Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix F_AQ and GHG Technical Memo-Screencheck_Clean_WITH TABLES AND INSERTS.pdf
APPENDIX F Air Quality and Greenhouse Gas Emissions Memo Appendix F AIR QUALITY AND GREENHOUSE GAS TECHNICAL MEMO PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. OCTOBER 2, 2018 INTERNAL DRAFT- SUBJECT TO CHANGE 201 Haskins Way Project Appendix F Contents 1. Introduction 1.1. Project Description 1.2 Scope 1.3 Impacts Evaluation 1.3.1 Criteria Air Pollutants and Precursors 1.3.2 Greenhouse Gas Emissions 1.3.3 Local Carbon Monoxide 2. Emission Estimates 2.1. Construction Emissions 2.1.1 Off -Road Equipment Exhaust Emissions 2.1.2 Onsite Fugitive Dust Emissions 2.1.3 On -Road Vehicle Emissions 2.1.4 Architectural Coating and Paving Emissions 2.2 Operational Emissions 2.2.1 Mobile Source Emissions 2.2.2 Area Source Emissions 2.2.3 Stationary Source Emissions 3. Results 3.1. Criteria Air Pollutants and Precursors 3.1.1 Construction CAPs 3.1.2 Operational CAPs 3.2 Greenhouse Gases 3.2.1 Construction GHGs 3.2.2 Operational GHG 3.3 Localized Carbon Monoxide Screencheck Draft F -1 October 2, 2018 201 Haskins Way Project Appendix F Tables Table 1 -1. Air Quality CEQA Thresholds of Significance Table 2 -1.1. Construction Schedule —Project Phase 1 Table 2 -1.2. Construction Schedule — Project Phase 2 Table 2 -2. Construction Equipment Roster Table 2 -3. Construction Trips Table 2 -4. Coating Surface Areas Table 2 -5. Trip Rates Table 5 -1. Air Quality CEQA Assessment Results Table 5 -2. Unmitigated Construction- Related CAP Emissions Table 5 -3. Mitigated Construction- Related CAP Emissions Table 5 -4. Unmitigated Operational - Related CAP Emissions (lb /day) Table 5 -5. Unmitigated Operational - Related CAP Emissions (tpy) Table 5 -6. Unmitigated Construction- Related GHG Emissions Table 5 -7. Unmitigated Operational- Related GHG Emissions with Amortized Construction Figures Figure 1 -1. Project Map Figure 1 -2 Project Plan Figure 5 -1 Emergency Generator Emission Calculations Attachments Attachment A. Project Phase 1 Annual Emission Report Attachment B Project Phase 1 Summer Emission Report Attachment C Project Phase 1 Winter Emission Report Attachment D Project Phase 1 Mitigation Report Attachment E. Project Phase 2 Annual Emission Report Attachment F Project Phase 2 Summer Emission Report Attachment G Project Phase 2 Winter Emission Report Attachment H Project Phase 2 Mitigation Report Attachment I Intersection Volume Summary Screencheck Draft F -2 October 2, 2018 201 Haskins Way Project Appendix F 1. Introduction SWCA Environmental Consultants (SWCA) has prepared this technical report document on behalf of Alexandria Real Estate Equities, Inc (ARE). The purpose of this report is to elucidate the methodologies used to evaluate the effects of the proposed 201 Haskins Way Project on ambient air quality, greenhouse gas emissions (GHGs), and health risks. The evaluation of project impacts was conducted as recommended in the Bay Area Air Management District (BAAQMD) California Environmental Quality Act (CEQA) Air Quality Guidelines dated May 20171, which is incorporated into this technical document by reference. 1.1 Project Description The proposed project area is bounded by the San Francisco Bay to the east and Highway 101 and railway lines to the west. The project site is composed of eight parcels encompassing approximately 18.2 acres which are outlined in Figure 1 -1. Seven of the parcels are currently zoned as a Mixed Industrial (MI) district and one of the parcels is currently zoned as a Business Commercial (BC) district. As the project sponsor, ARE plans to rezone all eight existing parcels to a Business Technology Park (BTP) district. The proposed rezoning will allow construction of BTP offices and associated parking. The project plan consists of two phases of construction as summarized below: Phase 1 Phase 1 of construction will involve the demolition of a 24,075- gross- square -foot (gsf) building at 201 Haskins Way along with the surface lot previously associated with light industrial trucking activity. Following demolition, a 311,368 -gsf office building (201 Haskins Way Building) with a 63- foot -tall, 3 -story wing and a 95- foot -tall, 5 -story wing, a 720 - stall, 5 -level parking structure, and 183 surface parking spaces will be constructed on at 201 Haskins Way. A 25,000 -gsf, 2 -story addition to the existing western building at 400 -450 East Jamie Court will also be constructed. Construction will commence in late 2018 or early 2019 and will be completed within approximately 18 months. It is assumed that operation of the project will begin immediately after construction is completed. Figure 1 -2 shows the planned Phase 1 and 2 building locations. Phase 2 Phase 2 of construction will involve the demolition of approximately 157,995 -gsf of light industrial buildings along with the associated surface parking lots on the parcels located at 101 and 151 Haskins Way, 410 and 430 East Grand Avenue, 451 East Jamie Court, and an unaddressed parcel at APN 015- 102 -290. As shown in Figure 1 -2, a new 256,232 -gsf office building (East Grand Building) with a 63- foot -tall, 3 -story wing and a 95- foot -tall, 5 -story wing will be constructed. The parking garage constructed during Phase 1 will be expanded to the two parcels to the east adding 340 stalls and 243 additional surface parking spaces will be added during Phase 2. Additionally, an additional 85,000 gsf of BTP office space would be constructed at 400 -450 East Jamie Court. It is conservatively assumed that construction of Phase 2 will be commenced immediately upon termination of the Phase 1 construction project. Construction ' Available online at: hM2: / /www.baagmd.gov / —/ media / Files /Planning %20and %20Research / CEQA/ BAAQMD ° /`20CEQA %20Guidelines %20Mg ° 02011.ashx ?la =en. Accessed June 6, 2018. Screencheck Draft F -3 October 2, 2018 Figure 1 -1 - Project Area Map r" 401 E Grand (015- 101 -140) 415 E Grand (015- 101 -120) LLjEa'st ast Grand Avenue 377 Swift (015- 064 -040) rand -180) Swift Ave IT r 390 Swift (101- 960 -010) 431 E Grand Legend (015- 101 -130) � � � ,� Phase 1 Area f � trtt:}f poq Q Phase 2 Area o 430 E Grand r - (015- 102 -160) r' 620 ELGrand4 (015- 102 -370) 4 U) - K c J,0201 Haskins 015 - +1 102 -230) t 1- ,4 East Jamie Court a ■ - �"+ - L1U79 7UL -Z9UJ �� �� San Francisco;Bay Trail 451 E Jamie (015- 102 -240) 0 O F 0 I Iw Bm- AWL. 500 E Ja 015 -102- Feet O 0 50 100 200 Figure 1 -2 — Project Plan j Legend Proposed Rrojed � Phare 1 Area EAST GRAND _ III Phase 2 Area +ice 4: z � : Ea ran �iu'i I d1r , 9 Lam, f° ,urfzc, Parkii),6 Park: l' —f 77 �I ` Lot - �,I ; �I Lov- - -,s 2C 1 Ha Li--- 3 Levels` „� w FAST JALAIF COURT III J_ — -- _ - -- Ii - -- - �. F — �I , i k, ` IIT- _FE�ils� _ in, ° -�.ftf liU���' 1� - '�.� I rJ � �I � ELIII�illlj � 1 1�3= rl - -- -- -- — L — _ — -- - - -` — Sari rrandScQ Bay Trail -- -- — - - - --- SAN FRANCISCO BAY PLANNED CONSTRUCTION 201 Haskins Way Project Appendix F activity on Phase 2 will likely be completed within approximately 18 months of the date of commencement and it is assumed that operation of the project will begin immediately after construction is completed. 1.2 Scope BAAQMD has developed Thresholds of Significance (TOS) for certain air pollutants with which to compare project impacts. Should a project's emission levels exceed the TOS, the emissions would be considered cumulatively considerable and result in significant adverse impacts to the San Francisco Bay Area Basin's existing air quality conditions. This section summarizes which pollutants require evaluation in accordance with the BAAQMD CEQA Guidelines document. Impacts Evaluated Impacts from the 201 Haskins Way Project were compared to the screening criteria specified in the BAAQMD CEQA guidelines or to the TOS specified in Table 1 -1, as applicable. The project impacts were assessed for criteria air pollutants and precursors (CAPS), local carbon monoxide (CO), and GHGs. Impacts Not Evaluated BAAQMD CEQA guidelines also specify that an individual project and cumulative Health Risk Assessment (HRA) be conducted for projects impacting off -site sensitive receptors2 within the project zone of influence' and for newly sited on -site sensitive receptors potentially affected by on -site and off -site sources of toxic air contaminants (TACs). However, no new sensitive receptors will be sited as part of the project rezoning and there are no sensitive receptors within 1,000 feet of the project site. Thus, no HRA was conducted and project impacts will be less -than- significant. Additionally, evaluation of worst case scenario impacts from accidental release of acutely hazardous air pollutants (HAPs) is recommended if • the project would site a new source that stores or uses potentially hazardous materials and is locating near receptors; or • the project would site a new receptor near existing sources that store or use acutely hazardous materials Because the rezoning project will consist of the development of office buildings and parking structures and lots, no storage or use of substantial amounts of hazardous materials is anticipated, and no new receptors would be created. Therefore, an evaluation of impacts of potential accidental release of HAPs was not conducted because it is evident that there will be no project impacts. 2 BAAQMD refers to receptors throughout the May 2017 CEQA guidelines. A location should be considered a receptor if sensitive individuals are likely to spend a significant amount of time there. Sensitive individuals refer to those segments of the population most susceptible to poor air quality: children, the elderly, and those with pre- existing serious health problems affected by air quality (ARB 2005). Examples of receptors include residences, schools and school yards, parks and playgrounds, daycare centers, nursing homes, and medical facilities. ' BAAQMD CEQA guidelines specify that the zone of influence of a project is a 1,000 -foot radius from the project property line or receptor. Screencheck Draft F -4 October 2, 2018 MOM ROG 54 54 10 NO,, 54 54 10 PM10 (exhaust) 82 82 15 PM2.5 (exhaust) 54 54 10 PM10 /PM2.5 (fugitive dust) Best Management None Practices 9.0 ppm (8 -hour average) Local CO None 20.0 ppm (1 -hour average) Compliance with Qualified GHG Reduction Strategy; GHGs - Projects other than OR Stationary Sources None 1,100 MT CO 2 e /yr; OR 4.6 MT CO2e /SP /yr (residents + employees) GHGs - Stationary Sources None 10,000 MT CO2e /yr Compliance with Qualified Community Risk Reduction Plan; OR Risks and Hazards for new Increased cancer risk of > 10.0 in a million; sources and receptors Same as Operational Increased non - cancer risk of > 1.0 Hazard Index; (Individual Project) Ambient PM2.5 increase > 0.3 µg /m3 Zone of Influence: 1,000 -foot radius from property line of source or receptor Compliance with Qualified Community Risk Reduction Plan; OR Risk and Hazards for new Increased cancer risk of > 100.0 in a million; sources and receptors Same as Operational Increased non - cancer risk of > 10.0 Hazard Index; (Cumulative Threshold) Ambient PM2.5 increase > 0.8 µg /m3 Zone of Influence: 1,000 -foot radius from property line of source or receptor Storage or use of acutely hazardous materials Accidental Release of Acutely locating near receptors or new receptors locating Hazardous Air Pollutants None near stored or used acutely hazardous materials considered signficant Five confirmed complaints per year averaged over Odors None three years. 201 Haskins Way Project Appendix F Odor impacts could result from siting a new odor source near existing sensitive receptors or siting a new sensitive receptor near an existing odor source. The proposed rezoning project construction or operation would not create substantial odors, nor site a new sensitive receptor near an existing odor source. Therefore, impacts are assumed to be less than significant. 1.3 Impacts Evaluation 1.3.1 Criteria Air Pollutants and Precursors CAP emissions were compared with the TOS shown in Table 1 -1 for construction- related average daily emissions and operational - related average daily and maximum annual emissions. California Emissions Estimator Model (CalEEMod)4 Version 2016.3.2 was utilized to quantify CAP emissions from construction and operations. Emergency diesel generator emissions were quantified separately using the engine vendor specifications. Input data sources and justification are summarized in Section 2. 1.3.2 Greenhouse Gas Emissions GHG emissions were compared with the TOS shown in Table 1 -1 for operational- related maximum annual emissions from the project including stationary sources. The BAAQMD does not have an adopted TOS for construction- related GHG emissions. However, construction related GHG emissions are quantified and added to operational emissions and compared with the BAAQMD operational threshold. CalEEMod and diesel emergency generator information was used to calculate GHG emissions for the GHG impacts evaluation. Input data sources and justification are summarized in Section 2. In addition, GHG emissions were examined for consistency with the City's CAP, Plan Bay Area, and the State's 2030 and 2050 emission reduction goals. 1.3.3 Local Carbon Monoxide BAAQMD has established screening criteria to evaluate whether more in -depth analysis is warranted to assess impacts. The local CO was evaluated by comparison with the screening criteria established by BAAQMD. If all specified screening criteria are met, then it is assumed that proposed project emissions result in less- than - significant impact to air quality. To meet the BAAQMD screening criteria the project must: be consistent with an applicable congestion management program established by the county congestion management agency for designated roads or highways, regional transportation plan, and local congestion management agency plans; and not increase traffic volumes at affected intersections to more than 44,000 vehicles per hour; and not increase traffic volumes at affected intersections to more than 24,000 vehicles per hour where vertical and/or horizontal mixing is substantially limited (e.g., tunnel, parking garage, bridge underpass, natural or urban street canyon, below -grade roadway) 4 California Emissions Estimator Model. Developed for California Air Pollution Control Officers Association (CAPCOA) in Collaboration with California Air Districts. The model can be downloaded from: http: / /caleemod.com/. Accessed May 29,2018. Screencheck Draft F -5 October 2, 2018 201 Haskins Way Project Appendix F Section 5 provides the results from the comparison of the local CO impacts with BAAQMD's established screening criteria. The impacts were determined to meet BAAQMD's screening criteria, which provide the Lead Agency with a conservative indication of whether the implementation of the proposed project would result in CO emissions that exceed BAAQMD's thresholds. 2. Emission Estimates Project average daily and maximum annual emission rates for CAP and GHG emissions were calculated using CaIEEMod, stationary source manufacturer's information and applicable emission factors. This data was used to directly assess TOS for construction and operational emissions from the project for CAPs and GHG emissions. The User's Guide for CaIEEMod Version 2016.3.2 dated November 2017 (CaIEEMod User's Guide) and associated Appendices are referenced throughout this section to explain the calculation methodologies and can be located on the CaIEEMod website5. The CaIEEMod User's Guide is incorporated by reference. 2.1 Construction Emissions Emission rates from construction activities resulting from Phase 1 and Phase 2 of the project were calculated using CaIEEMod. Project construction activities for Phase 1 and Phase 2 will not overlap, thus, two separate CaIEEMod analyses were conducted to determine the average daily emissions for each of the two project phases. Construction emissions generated from off -road construction equipment and on -road vehicles include reactive organic gas (ROG), oxides of nitrogen (NOX), CO, sulfur dioxide (S02), direct emissions of particulate matter with a diameter less than 10 microns (PMIo) and particulate matter with a diameter less than 2.5 microns (PM2.5), and GHG emissions. In addition, fugitive dust in the form of PMIo and PM2.5 arises from construction activities such as materials movement, grading, demolition, and construction equipment or vehicle operations. Phases of construction where architectural coatings are applied contribute to the release of ROG emissions. 2.1.1 Off -road Equipment Emissions The construction schedule (shown in Table 2 -1.1 and Table 2 -1.2) and off -road equipment roster (shown in Table 2 -2) for Phase 1 and Phase 2 were developed based on information from ARE and the construction company. In addition to information provided by the project applicant, CaIEEMod defaults for horsepower (hp), load factor (LF), and individual pollutant grams per horsepower -hour (g /hp -hr) were used to calculate emissions. Load factor and g /hp -hr values used based on equipment type and construction year can be found by referring to the CaIEEMod User's Guide, Appendix D Table 3.3 for hp and LF and Table 3.4 for g/hp -hr. ROG, NO, CO, S02, Exhaust PMIo, Exhaust PM2.5, and GHG emissions are calculated for each piece of equipment based on the following formula: Emissions (lbs) /day = g/hp -hr * hr /day * hp * LF/ 453.6 g /lb Based on the calculated equipment emissions and construction schedule, daily average and maximum annual emissions for each construction year were calculated. 5 User's Guide for CaIEEMod Version 2016.3.2. Available online at: http: / /caleemod.com/. Accessed June 6, 2018 Screencheck Draft F -6 October 2, 2018 Table 2 -1.1 1 Demolition 12/12/2018 1/8/2019 5 20 2 Soils Abatement / Remove / Replace 12/26/2018 1/22/2019 9 20 3 Site Prep and Make Ready 1/23/2019 3/12/2019 5 35 4 Parking Garage Underground 2/22/2019 4/4/2019 5 30 5 Parking Garage Core Construction 4/4/2019 1/20/2020 5 208 6 Parking Garage Exterior Improvements 12/2/2019 12/30/2019 5 21 7 Lab / Office Building Underground 2/22/2019 4/18/2019 5 40 8 Lab / Office Building Core Construction 4/19/2019 4/14/2020 5 258 9 Lab / Office Building Exterior Improvements 1/15/2020 4/14/2020 5 65 10 Lab / Office Building Tenant Improvements 12/26/2019 10/27/2020 5 219 11 Landscaping and Site Improvements 1/6/2020 7/3/2020 5 130 Table 2 -1.2 1 Demolition 10/28/2020 11/24/2020 5 20 2 Soils Abatement / Remove / Replace 11/11/2020 12/8/2020 9 20 3 Site Prep and Make Ready 12/9/2020 1/26/2021 5 35 4 Parking Garage Underground 1/8/2021 2/18/2021 5 30 5 Parking Garage Core Construction 2/18/2021 7/7/2021 5 100 6 Parking Garage Exterior Improvements 5/18/2021 6/16/2021 5 22 7 Lab / Office Building Underground 1/8/2021 3/4/2021 5 40 8 Lab / Office Building Core Construction 3/5/2021 3/4/2022 5 261 9 Lab / Office Building Exterior Improvements 12/4/2021 3/4/2022 5 65 10 Lab / Office Building Tenant Improvements 11/14/2021 9/15/2022 5 219 11 Landscaping and Site Improvements 11/25/2021 5/25/2022 5 130 Table 2 -2 1 Construction of Phase 1 and Phase 2 of the Project are sufficiently similar to assume the same equipment roster is utilized during the construction phases 2 Painting and Fagade Equipment are classified as "Other General Industrial Equipment" in CaIEEMod. . . .. . . .. . . .. . . .. . . .. . . . . .- . . . . .. . . . . .. . . . IL . .. . . . . .. . . . . .. Aerial Lifts - - - - - - - - 1 7 1 6 - - 4 7 3 6 1 7 - - Air Compressors 2 7 - - - - - - - - - - - - 4 6 - - 1 7 - - Bore /Drill Rigs - - - - 2 7 1 7 - - - - 2 4 - - - - - - - - Cement and Mortar Mixers - - - - - - - - 6 4 - - - - - - - - - - 2 4 Concrete /Industrial Saws 2 6 - - - - - - - - - - - - - - - - - - - - Cranes - - - - - - - - 1 7 1 3 - - 2 7 - - - - - - Crawler Tractors - - 1 4 - - - - - - - - - - - - - - - - - - Dumpers /Tenders 1 4 2 6 1 6 - - - - - - - - - - - - - - 1 6 Excavators 2 3 2 5 1 4 2 7 - - - - 2 - - - - - - - - - Forklifts 1 7 - - - - - - - - - - - - - - - - - - - - Generator Sets - - - - - - 2 4 - - - - 2 4 - - - - - - - - Off - Highway Trucks 2 4 3 4 2 4 - - 1 4 1 4 - - 2 4 2 4 2 4 - - Other General Industrial Equipment (Specify) - - - - - - - - - - 1 4 - - - - 2 7 - - - - Paving Equipment - - - - - - - - - - - - - - - - - - - - 2 7 Plate Compactors - - 2 5 2 5 2 4 1 4 - - 2 4 - - - - - - 2 4 Pressure Washers - - - - - - - - - - 1 2 - - - - 1 4 - - - - Pumps - - - - - - - - 1 6 - - - - - - - - - - - - Rollers - - - - - - - - - - - - - - - - - - - - 2 5 Rough Terrain Forklifts - - - - - - 2 2 1 6 1 5 2 8 2 6 3 7 1 7 1 3 Rubber Tired Dozers 2 6 - - - - - - - - - - - - - - - - - - 2 4 Rubber Tired Loaders - - 2 5 2 6 1 2 - - - - 1 6 - - - - - - - - Scrapers - - 2 4 2 6 - - - - - - - - - - - - - - - - Skid Steer Loaders 1 6 - - - - - - - - - - - - - - - - - - 1 6 Sweepers /Scrubbers 1 4 1 4 1 4 1 4 - - - - 1 4 1 4 1 4 1 6 - - Tractors /Loaders /Backhoes 2 5 1 6 2 6 2 6 - - - - 2 6 - - - - - - 2 4 Trenchers - - - - - - 2 4 - - - - 4 7 - - - - - - - - Welders - - - - - - - - 3 6 2 5 - - 5 7 2 6 1 5 - - 1 Construction of Phase 1 and Phase 2 of the Project are sufficiently similar to assume the same equipment roster is utilized during the construction phases 2 Painting and Fagade Equipment are classified as "Other General Industrial Equipment" in CaIEEMod. 201 Haskins Way Project Appendix F 2.1.2 Onsite Fugitive Dust Emissions Demolition and onsite materials movement activities generate fugitive dust. PM2.5 and PMIo resulting from fugitive dust emissions were calculated using CalEEMod defaults and soils import/export and demolition volumes provided by ARE's construction company. CalEEMod calculates demolition emissions based on methodologies and default emission factors from a 1988 report 6 prepared for the United States Environmental Protection Agency (U.S. EPA) by Midwest Research Institute (MRI). Fugitive dust from demolition operations are generated primarily through mechanical and/or explosive dismemberment and through debris loading and associated on -site truck traffic on paved and unpaved roads. Dust emissions from mechanical or explosive dismemberment are based on the tons of debris demolished, the mean wind speed, material moisture content (default of 2 percent), and a particle size multiplier for PMIo and PM2.5 (default of 0.35 and 0.053, respectively). The dust emissions from debris loading are calculated using the tons of debris loaded, particle size multipliers, and an emission factor for total suspended particulates (TSP) (default of 0.58 lb /ton) from the 1988 MRI report. The TSP emission factor is based on two tests of the filling of trucks with crushed limestone using a front - end loader. Specific formulas used to calculate demolition emissions can be found in the CalEEMod User's Guide Appendix A, section 4.4. Materials movement activities include site grading, dozers moving dirt onsite, and truck loading and unloading. Detailed calculation methodology can be found in the CalEEMod User's Guide Appendix A, Section 4.3. For grading activities, emissions are calculated by multiplying pound per vehicle miles traveled (lb/VMT) emission factors by grading equipment vehicle miles traveled (VMT). Emission factors in lb/VMT for PMIo and PM2.5 are determined by mean vehicle speed and U.S. EPA AP -42 Section 11.97, Table 11.9 -1 Emission Factor Equations and Scaling Factors for grading. The VMT for grading equipment is based on the total acres graded divided by the grading equipment blade width (default of 12 feet). The CalEEMod default for total acres graded is based on the type and number of grading equipment and equipment- specific grading rates from Walker's Building Estimator's Reference Book and determinations by the South Coast Air Quality Management District (SCAQMD). Emissions from bulldozing are calculated by multiplying the pound per hour (lb /hr) emission factors by the hours of operation for bulldozing equipment. Emission factors in lb /hr for PMIo and PM2.5 are determined by material moisture content, material silt content and U.S. EPA AP -42 Section 11.9, Table 11.9 -1 Emission Factor Equations and Scaling Factors for bulldozing overburden material. CaIEEMod uses the overburden constants associated with overburden as defaults for calculation of bulldozing dust emissions since of the available material options in AP- 42 Table 11.9 -1, overburden most closely models the bulldozed materials during construction. Fugitive dust emissions from truck loading and unloading of imported and exported soils are based on the tons of loaded and unloaded materials, the mean wind speed, material moisture content, and a particle size multiplier for PMIo and PM2.5 (default of 0.35 and 0.053, respectively). 6 Grelinger, M.A., Muleski, G., Kinsey, J.S., Cowherd, C., & Hecht, D. Gap - filling PM 10 emission factors for selected open -area dust sources. United States. 1988 7 U.S. EPA AP -42, Fifth Edition, Volume I Chapter 11: Mineral Products Industry. Section 11.9: Western Surface Coal Mining. Available online at: https:/ /www3.epa.gov /ttnchiel /ap42 /chl l/. Accessed June 6, 2018. Screencheck Draft F -7 October 2, 2018 201 Haskins Way Project Appendix F 2.1.3 On -Road Vehicle Emissions During construction, worker trips, vendor trips, and hauling trips by on -road mobile sources contribute to exhaust emissions of ROG, NO, CO, S02, Exhaust PMIo, Exhaust PM2.5, and GHG emissions. Another source of emissions is known as evaporative emissions where ROG is emitted due to venting of fuel from a vehicle when a vehicle is parked, driven, and refueled. PM emissions from brake and tire wear as well as on -road fugitive dust emissions associated with vehicles travelling over paved and unpaved roads also result from construction- related travel. The CalEEMod User's Guide, Appendix A, Section 4.5 and 4.6 describe in detail the emission factors used, CalEEMod default assumptions, and calculation methodologies for the emissions associated with on -road vehicle emissions. The number of worker and vendor trips per day is estimated based on the methodology specified in the CalEEMod User's Guide, Appendix A, Section 4.5, which is explained in more detail in the footnote associated with Table 2 -3. The number of hauling trips is based on the amount of material demolished, imported, and exported and the information provided by the construction company that each truck has the capacity to haul 20 cubic yards of materials. Haul trips are assumed not to be phased since the imported soils are sourced from a different location than exported soils. The number of trips per phase of construction is shown in Table 2 -3 along with associated trip lengths. Default trip lengths from CalEEMod were utilized for worker and vendor trips. Since the location of the landfill where demolished and exported materials will be taken and the location of the quarry where backfill material will be sourced from are known, the trip lengths are adjusted appropriately for haul trips based on actual trip lengths, number of haul trips for import and export, and the distances to the respective locations. Based on the trips per day and associated trip lengths, vehicle miles traveled were determined. EMFAC2014 web database emission factors for each pollutant (except methane), vehicle class, season, and operating year for San Mateo County based on aggregated model year and speed data were used to determine the annual and seasonal lb/VMT for on -road vehicle direct emissions. The CalEEMod User's Guide Appendix A, Section 4.5 and 4.6 explains this in more detail. Methane emission factors in lb/VMT were provided by the California Air Resources Board (CARB). The CalEEMod default vehicle mixes were used for worker, vendor, and hauling trips. To determine fugitive dust (PM2.5 and PMIo) emissions, it was assumed that all roads travelled by workers, vendors, and haulers were 100% paved due to site geography. Methodologies in CalEEMod used to calculate fugitive dust emissions for vehicles travelling on paved roads are based on U.S. EPA's AP -42 Section 13.2.1.9 CalEEMod default values for road silt loading and average weight of vehicles travelling the road as well as precipitation data for San Mateo county were used. CalEEMod conservatively assumes no precipitation when calculating daily emissions. 2.1.4 Architectural Coating and Paving Emissions ROG emissions result from off - gassing from evaporation of solvents contained in surface coatings and off - gassing associated with asphalt paving of parking lots. ROG emissions from architectural coatings are based on the estimated surface area painted and an lb VOC /square foot emission factor which varies by construction start year, location, and coating 8 California Air Resources Board EMFAC2014 Web Database. Available online at: https: / /www.arb.ca.2ov /emfac /2014/. Accessed June 6,2018. 9 U.S. EPA AP -42, Fifth Edition, Volume I Chapter 13: Miscellaneous Sources. Section 13.2: Introduction to Fugitive Dust Sources. Section 13.2.1: Paved Roads. Available online at: https:// www3 .epa.gov /ttn/chief /ap42 /chl3 /. Accessed June 6, 2018. Screencheck Draft F -8 October 2, 2018 Table 2 -3 Lri aulin 53 Demolition 20 10.8 - - 230 19 Soils Abatement and Replacement 20 10.8 - - 814 12.6 Site Prep and Make Ready 19 10.8 - - - - Parking Garage Underground 11 10.8 5 7.3 - - Office Building Underground 13 10.8 6 7.3 - - Parking Garage Core 96 10.8 43 7.3 - - Office Building Core 113 10.8 50 7.3 - - Parking Garage exterior improvements 22 10.8 - - - - Office Building Tenant Imrovements 19 10.8 - - - - Landscaping and Site Improvements 19 10.8 - - - - Office Building Exterior Improvements 7 10.8 - - - - Demolition 20 10.8 - - 1509 19 Soils Abatement and Replacement 20 10.8 - - 659 12.6 Site Prep and Make Ready 19 10.8 - - - - Parking Garage Underground 6 10.8 3 7.3 - - Office Building Underground 13 10.8 6 7.3 - - Parking Garage Core 46 10.8 21 7.3 - - Office Building Core 114 10.8 51 7.3 - - Parking Garage exterior improvements 11 10.8 - - - - Office Building Tenant Imrovements 19 10.8 - - - - Landscaping and Site Improvements 19 10.8 - - - - Office Building Exterior Improvements 7 10.8 - - - - i Calculated according to methodologies specified in the CalEEmod User's Guide Appendix A. For all construction phases except building construction and architectural coating phases, the number of workers based on 1.25 workers per equipment in that phase. For building construction phases, worker and vendor trip rates are based on SMAQMD Building Construction worker and Vendor Trip rates. These rates were obtained from a comprehensive field study conducted by SMAQMD in 2008 (updated 2010) of worker /vendor trips associated with construction of different land use types and are used as the basis for the CalEEMod default values. These rates are utilized to estimate the worker and vendor trip rates associated with this project and where necessary adjusted using the same approach to account for multiple phases in order to run CalEEMod. Architectural coating worker trips are based on 20% of the associated building construction phase trips. Note that construction coating stage for the office building are separated into interior and exterior coating phases in the project construction schedule. Therefore, the outdoor coating stage is assumed to require 25% of the worker trips and the indoor coating stage is assumed to require 75% of the worker trips based on CalEEmod default assumption that exterior shell is 25% of building surface area. 2CalEEMod default trip rates. 3 Based on the volumes of debris from demolition, soils exported, and soils imported. 4 Distance to Half Moon Bay Landfill is 19 miles. Distance to quarry where imported material is sourced is 6.2 miles. Hauling Trip length for Soils abatement and replacement Phase is based on weighted average trip length. 201 Haskins Way Project Appendix F type. The default CaIEEMod factors for San Mateo County for non - residential interior, non- residential exterior, and parking lot paint were used to estimate surface coating emissions. Methodologies from the CalEEMod User's Guide, Appendix A, Section 4.7 for estimating office building and parking lot surface areas were used. The estimated building and parking lot surface areas for coating operations are shown in Table 2 -4 and the associated footnote goes into more detail on the methodology for estimating these surface areas. Asphalt paving off -gas emissions of ROG are determined based on the acreage of parking lot area and a default emission factor of 2.62 lb ROG /acre based on the factor developed by the Sacramento Metropolitan Air Quality Management District (SMAQMD) in the 1994 development of Air Quality TOS document, first edition and are incorporated by reference in the CALEEMod User's Guide Appendix A, page 18. The parking garage area is assumed to be concrete with no off - gassing and thus only surface parking lot areas are used to determine ROG emissions associated with asphalt paving. To conservatively estimate emissions from asphalt paving activities, it is assumed that the entire acreage of the construction site not used by building or parking structure footprints makes up the parking lot area and will be asphalt - paved. This is a conservative estimate since a portion of the BTP district will be landscaped and pedestrian sidewalks and other walkways will not be asphalt - coated. Table 2 -3 2.2 Operational Emissions Emission rates from all operational - related activities resulting from Phase 1 and Phase 2 of the project except for stationary diesel -fired emergency generator engines were calculated using CalEEMod. Project operational - related activities for Phase 1 and Phase 2 were summed to determine the average daily emissions and maximum annual emission rates. Phase 1 and Phase 2 operational - related emissions are however, evaluated separately to allow demonstration that both phases of project operation will meet the specified TOS. This is particularly important to evaluate the GHG emission metric ton (MT) carbon dioxide equivalent (CO2e) per service population10 (SP) per year TOS as provided in Table 1 -1 since the operational - related emissions from Phase 1 and Phase 2 of the project will have different annual CO2e emissions and service populations. It is important to note that stationary source emissions of CO2e for emergency generator engines were evaluated and compared against the TOS of 10,000 MTCO2e /yr of GHG emissions since stationary sources are regulated under CARB's Mandatory Reporting Rule for GHG 11 which requires mandatory reporting of GHG emissions for stationary combustion sources under Subarticle 2, Section 95115. Additionally, impacts from these emissions are being mitigated at stationary sources through the California Cap and Trade Program 12. Because of this, the CO2e emissions associated with stationary source operational - related emissions are not aggregated with the other project operational - related GHG emissions to assess the MTCO2e /SP /yr threshold. 10 BAAQMD's CEQA guidelines specify that service population is determined based on the number of residents (not relevant to this project) plus the number of jobs estimated for a given point in time. The estimated service population for the project is based on 300 square feet per employee. 11 California Code of Regulations Title 17. Public Health, Division 3. Air Resources, Chapter 1. Air Resources Board, Subchapter 10. Climate Change, Article 2: Mandatory Greenhouse Gas Emissions Reporting (2016 Regulation). Available online at: htWs:/ /www.arb.ca.gov /cc /reportina//aha -rep /regulation /mrr- 2016 - unofficial- 2017 -10- 10.pdV ga =2. 143509363. 710610083. 1528304228- 428886969.1525371933. Accessed June 6, 2018. 12 California Code of Regulations Title 17. Public Health, Division 3. Air Resources, Chapter 1. Air Resources Board, Subchapter 10. Climate Change, Article 5: California Cap on Greenhouse Gas Emissions and Market -Based Compliance Mechanisms. Available online: https: / /arb.ca.gov /cc /capandtrade /capandtrade /unofficial_ct 100217.pdf. Accessed June 6, 2018. Screencheck Draft F -9 October 2, 2018 Table 2 -4 1 CalEEMod calculates the gross square footage of the parking garage and lots based on the number of spaces for coating ROG emission estimates. Z CalEEMod Appendix A specifies that nonresidential building surface areas be estimated based on two -times the floor square footage. 3 CalEEMod Appendix A specifies that fraction of surface area being coated should be based on 75% of estimated building surface area for building interior spaces, and 25% of estimated building surface area for building exterior shell. 4 CalEEMod default assumption is that 6 percent of parking lot surface area is coated. 201 Haskins Way Project Appendix F Previous light trucking operations at 201 Haskins Way ceased prior to the issuance of the NOP and therefore, according to BAAQMD CEQA guidelines", the emission levels associated with this previous land use cannot be subtracted from the emission levels estimated for the new proposed land use. Additionally, since the Phase 2 development is still conceptual, it is unclear whether the current land use operations will continue or would continue regardless of the Phase IT project approval. Therefore, a conservative approach was taken for the impacts analyses and none of the existing emission levels associated with current land uses are subtracted from estimated project emission levels to determine net project impacts. Emissions generated from mobile sources, area sources, and stationary sources associated with the BTP district operations are summarized below. 2.2.1 Mobile Source Emissions Mobile source emissions include emissions from on -road vehicles used for transport to and from the office park by workers, delivery drivers, and customers. There will be additional mobile source emissions from BTP district operation and maintenance activities. These emissions will result from the use of off -road equipment such as forklifts, cranes, and power washers. These mobile sources contribute to emissions of ROG, NO, CO, S02, direct emissions of PM10 and PM2.5, and GHG emissions. Fugitive dust in the form of PMIo and PM2.5 are also created due to vehicle travel over paved roadways. Off -road equipment emissions are determined in the same manner as off -road equipment emissions during the construction phase (see Section 2.1.1, Off - road Equipment Emissions on pp. F -5). On -road vehicle emissions are calculated as described below. Trip rates associated with the project were based on a traffic study which quantified peak hour trips associated with the proposed project operations for Phase 1 and Phase 2. PM peak hourly total trips were doubled to estimate a daily trip rate, which should afford an adequately conservative estimate of daily trips associated with each Phase of operation. Based on this and the BTP district square footage, SWCA determined a weekday trip rate in trips /ksf /day. The trip rates determined by this method were lower than CalEEMod default values for this land use type due to higher than typical suburban utilization of alternative modes of transportation. A summary of the assumed trip rates for weekdays, Saturdays, and Sundays is shown in Table 2 -5 and the associated footnote goes into more detail on how these rates were determined. Trip type percentages were adjusted from CalEEMod defaults for commercial land usage to be 71 percent worker trips, (C -W), 19 percent delivery driver trips (C -NW), and 10 percent customer trips (C -C) since the nature of the project would result in less customer trips than with typical commercial land usage. CalEEMod defaults for trip lengths and trip characteristics with regard to primary, diverted, or pass -by trips were used. Using the variables listed above, the CalEEMod program calculated a value for daily VMT based on the methodology described in the CalEEMod User's Guide, Appendix A, Section 5.1. 13 BAAQMD CEQA Guidelines state: "If a proposed project involves the removal of existing emission sources, BAAQMD recommends subtracting the existing emissions levels from the emissions levels estimated for the new proposed land use. This net calculation is permissible only if the existing emission sources were operational at the time that the Notice of Preparation (NOP) for the CEQA project was circulated or in the absence of an NOP when environmental analysis begins, and would continue if the proposed redevelopment project is not approved. This net calculation is not permitted for emission sources that ceased to operate, or the land uses were vacated and/or demolished, prior to circulation of the NOP or the commencement of environmental analysis. This approach is consistent with the definition of baseline conditions pursuant to CEQA." 14 The traffic study evaluated peak hour traffic during PM and AM peak hours. PM peak hour traffic volumes were the highest, and thus, these were used to conservatively estimate trip rates. Screencheck Draft F -10 October 2, 2018 Table 2 -5 i rarnc peaK nour trips are Trom ine iraTTic stuay conauctea Tor the project. z Weekday Trip rate assumes that the peak hour trips per day are doubled to conservatively account for worker trips for lunch breaks and commuter trips from workers with different work schedules than typical. 3 Saturday and Sunday Trip rates are based on the ratio of CalEEMod default Weekday, Saturday and Sunday Trip rates 201 Haskins Way Project Appendix F The lb/VMT emission factors were determined in the same manner as emission factors from on- road vehicles associated with construction (described in section 2.1.3, On -Road Vehicle Emissions on pp. F -7). CalEEMod defaults for fleet mix, road silt, and average vehicle weight were used to derive these factors, and like construction trips, trips related to operation of the BTP district are assumed to occur over 100% paved road surfaces. The emission factors, methodologies, and calculations to determine the VMT and lb /VMT factors are described in detail in the CalEEMod User's Guide, Appendix A, Section 5. Based on the daily CaIEEMod defaults for VMT and lb/VMT, emissions of CAPS, GHGs, and fugitive dust associated with BTP district operations for both Phase 1 and Phase 2. 2.2.2 Area Source Emissions Area source emissions are classified into the direct and indirect area source emissions associated with project operations. Direct area source emissions occur when emissions are released from inside the project area. Direct emissions will include: • ROG emissions from consumer products; • ROG emissions from reapplication of architectural coatings; • CAP and GHG emissions from landscaping equipment and; • CAP and GHG emissions from building natural gas usage Indirect area sources include sources of emissions where the emission point is located outside the project area, but the emissions are a direct result of the project's use of a resource or generation of waste through normal operations. For CEQA project impacts analyses, pollutant indirect impacts are attributed to a project when: • pollutant emissions that are not permitted or effectively regulated through stationary source requirements at the emission point; and, the efforts of the operation responsible for using the resource or generating the waste are most effective in reducing the impacts should be attributed to project operational - related impacts. Because the BAAQMD has a well- developed system for regulating CAPS from stationary sources (such as power plants, wastewater treatment plants, and landfills), GHGs are the only pollutants that are compared to CEQA TOS as indirect area source impacts. Indirect area source emissions applicable to the project are listed below: • GHG emissions from electricity usage (generated by the burning of fuel at the power plant which produces electricity); • GHG emissions from electricity usage for supplying freshwater to the BTP; • GHG emissions from electricity usage for treating wastewater and distributing treated wastewater; • GHG emissions evolved from wastewater in the wastewater treatment process (includes methane and nitrous oxides that are emitted directly at the wastewater treatment plant); and • GHG emissions (methane) resulting from the disposal of solid waste in landfills Screencheck Draft F -11 October 2, 2018 201 Haskins Way Project Appendix F For area sources, CalEEMod defaults and the calculation methodologies specified in the CalEEMod User's Guide, Appendix A, Section 6 through Section 9 were used to determine emissions. 2.2.3 Stationary Source Emissions Stationary source emissions result from the operation of emergency diesel generators which serve the BTP district office buildings. For the project it was assumed that one 896 hp emergency generator will be located next to the building footprint for each newly constructed office building (2 in Phase 1 operation and 2 more in Phase 2 operation) for a total of four emergency generators. These units will be operated 20 minutes per day, once per week for maintenance and testing purposes. Emissions from the emergency generators include ROG, NO, CO, S02, exhaust emissions of PMIo and PM2.5, and GHG emissions. The engine will be compliant with U.S. EPA's Tier exhaust emission standards for nonroad compression- ignition engines applicable to its model year. To be conservative, the Tier 2 emission factors were used to calculate ROG, NO, CO, PM10 and PM2.5. GHG emissions of CO2, CHa, and N20 were calculated using 40 CFR Part 98, Subpart C Tables C -1 and C -2 emission factors for diesel fuel (petroleum distillate No. 2). Emergency standby engines with a model year of 2012 or newer have specified limitations for operations in non - emergency situations. As specified in Section 9 -8 -330 of BAAQMD Regulation 9, Rule 815, emergency standby engines may not be operated for maintenance and readiness checks more than 50 hours per year unless required to comply with NFPA testing requirements. The maintenance and testing schedule proposed once operations begin in the BTP district should be well below the 50 hours per year limitation for maintenance and readiness testing specified in the BAAQMD regulation, but emissions of CAPs and GHGs are conservatively based on 50 hours per year of operation. 3. Results Section 3 of this technical document discusses results of analyses conducted and demonstrates that the project will not result in cumulatively considerable impacts based on comparison against BAAQMD TOS or screening thresholds. Project impacts would be considered cumulatively considerable if the TOS is exceeded after mitigation is applied. All impacts related to the project construction and operation were determined to be either less- than - significant, or less -than- significant with mitigation. As provided in Section 1.2 of this Chapter (regarding scope), no quantitative analysis was required to determine potential project impacts to sensitive receptors regarding cancer risk, non- cancer health index, PM2.5 concentrations, accidental release of acutely hazardous pollutants, or odors since no sensitive receptors exist within the project zone of influence. Therefore, these topics are not addressed in this section, but a summary of all pollutant emissions, potential risks assessed and justification of CEQA significance level determined is listed in Table 5 -1. Full CalEEMod results are included in Attachments A -H for reference. 3.1 Criteria Air Pollutant and Precursors 15 Bay Area Air Quality Management District Current Rules. Reg 9, Rule 8: Nitrogen Oxides and Carbon Monoxide from Stationary Internal Combustion Engines. Available online at: hqp: / /www.baagmd.gov /rules- and - compliance /current- rules. Accessed June 6, 2018. Screencheck Draft F -12 October 2, 2018 Table 5 -1 Air Quality Q, Assessment Criteria Evaluated Contribution to Impacts Mitigation Proposed Average Daily CAP Construction Less - than - significant MM AQ -1: Off -road equipment greater that 25 horsepower used during construction shall meet CalEEMod results reveal that after implementation of the Related Emissions with Mitigation the Tier 4 Final off -road emission standards. Should the utilization of equipment meeting this specified mitigation measures for both Phase 1 and Phase 2 standard prove to be technically infeasible, the construction contractor will select the lowest- of the project, the average daily construction emissions are emitting off -road equipment available. The construction contractor shall develop a Construction below the Thresholds of Significance developed by the Emissions Minimization Plan (CEMP) which establishes the process used to select the lowest- BAAQMD. emitting off -road equipment and specify the steps that will be taken to reduce emissions of CAPS. The CEMP will be submitted to the City's Planning Department and approved prior to utilizing off -road equipment greater than 25 horsepower that does not meet Tier 4 Final off -road emission standards. MM AQ -2: Implement BAAQMD Basic Construction Mitigation Measures. Average Daily CAP Operational- Less - than - significant None CalEEMod results combined with average daily diesel -fired Related Emissions emergency generator emissions reveal that once the rezoning project is complete, the average daily operational - related emissions from Phase 1 and Phase 2 of the project are below the Thresholds of Significance developed by the BAAQMD. Maximum Annual CAP Less - than - significant None CalEEMod results combined with annual diesel -fired Operational - Related Emissions emergency generator emissions reveal that once the rezoning project is complete, the maximum annual operational - related emissions from Phase 1 and Phase 2 of the project are below the Thresholds of Significance developed by the BAAQMD. Maximum Annual GHG Less - than - significant None CalEEMod was used to quantify construction - related GHG Construction - Related Emissions emissions. No specific Threshold of Significance is specified for construction - related GHG emissions. However, BAAQMD recommends assessing these emissions against local and state GHG emission reduction goals. To accomplish this, GHG emissions from construction were distributed over an assumed 40 year project lifespan since GHG emissions have long term impacts on climate. The average annual construction - related CO2e emissions were added to the annual operational - related CO2e emissions and the combined total was evaluated against the operational - related Threshold of Significance established by BAAQMD. Maximum Annual GHG Less- than - significant None CalEEMod results combined with annual diesel -fired Operational - Related Emissions emergency generator emissions reveal that once the rezoning project is complete, the maximum annual operational - related GHG emissions from Phase 1 and Phase 2 of the project are below the Thresholds of Significance developed by the BAAQMD. As mentioned above, annual average construction - related GHG emissions were included when comparing the project emissions against the operational Threshold of Signficance as well. Excess lifetime cancer risk, Less - than - significant None BAAQMD CEQA Gudelines recommend that potential effects chronic hazard index, and fine of TAC and PM2.5 sources from construction - related activities articulate matter (PM25) on sensitive receptors located within 1,000 feet of the project concentration from project property boundary be evaluated. There are no sensitive construction on off -site receptors located within 1,000 feet of the project, and sensitive receptors. therefore, the risk impacts are estimated to be less -than- significant. Excess lifetime cancer risk, Less - than - significant None BAAQMD CEQA Gudelines recommend that potential effects chronic hazard index, and fine of TAC and PM2.5 sources from construction - related activities articulate matter (PM2.5) on sensitive receptors located within 1,000 feet of the project concentration from project property boundary be evaluated. There are no sensitive operation on off -site sensitive receptors located within 1,000 feet of the project, and receptors. therefore, the risk impacts are estimated to be less -than- significant. Excess lifetime cancer risk, No Impact None There are no new receptors sited as part of the proposed chronic hazard index, and fine project. articulate matter (PM2.5) concentration from project construction on on -site sensitive receptors. Excess lifetime cancer risk, No Impact None There are no new receptors sited as part of the proposed chronic hazard index, and fine project. articulate matter (PM2.5) concentration from project operation on on -site sensitive receptors. Cumulative excess lifetime Less- than - significant None Since individual project impacts are less- than - significant, no cancer risk, chronic hazard cumulative impacts are anticipated on off -site receptors. index, and fine articulate matter (PM2.5) concentration from project construction on off -site sensitive receptors. Cumulative excess lifetime Less- than - significant None Since individual project impacts are less- than - significant, no cancer risk, chronic hazard cumulative impacts are anticipated on off -site receptors. index, and fine articulate matter (PM2.5) concentration from project operation on off - site sensitive receptors. Table 5 -1 Air Quality Q. Assessment Criteria Evaluated Contribution to Impacts Mitigation ... A Cumulative excess lifetime No Impact is None There are no new receptors sited as part of the proposed cancer risk, chronic hazard project. index, and fine articulate matter (PM2.5) concentration from project construction on on site sensitive receptors. Cumulative excess lifetime No Impact None There are no new receptors sited as part of the proposed cancer risk, chronic hazard project. index, and fine articulate matter (PM2.5) concentration from project operation on on- site sensitive receptors. Storage or use of acutely No Impact None There are no new receptors sited as part of the proposed hazardous materials locating project and there will not be hazardous materials used or near receptors or new stored as part of project operations. receptors locating near stored or used acutely hazardous materials. Odor Complaints No Impact None The project construction and operation would not contribute to objectionable odors that affect a significant number of people. 201 Haskins Way Project Appendix F 3.1.1 Construction CAPs The TOS for construction- related CAPs and precursors are: • Daily average ROG, NO, and PM2.5 emissions of greater than 54 lb /day; • Daily average PMIo emissions of greater than 821b /day; and, • No specific TOS is established for PM2.5 and PMIo from construction fugitive dust. However, if best management practices are implemented during construction, then it is assumed that these emissions are below the TOS. Based on calculated data, CAP emissions from construction were less- than - significant with mitigation. The highest average daily pre- mitigation and post- mitigation construction emissions from Phase 1 and Phase 2 of the construction project are listed in Tables 5 -2 and 5 -3, respectively. For both Phase 1 and Phase 2 of construction, the pre- mitigation emissions of NO, are higher than the TOS of 54 lb /day. The following mitigation measure will be applied during construction of the project: MMAQ -1: Off -road equipment greater that 25 horsepower used during construction shall meet the Tier 4 Final off -road emission standards. Should the utilization of equipment meeting this standard prove to be technically infeasible, the construction contractor will select the lowest - emitting off -road equipment available. The construction contractor shall develop a Construction Emissions Minimization Plan (CEMP) which establishes the process used to select the lowest - emitting off -road equipment and specify the steps that will be taken to reduce emissions of CAPs. The CEMP will be submitted to the City's Planning Department and approved prior to utilizing off -road equipment greater than 25 horsepower that does not meet Tier 4 Final off -road emission standards. For all construction projects, BAAQMD's Basic Construction Mitigation Measures should be implemented to reduce emissions regardless of whether impacts would exceed Thresholds of Significance. The Basic Construction Mitigation Measures establish best practices during construction and implementation of these measures is considered in determining whether fugitive dust emissions from construction meet the TOS. These mitigation measures are listed below and will be applied to project construction: MMAQ -2: Implement BAAQMD Basic Construction Mitigation Measures. These measures are listed below: • All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day. • All haul trucks transporting soil, sand, or other loose material off -site shall be covered. • All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. • All vehicle speeds on unpaved roads shall be limited to 15 mph. • All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. Screencheck Draft F -13 October 2, 2018 Table 5 -2 Phase 1 43.00 118.86 5.37 4.98 4.47 0.93 Phase2 39.57 108.65 4.31 3.99 3.62 0.78 Best Best BAAQMD TOS 54 54 82 54 Management Management Practices Practices 1 Displays unmitigated maximum average daily emission rates determined based from CalEEmod version 2016.3.2. Table 5 -3 Phase 1 33.34 39.55 0.42 0.42 3.32 0.75 Phase2 32.41 40.51 0.32 Maz 2.69 0.64 Best Best BAAQMD TOS 54 54 82 54 Management Management Practices Practices 1 Displays mitigated maximum average daily emission rates determined based from CalEEmod version 2016.3.2. 201 Haskins Way Project Appendix F • Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. • All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. • Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible to ensure compliance with applicable regulations. 3.1.2 Operational CAPs The TOS for operational - related CAPs and precursors are: • Daily average ROG, NO, and PM2.5 emissions of greater than 54 lb /day; • Daily average PMIo emissions of greater than 82 lb /day; • Maximum annual ROG, NO, and PM2.5 emissions of greater than 10 tons per year (tpy); and, • Maximum annual PMIo emissions of greater than 15 tpy Based on calculated data, CAP emissions from the operation of Phase 1, Phase 2, and Phase 1 & 2 operation combined were less than significant without any mitigation measures applied. The highest average daily and maximum annual emissions from Phase 1, Phase 2, and Phase 1 & 2 operation are shown in Tables 5 -4 and 5 -5. 3.2 Greenhouse Gases 3.2.1 Construction GHGs There is no established TOS specifically for GHG emissions resulting from construction. However, impacts from construction- related GHG emissions should be assessed to determine compatibility with local and state GHG emission reduction goals. The GHG emissions for each year of construction for each Project Phase are listed in Table 5 -6. To assess GHG impacts from construction, the GHG emissions for the Phase 1, Phase 2, and Phase 1 & 2 construction periods (approximately 18 months for each phase) were amortized over an assumed lifespan of 40 years for the BTP district office buildings. Table 5 -6 lists the construction- related GHG emissions in MTCO2e /yr determined using the aforementioned method. The appropriate amortized MT /yr CO2e construction values were then added to Phase 1 and Phase 1 & 2 operational- related GHG emissions to assess compliance with operational TOS as described in Section 3.2.2, Operational GHGs. This methodology is consistent with the approach adopted as standard practice by multiple local Air Quality Districts for assessing construction GHG emission impacts. Using this methodology, potential impacts related to GHG construction emissions can be assessed in a quantitative manner. Screencheck Draft F -14 October 2, 2018 Table 5 -4 Phase 1 10.86 15.45 0.63 0.60 3.68 0.98 Phase 2 10.69 13.44 0.53 0.51 3.73 1.00 Combined 21.55 28.89 1.16 1.11 7.41 1.98 BAAQMD TOS 54 54 82 54 None None 1 Displays unmitigated maximum average daily emission rates determined based from CalEEmod version 2016.3.2. Table 5 -5 Phase 1 1.81 1.47 0.06 0.06 0.48 0.13 Phase 2 1.80 1.37 0.06 0.05 0.00 0.13 Combined 3.61 2.84 0.12 0.12 0.48 0.26 BAAQMD TOS 10 10 15 10 None None 1 Displays unmitigated maximum annual emission rates determined based from CalEEmod version 2016.3.2. Table 5 -6 uispiays unmitigaiea maximum annual emission rates aeterminea oasea rrom t_aittmoa version Lu1b.,3.L. 2 Total construction emissions of CO2e is metric tons is distributed over 40 years (assumed lifetime of the BTP district) to calculate an average annual MT /yr emission rate so that construction emissions can be added to operational emissions of the project. In this way, all project GHG emissions can be quantitatively assessed against the BAAQMD TOS. Table 5 -7 Area 0.02 0.02 0.04 Energy 2070.09 2070.09 3904.37 Mobile 486.46 486.46 955.07 Off -Road 27.46 27.46 54.92 Waste 157.32 157.32 316.91 Water 213.31 213.31 429.70 Vegetation (amortized)' -0.88 -0.88 -2.01 Construction (amortized)' 45.95 87.02 87.02 Maximum Annual Emissions (MT /yr) 2999.73 3040.80 5746.02 Service Population (SP) 1120.00 1120.00 2260.00 Emissions per SP (MT /SP /yr) 2.68 2.72 2.54 BAAQMD TOS (MT /SP /yr) 4.60 4.60 4.60 uuNiay� uinniugaLcu inaxniiuiii aiiiivai ciiiu�iuii laid ucUcinnncu udbt= iiuni %-d LL111vu vci�iun cvlo.j.c aiiu C1 b aniuiuccu wIuuuuivii rates from Table 5 -6 2 Total construction emissions of CO2e is metric tons is distributed over 40 years (assumed lifetime of the BTP district) to calculate an average annual MT /yr emission rate so that construction emissions can be added to operational emissions of the project. In this way, all project GHG emissions can be quantitatively assessed against the BAAQMD TOS. Reduction in CO2e from net new tree sequestration is also amortized over 40 years for consistency. 201 Haskins Way Project Appendix F 3.2.2 Operational GHGs The TOS for Operational Emissions of GHG are: • 1,100 MTCO2e /yr or 4.6 MTCO2e /SP /year for all project operations except stationary sources16 ; • 10,000 MTCO2e /yr for stationary source emissions The stationary source emergency generator emissions are below the 10,000 MTCO2e /year threshold during Phase 1, and Phase 1 & 2 project operations. Emergency generator GHG emission calculations as shown in Figure 5 -1. The GHG emissions from non - stationary sources are below the 4.6 MTCO2e /yr TOS during Phase 1, and Phase 1 & 2 operations. Table 5 -7 lists the maximum annual CO2e emissions in MT /year, the SP, and the maximum annual MTCO2e /SP /yr for Phase 1 operation plus amortized Phase 1 construction, Phase 1 operation plus amortized Phase 1 and 2 construction, and combined Phase 1 and 2 operation plus amortized Phase 1 and 2 construction. Impacts from GHG emissions were determined to be less- than - significant without the need for mitigation. 3.3 Localized Carbon Monoxide There are no TOS associated with CO concentrations with respect to construction. For project operations, the TOS is based on 1- and 8 -hour CAAQS for CO concentrations. Impacts from the project operation due to effects on local CO concentrations were determined to be less- than - significant based on BAAQMD's established screening criteria as listed below: • The project is consistent with an applicable congestion management program established by the county's congestion management agency for designated roads or highways, regional transportation plan, and local congestion management agency plans; • The project traffic would not increase traffic volumes at affected intersections to more than 44,000 vehicles per hour; and • The project traffic would not increase traffic volumes at affected intersections to more than 24,000 vehicles per hour where vertical and/or horizontal mixing is substantially limited (e.g., tunnel, parking garage, bridge underpass, natural or urban street canyon, below -grade roadway). The project is consistent with the San Mateo County Congestion Management program and would not cause traffic volumes to exceed the volumes listed in the screening criteria for any intersection as shown Attachment I. Therefore, the project meets the screening criteria and will not lead to significant air quality impacts with respect to local CO concentrations. 16 As mentioned in Section 3.2.1, Construction GHGs, average annual construction emissions during the construction period were distributed over a building lifespan of 40 years and have been added to GHG operational emissions as a method for assessing the significance of GHG emissions during construction. Screencheck Draft F -15 October 2, 2018 Attachment A PROJECT PHASE 1 ANNUAL EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Haskins Way Rezone Phase I San Mateo County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park 311.37 1000sgft 1.80 i 311,368.00 0 ............................................................................ a................................................ ............................... ...........................................................................................__._._._._._._._ t.._._._._._._._._._._._._._._._.;..... ............................... Office Park 25.00 1000sgft 0.30 25,000.00 i i 0 Enclosed Parking with Elevator 720.00 Space 1.30 288,000.00 i 0 Parking Lot 203.00 Space 3.35 81,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Climate Zone 5 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4 Intensity 0.029 (lb /M W hr) (lb /M W hr) 1.3 User Entered Comments & Non - Default Data Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Precipitation Freq (Days) 70 Operational Year 2020 N20 Intensity 0.006 (lb /MWhr) CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - See Appendix F of the Environmental Impact Report Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Area Coating - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Stationary Sources - Emergency Generators and Fire Pumps - See Appendix F of the Environmental Impact Report Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea _Nonresidential_Ezterior 168,184.00 0.00 .................... .......................................................... }............................................................................. r } ............................................. ...........................:...................................................................... tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 168,184.00 € 0.00 r tblArchitecluralCoaling ConstArea _ Nonresidential _interior 504,552.00 € 0.00 r tblArchitecturalCoating ConstArea_ Nonresidential _ interior 504,552.00 i 0.00 tblArchitecturalCoaling ConstArea_Parking 22,152.00 i 0.00 tblArchitecluralCoating ConstArea_Parking 22,152.00 i 0.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 5.00 ............................................... ............................... }.............................................. ............................... }.............................................. ............................... ;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 ............................................... ............................... }.............................................. ............................... }.............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 9.00 ..............................................................................}.............................................................................}.......................................... .................................... i....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated . 0.00 i 1.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 15.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 i 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 € 1.00 : tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i i 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 6.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual tblConstEquiplMitigation N NumberOfEquipmentMitigated 0 0.00 2 2.00 ................... .......................................................... . ............................................................................. - - — ----------------------- — — — — — — — --------- . ...................................................................... tblConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 8 8.00 ................... .......................................................... . ............................................................................. . . ............................................................................. . ...................................................................... tb[ConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 11.00 ................... .......................................................... . ............................................................................. . . .................................................. ................ . .. . .. . .. . .. . .. . ......... - - — . . . . . . . . . .............................. tb[ConstEcluiplMitigation N NumberOfEquipmentMitigated 0 0.00 6 6.00 ................... .......................................................... . ............................................................................. . . ............................................................................. . ...................................................................... tblConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 13.00 ................... .......................................................... . ............................................................................. . . ................................................. . *"*"*"* .................. ..................................................................... tblConstlIquiplMitigation T Tier N No Change T Tier 4 Final ................... .......................................................... # # ............................................................................. . . ............................................................................. . ..................................................................... tblConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. . .............................................................................. . ..................................................................... tb[ConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . .............................................................. . ............................................................................. . ..................................................................... tblConstEcluiplMitigation T Tier N No Change Tier 4 Final .............................................................................. F F ............................................................................. . .......................................................... - --- ............ . ..................................................................... tblConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . .............................................................................. . ..................................................................... thlConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . ? ............................................................................. . ..................................................................... tblConstEcluiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ....................................................... . ................................................... — — ......... . ..................................................................... tblConstEcluiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . T ............................................................................. . ..................................................................... tb[ConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ................................................................... . ................................................................................ tblConstEclulplMitigation T Tier N No Change Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbIConstEquipMifigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEcluiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . .............................................................................. . ..................................................................... tb[ConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEcluiplMitigation T Tier N No Change T Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . .................................................................................................................................................... thlConstEcluiplMitigation T Tier N No Change T Tier 4 Final .............................................................................. . .................................................................... . . . . .... .............................................................................. . . . . . ............................................................... tblConstEclulplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . ........................................ . .................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEcluiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. 4 4 .............................................................................. . ....................................................................... CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual tblConstEquiplMitigation Tier No Change Tier 4 Final ........................ ..................................................... ............................................................................. - - ----------------------- - - ----- - - - - - - - -- : ...................................................................... tblConstructionPhase NumDays 20.00 65.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... ii;lC onstructionlPhase NumDays 20.00 21.00 .................... ................................................... ............................................................................. . .............................................................................. ...................................................................... tblConstructionPhase NumDays 20.00 219.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... tblConstructionPhase NumDays 230.00 30.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NumDays 230.00 40.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NumDays 230.00 208.00 .............................................................................. ............................................................................. .............................................................................. ..................................................................... tbIConstructionPhase NumDays 230.00 258.00 .............................................................................. .............................................................. ............................................................................. ..................................................................... tblConstructionlPhase NumDays 20.00 130.00 .............................................................................. F ............................................................................. .......................................................... --- ............ ..................................................................... tblConstructionlPhase NumDays 10.00 20.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblConstructionlPhase NumDays 10.00 35.00 .............................................................................. ................................................... -- ...................... .............................................................................. ..................................................................... thlGrading AcresOfGrading 25.00 Om .............................................................................. ............................................................................. . ............................................................................. j ..................................................................... thlGrading MateriallExported . 0.00 8,775.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tbiGrading Materialimported 0.00 7,500.00 .............................................................................. ............................................................... - ---------------------------------------------------- - ......... ..................................................................... tblLandUse LandUseSquareFeet 311,370.00 311,368.00 .............................................................................. ........................................................................... . ............................................................................. ..................................................................... tblLandUse LotAcreage 0Z7 UO .............................................................................. ............................................................................. . .............................................................................. i ..................................................................... tblLandUse LotAcreage 1 7.15 1.80 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblLandUse LotAcreage 6.48 1.30 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblLandUse LotAcreage 1-83 3.35 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .............................................................................. ..................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................. ............................................................................. . ............................................................................. ..................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .................................................................................................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 i 2.00 .............................................................................. ............................................................................. .............................................................................. . . . . ............................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. . ............................................................................. ...................................................................... tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. .............................................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00 CalEEMod Version: CaIEEMod.2016.3.2 Page 6 of 64 Date: 5/31/2018 7:57 I'M tblOffRoadEquipment ........................................................... tblOffRoadEquipment ........................................................... tb[OffRoadEquipment ........................................................... tblOffRoadEquipment ........................................................... tblOffRoadEquipment ........................................................... tblOffRoadEquipment ........................................................... tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tb[OffRoadEquipment ............................................................ tb[OffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ th[OffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOperMonalOffRoadEquipment ............................................................ tblOperationalOffftadEquipment ............................................................ thlOperationalOffRoadEquipment ............................................................ tblOperabonalOffftadEquipment ............................................................ tblOperMonalOffftadEquipment ............................................................ thlOperationalOffRoadEquipment ............................................................ tblOperabonalOffftadEquipment ............................................................ tblOperabonalOffftadEquipment ............................................................ tblOperMonalOffftadEquipment ............................................................ tblOperabonalOffRoad Equipment Haskins Way Rezone Phase I - San Mateo County, Annual OffRoadEquipmentUnitAmount 4.00 2.00 ................................................................... - - ----------------------- - - ----- - - - - - - - -- : .......................................... OffRoadEquipmentUnitAmount 1.00 3.00 ................................................................... . ............................................................................. .......................................... OffRoadEquipmentUnitAmount 1.00 5.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8.00 3.00 ................................................................... . ............... -- .......................................................... .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8-00 6.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... ............................................................................. .......................................... UsageHours 8.00 4.00 .................................................................. . t .................................................................. ........... .......................................... UsageHours i 7.00 6.00 ................................................................... ............... --- ....................................................... .......................................... UsageHours 8-00 4.00 ................................................................... .............................................................................. .......................................... UsageHours TOO 6.00 ................................................................... UsageHours . ............................................................................. .......................................... 8.00 6.00 ......................................... .......................... UsageHours ? . ......................................................................... . .. .. .. .. .. ....... 8.00 ........................... 7.00 .............................................................. .... UsageHours . ................................................................... .......................................... 6.00 7.00 ................................................................... UsageHours T ...................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . .. . .. . .. &00 i i . ........................... 7.00 ................................................................... . .............................................................................. i .......................................... UsageHours 8.00 5.00 ................................................................... . .................................. .......................................... .......................................... OperDaysPeffear 260.00 2.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 365-00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 52.00 ................................................................... . .............................................................................. .......................................... OperDaysPeffear 260.00 1.00 ................................................................... . ............................................................................. .......................................... OperHoursPerDay 8.00 0.30 ................................................................... . ............... -- .......................................................... .......................................... OperHoursPerOay 8.00 16.00 ................................................................... . ............................................................................... ; .......................................... OperOffRoadEquipmentNumber 0.00 i 1.00 ................................................................... .............................................................................. . . . . .................................... OperOffRoadEquipmentNumber OM 1.00 ................................................................... OperOffRoadEquipmentNumber . ............................................................................. .......................................... 0.00 4.00 ................................................................... .............................................................................. .......................................... OperOffRoadEquipmentNumber 0-00 1.00 CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 64 Date: 5/31/2018 7:57 I'M Haskins Way Rezone Phase I - San Mateo County, Annual tblSequestrafion NumberOfNewTrees 0.00 62.00 ........................ .......................................... . ............................................................................. - - ----------------------- - - ----- - - - - - - - ...................................................................... OFn sAndVMT HaulingTripLength 20.00 19.00 ......................... ............................................... ............................................................................. . ............................................................................. ...................................................................... &T ripsAndVMT HaulingTrIpLength 20.00 19.00 . . . ........................ ................................... . . . . . . . . ............................................................. . . . . . . . . . . . . . . . .. . .. . .. . .. . .. . .. . .. . .. . .. ........................................................ . .. . . . . . . . . . . . . . . . . ..................... . .. . .. . .. . . . . . . . . . . . . . . . . OFn sAndVMT HaulingTripLength 20.00 19.00 ......................... ............................................ ............................................................................. . ............................................................................. ...................................................................... 0FrIpSAndVMT Hauling`FripLength 20.00 12.60 ......................... ............................................ ............................................................................. . ............... -- .......................................................... ..................................................................... tbF..: npsAndVMT HaulingTrIpLength 20.00 19.00 ......................... ............................................ ............................................................................. . ............................................................................. ..................................................................... &FrIpSAndVMT Haullng`rripLength 20.00 19.00 .............................................................................. ............................................................................. .............................................................................. ..................................................................... tbITrIpsAndVMT Hauling`rripLength 20.00 19.00 .............................................................................. .............................................................. ............................................................................. ..................................................................... tbITrjpsAndVMT HaulingTrIpLength 20.00 19.00 .............................................................................. ............................................................................. . .......................................................... --- ............ ..................................................................... tbITrIpsAndVMT HaulingTripLength 20.00 19.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]TripsAndVMT Haullng`rripLength 20.00 19.00 .............................................................................. ................................................... -- ...................... .............................................................................. ..................................................................... tbITrIpsAndVMT Hauling`rripLength MOO 19.00 .............................................................................. ............................................................................. . ....................................... . .................................... ..................................................................... tbITrjpsAndVMT HauflngTrIpNumber . 185.00 230.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tbITrIpsAndVMT HaulingTripNumber 2,034.00 814.00 .............................................................................. ............................................................... - ---------------------------------------------------- - ......... ..................................................................... tbITrIpsAndVMT VendorTripNumber 116.00 5.00 .............................................................................. ........................................................................... . ............................................................................. ..................................................................... tbITrIpsAndVMT VendorTripNumber 116.00 6.00 .............................................................................. ............................................................................. . .............................................................................. i ..................................................................... tbITrjpsAndVMT VendoffripNumber 116.00 43.00 ....................................................................... ............................................................................. . ............................................................................. ..................................................................... tbITripsAndVMT VendoffripNumber 116.00 50.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]TripsAndVMT WorkerTripNumber 40.00 20-00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tbITrIpsAndVMT WorkeffripNumber 38.00 19.00 ..................... I ........................................................ ............................................................................. . .............................................................................. ..................................................................... tbITrjpsAndVMT WorkerTripNumber 53.00 7.00 ....................................................................... ............................................................................. . ............................................................................. ..................................................................... tbITripsAndVMT WorkerTripNumber 40.00 20.00 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]TripsAndVMT WorkeffripNumber 38.00 19.00 .............................................................................. ............................................................................. . .................................................................................................................................................... tb]TripsAndVMT WorkerTripNumber 263.00 i 11.00 .............................................................................. .................................................................... . . . .... .............................................................................. . . . . ............................................................... tb]TripsAndVMT WorkerTripNumber 263.00 13.00 .............................................................................. ............................................................................. ............................................................................. ...................................................................... tb]TripsAndVMT WorkeffripNumber 263.00 96.00 .............................................................................. ............................................................................. i .............................................................................. ...................................................................... tbITrIpSAndVMT WorkerTripNumber 26100 113.00 CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 64 Date: 5/31/2018 7:57 I'M Haskins Way Rezone Phase I - San Mateo County, Annual tbITripsAndVMT WorkeffripNumber 53.00 22.00 ........................ .......................................... . ............................................................................. - — ----------------------- — — — — — — — — — — — — ...................................................................... OFn sAndVMT WorkerTripNumber 53.00 19.00 .......................... ........................................... ............................................................................. . ............................................................................. ...................................................................... ii;.IVe hicleTdps CC TTP 48.00 10.00 ........................... .................................................. ............................................................................. . .............................................................................. ...................................................................... tblVehicleTrips CW TTP 33.00 71.00 .......................... . . . ....................................... . . . ............................................................. . . . . . . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . . .......................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ........................................................ iI� ehicleTdps ST TR 1.64 0.27 .......................... ............................................. ............................................................................. . ............................................................................. ................................ .............................. i�I�ehicleTrips SU TR 0.76 E'1'� .............................................................................. ............................................................................. .............................................................................. ....................................................................... tbiVehicieTrips WD TR 11.42 1.86 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 2.1 Overall Construction Unmitigated Construction Mitigated Construction ROG NO, CO S02 F1910ve Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 1 PM70 1 Total PM2.5 PM2.5 I I I I Year tons /yr MT /yr 2018 i 0.0449 0.4726 0.2796 6.2000e- 0.0215 0.0221 0.0436 3.95008- 0.0208 0.0247 i 0.0000 ! 57.3397 57.3397 0.0130 0.0000 1 57.6654 r: 003 004 003 003 003 003 .............................. N....... ............ ....... ............ ............... .... .._............................ .................._._._._._._ ................... ............ _..... ...... ............ ................... ................... f.................. i.._........................._ ....... ................... .............. _._ ................... 2019 fl 1.0442 9.1389 7.0548 0.0161 0.2631 0.3956 0.6588 0.0662 0.3758 0.4419 i 0.0000 ;1,431.4171 1,431.4171 0.2927 0.0000 11438.7355 .............................. 4- 2020 2.3990 ._._._._._. i 5.2065 .... ..............._............... i 4.4216 9.14008- ._._._._._. 1 0.0804 ._............... i 0.2436 _._._._._._. i 0.3241 _._._._._._. i 0.0217 ._............... i 0.2290 _._._._._._. y..................:._...................._._._._._._._._._._._.._... 0.2508 0.0000 i 796.1108 796.1108 I 0.1972 ............................... i 0.0000 801.0401 003 , Maximum 2.3990 9.1389 7.0548 0.0161 0.2631 0.3956 0.6588 0.0662 0.3758 1 0.4419 0.0000 1,431.4171 1,431.4171 0.2927 0.0000 1,438.7355 Mitigated Construction ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM25 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Year tons /yr MT /yr 2018 ;i 8.67008- 0.0908 0.2971 6.2000e- 0.0133 1.12008- 0.0144 2.71008- 1.11008- 3.83008- 0.0000 a 57.3396 57.3396 0.0130 0.0000 57.6653 r: 003 004 003 003 003 003 .............. ................ ............. ................... ................... .............. .................._._._._._._ ...... ............................... ..... .............. ............. _._.. .................. :..... _._._._._ ._._.............. .................. ................... ................... 2019 0.3111 3.0373 7.6771 0.0161 0.2440 0.0328 0.2768 0.0640 0.0324 0.0963 j 0.0000 21,431.4158 r 1,431.4158 0.2927 0.0000 1,438.7343 .............. ...............y'._.........._. 2020 1.9648 ------------- 1.4685 .................. 4.9549 _._._....... 9.14008- ------------- 0.0804 ._............... 0.0168 _._._._._._. 0.0973 _._._._._._. 0.0217 0.0167 y'..................? 0.0385 : 0.0000 :796.1099 796.1099 0.1972 0.0000 801.0393 003 , Maximum 1.9648 3.0373 7.6771 0.0161 0.2440 0.0328 0.2768 0.0640 0.0324 0.0963 0.0000 1,431.4158 1,431.4156 0.2927 0.0000 1,438.7343 CalEEMod Version: CalEEMOd.2016.3.2 Page 10 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Quarter ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 TotaICO2 CH4 N20 CO2e 9 -11 -2019 2.5451 0.9934 4 9 -12 -2019 PM10 PM10 Total PM2.5 PM2.5 Total 4.1044 1 7824 6 3 -12 -2020 6 -11 -2020 2,7096 Percent 34.50 68.98 -9.98 0.00 7.48 92.33 62.15 3.77 91.97 80.68 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 1 1 1 1 1 1 Quarter Start Date End Date Maximum Unmitigated ROG +NOX (tons /quarter) Maximum Mitigated ROG +NOX (tons /quarter) 1 12 -12 -2018 3 -11 -2019 24398 04232 2 3 -12 -2019 6 -11 -2019 2.4593 0.7551 3 6 -12 -2019 9 -11 -2019 2.5451 0.9934 4 9 -12 -2019 12 -11 -2019 2.5710 1.0034 5 12 -12 -2019 3 -11 -2020 4.1044 1 7824 6 3 -12 -2020 6 -11 -2020 2,7096 1.1392 7 6 -12 -2020 9 -11 -2020 1.0493 0.5332 8 9 -12 -2020 9 -30 -2020 0.1769 0.1041 Highest 4.1044 1 7824 CaIEEMod Version: CalEEMOd.2016.3.2 Page 11 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 2.2 Overall Operational Unmitigated Operational ROG NO, CO 502 Fugitve Exhaust PM10 Fugitive Ex at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 1 PM70 1 Total PM2.5 PM2.5 I I I I Category tons /yr MT /yr Area 1.5217 1.1000e- 0.0117 0.0000 4.0000e- 4.0000e- 4.000Oe- 4.000Oe- i 0.0000 ! 0.0225 0.0225 6.000Oe- 0.0000 i 0.0240 004 005 005 005 005 005 ............... ............... y....... ............ ................... ................... .._ ............... ................... ................. _ ............ _.... ................... ................... .................... i.................. i.._ --------------- ._ ---- _._ ------- ------------------- ............. _._ ................... Energy ,E 0.0338 0.3069 0.2578 1.8400e- 0.0233 0.0233 0.0233 0.0233 i 0.0000 ;2,061.3394 2,061.3394 0.0845 0.0223 2,070.0925 003 r ................... ...........�:.._............... Mobile i 0.1318 ._._._._._. i 0.4402 .... ..............._............... 1.5751 5.3200e- ._._._._._. i 0.4776 ................. i 5.7700e- _._._._._._. i 0.4834 ............. i 0.1284 ._............... i 5.4200e- _._._._._._. y..................:._...................._._._ i 0.7338 0.0000 486.0149 ._._._._._._._._.._.........._. 486.0149 1 0.0178 ! 