborhood in 1946. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 19. Sunshine Gardens neighborhood in 1956. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). 173 Figure 20. Sunshine Gardens neighborhood in 1968. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 21. Sunshine Gardens neighborhood in 2010. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). 174 Subject Site: 1256 Mission Road, 1261-1267 Baywood Avenue, 1262 Edgewood Way Construction The following table shows the records on file at the Building Division of South San Francisco. The earliest records date to 1984 and there were no records for 1261-1267 Baywood Avenue. The early construction history of the property is unknown. 1256 Mission Road Date Permit Number Owner Architect Description Oct. 26, 1984 84-1019 Macolini Ed Castagnetto Roofing Co. Overlay original roof with 1-40 lb. and 2-15 lb. molded solid new gravel stop, flood coat and embed gravel. Sept 9, 1985 None None None Spoke with “Butch” Cuneo regarding the abandoned home on Mission… said that structure will be torn down during this coming winter when there is less dust. He was told to board up the meter box and get PG&E to disconnect the electricity. 1262 Edgewood Way Date Permit Number Owner Architect Description November 17, 1995 P95-655 Antonio J. Cuneo, Jr. Southwood Plumbing and Heating Application for plumbing-mechanical permit Historic aerial photographs of the site show buildings on the property, but architectural details are not distinguishable (Figures 22-27). The 1943 aerial photograph shows that there were buildings at the same locations as 1256 Mission Road and the southeast house at 1262 Edgewood Way (Figure 22). The northwest house at 1262 Edgewood Way does not appear in the 1946 aerial photograph but is depicted in the 1956 aerial photograph (Figures 23-24). The aerial photographs show that between 1968 and 1993, a building that was situated northwest of 1256 Mission Road was demolished (Figures 25- 26). No other construction history records for the subject site were found. 175 Figure 22. Subject site in 1943. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 23. Subject site in 1946. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 24. Subject site in 1956. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 25. Subject site in 1968. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 26. Subject site in 1993. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). Figure 27. Subject site in 2010. Subject property outlined in red. Edited by author. Source: Stantec Consulting Services Inc., Phase I Environmental Site Assessment (May 30, 2014). 176 Ownership According to Stantec Consulting Services’ Phase I Environmental Site Assessment, Antonio Cuneo, the current site owner, recalled that the property was purchased by his grandparents in the 1940s and it had been previously used as a vegetable and flower farm. Antonio Cuneo is the son of Eldina and Joseph Cuneo (Figure 28). The Cuneos sold their produce to the San Francisco Farmers Market on Alemany Boulevard.13 The family sold the subject properties in 1998 and 2006. Figure 28. Eldina Ratto Cuneo depicted in her fields. The surrounding buildings show that this field is not the subject property. Source: South San Francisco Historical Society. 13 San Francisco Historical Society, Eldina Ratto Cuneo (n.d.). 177 The following tables show deed information made available online by San Mateo County. Online records only go as far back as 1985. Biographical information was found on Ancestry.com, through online research, and in city directories at the South San Francisco History Room. The early pre-1940 directories in the History Room do not include the subject property since it was not part of the official borders of the city at that time. Researching the California Digital Newspaper Collection did not yield any biographical information. No deed information was found for 1261-1267 Baywood Avenue. 1256 Mission Road (APN #011-171-500) Date Document # Grantor Grantee December 26, 2006 2006-194405 Albert Capurro Antonio Cuneo (b.1929 – d.1985): Antonio Cuneo was born to Joseph/Guiseppe and Idolina/Edolina/Adonline/Eldina Cuneo, Italian immigrants who worked on a duck farm. City directories from 1952 to 1978 list the Cuneo Produce Market, the Cuneo Ranch, and Cuneo Produce. No December 26, 2006 2006-194891 Jane Peabody, a relative of Antonio Cuneo Antonio Cuneo 1262 Edgewood Way (APN #011-171-330) Date Document # Grantor Grantee March 13, 1998 1998-033430 Idolina Cuneo Rev Intervivos Trust, Antonio J. Cuneo Junior Trust Antonio J. Cuneo Jr. Trust March 13, 1998 1998-033431 Jane Peabody Antonio J. Cuneo Jr., currently 64 years old Occupancy The following tables contain the names of occupants of the subject properties between 1977 and 2013, based on information published Stantec Consulting Services’ Phase I Environmental Site Assessment. The early pre-1940 directories in the South San Francisco History Room do not include the subject property 178 since it was not part of the official borders of the city at that time. Earlier occupants are therefore not known. 1261-1267 Baywood Avenue was not listed in the city directories. 1256 Mission Road Year Resident or Business Name(s) Source 1977 Address not listed Haines Cross-Cross Directory 1980 Address not listed Haines Cross-Cross Directory 1985 Address not listed Haines Cross-Cross Directory 1990 Address not listed Haines Cross-Cross Directory 1995 Address not listed Haines Cross-Cross Directory 1999 Albert Capurro Cole Information Service 2003 Albert Capurro Cole Information Service 2008 Address not listed Cole Information Service 2013 Address not listed Cole Information Service 1262 Edgewood Way Year Resident or Business Name(s) Source 1977 A. Cuneo Haines Cross-Cross Directory 1980 A. Cuneo Haines Cross-Cross Directory 1985 A. Cuneo Haines Cross-Cross Directory 1990 A. Cuneo Haines Cross-Cross Directory 1995 No resident listed Haines Cross-Cross Directory 1999 “Occupant unknown” Cole Information Service 179 2003 Jerry Morello Cole Information Service 2008 “Occupant unknown” Cole Information Service 2013 Zendy Moreno Cole Information Service EVALUATION OF HISTORIC SIGNIFICANCE AND INTEGRITY The following evaluations are for eligibility to the California Register of Historical Resources, based on the research conducted above. Both the property as a whole and the individual buildings on the property are evaluated. Evaluations include a consideration of the property’s or buildings’ historic significance, and whether the property or buildings retain enough integrity to convey their historic significance. California Register of Historical Resources The California Register of Historical Resources (California Register) is an inventory of significant architectural, archaeological, and historical resources in the State of California. Resources can be listed in the California Register through a number of methods. State Historical Landmarks and National Register-listed properties are automatically listed in the California Register. Properties can also be nominated to the California Register by local governments, private organizations, or citizens. The evaluative criteria used by the California Register for determining eligibility are closely based on those developed by the National Park Service for the National Register of Historic Places. These criteria can be used to evaluate landscapes as well as individual buildings. In order for a property to be eligible for listing in the California Register, it must be found significant under one or more of the following criteria:  Criterion 1 (Events): Resources that are associated with events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States.  Criterion 2 (Persons): Resources that are associated with the lives of persons important to local, California, or national history.  Criterion 3 (Architecture): Resources that embody the distinctive characteristics of a type, period, region, or method of construction, or represent the work of a master, or possess high artistic values. 180  Criterion 4 (Information Potential): Resources or sites that have yielded or have the potential to yield information important to the prehistory or history of the local area, California, or the nation. Entire Property: 1256 Mission Road, 1261-1267 Baywood Avenue, and 1262 Edgewood Way The subject site consists of three buildings and a formerly farmed landscape. The historic context above establishes the relevant period of agricultural development from the 1850s, when land in the area began to be cultivated, until the 1940s-50s, when commercial and residential development dominated the area. Although there were a few farms—Twelve Mile Farm, the Rod McLellan Nursery, the Cerruti vegetable farm, and the subject site—that continued to be cultivated past the 1940s-50s, the area as a whole was no longer defined by the agricultural industry. The important period of agricultural development therefore ends in the 1940s-50s. The property does not appear to be a historic resource or cultural landscape under California Register Criterion 1 (Events) as a property that is associated with events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States. The property was one of many that were developed during the late nineteenth and early twentieth century for farming. Much of the unincorporated area near South San Francisco and Colma was covered with farming operations. The context of farming was an important period in the area’s history, but no information was uncovered that indicates that this particular property was individually important or significant compared to other farms in Colma and South San Francisco. The property is one of the last remaining undeveloped parcels in the area. It does not, however, retain sufficient integrity to its historic farming period, and therefore it is not able to sufficiently convey this historic context (see below for further discussion of integrity). The property also does not appear historically significant under Criterion 2 (Persons) for its association with persons important to local, state, or national history. Though the Cuneo family has owned the subject property since the 1940s, research has not shown that any members of the family were especially significant in the civic, economic, or cultural development of Colma and South San Francisco, aside from their longevity as farmers of this site. There was little information about the Cuneo family, and the later owners and occupants at local repositories, and no references to these individuals in local newspaper articles and the internet. The property as a whole, therefore, does not appear eligible for listing under Criterion 2 (Persons) for an association with persons important to local, state, or national history. 181 The property does not appear eligible for listing under Criterion 3 (Architecture). None of the buildings on the property are individually architecturally significant (described in more detail below). The property as a whole does not represent an architecturally cohesive grouping of buildings that would embody the distinctive characteristics of a type, period, region, or method of construction, or represent the work of a master, or possess high artistic values. Rather, the property as a whole includes: 1256 Mission Road, a Mediterranean Revival style home built in the 1920s or 1930s; the southeast house at 1262 Edgewood Way, a vernacular residence that appears to have been built in the 1910s; and the northwest house at 1262 Edgewood Way, a residence without a particular style that was built between 1946 and 1956. There are also a number of small sheds on the property that have an unknown construction date. A cohesive grouping or complex of farm-related buildings would typically include a primary residence, barns or sheds for equipment, and other outbuildings.14 As the oldest residence on the site, the southeast house at 1262 Edgewood Way was likely once the primary residence for the farmers. It is not clear, however, whether 1256 Mission Road also functioned as part of the farm. The northwest house at 1262 Edgewood Way was built between 1946 and 1956, as part of the residential development that consumed the open space at that time. The house is a mid-century suburban house that was constructed on farmland but is not of a type or period of construction typically associated with an agricultural context and does not architecturally relate to the other buildings. Most of the small sheds appear to have been used for storage for agricultural-related materials, but the date of their construction is unknown; and none of the ancillary structures are larger buildings that may have been associated with production or packaging. As a grouping, the buildings do not embody the distinctive characteristics of a type, period, region, or method of construction, or convey a historic use or development pattern. In sum, the property as a whole does not include architecture that appears eligible for listing in the California Register under Criterion 3 (Architecture). California Register Criterion 4 (Information Potential) is not relevant to this evaluation. The “potential to yield information important to the prehistory or history of California” typically relates to archeological resources, rather than built resources. When Criterion 4 does relate to built resources, it is for cases when the building itself is the principal source of important construction-related information. Based on historic research, Criterion 4 is not applicable to the property of the project site. Individual Property: 1256 Mission Road 1256 Mission Road does not appear to be a historic resource individually under California Register Criterion 1 (Events) as a property that is associated with events that have made a significant 14 Past Consultants, LLC, Historic Context Statement for Agricultural Resource in the North County Planning Area, Monterey County (September 2010) 111. 182 contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States. Research did not indicate that the building’s function related the larger historic context of agriculture on the property. The home may have been associated with the farming that occurred on the plot but there is no documentation to confirm this. Moreover, there is a better example of farmstead housing that has been designated as the Old Mission Road Historic District in nearby Colma. This district contains a collection of six buildings that are associated with farming in the area. Under Criterion 2 (Persons), it is not evident through historic research that the Cuneos, the owners of 1256 Mission Road, were especially significant in the history and development of Colma or South San Francisco, aside from their tenure at the subject site and others in the area. Thus, 1256 Mission Road does not appear eligible for listing in association with significant people. Under Criterion 3 (Architecture), 1256 Mission Road is a typical example of a Mediterranean Revival style house and is not important as a type, period, or method of construction. Research did not uncover an architect or builder, and the building cannot be considered to have high artistic values. It therefore lacks individual significance. California Register Criterion 4 (Information Potential) is not relevant to this evaluation. Individual Property: 1261-1267 Baywood Avenue There are no buildings to evaluate on this site. Individual Property: Southeast House at 1262 Edgewood Way The southeast house at 1262 Edgewood Way does not appear to be a historic resource individually under California Register Criterion 1 (Events) as a property that is associated with events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States. Research did not indicate that the building’s function related to the larger historic context of agriculture on the property. As the oldest building on the project site, the house was likely once the primary residence of a farmer, but no documentation was found to confirm this. Moreover, there is a confirmed example of farmstead housing that has been designated as the Old Mission Road Historic District. This district contains a collection of six buildings that are associated with farming in the area. Under Criterion 2 (Persons), it is not evident through historic research that the Cuneos, the owners of the southeast house at 1262 Edgewood Way, were especially significant in the history and development of Colma and South San Francisco, aside from their tenure at this property and others in the area. Thus, 183 the southeast house at 1262 Edgewood Way does not appear eligible for listing in association with significant people. Under Criterion 3 (Architecture), the southeast house at 1262 Edgewood Way is a good example of a vernacular building with Craftsman style influences that appears to have been built in the 1910s. It does not stand out, however, as individually important as a type, period, or method of construction. Research did not uncover an architect or builder, and the building cannot be considered to have high artistic values. It therefore lacks individual significance. California Register Criterion 4 (Information Potential) is not relevant to this evaluation. Individual Property: Northwest House at 1262 Edgewood Way The northwest house at 1262 Edgewood Way is not a historic resource individually under California Register Criterion 1 (Events) as a property that is associated with events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States. The building was constructed between 1946 and 1956 as part of the residential building boom of the area and is therefore not associated with the relevant period of agricultural development for the site. Under Criterion 2 (Persons), it is not evident through historic research that the Cuneos, the owners of the northwest house at 1262 Edgewood Way, were especially significant in the history and development of Colma and South San Francisco, aside from their tenure at this property and others in the area. Thus, northwest house at 1262 Edgewood Way does not appear eligible for listing in association with significant people. Under Criterion 3 (Architecture), the northwest house at 1262 Edgewood Way does not have an apparent architectural style, though it uses modern materials, and it does not stand out as important as a type, period, or method of construction. Research did not uncover an architect, and the building cannot be considered to have high artistic values. It therefore lacks individual significance. California Register Criterion 4 (Information Potential) is not relevant to this evaluation. 184 Integrity A discussion of integrity is usually reserved for sites determined to be historically significant. Although neither the site nor any of the buildings were found to be significant, integrity will still be assessed. Integrity is often described as the retention of characteristics that enable a property to convey its appearance as it existed during its historic period. According to integrity thresholds outlined in the Historic Context Statement for Agricultural Resource in the North County Planning Area, Monterey County, the seven aspects of integrity for agriculture-related cultural landscapes are defined as: Location is the place where the significant activities that shaped a property took place, often determined by geographical factors. Setting is the physical environment within and surrounding a property, including large-scale features (e.g., woodlands or rock formations) and small-scale features (e.g., fences, gateposts, springs or individual trees). Design is the composition of natural and cultural elements comprising the form, plan, and spatial organization of a property. Elements include buildings, structures, boundary demarcations, circulation networks, windbreaks, vegetation and topography. Materials include construction materials of buildings, outbuildings, roadways, fences, and other structures. For rural historic landscapes, vegetation similar to historic species in scale, type and visual effect will generally convey historic integrity. Workmanship is exhibited in the ways people have fashioned their environment for functional and decorative purposes, including how they constructed buildings, fences and small-scale elements. For rural historic landscapes, workmanship in raising crops contributes to integrity if it reflects traditional or historic practices. Feeling is intangible but is evoked by the presence of physical characteristics that reflect the historic scene. The cumulative effect of setting, design, materials and workmanship creates the sense of past time and place. 185 Association is the direct link between a property and the important events or persons that shaped it. Continued use and occupation help maintain integrity of association if traditional practices are carried on. Using traditional methods in new construction reinforces a property’s integrity by linking past and present.15 Entire Property: 1256 Mission Road, 1261-1267 Baywood Avenue, and 1262 Edgewood Way Based on the definitions for each aspect of integrity established above, the entire subject site retains integrity of location because it has not moved. The property has lost integrity of setting since the surrounding area has been converted to suburban housing. The site does not retain integrity of design and materials since one of the buildings has been demolished and, aside from the existing open land, there are no plant remains to indicate the type of farming that took place on the site. Integrity of workmanship for the site, such as the sheds and fencing that separates some areas, could not be determined since the date of construction for the small sheds is unknown. Feeling has diminished since the sense of past time and place has eroded with the impacts to setting and the cessation of farming on the property. While the property’s association with agriculture is conveyed by the open land, the small sheds, and the tractor on the property, the type of farming is not apparent and no important events or persons have been identified that previously or currently are associated with the property. Although two buildings from the relevant period of agricultural development remain, the buildings are not clearly associated with farming. The small sheds were used for farming, but are not sufficient themselves to convey an association with farming for the entire site. For these reasons, the property as a cultural landscape has lost integrity to the historic context of farming in Colma and South San Francisco during the nineteenth and twentieth centuries. Eligibility for listing in the California Register requires both historic significance and integrity. The subject site as a whole has been found in this evaluation to lack both historic significance and integrity, and is not considered eligible for the California Register. Individual Property: 1256 Mission Road Based on the definitions for each aspect of integrity established above, 1256 Mission Road retains integrity of location because it has not moved. The building has lost some integrity of setting since the surrounding area has been converted to suburban housing. The building retains integrity of design since no apparent alterations have changed the floor plan or the façades. The building retains integrity of materials and workmanship, despite the fact that the windows have been boarded and the building has 15 Past Consultants, LLC, Historic Context Statement for Agricultural Resource in the North County Planning Area, Monterey County (September 2010) 127. 186 deteriorated in other aspects. Feeling has diminished since the sense of past time and place has eroded with the impacts to setting, though the building does still read as a residence from the 1920s or 1930s. Although the Cuneo family owned the house, no evidence was found to associate the house with the farming that took place on the property. For these reasons, 1256 Mission Road retains moderate integrity. Individual Property: 1261-1267 Baywood Avenue There are no buildings on the site to assess. Individual Property: Southeast house at 1262 Edgewood Way Based on the definitions for each aspect of integrity established above, the southeast house at 1262 Edgewood Way retains integrity of location because it has not moved. The building has lost some integrity of setting since the surrounding area has been converted to suburban housing. The building retains integrity of design, materials, and workmanship since no apparent alterations have changed the floor plan or the building’s appearance. Feeling has diminished since the sense of past time and place has eroded with the impacts to setting and the cessation of farming on the property. Although the Cuneo family owned the house, no evidence was found to associate the house with the farming that took place on the property. For these reasons, the southeast house at 1262 Edgewood Way retains moderate integrity. Individual Property: Northwest house at 1262 Edgewood Way Based on the definitions for each aspect of integrity established above, the northwest house at 1262 Edgewood Way retains integrity of location because it has not moved. The building has integrity of setting since it is surrounded by suburban housing which was built around the same time as the subject building. The building retains integrity of design, materials, and workmanship since no apparent alterations have changed the floor plan or the building’s appearance. The cumulative impact of these various aspects of integrity contribute to the integrity of feeling for the property. Given that the house continues to be used as a residence, it also retains integrity of association. The northwest house at 1262 Edgewood Way retains high integrity, although it does not have historic significance. CONCLUSION In conclusion, the property which includes 1256 Mission Road, 1261-1267 Baywood Avenue, and 1262 Edgewood Way does not appear eligible for listing in the California Register because it lacks significance and integrity. The individual buildings also do not appear eligible for listing in the California Register because they lack significance under any criteria. Based on the information provided in this 187 memorandum, none of the buildings or the property as a whole qualify as historical resources for the purposes of CEQA. 188 Attachment 7 Correspondence from the Public 189 190 From: Barbara J Lara <jnblara1@gmail.com> Sent: Saturday, February 14, 2015 1:15 PM To: Gross, Billy Subject: Baywood opening Plan B As a long time resident of Sequoia Ave, I vehemently object to the opening of Baywood Ave on Sequoia Ave! Barbara J Lara 296 Sequoia Ave. 191 From: Dennis Rudoni <dcr2356@aol.com> Sent: Friday, February 13, 2015 3:58 PM To: Gross, Billy Cc: Samantha@cityventures.com Subject: Development at 1256 Mission rd. Hello Billy and Samantha, I am a 3rd generation SSF resident. I was raised in Sunshine Gardens as was my wife. My parents were "original" owners on Crestwood dr. We were fortunate enough to raise our children in Sunshine Gardens. We still live here at the house my wife was raised in. I hope you're still with me, if you are please know, this is a neighborhood of single dwelling homes. I and many of us in the "Gardens" are against this plan of intrusion by a populace of people who would have no roots in our neighborhood. I am not talking about a couple buying a house in the Gardens and living there and possibly raising their children here. I know there is not enough housing. I get it. I also know this development is going through. In my opinion, if there is access to or from this development on Baywood ave then that would greatly affect my investment of my property in a negative way. You have already heard all the negatives as to why it is a bad idea to let this development have ins or outs of a well established single dwelling neighborhood. Now you propose to intrude not 1 block (Edgewood) but 2 blocks (Baywood) up into our neighborhood for this traffic to get to and from their development. I don't have the money to fight this other than to file a class action suit on behalf of the residents of Sunshine Gardens. If you do this you will affect my life in a negative way that I did not ask for. I have lived here all my life because of the quality of life that I have received here in the Gardens. I am asking, no, demanding that you see that this decision of intrusion will negatively affect that quality of life. Dennis C Rudoni dcr2356@aol.com 192 February 17, 2015 To: Mr. Billy Gross, Senior Planner City of South San Francisco From: Louise Pacheco, Franca and & Remo Moschini South San Francisco Resident 1252 Baywood Avenue Subject: Proposed development at 1256 Mission Road, South San Francisco I am writing because I have just been made aware of the proposed development planned for 1256 Mission Road, South San Francisco. I am extremely disappointed that the City is considering squeezing - in yet one more development without any regard to the quiet community of Sunshine Gardens. I have not pulled all the documentation regarding this plan nor have I obtained the CEQA documents yet to review what the findings are and the mitigations you will be proposing to deal with the traffic , noise and parking issues which will certainly evolve from this project. My parents currently live on Baywood Avenue and have since 1960. Their property is across the street from this proposed development. They are elderly Italian immigrants who are very upset at what's happening . As their daughter and future heir to their home I'm speaking for them as well as myself. I still currently reside in SSF and am victim to the development that is going in on Spruce and El Camino. I fully understand the outcry from the residents on Edgewood as well. This has been a quiet dead end street and I'm happy to hear that you are now reconsidering to not disrupt that street. However, in order to make up for that, you are now considering opening up Baywood to accommodate ingress/egress to the town house complex in lieu of the Edgewood option. This is still unacceptable. Since the housing location was decided because its close proximity to public transportation, school and the like, then all ingress/egress should come out on Mission Road.....not Baywood. I have no issues and welcome the single family homes with access from Baywood because those homes will have their own garages, driveway and frontage parking. My main concern is simple.....31 units. Assuming residents would have two cars where would that overflow parking go. Assuming the residents have 31 visitors or more, where would that overflow parking go. Access from Baywood will invite overflow parking issues on this peaceful street and inconvenience the long-time residents who live there. Access from Baywood will also add a significant amount of traffic to a minimal to no traffic street. Baywood will be an attractive cut-across street as well. My elderly parents who need front access to their home, will now be jeopardized. 193 By containing all ingress/egress onto Mission Road (you can design a loop around to include fire truck access). Surely you can make that work. You need to avoid encroaching into the quite community of Sunshine Gardens and keep the plan on Mission Road, where the Sunshine Gardens is less affected. I also recommend that a stop sign be placed at the three-way at the bottom of Sequoia and Mission Road.....since BART it's become a challenge to get across. I'm not thrilled about what low income/medium income housing invites to this community, but I also understand the State's mandate that cities need to provide for this. I don't like it . Many wonderful communities spanning down the peninsula and now in SSF has lost its character and suburb feel. The view that my parents enjoy, will now be blocked by the 3-story units. Privacy will be violated. However, I won't fight that battle as I'm a reasonable person. Having said that, I am absolutely against any townhouse access from Baywood and support the single family homes plan on Baywood. Period. Please go back to the developer....you hold the cards, to have them re-think ingress/egress from Mission Road only. As you can see, I'm not necessarily against the development plan, just how it effects Baywood. Your duty is to ensure the best interest of the city and its residents. Disrupting a quiet community like Sunshine Gardens is not in the best interest of the residents here who are loyal, long- time tax-paying citizens. All we are asking is a better plan for the ingress/egress issue. I do plan to attend the February 25th town meeting as will many of us. Again, I respectfully request that you will reconsider using Baywood for any townhouse access and keep the single family home plan intact. Respectfully, 194 TABLEOFCONTENTS ARTICLEIDEFINITIONS ....................2 1.AnnexationProperty ..............2 2.ArchitecturalGuidelines ...........2 3.ArchitecturalReviewCommittee ........2 4.Articles ...................2 5.Assessments ..................3 6.BestManagementPractices ...........4 7.Board.....................5 8.By-Laws ....................5 9.CalBRE ....................5 10.City .....................5 11.CommonArea ..................5 12.CommonExpenses ................6 13.CommonProperty ................6 14.Condominium ..................7 15.CondominiumPlan ...............7 16.CondominiumUnit ...............7 17.Corporation ..................7 18.CorporationProperty .............8 19.CostCenterBudget ..............9 20.CostCenterElement ..............9 21.CostCenterExpenses .............9 22.County ....................9 23.Declarant ...................9 24.Declaration ..................10 25.Dispute ....................10 26.ExclusiveUseCorporationProperty ......10 27.FHLMC.....................10 28.FNMA .....................10 29.GNMA .....................10 30.Include,Including ..............10 31.Improvements .................11 32.LimitedWarranty ...............11 33.LocalGovernmentAgency ............11 34.Lot......................11 35.Maintain,Maintenance .............11 36.MaintenanceGuidelines;MaintenanceManual; MaintenanceObligations ............12 37.Member ....................12 38.Module ....................12 39.Mortgage ...................12 40.Mortgagee ...................12 41.Mortgagor ...................12 42.NoticeandHearing ..............12 43.NoticeofAnnexation .............13 44.Owner.....................13 45.Phase.....................13 46.Project ....................13 47.RulesandRegulations .............13 48.VA/FHA ....................13 49.WaterQualityManagementPlans ........14 52027.048-22139.FCM110714 (i) 50.Interpretation ................14 51.ApplicationofDefinitions ..........15 ARTICLEIIINTRODUCTIONTOTHESOUTHCITYSTATION .......15 1.GeneralPlanofDevelopment ..........15 2.MembershipinCorporation ...........16 3.AnnexationofSubsequentPhasesIntothe Corporation ..................16 4.Declarant’sUseofPrivateDrives, Aisles,andCommonParkingAreas andUtilities .................16 5.PostTensionSlabs ..............16 6.DevelopmentControl ..............17 7.Non-LiabilityofDeclarant ..........18 8.IrrevocableLimitedPowerofAttorney .....19 9.MortgageInterestandOtherEncumbrances toTakeSubjecttoPowerofAttorney .....21 ARTICLEIIIDESCRIPTIONOFTHECONDOMINIUMS ..........21 1.CondominiumUnit ...............21 2.PresumptionofBoundariesof CondominiumUnits ...............23 3.CommonArea ..................23 4.ExclusiveUseCorporationProperty ......23 5.UndividedFractionalFeeInterest inCommonArea ................25 6.EasementsOverCorporationProperty ......25 7.ComponentsofCondominiumOwnership ......25 8.CondominiumNumbering .............26 9.GuestParkingAreas ..............26 10.ReservationofEasementsOverCorporation PropertyForSubsequentPhases ........26 ARTICLEIVRESERVATIONOFEASEMENTSANDOTHER PROPERTYRIGHTSINTHECORPORATIONPROPERTY ....26 1.Owners’Easements ...............26 2.LimitationsonOwners’EasementRights ....26 3.DelegationofCorporationProperty UseRights ..................29 4.EasementsforVehicularTraffic ........29 5.EasementsforAirConditioners/Solar Collector ...................29 6.EasementsforUtilities ............30 7.EasementsforMaintenanceofthe CorporationPropertybytheCorporation ....32 8.EasementsforClusteredMailboxes .......32 9.EasementsOverSidewalks ...........32 10.EasementsforDrainage ............32 11.EasementforAreaDrains ...........33 12.EasementsforConstructionandSales .....34 13.EasementsforMasterAntennae,Cable TelevisionandAlarmSystemCabling ......34 52027.048-22139.FCM110714 (ii) 14.ReservationofConstructionRights byDeclarant .................34 15.EasementforPublicServiceUses .......34 16.ControlofCorporationProperty ........35 17.EasementsforEncroachments ..........36 18.OtherEasementsandLicenses .........36 ARTICLEVTHECORPORATION ..................37 1.Membership ..................37 2.VotingRights .................37 3.SpecialProceduresForAppointment totheBoard .................38 4.AdjustmentofVotingRights ..........38 5.VestingofVotingRights ...........38 6.SuspensionofVotingRights ..........38 7.Transfer ...................39 8.RecordDates .................39 ARTICLEVIPOWERSANDDUTIESOFTHECORPORATION ........39 1.ManagementBody ................39 2.Powers ....................39 3.Duties ....................42 4.DiscretionaryPowers .............51 5.NotificationbyCorporationofDefects ....52 6.AwardsRenderedinConstruction DefectsDisputes ...............53 7.SpecialMeetingoftheCorporationfor ConstructionDefectDisputes .........53 8.DelegationsofDuties .............53 9.RightofEntryforEmergency .........53 10.RightofEntryforRepairs ..........53 11.LimitationsonBoardAction ..........54 12.Licenses,EasementsandRights-of-Way .....55 13.NewImprovements ...............55 14.CorporationRulesandRegulations .......56 15.NonliabilityandIndemnification .......56 16.ArbitrationofDisputes ............58 ARTICLEVIIASSESSMENTS ....................67 1.CreationoftheLienandPersonal ObligationofAssessment ...........67 2.PurposeofRegularAssessments:Levyand Collection ..................67 3.RegularAssessments-Basis ..........67 4.SpecialAssessmentsforCapitalImprovements.70 5.ComplianceAssessments ............71 6.NoticeofIncreaseinAssessments .......71 7.CostCenterAssessmentComponent .......71 8.SpecialBenefitAssessments ..........72 9.DateofCommencementofRegularAssessments: DueDates ...................72 10.CollectionofAssessments ...........73 52027.048-22139.FCM110714 (iii) 11.CertificationofPayment ...........73 12.DeliverybyOwner ...............73 13.DeliveryofStatement .............74 14.DeliverybyDeclarant .............74 15.Reserves ...................74 16.OffsetsandWaiverProhibited .........75 17.ExemptProperty ................75 18.InitialCapitalContributions .........75 ARTICLEVIIIEFFECTOFNONPAYMENTOFASSESSMENTS: REMEDIESOFTHECORPORATION ............75 1.EffectofNonpaymentofAssessments:Remedies oftheCorporation ..............75 2.NoticeofDelinquentAssessments .......76 3.ForeclosureSale ...............76 4.CuringofDefault ...............76 5.CumulativeRemedies ..............77 6.MortgageeProtection .............77 ARTICLEIXUSERESTRICTIONS ..................77 1.PrivateDwelling ...............77 2.CommonPropertyUse ..............77 3.ConductAffectingInsurance ..........77 4.LiabilityforDamagetotheCommonProperty..78 5.Signs.....................78 6.MaintenanceofAnimals ............79 7.QuietEnjoyment ................79 8.StructuralChanges ..............80 9.Improvements .................80 10.WindowCoverings ...............80 11.CommercialActivity ..............81 12.ParkingandVehicularRestrictions ......81 13.RegulationofParking;Towing .........84 14.ComplianceWithManagementDocuments .....84 15.Solar.....................84 16.AntennaRestriction ..............85 17.OtherImprovements ..............86 18.WaterSofteners ................87 19.Leasing ....................87 20.Drilling ...................87 21.Trash.....................87 22.ExemptionofDeclarant ............88 23.NoEasementsForViewPurposes;Disclaimer..89 24.ScreenDoors .................89 25.PollutantControl ...............89 26.CorporationProperty .............90 27.RightsofDisabled ..............91 28.WaterBeds ..................91 29.AutomaticFireSprinklerandAlarmSystem...91 30.NoUseofHazardousMaterials .........92 31.Noise.....................92 32.Sub-meteringofWater .............94 33.NoWarrantyofEnforceability .........95 52027.048-22139.FCM110714 (iv) ARTICLEXREPAIRANDMAINTENANCE ...............95 1.RepairandMaintenancebyCorporation .....95 2.MaintenanceManual ..............98 3.ProjectInspections ..............99 4.MaintenanceofPhasesSubjectto ConstructionEasement .............100 5.RepairandMaintenancebyOwner ........100 6.DamageandDestructionAffectinga Condominium..................103 7.LevyofComplianceAssessments ........104 8.MaintenanceofPublicUtilities ........104 ARTICLEXIENVIRONMENTALANDOTHERDISCLOSURES ANDREQUIREMENTS ..................104 1.EnvironmentalRequirements ..........104 ARTICLEXIIARCHITECTURALREVIEW-APPROVAL ..........106 1.ExemptionsFromArchitecturalReview .....106 2.ArchitecturalReview .............106 3.ArchitecturalReviewCommittee ........107 4.MeetingsoftheArchitecturalReview Committee ...................107 5.ArchitecturalApproval-ReviewofPlans andSpecifications ..............108 6.DecisionsoftheArchitecturalReview Committee ...................109 7.SubmittaltoPublicAgencies-Rightof ArchitecturalReviewCommitteetoReview ...110 8.ConflictsBetweenGovernmentalAgencies andArchitecturalReviewCommittee ......110 9.NoWaiverofFutureApprovals .........110 10.CompensationofMembers ............110 11.Variances ...................111 12.InspectionofWork ..............111 13.Non-LiabilityofArchitecturalReview CommitteeMembers ...............111 14.Appeal ....................112 15.ApprovalofCity ...............112 ARTICLEXIIIDAMAGEORDESTRUCTIONTO THECORPORATIONPROPERTY ..............112 1.ElectiontoRestoreCorporationProperty ...112 2.ElectionNottoRestoreCorporation Property ...................113 3.ExcessInsuranceProceeds ...........114 ARTICLEXIVCONDEMNATION ....................114 1.DistributionofAwards ............114 2.BoardofDirectorsasAttorney-in-Fact ....114 52027.048-22139.FCM110714 (v) ARTICLEXVCOVENANTAGAINSTPARTITION .............114 1.GeneralCovenantAgainstPartition ......114 2.JudicialPartitionoftheProject .......114 3.BoardofDirectors’PowerofSaleinEvent ofJudicialPartition .............115 ARTICLEXVIINSURANCE .....................115 1.RequiredInsuranceCoverage ..........115 2.OptionalInsuranceCoverage ..........118 3.NoticeofCancellationofInsurance ......118 4.ReviewofCoverage ..............118 5.WaiverbyOwners ...............118 6.Premiums,ProceedsandSettlement .......119 7.RightsandDutiesofOwnerstoInsure .....119 8.TrusteeforPolicies .............120 9.MortgageClause ................120 10.ComplianceWithRequirementsofFHLMC,FNMA andVA/FHA ..................120 11.RequiredWaiver ................122 12.AnnualNotificationofInsurance .......122 ARTICLEXVIIMORTGAGEEPROTECTION ................123 1.MortgageeProtectionProvisions ........123 2.ViolationofMortgageeProtectionProvisions.127 3.EffectofAmendments .............128 4.AmendmentstoConformWithMortgagee Requirements .................128 ARTICLEXVIIIENFORCEMENTOFBONDEDOBLIGATIONS .........128 1.EnforcementofBondedObligations .......128 ARTICLEXIXANNEXATIONOFADDITIONALPROPERTY .........129 1.PhasedDevelopmentoftheProject .......129 2.AnnexationPursuanttoGeneralPlan ......130 3.AnnexationPursuanttoApproval ........130 4.NoticeofAnnexation .............130 5.EffectiveDateofAnnexation .........130 6.RightofDe-Annexation ............131 7.AmendmentstoNoticesofAnnexation ......131 ARTICLEXXVETERANSAFFAIRSPROVISIONS ............131 1.CondominiumOwnership .............131 2.CondominiumDocumentation ...........131 3.Amendments ..................132 4.DescriptionoftheCondominiumUnits, CommonArea,andCorporationProperty .....132 5.Corporation’sRightofTerminationof CertainContracts ...............132 6.Corporation’sRightofEntryandOtherRights.133 52027.048-22139.FCM110714 (vi) 7.Assessments ..................133 8.ReservesandWorkingCapital .........133 9.VotingRights .................133 10.Easements ...................134 11.RestrictionsonAlienation ..........134 12.RightsofAction ...............134 13.MiscellaneousRequirements ..........134 ARTICLEXXIGENERALPROVISIONS .................137 1.Enforcement ..................137 2.Severability .................139 3.Term .....................139 4.Construction .................139 5.SingularIncludesPlural ...........139 6.Amendments ..................140 7.Encroachments .................143 8.Notices ....................143 9.Attorneys’Fees ................143 10.MergersorConsolidations ...........144 11.NoticeofProcedures .............144 12.NoEnhancedProtectionAgreement .......144 13.DECLARANT’SELECTIONTOOPTINTO PRE-LITIGATIONPROCEDURESSETFORTHINRIGHT TOREPAIRLAW .................144 14.AgentforNotice ...............145 15.AlternativeDisputeResolutionofDisputes..145 16.CorporationPropertyClaims ..........145 17.MaintenanceStandards .............145 18.NoRepresentationsorWarranties .......145 19.Exhibits ...................146 20.ProjectDisclosures ..............146 21.PrioritiesandInconsistencies ........148 22.Declarant’sRepresentative ..........148 23.CompliancewithRequirementsofFHLMC, FNMA,andVA/FHA ...............148 ARTICLEXXIIADDITIONALREQUIREMENTSOFCITY ..........149 1.LandscapePlansandConstruction ofImprovements ................149 2.ApprovalofCity ...............150 EXHIBITS: ExhibitALegalDescriptionofPhase1 ExhibitBAnnexationProperty ExhibitCCorporationMaintainedFencesandWalls ExhibitDCorporationMaintainedStormDrainFacilities ExhibitESampleFormofLimitedWarranty ExhibitFNoParkingAreas ExhibitGMaintenanceMatrix 52027.048-22139.FCM110714 (vii) DECLARATIONOFCOVENANTS,CONDITIONS ANDRESTRICTIONS,AND RESERVATIONOFEASEMENTSFOR SOUTHCITYSTATION ____________________________________ THISDECLARATIONOFCOVENANTS,CONDITIONSANDRESTRIC- TIONS,ANDRESERVATIONOFEASEMENTSFORSOUTHCITYSTATIONismade this_____dayof_______________,201_,byCITYVENTURES HOMEBUILDING,LLC,aDelawarelimitedliabilitycompany(herein- afterreferredtoasthe"Declarant"). W I T N E S S E T H: A.Declarantownsthatcertainrealpropertylocatedin theCityofSouthSanFrancisco,CountyofSanMateo,Stateof California,moreparticularlydescribedonExhibit"A"attached hereto(hereinafterreferredtoasthe"Property"or"Phase1"). B.DeclarantdesirestosubdivideLot1ofTractNo.