HomeMy WebLinkAbout2003-09-24 e-packetAGENDA
REDEVELOPMENT AGENCY
CITY OF SOUTH SAN FRANCISCO
REGULAR MEETING
MUNICIPAL SERVICE BUILDING
COMMUNITY ROOM
SEPTEMBER 24, 2003
7:00 P.M.
PEOPLE OF SOUTH SAN FRANCISCO
You are invited to offer your suggestions. In order that you may know our method of conducting Agency
business, we proceed as follows:
The regular meetings of the Redevelopment Agency are held on the second and fourth Wednesday of
each month at 7:00 p.m. in the Municipal Services Building, Community Room, 33 Arroyo Drive, South
San Francisco, California.
Public Comment: For those wishing to address the Board on any Agenda or non-Agendized item, please
complete a Speaker Card located at the entrance to the Community Room and submit it to the Clerk.
Please be sure to indicate the Agenda Item # you wish to address or the topic of your public comment.
California law prevents Redevelopment Agency from taking action on any item not on the Agenda
(except in emergency circumstances). Your question or problem may be referred to staff for investigation
and/or action where appropriate or the matter may be placed on a future Agenda for more comprehensive
action or a report. When your name is called, please come to the podium, state your name and address for
the Minutes. COMMENTS ARE GENERALLY LIMITED TO FIVE (5) MINUTES PER SPEAKER. In
the event that there are more than six persons desiring to speak, the Chair may reduce the amount of time
per speaker to three (3) minutes. Thank you for your cooperation.
The Clerk will read successively the items of business appearing on the Agenda. As she completes
reading an item, it will be ready for Board action.
KARYL MATSUMOTO
Vice Chair
RICHARD A. GARBARINO, SR.
Boardmember
BEVERLY BONALANZA-FORD
Investment Officer
MICHAEL A. WILSON
Executive Director
PEDRO GONZALEZ
Chairman
JOSEPH A. FERNEKES
Boardmember
RAYMOND L. GREEN
Boardmember
SYLVIA M. PAYNE
Clerk
STEVEN T. MATTAS
Counsel
PLEASE TURN OFF CELL PHONES AND PAGERS
HEARING ASSISTANCE EQUIPMENT IS AVAILABLE FOR USE BY THE HEARING-IMPAIRED AT REDEVELOPMENT AGENCY MEETINGS
CALL TO ORDER
ROLL CALL
AGENDA REVIEW
PUBLIC COMMENTS
CONSENT CALENDAR
1. Motion to approve the minutes of September 10, 2003
2. Motion to confirm expense claims of September 24, 2003
ADJOURNMENT
REGULAR REDEVELOPMENT AGENCY MEETING SEPTEMBER 24, 2003
AGENDA PAGE 2
AGENDA
CITY COUNCIL
CITY OF SOUTH SAN FRANCISCO
REGULAR MEETING
MUNICIPAL SERVICE BUILDING
COMMUNITY ROOM
SEPTEMBER 24, 2003
7:30 P.M.
PEOPLE OF SOUTH SAN FRANCISCO
You are invited to offer your suggestions. In order that you may know our method of conducting
Council business, we proceed as follows:
The regular meetings of the City Council are held on the second and fourth Wednesday of each month at
7:30 p.m. in the Municipal Services Building, Community Room, 33 Arroyo Drive, South San
Francisco, California.
Public Comment: For those wishing to address the City Council on any Agenda or non-Agendized item,
please complete a Speaker Card located at the entrance to the Council Chamber's and submit it to the
City Clerk. Please be sure to indicate the Agenda Item # you wish to address or the topic of your public
comment. California law prevents the City Council from taking action on any item not on the Agenda
(except in emergency circumstances). Your question or problem may be referred to staff for
investigation and/or action where appropriate or the matter may be placed on a future Agenda for more
comprehensive action or a report. When your name is called, please come to the podium, state your
name and address for the Minutes. COMMENTS ARE GENERALLY LIMITED TO FIVE (5)
MINUTES PER SPEAKER. In the event that there are more than six persons desiring to speak, the
Mayor may reduce the amount of time per speaker to three (3) minutes. Thank you for your cooperation.
The City Clerk will read successively the items of business appearing on the Agenda. As she completes
reading an item, it will be ready for Council action.
PEDRO GONZALEZ
Mayor
KARYL MATSUMOTO
Mayor Pro Tem
JOSEPH A. FERNEKES
Councilman
RICHARD A GARBARINO, SR.
Councilman
RAYMOND L. GREEN
Councilman
BEVERLY BONALANZA-FORD
City Treasurer
SYLVIA M. PAYNE
City Clerk
MICHAEL A. WILSON
City Manager
STEVEN T. MATTAS
City Attorney
PLEASE TURN OFF CELL PHONES AND PAGERS
HEARING ASSISTANCE EQUIPMENT AVAILABLE FOR USE BY THE HEARING IMPAIRED AT CITY COUNCIL MEETINGS
CALL TO ORDER
ROLL CALL
PLEDGE OF ALLEGIANCE
INVOCATION
PRESENTATIONS
· Beautification Awards - Committee member Saundra Nichols
· Families on Track - Ms. Julene Hunter Johnson, Executive Director
· Colma Creek Update - Public Works Director John Gibbs
· Caltrain Station and Linden Grade Separation Project Update - Public Works Director John
Gibbs
AGENDA REVIEW
PUBLIC COMMENTS
ITEMS FROM COUNCIL
· Community Forum
· Subcommittee Reports
CONSENT CALENDAR
1. Motion to approve the minutes of September 10, 2003
2. Motion to confirm expense claims of September 24, 2003
Motion to approve recommendation for loan art pieces at the Orange Memorial Park
Sculpture Garden
Motion to approve ordinance to amend the contract with the Board of Administration,
California Public Employees' Retirement System (PERS), to provide Section 21354.5
(2.7% at 55 full and modified formula) for local miscellaneous members
o
Acknowledgement of proclamation issued to Rose C. (Sousa) Kennedy, 98th birthday,
September 9, 2003
PUBLIC HEARING
Resolution authorizing submittal of the 2002-2003 Consolidated Annual Performance
and Evaluations Report to the Department of Housing and Urban Development
ADMINISTRATIVE BUSINESS
7. Discussion: Noise Analysis Report for Sister Cities Boulevard and sound wall design
REGULAR CITY COUNCIL MEETING
AGENDA
SEPTEMBER 24, 2003
PAGE 2
Resolution supporting AB 1546 to support programs that address the impact of
automobiles
o
Reimbursement resolution authorizing the Wet Weather Program (Phases 1 through 5)
for the approved $45 million State Revolving Fund (SRF) loan as required by the State
Water Resources Control Board
10.