0.0000 ................... 486.4606 i 003__!._._._._._. i._. 003._._i i._._._._._- i_. 003__i i ! ............... ............... h._.___ ---- ._._._._._._ ....._._._. ......_. ._._._._._. * _ _ _ ._._._._� .................i Offroad i 0.0283 0.2561 0.2322 3.1000'- 0.0186 0.0186 0.0172 0.0172 0.0000 i 27.2549 27.2549 8.2200e- 0.0000 i 27.4603 004 003 i .............. ................r....._._._._._ Waste ............... ................... _ .�. ......... ................... .._._._._._. 0.0000 .................... 0.0000 ................. .............. 0.0000 ............ }.................. :.. �._._._._..._._._._........._..... 0.0000 63.4996 0.0000 63.4996 ........ 3.7527 ..... .. ............................... 0.0000 157.3177 re .............................. p .._...................._._._._. Water ... ................_.............. ._._._._._. i ._................_._._._._._. 0.0000 0.0000 _ ........... i ._............ ... i 0.0000 _ _._._._._. yr.... .............. :._.............. r ! 0.0000 18.9668 131.4163 r ._._._._._._ i 150.3831 ................ ...... i 1.9540 _._._... i 0.0472 ............... .. 213.3073 Total 1.7156 1.0032 2.0767 7.4700'• 0.4776 0.0478 0.5254 0.1284 0.0460 0.1743 82.4664 2,706.0480 2,788.5144 5.8174 0.0695 2,954.6623 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 12 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 2.2 Overall Operational Mitigated Operational ROG ROG NO. CO S02 Fugitive Exh ... t PM10 Fugitive Exhaus[ PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total I PM2.5 PM2.5 Percent 0.00 0.00 Category tons /yr MT/y, Area 1.5217 1.1000.- 0.0117 0.0000 0.00 4.0000e- 4.000Oe- 0.00 4.0000.- 4.000Oe- r 0.0000 ! 0.0225 0.0225 6.000Oe- 0.0000 i 0.0240 004 1 1 005 005 1 005 005 i 1 005 I ............... ............... y....... ............ .................. ................... .._ ............... ................... ................. _ ............ _.... ................... ................... ................... ............... ................... Energy ,E 0.0338 0.3069 0.2578 1.8400.- 0.0233 0.0233 0.0233 0.0233 i 0.0000 ;2,061.3394 2,061.3394 0.0845 0.0223 2,070.0925 003 r ................... ...........�:.._............... Mobile i 0.1318 ._._._._._. i 0.4402 .... ..............._............... 1.5751 5.3200. - ._._._._._. i 0.4776 ................. i 5.7700e- _._._._._._. i 0.4834 ............. i 0.1284 ................. i 5.4200e- _._._._._._. y'..................:_...................._._._ i 0.1338 0.0000 11'486.0149 ._._._._._._._._.._.........._. 486.0149 i 0.0178 i 0.0000 ................... 486.4606 i 003__i._._._._._. i._. 003._._i i._._._._._- i_. 003__i ............... ............... h._.___ ---- ._._._._._._ ....._._._. 1111.._. ._._._._._. * _ _ _ ._._._._r .................i 0;T0 _"__"" ...... 0100___ ...27............ Offroad i 0.0283 0.2561 0.2322 3.1000.- 0.0186 0.0186 0.0172 0.0172 0.0000 i 27.2549 27.2549 8.2200.- 0.0000 I 27.4603 004 003 I .......... .... ................r....._._._._._ Waste ... ........_._.................... _ ._. ......... ................... .._._ ....... 0.0000 .................... 0.0000 ................. .............. 0.0000 ............ }.................. :_._._._._._..._._._._........._3......._._. 0.0000 63.4996 0.0000 63.4996 3.7527 ................... 0.0000 ........ ........... 157.3177 .............................. .1.._............... Water ; ._._._._._. i ... ................_.............. I ._._._._._. i i ._.........1......_.0. i 0.0000 .0._.0._. i 0.0000 _._._._._._. i ._............ I 0.0000 _ _._._._._.yr. .................:.._.31....163 : -0-0-0,0_0--- 18.9668 131.4163 r ............. i 150.3831 _._._._. 1.9540 _............ 0.0472 ............... 213.3073 Total 1.7156 1.0032 2.0767 7.4700.- 0.4776 0.0476 0.5254 0.1284 0.0460 0.1743 82.4664 2,706.0480 2,788.5144 5.8174 0.0695 2,954.6623 003 ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e PM70 PM 10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 1 1 1 1 1 1 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 2.3 Vegetation Veaetation Cote Category MT New Trees 43.8960 Total r 43.6960 3.0 Construction Detail Construction Phase CalEEMod Version: CalEEMod.2016.3.2 Page 14 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Phase Number Phase Name I Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition ;D emolition :12/12/2018 ?1/8/2019 5 i 20 .................................... ................... 2 r } .............................................................. . :Soils Abatement/Remove/Replace Remove/Replace Site Preparation •............... .................. 112/26/2018 ................... ............. :1/22/2019 .- ._..._._._._._ 5 ._._._._._.__ 20 ................................... ............................... ...................}...................................... 3 ......................... :Site Prep and Make Ready :Site Preparation i ................................. 1112312019 i............................ :3/1212019 5 35 ........................... ............................... ................... 4 }.............................................................. ;Parking Garage Underground .' ; Building Construction __._..;............................ ..... ;2/22/2019 ......................... 24/412019 5 _ 30 ................................... ............................... ................... 5 i.............................................................. :Office Building Underground :Building Construction .............................. 12/22/2019 ......................... :4/18/2019 5 40 ........................... ............................... ................... 6 f.............................................................. .. *.Parking Garage Core Construction :Building Construction !................................. ;4/412019 ...................... ;1/20/2020 5 _ 208 ................................... ............................... ................... 7 f................................ ............................... *.Office Building Core Construction j a Building Construction ........................................ 1411912019 ......................_.""""""' ;4/14/2020 5 '-'-'----- 258 ................................... ............................... ................... 8 } ............................................................... *.Parking Garage Exterior i........................................................... :Architectural Coating i 12/212019 ° 12/3012019 5 21 ........................... ............................... i *.Improvements ` ` t ................... 9 ............................................................... *.Office Building Tenant *.Improvements 6—'-'-'-'-'---- Architectural Coating ................................. 12/2612019 ................................ 10/2712020 5 219 ................... 10 ;......................... ...................................... .Landscaping and Site *.Improvements _....._._. _._._.........._._._._._._____. ._._._.____._._._ ?Pautng !1/6/2020 ............. ................... 7/3/2020 ..................... 5 a..................... 130; '• .................................................................. t ................... ....... ......................................................... . ............................................................ ----- ----- . '•------................................................................... 11 *.Office Building Exterior ;Architectural Coaling :1/15/2020 :4/14/2020 5: 65: *.Improvements Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.65 Residential Indoor: 0; Residential Outdoor: 0; Non - Residential Indoor: 0; Non - Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sgft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition 9 Air Compressors 2i 7.00: 7811 0.41 .........................................................................}_ ....______________'_'_._._._._. _____'— y................................. .................................... Demolition ?Concrete/Industrial Saws 21 i 6.00 81? O.T. ........................-.-.-.-.-.-. ...- ..........................i Demolition ___'_ f................................_.___ ;Dumpers/Tenders I 1 ................................. 1� .. .................................. 4.00: y................................... 161 . 0.31 Demolition *. Excavators 2: 3.002 0.31 CalEEMod Version: CalEEMod.2016.3.2 Page 15 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Demolition 'Forklifts 11 7.00; 0.20 ............ . ........................... . --------------------- I .................................. ................................... ..................................... 'Demolition '* ''* '" '-", ......................... * .................. 'Off-Highway Truc;s 1 4.00;: 4021 0.38 1 1 1.............. ............................... i Demolition '''", ........................................ .................................. .................................. 4 ............................. - 'Rubber Tired Dozers �.z 21 6.00 247! ... ...................................................................... - --------- - --------------------------------- --------- ......................... ................................... i ..................................... Demolition Skid Steer Loaders 1 6.00:: 651 0.37 ' --- ----------------- - - ------- i .................................. .................................. a ..................................... 6e m 'oli''", tjon Sweepers/Scrubbers 1 4.00� 641: 0.46 ................................................................. I ---------------- - - ------- j ................................. T .................................. ..................................... Demolition Tractors/Loaders/Backhoes 21 5.00:: 97: 0.37 ''' ' * '' *'' * ' ' """, ........... I--- - - - ................................. ................................... ............................. �o11s mentRamove Re pace Crawler Tractors 1: 4.001 2121 .......................................................................... - - - -- - - - - - ------------------------------- .................................. . . . ............................. i ..................................... Soils AlhatementlRemove(Replace, ;Dumpers/Tenders 21 6.001 161 0.38 .......................................................................... I ---- - ---------------- - - - - ------------- - - - I .................................. ................................. . I : ..................................... Soils Abatement/Remove/Replace Excavators 21 5.00� 158i 0.38 .......................................................................... -------------------- - - - - I ................................. ..................................... 1 .................................. Soils AbatemenVRemove/Replace Off-Highway Trucks 31 4.00: 402i 0.38 .......................................................................... ----------------- - - - - - - - - - - - - - .................................. ................................ Soils AbatementfRemove(Replace 'Plate Compactors 2i: 5.001 0.43 .......................................................................... 4 ----------------- - - - - ---------- Soils Abatement/Remove/Replace Rubber Tired Loaders 21 5.00 2031 0.36 .......................................................................... . - - - - - - T ---------------- - - - - - - ...................................................................... ..................................... Soils Abatement/Remove/Replace 'Scrapers 21 4.00 3671 0.48 .......................................................................... ------------------------------- --- ................................. : . .................................. ..................................... Soils Abatement(Remove/Replace 'Sweepers/Scrubbers i 11 4.00; 0.46 .......................................................................... ____T ........................ ---- .. .. .. .. .. ................ . . .................................. ..................................... Soils Abatement/Remove/Replace 'Tractors/Loaders/Backhoes 11 6.001 971 0.37 .......................................................................... .. . . . . . . . . . . . . - -- - - ---------------- ................ ................................. .................... ............... ..................................... Site Prep and Make Ready 'Bore/Drill Rigs 2:9 7.00; 0.50 .......................................................................... - ---------------- - - - ---------------------------------- ................................... 4 .......................... ........... Site Prep and Make Ready ;Dumpers/Tenders 16: 0.38 ................................... ..................................... .......................................................................... t --------- ----------------------- 4': Site Prep and Make Ready Excavators 1 .00 1581: 0.38 .......................................................................... -------- ------- - - - - --- ...... ............ ...................... ..................................... Site Prep and Make Ready Off-Highway Trucks i 21 ................. 4.00;: 4021 0.38 .......................................................................... - -------- ......................... .................................. ..................................... Site Prep and Make Ready Plate Compactors 2 5.00! 81 0.43 ............................................................ ............................... .............................. 4 ..................................... Site Prep and Make Ready 'Rubber Tired Loaders 2 6.00 2031 0.36 .......................................................................... I - - ---- ........................ ............ i ...................................................................... ..................................... Site Prep and Make Ready ;Scrapers 2i i 6.00:: 3671: 0.48 ........................................................................ 1 - ------------- - - - - - - ................................... .................................... ..................................... Site Prep and Make Ready ;Sweepers/Scrubbers 1 1 j 4.00 641: 0.46 .......................................................................... . ......................... r .................................. ..................................... Site Prep and Make Ready Tractors/Loaders/Backhoes 21 6.00�: 971 0.37 .......................................................................... +_ ------------ -i ............................ L ................ __ .............. I ........... I .................. Parking Garage Underground 'BorelDrill Rigs I i 7.00: 2211 0.50 .......................................................................... ---------------- - - - - - - ................................. .................................. .......................... ........... Parking Garage Underground eExcavators 2 7.00 1581 0.38 .......................................................................... ...................................................................... Parking Garage Underground ;Generator Sets 2 ..............................4.00.... - - - - ------------------------84---- ..................................... :: :: 0.74 CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Parking Garage Underground I Plate Compactors 2 4.00; 0.43 ........... . ..................... ------------------ .............. if .................................. ................................... ..................................... '�arki'ng' Garage Underground ' '' ........... 'Rough Terrain 1 2.00; 100! 0.40 1 1 ............... 'Parki'ng' Garage U n"d"e"r"g'r"o"u"*n"d""""'* - -- - -------------- I ......... ............ .................................. ........................... 'Rubber Tired Loaders 1 2.001 203! 0.36 '�'a* rM, Parking Garage Underground ''' '"", Sweepers/Scrubbers 1 4.00; 641: Y�6- ........... - - - ----------------- - - ------- ........................ ... .................................. ..................................... Parking Underground Tractors/Loaders/Backhoes ..w6 97: 0.37 Garage n 21 0: ''''' ' ' '' ...................... ---------------- - - ------- j ................................. .................................. ..................................... �arking Garage Underground ;Trenchers 21 4.001; 781: 0.50 ................................................................... - - - - - - - - - - - ......... .................................... ............................. �6 Office Building Underground Bore/Drill Rigs 2:! 4.00: 2211 y .......................................................................... ------- - - - - - --------------------- ................................... . . . ............................. i ..................................... Office Building Underground a Excavators i 21 7.00: 158i 0.38 i .......................................................................... - ---- - ---------------- - - - - - ------------- - - - I .................................. ....................... ........... ..................................... Office Building Underground Generator Sets 21 4.00� 84i 0.74 .......................................................................... ................................. ................................... ..................................... Office Building Underground a Plate Compactors 21 4L00: 8 i 0.43 .......................................................................... I ----------------- - - - - - - - - - - - - - .................................. ................................... Office Building Underground 'Rough Terrain Forklifts 2 : 8.001: 1001 0.40 .......................................................................... ---------------- - - - - ---------- ................................................................................ Office Building Underground 'Rubber Tired Loaders 1 1 i 6.00; 0.36 .......................................................................... ---------------- - - - - - - ................................. .................................... ........................ ............. Office Building Underground 'Sweepers/Scrubbers i 11 4.00i 641 0.46 .......................................................................... ' ........ . . . . . ................... - - - ................................. .................................. ...................................... Office Building Underground Tractors/Loaders/Backhms 2! 6.00 97: ! 0.37 .......................................................................... I .................................. i ..................................... Office Building Underground 'Trenchers 41 7.001 781 0.50 .......................................................................... ---------------------- - - ---------------- ............... ................................. .............................. ... ................................... Parking Garage Core Construction 'Aerial Lifts 1 7.00 631 0.31 .......................................................................... ............... . ...................... ................................... I ..................................... Parking Garage Core Construction 'Cement and Mortar Mixers I 6! 4.00;: 9 0.56 .......................................................................... Parking Garage Core Construction 'Cranes 1 TOW 231 0.29 .......................................................................... .................................. ..................................... Parking Garage Core Construction Off-Highway Trucks 4 0,0;:. 402! 0.38 .......................................................................... - - - --- - . .........................4.00.: ...........................402 .......................... ........................... ...................................... Parking Garage Core Construction Plate Compactors 1 ! 4.00; 81 0.43 .......................................................................... ................ . . ............ .................................. Parking Garage Core Construction Pumps 1 6.00:: 84:: 0.74 ........................................................................ +_ . . . . . ..................................... ................................................................ ..................................... Parking Garage Core Construction Rough Terrain Forklifts 1 i 6.00 too:: 0.40 .......................................................................... __ _- - - - --- j ................................... : ................................... ..................................... Parking Garage Core Construction 7 W elders 31 6.00 46: 0.45 .......................................................................... ------------ 4 .................................. r .................................. I ..................................... Office Building Core Construction 'Aerial Lifts 41 7.00:: 631 0.3 .......................................................................... 1 - ------------------ Office Building Core Construction iAir Compressors 4i 6.001 781 0.48 .......................................................................... ------------------ - - - - - -- I ................................. .................................. I ................... .................. Office Building Core Construction vCranes 21 7.001 231:: 0.29 i .......................................................................... ...................................................................... ................................. Office Building Core Construction Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CalEEMod Version: CalEEMod.2016.3.2 Page 17 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Office Building Core Construction Rough Terrain Forklifts 2 6.00; 0.40 'E' ''''' -''''l........ . 9........................ -------------------------- ............... .................................. ................................... ..................................... ilceaut1ding C ore C onstructon ,Sweepers /Scrubbers 4.00;: 641 0.46 Construction - - ------------ - - - - - - - .................. ........................ .....................'6ce' ", '', '--"', , ", " ', - lder 700 ......5 Office C ore Wes 5 . 1 46! ''' , '' '""'"'""*'""*"*"""'"'........... . ..................................................... .................................. ................................... I ........................ ..... �arMng Garage ExeriorImprmements Aerial Lifts 11 6.00 63: ''i ........... - - - ---------------- - - ------- I .................................. r .................................. ..................................... Parking Garage ExerorIr prove n ants Cranes 11 3.00:: 2311 0.29 '''i' "'-i ---------------- - - ------- j ................................. .................................. ..................................... Parking Garage ExerorImprave m ents Trucks 11 4.001; 4021 0.38 '�'a* Parking ng Garage 'Ex-te rto-r-Improvements , * '-- '* - - - - - - ...... 'Other General Industrial Equipment 1 : y�� 4.00: 881 .......................................................................... ------- - - - - - - - - ------------------------- ................................... . . . ............................. i ..................................... Parking Garage Exterior Improvements :Pressure Washers 1 11 2.00: 131 0.30 .......................................................................... ----------------------- --------- ------------- - - - .................................. .................................. ..................................... Parking Garage Exterior Improvements Rough Terrain Forklifts 1 1 5.00� 100i 0.40 I .......................................................................... - -------- f ----------------------- - - - ................................. ................................... ..................................... Parking Garage Exterior Improvements e Welders 1 21 5.00: 46; 0.45 .......................................................................... - ------------------- - - - - - - ................................ T001 Al .............................. 0".'31' I .......................................................................... 4 --------------------------- - --------- - - - --- F - - - - - - .................................... ..................... . ............ ..................................... Office Building Tenant Improvements Aerial Lifts Office Building Tenant Improvements 'Air Compressors i 11 7.00: 78! 0.48 .......................................................................... . - - - - - - T ---------------- - - - - - - ...................................................................... ..................................... Office Building Tenant Improvements :Off- Highway Trucks 1 2 4.00; 4021! 0.38 .......................................................................... -------- - - - - - ------------------- - - - ................................. .................................. ...................................... Office Building Tenant Improvements ;Rough Terrain Forklifts 1 7.00: 100! 0.40 ........ .. .................................. ..................................... 641 0.46 Office Building Tenant Improvements ;Sweepers/Scrubbers 11 6.001 .......................................................................... .. . ................... . - - ---------------- --------------- ................................. j ........................ .......... ..................................... Office Building Tenant Improvements ;Welders 1 5.001 46 0.45 1 .......................................................................... ---------------- - ------- - - ------------------------- .......... ................................... 4 .................. ................... ;Cement and Mortar Mixers 4�003 0.56 Landscaping and Site Improvements 21 9: .......................................................................... I V * ........... ................................... ..................................... Landscaping and Site Improvements Dumpers/Tenders i I 6.0W: 16i 0.38 .......................................................................... - ------------- - ................................... ..................................... Landscaping and Site Improvements Waving Equipment 21 ................. 7'.00.: 1321 0.36 .......................................................................... ................................... .................................. a...... ............................... Landscaping and Site Improvements Plate Compactors 2 4.0 81 0.43 .......................................................................... .................................. 4 ....................... ........... .................................. !. . .. Landscaping and Site Improvements Rollers 2 5.00] 80 1 0.38 ........................................................................ ............................ ................................... j ..................................... Landscaping and Site Improvements ;Rough Terrain Forklifts 1 i 3.00 1001 .......................................................................... : ................................... ................................... ..................................... Landscaping and Site Improvements Rubber Tired Dozers 21 4.00 247:: 0.40 651 0.37 .......................................................................... ---------- ......................... .......................................................................... ------ I ........................ :! -I ........... ............. Landscaping and Site Improvements Skid Steer Loaders 6.00 Landscaping and Site Improvements 'Tractors/Loaders/Backhoes 21 4.00:: 971 0.37 .......................................................................... ------------------ - - - - - -- ................................. .................................. ....................... .............. Office Building Exterior Improvements eAerial Lifts 1 31 6.00 63:: 0.31 .......................................................................... ...................................................................... ................................. Office Building Exterior Improvements ;Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CalEEMod Version: CalEEMOd.2016.3.2 Page 18 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Office Building Exterior Improvements ;Other General Industrial Equipment 2 7.00: 88 0.34 Offi Building Exterior Improvements ;Pressure Washers 11 4.00; 13! 0. ce 30 .... ...�_ _______ ................. ..................... ..................... Office Building Exeror Imp. ..rove.. . me... nts ;Rough Terrain Forklifts 3: 7.00; 100! 0.40 .......................................................................... �. . ......................................... _._._._._ i.................................. k.............................. ..... i...... ............................... Office Building Exterior Improvements ;Sweepers /Scrubbers 1 j 4.00: 641 0.46 .......................................................................... j........................................ ............................... .......................... ....... W._._ ....... _ ................. _ ...... ............................... Office Building Exterior Improvements : Welders 2: 6.00: 46: 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Worker Trip Number Length Vendor Trip Length Hauling Trip Worker Vehicle Length Class Vendor Vehicle Class Hauling Vehicle Class Demolition 16 20.00; 0.00 230.00; 10.80! 7.30; 19.00: LD_Mix 11HDT_Mix 1HHDT e Soils 16 20.001 0.00 814.00; 10.801 7.30; 12.601LD Mix iHDT Mix HHDT ................................... �.�,._.__"�__ - i .................... ....... .....................a_________ i .i................... ` I .._._........_._._._._._._.; j..................... ............................... Site Prep and Make r r 15 9.0011 19.001 0.00 0.00; 10.801 7.... 1 7.30; 19.00 19.00ILD_Mix iHDT_Mix HHDT Parking Garage 15 11.00! 5.00 0.00; 10.801 7.30: iHDT_Mix HHDT : i..a.,.,..,.....a r .....................d.......... ........{.""""._._._._._._._._. Office Building r 18 ! 13.00; ..............................._.. 6.00 i __ .......................... .................._._._._._._._ 0.00; 10.801 7.30; �"" --- - - " "' ti............................ 19.001 LD_Mix IHDT_Mix .......................... HHDT ............ ..............................r Parking Garage Core i 15� •........................... 96.001 43.00 ._._._._._._..... _._.........._._._._. 0.00; 10.801 7.30: 19.0011 LD_Mix ......... ...... ... HDT_Mix ............ ...... HHDT Office Building Core 20� i 113.001 50.00 0.00: 7.30; 19.00iLD_Mix :HDT_Mix HHDT .......................................... }._.-'-'-'-----...._.+__-____ I...................................................»______-- -J............................! i ____ _._._._._._ _ .................. .......................... Parking Garage 8I 22.001 0.00 0.00; 10.801 7.30; 19.00i LD_Mix iHDT_Mix HHDT .. ....:...:...................... r ........................................ ..{.._. ............ _........... Office Building Tenant 7 ;.......................... 19.00; 0.00 i ................... ..... ;........................• 0.00! 10.80; ... 7.30; __________- 19.00` LD_Mix ' ................ ........... jHDT_Mix .......................... . IHHDT i LanLandscaping and Site 15 19.00, 0.00 0.00; 10.80 7.30; 19.0011 LD_Mix HDT_Mix HHDT » . . . . .. ... . . . . , . . . . . . Office Building Exterior ; 14 7.00: o.00: 10.80: 7.30: 19.00: LD_Mix : HDT_Mix ::HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CalEEMOd.2016.3.2 Page 19 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.2 Demolition - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust I 0.0286 1 0.0103 j 6.0000. - 1.6900. - 0.0140 0.0000 0.0140 2.1200.- 0.0000 2 0.- .120 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 N I 005 1 003 004 I 003 I 004 I I 004 003 i 003 I . I eeee_._.�_._._._._._. eeeess m���- � ssss- _.����- ______ ._. _._._ ................ ..:eeee�� ��� s�ss�� eeess ................... Vendor i 0.0000 0.0000 0.0000 0.0000 Off -Road i 0.0348 0.3303 0.2051 3.8000.- 0.0000 0.0181 0.0181 0.0000 0.0171 0.0171 i 0.0000 i 34.2603 34.2603 8.4000.- 0.0000 34.4704 004 ' 3.3000e- 003 1.1000e- 1.0000e- Total 0.0348 0.3303 0.2051 3.8000.- 0.0140 0.0181 0.0321 2.1200.- 0.0171 0.0192 0.0000 34.2603 34.2603 8.4000e. 0.0000 34.4704 004 005 004 r 004 005 003 0.0289 0.0137 7.0000.• 2.7900e- 003 2.9200e• 7.4000'. Unmitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 8.2000e- I 0.0286 1 0.0103 j 6.0000. - 1.6900. - I 1.2000. - ! 1.8100e- ? 4.5000. - 1.1000e- I 5.6000e- ; 0.0000 i 6.6007 6.6007 7.9000e- 0.0000 6.6203 004 I I 005 1 003 004 I 003 I 004 I I 004 I 004 r i I I 004 I . eeeee_ eeee_._.�_._._._._._. eeeess m���- � ssss- _.����- ______ ._. _._._ ................ ..:eeee�� ��� s�ss�� eeess ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker 4.6000e- 3.3000e- 3.3600e- 1.0000.- 1.1000e- 1.0000e- 1.1100e- 2.9000.- 1.000Oe- 3.0000.- : 0.0000 0.9783 0.9783 2.000Oe- 0.0000 0.9789 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 1.2800.• 0.0289 0.0137 7.0000.• 2.7900e- 1.3000e• 2.9200e• 7.4000'. 1.2000.• 8.6000.• 0.0000 7.5790 7.5790 8.1000.• 0.0000 7.5992 003 005 003 004 003 004 004 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 20 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.2 Demolition - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust I 0.0286 1 0.0103 j 6.0000. - 1.6900. - 6.2900e- 0.0000 6.2900.- 9.5000o- 0.0000 9.5000.- 0.0000 i 0.0000 0.0000 0.0000 0.0000 I 0.0000 N I I 005 1 003 003 I 003 003 004 I 004 r 004 I 004 I 1 .............................. . i ................... ................... ................... ................... ................... ....... _._. ...... ................... ................... ................... .................... ' .......... . .............. ............ ............. Off -Road 4.9000.- 0.0307 0.2162 3.8000.- 0.0000 6.5000.- 6.5000.- 0.0000 6.5000.- 6.5000.- i 0.0000 i 34.2602 34.2602 8.4000.- 0.0000 34.4703 003 , 004 004 004 004 004 ' 003 Total 4.9000.• 0.0307 0.2162 3.8000e• 6.2900e• 6.5000e• 6.9400e• 9.5000e• 6.5000e• 1.6000.• 0.0000 34.2602 34.2602 8.4000e- 0.0000 34.4703 003 004 003 005 004 003 004 003 004 004 003 005 003 Mitigated Construction Off -Site ROG NO, CO 502 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 8.2000e- I 0.0286 1 0.0103 j 6.0000. - 1.6900. - I 1.2000. - ! 1.8100e- ? 4.5000. - I 1.1000e- I 5.6000e- ; 0.0000 i 6.6007 '1 6.6007 I 7.9000e- 0.0000 6.6203 004 I I 005 1 003 004 I 003 I 004 I 004 I 004 r i I 004 I . 1111._ eeee_._.�_._._._._._. eeeess m���- � ssss- _.����- ______ ._. _._._ ................ ..:eeee�� ��� s�ss�� eeess ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker 4.6000.- 3.3000.- 3.3600.- 1.0000.- 1.1000.- 1.0000.- 1.1100.- 2.9000.- 1.0000.- 3.0000.- : 0.0000 0.9783 0.9783 2.0000.- 0.0000 0.9789 004 , 004 003 005 003 005 003 004 005 004 , 005 Total 1.2800.- 0.0289 0.0137 7.00001- 2.7900.- 1.3000.- 2.9200.- 7.4000.- 1.20000- 8.6000.- 0.0000 7.5790 7.5790 8.1000.• 0.0000 7.5992 003 005 003 004 003 004 004 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 21 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.2 Demolition - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Fugitive Dust I . . 1 . 5.9900e- 0.0000 5.9900e- 9.1000e- 0.0000 9.1000e- 0.0000 i 0.0000 0.0000 0.0000 0.0000 I 0.0000 N 004 I I 003 003 003 003 004 004 004 j 004 r j I 004 .............................. . i....... ........... ................... ................... ................... ................... ....... _._ ....... ................... ................... ................... .................... ' ............. .............. ......_.... ............. Off -Road 0.0138 0.1304 0.0864 1.6000e- 0.0000 6.9800e- 6.9800e- 0.0000 6.5800e- 6.5800,- 0.0000 i 14.5100 14.5100 3.5600e- 11 0.0000 145991 0.0000 0.0000 0.0000 004 .: 003 003 003 003 003 Total 0.0138 0.1304 0.0864 1.6000,- 5.9900,- 6.9800,- 0.0130 9.1000,- 6.58001- 7.4900;- 0.0000 14.5100 14.5100 3.56001- 0.0000 14.5991 0.0000 1.3000,- : 0.0000 0.4062 0.4062 004 003 003 004 ' 004 003 003 004 003 j Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling ti 33 - I . . 1 . . . . ! .,I ? . 1 . . . � 2.7884 I 34000. - � 0.0000 2.7969 004 I I 003 005 003 005 003 004 005 j 004 r j I 004 I .............................. - - - - _ --------- ............... ..... ........................ Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0 .0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker 1.8000e- 1.2000e- 1.2900e- 0.0000 4.7000e- 0.0000 4.8000,- 1.3000,- 0.0000 1.3000,- : 0.0000 0.4062 0.4062 1.0000.- 0.0000 0.4064 004 ' 004 003 004 004 004 004 , 005 Total S.1000e- 0.0117 5.7400,- 3.00001- 1.98001- 5.0000,- 2.04001- 5.2000.- 4.0000.- 5.6000.- 0.0000 3.1946 3.1946 3.50001- 0.0000 3.2033 004 003 005 003 005 003 004 005 004 j 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 22 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.2 Demolition - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust I . . 1 . 2.7000e- 0.0000 2.7000.- 4.1000o- 0.0000 4.1000.- 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 N 004 I I 003 003 003 003 004 004 004 j 004 r j I 004 .............................. . i ................... ................... ................... ................... ................... ._._._._. ...... ................... ................... ................... .................... ' ............. .............. ......_.... ............ Off -Road 2.1000.- 0.0132 0.0927 1.6000e- 0.0000 2.8000e- 2.8000e- 0.0000 2.8000.- 2.8000e- i 0.0000 i 14.5100 14.5100 3.5600e- 11 0.0000 14.5991 003 , 0.0000 0.0000 004 .: 004 004 004 004 + 003 Total 2.1000e• 0.0132 0.0927 1.6000e• 2.7000e• 2.8000e• 2.9800e• 4.1000e. 2.8000e• 6.9000.• 0.0000 14.5100 14.5100 3.5600e• 0.0000 14.5991 003 1.3000.- : 0.0000 0.4062 0.4062 004 003 004 003 004 004 004 004 003 004 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 33 - I . . 1 . . . . ! ..I ? . 1 . . . � 2.7884 I 34000. - � 0.0000 2.7969 004 I I 003 005 003 005 003 004 005 j 004 r j I 004 I .............................. - - - - _ --------- ............... ..... ........................ Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0 .0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker 1.8000e- 1.2000e- 1.2900e- 0.0000 4.7000e- 0.0000 4.8000.- 1.3000.- 0.0000 1.3000.- : 0.0000 0.4062 0.4062 1.0000.- 0.0000 0.4064 004 ' 004 003 004 004 004 004 , 005 Total S.1000e- 0.0117 5.7400.- 3.00001- 1.98001- 5.0000,- 2.04001- 5.2000.- 4.0000.- 5.6000.- 0.0000 3.1946 3.1946 3.50001- 0.0000 3.2033 004 003 005 003 005 003 004 005 004 j 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 23 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fu five Dust ,. j 0.0217 7.6900e- j 5.0000. - 9.2000e- 0.0000 9.2000.- 1.4000o- 0.0000 1.4000.- 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 ii 004 003 004 003 004 004 00 004 : 4 004 ......._91 ....................i................... ................... ................... ................... ................... ...._._._....... ................... ................... ................... .................... ' _ ............... Off -Road ;i 8.0800.- 0.0916 0.0522 1.2000e- 0.0000 3.7600e- 3.7600e- 0.0000 3.4600e- 3.4600.- i 0.0000 i 10.6085 10.6085 3.2500e- 0.0000 106898 003 , 0.0000 0.0000 004 .: 003 003 003 003 003 Total 8.0800.• 0.0916 0.0522 1.2000e• 9.2000e• 3.7600e• 4.6800e• 1.4000e• 3.4600e• 3.6000.• 0.0000 10.6085 10.6085 3.2500e. 0.0000 10.6898 003 9.0000.- : 0.0000 0.2795 0.2795 004 004 003 003 004 003 003 004 003 004 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling ti 6.2000e- j 0.0217 7.6900e- j 5.0000. - 3.4400. - 1 8.0000.- 3.5200e- ! ? 8.7000. 18.000Oe- I 9.5000e- 0.0000 4.6124 i 4.6124 I 56000 . - 0.0000 � 4.6263 004 003 005 003 005 I 003 00 I 005 4 004 I .............................. ----- - - - - _ ............... - ----- ----- ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: . i Worker 1.3000e- 9.000Oe- 9.6000.- 0.0000 3.1000e- 0.0000 3.2000.- 8.0000.- 0.0000 9.0000.- : 0.0000 0.2795 0.2795 1.000Oe- 0.0000 0.2797 004 ' 005 004 004 004 005 005 , 005 Total 7.5000.• 0.0218 8.6500e- 5.0000e• 3.7500e- 8.0000.• 3.8400e• 9.5000e• 8.0000e- 1.0400.• 0-00'0 4.1911 4.8919 5.7000e• 0.0000 4.9060 004 003 005 003 005 003 004 005 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 24 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fu five Dust ,. j 0.0217 7.6900e- j 5.0000. - 4.1000.- 0.0000 4.1000e- 6.0000e- 0.0000 6.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 N 004 003 004 003 004 005 00 005 4 004 ......._91 ...................'i .................. ................... ................... ................... ._................_._._._....... ................... ................... ................... .................... ' _ ............... Off -Road ;i 1.7500.- 9.3600e- 0.0586 1.2000e- 0.0000 2.6000e- 2.6000e- 0.0000 2.6000.- 2.6000.- i 0.0000 i 10.6085 10.6085 3.2500e- 0.0000 106898 003 , 003 0.0000 004 .: 004 004 004 004 003 Total 1.7500.• 9.3600e• 0.0586 1.2000.- 4.1000e- 2.6000e- 6.7000e. 6.0000e. 2.6000e- 3.2000.- 0.0000 10.6085 10.6085 3.2500e. 0.0000 10.6898 003 003 0.2795 004 004 004 004 005 004 004 004 003 004 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 6.2000e- j 0.0217 7.6900e- j 5.0000. - 3.4400. - 1 8.0000.- 3.5200e- ! ? 8.7000. 18.000Oe- I 9.5000e- 0.0000 4.6124 i 4.6124 I 56000 . - 0.0000 � 4.6263 004 003 005 003 005 I 003 00 I 005 4 004 I .............................. ----- - - - - _ ............... - ----- ----- ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: . i Worker 1.3000e- 9.000Oe- 9.6000.- 0.0000 3.1000e- 0.0000 3.2000.- 8.0000.- 0.0000 9.0000.- : 0.0000 0.2795 0.2795 1.000Oe- 0.0000 0.2797 004 ' 005 004 004 004 005 005 , 005 Total 7.5000.• 0.0218 8.6500e- 5.0000e• 3.7500e- 8.0000.• 3.8400e• 9.5000e• 8.0000e- 1.0400.• 0.0000 4.8919 4.8919 5.7000e• 0.0000 4.9060 004 003 005 003 005 003 004 005 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 25 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust 0.0825 1 0.0308 1.8000e- 9.2000e- 0.0000 9.2000,- 1.4000o- 0.0000 1.4000,- 0.0000 ! 0.0000 0.0000 0.0000 0.0000 i 0.0000 003 I I I 004 004 004 004 004 I 004 004 j t 003 j 1 ... ........................... .. ............... ssss- - eels ................... Off -Road i 0.0299 0.3287 0.1991 4.7000e- 0.0000 0.0134 0.0134 0.0000 0.0123 0.0123 i 0.0000 i 41.7556 41.7556 0.0130 0.0000 42.0807 .: 004 ' Total 0.0299 0.3287 0.1991 4.7000,- 9.2000,- 0.0134 0.0143 1.4000e- 0.0123 0.0125 0.0000 41.7556 41.7556 0.0130 0.0000 42.0607 004 r 004 003 004 004 005 003 004 005 004 r 005 Unmitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling ti 2.3100e- 0.0825 1 0.0308 1.8000e- 4.0800, - 13.000Oe- ! 4.3800e- ? 1.1000o- 12.9000e- I 1.3900,- ; 0.0000 i 18.1923 1 18.1923 I 22300, - 0.0000 18.2482 003 I I I 004 1 003 004 I 003 t 003 I 004 I 003 r j t 003 j ... ........................... .. ............... ssss- - eels ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: . i Worker 4.7000,- 3.3000,- 3.4300,- 1.0000,- 1.2600,- 1.0000,- 1.2700,- 3.4000,- 1.0000,- 3.4000,- : 0.0000 1.0833 1.0833 2.0000,- 0.0000 1.0838 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 2.7800,- 0.0828 0.0342 1.9000,- 5.3400,- 3.1000,- 5.6500,- 1.4400e. 3.0000e. 1.7300" 0.0000 19.2756 19.2756 2.2500e. 0.0000 19.3320 003 004 003 004 003 003 004 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 26 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust 0.0825 1 0.0308 1.8000e- 4.1000.- 0.0000 4.1000e- 6.0000.- 0.0000 6.0000e- 0.0000 1: 0.0000 0.0000 0.0000 0.0000 i 0.0000 003 I I I 004 004 004 004 005 I 004 005 i t 003 j i ... ........................... .. ............... ssss- - eels ................... Off -Road ;i 6.9900.- 0.0374 0.2344 4.7000e- 0.0000 1.0600e- 1.0600e- 0.0000 1.0600.- 1.0600e- i 0.0000 i 41.7555 41.7555 0.0130 0.0000 42.0807 003 r 004 003 003 003 003 + Total 6.9900*• 0.0374 0.2344 4.7000,- 4.1000,- 1.0600,- 1.4700e- 6.0000,- 1.06001• 1.1200.• 0.0000 41.7555 41.7555 0.0130 0.0000 42.0607 003 004 003 004 004 003 003 005 003 003 1 005 Mitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling ti 2.3100e- 0.0825 1 0.0308 1.8000e- 4.0800. - 13.000Oe- ! 4.3800e- ? 1.1000o- 12.9000e- I 1.3900.- ; 0.0000 i 18.1923 1 18.1923 I 22300. - 0.0000 18.2482 003 I I I 004 1 003 004 I 003 i 003 I 004 I 003 r i t 003 j ... ........................... .. ............... ssss- - eels ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 .: . i Worker 4.7000.- 3.3000.- 3.4300.- 1.0000.- 1.2600.- 1.0000.- 1.2700.- 3.4000.- 1.0000.- 3.4000.- : 0.0000 1.0833 1.0833 2.0000.- 0.0000 1.0838 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 2.7800.- 0.0828 0.0342 1.9000,- 5.3400.- 3.1000,- 5.6500,- 1.4400.- 3.0000e• 1.7300.- 0.0000 19.2756 19.2756 2.2500.- 0.0000 19.3320 003 004 003 004 003 003 004 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 27 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust 0.0000 1 i 0.0000 1 j 0.0000 I 0.0278 0.0000 0.0278 3.0100o- 0.0000 3.0100. 0.0000 i 0.0000 0.0000 0.0000 0.0000 I 0.0000 003 003 ! :I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 Off -Road i 0.0721 0.8227 0.5033 1.2500e- 0.0328 0.0328 0.0302 0.0302 i 0.0000 1 111.7631 111.7631 0.0351 0.0000 112.6397 Worker ,i 9.8000e- 6.9000e- 7.1300e- 003 2.6200e- 2.0000,- 2.6300e- 7.0000,- 2.000Oe- ' 2.2511 5.0000e- 0.0000 2.2523 Total 0.0721 0.8227 0.5033 1.2500e- 0.0278 0.0328 0.0606 3.0100,- 0.0302 0.0332 0.0000 111.7631 111.7631 0.0351 0.0000 112.6397 Total 9.8000,- 6.90001- 7.1300e- 003 2.62001- 2.0000,- 2.63001- 003 2.0000.- 7.1000e. 0.0000 2.2511 2.2511 5.0000.- 0.0000 2.2523 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I j 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 9.8000e- 6.9000e- 7.1300e- 2.0000.- 2.6200e- 2.0000,- 2.6300e- 7.0000,- 2.000Oe- 7.1000,- : 0.0000 2.2511 2.2511 5.0000e- 0.0000 2.2523 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 9.8000,- 6.90001- 7.1300e- 2.0000,- 2.62001- 2.0000,- 2.63001- 7.0000.- 2.0000.- 7.1000e. 0.0000 2.2511 2.2511 5.0000.- 0.0000 2.2523 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 28 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Fugitive Dust 0.0000 1 i 0.0000 1 j 0.0000 I 0.0125 0.0000 0.0125 1.3500.- 0.0000 1.3500.- � 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 003 003 ! :I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 Off -Road i 0.0173 0.0886 0.6094 1.2500e- 2.4700e- 2.4700e- 2.4700.- 2.4700e- i 0.0000 i 111.7630 111.7630 0.0351 0.0000 112.6396 Worker ,i 9.8000e- 6.9000e- 7.1300e- 003 2.6200e- 003 003 7.0000.- 003 003 + 2.2511 5.0000e- 0.0000 2.2523 Total 0.0173 0.0886 0.6094 1.2500,- 0.0125 2.4700,- 0.0150 1.3500,- 2.4700"- 3.6200e. 0.0000 111.7630 111.7630 0.0351 0.0000 112.6396 Total 9.8000.- 6.90001- 7.1300e- 003 2.62001- 003 2.63001- 003 003 003 2.2511 5.0000.- 0.0000 2.2523 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I j 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 9.8000e- 6.9000e- 7.1300e- 2.0000.- 2.6200e- 2.0000.- 2.6300e- 7.0000.- 2.000Oe- 7.1000.- : 0.0000 2.2511 2.2511 5.0000e- 0.0000 2.2523 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 9.8000.- 6.90001- 7.1300e- 2.0000.- 2.62001- 2.0000,- 2.63001- 7.0000.- 2.0000.- 7.1000e. 0.0000 2.2511 2.2511 5.0000.- 0.0000 2.2523 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 29 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.5 Parking Garage Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.0342 0.3412 0.3017 5.5000e- 0.0000 0.0190 0.0190 1 0.0178 i 0.0178 0.0000 i 49.1174 49.1174 0.0133 0.0000 I 49.4498 • 0.0000 1 I 0.0000 004 0.0000 ' ' 1 I Total 0.0342 0.3412 0.3017 5.5000e- I 0.0190 0.0190 0.0178 0.0176 0.0000 49.1174 49.1174 0.0133 0.0000 49.4498 Vendor ;i 3.6000e- 9.5800e- 004 2.000Oe- 4.9000e- 7.000Oe- 5.5000e- 1.4000e- Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 1 I 0.0000 0.0000 0.0000 1 1 I 1 I I r I ! Vendor ;i 3.6000e- 9.5800e- 3.6800a- 2.000Oe- 4.9000e- 7.000Oe- 5.5000e- 1.4000e- 6.000Oe- 2.0000e- ; 0.0000 E 2.0063 2.0063 1.8000e- 0.0000 2.0107 004 003 003 005 004 005 004 004 005 004 004 Worker 4.9000e- 3.4000e- 3.5400e- 1.0000e- 1.3000e- 1.0000a 1.3100a 3.S000e- 1.000Oe- 3.S000e- : 0.0000 1.1171 1.1171 2.0000e- 0.0000 1.1177 004 r 004 003 005 003 005 003 004 005 004 r 005 Total mom-- 9.9200e- 9.9200e- 7.2200e- 3.0000e. 1.7900e- 8.0000 e- 1.8600e. 4.9000e- 7.000Oe. 5.5000a. 0.0000 3.1234 3.1234 2.000Oe- 0.0000 3.1284 004 003 003 005 003 005 003 004 005 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 30 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.5 Parking Garage Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road ;! 7.34001- 0.0416 0.3586 5.50001- 0.0000 1.01001- 1.01001- ? 0.0000 1.Ot00e- 1.01001- 0.0000 i 49.1173 49.1173 0.0133 0.0000 49.4497 003 • 004 003 003 003 003 r r i Total 7.34001- 0.0476 0.3566 S.S000e- 3.6800a- 1.01001- 1.01001- 7.000Oe- 1.01001- 1.01001- 0.0000 49.1173 49.1173 0.0133 0.0000 49.4497 003 0.0000 2.0107 004 003 003 003 004 003 003 004 005 004 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 I 0.0000 0.0000 0.0000 r Vendor ;i 3.6000e- 9.5800e- 3.6800a- 2.00001- 4.9000e- 7.000Oe- 5.5000e- 1.4000e- 6.000Oe- 2.0000e- ; 0.0000 E 2.0063 2.0063 1.8000e- 0.0000 2.0107 004 003 003 005 004 005 004 004 005 004 004 Worker 4.90001- 3.40001- 3.54001- 1.00001- 1.30001- 1.0000a 1.31001- 3.50001- 1.00001- 3.50001- : 0.0000 1.1171 1.1171 2.00001- 0.0000 1.1177 004 P 004 003 005 003 005 003 004 005 004 r 005 Total 8.5000.- 9.92001- 7.22001- 3.00001- 1.79001- 8.00001- 1.8600,- 4.90001- 7.00001- 5.5000.- 0.0000 3.1234 3.1234 2.00001- 0.0000 3.1284 004 003 003 005 003 005 003 004 005 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 31 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.6 Office Building Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road 0.0763 0.7638 0.6251 1.1000.- 0.0000 0.0445 0.0445 ? 0.0000 0.0413 0.0413 0.0000 i 97.6295 97.6295 0.0279 0.0000 I 98.3268 0.0000 1 003 I 1 I E I I I r 1 I Total 0.0763 0.7638 0.6251 1.1000.- 0.0445 0.0445 0.0413 0.0413 0.0000 97.6295 97.6295 0.0279 0.0000 987268 003 0.0153 5.8800.- 3.000Oe- 7.8000e- 1.1000e- 8.9000e- 2.3000.- 1.000Oe- 3.3000.- ; 0.0000 i 3.2101 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 0.0000 I 0.0000 ; 0.0000 i 0.0000 x0000 0.0000 0.0000 0.0000 1 E I 1 I E I I I r 1 I I ! Vendor ;i 5.7000e- 0.0153 5.8800.- 3.000Oe- 7.8000e- 1.1000e- 8.9000e- 2.3000.- 1.000Oe- 3.3000.- ; 0.0000 i 3.2101 3.2101 2.8000e- 0.0000 3.2171 004 003 005 004 004 004 004 004 004 004 Worker �i 7.7000e- 5.4000e- 5.5800.- 2.0000.- 2.0500e- 1.0000e- 2.O600e- 5.4000.- 1.000Oa- 5.6000.- : 0.0000 1.7603 1.7603 4.0000.- 0.0000 1.7612 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 1.3400.• 0.0159 0.0115 5.0000.- 2.8300.- 1.2000.- 2.9500.- 7.7000.- 1.1000.- 8.9000.• 0.0000 4.9703 4.9703 3.2000.• 0.0000 4.9784 003 005 003 004 003 004 004 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 32 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.6 Office Building Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.0142 0.0745 0.7228 1.1000.- 0.0000 1.9400.- 1.9400-- ? 0.0000 1.9400-- 1.9400.- 0.0000 i 97.6293 97.6293 0.0279 0.0000 I 98.3267 0.0000 003 003 003 003 003 r r ' Total 0.0142 0.0745 0.7228 1.1000-- 1.9400'- 1.9400.- 1.9400¢- 1.9400.- 0.0000 97.6293 97.6293 0.0279 0.0000 9867 .32 003 0.0153 003 003 7.8000e- 003 003 2.3000.- 1.000Oe- 3.3000.- ; 0.0000 i 3.2101 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2- I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 0.0000 I 0.0000 ; 0.0000 i 0.0000 x0000 0.0000 0.0000 0.0000 I r I Vendor ;i 5.7000e- 0.0153 5.8800.- 3.000Oe- 7.8000e- 1.1000e- 8.9000e- 2.3000.- 1.000Oe- 3.3000.- ; 0.0000 i 3.2101 3.2101 2.8000e- 0.0000 3.2171 004 003 005 004 004 004 004 004 004 004 Worker �i 7.7000e- 5.4000e- 5.5800.- 2.0000.- 2.0500e- 1.0000e- 2.O600e- 5.4000.- 1.000Oa- 5.6000.- : 0.0000 1.7603 1.7603 4.0000.- 0.0000 1.7612 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 1.3400.• 0.0159 0.0115 5.0000.- 2.8300.- 1.2000.- 2.9500.- 7.7000.- 1.1000.- 8.9000.• 0.0000 4.9703 4.9703 3.2000.• 0.0000 4.9784 003 005 003 004 003 004 004 004 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 33 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 I I I Category tons /yr MT/y, Off -Road i 0.2284 1.8036 1.4179 23900'- 0.0000 0.0854 i 0.0854 1 0.0821 0.0821 0.0000 1: 233.8732 233.8732 0.0545 0.0000 1 235.2344 0.0000 0.0000 0.0000 003 t ' I r I I Total 0.2284 1.8036 1.4179 2.7900'. ! 0.0854 0.0854 0.0821 0.0821 0.0000 233.8732 233.8732 0.0545 0.0000 235.2344 003 Vendor i 0.0198 0.5326 Unmitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 1 E I 1 I ! I I I r 1 I I ! Vendor i 0.0198 0.5326 0.2045 1.1200e- 0.0272 3.6800e- 0.0309 7.8600'- 3.5200e- 0.0114 ; 0.0000 i 111.5763 111.5763 9.8500e- 0.0000 111.8226 003 003 003 003 003 .: Worker i 0.0275 0.0194 0.1998 7.000Oe- 0.0733 4.7000'- 0.0738 0.0195 4.3000e- 0.0199 : 0.0000 63.0452 63.0452 1.3500e- 0.0000 63.0790 004 004 004 003 Total 0.0474 0.5520 0.4043 1.8200'- 0.1005 4.1500,- 0.1046 0.0274 3.95001• 0.0313 0.0000 174.6215 174.6215 0.0112 0.0000 174.9016 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 34 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 I PM10 I Total PM2.5 PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.0538 0.5127 1.5279 2.7900.- 0.0000 8.4300.- 8.4300.- ? 0.0000 8.4300.- 8.4300.- 0.0000 i 233.8729 233.8729 0.0545 0.0000 i 235.2341 0.0000 1 003 I 003 003 I 003 003 r I r 1 i Total 0.0538 0.5127 1.5279 2.7900.- 8.4300.- 8.4300.- 8.4300.- 8.4300.- 0.0000 233.8729 233.8729 0.0545 23 0.0000 235.41 003 0.5326 003 003 0.0272 003 003 7.B600e- 3.5200e- 0.0114 ; 0.0000 i 111.5763 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 x0000 I 0.0000 0.0000 0.0000 1 E I 1 I ! I I r 1 I ! Vendor i 0.0198 0.5326 0.2045 1.1200.- 0.0272 3.6800.- 0.0309 7.B600e- 3.5200e- 0.0114 ; 0.0000 i 111.5763 111.5763 9.8500.- 0.0000 111.6226 003 003 003 003 003 .: Worker i 0.0275 0.0194 0.1998 7.000Oe- 0.0733 4.7000.- 0.0738 0.0195 4.3000e- 0.0199 : 0.0000 63.0452 63.0452 1.3500.- 0.0000 63.0790 004 004 004 003 Total 0.0474 0.5520 0.4043 1.8200.- 0.1005 4.1500,- 0.1046 0.0274 3.9500,- 0.0313 0.0000 174.6215 174.6215 0.0112 0.0000 174.9016 1 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 35 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive E:t-at PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.0150 0.1201 0.0999 2.0000.- 1 5.4300.- 5.4300e- 0.0000 5.2200e- 5.2200.- D.D000 i 16.6612 16.6612 3.8500.- 0.0000 I 16.7575 0.0000 0.0000 004 003 003 003 003 r x 003 r Total 0.0150 0.1201 0.0999 2.0000.- 5.4300.- 5.4300.- 5.2200.- 5.2200.- 0.0000 16.6612 16.6612 3.8500.- 0.0000 16.7575 004 003 003 Vendor ;i 1.1700e- 003 003 8.0000.- 003 1.7000e- Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 I r I Vendor ;i 1.1700e- 0.0349 0.0139 8.0000.- 1.9600e- 1.7000e- 2.1400e- .- 5.7000000e- 1.7 7.3000.- ; 0.0000 E 7.9763 7.9763 6.9000e- 0.0000 7.9936 003 005 003 004 003 004 004 004 004 .: Worker 1.8300e- 1.2400e- 0.0131 5.0000.- 5.2900e- 3.0000.- 5.3200e- 1.4100.- 3.000Oa- 1.4400.- : 0.0000 4.4052 4.4052 9.0000e- 0.0000 4.4073 003 P 003 005 003 005 003 003 005 003 r 005 Total 3.0000e- 0.0361 0.0270 1.3000.- 7.2500e- 2.0000e. 7.4600e. 1.9800.- 2.0000.- 2.1700.- 0.0000 12.3815 12.3815 7.8000.- 0.0000 12.4009 003 004 003 004 003 003 004 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 36 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2s PM2.5 I I I Category tons /yr MT/y, Off -Road ;! 3.8800.- 0.0370 0.1103 2.000Oe- i 6.7000.- 6.1000.- 0.0000 6.1000e- 6.1000e- 0.0000 i 16.6612 16.6612 3.8500.- 0.0000 i 16.7575 003 • 0.0000 004 004 004 1 004 004 r x 003 I r Total 3.8800.- 0.0370 0.7103 2.0000.- 6.1000.- 6.10000- 6.1000e- 6.1000e- 0.0000 16.6612 16.6612 3.8500.- 0.0000 16.7575 003 004 004 004 Vendor ;i 1.1700e- 004 004 8.0000.- 003 1.7004OOe- 0e- Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 0.0000 I 0.0000 ; 0.0000 i 0.0000 x0000 0.0000 0.0000 0.0000 1 E I 1 I ! I I I r ! I I ! Vendor ;i 1.1700e- 0.0349 0.0139 8.0000.- 1.9600e- 1.7004OOe- 0e- 2.1 5.7000.- 1.7000e- 7.3000.- ; 0.0000 E 7.9763 7.9763 6.9000e- 0.0000 7.9936 003 005 003 004 003 004 004 004 004 .: Worker 1.8300e- 1.2400e- 0.0131 5.0000.- 5.2900e- 3.0000e- 5.3200e- 1.4100.- 3.000Oe- 1.4400.- : 0.0000 4.4052 4.4052 9.0000e- 0.0000 4.4073 003 r 003 005 003 005 003 003 005 003 r 005 Total 3.0000e- 0.0361 0.0270 1.3000.- 7.2500.- 2.0000e. 7.4600.- 1.9800.- 2.0000.- 2.1700.- 0.0000 12.3815 12.3815 7.8000.- 0.0000 12.4009 003 004 003 004 003 003 004 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 37 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.8 Office Building Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road 0.4430 3.5270 2.8871 5.3700r- 0.0000 0.1776 0.1776 ? 0.0000 0.1703 0.1703 0.0000 i 461.5167 461.5167 0.1131 0.0000 1 464.3443 0.0000 1 003 1 I 1 r I r 122.3835 I Total 0.4430 3.5270 2.8871 5.37001- 0.2243 0.1776 0.1776 4.0300e, 0.1703 0.1703 0.0000 461.5167 461.5167 0.1131 0.0000 464.3443 0.0000 122.6536 003 003 003 003 003 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 1 I 0.0000 0.0000 0.0000 1 1 I 1 I I r 122.3835 I ! Vendor 1 0.0217 0.5842 0.2243 1.2300e- 0.0298 4.0300e, 0.0339 8.62001- 3.8600e- 0.0125 ; 0.0000 i 122.3835 0.0108 0.0000 122.6536 003 003 003 003 .: Worker i 0.0306 0.0215 0.2218 7.7000e- 0.0814 5.20001- 0.0819 0.0217 4.8000e- 0.0221 0.0000 70.0018 70.0018 1.50001- 0.0000 70.0392 r 004 004 004 r 003 Total 0.0523 0.6057 0.4462 2.00001- 0.1112 4.55001- 0.1156 0.0303 4.34001- 0.0346 0.0000 192.3852 192.3852 0.0123 0.0000 192.6929 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 38 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.8 Office Building Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.0765 0.9548 3.0827 5,3700a- 0.0000 711110e- 7.9500e- ? 0.0000 7.9500e- 7.9500o- 0.0000 i 461.5162 461.5162 0.1131 0.0000 1 464.3437 0.0000 003 003 003 003 003 r r 122.3835 Total 0.0765 0.9548 3.0827 5.3700.- 0.2243 7.9500.. 7.9500.- 4.0300e- 7.9500.- 7.9500x- 0.0000 461.5162 461.5162 0.1131 0.0000 464.3437 0.0000 122.6536 003 003 003 003 003 003 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 I 0.0000 0.0000 0.0000 r 122.3835 Vendor 1 0.0217 0.5842 0.2243 1.2300e- 0.0298 4.0300e- 0.0339 8.6200.- 3.8600e- 0.0125 ; 0.0000 i 122.3835 0.0108 0.0000 122.6536 003 003 003 003 .: Worker i 0.0306 0.0215 0.2218 7.7000e- 0.0814 5.2000.- 0.0819 0.0217 4.8000e- 0.0221 0.0000 70.0018 70.0018 1.5000.- 0.0000 70.0392 r 004 004 004 r 003 Total 0.0523 0.6057 0.4462 2.0000.- 0.1112 4.55001- 0.1156 0.0303 4.3400.- 0.0346 0.0000 192.3852 192.3852 0.0123 0.0000 192.6929 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 39 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.8 Office Building Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 I PM10 I Total PM2.5 PM2.5 I I I Category tons /yr MT/y, Off -Road ? 0.1648 1.3267 1.1564 2.20001- 0.0000 3 0.0636 1 0.0636 1 0.0610 0.0610 0.0000 i 186.5214 186.5214 0.0455 0.0000 1 187.6584 I 0.0000 I 0.0000 ! 0.0000 003 ' r I ' Total 0.1648 1.3267 1.1564 2.20001- 0.0636 0.0636 0.0610 0.0610 0.0000 186.5214 186.5214 0.0455 0.0000 1876584 1.08001- 0.0133 3.53001- 003 4.57001- ; 0.0000 E 49.6863 49.6863 4.3200e- 0.0000 49.7943 003 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 3 I 0.0000 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 I I 0.0000 I 0.0000 ! 0.0000 r Vendor ;i 7.2700e- 0.2174 0.0866 5.000Oe- 0.0122 1.08001- 0.0133 3.53001- 1.0400e- 4.57001- ; 0.0000 E 49.6863 49.6863 4.3200e- 0.0000 49.7943 003 004 003 003 003 003 003 .: Worker i 0.0116 7.8300e- 0.0825 3.10001- 0.0334 2.1000e- 0.0336 8.88001- 1.9000e- 9.07001- : 0.0000 27.7781 27.7781 5.40001- 0.0000 27.7916 r 003 004 004 003 004 003 r 004 Total 0.0188 0.2253 0.1690 8.10001- 0.0456 1.29001- 0.0469 0.0124 1.2311G,' 0.0136 0.0000 77.4644 77.4644 4.8600e. 0.0000 77.5859 004 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 40 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.8 Office Building Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 Nam- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2s PM2.5 I I I Category tons /yr MT/y, Off -Road I 0.0313 0.3913 1.2634 2.2000-- 0.0000 3 3.2600-- 3.2600 -- ? 0.0000 1 3.2600e- 3.2600 -- 0.0000 i 186.5211 186.5211 0.0455 0.0000 i 187.6582 0.0000 003 003 003 003 003 r r i Total 0.0313 0.3913 1.2634 2.2000-- 0.0866 3.2600 -- 3.2600-- 1.0800e- 3.2600.- 3.2600-- 0.0000 186.5211 186.5211 0.0455 0.0000 187.6582 4.3200e- 0.0000 49.7943 003 003 003 003 003 003 003 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 3 I 0.0000 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 I I 0.0000 I 0.0000 ! 0.0000 r Vendor ;i 7.2700e- 0.2174 0.0866 5.000Oe- 0.0122 1.0800e- 0.0133 3.5300 -- 1.0400e- 4.5700 -- ; 0.0000 E 49.6863 49.6863 4.3200e- 0.0000 49.7943 003 004 003 003 003 003 003 .: Worker i 0.0116 7.8300e- 0.0825 3.1000 -- 0.0334 2.1000e- 0.0336 8.8800 -- 1.9000e- 9.0700-- : 0.0000 27.7781 27.7781 5.4000 -- 0.0000 27.7916 r 003 004 004 003 004 003 r 004 Total 0.0188 0.2253 0.1690 8.1000 -- 0.0456 1.29001- 0.0469 0.0124 1.23,11" 0.0136 0.0000 77.4644 77.4644 4.8600e. 0.0000 77.5859 004 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 41 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.9 Parking Garage Exterior Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 'i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 'i .............................. : i....... ........... Off -Road 0.0135 ................... 0.1135 ................... 0.0887 ................... 1.8000e- ................... ._._._._ ....... 5.3500e- ................... 5.3500e- ................... ................... 5.0300e- ! .................... ' 5.0300,- i 0.0000 i 15.2572 .................. 15.2572 .............. 4.4400,- ..... ....._.... ............. 0.0000 15.3682 Vendor 1 0.0000 004 0.0000 003 003 0.0000 003 003 + 0.0000 003 0.0000 Total 0.0135 0.1135 0.0887 1.8000,- 5.3500,- 5.3500e- 5.0300,- 5.0300e. 0.0000 15.2572 15.2572 4.4400e- 0.0000 153682 004 Worker ,i 6.8000,- 003 003 2.0000,- 003 003 1.8300,- 003 1.0000,- Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I j 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 6.8000,- 4.8000,- 4.9600,- 2.0000,- 1.8200,- 1.0000a 1.8300,- 4.8000,- 1.0000,- 4.9000,- : 0.0000 7.5639 1.5639 3.0000,- 0.0000 1.5648 004 , 004 003 005 003 005 003 004 005 004 , 005 Total 6.8000,- 4.80001- 4.9600e- 2.0000,- 1.82001- 1.0000,- 1.83001- 4.8000'- 1.01001' 4.9010'- 0.0000 1.5639 1.5639 3.00001- 0.0000 1.5648 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 42 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.9 Parking Garage Exterior Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive E:t-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 'i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 'i ........................... : i. ................... Off -Road 2.59001- ................... 0.0283 ................... 0.0991 .................... 1.8000e- ._ ............... ._._._._. ...... 3.1000e- ................... 3.1000e- ................... ................... 3.1000e- ! .................... ' 3.10001- i 0.0000 i 15.2572 ............. 15.2572 .............. 4.44001- ..... ....._.... ............. 0.0000 15.3682 003 , Vendor 1 0.0000 004 0.0000 004 004 0.0000 004 004 , 0.0000 003 0.0000 Total 2.5900' 0,0211 0.0991 1.8000e- 3.1000e• 3.1000e• 3.1000e- 3.10001• 0.0000 15.2572 15.2572 4.4400e- 0.0000 15.3682 003 004 Worker ,i 6.80001- 004 004 2.00001- 004 004 1.83001- 003 1.00001- Mitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 ! 0.0000 j 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 I 0.0000 0.0000 0.0000 r Vendor 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 6.80001- 4.80001- 4.96001- 2.00001- 1.82001- 1.0000a 1.83001- 4.80001- 1.00001- 4.90001- : 0.0000 7.5639 1.5639 3.00001- 0.0000 1.5648 004 , 004 003 005 003 005 003 004 005 004 , 005 Total 6.80001- 4.80001- 4.9600e- 2.00001- 1.82001- 1.0000,- 1.83001- 4.8000'- 1.01001' 4.9010'- 0.0000 1.5639 1.5639 3.00001- 0.0000 1.5648 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 43 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 0.0228 0.0000 i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 1 I 1 I I r I ! Off -Road li 3.2700,- 0.0288 0.0235 5.000Oe- 0.0000 1.4200e- 1.4200e- 0.0000 1.3400e- 1.3400,- i 0.0000 i 4.3514 4.3514 1.2000e- 00 0.00 4.3815 003 005 003 003 003 003 ' 003 Total 0.0260 0.0288 0.0235 5.0001e- 3.0000,- 1.4200,- 1.4200e- 8.0000,- 1.3400e- 1.3400,- 0.0000 4.3514 4.3514 1.2000e- 0.0000 4.3815 004 r 005 004 005 004 003 003 005 003 003 003 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 j 0.0000 I ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 1 I 0.0000 0.0000 0.0000 1 1 I 1 I I r I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker li 1.1000,- 8.000Oe- 8.2000,- 0.0000 3.0000,- 0.0000 3.000Oa- 8.0000,- 0.0000 B.000Oe- : 0.0000 0.2573 0.2573 1.0000,- 0.0000 0.2574 004 r 005 004 004 004 005 005 r 005 Total 1.1000,- 8.0000e. 8.2000e. 0.0000 3.00001- 0.0000 3.00001- 8.0000.- 0.0000 8.0000.- 0.0000 0.2573 0.2573 1.0000.- 0.0000 0.2574 004 005 004 004 004 005 005 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 44 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive F_xt-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 0.0228 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 1 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 :i i ! Off -Road li 6.9000e- 7.O600e- 0.0277 5.000Oe- 0.0000 8.0000e- 8.0000.- 0.0000 8.0000e- 8.0000e- i 0.0000 4.3514 4.3514 1.2000e- 0.0000 4.3815 004 003 005 005 005 005 005 ' 003 Total 0.0235 7.0800.- 0.0271 5.0000,- 3.0000.- 8.000Oe- 8.000Oe- 8.0000.- 8.0000.• 8.0000.• 0.0000 4.3514 4.3514 1.2000.- 0.0000 4.3815 004 r 003 004 005 004 005 005 005 005 005 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I j 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker li 1.1000.- 8.000Oe- 8.2000.- 0.0000 3.0000.- 0.0000 3.000Oa- 8.0000.- 0.0000 B.000Oe- : 0.0000 0.2573 0.2573 1.0000.- 0.0000 0.2574 004 r 005 004 004 004 005 005 r 005 Total 1.1000.- 8.0000e. 8.2000e. 0.0000 3.00001- 0.0000 3.00001- 8.0000.- 0.0000 8.0000.- 0.0000 0.2573 0.2573 1.0000.- 0.0000 0.2574 004 005 004 004 004 005 005 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 45 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category tons /yr MT/y, Archit. Coatin g 1.2235 0.0000 i 0.0000 1 j 0.0000 I 0.0000 0.0000 0,0000 ? 0.0000 0.0000 0.0000 ;' 0.0000 � 0.0000 0.0000 0.0000 0.0000 i 0.0000 .. 1 1 I I 1 I ! I ! Off -Road 0.1627 1.4074 1.2372 2.6500e- 0.0000 0.0677 0.0677 0.0000 0.0639 0.0639 0.0000 i 229.7185 229.7185 0.0642 0.0000 231.3234 .: .............................. r................... _ ................. ................... 003 ................... ................. .. ................... ................... ................... .................... ..................«.......................................... ............................... ................... Total 1.3862 1.4074 1.2372 2.6500e. 0.0161 0.0677 0.0677 4.2800e- 0.0639 0.0639 0.0000 229.7185 229.7185 0.0642 0.0000 231.3234 003 , 003 003 004 003 005 003 , 004 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 1 I 0.0000 1 0.0000 0.0000 1 1 I I 1 I I r I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 .: .............................. r................... _ ................. ................... ................... ................... ................. .. ................... ................... ................... .................... ..................«.......................................... ............................... ................... Worker ,i 5.5700e- 3.7700e- 0.0398 1.5000.- 0.0161 1.0000e- 0.0162 4.2800e- 9.000Oe- 4.3700.- : 0.0000 13.3892 13.3892 2.6000.- 0.0000 13.3957 003 , 003 004 004 003 005 003 , 004 Total 5.5700.- 3.7700.- 0.0398 1.5000.- 0.0161 1.0000e. 0.0162 4.2800.- 9.0000.- 4.3700.- 0.0000 13.3892 13.3892 2.6000e. 0.0000 13.3957 003 003 004 004 003 005 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 46 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive F_xt-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 1.2235 0.0000 i 0.0000 j 0.0000 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 r Off -Road i 0.0369 0.3796 1.4879 2.6500e- 0.0000 4.1400e- 4.1400e- 0.0000 4.1400e- 4.1400,- i 0.0000 i 229.7182 229.7182 0.0642 0.0000 231.3231 .: 003 003 003 003 003 + Total 1.2605 0.3796 1.4879 2.6500,- 0.0161 4.1400,- 4.1400,- 4.2800e- 4.1400,- 4.1400.- 0.0000 229.7162 2291182 0.0642 7.0000 231.3231 003 r 003 003 003 003 003 003 003 004 Mitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 ! 0.0000 j 0.0000 ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 I 0.0000 0.0000 0.0000 r Vendor 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 5.5700e- 3.7706e- 0.0398 1.5000,- 0.0161 1.0000e- 0.0162 4.2800e- 9.000Oe- 4.3700,- : 0.0000 13.3892 13.3892 2.6000,- 0.0000 13.3957 003 r 003 004 004 003 005 003 r 004 Total 5.5700,- 3.77001- 0.0398 1.5000,- 0.0161 1.00001- 0.0162 4.21111' 9.1111', 4.3700"- 0.0000 13.3892 13.3892 2.6000e. 0.0000 13.3957 003 003 004 004 003 005 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 47 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM25 PM2.5 Category tons /yr MT/y, Off -Road 0.1415 1.4430 1.0286 1.7300,- 0.0000 1 0.0741 0.0741 ? 0.0000 1 0.0684 0.0684 0.0000 149.8986 149.8986 0.0468 0.0000 1 151.0686 ,. ii 003r ! r .............................. ................... ................... ................... ................... ._. .............. ................... ................... ................... ................... .................... R ............ ............ _._._. ...... ........... Paving r' 4.3900,- 0.0000 0.0000 .: 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 003 Worker ,i 3.3700,- 2.2800,- 0.0240 9.0000 a 9.7200,- 6.0000,- 9.7600,- 2.5900,- I Total 0.1458 1.4430 1.0286 1.7300,• 8.0997 0.0741 0.0741 0.0684 0.0684 0.0000 149.8986 149.8986 0.0468 0.0000 151.0686 005 003 r 003 Total 3.3700,- 2.2800,- 0.0240 9.0000,• 9.72001- 6.0000,- 9.78001- Unmitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 i 0.0000 I 0.0000 1 ! 0.0000 I i 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I i 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 3.3700,- 2.2800,- 0.0240 9.0000 a 9.7200,- 6.0000,- 9.7600,- 2.5900,- 6.0000,- 2.6400,- : 0.0000 8.0958 8.0958 1.6000,- 0.0000 8.0997 003 r 003 005 003 005 003 003 005 003 r 004 Total 3.3700,- 2.2800,- 0.0240 9.0000,• 9.72001- 6.0000,- 9.78001- 2.5900e• 6.0000e. 2.6400.• 0.0000 8.0958 8.0958 1.6000,• 0.0000 8.0997 003 003 005 003 005 003 003 005 003 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 48 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM25 PM2.5 Category tons /yr MT/Y' Off -Road 0.0311 0.2003 1.1014 1.7300.- 0.0000 5.0800 e- 5.0800.- ? 0.0000 5.OSOOe- 5.0800o- 0.0000 149.8984 149.8984 0.0468 0.0000 i 151.0684 ,. 'i 1 003 003 003 003 003 ! I r I .............................. . i ................... ................... ................... ................... ._................ ...... _._....... ................... ................. .. ................... ..................... ' ............ ............ ......_.... ........... Paving " 4.3900.- 0.0000 0.0000 .: 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 003 Worker ,i 3.3700.- 2.2800.- 0.0240 9.0000 a 9.7200.- 6.0000.- 9.7600.- 2.5900.- 6.0000.- Total 0.0355 0.2003 1.1014 1.7300e. 8.0997 5.0800e. 5.0800e. 5.0800e- 5.0800.- 0.0000 149.8984 149.8984 0.0468 0.0000 151.0684 005 003 , 003 003 003 2.2800,- 003 003 9.72001- 6.0000,- 9.78001- Mitigated Construction Off -Site ROG NO, CO 802 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic-0O2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 j 0.0000 I ? 0.0000 I 0.0000 I 0.0000 ; 0.0000 i 0.0000 0.0000 1 I 0.0000 0.0000 0.0000 1 1 I 1 I I r I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker ,i 3.3700.- 2.2800.- 0.0240 9.0000 a 9.7200.- 6.0000.- 9.7600.- 2.5900.- 6.0000.- 2.6400.- : 0.0000 8.0958 8.0958 1.6000.- 0.0000 8.0997 003 , 003 005 003 005 003 003 005 003 , 004 Total 3.3700.- 2.2800,- 0.0240 9.0000.• 9.72001- 6.0000,- 9.78001- 2.5900e• 6.0000e. 2.6400.• 0.0000 8.0958 8.0958 1.6000.• 0.0000 8.0997 003 003 005 003 005 003 003 005 003 004 CalEEMod Version: CalEEMOd.2016.3.2 Page 49 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 'i 0.5847 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 1 0.0000 0.0000 0.0000 ! 0.0000 0.0000 0.0000 0.0000 I 0.0000 :i .............................. ....... ............ ................... ................... ................... ._ ............... ._._._._. ...... ................... .............. _._ ................... .................... .................. 3.._._._._._._ ..................................... ._. _._._.......................... Off -Road i 0.0710 0.6415 0.6354 1.1700e- 0.0000 0.0311 0.0311 0.0000 0.0290 0.0290 i 0.0000 i 100.4889 100.4889 0.0308 0.0000 101.2579 003 Total 0.6557 0.6415 0.6354 1.1700,- 1.7900,- 0.0311 0.0311 4.8000,- 0.0290 0.0290 0.0000 100.4869 100.4889 0.0308 0.0000 101.2579 004 r 004 003 003 003 005 003 004 005 004 r 005 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I j 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I 0.0000 1 I 0.0000 I 0.0000 ! 0.0000 r Vendor 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Worker ,i 6.2000,- 4.2000,- 4.4300,- 2.0000,- 1.7900,- 1.0000a 1.8000,- 4.8000,- 1.0000,- 4.9000,- : 0.0000 7.4913 1.4913 3.0000,- 0.0000 1.4921 004 r 004 003 005 003 005 003 004 005 004 r 005 Total 6.2000,- 4.20001- 4.4300e- 2.0000,- 1.79001- 1.0000,- 1.80001- 4.8000'- 1.01001' 4.911111'- 0.0000 1.4913 1.4913 3.00001- 0.0000 1.4921 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CalEEMOd.2016.3.2 Page 50 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Et-at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category tons /yr MT/y, Archit. Coating 'i 0.5847 0.0000 1 I 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 'i .............................. : i....... ........... Off -Road 0.0176 ................... 0.1923 ................... 0.7277 ................... 1.1700,- ._ ............... ._._._._ ....... 2.0700,- ................... 2.0700,- .............. _._ ................... 2.0700,- ! .................... ' 2.0700,- i 0.0000 :100.4868 ............... 100.4888 ............ 0.0308 _._._.... ... ............... 0.0000 1012578 Vendor i 0.0000 003 0.0000 003 003 0.0000 003 003 + 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 Total 0.6022 0.1923 0.7277 1.1700,- _ ................. 2.0700e- 2.0700,- ................... 2.0700,- 2.0700,- 0.0000 100.4888 100.4888 0.0308 0.0000 101.2578 ............................... 003 Worker ,i 6.2000e- 003 003 2.0000.- 003 003 1.8000e- 4.8000,- 1.00OOe- Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling i 0.0000 0.0000 1 I 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 I 0.0000 I ? 0.0000 1 I 0.0000 I I 0.0000 ; 0.0000 i 0.0000 I I 0.0000 1 I 0.0000 I 1 0.0000 ! 0.0000 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .: .............................. r................... _ ................. ................... ................... ................... ................. .. ................... ................... ....... _._ ....... .................... ..................«.......................................... ............................... ................... Worker ,i 6.2000e- 4.2000e- 4.4300e- 2.0000.- 1.7900e- 1.0000e- 1.8000e- 4.8000,- 1.00OOe- 4.9000,- : 0.0000 1.4913 1.4913 3.00OOe- 0.0000 1.4921 004 , 004 003 005 003 005 003 004 005 004 , 005 Total 6.2000.• 4.2000e• 4.4300e- 2.0000e• 1.7900e- 1.0000,• 1.8000e. 4.8000e. 1.0000e. 4.9000,• 0.0000 1.4913 1.4913 3.00OOe- 0.0000 1.4921 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile CaIEEMod Version: CalEEMOd.2016.3.2 Page 51 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NO, CO 1 S02 I Fugitive PM10 I -,us PM10 PM Total Fugitive PM2.5 Faust PM2.5 PM2.5 Total Bin- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category tons /yr MT/y, Mitigated ;� 0.1318 0.4402 1.5751 5.3200e- 0.4776 5.7700e- 0.4834 0.1284 5.4200,- 0.1338 0.0000 486.0149 486.0149 0.0178 0.0000 486.4606 :1 003 625.65 003 40.36 1,288,492 1..5.420(1,- 003 ; .............................. ; I . . . . . . .......... . . . :. . . ............... ................... . . . . . . . . . . . . . .... .: . . . . ............... . . . . . . . . . . . . . . . . . . . ................ . .: . . . . ............... . ........ . . . . . . . . . ..................... j . . . . . . . . . . . . . . . . . .1............. . . . . .: . . . . . . . . . . . . . . . . . .: . . . . . . . . . . . . . . . . . .: . . . . . . . . . . . . . . . . . .: . . . . . . . . . . . . . . . . . . . Unmitigated i 0.1318 a 0.4402 i 1.5751 i 5.3200e- i 0.4776 i 5.7700. - i 0.4834 i 0.1284 i 5.4200. - i 0.1338 ; 0.0000 i 486.0149 1 486.0149 i 0.0178 E 0.0000 i 486.4606 003 003 003 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator ............... .................�....... . 0.00 i .... _ 0.00 0.00 ... ...... +................... ......... ........�...................... ' ................. Office Park 579.15 ; 84.07 1 37.36 ' 1,192,727 1,192,727 .................. �....................... Office Park ................................................ 46.50 ; 1..... ............................... 6.75 3.00 . 95,764 ...............................}..................................................................................................... : 95,764 ............................... Parking Lot 0.00 0.00 0.00 Total 625.65 90.82 40.36 1,288,492 1,288,492 4.3 Trip Type Information CalEEMod Version: CaIEEMod.2016.3.2 Page 52 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Miles 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... Trip % Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C- H-S or C-C H-O or C-NW Primary Diverted Pass-by EnclosedParking with Elevator 7 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Office Pa.k . . . . . . . . . . . ................. 9.50 ........................................................ 7.30 7.30 71. ...................... ............................................................. 10:00._._:..........19.00...... 82 ............................ ............................................ 15 3 ........... .00 __ Office Park 7.30 7.30 • 71.00 10.00 19.00 82 15 3 .................. Parking Lot . . . . 9.50 .......................... 7.30 ............................ . 7.30 ........................ 0.00 ....... . ............... ....................................................................................................................................... 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... ................... -- - --------- -------------- ..................... 0.490452, 0-0497421 0.253638; 0-136789: 0-0179261. 0.006526: 0.021436!1 0.006323; 0.003943!. 0.003278; 0-0087711: 0.0004351 0.000741 4 .................... Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CalEEMOd Version: CalEEMOd.2016.3.2 Page 53 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated ROG I NO, I CO I S02 I Fugitive PM10 I Exhaust PM10 PM70 Total Fugitive PM2.5 Exhaust I PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category tons /yr MT /yr PM10 PM 10 Electricity PM2.5 0.0000 0.0000 0.0000 0.0000 0.0000 ;1,727.2922 1,727.2922 0.0781 0.0162 1;734.0602 Mitigated Land Use I kBTU /yr tons /yr r Enclosed Parking j 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Electricity I E I i 1 0.0000 1 0.0000 I 1 0.0000 1 0.0000 0.0000 ;1,727.2922!1,727.29221 0.0781 ! 0.0162 1,734.0602 Unmitigated i E I i I I i I I i I ! ..... .NaturalGas _._._ - _____ _____ i 0.0338 T 0.3069 0.2578 TI1.8400e- _ _.____ 0.0233u _____ 0.0233 _-0-0_-3_ 0.0233 _0-._._ ._._ } ....................______ _ 0.0233 ' 0.0000 E 334.0472 334.0472T 6.4000,- 6.1200,- 336.0323 Mitigated : I I 003 _._._._._._. 1.4000e- ... ........... 17300e- : '; I 003 003 1 1.7300e- .............................. _._......._._. 24.8275 ................. 4.8000 e- _._._._._._.................... 4.600 0 . 24 .9.751 ...... 1 003 1............ ir _._ NaturalGas 0.0338 0.3069 0.2578 i 1.8400. - i 0.0233 0.0233 0.0233 0.0233 0.0000 i 334.0472 i 334.0472 i 6.4000. - i 6.1200e- : 336.0323 Unmitigated 003 004 i i 004 - 003 003 5.2 Energy by Land Use - NaturalGas Unmitigated Natur.IG. ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5Tntal Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e s Use PM10 PM 10 Total PM2.5 PM2.5 Land Use I kBTU /yr tons /yr MT/y, Enclosed Parking j 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 a 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator ............. .................:._._._._._. Office Park -{ i0-._.................._._._._._ 1 465250 ri 2.5100e- 0.0228 ._._._._._._. 0.0192 _._._._._._. 1.4000e- ... ........... 17300e- 1.7300e- ....._._._._...._._._._._._.._._.............T. 1 1 1.7300e- .................L..._._._._._. 1.7300 0.0000 I 24.8275 _._......._._. 24.8275 ................. 4.8000 e- _._._._._._.................... 4.600 0 . 24 .9.751 ...... 1 003 1............ ir _._ E ... I _. _2_3_. 004 1 .__0_0_0., 003 I _0_ 1 003 __2__ I 003 _02_6 _..__.0216 003 3 .................. 004 i i 004 - Offi.................. Park i 5.79456e i 2_ 16 y 0.0000 309.2197 309.2197 .9300,- 5.6700,- 1ce 1 +006 �� I 003 S 003 003 1 .............................. Parking Lot ------ ............. _._.. 0 E 0.0000 ............... ... 0.0000 ............. _._.. 0.0000 .................. 0.0000 ................... ................ ...._ 0.0000 ............... 0.0000 ................... ................... 0.0000 ..... _ ............. y .................. ................... 0.0000 : 0.0000 1 0.0000 , ' ......_._._._.. 0.0000 _._._._.... 0.0000 ........._. 0.0000 ........... 0.0000 Total 0.0338 0.3069 0.2578 1.8400,- 0.0233 0.0233 0.0233 0.0233 0.0000 334.0472 334.0472 6.4100e- 6.1300e- 336.0323 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 54 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated NaturalGa ROG NOx CO 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 Total PM2.5 PM2.5 Land Use kBTU /yr tons /yr MT /yr Enclosed Parking j 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator .............................. Office Park ......................... i 465250 :i 2.5100e- _....... 0.0228 ................... 0.0192 ...................................... 1.4000.- ................... 1.7300e- .................. 1.7300e- ................... ............ - - - - -- 1.7300e- ----- _._......._. j.................. {................... 1.7300e- 0.0000 i 24.8275 ................. ... 24.8275 .................. 4.8000e- ................... 4.6000e- ................... 24.9751 i 003 004 003 003 003 003 I 004 004 .......................... ....:._._._._._..4:.._._._._._. Office Park 15.79456e . 0.0313 ...._.._._._ i 0.2841 ._._._._._._. I 0.2386 _._._._._._. 11.7000e- ............._._ i ._._._._._._.._............... i 0.0216 i 0.0216 ....._._._._._ I ._._._._._._. I 0.0216 ._._ ............. t ..................L_._._._._._. 3 0.0216 0.0000 309.2197 ._._._._._. 1 309.2197 ._............._ 5.9300.- ......_._._._. i 5.6700.- .................. 311.0573 +006 :j f I 003 i I i : 003 003 ..............................' Parking Lot ........ _._ 0 0.0000 0.0000 0.0000 ._._._._._._ 0.0000 _._._.___ ._._._._.__ 0.0000 ._..._._.__ _._._._._.._.____._. 0.0000 r ._._._._ 0.0000 0.0000 0.0000 _._._._._ _ 0.0000 _ __._._ 0.0000 _._._.__ 0.0000 .......... 0.0000 177a7-1 I i Total 0.0338 0.3069 0.2578 1.8400.- 0.0233 0.0233 0.0233 0.0233 0.0000 334.0472 334.0472 6.4100.. 6.1300.- 336.0323 003 1 1 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 55 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Electricity Total CO2 CH4 N20 CO2e Use Land Use kWh /yr MT /yr Enclosed Parking j 1.68768e �! 490.9655 0.0222 4.5900e- 492.8892 with Elevator ! +006 . : �! ........................................... 003 .............................. Office Park }_____ i3.90767e �i1,136.7855 0.0514 ............................._. 0.0106 1,141.2398 +006 ii .......................... ....._._._._._..{..._._._._._. Office Park I 313750 '1 91.2735 ............. 1 4.1300e- ._._._._._._. 18.5000e- .................. 91.6311 I y 003 f 004 ..............................' Parking Lot ..........._._ 28420 .i 8.2677 3.7000e __._._._._................... 8.. 000.- 8.3001 004 005 I I Total 1 111,727.21221 0.0781 1 0.0162 1,734.0602 CaIEEMod Version: CalEEMOd.2016.3.2 Page 56 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Total CO2 CH4 N20 CO2e Use Land Use kWh /yr MT /yr Enclosed Parking j 1.68768e �! 490.9655 0.0222 4.5900e- 492.8892 with Elevator ! +006 . : . �! 003 .............................. Office Park }_____ i 3.90767' ..................................... �i 1,136.7855 0.0514 ................... 0.0106 ..............._. 1,141.2398 +006 ii ........................... ...:._._._._._..{1..._._._._._. Office Park 313750 '� 91.2735 ............. 1 4.1300e- ._._._._._._. 1 8.5000'- .................. 91.6311 I II 003 f 004 .............................. Parking Lot .......... _._' 28420 .i 8.2677 3.7000e- __._._._._................... 8.0000e- 8.3001 ' 004 005 I I Total 1,727.2922 0.0781 0.0162 1,734.0802 6.0 Area Detail 6.1 Mitigation Measures Area CalEEMOd Version: CalEEMOd.2016.3.2 Page 57 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 6.2 Area by SubCategory Unmitigated ROG I NO, I CO I S02 1 Fugitive PM10 1 Exhaust PM10 I PM10 Total Fugitive PM2.5 I Exhaust PM2.5 PM2.5Total Bio -0O2 I NBio -0O2 Total CO2 CHI N20 I CO2e Category tons/yr MT /yr Mitigated ;i 1.5217 1.1000.- 0.0117 0.0000 PM10 4.00001- 4.00001- PM2.5 0 4.00001- 4.000Oe- ; 0.0000 a 0.0225 0 0.0225 6.0000.- 0.0000 0.0240 004 SubCategory tons /yr MT /yr 005 005 005 005 i 0.0000 005 0.0000 ................... ...........�:.................. ................... �...0............. �.................. �......... .........:....................4 0.0000 ....... .........................4............... . :.................._ f....... ............................... �... ............................... ................ ...................... Unmitigated 1.5217 i 1.1000e- i 0.0117 0.0000 E 4.0000e- i 4.00001 - i E 4.000Oe- i 4.000Oe- 0.0000 i 0.0225 0.0225 i 6.000Oe- i 0.0000 0.0240 004 ............................... i.................. ;.................. .................... 005 005 ....... ........... . 005 005 005 0.0000 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total 002 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 SubCategory tons /yr MT /yr Architectural ! 0.1831 0.0000 0.0000 0.0000 0.0000 0.0000 ! 0.0000 0.0000 0.0000 0.0000 0.0000 Coating .............................. ................... ................... ................... .................. ................................................................................. ............................... i.................. ;.................. .................... ................... .................. ....... ........... . Consumer 1.3376 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products r i Landscaping ;i 1.1000. - i 1.1000e- i 0.0117 0.0000 1 1 4.0000e- 1 4.000Oe- I i 4.000Oe- i 4.0000.- 0.0000 i 0.0225 1 0.0225 1 6.0000. - i 0.0000 0.0240 003 004 1 1 005 1 005 005 005 ! , r I I 005 i Total 1.5218 1.10001- 0.0117 0.0000 4.10/0e- 4.1000'- 4.0000.- 4.0000.- 0.0000 0.0225 0.0225 6.0000e- 0.0000 0.0240 004 005 005 005 005 oos CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOT CO 502 Fugifi a Exhaust PM10 Fugitive Ex at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CHI N20 1:02e PM10 I PM70 I Total PM2.5 PM2.5 I I I I SubCategory tons /yr MT /yr Architectural i 0.1831 0.0000 0.0000 0.0000 0.0000 i 0.0000 ! 0.0000 0.0000 0.0000 0.0000 i 0.0000 Coating .............................. r...... ............. ..... .................................._... ........ ....................... ...... ............ ................. ....................................... .................... i.................. i.._............... ------- _._........ .................. .......... ........ .................. . Consumer i 1.3376 0.0000 0.0000 0.0000 0.0000 i 0.0000 ! 0.0000 0.0000 0.0000 0.0000 0.0000 Products .............................. ,rS,.._............... Landscaping 1.1000e- ._._._._._. i 1.1000e- .... .............. i 0.0117 ................. 0.0000 ._._._._._. i ._............... i 4.000Oe- _._._._._._._._._._._._. i 4.000Oe- i ._............... 1 4.000Oe- _._._._._._. yr..................._...................._._._._._._._._._._._.._... i 4.000Oe- 0.0000 i 0.0225 0.0225 i 6.000Oe- ............................... i 0.0000 0.0240 003 004 I 005 005 005 005 i r 005 Total 1.5218 1.1000e• 0.0117 0.0000 4.000Oe- 4.000Oe- 4.000Oe- 4.000Oe- 0.0000 0.0225 0.0225 "000,e- 0.0000 0.0240 004 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water CalEEMOd Version: CalEEMOd.2016.3.2 Page 59 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 7.2 Water by Land Use Unmitigated Total CO2 I CH4 I N20 Coll Category — MT /yr Mitigated ;i 150.3831 1.9540 0.0472 213.3073 .............................. r.. ............... ...... ............ ......................................... Land Use Unmitigated :i 150.3831 1.9540 i 0.0472 i 213.3073 7.2 Water by Land Use Unmitigated Indoor /Out Total CO2 CH4 N20 CO2e door Use Land Use Mgal MT /yr Enclosed Parking 0/0 ! 0.0000 0.0000 0.0000 i 0.0000 with Elevator Office Park i 59.7843 / :i 150.3831 1.9540 0.0472 213.3073 36.642 �i .............................. i._._._._._•y.............. Parking Lot I 010 is 0.0000 ' .................. i 0.0000 ._ ............... 0.0000 ................... 0.0000 Total 150.3831 1.9540 0.0472 213.3073 CalEEMod Version: CalEEMOd.2016.3.2 Page 60 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 7.2 Water by Land Use Mitigated 8.0 Waste Detail 8.1 Mitigation Measures Waste Indoor /Out Total CO2 CH4 N20 CO2e door Use 1 Land Use Mgal MT /yr Enclosed Parking j 0 / 0 i 0.0000 0.0000 0.0000 0.0000 with Elevator Office Park i 59.7843/ 'i 150.3831 1.9540 0.0472 213.3073 i 36.642 r �................... .............................. Parking Lot i................. ii................... 0 / 0 i 0.0000 ................... 0.0000 ................ .. I 0.0000 0.0000 Total 150.3837 1.9540 0.0472 213.3073 8.0 Waste Detail 8.1 Mitigation Measures Waste CalEEMOd Version: CalEEMOd.2016.3.2 Page 61 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual Category /Year 8.2 Waste by Land Use Unmitigated Total CO2 CH4 I N20 I CO2e CO2e MT/y, Mitigated ;i 63.4996 3.7527 0.0000 157.3177 .................................................:...................:.... ............................... Unmitigated �i 63.4996 3.7527 0.0000 157.3177 8.2 Waste by Land Use Unmitigated Waste Total CO2 CH4 N20 CO2e Disposed I I Land Use tons MT /yr Enclosed Parking 0 ! 0.0000 0.0000 0.0000 1 0.0000 with Elevator .............................. }--- _.__- :j 1.------------------ ...................------------------- i ------ .----------- . Office Park i 312.82 :i 63.4996 3.7527 0.0000 157.3177 • .......................... ....:._._._._._. +....._._._._._ Parking Lot 0 ii 1 0.0000 ' ........... ........_... 1 0.0000 ............................... 0.0000 0.0000 Total 63.4996 3.7527 0.0000 157.3177 CaIEEMod Version: CalEEMod.2016.3.2 Page 62 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 8.2 Waste by Land Use Mitigated 9.0 Operational Off road Equipment Type Waste Total CO2 CH4 N20 CO2e Fuel Type Disposed 1 I I I Land Use I tons MT/yr Enclosed Parking 0 0.0000 0.0000 0.0000 0.0000 with Elevator 1 8.001; 3651 W 0.20 ................... .......... Office Park . ...... i 312.82 ................................. 63.4996 3.7527 ................................. 0.0000 157.3177 .. ............. Parking Let ............ 0 ii ............. 0.0000 .................. i 0.0000 .. . ............... 0.0000 ................... 0.0000 Total 0.74 13.4916 3.7527 0.0000 157.3177 9.0 Operational Off road Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor Fuel Type Cranes 1 8.001 21 2311; 0.29 Diesel .............................................................................. ....................................... ................................................I . .................................... Forklifts 1 8.001; 3651 W 0.20 Diesel .......... ................................................................... ....................................... ............................................... . . . . . .................................... Generator Sets 4, 0.30i 521 841: 0.74 Diesel .............................................................................. ....................................... ------------------------------- I - - - - - --------- ............................................. .................................... Pressure Washers 1 16.00: I 13; Diesel CalEEMod Version: CalEEMod.2016.3.2 Page 63 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual UnMitigated/Mitigated 10.0 Stationary Equipment Fire Pumps and ErnerclencV Generators Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F771-77771 User Defined Equipment Equipment Type Number 11.0 Vegetation ROG NO, CO S02 FIIltl ve Exhaust PMIO Fugitive EA)aust PM2.5 Total Blo- CO2 NBi.- CO21 Total CO21 CH4 N20 CO2, I I 'Mjr I Total I PM2.5 PM2.5 I I I I Equipment Type tona/yr MT/yr Cranes fl: 4.5000e- 11901,- 2.11200e- 1.0000 - 2.20OOe- 2.2000a 2.000Oe- 20000 0.0000 0.5069 0.5069 1.6000 - 0.0000 0.5110 004 003 003 005 004 004 004 004 004 ........................ . . ........... '1 -------- -] -1 -------------- .................. ------------ --- Forklifts 0.0263 0.2368 0 Ti7 1' 0.0176 377 62' 0.0162 0.0000 i 24.5082 i 24.5082 17.9300e- 0.0000 24.7063 N 004 1 003 ............................... - --------- Generator Sets 1.5600e- 0.0136 7.7000.- ------ 1-7;7Toje-T - --------- .................. «_____ 7.7000e- 0.0000 2.2043 ------ 2.2043 1.2000e-- 0.0000 2.2074 003 005 004 1 004 1 004 1 004 004 .............................. .................. - i---- ................. ................... .......... ................... .... . ............. .................... .................. .. . . . .... . ...... ................... ................... ................... ................... P-ra, 4.000Oe- 3.11000o- 2.4000e- 0.0000 1.0000.- 1.0000.- 1.0000.- 1.0000' 0.0000 0.0355 0.0355 0.0000 0.0000 0.0356 Wash.'s 005 004 004 005 0 0 5 005 005 • Total 0.0211 3.2167 0.2322 3.2000a. 0.0111 1-1111 ().()172 0.0172 27.2549 8.2100e- 0.0000 27.4603 11 1 004 727.2549 003 10.0 Stationary Equipment Fire Pumps and ErnerclencV Generators Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F771-77771 User Defined Equipment Equipment Type Number 11.0 Vegetation CalEEMOd Version: CaIEEMod.2016.3.2 Page 64 of 64 Date: 5/31/2018 7:57 PM Haskins Way Rezone Phase I - San Mateo County, Annual 11.2 Net New Trees Species Class Total CO2 CH4 N20 CO2e Category MT Unmitigated ;: 43.8960 i 0.0000 i 0.0000 i 43.8960 11.2 Net New Trees Species Class Number of Trees N20 CO2e MT E Miscellaneous i 62 0.0000 0.0000 43.8960 Total F41,1111 0.0000 0.0000 43.8980 Attachment B PROJECT PHASE 1 SUMMER EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CalEEMod Version: CaIEEMod.2016.3.2 Page 1 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Haskins Way Rezone Phase I San Mateo County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park 31137 1000sgft 1.80 i 311,368.00 0 ............................................................................ a................................................ ............................... ...........................................................................................__._._._._._._._ t.._._._._._._._._._._._._._._._.;..... ............................... Office Park 25.00 1000sgft 0.30 25,000.00 i i 0 Enclosed Parking with Elevator 720.00 Space 1.30 288,000.00 i 0 Parking Lot 203.00 Space 3.35 81,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Climate Zone 5 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4 Intensity 0.029 (lb /M W hr) (lb /M W hr) 1.3 User Entered Comments & Non - Default Data Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Precipitation Freq (Days) 70 Operational Year 2020 N20 Intensity 0.006 (lb /MWhr) CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - See Appendix F of the Environmental Impact Report Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Area Coating - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Stationary Sources - Emergency Generators and Fire Pumps - See Appendix F of the Environmental Impact Report Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea _Nonresidential_Ezterior 168,184.00 € 0.00 .................... .......................................................... }............................................................................. r } ............................................. ...........................:...................................................................... tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 168,184.00 € 0.00 r tblArchitecluralCoaling ConstArea _ Nonresidential _interior 504,552.00 € 0.00 r tblArchitecturalCoating ConstArea_ Nonresidential _ interior 504,552.00 i 0.00 tblArchitecturalCoating ConstArea_Parking 22,152.00 i 0.00 tblArchitecturalCoating ConstArea_Parking 22,152.00 i 0.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 5.00 ............................................... ............................... }.............................................. ............................... }.............................................. ............................... ;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 ............................................... ............................... }.............................................. ............................... }.............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 ..............................................................................}.............................................................................}.......................................... .................................... r i....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated . 0.00 i 1.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 15.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 3.00 r tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated : 0.00 € 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i i 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 111 0.00 6.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 4 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer tblConstEquiplMitigation N NumberOfEquipmentMitigated 0 0.00 2 2.00 ................... .......................................................... . ............................................................................. . ...................................................................... tblConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 8 8.00 ................... .......................................................... . ............................................................................. . . ............................................................................. j j ...................................................................... tb[ConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 11.00 ................... .......................................................... . ............................................................................. . . .................................................. ................ .. . .. . .. . .. . . .. . ......... - - . . . . . . . . . ................................. tb[ConstEquipMifigation N NumberOfEquipmentMitigated 0 0.00 6 6.00 ................... .......................................................... . ............................................................................. . . ............................................................................. . ...................................................................... tblConstEquiplM itigation N NumberOfEquipmentMitigated 0 0.00 13.00 ................... .......................................................... . ............................................................................. . . ..................... . .......................... . ..................................................................... *"*"*"* .................. tblConstEquipMifigation T Tier N No Change T Tier 4 Final ................... .......................................................... # # ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. . .............................................................................. . ..................................................................... tb[ConstEquiplMidgation T Tier N No Change T Tier 4 Final .............................................................................. . .............................................................. . ............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N No Change Tier 4 Final .............................................................................. F F ............................................................................. . .......................................................... - --- ............ ..................................................................... tblConstEquiplMifigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ................................................... - -- ...................... . .............................................................................. . ..................................................................... tblConstEquipMlbgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N . No Change Tier 4 Final .............................................................................. . ............................................................................. . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ....................................................... . ............... .................................................. . ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . T ............................................................................. . ..................................................................... tb[Constl7quiplMidgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ................................................................... . ................................................................................ tblConstEqulpMlUgaUon T Tier N No Change Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... thlConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquipMlbgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . .............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N No Change Tier 4 Final .............................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbIConstEquipMidgation T Tier N No Change T Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . .................................................................................................................................................... tb[Constl7quiplMidgation T Tier N No Change i Tier 4 Final .............................................................................. . .................................................................... . . . . .... .............................................................................. . . . . . ............................................................... tblConstEqulpMlUgafion T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. . . ........................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . .. . .. . .. . . .. . ........................... . .. . .. . .. . .. . . . . . . . . . . . . . . . tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. i i .............................................................................. . ....................................................................... CaIEEMod Version: CalEEMod.2016.3.2 Page 5 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer tblConstEquipMifigafion Tier No Change Tier 4 Final ........................ ..................................................... ............................................................................. - - ------------- - - - - - - - - - - - - - - - - - -- : ...................................................................... tb]ConstrucfionPhase NurnDays 20.00 65.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... ii;lC onstructionPhase NurnDays 20.00 21.00 .................... ................................................... ............................................................................. . .............................................................................. ...................................................................... tblConstructionPhase NurnDays 20.00 219.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... tblConstructionPhase NurnDays 230.00 30.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NurnDays 230.00 40.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NurnDays 230.00 208.00 .............................................................................. ............................................................................. .............................................................................. ..................................................................... tbIConstructionPhase NurnDays 230.00 258.00 .............................................................................. .............................................................. ............................................................................. ..................................................................... tbIConstructionPhase NurnDays 20.00 130.00 .............................................................................. F ............................................................................. .......................................................... --- ............ ..................................................................... tblConstructionl3hase NurnDays 10.00 20.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NurnDays 10.00 35.00 .............................................................................. ................................................... -- ...................... .............................................................................. ..................................................................... thiGrading AcresOfGrading 25.00 0.00 .............................................................................. ............................................................................. . ............................................................................. j ..................................................................... thiGrading MaterialExported 0.00 8,775.00 .............................................................................. ............................................................................. . . ............................................................................. ..................................................................... tbiGrading Materialimported 0.00 7,500.00 .............................................................................. ............................................................... - ------------------------------------------------ -- ......... ..................................................................... tb]LandUse LandUseSquareFeet 311,370.00 311,368.00 .............................................................................. ........................................................................... . ............................................................................. ..................................................................... tbILandUse LotAcreage 0Z7 UO .............................................................................. ............................................................................. . .............................................................................. i ..................................................................... tb]LandUse LotAcreage 1 7.15 1.80 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]LandUse LotAcreage 6.48 1.30 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]LandUse LotAcreage 1-83 3.35 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .......... . ..................................................... ............................................................................. . ............................................................................. ..................................................................... lOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .................................................................................................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 i 2.00 .............................................................................. ............................................................................. .............................................................................. . . . . ............................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. . ............................................................................. ...................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. i .............................................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00 CalEEMod Version: CaIEEMod.2016.3.2 Page 6 of 56 tblOffRoadEquipment ........................................................... tblOffRoadEquipment lOff R wd E q u i p m e n t lOff R oad E q u i p m e n t iOff R oad E q u i p m e n t iOff R oad E q u 1 p m e n t iOff R oad E q u i p m e n t ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffftadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ tblOperabonalOffRoadEquipment ............................................................ tblOperabonalOffRoadEqulpment ............................................................ tblOperational OffRoad Equlpmwt ............................................................ tblOperabonalOffRoadEquipment ............................................................ thlOperabonalOffRoadEquipment ............................................................ tblOperational OffRoad Equipment ............................................................ thlOperational OffRoad Equipment ............................................................ tblOperabonalOffRoadEquipment ............................................................ tblOperabonalOffRoad Equlpment ............................................................ tblOperational OffRoad Equipment Haskins Way Rezone Phase I - San Mateo County, Summer OffRoadEquipmentUnitAmount 4.00 2.00 ................................................................... - - ----------------------- - - ----- - - - - - - - -- : .......................................... OffRoadEquipmmtUnitAmount 1.00 3.00 ................................................................... . ............................................................................. .......................................... OffRoadEquiprnentUnitAmount 1.00 5.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8.00 3.00 ................................................................... . ............... -- .......................................................... .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8-00 6.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... ............................................................................. .......................................... UsageHours 8.00 4.00 .................................................................. . t .................................................................. ........... .......................................... UsageHours i 7.00 6.00 ................................................................... ............... --- ....................................................... .......................................... UsageHours 8-00 4.00 ................................................................... .............................................................................. .......................................... UsageHours TOO 6.00 ................................................................... UsageHours . ............................................................................. .......................................... 8.00 6.00 ......................................... .......................... UsageHours ? . ......................................................................... . .. .. .. .. .. ....... 8.00 ........................... 7.00 .............................................................. .... UsageHours . ................................................................... .......................................... 6.00 7.00 ................................................................... UsageHours T ...................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . .. . .. . .. &00 i i . ........................... 7.00 ................................................................... . .............................................................................. i .......................................... UsageHours 8.00 5.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 2.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 365.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 52.00 ................................................................... . .............................................................................. .......................................... OperDaysPeffear 260.00 1.00 ................................................................... . ............................................................................. .......................................... OperHoursPerDay 8.00 0.30 ................................................................... . ............... -- .......................................................... .......................................... OperHoursPerOay 8.00 16.00 ................................................................... . ............................................................................... ; .......................................... OperOffRoadEquipmentNumber 0.00 ................................................................... .............................................................................. . . . . .................................... OperOffRoadEquipmentNumber 0.00 1.00 ................................................................... OperOffRoadEquipmentNumber . ............................................................................. .......................................... 0.00 4.00 ................................................................... .............................................................................. .......................................... OperOffRoadEquipmentNumber 0-00 1.00 Date: 5/31/2018 8:00 PM CalEEMod Version: Ca1EEMod.2016.3.2 Page 7 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer tblSequestrafion N NumberOfNewTrees 0 0.00 6 62.00 ........................ . ........ .. ................................................. - - - ----------------------- - - ----- - - - - - - - -- : ...................................................................... �auling`rripLength 2 20.00 1 19.00 ........................ ........................ . ....................... . .. ....................... . ........................ . .............. i ...................................................................... tblTripsAndVMT � �auling`rripLength 2 20.00' 19.00 ........................ . ...................... . .. ................................................. . . ........................................... . ......... ........................ . ............................................. �auling`rdpLength 2 20.00" . 19.00 ........................ -- -O ................. . ....... .............. . ........ .. ................................................. . . ......................................... . .......... ............ .....................................................................Z W . W � �aulingrripLength 2 25i . 12.60 ........................ . ...................... . .. ................................................. . . ........................................... . ................................. ..................................................................... �auling`rripLength 2 20.00* 1 19.00 ................ . ........ . .......................... . . ................... .............. ............................................................................ �s �aulinjripLength 1 20.00' 19.00 .............................................................................. . ............................................................................. . .............................................................................. . ..................................................................... tbITripsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . .............................................................. . ............................................................................. . ..................................................................... tblTrlpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblTrlpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ................................................... - -- ...................... . .............................................................................. . ..................................................................... tbITNpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . ....................................... . . .................................... ..................................................................... tbITrlpsAndVMT H HaulingTripNumber 1 185.00 230.00 .............................................................................. . ............................................................................. . ............................................................................. . ..................................................................... tbITripsAndVMT H HaullngTripNumber 2 2,034.00 8 814.00 .............................................................................. . ............................................ .................. . .... - ----------------------------------------------------- . ......... ..................................................................... tbITripsAndVMT V VendoffripNumber 1 116.00 5.00 .............................................................................. . ........................................................................... . ............................................................................. . ..................................................................... tbITripsAndVMT V VendorTripNumber 1 116.00 6.00 .............................................................................. . ............................................................................. . . .............................................................................. i i ..................................................................... tbITrlpsAndVMT 1 VendoffrlpNumber 1 1 4 116.00 43.00 ....................................................................... . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT V VendoffrlpNumber 1 116.00 5 50.00 .............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 4 40.00 20.00 .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 3 38.00 1 19.00 .............................................................................. . ............................................................................. . . .............................................................................. . ..................................................................... tbITrlpsAndVMT W WorkeffrlpNumber 5 53.00 7.00 ........................................................... . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 4 40.00 2 20.00 ............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 3 38.00 19.00 .............................................................................. . ............................................................................. . . .................................................................................................................................................... tbITripsAndVMT W WorkeffripNumber 2 263.00 .............................................................................. . ...................................................... . . . . .... .............................................................................. . . . . . ............................................................... tbITrlpsAndVMT W WorkeffrlpNumber 2 263.00 13.00 .............................................................................. . ............................................................................. . ............................................................................. . ......................................... ................... . . . . . . . . . tbITripsAndVMT W WorkerlpNumber 2 263.00 9 96.00 .............................................................................. . ............................................................................. . .............................................................................. . ....................................................................... CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer tbITripsAndVMT WorkeffdpNurnber 53.00 22.00 ........................ --Z ........................ -OW ....... .................................................... ...................................................................... iW-r--�s zrkeffripNumber 53.00 19.00 ........................... .................................................. ............................................................................. 4 ............................................................................. ...................................................................... tblVehicleTrips CC TTP 48.00 10.00 ........................... .................................................. ............................................................................. f .............................................................................. ...................................................................... tblVehicleTrips CW TTP 33.00 71.00 ........................... .................................................. ............................................................................. f ............................................................................. ...................................................................... tblVehicleTrips ST TR 1.64 0.27 ........................... .................................................. ............................................................................. f ............................................................................. ................................ ......... .................... tblVehicleTrips SU TR 0.76 .............................................................................. ............................................................................. .............................................................................. ....................................................................... tblVehicleTrips WD TR 11.42 1.86 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 1 PM70 1 Total PM2.5 PM2.5 I I I I Year lb/day lb/day 2018 i 9.5572 107.6822 61.5904 0.1486 4.4702 4.5300 9.0001 0.9252 4.2337 5.1589 i 0.0000 !15,172.124 15,172.124 3.5505 0.0000 115,260.887 r: 8 8 I 3 ............... ............... N........ ........... ................... ................... .._...................._._._._.................... ------------ _._. _................. ....... ..............................- .................. 1.. _................_._._._....... ......................... ............................... 2019 �i 22.6808 109.4068 81.6240 0.1740 3.4741 5.3731 7.5236 0.7253 4.9834 5.2702 i 0.0000 ;16,960.746 16,960.746 4.7586 0.0000 17,045.538 ' 1 1 5 ................... ...........�:.._............... 2020 : 42.9059 ._._._._._. i 118.5960 .... ..............._............... i 101.3584 0.2191 ._._._._._. 1 2.7142 ._............... i 5.2637 _._._._._._. i 7.9779 --- 0-7-371--- 1 0.7341 ._............... 4.9710 _._._._._._. y...................._...................._._._._. 5.7051 0.0000 21,097.547 _._._._._._._.._............... 21,097.547 4.7097 i 0.0000 ................... 21,215.289 , 1 1 1 1 1 1 I 3 7 Maximum 42.9059 118.5960 101.3584 0.2191 4.4702 5.3731 9.0001 0.9252 4.9834 5.7051 0.0000 21,097.547 21,097.547 4.7586 0.0000 21,215.289 1 1 7 Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Year Ib /day lb /day 2018 2.1238 23.7910 66.3947 0.1486 3.3215 0.2838 3.6053 0.7513 0.2812 1.0325 P, 0.0000 :15,172.124 15,172.124 3.5505 0.0000 15,260.887 r: 8 8 3 2019 : 14.5420 34.0844 96.3617 0.1740 2.6813 0.3357 3.0170 0.7253 0.3312 1.0565 0.0000 216,960.746 16,960.746 4.7586 0.0000 17,045.538 ' e 0 r 0 5 2020 : 33.2427 39.2877 111.9940 0.2191 2.7142 0.4196 3.1339 0.7341 0.4163 1.1504 0.0000 :21,097.547 21,097.547 4.7097 0.0000 21,215.289 ' 1 , 1 7 Maximum 33.2427 39.2877 111.9940 0.2191 3.3215 0.4196 3.6053 MM 0.4163 1.1504 0.0000 21,097.547 21,097.547 4.7586 0.0000 21,215.289 1 j 1 7 CaIEEMod Version: CalEEMOd.2016.3.2 Page 10 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 TotaICO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total I I Percent 33.58 71.06 -12.34 0.00 18.22 93.15 60.18 7.29 92.75 79.92 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 003 005 1 004 1 ' 1 1 1 1 .............................. r.................._,.. .... ....... ............................. 2.2 Overall Operational Unmitigated Operational ROG NO, CO 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5TOta1 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2,5 I I I Category lb /day lb/day Area fl 8.3445 ! 1.1900e- ! 0 129 ! 1.000Oe- ! ! 4.6000e- ! 4.6000e- ! ! 4.6000e- i 4.6000e- ' 0.2756 ! 0.2756 i 7.4000e- ! 0.2941 003 005 004 004 ' 004 004 004 .............................. r.................._,.. .... ....... ............................. ... ........ ...!.................. .!................._!._._•_•_._ _........... ........... .............. i......................................!............._._.!............_._.!.... _._._.......................... Energy �; 0.1850 1.6814 1.. 1.4124 1................... 0.0101 1.................. 1................................................................................ 0.1278 0.1278 0.1278 0.1278 2,017.6659 1 2,017.6659 1 0.0387 0.0370 l 2,029.6559 .............................I .... Mobile 1.0633 ................. ! 3.0826 I 11.8431 j 0.0413 i 3.677D j 0.0426 3.7195 j 0.9845 ........................._..... 0.0400 1.0245 ;4,155.7629]4,155.7629] 0.1459 I 4,1594095 .............................. r ...... ..........._......................................................._....... Offroad 0.7461 7.8321 4.3393 9.380De- ...._......�................._' 0.3775 ._._._._._..._._._._._._................._................... 0.3775 0.3520 t...................................... 0.3520 878.4557 �............._._. 878.4557 _._._........ 0.2418 .................. ................... 884.5017 ' 003 , Total 10.3389 12.5973 17.7242 0.0607 3.6770 0.5484 4.2253 0.9845 0.5203 1.5048 7,052.1601 7,052.1601 0.4271 0.0370 7,073.8612 CaIEEMod Version: CalEEMOd.2016.3.2 Page 11 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 2.2 Overall Operational Mitigated Operational 3.0 Construction Detail Construction Phase ROG NO. CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I PM10 PM10 I Total PM2.5 PM2.5 Total ACO2e Category Ib /day Ib /day Area . 8.3445 1.1900e- 0.1294 1.000Oe- 0.00 4.6000e- 4.6000.- 0.00 4.6000.- 4.6000.- " 0.2756 0.2756 7.40001- 0.00 i 0.2941 Reduction 003 005 004 004 004 004 004 .............................. N....0 ............................... ....... ......... .....- ... ......... ... .................. .................. ...... . ........ ...................... ...................................... ................... 1..-...................-.-.-....... ------------------- ............. -.- ................... Energy ti 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 i ;2,017.6659 2,017.6659 0.0387 0.0370 2,029.6559 .............................. 1'5...... ............. Mobile 1.0633 r ._._._._._. i 3.0826 i .... ..............._............... 11.8431 i 0.0413 ._._._._._. i 3.6770 i ._............... i 0.0426 i _._._._._._. i 3.7195 i _._._._._._. I 0.9845 I ._............... 1 0.0400 1 _._._._._._. y..................°._...................._._. i 1.0245 114,155.7629 i i i _._._._._._._._._.._........... 4,155.76291 i 0.1459 I i i ................. 4,159.4095 r Offroad i 0.7461 i _ _ 7.8321 i 4.3393 __ 9.3800.- i __________ i _ 0.3775 i 0.3775 __________ 0.3520 _ _r 0.3520 i 878.4557 878.4557 0.2418 _ , Total 10.3389 12.5973 17.7242 0.0607 3.6770 0.5484 4.2253 0.9845 0.5203 1 1.5048 1 7,052.1601 7,052.1601 0.4271 0.0370 7,073.8612 3.0 Construction Detail Construction Phase ROG NOx CO 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 PM10 PM10 Total PM2.5 PM2.5 Total ACO2e Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Phase Number Phase Name I Phase Type Start Date I End Date Num Days Weak Num Days Phase Description 1 :Demolition ;D emolition :12/12/2018 ?1/8/2019 5 i 20 ................................... ................... 2 r } .............................................................. . :Soils Abatement/Remove/Replace Remove/Replace Site Preparation •............... .................. 112/26/2018 ................... ............. :1/22/2019 .- ._..._._._._._ 5 ._._._._._.__ 20 ................................... ............................... ...................}...................................... 3 ......................... :Site Prep and Make Ready :Site Preparation i ................................. 1112312019 i............................ :3/1212019 5 35 ........................... ............................... ................... 4 }.............................................................. ;Parking Garage Underground .' ; Building Construction __._..;............................ ..... ;2/22/2019 ......................... 24/412019 5 _ 30 ................................... ............................... ................... 5 i.............................................................. :Office Building Underground :Building Construction .............................. 12/22/2019 ......................... :4/18/2019 5 40 ........................... ............................... ................... 6 f.............................................................. .. *.Parking Garage Core Construction :Building Construction ! ................................. ;4/412019 ..... ............................i__ ;1/20/2020 5 _ 208 ................................... ............................... ................... 7 f................................ ............................... *.Office Building Core Construction j a Building Construction ........................................ 1411912019 ......................_.""""""' ;4/14/2020 5 '-'-'----- 258 ................................... ............................... 8 *.Parking Garage Exterior :Architectural Coating ! 12/212019 12/3012019 5 21 i *.Improvements *. ` ` ................... 9 .................................. .............................6— *.Office Building Tenant *.Improvements ---------- - -- Architectural Coating ................................. 12/2612019 ............................... 10/2712020 5 219 10 .Landscaping and Site *.Improvements ?Pautng !1/6/2020 7/3/2020 5 130; '• ................... ....... ......................................................... . ............................................................ ----- ----- . '•------.................................................................. 11 *.Office Building Exterior ;Architectural Coaling :1/15/2020 :4/14/2020 5: 65: *.Improvements Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.65 Residential Indoor: 0; Residential Outdoor: 0; Non - Residential Indoor: 0; Non - Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sgft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition 9 Air Compressors 2i 7.00: 7811 0.41 ........................................................................._ } .... ______________'_'_._._._._. .................................. ................................... a..... ............................... Demolition ?Concrete/Industrial Saws 21 6.00 81? O.T. ........................_._._._._._. ..._..........................i Demolition ___'_ f................................_'___ ;Dumpers/Tenders I 1 ................................. 1� .. .................................. 4.00: y................................... 161 . 0.31 Demolition *. Excavators 2: 3.002 0.31 CaIEEMod Version: Ca1EEMod.2016.3.2 Page 13 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Demolition JForklifts 1 7.00: 89� 0.20 ... ...................................................................... Demolition ........................ ............................................. Off-Highway Trucks ............................................. .................................. 21 .......................................................................... 4.W 402 0.38 ... ...................................................................... Demolition ...................... . . ....... . 1Rubber Tired Dozers ............ .................................. 2:: ................................... 6.002 ..................................... 2471 0.40 ................................. ........................ ...................................................................... Demolition 'Skid Steer Loaders &W 651 0.37 .................................................. — ------------------------ --------------------------------------- .................................. .............................. .............................. , Demolition 'Sweepers/Scrubbers 4.00:: 64; 6.Z, 'Demolition ............................................ ............ . . . . . . ....... . . ......... ........................................... j .................................. 'Tractors/Loaders/Backhoes 2i .................................... 5.00�: ..................................... 971: 0.37 , ,: ', '' " ', , ''* ........... .................................................. .......... . . . ............... .................................. ................................... ........... &i Is Abatemen URemove/Re pace Crawler Tractors 1 4.00:! 2121 ..... .................................................................... Soils AbatemenURemove/Replace . .......................................................... 'Dumpers/Tenders .................................. 21 .................................... 6.00; ..................................... 16i 038 ..... .................................................................... Soils AbatemenURemove/Replace . . Excavators . . ........ ............................... j .................................. 2 i .................................... 5.00; ..................................... 0.38 ..... .................................................................... Soils Abatement/Remove/Replace .. ---------- Off-H ighway Trucks ---------------------------------------- .................................. 31: .................................... 4.W ..................................... 4021 0.38 ..... .................................................................... Soils AbatemenURemove/ReplaGe .. .................................................... 'Plate Compactors ................................. .................................. 2 ................................... 5.00: ..................................... 8i 0.43 .......................................................................... Soils Abatement/Remove/Replace ...................................................................... iRubber Tired Loaders ----- — ! ----- .................................. 21 .................................... 5.00: ..................................... 2031: 036 .......................................................................... Soils Alhatement/Remove/Replace - 'Scrapers 1 — - - - -------------------------------------- i .................................. 21 ! ................................... 4.00:: .. ..................................... 3671 0.48 .......................................................................... Soils AbatemenURemo-/Replace ;Sweepers /Scrubbers . . . . ............................... ........................... ...... .................................... 4,.00:: ..................................... 64 0.46 .......................................................................... Soils AbatemenURemove/ReplaGe . i Tractors/Loaders/Backhoes ............. ........... ................. 11 i i ............. .................................... 6.00; ..................................... 0.37 .......................................................................... Site Prep and Make Ready ----------------------------------------------- 'Bore/Drill Rigs -.1 ...................................................................... 2i 7.00: ...................................... 2211! 0.50 .......................................................................... Site Prep and Make Ready ........... ....................... . . ;Dumpers/Tenders . . ........ 0.38- .......................................................................... ----------------------------- ............... .................................. .................................... ..................................... Site Prep and Make Ready Excavators 1 4.00i 158; .......................................................................... Site Prep and Make Ready - - - - - - - - - - - - - - -- 'Off-Highway Trucks ........... .................................. 2 4.00:: 4021 0.38 .......................................................................... Site Prep and Make Ready ----------------------------------------------- ------- - - - ---------------- 'Plate Compactors .................................. 21 ................................... 5.00: j ..................................... 8 i i 0.43 ........................................................ ------------------------------------------------ - - - - - - - ---------- — ----- .................................. Site Prep and Make Ready 'Rubber Tired Loaders 2 i &W 2031 0.36 ................. ----- - - - ---- - - - - - - - - - - - - - - - - - --------------------------------------------- j .................................. .................................... ..................................... Site Prep and Make Ready !Scrapers 2i 6.00 367; .......................... .......... ........... .......... ............... .... ................. ..................................... Site Prep and Make Ready 'Sweepers/Scrubbers i : 4.00:: 64 0.46 .................. ----------------------------------------------- ------- - - - ---------------- : .................................. ................................... ..................................... Site Prep and Make Ready 'Tractors/Loaders/Backhoes 2: 6.002 971 037 .......................................................................... Parking Garage Underground ......... .................................... 'Bore/Drill Rigs ........ .................................. 11 .................................... 7.00; ..................................... 2211 0.50 .......................................................................... Parking Garage Underground .. Excavators ........ . . . ............................... i i .................................. 21 .................................... 7.00 ..................................... 1581: 0.38 .......................................................................... Parking Garage Underground ...................................................................... ;Generator Sets . ...................................................................... 2:: 4.00] ..................................... 84:: 0.74 CaIEEMod Version: CalEEMod.2016.3.2 Page 14 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Parking Garage Underground I Plate Compactors 2 4.00; 0.43 ........... . ..................... .............. �I .................................. ................................... ..................................... '�arki'ng' Garage Underground ' '' ........... 'Rough Terrain 1 2.00; 100! 0.40 1 1 ....................... 'Parki'ng' Garage U n"d"e"r"g'r"o"u"*n"d""""'* - -- - -------------- I ......... ............ .................................. ........................... 'Rubber Tired Loaders 1 2.001 203! 0.36 '�'a* rM, Parking Garage Underground ''' '"", Sweepers/Scrubbers 1 4.00; 641: Y�6- ........... - - - ----------------- - - ------- ........................ ... .................................. ..................................... Parking Underground Tractors/Loaders/Backhoes ..w6 97: 0.37 Garage n 21 0: ''''' ' ' '' ...................... ---------------- - - ------- j ................................. .................................. ..................................... �arking Garage Underground ;Trenchers 21 4.001; 781: 0.50 ................................................................... - - - - - - - - - - - ......... .................................... ............................. �6 Office Building Underground Bore/Drill Rigs 2:! 4.00: 2211 y .......................................................................... ------- - - - - - --------------------- ................................... . . . ............................. i ..................................... Office Building Underground Excavators i 21 7.00: 158i 0.38 i .......................................................................... - ---- - ---------------- - - - - - ------------- - - - I .................................. ....................... ........... ..................................... Office Building Underground Generator Sets 21 4.W 84i 0.74 .......................................................................... ................................. ................................... ..................................... Office Building Underground Plate Compactors 21 4L00: 8 i 0.43 .......................................................................... I ----------------- - - - - - - - - - - - - - .................................. ................................... Office Building Underground 'Rough Terrain Forklifts 2 : 8.001: 1001 0.40 .......................................................................... ---------------- - - - - ---------- ................................................................................ Office Building Underground 'Rubber Tired Loaders 1 1 i 6.00; 0.36 .......................................................................... ---------------- - - - - - - ................................. .................................... ........................ ............. Office Building Underground 'Sweepers/Scrubbers i 11 4.00i 641 0.46 .......................................................................... ' ........ . . . . . ................... - - - ................................. .................................. ...................................... Office Building Underground Tractors/Loaders/Backhms 2! 6.00 97: ! 0.37 .......................................................................... I .................................. II ..................................... Office Building Underground 'Trenchers 41 7.001 781 0.50 .......................................................................... ---------------------- - - ---------------- ............... ................................. .............................. ... ................................... Parking Garage Core Construction 'Aerial Lifts 1 7.00 631 0.31 .......................................................................... ............... . ...................... ................................... I ..................................... Parking Garage Core Construction 'Cement and Mortar Mixers I 6! 4.00:: 9 0.56 .......................................................................... Parking Garage Core Construction 'Cranes 1 7.00: 231 0.29 .......................................................................... .................................. ..................................... Parking Garage Core Construction Off-Highway Trucks 4 0,0::. 402! 0.38 .......................................................................... - - - --- - . .........................4.00.: ...........................402 .......................... ........................... ...................................... Parking Garage Core Construction Plate Compactors 1 ! 4.00; 81 0.43 .......................................................................... ................ . . ............ .................................. ! ................................... 4 ..................................... Parking Garage Core Construction Pumps 11 6.00:: 84:: 0.74 ........................................................................ +_ . . . . . ..................................... ................................................................ ..................................... Parking Garage Core Construction Rough Terrain Forklifts 1 i 6.00 too:: 0.40 .......................................................................... __ _- - - - --- j ................................... : ................................... ..................................... Parking Garage Core Construction 31 6.00 46: 0.45 .......................................................................... ------------ 4 .................................. r .................................. I ..................................... Office Building Core Construction 'Aerial Lifts 41 7.00:: 631 0.3 .......................................................................... 1 - ------------------ Office Building Core Construction ;Air Compressors 4i 6.001 781 0.48 .......................................................................... ------------------ - - - - - -- I ................................. .................................. I ................... .................. Office Building Core Construction ;Cranes 2i 7.001 231:: 0.29 i .......................................................................... ...................................................................... ................................. Office Building Core Construction Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CaIEEMod Version: CalEEMod.2016.3.2 Page 15 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Office Building Core Construction Rough Terrain Forklifts 2 6.00; 0.40 'E' '' ' '' -'''' l ........ }. _. _................. _. _ ........................ --------------------- I ............................. .............. .................................... ................................... ............................. ........ ilceaut1ding C ore C onstructon ,Sweepers /Scrubbers i 1 4.00; 641 0.46 4 - - ------------ - - - - - - - .................. ......................... .....................'6ce' ", '', '- -"', , ", i" ', - lder 700 i ......5 Office C ore Construction Wes 5 7.00; 46! ''' , '' '""'"'""*'""*"*"""'"'........... . ..................................................... .................................. ................................... I ........................ ..... �arMng Garage ExeriorImprmements Aerial Lifts 11 6.00 63: ''i ........... - - - ---------------- - - ------- I .................................. r .................................. ..................................... Parking Garage ExerorIr prove n ants Cranes 11 3.00:: 2311 0.29 '''i' "'-i ---------------- - - ------- j ................................. .................................. ..................................... Parking Garage ExerorImprave m ents ,Off-Highway Trucks 11 4.001; 4021 0.38 '�'a* Parking ng Garage 'Ex-te rto-r-Improvements , * '-- '* - - - - - - ...... 'Other General Industrial Equipment 1 : y�� 4.00: 881 .......................................................................... ------- - - - - - - - - ------------------------- ................................... . . . ............................. i ..................................... Parking Garage Exterior Improvements :Pressure Washers 1 11 2.00: 131 0.30 .......................................................................... ----------------------- --------- ------------- - - - .................................. .................................. ..................................... Parking Garage Exterior Improvements Rough Terrain Forklifts 1 1 5.00� 100i 0.40 I .......................................................................... - -------- f ----------------------- - - - ................................. ................................... ..................................... Parking Garage Exterior Improvements e Welders 1 21 5.00: 46; 0.45 .......................................................................... - ------------------- - - - - - - ................................ T001 Al .............................. 0".'31' I .......................................................................... 4 --------------------------- - --------- - - - --- F - - - - - - .................................... ..................... . ............ ..................................... Office Building Tenant Improvements Aerial Lifts Office Building Tenant Improvements 'Air Compressors i 11 7.00: 78! 0.48 .......................................................................... . - - - - - - T ---------------- - - - - - - ...................................................................... ..................................... Office Building Tenant Improvements :Off- Highway Trucks 1 2 4.00; 4021! 0.38 .......................................................................... -------- - - - - - ------------------- - - - ................................. .................................. ...................................... Office Building Tenant Improvements ;Rough Terrain Forklifts 1 7.00: 100! 0.40 ........ .. .................................. ..................................... 641 0.46 Office Building Tenant Improvements ;Sweepers/Scrubbers 11 6.001 .......................................................................... .. . ................... . - - ---------------- --------------- ................................. j ........................ .......... ..................................... Office Building Tenant Improvements ;Welders 1 5.001 46 0.45 1 .......................................................................... ---------------- - ------- - - ------------------------- .......... ................................... 4 .................. ................... ;Cement and Mortar Mixers 4�003 0.56 Landscaping and Site Improvements 21 9: .......................................................................... I V * ........... ................................... ..................................... Landscaping and Site Improvements Dumpers/Tenders i I 6.0W: 16i 0.38 .......................................................................... - ------------- - ................................... ..................................... Landscaping and Site Improvements Waving Equipment 21 ................. 7'.00.: 1321 0.36 .......................................................................... ................................... .................................. a...... ............................... Landscaping and Site Improvements Plate Compactors 2 4.0 81 0.43 .......................................................................... .................................. 4 ....................... ........... .................................. !. . .. Landscaping and Site Improvements Rollers 2 5.00] 80 1 0.38 ........................................................................ ............................ ................................... j ..................................... Landscaping and Site Improvements ;Rough Terrain Forklifts 1 i 3.00 1001 0.40 .......................................................................... : ................................... ................................... ..................................... Landscaping and Site Improvements Rubber Tired Dozers 21 4.00 247:: 0.40 651 0.37 .......................................................................... ---------- ......................... .......................................................................... ------ I ........................ :! -I ........... ............. Landscaping and Site Improvements Skid Steer Loaders 6.00 Landscaping and Site Improvements 'Tractors/Loaders/Backhoes 2I 4.00:: 971 0.37 .......................................................................... ------------------ - - - - - -- ................................. .................................. ....................... .............. Office Building Exterior Improvements eAerial Lifts 1 3I 6.00 63:: 0.31 .......................................................................... ...................................................................... ................................. Office Building Exterior Improvements ;Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CalEEMod Version: CalEEMOd.2016.3.2 Page 16 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Office Building Exterior Improvements ;Other General Industrial Equipment 2: 7.00 88 0.34 Offi Building Exterior Improvements ;Pressure Washers 11 4.00; 13! 0. ce 30 .... ...�_ _______ ................. ..................... ..................... Office Building Exeror Imp. ..rove.. . me... nts ;Rough Terrain Forklifts 3: 7.00; 100! 0.40 .......................................................................... �. . ......................................... _._._._._ i.................................. k.............................. ..... i...... ............................... Office Building Exterior Improvements ;Sweepers /Scrubbers 1 j 4.00 6411 0.46 .......................................................................... j........................................ ............................... .......................... ....... W._._ ....... _ ................. _ ...... ............................... Office Building Exterior Improvements : Welders 2: 6.00: 46: 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Worker Trip Number Length Vendor Trip Length Hauling Trip Worker Vehicle Length Class Vendor Vehicle Class Hauling Vehicle Class Demolition 16 20.00; 0.00 230.00; 10.80! 7.30; 19.00: LD_Mix 11HDT_Mix 1HHDT e Soils 16 20.001 0.00 814.00; 10.801 7.30; 12.601LD Mix iHDT Mix HHDT ................................... �.�,._.__"�__ - i .................... ....... .....................a_________ i .i................... ` I .._._........_._._._._._._.; j..................... ............................... Site Prep and Make r r 15 19.001 9.0011 0.00 0.00; 10.801 7.... 1 7.30; 19.00ILD_Mix 19.00 iHDT_Mix HHDT Parking Garage 15 11.00! 5.00 0.00; 10.801 7.30: iHDT_Mix HHDT : i..a.,.,..,.....a r .....................d.......... ........{.""""._._._._._._._._. Office Building r 18 ! 13.00; ..............................._.. 6.00 i __ .......................... .................._._._._._._._ 0.00; 10.801 7.30; �"" --- - - " "' ti............................ 19.001 LD_Mix IHDT_Mix .......................... HHDT ............ ..............................r Parking Garage Core i 15� •........................... 96.001 43.00 ._._._._._._..... _._.........._._._._. 0.00; 10.801 7.30: 19.0011 LD_Mix ......... ...... ... HDT_Mix ............ ...... HHDT Office Building Core 20� i 113.001 50.00 0.00: 7.30; 19.00iLD_Mix :HDT_Mix HHDT ...................... .............................. . Parking Garage 8I 22.001 0.00 0.00; 10.801 7.30; 19.00iLD_Mix iHDT_Mix HHDT .. ....:...:...................... r ........................................ ..{.._. ............ _........... Office Building Tenant 7 ;.......................... 19.00; 0.00 ................... ..... ;........................• 0.00! 10.80; ... 7.30; __________- 19.00` LD_Mix ................ ........... jHDT_Mix .......................... . IHHDT i LanLandscaping and Site 15 19.00, 0.00 0.00; 10.80 7.30; 19.0011 LD_Mix HDT_Mix HHDT » . . . . .. ... . . . . , . . . . . . Office Building Exterior ; 14 7.00: o.00: 10.80: 7.30: 19.00: LD_Mix : HDT_Mix ::HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CalEEMOd.2016.3.2 Page 17 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.2 Demolition - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 I PM10 I Total PM25 I PM2.5 I I I Category Ib /day Ib /day Fugitive Dust 1 3.9878 ! ! 1.4528 ! 1 9.3200e- I 1.9965 0.0000 1.9965 0.3023 0.0000 0.3023 0.0000 I 0.1231 1 ! 0.0000 .................. .........._�................... ............................................................ ! I 003 ..................._._._....... ............................................. 1 ............................... . .................3.._._._._._._ ............_._....................._. 1 _._._.......................... Off -Road 4.9647 , 47.1807 29.2937 0.0546 2.5916 2.5916 2.4452 2.4452 ;5,395.0663 5,395.0663 1.3234 5,428.1506 Total 4.9647 47.1807 29.2937 0.0546 1.9965 2.5916 4.5882 0.3023 2.4452 2.7475 5,395.0663 5,395.0663 1.3234 5,428.1506 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1163 1 3.9878 ! ! 1.4528 ! 1 9.3200e- I 1 0.2516 1 1 I 0.0165 1 0.2681 I 1 0.0671 1 0.0158 I 0.0829 ;1,044.1428! I 1,044.1428 ! I 0.1231 1 ! 1,047.2213 1 ! I 003 1 I 1 I I 1 1 ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. r ....... ............ _ ................. ................... ................... ................... ................. .. ................... ................... ................... .................... ..................«.......................................... ............................... ................... Worker i 0.0659 0.0418 0.5066 1.6400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 : 163.5573 163.5573 3.7900e- 163.6521 , 003 003 004 , 003 Total 0.1822 4.0296 1.9594 0.0110 0.4159 0.0175 0.4334 0.1107 0.0167 0.1274 1,207.7001 1,207.7001 0.1269 1,210.8734 CaIEEMod Version: CalEEMOd.2016.3.2 Page 18 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.2 Demolition - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category Ib /day Ib /day Fugitive Dust 1 3.9878 ! ! 1.4528 ! 1 9.3200e- I 0.8984 0.0000 0.8984 0.1360 0.0000 0.1360 0.0000 I 0.1231 1 ! 0.0000 1 ! I 003 1 I 1 I I 1 1 ! Off -Road i 0.6994 4.3871 30.8868 0.0546 0.0928 0.0928 0.0928 0.0928 i 0.0000 ;5,395.0663 5,395.0663 1.3234 5,428.1506 Total 0.6994 4.3871 30.8868 0.0546 0.8984 0.0928 0.9912 0.1360 0.0928 0.2288 0.0000 5,395.0663 5,395.0663 1.3234 5,428.1506 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1163 1 3.9878 ! ! 1.4528 ! 1 9.3200e- I 1 0.2516 1 1 I 0.0165 1 0.2681 I 1 0.0671 1 0.0158 I 0.0829 ;1,044.1428! I 1,044.1428 ! I 0.1231 1 ! 1,047.2213 1 ! I 003 1 I 1 I I 1 1 ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. r ....... ............ _ ................. ................... ................... ................... ................. .. ................... ................... ................... .................... ..................«.......................................... ............................... ................... Worker i 0.0659 0.0418 0.5066 1.6400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 : 163.5573 163.5573 3.7900e- 163.6521 , 003 003 004 , 003 Total 0.1822 4.0296 1.9594 0.0110 0.4159 0.0175 0.4334 0.1107 0.0167 1.1277-'[ 1,207.7001 1,207.7001 0.1269 1,210.8734 CaIEEMod Version: CalEEMOd.2016.3.2 Page 19 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.2 Demolition - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 3.7749 I 1.4652 j 9,1400e- 1.9965 0.0000 1.9965 0.3023 0.0000 0.3023 0.0000 0.1246 1 0.0000 :I 1 ! I 003 1 I I ! I i 1 1 I ! Off -Road i 4.5959 43.4661 28.8099 0.0546 2.3262 2.3262 2.1924 2.1924 15,331.5149 5,331.5149 1.3095 5,364.2514 Total 4.5959 43.4661 28.8099 0.0546 1.9965 2.3262 4.3227 0.3023 2.1924 2.4947 5,331.5149 5,331.5149 1.3095 5,364.2514 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.1095 3.7749 I 1.4652 j 9,1400e- 0.5267 ! 0.0151 ! 0.5418 0.1346 I 0.0144 I 0.1491 i1,029.2484h,02914841 0.1246 1 1,032.3626 1 ! I 003 1 I I ! I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0597 0.0367 0.4547 1.5900e- 0.1643 1.0100e- 0.1653 0.0436 9.3000e- 0.0445 : 158.4636 158.4636 3.3500e- 158.5475 , 003 003 004 , 003 Total 0.1692 3.8116 1.9199 0.0107 0.6910 0.0161 0.7071 0.1782 0.0154 0.1936 1,187.7120 1,187.7120 0.1279 1,190.9101 CaIEEMod Version: CalEEMOd.2016.3.2 Page 20 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.2 Demolition - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 3.7749 I 1.4652 j 9,1400e- 0.8984 0.0000 0.8984 0.1360 0.0000 0.1360 0.0000 0.1246 1 0.0000 1 ! I 003 1 I I ! I I 1 I ! Off -Road i 0.6994 4.3867 30.8868 0.0546 0.0927 0.0927 0.0927 0.0927 i 0.0000 15,331.5149 5,331.5149 1.3095 ____ 5,364.2514 Total 0.6994 4.3867 30.8868 0.0546 0.8984 0.0927 0.9911 0.1360 0.0927 0.2287 0.0000 5,331.5149 5,331.5149 1.3095 5,364.2514 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bin, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.1095 3.7749 I 1.4652 j 9,1400e- 0.5267 ! 0.0151 ! 0.5418 0.1346 I 0.0144 I 0.1491 i1,029.2484h,02914841 0.1246 1 1,032.3626 1 ! I 003 1 I I ! I I 1 I ! ... ........................... .. - _____ .................. . ______ ____ ................... Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0597 0.0367 0.4547 1.5900e- 0.1643 1.0100e- 0.1653 0.0436 9.3000e- 0.0445 : 158.4636 158.4636 3.3500e- 158.5475 , 003 003 004 , 003 Total 0.1692 3.8116 1.9199 0.0107 0.6910 0.0161 0.7071 0.1782 0.0154 0.1936 1,187.7120 1,187.7120 0.1279 1,190.9101 CaIEEMod Version: CalEEMOd.2016.3.2 Page 21 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.6533 1 1 3.7486 ! 0.0228 I 0.0920 0.0000 0.0920 0.0139 0.0000 0.0139 0.0000 0.3038 I 1 ! 0.0000 .................. .........._�................... ...... ............................... ...................._................_._._._................................................................................... �. .................3.._._._._._._ ................ ................... ._. _._._.......................... Off -Road i 4.0415 , 45.7768 26.0820 0.0585 0.0000 1.8797 1.8797 0.0000 1.7325 1.7325 E5,846.9481 ' 5,846.9481 1.7927 5,891.7642 Total 4.0415 45.7768 26.0820 0.0585 0.0920 1.8797 1.9717 0.0139 1.7325 1.7464 5,846.9481 5,846.9481 1.7927 5,891.7642 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.3029 10.6533 1 1 3.7486 ! 0.0228 I 1.8015 1 ! 0.0401 1.8416 I ? 0.4548 1 1 0.0384 I i 0.4931 12,558.85311'2,558.85311 I 1 0.3038 I 1 ! 2,566.4469 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0659 0.0418 0.5066 1.6400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 : 163.5573 163.5573 3.7900e- 163.6521 , 003 003 004 , 003 Total 0.3689 10.6951 4.2553 0.0245 1.9658 0.0412 2.0069 0.4983 0.0393 0.5377 2,722.4104 2,722.4104 0.3075 2,730.0990 CaIEEMod Version: CalEEMOd.2016.3.2 Page 22 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.6533 1 1 3.7486 ! 0.0228 I 0.0414 0.0000 0.0414 6.2700.- 0.0000 6.2700.- i 0.0000 0.3038 I 1 ! 0.0000 003 003 1 :I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 Off -Road i 0.8733 4.6792 29.2933 0.0585 0.1324 0.1324 0.1324 0.1324 i 0.0000 15,846.9481 , 5,846.9481 1.7927 5,891.7642 Total 0.8733 4.6792 29.2933 0.0585 0.0414 0.1324 0.1736 6.2700.- 0.1324 0.1386 0.0000 5,846.9481 5,846.9481 1.7927 5,891.7642 , 003 003 003 004 , 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.3029 10.6533 1 1 3.7486 ! 0.0228 I 1.8015 1 ! 0.0401 1.8416 I ? 0.4548 1 1 0.0384 I i 0.4931 12,558.85311'2,558.85311 I 1 0.3038 I 1 ! 2,566.4469 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0659 0.0418 0.5066 1.6400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 : 163.5573 163.5573 3.7900e- 163.6521 , 003 003 004 , 003 Total 0.3689 10.6951 4.2553 0.0245 1.9658 0.0412 2.0069 0.4983 0.0393 0.5377 2,722.4104 2,722.4104 0.3075 2,730.0990 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.1109 I 1 ! 3.7588 ! ! I 0.0224 I I 0.0920 0.0000 0.0920 0.0139 0.0000 0.0139 0.0000 I 0.3056 I 1 ! ! 0.0000 Off -Road 3.7374 , 41.0850 24.8887 0.0585 0.0000 1.6695 1.6695 0.0000 1.5391 1.5391 '5,753.4568 5,753.4568 1.7921 15,798.2583 Total 3.7374 41.0850 24.8887 0.0585 0.0920 1.6695 1.7615 0.0139 1.5391 1.5530 5,753.4568 5,753.4568 1.7921 5,797.2583 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive E�aust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 I I I Category lb/day Ib /day Hauling ! 0.2840 10.1109 I 1 ! 3.7588 ! ! I 0.0224 I I ! 0.5302 1 1 I 0.0367 I 0.5670 I I I 0.1427 ! 1 1 0.0351 ! I 1 0.1779 :2,523.353212,523.3532 I ! 1 I 0.3056 I 1 ! ! 2,530.9922 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker i 0.0597 0.0367 0.4547 1.5900e- 0.1643 1.0100e- 0.1653 0.0436 9.3000e- 0.0445 : 158.4636 158.4636 3.3500e- 158.5475 , 003 003 004 , 003 Total 0.3437 10.1476 4.2131 0.0240 0.6945 0.0377 0.7323 0.1663 0.0361 0.2224 2,681.8169 2,681.8169 0.3089 2.689.5396 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive E)aust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.1109 I 1 ! 3.7588 ! ! I 0.0224 I I 0.0414 0.0000 0.0414 6.2700.- 0.0000 6.2700.- i 0.0000 I 0.3056 I 1 ! ! 0.0000 003 003 1 :I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 Off -Road i 0.8733 4.6778 29.2932 0.0585 0.1320 0.1320 0.1320 0.1320 i 0.0000 15,753.4568 , 5,753.4568 1.7921 5,798.2583 Total 0.8733 4.6778 29.2932 0.0585 0.0414 0.1320 0.1735 6.2700.- 0.1320 0.1383 0.0000 5,753.4568 5,753.4568 1.7921 5,798.2563 , 003 003 003 004 , 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive E�aust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 I I I Category lb/day Ib /day Hauling i 0.2840 10.1109 I 1 ! 3.7588 ! ! I 0.0224 I I 1 0.5302 1 1 I 0.0367 I 0.5670 I I I 0.1427 ! 1 I 0.0351 ! I i 0.1779 :2,523.353212,523.3532 I ! 1 I 0.3056 I 1 ! ! 2,530.9922 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Worker i 0.0597 0.0367 0.4547 1.5900e- 0.1643 1.0100e- 0.1653 0.0436 9.3000e- 0.0445 : 158.4636 158.4636 3.3500.- 158.5475 , 003 003 004 , 003 Total 0.3437 10.1476 4.2131 0.0240 0.6945 0.0377 0.7323 0.1663 0.0361 0.2224 2,661.8169 2,681.8169 0.3089 2.689.5396 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 25 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 0.0000 I i 0.0000 1 j 0.0000 I 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 1 0.0000 0.0000 1 I 1 I I 1 I ! Off -Road 4.1225 47.0098 28.7596 0.0714 0.0000 1.8713 1.8713 0.0000 1.7237 1.7237 ;7,039.8701 7,039.8701 2.2086 17,095.0857 Total 4.1225 47.0098 28.7596 0.0714 1.5908 1.8713 3.4621 0.1718 1.7237 1.8954 7,039.8701 7,039.8701 2.2086 7,095.0857 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 x0000 1 0.0000 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0567 0.0349 0.4320 1.5100e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 150.5405 150.5405 3.19001- 150.6201 003 004 004 003 Total 0.0567 0.0349 0.4320 1.51001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 150.5405 150.5405 3.1900e. 150.6201 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 26 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 0.0000 I i 0.0000 1 j 0.0000 I 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 0.0000 1 0.0000 0.0000 1 I 1 I I 1 I ! Off -Road 0.9871 5.0607 34.8207 0.0714 0.0000 0.1411 0.1411 0.0000 0.1411 0.1411 0.0000 E7,039.8701 7,039.8701 2.2086 17,095.0856 Total 0.9871 5.0607 34.8207 0.0714 0.7158 0.1411 0.8570 0.0773 0.1411 0.2184 0.0000 7,039.8701 7,039.8701 2.2086 7,095.0856 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 x0000 1 0.0000 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0567 0.0349 0.4320 1.5100e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 150.5405 150.5405 3.19001- 150.6201 003 004 004 003 Total 0.0567 0.0349 0.4320 1.51001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 150.5405 150.5405 3.1900e. 150.6201 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 27 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.5 Parking Garage Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road ? 2.2820 22.7467 20.1134 0.0369 Total 1.2660 1.2660 : f 1.1836 1.1836 13,609.5102 3,609.5102 0.9770 :3.633.9358 Total 2.2820 22.7467 20.1134 0.0369 Ib /day 1.2660 1.2660 1.1836 1.1836 3,609.5102 3,609.5102 0.9770 ! 0.0000 3,633.9358 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling : 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 3 I 1 I I 1 I ! Vendor i 0.0233 0.6281 0.2347 1.3600e- 0.0337 4.3700e- 0.0381 9.7100e- 4.1800e- 0.0139 i 148.5071 148.5071 0.0129 148.8286 003 003 003 003 .: Worker i 0.0328 0.0202 0.2501 8.7000e- 0.0904 5.6000e- 0.0909 0.0240 5.1000e- 0.0245 87.1550 87.1550 1.8400e- 87.2011 , 004 004 004 , 003 Total 0.0561 0.6483 0.4848 2.2300e- 0.1241 4.9300e- 0.1290 0.0337 4.6900" 0.0384 235.6621 235.6621 0.0147 236.0297 003 003 003 1 1 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 28 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.5 Parking Garage Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road ? 0.4893 2.7741 23.9077 0.0369 Total 0.0676 1 0.0676 1 ' 0.0676 0.0676 0.0000 ;3,609.5101 ' 3,609.5101 0.9770 13,633.9358 Total 0.4893 2.7741 23.9077 0.0369 Ib /day 0.0676 0.0676 0.0676 0.0676 0.0000 3,609.5101 3,609.5101 0.9770 1 3,633.9358 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category Ib /day lb/day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 3 I 1 I I 1 I ! Vendor i 0.0233 0.6281 0.2347 1.3600e- 0.0337 4.3700e- 0.0381 9.7100e- 4.1800e- 0.0139 i 148.5071 148.5071 0.0129 148.8286 003 003 003 003 .: Worker i 0.0328 0.0202 0.2501 8.7000e- 0.0904 5.6000e- 0.0909 0.0240 5.1000e- 0.0245 87.1550 87.1550 1.8400e- 87.2011 , 004 004 004 , 003 Total 0.0561 0.6483 0.4848 2.2300e- 0.1241 4.9300e- 0.1290 0.0337 4.6900" 0.0384 235.6621 235.6621 0.0147 236.0297 003 003 003 1 1 CaIEEMod Version: CalEEMOd.2016.3.2 Page 29 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.6 Office Building Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG I NO, I CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 3.8158 • 38.1896 31.2571 0.0548 Total 2.2240 2.2240 2.0650 2.0650 :5,380.9026 ' 5,380.9026 1.5375 1 15,419.3395 Total 3.8158 38.1896 31.2571 0.0548 Hauling i 0.0000 2.2240 2.2240 i 0.0000 I 2.0650 2.0650 1 5,380.9026 5,380.9026 1.5375 1 5,419.3395 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 i 0.0000 I i 0.0000 1 i 0.0000 I 0.0000 ! 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 I 0.0000 0.0000 1 I I 1 I I I ! Vendor i 0.0279 0.7537 0.2816 1.6300e- 0.0405 5.2400e- 0.0457 0.0117 5.0100e- 0.0167 i 178.2085 178.2085 0.0154 178.5944 003 003 003 .: Worker i 0.0388 0.0239 0.2956 1.0300e- 0.1068 6.6000e- 0.1075 0.0283 6.0000e- 0.0289 : 103.0014 103.0014 2.1800e- 103.0559 003 004 004 003 Total 0.0667 0.7776 0.5772 2.6600e- 0.1473 5.9000e- 0.1532 0.0400 5.6100e• 0.0456 261.2099 261.2099 0.0176 281.6502 003 003 003 1 CaIEEMod Version: CalEEMOd.2016.3.2 Page 30 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.6 Office Building Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO I S02 I Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road ? 0.7092 • 3.7272 36.1394 0.0548 Total 0.0969 0.0969 ' 0.0969 0.0969 0.0000 ;5,380.9026 ' 5,380.9026 1.5375 15,419.3395 I Total 0.7092 3.7272 36.1394 0.0548 Hauling i 0.0000 0.0969 0.0969 i 0.0000 I 0.0969 0.0969 1 0.0000 5,380.9026 5,380.9026 1.5375 1 5,419.3395 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 i 0.0000 I i 0.0000 1 i 0.0000 I 0.0000 ! 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 1 0.0000 0.0000 1 I I 1 I I I ! Vendor i 0.0279 0.7537 0.2816 1.6300e- 0.0405 5.2400e- 0.0457 0.0117 5.0100e- 0.0167 i 178.2085 178.2085 0.0154 178.5944 003 003 003 .: Worker i 0.0388 0.0239 0.2956 1.0300e- 0.1068 6.6000e- 0.1075 0.0283 6.0000e- 0.0289 : 103.0014 103.0014 2.1800e- 103.0559 003 004 004 003 Total 0.0667 0.7776 0.5772 2.6600e- 0.1473 5.9000e- 0.1532 0.0400 5.6100e• 0.0456 261.2099 261.2099 0.0176 281.6502 003 003 003 1 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 31 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2s Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road 2.3541 • 18.5942 14.6174 0.0288 Total 0.8807 0.8807 0.8463 0.8463 ;2,657.7430 ' 2,657.7430 0.6187 1 12,673.2116 I Total 2.3541 18.5942 14.6174 0.0288 Hauling i 0.0000 0.8807 0.8807 j 0.0000 I 0.8463 0.8463 1 2,657.7430 2,657.7430 0.6187 1 2,6772116 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 i 0.0000 I I 0.0000 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 1 0.0000 1 0.0000 E 1 I I 1 I I I ! Vendor i 0.2002 5.4015 2.0180 0.0117 0.2902 0.0376 0.3278 0.0835 0.0359 0.1194 ;1,277.1612 1,277.1612 0.1106 1,279.9262 .: . E Worker i 0.2865 0.1762 2.1828 7.6300e- 0.7886 4.8500e- 0.7935 0.2092 4.4700e- 0.2136 760.6254 760.6254 0.0161 761.0278 , 003 003 003 Total 0.4868 5.5777 4.2008 0.0193 1.0788 0.0424 1.1212 0.2927 0.0404 0.3331 2,037.7866 2,037.7866 0.1267 2,040.9540 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 32 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road ? 0.5550 • 5.2854 15.7514 0.0288 Total 0.0869 0.0869 0.0869 0.0869 0.0000 ;2,657.7430 ' 2,657.7430 0.6187 12,673.2116 I Total 0.5550 5.2854 15.7514 0.0288 Hauling i 0.0000 0.0869 0.0869 j 0.0000 I 0.0869 0.0869 0.0000 2,657.7430 2,657.7430 0.6187 1 2,673.2116 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 i 0.0000 I I 0.0000 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 1 0.0000 1 0.0000 E 1 I I 1 I I I ! Vendor i 0.2002 5.4015 2.0180 0.0117 0.2902 0.0376 0.3278 0.0835 0.0359 0.1194 ;1,277.1612 1,277.1612 0.1106 1,279.9262 .: . E Worker i 0.2865 0.1762 2.1828 7.6300e- 0.7886 4.8500e- 0.7935 0.2092 4.4700e- 0.2136 760.6254 760.6254 0.0161 761.0278 , 003 003 003 Total 0.4868 5.5777 4.2008 0.0193 1.0788 0.0424 1.1212 0.2927 0.0404 0.3331 2,037.7866 2,037.7866 0.1267 2,040.9540 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 33 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2s Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road 2.1464 • 17.1521 14.2644 0.0288 Total 0.7752 0.7752 0.7451 0.7451 :2,623.6941 ' 2,623.6941 0.6063 1 12,638.8526 I Total 2.1464 17.1521 14.2644 0.0288 Hauling i 0.0000 0.7752 0.7752 j 0.0000 I 0.7451 0.7451 1 2,623.6941 2,623.6941 0.6063 1 2,638.8526 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 0.0000 I 0.0000 I x0000 0.0000 it 0.0000 1 1 0.0000 1 0.0000 1 I 1 I I I ! Vendor i 0.1633 4.9110 1.9039 0.0115 0.2902 0.0246 0.3148 0.0835 0.0235 0.1070 ;1,265.3324 1,265.3324 0.1080 1,268.0321 .: Worker i 0.2638 0.1564 1.9866 7.3800e- 0.7886 4.7500'- 0.7934 0.2092 4.3700e- 0.2136 736.4341 736.4341 0.0142 736.7900 , 003 003 003 , Total 0.4270 5.0674 3.8905 0.0189 1.0788 0.0294 1.1082 0.2927 0.0279 0.3206 2,001.7665 2,001.7665 0.1222 2,007.8221 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 34 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day OR -Road 0.5550 • 5.2854 15.7517 0.0288 Total 0.0867 0.0867 0.0867 0.0867 0.0000 :2,623.6941 ' 2,623.6941 0.6063 1 12,638.8526 I Total 0.5550 5.2854 15.7517 0.0288 Hauling i 0.0000 0.0867 0.0867 j 0.0000 I 0.0867 0.0867 0.0000 2,623.6941 2,623.6941 0.6063 1 2,638.8526 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 0.0000 I 0.0000 I x0000 0.0000 it 0.0000 I 1 0.0000 1 0.0000 1 I 1 I I I ! Vendor i 0.1633 4.9110 1.9039 0.0115 0.2902 0.0246 0.3148 0.0835 0.0235 0.1070 ;1,265.3324 1,265.3324 0.1080 1,268.0321 .: Worker i 0.2638 0.1564 1.9866 7.3800e- 0.7886 4.7500'- 0.7934 0.2092 4.3700e- 0.2136 736.4341 736.4341 0.0142 736.7900 , 003 003 003 , Total 0.4270 5.0674 3.8905 0.0189 1.0788 0.0294 1.1082 0.2927 0.0279 0.3206 2,001.7665 2,001.7665 0.1222 2,007.8221 CaIEEMod Version: CalEEMOd.2016.3.2 Page 35 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.8 Office Building Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, I CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 4.8417 38.5463 31.5527 0.0587 1.9408 1.9408 1.8617 1.8617 ;5,559.9467 5,559.9467 1.3626 15,594.0106 I Total 4.8417 38.5463 31.5527 0.0587 1.9408 1.9408 1.8617 1.8617 5,559.9467 5,559.9467 1.3626 5,594.0106 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 3 I I 1 I I 1 I ! Vendor i 0.2328 6.2809 2.3465 0.0136 0.3374 0.0437 0.3811 0.0971 0.0418 0.1389 ;1,485.0712 1,485.0712 0.1286 1,488.2863 .: Worker i 0.3372 0.2074 2.5693 8.9800e- 0.9283 5.7100e- 0.9340 0.2462 5.2600e- 0.2515 895.3195 895.3195 0.0189 895.7931 , 003 003 003 , Total 0.5701 6.4883 4.9158 0.0225 1.2657 0.0494 1.3151 0.3433 0.0470 0.3904 2,380.3907 2,380.3907 0.1476 2,387.0794 CaIEEMod Version: CalEEMOd.2016.3.2 Page 36 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.8 Office Building Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.8356 10.4353 33.6911 0.0587 Total 0.0869 0.0869 1 0.0869 0.0869 0.0000 15,559.9467 ' 5,559.9467 1.3626 I •5,594.0106 Total 0.8356 10.4353 33.6911 0.0587 lb/day 0.0869 0.0869 0.0869 1 0.0869 0.0000 5,559.9467 5,559.9467 1.3626 5,594.0106 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 3 I I 1 I I 1 I ! Vendor i 0.2328 6.2809 2.3465 0.0136 0.3374 0.0437 0.3811 0.0971 0.0418 0.1389 ;1,485.0712 1,485.0712 0.1286 1,488.2863 .: Worker i 0.3372 0.2074 2.5693 8.9800e- 0.9283 5.7100e- 0.9340 0.2462 5.2600e- 0.2515 895.3195 895.3195 0.0189 895.7931 , 003 003 003 , Total 0.5701 6.4883 4.9158 0.0225 1.2657 0.0494 1.3151 0.3433 0.0470 0.3904 2,380.3907 2,380.3907 0.1476 2,387.0794 CaIEEMod Version: CalEEMOd.2016.3.2 Page 37 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.8 Office Building Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category lb/day Ib /day Off -Road ? 4.3957 wi 35.3791 30.8372 0.0587 Total 1.0954 1.6954 1 ' 1.6256 1.6256 ;5,482.7895 5,482.7895 1.3369 15,516.2120 I Total 4.3957 35.3791 30.8372 0.0587 lb/day 1.6954 1.777 1.6256 1.6256 5,482.7895 5,482.7895 1.3369 5,517.2120 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 0.0000 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 I 1 I 1 I I 1 . I ! Vendor i 0.1898 5.7104 2.2138 0.0134 0.3375 0.0266 0.3661 0.0971 0.0274 0.1245 :1,471.3167 1,471.3167 0.1256 1,474.4559 .: Worker i 0.3105 0.1841 2.3384 8.6900e- 0.9283 5.5900e- 0.9339 0.2462 5.1500e- 0.2514 866.8443 866.8443 0.0168 867.2633 , 003 003 003 , Total 0.5003 5.8945 4.5523 0.0221 1.2657 0.0342 1.2999 0.3433 0.0325 0.3758 12,33B.161012,338.1610 0.1423 2,341.7192 CaIEEMod Version: CalEEMOd.2016.3.2 Page 38 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.8 Office Building Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.8356 10.4353 33.6911 0.0587 Total 0.0869 0.0869 1 0.0869 0.0869 0.0000 15,482.7895 ' 5,482.7895 1.3369 15,516.2120 I Total 0.8356 10.4353 33.6911 0.0587 lb/day 0.0869 0.0869 0.0869 1 0.0869 0.0000 5,482.7895 5,482.78951 1.3369 5,517.2120 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 0.0000 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 I 1 I 1 I I 1 . I ! Vendor i 0.1898 5.7104 2.2138 0.0134 0.3375 0.0266 0.3661 0.0971 0.0274 0.1245 :1,471.3167 1,471.3167 0.1256 1,474.4559 .: Worker i 0.3105 0.1841 2.3384 8.6900e- 0.9283 5.5900e- 0.9339 0.2462 5.1500e- 0.2514 866.8443 866.8443 0.0168 867.2633 , 003 003 003 , Total 0.5003 5.8945 4.5523 0.0221 1.2657 0.0342 1.2999 0.3433 0.0325 0.3758 12,33B.161012,338.1610 0.1423 2,341.7192 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 39 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.9 Parking Garage Exterior Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category lb/day Ib /day Archit. Coating ;i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0,0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 N .............................. ...... ............. ................... ................... ................... ._ ............... ._._._._ ....... ................... ................. .. ................... i ! .................... .................. 3............. ... ............... ................... ................... ................... Off -Road 1.2882 10.8104 8.4431 0.0168 0.0000 0.5092 0.5092 0.0000 0.4787 0.4787 11,601.7329 1,601.7329 0.4660 1,613.3827 Total 1.2882 10.8104 8.4431 0.0168 0.5092 0.5092 0.4787 0.4787 1,601.7329 1,601.7329 0.4660 1,613.3827 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic, CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0657 0.0404 0.5002 1.7500e- 0.1807 1.1100,- 0.1818 0.0479 1.0200e- 0.0490 : 174.3100 174.3100 3.6900e- 174.4022 003 003 003 003 Total 0.0657 6.6404 0.5002 1.7500,- 0.1807 1.1100,- 0.1816 0.0479 1.0200x- 0.0490 174.3100 174.3100 3.6900a- 174.4022 003 003 003 1 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 40 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.9 Parking Garage Exterior Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Aruhit. Coating N 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0,0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I 1 I ! Off -Road i 0.2468 2.6909 9.4342 0.0168 0.0000 0.0295 0.0295 0.0000 0.0295 0.0295 i 0.0000 11,601.7329 1,601.7329 0.4660 1,613.3827 Total 0.2468 2.6909 9.4342 0.0168 0.0295 0.0295 0.0295 0.0295 0.0000 1,601.7329 1,601.7329 0.4660 1,613.3627 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0657 0.0404 0.5002 1.7500e- 0.1807 1.1100,- 0.1818 0.0479 1.0200e- 0.0490 : 174.3100 174.3100 3.6900e- 174.4022 003 003 003 003 Total 0.0657 6.6404 0.5002 1.7500,- 0.1807 1.1100,- 0.1816 0.0479 1.0200,- 0.0490 174.3100 174.3100 3.69006- 174.4022 003 003 003 1 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 41 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 :I 1 I 1 'r I 1 I Off-Road 1.6358 14.4190 11.7398 0.0247 0.0000 0.7115 0.7115 0.0000 0.6716 0.6716 ;2,398.2956 2,398.2956 0.6633 12,414.8779 Total 13.0176 14.4190 11.7396 0.0241 0.7115 0.7115 0.6716 0.6716 1 2,398.2956 2,398.2956 0.6633 2,414.8779 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 x0000 1 0.0000 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0567 0.0349 0.4320 1.5100e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 150.5405 150.5405 3.19001- 150.6201 003 004 004 003 Total 0.0567 0.0349 0.4320 1.51001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 150.5405 150.5405 3.1900e. 150.6201 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 42 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coatin g 11.3818 0.0600 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 ! 0.0000 I 0.0000 0.0000 ..o 1 I 1 I ! 1 I ! Off -Road 0.3436 , 3.5316 13.8407 0.0247 0.0000 0.0385 0.0385 0.0000 0.0385 0.0385 0.0000 ;2,398.2956 , 2,398.2956 0.6633 2,414.8779 I Total 11.7254 3.5316 13.8407 0.0247 0.0385 0.0365 0.0385 0.0385 0.0000 2,398.2956 2,398.2956 0.6633 2,414.8779 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0600 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 x0000 I 0.0000 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0567 0.0349 0.4320 1.5100e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 150.5405 150.5405 3.19001- 150.6201 003 004 004 003 Total 0.0567 0.0349 0.4320 1.51001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 150.5405 150.5405 3.1900e. 150.6201 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 43 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 .............................. 'I...... ............. ................... ................... ................... ._ ............... ._._._._. ...... ................... ................... ................... : .................... ' I 1 ! Off -Road 1.5134 , 13.0916 11.5089 0.0247 0.0000 0.6302 0.6302 0.0000 0.5944 0.5944 E2,355.5468 2,355.5468 0.6583 12,372.0039 Total 12.8952 13.0916 ICON 0.0247 0.6302 0.6302 0.5944 0.5944 2,355.5468 2,355.5468 0.6583 2,372.0039 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust P1070 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 145.7526 145.7526 2.8200e- 145.8230 , 003 004 004 , 003 Total 0.0522 0.0310 0.3932 1.46001- 0.1561 9.40001- 0.1570 0.0414 8.70001- 0.0423 145.7526 145.7526 2.82001- 145.8230 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 44 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 :i ............................_ ------- .----------- ------------------- ------------------- ...................._................_._._._.................................................................................. 1 I 1 I i ! y..................{.._._._._._... ................... ................... ._.. .._._.......................... Off -Road i 0.3436 , 3.5316 13.8407 0.0247 0.0000 0.0385 0.0385 0.0000 0.0385 0.0385 i 0.0000 12,355.5468 , 2,355.5468 0.6583 2,372.0039 Total 11.7254 3.5316 13.8407 0.0247 0.0385 0.0365 0.0385 0.0385 0.0000 2,355.5468 2,355.5468 0.6583 2,312.0039 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 145.7526 145.7526 2.8200e- 145.8230 , 003 004 004 , 003 Total 0.0522 0.0310 0.3932 1.46001- 0.1561 9.40001- 0.1570 0.0414 8.70001- 0.0423 145.7526 145.7526 2.82001- 145.8230 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 45 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 Category Ib /day Ib /day 00 -Road 2.1762 22.1999 15.8241 0.0267 0.0000 1.1404 1.1404 ? 0.0000 1.0521 1.0521 ;2,542.0761 2,542.0761 0.7936 12,561.9165 .............................. .... ............... Paving 0.0675 ................... ................... ................... ._ ............... ....... _._ ....... 0.0000 ................... 0.0000 ................... ................... 0.0000 .................... R.................. :.................... 0.0000 .................. 0.0000 ................... ........ ...........� .................. 1 0.0000 I 2.2437 t7t, 22.1999 15.8241 0.0267 0.0000 1.1404 1.1404 0.0000 1.0521 1.0521 2,542.0761 2,542.0761 0.7936 2,561.9165 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 : 145.7526 145.7526 2.8200e- 145.8230 , 003 004 004 , 003 Total 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 8.7.0.- 0.0423 145.7526 145.7526 2.8200e- 145.8230 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 46 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 PM2.5 Category Ib /day Ib /day Off-Road ? 0.4787 3.0819 16.9451 0.0267 0.0000 0.0781 0.0781 ? 0.0000 0.0781 MIMI � 0.0000 ;2,542.0761 2,542.0761 0.7936 1 12,561.9165 I .............................. ........ ........... ...... .. ........... ................... ................... ._. .............. ....... _._ ....... ................... ................... ................... .................... .................. :................... ..................................... I ................... ................... Paving 0.0675 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5463 3.0819 16.9451 0.0267 0.0781 0.0761 0.0781 0.0781 0.0000 2,542.0761 2,542.0761 0.7936 2,561.9165 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 : 145.7526 145.7526 2.8200e- 145.8230 , 003 004 004 , 003 Total 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 1.7101" 0.0423 145.7526 145.7526 2.8200e- 145.8230 003 004 004 1 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 47 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Archit. Coating 17.9892 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 1 0.0000 0.0000 ? 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 I ! 0.0000 i Off -Road i 2.1848 19.7380 19.5498 0.0359 0.0000 0.9568 0.9568 0.0000 0.8913 0.8913 ;3,408.3096 3,408.3096 1.0433 3,434.3930 Total 20.1740 19.7380 19.5498 0.0359 0.9568 x.9568 0.8913 0.8913 j 3,408.3096 3,408.3096 1.0433 3,434.3930 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 1 ! 0.0000 0.0000 I ? 0.0000 1 I 0.0000 I I x0000 0.0000 I x0000 1 I 0.0000 I ! 0.0000 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0192 0.0114 0.1449 5.4000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e- 0.0156 : 53.6983 53.6983 1.0400e- 53.7243 004 004 004 003 Total 0.0192 0.0114 0.1449 5.4000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e• 0.0156 53.6983 53.6983 1.0400e• 53.7243 004 004 004 1 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 48 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 17.9892 0.0000 I I 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 0.0000 ............................_....... ............ ................... ....................................... ._................_._._._....... ................... ................... ................... .................... .................. 3.. .............. ... .............. ................... ....... ............................... Off -Road i 0.5403 it , 5.9183 22.3915 0.0359 0.0000 0.0637 0.0637 0.0000 0.0637 0.0637 i 0.0000 13,408.3096 + 3,408.3096 1.0433 3,434.3930 Total 18.5295 5.9183 22.3915 0.0359 0.0637 0.0637 0.0637 0.0637 0.0000 3,408.3096 3,408.3086 1.0433 3,434.3930 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I I 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 x0000 I 0.0000 0.0000 1 I 1 I I 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0192 0.0114 0.1449 5.4000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e- 0.0156 : 53.6983 53.6983 1.0400e- 53.7243 004 004 004 003 Total 0.0192 0.0114 0.1449 5.4000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e• 0.0156 53.6983 53.6983 1.0400e• 53.7243 004 004 004 1 1 003 4.0 Operational Detail - Mobile CaIEEMod Version: CalEEMOd.2016.3.2 Page 49 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 4.1 Mitigation Measures Mobile ROG 4.2 Trip Summary Information Average Daily Trip Rate NO, I CO I S02 I Fugitive PM10 I -,"at PM10 PM10 Total Fugitive PM2.5 Faust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib /dey lb /day Mitigated ;� 1.0633 3.0826 11.8431 0.0413 3.6770 0.0426 3.7195 0.9845 0.0400 1.0245 I 4,155.7629 4,155.7629 0.7459 0.00 4,159.4095 jl...................; ...3............ ...1............. ;..................:....... Total ......... ..:.... ............... ; ..... ............:................... 1,288,492 .... ............... ; ...................;...... ............1.................. ........ ......... .:.... ............... ....... ............................... Unmitigated 1.0633 3.0826 i 11.8431 i 0.0413 3.6770 0.0426 3.7195 0.9845 0.0400 1.0245 ;4,155.7629:4,155.7629: 0.1459 ;4,159.4095 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator ............... .................a....... . 0.00 i .... _ 0.00 0.00 ... ...... +................... ......... ........�...................... ' ................. Office Park 579.15 ; 84.07 I 37.36 ' 1,192,727 1,192,727 ................... �....................... Office Park ................................................ 46.50 ; 1..... ............................... 6.75 3.00 . 95,764 ...............................}..................................................................................................... : 95,764 ............................... Parking Lot 0.00 0.00 0.00 Total 625.65 90.82 40.36 1,288,492 1,288,492 4.3 Trip Type Information CalEEMod Version: CaIEEMod.2016.3.2 Page 50 of 56 Date: 5/31/2018 8:00 I'M Haskins Way Rezone Phase I - San Mateo County, Summer 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Miles 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... Trip % Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C- H-S or C-C H-O or C-NW Primary Diverted Pass-by EnclosedParking with Elevator 7 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Office Pa.k . . . . . . . . . . . ................. 9.50 ........................................................ 7.30 7.30 71. ...................... ............................................................. 10:00._._:..........19.00...... 82 ............................ ............................................ 15 3 ........... .00 __ Office Park 7.30 7.30 • 71.00 10.00 19.00 82 15 3 .................. Parking Lot . . . . 9.50 .......................... 7.30 ............................ . 7.30 ........................ 0.00 ....... . ............... ....................................................................................................................................... 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... ................... -- - --------- -------------- ..................... 0.490452, 0-0497421 0.253638: 0-136789: 0-0179261. 0.006526: 0.021436!1 0.006323; 0.003943!. 0.003278; 0-0087711: 0.0004351 0.000741 4 .................... Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CalEEMOd.2016.3.2 Page 51 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated ROG I NO, I CO I S02 I Fugitive PM10 I Exhaust PM10 PM70 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e edtC?ofy!. lb/day I Ib /day NaturalGas 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 ;2,017.6659 2,017.6659 0.0387 0.0370 21029.6559 Mitigated Land Use kBTU /yr Ib /day lb /day s................................ i x0000 0.0000 0.0000 .................... ..........r...................; NaturalGas 0.1850 ....... ...........,- 1.6814 .................................... 1.4124 , ..................,...0............................... 0.0101 0.1278 0.1278 ... ...:...................;...................... 0.1278 ....... .........,_. 0.1278 2,017.6659:2,017.6659: ................ ............... ...._.. 0.0387 ............. ...................... 0.0370 ;2,029.6559 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5Total Bio -0O2 NBio- CO2 TotaICO2 CH4 N20 CO2e s Use I I PM10 PM10 Total PM2.5 PM2.5 Land Use kBTU /yr Ib /day lb /day Enclosed Parking j 0 ! 0.0000 x0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 with Elevator .............................. Office Park }_____ ............................................................................................................................................................. i 1274.66 :i 0.0138 0.1250 0.1050 7.5000e- 9.5000e- 9.50008- .............................y' 9.50008- .................. i.... ............... 9.50008- 1 149.9597 ................... 149.9597 ................... 2.87008- ................... 2.75008- ................... 150.8509 004 003 003 003 003 I 003 003 ................... ...................... Office Park A 1 15875.5 :1 0.1712 ............. i 1.5564 ............. I 1.3074 _._._._._._. 1 9.34008 - ............. i ............. I 0.1183 ................. i 0.1183 .............. i ............. i 0.1183 ._._.............*.................. .............. 3 0.1183 11,867.706211,867.70621 ._._._._._. ................. 0.0358 _._._._._._................... i 0.0342 1,878.8050 ........a rki ................_._._._._._ Parking Lot I !! ._._._._._.: 0 i 0.0000 1 0.0000 I 0.0000 I 003 .-•-•-•-•-•- 0.0000 i ----- i 0.0000 i -•___---•----- 0.0000 i i ._._._._._. 0.0000 3 ' 1 y.................. _._._•-° 0.0000 0.0000 1 ---•'j7 - 0.0000 1 --.-._•_° 0.0000 -._._._._ 0.0000 00...... i 0.0000 i Total 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 1 0.1278 0.1278 2,017.6659 2,017.6659 0.0387 0.0370 2,029.6559 CaIEEMod Version: CalEEMOd.2016.3.2 Page 52 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa ROG NOx CO 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bic - CO2 NBio- CO2 Total CO2 CH4 N20 CO2, s Use PM10 PM10 Total PM2.5 PM2.5 Land Use kBTU /yr I lb/day lb/day Enclosed Parking j 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator i .............................. Office Park }----- .................. i 1.27466 �1 0.0138 ._ .... _._ ....... 0.1250 ................... 0.1050 ................... 7.5000e- ................... ................... 9.5000e- .................. 9.5000. ................... ................... 9.5000e- .._._._ ....... _.y' .................. i................... 9.5000e- i 149.9597 ................... 149.9597 ................... 2.8700e- ................... 2.7500e- ................... 150.8509 004 003 003 003 003 i ' 003 003 Office Park 158755 ' 0.1712 i 1.5564 1 1.3074 i 9.3400e- i i 0.1183 i 0.1183 I I 0.1183 3 0.1183 ! 1,867.7062 1,867.7062 0.0358 i 0.0342 1,878.8050 1 ;.I i I i 003 i i i i I 3 ' I ..............................1 Parking Lot ......... _._ 0 0.0000 0.0000 0.0000 0.0000 �.�.�� _._._._._.._._._.___ 0.0000 0.0000 ._..._._.__ _._._._._.._.____._. 0.0000 ._._._._ 0.0000 0.0000 _._._._._ _ 0.0000 _ _._._.__ 0.0000 _._._.__ 0.0000 .......... 0.0000 I i i Total 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 1 0.1278 1 12,117-115912,017.16191 0.0387 1 0.0370 2,029.6559 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMOd.2016.3.2 Page 53 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 6.2 Area by SubCategory Unmitigated ROG I NO, I CO I S02 Fugitive PM10 1 Exhaust PM10 PM10 Total Fugitive PM2.5 I Exhaust PM2.5 PM2.5Total Bio -0O2 I NBio -0O2 Total CO2 CHI N20 I CO2e Category lb/day lb/day Mitigated ;E 8.3445 1.1900.- 0.1294 1.00001- Total 4.60001- 4.60001- 4.60001- 4.6000e- ; i 0.2756 0.2756 7.4000.- 0.2941 003 lb /day 005 Architectural 1.0033 004 004 004 004 i 0.0000 004 0.0000 ................... ...........�i.................. :....................................:........................ 0.0000 ............................... Coating ............................................ ............................... ........................................... ............................... _.............. . ............... Unmitigated 8.3445 i 1.1900e- i 0.1294 i 1.00001- i i 4.6000e- i 4.60001 - i i 4.6000e- : 4.6000e- 0.2756 0.2756 i 7.4000e- i 0:2941 003 i..................;................... 005 004 004 Consumer i 7.3291 004 004 004 0.0000 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total 002 CH4 N20 COI, I I I PM10 I PM10 Total PM2.5 PM2.5 SubCategory lb /day lb /day Architectural 1.0033 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating .............................. ...... ............................... ...................................................................................................................... ............................... i..................;................... ............................................ ............................... Consumer i 7.3291 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products i r: Landscaping `i 0.0122 i 1.1900e- 1 0.1294 1.0000e- 1 1 4.6000e- 1 4.6000.- 1 i 4.6000. - i 4.6000.- i 0.2756 I 0.2756 I 7.4000. - i 0.2941 003 1 005 004 I 004 004 I 004 , 004 ! Total 73445 1.19001- 0.7294 1.0000.- 4.6000 e- 4.60001- 4.6000.- 4.6000.- 0.2756 0.2756 7.40001- 0.2941 003 005 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad ROG NOT CO 502 Fugitve Exhaust PM10 Fugitive Ex at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 1:02e PM10 I PM70 I Total PM2.5 PM2.5 I I I I I SubCategory lb/day lb/day Architectural 1.0033 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating .............................. r............... .... ................... ................... ................... .................. ........ ............ .................. ................... ................... .................... i.................. i..-................ ...... ........... .................. ............. ... ....... ........... . Consumer ,E 7.3291 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 Products ..................... .........,ri,.._............... Landscaping i 0.0122 ._._._._._. i 1.1900'- .... ..............._............... i 0.1294 1.0000'- ._._._._._. i ._............... i 4.6000'- _._._._._._. i 4.6000'- _._._._._._. i ._............... 1 4.6000'- _._._._._._. y'..................°._...................._._. i 4.6000'- " 0.2756 _._._._._._._._._.._........... 0.2756 1 7.4000'- i ........... 0.2941 003 i 005 1 004 i 004 i 004 004 i 004 i r Total 8.3445 1.1900'- 0.1294 1.0000'- 4.6000.- 4.6000.- 4.6000e- 4.6000'- 0.2756 0.2756 7.4000'- 0.2941 003 005 004 004 004 004 004 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad CalEEMod Version: CalEEMod.2016.3.2 Page 55 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer Equipment Type Number Hours/Day DaysNear Horse Power I Load Factor Fuel Type Cranes 1 8.001 2L 2311: 0.29 Diesel Forklifts .......................................................... ....................................... 1 ............................................... 8.00i 3651 - - - - - 89� 0.20 .................................... Diesel ............. 'W�� ....................................... ............................................... I Total : . .................................... ;a Generator Sets 4' O.A 52 841: 0.74 Diesel .......... . .......... ......................... ............ ............................... . . . . . ......... ............................................. . 5.77001- ........................... Pressure Washers i O�2.223. 16.00� 1 13;: 0.30' Diesel UnMitigated/Mitigated 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day HoursNear Horse Power I Load Factor I Fuel TYP7.1 Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F7y7pe77771 ROG NO. CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Blo- CO2 NlIl,- CO21 Total CO21 C114 N20 CO2, I I I PM10 I PM10 I I Total Pm2s I I PIA2.5 I I I Equipment Type lb/day lb/day Cranes 0.4534 5,3915 2*1154 5.77001- I ).2223 O�2.223. 0,2045 0,2045 558.7896 55&7896 0.1807 563.3077 I 0.3 ............................ it Forklifts 0.1440 ............ 1 1.2975 ............. 1.1803 ............. i 1.5300.- . . ............... 1 ........ 0.0967 .... . .. .. 0.0967 . . ............... .................. .. . .............. 148.0308 ............ i 148.0308 ........... I 0.0479 ............. . ................. 149.2277 003 ............................... Generator Sets 0.0539 05218 0.5558 9.9000.- 0.0294 0.0294 - - - ----- 0.0294 --- -* .................. . -9-3-45-52 OM94 52 5.2600.-- ................... 93.5867 004 003 ................. .............r............._._. .1. Pressure 08 0 39 06 T. 3 --- E.Z -7 1 i� . Tc�Z--' .............. ... ... ............... ..... ..... .... .................. .. ....... 0.0292 .............. ................ ... 78.3795 Washers 003 003 Total 0.7461 7.8321 4.3393 9.3900.. 0.3775 0.3775 -77773720 878.4557 878.4557 0.2418 88 003 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day HoursNear Horse Power I Load Factor I Fuel TYP7.1 Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F7y7pe77771 CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 56 Date: 5/31/2018 8:00 PM Haskins Way Rezone Phase I - San Mateo County, Summer User Defined Equipment Equipment Type Number 11.0 Vegetation Attachment C PROJECT PHASE 1 WINTER EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Haskins Way Rezone Phase I San Mateo County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park 31137 1000sgft 1.80 i 311,368.00 0 ............................................................................ a................................................ ............................... ...........................................................................................__._._._._._._._ t.._._._._._._._._._._._._._._._.;..... ............................... Office Park 25.00 1000sgft 0.30 25,000.00 i i 0 Enclosed Parking with Elevator 720.00 Space 1.30 288,000.00 i 0 Parking Lot 203.00 Space 3.35 81,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Climate Zone 5 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4 Intensity 0.029 (lb /M W hr) (lb /M W hr) 1.3 User Entered Comments & Non - Default Data Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Precipitation Freq (Days) 70 Operational Year 2020 N20 Intensity 0.006 (lb /MWhr) CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - See Appendix F of the Environmental Impact Report Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Area Coating - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Stationary Sources - Emergency Generators and Fire Pumps - See Appendix F of the Environmental Impact Report Table Name Column Name M Default Value New Value tblArchitecturalCoating ConstArea _Nonresidential_Ezterior 168,184.00 € 0.00 .................... .......................................................... }............................................................................. r } ............................................. ...........................:...................................................................... tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 168,184.00 € 0.00 r tblArchitecturalCoaling ConstArea _ Nonresidential _interior 504,552.00 € 0.00 r tblArchitecturalCoating ConstArea_ Nonresidential _ interior 504,552.00 i 0.00 tblArchitecluralCoaling ConstArea_Parking 22,152.00 i 0.00 tblArchitecluralCoating ConstArea_Parking 22,152.00 i 0.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 7.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 5.00 ............................................... ............................... }.............................................. ............................... }.............................................. ............................... ;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 2.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 ............................................... ............................... }.............................................. ............................... }.............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 9.00 ..............................................................................}.............................................................................}.......................................... .................................... i....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated . 0.00 i 1.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 15.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated r 0.00 i 3.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 € 1.00 : tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i i 13.00 tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 i 4.00 tblConstEquipMitigation NumberOfEquipmentMitigated 111 0.00 6.00 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . } . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 4.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 4 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter tblConstEquiplMitigation N NumberOfEquipmentMitigated 0 0.00 2 2.00 ................... .......................................................... . ............................................................................. . ...................................................................... tblConstEquiplMitigafion N NumberOfEquipmentMitigated 0 0.00 8 8.00 ................... .......................................................... . ............................................................................. . . ............................................................................. j j ...................................................................... tb[ConstEquipMitigation N NumberOfEquipmentMitigated 0 0.00 11.00 ................... .......................................................... . ............................................................................. . . .................................................. ................ .. . .. . .. . .. . . .. . ......... - - . . . . . . . . . ................................. tb[ConstEquipMifigation N NumberOfEquipmentMitigated 0 0.00 6 6.00 ................... .......................................................... . ............................................................................. . . ............................................................................. . ...................................................................... tblConstEquiplMitigation N NumberOfEquipmentMitigated 0 0.00 13.00 ................... .......................................................... . ............................................................................. . . ..................... . .......................... . ..................................................................... *"*"*"* .................. tblConstEquipMifigation T Tier N No Change T Tier 4 Final ................... .......................................................... # # ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. . .............................................................................. . ..................................................................... tb[ConstEquiplMidgation T Tier N No Change T Tier 4 Final .............................................................................. . .............................................................. . ............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N No Change Tier 4 Final .............................................................................. F F ............................................................................. . .......................................................... - --- ............ ..................................................................... tblConstEquiplMifigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ................................................... - -- ...................... . .............................................................................. . ..................................................................... tblConstEquipMlbgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N . No Change Tier 4 Final .............................................................................. . ............................................................................. . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ....................................................... . ............... .................................................. . ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . T ............................................................................. . ..................................................................... tb[Constl7quiplMidgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ................................................................... . ................................................................................ tblConstEqulpMlUgaUon T Tier N No Change Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquiplMifigation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... thlConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblConstEquipMlbgation T Tier N No Change T Tier 4 Final .............................................................................. . ............................................................................. . . .............................................................................. . ..................................................................... tblConstEqulpMlUgabon T Tier N No Change Tier 4 Final .............................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbIConstEquipMidgation T Tier N No Change T Tier 4 Final ............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tblConstEquiplMitigation T Tier N No Change Tier 4 Final .............................................................................. . ............................................................................. . . .................................................................................................................................................... tb[Constl7quiplMidgation T Tier N No Change i Tier 4 Final .............................................................................. . .................................................................... . . . . .... .............................................................................. . . . . . ............................................................... tblConstEqulpMlUgafion T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. . . ........................................ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . .. . .. . .. . . .. . ........................... . .. . .. . .. . .. . . . . . . . . . . . . . . . tblConstEquiplMifigation T Tier N No Change Tier 4 Final .............................................................................. # # ............................................................................. i i .............................................................................. . ....................................................................... CaIEEMod Version: CalEEMod.2016.3.2 Page 5 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter tblConstEquipMifigafion Tier No Change Tier 4 Final ........................ ..................................................... ............................................................................. - - ------------- - - - - - - - - - - - - - - - - - -- : ...................................................................... tb]ConstrucfionPhase NumDays 20.00 65.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... ii;lC onstructionPhase NumDays 20.00 21.00 .................... ................................................... ............................................................................. . .............................................................................. ...................................................................... tblConstructionPhase NumDays 20.00 219.00 .................... ................................................... ............................................................................. . ............................................................................. ...................................................................... tblConstructionPhase NumDays 230.00 30.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NumDays 230.00 40.00 .................... ................................................... ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NumDays 230.00 208.00 .............................................................................. ............................................................................. .............................................................................. ..................................................................... tbIConstructionPhase NumDays 230.00 258.00 .............................................................................. .............................................................. ............................................................................. ..................................................................... tbIConstructionPhase NumDays 20.00 130.00 .............................................................................. F ............................................................................. .......................................................... --- ............ ..................................................................... tblConstructionl3hase NumDays 10.00 20.00 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tblConstructionPhase NumDays 10.00 35.00 .............................................................................. ................................................... -- ...................... .............................................................................. ..................................................................... thiGrading AcresOfGrading 25.00 Om .............................................................................. ............................................................................. . ............................................................................. j ..................................................................... thiGrading MaterialExported 0.00 8,775.00 .............................................................................. ............................................................................. . . ............................................................................. ..................................................................... tbiGrading Materialimported 0.00 7,500.00 .............................................................................. ............................................................... - ------------------------------------------------ -- ......... ..................................................................... tb]LandUse LandUseSquareFeet 311,370.00 311,368.00 .............................................................................. ........................................................................... . ............................................................................. ..................................................................... tbILandUse LotAcreage 0Z7 UO .............................................................................. ............................................................................. . .............................................................................. i ..................................................................... tb]LandUse LotAcreage 1 7.15 1.80 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]LandUse LotAcreage 6.48 1.30 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... tb]LandUse LotAcreage 1-83 3.35 .............................................................................. ............................................................................. . ............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .......... . ..................................................... ............................................................................. . ............................................................................. ..................................................................... lOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 ............................................................................. ............................................................................. . ............................................................................. ..................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 .............................................................................. ............................................................................. . .................................................................................................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 i 2.00 .............................................................................. ............................................................................. .............................................................................. . . . . ............................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. . ............................................................................. ...................................................................... thlOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 2.00 .............................................................................. ............................................................................. i .............................................................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I tblOffRoadEquipment OffRoadEquipmentUnitAmount 4.00 1.00 CalEEMod Version: CaIEEMod.2016.3.2 Page 6 of 56 Date: 5/31/2018 8:02 PM tblOffRoadEquipment ........................................................... thlOffRoadEquipment lOff R wd E q u i p m e n t lOff R oad E q u i p m e n t iOff R oad E q u i p m e n t iOff R oad E q u 1 p m e n t iOff R oad E q u i p m e n t ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ tblOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ thlOffRoadEquipment ............................................................ tblOperabonalOffRoadEquipment ............................................................ tblOperabonalOffRoadEqulpment ............................................................ tblOperational OffRoad Equlpmwt ............................................................ tblOperabonalOffRoadEquipment ............................................................ thlOperabonalOffRoadEquipment ............................................................ tblOperational OffRoad Equipment ............................................................ thlOperational OffRoad Equipment ............................................................ tblOperabonalOffRoadEquipment ............................................................ tblOperabonalOffRoad Equlpment ............................................................ tblOperational OffRoad Equipment Haskins Way Rezone Phase I - San Mateo County, Winter OffRoadEquipmentUnitAmount 4.00 2.00 ................................................................... - - ----------------------- - - ----- - - - - - - - -- : .......................................... OffRoadEquipmentUnitAmount 1.00 3.00 ................................................................... . ............................................................................. .......................................... OffRoadEquipmentUnitAmount 1.00 5.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8.00 3.00 ................................................................... . ............... -- .......................................................... .......................................... UsageHours 8.00 6.00 ................................................................... . ............................................................................. .......................................... UsageHours 8-00 6.00 ................................................................... .............................................................................. .......................................... UsageHours 8.00 6.00 ................................................................... ............................................................................. .......................................... UsageHours 8.00 4.00 .................................................................. . t .................................................................. ........... .......................................... UsageHours i 7.00 6.00 ................................................................... ............... --- ....................................................... .......................................... UsageHours 8-00 4.00 ................................................................... .............................................................................. .......................................... UsageHours TOO 6.00 ................................................................... UsageHours . ............................................................................. .......................................... 8.00 6.00 ......................................... .......................... UsageHours ? . ......................................................................... . .. .. .. .. .. ....... 8.00 ........................... 7.00 .............................................................. .... UsageHours . ................................................................... .......................................... 6.00 7.00 ................................................................... UsageHours T ...................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. . .. . .. . .. &00 i i . ........................... 7.00 ................................................................... . .............................................................................. i .......................................... UsageHours 8.00 5.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 2.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 365.00 ................................................................... . ............................................................................. .......................................... OperDaysPeffear 260.00 52.00 ................................................................... . .............................................................................. .......................................... OperDaysPeffear 260.00 1.00 ................................................................... . ............................................................................. .......................................... OperHoursPerDay 8.00 0.30 ................................................................... . ............... -- .......................................................... .......................................... OperHoursPerOay 8.00 16.00 ................................................................... . ............................................................................... ; .......................................... OperOffRoadEquipmentNumber 0.00 ................................................................... .............................................................................. . . . . .................................... OperOffRoadEquipmentNumber 0.00 1.00 ................................................................... OperOffRoadEquipmentNumber . ............................................................................. .......................................... 0.00 4.00 ................................................................... .............................................................................. .......................................... OperOffRoadEquipmentNumber 0-00 1.00 CalEEMod Version: CaIEEMod.2016.3.2 Page 7 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter tblSequestrafion N NumberOfNewTrees 0 0.00 6 62.00 ........................ . ........ .. ................................................. - - - ----------------------- - - ----- - - - - - - - -- : ...................................................................... �auling`rripLength 2 20.00 1 19.00 ........................ ........................ . ....................... . .. ....................... . ........................ . .............. i ...................................................................... tblTripsAndVMT � �auling`rripLength 2 20.00' 19.00 ................ . ....... ...................... . .. ................................................. . . ........................................... . ......... ........................ . ............................................. �auling`rdpLength 2 20.00" . 19.00 ........................ -- -O ................. . ....... .............. . ........ .. ................................................. . . ......................................... . .......... ............ .....................................................................Z W . W � �aulingrripLength 2 25i . 12.60 ........................ . ...................... . .. ................................................. . . ........................................... . ................................. ..................................................................... �auling`rripLength 2 20.00* 1 19.00 ................ . ........ . .......................... . . ................... .............. ............................................................................ �s �aulinjripLength 1 20.00' 19.00 .............................................................................. . ............................................................................. . .............................................................................. . ..................................................................... tbITripsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . .............................................................. . ............................................................................. . ..................................................................... tblTrlpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . . ............................................................................. . ..................................................................... tblTrlpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ................................................... - -- ...................... . .............................................................................. . ..................................................................... tbITNpsAndVMT H HaulingTripLength 2 20.00 1 19.00 ............................... .............................................. . ............................................................................. . ....................................... . . .................................... ..................................................................... tbITrlpsAndVMT H HaulingTripNumber 1 185.00 230.00 .............................................................................. . ............................................................................. . ............................................................................. . ..................................................................... tbITripsAndVMT H HaullngTripNumber 2 2,034.00 8 814.00 .............................................................................. . ............................................ .................. . .... - ----------------------------------------------------- . ......... ..................................................................... tbITripsAndVMT V VendorTripNumber 1 116.00 5.00 .............................................................................. . ........................................................................... . ............................................................................. . ..................................................................... tbITripsAndVMT V VendorTripNumber 1 116.00 6.00 .............................................................................. . ............................................................................. . . .............................................................................. i i ..................................................................... tbITrlpsAndVMT 1 VendorTripNumber 1 1 4 116.00 43.00 ....................................................................... . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT V VendorTripNumber 1 116.00 5 50.00 .............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 4 40.00 20.00 .............................................................................. . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 3 38.00 1 19.00 .............................................................................. . ............................................................................. . . .............................................................................. . ..................................................................... tbITrlpsAndVMT W WorkeffrlpNumber 5 53.00 7.00 ........................................................... . ............................................................................. . . ............................................................................. . ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 4 40.00 2 20.00 ............................................................................. . ............................................................................. . . ............................................................................. ..................................................................... tbITripsAndVMT W WorkeffrlpNumber 3 38.00 19.00 .............................................................................. . ............................................................................. . . .................................................................................................................................................... tbITripsAndVMT W WorkerTripNumber 2 263.00 .............................................................................. . ...................................................... . . . . .... .............................................................................. . . . . . ............................................................... tbITrlpsAndVMT W WorkeffrlpNumber 2 263.00 13.00 .............................................................................. . ............................................................................. . ............................................................................. . ......................................... ................... . . . . . . . . . tbITripsAndVMT W WorkerlpNumber 2 263.00 9 96.00 .............................................................................. . ............................................................................. . .............................................................................. . ....................................................................... CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter tbITripsAndVMT WorkeffdpNurnber 53.00 22.00 ........................ --Z ........................ -OW ....... .................................................... ...................................................................... iW-r--�s zrkeffripNumber 53.00 19.00 ........................... .................................................. ............................................................................. 4 ............................................................................. ...................................................................... tblVehicleTrips CC TTP 48.00 10.00 ........................... .................................................. ............................................................................. f .............................................................................. ...................................................................... tblVehicleTrips CW TTP 33.00 71.00 ........................... .................................................. ............................................................................. f ............................................................................. ...................................................................... tblVehicleTrips ST TR 1.64 0.27 ........................... .................................................. ............................................................................. f ............................................................................. ................................ ......... .................... tblVehicleTrips SU TR 0.76 .............................................................................. ............................................................................. .............................................................................. ....................................................................... tblVehicleTrips WD TR 11.42 1.86 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NO, CO S02 F1910ve Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 1 PM70 1 Total PM2.5 PM2.5 I I I I Year lb/day lb/day 2018 ! 9.5870 108.0638 61.8555 0.1479 4.4702 4.5320 9.0022 0.9252 4.2356 5.1609 i 0.0000 !15,100.996 15,100.996 3.5572 0.0000 115,189.927 9 9 2 ............... ............... N........ ........... ................... .------------------ .._............... ------ _._._._... ................. ------------ _._. _.................................... ------------------- f.................. i.._................_...._._............. ............................... ................... ................... 2019 �i 22.7835 109.4496 81.6463 0.1724 3.4741 5.3733 7.5255 0.7253 4.9836 5.2704 i 0.0000 16,791.271 16,791.271 4.7591 0.0000 16,876.181 2 2 8 ...................... ........�'.°..._............... 2020 a 43.0018 ._._._._._. i 118.8615 .... ....5.5.5.4...._............... i 101.5554 0.2175 ._._._._._. 1 2.7142 ._5..2.6.4....... i -5-2-6-4-9-- _._7-979._._. 7.9792 _._._._._._. I 0.7341 ................. i 4.9722 ............ y.................. :20,929 ....... 5.7063 0.0000 20,929.775 .............. 20,929.775 ............. 4.7134 ._............... i 0.0000 ................... 21,047.610 610 ' 1 1 1 I 4 4 I 3 2 Maximum 43.0018 118.8615 101.5554 0.2175 4.4702 5.3733 9.0022 0.9252 4.9836 5.7063 0.0000 20,929.775 20,929.775 4.7591 0.0000 21,047.610 4 4 2 Mitigated Construction ROG NOx CO 802 Fugitive Exhaust PM10 Fugitive Exhaust PM25 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Year Ib /day lb/day 2018 2.1535 24.1727 66.6598 0.1479 3.3215 0.2858 3.6073 0.7513 0.2831 1.0344 P, 0.0000 :15,100.996 15,100.996 3.5572 0.0000 15,189.927 9 9 2 .............................. M..... .............. .................. ................... ..... _._._._._ ._..............._._...._.........................................................................._._....................:....._............._._._._........ .................. ................... ................... 2019 i 14.6447 34.3973 96.3840 0.1724 2.6813 0.3375 3.0189 0.7253 0.3329 1.0583 0.0000 :16,791.271 16,791.271 4.7591 0.0000 16,876.181 2 2 7 r. . ..............5.............555 2020 i 33.3386 ._._._._._. 39.5532 112.1910 _._._....... 0.2175 ._._._.__ 2.7142 ..... ............ 0.4209 _._._._._._. 3.1352 .......... 0.7341 _ 0.4176 r _ 5555_._ .................._'_'_'_'_ 1.1516 0.0000 : 20,929.7751 20,929.775 _ _._._._._ 4.7134 ............ 0.0000 ................ 21,047.610 ' i i 4 5 4 2 Maximum 33.3386 39.5532 112.1910 0.2175 3.3215 0.4209 3.6073 0.7513 0.4176 1.1516 0.0000 20,929.775 20,929.775 4.7591 0.0000 21,047.610 4 4 2 CalEEMOd Version: CalEEMOd.2016.3.2 Page 10 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e 1 PM10 PM10 Total PM2.5 PM2.5 Total Percent 33.48 70.83 -12.31 0.00 18.22 93.12 60.17 7.29 92.72 79.90 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 003 1 1 i 004 1 1 1 004 ........................ 2.2 Overall Operational Unmitigated Operational ROG NO, CO S02 Fugitive Exhaust PM 10 Fugitive Exhaust PM2.5 Total Blo- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2,5 Category lb /day lb /day Area fl 8.3445 ! 1.1900'- ! 0 129 ! 1.0000'- ! ! 4.6000'- 1 4.6000'- ! 4.6000'- ! 4.6000'- 0.2756 0.2756 ! 7.4000'- 0.2941 003 005 ! i 004 004 004 r 004 004 ........................ ._ p ._ ° °° _ ° °._ .................. Energy 0.1850 9Y '• 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 :2,017.6659 e 2 017.6659 0.0387 0.0370 2,G29.6559 Mobile i 0.9832 3.3536 12.1567 0.0392 3.6770 1 0.0427 3.7197 0.9845 0.0401 p i 1.0247 :3,945.335413,945.33541 0.1477 3,949.0271 r: Offroad E 0.7461 7.8321 4.3393 9.3800'- 0.3775 0.3775 0.3520 0.3520 ! 678.4557 876.4557 0.2418 884.5017 , 003 ' Total 10.2588 12.8682 18.0378 0.0586 3.6770 0.5485 4.2255 0.9845 0.5204 1.5049 6,841.7326 6,841.7326 0.4289 0.0370 6,663.4787 CaIEEMod Version: CalEEMOd.2016.3.2 Page 11 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 2.2 Overall Operational Mitigated Operational 3.0 Construction Detail Construction Phase ROG NO. CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e I I PM10 PM10 I Total PM2.5 PM2.5 Total ACO2e Category Ib /day Ib /day Area . 8.3445 1.1900e- 0.1294 1.000Oe- 0.00 4.6000e- 4.6000.- 0.00 4.6000.- 4.6000e- ' 0.2756 0.275fi 7.4000.- 0.00 i 0.2941 Reduction 003 005 004 004 004 004 004 .............................. N......................... ............................... .._ ............ ...................... ....... ............ ............ _....................... ................... .................... ................... 1.._ ..................._._._....... ................... .............. _._ ................... Energy �i 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 i ;2,017.6659 2,017.6659 0.0387 0.0370 2,029.6559 ...................... ........1':•..._............... Mobile ,e 0.9832 ._._._._._. i 3.3536 i .... ..............._............... i 12.1567 i 0.0392 ._._._._._. i 3.6770 i ._............... i 0.0427 1 _._._._._._. .7197 i 3.7197- 1 _. - I 0.9845 I ._............... 1 0.0401 1 _._._._._._.. t..................: ._...................._._._._._ i 1.0247 13,945.335413,945.33541 1 i ._._._._._._.._........... 0.1477 i ................. 3,949.0271 .......... ..... .............. r Offroad i 0.7461 ._ ._._._._._..........._......._. 7.8321 4.3393 __ 9.3800.- -003 - 0.3775 0.3775 0.3520 r *.............. ....�._.___�._•............._._ 0.3520 i 878.4557 878.4557 0.2418 ���.. ............... 1 884.5017 , Total 10.2588 12.8682 18.0378 0.0586 3.6770 0.5485 4.2255 0.9845 0.5204 1 1.5049 1 1 6,841.7326 6,841.7326 0.4289 0.0370 1 6,863.4787 3.0 Construction Detail Construction Phase ROG NOx CO 802 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 PM10 PM10 Total PM2.5 PM2.5 Total ACO2e Percent 0.00 000 0.00 000 0.00 0.00 0.00 000 0.00 0.00 0.00 000 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase CalEEMod Version: CalEEMod.2016.3.2 Page 12 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Phase Number Phase Name I Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition ;D emolition :12/12/2018 ?1/8/2019 5 i 20 .................................... ................... 2 r } .............................................................. . :Soils Abatement/Remove/Replace Remove/Replace Site Preparation •............... .................. 112/26/2018 ................... ............. :1/22/2019 .- ._..._._._._._ 5 ._._._._._.__ 20 ................................... ............................... ...................}...................................... 3 ......................... :Site Prep and Make Ready :Site Preparation i ................................. 1112312019 i............................ :3/1212019 5 35 ........................... ............................... ................... 4 }.............................................................. ;Parking Garage Underground .' ; Building Construction __._..;............................ ..... ;2/22/2019 ......................... 24/412019 5 _ 30 ................................... ............................... ................... 5 i.............................................................. :Office Building Underground :Building Construction .............................. 12/22/2019 ......................... :4/18/2019 5 40 ........................... ............................... ................... 6 f.............................................................. .. *.Parking Garage Core Construction :Building Construction !................................. ;4/412019 ...................... ;1/20/2020 5 _ 208 ................................... ............................... ................... 7 f................................ ............................... *.Office Building Core Construction j a Building Construction ........................................ 1411912019 ......................_.""""""' ;4/14/2020 5 '-'-'----- 258 ................................... ............................... ................... 8 } ............................................................... *.Parking Garage Exterior i........................................................... :Architectural Coating i 12/212019 ° 12/3012019 5 21 ........................... ............................... i *.Improvements ` ` t ................... 9 ............................................................... *.Office Building Tenant *.Improvements 6—'-'-'-'-'---- Architectural Coating ................................. 12/2612019 ................................ 10/2712020 5 219 ................... 10 ;......................... ...................................... .Landscaping and Site *.Improvements _....._._. _._._.........._._._._._._____. ._._._.____._._._ ?Pautng !1/6/2020 ............. ................... 7/3/2020 ..................... 5 a..................... 130; '• .................................................................. t ................... ....... ......................................................... . ............................................................ ----- ----- . '•------................................................................... 11 *.Office Building Exterior ;Architectural Coaling :1/15/2020 :4/14/2020 5: 65: *.Improvements Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 4.65 Residential Indoor: 0; Residential Outdoor: 0; Non - Residential Indoor: 0; Non - Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sgft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition 9 Air Compressors 2i 7.00: 7811 0.41 .........................................................................}_ ....______________'_'_._._._._. _____'— y................................. .................................... Demolition ?Concrete/Industrial Saws 21 i 6.00 81? O.T. ........................_._._._._._. ..._..........................i Demolition ___'_ f................................_.___ ;Dumpers/Tenders I 1 ................................. 1� .. .................................. 4.00: y................................... 161 . 0.31 Demolition *. Excavators 2: 3.002 0.31 CaIEEMod Version: CalEEMod.2016.3.2 Page 13 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Demolition JForklifts 1 7.00: 89� 0.20 ... ...................................................................... Demolition ........................ ............................................. Off-Highway Trucks ............................................. .................................. 21 .......................................................................... 4.W 402 0.38 ... ...................................................................... Demolition ...................... . . ....... . 1Rubber Tired Dozers ............ .................................. 2:: ................................... 6.002 ..................................... 2471 0.40 ................................. ........................ ...................................................................... Demolition 'Skid Steer Loaders &W 651 0.37 .................................................. — ------------------------ --------------------------------------- .................................. .............................. .............................. , Demolition 'Sweepers/Scrubbers 4.00:: 64; 6.Z, 'Demolition ............................................ ............ . . . . . . ....... . . ......... ........................................... j .................................. 'Tractors/Loaders/Backhoes 2i .................................... 5.00�: ..................................... 971: 0.37 , ,: ', '' " ', , ''* ........... .................................................. .......... . . . ............... .................................. ................................... ........... &i Is Abatemen URemove/Re pace Crawler Tractors 1 4.00:! 2121 ..... .................................................................... Soils AbatemenURemove/Replace . .......................................................... 'Dumpers/Tenders .................................. 21 .................................... 6.00; ..................................... 16i 038 ..... .................................................................... Soils AbatemenURemove/Replace . . Excavators . . ........ ............................... j .................................. 2 i .................................... 5.00; ..................................... 0.38 ..... .................................................................... Soils Abatement/Remove/Replace .. ---------- Off-H ighway Trucks ---------------------------------------- .................................. 31: .................................... 4.W ..................................... 4021 0.38 ..... .................................................................... Soils AbatemenURemove/ReplaGe .. .................................................... 'Plate Compactors ................................. .................................. 2 ................................... 5.00: ..................................... 8i 0.43 .......................................................................... Soils Abatement/Remove/Replace ...................................................................... iRubber Tired Loaders ----- — ! ----- .................................. 21 .................................... 5.00: ..................................... 2031: 036 .......................................................................... Soils AbatemenURemove/Replace - 'Scrapers 1 — - - - -------------------------------------- i .................................. 2 i ! ................................... 4.00:: .. ..................................... 3671 0.48 .......................................................................... Soils AbatemenURemo-/Replace ;Sweepers /Scrubbers . . . . ............................... ........................... ...... .................................... 4,.00:: ..................................... 64 0.46 .......................................................................... Soils AbatemenURemove/ReplaGe . i Tractors/Loaders/Backhoes ............. ........... ................. 11 i i ............. .................................... 6.00; ..................................... 0.37 .......................................................................... Site Prep and Make Ready ----------------------------------------------- 'Bore/Drill Rigs -.1 ...................................................................... 2i 7.00: ...................................... 2211! 0.50 .......................................................................... Site Prep and Make Ready ........... ....................... . . ;Dumpers/Tenders . . ........ .......................................................................... ----------------------------- ............... .................................. .................................... ..................................... Site Prep and Make Ready Excavators 1 4.00i 158; .......................................................................... Site Prep and Make Ready - - - - - - - - - - - - - - -- 'Off-Highway Trucks ........... .................................. 2 4.00:: 4021 0.38 .......................................................................... Site Prep and Make Ready ----------------------------------------------- ------- - - - ---------------- 'Plate Compactors .................................. 21 ................................... 5.00: j ..................................... 8 i i 0.43 ........................................................ ------------------------------------------------ - - - - - - - ---------- — ----- .................................. Site Prep and Make Ready 'Rubber Tired Loaders 2 i &W 2031 0.36 ................. ----- - - - ---- - - - - - - - - - - - - - - - - - --------------------------------------------- j .................................. .................................... ..................................... Site Prep and Make Ready !Scrapers 2i 6.00 367; .......................... .......... ........... .......... ............... .... ................. ..................................... Site Prep and Make Ready 'Sweepers/Scrubbers i : 4.00:: 64 0.46 .................. ----------------------------------------------- ------- - - - ---------------- : .................................. ................................... ..................................... Site Prep and Make Ready 'Tractors/Loaders/Backhoes 2: 6.002 971 037 .......................................................................... Parking Garage Underground ......... .................................... 'Bore/Drill Rigs ........ .................................. 11 .................................... 7.00; ..................................... 2211 0.50 .......................................................................... Parking Garage Underground .. Excavators ........ . . . ............................... i i .................................. 21 .................................... 7.00 ..................................... 1581: 0.38 .......................................................................... Parking Garage Underground ...................................................................... ;Generator Sets . ...................................................................... 2:: 4.00] ..................................... 84:: 0.74 CaIEEMod Version: CalEEMod.2016.3.2 Page 14 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Parking Garage Underground I Plate Compactors 2 4.00; 0.43 ........... . ..................... ------------------ .............. �I .................................. ................................... ..................................... '�arki'ng' Garage Underground ' '' ........... 'Rough Terrain 1 2.00; 100! 0.40 1 1 ....................... 'Parki'ng' Garage U n"d"e"r"g'r"o"u"*n"d""""'* - -- - -------------- I ......... ............ .................................. ........................... 'Rubber Tired Loaders 1 2.001 203! 0.36 '�'a* rM, Parking Garage Underground ''' '"", Sweepers/Scrubbers 1 4.00; 641: Y�6- ........... - - - ----------------- - - ------- ........................ ... .................................. ..................................... Parking Underground Tractors/Loaders/Backhoes ..w6 97: 0.37 Garage n 21 0: ''''' ' ' '' ...................... ---------------- - - ------- j ................................. .................................. ..................................... �arking Garage Underground ;Trenchers 21 4.001; 781: 0.50 ................................................................... - - - - - - - - - - - ......... .................................... ............................. �6 Office Building Underground Bore/Drill Rigs 2:! 4.00: 2211 y .......................................................................... ------- - - - - - --------------------- ................................... . . . ............................. i ..................................... Office Building Underground a Excavators i 21 7.00: 158i 0.38 i .......................................................................... - ---- - ---------------- - - - - - ------------- - - - I .................................. ....................... ........... ..................................... Office Building Underground Generator Sets 21 4.00� 84i 0.74 .......................................................................... ................................. ................................... ..................................... Office Building Underground a Plate Compactors 21 4L00: 8 i 0.43 .......................................................................... I ----------------- - - - - - - - - - - - - - .................................. ................................... Office Building Underground 'Rough Terrain Forklifts 2 : 8.001: 1001 0.40 .......................................................................... ---------------- - - - - ---------- ................................................................................ Office Building Underground 'Rubber Tired Loaders 1 1 i 6.00; 0.36 .......................................................................... ---------------- - - - - - - ................................. .................................... ........................ ............. Office Building Underground 'Sweepers/Scrubbers i 11 4.00i 641 0.46 .......................................................................... ' ........ . . . . . ................... - - - ................................. .................................. ...................................... Office Building Underground Tractors/Loaders/Backhms 2! 6.00 97: ! 0.37 .......................................................................... I .................................. i ..................................... Office Building Underground 'Trenchers 41 7.001 781 0.50 .......................................................................... ---------------------- - - ---------------- ............... ................................. .............................. ... ................................... Parking Garage Core Construction 'Aerial Lifts 1 7.00 631 0.31 .......................................................................... ............... . ...................... ................................... I ..................................... Parking Garage Core Construction 'Cement and Mortar Mixers I 6! 4.00;: 9 0.56 .......................................................................... Parking Garage Core Construction 'Cranes 1 TOW 231 0.29 .......................................................................... .................................. ..................................... Parking Garage Core Construction Off-Highway Trucks 4 0,0;:. 402! 0.38 .......................................................................... - - - --- - . .........................4.00.: ...........................402 .......................... ........................... ...................................... Parking Garage Core Construction Plate Compactors 1 ! 4.00; 81 0.43 .......................................................................... ................ . . ............ .................................. Parking Garage Core Construction Pumps 1 6.00:: 84:: 0.74 ........................................................................ +_ . . . . . ..................................... ................................................................ ..................................... Parking Garage Core Construction Rough Terrain Forklifts 1 i 6.00 too:: 0.40 .......................................................................... __ _- - - - --- j ................................... : ................................... ..................................... Parking Garage Core Construction 7 W elders 31 6.00 46: 0.45 .......................................................................... ------------ 4 .................................. r .................................. I ..................................... Office Building Core Construction 'Aerial Lifts 41 7.00:: 631 0.3 .......................................................................... 1 - ------------------ Office Building Core Construction iAir Compressors 4i 6.001 781 0.48 .......................................................................... ------------------ - - - - - -- I ................................. .................................. I ................... .................. Office Building Core Construction vCranes 2i 7.001 231:: 0.29 i .......................................................................... ...................................................................... ................................. Office Building Core Construction Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CaIEEMod Version: CalEEMod.2016.3.2 Page 15 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Office Building Core Construction Rough Terrain Forklifts 2 6.00; 0.40 'E' '' ' '' -'''' l ........ . 9 ........................ -------------------------- I ............................ ............... .................................. ................................... ............................. ........ ilceaut1ding C ore C onstructon ,Sweepers /Scrubbers 4.00; 641 0.46 4 - - ------------ - - - - - - - .................. ......................... .....................'6ce' ", '', '- -"', , ", i" ', - lder 700 i ......5 Office C ore Construction Wes 5 7.00; 46! ''' , '' '""'"'""*'""*"*"""'"'........... . ..................................................... .................................. ................................... I ........................ ..... �arMng Garage ExeriorImprmements Aerial Lifts 11 6.00 63: ''i ........... - - - ---------------- - - ------- I .................................. r .................................. ..................................... Parking Garage ExerorIr prove n ants Cranes 11 3.00:: 2311 0.29 '''i' "'-i ---------------- - - ------- j ................................. .................................. ..................................... Parking Garage ExerorImprave m ents ,Off-Highway Trucks 11 4.001; 4021 0.38 '�'a* Parking ng Garage 'Ex-te rto-r-Improvements , * '-- '* - - - - - - ...... 'Other General Industrial Equipment 1 : y�� 4.00: 881 .......................................................................... ------- - - - - - - - - ------------------------- ................................... . . . ............................. i ..................................... Parking Garage Exterior Improvements :Pressure Washers 1 11 2.00: 131 0.30 .......................................................................... ----------------------- --------- ------------- - - - .................................. .................................. ..................................... Parking Garage Exterior Improvements Rough Terrain Forklifts 1 1 5.00� 100i 0.40 I .......................................................................... - -------- f ----------------------- - - - ................................. ................................... ..................................... Parking Garage Exterior Improvements e Welders 1 21 5.00: 46; 0.45 .......................................................................... - ------------------- - - - - - - ................................ T001 Al .............................. 0".'31' I .......................................................................... 4 --------------------------- - --------- - - - --- F - - - - - - .................................... ..................... . ............ ..................................... Office Building Tenant Improvements Aerial Lifts Office Building Tenant Improvements 'Air Compressors i 11 7.00: 78! 0.48 .......................................................................... . - - - - - - T ---------------- - - - - - - ...................................................................... ..................................... Office Building Tenant Improvements :Off- Highway Trucks 1 2 4.00; 4021! 0.38 .......................................................................... -------- - - - - - ------------------- - - - ................................. .................................. ...................................... Office Building Tenant Improvements ;Rough Terrain Forklifts 1 7.00: 100! 0.40 ........ .. .................................. ..................................... 641 0.46 Office Building Tenant Improvements ;Sweepers/Scrubbers 11 6.001 .......................................................................... .. . ................... . - - ---------------- --------------- ................................. j ........................ .......... ..................................... Office Building Tenant Improvements ;Welders 1 5.001 46 0.45 1 .......................................................................... ---------------- - ------- - - ------------------------- .......... ................................... 4 .................. ................... ;Cement and Mortar Mixers 4�003 0.56 Landscaping and Site Improvements 21 9: .......................................................................... I V * ........... ................................... ..................................... Landscaping and Site Improvements Dumpers/Tenders i I 6.0W: 16i 0.38 .......................................................................... - ------------- - ................................... ..................................... Landscaping and Site Improvements Waving Equipment 21 ................. 7'.00.: 1321 0.36 .......................................................................... ................................... .................................. a...... ............................... Landscaping and Site Improvements Plate Compactors 2 4.0 81 0.43 .......................................................................... .................................. 4 ....................... ........... .................................. !. . .. Landscaping and Site Improvements Rollers 2 5.00] 80 1 0.38 ........................................................................ ............................ ................................... j ..................................... Landscaping and Site Improvements ;Rough Terrain Forklifts 1 i 3.00 1001 0.40 .......................................................................... : ................................... ................................... ..................................... Landscaping and Site Improvements Rubber Tired Dozers 21 4.00 247:: 0.40 651 0.37 .......................................................................... ---------- ......................... .......................................................................... ------ I ........................ :! -I ........... ............. Landscaping and Site Improvements Skid Steer Loaders 6.00 Landscaping and Site Improvements 'Tractors/Loaders/Backhoes 2I 4.00:: 971 0.37 .......................................................................... ------------------ - - - - - -- ................................. .................................. ....................... .............. Office Building Exterior Improvements eAerial Lifts 1 3I 6.00 63:: 0.31 .......................................................................... ...................................................................... ................................. Office Building Exterior Improvements ;Off-Highway Trucks 2:: 4.00:: 402:: 0.38 CalEEMod Version: CalEEMOd.2016.3.2 Page 16 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Office Building Exterior Improvements ;Other General Industrial Equipment 21 7.00 88 0.34 Office Building Exterior Improvements ;Pressure Washers 11 4.00; 131 0.30 .... ...�_ _______ ................. ..................... ..................... Office Building Exeror Imp. ..rove.. . me... nts ;Rough Terrain Forklifts 3: 7.00; 1001 0.40 .......................................................................... �. . ......................................... _._._._._ i.................................. k.............................. ..... i...... ............................... Office Building Exterior Improvements ;Sweepers /Scrubbers 1 j 4.00: 641 0.46 .......................................................................... j........................................ ............................... .......................... ....... W._._ ....... _ ................. _ ...... ............................... Office Building Exterior Improvements : Welders 2: 6.00: 46: 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Worker Trip Number Length Vendor Trip Length Hauling Trip Worker Vehicle Length Class Vendor Vehicle Class Hauling Vehicle Class Demolition 16 20.001 0.00 230.001 10.801 7.30; 19.00: LD_Mix 11HDT_Mix 1HHDT e Soils 16 20.001 0.00 814.00; 10.801 7.30; 12.601LD Mix iHDT Mix HHDT ................................... �.�,._.__"�__ - i .................... ....... .....................a_________ i .i................... ` I .._._........_._._._._._._.; j..................... ............................... Site Prep and Make r r 15 19.001 9.0011 0.00 0.00; 10.801 7.... 1 7.30; 19.00ILD_Mix 19.00 iHDT_Mix HHDT Parking Garage 15 11.00! 5.00 0.00; 10.801 7.30: iHDT_Mix HHDT : i..a.,.,..,.....a r .....................d.......... ........{.""""._._._._._._._._. Office Building r 18 ! 13.00; ..............................._.. 6.00 i __ .......................... .................._._._._._._._ 0.00; 10.801 7.30; �"" --- - - " "' ti............................ 19.001 LD_Mix IHDT_Mix .......................... HHDT ............ ..............................r Parking Garage Core i 15� •........................... 96.001 43.00 ._._._._._._..... _._.........._._._._. 0.00; 10.801 7.30: 19.0011 LD_Mix ......... ...... ... HDT_Mix ............ ...... HHDT Office Building Core 20� i 113.001 50.00 0.00: 7.30; 19.00iLD_Mix :HDT_Mix HHDT ...................... .............................. . Parking Garage 8I 22.001 0.00 0.00; 10.801 7.30; 19.00iLD_Mix iHDT_Mix HHDT .. ....:...:...................... r ........................................ ..{.._. ............ _........... Office Building Tenant 7 ;.......................... 19.00; 0.00 ................... ..... ;........................• 0.001 10.80; ... 7.30; __________- 19.00` LD_Mix ................ ........... jHDT_Mix .......................... . IHHDT i LanLandscaping and Site 15 19.001 0.00 0.00; 10.80 7.30; 19.0011 LD_Mix HDT_Mix HHDT » . . . . .. ... . . . . , . . . . . . Office Building Exterior ; 14 7.00: o.00: 10.80: 7.30: 19.00: LD_Mix : HDT_Mix ::HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CalEEMOd.2016.3.2 Page 17 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.2 Demolition - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust ! 9.2200e- 1 0.2516 I 0.0169 1.9965 0.0000 1.9965 0.3023 0.0000 0.3023 0.0000 1,036.0319 ! ! ! 0.0000 1 1 I I 1 1 I I I ! 1 I 1 ! Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off -Road i 4.9647 47.1807 29.2937 0.0546 0.0000 2.5916 2.5916 o.0000 2.4452 2.4452 15,395.0663 5,395.0663 1.3234 5,428.1506 Total 4.9647 47.1807 29.2937 0.0546 1.9965 2.5916 4.5882 0.3023 2.4452 2.7475 5,395.0663 5,395.0663 1.3234 9.4000e- 5,428.1506 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1196 4.1110 ! 1.5093 I ! 9.2200e- 1 0.2516 I 0.0169 0.2685 I 1 0.0671 0.0162 i 0.0833 ;1,032.9164!1,032.9164 0.1246 t 1,036.0319 ! ! ! ! ! 003 1 1 I I 1 1 I I I ! 1 I 1 ! Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 �� o.0000 .: ....................................................................................................................................................................................................... ...................... .................. ,... ............... ................... ................... ............. ............... Worker 0.0731 0.0516 0.4962 1.5400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 153.4723 153.4723 3.6600e- 153.5637 r 003 003 004 r 003 Total 0.1927 4.1626 2.0055 0.0108 0.4159 0.0180 0.4338 0.1107 0.0171 0.1278 1,186.3887 1,186.3887 0.1283 1,189.5955 CaIEEMod Version: CalEEMOd.2016.3.2 Page 18 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.2 Demolition - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust ! 9.2200e- 1 0.2516 I 0.0169 0.8984 0.0000 0.8984 0.1360 0.0000 0.1360 0.0000 1,036.0319 ! ! ! 0.0000 1 1 I I 1 1 I I I ! 1 I 1 ! Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off -Road i 0.6994 4.3871 30.8868 0.0546 0.0000 0.0928 0.0928 00000 0.0928 0.0928 i 0.0000 ;5,395.0663 5,395.0663 1.3234 5,428.1506 Total 0.6994 4.3871 30.8868 0.0546 0.8984 0.0928 0.9912 0.1360 0.0928 0.2288 0.0000 5,395.0663 5,395.0663 1.3234 9.4000e- 5,428.1506 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1196 4.1110 ! 1.5093 I ! 9.2200e- 1 0.2516 I 0.0169 0.2685 I 1 0.0671 0.0162 i 0.0833 ;1,032.9164!1,032.9164 0.1246 t 1,036.0319 ! ! ! ! ! 003 1 1 I I 1 1 I I I ! 1 I 1 ! Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 �0.0000� �� 00000 .: ....................................................................................................................................................................................................... ...................... .................. ,... ............... ................... ................... ............. ............... Worker 0.0731 0.0516 0.4962 1.5400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 153.4723 153.4723 3.6600e- 153.5637 r 003 003 004 r 003 Total 0.1927 4.1626 2.0055 0.0108 0.4159 0.0180 0.4338 0.1107 0.0171 0.1278 1,186.3887 1,186.3887 0.1283 1,189.5955 CaIEEMod Version: CalEEMOd.2016.3.2 Page 19 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.2 Demolition - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust i 3.8906 1.5115 j 9.0400. - 1.9965 0.0000 1.9965 0.3023 0.0000 0.3023 0.0000 0.1258 I 0.0000 I 1 I 003 r Off -Road i 4.5959 43.4661 28.8099 0.0546 2.3262 2.3262 2.1924 2.1924 15,331.5149 5,331.5149 1.3095 5,364.2514 Total 4.5959 43.4661 28.8099 0.0546 1.9965 2.3262 4.3227 0.3023 2.1924 2.4947 5,331.5149 5,331.5149 1.3095 6,364.2614 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1123 i 3.8906 1.5115 j 9.0400. - 0.5267 1 0.0155 ! 0.5422 0.1346 1 0.0148 I 0.1495 ;1,018.047111,018.04711 0.1258 I 1,021.1929 I 1 I 003 r Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0663 0.0453 0.4426 1.4900e- 0.1643 1.0100.- 0.1653 0.0436 9.3000e- 0.0445 : 148.6946 148.6946 3.2200e- 148.7750 r 003 003 004 r 003 Total 0.1785 3.9359 1.9540 0.0105 0.6910 0.0165 0.7075 0.1782 0.0158 0.1940 1,166.7417 1,166.7417 0.1291 1,169.9679 CaIEEMod Version: CalEEMOd.2016.3.2 Page 20 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.2 Demolition - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust i 3.8906 1.5115 j 9.0400. - 0.8984 0.0000 0.8984 0.1360 0.0000 0.1360 0.0000 0.1258 I 0.0000 I 1 I 003 ! I E I I r 1 1 ! Off -Road i 0.6994 4.3867 30.8868 0.0546 0.0927 0.0927 0.0927 0.0927 i 0.0000 15,331.5149 5,331.5149 1.3095 5,364.2514 Total 0.6994 4.3867 30.8868 0.0546 0.8984 0.0927 0.9911 0.1360 0.0927 0.2287 0.0000 5,331.5149 5,331.5149 1.3095 5,364.2514 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling 0.1123 i 3.8906 1.5115 j 9.0400. - 0.5267 1 0.0155 ! 0.5422 0.1346 1 0.0148 I 0.1495 ;1,018.047111,018.04711 0.1258 I 1,021.1929 I 1 I 003 ! I E I I r 1 1 ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0663 0.0453 0.4426 1.4900e- 0.1643 1.0100.- 0.1653 0.0436 9.3000e- 0.0445 : 148.6946 148.6946 3.2200e- 148.7750 r 003 003 004 r 003 Total 0.1785 3.9359 1.9540 0.0105 0.6910 0.0165 0.7075 0.1782 0.0158 0.1940 1,166.7417 1,166.7417 0.1291 1,169.9679 CaIEEMod Version: CalEEMOd.2016.3.2 Page 21 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2018 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.8922 I 1 ! 3.9781 ! ! I 0.0225 I I 0.0920 0.0000 0.0920 0.0139 0.0000 0.0139 0.0000 I 0.3093 I 1 ! ! 0.0000 .................. .........._�................... ...... ............................... ...................._................_._._._................................................................................... �. .................3.._._._._._._ ................ ................... ._. _._._.......................... Off -Road i 4.0415 , 45.7768 26.0820 0.0585 0.0000 1.8797 1.8797 0.0000 1.7325 1.7325 E5,846.9481 ' 5,846.9481 1.7927 5,891.7642 Total 4.0415 45.7768 26.0820 0.0585 0.0920 1.8797 1.9717 0.0139 1.7325 1.7464 5,846.9481 5,846.9481 1.7927 5,891.7642 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.3150 10.8922 I 1 ! 3.9781 ! ! I 0.0225 I I 1 1.8015 1 1 I 0.0417 I 1.8432 I I ! 0.4548 ! 1 0.0399 I I i 0.4947 ;2,519.121612,519.1216 I ! 1 I 0.3093 I 1 ! ! 2,526.8532 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: . 1 Worker i 0.0731 0.0516 0.4962 1.5400e- 0.1643 1.0200e- 0.1653 0.0436 9.4000e- 0.0445 : 153.4723 153.4723 3.6600e- 153.5637 r 003 003 004 r 003 Total 0.3881 10.9438 4.4743 0.0240 1.9658 0.0428 2.0085 0.4983 0.0409 0.5392 2,672.5938 2,672.5938 0.3129 2,680.4168 CaIEEMod Version: CalEEMOd.2016.3.2 Page 22 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2018 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 10.8922 I 1 ! 3.9781 ! ! I 0.0225 I I 0.0414 0.0000 0.0414 6.2700.- 0.0000 6.2700.- i 0.0000 0.3093 I I 1 ! ! 0.0000 003 003 1 :I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 Off -Road i 0.8733 4.6792 29.2933 0.0585 0.1324 0.1324 0.1324 0.1324 i 0.0000 15,846.9481 , 5,846.9481 1.7927 5,891.7642 Total 0.8733 4.6792 29.2933 0.0585 0.0414 0.1324 0.1736 6.2700.- 0.1324 0.1386 0.0000 5,846.9481 5,846.9481 1.7927 5,891.7642 , 003 003 003 004 , 003 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.3150 10.8922 I 1 ! 3.9781 ! ! I 0.0225 I I 1 1.8015 1 1 I 0.0417 I 1.8432 I I ! 0.4548 ! 1 0.0399 I I i 0.4947 ;2,519.121612,519.1216 I 1 ! 0.3093 I I 1 ! ! 2,526.8532 : Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: . 1 Worker i 0.0731 0.0516 0.4962 1.5400e- 0.1643 1.0200.- 0.1653 0.0436 9.4000e- 0.0445 : 153.4723 153.4723 3.6600e- 153.5637 , 003 003 004 , 003 Total 0.3881 10.9438 4.4743 0.0240 1.9658 0.0428 2.0085 0.4983 0.0409 0.5392 2,672.5938 2,672.5938 0.3129 2,680.4168 CaIEEMod Version: CalEEMOd.2016.3.2 Page 23 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Fugitive Dust I 10.3345 ! ! 3.9593 ! I 0.0221 I 0.0920 0.0000 0.0920 0.0139 0.0000 0.0139 0.0000 0.3103 I 1 ! 0.0000 1 ! I 1 I 1 I I 1 1 ! Off -Road 3.7374 , 41.0850 24.8887 0.0585 1.6695 1.6695 1.5391 1.5391 '5,753.4568 5,753.4568 1.7921 15,798.2583 Total 3.7374 41.0850 24.8887 0.0585 0.0920 1.6695 1.7615 0.0139 1.5391 1.5530 5,753.4568 5,753.4568 1.7921 5,797.2583 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling ! 0.2942 I 10.3345 ! ! 3.9593 ! I 0.0221 I ! 0.5302 1 I 0.0382 I 0.5684 I I 0.1427 ! 0.0365 I 1 0.1793 ;2,483.7104!2,483.7104 ! 0.3103 I 1 ! 2,491.4677 1 ! I 1 I 1 I I 1 1 ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: .............................. r ....... ............ _ ................. ................... ................... ................... ......... .......... ................... ................... .......... _ ....... .................... ..................«.................. .... ............... ................... ................... ................... Worker i 0.0663 0.0453 0.4426 1.4900.- 0.1643 1.0100.- 0.1653 0.0436 9.3000e- 0.0445 : 148.6946 148.6946 3.2200e- 148.7750 r 003 003 004 r 003 Total 0.3605 10.3798 4.4018 0.0235 0.6945 0.0392 0.7337 0.1663 0.0375 0.2238 2,632.4049 2,632.4049 0.3135 2,640.2427 CaIEEMod Version: CalEEMOd.2016.3.2 Page 24 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust ! 10.3345 ! ! 3.9593 ! ! 0.0221 I 0.0414 0.0000 0.0414 6.2700*- 0.0000 6.2700*- i 0.0000 0.3103 I 1 ! 0.0000 1 ! I 1 I 003 I 003 ! 1 1 ! :! i Off -Road i 0.8733 4.6778 29.2932 0.0585 0.0000 0.1320 0.1320 0.0000 0.1320 0.1320 i 0.0000 15,753.4568 5,753.4568 1.7921 5,798.2583 Total 0.8733 4.6778 29.2832 0.0585 0.0414 0.1320 0.1735 6.2700*- 0.1320 0.1383 0.0000 5,753.4568 5,753.4568 1.7921 ................... 5,798.2563 Worker i 0.0663 0.0453 0.4426 1.4900.- 0.1643 1.0100 * - 0.1653 003 9.3000e- 0.0445 : 148.6946 148.6946 3.2200e- 148.7750 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling ! 0.2942 ! 10.3345 ! ! 3.9593 ! ! 0.0221 I ! 0.5302 1 I 0.0382 I 0.5684 I I 0.1427 ! 0.0365 I i 0.1793 ;2,483.7104!2,483.7104 ! 0.3103 I 1 ! 2,491.4677 1 ! I 1 I 1 I I 1 1 ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: .............................. r ....... ............ _ ................. ................... ................... ................... ......... .......... ................... ................... .......... _ ....... .................... ..................«.................. .... ............... ................... ................... ................... Worker i 0.0663 0.0453 0.4426 1.4900.- 0.1643 1.0100 * - 0.1653 0.0436 9.3000e- 0.0445 : 148.6946 148.6946 3.2200e- 148.7750 r 003 003 004 r 003 Total 0.3605 10.3798 4.4018 0.0235 0.6945 0.0392 0.7337 0.1663 0.0375 0.2238 2,632.4049 2,632.4049 0.3135 2,640.2427 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 25 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 0.0000 I i 0.0000 1 j 0.0000 I 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Off -Road 4.1225 47.0098 28.7596 0.0714 0.0000 1.8713 1.8713 0.0000 1.7237 1.7237 ;7,039.8701 7,039.8701 2.2086 17,095.0857 Total 4.1225 47.0098 28.7596 0.0714 1.5908 1.8713 3.4621 0.1718 1.7237 1.8954 7,039.8701 7,039.8701 2.2086 7,095.0857 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0630 0.0431 0.4204 1.4200e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 141.2598 141.2598 3.06001- 141.3362 003 004 004 003 Total 0.0630 0.0431 0.4204 1.42001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 1412598 172598 3.0600e. 141.3362 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 26 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Fugitive Dust 0.0000 I i 0.0000 1 j 0.0000 I 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Off -Road 0.9871 5.0607 34.8207 0.0714 0.0000 0.1411 0.1411 0.0000 0.1411 0.1411 0.0000 E7,039.8701 7,039.8701 2.2086 17,095.0856 Total 0.9871 5.0607 34.8207 0.0714 0.7158 0.1411 0.8570 0.0773 0.1411 0.2184 0.0000 7,039.8701 7,039.8701 2.2066 7,095.0856 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0630 0.0431 0.4204 1.4200e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 141.2598 141.2598 3.06001- 141.3362 003 004 004 003 Total 0.0630 0.0431 0.4204 1.42001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 1412598 172598 3.0600e. 141.3362 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 27 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.5 Parking Garage Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM15 Exhaust I PM2.5 PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road 2.2820 22.7467 20.1134 0.0369 Total 1.2660 12660 i 1.1836 1 1.1836 ;3,609.5102 3,609.5102 0.9770 1 1: 1111.9358 Total 2.2820 22.7467 20.1134 0.0369 j 0.0000 1760 1.2660 ! 0.0000 1.1836 1 1.1836 1 3,609.5102 3,609.5102 0.9770 1 3,633.9358 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling : 0.0000 0.0000 j 0.0000 i 0.0000 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 Vendor 0.0244 0.6391 0.2567 1.3300e- 0.0337 4.4700e- 0.0382 9.7100s- 4.2700e- r 0.0140 145.9608 145.9608 v 0.0132� __ 146.2910 .; 003 003 003 003 ; . ..................................... ............................... Worker : 0.0365 0.0249 ...... ............................... 0.2434 8.2000e- .................................................................................................................. 0.0904 5.6000e- 0.0909 0.0240 5.1000e- �..................«............................................................. 0.0245 81.7820 81.7820 1.7700e- ............................... 81.8262 r 004 004 004 r 003 Total 0.0608 0.6640 0.5001 2.1500e- 0.1241 5.0300e. 0.1291 0.0337 4.7800e- 0.0385 227.7428 227.7426 0.0150 228.1172 003 003 003 1 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 28 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.5 Parking Garage Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM15 Exhaust I PM2.5 PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.4893 2.7741 23.9077 0.0369 Total 0.0676 1 0.0676 1 ' 0.0676 0.0676 0.0000 ;3,609.5101 r 3,609.5101 0.9770 13,633.9358 Total 0.4893 2.7741 23.9077 0.0369 lb/day 0.0676 0.0676 0.0676 0.0676 0.0000 3,609.5101 3,609.5101 0.9770 1 3,633.9358 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 j 0.0000 i 0.0000 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 Vendor 0.0244 0.6391 0.2567 1.3300e- 0.0337 4.4700e- 0.0382 9.7100s- 4.2700e- r 0.0140 145.9608 145.9608 v 0.0132� __ 146.2910 .; 003 003 003 003 ; ...................................... ............................... Worker i 0.0365 0.0249 ...... ............................... 0.2434 8.2000e- .............. . . . 0.0904 ................. . 5.6000e- ................... 0.0909 ................... 0.0240 ....... . . . ....... 5.1000e- .................... ..................«............................................................. 0.0245 81.7820 81.7820 1.7700e- ............................... 81.8262 r 004 004 004 r 003 Total 0.0608 0.6640 0.5001 2.1500e- 0.1241 5.0300e. 0.1291 0.0337 4.7800e- 0.0385 227.7428 227.7426 0.0150 228.1172 003 003 003 1 CaIEEMod Version: CalEEMOd.2016.3.2 Page 29 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.6 Office Building Underground - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG I NO, I CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 3.8158 • 38.1896 31.2571 0.0548 Total 2.2240 2.2240 2.0650 2.0650 :5,380.9026 ' 5,380.9026 1.5375 1 15,419.3395 Total 3.8158 38.1896 31.2571 0.0548 Hauling i 0.0000 2.2240 2.2240 j 0.0000 I 2.0650 2.0650 1 5,380.9026 5,380.9026 1.5375 1 5,419.3395 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 3 I 1 I I r 1 I ! Vendor i 0.0293 0.7669 0.3080 1.6000.- 0.0405 5.3600e, 0.0459 0.0117 5.1300e- 0.0168 ; i 175.1530 175.1530 0.0159 175.5492 003 003 003 .: .............................. r ....... ............ _ ................. ........ ........... ...... ............. ................... ................. .. ................... ................... .... _._._ ....... .................... .................. «............. ..... .................. ................... ................... ................... Worker i 0.0431 0.0295 0.2877 9.7000.- 0.1068 6.6000.- 0.1075 0.0283 6.0000e- 0.0289 : 96.6515 96.6515 2.0900.- 96.7037 P 004 004 004 r 003 Total 0.0723 0.7964 0.5957 2.5700.- 0.1473 6.0200e- 0.1533 0.0400 5.7300.- 0.0457 271.8044 271.8044 0.0179 272.2529 003 003 003 1 1 CaIEEMod Version: CalEEMOd.2016.3.2 Page 30 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.6 Office Building Underground - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.7092 • 3.7272 36.1394 0.0548 Total 0.0969 i 0.0969 1 ' 0.0969 0.0969 0.0000 ;5,380.9026 ' 5,380.9026 1.5375 1 15,419.3395 I Total 0.7092 3.7272 36.1394 0.0548 lb/day 0.0969 0.0969 0.0969 0.0969 0.0000 5,380.9026 5,380.9026 1.5375 1 5,419.3395 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 1 0.0000 0.0000 3 I 1 I I r 1 I ! Vendor i 0.0293 0.7669 0.3080 1.6000.- 0.0405 5.3600e, 0.0459 0.0117 5.1300e- 0.0168 ; i 175.1530 175.1530 0.0159 175.5492 003 003 003 .: Worker i 0.0431 0.0295 0.2877 9.7000.- 0.1068 6.6000.- 0.1075 0.0283 6.0000e- 0.0289 : 96.6515 96.6515 2.0900.- 96.7037 P 004 004 004 r 003 Total 0.0723 0.7964 0.5957 2.5700.- 0.1473 6.0200e- 0.1533 0.0400 5.7300.- 0.0457 271.8044 271.8044 0.0179 272.2529 003 003 003 1 1 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 31 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2s Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road 2.3541 • 18.5942 14.6174 0.0288 Total 0.8807 0.8807 ' 0.8463 0.8463 :2,657.7430 ' 2,657.7430 0.6187 1 2,6732116 I Total 2.3541 18.5942 14.6174 0.0288 Hauling i 0.0000 0.8807 0.8807 j 0.0000 I 0.8463 0.8463 2,657.7430 2,657.7430 0.6187 1 2,6772116 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 it 0.0000 1 1 0.0000 1 0.0000 1 I 1 I I r --[255.2629 I ! Vendor i 0.2097 5.4964 2.2074 0.0115 0.2902 0.0384 0.3286 0.0835 0.0367 0.1202 :1,255.2629 0.1136 1,258.1022 Worker i 0.3181 0.2175 2.1243 7.1600e- 0.7886 4.8500e- 0.7935 0.2092 4.4700e- 0.2136 713.7339 13.7339 0.0154 714.1199 P 003 003 003 r Total 0.5278 5.7140 4.3317 0.0186 1.0788 0.0433 1.1221 0.2927 0.0412 0.3339 1,968.9968 1,968.9968 0.1290 1,9772221 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 32 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road 0.5550 • 5.2854 15.7514 0.0288 Total 0.0869 0.0869 0.0869 0.0869 0.0000 ;2,657.7430 ' 2,657.7430 0.6187 1 2,673.2116 i Total 0.5550 5.2854 15.7514 0.0288 Hauling i 0.0000 0.0869 0.0869 j 0.0000 I 0.0869 0.0869 0.0000 2,657.7430 2,657.7430 0.6187 1 2,673.2116 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 it 0.0000 1 1 0.0000 1 0.0000 1 I 1 I I r --[255.2629 I ! Vendor i 0.2097 5.4964 2.2074 0.0115 0.2902 0.0384 0.3286 0.0835 0.0367 0.1202 :1,255.2629 0.1136 1,258.1022 Worker i 0.3181 0.2175 2.1243 7.1600e- 0.7886 4.8500e- 0.7935 0.2092 4.4700e- 0.2136 713.7339 13.7339 0.0154 714.1199 P 003 003 003 r Total 0.5278 5.7140 4.3317 0.0186 1.0788 0.0433 1.1221 0.2927 0.0412 0.3339 1,968.9968 1,968.9968 0.1290 1,9772221 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 33 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG I NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2s Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 2.1464 • 17.1521 14.2644 0.0288 Total 0.7752 0.7752 0.7451 0.7451 ;2,623.6941 ' 2,623.6941 0.6063 12,638.8526 Total 2.1464 17.1521 14.2644 0.0288 Hauling i 0.0000 0.7752 0.7752 j 0.0000 I 0.7451 0.7451 1 2,623.6941 2,623.6941 0.6063 1 2,638.6526 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 x0000 I 0.0000 0.0000 1 I 1 I I r 1 I ! Vendor i 0.1712 4.9889 2.0721 0.0113 0.2902 0.0252 0.3154 0.0635 0.0241 0.1076 ;1,243.2598 1,243.2598 0.1105 1,246.0221 .: Worker i 0.2936 0.1931 1.9236 6.9300e- 0.7886 4.7500e- 0.7934 0.2092 4.3700e- 0.2136 691.0672 691.0672 0.0136 691.4068 P 003 003 003 r Total 0.4647 5.1820 3.9957 0.0183 1.0788 0.0300 1.1088 0.2927 0.0285 0.3212 1,934.3270 1,934.3270 0.1241 1,937.4269 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 34 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, I CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 I NBio- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road 0.5550 • 5.2854 15.7517 0.0288 Total 0.0867 0.0867 0.0867 0.0867 0.0000 :2,623.6941 r 2,623.6941 0.6063 1 2,638.8526 I Total 0.5550 5.2854 15.7517 0.0288 Hauling i 0.0000 0.0867 0.0867 j 0.0000 I 0.0867 0.0867 0.0000 2,623.6941 2,623.6941 0.6063 1 2,638.8526 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 ! 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 x0000 1 0.0000 0.0000 1 I 1 I I r 1 I ! Vendor i 0.1712 4.9889 2.0721 0.0113 0.2902 0.0252 0.3154 0.0635 0.0241 0.1076 ;1,243.2598 1,243.2598 0.1105 1,246.0221 .: Worker i 0.2936 0.1931 1.9236 6.9300e- 0.7886 4.7500e- 0.7934 0.2092 4.3700e- 0.2136 691.0672 691.0672 0.0136 691.4068 P 003 003 003 r Total 0.4647 5.1820 3.9957 0.0183 1.0788 0.0300 1.1088 0.2927 0.0285 0.3212 1,934.3270 1,934.3270 0.1241 1,937.4269 CaIEEMod Version: CalEEMOd.2016.3.2 Page 35 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.8 Office Building Core Construction - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 4.8417 38.5463 31.5527 0.0587 Total 1.9408 1.9408 1 t 1.8617 1.8617 5,559.9467 5,559.9467 1.3626 •5,594.0106 I Total 4.8417 38.5463 31.5527 0.0587 lb/day 1.9408 1.9408 1.8617 1.8617 5,559.9467 5,559.9467 1.3626 5,594.0106 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 .............................. ___ ______ ______ 1 ______ ______ I _____ 1 _._____ I ______ I r __._._._._ f..................______ 1 _._._. I ______ ! ____ .............096 Vendor i 0.2438 6.3912 2.5668 0.0133 0.3374 0.0447 0.3821 0.0971 0.0427 0.1398 :1,459.6080 1,459.6080 0.1321 1,462.9096 .: .............................. r........ ........... ................... ................... ................... ................... ......... .......... ................... ................... .... _._._....... .................... ..................«.................................... ........... ........ ................... ................... Worker i 0.3744 0.2561 2.5005 8.4300e- 0.9283 5.7100e- 0.9340 0.2462 5.2600e- 0.2515 840.1243 840.1243 0.0182 840.5786 r 003 003 003 r Total 0.6182 6.6472 5.0673 0.0218 1.2657 0.0504 1.3161 0.3433 0.0480 0.3913 2,299.7323 2,299.7323 0.1502 2,307.4862 CaIEEMod Version: CalEEMOd.2016.3.2 Page 36 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.8 Office Building Core Construction - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.8356 10.4353 316911 0.0587 Total 0.0869 0.0869 1 0.0869 0.0869 0.0000 15,559.9467 r 5,559.9467 1.3626 I •5,594.0106 Total 0.8356 10.4353 33.6911 0.0587 lb/day 0.0869 0.0869 0.0869 1 0.0869 0.0000 5,559.9467 5,559.9467 1.3626 5,594.0106 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 i 0.0000 I 0.0000 0.0000 .............................. ___ ______ ______ 1 ______ ______ I _____ 1 _._____ I ______ I r __._._._._ f..................______ 1 _._._. I ______ ! ____ .............096 Vendor i 0.2438 6.3912 2.5668 0.0133 0.3374 0.0447 0.3821 0.0971 0.0427 0.1398 :1,459.6080 1,459.6080 0.1321 1,462.9096 .: .............................. r........ ........... ................... ................... ................... ................... ......... .......... ................... ................... .... _._._....... .................... ..................«.................................... ........... ........ ................... ................... Worker i 0.3744 0.2561 2.5005 8.4300e- 0.9283 5.7100e- 0.9340 0.2462 5.2600e- 0.2515 840.1243 840.1243 0.0182 840.5786 r 003 003 003 r Total 0.6182 6.6472 5.0673 0.0218 1.2657 0.0504 1.3161 0.3433 0.0480 0.3913 2,299.7323 2,299.7323 0.1502 2,307.4882 CaIEEMod Version: CalEEMOd.2016.3.2 Page 37 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.8 Office Building Core Construction - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO I S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category lb/day Ib /day Off -Road ? 4.3957 35.3791 30.8372 0.0587 Total 1.6054 1.6954 1 it t 1.6256 1.6256 ;5,482.7895 5,482.7895 1.3369 15,516.2120 I Total 4.3957 35.3791 30.8372 0.0587 lb/day 1.6954 1.6954 1.6256 1.6256 5,482.7895 5,482.7895 1.3369 5,516.2120 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 0.0000 1 I 1 I I r 1 I ! Vendor i 0.1990 5.8011 2.4094 0.0132 0.3375 0.0293 0.3668 0.0971 0.0280 0.1251 :1,445.6509 1,445.6509 0.1285 1,448.8630 .: Worker i 0.3455 0.2272 2.2643 8.1600e- 0.9283 5.5900e- 0.9339 0.2462 5.1500e- 0.2514 813.4437 813.4437 0.0160 813.8434 r 003 003 003 r Total 0.5446 6.0283 4.6737 0.0213 1.2657 0.0349 1.3006 0.3433 0.0332 0.3765 2,259.0946 2,259.0946 0.1445 2,267.7063 CaIEEMod Version: CalEEMOd.2016.3.2 Page 38 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.8 Office Building Core Construction - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive PM10 I Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 I PM2.5 Total Bio- CO2 I Nam- CO2 Total CO2 CH4 I N20 I CO2e Category Ib /day Ib /day Off -Road ? 0.8356 10.4353 316911 0.0587 Total 0.0869 0.0869 1 0.0869 0.0869 0.0000 15,482.7895 r 5,482.7895 1.3369 15,516.2120 I Total 0.8356 10.4353 33.6911 0.0587 lb/day 0.0869 0.0869 0.0869 1 0.0869 0.0000 5,482.7895 5,482.78951 1.3369 5,517.2120 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 0.0000 1 I 1 I I r 1 I ! Vendor i 0.1990 5.8011 2.4094 0.0132 0.3375 0.0293 0.3668 0.0971 0.0280 0.1251 :1,445.6509 1,445.6509 0.1285 1,448.8630 .: Worker i 0.3455 0.2272 2.2643 8.1600e- 0.9283 5.5900e- 0.9339 0.2462 5.1500e- 0.2514 813.4437 813.4437 0.0160 813.8434 r 003 003 003 r Total 0.5446 6.0283 4.6737 0.0213 1.2657 0.0349 1.3006 0.3433 0.0332 0.3765 2,259.0946 2,259.0946 0.1445 2,267.7063 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 39 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.9 Parking Garage Exterior Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating ;i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I x0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 1 .............................. o.0000 0.0000 0.0000 0.0000 N .............................. ...... ............. ................... ................... ................... ._ ............... ._._._._ ....... ................... ................... ................... i ! .................... .................. {............. ... ............... ................... ................... ................... Off -Road 1.2882 10.8104 8.4431 0.0168 0.5092 0.5092 .............. 0.4787 0.4787 11,601.7329 1,601.7329 0.4660 0.1818 1,613.3827 Total 1.2882 10.8104 8.4431 0.0168 0.5092 0.5092 003 0.4787 0.4787 1,601.7329 1,601.7329 0.4660 003 1,613.3827 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 I 1 .............................. o.0000 0.0000 0.0000 I 0.0000 1 o.0000 o.0000� I 0.0000 1 0.0000 I 0.0000 I 0.0000 0.0000 1 0.0000 I �0.0000� ! �� 00000 .: .............................. ........ .... ........................... ................... ................... ................... ..... .............. ................... ................... ....... _................... ...........�.................., .... ............................... .............. ........... .............. Worker 0.0729 0.0499 0.4868 1.6400e- 0.1807 1.1100.- 0.1818 0.0479 1.0200e- 0.0490 163.5640 163.5640 3.5400e- 163.6525 003 003 003 003 Total 0.0729 0.0499 0.4868 1.6400.- 0.1807 1.1100e. 0.1816 0.0479 1.0200.- 0.0490 163.5640 163.5640 3.5400.- 1676525 003 003 003 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 40 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.9 Parking Garage Exterior Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Aruhit. Coating N 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 0.0000 0,0000 I x0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 1 .............................. o.0000 0.0000 0.0000 0.0000 1 o.0000 o.0000� I 0.0000 1 0.0000 I 0.0000 I 0.0000 0.0000 1 0.0000 I �0.0000� ! �� 00000 .: .............................. ........ .... ........................... ................... ................... ................... ..... .............. Off -Road i 0.2468 2.6909 9.4342 0.0168 0.0295 0.0295 .............. 0.0295 0.0295 i 0.0000 11,601.7329 1,601.7329 0.4660 0.1818 1,613.3827 Total 0.2468 2.6909 9.4342 0.0168 0.0295 0.0295 003 0.0295 0.0295 0.0000 1,601.7329 1,601.7329 0.4660 003 1,613.3627 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bic- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 1 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 I 1 .............................. o.0000 0.0000 0.0000 I 0.0000 1 o.0000 o.0000� I 0.0000 1 0.0000 I 0.0000 I 0.0000 0.0000 1 0.0000 I �0.0000� ! �� 00000 .: .............................. ........ .... ........................... ................... ................... ................... ..... .............. ................... ................... ....... _................... ...........�.................., .... ............................... .............. ........... .............. Worker 0.0729 0.0499 0.4868 1.6400e- 0.1807 1.1100.- 0.1818 0.0479 1.0200e- 0.0490 163.5640 163.5640 3.5400e- 163.6525 003 003 003 003 Total 0.0729 0.0499 0.4868 1.6400.- 0.1807 1.1100e. 0.1816 0.0479 1.0200.- 0.0490 163.5640 163.5640 3.5400.- 1676525 003 003 003 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 41 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2019 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 a0000 1 0.0000 I 0.0000 . .............................i...... ............. ................... ................... ................... ._. .............. ._._._._. ...... ................... .............. ..._ ................... : .................... ' I r 1 ! Off -Road ; -Road 1.6358 14.4190 11.7398 0.0247 0.0000 0.7115 0.7115 0.0000 0.6716 0.6716 ;2,398.2956 2,398.2956 0.6633 12,414.8779 Total 13.0116 14.4190 11.7396 0.0247 0.7115 0.7115 0.6716 0.6116 1 2,398.2956 2,398.2956 0.6633 2,414.8779 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0630 0.0431 0.4204 1.4200e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 141.2598 141.2598 3.06001- 141.3362 003 004 004 003 Total 0.0630 0.0431 0.4204 1.42001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 1412598 172598 3.0600e. 141.3362 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 42 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2019 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0,0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 :i 1 I 1 I i ! 