^, asauthorizedbySection66427oftheCaliforniaGovernmentCode, into"condominiums,"asdefinedinSection783oftheCalifornia CivilCode,andtodevelopPhase1andanyofthe"Annexation Property,"ashereinafterdefined,whichissubsequentlyannexedto Phase1pursuanttotheArticlehereinentitled"Annexationof AdditionalProperty"asacommoninterestdevelopment,more particularlydescribedinSection4125oftheCaliforniaCivilCode asa"condominiumproject"(hereinafterreferredtoasthe "Project"),asmoreparticularlydescribedbelow. C.Declarantdeemsitdesirabletoimposeageneral planforthedevelopment,maintenance,improvement,protection, use,occupancyandenjoymentoftheProject,andtoestablish, adoptandimposecovenants,conditions,restrictions,easements, equitableservitudes,liensandcharges(hereinafterreferredtoas the"ProtectiveCovenants")upontheProjectforthepurposeof enforcing,protectingandpreservingthevalue,desirabilityand attractivenessoftheProject. D.Declarantdeemsitdesirablefortheefficient enforcement,protectionandpreservationofthevalue,desirability andattractivenessoftheProjecttocreateacorporationwhich shallbedelegatedandassignedthepowersofadministeringand enforcingtheProtectiveCovenants. E.SouthCityStationCommunityCorporation,aCali- fornianonprofit,mutualbenefitcorporation,hasbeenorwillbe incorporatedunderthelawsoftheStateofCaliforniaforthe purposeofexercisingtheaforesaidpowers. -1-52027.048-22139.FCM110714 F.DeclarantintendstoconveyPhase1,andanyandall realpropertyannexedthereto,subjecttotheProtectiveCovenants setforthhereinbelow. NOW,THEREFORE,pursuanttoSections4000,et seq.,of theCaliforniaCivilCode,Declarantdeclaresthatitdoeshereby establishageneralplanforthedevelopment,maintenance,care, improvement,protection,use,occupancy,managementandenjoyment oftheProject,andthatalloranyportionoftheProjectshallbe held,sold,conveyed,encumbered,hypothecated,leased,used, occupiedandimproved,subjecttotheprotectivecovenantsset forthherein("ProtectiveCovenants").Eachandallofthe ProtectiveCovenantsshallrunwiththeProject,andshallbe bindinguponallpersonshavinganyright,titleorinterestinthe Project,oranyportionthereof,theirheirs,successorsand assigns,andshallinuretothebenefitofandbebindinguponDe- clarant,itssuccessorsandassigns,allsubsequentownersofall oranyportionoftheProject,togetherwiththeirgrantees,heirs, executors,administrators,devisees,successorsandassigns. ARTICLEI DEFINITIONS Section1."AnnexationProperty"shallmeanandrefer tothatcertainrealpropertydescribedinExhibit"B"attached hereto,includingallImprovements(asdefinedbelow)constructed thereon,alloranyportionofwhichmaybeannexedtoPhase1as setforthintheArticlehereinentitled"AnnexationofAdditional Property." Section2."ArchitecturalGuidelines"shallmeanand refertothosecertainarchitecturalstandards,landscapestandards andothergeneralpolicies,proceduresandcriteriawhichmaybe adoptedbytheBoardpursuanttothisDeclarationforusebythe ArchitecturalReviewCommitteeinreviewingplansandspecifica- tionsforproposedImprovementstoanOwner’sCondominium(e.g., ExclusiveUseCorporationProperty).TheArchitecturalGuidelines aregeneralguidelinesandmaybeamendedfromtimetotimebya majorityoftheBoard.AcopyoftheArchitecturalGuidelinesmay beobtainedfromtheArchitecturalReviewCommittee. Section3."ArchitecturalReviewCommittee"shallmean andrefertothecommitteecreatedpursuanttotheArticleherein entitled"ArchitecturalReview-Approval." Section4."Articles"shallmeanandrefertotheAr- ticlesofIncorporationofSouthCityStationCommunity Corporation,asfiledintheOfficeoftheSecretaryofStateof theStateofCalifornia,assuchArticlesmaybeamended,fromtime totime. -2-52027.048-22139.FCM110714 Section5."Assessments"shallbeusedasageneric termwhichshallmeanandrefertothefollowing: (a)"RegularAssessment"shallmeanandreferto theannualchargeagainsteachOwnerandhisrespective CondominiumrepresentingaportionoftheCommonExpensesof theCorporation; (1)"GeneralAssessmentComponent."The GeneralAssessmentComponent(orbaseassessmentcompo- nentasmaybereferredtointheCalBREapprovedBudget) consistsoftheCommonExpensesoftheCorporation, exclusiveofallCostCenterExpenses(definedbelow) budgetedtocertainCondominiumswhichareattachedand partofacondominiumbuildingwithmorethanone CondominiumasopposedtothoseCondominiumswhichare notattachedtoanotherCondominium.TheGeneral AssessmentComponentshallbeallocatedequallyamongall oftheOwnersandtheirrespectiveCondominiumbasedupon thenumberofCondominiumsowned;and (2)"CostCenterAssessmentComponent."The CostCenterExpensesbudgetedexclusivelytoaCost CenterElement("CostCenterAssessmentComponent"),if applicable,shallbeassessedsolelytotheOwnersof Condominiumstowhichtheexclusiveordisproportionate operation,maintenance,repair,replacement,and/or fundingofreserves,costsandexpensesofsuchCost CenterElementhasbeenallocated(e.g.,fireand casualtybuildinginsurance,exteriorbuilding maintenance,buildingreservesandoperatingbuilding lights,roof,paint,andfiresprinklersandfirealarms forthebuildingscontainingmorethanoneCondominium Units).ItisanticipatedthattheCostCenterAssessment Componentwillbeallocatedonapro-ratabasisamong thoseCondominiumswhicharesubjectthereto,asset forthintheCorporationbudgetorotherwisedetermined bytheBoard. (b)"ComplianceAssessment"shallmeanandreferto thepersonalchargeagainstanOwnerrepresentingthecosts incurredbytheCorporationtorepairanydamagetotheCommon Property(asdefinedbelow)forwhichsuchOwner(orany memberofhisfamily,orhisguests,invitees,tenantsor lessees)wasresponsible,thecostsincurredbytheCorpora- tiontobringsuchOwnerandhisCondominiumintocompliance withthisDeclaration,and/oranyamountduetheCorporation basedupondisciplinaryproceedingsagainstanOwnerinac- cordancewiththisDeclaration,oranyamountduetheCorpora- tiontoreimbursetheCorporationforadministrativecosts attributabletoanOwnerasprovidedherein; -3-52027.048-22139.FCM110714 (c)"SpecialAssessment"shallmeanandreferto thechargeagainstanOwnerandhisrespectiveCondominium representingaportionofthecostofreconstructingany damagedordestroyedportionorportionsoftheCommon Property,ofconstructingorinstallinganycapitalimprove- mentstotheCommonProperty,oroftakinganyextraordinary actionforthebenefitoftheCommonPropertyorthemember- shipoftheCorporation,pursuanttotheprovisionsofthis Declaration.Inaddition,SpecialAssessmentshallmeanand refertoareasonablefineorpenaltyassessedbytheBoard, plusinterestandotherchargesonsuchSpecialAssessmentas providedforherein;and (d)"SpecialBenefitAssessment"shallmeanand refertoacharge,excludingtheCostCenterAssessment Component,leviedbytheCorporationagainstanOwnerandhis respectiveCondominiumtocovertheexpensesincurredbythe Corporationintheoperation,maintenance,repairand/or fundingofreservesforaportionoftheProjectdesignatedby DeclarantortheBoardasa"SpecialBenefitArea,"which expensesareallocableonlytotheOwnersandtheir CondominiumwithinsuchanArea.SpecialBenefitAssessments orSpecialBenefitAreasmaybeidentifiedbytheDeclarant and/ortheBoard. Section6."BestManagementPractices"shallmeanand refertothosecertainstructural,treatmentcontrol,andnon- structuralwaterqualitymanagementpracticessetforthin,or otherwiserequiredpursuantto,theWaterQualityManagementPlan ("WQMP")and/orStandardUrbanStormWaterManagementPlan ("SUSMP")approvedfororapplicabletotheProject.Thestructur- alandtreatmentcontrolBestManagementPracticesmayinclude, withoutlimitation,landscapeplanting,hillsideplanting,roof runoffcontrols,efficientirrigationtechnology,slopeandchannel protectionmeasures,stormdrainsignage,trashstorageareas, littercontrolrequirements,in-flowbasedtreatmentcontrolBMPs (e.g.,vegetatedbufferstrips,vegetatedswales,multiplesystems, bioretentions,andhydrodynamicseparationsystems),volumebased treatmentcontrolBMPs(e.g.,wetponds,constructedwetlands, extendeddetentionbasins,detentionpipes,waterqualityinlets, retention/irrigation,infiltrationbasins,infiltrationtrenches, mediafilters,andmanufacturedproprietarydevices),detention basins,retentionbasins,debrisbasins,“V”ditches,benchdrains, catchbasins,catchbasinmediafilters,fossilfilters,inlet trashracks,drainpacsandotherstormdrainfiltrationdevices, energydissipaters,culverts,pipes,andrelatedstormdrainand waterqualityfacilitiesconstructedintheProject.Thenon- structuralBestManagementPracticesgenerallyrequirethe CorporationandtheOwnersandotherresidentswithintheProject tobeawareofthesensitivenaturalenvironmentsurroundingthe Projectandtotakeappropriateactionstocontrolrunofffromthe Project.WithrespecttotheCorporation,thenon-structuralBest ManagementPracticesmayinclude:(i)providinginformational -4-52027.048-22139.FCM110714 materialstotheOwnersandotherresidentswithintheProject regardinggeneralgoodhousekeepingpracticesforprotectionof stormwaterquality;(ii)restrictingcertainactivitiesaddressed intheinformationalmaterialstoprotectthequalityofwater enteringthestormdrainsystem;(iii)managingthelandscapingon theCorporationProperty,including,withoutlimitation,using fertilizersandpesticidesinaccordancewiththe“Management GuidelinesforUseofFertilizersandPesticides”whichis included,ifapplicable,intheappendixtotheWaterQuality ManagementPlans;(iv)performingonaregularlyscheduledbasis maintenanceconsisting,ataminimum,oflittercontrol;(v) inspectingandcleaninganycatchbasinslocatedontheCorporation Property;and(vi)sweepinganyon-siteprivatepavedareasona regularbasisandpriortotherainyseason.Withrespecttothe OwnersandotherresidentswithintheProject,thenon-structural BestManagementPracticesmayinclude,amongotherthings, restrictingcertainactivitiestoprotectthequalityofwater enteringthestormdrainsystem(e.g.,prohibitingthedisposalof motoroil,paintproducts,cardetergentsandotherpollutantsinto thestormdrainsintheProject).TheBestManagementPractices aredesignedandintendedtocontrolrunoffandmustbeimplemented bytheCorporation,andtheOwnersandotherresidentswithinthe Project.TheBestManagementPracticesmaybemodifiedfromtimeto timebytheDeclarantoranypublicagencyhavingjurisdiction regardingwaterqualityforrunoffwatersfromtheProjectinorder tocontrolrunoffastheProjectdevelopsandrunoffconditions change.CompliancebytheCorporationandtheOwnerswiththeBest ManagementPractices,astheymaybemodifiedfromtimetotime, maybemonitoredandenforcedbyanypublicagencyhavingjurisdic- tionregardingwaterqualityforrunoffwatersfromtheProject, including,withoutlimitation,theCity,County,RegionalWater QualityControlBoard,andStateWaterResourcesBoard. Section7."Board"shallmeanandrefertotheBoardof DirectorsoftheCorporation,electedinaccordancewiththeBy- LawsoftheCorporationandthisDeclaration. Section8."By-Laws"shallmeanandrefertotheBy- LawsoftheCorporationwhichhavebeen,orwillbe,adoptedbythe Board,assuchBy-Lawsmaybeamended,fromtimetotime. Section9."CalBRE"shallmeanandrefertotheBureau ofRealEstateoftheStateofCalifornia,whichadministersthe saleofsubdividedlandspursuanttoSections11000,et seq.,of theCaliforniaBusinessandProfessionsCode,oranysimilar Californiastatutehereinafterenacted. Section10."City"shallmeanandrefertotheCityof SouthSanFrancisco,Californiaanditsvariousdepartments, divisions,employeesandrepresentatives. Section11."CommonArea"inPhase1shallmeanand refertothatcertainportionofPhase1describedasModuleBon -5-52027.048-22139.FCM110714 theCondominiumPlanforPhase1,asdefinedinSection4095ofthe CaliforniaCivilCodeandasmoreparticularlydescribed hereinbelow.PortionsoftheAnnexationPropertymaybedesignated asadditional"CommonArea"forasubsequentPhaseinanyNoticeof AnnexationrecordedintheOfficeoftheCountyRecorder,inac- cordancewiththeArticlehereinentitled"AnnexationofAdditional Property." Section12."CommonExpenses"shallmeanandreferto theactualandestimatedcoststobepaidbytheCorporationfor thecommonbenefitofallOwnersofCondominiumsintheProject. ExceptasotherwiseprovidedinthisDeclaration,theCommon Expensesshallincludeallcostsandexpensesincurredbythe Corporationinconnectionwiththefollowing:(a)owning,maintain- ing,managing,operating,repairingandreplacingtheCorporation Property;(b)managingandadministeringtheCorporation,in- cluding,butnotlimitedto,compensationpaidbytheCorporation tomanagers,accountants,attorneys,budgetpreparers,andother consultantsandanyCorporationemployees;(c)allgeneraloffice andadministrativeexpensesincurredbytheArchitecturalReview Committee;(e)providingutilitiesandotherservicestothe CorporationProperty,and,ifnotseparatelymetered,tothe CondominiumUnits(e.g.,domesticwater[subjecttoasubmeter reimbursementfromtheOwners,etc.);(f)providinginsurance(and payingdeductibles)asprovidedforherein;(g)payingthatportion ofanyAssessmentattributabletoCommonExpensesnotpaidbythe Ownerresponsibleforpayment;(h)payingtaxesfortheCorpora- tion;(i)payingallreasonableout-of-pocketexpensesactually incurredbythemembersoftheBoardandofficersofthe Corporationinperformingtheirdutiesasprovidedherein(e.g., postageandphotocopying);(j)enforcingtheprovisionsofthis Declaration,theBy-Law,andRulesandRegulations;and(k)paying forallothergoodsandservicesasreasonablyrequiredbythe Corporationtoperformitspowersanddutiesassetforthherein. Additionally,theCommonExpensesshallincludeadequatereserves, astheBoardshalldeterminetobeappropriate,fortherepairand replacementofthoseelementsoftheCorporationPropertywhich mustberepairedorreplacedonaperiodicbasis,ratherthanona regularannualbasis.TheCommonExpensesdonotincludeany actualorestimatedcoststobepaidbytheCorporationforthose ImprovementstotheCorporationPropertywhichconstituteSpecial BenefitImprovementsandwhichareallocableasSpecialBenefit ExpensestotheOwnersofCondominiumswithinaSpecialBenefit Area. Section13."CommonProperty"asusedhereinshallmean andrefercollectivelytoallCommonAreaandtoallCorporation PropertyintheProject.CommonPropertyshallalsoincludeany additionalCorporationPropertyandCommonAreawhicharedesignat- edanddescribedassuchandwhichareannexedintotheProject pursuanttoaNoticeofAnnexationrecordedintheOfficeofthe CountyRecorder,inaccordancewiththeArticlehereinentitled "AnnexationofAdditionalProperty." -6-52027.048-22139.FCM110714 Section14."Condominium"shallmeananestateinreal property,asdefinedinCaliforniaCivilCodeSections4125and 4185,assamemaybeamendedfromtimetotime,consistingofa separateinterestinaCondominiumUnit,anundividedfractional feeinterestintheCommonAreaofthatPhaseoftheProjectof whichtheCondominiumisapart,asmoreparticularlyshownand describedinaCondominiumPlanaffectingsuchPhaserecordedin theOfficeoftheCountyRecorder,togetherwithallexclusiveand nonexclusiveeasementsappurtenantthereto.CondominiumsinPhase 1oftheProjectaremoreparticularlydescribedinArticleIIIof thisDeclaration.CondominiumsinanysubsequentPhasemaybedes- cribedinaNoticeofAnnexationandintheCondominiumPlanwhich arerecordedthataffectsuchPhase. Section15."CondominiumPlan"shallmeanandreferto eachofthoseinstrumentsentitled"CondominiumPlan,"preparedin accordancewithSections4120and4285-4295oftheCaliforniaCivil Code,asthesamemaybeamended,fromtimetotime,andrecorded intheOfficeoftheCountyRecorder,affectingone(1)ormore PhasesoftheProject,andshallconsistof(a)adescriptionor surveymapoftheProjectorPhasethereof,whichshallrefertoor showmonumentationontheground;(b)athree-dimensional descriptionoftheProjectorPhasethereof,oneormoredimensions ofwhichmayextendforanindefinitedistanceupwardsordownwards insufficientdetailtoidentifytheCommonArea,eachCondominium UnitandtheCorporationProperty;and(c)acertificateconsenting totherecordationthereofsignedandacknowledgedbytherecord owneroffeetitletothepropertyincludedintheCondominium Plan,andbyeitherthetrusteeorthebeneficiaryofeachrecorded deedoftrustandtheMortgageeofeachrecordedMortgage encumberingpropertyincludedintheCondominiumPlan.The CondominiumPlanforPhase1shallberecordedpriortoorconcur- rentlywiththisDeclaration,andtheCondominiumPlanforeach subsequentPhaseoftheProjectshallberecordedpriortoor concurrentlywiththeNoticeofAnnexationforsuchPhase. Section16."CondominiumUnit"shallmeanandreferto theelementsofaCondominiumwhicharenotownedincommonwith theOwnersofotherCondominiumsintheparticularPhaseinwhich theCondominiumislocated.CondominiumUnitsinPhase1aremore particularlydescribedintheArticlehereinentitled"Description oftheCondominiums"andintheCondominiumPlanrecordedforsuch Phase.CondominiumUnitsinsubsequentPhasesshallbedescribedin aNoticeofAnnexationandintheCondominiumPlanrecordedfor eachrespectivePhaseoftheProject.Forpurposesofthis Declaration,theterm"CondominiumUnit"isdeemedtobea "separateinterest,"asdefinedinSections4125and4185ofthe CaliforniaCivilCode,assamemaybeamendedfromtimetotime. Section17."Corporation"shallmeanandrefertoSouth CityStationCommunityCorporation,aCalifornianonprofit,mutual benefitcorporation,inwhichallOwnersshallhaveamembership interestasmoreparticularlydescribedhereinbelow,providedthat -7-52027.048-22139.FCM110714 membershipshallbelimitedtoOwners.IntheeventtheCorpora- tionasacorporateentityisdissolved,anonprofit,unincorporat- edassociationshallforthwithandwithoutfurtheractionornotice beformedtosucceedtoalloftherightsanddutiesofsaid Corporation,assetforthherein.Theaffairsofsuchunincorpo- ratedassociationshallbegovernedbytheBy-Lawsandthis Declarationasiftheywerecreatedforthepurposeofgoverning theaffairsofanunincorporatedassociation.Asrequiredbythe City’sMunicipalCode,theCorporationshallnotceasetoexistas anincorporatedorunincorporatedentityunlesstheProjectis terminatedwiththewrittenapprovaloftheCity;thesaleor developmentofanyportionoftheCorporationPropertywithoutthe priorwrittenapprovaloftheCityisexpresslyprohibited. Section18."CorporationProperty"shallmeanandrefer toallpersonalpropertynoworhereinafterownedbytheCorpora- tionandallthatrealproperty(andallImprovementsthereon) ownedinfeebytheCorporationoroverwhichtheCorporationhas aneasementfortheuse,care,maintenanceorotherpurposeforthe commonuse,benefit,andenjoymentofallmembersasprovided herein.InthisfirstphaseoftheProject,theCorporation PropertyisthatportionofLot1ofTractNo.^shownand describedasModule"A"(exceptingtherefromtheCondominiumUnits) andModule"D"ontheCondominiumPlanandallthatcertainreal propertyoverwhichtheCorporationhasaneasementforirrigation, landscaping,maintenance,and/orotherpurposes.Modules"A"and "D,"exceptingtherefromtheCondominiumUnits,andtheeasements describedherein,willbeconveyedtotheCorporation.The CorporationPropertyshallinclude,withoutlimitation,all easementstotheCorporationassetforthherein,thecondominium buildings(exceptingtherefromtheCondominiumUnits),together withallImprovementsincludingawnings,bearingwalls,columns, beams,roofs,slabs,foundations,chimneys,fences,exteriorstairs andlandings,reservoirs,tanks,pumps,commonmailboxstructures (excludingtheindividualmailboxesandthehinges,locksandkeys thereof,whichshallbemaintainedbytheOwners),irrigation equipment,firesprinklers,includingsprinklerheadswhich protrudeintotheairspaceoftheCondominiumUnit,ifany,fire standpipes,firealarmsystems,fireextinguishers,andotherfire preventionequipmentand/orfacilitieslocatedonorservic- ing/protectingtheCorporationProperty,andothercentralser- vices,pipes,ducts,flues,chutes,conduits,wires,exterior lightingandotherutilityinstallationswhereverlocated(except allutilitylines,installationsand/oroutletsthereofwhen locatedwithinorexclusivelyservingoneCondominiumUnit, includingtheinternalandexternaltelephonewiringdesignedto exclusivelyserveaCondominiumUnit),commonstairwells(ifany), poles,sumppumps,sidewalks(ifany),thoseportionsofthesound walls,retainingwalls,perimeterwalls,andfencesdescribed and/ordepictedasmaintainedbytheCorporationonanExhibitto thisDeclarationorarecordedNoticeofAnnexation(e.g.,Exhibit "C"hereto),theprivatedrivesandaislesandcommonparking areas,thoseportionsoftheprivatestormdrainsystemforthe -8-52027.048-22139.FCM110714 Projectdescribedand/ordepictedasmaintainedbytheCorporation inanExhibittothisDeclarationorarecordedNoticeof Annexation(e.g.,Exhibit"D"hereto),signs,Projectmonument signsanddirectories,andlandscapingandirrigationimprovements locatedontheCorporationProperty,exceptingtherefromlandscap- ingandimprovementslocatedintheExclusiveUseCorporation Property.PortionsoftheAnnexationPropertymaybeannexed separatelyoraspartofasubsequentPhaseandshallbedesignated asCorporationPropertyinanyNoticeofAnnexationrecordedinthe OfficeoftheCountyRecorder,inaccordancewiththeprovisionsof theArticlehereinentitled"AnnexationofAdditionalProperty." Section19."CostCenterBudget"shallmeanandreferto theCostCenterBudgetoftheCorporationreviewedbytheCalBREor BoardwhichsetsforththeCommonExpensesoftheCorporation budgetedtotheCostCenteronly. Section20."CostCenterElement"shallmeanone(1)or moreImprovementsormaintenanceareas,including,butnotlimited to,exteriorbuildingmaintenance,fireandcasualtybuilding insurance,buildingreservesandoperatingbuildinglights,paint, firesprinklersandfirealarms,androofreservesandmaintenance, designatedbytheDeclarant,Board,ordescribedinthebudget reviewedbytheCalBREorBoard,andwhichthemaintenancecostfor suchimprovementsormaintenanceareasisrestrictedtocertain OwnersofCondominiumsspecifiedand/ordescribedinthisDeclara- tion,orabudgetreviewedbytheCalBREortheBoard,andwhere theexpenseofoperating,maintaining,repairing,andreplacing suchImprovementsormaintenanceareasisbornesolelyor disproportionately(e.g.,avariable/prorataallocationbasedon squarefootageoftheaffectedCondominium)bysuchspecified Owners. Section21."CostCenterExpenses"shallmeancurrent expensesattributabletoaCostCenterElementwhicharesubjectto maintenancebytheCorporationandreservesforsaidCostCenter Element(e.g.,exteriorbuildingmaintenance,fireandcasualty buildinginsurance,buildingreservesandoperatingbuilding lights,paint,firesprinklersandfirealarms,androofreserves andmaintenanceetc.). Section22."County"shallmeanandrefertotheCounty ofSanMateo,California,anditsvariousdepartments,divisions, employees,andrepresentatives. Section23."Declarant"shallmeanandrefertoCity VenturesHomebuilding,LLC,aDelawarelimitedliabilitycompany, anditssuccessorsandassigns,ifsuchsuccessorsandassigns acquireanyorallofDeclarant’sinterestinthePropertyforthe purposeofpurchaseorsale,excludinganyOwners,andDeclarant hasexpresslytransferredorassignedtosuchsuccessorsorassigns itsrightsanddutiesasDeclaranttoalloranyportionofthe Project.Foranysuccessorassigneeof"Declarant"tobedeemeda -9-52027.048-22139.FCM110714 DeclarantunderthetermsofthisDeclaration,Declarantshall recordintheCountyadocumentsodesignatingsaidsuccessoror assigneeasDeclarant.AsuccessorDeclarantshallalsobedeemed toincludethebeneficiaryunderanydeedoftrustsecuringan obligationfromathenexistingDeclarantencumberingallorany portionoftheProperty,whichbeneficiaryhasacquiredanysuch propertybyforeclosure,powerofsaleordeedinlieuofsuch foreclosureorsale. Section24."Declaration"shallmeanandrefertothis DeclarationofCovenants,ConditionsandRestrictions,andReser- vationofEasements,andtoallamendmentstothisDeclarationas mayberecorded,fromtimetotime,intheOfficeoftheCounty Recorder,inaccordancewithSection4135andSection4250et seq. oftheCaliforniaCivilCode. Section25."Dispute"shallhavethemeaningsetforth hereinbelow. Section26."ExclusiveUseCorporationProperty"shall meanthoseportionsoftheCorporationPropertyoverwhich exclusiveeasementsorlicensesarereservedforthebenefitof certainOwners,asdescribedhereinandshownontheCondominium Plan,including,withoutlimitation,balconies,porches,air conditioningpads,solarcollectors,andinternalandexternal telephonewiringdesignedtoserveasingleCondominiumUnitbut locatedoutsidetheboundariesoftheCondominiumUnit,if applicable,inaccordancewithCaliforniaCivilCodeSection4145, assamemaybeamendedfromtimetotime.Thelocationofthe ExclusiveUseCorporationPropertyairconditioningpadsandsolar collectorsshallbethoselocationsasoriginallyconstructedby Declarant. Section27."FHLMC"shallmeanandrefertotheFederal HomeLoanMortgageCorporation(TheMortgageCorporation)created byTitleIIIoftheEmergencyHomeFinanceActof1970,assamemay beamended,fromtimetotime,includinganysuccessorsthereto. Section28."FNMA"shallmeanandrefertotheFederal NationalMortgageAssociation,agovernment-sponsoredprivate corporationestablishedpursuanttoTitleVIIIoftheHousingand UrbanDevelopmentActof1968,asamended,fromtimetotime, includinganysuccessorsthereto. Section29."GNMA"shallmeanandrefertotheGovern- mentNationalMortgageAssociationadministeredbytheUnited StatesDepartmentofHousingandUrbanDevelopment,includingany successorsthereto. Section30."Include,Including"(whethercapitalizedor not)shallmean"includeswithoutlimitation"and"including withoutlimitation,"respectively. -10-52027.048-22139.FCM110714 Section31."Improvements"shallmeanandrefertoall structuresandappurtenancestheretoofeverykind,including,but notlimitedto,Condominiumbuildings(excludingtheCondominium Units),openparkingareas,swimmingpools,spas,cabanas,private streets,drives,andaisles,streetlights,pavement,sidewalks, walls,fences,decorativeorinformativesigns,retainingwalls, mailkiosks,trellises,televisionandradioantenna,screens,pri- vateutilitylineconnections,poles,signs,allCorporation Propertylandscapingandirrigationsystems.Improvementsshall alsomeanandrefertoalladditionsand/ormodificationstothe exteriorofanyCondominiumbuilding,including,butnotlimited to,(a)paintingtheexteriorofanyCondominiumbuildingorother structure,(b)changingtheroofingmaterialonanyCondominium building,and/or(c)building,constructing,installing,altering orplanting,asthecasemaybe,anyspas,gazebos,stairs, screeningwallsorfences,shades,awnings,screendoors,exterior doors,skylights,solarcollectors,airconditioningand/orwater softeningorrefiningfixturesorsystems,andalllandscaping whichleftinitsnaturalconditionwillgrowtoaheightinexcess oftwentyfeet(20’). Section32."LimitedWarranty"shallmeanandreferto theexpresswrittenlimitedwarrantytobeprovidedbyDeclarantto theinitialOwnerswhoacquireaCondominiumfromtheDeclarant and,ifapplicable,anyotherexpresswrittenwarrantyprovidedby DeclaranttoanOwnerand/ortheCorporation.Asample copyofthe versioncurrentlyavailableisattachedheretoasExhibit"E"and providedforillustrativepurposesonly.EachOwnershallbe responsibletoensurethatthesubsequentpurchaserofsuchOwner’s Condominium,ifapplicable,isawareoftheLimitedWarrantyand theproceduresandformswhichmustbefollowedandexecutedto transfersuchLimitedWarranty,ifapplicable,tosaidsubsequent purchaser. Section33."LocalGovernmentAgency"shallmeanand refertotheCity,theCounty,apublicschooldistrict,apublic waterdistrict,andanyotherlocalormunicipalgovernmententity oragencyincluding,withoutlimitation,anycommunityservice area,specialassessmentdistrict,maintenancedistrictor communityfacilitiesdistrict. Section34."Lot"shallmeanandrefertoaplotofland whichisseparatelydescribedandnumberedorletteredona recordedtractmaporparcelmapassuchplotoflandmaybe modifiedorotherwiseadjustedbyarecordedlotlineadjustmentor recordedcertificateofcompliance. Section35."Maintain,Maintenance"(whethercapitalized ornot)shallmean"inspect,maintain,repairandreplace"and "maintenance,repairandreplacement,"respectively;provided, however,that"maintain"or"maintenance"shallnotinclude inspection,repairandreplace(ment)wherethecontextorspecific languageofthisDeclarationprovidesanothermeaning. -11-52027.048-22139.FCM110714 Section36."MaintenanceGuidelines;MaintenanceManual; MaintenanceObligations"shallmeanandrefertoanycurrent writtenguidelines,settingforthproceduresandstandardsforthe maintenanceandoperationofCorporationPropertyImprovementsor CondominiumsthatmaybeprovidedtotheCorporationorOwnersby Declarantoranygovernmentalagencyormanufacturerorsetforth hereinforthemaintenanceofCorporationPropertyoraCondominium andotherImprovementsDeclaranthasconstructedonorinthe Project.MaintenanceGuidelinesincludeanyMaintenanceManual initiallypreparedatDeclarant’sdirection,andrecommended inspectionsandmaintenanceactivitiesforcomponentsofthe CorporationPropertyorCondominiumandanyMaintenanceObligations preparedbyDeclarantpertainingtosame. Section37."Member"shallmeanandrefertoeveryper- sonorentitywhoholdsmembershipintheCorporation,asmore particularlysetforthintheArticlehereinentitled"TheCorp- oration,"andshallbesynonymouswiththeterm"Owner." Section38."Module"shallmeanandrefertoaseparate three-dimensionalvolumeoflandand/orairspaceshownand designatedasa"Module"onaCondominiumPlan.AModulemay includeCondominiumswithinitsboundaries;however,theCondomini- umsarenotanddonotconstituteModulesinandofthemselves. Section39."Mortgage"shallmeanandincludeany mortgageordeedoftrust,orotherconveyanceofaCondominium(or otherportionoftheProject)tosecuretheperformanceofan obligation,whichconveyancewillbereconveyeduponthecompletion ofsuchperformance,includinganinstallmentlandsalescontract (asdescribedinSections2985et seq.oftheCaliforniaCivil Code,assamemaybeamended,fromtimetotime).Theterm"Deedof Trust,"whenusedherein,shallbesynonymouswiththeterm "Mortgage." Section40."Mortgagee"shallmeanandrefertoaperson orentitytowhomaMortgageismade,andshallincludethe beneficiaryofaDeedofTrustorthevendorunderaninstallment landsalescontract,asthecasemaybe,andtheassigneesofa Mortgagee,beneficiaryorvendor. Section41."Mortgagor"shallmeanandrefertoaperson orentitywhomortgageshisoritsCondominiumtoanother,i.e., themakerofaMortgage,andshallincludeatrustorofaDeedof Trustandthevendeeunderaninstallmentlandsalescontract. Section42."NoticeandHearing"shallmeanandreferto writtennoticeandtheopportunityforahearingbeforetheBoard ortheArchitecturalReviewCommitteeoftheCorporation,as applicable,orothertribunalappointedbytheBoardinthemanner providedintheBy-Laws,atwhichtheaffectedOwnershallhavean opportunitytobeheardinthemannerprovidedhereinandinthe By-Laws. -12-52027.048-22139.FCM110714 Section43."NoticeofAnnexation"shallmeanandrefer tothatcertaindocumentrecordedforthepurposeofannexingall oraportionoftheAnnexationPropertyintotheProject,in accordancewiththeprovisionsofthisDeclaration,thereby subjectingsaidsubsequentPhasetotheprovisionsofthis DeclarationandtothejurisdictionoftheCorporation. Section44."Owner"shallmeanandrefertooneormore personsorentitieswhoaloneorcollectivelyaretherecordowner, orowners,offeesimpletitletoaCondominium,excludingthose personsorentitieshavinganysuchinterestmerelyassecurityfor theperformanceofanobligation.IfaCondominiumhasbeensold underalandsalescontract(asdescribedinSections2985et seq. oftheCaliforniaCivilCode,assamemaybeamended,fromtimeto time),inwhichtheStateofCaliforniaisthevendor,thenthe vendeeshallbedeemedtobetheOwnerofsuchCondominium.Ifa CondominiumisleasedbyDeclarantforatermoften(10)ormore years,includingrenewalperiods,andtheleaseormemorandum thereofisrecorded,thelesseeortransfereeoftheleasehold interestandnottheDeclarantshallbedeemedtheOwner.Iffee titletoaCondominiumisownedotherthanbyDeclarant,theOwner ofthefeetitleandnotthelesseeofsuchCondominiumshallbe deemedtheOwnerregardlessofthetermofthelease. Section45."Phase"shallmeanandrefertoaLot,or Lotsorportionsthereof,improvedwithCondominiumsorother Improvementswhichis(are)annexedintotheProjectinaccordance withthisDeclaration,andwhichis(are)subjecttoaseparate FinalSubdivisionPublicReportissuedbytheCalBRE,unlessthe PhaseconsistsonlyofCorporationPropertywhichdoesnotrequire aFinalSubdivisionPublicReport. Section46."Project"shallmeanandrefertoPhase1 (andtoallImprovements,includingtheCondominiumUnits,con- structedthereon),togetherwithallCommonPropertyandtoall portionsoftheAnnexationPropertywhichareannexedtoPhase1in accordancewiththeapplicableprovisionsofthisDeclaration. Section47."RulesandRegulations"shallmeanandrefer totheRulesandRegulationsadoptedbytheBoardpursuanttothe By-LawsorthisDeclaration,astheymaybeamended,fromtimeto time. Section48."VA/FHA"shallmeanandrefertotheUnited StatesDepartmentofVeteransAffairsand/orFederalHousingAd- ministration,includingthedepartmentoragencyoftheUnited StatesgovernmentasshallsucceedtotheVAand/orFHA.For purposesoftheFHA’srequirements,including,withoutlimitation, thecertificationbyanattorneyrequiredbyHUDHandbook4150.1 Rev-1thatall"condominiumlegaldocuments"meettheHUDguide- linessetforthinHUDHandbook4265.1,Appendix24,andstateand localcondominiumlaws,theArticles,By-Laws,Declaration,and CondominiumPlanshallconstitutethe"condominiumlegaldocuments. -13-52027.048-22139.FCM110714 Section49."WaterQualityManagementPlans"shallmean andrefertoallapplicableplansandrequirementsforthe managementofstormwaterattheProject,including,without limitation,anyapplicableNationalPollutantDischargeElimination System("NPDES")permitrequirements,StandardUrbanStormWater ManagementPlan("SUSMP"),WaterQualityManagementPlan("WQMP"), StormWaterManagementPlan("SWMP"),DrainageAreaManagementPlan ("DAMP"),LocalImplementationPlan("LIP"),andotherstormwater qualitymanagementplansthatmaybepreparedandapprovedforthe Projectincompliancewithapplicablefederal,stateandlocal laws.TheWaterQualityManagementPlansaddresswaterrunoff generatedbytheresidentialareasandotherdevelopmentImprove- mentswithintheProjectandwillbemonitoredbyvariouspublic agencies(e.g.,theRegionalWaterQualityControlBoardandthe City).TheWaterQualityManagementPlanscontain,amongother things,certainBestManagementPracticesthatmustbefollowedby theCorporation,theOwners,and/orotherresidentswithinthe Project.TheWaterQualityManagementPlansandtherelatedBest ManagementPracticesmaybemodifiedatanytimebytheDeclarant and/orthepublicagencieshavingjurisdictionoversuchmatters. Section50.Interpretation. (a)GeneralRules.ThisDeclarationshallbe liberallyconstruedtoeffectuateitspurposeofcreatinga uniformplanforsubdividing,maintaining,improving, repairingandsellingtheCondominiumsintheProject.Asused inthisDeclaration,thesingularincludesthepluralandthe pluralthesingular.Themasculine,feminineandneutereach includestheother,unlessthecontextdictatesotherwise. (b)Articles,SectionsandExhibits.TheArticle andSectionheadingsareinsertedforconvenienceonlyandmay notbeconsideredinresolvingquestionsofinterpretationor construction.Unlessotherwiseindicated,anyreferencesin thisDeclarationtoarticles,sectionsorexhibitsareto Articles,SectionsandExhibitsofthisDeclaration.Except asotherwisenotedherein(e.g.,thesampleformofLimited Warranty,whichisattachedheretoforillustrativepurposes onlyandisnotincorporatedbyreference),allexhibits attachedtothisDeclarationareincorporatedinthisDeclara- tionbythisreference.Thelocationsanddimensionsofany ImprovementsdepictedontheExhibitsattachedheretoandto anyNoticeofAnnexationareapproximateonly,andtheas- builtlocationanddimensionofanysuchImprovementsby Declarantshallcontrol. (c)PrioritiesandInconsistencies.Ifthereare conflictsorinconsistenciesbetweenthisDeclarationandthe Articles,Bylaws,orRulesandRegulations,thentheprovi- sionsofthisDeclarationshallprevail. -14-52027.048-22139.FCM110714 (d)Severability.TheprovisionsofthisDeclara- tionareindependentandseverable.Adeterminationof invalidity,partialinvalidityorunenforceabilityofanyone (1)provisionofthisDeclarationbyacourtofcompetent jurisdictiondoesnotaffectthevalidityorenforceabilityof anyotherprovisionsofthisDeclaration. (e)StatutoryReferences.Allreferencesmadein thisDeclarationtostatutesaretothosestatutesascurrent- lyineffectortosubsequentlyenactedreplacementstatutes. Section51.ApplicationofDefinitions.Theaforesaid definitionsshallbeapplicablethroughoutthisDeclaration,andto anysupplementsoramendmentsheretofiledorrecordedpursuantto theprovisionsofthisDeclaration,andtoanyNoticeofAnnexation forasubsequentPhase,unlessotherwiseindicatedorthecontext shallprohibitsuchapplication. ARTICLEII INTRODUCTIONTOTHESOUTHCITYSTATION Section1.GeneralPlanofDevelopment.TheSouthCity Stationispresentlyplannedasamulti-phasecondominiumproject, asdefinedinSection4125oftheCaliforniaCivilCode,which,if completedasplanned,mayconsistofapproximatelythirty-five(35) residentialCondominiums,andvariousamenities.Nothinginthis Declarationand/orNoticeofAnnexationisintended,orshallbe interpreted,toconstitutean"enhancedprotectionagreement"as definedinSection901oftheCaliforniaCivilCode.TheProject willbedevelopedinaccordancewithCaliforniaCivilCode,Sec- tions4000,et seq.,andinsubstantialconformancewiththe developmentplan,CondominiumPlan,andthearchitecturalplansand otherplanssubmittedtoandapprovedbytheCityandreviewedby theCalBRE(whichplansmaysetforththearchitecturalstyleand thesizeoftheCondominiumUnits).Asoftherecordationdateof thisDeclaration,itisanticipatedthatthearchitecturalstyleof theCondominiumswillbeattachedCondominiumsdevelopment,and thatthesquarefootagesoftheresidentialCondominiumUnitsmay rangefromapproximately^to^squarefeet. (a)Aspresentlyplanned,Phase1willconsistof approximatelytwenty-one(21)residentialCondominiums,and CommonProperty.EachCondominiumUnitwillbecompleted priortothecloseofescrowforthesaleofsuchCondominium. TheCondominiumsaremoreparticularlydescribedinthe Articlehereinentitled"DescriptionoftheCondominiums."The OwnersinPhase1willreceivetitletotheirrespectiveCon- dominiumUnits,variouseasements(exclusiveandnonexclusive, assetforthinthisDeclaration),anundividedone/twenty- first(1/21st)interestintheCommonArea,andamembership intheCorporation. -15-52027.048-22139.FCM110714 (b)Aspresentlyplanned,subsequentPhasesofThe SouthCityStationmaybeannexedasmoreparticularlyset forthinthisDeclaration,andtheCondominiumUnitsinsuch Phasesmayormaynotbeofsimilarconstruction,size,and appearanceastheCondominiumUnitsinPhase1.TheOwnersin subsequentPhaseswillreceivetitletotheirrespective CondominiumUnits,variouseasements(exclusiveandnon- exclusive,assetforthinthisDeclarationandtheNoticeof AnnexationrecordedonsaidPhase),anundividedinterestin theCommonAreaofsuchPhase,andamembershipintheCorp- oration. Section2.MembershipinCorporation.Asmorepar- ticularlysetforthinthisDeclaration,eachOwnerofaCondo- miniumintheProjectshallautomaticallybecomeaMemberofthe Corporation,andshallbeobligatedforthepaymentofAssessments totheCorporation.Inaddition,exceptasotherwiseprovided herein,eachOwner,hisfamilymembers,lessees,tenants,guests andinvitees,willbeentitledtotheuseandenjoymentofthe CorporationPropertywithintheProject,inaccordancewiththis Declaration,theBy-LawsandRulesandRegulationsadoptedbythe Board. Section3.AnnexationofSubsequentPhasesIntothe Corporation.AtsuchtimeasfuturePhasesaredeveloped,ifever, DeclarantmayannexsaidPhasesintotheCorporationpursuantto thetermsandconditionssetforthherein.IfDeclarantelectsto annexsaidPhases,aNoticeofAnnexationshallberecordedoneach Phase,whichshallservetoimposetheProtectiveCovenantsset forthhereinuponsuchPhaseandtosubjectsuchPhasetothe jurisdictionoftheCorporation.ThevotingrightsintheCorpora- tionandtheAssessmentsleviedbytheCorporationshallbe adjustedassetforthherein. Section4.Declarant’sUseofPrivateDrives,Aisles, andCommonParkingAreasandUtilities.Declarantherebyreserves, togetherwiththerighttograntandtransferalloraportionof thesame,untiltheearlierofwhenDeclarantnolongerownsan interestinTractNo.^ortheAnnexationPropertyorfiveyears fromtherecordationofthisDeclaration,easementrightstouse theprivatedrivesandaislesandcommonparkingareasandany privateutilitieswithintheProjectfor,including,butnot limitedto,accessandconnectionofutilitiesbyDeclarantfor purposesofdevelopingtherealpropertycomprisingTractNo.^and theAnnexationProperty. Section5.PostTensionSlabs.EachOwnerhereby acknowledgesthattheconcreteslabforanOwner’sCondominiumUnit MAYbereinforcedwithagridofsteelcableswhichwereinstalled intheconcreteandthentightenedtocreateveryhightension. Thistypeofslabiscommonlyknownasa"PostTensionSlab."Each OwnerfurtheracknowledgescuttingintoaPostTensionSlabforany reason(e.g.,toinstallafloorsafe,toremodelplumbing,etc.) -16-52027.048-22139.FCM110714 isveryhazardousandmayresultinseriousdamagetotheCondomin- iumUnitand/orpersonalinjury.Byacceptingagrantdeedtothe Condominium,eachOwnerherebyspecificallycovenantsandagrees that: (a)He/sheshallnotcutintoorotherwisetamper withthePostTensionSlab; (b)He/sheshallnotknowinglypermitanyother persontocutintoortamperwiththePostTensionSlabso longasOwnerownsanyinterestintheCondominium; (c)He/sheshalldisclosetheexistenceofthePost TensionSlabtoanytenant,lessee,orgranteeoftheCondo- minium;and (d)He/sheshallindemnifyandholdDeclarant,and itsrespectiveofficers,employees,contractorsandagents, freeandharmlessfromandagainstanyandallclaims, damages,losses,orotherliability(includingattorneys’ fees)arisingfromanybreachofthisSection. Section6.DevelopmentControl.NothinginthisArticle orelsewhereinthisDeclarationshalllimit,restrict,abridgeor control,inanymannerwhatsoever,Declarant’srighttocomplete theplanning,development,grading,construction,advertising, marketing,leasingandsalesoftheCondominiums,andallother propertywithintheProject(includinganypropertywhichmaybe annexedtheretopursuanttotheprovisionsofthisDeclaration), including,withoutlimitation,thefollowingspecificrights,which maybeexercisedbyDeclarant,orbyitsagentsandemployees,in conjunctionwithsuchdevelopmentandmarketingofCondominiumsin theProject.Therefore,Declarantshallhavetherightto:(a) completeconstructionofanyImprovementsintheProject;(b)rede- signorotherwisealterthestyle,size,colororappearanceofany ImprovementsinanyportionoftheProjectownedbyDeclarantand implementanAssessmentschedulethereonconsistentwithsuch development;(c)constructadditionalImprovementsonanyportion ofTractNo.^and/ortheAnnexationPropertyownedbyDeclarant; (d)subdivide,resubdivide,adjustLotlines,gradeorre-gradeany portionoftheProjectownedbyDeclarant;and(e)otherwise controlallaspectsofdesigning,constructing,andphasingthe ImprovementsintheProject,andofmarketingandconveying CondominiumsintheProject.Infurtherancethereof,Declarant herebyreserves,untoitselfanditssuccessorsandassignsforso longasDeclarantownsanyinterestinTractNo.^and/orthe AnnexationProperty,however,nottoexceedfiveyearsfromthe recordationofthisDeclaration,andisentitledtoannexAnnex- ationPropertytotheProject: (a)Anonexclusiveeasementforingressandegress on,overandacrosstheProjectasnecessarytoconstructthe CondominiumUnitsandallotherImprovements; -17-52027.048-22139.FCM110714 (b)Theexclusiverighttomaintainone(1)ormore salesoffice(s),modelcomplex(es),constructiontrailer, interiordesignanddecoratorcenter(s)withinpropertyowned byDeclarant,andparkingareaforemployees,agentsandpro- spectivebuyers; (c)Theexclusiverighttoplacereasonablesigns, flags,banners,billboardsorotherformsofadvertisingon anyportionoftheProjectownedorcontrolledbyDeclarant and/orCorporationProperty(specificallyincludingthe Projectentryarea),asDeclarantdeemsnecessary,irrespec- tiveofsize,color,shapeormaterialsofsuchitemsaslong assuchusedoesnotunreasonablyinterferewiththeOwners’ reasonableuseoftheCorporationProperty; (d)AnonexclusiverighttoutilizetheCorporation Propertyandanyunassignedopenparkingspaces,ifany,in connectionwithitsprogramforthesaleorleasingof CondominiumsintheProject; (e)Therighttoinstall,place,replace,con- struct,reconstruct,modifyorremoveanyImprovementfromany CondominiumownedbyDeclarant,asDeclarantmay,initssole discretion,deemappropriate; (f)Therighttoconductanycommercialactivity uponanyCondominiumownedbyDeclarantwhichreasonably relatestothedevelopment,marketing,leasingorsaleofthe CondominiumsorotherpropertyintheProject;and (g)TherighttoutilizetheCorporationProperty intheProjectformarketingandpromotionalactivities; however,iftheseactivitiescouldresultinexcludingan OwnerfromthereasonableuseoftheCorporationProperty,the DeclarantmustfirstobtainapprovalfromtheBoard,which approvalmaybewithheldinthesoleandabsolutediscretion oftheBoard. EachOwnerherebygrants,uponacceptanceofhisdeedtohis CondominiumUnit,anirrevocablespecialpowerofattorneyto Declarant,foraslongasDeclaranthasanyownershipinterestin TractNo.^ortheAnnexationProperty,toexecuteandrecordall documentsandmapsnecessarytoallowDeclaranttoexerciseits rightsunderthisDeclarationortofurtherthedevelopmentand/or maintenanceofTractNo.^andtheAnnexationProperty. Section7.Non-LiabilityofDeclarant.Nothinginthis ArticleorelsewhereinthisDeclarationshallbeunderstoodor construedtocompelDeclaranttoconstructanysubsequentPhaseof theProject,nortocompelDeclaranttoannexsaidPhasesintothe Project.ThepurposeofthisArticleismerelytodescribethe legalrelationshipbetweenthefirstandanysubsequentPhasesof -18-52027.048-22139.FCM110714 theProjectintheeventalloranyofsuchPhasesshallbe constructedandannexedintotheProject. Section8.IrrevocableLimitedPowerofAttorney.Each OwnerofaCondominiumintheProject,byacceptingadeedtoa Condominium,herebyirrevocablyappointsDeclarantashisattorney- in-fact,forhimselfandeachofhisMortgagees,optionees, grantees,licensees,trustees,receivers,lessees,tenants, judgmentcreditors,heirs,legatees,devisees,administrators, executors,legalrepresentatives,successorsandassigns,whether voluntaryorinvoluntary,andherebygrantstoDeclarantan irrevocablelimitedpowerofattorneycoupledwithaninterestfor Declaranttoactashisattorney-in-factinconnectionwithany modificationtothedevelopmentplansofalloranyportionofthe Project.EachOwnerherebyacknowledgesandagreesthatthis irrevocablelimitedpowerofattorneyis:(a)retainedforthe benefitoftheDeclarantandnottheOwner;and(b)createdby Owner’sacceptanceofadeedtoaCondominiumandaspartofthe considerationforthepurchaseandsaleofaCondominium.Basedon theforegoing,eachOwnerfurtheracknowledgesandagreesthatthis irrevocablelimitedpowerofattorneyis"coupledwithaninterest" and,pursuanttoSection2356oftheCaliforniaCivilCode,assame maybeamended,fromtimetotime,maynotbeterminatedby:(a) theOwner’srevocationofsuchlimitedpowerofattorney;(b)the Owner’sdeath;or(c)theOwner’sincapacitytocontract.In furtherancethereofandsubjecttothelimitationsandrestrictions setforthinthisArticle,Declarantshallhavetherightandpower asadulyauthorizedattorney-in-facttoperformanyofthe followingactions: (a)Toprepare,execute,acknowledgeandrecordany maporrecordofsurveyaffectingtheProjectrequiredor permittedbytheprovisionsoftheSubdivisionMapActofthe StateofCaliforniaineffectonthedateoftherecordingof thisDeclaration,andasthereafteramended,andanyordinanc- es,rulesorregulationsoftheCity,andanyothergovernmen- talentitiesandauthoritieshavingjurisdictionoverthe Project,ineffectonthedateoftherecordingofthis Declaration,andasthereafterenactedoramended,orwhich mayberequiredorpermittedbyanytitleinsurer,and,in connectiontherewith,toperformallconditions,undertakeany obligationsandexecuteallagreementsanddocumentation requiredorpermittedbyanyfederal,Stateandlocalgovern- mentalentitiesandauthorities;toappearbeforeanysuch governmentalentitiesandauthorities;andtoexecute, acknowledgeanddeliveranyimprovementagreementsandbonds, andpostdepositssecuringtheperformanceofanysuch conditionsandobligations; (b)Toprepare,execute,acknowledgeandrecordany amendmenttoaCondominiumPlan,including,withoutlimita- tion,anyamendmentsnecessarytocausesuchCondominiumPlan toconformwiththeImprovementsasactuallybuilt,whichmay -19-52027.048-22139.FCM110714 berequiredorpermittedbythelawsoftheStateofCalifor- niaasineffectonthedateoftherecordingofthisDeclara- tion,asthereafterenactedoramended,andanyordinances, rulesandregulationsoftheCity,andanyothergovernmental entitiesandauthoritieshavingjurisdictionovertheProject, asineffectonthedateoftherecordingofthisDeclaration, andasthereafterenactedoramended,orwhichmayberequired orpermittedbyanytitleinsurer,and,inconnectionthere- with,toperformallconditions,undertakeanyobligationsand executeallagreementsanddocumentationrequiredorpermitted byanyfederal,Stateandlocalgovernmentalentitiesand authorities;andtoexecute,acknowledgeanddeliverany improvementagreementsandbonds,andpostdepositssecuring theperformanceofanysuchconditionsandobligations; (c)Toprepare,execute,acknowledgeandfilefor approvalanyapplicationforzoningorsetbackchangesorlot lineadjustments,orcondominiumplanamendments,orvariance orconditionalusepermits,oranyotherpermitsorreports requiredorpermittedbythelawsoftheStateofCalifornia asineffectonthedateoftherecordingofthisDeclaration, asthereafterenactedoramended,andanyordinances,rules andregulationsoftheCity,andanyothergovernmental entitiesandauthoritieshavingjurisdictionovertheProject, asineffectonthedateoftherecordingofthisDeclaration, andasthereafterenactedoramended,orwhichmayberequired orpermittedbyanytitleinsurer,and,inconnectionthere- with,toperformallconditions,undertakeanyobligationsand executeallagreementsanddocumentationrequiredorpermitted byanyfederal,Stateandlocalgovernmentalentitiesand authorities;andtoexecute,acknowledgeanddeliverany improvementagreementsandbonds,andpostdepositssecuring theperformanceofanysuchconditionsandobligations; (d)Tomakeapplicationsforanypropertyreports orpublicreports,oramendmentsthereto,orexemptionfrom therequirementsthereforrequiredorpermittedbyfederaland Statestatutes,rulesandregulationsrelatingtothesale, lease,transferorotherdispositionofsubdividedlands,and, inconnectiontherewith,toperformallconditions,undertake anyobligationsandexecuteallagreementsanddocumentation requiredorpermittedbyanyfederal,Stateandlocalgovern- mentalentitiesandauthorities;andtoexecute,acknowledge anddeliveranyimprovementagreementsandbonds,andpost depositssecuringtheperformanceofanysuchconditionsand obligations; (e)Todeliveranypublicreportsorproperty reports,oramendmentsthereto,obtainreceiptsandofferand administerrescissionrightsrequiredbylaw; (f)Toprepare,execute,acknowledgeandfilefor approvalanyregistrationorapplicationforanypermit, -20-52027.048-22139.FCM110714 approval,exemption,rulingorentitlement,whichregistration orapplicationisrequiredorpermittedpursuanttoanylawor regulationineffectasofthedateoftherecordingofthis Declaration,andashereafterenactedoramendedbyany federal,Stateandlocalgovernmentalentitiesandauthori- ties,and,inconnectiontherewith,toperformallconditions, undertakeanyobligationsandexecuteallagreementsand documentationrequiredorpermittedbysuchgovernmentalbody, andbyanysuchlawsandregulations;toappearbeforeany suchgovernmentalbodies,andtoexecuteanddeliverany improvementagreementsandbonds,andpostdepositssecuring theperformanceofanysuchconditionsandobligations;andto doallotherthingsnoworthereafterpermittedorrequiredby anysuchgovernmentalbodyandanysuchlawsandregulations; (g)Toprepare,execute,acknowledgeandrecordany deedsorwaiverswhichmaybepermittedorrequiredtoclear titletoanyconstructedorunconstructedCondominiumUnitsin theProject;and (h)Todoanyandallthingsnecessaryordesirable underthecircumstancestoeffectandaccomplishdevelopment oftheProject(e.g.,condominiumplanamendments,recordation ofmaintenanceguidelinesfortheCommonPropertyand/or Condominiums). Section9.MortgageInterestandOtherEncumbrancesto TakeSubjecttoPowerofAttorney.Theacceptanceorcreationof anyMortgageorotherencumbrance,whetherornotvoluntary, createdingoodfaithorgivenforvalue,shallbedeemedtobe acceptedorcreatedsubjecttoeachofthetermsandconditionsof thepowerofattorneydescribedhereinabove. ARTICLEIII DESCRIPTIONOFTHECONDOMINIUMS Declarant,inordertoestablishaplanofCondominium ownershipforPhase1,doesherebydeclarethatithasdivided,and doesherebydivide,Phase1intothefollowingfreeholdestates: Section1.CondominiumUnit.EachCondominiumUnit shallbeaseparateinterest,asdefinedinSections4125and4185 oftheCaliforniaCivilCode,assamemaybeamendedfromtimeto time,consistingofaResidentialAirspaceElement,andtheGarage AirspaceElementdefinedbelowinaccordancewiththeplansand specificationsforeachCondominiumUnitwithinPhase1,asmore particularlyshownanddescribedontheCondominiumPlan: (a)ResidentialAirspaceElement.Theresidential airspaceelementisboundbyandcontainedwithintheinterior unfinishedsurfacesoftheperimeterwalls,floors,ceilings, -21-52027.048-22139.FCM110714 windows,anddoorsofsaidelement,andtheairspaceencom- passedthereby,identifiedontheCondominiumPlanbytheword "Unit"anditsrespectiveCondominiumUnitnumber.Thelower andupperboundariesofeachresidentialairspaceelementare horizontalorslopedplanes,theelevationsofwhichareindi- catedinthediagrams(e.g.,verticalsections)and/ortables, ifany,setforthintheCondominiumPlan.Thelateralbound- ariesofeachresidentialairspaceelementareverticalplanes atthelimitsofthehorizontaldimensionsshownintheCondo- miniumPlanforeachresidentialairspaceelement. (b)GarageAirspaceElement.Ifapplicable,the garageairspaceelementisboundbyandcontainedwithinthe interiorunfinishedsurfacesoftheperimeterwalls,floors, ceilings,andgaragedoorofsaidelement,andtheairspace encompassedthereby,identifiedontheCondominiumPlanbythe letter"G"anditsrespectiveCondominiumUnitnumber.The lowerandupperboundariesofeachgarageairspaceelementare horizontalorslopedplanes,theelevationsofwhichare indicatedinthediagrams(e.g.,verticalsections)and/or tables,ifany,setforthintheCondominiumPlan.Thelateral boundariesofeachgarageairspaceelementareverticalplanes atthelimitsofthehorizontaldimensionsshowninthe CondominiumPlanforeachgarageairspaceelement. ExceptasmayotherwisebeprovidedinaNoticeof Annexation(wheretheremaybedetachedCondominiumUnits),each CondominiumUnitincludesboththeportionofthebuildingso describedandtheairspacesoencompassed,allwindowsanddoorsof saidCondominiumUnit(includingalllocks,handles,latches, screens,weatherstripping,exteriordoors,andthegaragedoor,if theCondominiumUnithasagarage),theforcedairheatingunit, theairconditioningcompressor,ifany,thehotwaterheater,all utilitylaterals,lines,pipesand/oroutletswhenlocatedwithin orexclusivelyservingsaidCondominiumUnit(includingthe internalandexternaltelephonewiringandsewerlateraldesigned toexclusivelyservetheCondominium,nomatterwheresuchare located),allbuilt-inappliancesandfixtures,thegaragedoor opener,thechimneyflueandfireboxportionofthefireplaceinor servicingtheCondominiumUnit,ifany,andtheinteriorstaircase, ifany,withintheairspaceoftheCondominiumUnit,butthefol- lowingarenotapartoftheCondominiumUnit:awnings,guttersand downspouts,bearingwalls,columns,beams,floors,roofs,slabs, foundations,chimneys,fences,exteriorstairsandlandings,re- servoirs,tanks,pumps,commonmailboxstructures,irrigation equipment,firesprinklers,includingsprinklerheadswhich protrudeintotheairspaceoftheCondominiumUnit,ifany,fire standpipes,firealarmsystems,fireextinguishers,andotherfire preventionequipmentand/orfacilitieslocatedonor servicing/protectingCorporationProperty,andothercentralser- vices,pipes,ducts,flues,chutes,conduits,wires,exterior lighting,andotherutilityinstallationswhereverlocated(except allutilityinstallationsand/oroutletsthereofwhenlocated -22-52027.048-22139.FCM110714 withinorexclusivelyservingoneCondominiumUnit,includingthe internalandexternaltelephonewiringdesignedtoexclusively serveaCondominiumUnit,and/orassetforthabove),poles,sump pumps,sidewalks(ifany),thoseportionsofthesoundwalls,re- tainingwalls,perimeterwalls,andfencesdescribedand/or depictedasmaintainedbytheCorporationonanExhibittothis DeclarationorarecordedNoticeofAnnexation(e.g.,Exhibit"C" hereto),theprivatedrivesandaislesandcommonparkingareasin theProject,thoseportionsoftheprivatestormdrainsystemfor theProjectdescribedand/ordepictedasmaintainedbythe CorporationonanExhibittothisDeclarationorarecordedNotice ofAnnexation(e.g.,Exhibit"D"hereto),poles,signs,Project monumentsignsanddirectories,andlandscapingandirrigation improvementslocatedontheCorporationProperty,excepting therefromlandscapingandimprovementslocatedintheExclusiveUse CorporationProperty. Section2.PresumptionofBoundariesofCondominium Units.IninterpretingthisDeclaration,theCondominiumPlan,and allinstrumentsofconveyance,theexistingphysicalboundariesof theCondominiumUnit,orofaCondominiumUnitreconstructedin substantialaccordancewiththeoriginalCondominiumPlanthereof, shallbeconclusivelypresumedtobeitsboundaries,ratherthan themetesandbounds(orotherdescription)expressedinthis Declaration,CondominiumPlan,orinstrumentofconveyance, regardlessofsettlingorlateralmovementofthecondominium buildingandregardlessofminorvariancesbetweentheboundaries shownintheCondominiumPlan,inthedeedand/orinthisDeclara- tion,andtheactualboundariesofthecondominiumbuilding. Section3.CommonArea.Asdescribedandreferredto hereinabove,theCommonAreainPhase1consistsofModule"B,"as depictedonthePhase1CondominiumPlan,butdoesnotincludeany oftheCondominiumUnitsorCorporationProperty.TheCommonArea iscomprisedofathree-dimensionalairspacevolume,thedimensions ofwhicharemoreparticularlydescribedintheCondominiumPlan. Section4.ExclusiveUseCorporationProperty. ExclusiveUseCorporationPropertyshallmeanandrefertothat portionoftheCorporationPropertywhichisreservedforthe exclusiveuseoftheOwnersofparticularCondominiumUnits.An ExclusiveUseCorporationPropertyconstitutesanexclusive easementorlicenseappurtenanttoitsassignedCondominiumUnit, subjecttotheexclusiveusesandpurposessetforthherein.Each