Motion to approve an addendum to the John Carollo Engineers contract to design and
produce all contract documents for the Lindenville Storm Drain Rehabilitation Project in
the amount of $400,000
ADJOURNMENT
REGULAR CITY COUNCIL MEETING
AGENDA
SEPTEMBER 24, 2003
PAGE 3
SOUTH SAN FRANCISCO
INFORMATION MEETING
WEDNESDAY, SEPTEMBER 24, 2003
CITY OF SOUTH SAN FRANCISCO
PENINSULA CORRIDOR JOINT POWERS BOARD (JPB)
CALTRAIN
CALTRAIN SERVICE IMPROVEMENTS - NEXT 5 YEARS
· 8 to 12 Daily Express Trains (Baby Bullets)
· Improved Schedule Of All Other Trains
· New Express Train Rolling Stock (Cars and Locomotives)
· 82 to 92 Daily Trains (78 Currently)
· Resume Weekend Service
· New Schedule, Express Service, Weekend Service - Spring 2004
CALTRAIN INFRASTRUCTURE IMPROVEMENTS- NEXT 5 YEARS
North and South CTX - Complete (by Spring 2004)
· New Stations at Bayshore and Lawrence
· Lengthen and Widen Colma Creek Bridge
· North and South 4-Track Segment For Overtakes
· New Signal System (Remote Controlled Dispatch, and Switches)
· Rehabilitate, Reconstruct Existing Tracks
· Replace all Jointed Rail with Continuous Welded Rail (by Spring 2004)
South San Francisco, South Linden, San Bruno Grade Separations
· Extend North CTX 4-Track Segment through South San Francisco to San Bruno
· Grade Separate South Linden, Scott, San Bruno, San Mateo, and Angus
· New Stations at South San Francisco and San Bruno
2
SOUTH SAN FRANCISCO STATION
LOOKING TOWARD PARKING
SOUTH SAN FRANCISCO
LOOKING SOUTH
3
II
SOUTH LINDEN AVENUE
LOOKING EAST
SOUTH LINDEN AVENUE
LOOKING WEST
5
SOUTH LINDEN AVENUE
LOOKING SOUTH
Project Study Report - A report that summarizes the project scope, budget,
schedule, and key relevant issues to construct the station, grade separation, 4-
track alignment including all other associated work. The report documents the
outcome of collaboration between JPB and various stake holders including the
City of South San Francisco, businesses, community and others.
6
SOUTH SAN FRANCISCO
SOUTH SAN FRANCISCO STATION
· Station access improvements
· Grade separated pedestrian crossing (undercrossing or overcrossing)
· Other improvements (Safety, Parking, Station Amenities)
· Incorporates City's long term plan
· Stakeholders (UPRR, Caltrans Maintenance Facility)
SOUTH LINDEN AVENUE GRADE SEPARATION
· Grade Separation Alternatives
· Scott Street grade separated pedestrian crossing (City of San Bruno)
4-TRACK ALIGNMENT
· 4-Track alignment from Tunnel Avenue (Brisbane) to Scott Street (San
Bruno) - 4 miles
· UPRR yard tracks rearrangement (SSF yard)
· UPRR tracks reconfiguration (Colma Creek to South Linden Avenue)
· UPRR team tracks relocation (Dubuque Avenue to UPRR property at Colma
Creek)
7
BAYSHORE STATION & 4-TRACK ALIGNMENT
(SAN FRANCISCO- BRISBANE)
NORTH END PROJECT LIMIT
(BRISBANE)
PROPOSED 4-TRACK ALIGNMENT
(BRISBANE)
PROPOSED 4-TRACK ALIGNMENT
(BRISBANE)
PROPOSED 4-TRACK ALIGNMENT
(BRISBANE / South San Francisco)
PROPOSED 4-TRACK ALIGNMENT
(South San Francisco)
PROPOSED 4-TRACK ALIGNMENT
(SOUTH SAN FRANCISCO)
PROPOSED 4-TRACK ALIGNMENT
(SOUTH SAN FRANCISCO)
UPPR YARD TRACKS
(SOUTH SAN FRANCISCO)
SOUTH SAN FRANCISCO STATION
SOUTH SAN FRANCISCO STATION
LOOKING SOUTH
PEDESTRIAN ENTRANCE TO PROPOSED
SOUTH SAN FRANCISCO STATION
22
SOUTH SAN FRANCISCO STATION
SOUTH SAN FRANCISCO STATION
ACCESS IMPROVEMENT
· Pedestrians through Caltrans Maintenance Facility (Corner of Grand Ave and South
Airport Blvd)
· Shuttle Bay/Drop-Offs on the east side adjacent to Executive Drive
· Grade Separated Pedestrian Crossing (Underpass or Overpass)
· Ease of access and connected to downtown
STATION AMENITIES
· 700' long outboard platforms with center fence
· Well lit, canopies, TMV, PA, VMS
· More parking, paved
PEDESTRIAN CROSSING
· Underpass or overpass crossings
· Underpass: 20' Wide, 10' high, well lit
· Overpass: over 25' high, 350 ft long ramp each side
JPB MINI SURVEY(JULY '03)
· Overwhelming support for new station at new location, and for modern with grade
separated crossing
· 40% preference for overpass, 30% for underpass; remaining no preference
24
NEW SOUTH SAN FRANCISCO STATION
' T
25
COMFORT SUITI=$
/-- 'SIDEWALK
EXECUTIVE DR.
PETRINI VAN STORAGiE
. ~.
EAST GRAND AVENUE MODIFICATION - ALTERNATIVE 2
NO LAND ACQUISITION REQUIRED
26
PEDESTRIAN OVERPA55
' /--CENTER FENCE
N ORTHBOUNO --J SOU TH BOUND'-~
pLA'R='ORM 131 A'F'FORM
' ,'- PLATFORM
CANOPY
SIDEWALK
~---STAIRS
I OOKING SOUTH
GRADE SEPARATED PEDESTRIAN CROSSING
OVERPASS OPTION
28
EXECUTIVE
DRIVE
ADA RAMP
/--PLATFORM
LIGHTING
/ fPLATFORM CANOPY
/ / ~--NORTHBOUND PLA~TORM
:^NOPY / / /t' 1§°'' I' 20' I' 15'. I --~SO~B/~ND
~ / /UT3 u~ MT2 MT4 r~ .....
. :.' '~'-r-ii r'-:~-:i i .... !
~- ~ i- ....... i ~- .... i i t ! ADA
- ·; i i. - - ~---C-~'N'~'.
· KI~$ I~ ,1~ PEDESTRIAN LII~I)~:tPASS LIGHT (TYP)
STAIRS
LOOKING SOUTH
SCALE:: 1' = 40'
GRADE SEPARATED PEDESTRIAN CROSSING
UNDERPASS OPTION
29
PROPOSED 4-TRACK ALIGNMENT
(SOUTH SAN FRANCISCO)
PROPOSED LOCATION FOR UPRR TEAM
TRACKS (SOUTH SAN FRANCISCO)
UPRR Team Tracks/Dock - Proposed Location
~POA BEALE
- t
I
!