1 I ! Off -Road i 0.3436 r 3.5316 13.8407 0.0247 0.0000 0.0385 0.0385 0.0000 0.0385 0.0385 i 0.0000 12,398.2956 , 2,398.2956 0.6633 2,414.8779 Total 11.7254 3.5316 13.8407 0.0247 0.0385 0.0365 0.0385 0.0385 0.0000 2,398.2956 2,398.2956 0.6633 2,414.8779 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0630 0.0431 0.4204 1.4200e- 0.1561 9.60001- 0.1570 0.0414 8.8000e- 0.0423 : 141.2598 141.2598 3.06001- 141.3362 003 004 004 003 Total 0.0630 0.0431 0.4204 1.42001- 0.1561 9.60001- 0.1570 0.0414 8.80001- 0.0423 1412598 172598 3.0600e. 141.3362 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 43 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 1 0.0000 I 0.0000 .............................. ' 1...... ............. ................... ................... ................... ._ ............... ._._._._ ....... ................... ................... ................... : .................... ' I r 1 ! Off -Road 1.5134 13.0916 11.5089 0.0247 0.0000 0.6302 0.6302 0.0000 0.5944 0.5944 12,355.5468 2,355.5468 0.6583 12,372.0039 Total 12.8952 13.0916 11.5089 0.0247 0.6302 0.6302 0.5944 0.5944 2,355.5468 2,355.5468 0.6583 2,372.0039 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust P1070 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio - CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 1 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 136.7737 136.7737 2.6900e- 136.8409 , 003 004 004 , 003 Total 0.0581 0.0382 0.3807 1.37001- 0.1561 9.40001- 0.1570 0.0414 8.70001- 0.0423 136.7737 136.7737 2.69001- 136.9409 003 004 004 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 44 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 11.3818 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0,0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 :i 1 I 1 I i ! 1 I ! Off -Road i 0.3436 r 3.5316 13.8407 0.0247 0.0000 0.0385 0.0385 0.0000 0.0385 0.0385 i 0.0000 12,355.5468 , 2,355.5468 0.6583 2,372.0039 Total 11.7254 3.5316 13.8407 0.0247 0.0385 0.0365 0.0385 0.0385 0.0000 2,355.5468 2,355.5468 0.6583 2,312.0039 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 136.7737 136.7737 2.6900e- 136.8409 r 003 004 004 r 003 Total 0.0581 0.0382 0.3807 1.37001- 0.1561 9.40001- 0.1570 0.0414 8.70001- 0.0423 136.7737 136.7737 2.69001- 136.8409 003 004 004 1 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 45 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 PM2.5 Category Ib /day Ib /day Off -Road N 2.1762 22.1999 15.8241 0.0267 0.0000 1.1404 1.1404 ? 0.0000 1.0521 1.0521 ;2,542.0761 2,542.0761 0.7936 12,561.9165 :I 1 I 1 i ? I r 1 I Paving 0.0675 Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.2437 t7t, 22.1999 15.8241 0.0267 1.1404 1.1404 1.0521 1.0521 2,542.0761 2,542.0761 0.7936 2,561.9165 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 136.7737 136.7737 2.6900e- 136.8409 r 003 004 004 r 003 Total 0.0581 0.0382 0.3807 1.37001- 0.1561 9.40001- 0.1570 0.0414 8.70001- 0.0423 136.7737 136.7737 2.69001- 136.9409 003 004 004 003 CaIEEMod Version: CaIEEMOd.2016.3.2 Page 46 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 PM2.5 Category Ib /day Ib /day Off -Road 0.4787 3.0819 16.9451 0.0267 0.0000 0.0781 0.0781 ? 0.0000 0.0781 MIMI 0.0000 ;2,542.0761 2,542.0761 0.7936 1 12,561.9165 I .............................. ........ ........... ...... .. ........... .......... ......... ................... ._. .............. ....... _._ ....... ................... ................... ................... .................... .................. :................... ..................................... I ................... ................... Paving 0.0675 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.5463 3.0819 16.9451 0.0267 0.0781 0.0761 0.0781 0.0781 0.0000 2,542.0761 2,542.0761 0.7936 2,561.9165 Mitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 1 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.40001- 0.1570 0.0414 8.7000e- 0.0423 : 136.7737 136.7737 2.6900e- 136.8409 P 003 004 004 r 003 Total 0.0581 0.0382 0.3807 1.37001- 0.1561 9.40001- 0.1570 0.0414 8.7000,- 0.0423 136.7737 136.7737 2.69001- 136.8409 003 004 004 1 1 003 CaIEEMod Version: CalEEMOd.2016.3.2 Page 47 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM25 I PM2.5 I I I I Category lb/day Ib /day Archit. Coating 17.9892 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I r 1 I ! Off -Road i 2.1848 19.7380 19.5498 0.0359 0.0000 0.9568 0.9568 0.0000 0.8913 0.8913 13,408.3096 3,408.3096 1.0433 3,434.3930 Total 20.1740 19.7380 19.5498 0.0359 0.9568 x.9568 0.8913 0.8913 3,408.3096 3,408.3096 1.0433 3,434.3930 Unmitigated Construction Off -Site ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I i 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0214 0.0141 0.1403 5.1000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e- 0.0156 : 50.3903 50.3903 9.9000e- 50.4151 004 004 004 004 Total 0.0214 0.0141 0.1403 5.1000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e• 0.0156 50.3903 50.3903 9.9000e• 50.4151 004 004 004 1 1 004 CaIEEMod Version: CalEEMOd.2016.3.2 Page 48 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 I Total PM2.5 PM2.5 I I I I Category Ib /day Ib /day Archit. Coating 17.9892 0.0000 I I 0.0000 1 j 0.0000 I 0.0000 0.0000 0.0000 ? 0.0000 0.0000 0.0000 0.0000 I 0.0000 1 0.0000 ............................_....... ............ .................. ........................................ ._................_._._._....... ................... ................... ................... .................... .................. 3.._._._......... ............. _._. ................... ....... ............................... Off -Road i 0.5403 it r 5.9183 22.3915 0.0359 0.0000 0.0637 0.0637 0.0000 0.0637 0.0637 i 0.0000 13,408.3096 + 3,408.3096 1.0433 3,434.3930 Total 18.5295 5.9183 22.3915 0.0359 0.0637 0.0637 0.0637 0.0637 0.0000 3,408.3096 3,408.3086 1.0433 3,434.3930 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NO, CO S02 Fugitive Exhaust PM70 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 I Total PM2.5 PM2.5 Category lb/day Ib /day Hauling i 0.0000 0.0000 I I 0.0000 1 j 0.0000 I 0.0000 ! 0.0000 0.0000 ? 0.0000 I 0.0000 I x0000 0.0000 0.0000 I 0.0000 1 0.0000 1 I 1 I I r 1 I ! Vendor i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .: Worker i 0.0214 0.0141 0.1403 5.1000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e- 0.0156 : 50.3903 50.3903 9.9000e- 50.4151 004 004 004 004 Total 0.0214 0.0141 0.1403 5.1000e- 0.0575 3.5000e- 0.0579 0.0153 3.2000e• 0.0156 50.3903 50.3903 9.9000e• 50.4151 004 004 004 1 1 004 4.0 Operational Detail - Mobile CaIEEMod Version: CalEEMOd.2016.3.2 Page 49 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx PO I S02 I Fugitive PM10 I -,"at PM10 PM10 Total Fugitive PM2.5 Faust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category lb /day lb /day Mitigated 11 0.9832 3.3536 12.1567 0.0392 3.6770 0.0427 3.7197 0.9845 0.0401 1.0247 X3,945.3354 3,945.3354 0.7477 3,949.0271 Total 625.65 90.82 1 40.36 11288,492 1,288,492 Unmitigated 0.9832 3.3536 : 12.1567 i 0.0392 3.6770 0.0427 3.7197 0.9845 0.0401 1.0247 ;3,945.3354:3,945.3354: 0.1477 ;3,949.0271 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Enclosed Parking with Elevator ............... .................�....... . 0.00 i .... _ 0.00 0.00 ' ... ...... +................... ......... ........�...................... ................. Office Park 579.15 ; 84.07 1 37.36 ' 1,192,727 1,192,727 .................. �....................... Office Park ................................................ 46.50 ; 1..... ............................... 6.75 3.00 . 95,764 : 95,764 ............................... } .............................. ................................. ...................................... ............................... Parking Lot 0.00 0.00 0.00 Total 625.65 90.82 1 40.36 11288,492 1,288,492 4.3 Trip Type Information CalEEMod Version: CaIEEMod.2016.3.2 Page 50 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Miles 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... Trip % Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C- H-S or C-C H-O or C-NW Primary Diverted Pass-by EnclosedParking with Elevator 7 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 Office Pa.k . . . . . . . . . . . ................. 9.50 ........................................................ 7.30 7.30 71. ...................... ............................................................. 10:00._._:..........19.00...... 82 ............................ ............................................ 15 3 ........... .00 __ Office Park 7.30 7.30 • 71.00 10.00 19.00 82 15 3 .................. Parking Lot . . . . 9.50 .......................... 7.30 ............................ . 7.30 ........................ 0.00 ....... . ............... ....................................................................................................................................... 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use ! LDA 1 LDT1 I LDT2 I MDV I LHDI I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator 0.490452 0.049742] 0.253638 0.136789 0.0179261; 0.006526; 0.006323 0.003943; 0.003278 0.008771 0.0004351 0.000741 • .............................................................. Office Park .......................... ................................... ................... -- - --------- -------------- ..................... 0.490452, 0-0497421 0.253638; 0-136789: 0-0179261. 0.006526: 0.021436!1 0.006323; 0.003943!. 0.003278; 0-0087711: 0.0004351 0.000741 4 .................... Parking Lot 0A904521 0.049742; 0A367891 0.017926 0M6526: 0M14361 0.0063231 0.0039432 0M32781 0.008771; 0M0435; 0.000741 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CalEEMOd.2016.3.2 Page 51 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated ROG I NO, I CO I S02 I Fugitive PM10 I Exhaust PM10 PM70 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e tdtC?ofy!. lb/day I Ib /day NaturalGas 0.1850 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 ;2,017.6659 2,017.6659 0.0387 0.0370 21029.6559 Mitigated Land Use kBTU /yr Ib /day lb /day s................................ i x0000 0.0000 0.0000 .................... ..........r...................; NaturalGas 0.1850 ....... ...........,- 1.6814 .................................... 1.4124 , ..................,...0............................... 0.0101 0.1278 0.1278 ... ...:...................;...................... 0.1278 ....... .........,_. 0.1278 2,017.6659:2,017.6659: ................ ............... ...._.. 0.0387 ............. ...................... 0.0370 ;2,029.6559 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5Total Bio -0O2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use I I PM10 PM10 Total PM2.5 PM2.5 Land Use kBTU /yr Ib /day lb /day Enclosed Parking j 0 ! 0.0000 x0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 with Elevator .............................. Office Park }_____ ................... i 1274.66 :i 0.0138 ........ ............ 0.1250 ................... 0.1050 ................... 7.50008- ................... ................... 9.50008- .... .............. 9.50008- ................... ................... 9.50008- ..... _ ............. y' .................. i.... ............... 9.50008- 1 149.9597 ................... 149.9597 ................... 2.8700e- ................... 2.75008- .................. 150.8509 �r 003 003 003 003 I 003 003 Office Park A004 1 15875.5 :1 0.1712 ............. i 1.5564 ............. I 1.3074 ............. 1 9.34008 - ............. i ............. I 0.1183 i 0.1183 I ...... 1 0.1183 3 0.1183 11,867.706211,867.70621 ------------- ._............ .. 0.0358 _._._._._._................... i 0.0342 1,878.8050 .............................. _._._._._._ ._._._._._.: 003 .-•-•-•-•-•- ----- ... •_._•_•_. - -•----- ._._._._._. y.................. -•-•-•-•- -•-•-•-•- - - ____ -._._._._ ....0. Para' Parking Lot 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 7- To 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0 1 0.0000 I Total 0.1850 1.6814 1.4124 0.0101 0.1276 1 0.1278 1 0.1278 1 71278 2,017.6659 2,017.6659 0.0387 0.0370 2,029.6559 CaIEEMod Version: CalEEMOd.2016.3.2 Page 52 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa ROG NOx CO 502 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bic - CO2 NBio- CO2 Total CO2 CH4 N20 CO2, s Use PM10 PM10 Total PM2.5 PM2.5 Land Use kBTU /yr I lb/day lb/day Enclosed Parking j 0 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator i .............................. Office Park }----- .................. i 1.27466 :1 0.0138 ._._._._ ....... 0.1250 ................... 0.1050 ................... 7.5000e- ................... ................... 9.5000e- ................... 9.5000.- ................... ................ _..._.- 9.5000e- ._._._._.y' .................. I................... 9.5000e- i 149.9597 ................... 149.9597 ................... 2.8700e- ................... 2.7500e- ................... 150.8509 004 003 003 003 003 ' i 003 003 Office Park 158755 ' 0.1712 i 1.5564 1 1.3074 i 9.3400. - i I 0.1183 i 0.1183 I I 0.1183 3 0.1183 1,867.70621 1,867.70621 0.0358 i 0.0342 1,878.8050 I ;.I 1 i i 003 i i 1 i I 3 ' I ..............................I ......... _._ __ �.�.�- _._._._._.._._._._.__ ._..._._.__ _._._._._. * .................. _ ._._._._ _._._._._ _ . i _ _._._.__ . i _._._.__ .......... Parking Lot 0 i 0.0000 i In 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i Total 0.1850 1 1.6814 1.4124 0.0101 0.1278 0.1278 0.1278 0.1278 1 2,017.6659 2,017.6659 0.0387 1 559 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMOd.2016.3.2 Page 53 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 6.2 Area by SubCategory Unmitigated ROG I NO, I CO I S02 Fugitive PM10 1 Exhaust PM10 PM10 Total Fugitive PM2.5 I Exhaust PM2.5 PM2.5Total Bio -0O2 I NBio -0O2 Total CO2 CHI N20 I CO2e Category lb/day lb/day Mitigated ;E 8.3445 1.1900.- 0.1294 1.00001- Total 4.60001- 4.60001- 4.60001- 4.6000e- ; i 0.2756 0.2756 7.4000.- 0.2941 003 lb /day 005 Architectural 1.0033 004 004 004 004 i 0.0000 004 0.0000 ................... ...........�i.................. :....................................:........................ 0.0000 ............................... Coating ............................................ ............................... ........................................... ............................... _.............. . ............... Unmitigated 8.3445 i 1.1900e- i 0.1294 i 1.00001- i i 4.6000e- i 4.60001 - i i 4.6000e- : 4.6000e- 0.2756 0.2756 i 7.4000e- i 0:2941 ... ..... 003 ........... i.. ................i....._._._._._ 005 004 004 Consumer i 7.3291 004 004 004 0.0000 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio -0O2 NBio -0O2 Total 002 CH4 N20 COI, I I I PM10 I PM10 Total PM2.5 PM2.5 SubCategory lb /day lb /day Architectural 1.0033 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating .............................. ...... ............................... ......................._._._........................................................................ ... ..... ................ ........... ........... i.. ................i....._._._._._ ............................................ ............................... Consumer i 7.3291 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products i r: Landscaping `i 0.0122 i 1.1900e- 1 0.1294 1.0000e- 1 1 4.6000e- 1 4.6000.- 1 i 4.6000. - i 4.6000.- i 0.2756 I 0.2756 I 7.4000. - i 0.2941 003 1 005 004 I 004 004 I 004 , 004 ! Total 73445 1.19001- 0.1294 1.0000.- 4.6000 e- 4.60001- 4.6000.- 4.6000¢- 0.2756 1.2716 7.40001- 0.2941 003 005 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad ROG NOT CO 502 Fugitve Exhaust PM10 Fugitive Ex at PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 1:02e PM10 I PM70 I Total PM2.5 PM2.5 I I I I I SubCategory lb/day lb/day Architectural 1.0033 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating .............................. r............... .... ................... ................... ................... .................. ........ ............ .................. ................... ................... .................... i.................. i..-................ ...... _._........ .................. ............. _._ ................... Consumer ,E 7.3291 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 Products ..................... .........,ri,.._............... Landscaping i 0.0122 ._._._._._. i 1.1900'- .... ..............._............... i 0.1294 1.0000'- ._._._._._. i ._............... i 4.6000'- _._._._._._. i 4.6000'- _._._._._._. i ._............... 1 4.6000'- _._._._._._. y'..................°._...................._._. i 4.6000'- " 0.2756 _._._._._._._._._.._........... 0.2756 1 7.4000'- i ........... 0.2941 003 i 005 1 004 1 004 1 004 004 i 004 i r Total 8.3445 1.1900'- 0.1294 1.0000'- 4.6000.- 4.6000.- 4.6000e- 4.6000'- 0.2756 0.2756 7.4000'- 0.2941 003 005 004 004 004 004 004 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad CaIEEMod Version: CalEEMod.2016.3.2 Page 55 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter Equipment Type Number Hours/Day DaysNear Horse Power I Load Factor Fuel Typei Cranes 1 8.001 2L 2311: 0.29 Diesel Forklifts ....................................... 1 ................................................ 8.00i 3651 ---- - 89� 0.20 .................................... Diesel ............. ....................................... ............................................... I Total : . .................................... Generator Sets 4; 0.30; 52 841: 0.74 Diesel .......... . .......... ......................... ............ ............................... . . . . . ......... ............................................. . 1*7700'- ........................... Pressure Washers i O�2.223. 16.00� 1 13;: 0.30' Diesel UnMitigated/Mitigated 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day HoursNear Horse Power I Load Factor I Fuel TYP7.1 Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F7y7pe77771 ROG NO. CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Blo- CO2 NlIl,- CO21 Total CO21 C114 N20 CO2, I I I PM10 I PM10 I I Total Pm2s I I PIA2.5 I I I Equipment Type lb/day lb/day Cranes 0.4534 5,3915 2 1114 1*7700'- 0,2223 O�2.223. 0,2045 0,2045 558.7896 55&7896 0.1807 563.3077 I 003 ............................ it Forklifts 0.1440 ............ 1 1.2975 ........ 1.1803 ............. i 1.5300.- . . ............... 1 .............. 0.0967 .... . .. .. 0.0967 . . ............... .................. .. . .............. 148.0308 ............ i 148.0308 ............. I 0.0479 ............. .................. 149.2277 003 ............................... Generator Sets 0.0539 05218 0.5558 9.9000.- 0.0294 0.0294 - - - ----- 0.0294 --- -* .................. . -9-3-45-52 OM94 52 5.2600.-- ................... 93.5867 004 003 ................. .............r............._._. .1. 0 39 Pressure 08 06 T. 3 --- E.Z -7 1 i� . Tc�Z--' .............. ... ... ............... ..... ..... .... .................. .. ....... 0.0292 .............. ................ ... 78.3795 Washers 003 003 Total 0.7461 7.8321 4.3393 9.3900.. 0.3775 0.3775 -77773720 878.4557 878.4557 0.2418 88 003 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day HoursNear Horse Power I Load Factor I Fuel TYP7.1 Boilers Equipment Type Number Heat Input/Day I Heat Input/Year Boiler Rating I F7y7pe77771 CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 56 Date: 5/31/2018 8:02 PM Haskins Way Rezone Phase I - San Mateo County, Winter User Defined Equipment Equipment Type Number 11.0 Vegetation Attachment D PROJECT PHASE 1 MITIGATION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 13 Date: 5/31/2018 8:04 PM Haskins Way Rezone Phase I San Mateo County, Mitigation Report Construction Mitigation Summary Phase ROG I No. Number Mitigated Total Number of Equipment DPF Oxidation Catalyst S02 I Exhaust PMIo I Exhaust PM21t I i.- .02 .I- 1 CO2 I Total CO I C14 1 1120 1 .01. Tier 4 Final 7;: 7 No Change 0.1 . .......................................................... ............................................... Percent R.d.cti.n .............. ........................ DreOrill Rigs ;Diesel ;Tier 4 Final 5: 5:: No Change 0.1 ........................................................................ Demolition .................. 0.83: 0.83: -0.06; .................. 0.00: : ................. 0.96; - ----------- 0.95. 0.00: ! .................. 0.00: : ........... 0.00: om� 0.00: ----------- 0.00 ...... ................................................................. .................. ................. ................. .................. ................. ................. ................. ................. ................. .................. ................. ................. Landscaping and Site Improvements 0.74 0.86: 0.00 0.93 0.921 0.00: 0.00: 10.00: 0.00: 10.00: 0.00 ........................................................................ .................. .................. ..................................... .................. ................. ................. .................. .................. .................. ................. ................. Office Building Core Construction 0.74:. 0.62;. -0.062: 0.00! 0.93: 0.93, 0.001 0.001 0.001 0.00l 0.001 0.00 ........................................................................ ................. ................. ................. .................. ................. n ................. ................. ............. : ............. .................. ................. ................. Office Building Exterior Improvements 0.08; 0.70; -0.14; 0.00: 0.93; 0.93, 0.00; 0.00: 0.00; 0.00; 0.00: 0.00 ........................................................................ ................. a ................ ................. .................. . . .............. . . .............. ................. .................. ............... .................. . ............... j ................. Office Building Tenant Improvements 0.09 0.73: 0.00; 0.94; 0-93, 0.00: 0.00 0.00 0.00 0.00: *" *' - " - *----- *-............. .... ... ... a . .. . . .. ... ... ..... ... : . .. . . .. ... . ....... ..'-- �wce Building Underground mund 0.80; 0.88; -0.15 o.00! 0.95: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 ........................................................................ ................. ................. ...................................................... ................. ................. .................. ................. .................. ................. ................. Parking Garage Core Construction 0.631 0.55;. -0.062: 0.00i 0.861 0.861 0,00: 0.00i 0.001 0.001 0.001 0.00 ............................................................ .................. .................. ................. .................. .................. ................. 4 ................. .................. .................. .................. ................. ................. Parking Garage Exterior Improvements : 0.77: 0.752 -0.112 0.00: 0.941 0.94: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 ........................................................................ ................. Z ................. ................. .................. . . .............. ................. 4 ................. .............. . .. .............. .................. _...._._.......i. ... Parking Garage Underground 0.77 0.85 -0.18: 0.941 0.94' 0.00: 000: o.00: 0.00 0.00: ........................................................................ ................................... ................. .................. . . .............. . . .............. 4 ................ : .................. ............. .................. ............. ................. Site Prep and Make Ready 0.75 0.89 -0.21 0.00: 0.92' 0.00: 0.001 0.00: 0.00: 0.00: 0.00 ........ ............................................................... ................. ................. ................. ..................................... Z ................. ................. .................. .................. .................. ................................... Soils Abatement/Ramove/Replace 0.702 0.712 -0.14: 0.00: 0.90! 0.90, 0,00: 0.00: 0.00: 0.00:: 0.00: 0.00 CIFFROAD Equipment Mitigation Equipment Type Fuel Type Tier Number Mitigated Total Number of Equipment DPF Oxidation Catalyst .vial Lifts ;Diesel :Tier 4 Final toE 10 No Change CA ............................................................ j ............................................... F .................................................... .................................... ......................................................... ................................ ................................................ r Compressors ;Diesel Tier 4 Final 7;: 7 No Change 0.1 . .......................................................... ............................................... ......................................................................................... .............. ........................ DreOrill Rigs ;Diesel ;Tier 4 Final 5: 5:: No Change 0.1 CaIEEMod Version: CalEEMod.2016.3.2 Page 2 of 13 Date: 5/31/2018 8:04 PM Cement and Mortar Mixers Diesel No Change 0: 8; No Change 0.00 ... ............................................................ ................ ............................................................... ........ .......... ............................. . . .......... -�o ............................................. . ." Concrete/industrial Saws ;Diesel vTier 4 Final 2: 2- Change 0.00 ... ............................................................ I ............................................... 1 ............................................................ . . . . . . ............. .................................................... Cranes Diesel ;Tier 4 Final 4 : 4. No Change 1 0.00 ... ............................................................ ............................................... I .............. ..................................... . . . . . ........................... ......................................................... .......... ..................... .................................................... Crawler Tractors ;Dime] ;Tier 4 Fin"al 1 1 No Change 0.00 ... ............................................................ ............................................... 1 .................................................... 4 .................................... ......................................................... ................................ .................................................... Dumpers/Tenders 'Diesel No Change 0: 5 No Change 0.00 ................................................................ I ............................................... .............. ................................... 1 .................................... ...................................................... . . .............................................................. . . . ........ . . . . Excavato rs 'Dime] Vier 4 Final 9: 9 No Change I 0.00 ................................................................ I ............................................... .............. ......................... ..................................... ......................................................... 1 .............. .................. I ........................................ Forklifts Dime] 'Tier 4 Final 1: 1 No Change 6.60 .......... ..................................................... I ............................................... .................................................... . . . . . . ....................... ................................... -- .................. ................................ 4 .................................................... Generator Sets 'Dime] 'Tier 4 Final 4 : 4 No Change 0.00 ........... .................................................... I ............................................... ............................................. ........................................ .................................................. ....... ................................ I .................................................... Off-Highway Trucks ;Diesel 'Tier 4 Final 15: 15 No Change 0.00 ................................................................ I ............................................... .................................................... .................................... ......................................................... .. . ........................... 1 .................................................... Other General Industrial EquipmentDiesel 'Tier 4 Final 3 3 No Change I 0.00 ................................................................ ............................................... .............. ...................................... .................................... ......................................................... ................................ .................................................... Paving Equipment Diesel 'Tier 4 Final 2;: 2 No Change 0.00 ............................................................... ............................................... .................................................... .................................... ......................................................... ................................ 4 .................................................... Plate Compactors ;Diesel 'No Change 0 : 11 No Change 0.00 ................................................................ ............................................... .................................................... .................................... ......................................................... ................................ .................................................... Pressure Washers :Diesel No Change 0: 2 No Change 0.00 ................................................................ ............................................... ....................... ....... ..................................... ......................................................... ................................ .................................................... Pumps :Diesel Tier 4 Final 1; 1 No Change 0.00 ...... ........................................................ Rollers 4 ............................................... :Diesel .............. ......................... Tier 4 Final ........ .................................... ......................................................... 2 2 .. . ..... .. ............ Change NoC 0.00 ............ .................................................. 4 ............................................... ll. .................................................... Rough Terrain Forklifts Diesel Tier 4 Final 13:: 13 No Change i 0.00 .......... .................................................... 4 ............................................... .................................................... .................................... ......................................................... : ............................... .................................................... Rubber Tired Dozens Diesel 'Tier 4 Final 4 4 No Change 0.00 .......... .................................................... 4 ............................................... .................................................... .................................... ......................................................... ............................... I .................................................... Rubber Tired Loaders :Diesel eTier4 Final 6: 6 No Change 0.00 ................................................................ ............................................... .............. : ........................................................................... ......................................................... .............. . . . . . .............................................................. Scrapers Diesel eTier4 Final 4 : 4 No Change I 0.00 ..... .......................................................... ............................................... ................................. ........................................................ ......................................................... ..... ......................... .................................................... Skid Steer Loaders :Diesel iTier4 Final 2E No Change 0.00 ............................................................... 4 ............................................... .................................................... . . .... . .......................... ......................................................... ............................... .................................................... Sweepers/Scrubbers :Diesel Final 'Tier 4 F 8: 8 N Change 0 C g 0.00 ................................................................ ............................................... .................................................... .................................... ....................................................... .................................................................................... Tractors/Loaders/Backhoes :Diesel 'Tier 4 Final it:: 11 Change No C g 0.00 ................................................................ ............................................... .............. : ............................. ........ .................................... ......................................................... . ................................................................ Trenchers ;Diesel 'Tier 4 Final 6: 6 No Change 1 0.00 ............................................................... i ............................................... ........................................... .................................... ........................ ................. ..................... .................................................... Welders 'Diesel :Tier 4 Final 13:: 13 0.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 3 of 13 Date: 5/31/2018 8:04 PM Equipment Type I ROG NOx I CO 1 S02 1 Exhaust PM10 Exhaust PM2.5 Blo- CO2 I I NlIlo-.02 I Total CO2 I C11 N20 CO2. Unmitigated tons/yr Unmitigated mt/yr ............................... .................. Aerial Lifts M9500E i��wz I ....... T�6-5-0-0"E' 001 . ............... --- .... .210OOE-00 3.1 1.12900E-002 ...................................................... I 1.039DOE-002 : O.00OOOE,000 1,07477E,002 FTTZ;�E.. .1 ��T - 3.43200E-002 FO.00OOOEIOOO .................. !,..1,01331E+002 ............................... .................. .......................... .1..l . ....................... ........................... ............... ...................... Air Compressors 1.71580E.007 i i.ite4ut+uuu 1.22580E+000 i 1.980OOE-003 8.134OOE-002 i 8.13400E-002 0.00000E+000 1,70323E+002 1,70323E+002 1 1.39400E-002 1 0.00000E+000 1.70672E+002 ............................... - -------------- ............. . -6, I . . . . . . -,6-,6-7,-0,0-O,,E-003 •.......................... I .......................... .......................... . ....................... 'I.697OOE-002 .............. i ........................... Bore/Drill Rigs 1.78100E-002 2.35350E-001 LiTi7i;Ew, 0'0'"O,,O"'O',E, 0,,0,,4,, 6.14000E-003 0.00000E+000 5.36263E+001" 5.36263E+001' 0.00000E+000 1 5.40504E +001 ............................... .......................... .......................... ......................... . .......................... ............... --- ..... .......................... .... ........................................... .......................... -.- ............... ...... .......................... ........................... Cement and i 2.21500E -002 1.38810E-001 1.16260E-001 2.70000E-004 5.42000E-003 5.42000E-003 0.00000E+000 1.72770E+001 1.72770E+001 1.79000E-003 0.00000E+000 i 1.73219E+001 M.,t.r Mixers ............................... ..................... Concrete/Industria 7.53000E -003 .......................... 5.72600E.002 . . . . . . . .............. 5.57600E-002 .......................... 9.00000E-005 ........................... 3.84000E-003 .......................... . ...................................................... 3.84000E-003 0.00000E+000 8.06485E+000 --------- - - - - - --------- 8.06485E+000 -------------------------- 6.10000E-004 .................................. O.00OOOE+000 .. --- .......... 8.08003E+000 I savvs ............................... Cranes -wi 1.88221E+000 7.22600E-001 I 1.85000E-003 7.93400E-002 .............. . ...................... i 7.29900E-002 0M000E+000 i 165370E+002 1.65370E+002 i 5.25800E-002 i 0.00000E+000 ....................... 1M684E+002 ............................... r ................... ..ZZWi.w; . ................. ..... . . .......................... .. . . . . . . . ............. ........................ .......................... .......................... ....... . . . . . . . ........ ....................... . . .......................... ......................... C-1., Tract ... 3.08000E-003 1.29800E-002 4.00000E-005 1.530OOE-003 1.41000E-003 00000E+000 3.53759E+000 3.53759E+000 1.12000E-003 0M000E+000 3.56548E+000 ............................... .......................... .................. ....... .......................... .......................... ........................... .......................... .......................... ........................... .......................... .......................... .......................... ......................... Dumpers/Tendem: 6.02000E-003 3.80900E-002 2.05400E-002 6.00000E-005 1.46000E-003 1.46000E-003 0.00000E +000 4M639E+000 4.52639E+000 4.90000E-004 0.00000E+000 4L53853E+000 ............................... r ................. ........ .......................... .......................... .......................... ........................... .......................... .......................... .............. ... ....................... .. .......................... .............. ......................... Excavators 2.36900E-002 2.44580E-001 2.93790E-001 4.60000E-004 1.18000E-002 1.08600E-002 OMOOOE+000 4.17912E+001 4.17912E+001 1.32000E-002 OMOOOE+000 421213E+001 ............................... .......................... .......................... .......................... .......................... ........................... ............... .......................... : ........................... .......................... .......................... .......................... .. ...................... Forklifts 1.510GOE-003 1.33900E-002 1.05500E-002 1.00000E-005 1.06000E-003 9.80000E-004 0M000E+000 1.21487E+000 1.21487E+000 3.80000E-004 0M000E+000 122437E+000 ............................... ...................... ... ...................... .......................... .......................... ........................... .......................... .......................... ........................... .......................... .......................... .... ..................... .......................... Generator Sets 1.554OOE-002 1.32230E-001 1.30310E-001 2.30000E-004 7.90000E-003 7.90000E-003 OMOOOE+000 1.9782317+001 1.97823EI001 1.25000E-003 OMOOOE+000 1M136E+001 ............................... .................... ........................... ..................... ........................... .................. .......................... .......................... .......................... - - - - - - ---------- . . . . . . . . ........... . . .......................... .......................... Off - Highway 2.55360E-001 2.51999E+000 1.45007E+000 4.90000E-003 9.17300E-002 8.43900E-002 OMOOOE+000 4.35260E,002 4.35260E+002 1.39130E-001 0.00000E+000 4.38738E+002 Truck. ............................... .......................... Other General 1.47700E-002 ........................... 1.34330E-001 .......................... 1.23760E-001 ........................... 1.60000E-004 ........................... 9.83000E-003 .......................... . ...................... f"""" '' 9.04000E-003 O.00OOOE+OW1 40043 E+O0T i `*'*'""'''," t 40043E+OOI 4.52000E -003 * '' 0.00000 E+000 "''"'' 1.41173E +001 Industrial i Equipment i .. .. .. ........... ........................... Paving Equipment 2.36000E-002 ........................... 2.43580E-001 .......................... 2.88290E-001 ........................ . . 4.60000E-004 . .......................... 1.21800E-002 .......................... .......................... ........................... 1.12100E-002 0M000E+000 4.07123E+001 ........................... 4.07123E+001 .......................... 1.31700E-002 ........ . . . . . ........ . . 0M000E+000 .......................... 1 4.10414E +001 ............................... .......................... ........................... .......................... ........................... ........................... .......................... .......................... v .......................... ........................... .......................... ........................... 4 .......................... Plate Compactors: 7.47000E -003 418400E 3923OOE-002 100000E-001 1.82000E -003} 00000E+000 5.82966E+000 5.82966E+000 6.10000E-004 00000E+000 I 5.84479E+000 ................................ ...... .................. ............... :002 ........ ......................... .......................... .-003 -- - - -------------------- .1.82000E .......................... .......................... ........................... ....................... -- ................ -- ...... ........................... 4 .......... Pressure i 5.88000E-003 4.61000E-003 100000E-005 2.800OOE-004 2.80000E-004 00000E+000 6.69340E-001 6.69340E-001 7.00000E-005 0.00000E+000 I 6.71050E-001 washers . ....... .. ............ --2-.9-4-8-3-0-E--O-G-1 . ........... .................. .......................... ....................... ............................ .......................... "1.840OOE-002 ........................... ..... ........ ............ ........................... 4 .......................... Pump. 3.b"Wi,-uUz I 2-.-9-7-4-4-0-E--0-0-1--- 5-.70-0-0-0-&-0-0-4-- 1.84000E-002 0.00000E+000 4.40862E+001 4.40862E+00 i 2.93000 -003 0.00 00E+000 - 4.41594E +001 i ............................... ---- - -;i7T - .... ...................... . . . . . . . . f ................ . ...... ...... -----------' - - I .................. . 1,691 OOE-002 ;�T 7;� E 2- O.OE-004 1. .7 ... E-0.2 + + 9.92.00...3 GOOOE000 . E . + . j E+R.11.. 001 ..-.-.--.-.- .. ............................... ......... . ..... ........................... .......................... .......................... ........................... .......................... .......................... .......................... .......................... .......................... ......................... 4 .......................... Rough Terrain i 7.32700E002 9.50600E-001 1.22029E+000 1.83000E-003 4.11000E -002 3.78100E-002 0M000E+000 i 1.62515E+002 1.62515E+002 5.19800E-002 0.00000E+000 1.63814E+002 Forklifts Min Rubber Tired i 8.75200E-002 9.22810E-001 i 3.33790E-001 i 13.80000E-004 4.51300E-002 - - - - - - 4.15200E-002 0.00000E+000 6.04308E+001 i 6.04308E+001 i 1.94200E-002 0.00000E+000 .......................... i 6.09163E+001 Dozers CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 13 Date: 5/31/2018 8:04 PM Rubber Thad i 2.30100E.002 i 2.78760E-001 i 9.66700E-002 i 3.6000011-004 i 9.35000E-003 a 8.60000E-003 0.00000EI000 i 3.23016E,001 i 3.23016E+001 i 1.02100E-002 i 0.00000E+000 i 3.25570E+001 Loaders .................. ................ :-- ........... --- .... Aerial Lifts 2.973OOE-002 ..... ..................... 6.78880E-001 ......................... 9.16740E-001 - -------------- 1.210OOE-003 1.980OOE-003 . .......................... - - - - - - - - 1.980OOE-003 O.00OOOE-000 1.07477E+002 1.07477E+002 3.43200E-002 ............................... ........................... Scrapers 1: 3.87800E-002 .............. ... .... 4.70680E-001 ................................................. 2.93680E-001 5.50000E-004 ........................... 1.84500E-002 . . . . . .... . . . .... .......................... ........................... 1 1.69700E-002 0.00000E,000 i 4.93674E+001 ..................... . ........................................ 4.93674E+001 I 1.56100E-002 . . . . . . . . . . . .. 0.00000E+000 i ........................... i 4.97575E+001 i ............................... Skid Steer .......................... 7,-8,2-O,-0'0',E, 0-0-2-, 1.20000E -004 -,2-,6-7,-0,0-O,-E,-O,-0,3-, ....................... ...................... L .......................... -2'.46000E-003 0.00000E+000 1.02603E+001 .................... 1.02603E+001' 3.30000E-003 1.70323E+002 .......................... 1.03428E+001 Loaders 1.70671E+002 ................................... ........................... ... .. ........... .. ..... .......................... ................ -- ...... .. . .......... . . . . . . . . ........................... ........ --- ........... ........................... .......................... ........................... ............................... S...pa./Scrublb ......................... Bore /Drill Rigs 7.45000E-003 3.23000E-002 2.73330E-001 . . .......................... .......................... 0.00000E+000 4.49012E+001 ................ . . . ...... 4.49012E+001 .......... 1.43E 5.36262E+001 .......................... 4M608E+001 ............................... ..................... ........................... ........................... ........................... ........................... ........................... . .......................... .......................... ........................... .......... .......................... ........................... Tractors /Loaders/ 3.69500E-002 3.70650E-001 3.75920E-001 5.10000E-004 2.43700E-002 2.24200E-002 0.00000E+000 4.53351E+001 4.53351E+001 1.44500t-002 U.Uuuuut+uuu 1 4.56964E +001 0.00000E,000 1.73218E+001 Mixers Trenchers i�3z;WW; ;,Zj�E' 0-G-4 2.51700E -002 ,----,", ...... . .......................... .......................... -2-3-1-6-0-0"E' 0, 02 0M000E+000 2.57437E+001 ........................... Z57437E+001 ...................... ............................... 8.150OOE-003 0. + 2�5 ............................... ......................... 8.08002E+000 Saws - - - - - - - - - - .......................... - - - - - - - - - - - - - - - ......................... Welders 3.44960E-001 1.49278E+000 E 1.66642E+000 i 2.37000E-003 i 8.87800E-002 i 8.87800E-002 0M000E+000 1.74798E+002 i 1.74798E+002 E 2.81400E-002 i 0.00000E+000 i 1.75502E+002 Equipment Type I ROG I NOx I CO I S02 I Exhaust PM1 0 1 Exhaust PM2.5 Bio- CO2 1 NBio-0O2 1 Total CO2 I CH4 I N20 I CO2e Mitigated t-/y, Mitigated mttyr .................. ................ :-- ........... --- .... Aerial Lifts 2.973OOE-002 ..... ..................... 6.78880E-001 ......................... 9.16740E-001 - -------------- 1.210OOE-003 1.980OOE-003 . .......................... - - - - - - - - 1.980OOE-003 O.00OOOE-000 1.07477E+002 1.07477E+002 3.43200E-002 0.00000E+000 ........................... 1.08335E+002 ................................... ........................... ........................... .......................... .......................... ........................... ........................... ...................................................... .......................... ........................... ........................... .......................... Air Compressors 1.98200E-002 8.59000E-002 1.22237E+000 1.98000E-003 2.64000E-003 2.64000E-003 0.00000EI000 1.70323E+002 1.70323E+002 1.39400E-002 0.00000E,000 1.70671E+002 ................................... ........................... ... .. ........... .. ..... .......................... ................ -- ...... .. . .......... . . . . . . . . ........................... ........ --- ........... ........................... .......................... ........................... ........................... ......................... Bore /Drill Rigs 7.45000E-003 3.23000E-002 2.73330E-001 6.00000E-004 9.90000E-004 9.90000E-004 0.00000E+000 5.36262E+001 5.36262E+001 1.69700E-002 0.00000E+000 5.40504E+001 ................................... ........................... . -- ...................... -- ................. .. ................ -- ...... ........................... ........................... ...................................................... .......................... ........................... ........................... .......................... Cement and Mortar i 2.21500E-002 1.38810E-001 1.16260E-001 2.70000E-004 5.42000E-003 5.42000E-003 0.00000E+000 1.72770E,001 1.72770E+001 1.79000E-003 0.00000E,000 1.73218E+001 Mixers .......................... ......... .......................... Concrete /Industrial 9.40000E-004 .......................... 4.07000E-003 .......................... 5.78800E-002 .......................... 9.00000E-005 .. . . . . . . . .............. 1.30000E-004 ........................... . ...................................................... 1.30000E-004 0.00000E+000 8.06484E+000 .......................... 8.06484E+000 ....... .......... 6.10000E -004 ....................... 0.00000E+000 ......................... 8.08002E+000 Saws ............ 6 .n."*"*"* F T .. 603 '�WWE ZT. ........................... ............. . . ;�jZjW;,Uln-;;�60 A. E+000 5370E+002 .......................... 6 OE+Z 537 ........................ 1.66684E+002 ............................... ................................. . ...................... ...... ............... . . . ...... ................... * ..... . ........................ .[l. . . ...................... .......................... . ..................... Crawler Tractors 4.80000E-004 2.09000E-003 1.76900E-002 4.00000E-005 6.00000E-005 6.00000E-005 O.00OOOE+000 3.53759E+000 1 3.53759E+000 1.12000E-003 0.00000E+000 3.56548E-6�� ................................... .......................... ------------------ -------------------------- - -- ---------------- ... ................... . . ... ...................... . ... .......................... ................. . ......................... ---------------- Dumpers rrenders 6.020OOE-003 3 809OOE-002 2.054OOE-002 6 00001E-,05 1.460OOE-003 1.460OOE-003 O.00OOOE-000 4.52638E+000 4.52638E+000 4.900OOE-004 0.00000E,00011 4 5"3"8"5"3"E 0'0"0" ....................... ........ .......................... E.-.tor. 5.7200GE-003 . ..... .2..4.7.800E - 02 .......................... 3.52620E-001 4-.-6W -WE ......................... 7.600OOE-004 ........................... .......................... ........................... 7.600OOE-004 O.00OOOE,000 4,17911E+001 ........................... 4.17911 E+001 .......................... 1.320OOE-002 .......................... O.00OOOE+000 .......................... 421212E+001 ................... ............... ........................... ......................... [ . ........ ................. ......................... . ......................... .. ........................... ........... ........................... ........................... .......................... .......................... .......................... Forklifts 1.60000E-004 7 10000E-004 1.01600E-002 1 0.00(,E_., 2.00000E-005 2.00000E-005 0.00000E+000 1.21487E+000 1.21487E+000 3.80000E-004 0.00000E+000 1.22437E+000 ................................... ........................... ............... .... .......................... ..................... . ....................... . ........................... .......................... ........................... .. . . . . . . . .......... . . .. .......................... ... .......... . . . . . . . . ........................ Generator Sets 2.300OOE-003 9.98000E -003 i 1.41970E-001 2.30000E-004 i 3.10000E -004 i 3.10000E-004 0.00000E+000 1.97822E+001 1.97822E+001 1 1.25000E-003 O.00OOOE+000 1 1.98136E+00 .......... ......................... ...................... Off - Highway Trucks 5.99300&00� 54'E 0'0"0" ........ .......................... 7.990OOE-003 O.00OOOE+000 4.35259E +002 5" 0-.) 1 4.38737E +002 . ,,,, ........ ..................... ........................... ! ------------------------------------------------ ......................... ........................... . ............... . . . .... . . . . ................... .......................... Other General 1.970OOE-003 8.520OOE-003 1.2130GE-001 1.600OOE-004 2.600OOE-004 2.600OOE-004 O.00OOOE+000 1.40043E+001 1.40043E+001 4.52000E-003 O.00OOOEIOOO 1.41173E+001 Industrial Equipment' CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 13 Date: 5/31/2018 8:04 PM Paving Equipment a 5.72000E -003 a 2.47900E -002 a 3.52740E -001 j 4.60000E -004 j 7.60000E -004 j 7.60000E -004 0.00000E +000 j 4.07122E +001 a 4.07122E +001 i 1.31700E -002 0.00000E +000 j 4.10414E +001 ... ............................... ........................._!.............. ..........._I.................. ......................... 1r.c..ent 42E012.94E :0.00000E +000 .1.20956E 0 -006 1...2..0..9..5..6..E .-0..06 1......................... 000000E +000 ................. .. ...1....1..9..9..9..8..E ..-..0..0..6. .. 0.00000E +000 .I+00 ................................... Plate Compactors ! 7.47000E -003 4.68400E -002 3.92300E -002 9.00000E -005 1.82000E -003 1.82000E -003 ; 0.00000E +000 j 5.82965E +000 5.82965E +000 6.10000E -004 0.00000E +000 j 5.64478E +000 .................................. ........................... ._._.........._._.. ... ....................... ............................... 9.27535E -001 _.................................................... j........................... :.............................. 9.67544E -001 9.67544E -001: 0.00000E +000 1.17424E -006 Pressure Washers ! 8.40000E -004 5.88000E -003 4.61000E -003 1.00000E -005 2.80000E -004 2.80000E -004 ; 0.00000E +000 ! 6.69340E -001 6.69340E -001. 7.00000E -005 0.00000E +000 j 6.71050E -001 .... ... ' .2.22300E .......... ......................... ........................... ........................... }...................................................... ......................... ............................ 8.62758E -001 ....................................................... Pumps j 5.13000E -003 -002 3.16400E -001 5.10000E -004 6.80000E -004 6.80000E -004 ; 0.00000E +000: 4.40861E +001 4.40861E +001 2.93000E -003 0.00000E +000 i 4.41593E +001 .................................. u...................... ............................_.. .......................................................................................................... i y............................................................................ ............................... _._._._.. .............. ....................... Rollers '. 2.61000E -003 i 1.13300E -002 1.61180E -001 1 2.10000E -004 i 3.50000E -004 i 3.50000E -004: 0.00000E +000 ! 1.87269E +001 1 1.87269E +001 i 6.06000E -003 1 0.00000E +000: 1.88783E +001 .........................i 0.00000E +000 1 1.15461E -006 .....1 _.____._._._. • i • : .....................1 ................. ! ..........................1 j _______._.y. .......................... Rough Terrain ! 2.24800E -002 9.74100E -002 1.38622E +000 1.83000E -003 3.00000E -003 3.00000E -003: 0.00000E +000: 1.62514E +002 1.62514E +002 5.19800E -002 0.00000E +000 ! 1.63814E +002 Forklifts ........... .......................:.................................................................................................... Rubber Tired Dozers: 8.36000E -003 3.62400E -002 3.06690E -001 ...... 6.80000E -004 ........................... 1.12000E -003 ........................._. ........ .............................................. 1.12000E -003 ; 0.00000E +000 j 6.04307E +001 ........................... 6.04307E +001 ........................... 1.94200E -002 ...................................................... . 0.00000E +000 1 6.09162E +001 ................................................................................................................................................................................................... j........................ ...:........................... . . ...................... ................................................. .......................... :.......................... . Rubber Tired 1 4.45000E -003 1.92700E -002 1.63050E -001 3.60000E -004 5.90000E -004 5.90000E -004: 0.00000E +000 1 3.23016E +001 3.23016E +001 1.02100E -002 0.00000E +000 j 3.25569E +001 Loaders . i ..................... ....... 6.76000E -003 ._._._._....... ... 2.92800E -002 ........................ 2.47780E -001 1 90000E 0 E 0.00000E +000 4.93673E +001 : ________ 4.93673E +001 1.5600E - 2 "0"770;0W-";i7 E 4.97575E +001Scrapers ............................... ....:.......................... _._._._._._._._._ 1.............. ..................._._._._._._. 1......................._. 1................................................. ............................... _._._._._._._._._ i.......................... ................. . !........................... Skid Steer Loaders ! 2.86000E -003 6.53800E -002 8.82800E -002 jjll' 120000E -004 1.90000E -004 1jI 1.90000E -004: 0.00000E +000 ! 1.02602E +001 1.02602E +001 3.30000E -003 0.00000E +000 1.03428E +001 ! ...................................!...................... ............................... ...........................................................................................................}........................................................................................... ........... . ! ............................... ........................... SweeparslSCrubbers! 1.24100E -002 2.83290E -001 3.82550E -001 5.10000E -004 8.30000E -004 8.30000E -004: 0.00000E +000 ! 4.49012E +001 4.49012E +p01 1.43800E -002 0.00000E +000'l 4.52607E +001 ................................... i..................................................... 1............................................................................... 1...........................}................................................................................................................................ ...1........................... Tractors /Loaders /Bai 6.22000E -003 2.69500E -002 3.83510E -001 5.10000E -004 8.30000E -004 8.30000E -004: 0.00000E +000 i 4.53350E +001 4.53350E +001 1.44500E -002 0.00000E +000 f 4.56964E +001 ckhoes 1 .............................................................. Trenchers 3.51 ............ ....I . .................. 2 E 0 ............................ ..... 4.70000E 0 0.. 0,000,0 E +.0.00 2.57437E +001 2.57437E +001 8.15000E -00_3 0_.0_0_00_0_E +_ 0_00 ............................... ______._._......_._._._.___ _ _._._._._._ ._._._._.____... ................................ .0........... ....... ------------------------- --------- ._._._._._._._. ... . .. ..2....5..9..4..7..3..E ...+..0..0..1 Welders 4.06900E -002 9.32390E -001 , 1.39010E +000 , 2.37000E -003 2.71000E -003 2.71000E -003 0...0000E +000 1.74798E +002 1.74798E +002: 2.81400E -002: 0.00000E +000: 1.75502E +002 Concrete/industrial ! 8.75166E -001 9.28921E -001 - 3.80201E -002 0.00000E +000 9.66146E -001 9.66146E -001 0.00000E +000 ! 1.23995E -006 1.23995E -006 0.00000E +000 0.00000E +000 1.23762E -006 ..........._Saws..._._._ ..................................................... ...... ......... ............ ................ ............ 1.......................... 1........................... t._._._._._.......... .:.... ...................... ........................... 1......................... Cranes 8.56139E -001 9.47663E -001 - 1.53557E -001 0.00000E +000 9.61810E -001 9.58487E -001: 0.00000E +000 1.20941E -006 1.20941E -D06 0.00000E +D00 0.00000E +000 1.13988E -006 .................. ...._._._._._............._.___ ._._._ 1...... ................._..._.__._.___ � ________ 1...........................}................... .............._._._..---- - - - - -- __._._.___._.._._._._._ ....... .................. ,......... .................. Crawler Tractors 8.44156E -001 9.48370E -001 - 3.62866E -001 0.00000E +000 j 9.60784E -001 j 9.57447E -001 0.00000E +000 0.00000E +D00 0.00000E +D00 j 0.00000E +000 j 0.00000E+000j 0.00000E +000 Reduction ....................Ls . Aerial 0 1 1......................P..e. ......................... 1r.c..ent 42E012.94E :0.00000E +000 .1.20956E 0 -006 1...2..0..9..5..6..E .-0..06 1......................... 000000E +000 ................. .. ...1....1..9..9..9..8..E ..-..0..0..6. .. 0.00000E +000 .I+00 ................................... ........................... ...0 .0.................. . . ......................a.................... ............................... .. ..... .............................. Air Compressos 8.84485E -001 9.27535E -001 1 2.79817E -003 0.00000E +000 9.67544E -001 9.67544E -001: 0.00000E +000 1.17424E -006 1.17424E -006 0.00000E +000 0.00000E +000 1.17184E -006 ................................ ...E........................... _._._._._._._ ._._........................... - -- ______ __ _ _________ _______ Bore /Drill Rigs : 5.81696E -001 8.62758E -001 - 1.07430E +000 0.00000E +000 8.51574E -001 838762E -001: 0.00000E +000 1.11886E -006 1.11886E -006 0.00000E +000 0.00000E +000 1.29509E -006 i Cement and Mortar 0.00000E +000 0.00000E +000 1 0.00000E +000 0.00000E +000 0.00000E +000 1 0.00000E +000: 0.00000E +000 1.15761E -006 1.15761E -006 0.00000E +000 0.00000E +000 1 1.15461E -006 Concrete/industrial ! 8.75166E -001 9.28921E -001 - 3.80201E -002 0.00000E +000 9.66146E -001 9.66146E -001 0.00000E +000 ! 1.23995E -006 1.23995E -006 0.00000E +000 0.00000E +000 1.23762E -006 ..........._Saws..._._._ ..................................................... ...... ......... ............ ................ ............ 1.......................... 1........................... t._._._._._.......... .:.... ...................... ........................... 1......................... Cranes 8.56139E -001 9.47663E -001 - 1.53557E -001 0.00000E +000 9.61810E -001 9.58487E -001: 0.00000E +000 1.20941E -006 1.20941E -D06 0.00000E +D00 0.00000E +000 1.13988E -006 .................. ...._._._._._............._.___ ._._._ 1...... ................._..._.__._.___ � ________ 1...........................}................... .............._._._..---- - - - - -- __._._.___._.._._._._._ ....... .................. ,......... .................. Crawler Tractors 8.44156E -001 9.48370E -001 - 3.62866E -001 0.00000E +000 j 9.60784E -001 j 9.57447E -001 0.00000E +000 0.00000E +D00 0.00000E +D00 j 0.00000E +000 j 0.00000E+000j 0.00000E +000 CaIEEMod Version: CalEEMod.2016.3.2 Page 6 of 13 Date: 5/31/2018 8:04 PM Dumpers/Tenders i 0.00000E+000 i 0.00000E+000 i 0.00000E+000 i 0.00000E-000 i 0.00000E+000 i 0.00000F+000 0.00000E+000 i 2.20927E-006 i 2.20927E-006 i 0.00000E+000 i 0.00000E+000 i 0.00000E+000 ... ............................... , , , , , , ..... ........ ........................... ..... ....... ....... . . . . . . . . . . . . . ......... ... . . . . . , , , , '1.18705E Excavators 9.35593E -001 -001 : 0.0-0-0-0-0-E-+-�6� 9.30018E 9.57140E -007 0.00000E +000 -006 ................... . . ................. - .......... '8.9404OF-" .. ..... ................... ....... .. ................. .... .. . ..................... . . . . ............................ t ................................................. . .. ...................... ......................... . ........... ........... Forklifts 0 0i 3.6966817-002 0 OOOODE-000 9.81132E-001 9.79592E-001 0.00000E+000 O.00OOOE+00"O" 0,00000E+000 0.00000E +000 0.00000E+000 0.00000&000 ................................... ........................... .......................... ........................... ........................... ........................... ........................... .............. ....................................... ......................... ... ...................... .... ................................................ Generator Sets 8.51995E-001 I.TZi��i-001 9.24525E-001 -8.94789E-002 I 0.00000E+000 I 9.60759E-001 9.60759E-001 0.00000E+000 1.01101E-006 1.01101E-006 [1.19469E-006 0.00000E+000 O.00OOOE+000 1.00941E-006 ... ............................... . ........................... ....................... . . ........................... ........................... ........................... ........................... ............ ...... . . ...................... .......................... ...................... ....................... .. Off - Highway Trucks 7.65312E-001 8.96940E-001 -6.15472E-001 0.00000E+000 i 9.12897E-001 i 9,05321E-001 0.00000E+000 1 1 9.4..6..9..E. 0.06 i 0.00000E+000 0.00000E+000 1.18522E-006 ........ ........................... .. . .................... - - -------------- ... .................... I .... .......................... . . ...................... . . .............. .... ..................... ________.J ......... ................ Other General 2 8.66622E-001 9.36574E-001 1.98772E-002 0.00000E+000 9,73550E-001 9.71239E-001 0.00000E+000 1,42814E-006 1,42814E-006 0.00000E+000 0.00000E+000 1.41670E-006 Industrial Equipment: Paving Equipment 7.57627E-001 8.98226E-001 -2.23560E-001 0.00000E+000 9.37603E-001 9.32203E-001 ci.'0'0000 E'+"0"0"0" ........................... 1.22813E-006 ................. ........ 1.22813E-006 .......................... 0.00000E+000 ..................................................... 0.00000E+000 1.21828E-006 ............... .............. ........................... ........................... .......... ............ .. ...................... -- ........................... ..................... ..... ............................ ........................... .......................... .......................... ........................... ......... ................ Plate Compactors O.00OOOE+000 O.00OOOE+000 O.00OOOE+000 O.00OOOE+000 O.00OOOE+000 O.00OOOE+000 O.00OOOE+000 1.71537E-006 1.71537E-006 0.00000E+000 0.00000E+000 j 1.71093E-006 ...... ............................. 1 : ........................... Pressure Washers O.00OOOE+000 ... .. ................... 0 OOOOOE+000 .......................... O.00OOOE+000 ... ...................... O.00OOOE-000 ........................... O.00OOOE+000 .......................... .............. ........................................ 0.00000E,000 0.00000E+000 0.00000E+000 ... ...................... 0.00000E+000 .......................... 0.00000E+000 .......................... 0.00000E+000 i 0.00000E +000 .............. .................... ........................... ........................... .......................... .......................... . ......................... .................. ... .................................................. .......................... .......................... .......................... I .......................... Pumps 8.59221E-001 9.25262E-001 -7.31608E-002 0.00000E+000 9.63043E-001 9.63043E -001 0.00000E+000 1.13414E-006 1.13414E-006 0.00000E+000 0.00000E+000 1.35872E-006 .............. ............ ..---. . . - .......... ............. ........... ........................... ........................... ...................... . ... ....................... .. Rollers 8.45653E -001 1119.32994E-001 -Z7119E-002 0.00000E+000 i 9.67532E-001 i 9.64718E-001 0.00000E+000 1.06798E-006 1.06798E-006 i 0.00000E+000 0.00000E+000 1.05942E -006 ........ .. ............... .......................... I ............... '-F'T��;;W'001 I ......... I - i i . .......................... ..................... - I ----------- ----- ................. ...... .......................... Rough Terrain 6.93190E-001 8.97528E-001 0��000JE+0fl..9.27007&001 9.2065BE"'O'"O"1" 0.00000E+000 1.16913E-006" 1.16913E'006 0.00000E+000 0.00000E+000 1.22090E-006 For �n! ................. ........... ............................ Rubber Tired Downs', 9.04479E-001 .................... 9.60729E-001 .......................... 8.11888E-002 ................. 0.00000E1000 ................. 9.75183E-001 .......................... ... ................................................... 9.73025E-001 0.00000E+000 1.15835E-006 .................. 1.15835E-006 ................ * O.00OOOE+000 ------------------- .......................... 0.00000E+000 1.14912E-006 ......... ......................... .......................... .. . . .......... . . . ...... .......................... ....... . . . .............. .................... .......................... .................. .......................... .................. "D*'O'*6" ......... *"* ....... .......................... 'O.00OOOE+000 Rubber Tired 8.06606E-001 9.30872E-001 -6.86666E-001 0.00000E+000 9,361118E-C101 9.11395E-001 0.00000E+000 1.23833E-006 1.23833E 00000 E+0003' 1.22.2E-006 Loaders ................................ .; ........................... Scrapers 1: 8.25683E-001 ....................... ............................... 9.37792E-001 1.56293E-001 .......................... 0.00000E+000 .... -- ................... 9.51220E-001 ...................... ... .......................... ..................... 9.46965E-001 0.00000E+000 1.21538E-006 ........................... 1.21538E-006 .......................... 0.00000E+000 ............................. ........... 0.00000E+000 1.20585E-006 ............................ v ........................ . . . *"*"*"*"* ............. I .......................... ........... ............... .. . . ------ . ........................ ................... ......................... Skid Steer Loaders 3.74179E-001 - 7.72780E -002 i .28900E-001 O.00OOOE-000 0.00000E1000 9.74635E-007 -007 O.00OOOE+000 O.00OOOE�000 9.66853E-007 ............................ '�;;;�-,;;�c-r-u-b-b'e ................... I . .... ...................... - - - - - .............. ....................... - - - - - .................................... ... ....................... . Sweepers /Scrubbers! 7.75018E-001 4.05926E . -001 3.54748E -002 0.00000E +000 9.78442E -001 0, 1 .00OOOE+000 1.11356E-006 TTT�;W O.00OOOE+000 1.10471E-006 ............................ -�..t. a' 8.31664E-001 ........................ 9.27290E-001 -2.01905E-002 ......................... 0.00000E+000 ........................... 9.65942E-001 ........................... ..................................................... 9.62979E-001 0.00000E+000 1.10290E-006 -006 0.00000E+000 0.00000E +000 ! 1.31301E -006 ckhoes ................................... ........................... Trenchers 9.04930E-001 ..................... .. ... 9.54350E-00 1 T .......... ........ ' - 3.561iW002 ............ ........... O.i�OOOE+000 .. ........................... j... 9.79706E-001 0.00000E+000 1...l..6..5..3..3..E. G..O..6... ......... ....... -.1-.1-6-533E-G06 0.00000E +000 -------- ......................... 0.00000E+000 1.15619E-006 ................................... -- ------- - - --- ---------- - - - - - - - - . .. .............. ............... ............. -------- -------- -------- .. .... ...................... Weldor. 8.82044E-001 3.75400E-001 1.65817E-001 0.00000E+000 9.69475E-001 9.69475E-001 0.00000E+000 1.20139E-006 1.20139E-006 0.00000E+000 0.00000E+000 1.13959E-006 Fugitive Dust Mitigation Yes/No Mitigation Measure Mitigation Input Mitigation Input Mitigation Input CalEEMod Version: CaIEEMod.2016.3.2 Page 7 of 13 Date: 5/31/2018 8:04 PM No iSoil Stabilizer for unpaved i PM 10 Reduction 2 0.00 PM2.5 Reduction: 0.00: :Roads ........................... No i............................... _._._ .................................. f......................................... .__ ........................ ; Replace Ground Cover of PM 10 Reduction I y ....... ... ..............a.__ 0.00: PM2.5 Reduction; ------ _ _.__- 0.00; .. ............................... ;Area Disturbed i ............................ Yes - ------------ -------- ._._._._._. ;Water Exposed Area f___......._._._._.___._.;. :........................................_._._._._._._._._._._.—._."-----._._._. TPM10 Reduction ; 55.00 "PM2.5 Reduction; _._._._....._._._._._....""-- -- 55.00`:. Frequency (per .......................... .......... f . 2.00 i € € €day) i No _._._._._._._._._._......._._._.__._._._._._._.. �....._._._._._._._._._._._._.;.._._ .... _._ ........................: .................................... .... ........................... ;Unpaved Road Mitigation Moisture Content; 0.00'Vehicle Speed ._._._._._._._._._._.__ 0.00: ..... ............................... ..........• :(mph) .......... ............................... No 'Clean Paved Road % PM Reduction:: 0.00: CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 13 Date: 5/31/2018 8:04 PM Unmitigated Mitigated Percent Reduction Ph.. Source PM10 PM2.5 PM10 PM2.5 PM10 PM2.5 Demolition Fugitive Dust 0.02 0.00i 0.01 0.00 0.55 0.5; .................................................................. Demolition ........................................................ .................................. Roads 0.00 ....................................... 0.00. i 0.00 0.00 . 0.00 ........ ............................ .... 0.00 .... ............................................................. Landscaping and Site Improvements ........................... ..................... Fugitive Dust ........... .. 0.00 . . . . . . . . . . . . . . . . ..... ...................................... 0.001 0.001 0.00 . . . . . . . . . . 0.00 .................................... 0.00 .... ............................................................. Landscaping and Site Improvements ......................................................... ............................. Roads 0.01 ...................................... 0,00: .... 0.01 0.00 0.00 ........... 0.00 ... .............................................................. Office Building Core Construction ........................................................ j .. . ............. Fugitive Dust ................ 0.00 . . . .................... . ...................................... 0.00. i 0.00 0.00 0.00 ..... ............................... 0.00 ... .............................................................. Office Building Core Construction ......................... --- ........................ ................. Read. -- ............. 0.16 . ................... . ........................................... 0.041 i 0.16 0.04 0.00 .................................... 0.00 ... .............................................................. Office Building Exterior Improvements ........................................................ ...................... It Fugitive Dust .. 0.00 ........................................... 0.00 0.00 0.00 . . . . . . . . . . 0.00 .................................... 0.00 .............................................. ,6w"C'e'-K'il'd`rg Exterior improvements ......................................................... .................................. i Roads 0.00 ........................................... 0.00i 0.00 . . . . . . ..... . . . 0.00 ................ . . . . 0.00 .................................... 0.00 .................51 :n" e Ui l g'* 'T"'e"n"a"n"t"Improvements '"' ` ........................................................ .................................. I Fugitive Dust 0.00 . . . . . . ....... ................................... 0.00i 0.00 0.00 0.00 .................................... 0.00 ' ", :"' """"""""""" """' 6 Wce Zi l5ing Tenant Improvements . .. ............................................. .................................. wo.; 0.02 --4 ........................................... 0.00l i 0.02 0.001 0.00 .................................... 0.00 .............................. Ow1ceBuilding , Underground ........................................................ .................................. Fugitive Dust 0.00 -4 .......................................... 0.00i 0.00 0.00 .................................... 0.00 Office Building U ........................................................ .................................. 1 1: Roads 1 0.00 i 0.0ol I............ 0.001 . . . . . . . . . . . . . . 0.00 10) .................................... 0.00 Parking .......................... r. Construction ......................................................... ........................... !Fugitive Dust �.00 0.00 ............................... 0.00 . . . . . . . . . . 0.0011 ......... . . . . . . . . . . . . . . 0.00 .................................... 0.00 E . ................. '�ar�i'n ra r. Construction j.......... -- ............................... . ......... j .................................. 1 Roads 1 0.11 . ................. 0.031 .11 0. 0� ot)� .................................... 0.00 .................................. -�ar n Garage nor Improvements ........................................................ ........................... Fugitive Dust .00 -1 ..................................... 0.00: .00 0.00i . 0.00 .............................. �.*�6 .............................. Parking Garage Extedor Improvements ........................................................ .................................. Roads 0.00 0.001 I 0.001 0.001 0.00 ... ................. ........... 0.00 ...... ........................................................... Parking Garage Underground ......................................................... ............................. Fugitive Dust 0.00 ........................................... 0.00i 0 .00 . ()()o . . ........... . . . . 0.00 .................................... 0.00 ...... ..................................................................................... Parking Garage Underground . ........................ .................................. Roads 0.00 ........................................... 0.001 i 0.00 0.00 0.00 .................................... 0.00 .................................................................. Site Prep and Make Ready j ........................................................ .......................... Fugitive Dust -- .... 0.03 . . .................... 1 ............................ 0.00: i ......... 0.01 0.00 0.55 .................................... 0.55 .................................................................. Site Prep and Make Ready ........................................................ .................................. Roads 0.00 .............................. ...................................... o .00 on 0 , 0.001 0.00 . . . . . . . . 0.00 .................................... 0.00 ......... ........................................................ Soils Abatement/Remove/Replace ......................................................... ........................... Fugitive Dust ...... .00 ............ 0.00; ............................... I - - - - - - 0.00 0.55 '_'_._____'°___ ------------------------------------ 0.54 .................................................................. Soils Abatement/Remove /Replace ........................................................ ................................. Roads 0.01:: ................. 0.00: .................... 0.011 .................................. . . . . . ........ 0.00: .................................. 0.001 .................................... 0.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 9 of 13 Date: 5/31/2018 8:04 PM Operational Percent Reduction Summary Operational Mobile Mitigation Project Setting Mitigation ICategory I 1 Input Value 1 1 I E-a..1 I Exhaust I I r4sio- I I I I ------------ ................................................................................................ :Increase Diversity .................................................................................................... Category 0.331 RO. N.. CO .102 MJC) PM2.5 Bi.- CO2 CO2 Total CO CH4 N20 CO2e ............................ No 21-and Use ......................................................................................................... Increase Transit Accessibility Percent Reduction ................................................. ............................... ............................ No 21-and Use ......................................................................................................... Integrate Below Market Rate Housing ..................................... 0.00 ....... ........................... ..................... ......................................................................................................... Architectural Coating . ............ 0.00: ......I..................___ 0.00: ° °°................. 0.00: 0,00: 0.00: I ................. 0.00: :--- 0,00: .................. 0.00: I ................. 0,00: .................. 0,001 0.00 ......................................................................................................... Consumer Products .................. .................. 0.00: .................. 0.00: .................. .................. 0.00: 0.00: 0.00: ................. ........... 0.00, .................. 0.001 0.00: .................. .................. 0.00: .................. 0.00: ................. 0.004: 0.00 't .... .......................................................................... ............... ...........0....... ...........0........ ...........0....... ...........0....... .................. ................. . ................. ...........0....... ...............0..0.. ...............0..0.. ...............0..0. ...........0.. . �la. in 6 7 00; 00: 00; 00: 0.00 0.00' 0.00: .00: 0 : 0 : 0 : 0..0 . ........................................................................................................................... .................. . . .............. . . .............. .................. ................. .................. ................ . ................ ................. . ............. ... Hearth I 0.00; 0.00: 0.00: 0.00: 0.00: 0.00: 0.00:: 0.00: 0.00: 0.00 .... ...................................................................................................................... ............ ................. .................. .................. ........... .................. .............. ................. ................. Landscaping I 1 0.00: 0.00: 0.00 0.00 0.00 0.00' 0.00; 0.00: 0.00: 0.00: 0.00! 0.00 ................. .............................................. .......... .................. .................. ..................................... .................. ................. . ................. ................... ! 1 .................. .......... .................. .......... ....... .................. ................. 0.00; 0.00; 0.00 0.00 0.0o 0.00, 0.00: 0.00: 0.00: 0.00: 0.00: ................................... --* ............................................... ................. .................. ................. ................. .................. ................. . ................. .................. .................. .................. ................. . ........... Natural 0.00; 0.00: 0.00: 0.00; 0.00: 0.00, 0.00: 0.00; 0.00:: 0.001 0.001 ............ ........................... ................. ........ ... ... ... ... . ... . .... .. . ...... . . ... ... . . ... . ... . ...Z,--,, ....... Water Indoor 0.00; 0.00; : : 0.0o 0.00 0.00 : 0.00• l 0.00: 0.00 0.00: 0.001 000 ............................................................. ............... .............. .. .. ............... ............... .............. .. .. ... .............. .. .... ........... ... .... ... .......... .... ... .......... .... ... .......... .... ... .......... ....... ... Wafer Outdoor 0.00; 0.00; 0.00: 0.00; 0.00: 0.00., 0.00: 0.00: 0.00; 0.00: 0.00: 0.00 Operational Mobile Mitigation Project Setting Mitigation ICategory % Reduction Input Value 1 Input Value 2 Input Value No ':Land Use (Increase Density ............................ No 21-and Use ------------ ................................................................................................ :Increase Diversity .................................................................................................... 1 0.111 0.331 ....................................... ............................... No . . . . . . . . . ;Land Use . . . . . . . . . . . . . . . . . It Improve Walkability Design .............................. . 0.00 . . . . ............ . ............. .... ............................... ............................ No ;Land Use ................................................................................................... :Improve Destination Accessibility ................................... 0.00 ................................................ ............................... ............................ No 21-and Use ......................................................................................................... Increase Transit Accessibility .......................................... 0.25 ................................................. ............................... ............................ No 21-and Use ......................................................................................................... Integrate Below Market Rate Housing ..................................... 0.00 ....... ........................... ..................... ............................ ............................ Land Use :anse 2 ........................................................................... ................................................... . l t uoa L d U S bT 1 I ........................................................................................................... . . t ..... . . . . . ............................. 0 0 Of .......................................... ................................................. ............................... CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 13 Date: 5/31/2018 8:04 PM - _ - - -- _.._..._._ -._. 1 1 ..........No........... School Trip .......................... .....................Implement School Bus Program i -------......... ..................._._......... ........................ :Total VMT Reduction 0.00: Area Mitigation Measure Implemented Mitigation Measure Input Value No Only Natural Gas Hearth •...................................... .....................................;.... ............................... ............................................................ No . . . . . . . . . . . . . . . ................... :No Hearth s................................................................................................................ ............................... ............................................................ No 'Use Low VOC Cleaning Supplies :................................................................................................................ ..................................................................... ............................................................ No :Use Low VOC Paint (Residential Interior) :................................................................................................................ ..................................................................... 100.00 ............................................................ No :Use Low VOC Paint (Residential Exterior) :................. ..................................................................... 150.00 ............................................................ No __ ........................................................................................... :Use Low VOC Paint (Non - residential Interior) :................................................................................................................ ....................................................... .............. 100.00 ............................................................ No :Use Low VOC Paint (Non - residential Exterior) s................................................................................................................ ..................................................................... 150.00 ............................................................ No :Use Low VOC Paint (Parking) ..................................................................... 150.00 ............................................................ No ;................................................................................................................ :% Electric Lawnmower ..................................................................... .................. __ ...................................... No ;................................................................................................................ :% Electric Leafblower :_____.--- ..................................................................... ............................................................ No ............................................. __ ...... __...................................................................... % Electric Chainsaw Energy Mitigation Measures Measure Implemented Mitigation Measure Input Value 1 Input Value 2 No :Exceed Title 24 ............................................................... :................................................................................................................ No :Install High Efficiency Lighting :.................................................................................. ...................... ........................................................ ..............................; No :On -site Renewable .....................................;.... ............................... CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 13 Appliance Type Land Use Subtype % Improvement ClothWasher 30.00 ...............................................................<_._._._._._._._._._._._._._._._._._._..........;........................... ............................... Dish W asher 15.00 ......... . ..................................................... : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : ................................................... . ...... Fan 50.00 .... . .......................................................... : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : .......................................................... Refrigerator 15.00 Water Mitigation Measures Measure Implemented IMitigation Measure Input Value 1 Input Value 2 No :Apply Water Conservation on Strategy :...................................... ............................................................ No ................................................................................................................ :Use Reclaimed Water ...................................... ......................................................................--.......................................................................--................................................._.... ............ No :Use Grey Water ............................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . No . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . :Install low -flow bathroom faucet . . . . . . . . . ...................................... . ...................................... 32.00: ..................................................................................................................................................................... No :Install low -flow Kitchen faucet s.................................................................................. ............................... _ . _ . _ . _ . ....... ............................... 18.00: ............................ No ............................... :Install low -flow Toilet s................ _ . _ . _ . _ . _ . _ . _ . _ . _ . _ . _ . _:....... ............................... 20.00: :...................................... ............................................................ No --- ........................................... ............... ............................... :Install low -flow Shower _._ ................................. 20.00: ....................................................................................................................................................................................................... ............;....... No :Turf Reduction ............................... ............................................................ No :................................................................................................................ :Use Water Efficient Irrigation Systems ._.__ ----------------- :...................................... 6.10: ............................................................................................................................................... No ..............................; :Water Efficient Landscape ... ............................... ............................... Solid Waste Mitigation Mitigation Measures IMN Date: 5/31/2018 8:04 PM CaIEEMod Version: CalEEMod.2016.3.2 Page 13 of 13 Date: 5/31/2018 8:04 PM - - ----------------------------------------- ---------------- Institute Recycling and Composting Services Percent Reduction in Waste Disposed Attachment E PROJECT PHASE 2 ANNUAL EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CalEEMod Version: CalEEMod.2016.3.2 1.0 Project Characteristics 1.1 Land Usage Page 1 of 64 Haskins Way Rezone Phase II - San Mateo County, Annual Haskins Way Rezone Phase II San Mateo County, Annual Date: 6/1/2018 11:09 AM Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park ; 256.23 ; 1000sgft 1.47 256,232.00 0 ............................................................................i...............................................................................}.......................................... .... ............................... Office Park 85.00 1000sgft 0.39 85,000.00 0 ............................................................................i................................................ ............................... .............................................. ............................... .. ............................... ........... ............................... ..... ............................... Enclosed Parking with Elevator ; 340.00 Space 0.61 136,000.00 0 Parking Lot i 243.00 i Space 3.15 97,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Precipitation Freq (Days) 70 Climate Zone 5 Operational Year 2022 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4Intensity 0.029 N20 Intensity 0.006 (lb /MWhr) (lb /MWhr) (lb /MWhr) 1.3 User Entered Comments & Non - Default Data CaIEEMod Version: CalEEMod.2016.3.2 Page 2 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report Stationary Sources - Emergency Generators and Fire Pumps - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 170,616.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Page 3 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual tblArchitecturalCoating ; ConstArea _ Nonresidential _Exterior ; 170,616.00 0.00 tblArchitecturalCoating ; ConstArea Nonresidential Interior ; 511,848.00 0.00 ..........................................................................;.............................................................................¢............................................ 4 ............................... ................................. ............................... tblArchitecturalCoating ConstArea _ Nonresidential _Interior 511,848.00 0.00 ;.............................................. ............................... ......................... ............................... .................. tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ...........................................................................;............................................ ............................... tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ..............................................................................;............................................... ............................... «..............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 ............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 .. ............................................ ............................... «.. ...;... ... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 .. ............................................ ............................... .. ...................... «.. ;... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 .........................................................................;.............................................................................}............................................ ............................... ................................. ............................... tblConstEquipMitigation ; NumberOfEquipmentMitigated ; 0.00 4.00 r tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ...........................................................................;............................................ ............................... ............. ---.......................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 ...........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ............................................ ............................... ......................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 4.00 ................................................. ............................. ;. .................... ............................... .. ............................... E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 15.00 ................................................. ............................. ;. E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 ..............................................................................;........................................................................................................................ ............................................................................ ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated ! 0.00 2.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 13.00 .........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated ; 0.00 4.00 .........................................................................;.............................................................................«............................................ ............................... .................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 6.00 ..........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated : 0.00 4.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 4 0.00 2.00 ..........................................................................i.............................................................................¢............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 8.00 ;. !1111111111111111 ....................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 11.00 ............................................... ............................... y..................................................................................................................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated i 0.00 6.00 CalEEMod Version: CalEEMod.2016.3.2 Page 4 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual tblConstEquipMitigation Number OfEquipment Mitigated 0.00 13.00 tblConstEquipMitigation Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation Tier 9 No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ................................................. ............................. ;. ....................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ .......................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final ................................................. ............................. ;. ;....................................... ............................... tblConstEquipMitigation : Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... tblConstructionPhase NumDays 20.00 65.00 ;. E ....................................... ............................... tblConstructionPhase : NumDays 9 20.00 22.00 ............................................... ............................... y. tblConstructionPhase NumDays 20.00 219.00 CalEEMod Version: CalEEMod.2016.3.2 Page 5 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual tblConstructionPhase NumDays 230.00 30.00 tblConstructionPhase NumDays 230.00 40.00 tblConstructionPhase NumDays 230.00 100.00 ;. E ....................................... ............................... tblConstructionPhase NumDays 230.00 261.