APPENDIX G
UPDATED ASSESSMENT OF GEOLOGY,
HAZARDOUS MATERIALS, AND
HYDROLOGY
AND FLOOD HAZARD UPDATE
20181427.001A /DOC # Page 1 of 10 August 2017
Copyright 2017 Kleinfelder
MEMORANDUM
TO: Ms. Rebecca Auld
FROM: Kleinfelder, Incorporated
DATE : August 31, 2017
SUBJECT: Updated analysis of Environmental Impact Sections
Oyster Point, South San Francisco
Introduction
Below is Kleinfelder’s updated analysis of the Environmental Impact Report (EIR) sections for Geology
and Soils (Chapter 9), Hazardous Materials (Chapter 11), and Hydrology (Chapter 12) to support the re-
entitlement of the current configuration of the project proposed by Oyster Point Development, LLC. The
technical memo is organized in a similar manner to the EIR sections reviewed for ease of comparison. If
sections, as numbered in the EIR, are not addressed in this memo, then there are no changes from the
original EIR document.
Chapter 9 GEOLOGY AND SOILS
Additional Documents Reviewed
California Building Code, Title 24, Part 2, Chapter 1, 2014,
City of South San Francisco Planning, Ken Anderson, 650.829.4337 – regarding adoption of
Local Hazard Mitigation Plan Annex by the City.
City of South San Francisco, 2011, “2010 Local Hazard Mitigation Plan, City of South San
Francisco Annex”, June 29.
PMC, 2014, “City of South San Francisco Climate Action Plan”, February 13.
California Geological Survey, 2000, “Earthquake zones of Required Investigation, San Francisco
South Quadrangle”, November 17.
California Building Code, Title 24, Part 2, Chapter 1, 2014.
City of South San Francisco Planning, Ken Anderson, 650.829.4337 – regarding adoption of
Local Hazard Mitigation Plan Annex by the City.
PMC, 2014, “City of South San Francisco Climate Action Plan”, February 13.
PAGE 9-1 CITY OF SOUTH SAN FRANCISCO HAZARD MITIGATION PLAN
The following paragraph was updated to reflect the Regional Hazard Mitigation plan:
In 2011 ABAG released a Regional Hazard Mitigation plan updating the 2006 HMP. The 2011
plan lists seven earthquake related hazards (fault-related ground surface rupture, seismic
shaking, earthquake induced landslides, liquefaction, dynamic/seismic compaction, lateral
spreading and tsunamis) and four weather related hazards (flooding, landslides, wildfires and
drought). The 2011 Regional HMP was approved by the Federal Emergency Management
DRAFT
20181427.001A /DOC # Page 2 of 10 August 2017
Copyright 2017 Kleinfelder
Agency (FEMA) in March 2011. Participating local governments, such as the City of South San
Francisco, have prepared annexes to the 2010 plan to specifically explain how the HMP applies
to their jurisdiction. The City prepared their annex in in 2010, releasing it on June 29, 2011.
The annex details previous disaster occurrences, assesses risk and vulnerability, describes
natural hazard exposure associated with land uses, critical facilities and infrastructure within the
City.
Conformity with mitigation measures Geo-3, Geo-3a and Geo-3b would reduce the impact of earthquake
and weather related hazards associated with the entire OPSP, including Phase I project.
Project Impact: less-than-significant.
PAGE 9-1 EAST OF 101 AREA PLAN
The following paragraph was updated to reflect updates to the East of 101 Area Plan:
The Oyster Point Specific Plan Appendix + Design Guidelines dated February 23, 2011 was
prepared to implement and refine the policies of the General Plan and the Design Element of the
East 101 Area Plan. The City Council of the City of South San Francisco approved the Plan
Appendix and Design Guidelines on March 23, 2011. An update to the plan presenting
Amendments through February 2016 was approved by the City of South San Francisco City
Council on February 10, 2016.
Conformity with mitigation measures Geo-2a, Geo-2b and Geo-2c would reduce the adherence to
updated regulations.
Project impact: less-than-significant.
PAGE 9-2 ALQUIST-PRIOLO EARTHQUAKE FAULT ZONING ACT
The following paragraph was updated to reflect identify new information regarding Earthquake
Zones of Required Investigation Map for the San Francisco South Quadrangle:
The 2011 EIR stated that “There is an Alquist-Priolo Earthquake Fault Zone Map for the
South San Francisco Quadrangle, in which the Project site is located.” This information
is incorrect. The project site is not located within the Alquist-Priolo Earthquake Fault
Zone.