I
32
ENTRANCE TO PROPOSED UPRR TEAM TRACKS / DOCK
33
EXIT OF PROPOSED UPRR TEAM TRACKS / DOCK
34
PRPOSED 4-TRACK ALIGNMENT
(SOUTH SAN FRANCISCO)
UPRR SPUR TRACKS
(SOUTH SAN FRANCISCO)
SOUTH LINDEN AVENUE
(SOUTH SAN FRANCISCO)
SOUTH LINDEN AVENUE GRADE SEPARATION
Alternatives Investigated:
Alternative No. I - Underpass (Railroad at grade, Lower Roadway 30 ft)
Not Feasible: - Major impacts to driveways
- Ground water
Alternative No. ;2 - Overpass (Railroad at grade, Raise Roadway 30 ft)
Not feasible: - Loss of adjacent businesses and other properties
- Appearance of Freeway
Alternative No. 3 - Underpass (Roadway at grade, Raise Railroad 20 ft)
Not Feasible: - Major impacts to UPRR spur tracks
- Additional road bed load to Colma Creek Bridge
Alternative No. 4 - Overpass (Roadway at grade, Lower Railroad 30 ft)
Not Feasible: - Can not lower Colma Creek Bridge
- Impact Scott Street
- Ground water
Alternative No. 5 - Combination (Raise Railroad 3 ft, Lower roadway 17 ft)
Currently under consideration
- Minimal impacts to some driveways
- Potential ground water
Alternative No. 6- Combination (Raise Railroad 9-12 ft, Lower roadway 8-11 ft)
Currently under consideration
- No impacts to driveways or businesses
- Walls
- Additional property take (UPRR on west side) is required
- Above ground water table
[Note: The roadway has about 4 ft hump across the tracks]
POTENTIAL IMPACTS DURING CONSTRUCTION - Temporary closure of South Linden Avenue
- UPRR spur tracks
- Some driveways
38
STRUCTURAL
................ ~-' ...... i;;;~
L~ P~T
LOW ~T
~ ~k - ~11~
~ 7~ 5+00 ~ 1~ ll+DO
~ POINT BEV - 13.60
HI,~t POINT 5'rA =
PM STA = 12,68.45
PM ~ - 13.77
t. 9~,<X2 V~ .t
134-(:0
SOUTH LINDEN AVENUE GRADE SEPARATION
ALTERNATIVE NO. 5
39
OF' RAIL 50.02: o
BRIDGE: o ~
ST~UCru~^~ ,~
e -1.fl ~,00%. e
,,,' ~ ~POINTELEV- g,l~ ~ ~ ~m
~ ~ o d
m ~ ~W POINT ~A = g+11.61 ~ ~' ~ -
P'vl STA - 6+4.1,87
PVI ELEV - 9.74
PVI STA -
PV1 ELEV- 9379
HIGH POINT EI..EV = 14.,~7
HIGH P~NT S'fA = 11+2D.91~i
PVI $'I'A - 11..t-02,85
P'vl ELEV- 1.5.02
'--PII~6P,6zE[~ z'TI~EET ~EN'I'BI, LI',E
9-1-00 1CH-OD 11-kgO
SOUTH LINDEN AVENUE GRADE SEPARATION
ALTERNATIVE NO. 6
40
PROPOSED 4-TRACK ALIGNMENT
(SSF - SAN BRUNO)
CONNECT TO SAN BRUNO GRADE
SEPARATION AND STATION PROJECT
PSR SCHEDULE
1. KICK-OFF
2. 35% PROJECT STUDY REPORT
3. 65% PROJECT STUDY REPORT
4. SSF CHAMBER OF COMMERCE-INFORMATION MEETING
5. SSF CITY COUNCIL & BUSINESSES- INFORMATION MEETING
6. 95% PROJECT STUDY REPORT
7. FINAL PROJECT STUDY REPORT
MAY, 2003
JUNE 25, 2003
AUGUST 8, 2003
SEPTEMBER 8, 2003
SEPTEMBER 24, 2003
OCTOBER, 2003
NOVEMBER, 2003
43
DRAFT
STAFF REPORT
FOR. DISCUSSION PURPOSES
DATE:
TO:
FROM:
SUBJECT:
XXXXXX
Honorable Mayor and City Council
Caltrain Safety Ad Hoc Committee (Ruane, Ibarra)
Caltrain Grade Separation
RECOMMENDATION: That the City Council:
1. Support the Joint Powers Board staff proposal for a grade separation, new station, and
additional tracks as described in the final Project Study Report (PSR).
2. Request that the Joint Powers Board staff proceed expeditiously with developing and
obtaining any agency or regulatory approval or permits for the project described in the
final PSR.
3. Request that the Joint Powers Board proceed expeditiously with the development of final
Plans Specifications and Estimates (PS&E) for the project described in the final PSR.
4. Request that the Joint Powers Board work with the City and other appropriate parties to
develop the necessary inter-agency agreements addressing all pertinent issues including
right-of-way, utility relocations, construction, and maintenance of the project described in
the final PSR.
5. Request that the Joint Powers Board develop a comprehensive funding plan for the grade
separation and new station project in conjunction with the development of the final PS&E
and cooperative agreements.
6. Extend the role of the existing Citizens Advisory Committee or form a new Citizens
Advisory Committee to provide input and guidance to the Joint Powers Board PS&E
development team and City staff on the further development and refinement of the
project described in the final PSR.
DISCUSSION: .... by City ......
ENVIRONMENTAL STATUS: .... to be determined before or during the development of
plans, specifications, and estimates (PS&E).
FISCAL IMPACT: .... to be determined in conjunction with the development of the final
PS&E and cooperative agreements.
DATE PREPARED: ....
RESOLUTION NO. 2003-77
RESOLUTION OF SAN BRUNO CITY COUNCIL SUPPORTING THE
PENINSULA CORRIDOR JOINT POWERS BOARD PROJECT STUDY
REPORT RECOMMENDING GRADE SEPARATION OF CALTRAIN TRACKS
IN SAN BRUNO, RELOCATION OF THE SAN BRUNO RAIL STATION, AND
ADDITIONAL TRACKS
WHEREAS, in order to completely eliminate the hazard or risk of a vehicular
or pedestrian accident with a railroad train, intersections of railroad corridors with
roadways and pedestrian pathways must be completely separated; and
WHEREAS, the grade crossings in San Bruno have experienced several.
accidents in recent years resulting in both vehicular accidents and pedestrian
fatalities; and
WHEREAS, following a fatal accident on March 4, 2000, citizens concerned
with safety at the crossings requested the that City Council address the safety
hazard associated with the at-grade crossings at San Bruno Avenue; and
WHEREAS, the City Council formed a Caltrain Safety Ad Hoc Committee to
investigate ways to make the crossing safer; and
WHEREAS, at the August 13, 2002, City Council meeting, the Caltrain Safety
Ad Hoc Committee recommended, and the City Council approved, support for
the concept of the grade separation and selected Alternative 5 as the preferred
alternative; and
WHEREAS, at the September 24, 2002, City Council meeting, the Council
took action to form a Citizens Advisory Committee to work with the staff of the
Peninsula Corridor Joint Powers Board (JPB) and City staff to refine details of the
preferred Alternative 5; and
WHEREAS, the Citizens Advisory Committee held a total of ten meetings
between October 1,2002 and March 13, 2003, with an additional meeting on
June 19, 2003, to review, receive and consider comments to the draft Project
Study Report; and
WHEREAS, JPB incorporated many of the comments from the Citizens
Advisory Committee and City staff, and issued the final Project Study Report
dated July 7, 2003; and
WHEREAS, the Project Study Report was thoroughly discussed by Council
and citizens at a meeting of this City Council held on August 12, 2003 following a
21-day public review and comment period.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of San
Bruno, as follows:
That the City Council supports the Peninsula Corridor Joint Powers
Board (Joint Powers Board) proposal for a grade separation, new
station, and additional tracks as described in the final Project Study
Report ("Project") date July 7, 2003.