ExclusiveUseCorporationPropertybalcony,porch,airconditioning pad,solarcollector,theCondominiumUnitwithinPhase1towhich suchitemsareappurtenant(asapplicable,notallCondominiumsmay havealloftheExclusiveUseCorporationPropertyareasdescribed below)isidentifiedintheCondominiumPlanasfollows: (a)Balcony.Ifapplicable,thebalconyareabound byandcontainedwithintheexteriorfinishedsurfacesofthe perimeterwalls,doorsand/orwindowsoftheadjoiningresi- -23-52027.048-22139.FCM110714 dentialelement,andtheinteriorfinishedsurfacesofthe balconyperimeterwallsand/orrailingsanddoors,identified intheCondominiumPlanbytheletter"B"anditsrespective CondominiumUnitnumber,isherebyassignedtosuchCondomini- umUnitasshownontheCondominiumPlan.Thelowerandupper elevationsofthebalconyareaaredescribedand/ordepicted intheCondominiumPlan.Anystorageareaslocatedinsaid balconyareaareconsideredpartofthebalconyareaevenif notspecificallydepictedontheCondominiumPlan.Ifthe balconyisdesignedfordecorativepurposesonly(e.g.,Romeo andJulietrailing/balcony),thebalconystructureandrailing willnotbedesignedtobeartheweightofapersonstanding onorleaningagainstthem,andnoOwnershouldstandonor leanagainst,orpermitanyoneelsetostandonorlean against,thebalconystructureorrailing. (b)Porch.Ifapplicable,theporchareaboundby andcontainedwithintheexteriorfinishedsurfacesofthepe- rimeterwalls,doorsand/orwindowsoftheadjoiningresi- dentialelementandgarageelement,andtheinteriorfinished surfacesoftheporchperimeterwallsand/orfencesanddoors, identifiedintheCondominiumPlanbytheletter"P"andits respectiveCondominiumUnitnumber,isherebyassignedtosuch CondominiumUnitasshownontheCondominiumPlan.Thelower andupperelevationsoftheporchareaaredescribedand/or depictedintheCondominiumPlan.Theporchareashall includetheapplicableentrystairsevenifnotspecifically depictedontheCondominiumPlan. (c)AirConditioningPad.Thelocationofthe ExclusiveUseCorporationPropertyairconditioningpadsshall bethoselocationsasoriginallyconstructedbyDeclarant. (d)SolarCollector.Ifapplicable,thelocationof theExclusiveUseCorporationPropertysolarcollectorsshall bethoselocationsasoriginallyconstructedbyDeclarant. Subjecttotheprovisionsherein,includingtheArticleentitled "RepairandMaintenance,"and/orinarecordedNoticeof Annexation,itshallbetheobligationofeachandeveryOwnerto keephisrespectiveExclusiveUseCorporationPropertyinaneat, clean,safeandattractiveconditionatalltimes,exceptforthe signage,striping,andstructuralintegrityoftheExclusiveUse CorporationPropertybalcony(ifapplicable).TheCorporation shallberesponsibleformaintenanceofthestructuralcomponents oftheExclusiveUseCorporationPropertybalcony;provided however,ifanymaintenanceorrepairsarerequiredduetowillful ornegligentactsoromissionsofanyOwner,hisfamily,lessees, tenants,guests,orinvitees,theCorporationshalllevya ComplianceAssessmentagainsttheOwnerforsuchcosts.Should landscapingbeplacedonabalconyorporch,theOwnermusttake adequatestepstocapturewaterfromsuchplantsandtopreventany damagetotheProjectorunsightlyconditions.TheBoardshallhave -24-52027.048-22139.FCM110714 therighttorestrictpotsorotheritemsfrombeingplacedontop oforattachedtoanyfenceorrailingortoallowthepotted plantstogrowontheexteriorofabalconyorporchrailing,fence orallorportionsofthebuilding.EachOwnershallberesponsible topayfortherepairsofanydamagewhichmaybecausedbythe placingoflandscaping(includingpottedplants)inhisorher ExclusiveUseCorporationPropertyarea.NoOwnershallmakeany improvementstohisorherbalcony,porch,orotherExclusiveUse CorporationPropertyareaunlessanduntiltheArchitecturalReview CommitteehasapprovedplansofsuchImprovementsshowingsuch detailastheArchitecturalReviewCommitteeoritsconsultant deemsappropriate.TheArchitecturalReviewCommitteeshallhave therighttorestrictorprohibitanyitemsfrombeingplacedonor attachedtoabalcony,porch,orotherExclusiveUseCorporation PropertyareawhicharewithinviewofotherOwnersandwhichthe ArchitecturalReviewCommitteedeemstobeunattractiveornot appropriate.EachOwnerassumesallriskswhichmayresultfrom ImprovementsheorshemakestohisorherExclusiveUseCorpora- tionPropertyareaorCondominiumUnit,andeachOwnerindemnifies andholdsharmlesstheCorporation,theArchitecturalReview Committee,DeclarantandeachotherOwnerfromanyclaims,demands, liabilities,judgments,attorney’sfeesandotherobligationswhich ariseoutoforareincurredinconnectionwiththeinstallation, existenceorremovalofsuchImprovements. Section5.UndividedFractionalFeeInterestinCommon Area.TheinterestintheCommonAreaofPhase1herebyestablished andwhichshallbeconveyedwitheachrespectiveCondominiumUnit inPhase1isaone/twenty-first(1/21st)undividedfractionalfee interest.Theaboverespectiveundividedfractionalfeeinterest establishedandtobeconveyedwiththerespectiveCondominium Units,asindicatedabove,cannotbechanged.Declarant,forandon behalfofitself,anditssuccessors,assignsandgrantees, covenantsandagreesthatneithertheCondominiumUnitnorthe respectiveundividedfractionalfeeinterestintheCommonArea shallbeseparatelyconveyedorencumbered.Anotherwisevalid conveyanceorencumbrancereferringonlytotheCondominiumUnit shallalsoconveyorencumbertherespectiveundividedfractional feeinterestintheCommonArea.Anyattempttoconveyorencumber theundividedfractionalfeeinterestintheCommonAreawithout therespectiveCondominiumUnitshallbenullandvoid. Section6.EasementsOverCorporationProperty.Each Ownershallhaveanonexclusiveeasementappurtenanttohisorher Condominiumforingress,egress,use,andenjoymentin,on,over, under,across,andthroughtheCorporationPropertyintheProject, exceptthoseportionsoftheCorporationPropertysetasideas ExclusiveUseCorporationProperty,subjecttotheprovisionsin thisDeclaration. Section7.ComponentsofCondominiumOwnership.Each CondominiuminPhase1includes:(a)aseparateinterestina CondominiumUnit,asdefinedinSection1hereinabove;(b)all -25-52027.048-22139.FCM110714 easements,exclusiveandnonexclusive,appurtenanttotherespec- tiveCondominiumUnit;(c)aone/twenty-first(1/21st)undivided fractionalfeeinterestastenants-in-commonintheCommonArea; and(d)amembershipintheCorporation. Section8.CondominiumNumbering.Thetwenty-one(21) individualCondominiumUnitswhichareherebyestablishedandwhich shallbeindividuallyconveyedaredescribedandnumberedonthe CondominiumPlan. Section9.GuestParkingAreas.Exceptasotherwise providedinthisDeclaration,theCondominiumPlan,ordetermined bytheBoard,anyunassignedopenparkingareas,shallbeusedonly forguestparkingortemporaryresidentparking.Temporaryresident parkingmeansnotmorethantwenty(20)continuoushours.Any resident’svehicleparkedinaguestparkingareamaynotbeleft inthatguestparkingareaformorethantwenty(20)continuous hours.Anyvehicleofaresidentparkedinaguestparkingspace formorethantwenty(20continuoushoursissubjecttotowwithout notice. Section10.ReservationofEasementsOverCorporation PropertyForSubsequentPhases.Declarantherebyreservestheright tograntnonexclusiveeasementsovertheCorporationPropertyin Phase1(exceptanyportionsoftheCorporationPropertysetaside asExclusiveUseCorporationPropertyandexceptforanyportions subjecttotherightsreservedbyDeclarantassetforthinthis Declaration)infavorofeachOwnerofaCondominiuminasubse- quentPhaseatsuchtimeastheannexationofsuchPhasebecomes effective,andtheOwnersoftheCondominiumsdescribedinthis Declarationshallautomaticallyobtainnonexclusiveeasementsover allCorporationPropertywhichisapartofsuchsubsequentPhase, exceptanyportionsoftheCorporationPropertysetasideasExclu- siveUseCorporationPropertyorsubjecttorightsreservedby Declarant. ARTICLEIV RESERVATIONOFEASEMENTSANDOTHER PROPERTYRIGHTSINTHECORPORATIONPROPERTY Section1.Owners’Easements.EveryOwnershallhave anonexclusiverightandeasementofaccess,useandenjoymentin andtotheCorporationPropertyintheProject.Saidrightand easementshallbeappurtenanttoandshallpasswithtitletoevery Condominium,subjecttothelimitationssetforthinSection2 below. Section2.LimitationsonOwners’EasementRights.The rightsandeasementsofaccess,useandenjoymentsetforthin Section1hereinaboveshallbesubjecttotheprovisionsofthis Declaration,including,butnotlimitedto,thefollowing: -26-52027.048-22139.FCM110714 (a)TherightofDeclaranttodesignateadditional CommonAreaandCorporationPropertybyrecordationofone(1) ormoreNoticesofAnnexation,pursuanttotheprovisionsof theArticlehereinentitled"AnnexationofAdditionalProper- ty"; (b)TherightoftheCorporationtoreasonably limitthenumberofguestsofOwners; (c)TherightoftheCorporationtoestablishand enforcereasonableRulesandRegulationspertainingtotheuse oftheCorporationPropertyandExclusiveUseCorporation Property,includingallfacilitieslocatedthereonandto enactuniformandreasonableArchitecturalGuidelines,in accordancewiththeArticlehereinentitled"Architectural Review"; (d)TherightoftheCorporation,inaccordance withitsArticles,By-LawsandthisDeclaration,toborrow moneywiththeassentofsixty-sevenpercent(67%)ofthe votingpoweroftheCorporation,excludingDeclarant,and/or toMortgage,pledge,deedintrustorotherwisehypothecate anyorallofitsrealorpersonalpropertyassecurityfor moneyborrowedordebtsincurred,forthepurposeofimproving orrepairingtheCorporationPropertyandrelatedfacilities; (e)TherightoftheCorporationtosuspendthe votingrightsandrightsandeasementsofanyMember(andthe personsderivingsuchrightsandeasementsfromanyMember)to useandenjoyanyamenitiesontheCorporationProperty (exceptforreasonablerightsofaccesstosuchMember’s Condominium)fortheperiodduringwhichanyAssessment againstsuchMember’sCondominiumremainsunpaidanddelin- quent;andafterNoticeandHearing,toimposemonetary penaltiesorsuspendsuchuserightsandeasementsfora periodnottoexceedthirty(30)daysforanynoncontinuing violationofthisDeclarationorRulesandRegulations,it beingunderstoodthatanysuspensionforeithernonpaymentof anyAssessmentsorbreachofsuchRulesshallnotconstitute awaiverordischargeoftheMember’sobligationstopay Assessmentsasprovidedherein; (f)Subjecttothetermsandprovisionsofthe Articlehereinentitled"MortgageeProtection,"therightof theCorporationtodedicateortransferalloranypartofthe CorporationPropertytoanypublicagency,authorityorutil- ityforsuchpurposesandsubjecttosuchconditionsasmaybe agreedtobytheOwners.Nosuchdedicationortransfershall beeffectiveunless:(1)aninstrumentapprovingsaiddedica- tionortransferissignedbytwoauthorizedofficersofthe CorporationattestingthatOwnersrepresentingatleastsixty- sevenpercent(67%)ofthevotingpoweroftheCorporation, excludingDeclarant,approvedsuchactionandisrecordedin -27-52027.048-22139.FCM110714 theOfficeoftheCountyRecorder,and(2)awrittennoticeof theproposeddedicationortransferissenttoeveryOwnernot lessthanfifteen(15)daysnormorethanthirty(30)daysin advance;provided,however,thatthededicationortransferof easementsforutilitiesorforotherpublicpurposesconsis- tentwiththeintendeduseoftheCorporationPropertyshall notrequirethepriorapprovaloftheMembersoftheCorpora- tion; (g)TherightofDeclarant(anditsrespective salesagents,representativesandprospectivepurchasers)to thenonexclusiveuseoftheCorporationProperty,andthe facilitieslocatedthereon,withoutchargeforsales,display accessandexhibitpurposes;provided,however,thatsuchuse shallceaseuponthedatethatDeclarantnolongerownsa CondominiumintheProject,noranyAnnexationProperty.Such useshallnotunreasonablyinterferewiththerightsofenjoy- mentoftheCorporationPropertybyotherOwners; (h)TherightoftheCorporationtoperformand exerciseitsdutiesandpowersassetforthherein; (i)TherightofDeclaranttodesignateadditional CorporationProperty,pursuanttothetermsoftheArticle hereinentitled"AnnexationofAdditionalProperty"; (j)TherightoftheCorporationtoapprove,which approvalshallnotbeunreasonablywithheld,andimpose variousconditionsonaccesstotheCorporationPropertyfor thepurposeofallowinganOwnertomaintaintheExclusiveUse CorporationPropertydesignedtoexclusivelyservehis particularCondominiumUnit(e.g.,therighttorequirethat onlyacontractororotherpersonapprovedbytheBoardenters therooforotherportionoftheCorporationProperty [including,withoutlimitation,theroofandotherportionsof thebuildingscontainingtheCondominiumUnits]andto conditionsuchentryonthecontractor’sorotherperson’s compliancewithreasonablerequirementsfortheprotectionof theCorporationProperty[e.g.,requirementsthatthe contractorbeappropriatelylicensed,maintaininsurance coverageonwhichtheCorporationisnamedasanadditional insured,and/orexecuteanindemnityagreementinfavorofthe Corporation]).Thisincludes,butisnotlimitedto,the rightoftheCorporation,actingthroughtheBoard,to reasonablyrestrictorconditionaccesstoroofs,maintenance andlandscapedareas,andsimilarareasoftheCorporation Property(e.g.,requirethatonlyacontractororotherperson approvedbytheBoardsentertherooforotherportionofthe CorporationProperty,conditionsuchentryonthecontractor’s orotherperson’scompliancewithrequirementsthatthe contractororotherpersonbeappropriatelylicensed,maintain insurancecoverageonwhichtheCorporationisnamedasan additionalinsured,and/orexecuteanindemnityagreementin -28-52027.048-22139.FCM110714 favoroftheCorporation,etc)andtoprohibitany modificationtoanyportionoftheCorporationProperty(e.g., thecondominiumbuildings); (k)OtherrightsoftheCorporation,theArchitec- turalReviewCommittee,theBoard,theOwnersandDeclarant withrespecttotheCorporationPropertyasmaybeprovided forinthisDeclaration;and (l)Anylimitations,restrictionsorconditions affectingtheuse,enjoymentormaintenanceoftheCorporation PropertyimposedbyDeclarant,orbytheCity,orother governmentalagencyhavingjurisdictiontoimposeanysuch limitations,restrictionsorconditions,including,butnot limitedto,therightsoftheCityorsuchothergovernmental agencyhavingjurisdictiontousetheirvehiclesorappro- priateequipmentoverthoseportionsoftheCorporation Propertydesignedforvehicularmovementtoperformmunicipal functionsoremergencyoressentialpublicservices. Section3.DelegationofCorporationPropertyUse Rights.SubjecttotherightsreservedtotheCorporationasset forthherein,anyOwnerwhoresideswithintheProjectmaydelegate hisrightsofuseandenjoymenttotheCorporationPropertytothe membersofhisimmediatefamilyandtheirguestsandinvitees.In theeventanOwnerhasrentedorleasedhisCondominium,hisrights touseandenjoycommonamenitiesontheCorporationPropertyshall beautomaticallydelegatedtohistenantsorlesseesforthe durationoftheirtenancy,andtheOwnershallforfeitanyrights touseandenjoyanycommonamenitiesontheCorporationProperty (exceptthoseportionsreasonablynecessarytoaccesssaidOwner’s Condominiumtoperformnormalfunctionsofalandlord)forthe durationofsuchtenancy.Withrespecttoaninstallmentlandsales contract,thesellerunderthecontractshallbedeemedtohave delegatedhisrightstouseandenjoyanycommonamenitiesonthe CorporationPropertytothepurchaserunderthecontract. Section4.EasementsforVehicularTraffic.Inaddition tothegeneralrightandeasementsforaccess,useandenjoyment grantedherein,thereshallbe,andDeclarantherebyreservesunto itself,anditssuccessorsandassigns,togetherwiththerightto grantandtransferalloraportionofthesame,anonexclusive appurtenanteasementforvehicularingress,egressandaccessover theprivatedrivesandaisleswithintheProjecttoamongother things,(i)accessanyportionoftheAnnexationPropertynot annexedtotheProjectand(ii)provideingress,egressandaccess toandfromanyportionoftheAnnexationPropertynotannexedinto theProject. Section5.EasementsforAirConditioners/Solar Collector.Astoanyairconditioningcompressorand/orsolar collectorwhichDeclarantlocatedonorwithinaportionofthe CommonProperty(e.g.,ontheroofofabuilding),thereishereby -29-52027.048-22139.FCM110714 created,establishedandgrantedanexclusiveeasementonsaid portionoftheCommonPropertyforthepermanentplacementofsuch compressorand/orsolarcollectorinthelocationswheresuch compressorand/orsolarcollectorwereoriginallyinstalledby Declarant.Additionally,andsubjecttorestrictions,conditions, andlimitationswhichmaybeimposedbytheBoard,eachsuch affectedOwnerisgrantedaneasementforingress,egressand accessonandovertheCommonPropertytomaintain,repairand replacehisorherrespectiveairconditioningcompressorand/or solarcollector;provided,however,thattheBoardshallhavethe righttorequirethatonlyacontractororotherpersonapprovedby theBoardenterorconductanyactivitiesaffectingtheroofor otherportionoftheCorporationProperty(e.g.,inconnectionwith anOwner’smaintenanceoftheairconditionerand/orsolar collectorforhisCondominium,etc.)andtoconditionsuchentryon thecontractor’sorotherperson’scompliancewithreasonable requirementsfortheprotectionoftheCorporationProperty(e.g., requirementsthatthecontractorbeappropriatelylicensed, maintainandprovidetheCorporationwithwrittenevidenceof insurancecoverageonwhichtheCorporationisnamedasan additionalinsured,obtaintheCorporation’swrittenpermissionto accesstheroof,and/orexecuteanindemnityagreementinfavorof theCorporation).Thelocationsoftheairconditionerpadsand solarcollectorsshallbethelocationsoftheairconditionerpads andsolarcollectorswherethesamewereoriginallyinstalledby Declarant. Section6.EasementsforUtilities.Therightsand dutiesoftheOwnersofCondominiumswithintheProjectwithre- specttomechanicalsystems,sanitarysewer,water,electricity, televisioncableandtelephonelines,andotherfacilities,shall begovernedbythefollowing: (a)Eachrespectiveutilitycompanyshallmaintain allutilityfacilitiesandconnectionsontheProjectownedby suchutilitycompany;provided,however,thatifanycompany shallfailtodoso,itshallbetheobligationofeachOwner tomaintainthosefacilitiesandconnectionslocatedupon, withinorexclusivelyservicingsuchOwner’sCondominium (e.g.,sewer/waterlaterals)whichmaybelocatedwithin CorporationProperty,anditshallbetheobligationofthe Corporationtomaintainthosefacilitiesandconnections locatedupontheCorporationPropertyand/orwhichprovide servicetomorethanone(1)Condominium(e.g.,trunk/main lineutilities).Notwithstandingtheforegoing,internaland externaltelephonewiringdesignedtoserveasingleCondomin- iumUnit,butlocatedoutsidetheboundariesoftheCondomini- umUnit,shallbemaintainedbytheOwnerofsaidCondominium Unit.Additionally,theCorporationshallmaintain,repair andreplaceanystampedconcrete,ifany,intheCorporation Propertythatisdamaged,destroyedoralteredinanymanner asaresultofrepairormaintenanceworktoutility facilitiesorconnectionsperformedbyautilitycompany, -30-52027.048-22139.FCM110714 unlesssuchrepairormaintenanceworkiscausedbyorthe resultofanOwner’s,hisfamilymembers’,guests’or invitees’negligenceorintentionalconduct. (b)Wherevermechanicalsystems,sanitarysewer,or waterconnections,firealarm,suppression,orprotection facilities,televisioncables,electricityortelephonelines areinstalledwithintheProjectanditbecomesnecessaryto gainaccesstosaidmechanicalsystems,connections,cables and/orlinesthroughaCondominiumUnitownedbysomeoneother thantheOwneroftheCondominiumUnitservedbysaid mechanicalsystems,connections,cablesand/orlines,the OwneroftheCondominiumUnitservedbysaidmechanical systems,connections,cablesand/orlinesshallhavethe right,andisherebygrantedaneasementtothefullextent necessarytherefor,toenteruponsuchotherCondominiumUnit ortohavetheutilitycompaniesenteruponsuchotherCondo- miniumUnittorepair,replaceandgenerallymaintainsaid mechanicalsystems,connections,cablesand/orlines. (c)Whenevermechanicalsystems,sanitarysewer,or waterconnections,firealarm,suppression,orprotection facilities,televisioncables,electricityortelephonelines areinstalledwithintheProject,andsaidmechanicalsystems, connections,facilities,cablesand/orlinesservemorethan one(1)CondominiumUnit,theOwnerofeachCondominiumUnit servedbysaidmechanicalsystems,connections,facilities, cablesand/orlinesshallbeentitledtothefulluseand enjoymentofsuchportionsofsameasservicehisCondominium Unit. (d)IntheeventofadisputebetweenOwnersre- spectingtherepairorrebuildingoftheaforesaidmechanical systems,connections,facilities,cablesand/orlines,orthe sharingofthecostthereof,uponwrittenrequestofone(1) ofsuchOwnersaddressedtotheCorporation,themattershall besubmittedtotheBoardwhoshalldecidethedispute,and thedecisionoftheBoardshallbefinalandconclusiveonthe Owners. (e)EasementsovertheProjectfortheinstallation andmaintenanceofmechanicalsystems,electricandtelephone lines,water,firealarm,suppression,andprotectionfacili- ties,drainageandsanitarysewerconnectionsandfacilities, andtelevisionantennacablesandfacilities,allasshownon therecordedmapoftheProjectand/ortheimprovementplans submittedbyDeclarantandapprovedbytheCity,andasmaybe hereafterrequiredorneededtoservicetheProject,are herebyreservedbyDeclarant,togetherwiththerighttogrant andtransferalloraportionofthesame. (f)TotheextentrequiredbytheCity,allutility linesshallbeplacedandmaintainedunderground,andallnew -31-52027.048-22139.FCM110714 roof,wallandground-mountedmechanicalequipment,utility equipment,andutilitymetersshallbescreenedfrompublic viewwithappropriatebuildingmaterialsand/orlandscaping. Section7.EasementsforMaintenanceoftheCorporation PropertybytheCorporation.Thereisherebycreated,grantedand reservedanonexclusiveeasementinfavoroftheCorporationfor ingress,egressandaccesson,overandacrossallportionsofthe Project(includingbutnotlimitedtotheCondominiumsinthe Project)asreasonablyrequiredbytheCorporationtoperformits maintenanceobligationssetforthinthisDeclarationoradoptedby theBoard.IntheeventitbecomesnecessaryfortheCorporationto enteruponanyCondominiumUnitorExclusiveUseCorporation Propertyforpurposesof:(a)performingitsmaintenance obligationsassetforthinthisDeclarationand/ortheRulesand Regulations;or(b)bringinganOwnerand/orhisCondominiuminto compliancewiththisDeclaration,inaccordancewiththeprovisions setforthherein,theCorporation,anditsdulyauthorizedagents andemployees,shallhavetheright,afterreasonablenoticetothe Ownerandatareasonablehouroftheday,toenteruponorwithin suchOwner’sCondominiumUnitfortheperformanceofsuchwork. SuchentryshallbemadewithaslittleinconveniencetotheOwner asispracticable,andintheeventthatanydamageshallbe proximatelycausedbysuchentry,theCorporationshallrepairthe sameatitsexpense.Notwithstandingtheforegoing,intheeventof anemergency,orforregularmaintenanceobligations(e.g.,the inspectionofthefiresprinklerheadswithintheCondominium Units),suchrightofentryshallbeimmediate. Section8.EasementsforClusteredMailboxes.Inorder tocomplywiththevariousrequirementsoftheCityandtheUnited StatesPostalService,clusteredmailboxesmaybeinstalledwithin theProject.Easementsareherebycreatedonandovertheaffected portionsoftheProjectandgrantedinfavorofallOwnersandthe UnitedStatesPostalServicefordelivery,depositandretrievalof mail.TheCorporationshallmaintainmailboxesintheProjectnot otherwisemaintainedbytheUnitedStatesPostalServices.Each Ownershallberesponsibleforthemaintenanceoftheindividual mailbox,includingthehinges,lock,andkeysthereof,exclusively servingsuchOwner. Section9.EasementsOverSidewalks.Therearehereby createdandreservednon-exclusivereciprocalappurtenantease- ments,grantedinfavorofallOwners,themembersoftheir families,theirlesseesandtenantsand/ortheirrespectiveguests andinvitees,forpedestrianaccess,useandenjoymenton,overand acrossallsidewalksandwalkwayswithintheCorporationProperty, ifany. Section10.EasementsforDrainage.Therearehereby created,grantedandreservedovertheCorporationPropertyand Condominiumseasementsfordrainageaccordingtotheestablished patternsfordrainagecreatedbytheapprovedgradingand/or -32-52027.048-22139.FCM110714 buildingplansfortheProject,aswellasaccordingtoDeclarant’s as-builtconditions,aswellastheactual,natural,existing drainagepatterns.EachOwnershallmaintainhisrespective CondominiumandExclusiveUseCorporationPropertyinsuchamanner toensurethatnowatercollectsorpondsinanylocationadjacent toanywallsorfences,ifany,oftheimmediatelyadjacent Condominium.Withoutlimitingpotentialliabilityasaresultof otheractivitiesoractions,eachOwnershallbeliableforany damagethatoccurstotheCorporationPropertyand/oraCondominium UnitasaresultofanOwner’smodificationstosuchOwner’s CondominiumorExclusiveUseCorporationProperty.EachOwner covenantsandagreesthatheshallnotobstructorotherwise interferewiththedrainagepatternsofwatersoverthebalcony, porch,orotherExclusiveUseCorporationPropertyareaofhis Condominium,or,inthealternative,thatintheeventitis necessaryandessentialtoaltersaiddrainagepatterns,hewill makeadequateprovisionsforproperdrainageandsubmitsuchplans forwrittenapprovalbytheArchitecturalReviewCommittee. Section11.EasementforAreaDrains.Declaranthereby establishes,reserves,andgrantstotheCorporationandOwners, nonexclusivereciprocaleasementsovertheCorporationPropertyfor drainagepurposestoaccommodatethedrainagesystem,including, butnotlimitedtoareadrainsandpipes,originallyinstalledby Declarant.TheCondominiumOwnerservedbysaiddrainagesystem shallberesponsibletomaintainandpreservesaidsystem(e.g., withinhisCondominiumorExclusiveUseCorporationArea)inan operatingconditiontoensureproperdrainageon,over,under, acrossandthroughthebalcony,porch,andotherExclusiveUse CorporationPropertyareasofhisCondominium(ifapplicable)in accordancewiththedrainagepatternscreatedbytheas-built conditionbyDeclarantfortheProject,andshallbearthecostof themaintenance,repairorreplacementassociatedwiththedrainage system(e.g.,inletstructures,areadrains,drainlines,etc.) whichaffectshisCondominium.NoOwnershallalterinanymanner whatsoever,orremovethedrainagesystemwithoutthepriorwritten approvaloftheBoard.Intheeventanyportionofthedrainage systemisdamaged,destroyedornotproperlymaintained,any CondominiumOwneraffectedbysuchdrainagesystemmaycausesaid repair,restorationormaintenanceworktobecompletedandshall beentitledtorecovertheappropriateexpensesfromtheOwner responsibleforsuchdamage,destructionorimpropermaintenance. Notwithstandingtheforegoing,ifanyportionofthedrainage systemisdamagedordestroyedasaproximateresultofanyactor omissionofanyOwner,oranymemberofhisfamily,guests, tenants,lesseesand/orinvitees(withoutregardtofault),such OwnershallimmediatelynotifytheCorporationofsuchdamageor destructionandshallbearallofthecostsrelatedthereto, includinganycostand/orexpenserelatedtotherepairofthe drainagesystemandanypersonalinjuryorpropertydamagetoany personorCondominiumintheProject. -33-52027.048-22139.FCM110714 Section12.EasementsforConstructionandSales.De- clarantherebyreservesuntoitself,anditssuccessorsand assigns,togetherwiththerighttograntandtransferallora portionofthesame,untiltheearlierofsuchtimeasDeclarantno longerhasanownershipinTractNo.^ortheAnnexationProperty orfiveyearsfromtherecordationofthisDeclaration,nonexclu- siveeasementsforaccess,ingressandegressonandoverthe Projecttocarryonnormalsalesactivity,includingtheoperation ofamodelscomplex,salesofficeandparkingarea,andthedisplay ofpromotionalsignsandexhibitsinconnectionwiththesaleor leaseofCondominiumsintheProject. Section13.EasementsforMasterAntennae,CableTele- visionandAlarmSystemCabling.Thereareherebyreservedforthe benefitofDeclarant,anditssuccessorsandassigns,togetherwith therighttograntandtransferalloraportionofthesame, nonexclusiveeasementsofaccess,ingressandegresstotheProject forpurposesofinstallation,operation,maintenance,repair, inspection,replacementandremovalofmasterantennae,cable televisionservicelines,alarmsystemcablingandallrelated facilitiesandequipment.Sucheasementsshallbefreely transferabletoanyotherpersonorentityforthepurposeof providingsuchservices.Allsuchmasterantennae,cabletelevision servicelinesandalarmsystemcablingshallremainthepropertyof Declarantoritssuccessorsandassigns.Theexerciseofallrights reservedhereundershallnotunreasonablyinterferewiththerea- sonableuseandenjoymentoftheProject.Declarant,oritssuc- cessorsandassigns,shallberesponsibleforanydamageinanyway arisingoutof,orinconnectionwith,therightsandactivities reservedhereunder. Section14.ReservationofConstructionRightsbyDe- clarant.InadditiontotherightsreservedbyDeclaranttocontrol developmentoftheProjectassetforthherein,including,butnot limitedto,intheArticleentitled"IntroductiontoTheSouth CityStation,"nothinginthisDeclarationshalllimittherightof Declaranttomaintaintemporaryfences,limitaccessbyOwnersto portionsoftheCorporationProperty,establish,reserveand/or grantadditionallicenses,easementsandrights-of-wayinfavorof Declarant,utilitycompaniesorothersasmay,fromtimetotime, bereasonablynecessaryforthedevelopmentoftheProjectandthe saleoftheCondominiumstherein.Theforegoingrightsestablished andreservedbyDeclarantshallbesubjectonlytotheapplicable regulationsandrequirementsoftheCityandtheCalBREandshall notresultintheinterferencewiththereasonableandregularuse andenjoymentoftheCorporationPropertybyOwners. Section15.EasementforPublicServiceUses.Inaddi- tiontotheforegoingeasementsovertheCorporationProperty, thereareherebycreated,establishedandgrantedeasementsfor publicservices,including,butnotlimitedto,theimmediateright ofpolice,fire,ambulance,andotherpublicservicesand authorizedrepresentativesoftheCityandotherLocalGovernment -34-52027.048-22139.FCM110714 AgenciestoenteruponanypartoftheProjectatanytimeforpur- posesofservingthehealthandwelfareofOwnersintheProject. AsrequiredbytheCity,noticeofsuchrightofgovernmental agencyaccessshallbeprominentlydisplayedinthecommonareasof theProject(i.e.,CorporationProperty). Section16.ControlofCorporationProperty.Control and/ortitleoftheCorporationPropertyinanyPhase(excluding thoseportionsoftheCorporationPropertywhicharesubjecttothe variousrightsreservedbyDeclarantassetforthinthisDeclara- tion)shallbeturnedoverbyDeclaranttotheCorporationpriorto orsimultaneouslywiththefirstcloseofescrowforthefirstsale ofaCondominiumintheapplicablePhase.Withoutlimitingthe generalityoftheforegoing,Declarantshallconveyfeetitleto CorporationPropertytotheCorporationfreeandclearofall encumbrancesandliens,exceptpropertyrightsinandtothe CorporationPropertywhichareofrecordorcreatedhereinorina NoticeofAnnexation,andanycurrentrealpropertytaxes,which shallbeproratedtothedateoftransfer.Asmoreparticularly setforthintheArticlehereinentitled"EnforcementofBonded Obligations,"intheeventthatImprovementsproposedtobe constructedwithintheCorporationPropertyinaPhasehavenot beencompletedpriortothefirstcloseofescrowinsuchPhase,as maybeevidencedbyaNoticeofCompletionrecordedintheOfficial RecordsoftheCounty,thecompletionofsuchImprovementsshallbe assuredinaccordancewithSection11018.5oftheCalifornia BusinessandProfessionsCode,oranysimilarstatutehereinafter enacted,andtheapplicableregulationsoftheCalBRE.The Corporationshallbeobligatedtoundertakeallmaintenance responsibilitiesfortheCorporationPropertywhentheCorporation leviesAssessmentsforthemaintenancethereof,orwhentheCity approvestheCorporationPropertyImprovements(asevidencedbythe releasebytheCityofanybondspostedbyDeclarantasrequiredby CityforsaidCorporationProperty)installedbyDeclarant, whicheverisfirsttooccur.Notwithstandingtheforegoing,ifthe contractorsorsubcontractorsofDeclarantarecontractually obligatedtomaintainorwarrantthelandscapingorother ImprovementsontheCorporationPropertyforaspecifiedperiodin whichsaidcontractorsorsub-contractorsshallperformsuchmain- tenance,theCorporationshallnotinterferewiththeperformance ofsuchwarrantyorothercontractualmaintenanceobligations. Maintenanceperformedbysuchcontractorsorsubcontractorsshall notservetopostponethecommencementofAssessmentspursuantto thisDeclaration,norentitleanOwnertoclaimanyoffsetor reductionintheamountofsuchAssessments.Declarantisnot obligatedtoinstallanyCorporationPropertyImprovementsother thanthoserequiredbytheCitypursuanttotheProjectapproval requirements.Thenature,design,qualityandquantityofall ImprovementstotheCorporationPropertyshallbedeterminedby Declarantinitssolediscretioninaccordancewiththetermsof theProjectapprovals.Intheeventthatadisputearisesbetween DeclarantandtheCorporationwithrespecttothenature,design, qualityorquantityoftheImprovements,ortheacceptanceof -35-52027.048-22139.FCM110714 maintenanceresponsibilitiestherefor,theCorporationshallbe obligatedtoacceptownershipand/orcontroloftheCorporation Propertyandundertakemaintenanceresponsibilitiespending resolutionofthedispute.Notwithstandinganythingtothecontrary hereinorintheBy-LawsfortheBoard,commencingonthedateof thefirstannualmeetingoftheOwners,Declarantshallrelinquish controlovertheCorporation’sabilitytodecidewhetherto initiateaconstructiondefectclaimunderDivision2,Part2, Title7(commencingwithSection895)oftheCaliforniaCivilCode. Therefore,theDeclarant,currentemployeesandagentsofDeclar- ant,BoardmemberswhoareappointedbyDeclarant,Boardmembers electedbyamajorityofvotescastbyDeclarant,andallother personswhosevoteorwrittenconsentisinconsistentwiththe intentoftheprecedingsentence,areprohibitedfromparticipating andvotinginanydecisionoftheCorporationorOwnerstoinitiate adefectclaim. Section17.EasementsforEncroachments.Declarant reservesforitsbenefitandthebenefitoftheOwners,andhereby creates,establishes,andgrantstotheOwnersareciprocal easementappurtenanttoeachCondominiumovertheCondominiumUnits andCommonPropertyforthepurposeof(i)accommodatingany existingencroachmentofanywall,eave,overhangs,wingwalls and/orchimneysofanyImprovementexistingonlyasofthedatethe escrowinitiallyclosedforthesaleoftheCondominiumfromthe DeclaranttoanOwner,and(ii)maintainingthesameandaccommo- datingauthorizedconstruction,reconstruction,repair,shifting, movement,ornaturalsettlingofsuchencroachmentsorImprove- ments.Declarantfurtherreservesreciprocaleasementsforutility servicesandrepairs,replacementandmaintenanceofthesameover theCommonPropertyforthebenefitoftheOwners.Useofthe foregoingeasementsmaynotunreasonablyinterferewitheach Owner’suseandenjoymentofOwner’srespectiveCondominium. Section18.OtherEasementsandLicenses.Inaddition totheforegoing,theProjectissubjecttoalleasementsand licensessetforthontherecordedmapofTractNo.^andthemaps ofanyAnnexationPropertyannexedintotheProjectinaccordance withtheprovisionsofthisDeclaration,aswellasanyandall othereasementsandlicensesrecordedagainsttheproperty comprisingtheProjectintheOfficeoftheCountyRecorder. Declarantreservesforitsbenefitanon-exclusiveeasementover theentiretyoftheProjectasreasonablynecessarytomaintain, repair,andreplaceanyImprovements(including,without limitation,stormdrainagefacilitiesandotherBestManagement Practices)thathavenotyetbeenconveyedtotheCorporation. -36-52027.048-22139.FCM110714 ARTICLEV THECORPORATION Section1.Membership.Everypersonorentitywhoor whichisanOwner,asdefinedhereinabove,shallbeaMemberofthe Corporation.Theforegoingisnotintendedtoincludepersonsor entitieswhoholdaninterestinaCondominiumintheProject merelyassecurityfortheperformanceofanobligation. Section2.VotingRights.TheCorporationshallhave two(2)classesofvotingmembership,asfollows: ClassA.ClassAMembersshallbeallOwners,with theinitialexceptionoftheDeclarantuntiltheconversionof theClassBMemberstoClassAMembers,andshallbeentitled toone(1)voteforeachCondominiumowned.Whenmorethanone (1)personholdsaninterestinanyCondominium,allsuchper- sonsshallbeMembers.ThevoteforsuchCondominiumshallbe exercisedastheyamongthemselvesdetermine,butinnoevent shallmorethanone(1)votebecastwithrespecttoany Condominium.TheCorporationshallrecognizethevotecastby aco-Owner,unlessanotherco-Ownershallcastaconflicting vote,inwhichcasebothvotesshallbenullandvoid,andnot recognizedbytheCorporation.Thenonvotingco-Ownerorco- Ownersshallbejointlyandseverallyresponsibleforallof theobligationsimposeduponthejointly-ownedCondominium. ClassB.TheClassBMembershallbetheDeclarant andshallbeentitledtothree(3)votesforeachCondominium ownedintheProjectuponwhichDeclarantisthenpayingthe appropriatemonthlyAssessmentsprovidedforhereinbelow.The ClassBmembershipshallceaseandbeconvertedtoClassA membershipuponthehappeningofanyofthefollowingevents, whicheveroccursearliest: (a)Thesecondanniversaryofthefirstclose ofescrowforthesaleofaCondominiumpursuanttothe originalissuancebytheCalBREofthemostrecently issuedFinalSubdivisionPublicReportforaPhaseofthe Project;or (b)Thefourthanniversaryofthefirstclose ofanescrowforthesaleofaCondominiumpursuantto theoriginalissuancebytheCalBREofaFinalSubdivi- sionPublicReportforPhase1. AnyactionbytheCorporationwhichmusthavetheap- provalofthemembershipoftheCorporationbeforebeingundertaken shallrequirethevoteorwrittenassentofbothamajorityofthe ClassBmembershipaswellasamajorityoftheClassAmembership, solongastherearetwo(2)outstandingclassesofmembership, unlessaspecificprovisionofthisDeclarationortheBy-Lawsor -37-52027.048-22139.FCM110714 ArticlesoftheCorporationrequires(i)theapprovalofagreater percentageofthevotingmembership,or(ii)avotebyMembers otherthanDeclarant,or(iii)aspecificapprovalpercentageof alltheMembers.Notwithstandingtheforegoing,anyactionbythe CorporationpursuanttotheArticlecontainedhereinentitled "EnforcementofBondedObligations"shallonlyrequireamajority ofthevotingpoweroftheOwners,otherthanDeclarant. Section3.SpecialProceduresForAppointmenttothe Board.Notwithstandingtheforegoing,theClassAMembersshall beentitledtoelectatleastoneofthemembersoftheBoard,so longastherearetwo(2)classesofmembershipoutstandinginthe Corporation,andallmembersoftheBoard(includingthose appointedbyDeclarant)shallbesubjecttoremoval,withor withoutcause,asprovidedintheBy-LawsandCalifornialaw.The requirementsofthisSection3,aswellasSection2above,ofthis ArticleVareintendedandshallbeconstruedtocomplywiththe timeframeandotherrequirementssetforthinCalifornialawand theregulationsoftheCaliforniaCommissionerofRealEstate (e.g.,CalBRERegulation2792.18,2792.19,etc.)regardingthe transferofcontroloftheCorporationfromtheDeclaranttothe Members. Notwithstandingtheforegoingoranyprovisioninthis Declaration,transferofcontroloftheCorporationshallpassto theOwnersofCondominiumsnolaterthanthelatestofthe following:(a)onehundredtwenty(120)daysafterthedateby whichseventy-fivepercent(75%)oftheCondominiumsintheProject havebeenconveyedbytheDeclaranttotheOwners;(b)three(3) yearsaftercompletionoftheProject,asevidencedbythefirst conveyanceofaCondominiumbyDeclaranttoanOwner;or(c)the timeframeestablishedunderCaliforniaorlocalcondominiumlaws ifspecificprovisionsregardingthetransferofcontrolexist. Section4.AdjustmentofVotingRights.Thevoting rightsintheCorporationshallbeadjustedonthefirstdayofthe firstmonthimmediatelyfollowingthefirstcloseofanescrowfor thesaleofaCondominiumineachPhaseoftheProject. Section5.VestingofVotingRights.Thevotingrights attributabletoanygivenCondominiumintheProject,asprovided forherein,shallnotvestuntiltheAssessmentsprovidedfor hereinbelowhavebeenleviedbytheCorporationagainstsaid Condominium. Section6.SuspensionofVotingRights.Asmorepar- ticularlysetforthintheArticleentitled"GeneralProvisions," theBoardshallhavetheauthority,amongotherthings,tosuspend thevotingrightsofanyMembertovoteatanymeetingofthe MembersforanyperiodduringwhichsuchOwnerisdelinquentinthe paymentofanyAssessment,regardlessoftype,itbeingunderstood thatanysuspensionfornonpaymentofanyAssessmentshallnot -38-52027.048-22139.FCM110714 constituteawaiverordischargeoftheMember’sobligationtopay theAssessmentsprovidedforinthisDeclaration. Section7.Transfer.TheCorporationmembershipheldby anyOwnerofaCondominiumshallnotbetransferred,pledgedor alienatedinanyway,exceptasincidentaltothesaleofsuch Condominium.Intheeventofsuchsale,theCorporationmembership mayonlybetransferred,pledgedoralienatedtothebonafide purchaserorpurchasersoftheCondominium,ortotheMortgagee(or thirdpartypurchaser)ofsuchCondominiumuponaforeclosuresale. Anyattempttomakeaprohibitedtransferisvoidandwillnotbe reflecteduponthebooksandrecordsoftheCorporation.The CorporationmaylevyareasonabletransferfeeagainstnewOwners andtheirCondominiums(whichfeeshallbeaComplianceAssessment chargeabletosuchnewOwner)toreimbursetheCorporationforthe actualadministrativecostoftransferringthemembershipstothe newOwnersontherecordsoftheCorporation. Section8.RecordDates.Forthepurposesofdetermin- ingMembersentitledtonoticeofanymeeting,tovoteorto exerciseanyotherrightsinrespectofanylawfulaction,the BoardmayfixinadvancerecorddatesasprovidedintheBy-Laws. ARTICLEVI POWERSANDDUTIESOFTHECORPORATION Section1.ManagementBody.TheCorporationishereby designatedasthemanagementbodyoftheProject.TheMembersof theCorporationshallbetheOwnersintheProjectasprovided herein,andtheaffairsoftheCorporationshallbemanagedbya BoardofDirectors,asmoreparticularlysetforthintheBy-Laws. TheinitialBoardshallbeappointedbytheDeclarant.Thereafter, theDirectorsshallbeelectedasprovidedintheBy-Laws. Section2.Powers.TheBoard,forandonbehalfofthe Corporation,shallhavetherightandpowertodoallthingsnec- essarytoconduct,manageandcontroltheaffairsandbusinessof theCorporation.SubjecttotheprovisionsoftheArticles,theBy- LawsandthisDeclaration,theBoardshallhaveallgeneralpowers authorizedundertheCaliforniaCorporationsCodefornonprofit, mutualbenefitcorporations,andshallhavethefollowingspecific powers: (a)EnforcetheprovisionsofthisDeclaration (including,butnotlimitedto,theabilitytorecordanotice ofnoncomplianceorviolation,unlessotherwiseprovidedby commonlaw),includinganyamendmentsthereto,andall contractsoranyagreementstowhichtheCorporationisa party; -39-52027.048-22139.FCM110714 (b)Acquire,manage,maintain,repairandreplace allCorporationPropertyandImprovementslocatedthereon,in- cludingallpersonalproperty,inaneat,clean,safeand attractiveconditionatalltimes,andpayforallutilities, gardening,irrigationwater,andothernecessaryservicesfor theCorporationProperty,allasmorespecificallysetforth herein,includingtheArticleentitled"Repairand Maintenance",andanyrecordedNoticeofAnnexation; (c)Maintainfire,casualty,liabilityandfidelity bondcoverage,andotherinsurancecoveragepursuanttothe termsofthatArticlehereinentitled"Insurance"; (d)Obtain,forthebenefitoftheCorporation Property,allcommonlymeteredwater(e.g.,domesticandfire water),sewer,andelectricservices,refusecollectionand cable(ormasterantenna)televisionservice,ifany; (e)Employandretainaprofessionalmanagerand/or managementcompanytoperformalloranyportionoftheduties andresponsibilitiesoftheBoardandengagesuchother personnel(includingattorneys,budgetpreparers,andaccoun- tants)asnecessaryfortheoperationoftheProjectand administrationoftheCorporation; (f)Payalltaxesandspecialassessmentswhich wouldbealienupontheentireProjectortheCorporation Property,anddischargeanylienorencumbranceleviedagainst theentireProjectortheCorporationProperty; (g)Payforreconstructionofanyportionofthe CorporationPropertydamagedordestroyed; (h)Delegateitspowers; (i)AdoptreasonableRulesandRegulationscon- cerningthemaintenance,improvement,useand/oroccupancyof theProjectandelectionproceduresincompliancewith CaliforniaCivilCodeSection4340-4370; (j)EnterintoanyCondominiumwhennecessaryin connectionwithmaintenanceorconstructionforwhichthe Corporationisresponsible; (k)Executelotlineandcondominiumboundary adjustments(andcorrespondingdeeds),enterintoamainte- nanceand/orotheragreementwithDeclarantorathirdparty, subjecttoCivilCodeSection4600,ifapplicable,grantfee titletooreasementsovertheCorporationPropertyto Declarantorathirdparty,and/orreceivefeetitletooran easementoverrealpropertyownedbyDeclarantorathird partyasreasonablynecessaryduetothoseconditionsinthe fieldwhereitisnotreadilyapparentwhereLotlinesare -40-52027.048-22139.FCM110714 locatedandtherespectiveparty’smaintenanceresponsibili- tiescommenceandend,andsuchadjustments,deedsand/or agreementswillpromoteaclearlydefinedanduniformmainte- nanceplanbytherespectivepartiesorasotherwisedeter- minedappropriatebyamajorityvoteoftheBoard; (l)Grantexclusiveeasementsorlicensesover portionsoftheCorporationPropertyinaccordancewithCali- forniaCivilCodeSection4600,assamemaybeamendedfrom timetotime,and(whererequiredbylaw)withtheassentof sixty-sevenpercent(67%)ofthevotingpoweroftheCorpora- tion; (m)LevyandcollectAssessmentsonallCondomini- umsintheProjectforwhichAssessmentshavecommenced,and enforcepaymentofsuchAssessmentsinaccordancewiththe termsandprovisionssetforthintheArticlehereinentitled "EffectofNonpaymentofAssessments:RemediesoftheCorpora- tion"; (n)SubjecttocompliancewithSection5925et seq. oftheCaliforniaCivilCode,assamemaybeamendedfromtime totime,institute,defend,settleorinterveneonbehalfof theCorporationinanydisputeresolutionproceedingin matterspertainingto(i)enforcementoftheDeclaration, RulesandRegulationsandBy-Laws;(ii)damagetotheCommon Property;(iii)damagetotheCondominiumUnitswhicharises outof,orisintegrallyrelatedto,damagetotheCommon PropertythattheCorporationisobligatedtomaintainor repair; (o)Negotiateandenterintoagreementsfor TelecommunicationServices,withtermsnotinexcessoften (10)years,providedthatDeclarantdoesnothaveadirector indirectownershipinterestinthesupplierofsuchservices orequipmentequaltoorgreaterthantenpercent(10%); (p)Negotiateandenterintoagreementswithany nonprofitcorporations(e.g.,governingportionsofTractNo. ^and/ortheAnnexationProperty),includingthestreetsand anyrecreationalamenitieslocatedthereon)orLocalGovern- mentAgencies; (q)Negotiateandenterintocontractsinwhichthe Corporationentersintolitigationoranyalternativedispute resolutionprocedurewhentheCorporation’sobligationtopay forservicesissetinwholeorinpartonacontingencybasis except(i)contractsforcollectionofassessmentorother accountsreceivable;(ii)contractsinvolvingevaluationof services;or(iii)contractswithatotalamounttobepaidby theCorporationnotinexcessofFortyThousandDollars ($40,000.00); -41-52027.048-22139.FCM110714 (r)Asapplicable,complywithtermsandprovisions ofCaliforniaCivilCodeSection6000,asamended,inconnec- tionwithanypotentiallitigationbaseduponaclaimfor defectsinthedesignorconstructionoftheCorporation Property; (s)Executeallnecessarydocumentsinorderto effectuatetheLimitedWarranty; (t)Authorizeanagent,managementcompanyrepre- sentative,orbookkeepertoappearandparticipateinasmall claimscourtactiononbehalfoftheCorporationinaccordance withCaliforniaCodeofCivilProcedureSection116.540(i), (j); (u)Withoutanylimitationoftheforegoingpowers, (i)operate,maintain,andinspecttheCorporationProperty anditsvariouscomponentsinconformancewithanyMaintenance GuidelinesandanyMaintenanceManual,and(ii)reviewany MaintenanceManualfornecessaryorappropriaterevisionsas deemednecessarybytheBoard(Declarantrecommendsatleast anannualreview);and (v)Performanyandallotheractsandthingsthat anonprofit,mutualbenefitcorporationorganizedunderthe lawsoftheStateofCaliforniaisempoweredtodo,whichmay benecessary,convenientorappropriateintheadministration ofitsaffairsforthespecificpurposesofmeetingitsduties assetforthinthisDeclaration. Section3.Duties.TheBoardshallperformandexecute thefollowingdutiesforandonbehalfoftheCorporation: (a)Provideorcausetobeprovided(e.g.,bya privateorpublicentity),water,sewer,electricity,garbage andtrashcollection(applicabletoCorporationProperty), regularperiodicdrainagedeviceclearingandothernecessary utilityservicesfortheCorporationProperty,ifany,and,if notseparatelymeteredorprovided,fortheCondominiumUnits (subjecttoreimbursement); (b)ProvideinsurancefortheCorporationandits MembersinaccordancewiththeprovisionsoftheArticle hereinbelowentitled"Insurance,"anddistributenoticesas mayberequiredbylaw; (c)Acquire,own,maintainandrepairallportions oftheCorporationProperty(includinganyCorporation PropertywhichisannexedintotheProject)inaneat,clean, safe,attractive,sanitaryandorderlyconditionatalltimes. Withoutlimitingthegeneralityoftheforegoing,theCorpora- tionshallberesponsibleformaintainingthecondominium buildings(excludingtheCondominiumUnits),firesprinklers, -42-52027.048-22139.FCM110714 includingsprinklerheadswhichprotrudeintotheairspaceof theCondominiumUnit,ifany,firestandpipes,firealarm systems,fireextinguishers,andotherfireprevention equipmentand/orfacilitieslocatedonCorporationProperty, awnings,commonwalkwaysandsidewalks(ifany),poles,sump pumps,portionsofthefences,soundwalls,retainingwalls, andperimeterwallsdescribedand/ordepictedasmaintainedby theCorporationonanExhibittothisDeclarationora recordedNoticeofAnnexation(e.g.,Exhibit"C"hereto), privatedrivesandaislesandparkingspaces,thoseportions oftheprivatestormdrainsystemsfortheProjectdescribed and/ordepictedasmaintainedbytheCorporationinanExhibit tothisDeclarationorarecordedNoticeofAnnexation(e.g., Exhibit"D"hereto),signs,Projectmonumentsignsand directories,andlandscapingandirrigationimprovementslo- catedontheCorporationProperty,exceptingtherefrom landscapingandimprovementslocatedintheExclusiveUse CorporationProperty,inaconditioncomparabletothe conditioninitiallyapprovedbytheCity; (d)Retainaprofessionalpropertymanagement companytomanagetheCorporationandtheinspection,repair, andmaintenanceoftheCorporationPropertyinaccordancewith theprovisionsofthisDeclaration; (e)LevyandcollectAssessmentsonallCondomini- umsintheProjectforwhichAssessmentshavecommenced,and enforcepaymentofsuchAssessmentsinaccordancewiththe termsandprovisionssetforthintheArticlehereinentitled "EffectofNonpaymentofAssessments:RemediesoftheCorpora- tion;" (f)Contractforanyothermaterial,supplies, furniture,labor,services,maintenance,repairs,structural alterationsandinsurancewhichtheCorporationisrequiredto payforpursuanttothetermsandprovisionsofthisDec- larationorbylaw; (g)Payallrealandpersonalpropertytaxesand AssessmentswhichtheCorporationisrequiredtopayfor pursuanttothetermsandprovisionsofthisDeclarationorby law,unlessseparatelyassessedtoOwners;provided,however, thatitshallbetheobligationofeachOwnertopayhis respectiveshareofthetaxassessmentleviedontheProject priortoseparateassessmentsbythetaxassessorpursuantto Section2188.6oftheCaliforniaRevenueandTaxationCode,as samemaybeamended,fromtimetotime; (h)Causeayearlyinspectiontobemade,bya licensedengineerorotherwisequalifiedindividual,ofany slopeareasanddrainagedeviceslocatedwithintheCorpora- tionProperty; -43-52027.048-22139.FCM110714 (i)Accept,aspartoftheProject,allproperty includedinorannexedtotheProject,inaccordancewiththe termsandprovisionsofthisDeclaration,andacceptall OwnersasMembersoftheCorporation.Inaddition,the CorporationshallacceptallCorporationProperty,conveyed, leasedorotherwisetransferredtoit,ifany,byDeclarant, itssuccessorsorassigns,oranappropriategovernmental agency; (j)Exceptasrequiredbylaw,causefinancial statementsandareservefundingplan(e.g.,consistentwith therequirementsofCaliforniaCivilCodeSections5300-5320 and5500-5580andFHLMC,FNMA,GNMAandVA/FHA)forthe Corporationtoberegularlypreparedandcopiesdistributedto eachMemberoftheCorporation,regardlessofthenumberof MembersortheamountofassetsoftheCorporation: (1)Aproformaoperatingstatement(budget) fortheimmediatelyfollowingfiscalyearshallbe distributedwithinthetimeperiodspecifiedbystatute priortothebeginningofthefiscalyear(e.g.,notless than30daysnormorethan90dayspriortothebeginning ofthefiscalyear),andshallcontainthefollowing information: i)AnitemizedestimateoftheCorpora- tion’srevenueandexpenses(including,without limitation,adequatefundingforinsurancecoverage anddeductibles),determinedonanaccrualbasis; ii)Asummary,printedinboldtype,of thecurrentstatusoftheCorporation’sreserves, baseduponthemostrecentrevieworstudyconduct- edpursuanttoCaliforniaCivilCodeSections5300 and5550-5570("Study"),asmaybeamended,from timetotime,andpreparedinaccordancewithall requirementsoflaw(e.g.,CivilCodeSections5300 and5550-5570); iii)Astatementpreparedinaccordance withallrequirementsoflaw(e.g.,CivilCode Section5300)astoallofthefollowing: (A)WhethertheBoardhasdeterminedto deferornotundertakerepairsorreplacement ofanymajorcomponentwitharemaininglife of30yearsorless,includingajustification forthedeferralordecisionnottoundertake therepairsorreplacement. (B)WhethertheBoard,consistentwith thereservefundingplanadoptedpursuantto Section5550,hasdeterminedoranticipates -44-52027.048-22139.FCM110714 thatthelevyofone(1)ormoreSpecial Assessmentswillberequiredtorepair, replaceorrestoreanymajorcomponent(e.g., ImprovementtotheCorporationProperty)orto provideadequatereservestherefor.Ifso,the statementshallalsosetouttheestimated amount,commencementdate,anddurationofthe SpecialAssessments;and (C)Themechanismormechanismsbywhich theBoardwillfundreservestorepairor