Conformity with mitigation measures Geo-1, Geo-2, Geo-3a and Geo-3b should occur as described in the
EIR.
Project Impact: less-than-significant.
PAGE 9-2 CALIFORNIA BUILDING CODE (2010)
20181427.001A /DOC # Page 3 of 10 August 2017
Copyright 2017 Kleinfelder
The following paragraph was updated to reflect revisions to the California Building Code (Revised,
2016)
The earthquake protection law (California Health and Safety Code section 19100 et seq.) requires
that structures be designed to resist stresses produced by lateral forces caused by wind and
earthquakes. Specific minimum standards for seismic safety and structural design to meet
earthquake protection requirements are set forth in Chapter 16 of the 2016 CBC.
For earthquake design, Chapter 16 of the 2016 CBC shall be used. To estimate seismic design
parameters, site class estimation is required. Based on the existence of Bay Mud and landfill
material, the site can be classified as Site Class E (soft soils) and/or Site Class D (stiff soils). For
the code level Maximum Considered Earthquake (MCE), the site could experience peak ground
accelerations (PGA) of 0.6g to 0.7g.
Conformity with mitigation measures Geo-3, Geo-3a and Geo-3b as outlined in the original EIR should
occur to address the impact of earthquake and weather related hazards associated with the entire OPSP,
including Phase I project.
Project Impact: less-than-significant.
PAGES 9-4 and 9-5 FAULTING AND SEISMICITY
The following updates were made to reflect the following information:
Based on the information provided in Hart and Bryant (2007)4 the site is not located within a
State-designated, Alquist-Priolo Earthquake Fault Rupture Hazard Zone where site-specific
studies addressing the potential for surface fault rupture are required and no known active faults
traverse the site.
4 Hart, E. W. and W. A. Bryant. 2007. “Fault-Rupture Hazard Zones in California: Alquist-Priolo Earthquake Fault Zoning Act
with index to Earthquake Fault Zone Maps.” (Special Publication 42) California Division of Mines and Geology.
Sacramento, CA.
Table 9.1: Faults in the Vicinity
Fault Name
Distance
(km) Direction
Maximum Moment
Magnitude
San Andreas - 1906 Rupture 7.3 Southwest 8.05
San Andreas – Peninsula 7.3 Southwest 7.2
San Gregorio 15.2 West 7.5
Hayward-Rodgers Creek – North 22.6 Northeast 6.6
Hayward-Rodgers Creek – Total 22.6 Northeast 7.3
Hayward-Rodgers Creek – South 23.4 East 6.8
Monte Vista – Shannon 27.5 Southeast 6.5
Calaveras (North of Calaveras Reservoir) 36.9 Northeast 6.9
20181427.001A /DOC # Page 4 of 10 August 2017
Copyright 2017 Kleinfelder
Concord - Green Valley 43.5 Northeast 6.9
Some name and distance corrections were made in the table (above). Each of the closest faults is
considered independent seismogenic sources to Oyster Point.
Additional Information
Based on the Fault Activity Map of California (2010) 5, the closest fault to the site is the City
College fault at a distance of about 1 mile to the southwest. The City College fault is a pre-
Quaternary fault and is not considered by CGS as an independent seismogenic source. The
Serra fault is located at a distance of about 3.5 miles to the southwest and is a Holocene fault.
However, this fault and is also not considered by CGS as an independent seismogenic source
and its sesmogenicity has been lumped with the San Andreas Fault. The San Andreas Fault is
the closest independent seismogenic fault and is located approximately 4.5 miles (7.3 kilometers)
southwest of Oyster Point. A major seismic event on these or other nearby faults may cause
substantial ground shaking at the site.
The project site is located in an area characterized by high seismic activity. A number of large
earthquakes have occurred within this area in the past years. Some of the significant nearby
events include the 1906 (M7.9) “Great” San Francisco earthquake, the 1838 (M7) San Francisco
Peninsula earthquake, the 1865 (M6.4) Santa Cruz Mountains earthquake, the 1868 (M6.8)
Hayward earthquake, the 1890 (M6.2) Pajaro Gap earthquake, the 1899 (M5.8) and 1984 (M6.1)
Morgan Hill earthquakes, the 1882 (M5.8) and 1892 (M5.8) Hollister earthquakes, the 1897
(M6.2) Gilroy earthquake, the two 1903 (M5.5) San Jose earthquakes, the 1910 (M5.8)
Watsonville earthquake, two 1926 (M6) Monterey Bay earthquakes, and the 1989 (M6.9) Loma
Prieta earthquake. During the 1989 Loma Prieta earthquake on the San Andreas Fault, several
California Strong Motion Instrumentation Program (CSMIP) stations in the area recorded free-
field horizontal peak ground accelerations ranging from 0.1 to 0.5 g (Thiel Jr., et al., 1990). The
recent South Napa (M6.0) earthquake was located about 65 km to the southwest. The
earthquake occurred along the West Napa fault. A PGA of as large as 1.0 g was recorded at the
Crokett-Carquinez Bridge Geotechnical Array site (Bray et al., 2014).