That the City Council requests the Joint Powers Board to proceed
expeditiously with developing and obtaining any agency or
regulatory approval or permits for the Project.
That the City Council further requests that the Joint Powers Board
proceed expeditiously with the development of final Plans,
Specifications and Estimates for the Project.
That the City Council further requests that the Joint Powers Board
work with the City and other appropriate parties to develop the
necessary inter-agency agreements addressing all pertinent issues
including right-of-way, utility relocations, construction, and
maintenance of the Project.
That the City Council further requests that the Joint Powers Board
develop a comprehensive funding plan for the Project in
conjunction with the development of the final Plans, Specifications
and Estimates and cooperative agreements.
That it is the intent of this Council to extend the role of the existing
Citizens Advisory Committee to provide input and guidance to th~
Joint Powers Board, City staff and the City Council.:pn the further~ ~ § -~
development and refinement of the Project. ':~ '" ~ o ~
.-~- ~. Q .,~
-.. _.
· o ~
---oOo--- :"
I hereby certify that foregoing Resolution No. 2003+77
was introduced and adopted by the San Bruno City COuncil .~'
at a regular meeting on September 9, 2003 by the followings, vot~
AYES:
NOES:
ABSENT:
· :? ~. ~' /~ ~,"~:.,~,~
..¢. L' ,..".~
',:~.' t:!.: :..",% .: ::: ~
L'.'.',,.,';,'."_ tj ',J
Councilmembers: Ibarra, Ruane, Mayor Franzella
Councilmembers: Pallas
Councilmembers: O'Connell
StaffXeport
DATE: September 24, 2003
TO: Honorable Mayor and City Council
FROM: Director of Recreation and Community Services
SUBJECT: Recommendation for Loan Art Pieces at Orange Memorial Park Sculpture Garden
RECOMMENDATION:
It is recommended that the City Council, by motion, approve one sculpture, Circumfusion by
Esmoreit Koetsier, and a pair of sculptures, Yin and Yang by Keith Bush for the Loan Art
Program at the Orange Park Sculpture Garden, as recommended by the Cultural Arts
Commission.
BACKGROUND/DISCUSSION:
The Loan Art Program was approved by the City Council in February of 2003. The goal of the Cultural
Arts Commission in recommending the program was to stretch limited funds available for the purchase
of public art by "renting" pieces for a limited time.
A competition was sponsored for artists willing to install a sculpture "on loan" in the Orange Park
Sculpture Garden. The competition was well advertised, with one extension of the application period.
The submittal deadline was July 31, 2003. A total of fourteen (14) sculpture pieces submitted by nine
(9) artists were reviewed by the Loan Art sub-committee, comprised of Commissioners Dennis
Crossland, Andrew Lee, Karen Ochsenhirt, and Joy-Ann Wendler. The sub-committee recommended
three (3) pieces of sculpture for the Sculpture Garden: Circumfusion by Esmoreit Koetsier, and a pair of
sculptures, Yin and Yang.by Keith Bush. These recommendations were approved by the full
Commission at their August meeting, and are being forwarded to the City Council for approval as
required by the conditions of the Loan Art Program.
Staffhave reviewed the pieces recommended for installation, spoken with the mists to ensure that they
understand their obligations under this program, and discussed installation and safety concerns with the
Maintenance Services Department. Staff feels the sculptures do not present a hazard to the public, or
present any installation or maintenance issues that would cause us not to support the Commission's
recommendation.
To: Honorable Mayor and City Council
Date: September 24, 2003
Subject: Recommendation for Loan Art Pieces
Page 2
The sculpture sub-committee recommends placement of the Circumfusion sculpture at the west end of
the garden, near the bocce ball courts. They recommend placement of the pair Yin and Yang at the east
end of the garden toward Tennis Drive. Staff will work with the sub-committee and the artists to place
the pieces attractively.
The terms of the loan arrangement are defined in the attached Loan Art Agreement. Specific items of
note are listed below.
1. The length of exhibit recommended by the Commission is two (2) years. However, there is
flexibility to define a shorter or longer exhibit period.
Display requirements for each of these three pieces of sculpture are unique, varying from a flat
surface mount on the ground to a raised pedestal. The city will work with the artist's
recommendations to prepare the sites for each piece, including installation of a base, if required.
Given the design of the Sculpture Garden with viewing "pads" already constructed, the cost of site
preparation using in-house crews should be minimal.
3. The artists are responsible for delivery of the pieces to the site, and mounting the pieces to the base
in conformance with the city's specification.
The artists are responsible for maintenance of the sculptures, including removal of graffiti, and repair
of damage or vandalism. The city would maintain the site, as it currently does for the Sculpture
Garden.
o
Property insurance may be provided by the artist, if desired. The city is not responsible for
reimbursement to the artist for damage or theft of the sculpture. It is anticipated that liability for
injury associated with the sculpture would be determined on a case by case basis depending on the
circumstances. The city assumes some liability as a result of exhibiting any sculpture in a public
place, whether it is on loan or purchased by the city. Staff believes due care has been taken of public
slfety considerations in recommending these pieces for display.
At the end of the loan period, the artists must reclaim the pieces unless an agreement is renewed. In
the event an artist offers to donate a piece rather than reclaim it, the city has the option of accepting
or not accepting the donation.
The compensation to each artist is $1500. It should be noted that the artist bears the full cost of
submitting the application, constructing the piece, delivering it to the site, travel to be on site for
installation, removing the sculpture at the conclusion of the loan term, and providing property
insurance if desired for the length of the display.
To: Honorable Mayor and City Council
Date: September 24, 2003
Subject: Recommendation for Loan Art Pieces
Page 3
FUNDING:
There are sufficient funds in the Commission's Art Fund to cover the costs of the cash award to the
artists and the installation of the sculpture and pair of sculptures being recommended for approval.