replacemajorcomponents,includingassess- ments,borrowing,useofotherassets,defer- ralofselectedreplacementofrepairs,or alternativemechanisms. (D)WhethertheCorporationhasany outstandingloanswithanoriginaltermof morethanoneyear,includingthepayee, interestrate,amountoutstanding,annual payment,andwhentheloanisscheduledtobe retired. iv)Ageneralstatementpreparedin accordancewithallrequirementsoflaw(e.g., CivilCodeSection5300)settingforththe proceduresutilizedbytheCorporationtocalculate andestablishreservestodefraythecostsof futurerepairs,replacementsoradditionstothe CorporationPropertyImprovements; v)AstatementastowhethertheBoard hasdeterminedoranticipatesthatthelevyofone (1)ormoreSpecialAssessmentswillberequiredto repair,replaceorrestoreanymajorImprovements totheCorporationProperty,ortoprovideadequate reservestherefor;and vi)Asummaryofthereservefunding planadoptedbytheBoardinaccordancewithCivil CodeSections5550.Thesummaryshallinclude noticetotheOwnersthatthefullreservestudy planisavailableuponrequest,andtheCorporation shallprovidethefullreservestudyplantoany Owneruponrequest. Notwithstandingtheforegoing,inlieuof distributingtheproformaoperatingbudgetrequired hereinabove,theBoardmayelecttodistributeasummary oftheproformabudgettoallMemberswithawritten notice,inatleast10-pointboldtypeonthefrontpage, thattheproformabudgetisavailableatthebusiness officeoftheCorporation,oratanothersuitableloca- -45-52027.048-22139.FCM110714 tionwithintheProject,andthatcopieswillbeprovided uponrequestandattheexpenseoftheCorporation.If anyMemberrequeststhatacopyoftheproformabudget requiredhereinbemailedtosaidMember,theCorporation shallmailthecopytotheMemberbyfirst-classmailat theexpenseoftheCorporation,withinfive(5)daysof thereceiptofsaidrequest; (2)Abalancesheetasofanaccountingdate whichisthelastdayofthemonthclosestintimetosix (6)monthsfromthedateofthecloseofescrowforthe firstsaleofaCondominium,andanoperatingstatement fortheperiodfromthedateofthefirstcloseofescrow tothesaidaccountingdate,shallbedistributedwithin sixty(60)daysaftertheaccountingdate.Thisoperating statementshallincludeascheduleofAssessmentsre- ceived,andreceivable,identifiedbythenumberofthe Condominiumsassessed; (3)Anannualreportconsistingofthefol- lowingshallbedistributedwithinonehundredtwenty (120)daysafterthecloseofthefiscalyear: i)Abalancesheetasofthelastday oftheCorporation’sfiscalyear; ii)Anoperating(income)statementfor thefiscalyear; iii)Astatementofchangesinfinancial positionforthefiscalyear;and iv)Anyinformationrequiredtobe reportedpursuanttoSection8322oftheCalifornia CorporationsCodeandSection5300oftheCalifor- niaCivilCode,aseachmaybeamendedfromtimeto time. Thisannualreportshallordinarilybepreparedbya licenseeoftheCaliforniaBoardofAccountancy,in accordancewithgenerallyacceptedaccountingprinciples, foranyfiscalyearinwhichthegrossincomeofthe CorporationexceedsSeventy-FiveThousandDollars ($75,000.00).However,ifforanyreasonthereportis notpreparedbyalicenseeoftheCaliforniaBoardof Accountancy,saidreportshallbeaccompaniedbya certificatefromanauthorizedofficeroftheCorporation thatthestatementswerepreparedwithoutauditfromthe booksandrecordsoftheCorporation; (4)AstatementoftheCorporation’spolicies andpracticesinenforcingitsremediesagainstMembers fornonpaymentofAssessments,assetforthinthe -46-52027.048-22139.FCM110714 Articlehereinentitled"EffectofNonpaymentofAssess- ments:RemediesoftheCorporation,"whichshallbedis- tributedwithinthetimeperiodrequiredbystatuteprior tothebeginningofthefiscalyear(e.g.,notlessthan 30daysnormorethan90dayspriortothebeginningof thefiscalyear);and (5)AsummaryoftheCorporation’sgeneral liabilityinsurancepolicy,earthquakeandfloodinsur- ancepolicy,ifoneormorehasbeenissued,andliabili- tycoveragepolicyfortheBoard,whichincludesstate- ments,asummary,andinformationrequiredunderCalifor- niaCivilCodeSection5300,assamemaybeamendedfrom timetotime.Currently,suchitemsofdisclosure includethefollowing:(1)thenameoftheinsurer;(2) thetypeofinsurance;(3)thepolicylimitsofthe insurance;and(4)theinsurancedeductibles. TheCorporationshall,assoonasreasonably practical,notifyitsMembersbyfirst-classmailifany ofthepoliciesdescribedinSubparagraph(i)abovehave lapsed,beencanceled,andarenotimmediatelyrenewed, restoredorreplaced,orifthereisasignificant change,suchasareductionincoverageorlimits,oran increaseinthedeductibleforanyofthosepolicies.If theCorporationreceivesanynoticeofnonrenewalofa policydescribedinthesubparagraphabove,theCorpora- tionshallimmediatelynotifyitsMembersifreplacement coveragewillnotbeineffectbythedatetheexisting coveragewilllapse.Totheextenttheinformationnoted aboveisdescribedwithintherespectiveinsurance policies,theCorporationmaydistributesuchinformation totheMembersandbeincompliancewiththedisclosure requirementsofthereferencedCivilCodeSection. Notificationregardingcancellationorpolicyrenewals mustcomplywithCivilCodeSection5810,assamemaybe amendedfromtimetotime.Currently,thesummary distributedpursuanttoSubparagraph(i)shallcontain, inatleast10-pointboldfacetype,thefollowing statement:"ThissummaryoftheCorporation’spolicies ofinsuranceprovidesonlycertaininformation,as requiredbySection5300oftheCaliforniaCivilCode, andshouldnotbeconsideredasubstituteforthe completepolicytermsandconditionscontainedinthe actualpoliciesofinsurance.AnyCorporationMember may,uponrequestandprovisionofreasonablenotice, reviewtheCorporation’sinsurancepoliciesand,upon requestandpaymentofreasonableduplicationcharges, obtaincopiesofthosepolicies.Althoughthe Corporationmaintainsthepoliciesofinsurancespecified inthissummary,theCorporation’spoliciesofinsurance maynotcoveryourproperty,includingpersonalproperty orrealpropertyimprovementstooraroundyourdwelling, -47-52027.048-22139.FCM110714 orpersonalinjuriesorotherlossesthatoccurwithinor aroundyourdwelling.Evenifalossiscovered,youmay neverthelessberesponsibleforpayingalloraportion ofanydeductiblethatapplies.CorporationMembers shouldconsultwiththeirindividualinsurancebrokeror agentforappropriateadditionalcoverage." (k)TheBoardshallreviewonaquarterlybasis, thefollowing: i)Acurrentreconciliationofthe Corporation’soperatingaccounts; ii)Acurrentreconciliationofamounts collectedasreserves; iii)Thecurrentyear’sactualamounts collectedasreservesandexpensescomparedtothe currentyear’sbudget; iv)Anincomeandexpensestatementfor theCorporation’soperatingandreserveaccounts; and v)Themostcurrentaccountstatements preparedbythefinancialinstitutionswherethe Corporationmaintainsitsoperatingandreserve accounts. WithdrawaloffundsfromtheCorporation’sreserve accountshallrequirethesignatureofeither:(i)two (2)membersoftheBoard;or(ii)one(1)memberofthe BoardandanofficeroftheCorporationwhoisnotalso amemberofitsBoard.AsusedinthisSection,"reserve account"meansmoneysthattheBoardhasidentifiedfrom itsannualbudgetforusetodefraythefuturerepairor replacementof,oradditionsto,thosemajorcomponents oftheCorporationPropertywhichtheCorporationis obligatedtorepairorreplaceonaperiodicbasis, ratherthanonaregularannualbasis.TheBoardshall notuseanyfundscollectedandbudgetedas"reserve" moneysforanycostsand/orexpensesthatarenotrelated torepairand/orreplacementcostsforthoseelementsof theCorporationPropertythatmustberepairedand/or replacedonaperiodicbasis.Notwithstandingthe foregoing,temporarytransferoffundsmayoccurin compliancewithCivilCodeSection5515,asmaybe amendedfromtimetotime.Intheeventreservefunds aretemporarilytransferredtopayfordisputeresolution proceedings,theBoardshallcomplywiththedisclosure andnotificationrequirementsofCivilCodeSection5520, asmaybeamendedfromtimetotime. -48-52027.048-22139.FCM110714 (l)Atleastonceeverythree(3)years,causea studyofthereserveaccountrequirementsoftheProjecttobe conductedifthecurrentreplacementvalueofthemajor componentswhichtheCorporationisobligatedtorepair, replace,restoreormaintainisequaltoorgreaterthanone- half(1/2)ofthegrossCorporationbudgetforanyfiscalyear oftheCorporation.Inconnectionwithsuchstudy,theBoard shallcausetobeconducted,ifrequiredbylaw,avisual inspectionoftheaccessibleareasofthemajorcomponentsof theCorporationPropertywhichtheCorporationisobligatedto repair,replace,restore,ormaintain.TheBoardshall considerandimplementthenecessaryadjustmentstothe Board’sanalysisofthereserveaccountrequirementsasa resultofsuchreview.Thereservestudyshallconsiderand include,ataminimum,therequirementssetforthinSections 5550-5560oftheCaliforniaCivilCode,asthesamemaybe amended,fromtimetotime; (m)AssumeandpayoutoftheAssessmentsprovided forhereinbelowallcostsandexpensesincurredbythe Corporationinconnectionwiththeperformanceandexecution ofalloftheaforesaidpowersandduties,andanyother powersanddutiestheCorporationmayassumeasprovidedfor inSection4hereinbelow; (n)Formulate,adoptandenforcesuchRulesand Regulationsasitmaydeemproperfortheoperationofthe CorporationPropertyandasnecessarytoestablishelection proceduresincompliancewithCaliforniaCivilCodeSections 5105,asmoreparticularlydescribedbelow.Noticeofadoption ofanysuchRulesandRegulationsandofanychange,amendment orrepealthereof,shallbegiveninwritingtoeachMember andshallbeonfileintheprincipalofficeofthe Corporation.IntheeventofanyconflictbetweensuchRules andRegulationsandthisDeclaration,thisDeclarationshall prevail; (o)Enforceandabidebyallapplicableprovisions ofthisDeclaration,theArticles,By-Laws,theLimited Warranty,allRulesandRegulationsoftheCorporation, ArchitecturalReviewCommitteerules,andallotherdocuments pertainingtotheownership,use,managementandcontrolof theProject.Amongotherthings,asrequiredbytheCity’s MunicipalCode,theBoardshallappointarepresentativeto authorizethetowingfromallCommonPropertyofanyabandoned ordismantledvehiclesleftonsuchpropertyinexcessoften (10)calendardays; (p)GivenoticesinwritingtoFHLMC,FNMA,GNMA andVA/FHA,andotherlendersandinvestorsparticipatingin thefinancingofthesaleofCondominiumsintheProject,as requiredherein; -49-52027.048-22139.FCM110714 (q)Withinten(10)daysofreceiptofawritten requestfromanOwner,providesaidOwnerwithacopyofthis DeclarationandtheBy-LawsandArticlesfortheCorporation, togetherwiththeproformaoperatingbudget,aninsurance policysummary,anychangeintheCorporation’scurrent RegularandSpecialAssessmentsandfeeswhichhavebeen approvedbytheBoard,butarenotyetimplemented,atrue statementinwritingastotheamountofanydelinquent Assessments,penalties,attorneys’feesandothercharges thereinasprovidedbythisDeclarationorothermanagement documentsoftheBoardasofthedateofsuchrequest.The Boardmayimposeafeeforprovidingtheforegoing,butinno eventshallthefeeexceedthereasonablecosttoprepareand reproducetherequesteddocuments.Inaddition,theBoard shallmakeavailableduringnormalworkingbusinesshoursor uponrequestunderreasonablecircumstancestoanyprospective purchaserofaCondominium,anyOwnerofaCondominium,any firstMortgageeandtheholder(s),insurer(s)andguarantor(s) ofthefirstMortgageonanyCondominium,currentcopiesof thisDeclaration,theArticles,theBy-Laws,theRulesand Regulations,themembershipregister,includingmailing addressesandtelephonenumbers,andallotherbooks,records andfinancialstatementsoftheCorporation,asrequiredby law; (r)AppointtheMemberstothevariousCommittees formedbytheBoard(e.g.,theNominatingCommittee,the ArchitecturalReviewCommittee,etc.)asmoreparticularlyset forthhereinorintheBy-Laws; (s)Periodicallyreviewandrevisethemaintenance guidelines,ifany,astheBoardmaydeemreasonableand prudenttoadjusttothechangingneedsoftheProjectandto complywithanyandallmaintenanceguidelinesprovidedbythe DeclarantorrecordedbyDeclarantagainsttheProject; (t)CauseasummaryoftheprovisionsofSection 5925-5965oftheCaliforniaCivilCode,assamemaybeamended fromtimetotime,regardingalternativedisputeresolution prefilingrequirementsandwhichspecificallyreference Section5925-5965oftheCivilCode,tobepreparedand annuallydistributedtoeachMemberoftheCorporation.The summaryshallbeprovidedeitheratthetimetheproforma operatingbudgetisdistributedhereinorinthemanner specifiedinSection5016oftheCaliforniaCorporationsCode, assamemaybeamendedfromtimetotime.Thesummaryshall includeadescriptionoftheCorporation’sinternaldispute resolutionprocess,asrequiredbySection5920oftheCivil Code; (u)ElecttheofficersoftheCorporationandfill anyvacanciesontheBoard; -50-52027.048-22139.FCM110714 (v)ExceptasotherwiseallowedunderSection6000 oftheCaliforniaCivilCode,assamemaybeamendedfromtime totime,obtainapprovalfromamajorityofMemberspriorto incurringdisputeresolutionexpenses,includingwithout limitationattorneys’fees,wheretheCorporationinitiates disputeresolutionproceedingsorisjoinedasaplaintiffin disputeresolutionproceedings.Suchapprovalshallnotbe necessaryifthelegalproceedingsareinitiatedto(i) enforceuserestrictionscontainedherein,(ii)enforce architecturalcontrolprovisionscontainedherein;or(iii) collectanyunpaidassessmentsleviedpursuanttothis Declaration; (w)Causeanoticeregarding"AssessmentsAnd Foreclosure"tobepreparedandannuallydistributedtoeach MemberoftheCorporationinaccordancewithCaliforniaCivil CodeSections5730,asthesamemaybeamendedfromtimeto time.ExceptasotherwiseprovidedinCaliforniaCivilCode Section5730,asthesamemaybeamendedfromtimetotime, thenoticeshallbeprintedin12-pointtypeandshallbe distributedduringthesixty(60)dayperiodimmediately precedingthebeginningoftheCorporation’sfiscalyear; (x)Withoutanylimitationoftheforegoingduties, (i)operate,maintain,andinspecttheCorporationProperty anditsvariouscomponentsinconformancewithanyMaintenance GuidelinesandanyMaintenanceManual,and(ii)reviewany MaintenanceManualfornecessaryorappropriaterevisionsas deemednecessarybytheBoard(Declarantrecommendsatleast anannualreview); (y)Adoptandprovideafair,reasonableand expeditiousprocedureforresolvingdisputesbetweenthe CorporationandMembersthatcomplieswithapplicablelaw (e.g.,CivilCodeSection5900et seq.),which,iftheBoard sodecides,maybetheproceduresetforthinCivilCode Section5915;and (z)Asrequiredbyapplicablelaw[e.g.,California CivilCodeSection4765,asthesamemaybeamendedfromtime totime,oranysuccessorstatute],causeanoticeofany requirementsforCorporationapprovalofphysicalchangesto CondominiumsorCommonPropertytobepreparedandannually distributedtoMembers.Thenoticeshalldescribethetypes ofchangesthatrequireCorporationapprovalandshallinclude acopyoftheprocedureusedtoreviewandapproveordisap- proveaproposedchange. Section4.DiscretionaryPowers.TheBoard,atits option,mayassume,performandexecutethefollowingpowersand dutiesforandonbehalfoftheCorporation: -51-52027.048-22139.FCM110714 (a)Retaintheservicesofsuchpersonnel,in additiontotheprofessionalpropertymanagementcompany,as theCorporationdeemsnecessaryandpropertoassistinthe operationoftheCorporationand/ormanagementoftheCorpora- tionProperty,regardlessofwhethersuchotherpersonnelare employeddirectlybytheCorporationorotherwise; (b)RemoveorreplaceanyImprovementthatextends intotheCorporationPropertyunderauthorityofaneasement whenaccesstoautilitylineunderneathsuchImprovementis requestedbyanyutilitycompany;provided,however,thatthe costshallbeassessedagainsttheOwneroftheCondominium involvedasaComplianceAssessmentifsaidOwnercausedthe ImprovementtobesoplacedintheCorporationProperty withoutlegalrighttodoso; (c)Incuranyliabilityorpayanycostsorex- pensesforasingleCondominiumorOwnerthereof;provided, however,thatintheeventtheCorporationdoesincuranysuch liabilityorpayanysuchcostsorexpenses,theamount thereofshallbespeciallyassessedagainsttheOwnerofsuch CondominiumasaComplianceAssessment;providedfurther, however,thatnothinghereinshallpermittheCorporationto assesstheOwnersforanynewImprovementstotheCorporation PropertyexceptasotherwiseprovidedinthisDeclaration; (d)Subjecttothelimitationssetforthinthis Article,contractforanyothermaterial,furniture,labor, services,maintenance,repairs,structuralalterationsor insurance,orpayanytaxesorAssessmentswhich,inthe opinionoftheBoard,shallbenecessaryorproperforthe operationoftheCommonPropertyforthebenefitoftheOwners orfortheenforcementofthisDeclaration;and (e)Enterintoamaintenanceorsubsidyagreement withDeclarant,atDeclarant’ssolediscretion,totemporarily reducethefinancialobligationsoftheOwnersforAssessment. Section5.NotificationbyCorporationofDefects.The Boardagreesthatintheeventofanyallegeddefectinany improvedCorporationPropertyforwhichtheCorporationbelieves theDeclarantmayberesponsible,theBoardwillprovideDeclarant withwrittennoticeofsuchdefectinaccordancewithCivilCode Section6000,asthesamemaybeamended.Declarantshallhavea reasonableopportunitytoinspectsuchallegeddefect,andif DeclarantagreeswiththeBoard(orotherwiseelectstoperformthe work)torepair,replaceorotherwisecureanydefectinworkman- shipand/ormaterial.TheCorporationacknowledgesandagreesthat Declarant(oritsauthorizedagents)shallbeentitledatitssole discretiontodeterminethematerialandmethodstobeusedin effectingsuchrepair,replacementorcure. -52-52027.048-22139.FCM110714 Section6.AwardsRenderedinConstructionDefects Disputes.AnyrecoverybytheCorporationoranyOwnerforany damage,toordefectin,theCorporationPropertyshallbeutilized solelyforthepurposeofcorrectingsuchdamageordefect. Section7.SpecialMeetingoftheCorporationfor ConstructionDefectDisputes.IntheeventtheBoarddecidesto commencebindingarbitrationproceedingsundertheLimitedWarranty ordecidestocommenceanyotherlegalproceedingsagainstanyof theDeclarantParties(asdefinedinSection16,below,ofthis Declaration)relatingtoconstructiondefectDisputes,the SecretaryshallcallaspecialmeetingoftheCorporation.In additiontotheinformationrequiredbySection6000tobe specifiedinthenoticeofsuchmeeting,thenoticeshallalso specifythefollowing:(a)theestimatedcoststorepairthe defects;(b)howthenecessaryrepairswillbefunded;(c)thename oftheattorneywhomtheCorporationiscontemplatingretainingand anestimateoftheattorney’sfees,consultant’sfeesandanyother coststobeincurredtoprosecutesuchproceedings;(d)howsuch feesandcostswillbefunded;(e)eachMember’sdutytodisclose toprospectivepurchaserstheallegeddefects;and(f)the potentialimpacttheproceedingsmayhaveonthemarketabilityand availabilityoffinancingforCondominiumsintheProject.Such noticeshallbesenttoallMembersoftheCorporation.The decisionoftheBoardtocommenceanyotherlegalproceedings againstanyoftheDeclarantPartiesrelatingtoaconstruction defectDisputemustbeapprovedbynotlessthanfifty-onepercent (51%)ofthevotingpoweroftheCorporationresidinginMembers otherthantheDeclarant. Section8.DelegationsofDuties.Intheeventthatthe Corporationshalldelegateanyorallofitsduties,powersor functionstoanyperson,corporationorfirmtoactasmanager, neithertheCorporationnorthemembersofitsBoardshallbe liableforanyomissionorimproperexercisebythemanagerofany suchduty,powerorfunctionsodelegated. Section9.RightofEntryforEmergency.TheBoard,any personauthorizedbytheBoardoranyOwnermayenteranyCondomin- iumintheeventofanyemergencyinvolvingillnessorpotential dangertolifeorproperty.Suchentryshallbemadewithaslittle inconveniencetotheOwnerasispracticable,andintheeventthat anydamageshallbeproximatelycausedbyorresultfromsaid entry,theCorporationshallrepairthesameatitsexpense. Section10.RightofEntryforRepairs.TheBoard,or anypersonauthorizedbytheBoard,shallhavetherighttoenter, uponreasonablenotice,anyCondominiumtoeffectnecessaryrepairs whichtheOwnerhasfailedtoperformorwhicharenecessaryin connectionwiththerepairstotheCorporationPropertyoranad- joiningCondominium.Suchentryshallbemadewithaslittlein- conveniencetotheOwnerasispracticable,andintheeventthat -53-52027.048-22139.FCM110714 anydamageshallbeproximatelycausedbyorresultfromsaid entry,theCorporationshallrepairthesameatitsexpense. Section11.LimitationsonBoardAction.TheBoardshall beprohibitedfromtakinganyofthefollowingactions,exceptwith thevoteorwrittenassentofamajorityoftheMembers,otherthan theDeclarant,constitutingaquorumconsistingofmorethanfifty percentofthevotingpoweroftheCorporationresidinginthe Members,otherthantheDeclarant: (a)Enteringintoacontractwithathirdperson, whereinthethirdpersonwillfurnishgoodsorservicesfor theCorporationPropertyortheCorporationforatermlonger thanone(1)year,withthefollowingexceptions: (1)Amanagementcontract,thetermsofwhich havebeenapprovedbytheVA/FHAandareconsistentwith provisionsherein; (2)Acontractwithapublicutilitycompany iftherateschargedforthematerialsorservicesare regulatedbythePublicUtilitiesCommission;provided, however,thatthetermofthecontractshallnotexceed theshortesttermforwhichthesupplierwillcontractat theregulatedrate; (3)Prepaidcasualtyand/orliabilityinsur- ancepoliciesofnottoexceedthree(3)yearsduration, providedthatthepolicypermitsforshort-ratecancella- tionbytheinsured; (4)Agreementsforcabletelevisionservices andequipmentorsatellitedishtelevisionservicesand equipmentofnottoexceedfive(5)yearsduration, providedthatthelessorundertheagreementisnotan entityinwhichDeclaranthasadirectorindirectin- terestoftenpercent(10%)ormore;and (5)Agreementsforsaleorleaseofburglar alarmandfirealarmequipmentinstallationandservices ofnottoexceedfive(5)yearsduration,providedthat thesupplierorsuppliersarenotentitiesinwhichthe Declaranthasadirectorindirectownershipinterestof tenpercent(10%)ormore. (b)Incurringaggregateexpendituresforcapital improvementstotheCorporationPropertyinanyfiscalyearin excessoffivepercent(5%)ofthebudgetedgrossexpensesof theCorporationforthatfiscalyear; (c)Sellingduringanyfiscalyearpropertyofthe Corporationhavinganaggregatefairmarketvaluegreaterthan -54-52027.048-22139.FCM110714 fivepercent(5%)ofthebudgetedgrossexpensesofthe Corporationforthatfiscalyear; (d)PayingcompensationtoDirectorsortoofficers oftheCorporationforservicesperformedintheconductof theCorporation’sbusiness;provided,however,thattheBoard maycauseaDirectororofficertobereimbursedforexpenses incurredincarryingonthebusinessoftheCorporation; (e)FillingavacancyontheBoardcreatedbythe removalofaDirector; (f)ExceptasotherwiseallowedunderSection6000 oftheCaliforniaCivilCode,assamemaybeamendedfromtime totime,incurringdisputeresolutionexpenses,including withoutlimitationattorneys’fees,wheretheCorporation initiatesdisputeresolutionproceedingsorisjoinedasa plaintiffindisputeresolutionproceedings.Suchapproval shallnotbenecessaryifthelegalproceedingsareinitiated to(i)enforcetheuserestrictionscontainedherein,(ii) enforcethearchitecturalcontrolprovisionscontainedherein; or(iii)collectanyunpaidassessmentsleviedpursuantto thisDeclaration;and (g)AmendingorlimitingtheCorporation’sduties andobligations(andbenefits)withrespecttotheLimited Warranty. Section12.Licenses,EasementsandRights-of-Way.The Board,forandonbehalfoftheCorporation,isauthorizedand empoweredtograntsuchlicenses,easementsandrights-of-wayfor sewerlines,waterlines,undergroundconduits,stormdrains, roadways,andotherpublicutilitypurposesoverthoseportionsof theCorporationPropertyuponwhichnobuildingorotherstructure hasbeenerectedasmaybenecessaryandappropriateforthe orderlymaintenance,preservationandenjoymentoftheCorporation Propertyorforthepreservationofthehealth,safety,convenience andwelfareoftheOwners.Suchlicenses,easementsandrights-of- waymaybegrantedatanytimepriortotwenty-one(21)yearsafter thedeathoftheindividualswhohavesignedthisDeclarationand theirissuewhoareinbeingasofthedatehereof,andtheright tograntsuchlicenses,easementsandrights-of-wayisherebyex- presslyreserved. Section13.NewImprovements.Exceptasotherwisepro- videdinthisDeclaration,theCorporationmayconstructnewIm- provementsoradditionstotheCommonProperty,ordemolishexist- ingImprovements,providedthatinthecaseofanyImprovement, additionordemolitioninvolvingatotalexpenditureinexcessof fivepercent(5%)ofthebudgetedgrossexpensesoftheCorporation forthatfiscalyear,thewrittenconsentorvoteofamajorityof theOwners(otherthantheDeclarant)intheProjectastothe maximumtotalcostthereforshallfirstbeobtained,andprovided -55-52027.048-22139.FCM110714 thatnoCondominiumshallbealteredordamagedbyanysuchdem- olitionorconstructionwithouttheconsentoftheOwnerthereof. TheBoardshalllevyaSpecialAssessmentagainstallOwnersinthe Projectforthecostofsuchwork. Section14.CorporationRulesandRegulations.TheBoard shallalsohavethepowertoadopt,amendandrepealRulesand Regulations,asitdeemsreasonable,whichmayincludethe establishmentofasystemoffinesandpenaltiesenforceableas ComplianceAssessments.TheRulesandRegulationsshallgovernsuch mattersinfurtheranceofthepurposesoftheCorporation, including,withoutlimitation,theuseoftheCommonProperty,the ExclusiveUseCorporationProperty(e.g.,airconditioningpads, balconies,porches,solarcollectors,etc.-e.g.,whattype,if any,ofplantsorfurnitureisacceptableonthebalconiesand porchs,requirementsforaccessingtheroofandotherCorporation Property,etc.),signs,parkingrestrictionsandenforcement,trash collection(applicabletoCorporationProperty),minimumstandards formaintenanceofCondominiumsconsistentwithsuchstandardsas maybesetforthinthisDeclarationoradoptedbytheArchi- tecturalReviewCommittee,electionproceduresincompliancewith CaliforniaCivilCodeSections5100-5130,andanyothermatter whichiswithinthejurisdictionoftheCorporation;provided, however,thattheRulesandRegulationsmaynotdiscriminateamong OwnersandshallnotbeinconsistentwiththisDeclaration,the ArticlesorBy-Laws.AcopyoftheRulesandRegulationsasthey may,fromtimetotime,beadopted,amendedorrepealed,ora noticesettingforththeadoption,amendmentorrepealofspecific portionsoftheRulesandRegulations,shallbedeliveredtoeach Ownerandmaybeplacedonfileintheprincipalofficeofthe Corporation.TheRulesandRegulationsshallhavethesameforce andeffectasiftheyweresetforthinandwerepartofthis Declaration,andshallbebindingontheOwnersandtheir successorsininterest,whetherornotactuallyreceivedthereby. TheRulesandRegulations,asadopted,amendedorrepealed,shall beavailableattheprincipalofficeoftheCorporationtoeach Owneruponrequest.Intheeventofanyconflictbetweenanysuch RulesandRegulationsandanyotherprovisionsofthisDeclaration, ortheArticlesorBy-Laws,theprovisionsoftheRulesandRegula- tionsshallbedeemedtobesuperseded. Section15.NonliabilityandIndemnification. (a)GeneralLimitation.Exceptasspecifically providedinthisDeclaration,orasrequiredbylaw,noright, powerorresponsibilityconferredontheBoardortheArchi- tecturalReviewCommitteebythisDeclaration,theArticlesor theBy-Laws,shallbeconstruedasadutyorobligation chargedupontheBoard,theArchitecturalReviewCommittee, anymemberoftheBoardortheArchitecturalReviewCommittee, oranyotherofficer,employeeoragentoftheCorporation. Nosuchpersonshallbeliabletoanyparty(otherthanthe CorporationorapartyclaiminginthenameoftheCorpora- -56-52027.048-22139.FCM110714 tion)forinjuriesordamageresultingfromsuchperson’sacts oromissionswithinwhatsuchpersonreasonablybelievedtobe thescopeofhisCorporationduties("OfficialActs"),except totheextentthatsuchinjuriesordamageresultfromsuch person’swillfulormaliciousmisconduct.Nosuchperson shallbeliabletotheCorporation(ortoanypartyclaiming inthenameoftheCorporation)forinjuriesordamage resultingfromsuchperson’sOfficialActs,excepttothe extentthatsuchinjuriesordamageresultfromsuchperson’s negligenceorwillfulormaliciousmisconduct; (b)PersonalLiabilityLimitation.Tothemaximum extentpermissibleunderthelaw,nopersonwhosuffers injury,including,butnotlimitedto,bodilyinjury(includ- ing,withoutlimitation,emotionaldistressorwrongfuldeath) orpropertydamageorlossasaresultofthetortiousactor omissionofavolunteerBoardmemberorvolunteerCorporation officershallrecoverdamagesfromsuchBoardmemberor officerifallthefollowingconditionsaresatisfied: (1)Atthetimetheactoromissionoccurred, theBoardmemberorofficerresidedintheProjectas eitheratenantoranOwneroftwo(2)orfewerCondomin- iums; (2)Theactoromissionwasperformedwithin thescopeoftheBoardmember’sorofficer’sCorporation duties,whichshallinclude,butshallnotbelimitedto, whethertoconductaninvestigationoftheCorporation Propertyforlatentdeficienciespriortotheexpiration oftheapplicablestatuteoflimitationsandwhetherto commenceacivilactionagainsttheDeclarantfordefects indesignorconstruction; (3)Theactoromissionwasperformedingood faith; (4)Theactoromissionwasnotwillful, wantonorgrosslynegligent;and (5)TheCorporationmaintainedandhadin effectatthetimetheactoromissionoccurred,andat thetimeaclaimwasmade,one(1)ormorepoliciesof insurancewhichincludedcoverageforgeneralliability fortheCorporationandindividualliabilityofofficers andDirectorsoftheCorporationfornegligentactsor omissionsinsuchcapacity,andbothtypesofcoverage wereintheamountofatleastFiveHundredThousand Dollars($500,000.00). (c)Indemnification.TheCorporationshallpayall expensesincurredby,andsatisfyanyjudgmentorfinelevied against,anypersonasaresultofanyactionorthreatened -57-52027.048-22139.FCM110714 actionagainstsuchpersontoimposeliabilityonsuchperson forhisofficialacts,providedthat: (1)TheBoarddeterminesthatsuchperson actedingoodfaithandinthemannersuchperson reasonablybelievedtobeinthebestinterestsofthe Corporation;and (2)Inthecaseofanactionorthreatened actionbyorintherightoftheCorporation,theBoard determinesthatsuchpersonactedwithsuchcare,includ- ingreasonableinquiry,asanordinaryprudentpersonin alikepositionwoulduseundersimilarcircumstances. AnydeterminationoftheBoardrequiredunderthis Sectionmustbeapprovedbyamajorityvoteofaquorum consistingofDirectorswhoarenotpartiestotheactionor threatenedactiongivingrisetotheindemnification.Ifthe Boardfailsorrefusestomakeanysuchdetermination,such determinationmaybemadebythevoteorwrittenconsentofa majorityofaquorumoftheMembersoftheCorporation, providedthatthepersontobeindemnifiedshallnotbe entitledtovote.Theentitlementtoindemnificationhereun- dershallinuretothebenefitoftheestate,executor, administrator,heirsordeviseesofanypersonentitledto suchindemnification. Section16.ArbitrationofDisputes.Unlessotherwise requiredbytheLimitedWarrantyfor"Disputes"(definedbelow) coveredthereunderorotherwiseresolvedbythenon-adversarial pre-litigationproceduressetforthinCaliforniaCivilCode Sections910through938withrespecttoconstructiondefectclaims orthenon-adversarialproceduressetforthinsubparagraphs(a) and(b)below,anyandallclaims,controversies,breachesor disputes(eacha"Dispute")betweenoramongtheDeclarant,orany director,officer,partner,attorney,member,employeeoragentof Declarant,oranycontractor,subcontractor,designprofessional, engineerorsupplierwhoprovidedlabor,servicesormaterialsto theProject(collectively,the"DeclarantParties"),theCorpora- tion,and/oranyOwner,relatingtoorarisingoutoftheProject, thisDeclarationoranyotheragreementsbetweentheDeclarant Parties,theCorporation,and/oranOwner,whethersuchDisputeis basedoncontract,tort,orstatute,including,withoutlimitation, anyDisputeover(1)breachofcontract,(2)negligentorinten- tionalmisrepresentationorfraud,(3)nondisclosure,(4)breachof anyallegeddutyofgoodfaithandfairdealing,(5)allegationsof latentorpatentconstructiondefects,or(6)anyothermatter arisingfromorrelatedtotheinterpretationofanytermor provisionofthisDeclaration,oranydefensegoingtothevalidity ofthisDeclaration,oranyprovisionofthisDeclaration,shallbe resolvedamicablyandwithoutthenecessityoftimeconsumingand costlylitigationthrougharbitrationpursuanttotheFederal ArbitrationActandsubjecttotheproceduressetforthinthis -58-52027.048-22139.FCM110714 Section16.AnyDisputeconcerningtheinterpretationorthe enforceabilityofthisSection16,including,withoutlimitation, itsrevocabilityorvoidabilityforanycause,anychallengesto theenforcementorthevalidityofthisDeclaration,orthis Section16,orthescopeofarbitrableissuesunderthisSection 16,andanydefenserelatingtotheenforcementofthisSection16, including,withoutlimitation,waiver,estoppel,orlaches,orany disputeconcerninganyarbitrationawardmadepursuanttothis Section16,shallbedecidedbyanarbitratorinaccordancewith thisSection16andnotbyacourtoflaw.Thenon-adversarial pre-litigationproceduressetforthinCaliforniaCivilCode Sections910through938shallapplywithrespecttoconstruction defectclaims.Thenonadversarialprocedurefortheresolutionof allotherDisputesandthoseconstructiondefectclaimswhich remainunresolvedaftercompletionorterminationofstatutorypre- litigationproceduressetforthinCivilCodeSections910through 938,shallbeassetforthinsubparagraphs(a)and(b)beloworas otherwisedeterminedbyDeclarant. (a)Notice.AnypersonwithaclaimregardingaDispute shallnotifytheDeclarantinwritingoftheclaim,whichwriting (i.e.,bypersonalormailserviceasauthorizedbyCodeofCivil ProcedureSections415.10,415.20,415.21,415.30or415.40tothe partytowhomtheDisputeisdirected)shalldescribethenatureof theclaimandanyproposedremedy(the"ClaimNotice"). (b)RighttoInspectandRighttoCorrectiveAction. CommencingonthedatetheClaimNoticeisdeliveredandcontinuing untiltheDisputeisresolved,theDeclarantanditsrepresenta- tivesshallhavetherightto(i)meetwiththepartyallegingthe DisputeatareasonabletimeandplacetodiscusstheDispute,(ii) entertheProjecttoinspectanyareasthataresubjecttothe Dispute,and(iii)conductinspectionsandtesting(including destructiveorinvasivetesting)inamannerdeemedappropriateby theDeclarant.Withinareasonableperiodafterreceiptofthe ClaimNotice,whichperiodshallnotexceedsixty(60)days,the Declarantandtheclaimantshallmeetatamutuallyacceptable placewithinorneartheProjecttodiscusstheDispute.Atsuch meetingoratsuchothermutuallyagreeabletime,theDeclarantand theDeclarant’srepresentatives,asnotedabove,shallhavefull accesstothepropertythatissubjecttotheDisputeclaimand shallhavetherighttoconductinspections,testingand/or destructiveorinvasivetestingofthesameinamannerdeemed appropriatebyDeclarant,whichrightsshallcontinueuntilsuch timeastheDisputeisresolvedassetforthherein.Thepartiesto theDisputeshallnegotiateingoodfaithinanattempttoresolve theclaim.IftheDeclarantelectstotakeanycorrectiveaction, DeclarantandDeclarant’srepresentativesandagentsshallbe providedfullaccesstotheProjecttotakeandcompletecorrective action.NothingsetforthinthisSection16imposesanyobligation onDeclaranttoinspect,repairorreplaceanyitemsoralleged defectsforwhichDeclarantisnototherwiseobligatedunder -59-52027.048-22139.FCM110714 applicableStateandfederallawortheLimitedWarrantyin connectionwiththesaleoftheCondominiums. (c)BindingArbitration.IntheeventthataDisputeis raisedandnotresolvedpursuanttothenonadversarialprocedures setforthaboveor,withrespecttoDisputessubjecttotheLimited Warranty,theproceduressetforthintheLimitedWarranty,such DisputeshallbesubmittedtobindingArbitration. IftheDisputeissubjecttotheLimitedWarranty,the Disputeshallbesubmittedtobindingarbitrationbyandpursuant toanyarbitrationprovisionssetforthintheLimitedWarranty. IftheDisputeisnotsubjecttotheLimitedWarranty,orthe LimitedWarrantydoesnotcontainanyarbitrationprovisions,the Disputeshallbesubmittedtobindingarbitrationbyandpursuant totherulesofaneutral,independentarbitrationserviceagreed uponbythepartiestothearbitration.Ifthepartiestothe Disputeareunabletoagreeuponaneutral,independentarbitration service,thenanypartymay,pursuanttotheprovisionsofthe FederalArbitrationAct(9U.S.C.§1et seq.),applytoacourtof competentjurisdictiontodesignateanarbitrationservice,which designationshallbebindingontheparties. Therulesandproceduresofthedesignatedarbitration serviceineffectatthetimetherequestforarbitrationis submittedshallbefollowed;otherwise,thepartiesagreetothe provisionssetforthbelow. (d)GeneralArbitrationProvisions. (i)Declarant,eachOwner,byacceptanceofadeed toaCondominium,andtheCorporation,byacceptanceofadeed totheCorporationProperty,acknowledgethatthisDeclaration involvesandconcernsinterstatecommerceandisgovernedby theprovisionsoftheFederalArbitrationAct(9U.S.C.§1,et seq.)nowineffectandasthesamemayfromtimetotimebe amended,totheexclusionofanydifferentorinconsistent stateorlocallaw,ordinance,regulation,orjudicialrule. Accordingly,anyandalldisputesshallbearbitrated,which arbitrationshallbemandatoryandbindingpursuanttothe FederalArbitrationAct. (ii)ThisSection16shallinuretothebenefitof, andbeenforceableby,Declarant’ssubcontractors,agents, vendors,suppliers,designprofessionals,warrantyadministra- tor,insurersandanyotherpersonswhomanyOwnerorthe Corporationcontendsisresponsibleforanyallegeddefectin ortotheProjectorsuchOwner’sCondominiumoranyimprove- mentorappurtenancethereto. (iii)Eachpartyshallbearitsownattorneys’fees andcosts(includingexpertcosts)forthearbitration. -60-52027.048-22139.FCM110714 (iv)ExceptasotherwiseprovidedintheLimited WarrantywithrespecttoDisputessubjectthereto,theparties shallbeentitledtoconductalldiscoveryasotherwise providedintheCaliforniaCodeofCivilProcedure,andthe arbitratorshalloverseediscoveryandmayenforceall discoveryordersinthesamemannerasanytrialcourtjudge, withrightstoregulatediscoveryandtoissueand/orenforce subpoenas,protectiveordersorotherlimitationsondiscovery availableunderCalifornialaw.Inthecontextofconstruc- tiondefectdisputes,allpartiesshallbeentitledto reasonablesiteinspections,visualinspections,destructive testing,andotherdiscoverymechanismscommonlyemployedin suchdisputes(e.g.,depositions). (v)Thearbitratorshalldecideallissuesoffact andlaw,andthedecisionofthearbitratorshallbefinaland binding.Declarant,theCorporation(byacceptanceofadeed totheCorporationProperty),andeachOwner(byacceptanceof adeedtoaCondominium)acknowledgesthatanapplicationto confirm,vacate,modifyorcorrectanawardrenderedbythe arbitratorshallbefiledinanycourtofcompetentjurisdic- tioninthecountywheretheProjectislocated. (vi)Theparticipationbyanypartyinanyjudicial proceedingconcerningthisSection16oranymatterarbitrable hereundershallnotbedeemedawaiveroftherighttoenforce thisSection16notwithstandinganyprovisionoflawtothe contrary,andshallnotbeassertedoracceptedasareasonto delay,torefusetoparticipateinarbitration,ortorefuse toenforcethisSection16. (vii)ExceptasotherwiseprovidedbytheLimited WarrantyforDisputessubjectthereto,orasrequiredby applicablelaw,theadministrativefeestoinitiatethe arbitrationshallbeadvancedbyDeclarantandthesubsequent feesandcostsofthearbitratorand/orthearbitration serviceshallbeborneequallybythepartiestothe arbitration;provided,however,theadministrationand arbitrationfeesandanyotherfeesandcostsofthe arbitrationultimatelyshallbeborneasdeterminedbythe arbitrator(including,butnotlimitedto,thefeetoinitiate thearbitration). (viii)Thearbitratorappointedtoserveshallbe aneutralandimpartialindividualandshallbeauthorizedto provideallrecognizedremediesavailableinlaworequityfor anycauseofactionthatisthebasisforarbitration. (ix)Thevenueofthearbitrationshallbeinthe Countyunlessthepartiestothearbitrationagreeinwriting toanotherlocation. -61-52027.048-22139.FCM110714 (x)IfanyprovisionofthisSection16shallbe determinedtobeunenforceableortohavebeenwaived,the remainingprovisionsshallbedeemedtobeseverabletherefrom andenforceableaccordingtotheirterms. (xi)Declarant,theCorporation,andeachOwnerare givinguptheirrespectivejudicialrightstodiscoveryand appeal,unlessthoserightsarespecificallyincludedinthis Section16.IfDeclarant,theCorporationoranyOwner refusestosubmittoarbitration,suchOwner,theCorporation orDeclarantmaybecompelledtoarbitrateundertheFederal ArbitrationActandtheCaliforniaArbitrationAct,tothe extenttheCaliforniaArbitrationActisconsistentwiththe FederalArbitrationAct. (xii)Intheeventtheforegoingarbitrationprovi- sionorthearbitrationprovisionintheLimitedWarrantyis heldnottoapplyorisheldinvalid,voidorunenforceablein itsentiretyforanyreason,Declarant,eachOwner,by acceptanceofadeedtoaCondominium,andtheCorporation,by acceptanceofadeedtotheCorporationProperty,agreethat allDisputesshallberesolvedinalawsuitbeforeajudgein acourtofcompetentjurisdiction;providedthatsuchlawsuit mustberesolvedbygeneraljudicialreferencepursuantto CaliforniaCodeofCivilProcedureSections638and641 through645,oranysuccessorstatutesthereto,andas modifiedbythisparagraph.Declarant,eachOwner(byaccep- tanceofadeedtoaCondominium),andtheCorporation(by acceptanceofadeedtotheCorporationProperty)acknowledge, understandandagreethatboththearbitrationandjudicial referenceproceduresnotedherein,asapplicable,involvea processwherebyresolutionoftheDisputedoesnotinvolvea jurytrialandspecificallyexcludesajuryfromanyinvolve- mentinresolutionoftheDispute.ThepartiestotheDispute shallcooperateinthejudicialreferenceproceeding. Declarant,eachOwner(byacceptanceofadeedtoaCondomini- um),andtheCorporation(byacceptanceofadeedtothe CorporationProperty)grantthegeneralrefereeauthorityto decideallissues,whetheroffactorlaw,includingwithout limitation,thevalidity,scopeandenforceabilityofthis disputeresolutionprovision,andtoreportastatementof decisiontothecourt.Allpartiesshallusetheprocedures adoptedbyanyentityofferingjudicialreferencedispute resolutionproceduresasmaybemutuallyacceptabletothe parties,providedthatthefollowingrulesandprocedures shallapplyinallcasesunlessthepartiesagreeotherwisein writing: (1)Thegeneralrefereemustbeaneutraland impartialretiredjudgewithsubstantialexperience inrealestatedevelopmentandresidentialcon- structionmatters.Anydisputeregardingthe selectionoftherefereeshallberesolvedbythe -62-52027.048-22139.FCM110714 entityprovidingthereferenceservices,or,ifno entityisinvolved,bythecourtwithappropriate jurisdiction. (2)Thegeneralreferenceproceedingshallproceed withoutajury.Declarant,eachOwner(byaccep- tanceofadeedtoaCondominium),andtheCorpora- tion(byacceptanceofadeedtotheCorporation Property)eachherebyacknowledge,understand,and agreethatthisproceduredoesnotinvolveajury trialandthatthisprocedureandthelackofa jurytrialshallbebindingupontheirrespective successorsandassignsanduponallpersonsand entitiesassertingrightsorclaimsorotherwise actingonbehalfofthemortheirsuccessorsand assigns. (3)Thepartiesshallbeentitledtoconductall discoveryasotherwiseprovidedintheCalifornia CodeofCivilProcedure,andtherefereeshall overseediscoveryandmayenforcealldiscovery ordersinthesamemannerasanytrialcourtjudge, withrightstoregulatediscoveryandtoissue and/orenforcesubpoenas,protectiveordersor otherlimitationsondiscoveryavailableunder Californialaw.Inthecontextofconstruction defectdisputes,allpartiesshallbeentitledto reasonablesiteinspections,visualinspections, destructivetesting,andotherdiscoverymechanisms commonlyemployedinsuchdisputes(e.g., depositions). (4)Thereferenceproceedingshallbeconductedin accordancewithCalifornialaw(includingtherules ofevidence),andinallregardsthegeneralrefer- eeshallfollowCalifornialawasapplicableatthe timeofthegeneralreferenceproceeding.The generalrefereemayissueanyremedyorrelief whichthecourtsoftheStateofCaliforniacould issueifpresentedthesamecircumstances,andthe generalrefereeshallfollowandotherwiseemploy thestandardsforissuingsuchreliefasdefinedby Californialaw.Thegeneralrefereemayrequire oneormorepre-hearingconferences.Astenograph- icrecordofthetrialshallbemade,providedthat therecordshallremainconfidentialexceptasmay benecessaryforpost-hearingmotionsandany appeals.Thegeneralreferee’sstatementofdeci- sionshallcontainfindingsoffactandconclusions oflawtotheextentapplicable.Thegeneral refereeshallhavetheauthoritytoruleonall post-hearingmotionsinthesamemannerasatrial judge.Thestatementofdecisionofthegeneral -63-52027.048-22139.FCM110714 refereeuponalloftheissuesconsideredbythe generalrefereeshallbebindingupontheparties, anduponfilingthestatementofdecisionwiththe clerkofanycourtoftheStateofCalifornia havingjurisdictionthereof,orwiththejudgeif thereisnoclerk,judgmentmaybeenteredthereon. Thejudgmentanddecisionofthegeneralreferee shallbeappealableinthesamemannerandsubject tothesamerulesasifrenderedbythecourt. (5)Anydisputeinvolvingthirdparties(i.e.,a personorentityotherthanDeclarant,orOwneror theCorporation)shallbeincludedinthegeneral referenceprocedureprescribedhereintotheextent permittedbylaw.Allpartiesshallcooperatein goodfaithtoensurethatallnecessaryandappro- priatepartiesareincludedinthejudicialrefer- enceproceeding. (6)Theexclusivevenueforallgeneralreference proceedingsshallbeintheCountywherethePro- jectislocated; (7)Exceptwhereattorneys’feesareawardedasan elementofsanctions,thepartiesshallbeartheir ownattorneys’feesinanyproceedingconducted underthisparagraph.Declarantshallinitially advanceallfeesandcostsnecessarytoinitiate thegeneralreferenceproceeding;however,the generalrefereemay,inhisorherdiscretion, reallocatesuchfeesandcostsamongthepartiesas theinterestsofjusticedictate.Thegeneral refereemayawardlitigationcoststotheprevail- ingparty.Thisprovisiondoesnotmodifyany provisionofacontractbetweenDeclarantandany otherentityotherthananOwnerrequiringindemni- ficationorestablishingadifferentallocationof costsbetweenDeclarantandsuchentity. (8)Ifanyprovisionofthisparagraphshallbe determinedtobeunenforceableortohavebeen waived,theremainingprovisionsshallbedeemedto beseverabletherefromandenforceableaccordingto theirterms. (e)InspectionEasements.TheDeclarantreserves easementstoenteranyCondominium,includingtheinteriorof theresidenceandtheExclusiveUseCorporationProperty,to inspectthoseareasandtoconductdestructivetesting referredtoinCaliforniaCivilCodeSection6000.However, theDeclarantshallnotifytheOwneroftheCondominiumofat leastthree(3)alternativedatesandtimeswhensuchinspec- tioncantakeplace(theearliestofwhichshallnotbeless -64-52027.048-22139.FCM110714 thanten(10)daysafterthenotificationisgiven)andthe DeclarantshallgivetheOwnertheopportunitytospecify whichdateandtimeisacceptabletotheOwner.Shouldthe Ownernotrespondaffirmativelywithrespecttooneofthe datesandtimeswithinfive(5)days,thentheDeclarantmay decidewhichofthedatesandtimestheinspectionandtesting shalltakeplaceandsonotifytheOwner.Alternatively,the Declarantmayseekajudicialorderallowingsuchinspection andtestingtotakeplace.Declarantshallbeentitledtoits reasonablyincurredattorneys’feesandbedeemedthe"pre- vailingparty"shouldsuchacourtorderbesoughtand obtained.Declarantshallbeobligatedtofullyrepairany damagecausedbyanysuchdestructivetesting. (f)Miscellaneous.Anyandallcommunicationsby andbetweentheparties,whetherwrittenororal,whichare deliveredbythepartiesortheirattorneysorotherrepresen- tativesinanefforttosettlethemattershallbeconsidered communicationsundertakeninthecourseofeffectinga settlementorcompromise,assuchshallnotbeadmissibleas anadmissiononthepartofanypartyoranyrepresentativeor agentofthatpartytobeutilizedforanysuchpurposeinany actionorproceeding. Nothinghereinshallbeconsideredtoreduceor extendanyapplicablestatuteoflimitation.Ifatanytime anactionwouldbebarredbyastatuteoflimitationifnot filedwithinsixty(60)days,thensuchactionmaybefiled notwithstandinganyotherprovisionofthisSection16. (g)ManufacturedProductsMaintenanceandLimited WarrantyInformation.EachOwner,astohisrespective Condominium,andtheCorporation,astotheCorporation Property,acknowledgethatDeclaranthasprovidedsuchOwner andtheCorporationwithmanufacturedproductmaintenance, preventativemaintenanceandlimitedwarrantyinformation pertainingtosuchOwner’sCondominiumandtotheCorporation Property.Declarantreservestheright,bywrittennoticeto eachOwnerand/ortotheCorporation,tosupplementand/or amendsuchmanufacturedproductmaintenance,preventative maintenanceandlimitedwarrantyinformationfromtimeto time.EachOwnerandtheCorporationalsoacknowledgethatby law,suchOwnerandsuchCorporationisobligatedtofollow allreasonablemaintenanceandpreventativemaintenance schedulesandobligationscommunicatedinwritingfrom Declarantaswellascommonlyacceptedmaintenancepractices. EachOwnerandtheCorporationcovenanttofaithfullyfollow allsuchmaintenanceandpreventativemaintenanceschedules andobligationscontainedinallsuchmanufacturedproduct maintenance,preventativemaintenanceandlimitedwarranty information(andeachOwnershallrequireandcauseanytenant orlesseeofsuchOwner’sCondominiumtofollowallsuch schedulesandobligations). -65-52027.048-22139.FCM110714 (h)Indemnification.EachOwnerofaCondominium intheProjectandtheCorporationcovenanttoindemnify, defendandholdDeclarantharmlessfromanyloss,costsor damagesarisingfromsuchOwner’sorsuchCorporation’s failureorrefusaltoperformitsrespectiveobligations. DECLARANT,THECORPORATIONANDEACHOWNERSHALLUSETHE PROCEDURESESTABLISHEDINTHISSECTION16TORESOLVEALLDISPUTES ANDSHALLBEDEEMEDTOWAIVETHEIRRIGHTSTORESOLVEDISPUTESIN ANYOTHERMANNER.PURSUANTTOTHISSECTION,DECLARANT,THE CORPORATION(BYACCEPTANCEOFADEEDTOTHECORPORATIONPROPERTY), ANDEACHOWNER(BYACCEPTANCEOFADEEDTOACONDOMINIUM)ACKNOWL- EDGE,UNDERSTAND,ANDAGREETHATTHEYSHALLHAVENORIGHTTOHAVE ANYDISPUTETRIEDBEFOREAJURY. THISSECTIONMAYNOTBEAMENDEDWITHOUTDECLARANT’SPRIOR WRITTENCONSENT,WHICHCONSENTMAYBEWITHHELDINDECLARANT’SSOLE ANDABSOLUTEDISCRETION. Section17.PowerofAttorneytoCorrectErrors.Upon acceptanceofadeedtoaCondominiumintheProject,eachOwner, onbehalfofhimselfandhisorherMortgagees,herebygrantsto theCorporationaspecialpowerofattorneytocorrectanyerrors inaCondominiumPlanbyexecutingonbehalfoftheaffectedOwners andMortgageesanamendmenttotheCondominiumPlanandan instrumenttoeffectanyconveyancesorpartialreconveyances necessarytocorrectsucherrors.Unlessbroaderprovisionsare providedinthisDeclaration,thepowerherebygiventothe Corporationislimitedasfollows: (a)Thepowermaybeexercisedonlytocorrecterrorsin aCondominiumPlanasevidencedbyawrittenstatementwhich describestheerror(s)andwhichissignedbytheengineerwho preparedtheCondominiumPlanorbyDeclarant. (b)ThepowermaynotbeexercisedonbehalfofanOwner orhisorherMortgageeiftheOwner’sCondominiumorExclu- siveUseCorporationProperty,ifapplicable,wouldbereduced insizebyreasonofthecorrection,unlesswrittenapproval isobtainedfromtheaffectedOwnerandMortgagee. Thepowerherebygiveniscoupledwithaninterestand maynotberevokedbyanOwner,butmayberevokedbyaMortgagee. AnysuchrevocationbyaMortgageeshallbebymeansofitssigned statementofrevocationrecordedintheofficialrecordsofthe County. -66-52027.048-22139.FCM110714 ARTICLEVII ASSESSMENTS Section1.CreationoftheLienandPersonalObligation ofAssessment.TheDeclarant,foreachCondominiumownedwithinthe Project,herebycovenants,andeachOwnerofanyCondominium,by acceptanceofadeedtherefor,whetherornotitshallbeso expressedinsuchdeed,isdeemedtocovenantandagreetopayto theCorporation:(a)RegularAssessments;(b)SpecialAssessments; (c)ComplianceAssessments;(d)SpecialBenefitAssessments;and (e)suchotherassessmentsastheCorporationmayperiodically establish.Exceptasotherwiseprovidedbylaw,theRegular, Special,andSpecialBenefitAssessments,togetherwithareason- ablelatechargeasmay,fromtimetotime,beestablishedbythe BoardinaccordancewithCalifornialaw,interest,costsandrea- sonableattorneys’feesforthecollectionthereof,shallbea chargeagainstandacontinuinglienupontheCondominiumagainst whicheachsuchAssessmentislevied,andshallalsobetheper- sonalobligationoftheOwnerofsuchpropertyatthetimewhenthe Assessmentcamedue.EachComplianceAssessmentleviedagainsta Condominium,togetherwithinterest,costs,reasonablelatecharges andreasonableattorneys’feesforthecollectionthereof,shallbe thepersonalobligationoftheOwnerofthepropertyatthetimeof theAssessment.ThepersonalobligationfordelinquentAssessments shallnotpasstothesuccessorsintitleunlessexpresslyassumed bythem. Section2.PurposeofRegularAssessments:Levyand Collection.TheRegularAssessmentsleviedbytheCorporationshall beusedexclusivelytopromotethehealth,safetyandwelfareof theresidentsintheProjectand,exceptasotherwiseprovidedin thisDeclaration,tomaintain,repair,replaceandimprovethe CorporationProperty,andanyotherImprovementsorareaswhichthe Corporationisobligatedtomaintain,asprovidedherein.The Corporation,byandthroughitsBoard,shalllevyandcollect AssessmentsfromtheOwnerofeachCondominiumintheProjectinan amountsufficienttocoveralloftheCommonExpensesincurredby theCorporationinconnectionwiththeperformanceandexecutionof thepowersanddutiessetforthinthisDeclaration,theBy-Laws andArticles.Inconnectiontherewith,theCorporationshallnot imposeorcollectAssessments,penaltiesorfeesthatexceedthe amountreasonablynecessaryforthepurposeorpurposesforwhich theywerelevied.NothinginthisDeclarationshallbeconstruedin suchawayastoprohibittheuseofCorporationAssessmentsor fundstoabateanyannoyanceornuisanceemanatingfromoutsidethe