According to the latest available maps, the OPSP site is not contained within an Alquist-Priolo Earthquake
Fault Zone boundary. Published geologic maps of the area show the San Andreas fault (the closest
known fault to the site) as lying about 7.3 kilometers (4.5 miles) to the west.
Project Impact: less-than-significant.
PAGES 9-7 GROUND IMPROVEMENT
Strong Ground Shaking
The text was edited to address new information regarding seismic event probabilities.
A recent publication prepared by the U.S. Geological Survey regarding earthquake probabilities in
the San Francisco Bay Area (Working Group on California Earthquake Probabilities, 2014)6
concludes that there is a 72 percent chance that one of the major faults within the Bay Area will
experience a major (M6.7+) earthquake during the period of 2014-2043. As has been
demonstrated recently by the 1989 (M6.9) Loma Prieta earthquake, the 1994 (M6.7) Northridge
20181427.001A /DOC # Page 5 of 10 August 2017
Copyright 2017 Kleinfelder
earthquake, and the 1995 (M6.9) Kobe earthquake, earthquakes of this magnitude range can
cause severe ground shaking and significant damage to modern urban areas.
Previous EIR stated that “according to a recent study completed by the Working Group of
California Earthquake Probabilities, which assess the probability of earthquakes in the San
Francisco Bay Area, there is a 62 percent probability that an earthquake of Magnitude 6.7 or
greater will strike within the life of the OPSP [Oyster Point Specific Plan] improvements.
Conformity with mitigation measures Geo-2a, -2b and -2c should occur to address strong seismic ground
shaking as well as compliance with applicable regulations and a design-level geotechnical investigation.
This applies to the entire OPSP, including the Phase I Project.
Project Impact: less-than-significant
Chapter 11 HAZARDOUS MATERIALS
Additional Documents Reviewed
Review of City of South San Francisco General Plan on line at www.ssf.net/360/Read the Plan
Bay Area Air Quality Management District, Compliance Advisory, March 5, 2013, Municipal Solid
Waste Landfills, BAAQMD Regulation 8, Rule 34, Section 113.
PAGE 11-2 BAY AREA AIR QUALITY MANAGEMENT DISTRICT (BAAQMD)
Updated Language
The site should qualify for a limited exemption from Regulation 8, Rule 34 (8-34-110) following
submittal and approval of a Design Capacity Report (to BAAQMD) and following demonstration
that the site does not pose a health risk to the public health and safety nor does it threaten the
environment under the California Health and Safety Code, Section 41805.5.
Project Impact – None.
PAGE 11-3 CITY OF SOUTH SAN FRANCISCO
Table 11.1
Select General Plan Policies Regarding Hazardous Materials
Updated per 8-8-17 revisions (revised section 8.3-G-2; removed section 8.3-I-3).
Policy Goal
8.3-G-1 Reduce solid and hazardous waste, and recycle to slow the filling of landfills in accord with
the California Integrated Waste Management Act of 1989.
8.3-G-2 Minimize the risk to life and property from the generation, storage, and
transportation of hazardous materials and waste in South San Francisco. Comply with all
applicable regulations and provisions for the storage, use and handling of hazardous
20181427.001A /DOC # Page 6 of 10 August 2017
Copyright 2017 Kleinfelder
substances as established by federal (EPA), State (DTSC, RWQCB, Cal OSHA, Cal EPA),
and local (County of San Mateo, City of South San Francisco) regulations.
8.3-I-4 Establish an ordinance specifying routes for transporting hazardous materials. Routes
should not pass through residential areas or other sensitive areas and allow specific times
for transport to reduce the impact and accident risk during peak travel periods.
Source: City of South San Francisco General Plan, posted on city site
Project Impact – None.
