Loading...
HomeMy WebLinkAboutApndx A_OPSP Update APPENDIX A 2017 OPSP UPDATE OYSTER POINT SOUTH SAN FRANCISCO PLANNING APPLICATION SUPPORT DOCUMENTS FOR: UPDATE OF 2011 APPROVED SPECIFIC PLAN 2017.01.30 OYSTER POINT DEVELOPMENT SOUTH SAN FRANCISCO | 2017.01.30 SOM | STEINBERG | DGA | FIELD OPERATIONS 1 PROJECT DESCRIPTION PHASE IC (CURRENTLY BEING IMPLEMENTED AS APPROVED IN 2011) PHASE IIC (CITY VISIONING PROCESS UNDERWAY) PHASE ID (CURRENTLY BEING IMPLEMENTED AS APPROVED IN 2011) PHASE IID (CONSISTENT WITH OPSP AS ADOPTED IN 2011) PHASE IIID AND IVD INFRASTRUCTURE AND OPEN SPACE WITH II,III,IVD Preliminary - Subject to Revision OYSTER POINT BLVD O Y S T E R P O I N T B L V D 1”=500’ 0 500’250’1000’ The Project Sponsor, Oyster Point Development (“OPD”), is proposing amendments to the Oyster Point Specific Plan (Chapter 20.230 of the South San Francisco Zoning Ordinance) and related entitlements to allow for the development of a new mixed-use community consisting of research and development (R&D), office, commercial, residential, recreational and public open space uses. Existing Oyster Point Specific Plan In 2011, the Oyster Point Specific Plan (OPSP) and related entitlements were approved to allow for the development of 2.25 million square feet of Office/R&D uses across an approximately 41.4 acre developer-owned site to be built out in four Phases (ID, IID, IIID, and IVD). In addition, two phases of infrastructure and open space improvements were approved throughout the site and across the adjacent 40-acre site owned by the City of South San Francisco (Phases IC and IIC). • Phase ID is proposed to include approximately 508,000 SF of office/R&D buildings on a site of approximately 10 acres and Phase IC is proposed to include infrastructure and open space improvements across approximately 25 acres. The Phase I Precise Plan, which outlined the detailed design of Phase ID and Phase IC, was approved at the same time as the OPSP in 2011. • Phases IID through IVD were proposed to include a total of approximately 1,750,000 square feet of office/R&D buildings at an FAR of 1.25 (calculated across the remaining 31.4 acre site, including open space). Phase IID through IVD would also include new infrastructure and open space improvements consisting of the continuation of the streets, sidewalks and utilities from Phase IC, a new sewer pump station, bicycle facilities, shuttle bus stops, and new open spaces including courtyards, plazas, parks, recreation facilities and Bay Trail improvements along the Oyster Cove Marina shoreline (subject to BCDC guidelines and approval). Precise Plans for Phases IID through IVD with detailed building design have not yet been developed at the time of the OPSP in 2011. • Phase IIC at the eastern portion of the Oyster Point Specific Plan was conceptually developed in 2011 to include some landscape, parking and landfill cap improvements. Detailed design of these improvements have not yet been developed at the time of the OPSP in 2011. Revised Oyster Point Specific Plan OPD proposes modifications to Phases IIID and IVD of the OPSP and related entitlements to allow for a different mix of uses, including residential and retail. Phases ID and IID are proposed to remain consistent with the OPSP adopted in 2011. • OPD and the City of South San Francisco are currently proceeding with the implementation of Phase ID and IC. No changes are proposed to the Oyster Point Specific Plan with respect to Phase ID or IC nor any changes to the Phase I Precise Plan. • Phase IID of the project is proposed to include approximately 1,070,000 square feet of office/R&D buildings including approximately 28,000 square feet of retail, amenity and/or flex-use space at an FAR≤1.25 across a total of 20.2 acres (which includes the area of the adjacent open space). Phase IID is proposed to include a partially below grade parking garage to accommodate a parking ratio of 2.5 stalls/1,000 SF of office/R&D space. Phase IID would be consistent with the OPSP (as adopted in 2011). Phase IID will require a Precise Plan that outlines the detailed