boundariesoftheProject.ThepercentageratefortheAssessments leviedbytheCorporationshallbeadjustedatsuchtimeasthe annexationofanadditionalPhasebecomeseffective.Regular Assessmentsmaybecollectedonamonthlyinstallmentbasis. Section3.RegularAssessments-Basis.Exceptfor thatportionoftheAssessmentsattributabletoCostCenter -67-52027.048-22139.FCM110714 Expenses(i.e.,theCostCenterAssessmentComponenthereinbelow), RegularAssessmentspayabletotheCorporationshallbeassessed equallyagainstallOwnersofCondominiums.EachOwner’spropor- tionateshareoftheCommonExpensesforanyfiscalyearofthe Corporationshallbeafraction,thenumeratorofwhichshallbe thenumberofCondominiumsownedbysuchOwner,andthedenominator ofwhichshallbethetotalnumberofCondominiumsintheProject whicharesubjecttoAssessment.Untilthefirstdayofthefiscal yearoftheCorporationimmediatelyfollowingthefirstcloseofan escrowforthesaleofaCondominiumintheProjecttoanOwner, themaximumRegularAssessmentshallbeassetforthinthePhase 1budgetreviewedbytheCalBRE.Notwithstandingthecommencement forpaymentofRegularAssessments,oranyotherprovisionsofthis Declaration,DeclarantandanyotherOwnerofaCondominiumwhich doesnotincludeastructuralImprovementforhumanoccupancyshall beexemptfromthepaymentofthatportionofanyAssessment(e.g., RegularAssessment)whichisforthepurposeofdefrayingoperating expensesandreservesdirectlyattributabletotheexistenceand/or useofsuchstructuralImprovements.Thisexemptionshallinclude, butshallnotnecessarilybelimitedto,thatportionofany Assessmentattributabletoroofreplacement,exteriormaintenance, exteriorwalkwayandcarportlighting,refusedisposal,cable televisionanddomesticwater,ifany,suppliedtoCondominiums. Thisexemptionshallbeineffectonlyuntiltheearliesttooccur of:(a)therecordationofanoticeofcompletionforthestructur- alImprovements;(b)theoccupancyoruseoftheCondominium;or (c)thecompletionofallelementsofthecondominiumbuilding whichtheCorporationisobligatedtomaintain,ifany.Declarant andanyOwnershallalsobeexemptedfromthepaymentofthat portionofanyAssessmentwhichisforthepurposeofdefraying expensesandreservesdirectlyattributabletotheexistenceand useofanyCorporationPropertyfacilitiesthatarenotcompleteat thetimeAssessmentscommence.Thislatterexemptionshallonlybe ineffectastoaparticularCorporationPropertyfacilityuntil theearlierof:(a)therecordationofanoticeofcompletionfor suchCorporationPropertyfacility;or(b)theplacementintouse oftheparticularCorporationPropertyfacility.Subjecttothe limitationsofCaliforniaCivilCodeSections5600-5650,assame maybeamended,fromtimetotime,fromandafterthefirstdayof thefiscalyearimmediatelyfollowingtheconveyanceofthefirst CondominiumtoanOwner,themaximumRegularAssessmentmaybein- creasedsubjecttothefollowinglimitations: (a)IncreasesinRegularAssessmentsforanyfiscal yearwhicharelessthanorequaltotwentypercent(20%) abovethemaximumRegularAssessmentfortheimmediately precedingfiscalyearmaybeapprovedbytheBoard,provided thattheBoardshall:(1)complywiththeprovisionssetforth inSections5300and5565oftheCaliforniaCivilCode,as samemaybeamendedfromtimetotime,withrespecttothe distributionoftheproformaoperatingbudgetofthe Corporationfortheforthcomingfiscalyear;or (2)obtainthe approvalofMembers,constitutingaquorum,castingamajority -68-52027.048-22139.FCM110714 ofaffirmativevotesatameetingoranelectionofthe CorporationconductedinaccordancewithCaliforniaCorpora- tionsCodeSections7510,et seq.,andSections7613,et seq. ForpurposesofthisentireSection3,aquorummeansmore thanfiftypercent(50%)oftheMembersoftheCorporation; (b)Notwithstandingmorerestrictivelimitations placedontheBoardbythisDeclarationorothergoverning documents,increasesinRegularAssessmentsforanyfiscal yearwhicharemorethantwentypercent(20%)aboveRegular Assessmentsfortheimmediatelyprecedingfiscalyearmayonly beapprovedbytheBoardaftertheBoardobtainstheapproval ofamajorityofaquorumofMemberspursuanttoSection4070 oftheCaliforniaCivilCode;and (c)TheAssessmentincreaselimitationsetforthin Subsection(b)abovedoesnotapplytoincreasesinAssess- mentsrelatedtoemergencysituations,whichshallbedeemed toincludethefollowing: (1)Extraordinaryexpensesrequiredbyan orderbyacourtofcompetentjurisdiction; (2)Extraordinaryexpensesforthemaintenance orrepairofCorporationPropertythatisnecessaryto remedyanydangerousconditionintheProjectthatrep- resentsathreatofdamageorinjurytoanypersonor property;and (3)Extraordinaryexpensesnecessarytorepair ormaintaintheCorporationPropertythatcouldnothave beenreasonablyanticipatedbytheBoardatthetimethe mostrecentCorporationbudgetwasprepared.Notwith- standingtheforegoing,intheeventthattheBoard increasestheRegularAssessmentabovetwentypercent (20%)pursuanttothisSubparagraph(3),theBoardshall distributewrittennoticeconcerningsaidincreasetoall OwnersandacopyofaresolutionadoptedbytheBoard settingforth:(i)thenecessityoftheextraordinaryex- penses;and(ii)thejustificationwhysaidexpenseswere notreasonablyforeseeableatthetimethemostrecent budgetwasprepared.Forthepurposeofcalculating whetheranincreasetoRegularAssessmentsexceedstwenty percent(20%),theterm"RegularAssessments"shallbe deemedtoincludetheamountassessedagainsteach CondominiumbytheCorporationasaRegularAssessment, plusanyamountpaidbytheDeclarantasasubsidyor pursuanttoanysubsidyormaintenanceagreements,tothe extentsuchsubsidypaymentsoffsetanamountwhichwould otherwisebepaidbyOwnersasRegularAssessments. TheBoardmaylevytheRegularAssessmentincompliancewith Section5600oftheCaliforniaCivilCode. -69-52027.048-22139.FCM110714 Section4.SpecialAssessmentsforCapitalImprove- ments. (a)InadditiontotheRegularAssessmentsautho- rizedabove,theBoardmaynot,subjecttothelimitationsof CaliforniaCivilCodeSections5600-5650,withoutthevoteor writtenapprovalofMembersconstitutingaquorum(whichshall meanmorethanfiftypercent[50%]ofOwnersoftheCorpora- tion)castingamajorityofaffirmativevotesatameetingor electionoftheCorporation,conductedinaccordancewith Sections7510,et seq.,and7613oftheCorporationsCode, levySpecialAssessmentstodefraythecostsofanyactionor undertakingonbehalfoftheCorporationwhichintheaggre- gateexceedfivepercent(5%)ofthebudgetedgrossexpenses oftheCorporationforthatfiscalyear.Thefivepercent(5%) limitationshallnotapplytoincreasesinSpecialAssessments relatedtoanemergencysituationwhichshallbedeemedto includethefollowing: (1)Extraordinaryexpensesrequiredbyan orderbyacourtofcompetentjurisdiction; (2)Extraordinaryexpensesforthemaintenance orrepairofCorporationPropertythatisnecessaryto remedyanydangerousconditionintheProjectthatrep- resentsathreatofdamageorinjurytoanypersonor property;and (3)Extraordinaryexpensesnecessarytorepair ormaintaintheCorporationPropertythatcouldnothave beenreasonablyanticipatedbytheBoardatthetimethe mostrecentCorporationbudgetwasprepared.Notwith- standingtheforegoing,intheeventtheBoardleviesany SpecialAssessmentthatexceedsthefivepercent(5%) limitationpursuanttothisSubparagraph(3),theBoard shalldistributewrittennoticeconcerningsaidSpecial AssessmenttoallOwnersandacopyofaresolution adoptedbytheBoardsettingforth:(i)thenecessityof saidSpecialAssessment;and(ii)thejustificationwhy saidSpecialAssessmentwasnotreasonablyforeseeableat thetimethemostrecentbudgetwasprepared.Exceptas providedinSubsection(b)below,everySpecialAssess- mentshallbelevieduponthesamebasisasthatpre- scribedforthelevyingofRegularAssessments. (b)ASpecialAssessmentleviedagainstOwnersto raisefundsforthereconstructionormajorrepairofthe CondominiumUnits,ifapplicable,intheProjectshallbe leviedonthebasisoftheratioofthesquarefootageofthe floorareaoftheCondominiumUnittobeassessed,tothe squarefootageofthefloorareaofallCondominiumUnitsto beassessed. -70-52027.048-22139.FCM110714 Section5.ComplianceAssessments.AComplianceAssess- mentmaynotbecharacterizednortreatedasanassessmentwhich maybecomealienagainsttheOwner’sCondominiumenforceablebya saleinaccordancewiththeprovisionsofSections2924et seq.of theCivilCode;provided,however,atsuchtimeasthesaleof CondominiumsisnotgovernedbytheCalBRE,theforegoingshallnot applytoanyComplianceAssessmentimposedagainstanOwner consistingofareasonablelatepaymentpenaltyfordelinquent Assessmentsand/orchargestoreimbursetheCorporationforthe lossofinterestandforcostsreasonablyincurred(including attorneys’fees)initseffortstocollectdelinquentAssessments orimposedforcostsincurredbytheCorporationintherepairof damagetoCommonPropertyandfacilitiesforwhichtheMemberor theMember’sguestsortenantswereresponsible. Section6.NoticeofIncreaseinAssessments.TheBoard shallprovidetotheOwners,byfirstclassmailtotheaddresson filewiththeCorporation,noticeofanyincreaseinRegular, Specialand/orSpecialBenefitAssessmentsnotlessthanthirty (30)normorethansixty(60)dayspriortosuchincreasebecoming due. Section7.CostCenterAssessmentComponent.ACost CenterAssessmentComponentshallbeassessedsolelytotheOwners ofCondominiumstowhichtheexclusiveordisproportionatemainte- nance,operation,repair,replacementorfundingofreserves obligationofaCostCenterElementhasbeenallocated.TheCost CenterAssessmentComponentcoversCommonExpensesofthe CorporationbudgetedtotheCondominiumssubjecttotheCostCenter AssessmentComponentintheCorporation’sCostCenterBudget(e.g., fireandcasualtybuildinginsurance,exteriorbuilding maintenance,buildingreservesandoperatingbuildinglights,roof, paint,andfiresprinklersandfirealarmsforthebuildings containingmorethanoneCondominiumUnits).Fundscollectedin paymentoftheCostCenterAssessmentComponentandCostCenter AssessmentComponentreservesshallbeusedsolelyforthepurposes setforthintheCorporation’sCostCenterBudget;provided, however,thattheBoardmayauthorizethetemporarytransferof suchfundsforthepaymentoftheCorporation’sshort-termcash flowrequirementsonthesametermsandconditionssetforthinthe applicableCivilCodeSections,e.g.,includingtermsand provisionsforrepayment,etc.TheCorporationshall,by acceptableaccountingpractices,takeappropriatemeasuresto ensurethatallfundscollectedinpaymentoftheCostCenter AssessmentComponentandCostCenterAssessmentComponentreserves arenotcommingledwiththegeneralfundsoftheCorporation.As setforthintheArticleofthisDeclarationentitled"Powersand DutiesoftheCorporation,"thefinancialstatementsandreserve fundingplantobepreparedanddistributedtoeachMemberofthe Corporationshallseparatelyaccountforthecollectionanduseof allfundsreceivedinpaymentoftheCostCenterAssessment ComponentandCostCenterAssessmentComponentreserves. -71-52027.048-22139.FCM110714 Section8.SpecialBenefitAssessments.Ifnot otherwiseallocatedbytheCorporation/BoardasaCostCenter AssessmentComponentoftheRegularAssessment,SpecialBenefit Assessmentsshallmeanandrefertoachargeleviedbythe CorporationagainstanOwnerandhisrespectiveCondominiumto covertheexpensesincurredbytheCorporationintheoperation, maintenance,repair,and/orfundingofreservesastoaportionof theProjectdesignatedhereinorinaNoticeofAnnexationorby theDeclarantorbytheBoardasa"SpecialBenefitArea"orwhich isidentifiedorreferredtoasanareaorfacilitybenefitting onlytheOwnerswithinsuchanArea.Theseexpensesareonly chargeabletoOwnersinaSpecialBenefitArea,andmayinclude, withoutlimitation,thefollowing: (a)Maintenance,management,operation,repairand replacementofparticularImprovementswithintheSpecial BenefitArea; (b)UtilitiesorservicesforthebenefitofOwners withintheSpecialBenefitArea; (c)Reasonablereserves,asdeemedappropriateby theBoard,forrepairandreplacementofanyImprovements maintainedbytheCorporationwithinaSpecialBenefitArea; and (d)UnpaidSpecialBenefitAssessments. TheCorporationshalldistributetoOwnerswithinanySpecial BenefitAreaaproformaoperatingstatementandbudgetforthe upcomingfiscalyearwhichshallestimatetheexpensesattributable totheSpecialBenefitArea,theallocationofsuchexpensesamong theaffectedOwners,andshallsetforththeamountandpayment scheduleoftheSpecialBenefitAssessments.IncreasesinSpecial BenefitAreaAssessmentsforanyfiscalyearwhicharelessthanor equaltotwentypercent(20%)abovethemaximumSpecialBenefit AreaAssessmentfortheimmediatelyprecedingfiscalyearmaybe approvedbytheBoard,providedthattheBoardshallobtainthe approvalofMembersaffectedbysuchAssessment,constitutinga quorum,castingamajorityofaffirmativevotes.Forpurposesof thisSection,aquorummeansmorethanfiftypercent(50%)ofthe MembersoftheCorporationaffectedbytheSpecialBenefitArea Assessment.TheAssessmentincreaselimitationsetforthherein- abovedoesnotapplytoincreasesinSpecialBenefitAreaAssess- mentsrelatedtoemergencysituationsthatcouldnothavebeen reasonablyanticipatedbytheBoardatthetimethemostrecent Corporationbudgetwaspreparedwhichdeterminedtheamountofthe SpecialBenefitAreaAssessments. Section9.DateofCommencementofRegularAssessments: DueDates.Subjecttotheexceptionwhichmayapplytomodel Condominiumsnotedbelow,theRegularAssessmentsprovidedfor hereinshallcommenceineachPhaseonthefirstdayofthefirst -72-52027.048-22139.FCM110714 monthfollowingthefirstcloseofescrowforthesaleofa CondominiuminsuchPhase,oronthefirstdayofthemonth followingthefirstoccupancyofaCondominiuminsuchPhase pursuanttoarentalorleaseagreementwiththeDeclarant,orits authorizedagent,whicheveroccursfirst.ThefirstRegularAssess- mentsshallbeadjustedaccordingtothenumberofmonthsremaining inthefiscalyear,assetforthintheBy-Laws.TheBoardshall fixtheamountoftheRegularAssessmentagainsteachCondominium atleastthirty(30)daysinadvanceofeachRegularAssessment period.WrittennoticeoftheRegularAssessmentshallbesentto everyOwnersubjecttotheprovisionshereinabove.Notwithstanding anyotherprovisionsofthisDeclarationandassetforthherein- above,untiltheearliertooccurof:(a)therecordationofa NoticeofCompletionofanImprovementtotheCorporationProperty inaPhase;or(b)theplacementintouseoftheCorporation PropertyinaPhase,eachOwner(includingDeclarant)maybe declaredbytheBoardtobeexemptfrompayingthatportionofthe RegularAssessmentwhichisdirectlyattributabletoexpensesand reservestobeincurredbytheCorporationinthemaintenance, operationandrepairofsuchCorporationPropertyinthePhase. Section10.CollectionofAssessments.Exceptasoth- erwiseprovidedinthisDeclaration(e.g.,CostCenterAssessment Component),orinanysubsequentNoticeofAnnexation,Regularand SpecialAssessmentsshallbeleviedatauniformrateforall Condominiumsandmaybecollectedonamonthlybasis.Ifany installmentofaRegularAssessmentislessthantheamount assessedandthepaymentdoesnotspecifytheCorporationfundsor fundintowhichitshouldbedeposited,thereceiptthereofbythe CorporationfromthatMembershallbecreditedinorderof priority,firsttotheoperatingfund,untilthatportionofthe RegularAssessmenthasbeensatisfied,andsecondtothereserve fund.ComplianceandSpecialBenefitAssessmentsshallbedue thirty(30)daysaftersuchAssessmenthasbeenleviedunless otherwisedeterminedbytheBoardinamannerconsistentwithCivil CodeSections5600-5650,asmaybeamendedfromtimetotime. Section11.CertificationofPayment.TheCorporation shall,upondemandandforareasonablecharge,furnishacer- tificatesignedbyanofficeroragentoftheCorporationsetting forthwhethertheAssessmentsonaspecifiedCondominiumhavebeen paid.IfacertificatestatesthatAssessmentshavebeenpaid,such certificateshallbeconclusiveevidenceofsuchpayment. Section12.DeliverybyOwner.EachOwnerofaCondo- miniumshall,assoonaspracticablepriortothetransferoftitle totheCondominiumortheexecutionofarealpropertysales contract,asdefinedinCaliforniaCivilCode,Section2985,oras maybeamended,fromtimetotime,givetotheprospective purchaseracopyofthisDeclarationandcopiesoftheBy-Lawsand ArticlesoftheCorporation,andatruestatement,inwriting,from theBoardastotheamountoftheCorporation’scurrentRegularand SpecialAssessmentsandfees,aswellasanydelinquentAssessments -73-52027.048-22139.FCM110714 andinformationrelatingtopenalties,attorneys’feesandother chargesauthorizedbythisDeclarationontheCondominiumasofthe datethestatementisissued,andanychangeintheCorporation’s currentAssessmentsandfeeswhichhavebeenapprovedbytheBoard buthavenotbecomedueandpayableasofthedatedisclosureis providedpursuanttothisSection. Section13.DeliveryofStatement.Uponwrittenrequest, theBoardshall,withinten(10)daysofthemailingordeliveryof suchrequest,respectively,providetheOwnerofaCondominiumwith acopyofthisDeclaration,andcopiesoftheBy-LawsandArticles oftheCorporation,togetherwiththeproformabudget,an insurancepolicysummary,atruestatementinwritingastothe amountofanydelinquentAssessments,penalties,attorneys’fees andotherchargesauthorizedbythisDeclarationontheCondominium asofthedateoftherequest,themostrecentfinancialstatement, theCorporation’scurrentRegularandSpecialAssessments,andany changeintheCorporation’scurrentAssessmentsandfeeswhichhave beenapprovedbytheBoardbuthavenotbecomedueandpayableas ofthedatedisclosureisprovidedpursuanttothisSection.The Boardmayimposeafeeforprovidingsuchdocumentsandstatements, butinnoeventshallthefeeexceedthereasonablecosttoprepare andreproducetherequesteddocuments. Section14.DeliverybyDeclarant.Inaccordancewith applicablelegalrequirements,withinninety(90)daysfollowing thefirstcloseofescrowforthesaleofaCondominiuminthe Project,orassoonasreasonablyobtainable,theDeclarantshall providetheCorporationwithcopiesofthe(1)recordedtractmap fortheProject;(2)CorporationPropertygrantand/oreasement deeds;(3)thisDeclaration;(4)filedArticlesofIncorporation; (5)theCorporation’sBy-Laws;(6)RulesandRegulationsand/or ArchitecturalGuidelinesadoptedbytheBoard(ifany);(7)notice ofcompletioncertificatesforCorporationProperty,ifany;(8) completionbond(s)namingtheCorporationasabeneficiary,ifany; (9)warrantiesforCorporationPropertyequipmentorfixtures,if any;(10)insurancepoliciesobtainedfortheCorporation;and(11) membershipregister,totheextentitisavailableandifrequired bylaw. Section15.Reserves.TheRegularAssessmentsshallin- cludereasonableamounts,asdeterminedbytheBoard,collectedas reservesforthefutureperiodicmaintenance,repairandreplace- mentofalloraportionoftheCorporationProperty,oranysuch otherpurposedeterminedbytheBoard.Allamountscollectedasre- servesshallbedepositedbytheBoardinaseparatebankaccount forthepurposesforwhichtheywerecollected,andaretobe segregatedfromandnotcommingledwithanyotherfundsofthe Corporation.Theexpenditureofsuchfundsshallbelimitedtothe repairandreplacementofthoseelementsoftheCorporation Propertywhichmustberepairedorreplacedaccordingtoareserve studyaspermittedbySections4177,4178,and5510-5560ofthe CaliforniaCivilCode,assamemaybeamendedfromtimetotime. -74-52027.048-22139.FCM110714 Section16.OffsetsandWaiverProhibited.NoOwnermay waiveorotherwiseavoidliabilityfortheAssessmentsprovidedfor hereinforanyreasonwhatsoever,including,butnotlimitedto, non-useoftheCorporationPropertyorabandonmentofhisCondo- minium,norshallanyOwnerbeentitledtoanyoffsetagainstany Assessmentprovidedforhereinforanyreasonwhatsoever,includ- ing,butnotlimitedto,anyexpendituremadebysuchOwnerforor onbehalfoftheCorporation. Section17.ExemptProperty.Thefollowingpropertysub- jecttothisDeclarationshallbeexemptfromtheAssessments herein: (a)Allpropertydedicatedtoandacceptedbya localpublicauthority; (b)Allpropertyownedbyacharitableornonprofit organizationexemptfromtaxationbythelawsoftheStateof California;however,nolandorImprovementsdevotedto dwellinguseshallbeexemptfromsaidAssessment;and (c)AnyCorporationPropertyownedinfeebythe Corporation. Section18.InitialCapitalContributions.Eachinitial purchaserofaCondominiumfromtheDeclarantintheProjectshall contributetotheworkingcapitaloftheCorporationanamount equalto^.Saidamountshallbedepositedbyeachinitial purchaserintohisrespectiveescrowforthepurchaseofhis CondominiumfromDeclarantandshallbedisbursedbytheescrow holdertotheCorporationatthecloseofescrowforthesaleof theCondominium.Thiscapitalcontributionshallinnowaybe deemedtobeaprepaymentofanyportionoftheRegularAssessment obligationoftheOwners. ARTICLEVIII EFFECTOFNONPAYMENTOFASSESSMENTS: REMEDIESOFTHECORPORATION Section1.EffectofNonpaymentofAssessments:Reme- diesoftheCorporation.AnyRegular,Special,orComplianceAs- sessmentnotpaidwithinfifteen(15)daysaftertheduedateshall bedeemeddelinquentandtheOwnershallberequiredtopay:(a) reasonablecostsofcollection,includingreasonableattorneys’ fees;(b)areasonablelatechargenotexceedingtenpercent(10%) ofthedelinquentAssessmentorTenDollars($10.00),whicheveris greater,orasmay,fromtimetotime,beestablishedbytheBoard inaccordancewithCalifornialaw;and(c)interestonallsums imposedunderthisSectionatanannualpercentageratenotto exceedtwelvepercent(12%)commencingthirty(30)daysafterthe Assessmentwasdue.TheBoard,forandonbehalfoftheCorpora- -75-52027.048-22139.FCM110714 tion,maycommencelegalactionagainsttheOwnerpersonally obligatedtopaythesame,or,inthecaseofaRegular,Special Assessment,mayforeclosethelienagainsthisCondominium.Such lienmayalsobeforeclosedbyapowerofsaleorothernonjudicial procedureprovidedforbythelawsoftheStateofCalifornia.In furtherancethereof,eachOwnerherebyvestsintheCorporation, itssuccessorsorassigns,therightandpowertobringallactions atlawortopursuelienforeclosureagainstanyOwnerforpurposes ofcollectingsuchdelinquentAssessments.Totheextentpermitted bylaw,eachOwnerwaives,withrespecttotheextentofanyliens createdpursuanttothisArticle,thebenefitofanyhomesteador exemptionlawsofCaliforniaineffectatthetimeanyAssessment, orinstallmentthereofbecomesdelinquentoranylienisimposed. TheCorporation’sacceptanceofanytenderofapartialpaymentof aninstallmentofanAssessmentoranycostsandattorney’sfees attributabletheretoshallnotbedeemedtobeawaiverofthe Corporation’srighttodemandandreceivefullpaymentsthereafter. PaymentsforAssessmentsshallfirstbeappliedtotheprincipal owedfortheAssessmentsandonlyaftersuchprincipalamountis paidinfull,shallsuchpaymentsbeappliedtointerestor collectionexpensesforsuchAssessments.Ifrequestedbyan Owner,theCorporationshallprovidetheOwnerwithareceiptof paymentofAssessments,indicatingthedateoftheOwner’spayment ofAssessmentsandthepersonwhoreceivedsuchpaymentonbehalf oftheCorporation.TheCorporationshallestablishamailing addressfortheovernightpaymentofAssessments. Section2.NoticeofDelinquentAssessments.Noaction shallbebroughttoforeclosealienfordelinquentAssessments,or toproceedunderthepowerofsaleherein,unlesstheCorporation complieswithallapplicableprovisionsoflaw[e.g.,California CivilCodeSections5650-5660,asthesamemaybeamendedfromtime totime,andprovisionsofCaliforniaCivilCodeSection2924, 2924(b),and2924(c),asmaybeamendedfromtimetotime]. Section3.ForeclosureSale.Anyforeclosuresalepro- videdforaboveistobeconductedbytheBoard,itsattorneyor otherpersonsauthorizedbytheBoard,inaccordancewiththe provisionsofSections2924,et seq.oftheCaliforniaCivilCode applicabletotheexerciseofpowersofsaleinMortgagesanddeeds oftrust,assamemaybeamended,fromtimetotime,orinany othermannerpermittedbylaw.TheCorporation,throughduly authorizedagents,shallhavethepowertobidontheCondominium ataforeclosuresaleandtoacquire,hold,lease,mortgageand conveythesame. Section4.CuringofDefault.Uponthetimelycuringof anydefaultforwhichaNoticeofDelinquentAssessmentsorlien wasfiledbytheCorporation,theofficersthereofarehereby authorizedtofileorrecord,asthecasemaybe,anappropriate releaseofsuchNoticeuponreceiptofpaymentfromthedefaulting OwnerofareasonablefeetobedeterminedbytheCorporationto coverthecostsofpreparingandfilingorrecordingsuchrelease. -76-52027.048-22139.FCM110714 Section5.CumulativeRemedies.TheCorporation’sreme- diesfornonpaymentofAssessments,including,butnotlimitedto, anactiontorecoveramoneyjudgment,Assessmentlienandrightof foreclosureandsale,arecumulativeandinadditiontoandnotin substitutionofanyotherrightsandremedieswhichtheCorporation anditsassignsmayhavehereunderoratlaw. Section6.MortgageeProtection.Notwithstandingall otherprovisionshereof,noliencreatedhereundernoranybreach ofthetermsandprovisionsofthisDeclaration,northeenforce- mentofanytermorprovisionhereof,shalldefeatorrenderin- validtherightsofanyMortgageeunderanyrecordedfirstMortgage ordeedoftrustuponaCondominiummadeingoodfaithandfor value;provided,thataftersuchMortgageeorotherpersonor entityobtainstitletosuchCondominiumbyjudicialornonjudicial foreclosure,suchCondominiumshallremainsubjecttothis DeclarationandthepaymentofAssessmentswhichfallduesubse- quenttothedateoftakingtitle. ARTICLEIX USERESTRICTIONS Exceptasotherwiseexpresslyprovidedinthis Declaration,theCondominiumUnitsandCommonPropertyshallbeoc- cupiedandusedonlyassetforthhereinbelow. Section1.PrivateDwelling.Exceptasotherwise providedinthisDeclaration,eachresidentialCondominium(as depictedontheCondominiumPlan)shallbeusedforresidential purposes(i.e.,singlefamilydwellingpurposesonly),exceptsuch temporaryusesasshallbepermittedbyDeclarantwhiletheProject isbeingdevelopedandCondominiumsarebeingsoldbyDeclarant; provided,however,thatDeclarantreservesuntoitself,andits successorsandassigns,togetherwiththerighttograntand transferalloraportionofthesame,forsolongasDeclarant ownsanyinterestinTractNo.^and/ortheAnnexationProperty, andisentitledtoannexAnnexationPropertytotheProject,the righttocarryonnormalsalesactivityontheProject,including theoperationofmodels,salesoffice,designcenterandparking area,providedDeclarantshallnotunreasonablyinterferewithany otherOwner’suseoftheCommonProperty. Section2.CommonPropertyUse.UseoftheCommon PropertyshallbesubjecttotheprovisionsofthisDeclaration, theRulesandRegulationsandtoanyadditionallimitationsimposed byanyoftheotherCorporationmanagementdocuments,andtoany additionallimitationsimposedbytheCorporationorBoard. Section3.ConductAffectingInsurance.Nothingshall bedoneorkeptinanyCondominiumUnitorintheCommonProperty whichwillincreasetherateofinsuranceontheCommonProperty -77-52027.048-22139.FCM110714 withouttheapprovaloftheCorporation.NoOwnershallpermit anythingtobedoneorkeptinhisCondominiumUnitorinthe CommonPropertywhichwillresultinthecancellationofinsurance ontheCommonPropertyorwhichwouldbeinviolationofanylaw. If,byreasonoftheoccupancyoruseofsaidpremisesbythe Owner,therateofinsurancetotheCommonPropertyshallbe increased,theOwnershallbecomepersonallyliablefortheaddi- tionalinsurancepremiums. Section4.LiabilityforDamagetotheCommonProperty. EachOwnershallbeliabletotheCorporation,pursuanttothelaws oftheStateofCalifornia,foranyandallcostsandexpenses whichmaybeincurredbytheCorporationtorepairanydamageto theCommonPropertywhichmaybesustainedbyreasonofthe negligentactsoromissionsorthewillfulmisconductofsaidOwner oranymemberofhisfamily,hisguests,tenants,lessees,ortheir respectiveguestsorinvitees,whetherminororadult.Subjectto NoticeandHearingandapprovalbyamajorityoftheBoard,any suchcostsandexpensesshallbeleviedbytheBoardaseithera SpecialorComplianceAssessmentagainstsuchOwner.TheCorpora- tionmay,afternoticeandhearingasprovidedintheBy-Laws,levy aSpecialorComplianceAssessmentagainstsaidOwnerequaltothe increase,ifany,ininsurancepremiumsdirectlyattributableto thedamagecausedbytheOwnerorpersonforwhomtheownermaybe responsible. Section5.Signs.SubjecttoCivilCodeSections712, 713,4705and4710,andCaliforniaGovernmentCodeSection434.5, assamemaybeamendedfromtimetotime,andtheRulesand RegulationsandArchitecturalReviewCommitteerules,nosign, advertisingdeviceorotherdisplayofanykindshallbedisplayed intheProjectoronanypublicstreetinorabuttingtheProject exceptforthefollowingsigns(allofwhichmustcomplywiththe City’sSignOrdinanceand,ifrequiredbysuchordinance,be approvedbytheCity’sPlanningDirectorpriortoinstallation): (a)entrymonuments,communityidentification signs,andtrafficorparkingcontrolsignsmaintainedbythe Corporation; (b)foreachCondominiumUnit,one(1)nameplateor similarOwnernameoraddressidentificationsignwhich complieswiththeArchitecturalReviewCommitteerules; (c)foreachCondominiumUnit,one(1)sign advisingoftheexistenceofsecurityservicesprotectinga CondominiumwhichcomplieswiththeArchitecturalReview Committeerules; (d)foreachCondominiumUnit,one(1)sign advertisingtheCondominiumUnitforsaleorleasethat complieswiththefollowingrequirements: -78-52027.048-22139.FCM110714 (1)thesignisnotlargerthansuchsigns commonlyutilizedforsimilarpurposesbyarealestate companylicensedtoconductbusinessintheStateof California; (2)thesignisattachedtothegroundbya conventional,singleverticalstakewhichdoesnotexceed normalsizestandardsforsignscommonlyutilizedfor similarpurposesbyarealestatecompanylicensedto conductbusinessintheStateofCalifornia(i.e.,not affixedtotheCondominiumbuildingorExclusiveUse CorporationProperty); (3)thetopofthesignisnottallerthan suchsignscommonlyutilizedforsimilarpurposesbya realestatecompanylicensedtoconductbusinessinthe StateofCalifornia;and (4)othersignsordisplaysauthorizedbythe ArchitecturalReviewCommitteerulesandregulationsand theCity. Section6.MaintenanceofAnimals.Noanimalsofany kindshallberaised,bredorkeptinanyCondominiumUnitorin theCommonProperty,exceptthatcommondomesticateddogs,cats, birdsorotherhouseholdpets(otherthansmallhouseholdpetssuch asfish),maybekeptineachCondominiumUnitinreasonable numbersasdeterminedbytheBoard;provided,however,thatno animalshallbekept,bredormaintainedforanycommercialpurpose andshallnotexceedanyweightlimitations,ifany,establishedby theBoard.AsusedinthisDeclaration,"reasonablenumbers"shall ordinarilymeantwo(2)totalpets(excludingsmallhouseholdpets suchasbirdsandfish)perCondominium;however,theBoardmay determinethatareasonablenumberinanyinstancemaybemoreor lessthantwo(2).EachOwnershallberesponsibleforcleaningup anyexcrementorotheruncleanorunsanitaryconditioncausedby saidanimalintheProject.Whilewalkingorexercisingananimal intheProject,theownerthereofshall,atalltimes,havereadily availablemeanstocleanupanyexcrementorotheruncleanor unsanitaryconditionscausedbysaidanimal.Allpermissiblepets belongingtoOwners,tenants,lesseesorguestsmustbekeptwithin anenclosedarea,oronaleashbeingheldbyapersoncapableof controllingtheanimal.TheCorporation,upontheapprovaloftwo- thirds(2/3)oftheBoard,shallhavetherighttoprohibitmain- tenanceofanyanimalwithintheProjectwhichconstitutesapri- vatenuisancetoanyotherperson.Everypersonbringingananimal uponorkeepingananimalintheProjectshallbeliablepursuant tothelawsoftheStateofCaliforniatoeachandallpersonsfor anyinjuryordamagetopersonsorpropertycausedbysuchanimal. Section7.QuietEnjoyment.NoOwnershallpermitor sufferanythingtobedoneintheProjectorkeptuponsuchOwner’s Condominiumwhichwillobstructorinterferewiththerightsof -79-52027.048-22139.FCM110714 quietenjoymentoftheotheroccupants,orannoythembyunreason- ablenoises(e.g.,inappropriateuseofhorns)orotherwise,nor willanyOwnercommitorpermitanynuisanceonthepremisesor commitorsufferanyimmoralorillegalacttobecommitted thereon.Notwithstandingtheforegoing,foraslongasDeclarant ownsanyinterestinTractNo.^andisentitledtoannexAnnex- ationPropertytotheProject,theDeclarant’seffortsinselling theCondominiumsmayinterferewiththeOwners’quietenjoymentof theCondominiums.EachOwneracknowledgestheforegoingandwaives anyclaimsagainsttheDeclarantfornuisanceduetoanyactivity relatedtoconstructing,sellingormarketingtheCondominiums. EachOwnershallcomplywithalloftherequirementsoftheBoard ofHealthandofallothergovernmentalauthoritieswithrespectto saidpremises,andshallremoveallrubbish,trashandgarbagefrom hisCondominiumUnit.Allclotheslines,refusecontainers, woodpiles,storageboxes,toolsandequipmentshallbeprohibited fromanyCondominiumunlessobscuredfromviewbyafenceor appropriatescreenapprovedbytheArchitecturalReviewCommittee providedforhereinbelow. Section8.StructuralChanges.Thereshallbeno structuralalteration,modificationorconstructiontotheexterior ofaCondominiumUnit,fenceorotherstructurewhatsoeverinthe ProjectwithoutthepriorwrittenapprovaloftheBoardorits designatedArchitecturalReviewCommitteeandtheCity,asrequired herein,exceptsuchworksofconstructionbyDeclarantduringthe developmentoftheProject. Section9.Improvements.AllImprovementsshallbe constructedinagoodandworkmanlikemanner,consistentwiththe standardbestpracticeofthesubjecttradesandinamanner acceptabletotheCity.Thereshallbenoconstruction,alteration orremovalofanyImprovementintheProject(otherthanthose repairsorrebuildingpermittedundertheArticleentitled"Damage orDestructiontotheCorporationProperty")withouttheapproval oftheArchitecturalReviewCommitteeandtheCity,assetforth hereinbelow.NoImprovementshallbeconstructeduponanyportion ofanyCorporationProperty,otherthansuchImprovementsasshall beconstructed:(a)bytheDeclarant(orapersonorentitytowhom Declarantassignsitsrightsasdeveloper)or(b)bytheCorpor- ationasprovidedherein,asmaybepermittedbytheArchitectural ReviewCommitteeinaccordancewiththeArticlehereinentitled "ArchitecturalReview-Approval."EachOwnerassumesallrisks whichmayresultfromImprovementshemakestohisCondominium Unit,andeachOwnerindemnifiesandholdsharmlesstheCorpora- tion,DeclarantandeachotherOwnerfromanyclaim,demands, liabilities,judgments,attorneys’feesandotherobligationswhich ariseoutoforareincurredinconnectionwiththeinstallation, existenceorremovalofsuchImprovements. Section10.WindowCoverings.Temporarywindowcoverings (“TemporaryWindowCoverings”)inadesignandcolorthatdoesnot conflictwiththesurroundingImprovements(butexcludingaluminum -80-52027.048-22139.FCM110714 foil,newspaper,plywoodoranyothercontrastingmaterial)are permittedforamaximumperiodofsixty(60)daysafterthe CondominiumisconveyedbyDeclaranttoanOwner.Exceptas specificallyprovidedintheproceedingsentence,noTemporary WindowCoveringsshallbeusedtocoveranydoororwindowofany Condominium.Allwindowcoverings(includingTemporaryWindow Coverings)shallbeofaneutralcolorharmoniouswithandnotin conflictwiththecolorschemeoftheexteriorwallsurfaceofthe Condominiumbuildings. Section11.CommercialActivity.Exceptasotherwise statedinthisDeclaration,nomanufacturing,mercantile,storage, vendingorindustrialoperationsofanykindshallbeconductedin oruponanyCondominiumUnitortheCommonProperty,exceptsuch temporaryusesasshallbepermittedbyDeclarantwhiletheProject isbeingconstructedandCondominiumsarebeingsoldbythe Declarant.Notwithstandingtheforegoing,thisSectionshallnot precludeanOwnerfrommaintainingabusinessorhomeofficeand conductingbusinessactivitiestherefromsolongas:(a)such activitiesareconductedinconformancewithallapplicable governmentordinances(e.g.,allrequiredpermitsandlicensesare obtained);(b)suchactivitydoesnotincreasetheliabilityor casualtyinsuranceobligationorpremiumoftheCorporation;and (c)suchactivitiesareconsistentwiththecharacterofthe ProjectandconformwiththeprovisionsofthisDeclaration.Inno event,however,shallanyOwnerortheCorporationusea CondominiumUnitasanofficefortherental,resaleorleasingof CondominiumswithoutthepriorwrittenconsentofDeclarantsolong asDeclarantownsaninterestinTractNo.^ortheAnnexation Property. Section12.ParkingandVehicularRestrictions. (a)AuthorizedVehicles.Thefollowingvehicles are"AuthorizedVehicles":standardpassengervehicles includingautomobiles,passengervansdesignedtoaccommodate ten(10)orfewerpeople,motorcycles(providedtheyare operatedatlevelsnotexceeding45decibels),andpick-up truckshavingamanufacturer'sratingorpayloadcapacityof one(1)tonorless;provided,however,thedimensionsofeach ofsuchforegoingvehiclesmaynotexceedthefollowing: (1)sevenfeet(7.0’)inwidth fromfarthest pointtopoint,includingmirrorsand tires; (2)eighteenfeet(18’)inlength,including bumperattachmentsandhitches;and (3)sixfeet,fourinches(6’4")inheight, includingroofracksorotherprojec- tions. -81-52027.048-22139.FCM110714 TheCorporationhasthepowertoidentifyadditionalvehicles asAuthorizedVehiclesintheRulesandRegulationsandto adaptthisrestrictiontoothertypesofvehicles. (b)RestrictedVehicles.Thefollowingvehicles are"RestrictedVehicles:"recreationalvehicles,motor homes,traveltrailers,campervans,boatsandthelike. (c)ProhibitedVehicles.Thefollowingvehicles are"ProhibitedVehicles":(a)commercial-typevehicles (e.g.,stakebedtrucks,tanktrucks,dumptrucks,stepvans, concretetrucksandlimousines),excludingthosewhich constituteAuthorizedVehicles;(b)busesorvansdesignedto accommodatemorethanten(10)people,(c)vehicleshaving morethantwo(2)axles,(d)trailers,(e)inoperablevehicles orpartsofvehicles,(f)aircraft,(g)anyvehicleor vehicularequipmentdeemedanuisancebytheBoard,and(h) anyothervehiclenotclassifiedasanAuthorizedVehicleor RestrictedVehicle.IfavehiclequalifiesasbothanAutho- rizedVehicleandaProhibitedVehicle,thenthevehicleis presumedtobeaProhibitedVehicle,unlessthevehicleis expresslyclassifiedasanAuthorizedVehicleinwritingby theBoard. (d)TemporaryParking."TemporaryParking"shall meantheparkingofdeliverytrucks,servicevehiclesand othercommercialvehiclesforpurposesrelatingtothe furnishingofservicestotheCorporation,anOwnerortenant, and/orforloadingandunloadingonly;provided,further,that nosuchtemporarilyparkedvehiclemayremainwithinthe Projectovernight. (e)LocalGovernmentAgencyRequirementsfor Parking.AlldrivesandaisleswithintheProjectaresubject totheProtectiveCovenantsofthisDeclaration,aswellas allapplicablelaws,ordinancesandregulationsofallgovern- mentalagencieshavingjurisdictionovertheProject. (f)ResidentParking.Exceptforpurposesof TemporaryParkinginareasotherthanfirelanes,ifany, OwnersandtheirtenantsshallparktheirAuthorizedVehicles intheirgarages.RestrictedVehiclesandProhibitedVehicles mayalsobeparkedinanOwner’sgarage,providedthatthe garagedooriskeptshut(exceptwhenthevehiclesare enteringorexitingthegarage)andtheOwner’sgaragehas sufficientspaceremainingfortheparkingoftheOwner’s AuthorizedVehicles. (g)NoParkingAreas.Thereshallbenoparkingof anyvehiclesonunpavedsurfaces,suchaslawnsordirt surfaces.Novehicleshallblockorimpedeaccessoffire fightingequipmenttoorthroughthedrivesandaislesorfire hydrantsintheProject.Noparkingispermittedinanyof -82-52027.048-22139.FCM110714 thefirelanesorotherareasdepictedonExhibit"F"attached heretoandincorporatedbythisreference,whichshallbe marked"NOPARKINGFIRELANETOWAWAY." (h)RulesandRegulations.TheBoardmay,from timetotime,establishsuchRulesandRegulationsforthe operatingandparkingofvehiclesintheProjectasitmay deemnecessaryordesirable,includingtheuseofany CorporationPropertyparkingbyguestsandotherinvitees. AnypermissionfromtheBoardfortheuseofCorporation PropertyforTemporaryParking,ifany,willcreateonlya licensetousesucharea,whichlicenseisrevocablebythe Boardatanytime. (i)ReportingofParkingViolations.EachOwneris authorizedtoreportparkingviolationstotheCorporation BoardofDirectors.Anyenforcementactiontakentocorrect violationsoftheparkingrulesandregulationsshallbein accordancewiththeprovisionssetforthherein. (j)ParkingAvailabilityinGarages.EachOwnerof aCondominiumwithagarageasdepictedontheCondominium planshall,atalltimes,keephisgaragereadilyavailable fortheparkingofthenumberofvehiclesforwhichthegarage wasconstructed,andshallnotstoreanyRestrictedVehicles, ProhibitedVehicles,goodsormaterialstherein,noruseany portionthereofforaworkshoporotheruse,ifsuchstorage orusewouldprevent,prohibit,and/orimpedesaidOwnerfrom parkingthenumberoffourwheelvehiclesthereinforwhich saidgaragewasoriginallydesignedandconstructedby Declaranttoaccommodate.EachOwnershallensurethatall parkingspacesinthegarageareatalltimesavailablefor parkingandshallusesuchspaceforparkinghisorher vehiclesthereinwhensaidvehiclesareintheProject. Garagedoorsshallremainclosedatalltimes,exceptas reasonablyrequiredforentrytoandexitfromthegarage. EachOwnershallensurethathisgaragedooropenerisin properworkingorderatalltimes; (k)VehicleRepairandMaintenance.NoOwnershall conductanyrepairstoanymotorvehicleofanykindwhatsoev- erinoruponanyportionoftheProject,exceptforemergency repairstheretoandthenonlytotheextentnecessaryto enablethevehicletobemovedtoaproperrepairfacility.In addition,noOwner’sgarageorExclusiveUseCorporation Propertyparkingspaceshallbeusedforanypurposeother thanparkingofanOwner’svehicleandstorage(onlysolong assuchstoragedoesnotinterferewiththeparkingofOwner’s vehiclestherein).NOWASHINGORPOLISHINGOFANYVEHICLEIN THEPROJECTISPERMITTED,UNLESSEXPRESSLYAUTHORIZEDBYTHE BOARDINWRITING. -83-52027.048-22139.FCM110714 Section13.RegulationofParking;Towing.Subjectto therightsoftheCorporation,throughitsofficers,committeesand agents,theBoardisherebyempoweredtoestablish"parking"and "noparking"areaswithintheCorporationProperty(e.g.,on privatedrivesandaisles,etc.),includinganyfirelanes,in accordancewithSection22658oftheCaliforniaVehicleCode,as thesamemaybeamendedfromtimetotime,oranysimilarstatute hereafterenacted,aswellastoenforcetheseparkinglimitations byallmeanslawfulforsuchenforcement,including,butnot limitedto,thelevyingoffinesandthecitingandtowingof vehicles.TheBoardshallhavetheauthoritytotowawayandstore anyvehicleorsimilarequipmentparkedinviolationoftheabove limitationswhetherthesameshallbelongtoanyOwneroramember ofhisfamilyortoanytenant,lessee,guestorinviteeofany Owner.Chargesforsuchtowingandstoringshallbeassessed againsttheOwneroftheCondominiumwhoisresponsibleforor associatedwiththeviolationofsuchrestrictions,andsuch assessmentmaybeenforcedasaComplianceAssessment.Asrequired bytheCity’sMunicipalCode,theBoardshallappointa representativetoauthorizethetowingfromallCommonPropertyof anyabandonedordismantledvehiclesleftonsuchpropertyin excessoften(10)calendardays. Section14.ComplianceWithManagementDocuments.All OwnersshallcomplywithalloftheProtectiveCovenantsasset forthherein,withtheprovisionsoftheArticlesandtheBy-Laws, withallRulesandRegulationsoftheCorporation. Section15.Solar.EachOwnershallownandshallbe responsible,attheOwner’ssolecostandexpense,forthe maintenanceofanysolarsystemexclusivelyservingtheOwner’s CondominiumUnit(including,withoutlimitation,solarcollectors and/orsolarcollectorsinstalledontheroofofthebuildingwhich exclusivelyservehisCondominium);provided,however,thatthe Boardshallhavetherighttorequirethatonlyacontractoror otherpersonapprovedbytheBoardentertherooforotherportion oftheCorporationPropertyforthepurposeofplacing, maintaining,repairing,andreplacingsuchsolarcollectorsor collectors,andshallhavetherighttoconditionsuchentryonthe contractor’sorotherperson’scompliancewithreasonablerequire- mentsfortheprotectionoftheCorporationProperty(e.g.,requir- ementsthatthecontractorbeappropriatelylicensed,maintain insurancecoverageonwhichtheCorporationisnamedasan additionalinsured,and/orexecuteanindemnityagreementinfavor oftheCorporation).EachOwnershallalsoberesponsiblefor procuringandmaintainingappropriatethirdpartyliability insurancerelatingtothesolarcollectors,andrelatedfacilities exclusivelyservingtheOwner’sCondominiumUnit,withlimits approvedbytheBoard(initsreasonablediscretion),andonwhich theCorporationshallbenamedasadditionalinsured.Sincethe Projectisbeingconstructedasasolarpoweredproject,certain typesofutilitieswillnotbepresentwithintheProject(e.g., naturalgas,etc.).Asaresult,Ownerswillnotbeabletouse -84-52027.048-22139.FCM110714 appliancespoweredbysuchutilities(e.g.,naturalgaspowered clothesdriers).EachOwnershallalsohavetherighttoplaceand maintainotherequipmentandfacilitiesrelatedtotheinstallation andmaintenanceofindividualsolarsystemswithinhisCondominium UnitandExclusiveUseCorporationProperty.Theinstallationand maintenanceofanysolarsystembyanindividualOwnershallbe subjecttoallapplicablezoningregulations,theUniformBuilding CodeandCityassociatedordinances,andreasonablereviewbythe ArchitecturalReviewCommitteeforcompliancewiththearchitec- turalstandardsadoptedbytheCorporation,basedonreasonable standardsconsistentwithSection714oftheCaliforniaCivilCode, assamemaybeamendedfromtimetotime.Ataminimum,anysolar collectorsaretobeintegratedwiththeroofdesignandanglewith thecollectorsandframecoloredtomatchtherooforbronzeano- dized.ByacceptanceofadeedtoaCondominiumintheProject, eachOwneracknowledgesthattheSolarShadeControlAct,codified atCaliforniaPublicResourcesCodeSections25980et seq.,asthe samemaybeamendedfromtimetotime,mayimpactthelandscaping improvementsthatanOwnermaymaintainonhisorherExclusiveUse CorporationPropertybalconyorporch.TheOwnershallbesolely responsibleforcomplyingwiththeSolarShadeControlAct,and neithertheBoardortheArchitecturalReviewCommitteeshallbe responsibleforenforcinganyOwner’scompliancewiththeSolar ShadeControlActorresolvinganydisputesbetweenOwnerswhich mayariseundertheSolarShadeControlAct.Byacceptanceofa deedtoaCondominium,eachOwneracknowledgesandagreesthat Declarantmakesnorepresentationorwarrantythatanysolarsystem installedintheProjectwill,foranytimeperiod,befreefrom shadingprohibitedbytheSolarShadeControlAct,and,tothe maximumextentpermissibleunderthelaw,eachOwnerreleasesand dischargesDeclarantandtheCorporationfromanyclaims,loss, liabilityand/ordamagearisingfromthenegativeimpactofany suchshading. Section16.AntennaRestriction.NoPersonmayinstall anyantennaorover-the-airreceivingdeviceexceptforan "AuthorizedAntenna"ifallowedhereunder.AnAuthorizedAntennais (i)anantennadesignedtoreceivedirectbroadcastsatellite service,includingdirect-to-homesatelliteservice,thatisone meterorlessindiameter,or(ii)anantennadesignedtoreceive videoprogrammingservice,includingmultichannelmultipoint distributionservice,instructionaltelevisionfixedservice,and localmultipointdistributionservice,andisonemeterorlessin diameterordiagonalmeasurement,(iii)anantennadesignedto receivetelevisionbroadcastsignals,or(iv)anantennausedto receiveandtransmitfixedwirelesssignals.AnAuthorizedAntenna maybemountedonamasttoreachtheheightneededtoreceivean acceptablequalitysignal,subjecttolocalgovernmentalagency permittingrequirementsforsafetypurposes. (a)RestrictionsonInstallation.TheArchitec- turalReviewCommitteemayadoptreasonablerestrictionson installationanduseofanAuthorizedAntennaaspartofits -85-52027.048-22139.FCM110714 designguidelinesinordertominimizevisibilityofthe AuthorizedAntennafromothersCondominiums.Suchrestric- tionsmaydesignateoneormorepreferredinstallation locations,orrequirecamouflagesuchaspaint(subjecttothe antennamanufacturer'srecommendations)orscreeningvegeta- tionorotherImprovements.However,norestrictionimposedby theCommitteemay(i)unreasonablydelayorpreventthe installation,maintenanceoruseofanAuthorizedAntenna, (ii)unreasonablyincreasethecostofinstallation,mainte- nanceoruseofanAuthorizedAntenna,or(iii)preclude acceptablequalityreception. (b)ProhibitionsonInstallation.TheArchitec- turalReviewCommitteemayprohibittheinstallationofan AuthorizedAntennainaparticularlocationif,inthe ArchitecturalReviewCommittee'sopinion,theinstallation, locationormaintenanceofsuchAuthorizedAntennaunreason- ablyaffectsthesafetyoftheOwnersoranyotherPerson,or foranyothersafety-relatedreasonestablishedbythe Committee,orimpactstheCondominiumBuilding(i.e.,no attachmenttotheexteriororroofoftheCondominiumBuild- ing).TheArchitecturalReviewCommitteemayalsoprohibitan OwnerfrominstallinganAuthorizedAntennaonanyreal propertywhichsuchOwnerdoesnotownorisnotentitledto exclusivelyuseorcontrolunderthisDeclaration(e.g.,an Ownershallhavenorighttoinstallanythingontheexterior oftheCondominiumbuildings).TheArchitecturalReview Committeealsohasthepowertoprohibitorrestrictthe installationofanyantennaorotherover-the-airreceiving devicethatdoesnotmeetthedefinitionofanAuthorized Antennaabove. (c)ReviewafterInstallation.TheArchitectural ReviewCommitteemayreviewthelocationandinstallationof anAuthorizedAntennaafteritisinstalled.Afterits review,theArchitecturalReviewCommitteemayrequirethat theAuthorizedAntennabemovedtoapreferredlocation(if onehasbeendesignated)forsafetyreasonsortocomplywith reasonablerestrictionssubjecttothisSectionandapplicable law. (d)RestatementofApplicableLaw.ThisSectionis intendedtobearestatementoftheauthoritygrantedtothe ArchitecturalReviewCommitteeunderthelaw.Allamendments, modifications,restatementsandinterpretationsofthelaw applicabletotheinstallation,useormaintenanceofan antennaorotherover-the-airreceivingdeviceshallbe interpretedtoamend,modify,restateorinterpretthis Section. Section17.OtherImprovements.Nobasketballbackboard orotherfixedorportablesportsapparatusmaybeconstructedor maintainedintheProjectwithouttheArchitecturalReview -86-52027.048-22139.FCM110714 Committee’spriorapproval.Nofenceorwallmaybeerected, alteredormaintainedonanyCondominiumexceptwiththeArchitec- turalReviewCommittee’spriorapproval.Nowiringofanykindor airconditioningfixture,watersoftenerorotherdevicesmaybe installedontheexteriorofthecondominiumbuildingorina Condominiumorbeallowedtoprotrudethroughthewallsorroofof thecondominiumbuilding,exceptone(1)ormorechimneysand vents,airconditioningunits,orsolarcollectorsoriginally installed,ifatall,byDeclarant,inaCondominium(withthe exceptionofthoseitemsinstalledduringtheoriginalconstruction ofaCondominiumbyDeclarant)unlesstheArchitecturalReview Committee’spriorwrittenapprovalisobtained. Section18.WaterSofteners.NoOwnershallinstallany on-siteregenerativewatersoftenerwithinanyportionofthe Project,unlessapprovedinwritingbytheBoardandapplicable LocalGovernmentalAgency. Section19.Leasing.Unlessotherwiseprohibitedby FNMA,GNMA,FHLMC,orVA/FA,noOwnershallbepermittedtorentor leaseanyportionofhisCondominiumfortransientorhotelpur- posesorforaperiodoflessthanthirty(30)days.Allrental andleaseagreementsshallbeinwriting,andshallprovidethat thetermsofsuchagreementshallbesubjectinallrespectstothe provisionsofthisDeclaration,By-Laws,Articles,RulesandRegu- lationsandthatanyfailurebythetenantorlesseetocomplywith thetermsofsuchdocumentsshallconstituteadefaultundersuch agreement.Notwithstandingtheforegoing,Declarantmayrequire eachOwnertocomplywithaninitialOwneroccupancyorresale requirementsimposedbyDeclarant. Section20.Drilling.Nooildrilling,oildevelopment operations,oilrefining,quarryingorminingoperationsofany kindshallbepermittedwithintheProject,norshalloilwells, tanks,tunnelsormineralexcavationsbepermittedwithinthe Project.Noderrickorotherstructuredesignedforuseinboring foroil,waterornaturalgasshallbeerected,maintainedor permittedwithintheProject. Section21.Trash.AsrequiredbytheCity,eachOwner shallplaceallrubbish,trash,garbage,recyclingmaterial,and otherwastematerialinbarrelsapprovedbytheCityandtherefuse disposalcompanyprovidingtrashcollectionservicetotheProject. EachOwnershallstorethebarrelsintheOwner’sgarage,except whenthebarrelsareplacedoutforcollectionbytherefuse disposalcompanyprovidingtrashcollectionservicetotheProject. EachOwnershallusehisbesteffortstoassurethatnoodorshall arisetherefromsoastobeunreasonablyoffensivetoanyadjacent CondominiumorotherportionoftheProject,ortootherwisebe unsanitary,unsightly,offensiveordetrimentaltoanyother residentsintheProject.Trashandrecyclingmaterialsmaynotbe storedovernightinbalconyorporchareasorotherExclusiveUse CorporationPropertyareas(ifany).Inaddition,notoxicor -87-52027.048-22139.FCM110714 hazardousmaterials(otherthanhouseholdcleansers)maybe disposedofwithinanytrashcontainerswithintheProject.The BoardmayadoptadditionalRulesandRegulationsregardingdisposal oftrashandrecyclingmaterialsastheBoardmaydeemreasonable andnecessary. Section22.ExemptionofDeclarant.Nothinginthis ArticleorelsewhereinthisDeclarationshalllimit,restrict, abridgeorcontrol,inanymannerwhatsoever,therightsofDe- claranttocompletetheplanning,development,grading,construc- tion,advertising,marketing,leasingandsalesoftheCondomini- ums,andallotherpropertywithintheProject(includingany propertywhichmaybeannexedtheretopursuanttotheprovisionsof thisDeclaration),including,withoutlimitation,thefollowing specificrights,whichmaybeexercisedbyDeclarant,andtheir successorsandassigns,orbytheiragentsandemployees,in conjunctionwithsuchdevelopmentandmarketing,untiltheearlier of(1)whenDeclarantnolongerownsaninterestinTractNo.