PAGE 11-5 VICINITY HAZARDOUS MATERIALS SITES
The following changes were noted for Table 11.2 Revisions (from Geotracker and Envirostor)
Seaboard Paper Company – 336 Oyster Point Boulevard Open – Inactive not closed
Wildberg Brothers – 349 Oyster Point Boulevard Open – Inactive not closed
Other than the updated information noted above, there are no changes to the conclusions of the original
EIR.
PAGES 11-9 THROUGH 11-19
No changes to the original EIR.
Chapter 12 HYDROLOGY
Additional Documents Reviewed
National Flood Insurance Program. Flood Insurance Rate Map. San Mateo County, California. Panel
42 OF 510. Effective Date October 16, 2012.
State Water Resources Control Board. Porter-Cologne Water Quality Control Act. Water Code
Division 7 and Related Sections, April 2017.
California Department of Water Resources. The National Flood Insurance Program in California.
Quick Guide Coastal Appendix: Planning for Sea-Level Rise. October, 2016.
Tetra Tech. Technical Memorandum. Short-term Flood Protection Plan for Oyster Point Landfill.
February 24, 2016.
California Department of Transportation. Construction Site Monitoring Program Guidance Manual.
August, 2013.
PAGE 12-3 SETTING - FLOODING
Update to floodplain descriptions to reflect FIRM map update available effective October 16, 2012.
20181427.001A /DOC # Page 7 of 10 August 2017
Copyright 2017 Kleinfelder
The majority of OPSP area (71 acres) is located outside of the Federal Emergency
Management Agency (FEMA) 100-year flood hazard zone (FEMA Zone X – Area of
Minimal Flood Zone) as delineated by the current FEMA Flood Insurance Rate Maps
(FIRMs) (2012). The borders of the site which abut the bay waters are within Zone VE
(10 acres), which defines areas in the 100-year flood hazard zone with wave action.
Additionally, the western shorelines are delineated as Zone AE (2 acres), which has a
one percent probability of flooding every year.
The OPSP area will not place new structures within the 100-year flood hazard zone as delineated by the
current Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMs).
Project Impact: None.
PAGE 12-3 REGULATORY SETTING – STATE LAWS AND REGULATIONS
Updated to reflect a new version of the Porter-Cologne Water Quality Act that is available.
The Porter-Cologne Water Quality Control Act, as amended, including statutes 2016,t
establishes the SWRCB and the RWQCBs as the principal state agencies having primary
responsibility for coordinating and controlling water quality in California. The Porter-
Cologne Act establishes the responsibility of the RWQCBs for adopting, implementing,
and enforcing water quality control plans (Basin Plans), which set forth the state’s water
quality standards (i.e. beneficial uses of surface waters and groundwater) and the
objectives or criteria necessary to protect those beneficial uses. The NPDES permit (see
subsequent section) must be consistent with the Basin Plan for the site region.
PAGE 12-4 REGULATORY SETTING – STATE LAWS AND REGULATIONS
Updated to reflect the project would comply with the most recent version of the Construction
General Permit Order.
The NPDES General Construction Permit Requirements apply to clearing, grading, and
disturbances to the ground such as excavation. The applicant is required to submit a
Notice of Intent (NOI) with the State Water Resource Control Board’s (SWRCB) Division
of Water Quality. The NOI includes general information on the types of construction
activities that will occur on the site. The applicant shall also be required to submit a site-
specific plan called the Stormwater Pollution Prevention Plan (SWPPP) for construction
activities. The SWPPP shall include a description of Best Management Practices (BMPs)
to minimize the discharge of pollutants from the site during construction. It is the
responsibility of the property owner to obtain coverage under the permit prior to site
construction. All construction and SWPPP activity would be in compliance with the
Construction General Permit Order 2009-2009-DWQ, (As amended by 2010-0014-DWQ
and 2012-0006-DWQ).
Implementation of these mitigation measures Hydro-1, Haz-4a, Haz-4d and Haz-4e would reduce the
OPSP’s impact related to contamination of off-site waters to a level of less-than-significant through use
of BMPs during installation of foundation piers, landfill cap upgrades, and continued monitoring for
leachate migration during operation and maintenance.
PAGE 12-4 REGULATORY SETTING – STATE LAWS AND REGULATIONS
20181427.001A /DOC # Page 8 of 10 August 2017
Copyright 2017 Kleinfelder
Updated to reflect the release of the California Climate Science and Data For Water Resources
Management report (2015).