By: ~,,'f~ ~ Approved:
Sharon Ranals
Director of Recreation and Community
Services
Michael A. Wilson
City Manager
Attachments:
1. Circumfusion, by Esmoreit Koetsier
2. Yin and Yang, by Keith Bush
3. Loan Art Program Agreement
YIN
Keith Bush
Keith Bush
City of South San Francisco
Orange Memorial Park Sculpture Garden
Loan Art Program Agreement
This Agreement, made and entered into on 200__, by and
between the CITY OF SOUTH SAN FRANCISCO, a municipal corporation (hereinafter
"CITY"), 400 Grand Avenue, South San Francisco, California, and
of
(hereinafter "ARTIS T").
1. PURPOSE
ARTIST agrees to temporarily loan to CITY, and CITY agrees to grant ARTIST, a temporary
exhibition permit to display ARTIST'S sculpture entitled
(hereinafter "SCULPTURE") at a public location, the Sculpture Garden in Orange Memorial
Park, South San Francisco, California (hereinafter "SCULPTURE GARDEN").
2. EXHIBITION SITE
The said referenced exhibition site is specifically area #
in the SCULPTURE GARDEN.
, located at
3. TERM
The exhibition dates shall be from 200__ through
ARTIST shall remove SCULPTUR~ on or before
exact date for removal shall be arranged between CITY and ARTIST.
200~.
200__.
The
4. BASE
SCULPTURE shall be installed on a base (hereinafter "BASE") agreed to and designed by
ARTIST and CITY. BASE will be constructed and installed by CITY.
5. PREPARATION OF SITE
Installation will not be performed until the preparation and construction of any BASE required
from CITY is complete. CITY is responsible for preparing SCULPTURE site according to the
instructions supplied by ARTIST and agreed to by CITY.
Notwithstanding the foregoing, in the event CITY is unable to construct or is delayed in the
construction of BASE or preparation of SCULPTURE site due to budgetary constraints,
inadequate available staffing, natural disaster or any other cause, ARTIST shall not have any
right to bring action or make any claim against CITY as a result of such inability or delay.
6. INSTALLATION AND REMOVAL
CITY shall coordinate the installation and removal of SCULPTUR]~ and shall assist ARTIST or
ARTIST'S representative with installation, with a minimal workforce, to the degree that the site
is a safe and workable environment. ARTIST will be responsible for the delivery of
SCULPTURE to the site, and for the on-site installation, and shall be responsible for
SCULPTURE on site during the installation. ARTIST will be responsible for, and cover all
expenses concerning the delivery and installation of SCULPTURE to the site.
7. IDENTIFICATION PLAQUE
CITY shall provide and install an identification plaque at the site of SCULPTURE to identify
title, artist's name, year of creation, and construction material. Design of the plaque shall be at
the full discretion of CITY.
8. MAINTENANCE
ARTIST shall maintain the SCULPTURE at ARTIST'S sole cost and expense. CITY shall
maintain SCULPTURE site, but will not provide reimbursement for ARTIST'S maintenance
costs.
In the event of defacing of or damage to SCULPTURE, whether by vandalism or act of God,
ARTIST shall make such repairs as are necessary within 72 hours of receiving notice from CITY
of damage, or in the event repairs cannot be completed within that time, provide CITY a written
plan and timetable for the repairs within that time.
If the nature of the damage renders SCULPTURE hazardous to the public and SCULPTURE is
determined not safe to remain in said location, SCULPTURE must be repaired to a condition not
considered hazardous to the public within a 12 - 24 hour time window after ARTIST receives
notification from CITY or SCULPTURE shall be removed from exhibition by ARTIST or by
CITY at expense of ARTIST.
Failure to comply with this section shall be deemed grounds for termination of this Agreement.
9. COMPENSATION
Compensation to ARTIST for being chosen to exhibit SCULPTURE within the City of South
San Francisco shall be provided by the City of South San Francisco. ARTIST will receive
$1,500 in cash as well as exposure in a brochure publicizing the public art of South San
Francisco. ARTIST will also receive exposure by having SCULPTURE exhibited in the
prominent and publicly accessible SCULPTURE GARDEN.
10. NOTICE OF TERMINATION
ARTIST acknowledges that permission to exhibit the aforesaid SCULPTURE may be revoked at
any time by CITY, and ARTIST further acknowledges that said SCULPTURE may be removed.
If ARTIST does not reclaim the aforesaid SCULPTURE within (30) days of Notice of
Termination, CITY or any of its agents, servants, officers or employees may dispose of said
SCULPTURE as they see fit. For purposes of the foregoing sentence, it is further agreed that a
written request to reclaim the aforesaid SCULPTURE executed by CITY and mailed to ARTIST
by United States registered or certified mail, or other form of mail which offers proof of mailing
and postage prepaid shall constitute '2qotice of Termination".
11. INSURANCE
If desired, ARTIST shall provide property insurance on the artwork at ARTIST'S sole cost and
expense. CITY will not provide reimbursement for property insurance.
2
12. HOLD HARMLESS AND INDEMNITY PROVISION
ARTIST shall defend, save, keep and hold harmless CITY, their officers, agents, employees and
volunteers from all damages, costs or expenses in law or equity that may at any time arise or be
asserted because of injury to property or bodily or personal injury (including death) occasioned
by any willful negligent act or omissions of ARTIST or any of ARTIST'S agents, employees and
volunteers. CITY will not be held liable for any accident, theft, vandalism, or damage to
SCULPTURE from any and all causes.
13. APPLICABLE LAWS AND ATTORNEY'S FEES.
This Agreement shall be interpreted and enforced pursuant to California law. Any action to
enforce or interpret this Agreement shall be brought in a court of competent jurisdiction in San
Mateo County, California. Should any legal action be brought by a party for breach of this
Agreement or to enforce any provision of this Agreement, the prevailing party shall be entitled
reasonable attorney's fees, court costs, and other such costs as may be affixed by the Court.
14. AMENDMENT
This Agreement constitutes the entire Agreement of parties and may only be amended by written
Agreement signed by both parties.
15. NOTICE
Unless otherwise provided herein, all notices required hereunder shall be given by United States
registered or certified mail, or other form of mail which offers proof of mailing, postage prepaid
and addressed to the party at the address below:
If to CITY:
City of South San Francisco
City Manager
P.O. Box 711
South San Francisco, CA 94083
If to ARTIST:
IN WITNESS WHEREOF, the parties have executed this Agreement on the date written above.
APPROVED AS TO FORM:
City Attorney
CITY OF SOUTH SAN FRANCISCO
City Manager
Artist
Print Name
F:kFile CabinetWIy SSF Documents~greements and Contracts 2003kArt Loan Agreement Final. DOC
Staff Report
DATE:
TO:
FROM:
SUBJECT:
September 24, 2003
The Honorable Mayor and City Council
Steven T. Mattas, City Attorney
Adoption of an ordinance amending the PERS Contract.to provide Section 21354.5
(2.7 @ Full and Modified Formula) for Local Miscellaneous Members.
RECOMMENDATION:
Adopting of an ordinance amending the PERS Contract to provide Section 21354.5 (2.7 @ Full and
Modified Formula) for Local Miscellaneous Members.
B ACKGROLIND/DISCUS SION:
Council has previously waived reading and introduced the following ordinance. The Ordinance is now
ready for adoption.