^or theAnnexationProperty,or(2)five(5)yearsfromtherecordation ofthisDeclaration: (a)Therighttomaintainandoperateone(1)or moreadvertising,salesorleasingoffice(s),construction trailer,portablerestrooms,locateduponanyPropertyowned byDeclarant,orCorporationProperty; (b)TherighttopostanddisplayfromanyCorpora- tionPropertyanysign,flag,banner,billboardorother advertisingwhichDeclarantmay,initssolediscretion,deem appropriate,irrespectiveofsize,color,shapeormaterials ofsuchitems,solongassuchusedoesnotunreasonably interferewiththeOwner’snormaluseandenjoymentofthe CorporationProperty; (c)Therighttoinstall,place,replace,con- struct,reconstruct,modifyorremoveanyImprovementfromany CorporationProperty,asDeclarantmay,initssolediscre- tion,deemappropriate;providedthatintheeventDeclarant removesanyCorporationownedImprovementfromanyCorporation Propertywithouttheexpresspriorwrittenconsentofthe Board,DeclarantshallreplacesuchImprovementwithan Improvementofsubstantiallysimilarvalue,appearanceand utilitywithinareasonableperiodfollowingcompletionofany worknecessitatingtheremovaloftheImprovement; (d)Therighttoconductanycommercialactivity uponanyCorporationPropertywhichreasonablyrelatestothe development,marketing,leasingorsalesoftheCondominiums intheProject; (e)TherighttoparkvehiclesuponanyCorporation Property;and -88-52027.048-22139.FCM110714 (f)Therighttousethecommongarageandall drivesandaisleswithintheProject,whichrightshallalso extendtoprospectivepurchasersorlesseesoftheCondomini- umsorofotherpropertywithintheProject. AlloranyportionoftherightsofDeclaranthereinand elsewhereinthisDeclarationmaybeassignedbyDeclaranttoany successor-in-interestintheProject,includingtheAnnexation Property,byanexpresswrittenassignmentrecordedintheOffice oftheCountyRecorder. Section23.NoEasementsForViewPurposes;Disclaimer. NeithertheCity,theDeclarantnortheArchitecturalReview Committee,northemembers,representatives,employeesorconsul- tantsofanyoftheforegoing,havemadeanyrepresentations whatsoeverconcerningtheview,ifany,thataparticularCondomin- iumorotherImprovementthereonwillenjoy.Therearenorights, expressorimpliedeasementswhatsoeverappurtenanttoany Condominiumforviewpurposesorforthepassageoflightandair acrossanyotherCondominiumoranypropertynotwithinthe Project,regardlessofwhethersuchCondominiumisownedby Declarant.EachOwneracceptingadeedtoaCondominiumhereby expresslyacknowledgesandagreesthattheCondominiums,wallsand fencesconstructedbyDeclarant,andfurtherconstruction,both withintheProjectandintheimmediatevicinityoftheProject, mayimpairtheviewfromsuchOwner’sCondominium,andeachOwner herebyexpresslyconsentstoanysuchimpairment.EachOwner furtheracknowledgesandunderstandsthatpropertysurroundingthe Projectmaybedevelopedorredevelopedinaccordancewith applicableCitystandards.Concernspertainingtothefuture developmentofsurroundingpropertyshouldbeaddressedwiththe City. Section24.ScreenDoors.NoOwnershallinstallany screendoorinanyportionoftheCondominiumUnitunlesssuch OwnerhaswrittenapprovalfromtheArchitecturalReviewCommittee. Section25.PollutantControl.TheCorporationandeach OwnershallcomplywithanyNPDESrequirements,WaterQuality ManagementPlans,andtheBMPguidelines(asdefinedbelow),as suchrequirements,plans,andguidelinesapplytotheProject. A.NPDESRequirements.TheProjectissubjectto allFederal,StateandlocalrequirementsoftheNationalPollutant DischargeEliminationSystem("NPDES")adoptedpursuanttothe FederalCleanWaterAct.PursuanttoaNPDESGeneralPermit, includingtheSanMateoCountyMunicipalStormwater,StateGeneral IndustrialandStateGeneralConstructionPermitsadoptedbythe StateWaterResourcesControlBoardandtheSanMateoCountyNPDES StormWaterPermitProgram,andDrainageAreaManagementPlan ("DAMP"),theCitymayhaveadoptedorapprovedaStandardUrban StormWaterManagementPlanfortheProject("SUSMP")which identifiescertainBestManagementPractices("BMP")toreducethe -89-52027.048-22139.FCM110714 dischargeofpollutantstostormwaterfacilities(e.g., appropriatestormwaterpollutioncontrolrelatedtotheProject’s structural,treatmentcontrol,andnon-structuralfacilitiesin ordertopreventallpollutantsfromcontactingstormwaterand keepingallproductsoferosionfrommovingoffsiteintoreceiving waters,asrequiredbytheStateWaterResourcesControlBoard [SWRCB]andtheNationalPollutantDischargeEliminationSystem [NPDES]),before,duringandafterconstructionontheProjectis completed.TheCorporationandtheOwnersshallcomplywithall applicableBMPsandperformallmaintenanceimposedbyDAMP,SWMP, andtheWQMP(ifapplicable),asamended,andtheCorporationshall obtainanycertificationsandpermitsoracceptanassignmentfrom Declarantofanysuchcertificationsandpermitsasarerequiredby theDAMP,SWMPandtheWQMP.ThecostsoftheCorporation’s portionofsuchmaintenance,ifany,shallbetreatedasCommon Expenses. B.SpecificBMPs.TheCorporationshallensure thatallCorporationProperty,consistingofprivatedrivesand aisles,sidewalks,parkingareas,andthelike,iskeptfreeof litteranddebrisandsweptinaccordancewiththerequirementsof theWaterQualityManagementPlans. C.Guidelines.TheCorporationshallensurethat allCorporationPropertylandscapeirrigationisimplementedin accordancewiththeBMPs,includingwithoutlimitation(a)the provisionforwatersensorsandprogrammableirrigationtimes allowingforshortcycles,(b)theuseofplantingmaterialsimilar tothatinstalledbyDeclarant,asapplicable,andwithsimilar waterrequirementsinordertoreduceexcessirrigationrunoffand topromotesurfacefiltration,and(c)maintainallpermanent slopeswithrequiredlandscapingwithnativeorotherdrought tolerantplantingmaterials. Nothingotherthannaturalrainwaterorpotablewatermaybe dischargedintothestormdrainsandstormdrainagesystemlocated onprivateorpublicproperty.Toxicchemicalsorhydrocarbon compoundssuchasgasoline,motoroil,antifreeze,solvents, paints,paintthinners,woodpreservativeandothersuchfluids shallnotbedischargedintoanystreet,publicorprivate,orinto stormdrainsorstormwaterconveyancesystems.Useanddisposal ofpesticides,fungicides,herbicides,insecticides,fertilizers andothersuchchemicaltreatmentsshallmeetFederal,State, CountyandCityrequirementsasprescribedontheirrespective containers.AllOwnerswithintheProjectandtheCorporationare requiredtocomplywithsuchrestrictions. Section26.CorporationProperty.NoOwnershalltake anyactionwhichwilldetractfromthemaintenanceoftheCorpora- tionPropertyinaneat,clean,safe,sanitary,attractiveand orderlyconditionatalltimes.NoOwnershalluseorpermitthe areaoutsideofthefrontdoortohisCondominiumUnitorhisor herExclusiveUseCorporationPropertybalcony,porch,orparking -90-52027.048-22139.FCM110714 spaceorotherExclusiveUseCorporationPropertyareatobeused inanymannerwhichwillobstructorinterferewiththerightsof quietenjoymentofotheroccupants.Withoutlimitingthegenerali- tyoftheforegoing,exceptasmaybeallowedbytheRulesand Regulations,noOwnershallinstall,place,keeporstoreany storageunits,boxes,refuse,recyclablematerials,storage, refuse,orrecyclingcontainers,woodpiles,personaleffects, clothing,shoes,clotheslines,clothesdryingracks,orother equipment,bicycles,oranychildren’stoysorequipment(includ- ing,withoutlimitation,tricycles,wagons,strollers,skateboards, scooters,slides,andplayhouses)intheareaoutsideofthefront doorofhisCondominiumUnitorwithinhisorherExclusiveUse CorporationPropertybalconyorporcharea;maintainanyplantsor planterboxesontopoforattachedtothefenceorrailing enclosinghisorherbalconyorporcharea;orwateranyplants locatedwithinhisbalconyorporchareainsuchamannersothat excesswaterdrainsintothebalconyorporchareaofanother CondominiumUnitoranyotherExclusiveUseCorporationProperty area.TheBoardmayadoptadditionalRulesandRegulations regardingtheCorporationProperty(includingallExclusiveUse CorporationPropertyareas)astheBoardmaydeemreasonableand necessary. Section27.RightsofDisabled.Subjecttothe provisionsofthisDeclaration,CivilCodeSection4760,Stateand FederalLawsregardingaccommodationsforthehandicapped,and approvalbytheArchitecturalReviewCommittee,eachOwnermay modifyhisCondominiumUnitandtherouteleadingtothefrontdoor ofhisCondominiumUnit,athissoleexpense,inordertofacili- tateaccesstohisCondominiumUnitbypersonswhoareblind, visuallyimpaired,deaforphysicallydisabled,ortoalter conditionswhichcouldbehazardoustosuchPersons. Section28.WaterBeds.EachOwnerherebyacknowledges thatnowaterbedsareallowedintheProject.AnyOwnerwho breachesthisSectionshallindemnifyandholdtheDeclarant, Corporation,andMembersharmlessfromanyclaims,damages,losses orotherliabilityarisingfromsuchbreach. Section29.AutomaticFireSprinklerandAlarmSystem. NoOwnerorotherresidentoftheProjectshallpaint,alter, modify,disable,removeortakeanyotheractionwhichmightimpair theautomaticfiresprinklersystemoralarmnotificationdevices intheProject,including,withoutlimitation,anysprinklerheads withinhisCondominiumUnit.Byacceptanceofadeedtoa CondominiumUnitwithanautomaticfiresprinklersystem(notall Condominiumswillhaveanautomaticfiresprinklersystem),each OwneracknowledgesthatafireinhisCondominiumwilltriggerthe releaseofwaterfromtheautomaticfiresprinklersystemandthat waterdamagetotheCondominiumUnitandpersonalpropertytherein mayoccur.Ownersareprohibitedfromhanginganyitemsfrom,or otherwisedamaging,anyexposedpipesorsprinklerheadsinhis CondominiumUnit.ExceptasauthorizedintheRulesand -91-52027.048-22139.FCM110714 Regulations(e.g.,useoffireextinguishersintheeventofa fire),noOwnermayalter,modify,disable,orremoveanyfire standpipes,fireextinguishers,orotherfirepreventionequipment intheProject. Section30.NoUseofHazardousMaterials.NoOwneror otheroccupantoftheProjectshalluseorallowanyportionofthe Projecttobeusedforthegeneration,manufacture,storage, disposal,orreleaseofHazardousMaterials.Forpurposesofthis Declaration,theterm"HazardousMaterials"shallmeanany substancesthataretoxic,corrosive,inflammable,and/orignit- able,petroleumandpetroleumbyproducts,lead,asbestos,any hazardouswastes,andanyothersubstancesthathavebeendefined as"hazardoussubstances,""hazardousmaterials,""hazardous wastes,""toxicsubstances,"orothertermsintendedtoconveysuch meaning,includingthosesodefinedinanyofthefollowingfederal statutes,beginningat15U.S.C.section2601et seq.,22U.S.C. section1251et seq.,42U.S.C.section6901et seq.(RCRA),42 U.S.C.section7401et seq.,42U.S.C.section9601et seq. (CERCLA),49U.S.C.section1801et seq.(HMTA);orCalifornia statutesbeginningatCaliforniaHealthandSafetyCodeSection 25100et seq.,Section25249.5et seq.,and25300,et seq.,and CaliforniaWaterCodeSection13000,et seq.,theregulationsand publicationsadoptedandpromulgatedpursuanttosuchstatutesand anysimilarstatutesandregulationsadoptedhereafter.Hazardous Materialsshallnotincludesubstancesthatarestoredonthe Propertyaspartofthenormalconstructionandoperationof residentialhousingorsubstancesgenerallyusedinageneral officeenvironment(e.g.,printertonercartridges,etc.). Section31.Noise.TheProjectgenerallyconsistsof attachedCondominiumsinaresidentialdevelopment.EachOwnerwill experiencebrightlights,noise,odors,fumes,andotheradverse impactsassociatedwith,butnotlimitedto,theuseofthe CondominiumUnitsandCorporationPropertyandasaresultof livingincloseproximitytoneighborsandbusinesses.These adverseimpactsinclude,withoutlimitation,noisegeneratedby plumbingfixturesandappliancesthatusewater(e.g.,toilets, sinks,bathtubs,showers,dishwashers,washingmachines),televi- sions,radios,stereosystems,computers,humanvoices,walkingon hardsurfaces,themovementoffurnitureandpeople,children cryingandplaying,animalnoises(e.g.,dogsbarking),theuseand maintenanceoflandscapingandrecreationalfacilities,air conditioners,exhaustsystemsandvents,electricaltransformers, airconditioningcondensers,maintenanceandrepairactivities,and otheractivities,andodorsandfumesgeneratedbythesmokingof cigarettes,cigars,pipes,barbecues,cooking,cleaning,andother activities.EachOwnerunderstandsandacknowledgesthatthe Projectislocatedinanurbanenvironment.Livinginanattached Condominiumwithinadenselypopulatedmixedresidentialand commercialcommunityentailslivingincloseproximityto businessesandotherpersons,withlimitationsonsolitude. Notwithstandingwhetherornotfloors,walls,andceilingshave -92-52027.048-22139.FCM110714 beenconstructedanddesignedtomeetapplicablebuildingcodes, theCondominiumbuildingsandindividualCondominiumsthereinare notsoundand/orodorproof,andnoiseand/orodorsfromadjacent Condominiums,theCorporationProperty,andnearbybusinesseswill beheardandsmelled.EachOwnershouldexpecttohearandfeel sounds,vibrationsandnoisesemanatingfromwithin,outside,above andbelowhis/herCondominiumUnit,including,withoutlimitation, soundsandvibrationsfromfootfallandothermovementsofpeople; useofplumbing,fans,closingandopeningofdoorsandcabinets; televisions,phones,computers,stereosandotherelectronic equipmentandactivitiesconductedintheCondominiumsand CorporationProperty.Residentsmayhearthesoundofgaragedoors openingatallhoursofthedayandnight,including,without limitation,themorningsandearlyeveningswhenresidentsleave andreturn.ResidentsoftheProjectmaynotengageinbehavioror activitiesintheirCondominiumswhichimpairotherresidents’ quietenjoymentoftheirCondominiums.TheProjectiscurrently locatedinanareainwhichconsiderablenoisefromtraffic, businesses,airtraffic,constructionactivities,truckdeliveries, trashpick-up,commercialuses,andotheractivitieswillalsobe generated. EachOwnerherebyacknowledgesandagreesthatnoalteration, repairorreplacementofwallcoveringsinCondominiums(i.e., thoseCondominiumslocatedincondominiumbuildingswithmorethan oneCondominiumUnit)whichmaydiminishtheeffectivenessofthe soundcontrolengineeringinthebuildingsintheProjectmaybe made.NoOwnershallinstallorreplaceanyflooringormakeany modificationstothefloororwallofaCondominiumexceptin accordancewiththerequirementsoftheCorporationwhichmay includethefollowing: (a)COMMONFLOORSYSTEMS (1)TheCondominiumUnitfloorsshallnotbe modifiedinsuchamannerwhichincreasesthenoise levelsinanyotherCondominiumUnitortheCorporation Property. (b)COMMONWALLSYSTEMS (1)CondominiumUnitcommonwalls(e.g.,party walls)shallnotbemodifiedinanymannerwithoutthe priorwrittenapprovaloftheArchitecturalReview Committeewhichwouldincreasethenoiselevelsinany otherCondominiumUnitortheCorporationProperty. (2)CondominiumUnitcommonwalls(e.g.,party walls)shallnotbemodifiedinanywaywhichwould compromisetheacousticalperformanceoftheas-builtby Declarantcommonwallassembly. -93-52027.048-22139.FCM110714 (c)PLUMBINGSYSTEM (1)TheplumbingsystemsoftheCondominium Units(excludingthefaucets)shallnotbemodifiedin anymannerwithoutthepriorwrittenapprovalofthe ArchitecturalReviewCommittee.TheOwnermustcomply withanyRulesandRegulationswhichmayrequirewritten evidencethatthemodificationswillnotincreasethe noiselevelsinanyotherCondominiumUnitgeneratedby theas-builtplumbingsystembyDeclarant.Examplesof suchmodificationsinclude,butarenotlimitedto,the installationofspatubs.IfrequiredbytheBoard,each Ownermustusealicensedandapprovedcontractorwhohas metanyinsuranceobligationsrequiredbytheBoard. (d)ALLOWEDNOISELEVELS (1)NoCondominiumUnitOwneroroccupant,or CondominiumUnitmechanical,plumbingorelectrical system,shallproducesoundlevelswithinanyother CondominiumUnitthatexceedtheinteriornoiselimitsof thelocalgoverningjurisdictioninanyotherCondominium Unit.Ifthereisnolocalnoiselimitthatapplies,the applicablelimitshallbeamaximumlevelof50dBAfrom 7:00A.M.to10:00P.M.and45dBAfrom10:00P.M.to 7:00A.M.asmeasuredinsideanyotherCondominiumUnit withallwindowsanddoorsoftheaffectedCondominium Unitinafullyclosedposition. (e)OTHERREQUIREMENTS (1)Tominimizethenoisetransmissionfroma CondominiumUnit,eachOwner(otherthanDeclarant)shall complywiththerequirementsnotedabove,andthe following: (a)Nomodificationsshallbemadeto anyCondominiumUnitwhichwouldresultinareduc- tionintheminimumimpactinsulationclassofthe CondominiumUnit. (b)Pianosshallhaveatleast1/2inch neoprenepadsunderthesupportstominimizevibra- tiontransmissionintothestructure. Section32.Sub-meteringofWater.Itiscurrently anticipatedthattherewillbeonemasterwatermetertothe Project,thattheproviderofwaterandsewerserviceswillbill theCorporationforthecostofthewaterdeliveredtotheProject, andthatsubmeterswillbeinstalledforeachCondominiumUnitin theProject.EachOwnerofaCondominiumwillbeobligatedto reimbursetheCorporationintheamountsreasonablybilledbythe Corporation,oranyprivatemeterreadingserviceretainedbythe -94-52027.048-22139.FCM110714 Corporation,forthecostofthewaterandsewerservicessupplied totheOwner’sCondominiumUnitandExclusiveUseCorporation Propertybasedonthereadingfromthesubmeterwhichmonitors waterconsumptionfromtheOwner’sCondominiumUnitandExclusive UseCorporationProperty.InbillingeachOwner,theCorporation shallutilizewaterconsumptioninformationfromthesubmeterand thebillinginformationwhichisprovidedbythesupplierofwater andsewerservices.Shouldthesupplierofsuchservicescharge penaltiesforexcessivewaterconsumptionorshouldthesupplier otherwisechargedifferentratesfordifferentlevelsof consumption,theCorporationmayinanyreasonablemannerutilize suchinformationinitsallocationanddeterminationof reimbursementamountspursuanttothisSection. Section33.NoWarrantyofEnforceability.While Declaranthasnoreasontobelievethattherestrictivecovenants containedinthisArticleorelsewhereinthisDeclarationareor maybeinvalidofunenforceableforanyreasonortoanyextent, Declarantmakesnowarrantyorrepresentationastothepresentor futurevalidityorenforceabilityofanysuchrestrictivecovenant. AnyOwneracquiringaCondominiumintheProjectinrelianceonone ormoreofsuchrestrictivecovenantsshallassumeallrisksofthe validityandenforceabilitythereof,and,byacquiringthe Condominium,agreestoholdDeclarantharmlessfromanyinjuryor damagetherefrom. ARTICLEX REPAIRANDMAINTENANCE Section1.RepairandMaintenancebyCorporation. Withoutlimitingthegeneralityoftheprovisionsherein,including theArticleentitled"PowersandDutiesoftheCorporation,"and exceptasotherwiseprovidedinthisDeclaration,theCorporation shallhavethedutytomaintaintheCorporationPropertyinaneat, clean,safe,sanitary,attractive,sound,healthy,orderly, attractive,andaestheticallypleasingconditionatalltimes,free ofweeds,visibledeterioration,graffiti,debris,and/orother conditionsthatviolatetheCity’sMunicipalCode.Without limitingthegeneralityoftheforegoing,suchmaintenanceshall include,butnotbelimitedto,painting,maintaining,repairing, restoring,replacing,removinggraffiti,andlandscaping(asthe casemaybe)thefollowing: (a)Theexteriorsurfacesofallbuildingsinthe ProjectcontainingmorethanoneCondominiumUnit,including exteriorwallsandroofs,doors(allrepairstoexteriordoors andgaragedoorstoindividualCondominiums,includingthe structuralmaintenancethereof,shallbeatthesoleexpense oftherespectiveOwnerunlessotherwiseagreedtobythe Board),thewalls,fences,and/orrailingsenclosingthe balconyandporchareas(eachOwnershallberesponsiblefor -95-52027.048-22139.FCM110714 theroutinemaintenanceoftheinteriorofhisbalconyand porchareas,includingsweepingandcleaning,andchanging lightbulbs,ifany,andthestructuralintegrityofthe porch),thestructuralintegrityofthebalconyandbalcony surfacewaterproofingmaterial,anyairconditionerpadsor forcedairheatingunitpads,onlyifsuchpadsarelocated outsidetheCondominiumUnitandoriginallyincludedinthe CorporationbudgetreviewedbytheCalBREorsubsequently approvedbytheBoard(ifsuchpadsarelocatedonwith ExclusiveUseCorporationProperty,themaintenanceshallbe thatoftheOwnerthereof),awnings,exteriorlightsonthe Condominiumbuildings(whicharenotcontrolledbyaswitch withintheCondominium),shutters,andguttersanddownspouts; (b)Theprivatedrivesandaisles(togetherwith anyprivatecommonstreetlightsand/orothercommonexterior lightsandotherImprovementsthereon),decorativepaving, openparkingareas,signagerequiredbytheCity,andcommon walkwaysandsidewalks(ifany). (c)Soundwalls,retainingwallsandotherProject fencesandwalls(thestructuralintegrity,topandexterior) describedand/ordepictedasmaintainedbytheCorporationon anExhibittothisDeclarationorarecordedNoticeof Annexation(e.g.,seeExhibit"C"attachedhereto).Project fencesandwallsshallmeanandrefertothosecertainwalls andfenceswhichwereoriginallyconstructedbyDeclaranton theCorporationPropertyorotherportionoftheProject, whicharedesignatedbyDeclarantorBoardtoconstitute Projectfencesandwallsandwhichwillbemaintained(e.g., inacleanandattractivecondition)bytheCorporationas providedherein; (d)Thoseportionsoftheprivatestormdrainage systemfortheProjectdescribedand/ordepictedasmaintained bytheCorporationonanExhibittothisDeclarationora recordedNoticeofAnnexation(e.g.,generally,seeExhibit "D"attachedhereto),includingallBMPs,storagedetention basin,biofilters,plantfilters,filtersystems,sumppumps (ifapplicable),andmechanicaldevicesand/orotherdevices originallyrequiredbytheCity,inaccordancewiththe maintenanceagreementapprovedbytheCityfortheProjectand otherWaterQualityManagementPlans; (e)Allcommonamenitiesmailboxstructures servicingmultipleCondominiums(excludingeachOwner’s mailboxandthehinges,lock,andkeysthereof,whichshallbe maintainedbytheOwner),Projectsigns,andmonumentation, andcommonlandscapingandirrigationimprovements,excepting therefromanylandscapingorotherImprovementslocatedin ExclusiveUseCorporationProperty; -96-52027.048-22139.FCM110714 (f)Aprogramfortheinspectionandthemainte- nanceof,allfiresprinklers,firestandpipes,firealarm systems,fireextinguishers,andotherfireprevention equipmentand/orfacilities,ifany,originallyinstalledby Declarantinthecondominiumbuildingsinaconditioncompara- bletotheconditionoriginallyapprovedbytheCity; (g)Allamenitiesandallfurnishings,equipment andotherpersonalpropertyownedbytheCorporation; (h)AllCorporationPropertylightingfacilities; (i)Aninspectionandpreventiveprogramforthe preventionanderadicationofinfestationbywooddestroying pestsandorganismsintheCorporationProperty(e.g.,those buildingswithmorethanoneCondominiumUnit).Inconnection withtheinspectionandpreventionprogramfortheprevention anderadicationofinfestationbywooddestroyingpestsand organisms,theCorporation,uponreasonablenotice(which shallbegivennolessthanfifteen[15]daysnormorethan thirty[30]daysbeforethedateoftemporaryrelocation)to eachOwnerandtheoccupantsofhis/herCondominiumUnit,may requiresuchOwnerandoccupantstotemporarilyrelocatefrom suchCondominiumUnitinordertoaccommodateeffortsbythe Corporationtoeradicatesuchinfestation.Thenoticeshall statethereasonforthetemporaryrelocation,thedateand timeofbeginningoftreatment,theanticipateddateandtime ofterminationoftreatment,andthattheoccupantswillbe responsiblefortheirownaccommodationsduringthetemporary relocation.AnydamagecausedtoaCondominiumUnitbysuch entrybytheBoardorbyanypersonauthorizedbytheBoard shallberepairedbytheBoardasaCommonExpenseofthe Corporation.Allcostsinvolvedinmaintainingtheinspection andpreventiveprogramaswellasrepairingandreplacingthe CorporationPropertyandImprovementsthereonwhentheneed forsuchmaintenance,repairorreplacementistheresultof wooddestroyingpestsororganismsshallbeaCommonExpense subjecttotherestrictionsapplicabletoSpecialAssessments; (j)MaintainingeverythingthattheCorporationis obligatedtomaintaininaclean,sanitaryandattractive conditionreasonablyconsistentwiththelevelofmaintenance reflectedinthemostcurrentbudgetoftheCorporation,and inconformancewithanyMaintenanceGuidelines.Unless specificallyprovidedinanyMaintenanceGuidelines,oras commonlyacceptedmaintenancepracticesmaygovern,theBoard shalldetermine,initssolediscretion,theleveland frequencyofmaintenanceoftheCorporationPropertyand Improvementsthereon(assetforthbelow,eachOwnershall maintaineverythingthatOwnerisobligatedtomaintainina clean,sanitaryandattractiveconditionandinconformance withanyMaintenanceGuidelinesandMaintenanceRecommenda- -97-52027.048-22139.FCM110714 tions,aswellascommonlyacceptedmaintenancepracticesand theproductmanufacturer’smaintenancerecommendations);and (k)Allotherareas,facilities,furnishingsand Improvementsofwhatevernatureasmay,fromtimetotime,be requestedbythevoteorwrittenconsentofthree-fourths (3/4)ofthevotingpoweroftheMembers. ExceptasotherwiseprovidedinthisDeclaration,allcostsand expensesforsuchmaintenanceaboveshallbeaCommonExpense,and shallbepaidoutofthegeneraloperatingfundoftheCorporation. TheBoardshallhavetherighttorequirethatonlyacontractoror otherpersonapprovedbytheBoardsentertherooforotherportion oftheCorporationPropertyandtoconditionsuchentryonthe contractor’sorotherperson’scompliancewithreasonablerequire- mentsfortheprotectionoftheCorporationProperty(e.g., requirementsthatthecontractorbeappropriatelylicensed, maintaininsurancecoverageonwhichtheCorporationisnamedasan additionalinsured,and/orexecuteanindemnityagreementinfavor oftheCorporation).Amaintenancematrixisattachedheretoas Exhibit"G"andincorporatedbyreference. Section2.MaintenanceManual.TheDeclarantmay delivertotheBoarda"MaintenanceManual"whichsetsforththe Declarant’sanditsconsultants’recommendedfrequencyofinspec- tionsandmaintenanceofvariouscomponentsoftheCorporation Property.TheBoardshall,duringitsmeetings,determinewhether therecommendedinspectionsandmaintenanceactivitieshavebeen followed,and,ifanysuchrecommendationshavenotbeenfollowed, whatcorrectivestepsneedtobetakentoassureproperinspection andmaintenanceoftheCorporationProperty.TheBoardshallkeep arecordofsuchdeterminationsintheBoard’sminutes.TheBoard shall,fromtimetotime,makeappropriaterevisionstothe MaintenanceManual.TheBoardshallreviewtheMaintenanceManual forappropriaterevisionsatleastonanannualbasisafterthe Boardhaspreparedtheannualproformabudgetandreservestudy requiredbytheBy-Laws. InadditiontotherequirementsofanyMaintenance Manual,theBoardmayhavetheCorporationPropertyinspectedat leastonceeverythree(3)yearsto(a)determinewhetherthe CorporationPropertyisbeingmaintainedadequatelyinaccordance withapplicablestandardsofmaintenance,(b)identifythe conditionoftheCorporationPropertyandanyImprovementsthereon, includingtheexistenceofanyhazardsordefects,andtheneedfor performingadditionalmaintenance,refurbishment,replacementor repair,and(c)recommendpreventativeactionswhichmaybetaken toreducepotentialmaintenancecoststobeincurredinthefuture. TheBoardmayemploysuchexpertsandconsultantsasarenecessary toperformsuchinspection.TheBoardmayhaveareportofthe resultsoftheinspectionprepared.Thereportshouldincludeat leastthefollowing: -98-52027.048-22139.FCM110714 (a)AdescriptionoftheconditionoftheCorpora- tionProperty,includingalistofitemsinspectedandthe statusofmaintenance,repairandneedforreplacementofall suchitems; (b)Adescriptionofallmaintenance,repairand replacementplannedfortheensuingfiscalyearandincluded inthebudget; (c)Ifanymaintenance,repairorreplacementisto bedeferred,thereasonforsuchdeferral; (d)Asummaryofallreportsofinspections performedbyanyexpertorconsultantemployedbytheBoardto performinspections; (e)Areportofthestatusofcompliancewiththe maintenance,replacementandrepairneedssetforthinthe inspectionreportforprecedingyears;and (f)SuchothermattersastheBoarddeemsappropri- ate. Section3.ProjectInspections.TheBoardshall requirestrictcompliancewithallprovisionsofthisDeclaration andshallperiodicallycauseacomplianceinspectionoftheProject tobeconductedbytheArchitecturalReviewCommitteetoreportany violationsthereof.TheBoardshallalsocauseinspectionsofthe CorporationPropertyandallImprovementsthereontobeconducted inconformancewiththeapplicableMaintenanceGuidelines,andin theabsenceofinspectionfrequencyrecommendationsinany applicableMaintenanceGuidelinesatleastonceeverythree(3) years,inconjunctionwiththeinspectionrequiredforthereserve studytobeconductedasrequiredherein,intheBy-Lawsorby Statelaw,to(a)determinewhethertheCorporationPropertyis beingmaintainedadequatelyinaccordancewithcommonlyaccepted standardsofmaintenance,(b)identifytheconditionofthe CorporationPropertyandanyImprovementsthereon,includingthe existenceofanyhazardsordefects,andtheneedforperforming additionalmaintenance,refurbishment,replacement,orrepair,and (c)recommendpreventiveactionswhichmaybetakentoreduce potentialmaintenancecoststobeincurredinthefuture.The Boardshallduringitsmeetings,regularlydeterminewhetherthe recommendedinspectionsandmaintenanceactivitiessetforthinany applicableMaintenanceGuidelineshavebeenfollowedand,ifnot followed,whatcorrectivestepsneedtobetakentoassureproper inspectionsandmaintenanceoftheCorporationPropertyandall Improvementsthereon.TheBoardshallkeeparecordofsuch determinationsintheBoard’sminutes.TheBoardshallkeep DeclarantfullyinformedoftheBoard’sactivitiesunderthis Section.TheBoardshallemploy,consistentwithreasonablecost management,suchexperts,contractorsandconsultantsasare -99-52027.048-22139.FCM110714 necessarytoperformtheinspectionsandmakethereportsrequired bythisSection. TheBoardshallprepareareportoftheresultsof eachoftheinspectionsrequiredbythisSection,whichshall complywithSection2above,including:Foraperiodoften(10) yearsafterthedateofthelastcloseofescrowforaCondominium intheProject,theBoardshallalsofurnishtoDeclarant(a)the reportofeachconditioninspectionperformedfortheBoard, wheneversuchinspectionisperformedandforwhateverportionof theCorporationPropertythatisinspected,withinthirty(30)days afterthecompletionofsuchinspection,and(b)themostrecent conditioninspectionreportpreparedforanyportionofthe CorporationProperty,withinten(10)daysaftertheCorporation’s receiptofawrittenrequestthereforfromDeclarant. Section4.MaintenanceofPhasesSubjecttoConstruc- tionEasement.Notwithstandinganythingstatedtothecontraryin thisDeclaration,theCorporationshallhavenoobligationto maintainorrepairanyportionofaPhaseuntilcommencementofthe Corporation’sAssessmentsagainsttheCondominiumswithinsuch Phase.ShouldanyImprovementsoverlapbetweenPhases,the Corporationshallonlyberesponsibletomaintainthatportionof suchImprovementswhichlieinthePhase(s)inwhichtheCorpora- tion’smaintenanceobligationshavecommenced. Section5.RepairandMaintenancebyOwner.Exceptas otherwiseprovidedelsewhereinthisDeclaration(e.g.,inSection 1above,etc.)regardingtheCorporation’smaintenanceobligations affectinganOwner’sCondominium,everyOwnershallhavetheduty tomaintain,repairandreplace,athissolecostandexpense,all ImprovementswithinsuchOwner’sCondominiumorwhichrepresentan integralpartthereof(e.g.,pipesandutilitylinesandoutlets whichprovideservicetoonlytheOwner’sCondominium,including theinternalandexternaltelephonewiringandprivatewaterand sewerlateralsdesignedtoexclusivelyservetheOwner’sCondomin- iumUnit,nomatterwheresucharelocated),inaneat,clean, safe,sanitary,attractiveandorderlyconditionatalltimes.Each OwnershallkeephisrespectiveExclusiveUseCorporationProperty inaneatandcleanconditioninaccordancewiththeCorporation RulesandRegulations.Withoutlimitingthegeneralityofthe foregoing,andbywayofexampleonly,andexceptasmayotherwise beprovidedinthisDeclaration(e.g.,Section1above)regarding theCorporation’smaintenanceobligations,everyOwnershall: (a)Paint,maintain,repair,replace,restore,de- corate,tile,finish,plaster,and/orlandscapeorcausetoso maintained,repaired,replaced,restored,decorated,tiled, finished,plaster,and/orlandscaped(asthecasemaybe)the following: (1)Theinteriorsurfacesofthewalls, ceilings,andfloorsofhisCondominiumUnit.However,no -100-52027.048-22139.FCM110714 bearingwalls,ceilings,slab,floorsorotherstructural orutilitybearingportionsofthebuildingshousingthe CondominiumUnitsshallbepiercedorotherwisealtered orrepaired,withoutthepriorwrittenapprovalofthe plansforthealterationorrepairbytheArchitectural ReviewCommittee,whichmayapproveordisapprovesuchin itssoleandabsolutediscretion.EachOwnershallhave therighttosubstitutenewfinishedsurfacesinplaceof thoseexistingontheceiling,floors,wallsanddoorsof hisorherCondominiumUnitaspurchasedfromDeclarant; however,hardfloorsurfacesshallnotbeinstalledin areasinwhichtheinstallationofsuchhardsurface floorcoveringwouldincreasethelevelofnoiseheardin anyCondominiumUnit,unlesstheinstallationofsuch hardsurfaceshasbeenapprovedbytheArchitectural ReviewCommitteeortheBoard. (2)EachOwnerofaCondominiumshallbe responsibleforthemaintenanceandrepairof: i)Thewindowsandtheinteriorsurfac- esofdoorsenclosingtheCondominiumUnit,includ- ingthemetalframes,tracksandexteriorscreens ofglassdoorsandwindows;provided,however: (A)TheCorporationmaycontractforthe replacementofwindows,inwhicheventthe OwnerwillreimbursetheCorporationforits costssoincurred; (3)Exceptasmayotherwisebeprovidedabove orapprovedbyaunanimousvoteoftheBoardandapplied inanon-discriminatorymanner,allwindowglass, screens,ifany,andallinteriordoorsandthestructur- alintegrityoftheexteriordoorsandgaragedoors (includinglocks,latches,weatherstripping,andthresh- olds); (4)Allinteriorlightingfixtures,all exteriorlightbulbscontrolledbyaswitchinsidethe CondominiumUnitandallinteriorplumbingfixtures, includingbackflowpreventiondevices,bathtubs,shower stalls,toilets,andsinks,heating,cooling,Cable television,waterheatingsystems,heatingsystems,and electricequipment/system,andotherutilities(e.g., sewerandwaterlines)whicharelocatedwithinorwhich exclusivelyservesaidOwner’sCondominiumUnit; (5)Allinternalandexternaltelephonewiring designedtoservehisCondominiumUnit; (6)Allkitchenappliances,forcedairheating units,theairconditioningunit,thehotwaterheater, -101-52027.048-22139.FCM110714 andthegaragedooropenerwhicharelocatedwithinor servicehisCondominiumUnit; (7)Routinemaintenance(e.g.,sweepingand cleaningandreplacinglightbulbs)ofanyExclusiveUse CorporationPropertyappurtenanttotheCondominiumUnit oranyinternalstairwayrepresentingaportionofthe CorporationPropertywhichisfortheprimaryuseofone ormoreCondominiums; (8)TheOwner’sExclusiveUseCorporation Property[e.g.,balcony(excludingthestructural integrityofthebalcony,whichistobemaintainedby theCorporation),porch,solarcollectors,air conditioningpad,asapplicable],andanylandscaping locatedtherein]; (9)Thoseportionsofthefencesand/orwalls describedand/ordepictedasmaintainedbytheOwnerson anExhibittothisDeclarationorarecordedNoticeof Annexation(e.g.,seeExhibit"C"attachedhereto).All Ownersshallmaintainthelandscapingoriginally installedbyDeclarantonsuchwallorotherlandscaping approvedbytheArchitecturalReviewCommittee; (10)Intheeventitisnecessarytoaccessthe CorporationPropertytomaintain,repair,and/orreplace anyutilitylateralsorlinesexclusivelyservinga Condominium(e.g.,sewerlateral,etc.)oranyExclusive UseCorporationProperty(e.g.,airconditioningunit, solarcollector,etc.),suchOwnershallcomplywithall conditions,requirementsandrestrictionsimposedbythe BoardinordertoaccesstheCorporationPropertyand completesuchwork (e.g.,requirementsthatthe contractorbeappropriatelylicensed,maintainand providetheCorporationwithwrittenevidenceof insurancecoverageonwhichtheCorporationisnamedas anadditionalinsured,obtaintheCorporation’swritten permissiontoaccesstherooforotherCorporation Property,and/orexecuteanindemnityagreementinfavor oftheCorporation,etc.). (11)EachOwnershall,withinOneHundred Twenty(120)daysafterthecloseofescrowforthe originalsaleoftheCondominiumtotheOwnerfrom Declarant(i.e.,thedateofrecordationofthegrant deedconveyingtheCondominiumfromtheDeclaranttothe Owner),installthelandscapinginsaidOwner’sExclusive UseCorporationPropertyporchareas,ifsuchareaas originallyconstructedbyDeclarationallowsfor landscaping; -102-52027.048-22139.FCM110714 (12)EachOwnerofaCondominiumUnitwhichis notpartofabuildingwithmorethanoneCondominium Unitshallberesponsibleformaintainingall ImprovementswithinhisorherCondominiumunless otherwiseprovidedhereinorinaNoticeofAnnexation. (13)EachOwnershallmaintaineverythingthat theOwnerisobligatedtomaintaininaclean,sanitary andattractiveconditionandinconformancewithany MaintenanceGuidelinesandMaintenanceRecommendations, aswellasproductmanufacturerrecommendationsand commonlyacceptedmaintenancepractices. (b)IntheeventanyOwnershallfailtoperform his/hermaintenanceobligationsassetforthherein,the Corporationshallhavetheright,butnottheduty,tocause suchmaintenancetobeperformed.IftheBoardelectstocause suchmaintenanceworktobeperformed,thecostthereof (includingareasonableadministrativefee)shallbeassessed againstsaidOwnerasaComplianceAssessment.EachOwner shallreimbursetheCorporationforthosecostsincurredwhich resultfromtheCondominiumoccupants’excessiveorneglectful useoftheExclusiveUseCorporationPropertyorother portionsoftheProject. Section6.DamageandDestructionAffectingaCondomin- ium. (a)DutytoRebuild.IntheeventanyCondominium isdamagedordestroyedbyfireorothercasualty,itshallbe thedutyoftheOwnertorepairorreconstructtheCondominium (e.g.,including,withoutlimitation,allinteriorwalls, lightingfixtures,plumbingfixtures,cabinets,furnitureand improvementstherein,togetherwithrestorationandrepairof allinteriorpaint,wallcoveringsandfloorcoverings),at theindividualexpenseoftheOwneroftheCondominiumUnit, unlesscoveredbyinsurancemaintainedbytheCorporationfor thebenefitofsuchOwnerasdeterminedbytheBoard,ina mannerwhichwillrestoreittoitsconditionandappearance immediatelypriorintimetosuchdamageordestruction,oras otherwiseapprovedbytheArchitecturalReviewCommittee. Notwithstandingtheforegoing,thestructuralelementsthereof shallberestoredasdeterminedbytheBoard.Theaffected Ownershallbeobligatedtoproceedwithallduediligence hereunder,andshallpromptlycommencereconstructionwithin areasonabletimeafterthedamageoccurs,andshallcomplete suchreconstructionassoonasreasonablypossiblethereafter. Notwithstandinghereintothecontrary,theOwnerofa CondominiumUnitwhichisnotlocatedinabuildingwithmore thanoneCondominiumUnit,shallberesponsibletorebuildall theImprovementsinhisorherCondominium. -103-52027.048-22139.FCM110714 (b)ApprovalofRestorationPlans;Designand Variance.Inconnectionwiththerestorationandrepairof anyCondominium,theOwnerthereofmayapplyforapprovalto theArchitecturalReviewCommitteetoreconstructandrebuild inamannerwhichwillprovideforanexteriorappearanceand designdifferentfromthatwhichexistedpriortothedateof thecasualty.Applicationforsuchapprovalshallbemadein writing,togetherwithfullandcompleteplansandspecifica- tions,workingdrawingsandelevationsshowingtheproposed reconstructionsandtheendresultthereof.TheArchitectural ReviewCommitteeshallgrantsuchapprovalonlyifthedesign proposedbytheOwnerwouldresultinafinishedCondominium inharmonyofexteriordesignwiththeotherCondominiumsin theProject.FailureoftheArchitecturalReviewCommitteeto actwithinsixty(60)daysafterreceiptofsucharequestin writing,coupledwithfullandcompleteplansandspecifi- cations,drawingsandelevationsshallconstituteapproval thereof.TheOwnershallalsoobtainapprovalfromtheCity oftheproposedCondominium. Section7.LevyofComplianceAssessments.Inthe eventtheCorporationshallincuranycostsorexpensesduetothe failureofanyOwnertoperformhismaintenanceobligationsasset forthherein,orinordertorepairanydamagetotheCorporation Propertyduetoanynegligentactsoromissionsorwillful misconductonthepartofanOwner,oranymemberofhisfamily, hisguests,invitees,tenantsorlessees,ortheirguestsor invitees,theCorporationshallhavetheright,butnottheduty, tocausesuchmaintenanceorrepairstobeperformed.IftheBoard electstocausesuchmaintenanceorrepairworktobeperformed, afterNoticeandHearingasprovidedintheBy-Laws,thecost thereofshallbeassessedagainstsaidOwnerasaCompliance Assessment. Section8.MaintenanceofPublicUtilities.Nothing containedhereinshallrequireorobligatetheCorporationto maintain,replaceorrestoretheundergroundfacilitiesorpublic utilitieswhicharelocatedwithineasementsintheCommonProperty ownedbysuchpublicutilities.However,theCorporationshalltake suchstepsasarenecessaryorconvenienttoensurethatsuch facilitiesareproperlymaintained,replacedorrestoredbysuch publicutilities. ARTICLEXI ENVIRONMENTALANDOTHERDISCLOSURES ANDREQUIREMENTS Section1.EnvironmentalRequirements. (a)DutiesandObligationsoftheOwners.To reduceand/oreliminatenegativeeffectsontheenvironment, -104-52027.048-22139.FCM110714 andtocomplywithallBestManagementPracticesandNPDES requirements,allOwnersshall: (1)Disposeofwastematerialsproperly, eliminatelittering,andparticipateintheCity’s recyclingprogram; (2)Usefertilizers,herbicides,pesticides andotherharmfulchemicalsproperlyandincompliance withallapplicablelaws; (3)Takeallnecessarysteps toinsurethat NO oil,antifreeze,paintsandsimilarchemicalsenterthe stormdrainsystems; (4)Takeallnecessarystepstoprevent excessiveerosionandsedimentation;and (5)Useproperlandscapingmethodstoelimi- natenon-stormwaterrunofftoavoidadverseimpactson theenvironment. (b)DutiesandObligationsoftheCorporation. Notwithstandinganythingtothecontrarysetforthherein,the Corporationshall: (1)Contractwithacontractortoperformthe followingactivities,subjecttothefollowinglimita- tions,periodicallytominimizethepollutionofstorm drainwater: i)Eithermechanicallyormanually removealllargesizeurbandebrisfromcatch basinsandstormdrainsperiodically(i.e.,at leasttwiceayear,onceimmediatelybeforeOctober 1,thebeginningoftherainyseason,andoncein January,andatsuchadditionaltimesasmaybe requiredbytheCityEngineer); ii)Ifapplicable,maintainstenciling onstormdrainssaying"NODUMPING,DRAINSTO OCEAN,CREEK,CHANNEL,"asappropriate; iii)Minimizeirrigationrunoffbyusing controllerstoprovideseveralshortwatering cycles; iv)Immediatelycorrectanyirrigation designormaintenancedeficiencieswhichcause excessiverunoff;and -105-52027.048-22139.FCM110714 v)Followallfertilizerapplications withlightirrigationtopermitfertilizertosoak intothelandscapedarea. (2)Beresponsibleforthemaintenanceand repair(excepttotheextentsuchmaintenanceorrepair obligationhasbeenacceptedbyapublicagency)ofthe following: i)Allstormdrainfacilitieslocated withintheProjectdepictedonanExhibittothis DeclarationorarecordedNoticeofAnnexationas beingmaintainedbytheCorporation,exceptthose drainingpublicstreets,ifany;and ii)Allotherpropertyorfacilities, themaintenanceofwhichisrequiredoftheCorpo- rationhereunder,including,withoutlimitation, landscaping,concretewalkwaysandperimeterwalls onProjectboundaries. TheCorporationandallOwners,asapplicable,shallcomply withallNPDESrequirementsandenforceallapplicablestructural andnon-structuralBestManagementPracticesasoutlinedand definedinthespecificCity-approvedWaterQualityManagementPlan fortheProjectinordertopreventthedischargeofpollutantsand contaminantsintothepublicwaterstormdrainsystem. ARTICLEXII ARCHITECTURALREVIEW-APPROVAL Section1.ExemptionsFromArchitecturalReview.Except asotherwiseprovidedhereinorapprovedbytheBoard,all Improvementsshallbesubjecttoarchitecturalapprovalbythe CorporationinaccordancewiththeprovisionsofthisDeclaration. Notwithstandingtheforegoing,Declarantshallbeexemptfrom compliancewithanyoftheprovisionsofthisArticleastheymay relatetotheoriginalconstructionanddevelopmentoftheProject byDeclarantinaccordancewiththeplansapprovedbytheCity; provided,however,ifDeclarantshalldesiretoconstructanyIm- provementstotheexteriorofthebuildinghousingtheCondominium Unit(e.g.,windows,doors,theExclusiveUseCorporationProperty areasappurtenanttotheCondominiumUnit,etc.)aftersuch CondominiumUnithasbeencompletedandapprovedbytheCity, DeclarantshallobtainapprovalforsuchImprovementsfromthe City,andprovidedfurther,ifDeclarantshallretainaCondominium forpersonaluse,anyImprovementstosuchCondominiumshallbe subjecttoarchitecturalapprovalpursuanttothisArticle. Section2.ArchitecturalReview.Exceptforthepur- posesofpropermaintenanceandrepair,andexceptasotherwise -106-52027.048-22139.FCM110714 permittedhereunder,nopersonshallbuild,construct,erector installanyImprovement,ormodifytheexteriorappearanceofhis CondominiumUnitorExclusiveUseCorporationProperty,untilall conditionswhichmaybeimposedbytheCityhavebeensatisfiedand untilanyandallplansandspecificationsrequiredpursuantto thisArticleshallhavebeensubmittedtoandapprovedinwriting bytheArchitecturalReviewCommittee.Forthepurposesofthis Section,theterm"exterior"shallmeananyoutsidewall,outside surface,roof,outsidedoor,porch,yard,balcony,airconditioning unit,solarcollector,orotheroutsidestructurewhichisvisible toothersintheProjectand/ortothepublic. Section3.ArchitecturalReviewCommittee.TheArchi- tecturalReviewCommitteeisherebyauthorizedwiththerightsand powerssetforthinthisArticle.SaidCommitteemayconsistof three(3)members,andeachinitialmembershallserveuntilthe firstelectionoftheBoard.Intheeventofthefailureor inabilityofanymemberoftheArchitecturalReviewCommitteeto act,theremainingmembersshalldesignateasuccessorwhoshall servefortheremainderofthetermofthememberhereplaces.The Declarantshallappointalloftheoriginalmembersofthe ArchitecturalReviewCommittee,andreplacementsthereto.Further, Declarantreservesthepowertoappointamajorityofthemembers oftheArchitecturalReviewCommitteeuntilninetypercent(90%)of theCondominiumsintheproposeddevelopmentoftheProject(i.e., Phase1andtheAnnexationProperty)havebeensoldandescrows closedoruntilthefifth(5th)anniversaryoftheissuanceofthe FinalSubdivisionPublicReportforthefirstPhaseoftheProject. Afterone(1)yearfromthedateoftheissuanceoftheFinal SubdivisionPublicReportforthefirstPhaseoftheProject,the Boardshallhavethepowertoappointone(1)membertotheAr- chitecturalReviewCommitteeuntilninetypercent(90%)ofthe CondominiumUnitsintheProjecthavebeensold,oruntilthefifth anniversarydateofthefirstcloseofescrowforthesaleofa CondominiumUnitpursuanttotheFinalSubdivisionPublicReport forthefirstPhaseoftheProject,whicheverfirstoccurs. Thereafter,theBoardshallhavethepowertoappointallofthe membersoftheArchitecturalReviewCommittee.Allmembers appointedtotheArchitecturalReviewCommitteebytheBoardshall befromthemembershipoftheCorporation.Membersappointedtothe ArchitecturalReviewCommitteebytheDeclarant,however,neednot bemembersoftheCorporation.NomemberoftheArchitecturalRev- iewCommitteeshallbeliabletoanypersonforhisdecisionsor failuretoactinmakingdecisionsasamemberoftheArchitectural ReviewCommittee.Declarantmay,initsdiscretionandatanytime, assigntotheCorporationbywrittenassignmentitspowersof removalandappointmentwithrespecttotheArchitecturalReview Committee,subjecttosuchtermsandconditionsregardingtheexer- cisethereofasDeclarantmayimpose. Section4.MeetingsoftheArchitecturalReviewCommit- tee.TheArchitecturalReviewCommitteeshallmeet,fromtimeto time,asnecessarytoperformitsdutieshereunder.TheArchitec- -107-52027.048-22139.FCM110714 turalReviewCommitteemay,byamajorityvoteofthemembers thereofandtheBoard,delegateanyoralloftheCommittee’s rightsandresponsibilitieshereundertoone(1)ormoreduly licensedarchitects,whoshallhavefullauthoritytoactonbehalf oftheArchitecturalReviewCommitteeonallmatterssodelegated. Section5.ArchitecturalApproval-ReviewofPlansand Specifications.TheArchitecturalReviewCommitteeshallhavethe rightanddutytopromulgatereasonablestandardsagainstwhichto examineanyrequestmadepursuanttothisArticle(e.g.,toensure thattheproposedplansareinconformancewithandareharmonious totheexteriordesignandexistingmaterialsoftheCondominium UnitsintheProject).TheArchitecturalReviewCommitteeshall considerandactuponanyandallplansandspecifications submittedforitsapprovalunderthisDeclaration,andperformsuch otherdutiesas,fromtimetotime,shallbeassignedtoitbythe Board,includingtheinspectionofconstructionandprogressto ensureitsconformancewiththeplansapprovedbytheArchitectural ReviewCommittee.Noconstruction,alteration,grading,addition, excavation,demolition,modification,decoration,redecorationor reconstructionofanImprovementshallbecommencedormaintained byanyOwneruntiltheplansandspecificationsthereforshowing thenature,kind,shape,height,width,color,materialsand locationofthesameshallhavebeensubmittedtotheArchitectural ReviewCommitteeandapprovedinwritingbytheArchitectural ReviewCommittee.Theinitialaddressforsubmissionofsuchplans andspecificationsshallbeprovidedtotheOwnersbytheBoard. TheArchitecturalReviewCommitteeshallapprovetheplansand specificationssubmittedforitsapprovalonlyifitdeemsthat: (a)theconstruction,alterationsoradditionscontemplatedthereby andthelocationsindicatedwillnotbedetrimentaltothe appearanceofthesurroundingareaoftheProjectasawhole;(b) theappearanceofanystructureaffectedtherebywillbeinharmony withsurroundingstructures;(c)theconstructionthereofwillnot detractfromthebeauty,wholesomenessandattractivenessofthe CorporationProperty,ortheenjoymentthereofbytheOwners;(d) theupkeepandmaintenancethereofwillnotbecomeaburdenonthe Corporation;and(e)theproposedImprovementsareinsubstantial compliancewiththeadoptedArchitecturalGuidelines,ifany.In additiontotheforegoing,initsreviewofplansandspecifica- tions,theArchitecturalReviewCommitteemaytakeintoconsider- ation,amongotherthings,thescaleofsitedimensions;conformity andharmonyofexternaldesignwithneighboringImprovements; effectoflocationanduseofImprovements(includinglandscaping) onneighboringCondominiumUnits;relationoftopography,gradeand finishgradeelevationtoneighboringCondominiumUnits;proper facingofallelevations;aestheticbeauty;andconformityofthe plansandspecificationstothepurposeandgeneralplanandintent oftheProtectiveCovenantsofthisDeclaration.TheArchitectural ReviewCommitteemaywithholdapprovaloftheplansandspecifica- tionsforanyproposedImprovementbecauseofnoncompliancewith anyofthespecificProtectiveCovenantssetforthinthis Declaration;becauseofthedissatisfactionoftheArchitectural -108-52027.048-22139.FCM110714 ReviewCommitteewiththeproposednature,kind,plan,design, shape,height,dimensions,proportions,architecturalstyle,color, finishormaterialstobeusedtherein,thepitchortypeofany proposedroof,orthesize,typeorlocationofanyproposedtrees orthelandscapingtobeplanted;orbecauseofthedissatisfaction oftheArchitecturalReviewCommitteewithanyaspectofthe proposedImprovementwhichcouldcausetheproposedImprovementto beinappropriate,inharmoniousorout-of-keepingwiththegeneral planofimprovementfortheProject,orwiththeImprovementsonor topographyofthesurroundingproperty. TheArchitecturalReviewCommitteemayconditionits approvalofproposalsorplansandspecificationsforanyImprove- ment:(a)onsuchchangesthereinasitdeemsappropriate,(b)upon theagreementbythepersonsubmittingthesametograntappropri- ateeasementstotheCorporationforthemaintenanceofthe Improvement,or(c)upontheagreementofthepersonsubmittingthe sametoreimbursetheCorporationforthecostofsuchmaintenance, oralloftheabove,andmayrequiresubmissionofadditionalplans andspecificationsorotherinformationpriortoapprovingor disapprovingthesubmission. TheArchitecturalReviewCommitteemayalsoissuerules orguidelinessettingforthproceduresforsubmissionofplansfor approval,requiringapaymentofafeetotheCorporationto accompanyeachsubmissionofplansandspecifications,orad- ditionalfactorswhichitwilltakeintoconsiderationinreviewing submissions. TheArchitecturalReviewCommitteemayrequiresuch detailinplansandspecificationssubmittedforitsreviewasit deemsproper,including,withoutlimitation,floorplans,site plans,drainageplans,elevationdrawings,landscapeplansand descriptionorsamplesofexteriormaterialandcolors. EachOwneracknowledgesandunderstandsthatheorshe hasabsolutelynorightorabilitytomodifytheCondominium BuildingscontainingmorethanoneCondominiuminanymanner, unlessotherwiseprovidedbytheBoard. Section6.DecisionsoftheArchitecturalReviewCom- mittee.UntilreceiptbytheArchitecturalReviewCommitteeofany requiredplansandspecifications,andsuchotherinformationas mayberequiredinSection5above,theArchitecturalReview Committeemaypostponereviewofanyplanssubmittedforapproval. DecisionsoftheArchitecturalReviewCommitteeandthereasons thereforshouldbetransmittedbytheArchitecturalReview Committeetotheapplicant,attheaddresssetforthintheap- plicationforapproval,withinforty-five(45)daysafterreceipt bytheArchitecturalReviewCommitteeofallplans,specifications andmaterialsrequired.Anyapplicationsubmittedpursuanttothe provisionsofSection5aboveshallbedeemedapproved,unless writtendisapprovalorarequestforadditionalinformationor -109-52027.048-22139.FCM110714 materialsbytheArchitecturalReviewCommitteeshallhavebeen transmittedtotheapplicantwithinforty-five(45)daysafterthe receiptbytheArchitecturalReviewCommitteeofallrequired materials. Section7.SubmittaltoPublicAgencies-Rightof ArchitecturalReviewCommitteetoReview.Uponobtainingthe writtenapprovaloftheArchitecturalReviewCommitteeforthe proposedImprovement,ifsuchImprovementrequiresabuilding permit,theOwnershallthereaftersubmittheplansandspecifica- tionstoallappropriategovernmentalagenciesinaccordancewith theirrespectiverequirements.Intheeventthatallapprovalsby thegovernmentalagenciesnecessaryfortheissuanceofabuilding permitarenotobtainedwithinsix(6)monthsafterthedateof approvalbytheArchitecturalReviewCommittee,theArchitectural ReviewCommitteeshallhavetheright,butnottheobligation,to