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstructionPhase NumDays 20.00 130.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 20.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 35.00 ............................................... ............................... ..................................................................................................................... ............................... tblGrading AcresOfGrading 25.00 0.00 ... ............................................ ............................... ..; .. ........................ ;... tblGradin g Material Exported 0.00 7,102.00 ... .............................................................................*............................................ ............................... ;... ................................. ............................... tblGrading ; Material Imported ; 0.00 6,070.00 tblLandUse i Land UseSquareFeet 256,230.00 256,232.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblLandUse i LotAcreage 5.88 1.47 i............................................... ............................... ..................................................................................................................... ............................... tblLandUse i LotAcreage 1.95 0.39 i............................................ ............................... ........................ tblLandUse i LotAcreage 3.06 0.61 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblLandUse : LotAcreage 2.19 3.15 ................................................. ............................. ;. ....................... ........................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 ..............................................................................;............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount ; 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 3.00 ................................................. ............................. ;. E....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 9 1.00 5.00 • ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 CalEEMod Version: CalEEMod.2016.3.2 Page 6 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual tblOffRoadEquipment UsageHours 8.00 3.00 tblOffRoadEquipment UsageHours 8.00 6.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ;. E ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ... ............................................ ............................... ..; .. ........................ ;... tblOffRoadEquipment UsageHours 8.00 6.00 ... .............................................................................*............................................ ;... ............................... ................................. ............................... tblOffRoadEquipment ; UsageHours ; 8.00 7.00 tblOffRoadEquipment i UsageHours 6.00 7.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 7.00 i............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 5.00 i............................................ ............................... ........................ tblOperational Off Road Equipment i OperDaysPerYear 260.00 2.00 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 365.00 tblOperational Off Road Equipment OperDaysPerYear 260.00 52.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 1.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment OperHoursPerDay 8.00 0.30 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment i OperHoursPerDay 8.00 16.00 tblOperational Off Road Equipment OperOff Road EquipmentNumber i 0.00 1.00 .............................................................................*............................................ ............................... tblOperationalOff Road Equipment i OperOff Road Equipment Number ; 0.00 1.00 r tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 4.00 tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblSequestration NumberOfNewTrees 9 0.00 80.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 9 20.00 19.00 ............................................... ............................... y. tblTripsAndVMT HaulingTripLength 20.00 19.00 CalEEMod Version: CalEEMod.2016.3.2 Page 7 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual tblTripsAndVMT HaulingTripLength 20.00 12.60 tblTripsAndVMT HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT ; HaulingTripN umber 149.00 1,509.00 ..........................................................................;.............................................................................*............................................ ............................... tblTripsAndVMT ; HaulingTripN umber ; 1,647.00 659.00 tblTripsAndVMT i VendorTripN umber 94.00 3.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 6.00 i............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 21.00 ..........................................................................i............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT VendorTripN umber 94.00 51.00 ;. E ....................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ................................................. ............................. ;. tblTripsAndVMT W orkerTripN umber 38.00 19.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblTripsAndVMT ; W orkerTripN umber 41.00 7.00 ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 38.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 207.00 6.00 ..........................................................................;.............................................................................}............................................ ............................... tblTripsAndVMT ; W orkerTripN umber ; 207.00 13.00 tblTripsAndVMT : W orkerTripN umber 207.00 46.00 tblTripsAndVMT : W orkerTripN umber 207.00 114.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 11.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 19.00 ;. E ....................................... ............................... tblVehicleTrips CC_TTP 48.00 10.00 tblVehicleTrips : CW_TTP : 33.00 71.00 CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase U- San Mateo County, Annual tblVehicleTrips ST TR 1.64 0.27 0.76 0.12 tblVehicleTrips WD TR 11.42 1.86 2.0 Emissions Summary CalEEMod Version: CalEEMod.2016.3.2 Page 9 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 2.1 Overall Construction Unmitigated Construction Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 I PM10 Total PM2.5 PM2.5 I I Year tons /yr MT /yr 2020 ; 0.1208 1.4500 : 0.8959 2.5400e- 0.0646 0.0514 0.1160 0.0110 0.0478 0.0588 : : 0.0000 233.8204 233.8204 0.0549 0.0000 235.1931 4.4100e- 0.0444 �. : 003 : e . .............................p. ___: ............. .............. : : : : ............. ............... .............. .............. .............. ............. .............. .............. + .............. .............. .............. ............. .............. ............. ..�.. 2021 1.1783 7.0010 6.3810 0.0143 0.1969 0.2928 0.4897 0.0490 0.2778 0.3268 0.0000 1,248.3940 1,248.3940 0.2656 0.0000 1,255.0346 003 ii . ............................... H ............... ... ......... .............................-- ... - - - -- ... .. ... .. ... ..... ..... ..... - - - - .. ........... ----------.... .............. .............. .............. ............... j................... + ....... ...........i................... -------------.............. ..............................' 2022 ;: 1.7912 1 2.9208 3.0202 : 6.4300e- : 0.0504 E 0.1264 : 0.1768 1 0.0136 1 0.1188 i 0.1323 0.0000 i 559.7498 E 559.7498 i 0.1421 : 0.0000 1 563.3033 .............................. 003 ................... 2021 ; 0.6117 E 2.4717 r 7.2061 Maximum 1.7912 7.0010 6.3810 0.0143 0.1969 0.2928 0.4897 0.0490 0.2778 0.3268 0.0000 1,248.3940 1,248.3940 0.2656 0.0000 1,255.0346 Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total I PM2.5 PM2.5 I I Year tons /yr MT /yr 2020 ; 0.0341 0.4467 1.0371 2.5400e- 0.0400 4.4100e- 0.0444 7.9300e- 4.3700e- 0.0123 ; 0.0000 i 233.8202 233.8202 0.0549 0.0000 235.1929 003 003 003 003 . .............................'0 .................... ..........,................... - ........... .............................. .................. ..... ........ .... ...................... ................... 2021 ; 0.6117 E 2.4717 r 7.2061 : 0.0143 E 0.1816 E 0.0230 : 0.2046 : 0.0474 : 0.0229 3 0.0702 ; 0.0000 1,248.3929:1,248.3929: r 0.2656 : 0.0000 1,255.0334 .........................I r ............ --1................ .............. .. ..............�................ l................ .............. ....................................*......................................°........................... r ............................... ............. 2022 ; 1.5552 0.9720 3.5502 6.4300e- : 0.0504 0.0114 0.0618 0.0136 0.0114 0.0250 ; 0.0000 E 559.7492 559.7492E 0.1421 0.0000 563.3027 003 Maximum 1.5552 2.4717 7.2061 0.0143 0.1816 0.0230 0.2046 0.0474 0.0229 0.0702 1 70000 1,248.3929 1,248.3929 0.2656 0.0000 1,255.0334 CalEEMod Version: CalEEMod.2016.3.2 Page 10 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual Quarter ROG NO CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -0O2 NBio -0O2 Total CO2 CH4 N20 CO2e 7 -27 -2021 1.9731 0.7977 4 7 -28 -2021 PM10 PM10 Total PM2.5 PM2.5 Total 3.1864 1.5432 6 1 -28 -2022 4 -27 -2022 2.2923 Percent 28.78 65.79 -14.53 0.00 12.80 91.75 60.28 6.41 91.31 79.25 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons /quarter) Maximum Mitigated ROG + NOX (tons /quarter) 1 10 -28 -2020 1 -27 -2021 2.3591 0.6006 2 1 -28 -2021 4 -27 -2021 1.9384 0.6305 3 4 -28 -2021 7 -27 -2021 1.9731 0.7977 4 7 -28 -2021 10 -27 -2021 1.3756 0.5642 5 10 -28 -2021 1 -27 -2022 3.1864 1.5432 6 1 -28 -2022 4 -27 -2022 2.2923 1.1441 7 4 -28 -2022 7 -27 -2022 0.9217 0.5317 8 7 -28 -2022 9 -30 -2022 0.3977 0.2718 Highest 3.1864 1.5432 Ca|EEyWod Version: Ca|EEK4od.2018.3.2 Page 11ofS4 Date: 6/1/201811:U0AM Haskins Way Rezone Phase U- San Mateo County, Annual 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total NBio- CO2 Total CO2 CH4 N20 CO2e I I I I I 005 003 005 005 005 005 005 000 826.4365 1,826.4365 0.0738 0.0201 1,834.2789 003 003 003 0'0'135 0.0135 0.0125 O�0125 O�0000 27.2549 27.2549 0 27.4599 W aste 0.0000 0.0000 0,0000 O�0000 64.4172 O�0000 64A172 3.8069 : 0.0000 159.5908 Water 0.0000 0.0000 0.0000 0.0000 19.2408 133.3151 152.5559 1 1.9823 0.0479 216.3892 Total 1.7064 1.9148 7.29OOe- 0.4846 0.0414 0.5261 0.1302 0.0401 0.1704 83.6580 2,455.2194177377878 0.0680 2,706.348 78967 1 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 12ofS4 Date: 6/1/201O11:80AM Haskins Way Rezone Phase U- San Mateo County, Annual 2.2 Overall Operational Mitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I I I I 005 003 005 005 005 005 005 000 826.4365 1,826.4365 0.0738 0.0201 1,834.2789 Reduction 003 003 003 0'0'135 0.0135 0.0125 O�0125 O�0000 27.2549 27.2549 0 27.4599 Waste 0.0000 0.0000 0,0000 O�0000 64.4172 O�0000 64A172 3.8069 : 0.0000 159.5908 1; Water 0.0000 0.0000 0.0000 0.0000 19.2408 133.3151 152.5559 1 1.9823 0.0479 216.3892 Total 1.7064 1.9148 7.29OOe- 0.4846 0.0414 0.5261 0.1302 0.0401 0.1704 83.6580 2,455.2194177377878 0.0680 2,706.348 78967 1 ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e Reduction CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 2.3 Vegetation Vegetation 3.0 Construction Detail Construction Phase CO2e Category NIT New Trees 56.6400 ii Total 56.6400 3.0 Construction Detail Construction Phase Co|EEK4od Version: Ca|EEK4od.2018.3.2 Page 14ofS4 Date: 8/1/201811:80AM Haskins Way Rezone Phase U- San Mateo County, Annual Phase Phase Name Phase Type Start Date End Date Num Days Num Days Phase Description 1 Memolition ;Demolition :11/24/2020 5i 20 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 2 ',Soils Abatement/Remove/Replace 'vSite Preparation ::11/11/2020 ::12/8/2020 5:i 20 3 'Site Prep and Make Ready ;Site Preparation :12/9/2020 :1/26/2021 5 35 4 'Parking Garage Underground ;Building Construction ::1/8/2021 2/18/2021 5: 30 5 ;Office Building Underground ;Building Construction ::1/8/2021 3/4/2021 5i 40 6 Parking Garage Core Construction Building Construction :2/18/2021 7/7/2021 5:i 100 7 ;Office Building Core Construction i Building Construction ::3/5/2021 3/4/2022 5: 261 8 'Parking Garage Exterior aArchitectural Coating 15/18/2021 6/16/2021 5: 221: 9 ;Office Building Tenant &Architectural Coating :11/14/2021 9/15/2022 5: 219:: 10 'Landscaping and Site !!Paving :11/25/2021 5/25/2022 5:: 130:: wImprovements 11 ;Office Building Exterior 'Architectural Coating :12/4/2021 3/4/2022 5: 65:: Acres ofGrading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres ofPaving: 3.76 Residential Indoor: 8; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Air Compressors 2: 7.M: 781: 0.48 ........................................................................... ? ...................................................................... f ...... ...................... Demolition ;Concrete/Industrial Saws 21 .................................. .................................... 6.001 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 3.001: 158:: 0.38 CoEEK4od Version: CaEEK4od.2018.3.2 Page 15ofS4 Date: 6/1/201O11:80AM Haskins Way Rezone Phase 11 - San Mateo County, Annual Demolition Forklifts 1 7.00�: 89:: 0.20 Demolition Off-Highway Trucks 2:: 4.00:: 402:: 0.38 Demolition ;Rubber Tired Dozers 2 6.001 2471 0.40 Demolition ;Skid Steer Loaders 1 : Demolition ;Sweepers/Scrubbers 4.00: 64: 0.46 Demolition Tractors/Loaders/Backhoes 2:: 5.001 971 0.37 Soils Abatement/Remove/Replace Crawler Tractors 1 Soils Abatement/Remove/Replace Dumpers/Tenders 2:: 6.001 16: 0.38 Soils Abatement/Remove/Replace i Excavators 2:: 5.001 1581 0.38 Soils Abatement/Remove/Replace Off-H ighway Trucks 3:: 4.00:: 402:: 0.38 Soils Abatement/Remove/Replace Plate Compactors 2 5.00: 8 0.43 Soils Abatement/Remove/Replace ;Rubber Tired Loaders 21 5.00: 203: 0.36 Soils Abatement/Remove/Replace Scrapers 2: 4.00:: 367:: 0.48 Soils Abatement/Remove/Replace ;Sweepers/Scrubbers 1 4.00: 64: 0.46 Soils Abatement/Remove/Replace IgTractors/Loaders/Backhoes 6.001 97:: 0.37 Site Prep and Make Ready ;Bore/Drill Rigs 2:: 7.00:: 221:: 0.50 Site Prep and Make Ready Dumpers/Tenders 1 6.001 161 Site Prep and Make Ready Excavators 4.00: 158: 0.38 Site Prep and Make Ready ;Off-Highway Trucks 21 4.001 4021 0.38 Site Prep and Make Ready i Plate Compactors Site Prep and Make Ready 9Rubber Tired Loaders 21 6.00:: 203:: 0.36 Site Prep and Make Ready Scrapers 2 6.001 367:: 0.48 Site Prep and Make Ready Sweepers/Sc rubbers 1 4.00:: 64:: 0.46 Site Prep and Make Ready IgTractors/Loaders/Backhoes 21 6.001 97:: 0.37 Parking Garage Underground Bore/Drill Rigs 7.001: 221:: 0.50 Parking Garage Underground Excavators 21 7.001 1581 0.38 Parking Garage Underground 'Generator Sets 2:: 4.00: 841: 0.74 CoEEK4od Version: CaEEK4od.2018.3.2 Page 18ofS4 Date: 6/1/201O11:80AM Haskins Way Rezone Phase 11 - San Mateo County, Annual Parking Garage Underground ;Plate Compactors 2: 4.00�: 8: 0.43 Parking Garage Underground Rough Terrain Forklifts 2:: 2.00:: 1001 0.40 Parking Garage Underground ;Rubber Tired Loaders 1 2.001 2031 0.36 Parking Garage Underground 'vSweepers/Scrubbers 1 Parking Garage Underground 'vTractors/Loaders/Backhoes 2:: 6.00:: 97:: 0.37 Parking Garage Underground 'vTrenchers 2:: 4.00:: 78:: 0.50 Office Building Underground Bore/Drill Rigs 2:: 4.00:: 221:: 0.50 Office Building Underground Excavators 2:: 7.00:: 158:: 0.38 Office Building Underground I Generator Sets 2: 4.001 841 0.74 Office Building Underground 9'Plate Compactors Office Building Underground Rough Terrain Forklifts 2:: 8.001 100i 0.40 Office Building Underground ;Rubber Tired Loaders 1 6.00:: 203:: 0.36 Office Building Underground Sweepers/Scrubbers i : Office Building Underground ;Tractors/Loaders/Backhoes 2: Office Building Underground IgTrenchers 41 7.001 781 0.50 Parking Garage Core Construction IV Aerial Lifts i : Parking Garage Core Construction Cement and Mortar Mixers 6: 4.001 9: 0.56 Parking Garage Core Construction ;Cranes 7.00:: 231:: 0.29 Parking Garage Core Construction Off-Highway Trucks i : Parking Garage Core Construction Plate Compactors 4.00: 8 0.43 Parking Garage Core Construction Pumps 6.00:: 841 0.74 Parking Garage Core Construction Rough Terrain Forklifts 11 Parking Garage Core Construction '!Welders 3 1 6.00:: 46:: 0.45 Office Building Core Construction 'Aerial Lifts 41 7.001 631: 0.31 Office Building Core Construction IV Air Compressors 4: 6.001 78: 0.48 Office Building Core Construction Cranes 21 7.001 2311 0.29 Office Building Core Construction 'Off-Highway Trucks 2:: 4.00: 402:: 0.38 Ca|EEMod Version: Ca|EEMod.2018.3.2 Page 17of04 Date: 8/1/201811:00AKJ HamknaVVavRazonePhanaU- SanyWetaoCounty.Annua| Office Building Core Construction Rough Terrain Forklifts 2 6.001 1001 0.40 Office Building Core Construction Sweepers/Scrubbers 1 Office Building Core Construction 'TWelders 5: 7.001 461 0.45 Parking Garage Exterior Improvements ;;Aerial Lifts 1 6.001 631: 0.31 Parking Garage Exterior Improvements Cranes 1 3.001 2311: 0.29 Parking Garage Exterior Improvements Off-Highway Trucks 11 Parking Garage Exterior Improvements Other General Industrial Equipment 1! 4.002: 881: 0.34 Parking Garage Exterior Improvements Pressure Washers 2.00:: 13's 0.30 Parking Garage Exterior Improvements Rough Terrain Forklifts 1 5.00:: 1001 0.40 Parking Garage Exterior Improvements vWelders 2:: 5.00:: 46 0.45 Office Building Tenant Improvements Aerial Lifts i i Office Building Tenant Improvements vvAir Compressors 1 7.001 781: 0.48 Office Building Tenant Improvements Off-Highway Trucks 2 4.00:: 402 0.38 Office Building Tenant Improvements Rough Terrain Forklifts I Office Building Tenant Improvements ;Sweepers/Scrubbers 1 &M 64: 0.46 Office Building Tenant Improvements vvWelders 1 5.001 461: 0.45 Landscaping and Site Improvements Cement and Mortar Mixers 21: 4.00:: 9 0.56 Landscaping and Site Improvements Dumpers/Tenders 1 6.001: 161 0.38 Landscaping and Site Improvements Paving Equipment Landscaping and Site Improvements Plate Compactors 21: 4.001 8 0.43 Landscaping and Site Improvements IRollers 2 5.001 80 1 0.38 Landscaping and Site Improvements Rough Terrain Forklifts 3.00:: 1001 0.40 Landscaping and Site Improvements Rubber Tired Dozers 2 i Landscaping and Site Improvements vSkid Steer Loaders 1 6.00:: 65 0.37 Landscaping and Site Improvements v!Tractors/Loaders/Backhoes 2 Office Building Exterior Improvements ;Aerial Lifts 3i 6.00:: 631 0.31 Office Building Exterior Improvements 'Off-Highway Trucks 2 4.001 4021 0.38 CalEEMod Version: CalEEMod.2016.3.2 Page 18 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual Office Building Exterior Improvements ;Other General Industrial Equipment Vendor Trip Number 2 7.00: 88 0.34 Office Building Exterior Improvements Pressure Washers 1 4.00; 131 0.30 .........................................................................-------------------------------- Office Building Exterior Improvements ----........................... h Terrain Forklifts ;Rough .....................I 1 ............................... 31 ... .............................. 7.00: ... ............................... 100; 0.40 ...........................................................................------------------------------------ Office Building Exterior Improvements ............................... :Sweepers /Scrubbers +....................... ---------- .............................................. 11 ..................................... 4.00; ...................................... 641 0.46 Office Building Exterior Improvements .................................... ............................... ;Welders . .. • ... ............................ 2: ; ----------------------------- 6.00: . ............................... 46: 0.45 Trips and VMT Phase Name Offroad Equipment Worker Trip Count Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition ; 16 20.001 0.001 1,509.00; 10.801 7.30; 19.00: LD Mix HDT Mix 1HHDT s ....... ...........................--- :........................... .i. Soils 161 20.001 0.00 659.00: 10.801 7.30: 12.601 LD_Mix HDT_Mix I HHDT ' Site Prep and Make 15 19.001 0.00 0.001 10.801 7.30: 19.001:1-D Mix 1 HDT_Mix I HHDT ...... ............................... Parking Garage �-------------------------� ---------------------------:..................... ............................... 15 6.00' 3.001 0.00; �................. 10.801 7.301 19.001 LD Mix I HDT_Mix ..................... 1 HHDT .................., Office Building 18 13.001 ........................... 6.00: 0.00 ............................. 10.80: 19.00: : HDT_Mix I HHDT .::.. ............I................. Parking Garage Core "= ..... ........................................................ 15 46.001 21.001 .................... 0.001 ------------------------ 10.801 ...................... 7.30: --------------------- 19.001 ------------------------------- LD_Mix ...................... ; HDT_Mix ..................... I HHDT !2 stn'..ct ................. Office Building Core 9 ..... ...... .......... ------------ ----------------------- 20 114.001 ...................... ..:.. 51.001 .................... -- 0.001 ------------------- --.... 10.801 ...................... ..... 7.301 --------------------- -- 19.001 ------------------------------- .L- - LD Mix ...................... .. - :HDT Mix .. ..................... I HHDT Parking Garage 8i 11.001 0.001 0.00 10.80: 19.00: : HDT_Mix ; HHDT C.h. -..... :. �.' ::..........."M ...................... -- ..... ....................... .... ...................... :... .................... . ............... .... ...................... ..................... ----- --------------------- - - - - -. .......- .. ............. ..................... r Office Buildin g Tenant 19.001 I.....r...,..w...r.M 0.001 0.001 10.801 7.30: 19.001 LD Mix ':HDT Mix I HHDT : Landscaping and Site I..... .......................................................................................................................... 15 19.00 : . 0.00 0.001 10.801 ............................... 7.301 ' 19.001 LDMix ' HDTMix F ........................ HDT rr...r. m'an!r Office Building Exterior ; 141 7.001 0.001 0.001 10.801 7.301 19.001 LD-Mix : HDT_Mix 1 HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CalEEMod Version: CalEEMod.2016.3.2 Page 19 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.2 Demolition - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 0.0162 0.0000 0.0162 2.4400e- I 0.0000 i 2.4400e- e 0.0000 0.0000 0.0000 x0000 0.0000 0.0000 003 i 003 e . ............................. «. i i i .............. ............... + .............. ............. ............. .............. ............. Off -Road ; 0.0428 0.3997 0.2831 5.5000e- 0.0209 0.0209 0.0197 0.0197 0.0000 ° 47.6236 47.6236 0.0118 0.0000 47.9181 .. ........................ .r.. 004 it .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.00OOe- i 1.5700e- i 1.00OOe- i 1.5800e- i 4.2000e- i 1.00OOe- I 4.3000e- ; 0.0000 1.3111 1.3111 i 3.00OOe- i 0.0000 1.3117 Total 0.0428 0.3997 0.2831 5.5000e- 0.0162 0.0209 0.0371 2.4400e- 0.0197 0.0222 0.0000 47.6236 47.6236 0.0118 0.0000 47.9181 7.5300e- 0.0000 61.6285 004 004 003 003 004 003 1 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Hauling ; 6.4100e- i 0.2346 0.0974 15.9000e- i 0.0120 i 7.2000e- i 0.0127 i 3.2900e- i 6.9000e- I 3.9900e- ; 0.0000 i 60.1292 i 60.1292 i 7.5000e- i 0.0000 60.3168 003 004 004 003 004 003 003 ........... ...............M............... .............. .............. .............. .............. ............. . .... ............. .............. ................. ................... ................... ................... f....... ...........:................... ...................•......... .......... .................... ............. ..... ............. Vendor 0 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. ........................ .r.. .............. .............. .............. .............. ................... .............. .............. .............. .............. .................i....................................... . ..... ..... ..... .... ..... .... .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.00OOe- i 1.5700e- i 1.00OOe- i 1.5800e- i 4.2000e- i 1.00OOe- I 4.3000e- ; 0.0000 1.3111 1.3111 i 3.00OOe- i 0.0000 1.3117 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 6.9600e- 0.2349 0.1013 6.00OOe- 0.0136 7.3000e- 0.0143 3.7100e- 7.00OOe- 4.4200e- 0.0000 61.4403 61.4403 7.5300e- 0.0000 61.6285 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 20 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.2 Demolition - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total I PM2.5 I PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 7.2700e- I 0.0000 7.2700e- i 1.1000e- I 0.0000 1.1000e- e 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 003 i 003 003 003 ........... ...............M............... it i i « .................. ................... ................... ................... f....... ...........:................... ...................•......... .......... .................... ...............:............... ............. .............. ............. Off -Road ;I 6.9900e- 0.0439 0.3089 5.5000e- 9.3000e- 9.3000e- 9.3000e- 9.3000e- 0.0000 ° 47.6236 47.6236 0.0118 0.0000 I 47.9181 .. ........................ .r.. ,I 003 004 004 004 004 r 004 ............. Total 6.9900e- 0.0439 0.3089 5.5000e- 7.2700e- 9.3000e- 8.2000e- 1.1000e- 9.3000e- 2.0300e- 0.0000 47.6236 47.6236 0.0118 0.0000 47.9181 7.000Oe- 003 0.0000 61.4403 61.4403 004 003 004 003 003 004 003 004 1 003 004 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Hauling ; 6.4100e- i 0.2346 0.0974 15.9000e- i 0.0120 i 7.2000e- i 0.0127 i 3.2900e- i 6.9000e- I 3.9900e- ; 0.0000 i 60.1292 i 60.1292 i 7.5000e- i 0.0000 60.3168 003 004 004 003 004 003 003 ........... ...............M............... .............. .............. .............. .............. ............. . .... ............. .............. ................. ................... ................... ................... f....... ...........:................... ...................•......... .......... .................... ............. ..... ............. Vendor 0 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. ........................ .r.. .............. .............. .............. .............. ................... .............. .............. .............. .............. .................i....................................... . ..... ..... ..... .... ..... .... .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.000Oe- i 1.5700e- i 1.000Oe- i 1.5800e- i 4.2000e- i 1.000Oe- I 4.3000e- ; 0.0000 1.3111 1.3111 i 3.0000e- i 0.0000 1.3117 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 6.9600e- 0.2349 0.1013 6.000Oe- 0.0136 7.3000e- 0.0143 3.7100e- 7.000Oe- 4.4200e- 0.0000 61.4403 61.4403 7.5300e- 0.0000 61.6285 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 21 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total I PM2.5 I PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 7.4000e- I 0.0000 7.4000e- i 1.1000e- I 0.0000 1.1000e- e 0.0000 0.0000 0.0000 x0000 0.0000 0.0000 i 004 i 004 004 004 .......................... it i I i ............................... ................... �.................... ............. Off -Road ;I 0.0350 0.3724 0.2390 5.8000e- 0.0151 0.0151 0.0139 0.0139 0.0000 ° 51.0737 51.0737 0.0163 0.0000 51.4801 .. ........................ .r................ '1 004 it ............. .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.00OOe- i 1.5700e- i 1.00OOe- i 1.5800e- i 4.2000e- i 1.00OOe- I 4.3000e- ; 0.0000 1.3111 1.3111 I 3.00OOe- i 0.0000 1.3117 Total 0.0350 0.3724 0.2390 5.8000e- 7.4000e- 0.0151 0.0158 1.1000e- 0.0139 0.0140 0.0000 51.0737 51.0737 0.0163 0.0000 51.4801 19.4782 2.2900e- 0.0000 19.5354 004 004 003 004 003 004 003 003 004 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling ; 2.0500e- i 0.0775 0.0310 i 1.8000e- i 3.4800e- i 2.2000e- i 3.6900e- i 9.5000e- 1 2.1000e- I 1.1600e- ; 0.0000 i 18.1672 i 18.1672 i 2.2600e- i 0.0000 18.2237 003 004 003 004 003 004 004 003 003 .......................... M............... .............. .............. .............. .............. ............. .............. ............. ............................................. ............................... ................... �.................... ............. Vendor [0.0000"" 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. ........................ .r................ .............. .............. .............. .............. .............. .............. ............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .. ............. .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.00OOe- i 1.5700e- i 1.00OOe- i 1.5800e- i 4.2000e- i 1.00OOe- I 4.3000e- ; 0.0000 1.3111 1.3111 I 3.00OOe- i 0.0000 1.3117 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 2.6000e- 0.0779 0.0349 1.9000e- 5.0500e- 2.3000e- 5.2700e- 1.3700e- 2.2000e- 1.5900e- 0.0000 19.4782 19.4782 2.2900e- 0.0000 19.5354 003 004 003 004 003 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 22 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.3 Soils Abatement /Remove /Replace - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 I PM2.5 I Category tons /yr MT /yr Fugitive Dust ; 3.4000e- I 0.0000 3.4000e- i 5.000Oe- I 0.0000 5.000Oe- e 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 004 i i 004 005 EE 005 e .......................... « ............... E ...................................:................... I.................... ......... ..........I........................ .......... Off-Road ;i 8.7300e- 0.0468 0.2929 5.8000e- 1.3200e- 1.3200e- ;.3200e- 1.3200e- 0.0000 ° 51.0737 51.0737 0.0163 0.0000 51.4800 .. ........................ .r................ �i 003 004 003 003 003 003 ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.000Oe- i 1.5700e- i 1.000Oe- i 1.5800e- i 4.2000e- i 1.000Oe- I 4.3000e- ; 0.0000 1.3111 1.3111 I 3.000Oe- i 0.0000 1.3117 Total 8.7300e- 0.0468 0.2929 5.8000e- 3.4000e- 1.3200e- 1.6600e- 5.000Oe- 1.3200e- 1.3700e- 0.0000 51.0737 51.0737 0.0163 0.0000 51.4800 19.4782 003 0.0000 19.5354 004 004 003 003 005 003 003 003 003 1 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling ; 2.0500e- i 0.0775 0.0310 I 1.8000e- i 3.4800e- i 2.2000e- i 3.6900e- i 9.5000e- 1 2.1000e- I 1.1600e- ; 0.0000 i 18.1672 i 18.1672 i 2.2600e- i 0.0000 18.2237 003 004 003 004 003 004 004 003 003 .......................... M............... .............. .............. .............. .............. ............. .............. ............. ............................................. ............................... ................... �.................... ............. Vendor [0.0000"" 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. ........................ .r................ .............. .............. .............. .............. .............. .............. ............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .. ............. .............. .............. .............. ............. Worker ; 5.5000e- i 3.7000e- E 3.8900e- i 1.000Oe- i 1.5700e- i 1.000Oe- i 1.5800e- i 4.2000e- i 1.000Oe- I 4.3000e- ; 0.0000 1.3111 1.3111 I 3.000Oe- i 0.0000 1.3117 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 2.6000e- 0.0779 0.0349 1.9000e- 5.0500e- 2.3000e- 5.2700e- 1.3700e- 2.2000e- 1.5900e- 0.0000 19.4782 19.4782 2.2900e- 0.0000 19.5354 003 004 003 004 003 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 23 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 0.0278 0.0000 0.0278 3.0100e- 0.0000 3.0100e- e 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... , 003 i 003 . ............. .............................. «. 3 : .......... ............. .............. .............. .............. .............. .............. ............. ........................... ............... .............. ............. ............. .............. ............ . ..:.. Off -Road ; 0.0330 0.3648 0.2345 6.1000e- 0.0144 0.0144 0.0133 0.0133 0.0000 ° 53.1459 53.1459 0.0170 0.0000 53.5719 Worker '1 004 it ; 0.0000 1.0587 1.0587 12.00OOe- i 0.0000 1.0592 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 0.0330 0.3648 0.2345 6.1000e- 0.0278 0.0144 0.0422 3.0100e- 0.0133 0.0163 0.0000 53.1459 53.1459 0.0170 0.0000 53.5719 004 004 003 005 003 004 003 004 005 003 1 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.4000e- i 3.00OOe- E 3.1400e- i 1.00OOe- i 1.2700e- i 1.00OOe- i 1.2800e- i 3.4000e- i 1.00OOe- I 3.5000e- ; 0.0000 1.0587 1.0587 12.00OOe- i 0.0000 1.0592 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 4.4000e- 3.00OOe- 3.1400e- 1.00OOe- 1.2700e- 1.00OOe- 1.2800e- 3.4000e- 1.00OOe- 3.5000e- 0.0000 1.0587 1.0587 2.00OOe- 0.0000 1.0592 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 24 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 0.0125 0.0000 0.0125 1.3500e- 0.0000 i 1.3500e- e 0.0000 0.0000 0.0000 x0000 0.0000 0.0000 .......................... 003 i 003 . ............. Vendor ............ .............. .............. .............. .............. .............. ............. ............. «. i i i .............. E .............. ........... ............. ............. .... Off -Road ; 8.3900e- 0.0430 0.2960 6.1000e- 1.2000e- 1.2000e- 1.2000e- 1.2000e- 0.0000 ° 53.1458 53.1458 0.0170 0.0000 53.5718 Worker .I 003 004 003 003 003 003 1.0592 r ; 005 Total 8.3900e- 0.0430 0.2960 6.1000e- 0.0125 1.2000e- 0.0137 1.3500e- 1.2000e- 2.5500e- 0.0000 53.1458 53.1458 0.0170 0.0000 53.5718 004 004 003 005 003 004 003 003 005 003 003 003 005 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.4000e- i 3.000Oe- E 3.1400e- i 1.000Oe- i 1.2700e- i 1.000Oe- i 1.2800e- i 3.4000e- i 1.000Oe- I 3.5000e- ; 0.0000 1.0587 1.0587 12.000Oe- i 0.0000 1.0592 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 4.4000e- 3.000Oe- 3.1400e- 1.000Oe- 1.2700e- 1.000Oe- 1.2800e- 3.4000e- 1.000Oe- 3.5000e- 0.0000 1.0587 1.0587 2.000Oe- 0.0000 1.0592 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 25 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 0.0278 0.0000 0.0278 3.0100e- 0.0000 3.0100e- e 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... , 003 i 003 . ............. .............................. «. 3 : .......... ............. .............. .............. .............. .............. .............. .............. ........................... ............... .............. ............. ............. .............. ............ . ..:.. Off -Road ; 0.0322 0.3421 0.2393 6.4000e- 0.0134 0.0134 0.0124 0.0124 0.0000 ° 56.3172 56.3172 0.0181 0.0000 56.7686 Worker '1 004 it ; 0.0000 1.0811 1.0811 i 2.00OOe- i 0.0000 1.0816 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 0.0322 0.3421 0.2393 6.4000e- 0.0278 0.0134 0.0413 3.0100e- 0.0124 0.0154 0.0000 56.3172 56.3172 0.0181 0.0000 56.7686 004 004 003 005 003 004 003 004 005 003 1 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.4000e- i 2.8000e- E 3.0700e- i 1.00OOe- i 1.3500e- i 1.00OOe- i 1.3500e- i 3.6000e- i 1.00OOe- I 3.7000e- ; 0.0000 1.0811 1.0811 i 2.00OOe- i 0.0000 1.0816 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 4.4000e- 2.8000e- 3.0700e- 1.00OOe- 1.3500e- 1.00OOe- 1.3500e- 3.6000e- 1.00OOe- 3.7000e- 0.0000 1.0811 1.0811 2.00OOe- 0.0000 1.0816 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 26 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.4 Site Prep and Make Ready - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Fugitive Dust ; 0.0125 0.0000 0.0125 1.3500e- 0.0000 i 1.3500e- e 0.0000 0.0000 0.0000 x0000 0.0000 0.0000 .......................... 003 i 003 e Vendor ............ .............. .............. .............. .............. ............. ............. ............. «. i i i .............. E + .............. ........... ............. ............. .... Off -Road ; 8.8800e- 0.0455 0.3134 6.4000e- 1.2700e- 1.2700e- ;.2700e- 1.2700e- 0.0000 ° 56.3171 56.3171 0.0181 0.0000 56.7686 Worker ,I 003 004 003 003 003 r 003 1.0816 Total 8.8800e- 0.0455 0.3134 6.4000e- 0.0125 1.2700e- 0.0138 1.3500e- 1.2700e- 2.6200e- 0.0000 56.3171 56.3171 0.0181 0.0000 56.7686 2.000Oe- 003 1.0816 004 003 003 003 003 003 003 005 004 005 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.4000e- i 2.8000e- E 3.0700e- i 1.000Oe- i 1.3500e- i 1.000Oe- i 1.3500e- i 3.6000e- i 1.000Oe- I 3.7000e- ; 0.0000 1.0811 1.0811 i 2.000Oe- i 0.0000 1.0816 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 4.4000e- 2.8000e- 3.0700e- 1.000Oe- 1.3500e- 1.000Oe- 1.3500e- 3.6000e- 1.000Oe- 3.7000e- 0.0000 1.0811 1.0811 2.000Oe- 0.0000 1.0816 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 27 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.5 Parking Garage Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 I PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Off -Road ; 0.0292 0.2848 0.2993 5.5000e- i 0.0150 0.0150 0.0140 0.0140 j 0.0000 i 48.3138 48.3138 i 0.0132 0.0000 48.6441 .......................... ,I 004 j ............. Vendor �I e 1.1802 Total 0.0292 0.2848 0.2993 5.5000e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 0.0150 0.0150 Worker 0.0140 0.0140 0.0000 48.3138 48.3138 0.0132 0.0000 48.6441 3.7000e- 4.8400e- 3.6300e- 2.00OOe- 1.00OOe- 004 1.0100e- 2.7000e- 1.00OOe- 2.9000e- 0.0000 1.7467 1.7467 1.1000e- 0.0000 1.7495 004 003 003 005 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ....................................:....... ............................... •................... �.................... ............. Vendor ; 1.4000e- 4.6900e- 2.0100e- 1.00OOe- 2.9000e- 1.00OOe- 3.00OOe- 8.00OOe- 1.00OOe- 1.00OOe- ; 0.0000 1.1777 1.1777 1.00OOe- 0.0000 1.1802 003 003 005 004 005 004 005 005 004 004 ... .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 2.3000e- i 1.5000e- E 1.6200e- i 1.00OOe- i 7.1000e- i 0.0000 i 7.1000e- i 1.9000e- i 0.0000 I 1.9000e- ; 0.0000 0.5690 0.5690 I 1.00OOe- i 0.0000 0.5693 004 004 003 005 004 004 004 004 .: ; 005 Total 3.7000e- 4.8400e- 3.6300e- 2.00OOe- 1.00OOe- 1.00OOe- 1.0100e- 2.7000e- 1.00OOe- 2.9000e- 0.0000 1.7467 1.7467 1.1000e- 0.0000 1.7495 004 003 003 005 003 005 003 004 005 004 004 CalEEMod Version: CalEEMod.2016.3.2 Page 28 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.5 Parking Garage Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total I PM2.5 I PM2.5 I Category tons /yr MT /yr Off -Road ; 7.34OOe- i 0.0416 0.3586 5.5000e- i i 1.0100e- 1.0100e- i i 1.01OOe- i 1.0100e- e 0.0000 i 48.3137 48.3137 0.0132 0.0000 48.6441 .......................... jl 003 004 003 003 003 003 e ............. Vendor ; 1.4000e- 4.6900e- 2.0100e- 1.000Oe- 2.9000e- 1.000Oe- 3.000Oe- 8.000Oe- 1.000Oe- 1.000Oe- ; 0.0000 1.1777 1.1777 1.000Oe- 0.0000 1.1802 Total 7.3400e- 0.0416 0.3586 5.5000e- 1.0100e- 1.0100e- ............. 1.0100e- 1.0100e- 0.0000 48.3137 48.3137 0.0132 0.0000 48.6441 Total 003 3.6300e- 2.000Oe- 004 003 003 2.7000e- 1.000Oe- 003 003 1.7467 1.1000e- 0.0000 1.7495 004 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ....................................:....... ............................... •................... �.................... ............. Vendor ; 1.4000e- 4.6900e- 2.0100e- 1.000Oe- 2.9000e- 1.000Oe- 3.000Oe- 8.000Oe- 1.000Oe- 1.000Oe- ; 0.0000 1.1777 1.1777 1.000Oe- 0.0000 1.1802 003 003 005 004 005 004 005 005 004 004 .............................. . ..... ..... ..... ..... ..... ..... .... r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 2.3000e- i 1.5000e- E 1.6200e- i 1.000Oe- i 7.1000e- i 0.0000 i 7.1000e- i 1.9000e- i 0.0000 I 1.9000e- ; 0.0000 0.5690 0.5690 I 1.000Oe- i 0.0000 0.5693 004 004 003 005 004 004 004 004 .: ; 005 Total 3.7000e- 4.8400e- 3.6300e- 2.000Oe- 1.000Oe- 1.000Oe- 1.0100e- 2.7000e- 1.000Oe- 2.9000e- 0.0000 1.7467 1.7467 1.1000e- 0.0000 1.7495 004 003 003 005 003 005 003 004 005 004 004 CalEEMod Version: CalEEMod.2016.3.2 Page 29 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.6 Office Building Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Off -Road ; 0.0659 0.6499 0.6194 1.1000e- i 0.0362 0.0362 0.0336 0.0336 j 0.0000 i 95.8901 95.8901 0.0278 0.0000 96.5850 ........... ...............M............... ,I 003 j ............. Vendor �I e 3.1472 Total 0.0659 0.6499 0.6194 1.1000e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 0.0362 0.0362 Worker 0.0336 0.0336 0.0000 95.8901 95.8901 0.0278 0.0000 96.5850 1.0400e- 0.0129 0.0100 5.00OOe- 2.8300e- 4.00OOe- 003 7.7000e- 4.00OOe- 8.1000e- 0.0000 4.7842 4.7842 3.00OOe- 0.0000 4.7917 003 005 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. .......................... .......... i................... ........ ...........•......... ..........�.................... ............. Vendor ; 3.8000e- 0.0125 5.3600e- 3.00OOe- 7.8000e- 3.00OOe- 8.1000e- 2.3000e- 3.00OOe- 2.5000e- ; 0.0000 3.1404 3.1404 2.7000e- 0.0000 3.1472 004 003 005 004 005 004 004 005 004 004 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 6.6000e- i 4.3000e- E 4.6700e- i 2.00OOe- i 2.0500e- i 1.00OOe- i 2.0600e- i 5.4000e- i 1.00OOe- I 5.6000e- ; 0.0000 1.6438 1.6438 i 3.00OOe- i 0.0000 1.6445 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 1.0400e- 0.0129 0.0100 5.00OOe- 2.8300e- 4.00OOe- 2.8700e- 7.7000e- 4.00OOe- 8.1000e- 0.0000 4.7842 4.7842 3.00OOe- 0.0000 4.7917 003 005 003 005 003 004 005 004 004 CalEEMod Version: CalEEMod.2016.3.2 Page 30 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.6 Office Building Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 I PM10 Total I PM2.5 I PM2.5 I Category tons /yr MT /yr Off -Road ; 0.0142 0.0745 0.7228 1.1000e- i i 1.9400e- i 1.9400e- i 1.9400e- i 1.9400e- e 0.0000 i 95.8900 95.8900 0.0278 0.0000 96.5849 ........... ...............M............... jl 003 003 003 003 003 .......... i................... ........ ...........•......... ..........�.................... ............. Vendor ; 3.8000e- 0.0125 5.3600e- 3.000Oe- 7.8000e- 3.000Oe- 8.1000e- 2.3000e- 3.000Oe- 2.5000e- ; 0.0000 3.1404 3.1404 2.7000e- 0.0000 3.1472 Total 0.0142 0.0745 0.7228 1.1000e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 1.9400e- 1.9400e- Worker 1.9400e- 1.9400e- 0.0000 95.8900 95.8900 0.0278 0.0000 96.5849 1.0400e- 0.0129 0.0100 5.000Oe- 2.8300e- 4.000Oe- 003 7.7000e- 003 003 0.0000 4.7842 003 003 0.0000 4.7917 003 005 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. .......................... .......... i................... ........ ...........•......... ..........�.................... ............. Vendor ; 3.8000e- 0.0125 5.3600e- 3.000Oe- 7.8000e- 3.000Oe- 8.1000e- 2.3000e- 3.000Oe- 2.5000e- ; 0.0000 3.1404 3.1404 2.7000e- 0.0000 3.1472 004 003 005 004 005 004 004 005 004 004 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 6.6000e- i 4.3000e- E 4.67OOe- i 2.000Oe- i 2.05OOe- i 1.000Oe- i 2.06OOe- i 5.4000e- i 1.000Oe- I 5.6000e- ; 0.0000 1.6438 1.6438 i 3.0000e- i 0.0000 1.6445 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 1.0400e- 0.0129 0.0100 5.000Oe- 2.8300e- 4.000Oe- 2.8700e- 7.7000e- 4.000Oe- 8.1000e- 0.0000 4.7842 4.7842 3.000Oe- 0.0000 4.7917 003 005 003 005 003 004 005 004 004 CalEEMod Version: CalEEMod.2016.3.2 Page 31 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 I PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Off -Road ; 0.0976 0.7821 0.6959 1.4400e- i 0.0337 0.0337 0.0324 0.0324 e 0.0000 i 119.0076 i 119.0076: 0.0270 0.0000 119.6830 ... ........... ...............M............... 003 it ..................:......................................•......... ..........�........................ .......... Vendor ; 3.3500e- 0.1094 0.0469 2.8000e- 6.8400e- 2.5000e- 7.0900e- 1.9800e- 2.4000e- 2.2200e- e 27.5382 Total 0.0976 0.7821 0.6959 1.4400e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 0.0337 0.0337 Worker 0.0324 0.0324 0.0000 119.0076 119.0076 0.0270 0.0000 119.6830 9.2100e- 0.1132 0.0883 4.4000e- 0.0250 003 0.0253 6.8000e- 3.4000e- 7.1400e- 0.0000 42.0197 42.0197 2.6300e- 0.0000 42.0857 003 004 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ..................... ..................:......................................•......... ..........�........................ .......... Vendor ; 3.3500e- 0.1094 0.0469 2.8000e- 6.8400e- 2.5000e- 7.0900e- 1.9800e- 2.4000e- 2.2200e- ; 0.0000 i 27.4788 27.4788 2.3700e- 0.0000 27.5382 003 004 003 004 003 003 004 003 003 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 5.8600e- i 3.8100e- ° 0.0413 i 1.6000e- i 0.0181 i 1.1000e- i 0.0182 i 4.8200e- i 1.00OOe- I 4.9200e- ; 0.0000 i 14.5408 i 14.5408 12.6000e- i 0.0000 14.5474 003 003 004 004 003 004 003 .: ; 004 Total 9.2100e- 0.1132 0.0883 4.4000e- 0.0250 3.6000e- 0.0253 6.8000e- 3.4000e- 7.1400e- 0.0000 42.0197 42.0197 2.6300e- 0.0000 42.0857 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 32 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.7 Parking Garage Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total I PM2.5 I PM2.5 I Category tons /yr MT /yr Off -Road j 0.0278 0.2643 0.7876 1.4400e- i 4.3300e- i 4.3300e- i 4.3300e- I 4.3300e- e 0.0000 i 119.0074 119.0074 i 0.0270 i 0.0000 119.6829 ... ........... ...............M............... jl 003 003 003 003 003 ..................:......................................•......... ..........�........................ .......... Vendor ; 3.3500e- 0.1094 0.0469 2.8000e- 6.8400e- 2.5000e- 7.0900e- 1.9800e- 2.4000e- 2.2200e- ; 0.0000 i 27.4788 27.4788 2.3700e- 0.0000 27.5382 Total 0.0278 0.2643 0.7876 1.4400e- 4.3300e- 4.3300e- ............. 4.3300e- 4.3300e- 0.0000 119.0074 119.0074 0.0270 0.0000 119.6829 Total 9.2100e- 0.1132 0.0883 4.4000e- 003 003 003 6.8000e- 3.4000e- 003 003 42.0197 2.6300e- 0.0000 42.0857 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ..................... ..................:......................................•......... ..........�........................ .......... Vendor ; 3.3500e- 0.1094 0.0469 2.8000e- 6.8400e- 2.5000e- 7.0900e- 1.9800e- 2.4000e- 2.2200e- ; 0.0000 i 27.4788 27.4788 2.3700e- 0.0000 27.5382 003 004 003 004 003 003 004 003 003 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. .............. .............. .............. ............. Worker ; 5.8600e- i 3.8100e- ° 0.0413 i 1.6000e- i 0.0181 i 1.1000e- i 0.0182 i 4.8200e- i 1.000Oe- I 4.9200e- ; 0.0000 i 14.5408 i 14.5408 12.6000e- i 0.0000 14.5474 003 003 004 004 003 004 003 .: ; 004 Total 9.2100e- 0.1132 0.0883 4.4000e- 0.0250 3.6000e- 0.0253 6.8000e- 3.4000e- 7.1400e- 0.0000 42.0197 42.0197 2.6300e- 0.0000 42.0857 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 33 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.8 Office Building Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Off -Road j 0.4275 3.4568 3.2519 6.3400e- i 0.1564 0.1564 0.1499 0.1499 e 0.0000 i 537.1762 537.1762: 0.1285 0.0000 540.3873 .......................... 003 it ............................... •.... �................... . ............. Vendor ; 0.0176 0.5736 0.2462 1.4400e- 0.0359 1.3100e- 0.0372 0.0104 1.2600e- 0.0116 e 144.4576 Total 0.4275 3.4568 3.2519 6.3400e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 0.1564 0.1564 Worker 0.1499 0.1499 0.0000 537.1762 537.1762 0.1285 0.0000 540.3873 0.0490 0.5940 0.4674 2.3000e- 0.1328 003 0.1347 0.0362 1.8000e- 0.0380 0.0000 221.9839 221.9839 0.0139 0.0000 222.3307 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ....................................:....... ............................... •.... �................... . ............. Vendor ; 0.0176 0.5736 0.2462 1.4400e- 0.0359 1.3100e- 0.0372 0.0104 1.2600e- 0.0116 0.... 2...... ; 0.0000 i 144.1461 144.1461 0.0125 0.0000 144.4576 003 003 003 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. ------------------------------------ .............. ............. Worker ; 0.0314 0.0204 0.2213 i 8.6000e- I 0.0969 i 5.9000e- i 0.0975 0.0258 i 5.4000e- 0.0263 ; 0.0000 i 77.8378 77.8378 i 1.4100e- i 0.0000 77.8731 004 004 004 ; 003 Total 0.0490 0.5940 0.4674 2.3000e- 0.1328 1.9000e- 0.1347 0.0362 1.8000e- 0.0380 0.0000 221.9839 221.9839 0.0139 0.0000 222.3307 003 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 34 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.8 Office Building Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total I PM2.5 I PM2.5 I I Category tons /yr MT /yr Off -Road ; 0.0902 1.1270 3.6386 6.3400e- i 9.3900e- 9.3900e- i 9.3900e- i 9.3900e- e 0.0000 i 537.1755 5371755: 0.1285 0.0000 540.3867 .......................... jl 003 003 003 003 003 ............................... •.... �................... . ............. Vendor ; 0.0176 0.5736 0.2462 1.4400e- 0.0359 1.3100e- 0.0372 0.0104 1.2600e- 0.0116 0.... 2...... ; 0.0000 i 144.1461 144.1461 0.0125 0.0000 144.4576 Total 0.0902 1.1270 3.6386 6.3400e- . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. 9.3900e- 9.3900e- Worker 9.3900e- 9.3900e- 0.0000 537.1755 537.1755 0.1285 0.0000 540.3867 0.0490 0.5940 0.4674 2.3000e- 0.1328 003 0.1347 003 003 0.0000 221.9839 003 003 0.0000 222.3307 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ....................................:....... ............................... •.... �................... . ............. Vendor ; 0.0176 0.5736 0.2462 1.4400e- 0.0359 1.3100e- 0.0372 0.0104 1.2600e- 0.0116 0.... 2...... ; 0.0000 i 144.1461 144.1461 0.0125 0.0000 144.4576 003 003 003 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. ------------------------------------ .............. ............. Worker ; 0.0314 0.0204 0.2213 i 8.6000e- I 0.0969 i 5.9000e- i 0.0975 0.0258 i 5.4000e- 0.0263 ; 0.0000 i 77.8378 77.8378 i 1.4100e- i 0.0000 77.8731 004 004 004 ; 003 Total 0.0490 0.5940 0.4674 2.3000e- 0.1328 1.9000e- 0.1347 0.0362 1.8000e- 0.0380 0.0000 221.9839 221.9839 0.0139 0.0000 222.3307 003 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 35 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.8 Office Building Core Construction - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Off -Road j 0.0810 0.6402 0.6652 1.3200e- i 0.0277 0.0277 0.0266 0.0266 e 0.0000 i 111.9240 i 111.9240: 0.0265 0.0000 112.5861 ........... ...............M............... 003 it i.............. ..... .... ...............•......... ..........�.................... ............. Vendor ; 3.4400e- 0.1124 0.0512 3.000Oe- 7.4800e- 2.4000e- 7.7200e- 2.1600e- 2.3000e- 2.3900e- e 29.7087 Total 0.0810 0.6402 0.6652 1.3200e- .............. .............. .............. .............. .............. .............. .............. .............. .. ...............I............... ............... ..... ..... ..... ..... ..... .... 0.0277 0.0277 Worker 0.0266 0.0266 0.0000 111.9240 111.9240 0.0265 0.0000 112.5861 9.6200e- 0.1162 0.0941 4.7000e- 0.0277 3.6000e- 003 7.5300e- 3.4000e- 7.8700e- 0.0000 45.2673 45.2673 2.8500e- 0.0000 45.3384 003 004 004 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. .................................... i.............. ..... .... ...............•......... ..........�.................... ............. Vendor ; 3.4400e- 0.1124 0.0512 3.000Oe- 7.4800e- 2.4000e- 7.7200e- 2.1600e- 2.3000e- 2.3900e- ; 0.0000 i 29.6443 29.6443 2.5800e- 0.0000 29.7087 003 004 003 004 003 003 004 003 003 .. ........................ .r................ .............. .............. .............. .............. .............. .............. .............. .............. .. ...............I............... ............... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 6.1800e- i 3.8400e- ° 0.0429 i 1.7000e- i 0.0202 i 1.2000e- i 0.0203 i 5.3700e- i 1.1000e- I 5.4800e- ; 0.0000 i 15.6230 15.6230 12.7000e- i 0.0000 15.6297 003 003 004 004 003 004 003 .: ; 004 Total 9.6200e- 0.1162 0.0941 4.7000e- 0.0277 3.6000e- 0.0280 7.5300e- 3.4000e- 7.8700e- 0.0000 45.2673 45.2673 2.8500e- 0.0000 45.3384 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 36 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.8 Office Building Core Construction - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 I PM10 Total I PM2.5 I PM2.5 I I Category tons /yr MT /yr Off -Road ; 0.0188 0.2348 0.7581 1.3200e- i i 1.9600e- 1.9600e- i 1.9600e- i 1.9600e- e 0.0000 i 111.9238 111.9238: 0.0265 0.0000 112.5860 ........... ...............M............... jl 003 003 003 003 003 i.............. ..... .... ...............•......... ..........�.................... ............. Vendor ; 3.4400e- 0.1124 0.0512 3.000Oe- 7.4800e- 2.4000e- 7.7200e- 2.1600e- 2.3000e- 2.3900e- ; 0.0000 i 29.6443 29.6443 2.5800e- 0.0000 29.7087 Total 0.0188 0.2348 0.7581 1.3200e- .............. .............. .............. .............. .............. .............. .............. .............. .. ...............I............... ............... ..... ..... ..... ..... ..... .... 1.9600e- 1.9600e- Worker 1.9600e- 1.9600e- 0.0000 111.9238 111.9238 0.0265 0.0000 112.5860 9.6200e- 0.1162 0.0941 4.7000e- 0.0277 3.6000e- 003 7.5300e- 3.4000e- 003 003 45.2673 003 003 45.3384 003 004 004 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. .................................... i.............. ..... .... ...............•......... ..........�.................... ............. Vendor ; 3.4400e- 0.1124 0.0512 3.000Oe- 7.4800e- 2.4000e- 7.7200e- 2.1600e- 2.3000e- 2.3900e- ; 0.0000 i 29.6443 29.6443 2.5800e- 0.0000 29.7087 003 004 003 004 003 003 004 003 003 .. ........................ .r................ .............. .............. .............. .............. .............. .............. .............. .............. .. ...............I............... ............... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 6.1800e- i 3.8400e- ° 0.0429 i 1.7000e- i 0.0202 i 1.2000e- i 0.0203 i 5.3700e- i 1.1000e- I 5.4800e- ; 0.0000 i 15.6230 15.6230 12.7000e- i 0.0000 15.6297 003 003 004 004 003 004 003 .: ; 004 Total 9.6200e- 0.1162 0.0941 4.7000e- 0.0277 3.6000e- 0.0280 7.5300e- 3.4000e- 7.8700e- 0.0000 45.2673 45.2673 2.8500e- 0.0000 45.3384 003 004 004 003 004 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 37 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.9 Parking Garage Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.0000 0.0000 0.0000 0.0000 E 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor �: : : E E 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E ................. .. ............................... .............. .............. ............. Off -Road ;I 0.0116 0.0974 0.0880 1.80OOe- 4.20OOe- 4.200Oe- 3.95OOe- 3.9500e- 0.0000 ° 15.6919 15.6919 4.5500e- 0.0000 15.8057 .I 004 003 003 003 r 003 003 Total 0.0116 0.0974 0.0880 1.8000e- 1.00OOe- 4.2000e- 4.2000e- 1.00OOe- 3.9500e- 3.9500e- 0.0000 15.6919 15.6919 4.5500e- 0.0000 15.8057 004 004 003 005 004 004 004 003 003 004 003 003 005 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 3.1OOOe- i 2.00OOe- E 2.17OOe- E 1.00OOe- i 9.50OOe- E 1.00OOe- i 9.60OOe- E 2.50OOe- i 1.00OOe- I 2.6000e- ; 0.0000 0.7650 0.7650 I 1.00OOe- E 0.0000 0.7653 004 004 003 005 004 005 004 004 005 004 .: ; 005 Total 3.1000e- 2.00OOe- 2.1700e- 1.00OOe- 9.5000e- 1.00OOe- 9.6000e- 2.5000e- 1.00OOe- 2.6000e- 0.0000 0.7650 0.7650 1.00OOe- 0.0000 0.7653 004 004 003 005 004 005 004 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 38 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.9 Parking Garage Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.0000 0.0000 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. ........... ............... �: : : i 3 «............... .............. .............. .............. .............. .............. ............. ............. .............. .................;... ............................... .............. ............. .............. ............. Off -Road ;i 2.71OOe- 0.0296 0.1038 1.8000e- 3.2000e- 3.2000e- 3.2000e- 3.2000e- 0.0000 ° 15.6919 15.6919 4.5500e- 0.0000 15.8057 Worker �i 003 004 004 004 004 004 003 004 004 003 005 004 005 004 004 005 004 .: ; 005 Total 2.7100e- 0.0296 0.1038 1.8000e- 1.000Oe- 3.2000e- 3.2000e- 1.000Oe- 3.2000e- 3.2000e- 07000 15.6919 15.6919 4.5500e- 0.0000 15.8057 004 004 003 005 004 004 004 004 004 004 004 004 005 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 3.1000e- i 2.000Oe- E 2.17OOe- i 1.000Oe- i 9.5000e- i 1.000Oe- i 9.6000e- i 2.5000e- i 1.000Oe- I 2.6000e- ; 0.0000 0.7650 0.7650 I 1.000Oe- i 0.0000 0.7653 004 004 003 005 004 005 004 004 005 004 .: ; 005 Total 3.1000e- 2.000Oe- 2.1700e- 1.000Oe- 9.5000e- 1.000Oe- 9.6000e- 2.5000e- 1.000Oe- 2.6000e- 0.0000 0.7650 0.7650 1.000Oe- 0.0000 0.7653 004 004 003 005 004 005 004 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 39 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.1974 0.0000 0.0000 0.0000 i : 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor : : i 3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .. Off -Road ;I 0.0238 0.2007 0.1965 4.3000e- 9.23OOe- 9.2300e- 8.7100e- 8.7100e- 0.0000 ° 37.3957 37.3957 0.0104 0.0000 37.6549 .I 004 003 003 003 r 003 Total 0.2212 0.2007 0.1965 4.3000e- 2.00OOe- 9.2300e- 9.2300e- 1.00OOe- 8.7100e- 8.7100e- 0.0000 37.3957 37.3957 0.0104 0.0000 37.6549 004 004 003 005 003 004 003 003 003 004 003 003 005 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 8.50OOe- i 5.50OOe- E 5.98OOe- i 2.00OOe- i 2.62OOe- i 2.00OOe- i 2.63OOe- i 7.00OOe- i 1.00OOe- I 7.1000e- ; 0.0000 2.1021 2.1021 14.00OOe- i 0.0000 2.1031 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 8.5000e- 5.5000e- 5.9800e- 2.00OOe- 2.6200e- 2.00OOe- 2.6300e- 7.00OOe- 1.00OOe- 7.1000e- 0.0000 2.1021 2.1021 4.00OOe- 0.0000 2.1031 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 40 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 01974 1: 0.0000 0.0000 0.0000 E : : 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor : : E E 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E .................+.. ............................... .............. ............. .............. ............. Off -Road ;I 6.01OOe- 0.0618 0.2422 4.3000e- 6.7000e- 6.7000e- 6.7000e- 6.7000e- 0.0000 ° 37.3957 37.3957 0.0104 0.0000 37.6549 ,I 003 004 004 004 004 004 Total r 5.9800e- 2.000Oe- Total 0.2034 0.0618 0.2422 4.3000e- 7.1000e- 6.7000e- 6.7000e- 4.000Oe- 6.7000e- 6.7000e- 07000 37.3957 37.3957 0.0104 0.0000 37.6549 005 003 004 005 004 004 004 004 004 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 8.5000e- i 5.5000e- E 5.98OOe- E 2.000Oe- i 2.62OOe- E 2.000Oe- i 2.63OOe- E 7.000Oe- i 1.000Oe- I 7.1000e- ; 0.0000 2.1021 2.1021 14.000Oe- E 0.0000 2.1031 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 8.5000e- 5.5000e- 5.9800e- 2.000Oe- 2.6200e- 2.000Oe- 2.6300e- 7.000Oe- 1.000Oe- 7.1000e- 0.0000 2.1021 2.1021 4.000Oe- 0.0000 2.1031 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 41 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 1.0375 0.0000 0.0000 0.0000 E : : 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor �: : : E E 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E .................+.. ............................... .............. ............. .............. ............. Off -Road ;I 0.1117 0.8932 1.0057 2.27OOe- 0.0392 0.0392 0.0370 0.0370 0.0000 ° 196.6320 196.6320 0.0543 0.0000 197.9898 '1 003 it ; 004 Total 4.2100e- 2.6200e- 0.0292 1.2000e- Total 1.1492 0.8932 1.0057 2.2700e- 3.7400e- 0.0392 0.0392 1.8000e- 0.0370 0.0370 0.0000 196.6320 196.6320 0.0543 0.0000 197.9898 005 003 005 003 004 1 1 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.21OOe- i 2.62OOe- ° 0.0292 E 1.20OOe- i 0.0138 E 8.00OOe- i 0.0138 E 3.66OOe- i 8.00OOe- I 3.7400e- ; 0.0000 E 10.6468 10.6468 I 1.8000e- E 0.0000 10.6513 003 003 004 005 003 005 003 .: ; 004 Total 4.2100e- 2.6200e- 0.0292 1.2000e- 0.0138 8.00OOe- 0.0138 3.6600e- 8.00OOe- 3.7400e- 0.0000 10.6468 10.6468 1.8000e- 0.0000 10.6513 003 003 004 005 003 005 003 004 CalEEMod Version: CalEEMod.2016.3.2 Page 42 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.10 Office Building Tenant Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 1.0375 0.0000 0.0000 0.0000 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor : : i 3 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off -Road ;I 0.0316 0.3249 1.2733 2.27OOe- 3.54OOe- 3.5400e- 3.54OOe- 3.5400e- 0.0000 ° 196.6318 196.6318 0.0543 0.0000 197.9895 Worker .I 003 003 003 003 003 10.6513 r ; 004 Total 1.0691 0.3249 1.2733 2.2700e- 8.000Oe- 3.5400e- 3.5400e- 8.000Oe- 3.54OOe- 3.54OOe- 3.5400e- 0.0718 196.6318 0.0543 0.0000 197.9895 003 003 004 003 003 003 003 003 003 004 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 4.21OOe- i 2.62OOe- ° 0.0292 i 1.2000e- i 0.0138 i 8.000Oe- i 0.0138 i 3.66OOe- i 8.000Oe- I 3.7400e- ; 0.0000 i 10.6468 10.6468 I 1.8000e- i 0.0000 10.6513 003 003 004 005 003 005 003 .: ; 004 Total 4.2100e- 2.6200e- 0.0292 1.2000e- 0.0138 8.000Oe- 0.0138 3.6600e- 8.000Oe- 3.7400e- 0.0000 10.6468 10.6468 1.8000e- 0.0000 10.6513 003 003 004 005 003 005 003 004 CalEEMod Version: CalEEMod.2016.3.2 Page 43 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Off -Road ; 0.0279 0.2834 0.2120 3.6000e- 0.0142 0.0142 0.0131 0.0131 j 0.0000 31.1340 31.1340 9.7200e- '• 0.0000 313770 .......................... jl 004 : ...:....... ............................... •................... �................... j 003 . ............................. ............. .............. .............. .............. .............. .............. ............. ............. «. i ......... E ............... ..:.. .............. ............. ........................... ......... .............. ............. Paving ;I 8.6000e- 0.0000 0.0000 0.0000 x0000 0.0000 ° 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .I 004 ; 0.0000 1.6216 1.6216 i 3.00OOe- i 0.0000 1.6224 r ; 005 Total 0.0287 0.2834 0.2120 3.6000e- 0.0142 0.0142 5.4000e- 0.0131 0.0131 0.0000 31.1340 31.1340 9.7200e- 0.0000 31.3770 004 004 003 005 004 005 003 004 005 004 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 6.5000e- i 4.3000e- E 4.6100e- i 2.00OOe- i 2.0200e- i 1.00OOe- i 2.0300e- i 5.4000e- i 1.00OOe- I 5.5000e- ; 0.0000 1.6216 1.6216 i 3.00OOe- i 0.0000 1.6224 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 6.5000e- 4.3000e- 4.6100e- 2.00OOe- 2.0200e- 1.00OOe- 2.0300e- 5.4000e- 1.00OOe- 5.5000e- 0.0000 1.6216 1.6216 3.00OOe- 0.0000 1.6224 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 44 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Off -Road ; 6.4600e- i 0.0416 0.2288 3.6000e- i i 1.0500e- 1.0500e- i 1.0500e- 1.0500e- e 0.0000 i 31.1340 31.1340 9.7200e- 0.0000 31.3770 .......................... jl 003 004 003 003 003 i : : I 003 e 003 Vendor «................... ... .............. .............. .............. .............. .............. ................... ............. .... E ...............i.............. ..:.. ........................... ......... .............. ............. Paving ;I 8.6000e- 0.0000 0.0000 0.0000 0.0000 0.0000 ° 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .I 004 ; 0.0000 1.6216 1.6216 i 3.000Oe- i 0.0000 1.6224 r ; 005 Total 7.3200e- 0.0416 0.2288 3.6000e- 1.0500e- 1.0500e- 5.4000e- 1.0500e- 1.0500e- 0.0000 31.1340 31.1340 9.7200e- 0.0000 31.3770 003 003 005 004 003 003 004 003 003 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 6.5000e- i 4.3000e- E 4.6100e- i 2.000Oe- i 2.0200e- i 1.000Oe- i 2.0300e- i 5.4000e- i 1.000Oe- I 5.5000e- ; 0.0000 1.6216 1.6216 i 3.000Oe- i 0.0000 1.6224 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 6.5000e- 4.3000e- 4.6100e- 2.000Oe- 2.0200e- 1.000Oe- 2.0300e- 5.4000e- 1.000Oe- 5.5000e- 0.0000 1.6216 1.6216 3.000Oe- 0.0000 1.6224 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 45 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Off -Road ; 0.0911 0.9212 0.7831 1.3700e- i 0.0444 0.0444 0.0410 E 0.0410 e 0.0000 i 118.7799 118.7799: 0.0371 0.0000 119.7069 .......................... 003 ° ...:....... ............................... •................... �................... e Vendor ............... E E I E E .............. .............. .............. ............. .... . ..........E ................... ................° ............... Paving 3.2700e- 0000 x0000 0.0000 0.0000 0.0000 0000 0.0000 0.0000 Worker 003 ; 0.0000 5.9599 5.9599 i 1.00OOe- E 0.0000 5.9624 r ; 004 Total 0.0944 0.9212 0.7831 1.3700e- 0.0444 0.0444 2.0500e- 0.0410 0.0410 0.0000 118.7799 118.7799 0.0371 0.0000 119.7069 003 003 005 003 005 003 003 005 003 004 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... . Worker ; 2.3600e- i 1.4600e- ° 0.0164 E 7.00OOe- i 7.7000e- E 5.00OOe- i 7.7500e- E 2.0500e- i 4.00OOe- I 2.0900e- ; 0.0000 5.9599 5.9599 i 1.00OOe- E 0.0000 5.9624 003 003 005 003 005 003 003 005 003 .: ; 004 Total 2.3600e- 1.4600e- 0.0164 7.00OOe- 7.7000e- 5.00OOe- 7.7500e- 2.0500e- 4.00OOe- 2.0900e- 0.0000 5.9599 5.9599 11.0000e- 0.0000 5.9624 003 003 005 003 005 003 003 005 003 004 CalEEMod Version: CalEEMod.2016.3.2 Page 46 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.11 Landscaping and Site Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Off -Road ; 0.0247 0.1587 0.8727 1.3700e- i i 4.0100e- 4.0100e- i 4.01OOe- 4.0100e- e 0.0000 i 118.7797 118.7797 i 0.0371 0.0000 119.7068 .......................... 3 003 i 003 003 003 003 e . ............................. .............. .............. .............. .............. ................... ............. «. i ......... ............... :.. .............. ............. .............. ............. .............. ............. Paving ;I 3.27OOe- 0.0000 0.0000 0.0000 x0000 0.0000 ° 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .I 003 ; 0.0000 5.9599 5.9599 i 1.000Oe- i 0.0000 5.9624 r ; 004 Total 0.0279 0.1587 0.8727 1.3700e- 4.0100e- 4.0100e- 2.0500e- 4.0100e- 4.0100e- 0.0000 118.7797 118.7797 0.0371 0.0000 119.7068 003 003 005 003 003 003 003 003 003 1 004 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... . Worker ; 2.36OOe- i 1.4600e- ° 0.0164 i 7.000Oe- i 7.7000e- i 5.000Oe- i 7.75OOe- i 2.05OOe- i 4.000Oe- I 2.0900e- ; 0.0000 5.9599 5.9599 i 1.000Oe- i 0.0000 5.9624 003 003 005 003 005 003 003 005 003 .: ; 004 Total 2.3600e- 1.4600e- 0.0164 7.000Oe- 7.7000e- 5.000Oe- 7.7500e- 2.0500e- 4.000Oe- 2.0900e- 0.0000 5.9599 5.9599 11.0000e- 0.0000 5.9624 003 003 005 003 005 003 003 005 003 004 CalEEMod Version: CalEEMod.2016.3.2 Page 47 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.1825 0.0000 0.0000 0.0000 E 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor �: : : E E 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E .................+.. ............................... .............. .............. ............. Off -Road ;I 0.0198 0.1773 0.1922 3.6000e- 8.1300e- 8.1300e- 7.5700e- 7.5700e- 0.0000 ° 30.9209 30.9209 9A200e- 0.0000 31.1563 .I 004 003 003 003 r 003 003 Total 0.2023 0.1773 0.1922 3.6000e- 0.0000 8.1300e- 8.1300e- 0.0000 7.5700e- 7.5700e- 07000 30.9209 30.9209 9.4200e- 0.0000 31.1563 004 004 003 004 004 004 003 003 004 003 003 005 003 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 1.8000e- i 1.2000e- E 1.2600e- E 0.0000 i 5.5000e- E 0.0000 i 5.5000e- E 1.5000e- i 0.0000 I 1.5000e- ; 0.0000 0.4426 0.4426 i 1.00OOe- E 0.0000 0.4428 004 004 003 004 004 004 004 .: ; 005 Total 1.8000e- 1.2000e- 1.2600e- 0.0000 5.5000e- 0.0000 5.5000e- 1.5000e- 0.0000 1.5000e- 0.0000 0.4426 0.4426 1.00OOe- 0.0000 0.4428 004 004 003 004 004 004 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 48 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.1825 0.0000 0.0000 0.0000 i 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... . i ...:....... ............................... •................... �................... . ............. Vendor «. : : 3 ° ............. .............. .............. .............. .............. .............. ............. ............. 0.0000 0.0000 0.0000 0.0000 0.0000 .............. ............. ............. ..... Off -Road ; 5.4000e- 0.0592 0.2239 3.6000e- 6.3000e- 6.3000e- 6.3000e- 6.3000e- 0.0000 ° 30.9208 30.9208 9.4200e- 0.0000 31.1562 Worker .I 003 004 004 004 004 004 003 r ; 005 Total 0.1879 0.0592 0.2239 3.6000e- 0.0000 6.3000e- 6.3000e- 0.0000 6.3000e- 6.3000e- 07000 30.9208 30.9208 9.4200e- 0.0000 31.1562 004 004 003 004 004 004 004 004 004 004 004 005 1 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .............................. . ..... ..... ..... ..... ..... ..... .... Worker ; 1.8000e- i 1.2000e- E 1.2600e- i 0.0000 i 5.5000e- i 0.0000 i 5.5000e- i 1.5000e- i 0.0000 I 1.5000e- ; 0.0000 0.4426 0.4426 i 1.000Oe- i 0.0000 0.4428 004 004 003 004 004 004 004 .: ; 005 Total 1.8000e- 1.2000e- 1.2600e- 0.0000 5.5000e- 0.0000 5.5000e- 1.5000e- 0.0000 1.5000e- 0.0000 0.4426 0.4426 1.000Oe- 0.0000 0.4428 004 004 003 004 004 004 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 49 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0.4106 0.0000 0.0000 0.0000 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor : : 3 ° 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . ............................. «. .............. ............... +.............. ............. ............. .............. ............. Off -Road ; 0.0394 0.3456 0.4239 8.1OOOe- 0.0147 0.0147 0.0137 0.0137 0.0000 ° 69.5806 69.5806 0.0211 0.0000 70.1086 '1 004 it ; 005 Total 3.8000e- 2.4000e- 2.6300e- 1.00OOe- Total 0.4500 0.3456 0.4239 8.1000e- 3.4000e- 0.0147 0.0147 2.00OOe- 0.0137 0.0137 0.0000 69.5806 69.5806 0.0211 0.0000 70.1086 005 003 004 005 004 005 1 1 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 3.80OOe- i 2.40OOe- E 2.63OOe- i 1.00OOe- i 1.2400e- i 1.00OOe- i 1.2500e- i 3.30OOe- i 1.00OOe- I 3.4000e- ; 0.0000 0.9593 0.9593 12.00OOe- i 0.0000 0.9597 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 3.8000e- 2.4000e- 2.6300e- 1.00OOe- 1.2400e- 1.00OOe- 1.2500e- 3.3000e- 1.00OOe- 3.4000e- 0.0000 0.9593 0.9593 2.00OOe- 0.0000 0.9597 004 004 003 005 003 005 003 004 005 004 005 CalEEMod Version: CalEEMod.2016.3.2 Page 50 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 3.12 Office Building Exterior Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category tons /yr MT /yr Archit. Coating 0A106 1: 0.0000 0.0000 0.0000 0.0000 j 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor : : i E 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off -Road ;I 0.0121 0.1331 0.5038 8.1OOOe- 1.4200e- 1.4200e- 1.4200e- 1.4200e- 0.0000 ° 69.5805 69.5805 0.0211 0.0000 I 70.1085 Worker .I 004 003 003 003 r 003 0.9597 Total 0.4228 0.1331 0.5038 8.1000e- 3.8000e- 2.4000e- 1.4200e- 1.4200e- 1.2400e- 1.4200e- 1.4200e- 07000 69.5805 69.5805 0.0211 0.0000 70.1085 2.00OOe- 0.0000 0.9597 004 003 003 003 005 003 003 005 004 005 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category tons /yr MT /yr Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 .......................... M............... .............. .............. .............. .............. ............. .............. ............. .............. ................................. ...:....... ............................... •................... �................... . ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 3.80OOe- i 2.40OOe- E 2.63OOe- i 1.00OOe- i 1.2400e- i 1.00OOe- i 1.2500e- i 3.30OOe- i 1.00OOe- I 3.4000e- ; 0.0000 0.9593 0.9593 12.00OOe- i 0.0000 0.9597 004 004 003 005 003 005 003 004 005 004 .: ; 005 Total 3.8000e- 2.4000e- 2.6300e- 1.00OOe- 1.2400e- 1.00OOe- 1.2500e- 3.3000e- 1.00OOe- 3.4000e- 0.0000 0.9593 0.9593 2.00OOe- 0.0000 0.9597 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile CalEEMod Version: CalEEMod.2016.3.2 Page 51 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx I CO I S02 I Fugitive PM10 Exhaust PM10 PM10 Total I Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 I N20 I CO2e Category ............................... tons /yr 476.59 i 69.18 30.75 981,509 981,509 MT /yr Mitigated ; 0.1184 0.3769 1.4178 5.1100e- 0.4846 4.2400e- 0.4889 0.1302 3.9600e- 0.1342 0.0000 i 468.1965 468.1965 0.0166 0.0000 468.6119 i...................................... ............................... 003 003 0.00 0.00 003 Total 634.69 j 92.13 40.95 r .............................. r......................................,................................................................................................................................ ......,.................... 1,307,108 t.............................................................................,........ ...........,................... Unmitigated ; 0.1184 0.3769 1.4178 5.1100e- 0.4846 4.2400e- 0.4889 0.1302 3.9600e- 0.1342 ; 0.0000 468.1965: 468.1965: 0.0166 0.0000 468.6119 003 003 003 ; 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT .closed. Parking with Elevator . 0.00 i 0.00 I 0;00 ..........E ............................. a...................... .. ..................................................................................................................... ............................... Office Park 476.59 i 69.18 30.75 981,509 981,509 ................. .................. ..... • •Office ..............................; _................................................................................. 1................................... ............................... Park• 158.10 i 22:95 10.20 325,599 325,599 ................................................ ....... .............................:. ................................................................ i...................................... ............................... Parking Lot 0.00 0.00 0.00 Total 634.69 j 92.13 40.95 i 1,307,108 1,307,108 4.3 Trip Type Information CalEEMod Version: CalEEMod.2016.3.2 Page 52 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 4.4 Fleet Mix Land Use LDA I Miles LDT2 I MDV I Trip % LHD2 I MHD I HHD I Trip Purpose % UBUS I Land Use H -W or C -W H -S or C -C C -NW H -O i H -W or C- H -S or C -C H -O or C -NW Primary 0.017521; Diverted 0.023236; Pass -by 0.004137; 0.0031581 0.009064; 0.0004711 W ............................................................ i........ ........... .................. Enclosed Parking with Elevator 9.50 7.30 i 7.30 0.00 0.00 i 0.00 0 . 0 ' 0 ..............................: ............................ .......................... ............................. 0.006864; 0.023236; ....................... a ..............................• 0.0041371 r ............. ................,............................ 0.009064; .........3..................... Office Park 9.50 7.30 7.30 • 71.00 10.00 ' � : i 19.00 82 1............. ' .............................. ............................. Office Park 9.50 ......................... ..............................; 7.30 7.30 71.00 ; ....................... a ............................... 10.00 19.00 i 0.476244; ' 0.262181: ............................... .................. .... ............................... E............................' Y ....................... E........................; ............................... 0.023236: .............................. ,............................ .................. ........................... Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 ; 0 0 4.4 Fleet Mix Land Use LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.004137; 0.0031581 0.009064; 0.0004711 0.00077 ............................................................ i........ ........... .................. Office Park ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.0041371 0.0031581 0.009064; 0.000471; 0.00077; Parking Lot i 0.476244; 0.050164: 0.262181: 0.139658: 0.0175211 0.006864: 0.023236: 0.006525: 0.004137: 0.003158: 0.0090641 0.000471: 0.00077; 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CalEEMod Version: CalEEMod.2016.3.2 Page 53 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category tons /yr I I MT /yr PM10 Total I Electricity ; PM2.5 0.0000 0.0000 1 0.0000 0.0000 ; 0.0000 :1,487.5588:1,487.5588: 0.0673 1 0.0139 1,493.3875 Mitigated tons /yr MT /yr Enclosed Parking 0 iE 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator is r ... .......................... N............... .............. .............. .............. .............. .............. .............. ............. .............. ............................................... ... .. .. ..... .. ... . .......... ........ ............... ............ ... �.................... ............. Electricity ; +006 0.0000 0.0000 0.0000 0.0000 ; 0.0000 1,487.5588 1,487.5588 0.0673 0.0139 1,493.3875 Unmitigated 003 003 003 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 r 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0342 0.3113 0.2615 .............................. ....... ",.... .............. ------- - - - - -- .............. .............. .............. .............. .............. .. ............................... ............. .............. .............. .............. ............. NaturalGas ; 0.0342 0.3113 0.2615 E 1.8700e- E 0.0237 0.0237 0.0237 0.0237 ; 0.0000 : 338.8777E 338.8777: 6.5000e- E 6.2100e- 340.8914 Mitigated ; 003 003 ; 003 003 .......... ...............r............... ... .. +..................:......................................:...................:....... 003 ............................... NaturalGas ; 0.0342 0.3113 0.2615 1.8700e- 0.0237 0.0237 0.0237 0.0237 ; 0.0000 338.8777: 338.8777: 6.5000e- 6.2100e- 340.8914 Unmitigated 003 ' 003 003 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use I I PM10 PM10 Total I PM2.5 I PM2.5 I Land Use kBTU /yr tons /yr MT /yr Enclosed Parking 0 iE 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 E 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator is r d: Office Park : 1.58185e 8.5300e- E 0.0775 E 0.0651 : 4.7000e- E : 5.8900e- E 5.8900e- : 5.8900e- E 5.8900e- E 0.0000 E 84.4135 : 84.4135 E 1.6200e- 3 1.5500e- : 84.9152 +006 003 004 003 003 003 003 r 003 003 ..............................«....... ............................... •............ ... •................... •................ .............. ............. ............. .............. .............. .................. t ........................... ...........1................... �................... •........ ...........i................... Office Park : 4.76848e 1: 0.0257 0.2338 0.1964 1.4000e- 0.0178 0.0178 0.0178 0.0178 0.0000 E 254.4641E 254.4641 4.8800e- 4.6700e- :255.9763 +006 003 003 003 Parking Lot 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 r 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0342 0.3113 0.2615 1.8700e- 0.0237 0.0237 0.0237 0.0237 0.0000 338.8777 338.8777 6.5000e- 6.2200e- 340.8914 003 003 003 CalEEMod Version: CalEEMod.2016.3.2 Page 54 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 I Total PM2.5 PM2.5 I Land Use kBTU /yr tons /yr MT /yr Enclosed Parking 0 :I 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 i 0.0000 i 0.0000 it 0.0000 i 0.0000 0.0000 with Elevator I it i i;................... . i •................................................................ •.............................................. I I.................... « ................. Office Park 11.58185e ............................... ............................... ai 8.5300e- 0.0775 0.0651 4.7000e- 5.8900e- 5.8900e- 5.8900e- 5.8900e- t ..................:.."8'4'.'4'1'3'5... .. ....................... ................... ............ . 0.0000 i 84.4135 1.6200e- 1.5500e- 84.9152 + 006 it 003 004 003 003 003 003 i 003 003 « ................. i. ::............................................. ............................... ............ ............................................. ..... ................................... .................. :................. ............................. .............................. ............. ...... Office Park 14.76848e 3i 0.0257 i 0.2338 I 0.1964 I 1.4000e- i 0.0178 i 0.0178 0.0178 i 0.0178 E 0.0000 i 254.4641 i 254.4641 4.8800e- E 4.6700e- 1 255.9763 +006 003 003 003 . ......................... ..... ..........ii................... .. t. Parking Lot 0 .. ..... .. .............. ............ ............ ............ i `... ..'... ....1 ................... `... ....................... `. .......... .............'................. ............... 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 +..................:...................•...................'...................`....... ............................... ' E 0.0000 i 0.0000 i 0.0000 0.0000 0.0000 I 0.0000 it it it Total 0.0342 0.3113 0.2615 1.8700e- 0.0237 0.0237 0.0237 0.0237 0.0000 338.8777 338.8777 6.5000e- 6.2200e- 340.8914 1 003 003 003 Co|EEyWod Version: Ca|EEK4od.2018.3.2 Page 55ofS4 Date: 8/1/201811:U0AM Haskins Way Rezone Phase U- San Mateo County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Use I Land Use] kWh/yr VIT/yr Enclosed Parking 796960 231,8448 0,0105 2.17OOe- 232.7532 with Elevator 003 Office Park I: 1.06675e 1 310.3298 ................... 0.0140 .................... 2.90OOe- ................ 311.5458 +006 003 .............................. ................. ............ ",'] Office Park 3.21571e 935.4874 0,0423 8.75OOe- 939,1529 +006 003 Parking Lot 34020 9. 004 005 Total 1,487.5588� 0.0773 1 0.0139 11,49138751 Co|EEyWod Version: Ca|EEK4od.2018.3.2 Page 58ofS4 Date: 8/1/201811:U0AM Haskins Way Rezone Phase U- San Mateo County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6'0 Area Detail 6.1 Mitigation Measures Area Use I Land Use] kWh/yr VIT/yr Enclosed Parking 796960 231,8448 0,0105 2.17OOe- 232.7532 with Elevator 003 Office Park I: 1.06675e 1 310.3298 ................... 0.0140 .................... 2.90OOe- ................ 311.5458 +006 003 .............................. ................. ............ ",'] Office Park 3.21571e 935.4874 0,0423 8.75OOe- 939,1529 +006 003 Parking Lot 34020 9. 004 005 Total 1,487.5588� 0.0773 1 0.0139 11,49138751 6'0 Area Detail 6.1 Mitigation Measures Area CalEEMod Version: CalEEMod.2016.3.2 Page 57 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 6.2 Area by SubCategory Unmitigated ROG I NOx I CO I S02 Fugitive PM10 Exhaust PM10 I PM10 Total I Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category tons /yr PM10 PM10 MT /yr Mitigated ; 1.5313 i 8.000Oe- 18.5100e- 0.0000 13.000Oe- i 3.000Oe- I 3.000Oe- i 3.000Oe- ; 0.0000 0.0165 i 0.0165 14.000Oe- i 0.0000 0.0176 .I 005 003 005 005 005 005 005 ........... .............. ............... ............. .............. ....................................... ............. ............. .............. .............. .. .............. *................ . Unmitigated ;I 1.5313 i 8.000Oe- i 8.5100e- i 0.0000 3.000Oe- E 3.000Oe- i i 3.000Oe- i 3.000Oe- ; 0.0000 0.0165 E 0.0165 E 4.000Oe- i 0.0000 0.0176 ,I r. 005 003 005 005 005 005 ; 005 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I SubCategory tons /yr MT /yr Architectural fli 0.1828 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating r i �. � .............................. �I i I I i r............................................................................ ................... ................... °................... I................... ................... °.................. ..+....... .............................. I....... ............................... I....... ............................... Consumer 1.3478 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products '0 Landscaping ; 7.9000e- 18.000Oe- 18.5100e- I 0.0000 E 13.000Oe- i 3.000Oe- I I 3.000Oe- E 3.000Oe- 0.0000 0.0165 0.0165 14.000Oe- i 0.0000 0.0176 ;I 004 005 003 005 005 005 005 r 005 Total 1.5314 8.000Oe- 8.5100e- 0.0000 3.000Oe- 3.000Oe- 3.000Oe- 3.000Oe- 0.0000 0.0165 0.0000 0.0176 005 003 005 005 005 005 7.000Oe- 005 CalEEMod Version: CalEEMod.2016.3.2 Page 58 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I SubCategory tons /yr MT /yr Architectural ; 0.1828 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 Coating : .. .......................... �I _ i ; i e p............... .............. .............. .............. .............. ............. .............. .............. ............. ................. .. .. ..... .. s .................. �................ .............. ............. .............. ............. Consumer ;i 1.3478 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products ' 0 ............ .............. ................... ................. .............. .............. .............. ............ ..... ..... Landscaping ; 7.9000e- i 8.000Oe- 8.5100e- I 0.0000 i i 3.000Oe- E 3.000Oe- 3.000Oe- i 3.000Oe- E 0.0000 I 0.0165 i 0.0165 i 4.000Oe- i 0.0000 I 0.0176 004 005 003 005 005 005 005 005 Total 1.5314 8.000Oe- 8.5100e- 0.0000 3.000Oe- 3.000Oe- 3.000Oe- 3.000Oe- 0.0000 0.0165 0.0165 4.000Oe- 0.0000 0.0176 005 003 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 5OofS4 Date: 8/1/201O11:U0AM Haskins Way Rezone Phase U- San Mateo County, Annual 7.2 Water by Land Use Unmitigated Total CO2 74 1 N20 I CO2e Category MT/yr Mitigated 152.5559 1.9823 1 0.0479 216.3892 Unmitigated 152.5559 1.9823 0.0479 216.3892 7.2 Water by Land Use Unmitigated door Use I Land Use] Mgal 1. MT/yr Enclosed Parking 0/0 a! 0.0000 '1 0.0000 0.0000 0.0000 with Elevator Office Park 1 60.6481 152.5559 1.9823 0.0479 216.3892 1 Parking Lot 0/0 0.0000 0.0000 0.0000 0.0000 Total 152.5559 1.9823 0.0479 216.3 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 80ofS4 Date: 6/1/201O11:80AM Haskins Way Rezone Phase U- San Mateo County, Annual 7.2 Water by Land Use Mitigated 8.0 Waste Detail 8.1 Mitigation Measures Waste door Use I Land Use] mgal MT/yr Enclosed Parking 0/0 ji 0.0000 '1 0.0000 0.0000 0.0000 with Elevator Office Park 60.6481 152.5559 1,9823 0.0479 216.3892 37.1714 1 Parking Lot 0/0 2 0.0000 1 0.0000 0.0000 0.0000 Total 152.5559 1.9823 0.0479 ;16.3892_ 8.0 Waste Detail 8.1 Mitigation Measures Waste Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 81ofS4 Date: 8/1/201O11:U0AM Haskins Way Rezone Phase U- San Mateo County, Annual 8.2 Waste by Land Use Unmitigated Mitigated 64,4172 3.8069 1 0.0000 159.5908 Unmitigated 64.4172 3.8069 0.0000 159.5908 8.2 Waste by Land Use Unmitigated Land Use] tons 1. MT/yr Enclosed Parking 1 0 21 0.0000 1 0.0000 0.0000 0.0000 with Elevator Office Park 11 317.34 64.4172 3.8069 0.0000 159.5908 Parking Lot i N 0.0000 0.0000 0.0000 0.0000 Total 64.4172 3.80 69 0.0000 159.5 CalEEMod Version: CalEEMod.2016.3.2 Page 62 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase 11 - San Mateo County, Annual 8.2 Waste by Land Use Mitigated 9.0 Operational Offroad Equipment Type Waste Total CO2 CH4 N20 CO2e Fuel Type Disposed 8.001 I I I Land Use tons ----------- MT/yr ---------------------------------------------- Enclosed Parking 0 11 0.0000 1 0.0000 0.0000 0.0000 with Elevator .................................... ................................................. . ............................................. .............................................................. .............................. ................. . Office Park 317.34 1 ................... 64.4172 ....... . ......... 3.8069 ................... 0.0000 ................... 159.5908 .............................................................................. .................................... ................................................ ............................................. . ----- .................................... Pressure Washers 1 16.001: 13: 0.30: Diesel ..........................«... .............4;................ . ... ................... ................... ................... Parking Lot 0 1 0,0000 i 0.0000 I 0.0000 1 0.0000 Total 64.4172 3.8069 0.0000 759.5908_ 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type Cranes 8.001 2:i 2311 0.291 Diesel .............................................................................. ....................................... ----------- ................................................ ---------------------------------------------- ...... . ........... .................................... Forklifts 1 8.00:: 3651 89:: 0.201 Diesel .............................................................................. .................................... ................................................. . ............................................. .............................................................. Generator Sets 4i 0.301 52 84': 0.74 Diesel .............................................................................. .................................... ................................................ ............................................. . ----- .................................... Pressure Washers 1 16.001: 13: 0.30: Diesel CalEEMod Version: CalEEMod.2016.3.2 Page 63 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual UnMitigated /Mitigated 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day HoursNear Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input /Day Heat InputNear Boiler Rating Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Equipment Type tons /yr MT /yr Cranes ; 3.7000e- i 4.18OOe- i 1.8900e- i 1.000Oe- i i 1.7000e- i 1.7000e- i i 1.6000e- I 1.6000e- ; 0.0000 0.5070 i 0.5070 i 1.6000e- i 0.0000 0.5111 004 003 003 005 004 004 004 004 004 ........... ...............N............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f .................. :............................................... ..........�........................ .......... Forklifts ; 0.0207 0.1925 0.2106 2.8000e- 0.0128 0.0128 0.0117 0.0117 ; 0.0000 i 24.5082 24.5082 7.9300e- 0.0000 24.7063 004 003 .............................. ... ..... ..... ...... ..... ..... r................... . "I.......... .............. .------ - - - - -- .............. .............. .............. .............. .............. .. ...............i............... ............. .............. .............. .............. ............. Generator Sets ; 1.2900e- I 0.0114 0.0143 i 3.000Oe- I i 5.7000e- i 5.7000e- i i 5.7000e- 5.7000e- ; 0.0000 2.2043 2.2043 i 1.000Oe- i 0.0000 2.2069 003 005 004 004 004 004 ; 004 .............................. Pressure .: r.------------------ 1................... I...................................... f............................ ..........�...................° ........... 1................... ; 4.000Oe- 3.000Oe- 2.4000e- 0.0000 1.000Oe- i 1.000Oe- 1.000Oe- ..................... 1.000Oe- .................. :............... ....................... 1............. ....................... ; 0.0000 0.0355 0.0355 i 0.0000 0.0000 ........... 0.0356 Washers ; 005 004 004 005 005 005 005 ; Total 0.0224 0.2084 0.2270 3.2000e- 0.0135 0.0135 0.0125 0.0125 0.0000 27.2549 27.2549 8.1900e- 0.0000 27.4599 004 003 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day HoursNear Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input /Day Heat InputNear Boiler Rating Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CalEEMod Version: CalEEMod.2016.3.2 Page 64 of 64 Date: 6/1/2018 11:09 AM Haskins Way Rezone Phase II - San Mateo County, Annual 11.2 Net New Trees Species Class Total CO2 C74 N20 CO2e Category MT Unmitigated ; 56.6400 0.0000 0.0000 56.6400 11.2 Net New Trees Species Class Number of Total CO2 Trees CH4 I N20 CO2e MT Miscellaneous i 80 3i 56.6400 i 0.0000 0.0000 I 56.6400 Total 56.6400 0.0000 0.0000 56.6400 Attachment F PROJECT PHASE 2 SUMMER EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics 1.1 Land Usage Page 1 of 56 Haskins Way Rezone Phase II - San Mateo County, Summer Haskins Way Rezone Phase II San Mateo County, Summer Date: 6/1/2018 11:12 AM Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park ; 256.23 ; 1000sgft 1.47 256,232.00 0 ............................................................................i...............................................................................}.......................................... .... ............................... Office Park 85.00 1000sgft 0.39 85,000.00 0 ............................................................................i................................................ ............................... .............................................. ............................... .. ............................... ........... ............................... ..... ............................... Enclosed Parking with Elevator ; 340.00 Space 0.61 136,000.00 0 Parking Lot i 243.00 i Space 3.15 97,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Precipitation Freq (Days) 70 Climate Zone 5 Operational Year 2022 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4Intensity 0.029 N20 Intensity 0.006 (lb /MWhr) (lb /MWhr) (lb /MWhr) 1.3 User Entered Comments & Non - Default Data CaIEEMod Version: CalEEMod.2016.3.2 Page 2 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report Stationary Sources - Emergency Generators and Fire Pumps - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 170,616.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer tblArchitecturalCoating ; ConstArea _ Nonresidential _Exterior ; 170,616.00 0.00 tblArchitecturalCoating ; ConstArea Nonresidential Interior ; 511,848.00 0.00 ..........................................................................;.............................................................................¢............................................ 4 ............................... ................................. ............................... tblArchitecturalCoating ConstArea _ Nonresidential _Interior 511,848.00 0.00 ;.............................................. ............................... ......................... ............................... .................. tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ...........................................................................;............................................ ............................... tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ..............................................................................;............................................... ............................... «..............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 ............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 .. ............................................ ............................... «.. ...;... ... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 .. ............................................ ............................... .. ...................... «.. ;... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 .........................................................................;.............................................................................}............................................ ............................... ................................. ............................... tblConstEquipMitigation ; NumberOfEquipmentMitigated ; 0.00 4.00 r tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ...........................................................................;............................................ ............................... ............. ---.......................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 ...........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ............................................ ............................... ......................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 4.00 ................................................. ............................. ;. .................... ............................... .. ............................... E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 15.00 ................................................. ............................. ;. E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 ..............................................................................;........................................................................................................................ ............................................................................ ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated ! 0.00 2.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 13.00 .........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated ; 0.00 4.00 .........................................................................;.............................................................................«............................................ ............................... .................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 6.00 ..........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated : 0.00 4.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 4 0.00 2.00 ..........................................................................i.............................................................................¢............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 8.00 ;. !1111111111111111 ....................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 11.00 ............................................... ............................... y..................................................................................................................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated i 0.00 6.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer tblConstEquipMitigation Number OfEquipment Mitigated 0.00 13.00 tblConstEquipMitigation Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ............................................ ............................... ..�.. ........................ ;... ... tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ................................................. ............................. ;. ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ .......................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final ................................................. ............................. ;. ;....................................... ............................... tblConstEquipMitigation : Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... tblConstructionPhase NumDays 20.00 65.00 ;. E ....................................... ............................... tblConstructionPhase : NumDays 20.00 22.00 tblConstructionPhase NumDays 20.00 219.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer tblConstructionPhase NumDays 230.00 30.00 tblConstructionPhase NumDays 230.00 40.00 tblConstructionPhase NumDays 230.00 100.00 ;. E ....................................... ............................... tblConstructionPhase NumDays 230.00 261.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstructionPhase NumDays 20.00 130.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 20.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 35.00 ............................................... ............................... ..................................................................................................................... ............................... tblGrading AcresOfGrading 25.00 0.00 ... ............................................ ............................... ..; .. ........................ ;... tblGradin g Material Exported 0.00 7,102.00 ... .............................................................................*............................................ ............................... ;... ................................. ............................... tblGrading ; Material Imported ; 0.00 6,070.00 tblLandUse i Land UseSquareFeet 256,230.00 256,232.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblLandUse i LotAcreage 5.88 1.47 i............................................... ............................... ..................................................................................................................... ............................... tblLandUse i LotAcreage 1.95 0.39 i............................................ ............................... ........................ tblLandUse i LotAcreage 3.06 0.61 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblLandUse : LotAcreage 2.19 3.15 ................................................. ............................. ;. ....................... ........................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 ..............................................................................;............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount ; 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 3.00 ................................................. ............................. ;. E....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 9 1.00 5.00 • ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer tblOffRoadEquipment UsageHours 8.00 3.00 tblOffRoadEquipment UsageHours 8.00 6.