In the interim, Bay Conservation and Development Commission (BCDC) has proposed
Bay Plan amendment language, which includes guidance for addressing future sea level
rise scenarios associated with planning and permitting development in potentially
susceptible areas in the San Francisco Bay Area. These scenarios are:
a sea level rise of 24 inches by 2050 (California, South of Cape Mendocino); and
a sea level rise of 66 inches by 2100 (California, South of Cape Mendocino; DWR
2015).
Source: California Department of Water resources. 2015. California Climate Science and Data For Water Resources
Management. Accessed August 30, 2017 at
http://www.water.ca.gov/climatechange/docs/CA_Climate_Science_and_Data_Final_Release_June_2015.pdf.
As shown on Figure 12.2, with construction of the Phase I Project including the proposed grading, no
structures will be located in areas subject to inundation under potentially high sea level rise projections for
2050 or 2100.
Project Impact: less than significant.
PAGE 12-7 WATER QUALITY STANDARDS OR WASTE DISCHARGE REQUIREMENTS
The following table was updated to address the revised California Stormwater BMP Handbook,
Industrial & Commercial, Effective September 2014.
ABLE 12.1
POTENTIAL POLLUTANTS FROM INDUSTRIAL ACTIVITIES
INDUSTRIAL ACTIVITY
Se
d
i
m
e
n
t
s
Nu
t
r
i
e
n
t
s
Me
t
a
l
s
Or
g
a
n
i
c
s
a
n
d
To
x
i
c
a
n
t
s
Fl
o
a
t
a
b
l
e
M
a
t
e
r
i
a
l
s
Ox
y
g
e
n
-
D
e
m
a
n
d
i
n
g
Su
b
s
t
a
n
c
e
s
Oi
l
&
G
r
e
a
s
e
Ba
c
t
e
r
i
a
Pe
s
t
i
c
i
d
e
s
Vehicle & Equipment Fueling X X X
Vehicle & Equipment Washing X X X X X X
Vehicle & Equipment Maintenance & Repair X X X
Outdoor Loading & Unloading of Materials X X X X X X X
Outdoor Container Storage of Liquids X X X X X X
20181427.001A /DOC # Page 9 of 10 August 2017
Copyright 2017 Kleinfelder
Outdoor Process Equipment Operations
& Maintenance
X X X X
Outdoor Storage of Raw Materials, Products,
& Byproducts
X X X X X X X
Waste Handling & Disposal X X X X X X
Contaminated or Erodible Surface Areas X X X X X X X X
Building & Grounds Maintenance X X X X X X X
Building Repair, Remodeling, & Construction X X X X
Parking/Storage Area Maintenance X X X X
Source: California Stormwater Quality Association, 2014. California Stormwater BMP Handbook, Industrial & Commercial.
Implementation of mitigation measures Hydro-1, Haz-4a, Haz-4d and Haz-4e should occur as well use of
BMPs during installation of foundation piers, landfill cap upgrades, and continued monitoring for leachate
migration during operation and maintenance.
Project Impact: less-than-significant.
PAGE 12-8 WATER QUALITY STANDARDS OR WASTE DISCHARGE REQUIREMENTS
Updated Mitigation measure to include an updated version of the Construction Site Monitoring
Program Guidance Manual.
Hydro-1: Best Management Practices (BMPs) shall be used during installation of foundation piers
to reduce the potential for gaps in the subsurface confining layers around the piers. BMP
requirements shall be identified in the SWPPP and shall be developed by the applicant or
their authorized representative. The exact BMPs to be implemented shall depend on final
pier design and type, but can include pre-drilling and grouting of concrete piers, use of
hollow steel piers, or other methods to reduce the risk of displaced refuse creating a void
in the Bay Mud layer. The proposed BMPs shall be benchmarked against the
Construction Site Monitoring Program Guidance Manual (CTSW-RT-11-255.20.1;
Caltrans 2013).
Source: California Department of Transportation. 2013. Construction Site Monitoring Program Guidance Manual.
Document number CTSW-RT-11-255.20.1. Accessed August 30, 2017 at
http://www.dot.ca.gov/hq/construc/stormwater/caltrans_guidance_manual-rev1.pdf
Implementation of these mitigation measures Hydro-1, Haz-4a, Haz-4d and Haz-4e should occur as well
as use of BMPs during installation of foundation piers, landfill cap upgrades, and continued monitoring
for leachate migration during operation and maintenance.
Project Impact: less-than-significant.