reviewallpreviouslyapprovedplansandspecifications.In addition,intheeventthatthegovernmentalagenciesrequire modificationstotheplansandspecificationspreviouslyapproved bytheArchitecturalReviewCommittee,theOwnershallsubmitto theArchitecturalReviewCommitteeallmodificationstotheplans andspecificationspreviouslyapprovedbytheArchitecturalReview Committee,whichshallhavetherighttoreviewandtoimpose furtherconditionsonanysuchmodifications. Section8.ConflictsBetweenGovernmentalAgenciesand ArchitecturalReviewCommittee.Intheeventofanyconflictin theconditionsofapprovalofanyproposedImprovementimposedby theLocalGovernmentalAgenciesandtheArchitecturalReview Committee,themorerestrictiveofsuchconditionsshallbe controlling.Further,nothinghereinshalllimittheArchitectural ReviewCommitteefromimposingconditionsofapprovalofany proposedImprovementswhicharemorerestrictivethanconditions thatmaybeimposedbytheappropriateLocalGovernmentalAgencies. Section9.NoWaiverofFutureApprovals.Theapproval oftheArchitecturalReviewCommitteetoanysubmissionsforany workdone,orproposedtobedone,orinconnectionwithanyother matterrequiringtheapprovalorconsentoftheArchitectural ReviewCommittee,shallnotbedeemedtoconstituteawaiverofany righttowithholdapprovalorconsentofanysimilarproposals, plansandspecifications,drawingsorothermatterssubsequentlyor additionallysubmittedforapproval. Section10.CompensationofMembers.Themembersofthe ArchitecturalReviewCommitteeshallreceivenocompensationfor servicesrendered,otherthanreimbursementbytheCorporation, pursuanttoBoardapproval,forexpensesincurredintheperfor- manceofsuchmembers’dutieshereunder.ThisSectionshallnotbe interpretedorconstruedtoprohibittheCorporationfromcompen- satinganydulylicensedArchitectwhohasbeendelegatedrights anddutiesasprovidedinthisArticle. -110-52027.048-22139.FCM110714 Section11.Variances.Wherecircumstancessuchasto- pography,locationofbuildings,locationoflandscapingorother mattersrequire,theArchitecturalReviewCommittee,bythevoteor writtenassentofamajorityofthemembersthereofandtheBoard, mayallowreasonablevariancesastoanyoftheProtective CovenantscontainedinthisDeclarationorprovisionsunderthe rulesandregulationspromulgatedbytheArchitecturalReview Committee,onsuchtermsandconditionsasitshallrequire.The grantingofsuchavarianceshallnotoperatetowaiveanyofthe termsandprovisionsofthisDeclarationforanypurpose,exceptas totheparticularCondominiumandparticularprovisionhereof coveredbythevariance,norshallitaffectinanywaytheOwner’s obligationtocomplywithallgovernmentallawsandregulations affectingtheOwner’suseofhisCondominium,including,butnot limitedto,zoningordinances,lotsetbacklinesorrequirements imposedbytheCityorothergovernmentalauthority. Section12.InspectionofWork.Uponconsentofthe Owner,whichconsentshallnotbeunreasonablywithheld,anymember orauthorizedrepresentativeoftheArchitecturalReviewCommittee may,atanyreasonablehouranduponreasonablenotice,enterand inspectanyCondominiumwhichhasbeenthesubjectmatterofan approvalofasubmissionforanImprovementtohisCondominium. SuchentryshallbemadewithaslittleinconveniencetotheOwner asreasonablypossible,andanydamagecausedtherebyshallbere- pairedbytheCorporation.IftheArchitecturalReviewCommittee findsthatsuchworkwasnotdoneinsubstantialcompliancewith theapprovedplansandspecifications,itshallnotifytheOwnerin writingofsuchnoncompliance,specifyingtheparticularsof noncomplianceandshallrequiretheOwnertoremedythesamewithin thirty(30)daysfromthedateofnotificationofsuchnoncompli- ance.Ifanoncomplianceexists,theBoard,afterNoticeand Hearing,maylevyaComplianceAssessmentagainstsuchOwnerfor thecostsofremovingorremedyingsuchnoncompliance. Section13.Non-LiabilityofArchitecturalReviewCom- mitteeMembers.NeitherDeclarant,theCorporation,theBoardor theArchitecturalReviewCommittee,orthemembersordesignated representativesthereof,shallbeliablefordamagestoanyOwner submittingplansorspecificationstothemforapproval,ortoany OwnerintheProjectaffectedbythisDeclarationbyreasonof mistakeinjudgment,negligenceornonfeasance,unlessdueto willfulmisconductorbadfaithoftheArchitecturalReviewCom- mittee.TheArchitecturalReviewCommittee’sapprovalordisap- provalofasubmissionshallbebasedsolelyontheconsiderations setforthinthisArticle,andinsuchrulesandregulationsasmay bepromulgatedbytheArchitecturalReviewCommittee,andthe ArchitecturalReviewCommitteeshallnotberesponsiblefor reviewing,norshallitsapprovalofanyplanordesignbedeemed approvalof,anyplansordesignfromthestandpointofstructural safetyandconformancewithbuildingorothercodesorrequestsof anyLocalGovernmentalAgency. -111-52027.048-22139.FCM110714 Section14.Appeal.Intheeventplansandspecifica- tionssubmittedtotheArchitecturalReviewCommitteearedisap- proved,thepartymakingsuchsubmissionmayappealinwritingto theBoard.ThewrittenrequestmustbereceivedbytheBoardnot morethanthirty(30)daysfollowingthefinaldecisionofthe ArchitecturalReviewCommittee.TheBoardmayrequestthewritten recommendationsoftheArchitecturalReviewCommitteeforreview. Withinsixty(60)daysfollowingreceiptoftherequestforappeal, theBoardshallconsidertheappealatanopenmeetingandrender itswrittendecision.ThefailurebytheBoardtorenderadecision withinsaidsixty(60)dayperiodshallbedeemedadecisionin favorofthepartymakingsuchsubmission. Section15.ApprovalofCity.EachOwnerissolely responsibleforensuringthatallplansandspecifications submittedbysuchOwnertotheArchitecturalReviewCommittee complywith,anddonotviolate,anyapplicableprovisionoflaw, including,withoutlimitation,theFairEmploymentandHousingAct (CaliforniaGovernmentCodeSection12900et seq.),theCity’s MunicipalCode,allapplicablebuildingandconstructioncodes,and allotherapplicablelaws,regulations,andordinancesgoverning landuseandpublicsafety.Approvalofanyproposedorexisting ImprovementbytheArchitecturalReviewCommitteeortheBoard,or thecompletionofanyImprovement,shallnotbeconstruedto warrantorrepresentinanywaythattheImprovementwasapproved byorcomplieswiththeminimumstandardsoftheCityoranyother provisionoflaw.Similarly,approvalofanyproposedorexisting ImprovementbytheCityshallnotbeconstruedtoconstitute approvalofsuchImprovementbytheArchitecturalReviewCommittee ortheBoard. ARTICLEXIII DAMAGEORDESTRUCTIONTO THECORPORATIONPROPERTY Section1.ElectiontoRestoreCorporationProperty. ExceptasotherwiseprovidedinSection2hereinbelow,damagetoor destructionofalloranyportionoftheCorporationPropertyshall behandledinthefollowingmanner: (a)Intheeventofdamagetoordestructionofthe CorporationPropertyandtheinsuranceproceedsaresufficient toeffecttotalrestoration,theCorporationshall,as promptlyasispractical,causetheCorporationPropertytobe repairedandreconstructedinagoodandworkmanlikemannerto itsconditionpriortosuchdamageordestruction. (b)Iftheinsuranceproceedsavailableareat leastninetypercent(90%)oftheestimatedcostoftotal repairandreconstructiontotheCorporationProperty,the Corporationshall,aspromptlyaspractical,causesuch -112-52027.048-22139.FCM110714 CorporationPropertytoberepairedandreconstructedina goodworkmanlikemannertoitsconditionpriortothedamage ordestruction,andthedifferencebetweentheinsurance proceedsandtheactualcostshallbeleviedbytheCorpora- tionasaSpecialAssessmentagainsteachCondominiumonan equalbasis. (c)Iftheinsuranceproceedsavailableareless thanninetypercent(90%)oftheestimatedcostoftotal repairandreconstructiontotheCorporationProperty,the Ownersshall,bythewrittenconsentorvoteofamajorityof theOwners,determinewhether(1)torestoretheCorporation Propertyaspromptlyaspracticaltoitsconditionpriorto thedamageordestruction,andtoraisethenecessaryfunds overandabovetheinsuranceproceedsavailablebylevying assessmentsagainsteachCondominiumonanequalbasis;or(2) torestoretheCorporationPropertyinawaywhichutilizes allavailableproceedsandanadditionalamountnotinexcess oftenpercent(10%)oftheestimatedcostoftotalrecon- structionandrepairtotheCorporationProperty,andwhichis assessableasprovidedabovetoallCondominiums,butwhichis lessexpensivethanrestoringtheCorporationPropertytoits conditionpriortothedamageordestruction. Section2.ElectionNottoRestoreCorporation Property. (a)Notwithstandingtheprovisionssetforthin Section1hereinabove,intheeventsixty-sevenpercent(67%) oftheOwners,otherthantheDeclarant,andsixty-seven percent(67%)ofthefirstMortgagees(baseduponone[1]vote foreachfirstMortgageowned)havegiventheirpriorwritten approval,theOwnersmayelectnottorebuildorrestorethe CorporationPropertyandtodisbursetheavailableinsurance proceedstothegeneralfundtotheCorporation. (b)IntheeventtheOwnersshallhavesovotednot torebuildtheCorporationProperty,theCorporationProperty shallbeclearedandlandscapedandthecostthereofshallbe paidforoutoftheavailableinsuranceproceedspriorto theirdistributiontothegeneralfundoftheCorporation. (c)IntheeventtheOwnersshallhavesovotednot torebuildtheCorporationProperty,unlesstheCityshall agreetothecontrary,itshallbetheobligationofthe CorporationandeachoftheOwnerstorebuildtheprivate drivesandaisles,ifany,andtheutilitiesandopenspaces, whichcomprisetheCorporationProperty,ifany,atleastto theextentsaidstreets,utilitiesandopenspaceswere acceptedinitiallybytheCityinlieuofpaymentoffeesdue pursuanttolaw. -113-52027.048-22139.FCM110714 Section3.ExcessInsuranceProceeds.Allinsurance proceedsshallbepayabletotheCorporationforthebenefitofthe OwnersandtheirrespectiveMortgagees.Intheeventanyexcess insuranceproceedsremainafterrestoringthedestroyedCorporation PropertypursuanttothisArticle,theBoardofDirectorsshall retainsuchsumsinthegeneralfundoftheCorporation.Any distributionoffundsinconnectionwiththeterminationofthe ProjectshallbeallocatedequallyamongalloftheCondominiumsin theProject.Anysuchdistributionshallbesubjecttotheprior rightsofMortgagees. ARTICLEXIV CONDEMNATION Section1.DistributionofAwards.Subjecttothelimi- tationssetforthintheArticlehereinentitled"MortgageeProtec- tion,"acondemnationawardaffectingalloranyportionofthe CorporationPropertyoftheProjectwhichisnotapportionedamong theOwnersbycourtjudgmentshallbedistributedtotheCorpora- tionanddepositedinthegeneralfundoftheCorporation. Section2.BoardofDirectorsasAttorney-in-Fact.All Owners,totheextentapplicable,ifatall,herebyappointthe BoardoftheCorporationastheirspecialattorney-in-factto handlethenegotiations,settlementsandagreementspertainingto anycondemnationaffectingonlytheCorporationProperty.The specialpowerofattorneyshallnotapplytotheSecretaryofthe DepartmentofVeteransAffairs,anOfficeroftheUnitedStatesof America.NoOwnermayparticipateasaparty,orotherwise,inany proceedingsrelatedtosuchcondemnation. ARTICLEXV COVENANTAGAINSTPARTITION Section1.GeneralCovenantAgainstPartition.Except asotherwiseprovidedinthisSection,theCommonAreashallremain undivided,andthereshallbenojudicialpartitionsoftheCommon Area.Nothinghereinshallbedeemedtopreventpartitionofaco- tenancyinaCondominium. Section2.JudicialPartitionoftheProject.TheOwner ofaCondominiumintheProjectmaymaintainapartitionactionas totheentireProjectasiftheOwnersofalltheCondominiumsin theProjectweretenants-in-commonintheentireProjectinthe sameproportionastheirinterestsintheCommonArea.Thecourt shallorderpartitionunderthisArticleonlybysaleoftheentire Projectandonlyupontheshowingofone(1)ofthefollowing: -114-52027.048-22139.FCM110714 (a)Morethanthree(3)yearsbeforethefilingof theaction,theProjectwasdamagedordestroyedsothata materialpartwasrenderedunfitforitsprioruse,andthe Projecthasnotbeenrebuiltorrepairedsubstantiallytoits statepriortothedamageordestruction; (b)Three-fourths(3/4)ormoreoftheProjectis destroyedorsubstantiallydamaged,andatleastsixty-seven percent(67%)oftheOwners(otherthanDeclarant)andsixty- sevenpercent(67%)ofthefirstMortgagees(baseduponone [1]voteforeachfirstMortgageowned)opposerepairor restorationoftheProject;or (c)TheProjecthasbeeninexistencemorethan fifty(50)years,isobsoleteanduneconomical,andatleast sixty-sevenpercent(67%)oftheOwners(otherthanDeclarant) andsixty-sevenpercent(67%)ofthefirstMortgagees(based uponone[1]voteforeachfirstMortgageowned)opposerepair orrestorationoftheProject. Section3.BoardofDirectors’PowerofSaleinEvent ofJudicialPartition.Declarant,foritselfandonbehalfofeach andeverypresentandsubsequentOwnerofone(1)ormoreCondo- miniumswithintheProject,herebyappointstheBoardasitsand theirattorney-in-facttoselltheentireProjectforthebenefit ofalloftheOwnersthereofwhenpartitionoftheProjectmaybe hadpursuanttothisDeclaration,whichpowershall:(a)bebinding uponalloftheOwners,whethertheyassumetheobligationsof theserestrictionsornot;(b)beexercisablebyavoteofatleast seventy-fivepercent(75%)ofthevotingpoweroftheBoard;and (c)beexercisableonlyafterrecordationofacertificatebythe Board,whichshallprovidethatsaidpowerisproperlyexercisable hereunder,andwhichcertificateshallbeconclusiveevidence thereofinfavorofanypersonrelyingthereoningoodfaith; provided,however,saidpowerofattorneyshallnotapplytothe SecretaryoftheDepartmentofVeteransAffairs,anOfficerofthe UnitedStatesofAmerica. ARTICLEXVI INSURANCE Section1.RequiredInsuranceCoverage.TheCorpora- tion,actingbyandthroughtheBoard,shallobtainfortheCorp- oration,andshallmaintainandpaythepremiumsforthefollowing insurancecoverage: (a)CasualtyandFireInsurance.Amasterpolicyor policiesofcasualtyandfireinsurance,withanextended coverageendorsementinanamountequaltoasnearaspossible onehundredpercent(100%)ofthecurrentreplacementcost (withoutdeductionfordepreciationorco-insurance)ofthe -115-52027.048-22139.FCM110714 CorporationProperty,togetherwithallImprovementslocated therein(exceptImprovementsmadebyanOwnertotheExclusive UseCorporationProperty)andincludingthoseportionsofthe CondominiumUnitsconsistingoffixtures,built-inorset-in appliances,cabinetsandinitialbasicfloorcoveringsas initiallyinstalledthereofinaccordancewiththeoriginal plansandspecificationsfortheProjectsubmittedby DeclarantandapprovedbytheCity(excludingupgradestoany oftheforegoing).Alternatively,ifapprovedbytheBoard, amasterpolicyorpoliciesofcasualtyandfireinsurance, withanextendedcoverageendorsementinanamountequaltoas nearaspossibleonehundredpercent(100%)ofthecurrent replacementcost(withoutdeductionfordepreciationorco- insuranceoftheCorporationProperty,togetherwithall Improvementslocatedtherein,exceptImprovementsmadebyan OwnertotheExclusiveUseCorporationProperty),but specificallyexcludinginteriorCondominiumUnitcoverage (including,withoutlimitation,interiorwallsandfloor coverings);intheeventtheBoardelectstoobtainsuch masterpolicy(ies),eachOwnershallprocureandmaintain,at theOwner’ssolecostandexpense,aninsurancepolicyof casualtyandfireinsurancecoveringtheinteriorofhis CondominiumUnit,includingreplacementofinterior improvementsandbettermentcoveragetoinsureimprovements thattheborrowermayhavemadetotheinteriorofthe CondominiumUnit(e.g.,aHO-6policy)sufficient,as reasonablydeterminedbytheinsurer,torepairthe CondominiumUnittoitsconditionwhichexistedimmediately priortoalossclaimevent.Saidpoliciesshallbeprimary andmaintainedforthebenefitoftheCorporation,theOwners andtheMortgagees,astheirinterestsshallappear,andshall waivetherightofsubrogationagainstOwners,ifobtainable. Ifreasonablyobtainable,thedeductibleshallbethelesser ofTenThousandDollars($10,000)oronepercent(1%)ofthe policyfaceamount.Suchpolicymustbewrittenbyaninsur- ancecarrierthatmeetstherequirementsofFNMA,FHLMC, and/orVA/FHAasapplicable.*Thecoveragedoesnotneedto includeland,foundations,excavations,orotheritems normallyexcludedfromsuchcoverage.Suchpolicyorpolicies mustcontain,ifrequiredandifobtainable: (1)AnAgreedAmountandInflationGuard Endorsement; (2)ConstructionCodeEndorsements(suchas DemolitionCostEndorsement); (3)ContingentLiabilityFromOperationof BuildingLawsEndorsement; (4)IncreasedConstructionEndorsementif thereisaconstructioncodeprovisionwhichwouldbecome -116-52027.048-22139.FCM110714 operativeandrequirechangestoundamagedportionsof theCorporationProperty;and (5)AnyotherspecialCondominiumEndorsements thatmaybeavailableorrequired. (b)GeneralLiabilityInsurance.Apolicyorpoli- ciesofcomprehensivegeneralliabilityinsurance(withcross- liabilityendorsement,ifobtainable)insuringtheCorpora- tion,theBoard,theOwners,theCityandtheDeclarant,and theagentsandemployeesofeachoftheforegoing,againstany liabilitytothepublicortoanyOwner,hisfamily,tenants, lesseesandtheirrespectiveguestsandinvitees,arisingfrom orincidenttotheownership,occupancy,use,maintenance and/orrepairoftheCorporationProperty,andfromlawsuits relatedtoemploymentcontractsinwhichtheCorporationisa party.ThelimitsofliabilityunderthisSectionshallbeset bytheBoardandshallbereviewedatleastannuallybythe Board,andincreasedordecreasedatthediscretionofthe Board;provided,however,thatsaidlimitsshallnotbeless thanTwoMillionDollars($2,000,000.00)forbodilyinjury, includingdeathsofpersonsandpropertydamagearisingoutof asingleoccurrence(unlessapprovedbyavoteofsixty-seven percent[67%]oftheMembers);providedfurther,ifFHLMC, FNMA,and/orVA/FHAparticipateinthefinancingofCondomini- umsintheProject,saidlimitsshallnotbelessthanthe minimumlimitsrequiredunderthethencurrentFHLMC,FNMA, and/orVA/FHAregulations. (c)Worker’sCompensationInsurance.Worker’scom- pensationinsurancetotheextentnecessarytocomplywithany applicablelaws. (d)FidelityBonds.Officers’andDirectors’errors andomissionsinsurance,andfidelitybondsnamingallpersons signingchecksorotherwisepossessingfiscalresponsibilities onbehalfoftheCorporation,including,butnotlimitedto, officers,directors,theBoard,trusteesandemployeesofthe Corporation,andofficers,employeesandagentsofany managementcompanyemployedbytheCorporationwhohandleor areresponsiblefortheadministrationofCorporationfunds, ifobtainable.Suchcoverageshallbeinanamountdeemed reasonablyappropriatebytheCorporation,butshallnotbe lessthantheestimatedmaximumfundsincustodyofthe Corporation(oritsmanagementcompany),ortwenty-five percent(25%)oftheestimatedannualoperatingexpensesof theProject,plusreserves,whicheverisgreater.Inaddition, iftheCorporationentersintoanagreementforprofessional managementoftheProject,theCorporationshallrequiresuch companytosubmitevidenceofitsfidelitybondcoverageto thesameextentastheCorporation’scoverage.TheCorporation shallbenamedasanadditionalobligeeinthemanagement agent’sbond. -117-52027.048-22139.FCM110714 (e)FloodInsurance.IftheProjectislocated withina"SpecialFloodHazardArea"designatedonaFederal EmergencyManagementAgencyfloodmap,adequatefloodinsur- anceundertheNationalFloodInsuranceProgramonbuildings intheProject,whichinsurancecoveragemustprotectthe interestsofallOwnersintheirCondominiumUnits,aswellas theCorporationPropertyandsatisfytherequirementsset forthinSection10,below,ofthisArticle. (f)Liability.IftheBoarddeterminesthecoverage isnecessaryandreasonablycosteffective,itmayobtain coveragenecessarytocomplywithCivilCodeSection5800, e.g.,one(1)ormorepoliciesofinsurancewhichinclude coverageofatleastFiveHundredThousandDollars ($500,000.00)for(i)generalliabilityfortheCorporation and(ii)individualliabilityofofficersandDirectorsofthe Corporationfornegligentactsoromissionsinsuchcapacity. Section2.OptionalInsuranceCoverage.TheCorpora- tion,actingatitsoptionandbyandthroughtheBoard,maypur- chasesuchotherinsuranceasitmaydeemnecessaryorappropriate, including,butnotlimitedto,officersanddirectorserrorsand omissionsinsurance,earthquakeinsurance,andfloodinsurance (e.g.,iffloodinsuranceisnotrequiredbecausetheProjectis notlocatedwithinaSpecialFloodHazardArea). Section3.NoticeofCancellationofInsurance.All policiesofinsurance(includingfidelitybonds)maintainedbythe Corporation,pursuanttothisArticle,shallcontainaprovision thatcoverageundersaidpoliciesmaynotbecanceled,terminated, allowedtoexpirebytheirowntermsorbesubstantiallymodified byanypartywithoutatleastthirty(30)dayspriorwrittennotice totheBoardandtoeachOwner,andsuchfirstMortgagees(or servicers)whoarenamedinthemortgageclauseand/orhavefiled awrittenrequestwiththeCorporationforsuchnotice.Alistof theOwnersandsuchfirstMortgageesshallbemadeavailablebythe Corporationtotheinsurancecarrieruponrequest. Section4.ReviewofCoverage.TheBoardshallannually determinewhethertheamountsandtypesofinsurancecoveragethat ithasobtainedpursuanttothisArticleshallprovideadequate coveragefortheProject,baseduponthethencurrentconstruction costs,insurancepracticesintheareainwhichtheProjectis located,andallotherfactorswhichmayindicatethateither additionalinsurancecoverageorincreasedcoverageunderexisting policiesisnecessaryordesirabletoprotecttheinterestsofthe Corporation,theOwnersandtheirrespectiveMortgagees.Ifthe Boarddeterminesthatincreasedcoverageoradditionalinsuranceis appropriate,itshallobtainsame. Section5.WaiverbyOwners.Astoallpoliciesofin- surancemaintainedbytheCorporationwhichwillnotbevoidedor -118-52027.048-22139.FCM110714 impairedthereby,eachOwnerherebywaivesandreleasesallclaims againsttheCorporation,theBoardandtheDeclarant,andthe agentsandemployeesofeachoftheforegoing,andallotherOwners withrespecttoanylosscoveredbysuchinsurance,whetherornot causedbythenegligenceof,orbreachof,anyagreementbysaid persons,butonlytotheextentoftheinsuranceproceedsreceived incompensationforsuchloss. Section6.Premiums,ProceedsandSettlement.Insurance premiumsforallblanketinsurancecoverageandanyotherinsurance coveragewhichtheBoardhasdeterminedisnecessarytoprotectthe interestsoftheCorporation,theOwnersandtheirrespective Mortgagees,shallbeaCommonExpensetobeincludedintheRegular AssessmentsleviedbytheCorporation.Allinsuranceproceedspaid totheCorporationshallbedisbursedasfollows:(a)intheevent ofanydamageordestructiontotheCorporationProperty,such proceedsshallbedisbursedinaccordancewiththeprovisionsof theArticlehereinentitled"DamageorDestructiontotheCorpora- tionProperty";and(b)intheeventofanyotherloss,the proceedsshallbedisbursedastheBoardshalldeemappropriate, subjecttothelimitationssetforthintheArticlehereinentitled "MortgageeProtection."TheCorporationisherebygrantedthe authoritytonegotiatelosssettlementswiththeappropriate insurancecarriers.AmajorityoftheBoardmustsignalossclaim formandreleaseforminconnectionwiththesettlementofaloss claim,andsuchsignaturesshallbebindingontheCorporationand itsMembers. Section7.RightsandDutiesofOwnerstoInsure.Each OwnershallobtainfireandcasualtyinsuranceonhisCondominium UnitandallImprovementsthereinandonhispersonalpropertyin amountshedeemsappropriate.ForthoseCondominiumswhicharenot partofabuildingwithmorethanoneCondominium,theentire structuralImprovementsmustbecoveredbyinsurance,sincethe Corporationisnotmaintaininginsuranceonthosedetached Condominiums.NothinghereinshallprecludeanyOwnerfromcarrying anypublicliabilityinsurance,businessinterruptionandanyother insurancecoverage,ashemaydeemdesirabletocoverhisindi- vidualliabilityfordamagetopersonorpropertyoccurringonor withinhisindividualCondominiumUnitorelsewhereupontheProj- ect.Ifobtainable,suchliabilityinsurancecoveragecarriedbyan Ownershallcontainawaiverofsubrogationofclaimsagainstthe Declarant,theCorporationandtheBoard,andtheiragentsand employees,andallotherOwners.Suchotherpoliciesshallnot adverselyaffectordiminishanyliabilityunderinsuranceobtained bytheCorporation.Ifanylossintendedtobecoveredbyinsurance carriedbytheCorporationshalloccurandtheproceedspayable thereundershallbereducedbyreasonofinsurancecarriedbyany Owner,suchOwnershallassigntheproceedsofsuchinsurance carriedbyhimtotheCorporationtotheextentofsuchreduction forapplicationbytheBoardtothesamepurposesasthereduced proceedsaretobeapplied. -119-52027.048-22139.FCM110714 Section8.TrusteeforPolicies.TheCorporationis herebyappointedandshallbedeemedtrusteefortheinterestsof allinsuredsunderthepoliciesofinsurancemaintainedbythe Corporation.Allinsuranceproceedsundersuchpoliciesshallbe paidtotheBoard,astrustees,andtheBoardshallhavefullpower toreceivesuchfundsonbehalfoftheCorporation,theOwnersand theirrespectiveMortgagees,andtodealtherewithasprovidedfor inthisDeclaration. Section9.MortgageClause.Allinsurancepolicies shouldhavethe"standardmortgageclause,"orequivalenten- dorsement,providingthatcoverageofaMortgageeunderthein- surancepolicywillnotbeadverselyaffectedordiminishedbyan actorneglectoftheMortgagor,whichiscommonlyacceptedby privateinstitutionalmortgageinvestorsintheareainwhichthe Projectislocated,unlesssuchcoverageisprohibitedbyap- plicablelaw.MortgagesownedbyFNMAmustnameasaMortgagee eitherFNMAortheservicersfortheMortgagesheldbyFNMAen- cumberingtheCondominiums.WhenaservicerisnamedastheMort- gagee,itsnameshouldbefollowedbythephrase"itssuccessors andassigns."IftheMortgageisownedinwholebyFHLMC,thename oftheserviceroftheMortgagefollowedbythephrase"its successorsandassigns,beneficiary"shouldbenamedasMortgagee insteadofFHLMC.Themortgageclauseshouldbeendorsedtofully protectFHLMC’sinterestsortheinterestofFHLMCandtheservicer whereapplicable.IfFHLMCmustbenamedasMortgagee,the endorsementshouldshowtheservicer’saddressinlieuofFHLMC’s address.AmortgageclauseinfavorofMortgageesholdingMort- gagesonCondominiumsisnotrequiredonapolicyinsuringthe CorporationProperty. Section10.ComplianceWithRequirementsofFHLMC,FNMA andVA/FHA.NotwithstandingtheprovisionsofthisArticle,the Corporationshallobtainandmaintainineffectsuchpoliciesof insurancemeetingallrequirementsofFHLMC,FNMA,and/orVA/FHA establishedbythoseentitiesforcondominiumprojectsforsolong asanyofsuchagenciescontinuetobeaMortgagee,Owner,insurer orguarantorofaMortgageintheProject,excepttotheextent suchcoverageisnotavailableatareasonablecostorhasbeen waived,inwriting,bysuchagencies,including,withoutlimita- tion,thefollowingrequirements: a.Eachinsurancecompanyprovidingthe insurancecoveragedescribedinthisArticleshall beagenerallyacceptable(i.e.,aninsurance carrierwhocansatisfythequalificationsfor insurancecarrierssetforthintheFNMAConven- tionalHomeMortgageSellingContractSupplement andtheFHLMCSellersGuide). b.Allinsurancepoliciescoveringthe CorporationProperty,oranyportionthereof,shall -120-52027.048-22139.FCM110714 beheldinthenameoftheCorporationforthe benefitoftheOwnersintheProject. c.Allinsurancepoliciesshallprovide thatacertificateofinsuranceshallbeissuedto eachOwnerandMortgageeuponrequest. d.Notwithstandinganyotherprovision ofthisDeclaration,theremaybenamedasan insured,onbehalfoftheCorporation,the Corporation’sauthorizedrepresentative,including anytrusteewithwhomsuchCorporationmayenter intoanyinsurancetrustagreementoranysuccessor tosuchtrustee,whoshallhaveexclusiveauthority tonegotiatelossesunderanypolicyprovidingsuch propertyorliabilityinsuranceandtoperformsuch otherfunctionsasarenecessarytoaccomplishthis purpose. e.Thecasualtyandfireinsurance policiesrequiredtobemaintainedbytheCorpora- tionshallalsocover,inadditiontoallother propertydescribedabove,allbuildingservices equipmentandsuppliesandotherpersonalproperty belongingtotheCorporation. f.Allfidelitybondsmaintainedbythe Corporationshallcontainwaiversbytheissuerof thebondsofalldefensesbasedupontheexclusion ofpersonsservingwithoutcompensationfromthe definitionof"employees"orsimilartermsor expressions.Notwithstandinganyotherprovision oftheDeclaration,innoeventmaytheaggregate amountofthefidelitybondsbelessthanasum equaltothree(3)monthsaggregatemonthlyin- stallmentsoftheRegularAssessmentsleviedonall Condominiumsplusreservefunds. g.IftheProjectislocatedinanarea whichhasbeenofficiallyidentifiedbytheSecre- taryoftheUnitedStatesDepartmentofHousingand UrbanDevelopmentashavingspecialfloodhazards andforwhichfloodinsurancehasbeenmadeavail- ableundertheNationalFloodInsuranceProgram ("NFIP"),theCorporationshallobtainandpaythe premiumsupon,asaCommonExpense,a"master"or "blanket"policyoffloodinsuranceonthebuild- ingsandanyotherpropertycoveredbytherequired formofpolicy,inanamountdeemedappropriateby theCorporation,butnotlessthanthefollowing: Thelesserof:(a)themaximumcoverageavailable undertheNFIPforallbuildingsandotherinsur- ablepropertywithintheProjecttotheextentthat -121-52027.048-22139.FCM110714 suchbuildingsandotherinsurablepropertyare withinanareahavingspecialfloodhazardsandare maintainedbytheCorporation;or(b)100%ofthe currentreplacementcostofallsuchbuildingsand insurableproperty.Suchpolicyshallbeinaform whichmeetsthecriteriasetforthintheguide- linesonthesubjectissuedbytheFederalInsur- anceAdministrator. h.IntheeventtheProjectcontainsa steamboiler,thecasualtyandfireinsurance policy(ies)tobemaintainedbytheCorporation shallprovidecoverageforlossordamagesresult- ingfromsteamboilerequipmentaccidentsinan amountnotlessthan$50,000peraccidentper location(orsuchgreateramountasdeemedprudent basedonthenatureoftheProject). Section11.RequiredWaiver.Allpoliciesofhazardand physicaldamageinsurancemayprovide,onlyifavailableata reasonablecosttotheCorporationasdeterminedbytheBoard,in itssolediscretion,forwaiverofthefollowingrights,tothe extentthattherespectiveinsurerswouldhavetherightswithout suchwaivers: (a)Anydefensebasedonco-insurance; (b)Anyrightofset-off,counterclaim,apportionment, prorationorcontributionbyreasonofotherinsurancenot carriedbytheCorporation; (c)Anyinvalidity,otheradverseeffectordefenseon accountofanybreachofwarrantyorconditioncausedbythe Corporation,anyOwneroranytenantofanyOwner,orarising fromanyact,neglectoromissionofanynamedinsured,orthe respectiveagents,contractorsandemployeesofanyinsured; (d)Anyrightoftheinsurertorepair,rebuildor replace,and,intheeventtheCondominiumisnotrepaired, rebuiltorreplacedfollowingloss,anyrighttopayunderthe insuranceanamountlessthanthereplacementvalueofthe improvementsinsuredorthefairmarketvaluethereof; (e)NoticeoftheassignmentofanyOwnerofitsinterest intheinsurancebyvirtueofaconveyanceofanyCondominium; and (f)AnyrighttorequireanyassignmentofanyMortgage totheinsurer. Section12.AnnualNotificationofInsurance.The Corporationshall,uponissuanceorrenewalofinsurance,butno lessthanannually,notifyitsMembersastotheamountandtypeof -122-52027.048-22139.FCM110714 insurancecarriedbytheCorporation,anditshallaccompanythis notificationwithstatementstotheeffectthattheCorporationis orisnotinsuredtothelevelsspecifiedbythisArticle,andthat ifnotsoinsured,Ownersmaybeindividuallyliablefortheentire amountofajudgment,andiftheCorporationisinsuredtothe levelsspecifiedinSection1above,thenOwnersmaybeindividual- lyliableonlyfortheirproportionalshareofAssessmentslevied topaytheamountofanyjudgmentwhichexceedsthelimitsofthe Corporation’sinsurance.TheCorporationshallfurtherprepareand distributetoallitsMembersasummaryoftheCorporation’s insurancecoveragepursuanttoSection5300oftheCaliforniaCivil Code. ARTICLEXVII MORTGAGEEPROTECTION Section1.MortgageeProtectionProvisions.Notwith- standinganyotherprovisionsinthisDeclarationtothecontrary, inordertoinduceFHLMC,FNMA,andVA/FHAandotherlendersand investors,toparticipateinthefinancingofthesaleofCondo- miniumsintheProject,thefollowingprovisionscontainedwithin thisArticleareaddedhereto,andtotheextenttheseadded provisionsconflictwithanyotherprovisionsinthisDeclaration, theseaddedprovisionsshallcontrol.TheDeclaration,theArticles andtheBy-LawsfortheCorporationarehereinaftercollectively referredtointhisArticleasthe"constituentdocuments."As usedherein,an"EligibleMortgageHolder"shallmeanandreferto theholder,insurerorguarantorofafirstMortgageonaCondomin- iumwhohasfiledwiththeCorporationawrittenrequestfornotice ofcertaininformationasprovidedherein.AnEligibleMortgage Holdermustsendawrittenrequestforsuchinformationtothe Corporation,statingitsnameandaddressandthenumberoraddress oftheCondominiumUnitonwhichithas(orinsuresorguarantees) theMortgage. (a)TherightofanOwnertosell,transferor otherwiseconveyhisCondominiumshallnotbesubjecttoany rightoffirstrefusaloranysimilarrestrictioninfavorof theCorporation; (b)ThelienoftheAssessmentsprovidedforherein shallbesubordinatetothelienofanyfirstMortgagenowor hereafterrecordeduponanyCondominiumsubjecttotheprovi- sionsherein.ThesaleortransferofanyCondominiumshall notaffecttheAssessmentlien;however,exceptasprovidedin theArticleentitled"VeteransAffairsProvisions,"thesale ortransferofanyCondominiumpursuanttojudicialor nonjudicialforeclosureofafirstMortgageorpursuanttoany remediesprovidedforintheMortgageshallextinguishthe lienofsuchAssessmentsastounpaidpaymentsforregularly budgetedduesorchargeswhichbecameduemorethansix(6) -123-52027.048-22139.FCM110714 monthspriorthereto.Nosaleortransfershallrelievesuch CondominiumfromliabilityforAssessmentsduewithinsix(6) monthsofsuchjudicialornonjudicialforeclosuresaleor transfer.AnyfirstMortgageewhoobtainstitletoaCondomin- iumpursuanttotheremediesprovidedintheMortgage,or foreclosureoftheMortgage,oranypurchaserataforeclosure saleofafirstMortgagewillnotbeliableformorethansix (6)monthsofunpaidAssessmentsorchargeswhichbecamedue priortotheacquisitionoftitletosuchCondominiumbythe Mortgagee(exceptforclaimsforashareofsuchAssessments orchargesresultingfromareallocationofsuchAssessments orchargestoallCondominiums,includingthemortgagedCondo- minium); (c)Exceptasmayotherwisebeprovidedhereinor bystatuteincaseofcondemnationorsubstantiallosstothe CorporationProperty,unlesssixty-sevenpercent(67%)ofthe OwnersotherthanDeclarant,orsixty-sevenpercent(67%)of thefirstMortgagees(baseduponone[1]voteforeachUnit encumberedbysaidMortgagee’sfirstMortgage)havegiven theirpriorwrittenapproval,neithertheCorporationnorthe Ownersshallbeentitledto: (1)Byactoromission,seektoabandonor terminatetheCondominiumProject; (2)Recordorfileanyamendmentwhichwould changetheproratainterestorobligationsofanyCon- dominiumforpurposesof:(i)levyingAssessmentsor charges,orallocatingdistributionsofhazardinsurance proceedsorcondemnationawards,or(ii)determiningthe proratashareofownershipofeachCondominiumUnitin theCommonArea; (3)PartitionorsubdivideanyCondominium, exceptasprovidedintheArticlehereinentitled"Cove- nantAgainstPartition";provided,however,thatno Condominiummaybepartitionedorsubdividedwithoutthe priorwrittenapprovalofthefirstMortgageeforsuch Condominium; (4)Byactoromissionseektoabandon,parti- tion,subdivide,encumber,sellortransferanyorallof theCorporationProperty.Thegrantingofeasementsfor publicutilitiesorforotherpublicpurposesconsistent withtheintendedusesoftheCorporationPropertyunder thisDeclarationandthegrantingofexclusiveeasements toOwnersoverportionsoftheCorporationPropertyto conformtheboundariesoftheCorporationPropertytothe asbuiltlocationofauthorizedImprovements,shallnot bedeemedatransferwithinthemeaningofthisclause; -124-52027.048-22139.FCM110714 (5)Usehazardinsuranceproceedsforlosses totheCorporationPropertyforotherthanrepair, replacementorreconstruction,subjecttotheprovisions ofthisDeclaration; (6)EffectanydecisionoftheCorporationto terminateprofessionalmanagementandassumeself- managementoftheProject,ifprofessionalmanagementwas previouslyrequiredbyaholder,insurerorguarantorof anyfirstMortgage; (7)Byactoromission,change,waiveor abandonanyprovisionsofthisDeclaration,orenforce- mentthereof,pertainingtoarchitecturaldesignofthe Condominiumsorthemaintenanceandoperationofthe CorporationPropertywithintheProject,including, withoutlimitation,sidewalks,fences,andlandscaping withintheProject;and (8)Failtomaintainfireinsuranceand extendedcoverageontheinsurableCorporationProperty onacurrentreplacementcostbasisinanamountnotless thanonehundredpercent(100%)oftheinsurablevalue thereof. (d)Alltaxes,Assessmentsandchargeswhichmay becomelienspriortothefirstMortgageunderlocallawshall relateonlytoindividualCondominiums,andnottotheProject asawhole; (e)Noprovisionoftheconstituentdocumentsshall beinterpretedtogivetheOwnerofaCondominium,orany otherparty,priorityoveranyrightsofthefirstMortgagee oftheCondominiumpursuanttoitsMortgageinthecaseofa distributiontosuchOwnerofinsuranceproceedsorcondemna- tionawardsforlossestooratakingoftheCondominiumUnits and/ortheCorporationProperty; (f)TheAssessmentsprovidedforintheconstituent documentsshallincludeanadequatereservefundformain- tenance,repairsandreplacementofthoseelementsofthe CorporationPropertythatmustbereplacedonaperiodic basis,andshallbepayableinregularinstallments,rather thanbySpecialAssessments; (g)EachEligibleMortgageHoldershallbeentitled totimelywrittennoticeofany: (1)Condemnation,eminentdomainproceeding, orcasualtylossthataffectseitheramaterialportion oftheProjectortheCondominiumUnitsecuringits Mortgage; -125-52027.048-22139.FCM110714 (2)Substantialdamageordestructiontothe Project,oranyportionthereof,whensuchlossexceeds TenThousandDollars($10,000.00); (3)Defaultintheperformancebyanindi- vidualOwnerofanyobligationundertheconstituent documents(including,butnotlimitedtothenonpayment ofAssessments)whichisnotcuredwithinsixty(60)days aftertheCorporationlearnsofsuchdefaultbytheOwner oftheCondominiumonwhichitholdstheMortgage; (4)Lapse,cancellationormaterialmodifica- tionofanyinsurancepolicyorfidelitybondmaintained bytheCorporation; (5)AbandonmentorterminationoftheProject; and (6)Proposedactionthatrequirestheconsent ofaspecifiedpercentageofEligibleMortgageHolders. (h)Anyagreementforprofessionalmanagementof theProjectoranyagreementwherebytheDeclarantwill provideservicestotheCorporationmaynotexceedone(1) year,renewablebyagreementofthepartiesforsuccessiveone (1)yearperiods,unlessapprovedbyeitheravoteorwritten assentofamajorityoftheCorporation’svotingpower,in whichcasethemaximumtermofthemanagementcontractis three(3)years.Anysuchagreementmustprovidefortermina- tionbyeitherpartywithorwithoutcauseandwithoutpayment ofaterminationfeeonatleastthirty(30)days’written notice,butnotmorethanninety(90)days’writtennotice.In theeventDeclarantexecutesacontractwithaprofessional managementcompanypriortotheOwners’electionofatleast amajorityoftheBoard,thecontractmustallowtermination bytheBoard,withoutpaymentofaterminationfee,atany timesubsequenttotheOwnersbeingelectedtoamajorityof positionsontheBoard; (i)Intheeventofsubstantialdamagetoordes- tructionofanyCondominiumUnitoranypartoftheCorpora- tionProperty,eachEligibleMortgageHolderforsuchCondo- miniumwillbeentitledtotimelywrittennoticeofanysuch damageordestruction; (j)EachEligibleMortgageHolderwill,upon request,beentitledto: (1)Examinecurrentcopiesofthebooks, recordsandfinancialstatementsoftheCorporation duringnormalbusinesshours; -126-52027.048-22139.FCM110714 (2)ObtainfromtheCorporationanannual auditedfinancialstatementoftheProjectforthe previousfiscalyear(withoutexpensetotheholder, insurer,orguarantorrequestingsaidstatement).Asset forthintheArticlehereinentitled"PowersandDuties oftheCorporation,"anannualreportshallbeavailable withinonehundredtwenty(120)daysafterthecloseof thefiscalyear.Ifforanyreason,thereportisnot audited,itshallbeaccompaniedbyacertificatefroman authorizedofficeroftheCorporationthatthereportwas preparedwithoutauditfromthebooksandrecordsofthe Corporation,andtheEligibleMortgageHoldermayhavean auditedfinancialstatementpreparedatitsownexpense; and (3)Receivewrittennoticeofallmeetingsof theCorporationandbepermittedtodesignatearep- resentativetoattendallsuchmeetings. (k)EachOwnershallnotifytheCorporation,in writing,withinten(10)daysafterthecloseofescrowfor thepurchaseofhisCondominiumofthenameandaddressofhis firstMortgagee,andthereafter,eachOwnershallpromptly notifytheCorporationofanychangesofnameoraddressfor hisfirstMortgagee; (l)EachOwnerherebyauthorizesafirstMortgagee onaCondominiumtofurnishinformationtotheBoardconcern- ingthestatusofanysuchfirstMortgage; (m)IntheeventanyportionoftheCommonProperty encroachesuponanyCondominiumUnitoranyCondominiumUnit encroachesupontheCommonPropertyasaresultofthe constructioninitiallyperformedbyDeclarant,reconstruction, repair,shifting,settlementormovementofanyportionofthe Project,avalideasementfortheencroachmentandforthe maintenanceofthesameshallexistsolongastheencroach- mentexists;and (n)FirstMortgageesofCondominiumUnitsmay, jointlyorsingularly,paytaxesorotherchargeswhicharein defaultandwhichmayhavebecomealienontheCommon Property,andmaypayoverduepremiumsonhazardinsurance policiesorsecurednewhazardinsurancecoverageonthelapse ofapolicyfortheCommonProperty,andfirstMortgagees payingsuchpaymentsshallbeowedimmediatereimbursement thereforfromtheCorporation.Upondemandbyanyfirst Mortgagee,theBoardshallexecute,onbehalfoftheCorpora- tion,anagreementestablishingtherightofallfirst Mortgageestosuchreimbursement. Section2.ViolationofMortgageeProtectionProvi- sions.NobreachofanyoftheforegoingProtectiveCovenantsshall -127-52027.048-22139.FCM110714 causeanyforfeitureoftitleorreversion,orbestowanyrightof re-entrywhatsoever,butintheeventthatanyone(1)ormoreof theseProtectiveCovenantsshallbeviolated,theDeclarant,its successorsandassigns,ortheCorporation,oranyOwnerofa CondominiumintheProject,maycommencealegalactioninany courtofcompetentjurisdictiontoenjoinorabatesaidviolation and/ortorecoverdamages;provided,however,thatanysuch violationshallnotdefeatorrenderinvalidthelienofany MortgagemadeingoodfaithandforvalueastosaidCondominium. SaidProtectiveCovenantsshallbebindinguponandeffective againstanyOwnerofsaidCondominium,oraportionthereof,whose titletheretoisacquiredbyforeclosure,atrusteesaleor otherwise. Section3.EffectofAmendments.Exceptasotherwise providedherein,noamendmentofthisDeclarationortheArticles ortheBy-LawsoftheCorporationshallaffecttherightsofany Mortgageewhoselienwascreatedpriortorecordationofsuch amendment. Section4.AmendmentstoConformWithMortgageeRe- quirements.ItistheintentofDeclarantthatthisDeclarationand theArticlesandBy-LawsoftheCorporation,andtheProjectin general,meetallrequirementsnecessarytopurchase,guarantee, insureandsubsidizeanyMortgageofaCondominiumintheProject bytheFHLMC,FNMA,andtheVA/FHA.Infurtheranceofsaidintent, DeclarantmayamendthisDeclarationwithouttheconsentofthe Membersatanytimeafterthecloseofescrowforthefirstsaleof aCondominiumintheProjectbyrecordingawritteninstrument settingforththeamendment,providedthattheamendmentis necessarytocausethisDeclarationtocomplywiththerequirements oftheCalBRE,FHLMC,FNMA,GNMA,and/orVA/FHA;provided,however, thatanysuchamendmentshallbeeffectiveonlyifDeclarantmails (bycertifiedorregisteredmailwitha"returnreceipt"requested) acopyoftheamendmenttoalloftheforegoingentitieswhichare, orhaveagreedtobe,aholder,insurerorguarantorofafirst Mortgage,anddoesnot,withinsixty(60)daysthereafter,receive anoticeofdisapprovalfromanysuchentity.Saidamendmentsshall notberecordedbyDeclarantuntilaftertheexpirationofsuch sixty(60)dayperiod. ARTICLEXVIII ENFORCEMENTOFBONDEDOBLIGATIONS Section1.EnforcementofBondedObligations.Inthe eventthatanyImprovementstotheCorporationPropertyinaPhase havenotbeencompletedpriortothefirstcloseofescrowfora CondominiuminthePhasefollowingtheissuanceofaFinal SubdivisionPublicReportbytheCalBRE,andtheCorporationisthe obligeeunderabondorotherarrangement(hereinafterreferredto asthe"Bond")tosecureaperformanceofthecommitmentof -128-52027.048-22139.FCM110714 DeclaranttocompletesuchImprovements,thefollowingprovisions shallapply: (a)TheBoardshallconsiderandvoteonthe questionofactionbytheCorporationtoenforcetheobliga- tionsundertheBondwithrespecttoanyImprovementsfor whichaNoticeofCompletionhasnotbeenfiledwithinsixty (60)daysafterthecompletiondatespecifiedforsuchIm- provementsinthePlannedConstructionStatementappendedto theBond.IftheCorporationhasgivenanextensioninwriting forthecompletionofanyCorporationPropertyImprovement, theBoardshallconsiderandvoteontheaforesaidquestionif aNoticeofCompletionhasnotbeenfiledwithinthirty(30) daysaftertheexpirationofsuchextension. (b)IntheeventthattheBoarddeterminesnotto initiateactiontoenforcetheobligationsundertheBond,or intheeventtheBoardfailstoconsiderandvoteonsuch questionasprovidedabove,theBoardshallcallaspecial meetingoftheMembersforthepurposeofvotingtooverride suchdecisionorsuchfailuretoactbytheBoard.Such meetingshallbecalledaccordingtotheprovisionsoftheBy- LawsdealingwithmeetingsoftheMembers,butinanyevent, suchmeetingshallbeheldnotlessthanthirty-five(35)days normorethanforty-five(45)daysafterreceiptbytheBoard ofapetitionforsuchmeetingsignedbyMembersrepresenting fivepercent(5%)ofthetotalvotingpoweroftheCorpora- tion. (c)TheonlyMembersentitledtovoteatsuch meetingofMembersshallbetheOwners,otherthanDeclarant. Avoteatsuchmeetingofamajorityofthevotingpowerof suchMembers,otherthantheDeclarant,totakeactionto enforcetheobligationsundertheBondshallbedeemedtobe thedecisionoftheCorporation,andtheBoardshallthereaf- terimplementsuchdecisionbyinitiatingandpursuing appropriateactioninthenameoftheCorporation. ARTICLEXIX ANNEXATIONOFADDITIONALPROPERTY Additionalpropertymaybeannexedtoandbecomesubject tothisDeclarationassetforthinthisArticle. Section1.PhasedDevelopmentoftheProject.Asset forthinArticleIIhereinentitled"IntroductiontoTheSouthCity Station,"DeclarantintendstodeveloptheProjectinaseriesof PhaseswhichmaybeannexedtotheProject.However,Declarantis undernoobligationtocontinuedevelopmentoftheProjector completeallPhasesoftheProject. -129-52027.048-22139.FCM110714 Section2.AnnexationPursuanttoGeneralPlan.Allor anypartoftherealpropertydescribedasAnnexationProperty herein,maybeannexedtotheProject,andaddedtotheschemeof thisDeclaration,andsubjectedtothejurisdictionoftheCorpor- ationwithouttheassentoftheCorporationoritsMembers,pro- videdandonconditionthat: (a)AnyannexationpursuanttothisSectionshall beallowedwhentheproposedannexationisinsubstantial conformancewiththeoverallgeneralplanofdevelopmentfor theProjectoriginallysubmittedtoandreviewedbytheCalBRE withthePhase1FinalSubdivisionPublicReportapplication, orassubsequentlyreviewedbytheCalBRE;and (b)ANoticeofAnnexation,asdescribedinSection 4ofthisArticle,shallberecordedcoveringtheAnnexation Property. Section3.AnnexationPursuanttoApproval.Exceptas otherwiseallowedpursuanttoSection2above,uponobtainingthe approvalinwritingof:(a)theDeclarantsolongasDeclarantowns anyportionofthePropertyand/orAnnexationProperty;and(b)the Corporationpursuanttothevoteorwrittenassentoftwo-thirds (2/3)ofthetotalvotesresidingintheCorporationMembers,other thantheDeclarant,theownerofanypropertywhodesirestoannex saidpropertytotheschemeofthisDeclarationandtosubjectit tothejurisdictionoftheCorporationmayfileofrecordaNotice ofAnnexation,asdescribedinSection4ofthisArticle. Section4.NoticeofAnnexation.Theannexationof additionalpropertyauthorizedunderthisArticleshallbemadeby recordingaNoticeofAnnexation,orsimilarinstrument,covering saidadditionalproperty,andtheNoticeofAnnexationshall expresslyprovidethattheschemeofthisDeclarationshallextend tosuchadditionalproperty.TheNoticeofAnnexationmaycontain suchcomplementaryadditionstoandmodificationsoftheProtective CovenantssetforthinthisDeclarationwhicharenecessaryto reflectthedifferentcharacter,ifany,oftheannexedproperty andwhicharenotinconsistentwiththegeneralschemeofthis Declaration.ExceptassetforthinthisSection,noNoticeof Annexationshalladd,delete,revoke,modifyorotherwisealterthe ProtectiveCovenantssetforthinthisDeclaration. Section5.EffectiveDateofAnnexation.AnyNoticeof AnnexationrecordedonaPhaseoftheProjectshallbecome effectivewithrespecttotheobligationsforpaymentofAssess- mentsimmediatelyupon: (a)Thefirstcloseofanescrowforthesaleofa CondominiuminaPhase,asevidencedbytherecordationofthe firstinstrumentofconveyanceforsaidCondominium;or -130-52027.048-22139.FCM110714 (b)TheconveyanceofanyCorporationPropertyin saidPhasetotheCorporation,whicheverfirstoccurs. Section6.RightofDe-Annexation.Declaranthereby reservestherighttode-annexanypropertywhichmaybeannexedto theProjectpursuanttothisDeclaration,andtodeletesaid propertyfromtheschemeofthisDeclarationandfromthejuris- dictionoftheCorporation,providedandonconditionthat(i)the de-annexationshallbemadepriortothefirstcloseofanescrow forthesaleofaCondominiuminthepropertytobede-annexed,(2) thede-annexationisrecordedinthesamemannerastheapplicable NoticeofAnnexation,(3)theDeclaranthasnotexercisedanyvote withrespecttoanyCondominiuminsuchproperty,(4)noassess- mentshavecommencedonanyportionofthepropertysubjecttothe de-annexation,and(5)adraftoftherevocationofNoticeof AnnexationhasbeensubmittedtoandapprovedbytheVA/FHA,if applicable,andVA/FHAisaguarantorofatleastoneloaninthe Project. Section7.AmendmentstoNoticesofAnnexation.Not- withstandinganyotherprovisionsinthisDeclarationtothecon- trary,aNoticeofAnnexationmaybeamendedbytherequisite affirmativevoteofMembers(andfirstMortgagees,ifapplicable), assetforthintheArticlehereinentitled"GeneralProvisions," inonlytheannexedpropertydescribedinsaidNoticeofAnnex- ation,ratherthanallMembers(andfirstMortgagees,ifapplica- ble)intheProject,onthefollowingconditions: (a)Suchamendmentappliesonlytotheannexed propertydescribedinsaidNoticeofAnnexation;and (b)Suchamendmentshallinnowaycontradict, revokeorotherwisealteranyoftheProtectiveCovenantsset forthinthisDeclaration. ARTICLEXX VETERANSAFFAIRSPROVISIONS Section1.CondominiumOwnership.Asnotedabove,each OwnerinPhase1shallreceivetitletohisorherrespectiveCon- dominiumUnit,variouseasements(exclusiveandnonexclusive,as setforthinthisDeclaration),anundividedone/twenty-first (1/21st)interestintheCommonAreaandamembershipintheCorp- oration. Section2.CondominiumDocumentation.ThisDeclaration andanyamendmentorrestatementheretoshallberecordedinthe County.TheBy-Lawsneednotberecorded.TheCorporationshall makeavailabletoallCondominiumOwners,lenders,andtheholders, insurersandguarantorsofthefirstMortgageonanyCondominium, -131-52027.048-22139.FCM110714 currentcopiesoftheDeclaration,By-Laws,Articles,Rulesand Regulations,andotherbooksandrecordsandfinancialstatements oftheCorporation.TheCorporationshallalsomakeavailableto prospectivepurchasersoftheCondominiumscurrentcopiesofthe Declaration,By-Laws,Articles,RulesandRegulations,andthemost recentannualauditedfinancialstatementoftheCorporation,if suchhasbeenprepared.ForpurposesofthisSection,theterm "available"shallmeanavailableforinspection,uponrequest, duringnormalbusinesshoursorunderotherreasonablecircumstanc- es. Section3.Amendments.WhiletheDeclarantisentitled toappointamajorityofthemembersoftheBoard(asprovidedin theArticleofthisDeclarationentitled"TheCorporation"),any amendmentstothisDeclaration(excludingamendmentswhichannex AnnexationPropertytotheProjectinaccordancewiththegeneral planofdevelopmentreviewedbytheCalBRE),theBy-Laws,orother enablingdocumentationmustbeapprovedbytheSecretaryof VeteransAffairsoranyemployeeoftheDepartmentofVeterans AffairsauthorizedtoactintheSecretary’sstead("Secretary") ifrequiredinconnectionwithaloanmadebytheDepartmentof VeteransAffairsforaCondominiumintheProject.Material amendmentsandextraordinaryactions(asdefinedinVA’sregula- tions)mustbeapprovedinthemannerspecifiedinSection1ofthe ArticleofthisDeclarationentitledMortgageeProtection(e.g.,by 67%oftheMembersotherthanDeclarant). Section4.DescriptionoftheCondominiumUnits,Common Area,andCorporationProperty.TheCondominiumUnits,Common Area,andCorporationProperty(includingtheoverallplanof development)aredescribedthroughoutthisDeclaration,including, withoutlimitation,intheArticlesofthisDeclarationentitled "IntroductiontoTheSouthCityStation,""Descriptionofthe Condominiums,"etc.MaintenancerequirementsfortheCondominium UnitsandCommonPropertyaresetforthintheArticleofthis Declarationentitled"RepairandMaintenance."Anyproposed annexationofAnnexationPropertyshallbeinsubstantialconfor- mancewiththeoverallgeneralplanofdevelopmentfortheProject originallysubmittedtoandreviewedbytheCalBREwiththe PropertyFinalSubdivisionPublicReportapplication,oras subsequentlyacceptedbytheCalBRE. Section5.Corporation’sRightofTerminationof CertainContracts.IntheeventtheCorporationexecutesanyof thefollowingcontractspriortotheOwners’electionofatleast amajorityoftheBoard,thecontractmustallowterminationbythe Board,withoutpaymentofaterminationfeeoranyotherpenalty, uponnotmorethanninety(90)days’noticetotheotherpartyto thecontract: (a)Anymanagementcontract,employmentcontractor leaseofrecreationalorparkingareasorfacilities;or -132-52027.048-22139.FCM110714 (b)Anycontractorleaseofrecreationalor