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ;. E ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ... ............................................ ............................... ..; .. ........................ ;... tblOffRoadEquipment UsageHours 8.00 6.00 ... .............................................................................*............................................ ;... ............................... ................................. ............................... tblOffRoadEquipment ; UsageHours ; 8.00 7.00 tblOffRoadEquipment i UsageHours 6.00 7.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 7.00 i............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 5.00 i............................................ ............................... ........................ tblOperational Off Road Equipment i OperDaysPerYear 260.00 2.00 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 365.00 tblOperational Off Road Equipment OperDaysPerYear 260.00 52.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 1.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment OperHoursPerDay 8.00 0.30 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment i OperHoursPerDay 8.00 16.00 tblOperational Off Road Equipment OperOff Road EquipmentNumber i 0.00 1.00 .............................................................................*............................................ ............................... tblOperationalOff Road Equipment i OperOff Road Equipment Number ; 0.00 1.00 r tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 4.00 tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblSequestration NumberOfNewTrees 9 0.00 80.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 9 20.00 19.00 ............................................... ............................... y. tblTripsAndVMT HaulingTripLength 20.00 19.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer tblTripsAndVMT HaulingTripLength 20.00 12.60 tblTripsAndVMT HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT ; HaulingTripN umber 149.00 1,509.00 ..........................................................................;.............................................................................*............................................ ............................... tblTripsAndVMT ; HaulingTripN umber ; 1,647.00 659.00 tblTripsAndVMT i VendorTripN umber 94.00 3.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 6.00 i............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 21.00 ..........................................................................i............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT VendorTripN umber 94.00 51.00 ;. E ....................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ................................................. ............................. ;. tblTripsAndVMT W orkerTripN umber 38.00 19.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblTripsAndVMT ; W orkerTripN umber 41.00 7.00 ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 38.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 207.00 6.00 ..........................................................................;.............................................................................}............................................ ............................... tblTripsAndVMT ; W orkerTripN umber ; 207.00 13.00 tblTripsAndVMT : W orkerTripN umber 207.00 46.00 tblTripsAndVMT : W orkerTripN umber 207.00 114.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 11.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 19.00 ;. E ....................................... ............................... tblVehicleTrips CC_TTP 48.00 10.00 tblVehicleTrips : CW_TTP : 33.00 71.00 CalEEMod Version: CalEEMod.2016.3.2 Page 8 of 56 Date: 6/l/2018 11:12 AM Haskins Way Rezone Phase U- San Mateo County, Summer tblVehicleTrips ST TR 1.64 0.27 0.76 0.12 tblVehicleTrips WD TR 11.42 1.86 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 Total PM2.5 PM2.5 I I Year lb/day lb/day 2020 8.7295 : 107.7794 1 65.7336 : 0.1928 3.6229 3.6946 7.3174 0.7823 3.4507 4.2329 0.0000 : 19,861.808; 19,861.808; 41682 : 0.0000 19,966.012 73.7125 : 9 9 5 0.6416 �: i ° : i e e I i 19,861.808 4.1682 0.0000 19,966.012 2021 39.5175 90.4773 81.4953 0.1711 1.9637 4.3076 6.2712 0.5124 3.9935 4.2655 0.0000 :16,447.177 16,447.177 4.7418 0.0000 16,545.746 r, : H'0 ........................ ........... ........................ ------------...................................................................------------....+....... ................ ...........:................... ........ ..............................' i................... 2022 11 38.4577 1 76.5489 79.5712 i 0.1705 i 1.6504 i 3.1882 i 4.8386 0.4455 3.0040 1 3.4496 0.0000 :16,386.643116,386.6431 3.9211 i 0.0000 116,484.671 ............ .............i:................ ' 2 2 6 .............. .............. I .............. ............. .............. Maximum 39.5175 1 ....................................... 0.1928 3.6229 4.3076 7.3174 0.7823 3.9935 4.2655 0.0000 1 0.5124 4.7418 0.0000 19,966.012 i 0.0000 16,545.746 r r ; 119,861.808119,861.8081 9 1 9 3 ..................................................'..... 5 Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 Total PM2.5 PM2.5 I I Year lb/day lb/day 2020 2.5208 39.6338 73.7125 0.1928 2.6939 0.3191 3.0131 0.6416 0.3150 0.9566 0.0000 :19,861.808 19,861.808 4.1682 0.0000 19,966.012 9 9 5 ............ .............i:................ .............. .............. .............. I .............. ............. .............. ............. ............... .................... *............... .............. ....................................... .............. ............. 2021 ; 32.3545: 28.4344 95.9821 i 0.1711 : 1.8907 E 0.3092 : 2.1184 1 0.5124 0.3090 : 0.7388 ; 0.0000 16,447.177; 16,447.177: 4.7418 i 0.0000 16,545.746 r r ; 3 ..................................................'..... r ............................... •...................' .... °.............. r ................... ................... 2022 ; 32.3210 28.1005 91.8984 0.1705 1.6504 0.2843 1.9347 0.4455 0.2832 0.7287 ' 0.0000 :16,386.643 16,386.643: 3.9211 0.0000 16,484.671 r r r 2 r 2 6 Maximum 32.3545 39.6338 95.9821 0.1928 2.6939 0.3191 3.0131 0.6416 0.3150 0.9566 0.0000 19,861.808 19,861.808 4.7418 0.0000 19,966.012 1 9 9 5 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 10of58 Date: 6/1/201811:12AM Haskins Way Rezone Phase U- San Mateo County, Summer 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Blo- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e I I I I I I Category lb1day lb/day 004 005 004 004 004 004 004 7057 3 8 1 0.1296 1 0,1296 0,1296 OA296 Reduction 2,059.0054 Offroad 0.6222 6.2823 4.0816 9.39OOe- 0.2922 1 0.2922 0.2727 0.2727 878.4964 878.4964 1 0.2408 1 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust IPM2.5Total Bio-0O2 NBio-0O2 TotalCO2 CH4 N20 CO2e I I I I I I Category lb1day lb/day 004 005 004 004 004 004 004 7057 3 8 1 0.1296 1 0,1296 0,1296 OA296 :2,046.8421 2,046.8421: 0.0392 0.0375 2,059.0054 Offroad 0.6222 6.2823 4.0816 9.39OOe- 0.2922 1 0.2922 0.2727 0.2727 878.4964 878.4964 1 0.2408 1 884.5153 Total 10.1624 10.6329 16.2959 0.0593 3.7308 0.4535 4.1842 0.9990 0.4319 _ 1.4309 6,925.00361 6,925.00361 0.4163 0.0375 6,946.5925 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 11of58 Date: 6/1/201O11:12AM Haskins Way Rezone Phase U- San Mateo County, Summer 2.2 Overall Operational Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I I I I Category lb/day lb/day 91 004 005 004 004 004 004 004 Energy 0.1876 7057 3 8 0.0102 0.1296 0,1296 0.1296 0.1296 2,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 Mobile 0.9572 2.6440 10.6870 0,0396 3.7308 0,0313 3.7621 0.9990 1 0.0292 1 0283 3,999.462913,999.46291 0.1357 4,00Z8561 Offroad 0,6222 6.2823 4.0816 9.39OOe- 0.2922 0.2922 0.2727 02727 878A964 878A964 0.2408 884.5153 Total 10.1624 10.6329 16.2959 0.0593 3.7308 077-7. 0.9990 0.4719 1.4309 6,925.00361 6,925.00361 0.4163 . 0.0375 6, 3.0 Construction Detail Construction Phase ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e Reduction 3.0 Construction Detail Construction Phase Co|EEK4od Version: Ca|EEK4od.2018.3.2 Page 12of58 Date: 8/1/201811:12AM Haskins Way Rezone Phase U- San Mateo County, Summer Phase Phase Name Phase Type Start Date End Date Num Days Num Days Phase Description 1 Memolition ;Demolition :11/24/2020 5i 20 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 2 ',Soils Abatement/Remove/Replace 'vSite Preparation ::11/11/2020 ::12/8/2020 5:i 20 3 'Site Prep and Make Ready ;Site Preparation :12/9/2020 :1/26/2021 5 35 4 'Parking Garage Underground ;Building Construction ::1/8/2021 2/18/2021 5: 30 5 ;Office Building Underground ;Building Construction ::1/8/2021 3/4/2021 5i 40 6 Parking Garage Core Construction Building Construction :2/18/2021 7/7/2021 5:i 100 7 ;Office Building Core Construction i Building Construction ::3/5/2021 3/4/2022 5: 261 8 'Parking Garage Exterior aArchitectural Coating 15/18/2021 6/16/2021 5: 221: 9 ;Office Building Tenant &Architectural Coating :11/14/2021 9/15/2022 5: 219:: 10 'Landscaping and Site !!Paving :11/25/2021 5/25/2022 5:: 130:: wImprovements 11 ;Office Building Exterior 'Architectural Coating :12/4/2021 3/4/2022 5: 65:: Acres ofGrading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres ofPaving: 3.76 Residential Indoor: 8; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Air Compressors 2: 7.M: 781: 0.48 ........................................................................... ? ...................................................................... f ...... ...................... Demolition ;Concrete/Industrial Saws 21 .................................. .................................... 6.001 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 3.001: 158:: 0.38 CoEEK4od Version: CaEEK4od.2018.3.2 Page 13of58 Date: 6/1/201O11:12AM Haskins Way Rezone Phase 11 - San Mateo County, Summer Demolition Forklifts 1 7.001 89:: 0.20 Demolition Off-Highway Trucks 2:: 4.00:: 402:: 0.38 Demolition ;Rubber Tired Dozers 2 6.001 2471 0.40 Demolition ;Skid Steer Loaders 1 : Demolition ;Sweepers/Scrubbers 4.00: 64: 0.46 Demolition Tractors/Loaders/Backhoes 2:: 5.001 971 0.37 Soils Abatement/Remove/Replace Crawler Tractors 1 Soils Abatement/Remove/Replace Dumpers/Tenders 2:: 6.001 16: 0.38 Soils Abatement/Remove/Replace i Excavators 2:: 5.001 1581 0.38 Soils Abatement/Remove/Replace Off-H ighway Trucks 3:: 4.00:: 402:: 0.38 Soils Abatement/Remove/Replace Plate Compactors 2 5.00: 8 0.43 Soils Abatement/Remove/Replace ;Rubber Tired Loaders 21 5.00: 203: 0.36 Soils Abatement/Remove/Replace Scrapers 2: 4.00:: 367:: 0.48 Soils Abatement/Remove/Replace ;Sweepers/Scrubbers 1 4.00: 64: 0.46 Soils Abatement/Remove/Replace IgTractors/Loaders/Backhoes 6.001 97:: 0.37 Site Prep and Make Ready ;Bore/Drill Rigs 2:: 7.00:: 221:: 0.50 Site Prep and Make Ready Dumpers/Tenders 1 6.001 161 Site Prep and Make Ready Excavators 4.00: 158: 0.38 Site Prep and Make Ready ;Off-Highway Trucks 21 4.001 4021 0.38 Site Prep and Make Ready i Plate Compactors Site Prep and Make Ready 9Rubber Tired Loaders 21 6.00:: 203:: 0.36 Site Prep and Make Ready Scrapers 2 6.001 367:: 0.48 Site Prep and Make Ready Sweepers/Sc rubbers 1 4.00:: 64:: 0.46 Site Prep and Make Ready IgTractors/Loaders/Backhoes 21 6.001 97:: 0.37 Parking Garage Underground Bore/Drill Rigs 7.001: 221:: 0.50 Parking Garage Underground Excavators 21 7.001 1581 0.38 Parking Garage Underground 'Generator Sets 2:: 4.00: 841: 0.74 CoEEK4od Version: CaEEK4od.2018.3.2 Page 14of58 Date: 6/1/201O11:12AM Haskins Way Rezone Phase 11 - San Mateo County, Summer Parking Garage Underground ;Plate Compactors 2: 4.001 8: 0.43 Parking Garage Underground Rough Terrain Forklifts 2:: 2.00:: 1001 0.40 Parking Garage Underground ;Rubber Tired Loaders 1 2.001 2031 0.36 Parking Garage Underground 'vSweepers/Scrubbers 1 Parking Garage Underground 'vTractors/Loaders/Backhoes 2:: 6.00:: 97:: 0.37 Parking Garage Underground 'vTrenchers 2:: 4.00:: 78:: 0.50 Office Building Underground Bore/Drill Rigs 2:: 4.00:: 221:: 0.50 Office Building Underground Excavators 2:: 7.00:: 158:: 0.38 Office Building Underground I Generator Sets 2: 4.001 841 0.74 Office Building Underground 9'Plate Compactors Office Building Underground Rough Terrain Forklifts 2:: 8.001 100i 0.40 Office Building Underground ;Rubber Tired Loaders 1 6.00:: 203:: 0.36 Office Building Underground Sweepers/Scrubbers i : Office Building Underground ;Tractors/Loaders/Backhoes 2: Office Building Underground IgTrenchers 41 7.001 781 0.50 Parking Garage Core Construction IV Aerial Lifts i : Parking Garage Core Construction Cement and Mortar Mixers 6: 4.001 9: 0.56 Parking Garage Core Construction ;Cranes 7.00:: 231:: 0.29 Parking Garage Core Construction Off-Highway Trucks i : Parking Garage Core Construction Plate Compactors 4.00: 8 0.43 Parking Garage Core Construction Pumps 6.00:: 841 0.74 Parking Garage Core Construction Rough Terrain Forklifts 11 Parking Garage Core Construction '!Welders 3 1 6.00:: 46:: 0.45 Office Building Core Construction 'Aerial Lifts 41 7.001 631: 0.31 Office Building Core Construction IV Air Compressors 4: 6.001 78: 0.48 Office Building Core Construction Cranes 21 7.001 2311 0.29 Office Building Core Construction 'Off-Highway Trucks 2:: 4.00: 402:: 0.38 Ca|EEMod Version: Ca|EEMod.2018.3.2 Page 15of5G Date: 8/1/201811:12AKJ Haskins Way Rezone Phase U' San Mateo County, Summer Office Building Core Construction Rough Terrain Forklifts 2 6.001 1001 0.40 Office Building Core Construction Sweepers/Scrubbers 1 Office Building Core Construction 'TWelders 5: 7.001 461 0.45 Parking Garage Exterior Improvements ;;Aerial Lifts 1 6.001 631: 0.31 Parking Garage Exterior Improvements Cranes 1 3.001 2311: 0.29 Parking Garage Exterior Improvements Off-Highway Trucks 11 Parking Garage Exterior Improvements Other General Industrial Equipment 1! 4.002: 881: 0.34 Parking Garage Exterior Improvements Pressure Washers 2.00:: 13's 0.30 Parking Garage Exterior Improvements Rough Terrain Forklifts 1 5.00:: 1001 0.40 Parking Garage Exterior Improvements vWelders 2:: 5.00:: 46 0.45 Office Building Tenant Improvements Aerial Lifts i i Office Building Tenant Improvements vvAir Compressors 1 7.001 781: 0.48 Office Building Tenant Improvements Off-Highway Trucks 2 4.00:: 402 0.38 Office Building Tenant Improvements Rough Terrain Forklifts I Office Building Tenant Improvements ;Sweepers/Scrubbers 1 &M 64: 0.46 Office Building Tenant Improvements vvWelders 1 5.001 461: 0.45 Landscaping and Site Improvements i Cement and Mortar Mixers 21: 4.00:: 9 0.56 Landscaping and Site Improvements Dumpers/Tenders 6.001 161 0.38 Landscaping and Site Improvements Paving Equipment 2 7.00:: 132's 0.36 Landscaping and Site Improvements Plate Compactors 21 4.00:: 8 1! 0.43 Landscaping and Site Improvements IRollers 21 5.00:: 801 0.38 Landscaping and Site Improvements Rough Terrain Forklifts 1 3.001 1001: 0.40 Landscaping and Site Improvements Rubber Tired Dozers Landscaping and Site Improvements vSkid Steer Loaders 11 6.00:: 65 0.37 Landscaping and Site Improvements v!Tractors/Loaders/Backhoes 2 Office Building Exterior Improvements ;Aerial Lifts 3i 6.00:: 631 0.31 Office Building Exterior Improvements 'Off-Highway Trucks 2 4.001 4021 0.38 CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer Office Building Exterior Improvements ;Other General Industrial Equipment Vendor Trip Number 2 7.001 88 0.34 Office Building Exterior Improvements Pressure Washers 1 4.00; 131 0.30 .........................................................................-------------------------------- Office Building Exterior Improvements ----........................... h Terrain Forklifts ;Rough .....................I 1 ............................... 31 ... .............................. 7.00: ... ............................... 100; 0.40 ...........................................................................------------------------------------ Office Building Exterior Improvements ............................... :Sweepers /Scrubbers +....................... ---------- .............................................. 11 ..................................... 4.00; ...................................... 641 0.46 Office Building Exterior Improvements .................................... ............................... ;Welders . .. • ... ............................ 2: ; ----------------------------- 6.00: . ............................... 46: 0.45 Trips and VMT Phase Name Offroad Equipment Worker Trip Count Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition ; 16 20.001 0.001 1,509.00; 10.801 7.30; 19.00: LD Mix HDT Mix 1HHDT s ....... ...........................--- :........................... .i. Soils 161 20.001 0.00 659.00: 10.801 7.30: 12.601 LD_Mix HDT_Mix I HHDT ' Site Prep and Make 15 19.001 0.00 0.001 10.801 7.30: 19.001:1-D Mix 1 HDT_Mix I HHDT ...... ............................... Parking Garage �-------------------------� ---------------------------:..................... ............................... 15 6.00' 3.001 0.00; �................. 10.801 7.301 19.001 LD Mix I HDT_Mix ..................... 1 HHDT .................., Office Building 18 13.001 ........................... 6.00: 0.00 ............................. 10.80: 19.00: :HDT Mix I HHDT .::.. ............I................. Parking Garage Core "= ..... ........................................................ 15 46.001 21.001 .................... 0.001 ------------------------ 10.801 ...................... 7.30: --------------------- 19.001 ------------------------------- LD_Mix ...................... ; HDT_Mix ..................... I HHDT !2 stn'..ct ................. Office Building Core 9 ..... ...... .......... ------------ ----------------------- 20 114.001 ...................... ..:.. 51.001 .................... -- 0.001 ------------------- --.... 10.801 ...................... ..... 7.301 --------------------- -- 19.001 ------------------------------- .L- - LD Mix ...................... .. - :HDT Mix .. ..................... I HHDT Parking Garage 8i 11.001 0.001 0.00 10.80: 19.00: :HDT Mix ; HHDT C.h. -..... :. �.' ::..........."M ...................... -- ..... ....................... .... ...................... :... .................... . ............... .... ...................... ..................... ----- --------------------- - - - - -. .......- .. ............. ..................... r Office Buildin g Tenant 19.001 I.....r...,..w...r.M 0.001 0.001 10.801 7.30: 19.001 LD Mix ':HDT Mix I HHDT : Landscaping and Site I..... .......................................................................................................................... 15 19.00 : . 0.00 0.001 10.801 ............................... 7.301 ' 19.001 LDMix ' HDTMix F ........................ HDT rr...r. m'an!r Office Building Exterior ; 141 7.001 0.001 0.001 10.801 7.301 19.001 LD-Mix : HDT_Mix 1 HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.2 Demolition - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.6146 0.0000 1.6146 0.2445 0.0000 0.2445 j 0.0000 0.0000 ........... ...............M............... �• 3 f..................:......................................'......... .......... .................... r Vendor i 3 i E 0.0000 .. «. ............ .............. ............ ... + .............. .... .•... Off -Road ; 4.2780 39.9671 28.3055 0.0546 2.0943 2.0943 1.9720 1.9720 ... ' 5,249.6062 5,249.6062 1.2985 5,282.0685 it ; 003 Total 0.6908 22.9354 10.0743 0.0603 Total 4.2780 39.9671 28.3055 0.0546 1.6146 2.0943 3.7089 0.2445 1.9720 2.2165 15,249.6062 5,249.6062 1.2985 1 5,282.0685 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.6358 i 22.9028 i 9.6605 1 0.0588 1.2446 1 0.0715 1.3161 0.3406 0.0684 0.4090 :6,659.2546 6,659.25461 0.8242 3 6,679.8596 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 0.0550 0.0326 0.4139 i 1.5400e- I 0.1643 i 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; i 153.4238 153.4238 i 2.9700e- i 153.4979 003 004 004 ; 003 Total 0.6908 22.9354 10.0743 0.0603 1.4089 0.0725 1.4813 0.3842 0.0693 0.4535 6,812.6784 6,812.6784 0.8272 6,833.3575 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.2 Demolition - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust E : : 0.7266 0.0000 0.7266 0.1100 0.0000 0.1100 j 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor : : E E 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E ................. .. ............................... .............. ............. .............. ............. Off -Road ;I 0.6993 4.3864 30.8868 0.0546 0.0926 0.0926 0.0926 0.0926 0.0000 ° 5,249.6062 5,249.6062 1.2985 5,282.0685 it ; 003 Total 0.6908 22.9354 10.0743 0.0603 Total 0.6993 4.3864 30.8868 0.0546 0.7266 0.0926 0.8191 0.1100 0.0926 1 0.2026 1 0.0000 5,249.6062 5,249.6062 1.2985 5,282.0685 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.6358 i 22.9028 i 9.6605 1 0.0588 1.2446 1 0.0715 1.3161 0.3406 0.0684 0.4090 :6,659.2546 6,659.25461 0.8242 3 6,679.8596 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 0.0550 0.0326 0.4139 E 1.5400e- E 0.1643 E 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; E 153.4238 153.4238 12.9700e- E 153.4979 003 004 004 ; 003 Total 0.6908 22.9354 10.0743 0.0603 1.4089 0.0725 1.4813 0.3842 0.0693 0.4535 6,812.6784 6,812.6784 0.8272 6,833.3575 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.0745 0.0000 0.0745 0.0113 0.0000 E : : 0.0113 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f....... ...........:................... ...................'......... .......... .................... ............. Vendor �: : : E E 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E .................;.. ............................... .............. ............. .............. ............. Off -Road ;I 3.5033 37.2418 23.8956 0.0585 1.5054 1.5054 1.3880 1.3880 5,629.9145 5,629.9145 1.7916 5,674.7048 ii ; 003 Total 3.5033 37.2418 23.8956 0.0585 0.0745 1.5054 1.5798 0.0113 1.3880 1.3993 1 5,629.9145 5,629.9145 1.7916 1 5,674.7048 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.2026 1 7.6025 3.0443 1 0.0178 0.3607 i 0.0214 0.3821 0.0987 0.0205 0.1192 :2,016.1860 2,016.18601 0.2479 i 2,022.3838 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f....... ...........:................... ...................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 0.0550 0.0326 0.4139 E 1.5400e- E 0.1643 E 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; E 153.4238 153.4238 12.9700e- E 153.4979 003 004 004 ; 003 Total 0.2575 7.6350 3.4582 0.0194 0.5250 0.0224 0.5474 0.1423 0.0214 0.1637 2,169.6098 2,169.6098 0.2509 2,175.8817 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.3 Soils Abatement /Remove /Replace - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.0335 0.0000 0.0335 5.0800e- I 0.0000 i 5.0800e- ' 0.0000 0.0000 ........... ...............M............... 003 ? 003 ............. . ............................. «. ............... + .............. ............. .............. ............. .............. ............. Off -Road ; 0.8732 4.6770 29.2932 0.0585 0.1317 0.1317 0.1317 0.1317 0.0000 ° 5,629.9145 5,629.9145 1.7916 ::5,674.7048 Worker it ; i 153.4238 153.4238 12.9700e- i 153.4979 003 004 004 ; 003 Total 0.8732 4.6770 29.2932 0.0585 0.0335 0.1317 0.1652 5.0800e- 0.1317 0.1368 0.0000 5,629.9145 5,629.9145 1.7916 2,175.8817 5,674.7048 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.2026 1 7.6025 3.0443 1 0.0178 0.3607 i 0.0214 0.3821 0.0987 0.0205 0.1192 :2,016.1860 2,016.18601 0.2479 1 2,022.3838 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f....... ...........:................... ...................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. . ..... ..... ..... ..... ..... ..... .... Worker ; 0.0550 0.0326 0.4139 i 1.5400e- I 0.1643 i 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; i 153.4238 153.4238 12.9700e- i 153.4979 003 004 004 ; 003 Total 0.2575 7.6350 3.4582 0.0194 0.5250 0.0224 0.5474 0.1423 0.0214 0.1637 2,169.6098 2,169.6098 0.2509 2,175.8817 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. . ............................. «. : : 3 ° .............. ............... ; .............. ............. .............. ............. .............. ............. Off -Road ; 3.8762 42.9197 27.5908 0.0714 1.6922 1.6922 1.5588 1.5588 6,892.1512 6,892.1512 2.2097 6,947.3943 Worker ii ; i 145.7526 i 145.7526 i 2.8200e- i 145.8230 Total 3.8762 42.9197 27.5908 0.0714 1.5908 1.6922 3.2829 0.1718 1.5588 1.7306 1 6,892.1512 6,892.1512 2.2097 145.7526 6,947.3943 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0522 0.0310 0.3932 i 1.4600e- I 0.1561 i 9.4000e- i 0.1570 0.0414 i 8.7000e- 0.0423 ; i 145.7526 i 145.7526 i 2.8200e- i 145.8230 003 004 004 ; 003 Total 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 145.7526 145.7526 2.8200e- 145.8230 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 j 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. . ............................. «. 3 ° ........................... .......... .................... :.............. :.. ............. .............. ............. Off -Road ; 0.9870 5.0603 34.8207 0.0714 0.1410 0.1410 0.1410 0.1410 0.0000 ° 6,892.1512 6,892.1512 2.2097 6,947.3943 Worker it ; i 145.7526 i 145.7526 12.8200e- i 145.8230 003 004 004 ; 003 Total 0.9870 5.0603 34.8207 0.0714 0.7158 0.1410 0.8568 0.0773 0.1410 0.2183 0.0000 6,892.1512 6,892.1512 2.2097 145.8230 6,947.3943 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0522 0.0310 0.3932 i 1.4600e- I 0.1561 i 9.4000e- i 0.1570 0.0414 i 8.7000e- 0.0423 ; i 145.7526 i 145.7526 12.8200e- i 145.8230 003 004 004 ; 003 Total 0.0522 0.0310 0.3932 1.4600e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 145.7526 145.7526 2.8200e- 145.8230 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. Vendor : : 3 ° 0.0000 0.0000 0.0000 0.0000 . ............................. «. .............. ............... +.............. ............. .............. .............. .............. ............. Off -Road ; 3.5814 38.0146 26.5918 0.0715 1.4921 1.4921 1.3748 1.3748 ' 6,897.6776 6,897.6776 2.2115 6,952.9653 ii ; 003 Total 3.5814 38.0146 26.5918 0.0715 1.5908 1.4921 3.0829 0.1718 1.3748 1.5465 1 6,897.6776 6,897.6776 2.2115 140.6197 6,952.9653 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 i 2.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.4 Site Prep and Make Ready - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 j 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. Vendor «. 3 ° '• ..............E ............ .............. ......... E ............................. ..... ............. Off -Road ; 0.9870 5.0601 34.8207 0.0715 0.1408 0.1408 0.1408 0.1408 0.0000 ° 6,897.6776 6,897.6776 2.2115 1 6,952.9653 Worker it ; i 140.5564 140.5564 12.5300e- i 140.6197 003 004 004 ; 003 Total 0.9870 5.0601 34.8207 0.0715 0.7158 0.1408 0.8567 0.0773 0.1408 1 0.2181 0.0000 6,897.6776 6,897.6776 2.2115 1 6,952.9653 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 12.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.5 Parking Garage Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road ; 1.9495 i 18.9873 19.9545 0.0369 1.0022 1.0022 0.9362 0.9362 j 3,550.4565; 3,550.45651 0.9710 3,574.7318 .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... ..........�.................... ............. Vendor ; 9.3600e7 0.3081 0.1287 7.9000e- 0.0203 7.00OOe- 0.0210 5.8300e- 6.7000e- 6.5000e- ; i 87.1803 87.1803 7.4100e- �• �I e e 003 Total 1.9495 18.9873 19.9545 0.0369 Worker 1.0022 1.0022 44.4062 0.9362 0.9362 ; 004 3,550.4565 3,550.4565 0.9710 0.2437 3,574.7318 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... ..........�.................... ............. Vendor ; 9.3600e7 0.3081 0.1287 7.9000e- 0.0203 7.00OOe- 0.0210 5.8300e- 6.7000e- 6.5000e- ; i 87.1803 87.1803 7.4100e- 87.3655 003 004 004 003 004 003 I.............. 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .................i. ... ..... ..... ..... ..... ..... .... ................. .............. .............. ............. .............. .............. .............. ............. Worker ; 0.0154 i 8.7700e- ° 0.1150 i 4.4000e- i 0.0493 i 2.9000e- i 0.0496 0.0131 2.6000e- 0.0133 ; i 44.3862 44.3862 i 8.00OOe- i 44.4062 003 004 004 004 ; 004 Total 0.0247 0.3169 0.2437 1.2300e- 0.0695 9.9000e- 0.0705 0.0189 9.3000e- 0.0198 131.5665 131.5665 8.2100e- 131.7717 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.5 Parking Garage Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road j 0.4893 2.7741 23.9077 I 0.0369 0.0676 0.0676 0.0676 0.0676 ' 0.0000 3,550.4565; 3,550.4565; 0.9710 i 3,574.7318 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... ..........�.................... ............. Vendor ; 9.3600e7 0.3081 0.1287 7.9000e- 0.0203 7.000Oe- 0.0210 5.8300e- 6.7000e- 6.5000e- ; i 87.1803 87.1803 7.4100e- 87.3655 Total 0.4893 2.7741 23.9077 0.0369 .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... 0.0676 0.0676 Worker 0.0676 0.0676 0.0000 3,550.4565 3,550.4565 0.9710 1 3,574.7318 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... ..........�.................... ............. Vendor ; 9.3600e7 0.3081 0.1287 7.9000e- 0.0203 7.000Oe- 0.0210 5.8300e- 6.7000e- 6.5000e- ; i 87.1803 87.1803 7.4100e- 87.3655 003 004 004 003 004 003 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0154 i 8.7700e- ° 0.1150 i 4.4000e- i 0.0493 i 2.9000e- i 0.0496 0.0131 2.6000e- 0.0133 ; i 44.3862 44.3862 i 8.000Oe- i 44.4062 003 004 004 004 .: ; 004 Total 0.0247 0.3169 0.2437 1.2300e- 0.0695 9.9000e- 0.0705 0.0189 9.3000e- 0.0198 131.5665 131.5665 8.2100e- 131.7717 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.6 Office Building Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 3.2943 i 32.4956 30.9701 0.0549 1.8093 1.8093 1.6788 1.6788 j 5,285.0376f 5,285.03761 1.5320 5,323.3378 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor it e 174.7309 Total 3.2943 32.4956 30.9701 0.0549 .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. . ..... ..... ..... ..... ..... ..... .... 1.8093 1.8093 Worker 1.6788 1.6788 96.2135 5,285.0376 5,285.0376 1.5320 5,323.3378 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 1 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor ; 0.0187 0.6162 0.2574 1.5800e- 0.0405 1.4000e- 0.0419 0.0117 1.3400e- 0.0130 ; i 174.3605 174.3605 0.0148 174.7309 003 003 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. . ..... ..... ..... ..... ..... ..... .... .............. ............. ------ ........ .............. .............. ............. Worker ; 0.0333 0.0190 0.2491 i 9.6000e- I 0.1068 i 6.2000e- i 0.1074 0.0283 i 5.7000e- 0.0289 ; i 96.1702 96.1702 1 1.7300e- i 96.2135 004 004 004 ; 003 Total 0.0521 0.6352 0.5065 2.5400e- 0.1473 2.0200e- 0.1493 0.0400 1.9100e- 0.0419 270.5307 270.5307 0.0166 270.9444 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.6 Office Building Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road j 0.7092 3.7272 36.1394 I 0.0549 0.0969 0.0969 0.0969 0.0969 ' 0.0000 5,285.0376; 5,285.03761 1.5320 5,323.3378 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor �• �I e e 174.7309 Total 0.7092 3.7272 36.1394 0.0549 .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. . ..... ..... ..... ..... ..... ..... .... 0.0969 0.0969 Worker 0.0969 0.0969 0.0000 5,285.0376 5,285.0376 1.5320 5,323.3378 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor ; 0.0187 0.6162 0.2574 1.5800e- 0.0405 1.4000e- 0.0419 0.0117 1.3400e- 0.0130 ; i 174.3605 174.3605 0.0148 174.7309 003 003 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. . ..... ..... ..... ..... ..... ..... .... .............. ............. ------ ........ .............. .............. ............. Worker ; 0.0333 0.0190 0.2491 i 9.6000e- I 0.1068 i 6.2000e- i 0.1074 0.0283 i 5.7000e- 0.0289 ; i 96.1702 96.1702 I 1.7300e- i 96.2135 004 004 004 ; 003 Total 0.0521 0.6352 0.5065 2.5400e- 0.1473 2.0200e- 0.1493 0.0400 1.9100e- 0.0419 270.5307 270.5307 0.0166 270.9444 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 1.9521 i 15.6423 13.9182 0.0288 0.6735 0.6735 0.6474 0.6474 j 2,623.6675- 2,623.66751 0.5957 2,638.5588 .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor ; 0.0655 2.1567 0.9009 5.5400e- 0.1417 4.9100e- 0.1467 0.0408 4.6900e- 0.0455 ; i 610.2618 610.2618 0.0519 �• �I e e Total 1.9521 15.6423 13.9182 0.0288 Worker 0.6735 0.6735 340.4478 0.6474 0.6474 ; 003 2,623.6675 2,623.6675 0.5957 1.7824 2,638.5588 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor ; 0.0655 2.1567 0.9009 5.5400e- 0.1417 4.9100e- 0.1467 0.0408 4.6900e- 0.0455 ; i 610.2618 610.2618 0.0519 611.5581 003 003 003 .. ........................ .r.... ............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. ..... ..... ..... ..... ..... ..... .... .............. ............. ------ ........ .............. .............. ............. Worker ; 0.1179 0.0673 0.8815 i 3.4100e- I 0.3779 i 2.2000e- i 0.3801 0.1002 i 2.0300e- 0.1023 ; i 340.2944 340.2944 i 6.1400e- i 340.4478 003 003 003 ; 003 Total 0.1835 2.2240 1.7824 8.9500e- 0.5196 7.1100e- 0.5267 0.1410 6.7200e- 0.1477 950.5562 950.5562 0.0580 952.0059 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.7 Parking Garage Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road j 0.5550 5.2854 15.7514 i 0.0288 0.0867 0.0867 0.0867 0.0867 ' 0.0000 2,623.6675; 2,623.66751 0.5957 2,638.5588 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor it e 611.5581 Total 0.5550 5.2854 15.7514 0.0288 0.0867 0.0867 ............. 0.0867 0.0867 0.0000 2,623.6675 2,623.6675 0.5957 ; 003 2,638.5588 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................•......... .......... .................... ............. Vendor ; 0.0655 2.1567 0.9009 5.5400e- 0.1417 4.9100e- 0.1467 0.0408 4.6900e- 0.0455 ; i 610.2618 610.2618 0.0519 611.5581 003 003 003 .. ........................ .r.... ............. .............. .............. .............. .............. .............. .............. .............. .............. .................i. ..... ..... ..... ..... ..... ..... .... .............. ............. ------ ........ .............. .............. ............. Worker ; 0.1179 0.0673 0.8815 i 3.4100e- I 0.3779 i 2.2000e- i 0.3801 0.1002 i 2.0300e- 0.1023 ; i 340.2944 340.2944 i 6.1400e- i 340.4478 003 003 003 ; 003 Total 0.1835 2.2240 1.7824 8.9500e- 0.5196 7.1100e- 0.5267 0.1410 6.7200e- 0.1477 950.5562 950.5562 0.0580 952.0059 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.8 Office Building Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 3.9585 i 32.0076 30.1103 0.0587 1.4477 1.4477 13879 1.3879 e 5,482.7347- 5,482.73471 1.3110 i 5,515.5098 .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1591 5.2377 2.1880 0.0135 0.3442 0.0119 0.3562 0.0991 0.0114 0.1105 1,482.0644 1,482.0644 0.1259 it .. .............................. e ............. .................................... .............. Total 3.9585 32.0076 30.1103 0.0587 1.4477 1.4477 1.3879 1.3879 4.3726 5,482.7347 5,482.7347 1.3110 1.2981 5,515.5098 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1591 5.2377 2.1880 0.0135 0.3442 0.0119 0.3562 0.0991 0.0114 0.1105 1,482.0644 1,482.0644 0.1259 1,485.2126 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .................................... .............. ............. Worker ; 0.2923 0.1667 2.1846 i 8.4500e- I 0.9365 i 5.4600e- i 0.9420 0.2484 i 5.0300e- 0.2534 ; i 843.3383 843.3383 i 0.0152 843.7184 003 003 003 ; Total 0.4514 5.4044 4.3726 0.0219 1.2807 0.0174 1.2981 0.3475 0.0164 0.3639 1 12,325.40271 2,325.4027 0.1411 2,328.9311 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.8 Office Building Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road j 0.8356 i 10.4353 33.6911 0.0587 0.0869 0.0869 0.0869 0.0869 j 0.0000 5,4827347; 5,482.73471 1.3110 5,515.5098 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor it e 1,485.2126 Total 0.8356 10.4353 33.6911 0.0587 0.0869 0.0869 843.7184 0.0869 0.0869 0.0000 5,482.7347 5,482.7347 1.3110 4.3726 5,515.5098 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1591 5.2377 2.1880 0.0135 0.3442 0.0119 0.3562 0.0991 0.0114 0.1105 1,482.0644 1,482.0644 0.1259 1,485.2126 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .................................... .............. ............. Worker ; 0.2923 0.1667 2.1846 i 8.4500e- I 0.9365 i 5.4600e- i 0.9420 0.2484 i 5.0300e- 0.2534 ; i 843.3383 843.3383 i 0.0152 843.7184 003 003 003 ; Total 0.4514 5.4044 4.3726 0.0219 1.2807 0.0174 1.2981 0.3475 0.0164 0.3639 1 12,325.40271 2,325.4027 0.1411 2,328.9311 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.8 Office Building Core Construction - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road ; 3.6007 i 28.4532 29.5639 0.0587 1.2305 1.2305 11805 1.1805 e 5,483.3351 i 5,483.33511 12977 5,515.7764 ..........................M.. ............. .............. .............. .............. .............. .............. .............. ............. .............. ................. f....... ...........:................... ...................•......... ..........�.................... ............. Vendor �• �I e e 1,466.1061 Total 3.6007 28.4532 29.5639 0.0587 ; 0.2753 0.1505 2.0379 i 8.1400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 1.2305 1.2305 1.1805 1.1805 5,483.3351 5,483.3351 1.2977 0.0214 5,515.7764 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ..........................M.. ............. .............. .............. .............. .............. .............. .............. ............. .............. ................. f....... ...........:................... ...................•......... ..........�.................... ............. Vendor 0.1496 4.9283 2.1887 0.0132 0.3443 0.0105 0.3548 0.0991 0.0100 0.1091 1,462.9764 1,462.9764 0.1252 1,466.1061 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .................................... .............. ............. Worker ; 0.2753 0.1505 2.0379 i 8.1400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 ; i 812.4213 812.4213 i 0.0137 812.7648 003 003 003 ; Total 0.4249 5.0787 4.2266 0.0214 1.2808 0.0159 1.2966 0.3475 0.0150 0.3624 1 12,275.39771 2,275.3977 0.1389 2,278.8709 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.8 Office Building Core Construction - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road j 0.8356 i 10.4353 33.6911 0.0587 0.0869 0.0869 0.0869 0.0869 j 0.0000 5,4833350; 5,483.33501 1.2977 5,515.7764 ..........................M.. ............. .............. .............. .............. .............. .............. .............. ............. .............. ................. f....... ...........:................... ...................•......... ..........�.................... ............. Vendor it e 1,466.1061 Total 0.8356 10.4353 33.6911 0.0587 0.0869 0.0869 812.7648 0.0869 0.0869 0.0000 5,483.3350 5,483.3350 1.2977 4.2266 5,515.7764 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ..........................M.. ............. .............. .............. .............. .............. .............. .............. ............. .............. ................. f....... ...........:................... ...................•......... ..........�.................... ............. Vendor 0.1496 4.9283 2.1887 0.0132 0.3443 0.0105 0.3548 0.0991 0.0100 0.1091 1,462.9764 1,462.9764 0.1252 1,466.1061 .. ........................ .r.. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .................................... .............. ............. Worker ; 0.2753 0.1505 2.0379 i 8.1400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 ; i 812.4213 812.4213 i 0.0137 812.7648 003 003 003 ; Total 0.4249 5.0787 4.2266 0.0214 1.2808 0.0159 1.2966 0.3475 0.0150 0.3624 1 12,275.39771 2,275.3977 0.1389 2,278.8709 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.9 Parking Garage Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ....... .............. ............. .............. ......... .............. .............. .............. ................... ............. .................... + .............. ............. ..:.. Off -Road ; 1.0586 8.8517 7.9963 0.0168 0.3816 0.3816 0.3588 0.3588 ' 1,572.4880 1,572.4880 0.4563 1:1,583.8951 it ; 003 Total 0.0282 0.0161 0.2108 8.2000e- Total 1.0586 8.8517 7.9963 0.0168 0.0245 0.3816 0.3816 1.4700e- 0.3588 0.3588 1,572.4880 1,572.4880 0.4563 1 1,583.8951 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0282 0.0161 0.2108 i 8.2000e- I 0.0904 i 5.3000e- i 0.0909 0.0240 i 4.9000e- 0.0245 ; i 81.3748 81.3748 i 1.4700e- i 81.4114 004 004 004 ; 003 Total 0.0282 0.0161 0.2108 8.2000e- 0.0904 5.3000e- 0.0909 0.0240 4.9000e- 0.0245 81.3748 81.3748 1.4700e- 81.4114 004 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.9 Parking Garage Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i i i 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ............. .............. .............. .............. .............. .............. ............. ............. ............. .............. .............. .............. ..:.. + .............. ........... ............. Off -Road ; 0.2464 2.6879 9.4337 0.0168 0.0291 0.0291 0.0291 0.0291 0.0000 ° 1,572.4880 1,572.4880 0.4563 11,583.8951 ii ; 003 Total 0.2464 2.6879 9.4337 0.0168 5.3000e- 0.0291 0.0291 4.9000e- 0.0291 0.0291 1 0.0000 11,572.4880 1,572.4880 0.4563 81.4114 1,583.8951 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 1 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0282 0.0161 0.2108 i 8.2000e- I 0.0904 i 5.3000e- i 0.0909 0.0240 1 4.9000e- 0.0245 ; i 81.3748 81.3748 i 1.4700e- i 81.4114 004 004 004 ; 003 Total 0.0282 0.0161 0.2108 8.2000e- 0.0904 5.3000e- 0.0909 0.0240 4.9000e- 0.0245 81.3748 81.3748 1.4700e- 81.4114 004 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 .. .............................. «................... ... .............. .............. .............. .............. .............. ................... ............. .............. .................... + .............. ..:.. ...•... Off -Road ; 1.3625 11.4669 11.2270 0.0247 0.5273 0.5273 0.4976 0.4976 ... ' 2,355.5254 2,355.5254 0.6531 ::2,371.8531 it ; 003 Total 0.0487 0.0278 0.3641 1.4100e- Total 12.6396 11.4669 11.2270 0.0247 0.0422 0.5273 0.5273 2.5300e- 0.4976 0.4976 12,355.5254 2,355.5254 0.6531 003 2,371.8531 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 12.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 .. .............................. «................... ... ..... .............. .............. .............. .............. .............. .............. ................... ............. .................... + .............. ..:.. ...•... .. Off -Road ; 0.3436 3.5316 13.8407 0.0247 0.0385 0.0385 0.0385 0.0385 0.0000 ° 2,355.5254 2,355.5254 0.6531 ::2,371.8531 it ; 003 Total 0.0487 0.0278 0.3641 1.4100e- Total 11.6208 3.5316 13.8407 0.0247 0.0422 0.0385 0.0385 2.5300e- 0.0385 0.0385 1 0.0000 12,355.5254 2,355.5254 0.6531 1 2,371.8531 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 12.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 j 0.0000 0.0000 ... ........... ...............M............... 3 , f..................:......................................'......... .......... .................... ............. Vendor i 3 i 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. ... .............. .............. .............. ............. ............. ... ....... ..... ..... ..... ...... ...... ..... «................... ........ .............. .................... + .............. ..i.. ...•... Off -Road ; 1.2145 9.7089 10.9318 0.0247 0.4259 0.4259 0.4026 0.4026 ' 2,355.9748 2,355.9748 0.6507 2,372.2430 ii ; 003 Total 12.4916 9.7089 10.9318 0.0247 8.9000e- 0.4259 0.4259 8.2000e- 0.4026 0.4026 12,355.9748 2,355.9748 0.6507 135.4608 2,372.2430 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0459 0.0251 0.3397 i 1.3600e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 135.4035 135.4035 12.2900e- i 135.4608 003 004 004 ; 003 Total 0.0459 0.0251 0.3397 1.3600e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 135.4035 135.4035 2.2900e- 135.4608 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.10 Office Building Tenant Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i i i 0.0000 0.0000 0.0000 0.0000 .. .............................. ...... ..... ..... ..... ..... ..... ...... ...... ..... «. ............. .............. .............. .............. .............. .............. ............. ............. ............. .............. .............. .............. + .............. .............. ............. ..:.. ...•... Off -Road ; 0.3436 3.5316 13.8407 0.0247 0.0385 0.0385 0.0385 0.0385 0.0000 ° 2,355.9748 2,355.9748 0.6507 2,3722430 it ; 003 Total 0.0459 0.0251 0.3397 1.3600e- Total 11.6208 3.5316 13.8407 0.0247 0.0422 0.0385 0.0385 2.2900e- 0.0385 0.0385 1 0.0000 12,355.9748 2,355.9748 0.6507 003 2,372.2430 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0459 0.0251 0.3397 i 1.3600e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 135.4035 135.4035 12.2900e- i 135.4608 003 004 004 ; 003 Total 0.0459 0.0251 0.3397 1.3600e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 135.4035 135.4035 2.2900e- 135.4608 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 2.0634 i 20.9931 15.7057 0.0267 1.0502 1.0502 0.9692 i 0.9692 e 2,542.1741 i 2,542.1741: 0.7937 2,562.0153 ... ........... ...............M............... 3 : f..................:......................................'......... .......... .................... ............. Vendor E : i E 0.0000 .. .............................. «. ............ ...... ..... ..... ...... ... .............. ............... f .. .............. ...... .............. ............. .............. ............. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... 0.0000 0.0000 it ; 003 Total 0.0487 0.0278 0.3641 1.4100e- Total 2.1268 20.9931 15.7057 0.0267 0.0422 1.0502 1.0502 2.5300e- 0.9692 0.9692 2,542.1741 2,542.1741 0.7937 003 2,562.0153 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 i 2.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 0.4787 3.0817 16.9450 0.0267 0.0780 0.0780 0.0780 i 0.0780 ' 0.0000 2,542.1741; 2,542.1741: 0.7937 2,562.0153 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 E 0.0000 .. .............................. ..... .............. ............. .............. .............. .............. .. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... ' 0.0000 0.0000 it ; 003 Total 0.0487 0.0278 0.3641 1.4100e- Total 0.5422 3.0817 16.9450 0.0267 0.0780 0.0780 140.5564 0.0780 0.0780 0.0000 2,542.1741 2,542.1741 0.7937 2,562.0153 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0487 0.0278 0.3641 i 1.4100e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 140.5564 140.5564 12.5300e- i 140.6197 003 004 004 ; 003 Total 0.0487 0.0278 0.3641 1.4100e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 140.5564 140.5564 2.5300e- 140.6197 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 1.7697 i 17.8870 15.2064 0.0267 0.8625 0.8625 0.7965 i 0.7965 j 2,542.3761 i 2,542.37611 0.7937 2,562.2190 ... ........... ...............M............... � 3 f..................:......................................'......... .......... .................... e Vendor : E i i E 0.0000 .. .............................. «. ............ ...... ..... ..... ...... ... .............. ............... .. .............. ............. .............. ............. .............. ............. Paving ; 0.0635 0.0000 0.0000 0.0000 x0000 ... ' 0.0000 0.0000 it ; 003 Total 0.0459 0.0251 0.3397 1.3600e- Total 1.8332 17.8870 15.2064 0.0267 0.0422 0.8625 0.8625 2.2900e- 0.7965 0.7965 12,542.3761 2,542.3761 0.7937 003 2,562.2190 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0459 0.0251 0.3397 i 1.3600e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 135.4035 135.4035 i 2.2900e- i 135.4608 003 004 004 ; 003 Total 0.0459 0.0251 0.3397 1.3600e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 135.4035 135.4035 2.2900e- 135.4608 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.11 Landscaping and Site Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 0.4787 3.0816 16.9451 0.0267 0.0779 0.0779 0.0779 i 0.0779 ' 0.0000 2,542.3761-2,542.3761:i 0.7937 2,562.2190 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 E 0.0000 .. .............................. ..... .............. ............. .............. .............. .............. .. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... ' 0.0000 0.0000 it ; 003 Total 0.0459 0.0251 0.3397 1.3600e- Total 0.5422 3.0816 16.9451 0.0267 0.0779 0.0779 135.4035 0.0779 0.0779 0.0000 2,542.3761 2,542.3761 0.7937 2,562.2190 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0459 0.0251 0.3397 i 1.3600e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 135.4035 135.4035 12.2900e- i 135.4608 003 004 004 ; 003 Total 0.0459 0.0251 0.3397 1.3600e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 135.4035 135.4035 2.2900e- 135.4608 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i 3 i 0.0000 0.0000 0.0000 0.0000 .. .............................. ............. .............. ......... .............. .............. .............. ................... ............. .............. «. ........ .................... + .............. ............. ..i.. Off -Road ; 1.9765 17.7248 19.2174 0.0359 0.8128 0.8128 0.7573 0.7573 ' 3,408.4436 3,408.4436 1.0379 3,434.3903 it ; 004 Total 0.0180 0.0102 0.1341 5.2000e- Total 20.2259 17.7248 19.2174 0.0359 0.0156 0.8128 0.8128 9.3000e- 0.7573 0.7573 13,408.4436 3,408.4436 1.0379 004 3,434.3903 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0180 0.0102 0.1341 i 5.2000e- I 0.0575 i 3.4000e- i 0.0578 0.0153 i 3.1000e- 0.0156 ; i 51.7839 51.7839 19.3000e- i 51.8073 004 004 004 ; 004 Total 0.0180 0.0102 0.1341 5.2000e- 0.0575 3.4000e- 0.0578 0.0153 3.1000e- 0.0156 51.7839 51.7839 9.3000e- 51.8073 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ........ .............. ............. .............. ......... .............. .............. .............. ............. ............. .................... ..:.. + .............. ............. Off -Road ; 0.5399 5.9157 22.3910 0.0359 0.0633 0.0633 0.0633 0.0633 0.0000 ° 3,408.4436 3,408.4436 1.0379 3,434.3903 it ; 004 Total 0.0180 0.0102 0.1341 5.2000e- Total 18.7892 5.9157 22.3910 0.0359 0.0156 0.0633 0.0633 9.3000e- 0.0633 0.0633 1 0.0000 13,408.4436 3,408.4436 1.0379 004 3,434.3903 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0180 0.0102 0.1341 i 5.2000e- I 0.0575 i 3.4000e- i 0.0578 0.0153 i 3.1000e- 0.0156 ; i 51.7839 51.7839 19.3000e- i 51.8073 004 004 004 ; 004 Total 0.0180 0.0102 0.1341 5.2000e- 0.0575 3.4000e- 0.0578 0.0153 3.1000e- 0.0156 51.7839 51.7839 9.3000e- 51.8073 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. ............. .............. ......... .............. .............. .............. ............. ............. «. ........ .............. .................... ..:.. + .............. ............. Off -Road ; 1.7493 15.3617 18.8380 0.0359 0.6514 0.6514 0.6075 0.6075 ' 3,408.8670 3,408.8670 1.0347 13,434.7342 it ; 004 Total 0.0169 9.2400e- 0.1251 5.00OOe- Total 19.9987 15.3617 18.8380 0.0359 0.0156 0.6514 0.6514 8.4000e- 0.6075 0.6075 13,408.8670 3,408.8670 1.0347 004 3,434.7342 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0169 i 9.2400e- ° 0.1251 i 5.00OOe- i 0.0575 i 3.30OOe- i 0.0578 0.0153 i 3.00OOe- 0.0156 ; i 49.8855 i 49.8855 18.4000e- i 49.9066 003 004 004 004 ; 004 Total 0.0169 9.2400e- 0.1251 5.00OOe- 0.0575 3.3000e- 0.0578 0.0153 3.00OOe- 0.0156 49.8855 49.8855 8.4000e- 49766 003 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 3.12 Office Building Exterior Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ........ .............. ............. .............. ......... .............. .............. .............. ............. ............. .................... .............. ............. ..:.. Off -Road ; 0.5396 5.9139 22.3905 0.0359 0.0631 0.0631 0.0631 0.0631 0.0000 ° 3,408.8670 3,408.8670 1.0347 ::3,434.7342 it ; 004 Total 0.0169 9.2400e- 0.1251 5.00OOe- Total 18.7889 5.9139 22.3905 0.0359 0.0156 0.0631 0.0631 8.4000e- 0.0631 0.0631 1 0.0000 13,408.8670 3,408.8670 1.0347 004 3,434.7342 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0169 i 9.2400e- ° 0.1251 i 5.00OOe- i 0.0575 i 3.30OOe- i 0.0578 0.0153 i 3.00OOe- 0.0156 ; i 49.8855 i 49.8855 18.4000e- i 49.9066 003 004 004 004 ; 004 Total 0.0169 9.2400e- 0.1251 5.00OOe- 0.0575 3.3000e- 0.0578 0.0153 3.00OOe- 0.0156 49.8855 49.8855 8.4000e- 49766 003 004 004 004 004 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx I CO I S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category lb/day Office Park 476.59 lb/day Mitigated ; 0.9572 2.6440 10.6870 0.0396 3.7308 0.0313 3.7621 0.9990 0.0292 1.0283 3,999.4629 3,999.4629 0.1357 4,002.8561 .............................. i............... ......... ....... ............ ............. ........ ........... ................... ......... ........... ....................... E............... ......... ........... ....,.................... t ................... ................... ...........................,........ ............................... Unmitigated ; 0.9572 2.6440 10.6870 0.0396 3.7308 0.0313 3.7621 0.9990 0.0292 1.0283 ; 3,999.4629: ............. 3,999.4629: 0.1357 4,002.8561 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT .closed. Parking with Elevator . 0.00 i 0.00 I 0;00 ..........E ............................. a...................... .. ..................................................................................................................... ............................... Office Park 476.59 i 69.18 30.75 981,509 981,509 ................. .................. ..... • •Office ..............................; _................................................................................. 1................................... ............................... Park• 158.10 i 22:95 10.20 325,599 325,599 ................................................ ....... .............................:. ................................................................ i...................................... ............................... Parking Lot 0.00 0.00 0.00 Total 634.69 j 92.13 40.95 i 1,307,108 1,307,108 4.3 Trip Type Information CalEEMod Version: CalEEMod.2016.3.2 Page 50 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 4.4 Fleet Mix Land Use LDA I Miles LDT2 I MDV I Trip % LHD2 I MHD I HHD I Trip Purpose % UBUS I Land Use H -W or C -W H -S or C -C C -NW H -O i H -W or C- H -S or C -C H -O or C -NW Primary 0.017521; Diverted 0.023236; Pass -by 0.004137; 0.0031581 0.009064; 0.0004711 W ............................................................ i........ ........... .................. Enclosed Parking with Elevator 9.50 7.30 i 7.30 0.00 0.00 i 0.00 0 . 0 ' 0 ..............................: ............................ .......................... ............................. 0.006864; 0.023236; ....................... a ..............................• 0.0041371 r ............. ................,............................ 0.009064; .........3..................... Office Park 9.50 7.30 7.30 • 71.00 10.00 ' � : i 19.00 82 1............. ' .............................. ............................. Office Park 9.50 ......................... ..............................; 7.30 7.30 71.00 ; ....................... a ............................... 10.00 19.00 i 0.476244; ' 0.262181: ............................... .................. .... ............................... E............................' Y ....................... E........................; ............................... 0.023236: .............................. ,............................ .................. ........................... Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 ; 0 0 4.4 Fleet Mix Land Use LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.004137; 0.0031581 0.009064; 0.0004711 0.00077 ............................................................ i........ ........... .................. Office Park ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.0041371 0.0031581 0.009064; 0.000471; 0.00077; Parking Lot i 0.476244; 0.050164: 0.262181: 0.139658: 0.0175211 0.006864: 0.023236: 0.006525: 0.004137: 0.003158: 0.0090641 0.000471: 0.00077; 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx I CO I S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category lb/day s Use lb/day NaturalGas ;:i 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 i 2,04&842112,046.8421: 0.0392 1 0.0375 2,059.0054 Mitigated ; PM2.5 PM2.5 .............................. r....................................... ............. ....................................... ....................................... ............... .............. .. .............. *................ ............. NaturalGas ; 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 ; 2,046.8421: 2,046.8421: 0.0392 : 0.0375 2,059.0054 Unmitigated r kBTU /yr lb/day � 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 Total PM2.5 PM2.5 I Land Use kBTU /yr lb/day lb/day Enclosed Parking 0 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator 1 :1 : 1 : i : : .. : : ... Office Park : 13064.3 is 0.1409 1.2808 1.0759 7.6800e- 0.0973 0.0973 i 0.0973 0.0973 1,536.9791 1,536.9791 0.0295 0.0282 1,546.1126 �..... 0 0 3 �...... I................... � ................. ....... ............................... i................... ........................ ............................... ................... .................... .................. ......------............................. ............... ................... ................... Office Park 1 4333.84 :1 0.0467 : 0.4249 1 0.3569 : 2.5500e- i i 0.0323 1 0.0323 1 1 0.0323 : 0.0323 i 509.8630: 509.8630 1 9.7700e- : 9.3500e- 512.8929 003 1 003 t 003 ` 1 ................... Parking Lot 0 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 : 0.0000 Total 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 1 12,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 I Total PM2.5 PM2.5 I Land Use kBTU /yr lb/day lb/day Enclosed Parking 0 :I 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 x0000 0.0000 ; 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator : i : : i Office Park I 13.0643 ai 0.1409 1.2808 1.0759 1 7.6800e- 0.0973 0.0973 0.0973 0.0973 1,536.9791 1,536.9791 0.0295 0.0282 1,546.1126 003...... ................. a:.............. .....�...................1..... ..............+...... ................................................................................................................................................. ................................... ...........i................... Office Park I 4.33384 :I 0.0467 1 0.4249 1 0.3569 1 2.5500e- 1 i 0.0323 i 0.0323 1 0.0323 i 0.0323 i 509.8630 i 509.8630 9.7700e- i 9.3500e- 1 512.8929 003 003 i 003 .............................. «................. ii......... Parking Lot 0 .......... •................ ...'...... .............'.... ...............•............... ............ . ....� ...................`... .... �...................'....... ............`.................. 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 ......................................•...................'...................`........ ............................... � E i 0.0000 i 0.0000 0.0000 0.0000 I 0.0000 Total 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 12,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 6.2 Area by SubCategory Unmitigated ROG I NOx I CO I S02 I Fugitive PM10 Exhaust PM10 PM10 Total I Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category lb/day PM10 PM10 lb/day Mitigated ; 8.3954 i 8.6000e- i 0.0945 1.000Oe- i i 3.4000e- i 3.4000e- 3.4000e- i 3.4000e- ; 0.2023 0.2023 i 5.3000e- i 0.2156 ji 004 005 004 004 004 004 004 ........... .............. ............... ............. .............. ....................................... ............. ............. .............. .............. .. .............. *................ .......... ............. Unmitigated ; 8.3954 i 8.6000e- i 0.0945 i 1.000Oe- E 3.4000e- E 3.4000e- i i 3.4000e- i 3.4000e- ; 0.2023 E 0.2023 E 5.3000e- i 0.2156 0.0000 0.0000 004 005 004 004 004 004 004 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I SubCategory lb/day lb/day Architectural ;'1 1.0016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating r i �. � .............................. �I i I I i r............................................................................ ................... ................... °................... I ................... �............... ............... Consumer 7.3850 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products .............................. H........................... ............................... ....... ............................... ___ __ ___ .............. .............. ............. Landscaping ; 8.7900e- i 8.6000e- 0.0945 1.000Oe- i i 3.4000e- i 3.4000e- I I 3.4000e- i 3.4000e- E 0.2023 0.2023 5.3000e- 0.2156 003 004 005 004 004 004 004 r 004 Total 8.3954 8.6000e- 0.0945 1.000Oe- 3.4000e- 3.4000e- 3.4000e- 3.4000e- 0.2023 0.2023 5.3000e- 0.2156 004 005 004 004 004 004 1 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I SubCategory lb/day lb/day Architectural ; 1.0016 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating e ; i ; i I e ; ........................................ r Consumer ;i 7.3850 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products ....... ........'0 ........... .................... .. ............ .............. ..... .............. ..... .............. .............. .------------.... ....... ...........:................... -------------.............. ............................' .. Landscaping ; 8.7900e- 8.6000e- 0.0945 1.00OOe- 3.4000e- 3.4000e- 3.4000e- 3 3.4000e- 0.2023 02023 5.3000e- 0.2156 ' 003 004 005 004 004 004 004 004 Total 8.3954 8.6000e- 0.0945 1.00OOe- 3.4000e- 3.4000e- 3.4000e- 3.4000e- 0.2023 0 0.2156 004 005 004 004 004 004 004 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad CaIEEMod Version: CalEEMod.2016.3.2 Page 55 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer Equipment Type Number Hours /Day CO Days/Year Horse Power Load Factor Fuel Type Cranes 1 8.00 2; 231: 0.29 Diesel Total CO2 CH4 N20 CO2e Forklifts 1 8.00; 3651 89: 0.201 Diesel PM2.5 PM2.5 Generator Sets 4 0.301 521 84 0.741 Diesel Cranes ; 0.3730 4.1843 1.8923 5.7700e- 0.1737 0.1737 0.1598 0.1598 : 558.8304 i 558.8304 : 0.1807 563.3488 ' 003 I I Pressure Washers 1; 16.00: 1: 13 0.30 Diesel UnMitigated /Mitigated 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day Hours /Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Equipment Type lb/day lb/day Cranes ; 0.3730 4.1843 1.8923 5.7700e- 0.1737 0.1737 0.1598 0.1598 : 558.8304 i 558.8304 : 0.1807 563.3488 ' 003 I I .: ; ; ; Forklifts �; 0.1136 1.0549 i 1.1538 1.5300e- i E 0.0699 i 0.0699 i 0.0643 1 0.0643 : 148.0308 i 148.0308 1 0.0479 i 1 149.2277 ' 003 Generator Sets ; 0.0495 1 0.4392 ; 0.5514 9.9000e- 3 i 0.0220 I 0.0220 i 0.0220 0.0220 : 93.4552 93.4552 4.4400e- i 93.5662 004 i 1 003 ; .: Pressure 0.0861 0.6039 0.4841 1.1000e- 0.0266 0.0266 0.0266 0.0266 78.1800 78.1800 7.7000e- i 78.3726 Washers ;1 003 003 r Total 0.6222 6.2823 4.0816 9.3900e- 0.2922 0.2922 0.2727 0.2727 878.4964 878.4964 0.2408 884.5153 003 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day Hours /Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 56 Date: 6/1/2018 11:12 AM Haskins Way Rezone Phase II - San Mateo County, Summer User Defined Equipment Equipment Type Number 11.0 Vegetation Attachment G PROJECT PHASE 2 WINTER EMISSION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics 1.1 Land Usage Page 1 of 56 Haskins Way Rezone Phase II - San Mateo County, Winter Haskins Way Rezone Phase II San Mateo County, Winter Date: 6/1/2018 11:13 AM Land Uses Size Metric Lot Acreage Floor Surface Area Population Office Park ; 256.23 ; 1000sgft 1.47 256,232.00 0 ............................................................................i...............................................................................}.......................................... .... ............................... Office Park 85.00 1000sgft 0.39 85,000.00 0 ............................................................................i................................................ ............................... .............................................. ............................... .. ............................... ........... ............................... ..... ............................... Enclosed Parking with Elevator ; 340.00 Space 0.61 136,000.00 0 Parking Lot i 243.00 i Space 3.15 97,200.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m /s) 2.2 Precipitation Freq (Days) 70 Climate Zone 5 Operational Year 2022 Utility Company Pacific Gas & Electric Company CO2 Intensity 641.35 CH4Intensity 0.029 N20 Intensity 0.006 (lb /MWhr) (lb /MWhr) (lb /MWhr) 1.3 User Entered Comments & Non - Default Data CaIEEMod Version: CalEEMod.2016.3.2 Page 2 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter Project Characteristics - Land Use - See Appendix F of the Environmental Impact Report Construction Phase - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Off -road Equipment - See Appendix F of the Environmental Impact Report Trips and VMT - See Appendix F of the Environmental Impact Report Demolition - Grading - See Appendix F of the Environmental Impact Report Architectural Coating - See Appendix F of the Environmental Impact Report Vehicle Trips - See Appendix F of the Environmental Impact Report Land Use Change - Sequestration - See Appendix F of the Environmental Impact Report Construction Off -road Equipment Mitigation - See Appendix F of the Environmental Impact Report Operational Off -Road Equipment - See Appendix F of the Environmental Impact Report Stationary Sources - Emergency Generators and Fire Pumps - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea _ Nonresidential _Exterior 170,616.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter tblArchitecturalCoating ; ConstArea _ Nonresidential _Exterior ; 170,616.00 0.00 tblArchitecturalCoating ; ConstArea Nonresidential Interior ; 511,848.00 0.00 ..........................................................................;.............................................................................¢............................................ 4 ............................... ................................. ............................... tblArchitecturalCoating ConstArea _ Nonresidential _Interior 511,848.00 0.00 ;.............................................. ............................... ......................... ............................... .................. tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ...........................................................................;............................................ ............................... tblArchitecturalCoating ConstArea_Parking 13,992.00 0.00 ..............................................................................;............................................... ............................... «..............................................................................;....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 10.00 ............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 7.00 .. ............................................ ............................... «.. ...;... ... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 5.00 .. ............................................ ............................... .. ...................... «.. ;... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 .........................................................................;.............................................................................}............................................ ............................... ................................. ............................... tblConstEquipMitigation ; NumberOfEquipmentMitigated ; 0.00 4.00 r tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ...........................................................................;............................................ ............................... ............. ---.......................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 9.00 ...........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 ............................................ ............................... ......................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 4.00 ................................................. ............................. ;. .................... ............................... .. ............................... E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 15.00 ................................................. ............................. ;. E....................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 3.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 2.00 ..............................................................................;........................................................................................................................ ............................................................................ ............................... tblConstEquipMitigation NumberOfEquipmentMitigated 0.00 1.00 tblConstEquipMitigation NumberOfEquipmentMitigated ! 0.00 2.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 13.00 .........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated ; 0.00 4.00 .........................................................................;.............................................................................«............................................ ............................... .................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated * 0.00 6.00 ..........................................................................;.............................................................................«............................................ ............................... ................................. ............................... tblConstEquipMitigation NumberOfEquipmentMitigated : 0.00 4.00 ..........................................................................;.............................................................................«............................................ ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 4 0.00 2.00 ..........................................................................i.............................................................................¢............................................ ............................... ................................. ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 8.00 ;. !1111111111111111 ....................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated 0.00 11.00 ............................................... ............................... y..................................................................................................................... ............................... tblConstEquipMitigation i NumberOfEquipmentMitigated i 0.00 6.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter tblConstEquipMitigation Number OfEquipment Mitigated 0.00 13.00 tblConstEquipMitigation Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation Tier 9 No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ................................................. ............................. ;. ....................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblConstEquipMitigation Tier No Change Tier 4 Final tblConstEquipMitigation Tier No Change Tier 4 Final ;. E ....................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;........................................................................................................................ .......................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final ............................................... ............................... .................................................................................................................... ............................... tblConstEquipMitigation ; Tier No Change Tier 4 Final tblConstEquipMitigation ; Tier No Change Tier 4 Final ..........................................................................;.............................................................................*............................................ ............................... tblConstEquipMitigation ; Tier ; No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final tblConstEquipMitigation : Tier No Change Tier 4 Final ................................................. ............................. ;. ;....................................... ............................... tblConstEquipMitigation : Tier No Change Tier 4 Final ..........................................................................;............................................ ............................... .......................................... ............................... tblConstructionPhase NumDays 20.00 65.00 ;. E ....................................... ............................... tblConstructionPhase : NumDays 9 20.00 22.00 ............................................... ............................... y. tblConstructionPhase NumDays 20.00 219.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter tblConstructionPhase NumDays 230.00 30.00 tblConstructionPhase NumDays 230.00 40.00 tblConstructionPhase NumDays 230.00 100.00 ;. E ....................................... ............................... tblConstructionPhase NumDays 230.00 261.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblConstructionPhase NumDays 20.00 130.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 20.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblConstructionPhase NumDays 10.00 35.00 ............................................... ............................... ..................................................................................................................... ............................... tblGrading AcresOfGrading 25.00 0.00 ... ............................................ ............................... ..; .. ........................ ;... tblGradin g Material Exported 0.00 7,102.00 ... .............................................................................*............................................ ............................... ;... ................................. ............................... tblGrading ; Material Imported ; 0.00 6,070.00 tblLandUse i Land UseSquareFeet 256,230.00 256,232.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblLandUse i LotAcreage 5.88 1.47 i............................................... ............................... ..................................................................................................................... ............................... tblLandUse i LotAcreage 1.95 0.39 i............................................ ............................... ........................ tblLandUse i LotAcreage 3.06 0.61 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblLandUse : LotAcreage 2.19 3.15 ................................................. ............................. ;. ....................... ........................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 ..............................................................................;............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount ; 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 3.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 4.00 2.00 tblOffRoadEquipment Off RoadEquipmentUnitAmount 1.00 3.00 ................................................. ............................. ;. E....................................... ............................... tblOffRoadEquipment Off RoadEquipmentUnitAmount 9 1.00 5.00 • ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter tblOffRoadEquipment UsageHours 8.00 3.00 tblOffRoadEquipment UsageHours 8.00 6.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ;. E ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 6.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOffRoadEquipment UsageHours 8.00 4.00 ............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment UsageHours 7.00 6.00 ... ............................................ ............................... ..; .. ........................ ;... tblOffRoadEquipment UsageHours 8.00 6.00 ... .............................................................................*............................................ ;... ............................... ................................. ............................... tblOffRoadEquipment ; UsageHours ; 8.00 7.00 tblOffRoadEquipment i UsageHours 6.00 7.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 7.00 i............................................... ............................... ..................................................................................................................... ............................... tblOffRoadEquipment i UsageHours 8.00 5.00 i............................................ ............................... ........................ tblOperational Off Road Equipment i OperDaysPerYear 260.00 2.00 ........................................................................................................................... ;.E ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 365.00 tblOperational Off Road Equipment OperDaysPerYear 260.00 52.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblOperational Off Road Equipment OperDaysPerYear 260.00 1.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment OperHoursPerDay 8.00 0.30 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblOperational Off Road Equipment i OperHoursPerDay 8.00 16.00 tblOperational Off Road Equipment OperOff Road EquipmentNumber i 0.00 1.00 .............................................................................*............................................ ............................... tblOperationalOff Road Equipment i OperOff Road Equipment Number ; 0.00 1.00 r tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 4.00 tblOperationalOff Road Equipment OperOff Road Equipment Number 0.00 1.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblSequestration NumberOfNewTrees 9 0.00 80.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 9 20.00 19.00 ............................................... ............................... y. tblTripsAndVMT HaulingTripLength 20.00 19.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter tblTripsAndVMT HaulingTripLength 20.00 12.60 tblTripsAndVMT HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ;. E ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... ............................................... ............................... ....................................... ............................... tblTripsAndVMT HaulingTripLength 20.00 19.00 ............................................... ............................... .............................................. ............................... ....................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; HaulingTripLength 20.00 19.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT ; HaulingTripN umber 149.00 1,509.00 ..........................................................................;.............................................................................*............................................ ............................... tblTripsAndVMT ; HaulingTripN umber ; 1,647.00 659.00 tblTripsAndVMT i VendorTripN umber 94.00 3.00 ..............................................................................i............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 6.00 i............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT i VendorTripN umber 94.00 21.00 ..........................................................................i............................................ ............................... .......................................... ............................... ................................. ............................... tblTripsAndVMT VendorTripN umber 94.00 51.00 ;. E ....................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ................................................. ............................. ;. tblTripsAndVMT W orkerTripN umber 38.00 19.00 ..............................................................................;........................................................................................................................ .... ............................... ....................................... ............................... tblTripsAndVMT ; W orkerTripN umber 41.00 7.00 ..............................................................................;............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT W orkerTripN umber 40.00 20.00 ............................................... ............................... .................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 38.00 19.00 ..............................................................................;............................................... ............................... ..................................................................................................................... ............................... tblTripsAndVMT ; W orkerTripN umber 207.00 6.00 ..........................................................................;.............................................................................}............................................ ............................... tblTripsAndVMT ; W orkerTripN umber ; 207.00 13.00 tblTripsAndVMT : W orkerTripN umber 207.00 46.00 tblTripsAndVMT : W orkerTripN umber 207.00 114.00 ..............................................................................;........................................................................................................................ ........................................................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 11.00 ..........................................................................;............................................ ............................... .......................................... ............................... tblTripsAndVMT : W orkerTripN umber 41.00 19.00 ;. E ....................................... ............................... tblVehicleTrips CC_TTP 48.00 10.00 tblVehicleTrips : CW_TTP : 33.00 71.00 CoEEK4od Version: CaEEK4od.2018.3.2 Page 8of58 Date: 6/1/201O11:13AM Haskins Way Rezone Phase 11 - San Mateo County, Winter tblVehicleTrips ST TR 1.64 0.27 0.76 0.12 tblVehicleTrips WD TR 11.42 1.86 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 PM10 Total PM2.5 PM2.5 I I Year lb/day lb/day 2020 8.7618 108.6515 i ' 66.0673 0.1916 3.6229 3.6972 7.3201 0.7823 3.4533 4.2355 : i 0.0000 19,736.373; 19,736.373; 4.1777 0.0000 19,840.817 0.3218 3.0158 0.6416 e : 0.0000 :19,736.373 19,736.373 4.1777 ° 0.0000 : e i i . .............................�0 ..................... ......1111.... ..... .............. ............. 2021 39.5738 90.5032 81.5761 0.1702 1.9637 4.3077 6.2713 0.5124 3.9936 4.2656 0.0000 ; 16,349.061 16,349.061 4.7421 0.0000 ; 16,447.671 i; ......................... $ 1---.............. . ............................... H ....................................... .............. -1-1111. .......------... 1111.......... .................. .............. .............. ............... ............... 1111. ... 1111. 11. 1111. 1111. 1111. .. ..............................' ...........i.........1--------- --------- j................... 2022 11 38.5127 i 76.6642 i 79.6407 i 0.1696 i 1.6504 i 3.1888 i 4.8392 i 0.4455 i 3.0046 3.4501 0.0000 ; 16,291.678; 16,291.678; 3.9226 i 0.0000 ; 16,389.743 ............. 2021 ; 32.4108 ; 28.5618 6 6 1 i 0.1702 1.8907 0.3093 2.1193 0.5124 0.3091 0.7396 Maximum 39.5738 1 16,447.671 0.1916 3.6229 4.3077 7.3201 0.7823 3.9936 4.2656 0.0000 19,736.373 19,736.373 4.7421 0.0000 19,840.817 .... °... ' .....'..... -------1111.. ............ ....... ............................... 2022 9 1 1 9 0.1696 1.6504 0.2848 1.9352 5 Mitigated Construction ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 I I Year lb/day lb/day 2020 ; 2.5531 40.5060 74.0462 0.1916 2.6939 0.3218 3.0158 0.6416 0.3175 0.9591 0.0000 :19,736.373 19,736.373 4.1777 ° 0.0000 19,840.817 9 9 5 ......................... J4................ .............. .............. ,... .............. .............. 1111. 1111. ............. .............. ............. ............... .................... I............... .............. ....................................... .............. ............. 2021 ; 32.4108 ; 28.5618 95.9896 i 0.1702 1.8907 0.3093 2.1193 0.5124 0.3091 0.7396 ; 0.0000 116,349.061;16,349.061; 4.7421 0.0000 16,447.671 r r 7 .... °... ' .....'..... -------1111.. ............ ....... ............................... 2022 ; 32.3760 28.2158 91.9680 0.1696 1.6504 0.2848 1.9352 0.4455 0.2837 0.7293 ' 0.0000 :16,291.678 ' 16,291.678: 3.9226 0.0000 16,389.743 .: 6 r 6 1 Maximum 32.4108 40.5060 95.9896 0.1916 2.6939 0.3218 3.0158 0.6416 0.3175 0.9591 0.0000 19,736.373 19,736.373 4.7421 0.0000 19,840.817 1 9 1 9 5 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 10of58 Date: 6/1/201811:13AM Haskins Way Rezone Phase U' San Mateo County, Winter 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Blo- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e I I I I I I Category lb1day lb/day 004 005 004 004 004 004 004 Reduction Mobile 0,8817 2.8688 1 10,9246 1 0.0377 3.7308 1 0,0314 3.7622 0.9990 1 0.0293 1 �0283 3,800.7872 3,800.7872: 0.1376 1 3,8042272 Offroad 0.6222 6.2823 4.0816 9.39OOe- 0.2922 1 0.2922 0.2727 0.2727 878.4964 878.4964 1 0.2408 1 2.2 Overall Operational Unmitigated Operational ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust IPM2.5Total Bio-0O2 NBio-0O2 TotalCO2 CH4 N20 CO2e I I I I I I Category lb1day lb/day 004 005 004 004 004 004 004 Mobile 0,8817 2.8688 1 10,9246 1 0.0377 3.7308 1 0,0314 3.7622 0.9990 1 0.0293 1 �0283 3,800.7872 3,800.7872: 0.1376 1 3,8042272 Offroad 0.6222 6.2823 4.0816 9.39OOe- 0.2922 1 0.2922 0.2727 0.2727 878.4964 878.4964 1 0.2408 1 884.5153 Total 10.0869 10.8577 16.5334 0.0573 3.7308 0.4536 4.1843 0.9990 0.4320 _ 1.4310 6,726.32791 6,726.32791 0.4181 0.0375 6,747.9636 Ca|EEK4od Version: Ca|EEK4od.2018.3.2 Page 11of58 Date: 6/1/201O11:13AM Haskins Way Rezone Phase U' San Mateo County, Winter 2.2 Overall Operational Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I I I I Category lb/day lb/day 91 004 005 004 004 004 004 004 Energy 0.1876 7057 3 8 0.0102 0.1296 0,1296 0.1296 0.1296 2,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 Mobile 0,8817 2.8688 10.9246 0,0377 3.7308 0,0314 3.7622 0.9990 1 0.0293 1 0283 3,800,787213,800.78721 0.1376 3,804.2272 Offroad 0,6222 6.2823 4.0816 9.39OOe- 0.2922 0.2922 0.2727 02727 878A964 878A964 0.2408 884.5153 Total 10.0869 10.8577 16.5334 0.0573 3.7308 077-7. 0.9990 0.4720 1.4310 6,726.32791 6,726.32791 0.4181 . 0.0375 6,747.96361 3.0 Construction Detail Construction Phase ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e Reduction 3.0 Construction Detail Construction Phase Co|EEK4od Version: Ca|EEK4od.2018.3.2 Page 12of58 Date: 8/1/201811:13AM Haskins Way Rezone Phase U' San Mateo County, Winter Phase Phase Name Phase Type Start Date End Date Num Days Num Days Phase Description 1 Memolition ;Demolition :11/24/2020 5i 20 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 2 ',Soils Abatement/Remove/Replace 'vSite Preparation ::11/11/2020 ::12/8/2020 5:i 20 3 'Site Prep and Make Ready ;Site Preparation :12/9/2020 :1/26/2021 5 35 4 'Parking Garage Underground ;Building Construction ::1/8/2021 2/18/2021 5: 30 5 ;Office Building Underground ;Building Construction ::1/8/2021 3/4/2021 5i 40 6 Parking Garage Core Construction Building Construction :2/18/2021 7/7/2021 5:i 100 7 ;Office Building Core Construction i Building Construction ::3/5/2021 3/4/2022 5: 261 8 'Parking Garage Exterior aArchitectural Coating 15/18/2021 6/16/2021 5: 221: 9 ;Office Building Tenant &Architectural Coating :11/14/2021 9/15/2022 5: 219:: 10 'Landscaping and Site !!Paving :11/25/2021 5/25/2022 5:: 130:: wImprovements 11 ;Office Building Exterior 'Architectural Coating :12/4/2021 3/4/2022 5: 65:: Acres ofGrading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres ofPaving: 3.76 Residential Indoor: 8; Residential Outdoor: 0; Non-Residential Indoor: 0; Non-Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Air Compressors 2: 7.M: 781: 0.48 ........................................................................... ? ...................................................................... f ...... ...................... Demolition ;Concrete/Industrial Saws 21 .................................. .................................... 6.001 81:: ..................................... 0.73 Demolition Dumpers/Tenders i Demolition 2 Excavators 3.001: 158:: 0.38 CoEEK4od Version: CaEEK4od.2018.3.2 Page 13of58 Date: 6/1/201O11:13AM Haskins Way Rezone Phase 11 - San Mateo County, Winter Demolition Forklifts 1 7.00�: 89:: 0.20 Demolition Off-Highway Trucks 2:: 4.00:: 402:: 0.38 Demolition ;Rubber Tired Dozers 2 6.001 2471 0.40 Demolition ;Skid Steer Loaders 1 : Demolition ;Sweepers/Scrubbers 4.00: 64: 0.46 Demolition Tractors/Loaders/Backhoes 2:: 5.001 971 0.37 Soils Abatement/Remove/Replace Crawler Tractors 1 Soils Abatement/Remove/Replace Dumpers/Tenders 2:: 6.001 16: 0.38 Soils Abatement/Remove/Replace i Excavators 2:: 5.001 1581 0.38 Soils Abatement/Remove/Replace Off-H ighway Trucks 3:: 4.00:: 402:: 0.38 Soils Abatement/Remove/Replace Plate Compactors 2 5.00: 8 0.43 Soils Abatement/Remove/Replace ;Rubber Tired Loaders 21 5.00: 203: 0.36 Soils Abatement/Remove/Replace Scrapers 2: 4.00:: 367:: 0.48 Soils Abatement/Remove/Replace ;Sweepers/Scrubbers 1 4.00: 64: 0.46 Soils Abatement/Remove/Replace IgTractors/Loaders/Backhoes 6.001 97:: 0.37 Site Prep and Make Ready ;Bore/Drill Rigs 2:: 7.00:: 221:: 0.50 Site Prep and Make Ready Dumpers/Tenders 1 6.001 161 Site Prep and Make Ready Excavators 4.00: 158: 0.38 Site Prep and Make Ready ;Off-Highway Trucks 21 4.001 4021 0.38 Site Prep and Make Ready i Plate Compactors Site Prep and Make Ready 9Rubber Tired Loaders 21 6.00:: 203:: 0.36 Site Prep and Make Ready Scrapers 2 6.001 367:: 0.48 Site Prep and Make Ready Sweepers/Sc rubbers 1 4.00:: 64:: 0.46 Site Prep and Make Ready IgTractors/Loaders/Backhoes 21 6.001 97:: 0.37 Parking Garage Underground Bore/Drill Rigs 7.001: 221:: 0.50 Parking Garage Underground Excavators 21 7.001 1581 0.38 Parking Garage Underground 'Generator Sets 2:: 4.00: 841: 0.74 CoEEK4od Version: CaEEK4od.2018.3.2 Page 14of58 Date: 6/1/201O11:13AM Haskins Way Rezone Phase 11 - San Mateo County, Winter Parking Garage Underground ;Plate Compactors 2: 4.00�: 8: 0.43 Parking Garage Underground Rough Terrain Forklifts 2:: 2.00:: 1001 0.40 Parking Garage Underground ;Rubber Tired Loaders 1 2.001 2031 0.36 Parking Garage Underground 'vSweepers/Scrubbers 1 Parking Garage Underground 'vTractors/Loaders/Backhoes 2:: 6.00:: 97:: 0.37 Parking Garage Underground 'vTrenchers 2:: 4.00:: 78:: 0.50 Office Building Underground Bore/Drill Rigs 2:: 4.00:: 221:: 0.50 Office Building Underground Excavators 2:: 7.00:: 158:: 0.38 Office Building Underground I Generator Sets 2: 4.001 841 0.74 Office Building Underground 9'Plate Compactors Office Building Underground Rough Terrain Forklifts 2:: 8.001 100i 0.40 Office Building Underground ;Rubber Tired Loaders 1 6.00:: 203:: 0.36 Office Building Underground Sweepers/Scrubbers i : Office Building Underground ;Tractors/Loaders/Backhoes 2: Office Building Underground IgTrenchers 41 7.001 781 0.50 Parking Garage Core Construction IV Aerial Lifts i : Parking Garage Core Construction Cement and Mortar Mixers 6: 4.001 9: 0.56 Parking Garage Core Construction Cranes 7.001 2311 0.29 Parking Garage Core Construction ;Off-Highway Trucks i Parking Garage Core Construction Plate Compactors 4.00: 8 0.43 Parking Garage Core Construction Pumps Parking Garage Core Construction Rough Terrain Forklifts i i Parking Garage Core Construction '!Welders 3 1 6.00:: 46:: 0.45 Office Building Core Construction 'Aerial Lifts 41 7.001 631: 0.31 Office Building Core Construction IV Air Compressors 4: 6.001 78: 0.48 Office Building Core Construction Cranes 21 7.001 2311 0.29 Office Building Core Construction 'Off-Highway Trucks 2:: 4.00: 402:: 0.38 Ca|EEMod Version: Ca|EEMod.2018.3.2 Page 15of5G Date: 8/1/201811:13AKJ HamknaVVavRezonePhooaU- SanyWateuCuunty.VVintar Office Building Core Construction Rough Terrain Forklifts 2 6.001 1001 0.40 Office Building Core Construction Sweepers/Scrubbers 1 Office Building Core Construction 'TWelders 5: 7.001 461 0.45 Parking Garage Exterior Improvements ;;Aerial Lifts 1 6.001 631: 0.31 Parking Garage Exterior Improvements Cranes 1 3.001 2311: 0.29 Parking Garage Exterior Improvements Off-Highway Trucks 11 Parking Garage Exterior Improvements Other General Industrial Equipment 1! 4.002: 881: 0.34 Parking Garage Exterior Improvements Pressure Washers 2.00:: 13's 0.30 Parking Garage Exterior Improvements Rough Terrain Forklifts 1 5.00:: 1001 0.40 Parking Garage Exterior Improvements vWelders 2:: 5.00:: 46 0.45 Office Building Tenant Improvements Aerial Lifts i i Office Building Tenant Improvements vvAir Compressors 1 7.001 781: 0.48 Office Building Tenant Improvements Off-Highway Trucks 2 4.00:: 402 0.38 Office Building Tenant Improvements Rough Terrain Forklifts I Office Building Tenant Improvements ;Sweepers/Scrubbers 1 &M 64: 0.46 Office Building Tenant Improvements vvWelders 1 5.001 461: 0.45 Landscaping and Site Improvements Cement and Mortar Mixers 21: 4.00:: 9 0.56 Landscaping and Site Improvements Dumpers/Tenders 1 6.001: 161 0.38 Landscaping and Site Improvements Paving Equipment Landscaping and Site Improvements Plate Compactors 21: 4.001 8 0.43 Landscaping and Site Improvements IRollers 2 5.001 80 1 0.38 Landscaping and Site Improvements Rough Terrain Forklifts 3.00:: 1001 0.40 Landscaping and Site Improvements Rubber Tired Dozers 2 i Landscaping and Site Improvements vSkid Steer Loaders 1 6.00:: 65 0.37 Landscaping and Site Improvements v!Tractors/Loaders/Backhoes 2 Office Building Exterior Improvements ;Aerial Lifts 3i 6.00:: 631 0.31 Office Building Exterior Improvements 'Off-Highway Trucks 2 4.001 4021 0.38 CalEEMod Version: CalEEMod.2016.3.2 Page 16 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter Office Building Exterior Improvements ;Other General Industrial Equipment Vendor Trip Number 2 7.00: 88 0.34 Office Building Exterior Improvements Pressure Washers 1 4.00; 131 0.30 .........................................................................-------------------------------- Office Building Exterior Improvements -------...................----- h Terrain Forklifts ;Rough .....................I 1 ............................... 3 ... .............................. 7.00: ... ............................... 100; 0.40 ...........................................................................------------------------------------ Office Building Exterior Improvements ............................... :Sweepers /Scrubbers +....................... ---------- .............................................. 1 ........................................................................... 4.00; 64; 0.46 Office Building Exterior Improvements .................................... ............................... ;Welders . .. • ... ............................ 2: ; ----------------------------- 6.00: . ............................... 46: 0.45 Trips and VMT Phase Name Offroad Equipment Worker Trip Count Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition ; 16 20.00; 0.00; 1,509.00; 10.80; 7.30; 19.00: LD Mix HDT Mix 1HHDT s ....... ...........................--- :........................... .i. Soils 161 20.001 0.00 659.00: 10.801 7.30: 12.601 LD_Mix HDT_Mix I HHDT ' Site Prep and Make 15 19.00; 0.00 0.00: 10.801 7.30: 19.001:1-D Mix 1 HDT_Mix I HHDT ...... ............................... Parking Garage �-------------------------� ---------------------------:..................... ............................... 15 6.00' 3.001 0.00; �................. 10.80; 7.30: 19.00; LD Mix I HDT_Mix ..................... HHDT .................., Office Building 18 13.00; ........................... 6.00: 0.00 ............................. 10.80: 7.30 19.00: LD Mix : HDT_Mix I HHDT .::.. ............I................. Parking Garage Core "= ..... ........................................................ 15 46.00; 21.001 .................... 0.00: ------------------------ 10.80; ...................... 7.30: --------------------- 19.00; ------------------------------- LD_Mix ...................... ; HDT_Mix ..................... I HHDT !2 stn'..ct ................. Office Building Core 9 ..... ...... .......... ------------ ----------------------- 20 114.00; ...................... ..:.. 51.001 .................... -- 0.00: ------------------- --.... 10.80; ...................... ..... 7.30: --------------------- -- 19.00; ------------------------------- .L- - LD Mix .. - ...................... :HDT Mix .. ..................... I HHDT Parking Garage 8i 11.00: 0.001 0.00 10.80: 7.30 19.00: LD Mix : HDT_Mix I HHDT C.h. -..... :. �.' ::..........."M ...................... -- ..... ....................... .... ...................... :... .................... . ............... .... ...................... ..................... ----- --------------------- - - - - -. .......- .. ............. ..................... r Office Buildin g Tenant 19.00; I.....r...,..w...r.M 0.001 0.00: 10.80; 7.30: 19.00; LD Mix ':HDT Mix I HHDT : Landscaping and Site I..... .......................................................................................................................... 15 19.00 : . 0.00 0.00; 10.801 ............................... 7.30: ' 19.001 LDMix ' HDTMix F ........................ HDT rr...r. m'an!r Office Building Exterior ; 141 7.001 0.001 0.001 10.80: 7.30: 19.001 LD-Mix : HDT_Mix 1 HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.2 Demolition - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.6146 0.0000 1.6146 0.2445 0.0000 0.2445 j 0.0000 0.0000 ........... ...............M............... �• 3 f.........................................................'......... .......... .................... r Vendor i 3 i E 0.0000 .. .............................. «. ............ .............. ............ ... + .............. .... .•... Off -Road ; 4.2780 39.9671 28.3055 0.0546 2.0943 2.0943 1.9720 1.9720 ... ' 5,249.6062 5,249.6062 1.2985 5,282.0685 ii ; 003 Total 0.7105 23.6356 10.2872 0.0596 Total 4.2780 39.9671 28.3055 0.0546 1.6146 2.0943 3.7089 0.2445 1.9720 2.2165 15,249.6062 5,249.6062 1.2985 1 5,282.0685 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.6494 i 23.5954 i 9.8864 1 0.0582 1.2446 1 0.0733 1.3179 0.3406 0.0702 0.4108 :6,585.1047 6,585.10471 0.8309 i 6,605.8778 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. ....................................... .............. ............. Worker ; 0.0612 0.0402 0.4008 i 1.4400e- I 0.1643 i 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; i 143.9723 143.9723 2.8300e- i 144.0431 003 004 004 ; 003 Total 0.7105 23.6356 10.2872 0.0596 1.4089 0.0743 1.4832 0.3842 0.0711 0.4553 1 6,729.0770 6,729.0770 0.8338 6,749.9209 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.2 Demolition - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust E : : 0.7266 0.0000 0.7266 0.1100 0.0000 0.1100 j 0.0000 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................'