AN ORDINANCE APPROVING AN AMENDMENT TO CONTRACT BETWEEN THE
BOARD OF ADMINISTRATION CALI:FORNIA PUBLIC EMPLOYEES' RETIREMENT
SYSTEM AND THE CITY COUNCIL OF THE CITY OF SOUTH SAN FRANCISCO
(Introduced 9/10/03, Vote 5-0)
Steven ~ Mattas, City Attorney
Michael A. Wilson, City Manager
Enclosure: Ordinance
ORDINANCE NO.
AN ORDINANCE APPROVING AN AMENDMENT TO CONTRACT
BETWEEN THE BOARD OF ADMINISTRATION CALIFORNIA PUBLIC
EMPLOYEES' RETIREMENT SYSTEM AND THE CITY COUNCIL CITY
OF SOUTH SAN FRANCISCO
WHEREAS, the City of South San Francisco has agreed to provide enhancements to the
City's retirement system as part of negotiations with members of AFSCME, Teamsters
(confidential), POA (non-sworn), Operating Engineers, Mid-Management and Executive
Management; and
WHEREAS, The California Public Employees' Retirement System staff have prepared
the attached Amendment to Contract to implement this enhanced retirement benefit (Section
21362.3 [2.7% @ 55 Modified and Full]; and
NOW THEREFORE, the City Council of the City of South San Francisco does ORDAIN
as follows:
The City Council of the City of South San Francisco does hereby approve Amendment
to Contract Between the Board of Administration California Public Employees' Retirement
System and the City Council of the City of South San Francisco attached hereto and incorporated
herein by reference.
BE IT FURTHER RESOLVED, that the Mayor is hereby authorized to execute the
Agreement on behalf of the City.
1. PUBLICATION AND EFFECTIVE DATE
This Ordinance shall be published once, with the names of those City Councilmembers
voting for or against it, in the San Mateo Times, a newspaper of general circulation in the City of
South San Francisco, as required by law, and shall become effective thirty (30) days from and
after its adoption.
2. SEVERAB~ITY
In the event any section or portion of this ordinance shall be determined invalid or
unconstitutional, such section or portion shall be deemed severable and all other sections or
portions hereof shall remain in full force and effect.
Introduced and adopted at a regular meeting of the City Council of the City of South San
Francisco, held the __ day of ,2003.
Adopted as an Ordinance of the City of South San Francisco at a regular meeting of the
City Council held the day of, 2003 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ATTEST:
City Clerk
As Mayor of the City of South San Francisco, I do hereby approve the foregoing
Ordinance this __ day of 2003.
Mayor
S :\Current Ord's\9-10-03 PERS.ord.doc
StaffReport
DATE:
TO:
FROM:
SUBJECT:
September 24, 2003
The Honorable Mayor and City Council
Assistant City Manager
RESOLUTION AUTHORIZING SUBMITTAL OF THE 2002-2003 CONSOLIDATED ANNUAL
PEaFOaMANCE nm) EVALUATION REPORT (CAPER) TO THE DEPAaTMENT OF
HOUSING AND URBAN DEVELOPMENT (HUD)
RECOMMENDATION:
It is recommended that City Council: 1) Hold a public hearing on the 2002-2003 Consolidated
Annual Performance and Evaluation Report (CAPER), and 2) Adopt the attached Resolution
authorizing the City Manager to execute all required documents for submittal to the Department of
Housing and Urban Development.
BACKGROUND:
The Department of Housing and Urban Development (HUD) requires communities receiving
Community Development Block Grant (CDBG) funds to submit a year-end Consolidated Annual
Performance and Evaluation Report (CAPER). The report describes the City's housing and
community development accomplishments during the 2002-2003 Fiscal Year and includes a
financial summary of CDBG expenditures. This year the report also includes a final description of
the City's accomplishments during the five-year 1998-2003 Consolidated Plan period.
Prior to submitting the report the City must give the public an oppommity to review the CAPER and
give testimony at a public hearing. CAPER reports are due to HUD 60 days after the completion of
jurisdiction's fiscal year.
In fiscal year 2002-2003, a total of $ 921,493 in CDBG funding was available for a broad range of
community development activities. The CDBG program is the primary funding source for many
services the City provides including housing rehabilitation, commercial fagade improvements,
childcare, adult day care, emergency food assistance, homeless services, and tutoring.
On April 22, 1998, the City Council authorized the submittal of the City's five-year Consolidated
Plan for Housing and Community Development for fiscal years 1998-99 through 2002-03. The
Consolidated Plan identified the housing and non-housing priorities the City would address during
1998-2003. In April 2002, the City Council authorized the submittal of the fourth One-Year Action
Plan for 2002-2003. The 2002-2003 CAPER describes City's accomplishments and compares them
to the goals set in 2002-2003 One Year Plan. Attached as Exhibit A is a summary of the CAPER
report.
STAFF REPORT
TO: Honorable Mayor and City Council
SUBJECT: Submittal of the 2002-2003 Consolidated Annual Performance and Evaluation Report
(CAPER) to the Department of Housing and Urban Development (HUD)
DATE: September 24, 2003
Page 2
CAPER FINANCIAL REPORTING MECHANISM:
In addition to the activity summary report, the CAPER provides a comprehensive accounting of all
CDBG funds allocated, expended, encumbered, or reprogrammed during the fiscal year. The
Department of Housing and Urban Development has developed special computer sot'tware that
allows the tracking of multi-year activities and expenditures for accurate financial monitoring of
individual CDBG projects and programs. The Finance and Housing and Community Development
Departments use the new sol,are system to request regular reimbursements from the U.S. Treasury
for CDBG activities.
CONCLUSION:
The CAPER has been available for public review in the Office of Economic and Community
Development since September 9, 2003, when the public comment period began. Any comments
received during the comment period or at the public hearing will be forwarded to HUD upon
submittal of the report on September 30, 2003, a federally mandated deadline.
Approved: Michael A. Wilson
City Manager
MAW:MVD:NF:AFSA
Attachment: Resolution
Exhibit A - CAPER Summary Report
Exhibit A
City of South San Francisco
Consolidated Annual Performance and Evaluation Report (CAPER)
Summary Report
2002- 2003
Housing Activities
A. Priority: Increase the supply of decent, affordable housing through the
acquisition and/or rehabilitation of existing housing units.
1. Owner-Occupied Housing
The City sponsors a variety of housing rehabilitation programs to assist residents maintain their
homes in good condition. They are the Housing Rehabilitation Loan Program, the Code
Enforcement Voucher Program, and the House Helpers Program through North Peninsula
Neighborhood Services Center (NPNSC).
The Housing Rehabilitation Loan Program assists low- and moderate-income homeowners with
housing repairs by providing low interest loans. During 2002-2003 the City assisted three
households with housing rehabilitation loans. Over the five-year Consolidated Plan period the
City assisted twelve households with rehabilitation loans.