20181427.001A /DOC # Page 10 of 10 August 2017
Copyright 2017 Kleinfelder
PAGE 12-11 STRUCTURES WITHIN A 100-YEAR FLOOD HAZARD AREA
Updated Section to FIRM map updates available effective October 16, 2012.
The OPSP does not include housing and the majority of the OPSP area, 86 percent of
the 83-acre area, is located outside of the 100-year flood hazard zones delineated by the
current Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps
(FIRMs).
Project Impact: none.
PAGE 12-11 SIGNIFICANT RISK INVOLVING FLOODING
The following section was updated to reflect the release of the California Climate Science and
Data For Water Resources Management report (2015).
As discussed in the regulatory section above, the recommended sea level rise
assumptions of 24 inches by 2050 and 66 inches by 2100 have been used to assess the
potential for climate-induced sea level rise flooding at the OPSP site (California, South of
Cape Mendocino; DWR 2015). Figure 12.1 shows the potential for flooding under these
assumed future conditions with no changes to the OPSP site. This figure indicates that
substantial portions of the Marina area would be susceptible to flooding under the year
2100 sea level rise scenario. The Phase I Project proposes landfill waste relocation and
re-grading of the Marina area according to an approved grading plan. The proposed re-
grading will result in higher elevation of areas near the shoreline, with the resultant
reduced potential for flooding under assumed future climate-change induced sea level
rise conditions shown in Figure 12.2
Source: California Department of Water resources. 2015. California Climate Science and Data For Water Resources
Management. Accessed August 30, 2017 at
http://www.water.ca.gov/climatechange/docs/CA_Climate_Science_and_Data_Final_Release_June_2015.pdf.
As shown on Figure 12.2, with construction of the Phase I Project including the proposed grading, no
structures will be located in areas subject to inundation under potentially high sea level rise projections for
2050 or 2100.
Project impact: less than significant.
FEMA LETTER OF MAP REVISIONS
APRIL 19, 2017
MR. PRADEEP GUPTA
MAYOR, CITY OF SOUTH SAN
FRANCISCO
400 GRAND AVENUE
SOUTH SAN FRANCISCO, CA 94080
CASE NO.: 17-09-1343A
COMMUNITY: CITY OF SOUTH SAN
FRANCISCO, SAN MATEO COUNTY,
CALIFORNIA
COMMUNITY NO.: 065062
DEAR MR. GUPTA:
This is in reference to a request that the Federal Emergency Management Agency (FEMA)
determine if the property described in the enclosed document is located within an identified
Special Flood Hazard Area, the area that would be inundated by the flood having a 1-percent
chance of being equaled or exceeded in any given year (base flood), on the effective
National Flood Insurance Program (NFIP) map. Using the information submitted and the
effective NFIP map, our determination is shown on the attached Letter of Map Revision
(LOMR) V Zone Determination Document. This determination document provides
additional information regarding the effective NFIP map, the legal description of the
property, and our determination.
Additional documents are enclosed which provide information regarding the subject
property and LOMRs. Please see the List of Enclosures below to determine which
documents are enclosed. Other attachments specific to this request may be included as
referenced in the Determination/Comment document. If you have any questions about this
letter or any of the enclosures, please contact the FEMA Map Information eXchange toll free
at 1-877-336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency
Management Agency, LOMC Clearinghouse, 3601 Eisenhower Avenue, Suite 500,
Alexandria, VA 22304-6426.
Sincerely,
Luis Rodriguez, P.E., Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration
List of Enclosures
• LOMR-VZ DETERMINATION DOCUMENT (REMOVAL)
cc: State/Commonwealth NFIP Coordinator
Community Map Repository
Region
Mr. Ronald Cameron
Page 1 of 3 Date: April 19, 2017 Case No.: 17-09-1343A LOMR-VZ
LETTER OF MAP REVISION – COASTAL HIGH HAZARD AREA
DETERMINATION DOCUMENT (REMOVAL)
COMMUNITY AND MAP PANEL INFORMATION LEGAL PROPERTY DESCRIPTION
COMMUNITY
CITY OF SOUTH SAN
FRANCISCO, SAN MATEO
COUNTY, CALIFORNIA
A parcel of land, as described in the Grant Deed recorded as Document No.