parkingareasorfacilities. Section6.Corporation’sRightofEntryandOther Rights.IfapplicableandconsistentwiththeCorporation’s maintenanceobligationsoftheCondominiumsassetforthherein, theCorporationshallhavetheimmediateright(withoutnoticeto theOwner)toenteruponorwithinanyOwner’sCondominiumUnit and/ortheCorporationPropertytoeffectemergencyrepairs,and shallhavetheright,afterreasonablenoticetotheOwnerandat areasonablehouroftheday,toenteruponorwithinanyOwner’s CondominiumUnitand/ortheCorporationPropertytoeffectother repairs,improvements,replacementormaintenance(asnecessary) forwhichtheCorporationhasresponsibilityunderthisDeclaration orthelaw.Assetforthherein,includingintheArticleofthis Declarationentitled"PowersandDutiesoftheCorporation,"the Corporationshallhavesuchotherrightsandpowersasare reasonablynecessarytotheongoingdevelopmentandoperationof theProject,includingwithoutlimitation,therighttogrant utilityeasementsunder,throughorovertheCorporationProperty. Section7.Assessments.Provisionsaddressingeach Owner’sresponsibilityfor,andtheCorporation’sauthoritytolevy andenforcethecollectionof,Assessmentsaresetforthinthe ArticleofthisDeclarationentitled"Assessments."Notwithstand- inganyotherprovisionsinthisDeclaration,alienforAssess- mentsshallnotbeaffectedbyanysaleortransferofaCondomini- umUnit,exceptthatasaleortransferofanyCondominiumpursuant tojudicialornonjudicialforeclosureofafirstMortgage guaranteedbyVAshallextinguishasubordinatelienforAssess- mentswhichbecamepayablepriortosuchsaleortransfer.Any suchsaleortransferpursuanttoajudicialornonjudicial foreclosureshallnotrelievethepurchaserortransfereeofthe Condominiumfromliabilityfor,nottheCondominiumsosoldor transferredfromthelienof,anyAssessmentsthereafterbecoming due. Section8.ReservesandWorkingCapital.Assetforth above,eachinitialpurchaserofaCondominiumfromtheDeclarant intheProjectshallcontributetotheworkingcapitalofthe Corporationanamountequalto^.Saidamountshallbedeposited byeachinitialpurchaserintohisrespectiveescrowforthe purchaseofhisCondominiumfromDeclarantandshallbedisbursed bytheescrowholdertotheCorporationatthecloseofescrowfor thesaleoftheCondominium.Thiscapitalcontributionshallinno waybedeemedtobeaprepaymentofanyportionoftheRegular AssessmentobligationoftheOwners. Section9.VotingRights.Provisionsaddressingeach Owner’svotingrights,includingtheallocationofaportionofthe votesintheCorporationtoeachOwner,aresetforthinthe ArticleofthisDeclarationentitled"TheCorporation." -133-52027.048-22139.FCM110714 Section10.Easements.NothinginthisDeclaration restrictsanOwner’srightofingressoregresstohisorher CondominiumUnit.AsprovidedintheArticleofthisDeclaration entitled"ReservationofEasementsandOtherPropertyRightsinthe CorporationProperty,"easementsforencroachmenthavebeen reservedinfavorofeachOwner.AsprovidedintheArticleof thisDeclarationentitledMortgageeProtection,intheeventany portionoftheCommonPropertyencroachesuponanyCondominiumUnit oranyCondominiumUnitencroachesupontheCommonPropertyasa resultoftheconstructioninitiallyperformedbyDeclarant, reconstruction,repair,shifting,settlementormovementofany portionoftheProject,avalideasementfortheencroachmentand forthemaintenanceofthesameshallexistsolongasthe encroachmentexists. Section11.RestrictionsonAlienation.Assetforthin theArticleofthisDeclarationentitled"MortgageeProtection," therightofanOwnertosell,transferorotherwiseconveyhis Condominiumshallnotbesubjecttoanyrightoffirstrefusalor anysimilarrestrictioninfavoroftheCorporation. Section12.RightsofAction.Asnotedbelow,the CorporationandeachOwnershallhavetherighttoenforce,by proceedingsatlaworinequity,alloftheProtectiveCovenants noworhereafterimposedbythisDeclarationandtheBy-Laws, respectively(andtheRulesandRegulationsdulyadoptedbythe Corporation),including,withoutlimitation,therighttoprosecute aproceedingatlaworinequityagainstthepersonorpersonswho haveviolated,orareattemptingtoviolate,anyofsaidProtective Covenants,toenjoinorpreventthemfromdoingso,torecorda noticeofnon-compliance,tocausesaidviolationtoberemedied and/ortorecoverdamagesforsaidviolation;provided,however, thatwithrespecttoAssessmentliens,theCorporationshallhave theexclusiverighttotheenforcementthereof. Section13.MiscellaneousRequirements. (a)DeclarantTransferofControlofCorporation.The Declarant’sClassBmembershipshallceaseandbeconvertedto ClassAmembership,andtheDeclarant’srighttosolely appointamajorityofthemembersoftheBoardshalltermi- nate,withinthetimeperiodsspecifiedinSections2and3of theArticleofthisDeclarationentitled"TheCorporation." (b)Taxes.AssetforthintheArticleofthisDeclara- tionentitled"MortgageeProtection,"alltaxes,Assessments andchargeswhichmaybecomelienspriortothefirstMortgage underlocallawshallrelateonlytoindividualCondominiums, andnottotheProjectasawhole. (c)CorporationBy-Laws.TheCorporation’sBy-Laws shallcontainsufficientprovisionsforthesuccessful governanceoftheCorporation,including,amongthings, -134-52027.048-22139.FCM110714 adequateprovisionsfortheelectionandremovalofdirectors andofficersoftheCorporation. (d)Insurance.TheCorporationandeachOwnershallbe requiredtomaintaininsuranceassetforthherein,including theArticleofthisDeclarationentitled"Insurance." (e)AnnexationofAdditionalProperty.Additional propertymaybeannexedintotheProjectassetforthinthe ArticleofthisDeclarationentitled"AnnexationofAdditional Property."Thequalityofconstructionofallimprovementsin anypropertyannexedtotheProjectmustbesubstantially consistentwiththequalityofconstructionofthe improvementsinPhase1.Theannexationofadditional propertytotheProjectmustnotaffectthestatutoryvalidity oftheProjectasacondominiumprojectorthevalidityof titletotheCondominiums.Anyproposedannexationof AnnexationPropertyshallbeinsubstantialconformancewith theoverallgeneralplanofdevelopmentfortheProject originallysubmittedtoandreviewedbytheCalBREwiththe PropertyFinalSubdivisionPublicReportapplication,oras subsequentlyacceptedbytheCalBRE.Assetforthbelow,the Declarant’srighttoannextheAnnexationPropertytothe Projectpursuanttotheoverallgeneralplanofdevelopment fortheProjectoriginallysubmittedtoandacceptedbythe CalBREshallterminateonthelatterof:(i)thedatewhichis seven(7)yearsafterthedateoftherecordationofthis Declaration;or(ii)asubsequentdateaftersuchseven(7) yearperiodasmaybeapprovedorallowedbytheCalBRE(e.g., issuanceofaFinalSubdivisionPublicReport).Exceptas otherwisestatedherein,theProjectmaynotbemergedwitha successorcondominiumregimewithoutpriorwrittenapprovalof theSecretary. (f)MinimumandMaximumPercentagesofUndivided InterestsintheCommonArea.Asnotedabove,eachOwnerin Phase1willreceiveanundividedone/twenty-first(1/21st) fractionalfeeinterestintheCommonAreaofPhase1,and eachOwnerofaCondominiuminasubsequentPhaseannexedto theProjectwillreceiveanundividedfractionalfeeinterest intheCommonAreaofsuchPhaseequaltotheratioofhis CondominiumtothetotalnumberofCondominiumsinsuchPhase. IfalloftheAnnexationPropertyisannexedintotheProject assetforthinthegeneralplanofdevelopmentcurrently acceptedbytheCalBRE,theProjectwillcontainatotalof thirty-five(35)Condominiums.Thebasisforreallocationof eachOwner’scommonexpenseliabilitiesandvotingrightsin theeventofannexationoftheAnnexationPropertyisset forthintheArticleentitled"TheCorporation"andthe Articleentitled"Assessments"ofthisDeclaration. (g)ProfessionalManagement.Asnotedabove,any agreementforprofessionalmanagementoftheProjectorany -135-52027.048-22139.FCM110714 agreementwherebytheDeclarantwillprovideservicestothe Corporationmaynotexceedone(1)year,renewablebyagree- mentofthepartiesforsuccessiveone(1)yearperiods, unlessapprovedbyeitheravoteorwrittenassentofa majorityoftheCorporation’svotingpowerorbyVAorFHA,in whichcasethemaximumtermofthemanagementcontractis three(3)years.Anysuchagreementmustprovidefortermina- tionbyeitherpartywithorwithoutcauseandwithoutpayment ofaterminationfeeonthirty(30)days’orninety(90)days’ orless,respectively,writtennotice. (h)Corporation’sBy-Laws.TheCorporation’sBy-Laws mustconformwiththefollowingrequirements: (1)NoticesofMeetings.TheBy-Lawsmustprovide thatmeetingsoftheMembersoftheCorporationregarding materialamendmentsorextraordinaryactions(asdefined inVA’sregulations)willbeheldonatleasttwenty-five (25)daysadvancenoticetoallMembersandthatmeetings forallotherpurposeswillbeheldonatleastseven(7) daysnotice.Thenoticemuststatethepurposeofthe meetingandcontainasummaryofanymaterialamendments orextraordinaryactionsproposed.Ifproxiesare permitted,thenoticemustcontainacopyoftheproxy thatmaybecastinlieuofattendanceatthemeeting. Thequorumforanysuchmeetingmustbeatleasttwenty (20)percentofthetotalnumberofvotes. (2)Election,Removal,andReplacementofBoardof DirectorsofCorporation.TheBy-Lawsmaynotalterthe provisionsforelection(orappointmentbyDeclarant)of BoardmembersoftheCorporationsetforthinthis Declaration.Inaddition,theBy-Lawsshallbe substantiallyconsistentwiththefollowingprovisions: i)RemovalofBoardMembersoftheCorpora- tion.Atanyregularorspecialmeetingduly called,anyone(1)ormoreoftheDirectorsofthe Corporationmayberemoved,withorwithoutcause, asprovidedherein,andasuccessormaythenand therebeelectedtofillthevacancysocreated. UnlesstheentireBoardisremovedfromofficeby thevoteofCorporationMembers,anindividual Directorshallnotberemovedpriortotheexpira- tionofhistermofofficeifthenumberofvotes castagainsthisremovalwouldbesufficientto electtheDirectorifvotedcumulativelyatan electionatwhichthesametotalnumberofvotes werecastandtheentirenumberofDirectorsau- thorizedatthetimeofthemostrecentelectionof theDirectorwerethenbeingelected.ADirector whohasbeenelectedtoofficesolelybythevotes ofMembersoftheCorporation,otherthanthe -136-52027.048-22139.FCM110714 Declarant,mayberemovedfromofficepriortothe expirationofhistermofofficeonlybythevote ofatleastasimplemajorityofthevotingpower residinginMembers,otherthantheDeclarant. ii)VacanciesonBoardofDirectorsofCorpo- ration.VacanciesontheBoardcausedbyanyrea- son,otherthantheremovalofaDirectorbyavote oftheCorporation,shallbefilledbyvoteofa majorityoftheremainingDirectors,eventhough theymayconstitutelessthanaquorum,andeach Directorsoelectedshallservefortheremainder ofthetermoftheDirectorhe/shereplaces;pro- vided,however,thatforaslongastheDeclarant hastherighttoappointamajorityoftheBoard membersundertheBy-Laws,theDeclarantmayap- pointanewBoardmembertofillanyvacancyre- sultingfromtheresignationofaBoardmember previouslyappointedbytheDeclarantwithoutthe approvaloftheremainingDirectors.Intheevent thatamajorityoftheremainingDirectorsare unabletoagreeuponasuccessorwithinfifteen (15)daysfollowingtheoccurrenceofavacancy,a specialelectiontofillthevacancyshallthenbe heldinaccordancewiththetermsprovidedinthe Articlehereinentitled"NominationandElectionof Directors,"inaccordancewiththesecretballot proceduressetforthintheBy-LawsandCalifornia CivilCodeSections5100-5130. ARTICLEXXI GENERALPROVISIONS Section1.Enforcement. (a)TheCorporation,theCity(initssolediscre- tion)ortheOwnerofanyCondominiumintheProject,includ- ingtheDeclarant,shallhavetheright(butnottheobliga- tion)toenforce,byproceedingsatlaworinequity,allof theProtectiveCovenantsnoworhereafterimposedbythis DeclarationandtheBy-Laws,respectively(andtheRulesand RegulationsdulyadoptedbytheCorporation),including,with- outlimitation,therighttoprosecuteaproceedingatlawor inequityagainstthepersonorpersonswhohaveviolated,or areattemptingtoviolate,anyofsaidProtectiveCovenants, toenjoinorpreventthemfromdoingso,torecordanoticeof non-compliance,tocausesaidviolationtoberemediedand/or torecoverdamagesforsaidviolation;provided,however,that withrespecttoAssessmentliens,theCorporationshallhave theexclusiverighttotheenforcementthereof. -137-52027.048-22139.FCM110714 (b)Theresultofeveryactoromissionwherebyany oftheProtectiveCovenantscontainedinthisDeclarationor theprovisionsoftheBy-Lawsareviolated,inwholeorin part,isherebydeclaredtobeandconstitutesanuisance,and everyremedyallowedbylaworequityagainstanuisanceshall beapplicableagainsteverysuchresultandmaybeexercised byanyOwner,bytheCorporation,orbyitssuccessorsin interest. (c)Theremedieshereinprovidedforbreachofthe ProtectiveCovenantscontainedinthisDeclarationorthe provisionsoftheBy-Lawsshallbedeemedcumulative,andnone ofsuchremediesshallbedeemedexclusive. (d)ThefailureoftheCorporationoranyOwnerto enforceanyoftheProtectiveCovenantscontainedinthis Declaration,theprovisionsoftheBy-LawsoranyRulesor Regulationsshallnotconstituteawaiveroftherightto enforcethesamethereafter. (e)Priortofilingacivilactionbyeitherthe CorporationorbyanOwner(butnottheCity)solelyfor declaratoryrelieforinjunctiverelief,orfordeclaratory relieforinjunctivereliefinconjunctionwithaclaimfor monetarydamagesotherthanCorporationAssessments,related totheenforcementoftheCorporationgoverningdocuments,the partiesmayberequiredtocomplywithCivilCodeSection5925 et seq.,ifapplicable.Failuretocomplywiththeprefiling requirementsofSection5925et seq.oftheCivilCodemay resultinthelossoftherighttosueregardingenforcement oftheCorporationgoverningdocuments.Uponmotionbyany partyforattorneys’feesandcostsastheprevailingparty, thecourt,indeterminingtheamountoftheaward,may consideraparty’srefusaltoparticipateinalternative disputeresolutionpriortothefilingoftheaction. (f)AbreachoftheProtectiveCovenantscontained inthisDeclarationoroftheprovisionsoftheBy-Lawsshall notaffectorimpairthelienorchargeofanybonafideMort- gageordeedoftrustmadeingoodfaithandforvalueonany Condominium;provided,however,thatanysubsequentOwnerof suchpropertyshallbeboundbysaidProtectiveCovenantsand theprovisionsoftheBy-Laws,whetherornotsuchOwner’s titlewasacquiredbyforeclosure,atrustee’ssaleor otherwise. (g)TheBoard,forandonbehalfoftheCorpora- tion,mayassessmonetarypenaltiesagainstanOwnerasa ComplianceAssessmentand/ortemporarilysuspendsaidOwner’s votingrightsandrighttousetherecreationalfacilities,if any,fortheperiodduringwhichanyAssessmentagainstsaid Owner’sCondominiumremainsunpaid;provided,however,the requirementsforNoticeandHearingsetforthintheBy-Laws -138-52027.048-22139.FCM110714 shallbefollowedwithrespecttotheaccusedOwnerbeforea decisiontoimposedisciplineisreached. (h)TheBoard,forandonbehalfoftheCorpora- tion,maytemporarilysuspendanOwner’svotingrightsand righttousetherecreationalfacilities,ifany,foraperiod nottoexceedthirty(30)daysforanyinfractionofthe Corporation’sRulesandRegulations;provided,however,the requirementsforNoticeandHearingsetforthintheBy-Laws shallbefollowedwithrespecttotheaccusedOwnerbeforea decisiontoimposedisciplineisreached. (i)Inadditiontotheabovegeneralrightsof enforcement,theCityshallhavetheright,throughitsagents andemployees,toenteruponanypartoftheProjectforthe purposeofenforcingtheCaliforniaVehicleCodeanditslocal ordinances,andisherebygrantedaneasementovertheProject forthatpurposeandtomaintaintheexteriorportionsofthe CorporationPropertyattheexpenseoftheCorporationin accordancewiththeCity’sMunicipalCode,asapplicable. NothinginthisSectionisintendedto,norshallitobligate, theCitytotakeenforcementaction;anysuchenforcement actionshallbeatheCity’ssolediscretionandelection. Section2.Severability.Invalidationofanyoneof theseProtectiveCovenantsbyjudgmentorcourtordershallinno wayaffectanyotherprovisionshereof,whichshallremaininfull forceandeffect. Section3.Term.TheProtectiveCovenantssetforthin thisDeclarationshallrunwithandbindtheProject,andshall inuretothebenefitoftheCorporationandbeenforceablebythe BoardortheOwnerofanylandsubjecttothisDeclaration,their respectivelegalrepresentatives,heirs,successorsandassigns, foratermoffifty(50)yearsfromthedatethisDeclarationis recorded,afterwhichtimesaidProtectiveCovenantsshallbe automaticallyextendedforsuccessiveperiodsoften(10)years, unlessaninstrument,signedbyamajorityofthethenOwners agreeingtoterminatesaidProtectiveCovenants,inwholeorin part,hasbeenrecordedwithinone(1)yearpriortothetermina- tionoftheinitialfifty(50)yearterm,orwithinone(1)year priortotheterminationofanysuccessiveten(10)yearperiod. Section4.Construction.TheprovisionsofthisDeclar- ationshallbeliberallyconstruedtoeffectuateitspurposeof creatingauniformplanforthedevelopment,maintenance, improvement,protection,use,occupancy,andenjoymentofthe Project.TheArticleandSectionheadingshavebeeninsertedfor convenienceonlyandshallnotbeconsideredorreferredtoin resolvingquestionsofinterpretationorconstruction. Section5.SingularIncludesPlural.Wheneverthecon- textofthisDeclarationmaysorequire,thesingularshallinclude -139-52027.048-22139.FCM110714 theplural,andthemasculineshallincludethefeminineand neuter. Section6.Amendments. (a)AmendmentsbyDeclarant.Priortothecloseof escrowforthesaleofaCondominiumtoamemberofthe public,inaccordancewithaFinalSubdivisionPublicReport issuedbytheCalBRE,thisDeclarationmaybeamended, restatedorterminatedbyaninstrumentexecutedbyDeclarant. NotwithstandinganyotherprovisionsofthisDeclaration,for solongasDeclarantownsanyportionofTractNo.^orthe AnnexationProperty,Declarantmayunilaterallyamendthis Declarationto(i)conformthisDeclarationtotherules, regulationsorrequirementsofVA/FHA,FHA,CalBRE,FNMA, GNMA,FHLMC,theCounty,City,State,orFederalgovernmentor anyotherLocalGovernmentalAgencyorentityapplicableto theProject,(ii)amendorsupplementanyoftheExhibitsto thisDeclaration,(iii)complywithanyCity,County,Stateor Federallawsorregulations,(iv)correctanytypographical errorsorinadvertenterrorsintheDeclarationand/or Exhibitsattachedthereto,(v)recordanymaintenance standardsand/orobligationsoftheCorporationandOwners, and(vi)supplementthisDeclarationwithprovisionswhich pertaintorightsandobligationsofDeclarant,theCorpora- tionortheOwnersarisingunderDivision2,Part2,Title7 (commencingwithSection895)oftheCaliforniaCivilCode. (b)AmendmentsbyCorporation.SubjecttoSection 6(a)above,andallapplicableprovisionsoflaw(e.g.,the provisionsofCaliforniaCivilCodeSections5100-5130 regardingsecretballots),thisDeclarationmaybeamended onlybyanaffirmativevoteofOwnersrepresentingnotless thansixty-sevenpercent(67%)oftheClassAvotingpowerand theClassBvotingpoweroftheCorporation.Atsuchtimewhen theClassBmembershipshallceaseandbeconvertedtoClass Amembership,anyandallamendmentstothisDeclarationshall beenactedbyrequiringthevoteorwrittenassentofOwners representingboth:(a)sixty-sevenpercent(67%)ofthetotal votingpoweroftheCorporation,and(b)sixty-sevenpercent (67%)ofthevotesofMembers,otherthantheDeclarant; provided,however,thatthepercentageofthevotingpower necessarytoamendaspecificprovisionshallnotbelessthan thepercentageofaffirmativevotesprescribedforactionto betakenundersaidprovision,andnoamendmentofaprovision ofthisDeclarationwhichrequirestheapprovalorconsentof DeclarantmaybemadewithoutthewrittenapprovalofDeclar- ant(e.g.,provisionspertainingtotheresolutionofDis- putes,MaintenanceGuidelines,MaintenanceManual,Maintenance Recommendations,etc.).AnyOwnerortheCorporationmay petitiontheSuperiorCourtofSanMateoCountyforanorder reducingthenecessarypercentagerequiredunderthisSection toamendthisDeclaration;provided,however,thatunderno -140-52027.048-22139.FCM110714 circumstancesshallanyprovisionrequiringtheconsentofthe Declarantbeamendedwithoutsuchconsent.Theprocedurefor effectingthispetitionissetforthinSection4275ofthe CaliforniaCivilCode,asthesamemaybeamended,fromtime totime. (c)ApprovalofMortgagees.Inadditiontothe rightsoffirstMortgagees,assetforthintheArticleherein entitled"MortgageeProtection,"intheeventthatFNMAor VA/FHAparticipatesinthefinancingofCondominiumsinthe Project,thewrittenconsentofnotlessthanfifty-one percent(51%)ofthe"EligibleMortgageHolders"(asdefined intheArticlehereinentitled"MortgageeProtection")shall berequiredforanyamendmentofa"material"nature.An amendmentwhichaffectsorpurportstoaffectanyofthe followingisconsideredmaterial: (1)ThelegalstatusoftheProjectasa commoninterestdevelopment; (2)Votingrights; (3)IncreasesinAssessmentsthatraisethe previouslyassessedamountbymorethantwenty-five percent(25%),assessmentliensorthepriorityof assessmentliens,includingthelevyandcollection thereof,enforcementprovisionsfornonpaymentand subordinationofliensfornonpayment; (4)Reductionsinreservesformaintenance, repairandreplacementoftheCorporationProperty; (5)ResponsibilityforCorporationProperty maintenanceandrepair; (6)ReallocationofinterestsintheCorpora- tionPropertyorrightstousetheCorporationProperty; (7)BoundariesofanyCondominiumUnit; (8)ConvertibilityofCorporationProperty intoCondominiumUnitsorCondominiumUnitsintoCorpora- tionProperty; (9)EncroachmentbyImprovementsintoCorpora- tionProperty; (10)ExpansionorcontractionoftheProject, oraddition,annexationorde-annexationofadditional propertytoorfromtheProject; (11)Reducedinsuranceorfidelitybonds requirements; -141-52027.048-22139.FCM110714 (12)Increasedrestrictionsontheleasingof Condominiums; (13)Impositionofrestrictionsonalienation, including,butnotlimitedto,rightsoffirstrefusal; (14)AnydecisionbytheCorporationtoes- tablishself-management,ifprofessionalmanagementwas previouslyrequiredbyanEligibleMortgageHolderor legaldocumentsgoverningtheProject; (15)RestorationorrepairoftheProjectina mannerotherthanasspecifiedinthisDeclaration; (16)Anyactiontoterminatethelegalstatus oftheProjectaftersubstantialdestructionorcondem- nationoccurs;and (17)Mortgageeprotectionprovisionsasset forthinthatArticlehereinaboveentitled"Mortgagee Protection,"andsuchotherprovisionsinthisDeclara- tionforwhichtheconsentofMortgageesshallbere- quiredorwhichareexpresslyforthebenefitofMort- gagees,insurersorguarantorsofMortgages. AnadditionoramendmenttothisDeclarationshallnotbe consideredmaterialifitisforthepurposeofcorrecting technicalerrorsorforclarificationonlyorimpactingrights whichdonotimpairthesecurityinterestofanEligible MortgageHolder.IntheeventtheCorporationisconsidering terminationofthelegalstatusoftheProjectforreasons otherthanthesubstantialdestructionorcondemnationofthe Project,thensixty-sevenpercent(67%)oftheEligible MortgageHoldersmustagreetosaidtermination. Notwithstandingtheforegoing,intheeventanyEligible MortgageHoldersreceivesawrittenrequest,deliveredby certifiedorregisteredmailwithreturnreceiptrequested, fromtheBoardtoapproveanyamendmenttothisDeclaration, andsuchEligibleMortgageHolderdoesnotdeliveranegative responseinwritingtotheBoardwithinsixty(60)daysofthe mailingofsuchrequestbytheBoard,suchEligibleMortgage Holdershallbedeemedtohaveapprovedsuchproposedamend- ment. (d)ApprovalbyCity.TheDeclarantortheCorpora- tionshallforward,orcausetobeforwarded,totheCity’s DirectorofPlanning,315MapleAve.,SouthSanFrancisco, California94080,awrittennoticeofanysuchamendmentor terminationandrequestforthewrittenconsentoftheCity Manager(orhisauthorizedrepresentative)ofsuchamendment ortermination.TheCityManager’swrittenconsenttothe amendmentorterminationshallberecordedconcurrentlywith anysuchamendmentortermination;anywrittenconsentwhich -142-52027.048-22139.FCM110714 isnotrecordedconcurrentlywiththeamendmentortermination shallbedeemednullandvoid.Notwithstandingtheforegoing, ifnonoticeofdisapprovalorwrittenconsentisreceivedby theCorporationwithinsixty(60)daysfollowingthemailing ofsuchnotice,suchamendmentorterminationshallbedeemed tobeapprovedbytheCity,andtheamendmentortermination instrumentmayberecordedwithouttheCity’swrittenconsent. (e)RecordationofAmendments.Anamendmentmadein accordancewiththeprovisionssetforthhereinaboveshallbe effectivewhenexecutedbythePresidentandSecretaryofthe Corporation,whoshallcertifythattheamendmenthasbeen approvedbythemembershipand,whereappropriate,bythe firstMortgagees,inthepercentagessetforthhereinabove, andrecordedintheOfficeoftheCountyRecorder.Uponsuch recordation,theamendmentshallbeeffectiveandbindingupon allOwnersandallMortgagees,regardlessofwhethersuch OwnerorsuchMortgageeconsentedtosuchamendment. Section7.Encroachments.Noneoftherightsandobli- gationsoftheOwnerscreatedhereinorbythedeedshallbealter- edinanywaybyencroachmentsduetosettlementorshiftingof structuresoranyothercause(exceptintentionalornegligentacts oftheOwners,otherthantheDeclarant).Thereshallbevalid easementsforthemaintenanceofsaidencroachmentssolongasthey shallexist;provided,however,thatinnoeventshallavalid easementforencroachmentbecreatedinfavorofanOwnerifsaid encroachmentoccurredduetothewillfulconductofsaidOwner. Section8.Notices.Anynoticepermittedorrequiredto bedeliveredasprovidedhereinshallbeinwritingandmaybe deliveredeitherpersonallyorbymail.Ifdeliveryismadeby firstclass,registeredorcertifiedmail,itshallbedeemedto havebeendeliveredandreceivedforty-eight(48)hoursaftera copyofthesamehasbeendepositedintheUnitedStatesmail, postageprepaid,addressedtoanypersonattheaddressgivenby suchpersontotheCorporationforthepurposeofserviceofsuch notice,ortotheCondominiumUnitofsuchpersonifnoaddresshas beengiventotheCorporation.Ifsuchnoticeisnotsentbyfirst class,regularorcertifiedmail,itshallbedeemedtohavebeen deliveredwhenreceived.Suchaddressmaybechanged,fromtimeto time,bynoticeinwritingtotheCorporation. Section9.Attorneys’Fees.Exceptasotherwise providedherein(e.g.,resolutionofDisputeswherebyeachpartyis responsibleforpaymentofhisattorneyfees,withouttherightto reimbursementfromtheotherpartyandnotwithstandingwhichparty maybethe"prevailingparty"),orintheLimitedWarranty,inthe eventtheBoard,Corporation,oranyOwnerofaCondominiumshall commencelegalproceedingsagainsttheOwnerofanyotherCondomin- iumtoenforcethecovenantsofthisDeclaration,ortodeclare rightshereunderastheresultofanybreach,orclaimofbreach, ofsaidcovenants,theprevailingpartyshallrecoverthecostof -143-52027.048-22139.FCM110714 thesuit,arbitration,oralternativedisputeresolution,in additiontoitscostsofsuit,includingreasonableattorneys’ fees,asmaybefixedbythecourt.Inaddition,ifanyOwner defaultsinmakingapaymentofAssessmentsandtheCorporationhas obtainedtheservicesofanattorneyinconnectiontherewith,the OwnercovenantsandagreestopaytotheCorporationanycostsor feesincurred,includingreasonableattorneys’fees,regardlessof whetherdisputeproceedingsareinstituted. Section10.MergersorConsolidations.Uponamergeror consolidationoftheCorporationwithanotherassociation,the Corporation’sproperties,rightsandobligationsmay,byoperation oflaw,betransferredtoanothersurvivingorconsolidated associationor,alternatively,theproperties,rightsandobliga- tionsofanotherassociationmay,byoperationoflaw,beaddedto theproperties,rightsandobligationsoftheCorporationasa survivingcorporationpursuanttoamerger.Thesurvivingor consolidatedassociationmayadministerandenforcetheProtective CovenantsestablishedbythisDeclarationgoverningtheProject, togetherwiththecovenantsandrestrictionsestablisheduponany otherpropertyasoneplan. Section11.NoticeofProcedures.OnSeptember20, 2002,theGovernoroftheStateofCaliforniasignedintolawthe constructiondisputereformbillknownasSenateBillNo.800, whichaddedsection43.99andTitle7(commencingwithsection895) toPart2ofDivision2oftheCaliforniaCivilCode("Rightto RepairLaw").TheRighttoRepairLawcontainsvariousprocedures whichmayimpactanOwner’slegalrightsasahomeownerandthe CorporationwithrespecttoclaimsimpactingtheCorporation Property.EachOwnerandtheCorporationmaywishtoconsultwith anattorneyorotherlegaladvisortoascertaintherequirementsof theRighttoRepairLawanditsimpactuponhislegalrights. Section12.NoEnhancedProtectionAgreement.Asnoted earlier,noprovisionsherein,andnorepresentationsorwarran- ties,expressedorimplied,byDeclarant,constitute,orshallbe interpretedtoconstitute,an"enhancedprotectionagreement,"as definedinSection901oftheCaliforniaCivilCode. Section13.DECLARANT’SELECTIONTOOPTINTOPRE- LITIGATIONPROCEDURESSETFORTHINRIGHTTOREPAIRLAW.BY ACCEPTANCEOFADEEDTOACONDOMINIUMORTHECORPORATIONPROPERTY, EACHOWNERANDTHECORPORATIONACKNOWLEDGETHATDECLARANTHAS ELECTEDTOUSECERTAINPROCEDURESREFERREDTOASTHE"STATUTORY PRE-LITIGATIONPROCEDURES"FORTHERESOLUTIONOFCONSTRUCTION DEFECTCLAIMSREGARDINGTHEPROJECT(INCLUDINGBUTNOTLIMITEDTO THECORPORATIONPROPERTY),ASSETFORTHINSECTIONS910THROUGH938 OFTHECALIFORNIACIVILCODE.NOTWITHSTANDINGTHEFOREGOING, NOTHINGINTHISSECTIONSHALLBEDEEMEDTOCONSTITUTEAWAIVEROF DECLARANT’SRIGHTS,IFANY,TOREQUIREANOWNERANDTHECORPORATION TOCOMPLYWITHTHEPROCEDURESOFTHELIMITEDWARRANTY,ORTHE PROCEDURESSETFORTHATCIVILCODESECTION6000ETSEQ.,ORTO -144-52027.048-22139.FCM110714 ENFORCEANYPROVISIONOFLAWRELATINGTOTHERESOLUTIONOFDISPUTES OTHERTHANSECTIONS910THROUGH938OFTHECALIFORNIACIVILCODE. EACHOWNER,ONBEHALFOFITSELFANDITSSUCCESSORSININTEREST, SHALLPROVIDECOPIESOFALLDOCUMENTSPROVIDEDBYDECLARANTTOSUCH OWNERTOANYSUBSEQUENTPURCHASEROFSAIDOWNER’SCONDOMINIUM. Section14.AgentforNotice.Noticeofdisputesshall begiventotheagentforserviceofprocessforDeclarantset forthinthemostcurrentrecordsoftheSecretaryofStateof California. Section15.AlternativeDisputeResolutionofDisputes. Ifadisputeremainsunresolvedaftercompletionorterminationof theStatutoryPre-LitigationProceduressetforthinCivilCode Sections910through938,thedisputeresolutionproceduresset forththisDeclarationortheLimitedWarranty,asapplicable, shallapply. Section16.CorporationPropertyClaims.Notwithstanding anyprovisiontothecontraryregardingresolutionofdisputes regardingtheCorporationProperty,atsuchtimeasanOwneris electedorappointedtotheBoard,theDeclarantshallbedeemedto haverelinquishedcontrolovertheCorporation’sabilityto initiateclaimsregardingtheCorporationProperty. Section17.MaintenanceStandards.EachOwnerandthe Corporationshallmaintaineverythinghe/she/it/theyareobligated tomaintaininamannerconsistentwiththeprovisionshereinand inconformancewithanymaintenanceobligationsandschedules (i.e.,procedures,standards,and/orschedulesforthemaintenance andoperationoftheCondominiumand/orCorporationPropertywhich maybeprovidedtosaidOwnerand/orCorporationbyDeclarant,as suchprocedures,standards,and/orschedulesmaybeupdatedand revisedasappropriate),productmanufacturer’smaintenance guidelines/recommendations,andcommonlyacceptedmaintenance standards.Unlessotherwiseprovidedinsuchmaintenanceobliga- tionsandschedules,eachOwnerandtheCorporationshalldetermine thelevelandfrequencyofmaintenanceofhisorherCondominium andCorporationProperty,asappropriate. Section18.NoRepresentationsorWarranties.No representationsorwarrantiesofanykind,expressorimplied,have beengivenormadebyDeclarant,oritsagentsoremployees,in connectionwiththeProject,oranyportionthereof,itsphysical condition,zoning,compliancewithapplicablelaws,fitnessfor intendeduse,orinconnectionwiththesubdivision,sale, operation,maintenance,costofmaintenance,taxesorregulation thereofasacondominiumproject,exceptasspecificallyand expresslysetforthinthisDeclarationortheLimitedWarranty, andexceptasmaybefiledbyDeclarant,fromtimetotime,with theCalBRE. -145-52027.048-22139.FCM110714 Section19.Exhibits.ExceptforExhibit"E"(whichis attachedforinformationalpurposesonly),theExhibitsattached heretoareincorporatedbythisreference.Notwithstandingany depictionthereon,theas-builtconditionbyDeclarantshall control.Inaddition,theCorporation’smaintenanceobligationwith respecttotheCorporationPropertydepictedthereonshallcommence whentheCorporationleviesAssessmentsapplicabletosaid Improvements(e.g.,althoughthedepictionsmayshowallofTract No.^,themaintenanceobligationsforthisCorporationonly includetheImprovementsintheCorporationPropertyofthe applicablephaseofdevelopmentwhicharesubjecttoassessments). Section20.ProjectDisclosures.Thefollowing disclosuresaremadetofacilitateeachOwner’sinvestigationof theProjectpriortopurchasingaCondominiumintheProject.The disclosuresarenotexhaustive,andnowarrantyorrepresentation ofanykindornatureismadeinconnectionwiththedisclosures. Theinformationsetforthinthedisclosuresmaychangeovertime. ByacceptanceofadeedtoaCondominiumintheProject,eachOwner acknowledgesandagreesthatsuchOwnerissolelyresponsiblefor investigatingthefollowingmatters,aswellasallothermatters ofinteresttosuchOwner,priortocompletingthepurchaseofa CondominiumintheProject. (a)ConditionsofApproval/NoticeofRestriction. TheProjectissubjectto,andrequiredtocomplywith,allterms andconditionsfortheapprovalofthetentativetractmapfor TractNo.^andthedevelopmentoftheProject(including,without limitation,theconditionsofapprovalfor^.Neitherthis Declarationnoranycontractofsale,lease,orotherwritten documentoranymeansormethodshallbeestablished,orshall attempttoestablish,anyrequirement,restriction,orlimitation ontheDeclarant,oranyperson,individualorentity,whichwould operate,directlyorindirectly,topreventorprecludeanyother developersofthePropertyorProject,oranyperson,individual, orentity,incomplyingwithallapplicableconditionsforthe approvalofthetentativemapanddevelopmentoftheProjectand otherCityordinances,rules,policies,orregulations. (b)NoiseandSoundsfromOtherCondominium Units/HardSurfaceFlooring.LivinginanattachedCondominium buildingwithinadenselypopulatedcommunityentailslivingin closeproximitytootherpersonsandbusinesses,withattendant limitationsonsolitude.TheCondominiumbuildingsandindividual CondominiumUnitsarenotsoundand/orodorproof,andnoises and/orodorsfromadjacentCondominiumsandtheCorporation Propertymaybeheardandsmelled.Ownerswillhearnoisefrom adjacentresidenceswithintheProject,including,butnotlimited to,noisefromshowers,bathtubs,sinks,toilets,dishwashers, washingmachines,orothersourcesofrunningwater.Also,Owners mayhearnoisefromitemssuchasvacuumcleaners,stereos,or televisions,orfrompeoplerunning,walkingorexercisingonhard surfaces.Finally,Ownerscanexpecttohearnoisefromadjacent -146-52027.048-22139.FCM110714 residentialandcommercialareas.Ownersmayalsoexperiencelight enteringtheresidencesfromstreetlightslocatedinproximityto thewindowsanddoorsoftheresidences.Declaranthasnocontrol overthetransmissionofnoiseorlightandtheirpotentialeffects onresidenceswithintheProject. (c)LimitedParking.Declarantmakesnowarranties orrepresentationsofanykind,expressorimplied,regardingthe availabilityofguestparkingintheProject. (d)MaintenanceofPrivateSewerLaterals.Asset forthherein(e.g.,intheArticleentitled"RepairandMainte- nance"),eachOwnerisresponsibleforthemaintenanceofthe privatesewerlateralsthatexclusivelyservetheOwner’sCondomin- ium).IfanOwnerisrequiredtodisturbtheCorporationProperty inordertomaintainhissewerlateral,theOwnerwillberesponsi- ble(athissolecostandexpense)forrestoringtheCorporation Propertytoitsexistingconditionpriortosuchdisturbanceand forfollowinganyproceduresrequiredbytheCorporation. (e)NOTICEOFAIRPORTINVICINITY.TheProjectis currentlylocatedwithinwhatisknownasanairportinfluencearea (i.e.,anareainwhichcurrentorfutureairport-relatednoise, overflight,safety,orairspaceprotectionfactorsmaysignifi- cantlyaffectlandusesornecessitaterestrictionsonthoseuses asdeterminedbyanairportlandusecommission),andmaybe subjecttosomeoftheannoyancesorinconveniencesassociatedwith proximitytoairportoperations(forexample:noise,vibration,or odors).Individualsensitivitiestothoseannoyancescanvaryfrom persontoperson.EachOwnermaywishto,andshouldconsiderwhat airportannoyances,ifany,areassociatedwiththeProjectbefore completingthepurchaseofaCondominiumintheProjectand determinewhethersuchlocationandairportannoyancesareaccept- able.Declarantmakesnowarrantiesorrepresentationsofanykind ornature,expressorimplied,regardinganyairport,including, withoutlimitation,anywarrantiesorrepresentationsregardingthe potentialforanyexpansionorchangeinuseoftheairport,types ofaircraftpermittedattheairport,flightpathsofaircraft,or hoursofoperationoftheairport.EachOwnerisresponsiblefor investigatingsuchmatterstotheOwner’sfullandcomplete satisfactionpriortocompletingthepurchaseofaCondominiumin theProject. (f)SuitabilityoftheCondominiumUnit.Each Ownerissolelyresponsibleforinvestigating,consultingwiththe Owner’sownlegal,tax,business,andotheradvisors,and determining,priortocompletingthepurchaseoftheCondominium Unit,whethertheCondominiumUnitandtheProject(including, withoutlimitation,thesquarefootage,structure,design,space, restrooms,accessibility,naturallighting,soundmitigation measures,ifany,parking,insurance,RulesandRegulations,and electrical,telecommunications,naturalgas,heating,ventilation, -147-52027.048-22139.FCM110714 airconditioning,watersupply,firesprinkler,anddrainage systems)aresuitablefortheOwner’sintendeduses. (g)Waiver.EachOwner,forandonbehalfof himselfandthemembersofhisfamily,histenants,lessees,guests andinvitees,expresslyapprovealloftheforegoingconditionsand risks,andwaivesallcausesofactionandcovenantsnottosuethe City,theDeclarant,andtheirrespectivedirectors,officers, members,employees,agentsandconsultantsforanydamagesor injurieswhichmayarisefromorrelatetoanyofsuchconditions and/orrisks. Section21.PrioritiesandInconsistencies.Ifthere areconflictsorinconsistenciesbetweenthisDeclarationand eithertheArticlesorBy-LawsoftheCorporation,thetermsand provisionsofthisDeclarationshallprevail,saveandexceptfor theprovisionsoftheArticlesofIncorporation. Section22.Declarant’sRepresentative.Commencingon thedateonwhichDeclarantnolongerhasanelectedrepresentative ontheBoard,andcontinuinguntilthedatethatisten(10)years afterthedateofthelastcloseofescrowintheProject,the Declarantshallbeentitledtoaccess(inrealtime)anywebsite maintainedbytheCorporationoritspropertymanagerforthe Projectandtoviewalldocumentspostedonthewebsite,shallbe entitledtoinspectandcopytheCorporation’sbooksandrecords, including,withoutlimitation,maintenancerecords,onthesame termsandconditionsasaMember(i.e.,assetforthinArticle XII,Section1,oftheBy-Laws),andshallbeentitledtohavea representative("Declarant’sRepresentative")presentatall meetingsoftheMembersandtheBoard,exceptwhentheBoard adjournstoexecutivesessiontoconsiderlitigation,mattersthat relatetotheformationofcontractswiththirdparties,Member discipline,orpersonnelmatters,ortomeetwithaMember,upon theMember’srequest,regardingtheMember’spaymentofassess- ments.ForsolongasDeclarant’sRepresentativeisentitledto attendsuchmeetings,theCorporationand/orMembers,asappropri- ate,shallprovideDeclarantwithwrittennoticeofallmeetingsof theBoardasifDeclarantwereanOwner/Member,andtheCorporation shallprovideDeclarant’sRepresentativewiththeproposedminutes andapprovedminutesofthemeetingsofOwners,theBoardand committees.TheDeclarant’sRepresentativeshallbepresentinan advisorycapacityonlyandshallnotbeaBoardmemberorhaveany righttovoteonmatterscomingbeforetheBoardoranyliability asaBoardmember.However,theDeclarant’sRepresentativeshall havetherighttospeakatallmeetings,andtheSecretaryshall accuratelynoteanystatementsmadebytheDeclarantintheminutes ofthemeetings.ThisSectionmaynotbeamendedwithouttheprior writtenapprovaloftheDeclarant,whichapprovalmaybewithheld inDeclarant’ssoleandabsolutediscretion. Section23.CompliancewithRequirementsofFHLMC,FNMA, andVA/FHA.NotwithstandinganyprovisionofthisDeclaration, -148-52027.048-22139.FCM110714 theDeclarantandCorporationshallcomplywithallrequirementsof FHLMC,FNMA,and/orVA/FHAestablishedbythoseentitiesfor condominiumprojectsforsolongasanyofsuchagenciescontinue tobeaMortgagee,Owner,insurerorguarantorofaMortgageinthe Project,including,withoutlimitation,thefollowingrequirements: a.AllImprovementsontheCorporation Propertyshallbesubstantiallycompletedbefore suchCorporationPropertyisconveyedtothe Corporation,notwithstandinganyregulationofthe CalBREallowingsuchconveyancetooccuruponthe postingofappropriatebonds. b.TheDeclarant’srighttoannexthe AnnexationPropertytotheProjectpursuanttothe overallgeneralplanofdevelopmentfortheProject originallysubmittedtoandacceptedbytheCalBRE shallterminateonthelatterof:(i)thedate whichisseven(7)yearsafterthedateofthe recordationofthisDeclaration;or(ii)asubse- quentdateaftersuchseven(7)yearperiodasmay beacceptedbytheCalBRE. ARTICLEXXII ADDITIONALREQUIREMENTSOFCITY Section1.LandscapePlansandConstructionof Improvements.AsrequiredbytheCity,Declarantshallimproveor causetobeimprovedthelandscapedportionsoftheCorporation Propertyasshownonthefollowingplans: (i)LandscapePlans.Plansconsistingof___sheets(s) designated________________,dated_______________preparedby _______________________,JobNo._______________,entitled _______________________.Declarantshallfileacopyofthe as-builtplanswiththeCorporation.TheCorporationshall maintainthesameonfileaspermanentrecordsavailablefor inspectionandreviewbyprospectiveOwnersandother interestedpersonsandfortheperformanceofitsdutieswith respectthereto. (ii)MaintenanceofLandscaping.TheCorporationshall maintainallofthelandscapingintheProject(exceptinthe ExclusiveUseCorporationPropertypatioareas)ingeneral accordancewiththelandscapingplansreferredtoin subparagraph(i),above,unlessclimaticconditionsmakesuch maintenanceimpracticableorunlesstheCityconsentstoa changeintheplanforlandscaping. (iii)ImprovementPlansofOtherCommonAreasor Properties.Aplanconsistingof_________sheets,dated -149-52027.048-22139.FCM110714 _______________,Revised_____________,preparedby _____________________________,JobNo. _______________________,entitled___________________. Declarantshallfileacopyoftheas-builtplanswiththe Corporation.TheCorporationshallmaintainthesameonfile aspermanentrecordsavailableforinspectionandreviewby prospectiveOwnersandotherinterestedpartiesandfor performanceofitsdutieswithrespectthereto. (iv)MaintenanceandRepair.TheCorporationshall maintainandrepairtheImprovementswithintheCorporation PropertyasconstructedbytheDeclarantinaccordancewith theplansoriginallyapprovedbytheCity,including,butnot limitedto,thedriveways,curbsandgutters,fences, landscapeplanting,watersupplysystem,sanitarysewer,storm drainsystem,arealightingsystem,firepreventionsystem, irrigationsystem,retainingwallsandsubdrainsystem, trafficcontrolsigns,devicesandstriping,gradesand slopes,andmaintainandrepairtheImprovementsasoriginally constructedbyDeclarantinotherportionsoftheCorporation Property.AnymodificationsoftheImprovementsinstalledin accordancewiththeplansapprovedbytheCityshallbemade onlyafterthewrittenapprovaloftheArchitecturalReview CommitteeisobtainedinaccordancewiththisDeclarationand allpermitsandotherLocalGovernmentAgencyapprovalsare obtained.TheCorporationshallprovidefundsforsaid maintenanceandrepairinaccordancewiththeprovisionsfor AssessmentssetforthinArticleVIIofthisDeclaration. Section2.ApprovalofCity.Theforegoingprovisions ofthisArticleshallnotberescinded,amendedormodifiedwithout thepriorapprovaloftheCity. [signaturestofollow] -150-52027.048-22139.FCM110714 INWITNESSWHEREOF,Declaranthasexecutedthisinstru- mentonthedayandyearfirstabovewritten. "DECLARANT" CITYVENTURESHOMEBUILDING,LLC, aDelawarelimitedliability company By:_________________________ Name:________________________ Title:_______________________ By:_________________________ Name:________________________ Title:_______________________ STATEOFCALIFORNIA) )ss. COUNTYOFORANGE) On______________,201__,beforeme,________________________, NameandTitleofOfficer personallyappeared______________________________________________, whoprovedtomeonthebasisofsatisfactoryevidencetobethe person(s)whosename(s)is/aresubscribedtothewithininstrument andacknowledgedtomethathe/she/theyexecutedthesamein his/her/theirauthorizedcapacity(ies),andthatbyhis/her/their signature(s)ontheinstrument,theperson(s),ortheentityupon behalfofwhichtheperson(s)acted,executedtheinstrument. IcertifyunderPENALTYOFPERJURYunderthelawsofthe StateofCaliforniathattheforegoingparagraphistrueand correct. WITNESSmyhandandofficialseal. __________________________ SignatureofNotaryPublic [SEAL] -151-52027.048-22139.FCM110714 EXHIBIT"A" LEGALDESCRIPTIONOFPHASE1 Phase1shallmeanandrefertothatcertainrealpropertylocated intheCityofSouthSanFrancisco,CountyofSanMateo,Stateof California,moreparticularlydescribedas: Modules"A,""B"and"D"depictedanddescribedonthePhase 1CondominiumPlan(recordedconcurrentlyherewith)asLot1 ofTractNo.^,asshownonaMaprecordedinBook_____, Pages___through____,inclusive,ofMapsintheOfficeof theCountyRecorderofsaidCounty;and Non-exclusiveeasementsin,on,over,under,acrossand throughLots2and3ofTractNo.^,asshownonaMap recordedinBook_____,Pages___through____,inclusive,of MapsintheOfficeoftheCountyRecorderofsaidCounty,for purposesofingress,egress,access,utilities,anddrainage accordingtotheapprovedgradingandbuildingplansforthe Project,aswellasaccordingtotheas-builtconditionofthe ProjectasoriginallyconstructedbyDeclarant,andtheestab- lishedpatternsfordrainagecreatedbyDeclarant,aswellas theactual,natural,existingdrainagepatterns. TheCondominiumUnitswithinPhase1areCondominiumUnits^ through^,inclusive,sdescribedand/ordepictedontheCondominium Planreferencedabove. Page1of1Page52027.048-22139.FCM110714 EXHIBIT"B" ANNEXATIONPROPERTY TheAnnexationPropertyshallmeanandrefertothatcertainreal propertylocatedintheCityofSouthSanFrancisco,CountyofSan Mateo,StateofCalifornia,moreparticularlydescribedas: AllofTractNo.^,asshownonaMaprecordedinBook_____, Pages____through____,inclusive,ofMaps,OfficialRecords ofSanMateoCounty,California,EXCEPTINGTHEREFROMPHASE1. Page1of1Page52027.048-22139.FCM110714 EXHIBIT"C" CORPORATIONMAINTAINEDFENCESANDWALLS (tobeattached) Page1of1Page52027.048-22139.FCM110714 EXHIBITD" CORPORATIONMAINTAINEDSTORMDRAINFACILITIES (tobeattached) Page1of1Page52027.048-22139.FCM110714 EXHIBIT"E" SAMPLEFORMOFLIMITEDWARRANTY (tobeattached) Page1of1Page52027.048-22139.FCM110714 EXHIBIT"F" NOPARKINGAREAS (tobeattached) Page1of1Page52027.048-22139.FCM110714 EXHIBIT"G" MAINTENANCEMATRIXFORATTACHEDCONDOMINIUMUNITS ITEMS CORPORATION RESPONSIBILITY OWNER’S RESPONSIBILITY Livingelement ofCondominium Unit. None.Ownermaintainstheentirety oftheresidentiallivingele- mentoftheCondominium,in- cluding,withoutlimitation, allinteriordoorsandtheir hardware,interiorwallsur- faces,drywall,cabinets, floorcoverings,ceilings, permanentfixtures,applianc- es,electricaloutletsand switches,toilets,smokede- tectors(includingperiodic testingandreplacementof batteries)andwashingmachine waterhoses. Residential LivingElement entrydoor TheCorporation periodically paintstheex- teriorsurface oftheentry door. Ownermaintainstheinterior surfaces,thehandle,locking mechanism,kickplatesandthe screendoorandperformsany touchuppaintingontheexte- riorsurfaceifnecessarybe- foretheCorporation'speriod- icpainting. Slidingglass doorsand screendoors servingthe Condominium Unit None.TheOwnermaintainsallpor- tionsoftheseitems,includ- ingthelockingmechanism, weatherproofing,sheathing, frameandanyglass.TheOwn- eralsopaints,stains,seals orotherwiseweatherproofsthe exteriorsurfaces. Windowsinthe Condominium Unit None.EachCondominiumOwnerisre- sponsibleforcleaningall windowsinhisCondominiumand maintainingallportionsof thewindowsincludingthe frame,screens,lockingmech- anismforthescreen,weather stripping,caulking,panesand sheathing. 52027.048-22139.FCM110714 Page1of7 LightFixtures andFans TheCorporation maintainsall lightfixtures andfansnot actuatedfrom switchescon- trolledfrom, orseparately meteredto,an Owner’sCondo- miniumUnit. TheOwnermaintainsthelight fixturesandfansactuated fromswitchescontrolledfrom, orseparatelymeteredto,the Owner'sCondominiumUnit. ExclusiveUse Corporation PropertySolar Collectors None.TheOwnermaintains. ExclusiveUse Corporation PropertyAir Conditioner None.TheOwnermaintains. ExclusiveUse Corporation PropertyPorch (ifapplicable) TheCorporation maintainsthe exteriorpaint- edsurfacesof solidporch railingsand theexterior andinterior surfacesof openrailings (e.g.,ironor tubularsteel railings). TheOwnermaintainsthe structureoftheporchandany surfaceontheporchfloor thathehasinstalled.The Ownersweepstheporchregu- larlyandkeepsitfreefrom debrisandreasonably protectedagainstdamage.The Ownermaintainsanyhosebibs, faucets,spigots,watershut- offvalves,andelectrical outletsandswitchesinthe porcharea.TheOwner maintainstheinteriorpainted surfaceofanysolidporch railings.TheOwnermaintains anylandscapingandanydrain openingswithintheenclosed porcharea. 52027.048-22139.FCM110714 Page2of7 ExclusiveUse Corporation Property Balcony(if applicable) TheCorporation maintainsthe exteriorpaint- edsurfacesof thebalcony railings,the exteriorand interiorsur- facesofopen railings(e.g., ironortubular steelrail- ings),anywa- terproofingor coatingorigi- nallyinstalled byDeclaranton thebalcony floor,the balconysupport structure,and allother structuralele- mentsofthe balcony. TheOwnermaintainsanysur- faceonthebalconyfloorthat hehasinstalled.TheOwner sweepsthebalconyregularly andkeepsitfreefromdebris andreasonablyprotected againstdamage.TheOwner maintainsanyhosebibs,fau- cets,spigots,watershut-off valves,andelectricaloutlets andswitchesinthebalcony area.TheOwnermaintainsany landscapingandanydrain openingswithintheenclosed balconyarea. Garage TheCorporation maintainsthe exteriorpaint- edsurfaceof thegaragedoor (however,all repairstoex- teriordoors andgarage doors,includ- ingthestruc- turalmainte- nancethereof, shallbeatthe soleexpenseof therespective Ownerunless otherwise agreedtoby theBoard). Ownermaintainstheinterior ofthegarage,including,wit- houtlimitation,theinterior paintedsurfaceofthegarage door,thestructuralintegrity ofthegaragedoor(unless otherwisedeterminedbythe Board)allotherdoorswithin thegarage,allinteriorwall surfaces,drywall,ceilings, permanentfixtures,applianc- es,andelectricaloutletsand switches. Telephonewir- ingexclusively servingaCon- dominium. None.TheOwnermaintains. 52027.048-22139.FCM110714 Page3of7 Utilities.TheCorporation maintainsthe utilitiesserv- ingtheCommon Propertyand allutilities whichserve individualCon- dominiumsbut whicharesub- jecttoacom- monmeter (e.g.,common domesticwater, etc.). TheOwnermaintainstheutili- tiesservinghisCondominium thatareseparatelymetered. Thisincludesallelectric linesservingtheCondominium thatarenotservicedbythe electriccompany,allwater linesexclusivelyservingthe Condominium,allindividual Condominiumsewerlateralsand wastewaterdrainlinesthat exclusivelyservethe Condominium,thewater pressureregulator(ifany), allplumbingoutletsandfix- tures,furnace,ducts,vents (HVAC,dryer,stove,oven), andcircuitbreakersex- clusivelyservingtheCondo- minium. 52027.048-22139.FCM110714 Page4of7 Roof,Exterior Walls,andStr- uctureofBuil- dings. TheCorporation maintainsthe structuralcom- ponentsofthe buildings,in- cluding,with- outlimitation, exteriorperim- eterwalls, bearingwalls, columns,fire- ratedwalls, roofs,roof tiles,slabs, foundations, exteriorstairs (ifany),rail- ings,thestru- cturalfloors (butnotthe floorcover- ings),includ- ingthestruc- turalfloors separatingthe differentsto- riesofthe buildings,an inspectionand preventivepro- gramforthe preventionand eradicationof infestationby wooddestroying pestsandor- ganisms,exte- riorfinished surfaces, shutters,gut- ters,anddown- spouts). None. 52027.048-22139.FCM110714 Page5of7 FireSprinkler Heads,Fire SprinklerSys- tem,FireAlarm System,Fire Extinguishers IntheCorpora- tionProperty, andOtherCom- monFirePre- ventionEquip- mentInstalled inCorporation Property. TheCorporation maintainsall elements. None. PrivateDrives, ParkingAreas, andCommon Walkways. TheCorporation maintains. None. Landscapingand Irrigation TheCorporation maintainsall landscapingand irrigationlo- catedinthe Corporation Propertyand anypotted plantsplaced ontheCorpora- tionProperty bytheCorpora- tion. TheOwnermaintainsanyland- scaping(includingpotted plants)withinhisbalconyand porch. Signs TheCorporation maintainsall Projectmonu- mentationand signs. MainlineStorm DrainageSystem andStormwater QualityDevices TheCorporation maintainsthose portionsofthe Projectstorm drainsystem depictedinan Exhibittothis Declarationor arecorded Noticeof Annexation. None. 52027.048-22139.FCM110714 Page6of7 PerimeterWalls TheCorporation maintainsthe Projectperime- terwalls. None. Note:Theforegoingmatrixdoesnotaddressthedetached CondominiumUnits.EachOwnerofadetachedCondominiumUnitis responsibleformaintainingtheentiretyofhisdetached CondominiumUnit. 52027.048-22139.FCM110714 Page7of7 EXHIBIT"J" FENCESANDWALLS (tobeattached) 52027.048-22139.FCM110714 Page1of1