The City administers a Code Enforcement Voucher Program that makes grants available to low-
income homeowners in the downtown central area and citywide. The Voucher program is a grant
subprogram of the Housing Rehabilitation Loan Program and is used to help residents correct
emergency code violations. Currently there are two types of Vouchers available: Emergency
Code Violation Vouchers and Debris Box Vouchers. During 2002-2003 the City issued three
Emergency Code Vouchers and eight Debris Box Vouchers. Over the five-year Consolidated
Plan period the City the City provided a total of 124 vouchers.
The City funded North Peninsula Neighborhood Services Center (NPNSC) to implement the
House Helpers Program, which provides minor home repairs for iow-income homeowners in the
downtown target area and citywide. In 2002-2003, NPNSC assisted 40 families. Of these 34
were senior heads of household. Over the five-year Consolidated Plan period NPNSC completed
home repairs for 250 households.
In 2001-2002 the City Council approved a first time homebuyer program for the City of South
San Francisco. During 2002-2003 the City made the necessary arrangements to administer the
program and begin making first time homebuyer loans. To fund this program the City allocated
$191,043 in CDBG and $250,000 in RDA. In 2002-2003, the City successfully made its first loan
to low-income buyer to help them purchase a below market rate unit.
Under the leadership of the Mayor and City Council, the City pasSed a housing inclusionary
ordinance in 2001-2002. Housing developers are required to make 20 percent of all new units
developed affordable to low- and moderate-income families. Eight percent (8%) of units must be
City of South San Francisco 2002-2003 CAPER Executive Summary, Page i
RESOLUTION
CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A RESOLUTION AUTHORIZING SUBMIqTAL OF THE 20()2-
2003 CONSOLIDATED ANNUAL PERFORMANCE AND
EVALUATION REPORT (CAPER) TO THE DEPARTMENT
OF HOUSING AND URBAN DEVELOPMENT
WHEREAS, the Department of Housing and Urban Development (HUD) requires
communities receiving Community Development Block Grant (CDBG) funds to submit a
year-end Consolidated Annual Performance and Evaluation Report (CAPER); and
WHEREAS, this years report also includes a final description of the City's
accomplishments during the five-year 1998-2003 Consolidated Plan period; and
WHEREAS, in fiscal year 2002-2003, a total of $921,493 in CDBG funding was
available for a broad range of community development activities; and
WHEREAS, the Consolidated Annual Performance hnd Evaluation Report
(CAPER) has been available for public review in the office of Economic and Community
Development, City Hall, 400 Grand Avenue since September 30, 2003.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
South San Francisco that the City Council hereby authorizes the City Manager to submit
the CAPER and execute all required documents for submittal to the Department of
Housing and Urban Development.
I hereby certify that the foregoing Resolution was regularly introduced and
adopted by the City Council of the City of South San Francisco, held on the __ day
of ,2003, by the following vote:
AYES:
NOES:
ABSTAIN: ..
ABSENT:
ATTEST:
City Clerk
S:\Current Reso's\9-24CAPER.res.doc
affordable to families at or below 80 percent median income and 12 percent must be affordable
to families at or below 120 percent median income. In 2002-2003 the City negotiated one
agreement to create eight affordable rental units at 206 Grand Avenue (the former Escape Bar).
Finally, the City worked with the County of San Mateo, various other cities on the peninsula,
financial institutions and lenders, and other interested parties to develop a uniform County-wide
first time homebuyer program. The Consortium also prepared loan documents for the uniform
program. In an effort to maintain and increase intergovernmental collaboration, the City of South
San Francisco has modeled it's first time homebuyer to adhere to the standards developed by the
Consortium will use its loans documents.
2. Rental Housing Acquisition and Rehabilitation
The Rental Housing Acquisition and Rehabilitation Program purchases blighted or substandard
homes in the community (or in specially designated target areas), rehabilitates the homes, and
converts them into affordable rental housing. The program is available citywide and funded by
CDBG, HOME and Redevelopment Agency Housing Set-Aside. The City leverages the federal
funds with Redevelopment Agency Housing funds.
During 2002-2003 the City worked with Mid-Peninsula Housing Coalition to purchase four
buildings (16 units total) in the Willow Gardens neighborhood project area. Rehabilitation of
the units occurs in the months following the purchase of each unit. Phase I work includes new
paint, new hearers, new flooring, and new windows in the units.
In 2002-2003 the City also negotiated with several property owners to purchase housing in or
near the downtown. City efforts included negotiating with owners and conducing property
appraisals. Efforts to purchase property during 2002-2003, however, were not successful.
In 2003 a new family from Shelter Network's Bridges program for homeless families moved into
the City's rental property at 109 Longford Avenue. The previous homeless family living there
successfully graduated from the program and moved into regular rental housing in March 2003.
Additional accomplishments during the five-year Consolidated Period included Assisting with
$1.2 million for the rehabilitation of a 16-unit SRO hotel and 8-unit apartment building at the
Grand Hotel, Completing a multi-million dollar rehabilitation of 65 SRO units at the
Metropolitan Hotel, and Purchasing 2 duplexes (4 units total) and rehabilitating them for
occupancy by for low-income families.
B. Priority: Increase the supply of affordable rental housing by constructing new
rental units.
1. Chestnut Creek
In 1998-99 the City negotiated a purchase option for the vacant site located at Old Mission Road
and Chestnut Avenue. Under contract with the Redevelopment Agency, BRIDGE Housing
Corporation, a nonprofit housing developer, completed construction of 40 affordable senior
housing units. Tenants moved into Chestnut Creek in April 2003.
City of South San Francisco 2002-2003 CAPER Executive Summary, Page ii
Other accomplishments during the five-year Consolidated Plan period include the development
of 33 affordable family housing units at Greenridge Apartments. The developer for this project
was Mid-Peninsula Housing Coalition. The City also acquired and banked land at 905 Linden
Avenue for a future housing development.
C. Priority: Provide service-enriched shelter and transitional housing for homeless
people and families.
Funding for Homeless Assistance Programs
The City funded several agencies and homeless shelters providing housing and services for
Homeless people. This included Shelter Network who received $14,000 in Redevelopment
Agency funds for the Family Crossroads Shelter and $10,000 for the Maple Street Shelter. These
transitional housing facilities are available to homeless families and individuals in the City of
South San Francisco. During 2002-2003, five (5) South San Francisco families stayed at Family
Crossroads and 37 individuals stayed at the Maple Street Shelter. Over the five-year
Consolidated Plan period Shelter Network housed 174 South San Francisco households.
The City also provided $7,000 in RDA funds through Samaritan House for the operation of the
North County Homeless Shelter. The North County Emergency Shelter is located in South San
Francisco and provides 90 beds for homeless men and women. Eighty-one South San Francisco
residents were served in 2002-03.
Other homeless shelters and service providers the City funded included: $8,000 to the Center for
Domestic Violence Prevention for providing shelter to battered women and their children, and
$25,000 to the Human Investment Project (HIP). NPNSC's social service program also helped
homeless individuals and families fred temporary and permanent housing. Over the five-year
Consolidated Plan period the Center for Domestic Violence Prevention has provided shelter for
57 South San Francisco Households. HIP has provided referrals to 437 households seeking
housing.