2016-082620, in the Office of the Recorder, San Mateo County, California
The portion of property is more particularly described by the following
metes and bounds:
COMMUNITY NO: 065062
AFFECTED MAP
PANEL
NUMBER: 06081C0042E
DATE: 10/16/2012
FLOODING SOURCE: SAN FRANCISCO BAY APPROXIMATE LATITUDE & LONGITUDE OF PROPERTY: 37.666314, -122.384655
SOURCE OF LAT & LONG: LOMA LOGIC DATUM: NAD 83
DETERMINATION
LOT BLOCK/
SECTION SUBDIVISION STREET
OUTCOME W
HAT IS
REMOVED
FROM THE
SFHA
FLOOD
ZONE
1% ANNUAL
CHANCE
FLOOD
ELEVATION
(NAVD 88)
LOWEST
ADJACENT
GRADE
ELEVATION
(NAVD 88)
LOWEST
LOT
ELEVATION
(NAVD 88)
-- -- -- 379/385/389 Oyster
Point Boulevard
Portion of
Property
X
(unshaded) 10.0 feet -- 10.8 feet
Special Flood Hazard Area (SFHA) – The SFHA is an area that would be inundated by the flood having a 1-percent chance of being equaled or exceeded
in any given year (base flood).
ADDITIONAL CONSIDERATIONS (Please refer to the appropriate section on Attachment 1 for the additional considerations listed below)
LEGAL DESCRIPTION (CONTINUED)
ZONE V
PORTIONS SFHA
STUDY UNDERWAY
SUPERSEDES PREVIOUS DETERMINATION
This document provides the Federal Emergency Management Agency’s determination regarding a request for a Letter of Map Revision for the property
described above. Using the information submitted and the effective National Flood Insurance Program (NFIP) map, we determined that the structure(s) on
the property is/are not located in a Coastal High Hazard Area or the SFHA, an area inundated by the flood having a 1-percent chance of being equaled or
exceeded in any given year (base flood). This document revises the effective NFIP map to remove the subject property from the Coastal High Hazard Area
and the SFHA located on the effective NFIP map; therefore, the federal mandatory flood insurance requirement does not apply. However, the lender has
the option to continue the flood insurance requirement to protect its financial risk on the loan. A Preferred Risk Policy (PRP) is available for buildings
located outside the SFHA. Information about the PRP and how one can apply is enclosed.
This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If
you have any questions about this document, please contact the FEMA Map Information eXchange toll free at 1-877-336-2627 (FEMA MAP) or by letter
addressed to the Federal Emergency Management Agency, LOMC Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria, VA 22304-6426.
Luis Rodriguez, P.E., Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration
Page 2 of 3 Date: April 19, 2017 Case No.: 17-09-1343A LOMR-VZ
LETTER OF MAP REVISION – COASTAL HIGH HAZARD AREA
DETERMINATION DOCUMENT (REMOVAL)
ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS)
This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map
Information eXchange toll free at 1-877-336-2627 (FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC
Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria, VA 22304-6426.
Luis Rodriguez, P.E., Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration
LEGAL PROPERTY DESCRIPTION (CONTINUED)
COMMENCING AT THE SOUTHWEST CORNER OF SECTION 14, TOWNSHIP 3 SOUTH,
RANGE 5 WEST M.D.B.M., THENCE ALONG THE RECORD BOUNDARY OF SAID PARCEL
ONE, SOUTH 00° 00' 55" EAST, 5.00 FEET TO THE POINT OF BEGINNING; THENCE ALONG
THE LINE DEFINING THE WESTERLY LIMIT OF AREA SUBJECT TO REMOVAL FROM THE
SPECIAL FLOOD HAZARD AREA, THE FOLLOWING TWELVE (12) COURSES: (1) NORTH 89°
59' 05" EAST, 285.00 FEET; (2) NORTH 31° 20' 39" EAST, 118.41 FEET; (3) NORTH 78° 17' 16"
EAST, 301.44 FEET; (4) NORTH 39° 25' 37" EAST, 58.26 FEET; (5) NORTH 14° 27' 15" EAST,
113.13 FEET; (6) NORTH 00° 18' 08" WEST, 124.15 FEET; (7) NORTH 05° 17' 55" WEST, 184.38
FEET; (8) NORTH 20° 30' 05" EAST, 898.70 FEET; (9) NORTH 44° 20' 40" EAST, 98.23 FEET;
(10) NORTH 28° 16' 15" EAST, 114.39 FEET; (11) NORTH 42° 08' 55" WEST, 351.93 FEET; AND