......... .......... .................... ............. Vendor : : E E 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E ................. .. ............................... .............. ............. .............. ............. Off -Road ;I 0.6993 4.3864 30.8868 0.0546 0.0926 0.0926 0.0926 0.0926 0.0000 ° 5,249.6062 5,249.6062 1.2985 5,282.0685 ii ; 003 Total 0.7105 23.6356 10.2872 0.0596 Total 0.6993 4.3864 30.8868 0.0546 0.7266 0.0926 0.8191 0.1100 0.0926 1 0.2026 1 0.0000 5,249.6062 5,249.6062 1.2985 5,282.0685 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.6494 i 23.5954 i 9.8864 1 0.0582 1.2446 1 0.0733 1.3179 0.3406 0.0702 0.4108 :6,585.1047 6,585.10471 0.8309 i 6,605.8778 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f.........................................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. ....................................... .............. ............. Worker ; 0.0612 0.0402 0.4008 E 1.4400e- E 0.1643 E 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; E 143.9723 143.9723 2.8300e- E 144.0431 003 004 004 ; 003 Total 0.7105 23.6356 10.2872 0.0596 1.4089 0.0743 1.4832 0.3842 0.0711 0.4553 1 6,729.0770 6,729.0770 0.8338 6,749.9209 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.0745 0.0000 0.0745 0.0113 0.0000 E : : 0.0113 0.0000 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor �: : : E E 0.0000 0.0000 0.0000 0.0000 ........... ............... «............... .............. .............. .............. .............. .............. ............. ............. ..............E .................;.. ............................... .............. ............. .............. ............. Off -Road ;I 3.5033 37.2418 23.8956 0.0585 1.5054 1.5054 1.3880 1.3880 5,629.9145 5,629.9145 1.7916 5,674.7048 ii ; 003 Total 3.5033 37.2418 23.8956 0.0585 0.0745 1.5054 1.5798 0.0113 1.3880 1.3993 1 5,629.9145 5,629.9145 1.7916 1 5,674.7048 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.2089 1 7.7668 3.1783 0.0175 0.3607 i 0.0222 0.3829 0.0987 0.0213 0.1200 :1,983.8038 1,983.80381 0.2511 1 1,990.0802 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .............. .............. .............. ............. Worker ; 0.0612 0.0402 0.4008 E 1.4400e- E 0.1643 E 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; E 143.9723 i 143.9723 12.8300e- E 144.0431 003 004 004 ; 003 Total 0.2701 7.8070 3.5790 0.0190 0.5250 0.0232 0.5482 0.1423 0.0222 0.1645 1 12,127.776212,127.77621 0.2539 2,134.1233 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.3 Soils Abatement /Remove /Replace - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.0335 0.0000 0.0335 5.0800e- I 0.0000 i 5.0800e- ' 0.0000 0.0000 ... ........... ...............M............... 003 ? 003 ............. . ............................. «. ............... + .............. ............. .............. ............. .............. ............. Off -Road ; 0.8732 4.6770 29.2932 0.0585 0.1317 0.1317 0.1317 0.1317 0.0000 ° 5,629.9145 5,629.9145 1.7916 ::5,674.7048 Worker ii ; i 143.9723 i 143.9723 12.8300e- i 144.0431 003 004 004 ; 003 Total 0.8732 4.6770 29.2932 0.0585 0.0335 0.1317 0.1652 5.0800e- 0.1317 0.1368 0.0000 5,629.9145 5,629.9145 1.7916 2,134.1233 5,674.7048 003 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Hauling 0.2089 1 7.7668 3.1783 0.0175 0.3607 i 0.0222 0.3829 0.0987 0.0213 0.1200 :1,983.8038 1,983.80381 0.2511 1 1,990.0802 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .............. .............. .............. ............. Worker ; 0.0612 0.0402 0.4008 i 1.4400e- I 0.1643 i 9.9000e- i 0.1653 0.0436 i 9.1000e- 0.0445 ; i 143.9723 i 143.9723 12.8300e- i 144.0431 003 004 004 ; 003 Total 0.2701 7.8070 3.5790 0.0190 0.5250 0.0232 0.5482 0.1423 0.0222 0.1645 1 12,127.776212,127.77621 0.2539 2,134.1233 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2020 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. . ............................. «. : : 3 ° .............. ............... ; .............. ............. .............. ............. .............. ............. Off -Road ; 3.8762 42.9197 27.5908 0.0714 1.6922 1.6922 1.5588 1.5588 6,892.1512 6,892.1512 2.2097 6,947.3943 Worker ii ; i 136.7737 136.7737 i 2.6900e- i 136.8409 Total 3.8762 42.9197 27.5908 0.0714 1.5908 1.6922 3.2829 0.1718 1.5588 1.7306 1 6,892.1512 6,892.1512 2.2097 136.7737 6,947.3943 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0581 0.0382 0.3807 i 1.3700e- I 0.1561 i 9.4000e- i 0.1570 0.0414 i 8.7000e- 0.0423 ; i 136.7737 136.7737 i 2.6900e- i 136.8409 003 004 004 ; 003 Total 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 136.7737 136.7737 2.6900e- 136.8409 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2020 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 j 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. . ............................. «. 3 ° ........................... .......... .................... :.............. :.. ............. .............. ............. Off -Road ; 0.9870 5.0603 34.8207 0.0714 0.1410 0.1410 0.1410 0.1410 0.0000 ° 6,892.1512 6,892.1512 2.2097 6,947.3943 Worker ii ; i 136.7737 136.7737 i 2.6900e- i 136.8409 003 004 004 ; 003 Total 0.9870 5.0603 34.8207 0.0714 0.7158 0.1410 0.8568 0.0773 0.1410 0.2183 0.0000 6,892.1512 6,892.1512 2.2097 136.8409 6,947.3943 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0581 0.0382 0.3807 i 1.3700e- I 0.1561 i 9.4000e- i 0.1570 0.0414 i 8.7000e- 0.0423 ; i 136.7737 136.7737 i 2.6900e- i 136.8409 003 004 004 ; 003 Total 0.0581 0.0382 0.3807 1.3700e- 0.1561 9.4000e- 0.1570 0.0414 8.7000e- 0.0423 136.7737 136.7737 2.6900e- 136.8409 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 1.5908 0.0000 1.5908 0.1718 0.0000 0.1718 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. Vendor : : 3 ° 0.0000 0.0000 0.0000 0.0000 . ............................. «. .............. ............... +.............. ............. .............. .............. .............. ............. Off -Road ; 3.5814 38.0146 26.5918 0.0715 1.4921 1.4921 1.3748 1.3748 ' 6,897.6776 6,897.6776 2.2115 6,952.9653 ii ; 003 Total 3.5814 38.0146 26.5918 0.0715 1.5908 1.4921 3.0829 0.1718 1.3748 1.5465 1 6,897.6776 6,897.6776 2.2115 131.9694 6,952.9653 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 i 2.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.4 Site Prep and Make Ready - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Fugitive Dust ; 0.7158 0.0000 0.7158 0.0773 0.0000 0.0773 j 0.0000 0.0000 ... ........... ...............M............... . i f..................:......................................'......... .......... .................... ............. Vendor «. 3 ° '• ..............E ............ .............. ......... E ............................. ..... ............. Off -Road ; 0.9870 5.0601 34.8207 0.0715 0.1408 0.1408 0.1408 0.1408 0.0000 ° 6,897.6776 6,897.6776 2.2115 1 6,952.9653 Worker ii ; i 131.9091 i 131.9091 i 2.4100e- i 131.9694 003 004 004 ; 003 Total 0.9870 5.0601 34.8207 0.0715 0.7158 0.1408 0.8567 0.0773 0.1408 1 0.2181 0.0000 6,897.6776 6,897.6776 2.2115 1 6,952.9653 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 i 2.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.5 Parking Garage Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road ; 1.9495 i 18.9873 19.9545 0.0369 1.0022 1.0022 0.9362 0.9362 j 3,550.4565; 3,550.45651 0.9710 3,574.7318 .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�........................ .......... Vendor ; 9.8700e7 0.3124 0.1398 7.8000e- 0.0203 7.4000e- 0.0210 5.8300e- 7.000Oe- 6.5300e- ; i 85.6654 85.6654 7.5700e- �• �I e e 003 Total 1.9495 18.9873 19.9545 0.0369 Worker 1.0022 1.0022 41.6745 0.9362 0.9362 ; 004 3,550.4565 3,550.4565 0.9710 0.2507 3,574.7318 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�........................ .......... Vendor ; 9.8700e7 0.3124 0.1398 7.8000e- 0.0203 7.4000e- 0.0210 5.8300e- 7.000Oe- 6.5300e- ; i 85.6654 85.6654 7.5700e- 85.8546 003 004 004 003 004 003 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0172 0.0108 0.1109 i 4.2000e- I 0.0493 i 2.9000e- i 0.0496 0.0131 2.6000e- 0.0133 ; i 41.6555 41.6555 i 7.6000e- i 41.6745 004 004 004 .: ; 004 Total 0.0271 0.3232 0.2507 1.2000e- 0.0695 1.0300e- 0.0706 0.0189 9.6000e- 0.0199 127.3210 127.3210 8.3300e- 127.5291 003 003 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.5 Parking Garage Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road j 0.4893 2.7741 23.9077 I 0.0369 0.0676 0.0676 0.0676 0.0676 ' 0.0000 3,550.4565; 3,550.4565; 0.9710 i 3,574.7318 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�........................ .......... Vendor ; 9.8700e7 0.3124 0.1398 7.8000e- 0.0203 7.4000e- 0.0210 5.8300e- 7.000Oe- 6.5300e- ; i 85.6654 85.6654 7.5700e- 85.8546 Total 0.4893 2.7741 23.9077 0.0369 .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... 0.0676 0.0676 Worker 0.0676 0.0676 0.0000 3,550.4565 3,550.4565 0.9710 1 3,574.7318 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�........................ .......... Vendor ; 9.8700e7 0.3124 0.1398 7.8000e- 0.0203 7.4000e- 0.0210 5.8300e- 7.000Oe- 6.5300e- ; i 85.6654 85.6654 7.5700e- 85.8546 003 004 004 003 004 003 003 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0172 0.0108 0.1109 i 4.2000e- I 0.0493 i 2.9000e- i 0.0496 0.0131 2.6000e- 0.0133 ; i 41.6555 41.6555 i 7.6000e- i 41.6745 004 004 004 .: ; 004 Total 0.0271 0.3232 0.2507 1.2000e- 0.0695 1.0300e- 0.0706 0.0189 9.6000e- 0.0199 127.3210 127.3210 8.3300e- 127.5291 003 003 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.6 Office Building Underground - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 3.2943 i 32.4956 30.9701 0.0549 1.8093 1.8093 1.6788 1.6788 j 5,285.0376f 5,285.03761 1.5320 5,323.3378 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... .......... .................... ............. Vendor it e 171.7092 Total 3.2943 32.4956 30.9701 0.0549 .............. .............. .............. .............. .............. .............. .............. .................i. ... ..... ..... ..... ..... .... 1.8093 1.8093 Worker 1.6788 1.6788 90.2948 5,285.0376 5,285.0376 1.5320 5,323.3378 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 1 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... .......... .................... ............. Vendor ; 0.0197 0.6248 0.2797 1.5600e- 0.0405 1.4700e- 0.0420 0.0117 1.4100e- 0.0131 ; i 171.3309 171.3309 0.0151 171.7092 003 003 003 .. .............................. .............. .............. .............. .............. .............. .............. .............. .................i. ... ..... ..... ..... ..... .... .............. ............. ----------------- ----------------- .............. ............. Worker ; 0.0372 0.0235 0.2403 i 9.00OOe- I 0.1068 i 6.2000e- i 0.1074 0.0283 i 5.7000e- 0.0289 ; i 90.2536 90.2536 1 1.6500e- i 90.2948 004 004 004 ; 003 Total 0.0570 0.6483 0.5199 2.4600e- 0.1473 2.0900e- 0.1494 0.0400 1.9800e- 0.0420 261.5845 261.5845 0.0168 262.0040 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.6 Office Building Underground - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road j 0.7092 3.7272 36.1394 I 0.0549 0.0969 0.0969 0.0969 0.0969 ' 0.0000 5,285.0376; 5,285.03761 1.5320 5,323.3378 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... .......... .................... ............. Vendor �• �I e e 171.7092 Total 0.7092 3.7272 36.1394 0.0549 .............. .............. .............. .............. .............. .............. .............. .................i. ... ..... ..... ..... ..... .... 0.0969 0.0969 Worker 0.0969 0.0969 0.0000 5,285.0376 5,285.0376 1.5320 5,323.3378 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f..................:......................................•......... .......... .................... ............. Vendor ; 0.0197 0.6248 0.2797 1.5600e- 0.0405 1.4700e- 0.0420 0.0117 1.4100e- 0.0131 ; i 171.3309 171.3309 0.0151 171.7092 003 003 003 .. .............................. .............. .............. .............. .............. .............. .............. .............. .................i. ... ..... ..... ..... ..... .... .............. ............. ----------------- ----------------- .............. ............. Worker ; 0.0372 0.0235 0.2403 i 9.000Oe- I 0.1068 i 6.2000e- i 0.1074 0.0283 i 5.7000e- 0.0289 ; i 90.2536 90.2536 i 1.6500e- i 90.2948 004 004 004 ; 003 Total 0.0570 0.6483 0.5199 2.4600e- 0.1473 2.0900e- 0.1494 0.0400 1.9800e- 0.0420 261.5845 261.5845 0.0168 262.0040 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 1.9521 i 15.6423 13.9182 0.0288 0.6735 0.6735 0.6474 0.6474 j 2,623.6675- 2,623.66751 0.5957 2,638.5588 .............. .............. .............. .............. .............. .............. ............. .............. ................. f...................................... ...................'.... ........ .......�.................... ............. Vendor ; 0.0691 2.1868 0.9788 5.4500e- 0.1417 5.1500e- 0.1469 0.0408 4.9300e- 0.0457 599.6581 599.6581 0.0530 � �I e e Total 1.9521 15.6423 13.9182 0.0288 Worker 0.6735 0.6735 319.5048 0.6474 0.6474 ; 003 2,623.6675 2,623.6675 0.5957 1.8290 2,638.5588 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f...................................... ...................'.... ........ .......�.................... ............. Vendor ; 0.0691 2.1868 0.9788 5.4500e- 0.1417 5.1500e- 0.1469 0.0408 4.9300e- 0.0457 599.6581 599.6581 0.0530 600.9821 003 003 003 .. ........................ .r................ . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. ------------------------------------ .............. ............. Worker ; 0.1317 0.0830 0.8501 i 3.2000e- I 0.3779 i 2.2000e- i 0.3801 0.1002 i 2.0300e- 0.1023 ; i 319.3589 319.3589 i 5.8400e- i 319.5048 003 003 003 ; 003 Total 0.2008 2.2698 1.8290 8.6500e- 0.5196 7.3500e- 0.5270 0.1410 6.9600e- 0.1480 919.0170 919.0170 0.0588 920.4869 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.7 Parking Garage Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road j 0.5550 5.2854 15.7514 i 0.0288 0.0867 0.0867 0.0867 0.0867 ' 0.0000 2,623.6675; 2,623.66751 0.5957 2,638.5588 ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f...................................... ...................'.... ........ .......�.................... ............. Vendor it e 600.9821 Total 0.5550 5.2854 15.7514 0.0288 0.0867 0.0867 ............. 0.0867 0.0867 0.0000 2,623.6675 2,623.6675 0.5957 ; 003 2,638.5588 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. .............. .............. ............. .............. ................. f...................................... ...................'.... ........ .......�.................... ............. Vendor ; 0.0691 2.1868 0.9788 5.4500e- 0.1417 5.1500e- 0.1469 0.0408 4.9300e- 0.0457 599.6581 599.6581 0.0530 600.9821 003 003 003 .. ........................ .r................ . ..... ..... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .............. .................i. .............. ............. ------------------------------------ .............. ............. Worker ; 0.1317 0.0830 0.8501 i 3.2000e- I 0.3779 i 2.2000e- i 0.3801 0.1002 i 2.0300e- 0.1023 ; i 319.3589 319.3589 i 5.8400e- i 319.5048 003 003 003 ; 003 Total 0.2008 2.2698 1.8290 8.6500e- 0.5196 7.3500e- 0.5270 0.1410 6.9600e- 0.1480 919.0170 919.0170 0.0588 920.4869 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.8 Office Building Core Construction - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 3.9585 i 32.0076 30.1103 0.0587 1.4477 1.4477 13879 1.3879 e 5,482.7347- 5,482.73471 1.3110 i 5,515.5098 .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1678 5.3107 2.3772 0.0132 0.3442 0.0125 0.3568 0.0991 0.0120 0.1110 1,456.3125 1,456.3125 0.1286 it .. .............................. e ............. .............. .............. .............. Total 3.9585 32.0076 30.1103 0.0587 1.4477 1.4477 1.3879 1.3879 4.4840 5,482.7347 5,482.7347 1.3110 1.2987 5,515.5098 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1678 5.3107 2.3772 0.0132 0.3442 0.0125 0.3568 0.0991 0.0120 0.1110 1,456.3125 1,456.3125 0.1286 1,459.5279 .. .............................. ... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .............. .............. .............. ............. Worker ; 0.3264 0.2057 2.1069 i 7.9300e- I 0.9365 i 5.4600e- i 0.9420 0.2484 i 5.0300e- 0.2534 ; i 791.4546 i 791.4546 i 0.0145 791.8162 003 003 003 ; Total 0.4942 5.5164 4.4840 0.0212 1.2807 0.0180 1.2987 0.3475 0.0170 0.3645 1 12,247.767112,247.76711 0.1431 2,251.3442 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.8 Office Building Core Construction - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 Category lb/day lb/day Off -Road j 0.8356 i 10.4353 33.6911 0.0587 0.0869 0.0869 0.0869 0.0869 j 0.0000 5,4827347; 5,482.73471 1.3110 5,515.5098 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor it e 1,459.5279 Total 0.8356 10.4353 33.6911 0.0587 0.0869 0.0869 791.8162 0.0869 0.0869 0.0000 5,482.7347 5,482.7347 1.3110 4.4840 5,515.5098 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ..........�.................... ............. Vendor 0.1678 5.3107 2.3772 0.0132 0.3442 0.0125 0.3568 0.0991 0.0120 0.1110 1,456.3125 1,456.3125 0.1286 1,459.5279 .. .............................. ... ..... ..... ..... ..... .... .............. .............. .............. .............. .............. .............. .............. .. ...............i............... ............. .............. .............. .............. ............. Worker ; 0.3264 0.2057 2.1069 i 7.9300e- I 0.9365 i 5.4600e- i 0.9420 0.2484 i 5.0300e- 0.2534 ; i 791.4546 i 791.4546 i 0.0145 791.8162 003 003 003 ; Total 0.4942 5.5164 4.4840 0.0212 1.2807 0.0180 1.2987 0.3475 0.0170 0.3645 1 12,247.767112,247.76711 0.1431 2,251.3442 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.8 Office Building Core Construction - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road ; 3.6007 i 28.4532 29.5639 0.0587 1.2305 1.2305 11805 1.1805 e 5,483.3351 i 5,483.33511 12977 5,515.7764 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ....... ...�.................... ............. Vendor �• �I e e 1,440.8169 Total 3.6007 28.4532 29.5639 0.0587 ; 0.3089 0.1856 1.9577 i 7.6400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 1.2305 1.2305 1.1805 1.1805 5,483.3351 5,483.3351 1.2977 0.0207 5,515.7764 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ....... ...�.................... ............. Vendor 0.1576 4.9945 2.3702 0.0130 0.3443 0.0110 0.3553 0.0991 0.0106 0.1096 1,437.6264 1,437.6264 0.1276 1,440.8169 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .................................... .............. ............. Worker ; 0.3089 0.1856 1.9577 i 7.6400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 ; i 762.5089 i 762.5089 i 0.0130 762.8347 003 003 003 ; Total 0.4666 5.1801 4.3279 0.0207 1.2808 0.0164 1.2972 0.3475 0.0155 0.3630 1 12,200.13531 2,200.1353 0.1407 2,203.6516 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.8 Office Building Core Construction - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Off -Road j 0.8356 i 10.4353 33.6911 0.0587 0.0869 0.0869 0.0869 0.0869 j 0.0000 5,4833350; 5,483.33501 1.2977 5,515.7764 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ....... ...�.................... ............. Vendor it e 1,440.8169 Total 0.8356 10.4353 33.6911 0.0587 0.0869 0.0869 762.8347 0.0869 0.0869 0.0000 5,483.3350 5,483.3350 1.2977 4.3279 5,515.7764 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................•......... ....... ...�.................... ............. Vendor 0.1576 4.9945 2.3702 0.0130 0.3443 0.0110 0.3553 0.0991 0.0106 0.1096 1,437.6264 1,437.6264 0.1276 1,440.8169 .. ........................ .r.. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .................................... .............. ............. Worker ; 0.3089 0.1856 1.9577 i 7.6400e- I 0.9365 i 5.3500e- i 0.9418 0.2484 i 4.9300e- 0.2533 ; i 762.5089 i 762.5089 i 0.0130 762.8347 003 003 003 ; Total 0.4666 5.1801 4.3279 0.0207 1.2808 0.0164 1.2972 0.3475 0.0155 0.3630 1 12,200.13531 2,200.1353 0.1407 2,203.6516 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.9 Parking Garage Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ....... .............. ............. .............. ......... .............. .............. .............. ................... ............. .................... + .............. ............. ..:.. Off -Road ; 1.0586 8.8517 7.9963 0.0168 0.3816 0.3816 0.3588 0.3588 ' 1,572.4880 1,572.4880 0.4563 11,583.8951 ii ; 003 Total 0.0315 0.0199 0.2033 7.7000e- Total 1.0586 8.8517 7.9963 0.0168 0.0245 0.3816 0.3816 1.4000e- 0.3588 0.3588 1,572.4880 1,572.4880 0.4563 1 1,583.8951 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0315 0.0199 0.2033 i 7.7000e- I 0.0904 i 5.3000e- i 0.0909 0.0240 i 4.9000e- 0.0245 ; i 76.3684 76.3684 i 1.4000e- i 76.4033 004 004 004 ; 003 Total 0.0315 0.0199 0.2033 7.7000e- 0.0904 5.3000e- 0.0909 0.0240 4.9000e- 0.0245 76.3684 76.3684 1.4000e- 76.4033 004 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.9 Parking Garage Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i i i 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ............. .............. .............. .............. .............. .............. ............. ............. ............. .............. .............. .............. ..:.. + .............. ........... ............. Off -Road ; 0.2464 2.6879 9.4337 0.0168 0.0291 0.0291 0.0291 0.0291 0.0000 ° 1,572.4880 1,572.4880 0.4563 11,583.8951 ii ; 003 Total 0.2464 2.6879 9.4337 0.0168 5.3000e- 0.0291 0.0291 4.9000e- 0.0291 0.0291 1 0.0000 11,572.4880 1,572.4880 0.4563 76.4033 1,583.8951 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0315 0.0199 0.2033 i 7.7000e- I 0.0904 i 5.3000e- i 0.0909 0.0240 i 4.9000e- 0.0245 ; i 76.3684 76.3684 i 1.4000e- i 76.4033 004 004 004 ; 003 Total 0.0315 0.0199 0.2033 7.7000e- 0.0904 5.3000e- 0.0909 0.0240 4.9000e- 0.0245 76.3684 76.3684 1.4000e- 76.4033 004 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 .. .............................. «................... ... .............. .............. .............. .............. .............. ................... ............. .............. .................... + .............. ..:.. ...•... Off -Road ; 1.3625 11.4669 11.2270 0.0247 0.5273 0.5273 0.4976 0.4976 ... ' 2,355.5254 2,355.5254 0.6531 ::2,371.8531 ii ; 003 Total 0.0544 0.0343 0.3511 1.3200e- Total 12.6396 11.4669 11.2270 0.0247 0.0422 0.5273 0.5273 2.4100e- 0.4976 0.4976 12,355.5254 2,355.5254 0.6531 003 2,371.8531 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 12.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 .. .............................. «................... ... ..... .............. .............. .............. .............. .............. .............. ................... ............. .................... + .............. ..:.. ...•... .. Off -Road ; 0.3436 3.5316 13.8407 0.0247 0.0385 0.0385 0.0385 0.0385 0.0000 ° 2,355.5254 2,355.5254 0.6531 ::2,371.8531 ii ; 003 Total 0.0544 0.0343 0.3511 1.3200e- Total 11.6208 3.5316 13.8407 0.0247 0.0422 0.0385 0.0385 2.4100e- 0.0385 0.0385 1 0.0000 12,355.5254 2,355.5254 0.6531 1 2,371.8531 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 12.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 j 0.0000 0.0000 ... ........... ...............M............... 3 , f..................:......................................'......... .......... .................... ............. Vendor i 3 i 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. ... .............. .............. .............. ............. ............. ... ....... ..... ..... ..... ...... ...... ..... «................... ........ .............. .................... + .............. ..i.. ...•... Off -Road ; 1.2145 9.7089 10.9318 0.0247 0.4259 0.4259 0.4026 0.4026 ' 2,355.9748 2,355.9748 0.6507 2,372.2430 ii ; 003 Total 12.4916 9.7089 10.9318 0.0247 8.9000e- 0.4259 0.4259 8.2000e- 0.4026 0.4026 12,355.9748 2,355.9748 0.6507 127.1391 2,372.2430 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0515 0.0309 0.3263 i 1.2700e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 127.0848 127.0848 12.1700e- i 127.1391 003 004 004 ; 003 Total 0.0515 0.0309 0.3263 1.2700e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 127.0848 127.0848 2.1700e- 127.1391 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.10 Office Building Tenant Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 11.2772 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i i i 0.0000 0.0000 0.0000 0.0000 .. .............................. ...... ..... ..... ..... ..... ..... ...... ...... ..... «. ............. .............. .............. .............. .............. .............. ............. ............. ............. .............. .............. .............. + .............. .............. ............. ..:.. ...•... Off -Road ; 0.3436 3.5316 13.8407 0.0247 0.0385 0.0385 0.0385 0.0385 0.0000 ° 2,355.9748 2,355.9748 0.6507 2,3722430 ii ; 003 Total 0.0515 0.0309 0.3263 1.2700e- Total 11.6208 3.5316 13.8407 0.0247 0.0422 0.0385 0.0385 2.1700e- 0.0385 0.0385 1 0.0000 12,355.9748 2,355.9748 0.6507 003 2,372.2430 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0515 0.0309 0.3263 i 1.2700e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 127.0848 127.0848 12.1700e- i 127.1391 003 004 004 ; 003 Total 0.0515 0.0309 0.3263 1.2700e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 127.0848 127.0848 2.1700e- 127.1391 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 2.0634 i 20.9931 15.7057 0.0267 1.0502 1.0502 0.9692 i 0.9692 e 2,542.1741 i 2,542.1741: 0.7937 2,562.0153 ... ........... ...............M............... 3 : f..................:......................................'......... .......... .................... ............. Vendor E : i E 0.0000 .. .............................. «. ............ ...... ..... ..... ...... ... .............. ............... f .. .............. ...... .............. ............. .............. ............. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... 0.0000 0.0000 ii ; 003 Total 0.0544 0.0343 0.3511 1.3200e- Total 2.1268 20.9931 15.7057 0.0267 0.0422 1.0502 1.0502 2.4100e- 0.9692 0.9692 2,542.1741 2,542.1741 0.7937 003 2,562.0153 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 i 2.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 0.4787 3.0817 16.9450 0.0267 0.0780 0.0780 0.0780 i 0.0780 ' 0.0000 2,542.1741; 2,542.1741: 0.7937 2,562.0153 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 E 0.0000 .. .............................. ..... .............. ............. .............. .............. .............. .. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... ' 0.0000 0.0000 ii ; 003 Total 0.0544 0.0343 0.3511 1.3200e- Total 0.5422 3.0817 16.9450 0.0267 0.0780 0.0780 131.9091 0.0780 0.0780 0.0000 2,542.1741 2,542.1741 0.7937 2,562.0153 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0544 0.0343 0.3511 i 1.3200e- I 0.1561 i 9.1000e- i 0.1570 0.0414 i 8.4000e- 0.0422 ; i 131.9091 i 131.9091 i 2.4100e- i 131.9694 003 004 004 ; 003 Total 0.0544 0.0343 0.3511 1.3200e- 0.1561 9.1000e- 0.1570 0.0414 8.4000e- 0.0422 131.9091 131.9091 2.4100e- 131.9694 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 1.7697 i 17.8870 15.2064 0.0267 0.8625 0.8625 0.7965 i 0.7965 j 2,542.3761 i 2,542.37611 0.7937 2,562.2190 ... ........... ...............M............... � 3 f..................:......................................'......... .......... .................... e Vendor : E i i E 0.0000 .. .............................. «. ............ ...... ..... ..... ...... ... .............. ............... .. .............. ............. .............. ............. .............. ............. Paving ; 0.0635 0.0000 0.0000 0.0000 x0000 ... ' 0.0000 0.0000 ii ; 003 Total 0.0515 0.0309 0.3263 1.2700e- Total 1.8332 17.8870 15.2064 0.0267 0.0422 0.8625 0.8625 2.1700e- 0.7965 0.7965 12,542.3761 2,542.3761 0.7937 003 2,562.2190 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0515 0.0309 0.3263 i 1.2700e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 127.0848 127.0848 i 2.1700e- i 127.1391 003 004 004 ; 003 Total 0.0515 0.0309 0.3263 1.2700e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 127.0848 127.0848 2.1700e- 127.1391 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.11 Landscaping and Site Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Off -Road ; 0.4787 3.0816 16.9451 0.0267 0.0779 0.0779 0.0779 i 0.0779 ' 0.0000 2,542.3761-2,542.3761:i 0.7937 2,562.2190 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 E 0.0000 .. .............................. ..... .............. ............. .............. .............. .............. .. Paving ; 0.0635 0.0000 0.0000 0.0000 0.0000 ... ' 0.0000 0.0000 ii ; 003 Total 0.0515 0.0309 0.3263 1.2700e- Total 0.5422 3.0816 16.9451 0.0267 0.0779 0.0779 127.0848 0.0779 0.0779 0.0000 2,542.3761 2,542.3761 0.7937 2,562.2190 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0515 0.0309 0.3263 i 1.2700e- I 0.1561 i 8.9000e- i 0.1570 0.0414 i 8.2000e- 0.0422 ; i 127.0848 127.0848 i 2.1700e- i 127.1391 003 004 004 ; 003 Total 0.0515 0.0309 0.3263 1.2700e- 0.1561 8.9000e- 0.1570 0.0414 8.2000e- 0.0422 127.0848 127.0848 2.1700e- 127.1391 003 004 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2021 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor i 3 i 0.0000 0.0000 0.0000 0.0000 .. .............................. ............. .............. ......... .............. .............. .............. ................... ............. .............. «. ........ .................... + .............. ............. ..i.. Off -Road ; 1.9765 17.7248 19.2174 0.0359 0.8128 0.8128 0.7573 0.7573 ' 3,408.4436 3,408.4436 1.0379 3,434.3903 ii ; 004 Total 0.0200 0.0126 0.1294 4.9000e- Total 20.2259 17.7248 19.2174 0.0359 0.0156 0.8128 0.8128 8.9000e- 0.7573 0.7573 13,408.4436 3,408.4436 1.0379 004 3,434.3903 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0200 0.0126 0.1294 i 4.9000e- I 0.0575 i 3.4000e- i 0.0578 0.0153 i 3.1000e- 0.0156 ; i 48.5981 i 48.5981 18.9000e- i 48.6203 004 004 004 ; 004 Total 0.0200 0.0126 0.1294 4.9000e- 0.0575 3.4000e- 0.0578 0.0153 3.1000e- 0.0156 48.5981 48.5981 8.9000e- 48.6203 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2021 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ........ .............. ............. .............. ......... .............. .............. .............. ............. ............. .................... ..:.. + .............. ............. Off -Road ; 0.5399 5.9157 22.3910 0.0359 0.0633 0.0633 0.0633 0.0633 0.0000 ° 3,408.4436 3,408.4436 1.0379 3,434.3903 ii ; 004 Total 0.0200 0.0126 0.1294 4.9000e- Total 18.7892 5.9157 22.3910 0.0359 0.0156 0.0633 0.0633 8.9000e- 0.0633 0.0633 1 0.0000 13,408.4436 3,408.4436 1.0379 004 3,434.3903 Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0200 0.0126 0.1294 i 4.9000e- I 0.0575 i 3.4000e- i 0.0578 0.0153 i 3.1000e- 0.0156 ; i 48.5981 i 48.5981 18.9000e- i 48.6203 004 004 004 ; 004 Total 0.0200 0.0126 0.1294 4.9000e- 0.0575 3.4000e- 0.0578 0.0153 3.1000e- 0.0156 48.5981 48.5981 8.9000e- 48.6203 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2022 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. ............. .............. ......... .............. .............. .............. ............. ............. «. ........ .............. .................... ..:.. + .............. ............. Off -Road ; 1.7493 15.3617 18.8380 0.0359 0.6514 0.6514 0.6075 0.6075 ' 3,408.8670 3,408.8670 1.0347 13,434.7342 ii ; 004 Total 0.0190 0.0114 0.1202 4.7000e- Total 19.9987 15.3617 18.8380 0.0359 0.0156 0.6514 0.6514 8.00OOe- 0.6075 0.6075 13,408.8670 3,408.8670 1.0347 004 3,434.7342 Unmitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0190 0.0114 0.1202 i 4.70OOe- I 0.0575 i 3.30OOe- i 0.0578 0.0153 i 3.00OOe- 0.0156 ; i 46.8207 46.8207 18.00OOe- i 46.8407 004 004 004 ; 004 Total 0.0190 0.0114 0.1202 4.7000e- 0.0575 3.3000e- 0.0578 0.0153 3.00OOe- 0.0156 46.8207 46.8207 8.00OOe- 46.8407 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 3.12 Office Building Exterior Improvements - 2022 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I Category lb/day lb/day Archit. Coating ; 18.2494 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ... ........... ...............M............... 3 f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. «. ........ .............. ............. .............. ......... .............. .............. .............. ............. ............. .................... .............. ............. ..:.. Off -Road ; 0.5396 5.9139 22.3905 0.0359 0.0631 0.0631 0.0631 0.0631 0.0000 ° 3,408.8670 3,408.8670 1.0347 ::3,434.7342 ii ; 004 Total 0.0190 0.0114 0.1202 4.7000e- Total 18.7889 5.9139 22.3905 0.0359 0.0156 0.0631 0.0631 8.00OOe- 0.0631 0.0631 1 0.0000 13,408.8670 3,408.8670 1.0347 004 3,434.7342 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I Category lb/day lb/day Hauling 0.0000 1 0.0000 Z 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 ... ........... ...............M............... .............. .............. .............. .............. ............. .............. ............. .............. ................. f..................:......................................'......... .......... .................... ............. Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .. .............................. .............. .............. .............. .............. .............. .............. .............. .............. .............. .. ...............i............... . ..... ..... ..... ..... ..... ..... .... ............. .............. .............. .............. ............. Worker ; 0.0190 0.0114 0.1202 i 4.70OOe- I 0.0575 i 3.30OOe- i 0.0578 0.0153 i 3.00OOe- 0.0156 ; i 46.8207 46.8207 18.00OOe- i 46.8407 004 004 004 ; 004 Total 0.0190 0.0114 0.1202 4.7000e- 0.0575 3.3000e- 0.0578 0.0153 3.00OOe- 0.0156 46.8207 46.8207 8.00OOe- 46.8407 004 004 004 004 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx I CO I S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 I N20 I CO2e Category lb/day Office Park 476.59 i 69.18 30.75 981,509 981,509 lb/day ..............................; Mitigated ; 0.8817 2.8688 10.9246 0.0377 3.7308 0.0314 3.7622 0.9990 0.0293 1.0283 3,800.7872 3,800.7872 0.1376 3,804.2272 Parking Lot 0.00 0.00 0.00 Total 634.69 j 92.13 40.95 i 1,307,108 1,307,108 i Unmitigated ; 0.8817 2.8688 10.9246 0.0377 3.7308 0.0314 3.7622 0.9990 0.0293 1.0283 ; 3,800.7872: 3,800.7872: 0.1376 3,804.2272 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT .closed. Parking with Elevator . 0.00 i 0.00 I 0;00 ..........E ............................. a...................... .. ..................................................................................................................... ............................... Office Park 476.59 i 69.18 30.75 981,509 981,509 ................. .................. ..... • •Office ..............................; _................................................................................. 1................................... ............................... Park• 158.10 i 22:95 10.20 325,599 325,599 ................................................ ....... .............................:. ................................................................ i...................................... ............................... Parking Lot 0.00 0.00 0.00 Total 634.69 j 92.13 40.95 i 1,307,108 1,307,108 4.3 Trip Type Information CalEEMod Version: CalEEMod.2016.3.2 Page 50 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 4.4 Fleet Mix Land Use LDA I Miles LDT2 I MDV I Trip % LHD2 I MHD I HHD I Trip Purpose % UBUS I Land Use H -W or C -W H -S or C -C C -NW H -O i H -W or C- H -S or C -C H -O or C -NW Primary 0.017521; Diverted 0.023236; Pass -by 0.004137; 0.0031581 0.009064; 0.0004711 W ............................................................ i........ ........... .................. Enclosed Parking with Elevator 9.50 7.30 i 7.30 0.00 0.00 i 0.00 0 . 0 ' 0 ..............................: ............................ .......................... ............................. 0.006864; 0.023236; ....................... a ..............................• 0.0041371 r ............. ................,............................ 0.009064; .........3..................... Office Park 9.50 7.30 7.30 • 71.00 10.00 ' � : i 19.00 82 1............. ' .............................. ............................. Office Park 9.50 ......................... ..............................; 7.30 7.30 71.00 ; ....................... a ............................... 10.00 19.00 i 0.476244; ' 0.262181: ............................... .................. .... ............................... E............................' Y ....................... E........................; ............................... 0.023236: .............................. ,............................ .................. ........................... Parking Lot 9.50 7.30 7.30 0.00 0.00 0.00 0 ; 0 0 4.4 Fleet Mix Land Use LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Enclosed Parking with Elevator ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.004137; 0.0031581 0.009064; 0.0004711 0.00077 ............................................................ i........ ........... .................. Office Park ; 0.476244; 0.050164; 0.262181; 0.1396581 0.017521; 0.006864; 0.023236; 0.006525; 0.0041371 0.0031581 0.009064; 0.000471; 0.00077; Parking Lot i 0.476244; 0.050164: 0.262181: 0.139658: 0.0175211 0.006864: 0.023236: 0.006525: 0.004137: 0.003158: 0.0090641 0.000471: 0.00077; 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx I CO I S02 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category lb/day s Use lb/day NaturalGas ;:i 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 i 2,04&842112,046.8421: 0.0392 1 0.0375 2,059.0054 Mitigated ; PM2.5 PM2.5 .............................. r....................................... ............. ....................................... ....................................... ............... .............. .. .............. *................ ............. NaturalGas ; 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 ; 2,046.8421: 2,046.8421: 0.0392 : 0.0375 2,059.0054 Unmitigated r kBTU /yr lb/day � 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 Total PM2.5 PM2.5 I Land Use kBTU /yr lb/day lb/day Enclosed Parking 0 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ; 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator 1 :1 : 1 : i : : .. : : ... Office Park : 13064.3 is 0.1409 1.2808 1.0759 7.6800e- 0.0973 0.0973 i 0.0973 0.0973 1,536.9791 1,536.9791 0.0295 0.0282 1,546.1126 �..... 0 0 3 �...... I................... � ................. ....... ............................... i................... ........................ ............................... ................... .................... .................. ......------............................. ............... ................... ................... Office Park 1 4333.84 :1 0.0467 : 0.4249 1 0.3569 : 2.5500e- i i 0.0323 1 0.0323 1 1 0.0323 : 0.0323 i 509.8630: 509.8630 1 9.7700e- : 9.3500e- 512.8929 003 1 003 t 003 ` 1 ................... Parking Lot 0 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 : 0.0000 Total 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 1 12,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e s Use PM10 PM10 I Total PM2.5 PM2.5 I Land Use kBTU /yr lb/day lb/day Enclosed Parking 0 :I 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 x0000 0.0000 ; 0.0000 0.0000 0.0000 0.0000 0.0000 with Elevator : i : : i Office Park I 13.0643 ai 0.1409 1.2808 1.0759 1 7.6800e- 0.0973 0.0973 0.0973 0.0973 1,536.9791 1,536.9791 0.0295 0.0282 1,546.1126 003...... ................. a:.............. .....�...................1..... ..............+...... ................................................................................................................................................. ................................... ...........i................... Office Park I 4.33384 :I 0.0467 1 0.4249 1 0.3569 1 2.5500e- 1 i 0.0323 i 0.0323 1 0.0323 i 0.0323 i 509.8630 i 509.8630 9.7700e- i 9.3500e- 1 512.8929 003 003 i 003 .............................. «................. ii......... Parking Lot 0 .......... •................ ...'...... .............'.... ...............•............... ............ . ....� ...................`... .... �...................'....... ............`.................. 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 ......................................•...................'...................`........ ............................... � E i 0.0000 i 0.0000 0.0000 0.0000 I 0.0000 Total 0.1876 1.7057 1.4328 0.0102 0.1296 0.1296 0.1296 0.1296 12,046.8421 2,046.8421 0.0392 0.0375 2,059.0054 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 6.2 Area by SubCategory Unmitigated ROG I NOx I CO I S02 I Fugitive PM10 Exhaust PM10 PM10 Total I Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Category lb/day PM10 PM10 lb/day Mitigated ; 8.3954 i 8.6000e- i 0.0945 1.000Oe- i i 3.4000e- i 3.4000e- 3.4000e- i 3.4000e- ; 0.2023 0.2023 i 5.3000e- i 0.2156 I 004 005 004 004 004 004 004 ........... .............. ............... ............. .............. ....................................... ............. ............. .............. .............. .. .............. *................ .......... ............. Unmitigated ; 8.3954 i 8.6000e- i 0.0945 i 1.000Oe- E 3.4000e- E 3.4000e- i i 3.4000e- i 3.4000e- ; 0.2023 E 0.2023 E 5.3000e- i 0.2156 0.0000 0.0000 004 005 004 004 004 004 004 6.2 Area by SubCategory Unmitigated ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 I I SubCategory lb/day lb/day Architectural ;'1 1.0016 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating r i �. � .............................. �I i I I i r............................................................................ ................... ................... °................... I ................... �............... ............... Consumer 7.3850 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products .............................. H........................... ............................... ....... ............................... ___ __ ___ .............. .............. ............. Landscaping ; 8.7900e- i 8.6000e- 0.0945 1.000Oe- i i 3.4000e- i 3.4000e- I I 3.4000e- i 3.4000e- E 0.2023 0.2023 5.3000e- 0.2156 003 004 005 004 004 004 004 r 004 Total 8.3954 8.6000e- 0.0945 1.000Oe- 3.4000e- 3.4000e- 3.4000e- 3.4000e- 0.2023 0.2023 5.3000e- 0.2156 004 005 004 004 004 004 1 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 SubCategory lb/day lb/day Architectural ; 1.0016 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating e ; .......................... i; p............... .............. i I e ; ........................................ .............. .............. .............. ............. .............. .............. r � .................. �................ .............. ............. .............. ............. Consumer ;I 7.3850 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products ;I ....... ........'0....................................... H . ..; .... .. -- ..; .. ..... ..... ....... ...........:................... ........................... ..............................' i................... Landscaping ; 8.7900e- 8.6000e- 0.0945 1.00OOe- 3.4000e- 3.4000e- 3.4000e- 3 3.4000e- 0.2023 02023 5.3000e- 0.2156 ' 003 004 005 004 004 004 004 004 Total 8.3954 8.6000e- 0.0945 1.00OOe- 3.4000e- 3.4000e- 3.4000e- 3.4000e- 0.2023 0.2023 5.3000e- 0.2156 004 005 004 004 004 004 004 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad CaIEEMod Version: CalEEMod.2016.3.2 Page 55 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter Equipment Type Number Hours /Day CO Days/Year Horse Power Load Factor Fuel Type Cranes 1 8.00 2; 231: 0.29 Diesel ..........................................................................i.... ............................... CH4 N20 CO2e Forklifts 1 8.00; 3651 89: 0.201 Diesel ..........................................................................i.... ............................... PM2.5 Generator Sets 499 0.301 52• 84 0.741 Diesel Cranes ; 0.3730 4.1843 1.8923 5.7700e- 0.1737 0.1737 0.1598 0.1598 : 558.8304 i 558.8304 : 0.1807 563.3488 ' 003 I I Pressure Washers 1; 16.00: 1: 13 0.30 Diesel UnMitigated /Mitigated 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day Hours /Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type ROG NOx CO S02 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e I I I PM10 I PM10 Total PM2.5 PM2.5 Equipment Type lb/day lb/day Cranes ; 0.3730 4.1843 1.8923 5.7700e- 0.1737 0.1737 0.1598 0.1598 : 558.8304 i 558.8304 : 0.1807 563.3488 ' 003 I I .: ; ; ; Forklifts �; 0.1136 1.0549 i 1.1538 1.5300e- i E 0.0699 i 0.0699 i 0.0643 1 0.0643 : 148.0308 i 148.0308 1 0.0479 i 1 149.2277 ' 003 Generator Sets ; 0.0495 1 0.4392 ; 0.5514 9.9000e- 3 i 0.0220 I 0.0220 i 0.0220 0.0220 : 93.4552 93.4552 4.4400e- i 93.5662 004 i 1 003 ; .: Pressure 0.0861 0.6039 0.4841 1.1000e- 0.0266 0.0266 0.0266 0.0266 78.1800 78.1800 7.7000e- i 78.3726 Washers ;1 003 003 r Total 0.6222 6.2823 4.0816 9.3900e- 0.2922 0.2922 0.2727 0.2727 878.4964 878.4964 0.2408 884.5153 003 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours /Day Hours /Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 56 Date: 6/1/2018 11:13 AM Haskins Way Rezone Phase II - San Mateo County, Winter User Defined Equipment Equipment Type Number 11.0 Vegetation Attachment H PROJECT PHASE 2 MITIGATION REPORT PREPARED BY SWCA ENVIRONMENTAL CONSULTANTS, INC. CaIEEMod Version: CaIEEMOd.2016.3.2 Construction Mitigation Summary Page 1 of 13 Haskins Way Rezone Phase II San Mateo County, Mitigation Report Date: 6/1/2018 11:18 AM OFFROAD Equipment Mitigation Equipment Type I I I Exhaust I Exhaust I I NBio- I Total I I Air Compressors 'Diesel Phase ROG NOx CO S02 PM10 PM2.5 Bio- CO2 CO2 CO2 CH4 N20 CO2e Percent Reduction ................................................................................................................................................ .............. T...................................... ...........................--------'"____ Demolition 0.72: 0.56: -0.07: 0.00: 0.92: 0.92; 0.00: 0.00: 0.00: 0.00: _____________.................. 0.00: 0.00 .. ...:... ...:... .. Landscaping and Site Improvements 0.70: 0.83: 0.10: 0.00: 0.91: 0.91; 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 . i..................:..................:..................:..................:..... .............:................. �................. i.................. i. .................:............. .. ...:... ...:... ............ .. Office Building Core Construction 0.70: 0.57: -0.111 0.00: 0.93: 0.92; 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 .. ...:... ...:... .. Office Building Exterior Improvements 0.06: 0.63: -0.18: 0.00: 0.91E 0.90; 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 .. ...:..................................... Office Building Tenant Improvements 0.07: 0.64: -0.25: 0.00: 0.91: 0.91; 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 Office Building Underground 0.77: 0.87: -0.16: 0.00: 0.95 0.94; 0.00: 0.00: 0.00: 0.00: 0.00; 0.00 r . .................. .................. .................. ... ... ... Parking Garage Core Construction 0.65: 0.58: 0.12: 0.00: 0.86; 0.86; 0.00: 0.00: 0.00: 0.00: 0.00; 0.00 ............ ..............4............... ..................................... ........... ............ .... ... ... ............ Parking Garage Exterior Improvements 0.75: 0.69; -0.18: 0.00; 0.92: 0.92; 0.00; 0.00: 0.00: 0.00: 0.00: 0.00 . .. ....... ...... ....... ..................... .... ...... ...:... ... .... .... .... ... .... .. Parking Garage Underground 0.74; 0.84; 0.20; 0.00; 0.93; 0.93; 0.00; 0.00; 0.00; 0.00; 0.00; 0.00 ...................................... :.................. :.................. :.................. :................. {................. :...... ............ i............... ............ ............ ....... ....... ...:... ............ .. Site Prep and Make Ready 0.73; 0.87; -0.28; 0.00; 0.91; 0.90; 0.00; 0.00; 0.00; 0.00; 0.00; 0.00 .. ...:..................................... Soils Abatement/Remove /Replace 0.70; 0.72; 0.20; 0.00; 0.90; 0.89; 0.00; 0.00; 0.00; 0.00; 0.00; 0.00 OFFROAD Equipment Mitigation Equipment Type Fuel Type Tier Number Mitigated Total Number of Equipment DPF Oxidation Catalyst Aerial Lifts ' Diesel 'Tier 4 Final 10: 10 No Change 0.00 Air Compressors 'Diesel 'Tier 4 Final 7: 7 No Change 0.00 Bore /Drill Rigs 'Diesel 'Tier 4 Final 5: 5€ No Change 0.00 CaEEk4odVernon: CaEEK4od.2018.3.2 Page 2 o 13 Date: 8/1/2018 11:18 AM Cement and Mortar Mixers Diesel ;NoChange 0 8:: No Change 0.00 Concrete/Industrial Saws 'Diesel 'Fier 4 Final 2: 2 No Change Cranes 'Diesel ;Tier 4 Final 4: 4 No Change 0.00 Crawler Tractors 'Diesel ;Tier 4 Final 1 1 No Change Dumpers[Tenders 'Diesel ;NoChange 0: 5 No Change Excavators 'Diesel ;Tier 4 Final 9: 9 No Change Forklifts Diesel ;Tier 4 Final 1 No Change Generator Sets Diesel iTier 4 Final 4 4 No Change Off-Highway Trucks Diesel ;Tier 4 Final 151 15 No Change 0.00 Other General Industrial Equipment.' Diesel �Mer 4 Final 3 3 No Change Paving Equipment 'Diesel Tier 4 Final 2 2 No Change 0.00 Plate Compactors 'Diesel No Change 0: 11 No Change Pressure Washers 'Diesel No Change 0 2 No Change 0.00 Pumps 'Diesel ;Tier 4 Final 1 1 No Change 0.00 Rollers 'Diesel ;Tier 4 Final 2: 2 No Change Rough Terrain Forklifts 'Diesel ;Tier 4 Final 13: 13 No Change Rubber Tired Dozers 'Diesel 19Tier 4 Final 4: 4 No Change Rubber Tired Loaders Diesel ;Tier 4 Final 6 6 No Change 0.00 Scrapers Diesel 9VTier 4 Final 4 4 No Change Skid Steer Loaders Diesel iTier 4 Final 2 2 No Change 0.00 Sweepers/Scrubbers Diesel ;Tier 4 Final 8 8 No Change 'Diesel ITTier Tractors/Loaders/Backhoes 4 Final 11: 11 No Change 0.00 Trenchers ITier 4 Final 6:: 6 No Change 0.00 Welders 'Diesel 'Tier 4 Final 131 13:: No Change 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 13 Date: 6/1/2018 11:18 AM Equipment Type ROG NOx I CO S02 Exhaust PM10 Exhaust PM2.5 Bio- CO2 I NBio- CO2 I Total CO2 I CH4 N20 CO2e Unmitigated tons /yr Unmitigated mt/yr ........................................................................................................... ........ ........................ Aerial Lifts i 2.51100E -002 1 3.98560E -001 1 7.41410E -001 I 1.14000E -003 ............. ............................... i 7.54000E -003: 6.94000E -003 ; 0.00000E +000 i 9.99767E +001 ....... 9.99767E +001 i 3.23300E -002 ........................... 1 0.00000E +000 i 1.00785E +002 ........................... :........... ................. .......................... ................................................................................._............................ ................................ ...................... .......................... ......................... ............................... Air Compressors E 1.45050E -001 1 1.00800E +000 1.22291E +000 2.00000E -003 �........................ 6.12800E -002 6.12800E -002 ; 0.00000E +000 i 1.71855E +002 1.71855E +002 1.16700E -002 0.00000E +000 1 1.72147E +002 ...................... t........................... _........................ ........................... Bore /Drill Rigs 1.67500E -002 2.00130E -001 ' 1.32320E -001 6.00000E -004 5.99000E -003 5.51000E -003 ; 0.00000E +000 5.27169E +001 5.27169E +001 1.70500E -002 0.00000E +000 5.31431E +001 ................ I................................................... ............................... ..........................; .........................._ ......................................... .............. ........................... ........................... ........................... ,........................... Cement and i 1.26300E -002 1 7.91600E -002: 6.63000E -002 1.50000E -004 1 3.08000E -003 1 3.08000E -003 ; 0.00000E +000 i 9.85294E +000 9.85294E +000 I 1.02000E -003 i 0.00000E +000 i 9.87851 E +000 Mortar Mixers : ; 2.11953E +001 1.16000E - 003 0.00000E +000 2.12242E +001 ........................... ............................... Concrete/Industrial 6.27000E -003 4.94800E -002 5.53000E -002 9.00000E -005 2.97000E -003 2.97000E.003 0.00000E +000 8.06484E +000 8.06484E +000 5.10000E -004 0.00000E +000 8.07762E +000 I Saws ; 2.10000E -004 8.39000E -003 7.72000E -003: 0.00000E +000 '. 1.87295E +001 1.87295E +001 6.06000E -003 0.00000E +000 1.88809E +001 Cranes 3 1.12490E -001 1.31344E +000 5.44200E -001 1.59000E -003 5.34800E -002 4.92000E -002 : 0.00000E +000 E 1.40029E +002 1.40029E +002 4.52900E -002 0.00000E +000 1.41161 E +002 Crawler Tractors : 2.89000E -003 1 3.72400E -002 I 1.25000E -002 1 4.00000E -005 I 1.40000E -003 I 1.29000E -003 ! 0.00000E +000 : 3.44906E +000 1 3.44906E +000 I 1.12000E -003 1 0.00000E +000 1 3.47695E +000 1 Dumpers/Tenders E 6.01000E -003 3.80500E -002 .05400E -002 00000E -005 -003 1.43000E -003 0.00000E +000 4.52639E +000 J4.52639E +000 .90000E -004 853 .. .. ... .. .. E +000 . . ........................ ............................................................................._..................................................... .......................... .............................................. ............................ Excavators 210100E -002 2.00090E -001 2.94370E -001 4.70000E -004 9.70000E -003 8.92000E -003 ; 0.00000E +000 4.08374E +001 4.08374E +001 1.32100E -002 0.00000E +000 4.11676E +001 Forklifts i 1.26000E -003 1.13500E -002 1.03300E -002 1.00000E -005 8.50000E -004 7.80000E -004: 0.00000E +000 E 1.17505E +000 1 1.17505E +000 3.80000E -004 0.00000E +000 1 1.18455E +000 Generator Sets i 1.25100E -002 I 1.10820E -001 I 1.28960E -001 1 2.30000E -004 1 5.87000E -003 1 5.87000E -003 ; 0.00000E +000 2 1.97823E +001 1 1.97823E +001 I 1.01000E -003 1 0.00000E +000 1 1.98075E +001 Off - Highway 2.00640E -001 1.68278E +000 1.21855E +000 4.56000E -003 6.15000E -002 5.65800E -002 ; 0.00000E +000: 4.00791E +002 4.00791E +002 1.29620E -001 0.00000E +000 4.04032E +002 Trucks I j............................................................................. .......................................................................... Other General 1.19400E -002 1.11610E -001 1.21610E -001 .......................................................... ....................... ...................... ......... 1.60000E -004 7.24000E -003 6.66000E -003 +001 ............................... i 1.40343E +001 1 4.54000E -003 1 0.00000E +000 1.41477E +001 Industrial Equipment I...........................:.......................................................................................................................................................................... ................... .................................:........................... 1........................... s ............................... Paving Equipment; 2.06000E -002 2.02450E -001 2.89500E -001 4.60000E -004 9.90000E -003 9.11000E -003 ; 0.00000E +000 E 4.07058E +001 4.07058E +001 1.31700E -002 0.00000E +000: 4.10349E +001 ............................ ...................... ...................... ...................... ...................... ...................... .................. ......_........................ ...................... ...................... ...................... ...................... ...................... Plate Compactors 6.39000E -003 4.00500E -002 3.35400E -002 8.00000E -005 1.56000E -003 1.56000E -003 0.00000E +000: 4.98512E +000 4.98512E +000 5.20000E -004 0.00000E +000 4.99806E +000 ... ..... ..... ..... ..... ..... _.................... .... s ... ..... ..... ..... .......................... ... Pressure 8.20000E -004 5.76000E -003 4.61000E -003 1.00000E -005 2.60000E -004 2.60000E -004 0.00000E +000 6.73780E -001 6.73780E -001 7.00000E -005 0.00000E +000 6.75450E -001 Washers ........................ ...................... ...................... ...................... i... Pumps 1.42700E -002 1.20380E -001 1.40270E -001 ...................... ...................... ................. ......�........................ ... ..... 2.50000E -004 6.66000E -003 6.66000E -003 0.00000E +000 2.11953E +001 2.11953E +001 1.16000E - 003 0.00000E +000 2.12242E +001 Rollers 1.39000E -002 1.43580E -001 1.51490E -001 2.10000E -004 8.39000E -003 7.72000E -003: 0.00000E +000 '. 1.87295E +001 1.87295E +001 6.06000E -003 0.00000E +000 1.88809E +001 Rough Terrain 5.85700E -002 7.69630E -001 1.13019E +000 1.70000E -003 1 2.87200E -002 ( 2.64200E -002 ; 0.00000E +000 ' 1.49311E +002 1.49311E +002 1 4.82900E -002 1 0.00000E +000 1.50518E +002 Forklifts i ................ .•....................... ............................... ........... p........................ .............................., ...... ------------------ ---,........................ ... Rubber Tired 7.34300E -002: 7.70970E -001: 3.00960E -001: 6.80000E -004: 3.70100E -002: 3.40500E -002 ; 0.00000E +000: 6.00300E +001: 6.00300E +001: 1.94100E -002: 0.00000E +000: 6.05153E +001 Dozers CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 13 Date: 6/1/2018 11:18 AM Rubber Tired i 2.05100E -002 i 2.35950E -001 i 9.28500E -002 i 3.60000E -004 i 7.85000E -003 i 7.22000E -003 } 0.00000E +000 i 3.15690E +001 i 3.15690E +001 i 1.02100E -002 i 0.00000E +000 i 3.18242E +001 Loaders } ....................... ........:.............. ............... ............................... ....... ..............................: 1 I l 0 : 4 I -002 0.00000E +000 4.82544E +001 I..4.11850E-001..I..2. 425 0E -001 .50000E - 1.605 56100 4.86446E +001 Scrapers 3.51400E -0 0 0 0 0 ........................... ------------------------ ------------------------ ........................................... ... ........................... ..................••• ••••••• ....................................................... ............................ • •• •••••••••••••••••••• ..................••• ...................... Skid Steer i 4.05000E -003 1 5.40000E -002: 7.80800E -002 I 1.20000E -004 1 2.09000E -003 i 1.92000E -003 ; 0.00000E +000 E 1.02225E +001: 1.02225E +001 1 3.31000E -003 i 0.00000E +000 i 1.03052E +001 Loaders Sweepers /Scrubb E 4.30500E -002 1 3.91760E -001 3.87360E -001 1 5.10000E -004 1 2.79300E -002 1 2.57000E -002 ; 0.00000E +000 E 4.46376E +001 1 4.46376E +001 I 1.44400E -002 1 0.00000E +000 1 4.49985E +001 ers ; .............................................................................................................................................................................................:......... ................................................................................................ ...:........................... Tractors /Loaders/ 3.02300E -002 1 3.05960E -001 3.69600E -001 5.10000E -004 1 1.78900E -002 1 1.64600E -002 ; 0.00000E +000 4.47111E +001 4.47111 E +001 1.44600E -002 1 0.00000E +000 4.50726E +001 Backhoes..J..... ........ ...� ........................... J......................... ..9...........................' ° ........................ ........................... 1........................ ...:........................... I ......................... Trenchers i 3.25100E -002 1 2.98530E -001 E 2.21540E -001 2.90000E -004 i 2.16800E -002 i 1.99400E -002 ; 0.00000E +000: 2.52092E +001. 2.52092E +001 1 8.15000E -003 i 0.00000E +000 i 2.54131E +001 ............................... : . - - - --. ; ......... .. ........................ Welders 2.41560E -001 1.22008E +000 i 1.39540E +000 i 2.08000E -003 E 5.84200E -002 E 5.84200E -002 ; 0.00000E +000 E 1.53282E +002 i 1.53282E +002: 1.95800E -002 i 0.00000E +000 i 1.53772E +002 Equipment Type ROG NOx I CO S02 Exhaust PM10 I Exhaust PM2.5 Bio- CO2 I NBio- CO2 I Total CO2 I CH4 I N20 I CO2e Mitigated tons /yr Mitigated mt/yr ................................................................................................................ ............................... ................... ....................... ............................... ................................................... Aerial Lifts i 2.80100E -002 6.39600E -001 8.63690E -001 1.14000E -003 1.87000E -003 1.87000E -003 ; 0.00000E +000 i 9.99766E +001 9.99766E +001 3.23300E -002 0.00000E +000 ' 1.00785E +002 ................................... ........................ ..................... . .......................... ........................... � .......................... :........................... ........................... ........................... ........................... ........................... Air Compressors i 2.00000E -002 8.66700E -002 1.23336E +000 2.00000E -003 2.67000E -003 2.67000E -003 ; 0.00000E +000 E 1.71855E +002 1.71855E +002 1.16700E -002 0.00000E +000 1.72147E +002 Bore /Drill Rigs E 7.45000E -003 3.23000E -002 2.73330E -001 6.00000E -004 9.90000E -004 9.90000E -004 ; 0.00000E +000 5.27168E +001 5.27168E +001 1.70500E -002 0.00000E +000 1 5.31431E +001 Cement and Mortar 1.26300E -002 1 7.91600E -002 1 6.63000E -002 1 1.50000E -004 1 3.08000E -003 1 3.08000E -003 ; 0.00000E +000 9.85293E +000 1 9.85293E +000 I 1.02000E -003 1 0.00000E +000 1 9.87850E +000 Mixers .... ............................... d; .................................................... ............. *; I ................. .. ........................ ......................... .. . -005 1.30000E -004 1.30000E -004 0.00000E +000 8.06484E +000 8.06484E +000 5.10000E -004 0.00000E +000 8.07761E +000 Saws ................................... ...... ......t .................... Cranes 0E -003 0.00000E +000 1.40029E +002 1.40029E +002 4.52900E -002 0.00000E +000 1.41161E +002 Concrete /Industrial 9.40000E -004 4.07000E -003 5.78800E -002 . 9.00000E Crawler Tractors 4.80000E -004 1 2.09000E -003 1.76900E -002 4.00000E -005 6.00000E -005 6.00000E -005 ; 0.00000E +000 • 3.44906E +000 1 3.44906E +000 1.12000E -003 0.00000E +000 3.47695E +000 ....................... Dumpers/Tenders i 6.01000E -003 3.80500E -002 2.05400E -002 6.00000E -005 1.43000E -003 1.43000E -003 ; 0.00000E +000 4.52638E +000 4.52638E +000 4.90000E -004 0.00000E +000 1 4.53853E +000 Excavators i 5.72000E -003 2.47800E -002 3.52620E -001 4.70000E -004 7.60000E -004 7.60000E -004: 0.00000E +000: 4.08373E +001 4.08373E +001 1.32100E -002 0.00000E +000 1 4.11675E +001 Forklifts 1 1.60000E -004 1 7.10000E -004 1 1.01600E -002 1 1.00000E -005 1 2.00000E -005 1 2.00000E -005 ; 0.00000E +000 1.17505E +000 1 1.17505E +000 1 3.80000E -004 1 0.00000E +000 1 1.18455E+0001 Generator Sets i 2.30000E -003 9.98000E -003 1.41970E -001 2.30000E -004 3.10000E -004 3.10000E -004 ; 0.00000E +000 i 1.97822E +001 1.97822E +001 1.01000E -003 0.00000E +000 1.98075E +001 i !, ................................................................................................................................... ..............................� ............................ .......................... .......................... .I- ........ .......................... ........................... :........................... Off - Highway Trucks i 5.58500E -002 2.42020E -001 2.04788E +000 4.56000E -003 7.45000E -003 7.45000E -003 ; 0.00000E +000 E 4.00790E +002 4.00790E +002 1.29620E -001 0.00000E +000 1 4.04031E +002 ......................... ..I...........................; ..........................; ..........................; ....................... ...:..........................; ..........................� .......................... :...........................:.......................... .................................. . ..................... ;........................... Other General 1.97000E -003: 8.56000E -003: 1.21790E -001: 1.60000E -004 2.60000E -004: 2.60000E -004 ; 0.00000E +000: 1.40343E +001 1.40343E +001: 4.54000E -003: 0.00000E +000: 1.41477E +001 Industrial Equipment; CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 13 Date: 6/1/2018 11:18 AM Paving Equipment i 5.72000E -003 i 2.47900E -002 i 3.52740E -001 i 4.60000E -004 i 7.60000E -004 i 7.60000E -004 0.00000E +000 i 4.07058E +001 i 4.07058E +001 i 1.31700E -002 i 0.00000E +000 i 4.10349E +001 Plate Compactors i 6.39000E -003 4.00500E -002 3.35400E -002 8.00000E -005 1.56000E -003 1.56000E -003 ; 0.00000E +000 i 4.98511 E +000 4.98511 E +000 5.20000E -004 0.00000E +000 i 4.99805E +000 ...................................:..........................................................................................••••••••••••••........................... Pressure Washers i 8.20000E -004 5.76000E -003 4.61000E -003 1.00000E -005 ............................... 2.60000E -004 ................................................................................................................................... 2.60000E -004 ; 0.00000E +000 i 6.73770E -001 6.73770E -001 7.00000E -005 ............................... 0.00000E +000 6.75450E -001 ............................ .................................................... Pumps i 2.47000E -003 . 1 1.06900E -002 ..................... 1 1.52110E -001 ...............•••••.. E 2.50000E -004 ........................................................ E 3.30000E -004: ....................... ................... 3.30000E -004 ; 0.00000E +000 E 2.11953E +001 ...................... E 2.11953E +001 ...................... E 1.16000E -003 ........................................................ 1 0.00000E +000 i 2.12242E +001 ...................................:..................................................................................................................................................................¢ ..........................:......................................................................................................... ...:........................... Rollers i 2.61000E -003 1........................... 1.13300E -002 1................................................................................................................................................................... 1.61180E -001 2.10000E -004 3.50000E -004 3.50000E -004 ; 0.00000E +000 1.87294E +001 1.............................................................................. 1.87294E +001 6.06000E -003 0.00000E +000 1.88809E +001 ...................................................... ............................... Rough Terrain i 2.08700E -002 1 9.04500E -002 E 1.28719E +000 1.70000E -003 E 2.78000E -003 E 2.78000E -003 ; 0.00000E +000 i 1.49311 E +002 E 1.49311 E +002 4.82900E -002 E 0.00000E +000 i 1.50518E +002 Forklifts : ; Rubber Tired Dozers: 8.36000E -003 3.62400E -002 3.06690E -001 6.80000E -004 1.12000E -003 1.12000E -003 0.00000E +000 i 6.00299E +001 6.00299E +001 1.94100E -002 0.00000E +000 1 6.05153E +001 ............................ ...................... ...................... ...................... ...................... ...................... ................. ...... ...................................................... ...................... ...................... ...................... ..................... Rubber Tired E 4.45000E -003 1.92700E -002 1.63050E -001 3.60000E -004 5.90000E -004 5.90000E -004 ; 0.00000E +000 i 3.15689E +001 3.15689E +001 1.02100E -002 0.00000E +000 1 3.18242E +001 Loaders ; ..:... ..... ..... ..... ............................. t ....................... ... ...... ... ..................... Scrapers 6.76000E -003 2.92800E -002 2.47780E -001 5.50000E -004 1 9.00000E -004 9.00000E -004 ; 0.00000E +000 4.82544E +001 4.82544E +001 1.56100E -002 0.00000E +000 4.86445E +001 ............................ .................. ¢........................ ...................... ...................... ...................... ...................... ..................... Skid Steer Loaders E 2.86000E -003 6.53800E -002 8.82800E -002 1.20000E -004 1.90000E -004 1.90000E -004 ; 0.00000E +000 i 1.02225E +001 1.02225E +001 3.31000E -003 0.00000E +000 1.03052E +001 .................................................................................................................................... .............................. ................................................. ............................... . ................................................. ............................... Sweepers/Scrubbers:, 1.24500E -002 2.84360E -001 3.83990E -001 5.10000E -004 8.30000E -004 8.30000E -004 ; 0.00000E +000 E 4.46375E +001 4.46375E +001 1.44400E -002 0.00000E +000 4.49984E +001 Tractors /Loaders /Ba E 6.22000E -003 2.69500E -002 3.83510E -001 5.10000E -004 8.30000E -004 8.30000E -004 ; 0.00000E +000 E 4.47110E +001 4.47110E +001 1.44600E -002 0.00000E +000 4.50725E +001 ckhoes .... ............................... .................................................................................................................................................................. .............................................................................................................•••.................. ............................... Trenchers E 3.51000E -003 1.52000E -002 2.16330E -001 2.90000E -004 4.70000E -004 4.70000E -004 ; 0.00000E +000 2.52092E +001 2.52092E +001 8.15000E -003 0.00000E +000 2.54130E +001 Welders 3.56800E -002: 8.17620E -001: 1.21900E +000: 2.08000E -003 2.38000E -003 ; 2.38000E -003 ; 0.00000E +000 1.53282E +002 1.53282E +002 1.95800E -002 ; 0.00000E +000 1.53772E +002 uipment Type ROG NOx CO S02 Exhaust PM10 I Exhaust PM2.5 Bio- CO2 I NBio- CO2 I Total CO2 I CH4 I N20 I CO2e Percent Reduction � .......................... ........................... 11........................... 11........................ ...1........................... t........................... 1....................... .... ....................................................... t........................... t........................ ...1........................... 1........................... Aerial Lifts : - 1.15492E -001 I - 6.04777E -001 1 - 1.64929E -001 1 0.00000E +000 1 7.51989E -001 1 7.30548E -001: 0.00000E +000 : 1.20028E -006 1 1.20028E -006 1 0.00000E +000 1 0.00000E +000 I 1.19065E -006 Air Compressors ? 8.62117E -001 1 9.14018E -001 I - 8.54519E -003 1 0.00000E +000 1 9.56430E -001 I 9.56430E -001 . 0.00000E +000 ' 1.16377E -006 1 1.16377E -006 1 0.00000E +000 1 0.00000E +000 I 1.16180E -006 Bore /Drill Rigs 5.55224E -001 8.38605E -001 - 1.06567E +000 0.00000E +000 8.34725E -001 8.20327E -001 ; 0.00000E +000: 1.13816E -006 1.13816E -006 0.00000E +000 0.00000E +000 1.31720E -006 Cement and Mortar E 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 ; 0.00000E +000: 1.01493E -006 1.01493E -006 0.00000E +000 0.00000E +000 I 1.01230E -006 Mixers '• ........ ...................... ...................... ...................... ...................... ...................... ................. ......t........................ ...................... ...................... ...................... ...................... ..................... Concrete /Industrial i 8.50080E -001 9.17745E -001 - 4.66546E -002 0.00000E +000 9.56229E -001 9.56229E -001 ; 0.00000E +000 i 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 I 1.23799E -006 Saws Cranes 8.25940E -001 9.35391E -001 - 3.19478E -001 0.00000E +000 9.51197E -001 9.46951E -001 ; 0.00000E +000 1.14262E -006 1.14262E -006 0.00000E +000 0.00000E +000 I 1.20430E -006 Crawler Tractors 8.33910E -001 9.43878E -001 - 4.15200E -001 0.00000E +000: 9.57143E -001 9.53488E -001 ; 0.00000E +000 0.00000E +000: 0.00000E +000: 0.00000E +000 ; 0.00000E +000 0.00000E +000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 13 Date: 6/1/2018 11:18 AM Dumpers/Tenders i 0.00000E +000 i 0.00000E +000 i 0.00000E +000 i 0.00000E +000 i 0.00000E +000 i 0.00000E +000 0.00000E +000 i 2.20927E -006 i 2.20927E -006 i 0.00000E +000 i 0.00000E +000 i 0.00000E +000 i........................... ........................... 1......................... ..ii......................•••-•' °F........................... 1......................... ..11..................... ......i ...9........................... Excavators E 7.27749E -001 ; 8.76156E -001 I - 1.97880E -001 1 0.00000E +000 1 9.21649E -001 1 9.14798E -001 : 0.00000E +000 i 1.22437E -006 I 1.22437E -006 1 0.00000E +000 1 0.00000E +000 I 1.21455E -006 Forklifts : 8.73016E -001 1 9.37445E -001 -02 E -001 9.74359E -001 0.00000E +000 0.00000E +000 0.00000E +000 E 0.00000E +000 0.00000E +000 .. .. . ...... ............. •••••••••••••••••••••••••••:...............................••••••••••••••••••.................................... ............................... .... ........................... .. . Generator Sets i 8.16147E -001 1 9.09944E -001 : - 1.00884E -001 E 0.00000E +000 E 9.47189E -001: 9.47189E -001 ; 0.00000E +000 E 1.01101E-006 E 1.01101E-006 E 0.00000E +000 1 0.00000E +000: 1.51458E -006 Off - Highway Trucks 7.21641E -001 8.56178E -001 - 6.80588E -001 0.00000E +000 8.78862E -001 8.68328E -001 ; 0.00000E +000 1.17268E -006 1.17268E -006 0.00000E +000 0.00000E +000 1.18803E -006 ................................... I........................... 1........................... 1...................................................... 1........................ ...1................... ........ ..................................................... 1...................................................... 1....................... ............................... Other General i 8.35008E -001 1 9.23304E -001 E - 1.48014E -003 0.00000E +000 E 9.64088E -001 E 9.60961E -001 ; 0.00000E +000: 1.42508E -006 E 1.42508E -006 0.00000E +000: 0.00000E +000: 7.06827E -007 Industrial Equipment! ; : ........................... t...................................................... ...................... ...................... ......... ..................... Paving Equipment : 7.22330E -001 8.77550E -001 - 2.18446E -001 0.00000E +000 9.23232E -001 9.16575E -001 ; 0.00000E +000: 9.82661E -007 9.82661E -007 0.00000E +000 0.00000E +000 I 1.21847E -006 ¢ ........................ ...................... ...................... ...................... ...................... ..... ..... ..... ............................. ... ;... Plate Compactors : 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 ; 0.00000E +000 2.00597E -006 2.00597E -006 0.00000E +000 0.00000E +000 1 2.00078E -006 ..................................................................................................................................................................¢.................................... ................................................................................................ ...:........................... Pressure Washers : 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000 0.00000E +000: 0.00000E +000 E 1.48416E -005 1.48416E -005 0.00000E +000 0.00000E +000: 0.00000E +000 Pumps : 8.26910E -001 9.11198E -001 - 8.44086E -002 0.00000E +000 9.50450E -001 9.50450E -001 ; 0.00000E +000 1.41541 E -006 1.41541E-006 0.00000E +000 0.00000E +000 1 9.42320E -007 : Rollers 1 8.12230E -001 1 9.21089E -001 I - 6.39646E -002 1 0.00000E +000 9 9.58284E -001 1 9.54663E -001 ; 0.00000E +000 I 1.06784E -006 I 1.06784E -006 1 0.00000E +000 1 0.00000E +000: 1.58891E -006 Rough Terrain E 6.43674E -001 8.82476E -001 - 1.38915E -001 0.00000E +000 9.03203E -001 8.94777E -001 ; 0.00000E +000 1.20554E -006 1.20554E -006 0.00000E +000 0.00000E +000 1.19587E -006 Forklifts ; .............................................................{ I........................... I ...................... .....{ I......................... ..jl........................... .......................... t...................................................... {...........................{ I................................ ...................... :........................... Rubber Tired Dozers: 8.86150E -001 1 9.52994E -001 - 1.90391E -002 1 0.00000E +000 1 9.69738E -001 9.67107E -001: 0.00000E +000 E 1.16608E -006 I 1.16608E -006 1 0.00000E +000 0.00000E +000 1.15673E -006 Rubber Tired : 7.83033E -001 9.18330E -001 0.00000E +000 9.24841 E -001 9.18283E -001 ; 0.00000E +000 1.26707E -006 1.26707E -006 1 0.00000E +000 1 0.00000E +000 1.25690E -006 Loadersi ...........................:I..-7.56058E-001.1 ....................................................:....................................................... r....................... ............................... ........................ 1................................................... ............................... ........ Scrapers E 8.07627E -001 1 9.28906E -001 1 6.23273E -002 1 0.00000E +000 1 9.43925E -001 1 9.39066E -001 ; 0.00000E +000 E 1.24341 E -006 1.24341E-006 1 0.00000E +000 1 0.00000E +000 1.23344E -006 .......... ............................ 1................................................... ........... . ............... ..-......:1.................... ¢.......................... :i ...........................1..................................0....0....0................................. .... .. .:......................... 827E -001 - 2.10741E -001 - 1.30635E -001 0.00000E +000 9.09091E -001 9.01042E -001 0.00000E +000 9.78233E -007 9.78233E -007 0.00E +000 0.00000E +000 9.70388E -007 ......................................................................................................................... .......... .......................... ........................... ........................... ;........................... Sweepers /Scrubbers: 7.10801E -001 2.74147E -001 8.69992E -003 0.00000E +000 9.7028.3.E -00. 1..: 9.67704E -001 0.00000E +000 1.12013E -006 1.12013E -006 0.00000E +000 0.00000E +000 1.33338E -006 Skid Steer Loaders 2.93 Tractors /Loaders /Ba 7.94244E -001 9.11917E -001 - 3.76353E -002 0.00000E +000 9.53605E -001 9.49575E -001 0.00000E +000 1.11829E -006 1.11829E -006 0.00000E +000 0.00000E +000 1.10932E -006 ckhoes 033E -001 9.49084E -001 2.35172E -002 0.00000E +000 9.78321'E' .78321 E 001 000000E +000 1.19004E -006 1.19004E -006 0.00000E +000 0.00000E +000 I 1.18050E -006 . .......................... 1 . .. ..............1. ........... .......................... ............................... ........................ ......................... 1....................... .... ........................... Trenchers 8.92 . Welders : 8.52293E -001: 3.29864E -001: 1.26415E -001 : 0.00000E +000: 9.59261E -001: 9.59261E -001 :O.00000E +000: 1.17430E -006: 1.17430E -006 : 0.00000E +000: 0.00000E +000: 1.17057E -006 Fugitive Dust Mitigation Yes /No Mitigation Measure Mitigation Input Mitigation Input Mitigation Input CaEEk4odVernon: CaEEK4od.2018.3.2 Page 7 o 13 Date: 8/1/2018 11:18 AM No ::Soil Stabilizer for unpaved ::PM10 Reduction 0.00:: PM2.5 Reduction Roads No :Replace Ground Cover of �PM10 Reduction 0.001 PM2.5 Reduction :Area Disturbed Yes Water Exposed Area �PM`10 Reduction 55.00, 'PM2.5 Reduction No :::Unpaved Road Mitigation 'Moisture Content' 0.001 Vehicle Speed No ::Clean Paved Road N PM Reduction:: 0.00: 55.00:: Frequency (per 2.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 8 of 13 Date: 6/1/2018 11:18 AM Unmitigated Mitigated Percent Reduction Phase Source PM10 PM2.5 PM10 PMZ� PM10 PM2.5 Demolition Fugitive Dust 0.02 0.001 0.01 i 0.00! 0.55 0.57 ................................................................... Demolition ......................................................... Roads .................................. 0.01 . ............................... ........................................... 0.00: ...................................................................................... 0.011 0.001! 0.00 ..................................... 0.00 .................................................................. Landscaping and Site Improvements j ......................................................... Fugitive Dust .................................. 0.00 . ..................................... ........................................... 0.001 . . ....................... 0. 00 .................................... 0.001! 0.00 ..................................... 0.00 ............................................................................................................................................................... Landscaping and Site Improvements Roads 0.01 ................................................................................... 0.001 ............................... 0.01 . ................................... 0.001! 0.00 ..................................... 0.00 .................................................................. Office Building Core Construction Fugitive Dust .......... 0.00 ............... 0�00: 0.001 0.001! ....................... 0.00 ..................................... 0.00 ............................................................................................................................ .................................. . ............................... ........................................... ................ ................................... ..................................... Office Building Core Construction Roads 0.16 0.041: 0.16 0.041 0.00 0.00 ................................................... Office Building Exterior Improvements ................................................ Fugitive Dust 0.00 . .......................................................................... 0.001 ... 0.00 ............................. 0.001 0.00 ..................................... 0.00 .................................................................................................................. Office Building Exterior Improvements Roads ........... 0.00 ........................................... 0.001! .......................................... 0.00 1 . . ............................. 9 0.00 ..................................... 0.00 .................................................................. Office Building Tenant Improvements ....... ********* ................. Fugitive Dust .................................. 0.00 ................................................................................... 0.001 . ...................... . ..... .............. 0.00 ............................ 0.001 ....... 0.00 ..................................... 0.00 .................................................................................................................. Office Building Tenant Improvements Roads ......... *11- ................. 0.02 .................................................................................. 0.001: ................................................. 0.02 ................................... 0.001! 0.00 ..................................... 0.00 .................................................................. ................................................ ................................................................................. ...... . ........................................................................... ..................................... Office Building Underground Fugitive Dust 0.00 0.001 0.004 0.001! 0.00 0.00 ............................................................................................................................................................... Office Building Underground Roads 0.00 ......................................................................................... 0.001 . ... ... . ....... 0.001 ................ 0.00! . ............ 0.0 ..................................... 0.00 .................................................................. Parking Garage Core Construction ................................................ Fugitive Dust 0.00 . ................................................................................................................................................................. 0.001 0.001 0.00! 0.00 ..................................... 0.00 .................................................................. j ......................................................... .................................. . ................................... ........................................... . ..................... ................................... ..................................... Parking Garage Core Construction Roads 0.02 0.011 0 0.011 0.00 0.00 .................................................................. Parking Garage Exterior Improvements ................................................ Fugitive Dust 0.00 . ...................................................................... 0.001 .............. 0.00 1 . ................................... 0.001! 0.00 ..................................... 0.00 .................................................................. Parking Garage Exterior Improvements ............................................................................................ 2,Roads 0.00 ..... ............................................................................................. 0.001 0.00 1 ................................... 0.001! 0.00 ..................................... 0.00 .................................................... ...... ............................................................................................ ................................................................................. ............. .... ................................................................... ..................................... Parking Garage Underground Fugitive Dust 0.00 0.001 0.001 0.00: 0.00 0.00 ................................................... Parking Garage Underground ................................................ Roads 0.00 ................................................................................ 0.001 ....... - -------------- 0 0. 01 . .. . ............................. 0.001 0.00 ..................................... 0.00 .................................................................................................................. Site Prep and Make Ready Fugitive Dust 0.06 ............................................... 0.011 . ............ - ............................. ............................... 0.03 1! 0.00 0.55 ..................................... 0.55 ............................................................................................................................ Site Prep and Make Ready Roads .................................. 0.00 . ... . .... . ...................................... 0.001! .... 0.00 ................................... 0.00 0.00 ..................................... 0.00 ............................................................................................................................................................... Soils AbatementlRemove/Replace Fugitive Dust 0.00 . ............................... ......................................... 0.00! 0.00 0.00 ............ 0.541 ..................................... 0.55 .................................................................. Soils Abatement/Remove/Replace ................................................ Roads 0.011 . ........................................... 0.001 ..................................................................................... 0.01 0.00:: 0.00:: .............................. ....... 0.00 CaIEEMod Version: CalEEMod.2016.3.2 Page 9 of 13 Date: 6/1/2018 11:18 AM Operational Percent Reduction Summary Category ROG I NOx I CO I S02 Exhaust PM10 I Exhaust PM2.5 I Bio- CO2 I NBio- CO2 I Total CO2 CH4 I N20 I CO2e Percent Reduction ............................. No :Land Use :Improve Walkability Design . ............................... 0.00; ........................ ............ ............................... No .........................................................................................................------------------...................................... �----------------------------------.. .................,...... .............------------...... Architectural Coating 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 7 --------------- --- 0.00: .................. . .................. 0.00: 0.00: .................. 0.00 e ..... ---------- .......................... :Land Use --------- ....... ......................................................................................................... ;Increase Transit Accessibility Consumer Products 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 e .................................................. ............................... .............................------------------------------------------------------------------------......------------------------------------........................................................ .................. : Land Use 11-and Use SubTotal Electricity 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 .................................................................... ............................... ............ ............ ............ ............ ............ .. .............. *............ ............ ............ ............ ...................................... Hearth 0.00: 0.00: 0.00: 0.00: 0.00: 0.00" 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 e .................................................................... ............................... ............ ............ .............. Landscaping 0.00: 0.00: 0.00: 0.00: 0.00: 0.00" 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 e ... ... ... .. Mobile 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 9 Natural Gas 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00 ....................................................................................................................................................................................„.................. ........................................................................:..................:..... Water Indoor 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: 0.00: ............................... 0.00: 0.00 ... ...... ...... ...:... ...:... ...:.................. :... y .............. ....... ...... ...... ....... .... ............. .. e Water Outdoor 0.00: 0.00; 0.00; 0.00; 0.00; 0.009 0.00; e 0.00; 0.00; 0.00: 0.00; 0.00 Operational Mobile Mitigation Project Setting: Mitigation Category Measure % Reduction Input Value 1 Input Value 2 Input Value No ::Land Use Increase Density 0.00; ................................................................................................................ No. Land Use ............................... ................................................................................................................------------........................................... ........................... Increase Diversity 0.09 0.301 ............................... ............................. No :Land Use :Improve Walkability Design . ............................... 0.00; ........................ ............ ............................... No :Land Use ;Improve Destination Accessibility 0.00 ...... ............................... ............................... .............................� No ..... ---------- .......................... :Land Use --------- ....... ......................................................................................................... ;Increase Transit Accessibility ........................................... 0.25 ------------------------------------ - - - - -- .................................................. ............................... ............................. No --------------------------------------------------..........................................................---------------........................................... :Land Use :Integrate Below Market Rate Housing ............................... ------------------------------------ - - - - -- 0.00; .................................................. ............................... .............................------------------------------------------------------------------------......------------------------------------........................................................ .................. : Land Use 11-and Use SubTotal ............................... ------------------------------ - - - - -- 0.00; ............ ............................... CaEEk4od Version: CaEEK4od.2018.3.2 Page 10of13 Date: 8/1/201811:18AM No ::Neighborhood Enhancements ::Improve Pedestrian Network No ::Neighborhood Enhancements ::Provide Traffic Calming Measures No Neighborhood Enhancements Implement NEV Network 0.001 Neighborhood Enhancements ::Neighborhood Enhancements Subtotal 0.001 No ::Parking Policy Pricing :Limit Parking Supply 0.00, No :Parking Policy Pricing :Unbundle Parking Costs 0.00 No Parking Policy Pricing :,On-street Market Pricing 0.00 ::Parking Policy Pricing ::Parking Policy Pricing Subtotal 0.001 No :Transit Improvements I Provide BRT System No :Transit Improvements :Expand Transit Network 0.00 No :Transit Improvements ::Increase Transit Frequency 0.001: ::Transit Improvements ::Transit Improvements Subtotal 0.001! land Use and Site Enhancement Subtotal 0.001! No ::Commute ::Implement Trip Reduction Program No :Commute ::Transit Subsidy No Commute ::Implement Employee Parking "Cash Out" No ::Commute Workplace Parking Charge No Commute :Encourage Telecommuting and Alternative 0.00:: :Work Schedules No ::Commute Warket Commute Trip Reduction Option 0.00 No ::Commute ::Employee Vanpool/Shuttle 0.00 2.00:: No ::Commute ::Provide Ride Sharing Program :Commute Commute Subtotal 0.001! CaIEEMod Version: CalEEMod.2016.3.2 Page 11 of 13 Date: 6/1/2018 11:18 AM No :School Trip :Implement School Bus Program 0.00 Total VMT Reduction Area Mitigation 1 �� Measure Implemented Mitigation Measure Input Value No :Only Natural Gas Hearth : ° .............................................................. No . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. No Hearth :................................................................................................................ . . ............ . ... . . . . . . ............. ............................... . ............................................................. No :Use Low VOC Cleaning Supplies :................................................................................................................ ..................................................................... ............................................................. No € Use Low VOC Paint (Residential Interior) :................................................................................................................ ..................................................................... 100.00 ............................................................. No Use Low VOC Paint (Residential Exterior) ..................................................................... 150.00 ....................................................................................................................................................................................................... ........... No € Use Low VOC Paint (Non - residential Interior) :................................................................................................................ ............................... 100.00 ............................................................. No : Use Low VOC Paint (Non - residential Exterior) :................................................................................................................ ..................................................................... 150.00 ............................................................. No ::Use Low VOC Paint (Parking) :................................................................................................................ ..................................................................... 150.00 ............................................................. No :% Electric Lawnmower ..................................................................... ....................................................................................................................................................................................................... ............. No : % Electric Leafblower ............................... ....................................................................................................................................................................................................... ............. No : % Electric Chainsaw ............................... Energy Mitigation Measures Measure Implemented Mitigation Measure Input Value 1 Input Value 2 No :Exceed Title 24 .......................................................................................................................... ............................................................................ ....,....... ............................... No :Install High Efficiency Lighting No :On -site Renewable CaIEEMod Version: CalEEMod.2016.3.2 Page 12 of 13 Date: 6/1/2018 11:18 AM Appliance Type Land Use Subtype % Improvement ClothW asher 30.00 ................................ ............................... ................................. .......................... . . . .. ............................ ............................... DishWasher 15.00 ................................ ............................... ............................................................................................. ............................... Fan 50.00 .................................. ............................... ............................................................................................... ............................... Refrigerator 15.00 Water Mitigation Measures Measure Implemented Mitigation Measure Input Value 1 Input Value 2 No ;Apply Water Conservation on Strategy ....................................................................................................................................................................................................... .................. No € Use Reclaimed Water ............................... ..................................................................................................................................................................... No ....... :Use Grey Water .......................................:....... ............................... ............................................................:................................................................................. No ......................... . . . . .. :Install low -flow bathroom faucet :................................................................................................................ .......................................:....... ............................... 32.00: ............................................................ No :Install low -flow Kitchen faucet ....................................... ....... ............................... 18.00: ............................................................:.......................................................................................................... No . . . . .. :Install low -flow Toilet .......................................:....... ............................... 20.00: ............................................................:................................................................................. No ......................... . . . . .. :Install low -flow Shower :................................................................................................................ .......................................:....... ............................... 20.00: :...................................... ............................................................ No :Turf Reduction ....................................... ..................................................................................................................................................................... No . . . . .. :Use Water Efficient Irrigation Systems ............................................... ............................... 6.10: ................................................................................................................................................................................... No :Water Efficient Landscape ............................... .. ............................... Solid Waste Mitigation Mitigation Measures Input Value CalEEMod Version: CalEEMod.2016.3.2 Page 13 of 13 Date: 6/1/2018 11:18 AM Institute Recycling and Composting Services Percent Reduction in Waste Disposed