design of the improvements. • Phase IIID and IVD are proposed to include approximately 1,472,000 square feet of mixed-use program including approximately 1,191 residential units and 22,000 square feet of retail, amenity and flex-use space. The maximum dwelling unit density of Phase IIID and IVD would be approximately 96 units/acre across the combined site of 12.4 acres. The proposed parking ratios for Phase IIID and IVD are 1.4 stalls/residential unit and 2.5 stalls/1,000 SF of retail/amenity space. Public realm improvements for Phases IIID and IVD are consistent with those approved in the OPSP in 2011.The proposed uses for Phase IIID and IVD require amendments to the General Plan and OPSP. In addition, Phases IIID and IVD will each require a Precise Plan that outlines the detailed design of the improvements within that phase. The intention is to allow the sequence of construction of Phase IID, IIID and IVD to be flexible, however, the first of these phases will include the infrastructure and open space improvements noted above. • Phase IIC improvements at the eastern portion of the Oyster Point Specific Plan area are currently under study by the City of South San Francisco. No changes are proposed to the Oyster Point Specific Plan with respect to Phase IIC at this time. SCOPE OF UPCOMING PRECISE PLANS 1. PHASE ID 2. PHASE IIID-A OYSTER POINT DEVELOPMENT SOUTH SAN FRANCISCO | 2017.01.30 SOM | STEINBERG | DGA | FIELD OPERATIONS 2 SITE PLAN 1”=300’ 0 300’150’600’ Building Above Podium Plaza over Podium with Parking and Amenity Public Road Private Road Pervious Surface BCDC 100’ Shoreline Bay Trail Proposed Garage Entry/Exit 2 lanes ( one lane each direction) 2 lanes ( one lane each direction) WEST BASIN CRESCENT PARK AND BEACH SAN FRANCISCO BAY OYSTER POINT BLVD OYSTER COVE MARINA OYSTE R P O I N T B L V D PHASE IC RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL RESIDENTIAL OFFICE/ R&D RESIDENTIAL Preliminary - Subject to Revision IMPERVIOUS SURFACE: 22.7 ACRES PERVIOUS SURFACE: 7.2 ACRES OFFICE/ R&D OFFICE/ R&D OFFICE/ R&D OFFICE/ R&D Building Above Podium Plaza over Podium with Parking and Amenity Public Road Private Road Pervious Surface BCDC 100’ Shoreline Bay Trail Proposed Garage Entry/Exit 2 lanes ( one lane each direction) 2 lanes ( one lane each direction) PHASE ID OYSTER POINT DEVELOPMENT SOUTH SAN FRANCISCO | 2017.01.30 SOM | STEINBERG | DGA | FIELD OPERATIONS 4 BUIILDING HEIGHT AND USE INTENSITY 1”=300’ 0 300’150’600’ 235FT 165FT 50FT 35FT 85FT 35FT 85FT 35FT 85FT 35FT 85FT 85FT 150FT 40FT 170FT 170FT 135FT 120FT Residential ~ 96 DU/Acre Oce/R&D : FAR 1.25 WEST BASIN SAN FRANCISCO BAY OYSTER POINT BLVD OYSTER COVE MARINA OYSTE R P O I N T B L V D Preliminary - Subject to Revision PHASE IC PHASE ID Building Above Podium Plaza over Podium with Parking and Amenity Public Road Private Road Pervious Surface BCDC 100’ Shoreline Bay Trail Proposed Garage Entry/Exit 2 lanes ( one lane each direction) 2 lanes ( one lane each direction) CRESCENT PARK AND BEACH OYSTER POINT DEVELOPMENT SOUTH SAN FRANCISCO | 2017.01.30 SOM | STEINBERG | DGA | FIELD OPERATIONS 5 +0.0 +40 +80 +120 +160 +200 +240 +280 PR O P E R T Y L I N E OYSTER POINT BLVD STREET PR O P E R T Y L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E OYSTER POINT BLVD PR O P E R T Y L I N E OYSTER POINT BLVD PR O P E R T Y L I N E +0.0 +40 +80 +120 +160 +200 +240 +280 +0.0 +40 +80 +120 +160 +200 +240 +280 +0.0 +40 +80 +120 +160 +200 +240 +280 PR O P E R T Y L I N E OYSTER POINT BLVD STREET PR O P E R T Y L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E OYSTER POINT BLVD PR O P E R T Y L I N E OYSTER POINT BLVD PR O P E R T Y L I N E +0.0 +40 +80 +120 +160 +200 +240 +280 +0.0 +40 +80 +120 +160 +200 +240 +280 PHASE IID PHASE III AND IVDPHASE ID SITE SECTION 1”=200’ 0 200’100’400’Preliminary - Subject to Revision 01 02 03 SECTION 01 SECTION 02 SECTION 03 PHASE III AND IVD PHASE IID OYSTER POINT DEVELOPMENT SOUTH SAN FRANCISCO | 2017.01.30 SOM | STEINBERG | DGA | FIELD OPERATIONS 6 Preliminary - Subject to Revision CONCEPTUAL VIEW OF WATERFRONT PROMENADE