(12) NORTH 62° 42' 50" EAST, 159.99 FEET TO A POINT ON THE NORTHERLY LINE OF SAID
PARCEL ONE; THENCE ALONG THE NORTHERLY LINE OF SAID PARCEL ONE NORTH 72°
25' 37" EAST, 197.57 FEET; THENCE ALONG THE RECORD BOUNDARY OF SAID PARCEL
ONE, THE FOLLOWING (11) COURSES; (1) NORTH 00° 00' 55" WEST, 51.63 FEET; (2) NORTH
89° 59' 05" EAST, 88.82 FEET; (3) SOUTH 26° 41' 01" EAST, 633.97 (CALLED 633.96 FEET ON 52
PM 59) FEET TO A POINT OF NON-TANGENT CURVATURE; (4) SOUTHWESTERLY ALONG
A CURVE TO THE LEFT, WHOSE RADIUS POINT BEARS SOUTH 26° 41' 01" EAST FOR 62.00
FEET, ALONG AN ARC LENGTH OF 46.46 FEET AND THROUGH A CENTRAL ANGLE OF 42°
56' 01", TO A POINT OF REVERSE CURVATURE; (5) SOUTHWESTERLY ALONG A CURVE TO
THE RIGHT, WHOSE RADIUS POINT BEARS NORTH 69° 37' 02" WEST FOR 50.00 FEET,
ALONG AN ARC LENGTH OF 37.47 FEET AND THROUGH A CENTRAL ANGLE OF 42° 56' 01",
TO A POINT OF TANGENT LINE; (6) SOUTH 63° 18' 59" WEST, 81.73 FEET; (7)
SOUTHWESTERLY ALONG A TANGENT CURVE TO THE LEFT, WHOSE RADIUS POINT
BEARS SOUTH 26° 41' 01" EAST FOR 275.00 FEET, ALONG AN ARC LENGTH OF 303.97 FEET,
AND THROUGH A CENTRAL ANGLE OF 63° 19' 54", TO A POINT OF TANGENT LINE; (8)
SOUTH 00° 00' 55" EAST, 410.00 FEET; (9) SOUTH 89° 59' 05" WEST, 321.00 FEET; (10) SOUTH
33° 44' 05" WEST, 167.01 FEET; AND (11) SOUTH 64° 44' 05" WEST, 257.40 FEET; THENCE
NORTH 81° 45' 55" WEST, 389.76 FEET ALONG THE SOUTHERLY LINE OF SAID PARCEL
ONE; THENCE NORTH 00° 00' 55" WEST, 187.73 FEET TO THE POINT OF BEGINNING
Page 3 of 3 Date: April 19, 2017 Case No.: 17-09-1343A LOMR-VZ
LETTER OF MAP REVISION – COASTAL HIGH HAZARD AREA
DETERMINATION DOCUMENT (REMOVAL)
ATTACHMENT 1 (ADDITIONAL CONSIDERATIONS)
This attachment provides additional information regarding this request. If you have any questions about this attachment, please contact the FEMA Map
Information eXchange toll free at 1-877-336-2627 (FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, LOMC
Clearinghouse, 3601 Eisenhower Avenue, Suite 500, Alexandria, VA 22304-6426.
Luis Rodriguez, P.E., Chief
Engineering Management Branch
Federal Insurance and Mitigation Administration
ZONE V (This Additional Consideration applies to the preceding property)
A portion of this property, but not the subject of the Determination/Comment Document, is located within a Coastal High
Hazard Area (Zone V, VE or V1-30). Therefore, any future construction or substantial improvement on the property
remains subject to Federal, State/Commonwealth, and local regulations for floodplain management. No construction
using fill for structural support or that may increase flood damage to other property may take place in these areas.
PORTIONS OF THE PROPERTY REMAIN IN THE SFHA (This Additional Consideration
applies to the preceding property)
Portions of this property, but not the subject of the Determination/Comment document, may remain in the Special Flood
Hazard Area. Therefore, any future construction or substantial improvement on the property remains subject to Federal,
State/Commonwealth, and local regulations for floodplain management.
STUDY UNDERWAY (This Additional Consideration applies to the preceding property)
This determination is based on the flood data presently available. However, the Federal Emergency Management Agency
is currently revising the National Flood Insurance Program (NFIP) map for the community. New flood data could be
generated that may affect this property. When the new NFIP map is issued it will supersede this determination. The
Federal requirement for the purchase of flood insurance will then be based on the newly revised NFIP map.
SUPERSEDES OUR PREVIOUS DETERMINATION (This Additional Consideration applies to all properties in
the LOMA DETERMINATION DOCUMENT (REMOVAL))
This Determination Document supersedes our previous determination dated 3/29/2017, for the subject property.