D. Priority: Provide housing opportunities for the disabled
Funding for Housing Accessibility Programs
The City provided $13,000 in CDBG funds to the Center for the Independence of the Disabled to
complete housing modifications for disabled residents, enabling residents to remain in their
homes in a safe and accessible manner. The program is available citywide to low-income
residents. CID served 31 disabled residents during 2002-2003. Over thc five-year Consolidated
Plan period CID has served 148 disabled households. NPNSC's House Helpers Program also
provided housing accessibility modifications for disabled residents.
City of South San Francisco 2002-2003 CAPER Executive Summary, Page iii
Non-Housing Community Development Activities
Priority: Core public service activities to improve the quality of life for City
residents and provide minimal levels of prevention assistance to keep families at
risk from becoming homeless.
Social Services.
The City funded 15 programs to provide crucial social services to the community in 2002-2003.
These included pre-school and after school childcare for 184 children, adult day care for 47
seniors, general social services for 758 residents, counseling and advocacy for 229 battered
women and children, counseling and other assistance for 49 disabled people, tutoring to adults
through project read for 44 individuals, new clothing for 314 very low-income youth, and weekly
grocery bag deliveries to 279 senior and disabled households. The City's nonprofit agencies
have leveraged their small CDBG grants of $2,000 to $20,000 to maximize the services they
offer South San Francisco residents. They have enriched the lives of many low-income residents
through the services they provide.
B. Priority: Rehabilitation assistance for non-housing activities including
institutional, commercial, and historic structures.
1. Commercial Facade Improvement Program
The Commercial Facade Improvement Program provides financial and technical assistance to
property owners undertaking structural and facade improvements to their buildings. These
improvements help owners increase the use of their commercial buildings and improve the
appearance of the downtown. The program is available in the Historic Downtown district and is
funded through CDBG and leveraged by the owners' funds.
In 2002-2003, the City allocated $175,000 for the Downtown Commercial Rehabilitation
Program. The following projects were completed or underway during the 2002-2003 fiscal year:
· Crimpers Bizzare, 312-314 Linden Avenue, $5,000 grant
· Mazatlan Restaurant, 203 Linden Avenue, $5,000 grant
· Bogy's Restaurant, 207 Linden Avenue, $5,000 grant
Over the five-year Consolidated Plan period the City has completed 17 facade improvements, 2
awning installation, and 10 sign improvements, benefiting a total of 33 businesses.
2. Other Rehabilitation Projects
The City also provided funding to address the rehabilitation needs of public and private
community buildings serving South San Francisco residents. Rehabilitation projects completed
during 2002-2003 includes
· Completed the renonvations of the restrooms at the Boys and Girls Club, including ADA
accessibility.
· Completed replacement of playground equipment with new accessible equipment
including the addition of disabled access ramps and new playground surfacing at various
city locations.
City of South San Francisco 2002-2003 CAPER Executive Summary, Page iv
Over the five-year Consolidated Plan the City has completed the rehabilitation of several public
and private community building serving South San Francisco residents. Among them are the
Community Learning Center, several playgrounds, Community Gatepath's center, North
Peninsula Neighborhood Services Center's office, the Historic Society Museum, and various
school district facilitates being used for the Families on Track Program serving low-income
children.
Lead Based Paint Abatement
Through this program the City identifies potential lead-based paint hazards in housing
rehabilitation projects. In 2002-2003, the City continued to work with the County of San Mateo
and other jurisdictions in the county to implement the new federal lead-based paint regulations
for housing. Actions included offering training to contractors, performing outreach, and
cooperating and sharing information with other entitlement jurisdictions.
Fair Housing Activities (Actions to Affirmatively Further Fair Housing)
In 2002-2003 the City supported numerous activities to ensure fair housing in the City of South
San Francisco. Programs included funding Project Sentinel and La Raza Ccntro Legal to conduct
fair housing education and advocacy. In 2002-2003, Project Sentinel assisted thirteen (13) South
San Francisco households facing housing discrimination and handled 602 telephone calls
requesting fair housing information. La Raza Centro Legal provided legal representation,
counseling, and information and referral for 154 households.
City of South San Francisco 2002-2003 CAPER Executive Summary, Page v
2002 - 20032 CAPER & Five-Year Consolidated Plan
Summary of Accomplishments
I. Housing Activities
housing units.
Program Activity
Priority: Increase the supply of decent, affordable housing through the acquisition and/or rehabilitation of existing
Owner-Occupied
City-Sponsored Housing
Rehabilitation Loan
Program
Voucher Program
Emergency Code
Violation Vouchers
Debris Box
Vouchers
Minor Home Repair
(House Helpers)
North Peninsula
Neighborhood Services
Center (NPNSC)
2002-2003 Objectives
Assist low- and moderate-income homeowners
with housing repairs in the Neighborhood Strategy
Area and citywide. Three to five (3-5) very low-
income households will be assisted with low
interest and/or deferred loans of up to $25,000.
Most households will be very low-income, elderly,
and female heads-of-household. Assist and
additional 22 families with vouchers.
Provide grants to low-income homeowners in the
downtown central area and citywide for
emergency repairs.
Provide homeowners grants of up to $2,500 to 12
low-income residents to clear up code violations in
their homes.
Help 10 low- and moderate-income residents in
the CDBG target area remove accumulated debris
and yard waste from their properties.
Provide free, minor home repairs to 50 very low-
income homeowners in the Neighborhood Strategy
Area and citywide. The majority of households
assisted will be large families with small children,
disabled residents and elderly, and female heads-
of-household.
2002-2003 Accomplishments
Provided CDBG rehabilitation loans funds in the
amount of $24,130 for the rehabilitation of 3
affordable units. City found it is more effective to
use vouchers to take care of immediate home
repair needs.
Provided $6,244 in CDBG vouchers to assist a
total of 11 low-income households correct code
violations. The City issued 3 emergency code
violation vouchers and 8 debris box vouchers.
Provided fi-ee, minor home repairs to the homes of
40 households.
Five-Year CP
Accomplishments
Provided 12 rehabilitation
loans to low-income
homeowners.
Completed rehabilitation of
Commercial Avenue project.
Provided 124 vouchers
(grants) to low-income
homeowners.
Over the past five years
NPNSC has provided free,
minor home repairs for 250
households.
A. Priority: Increase the supply of decent, affordable housing through the acquisition and/or rehabilitation of existing
housing units - continued.
Program Activity
Owner-Occupied
-Continued-
First-time Homebuyer
Loan Program
2002'2003 Objectives
Develop program guidelines for a new first-time
homebuyer loan program. Goal is to place 3-5
First time homebuyer first time homebuyer loans.
2002-2003 Accomplishments
Adopted policies and established a new First Time
Homebuyer Program. Assisted 1 family move into
a below market rate tmit. Allocated $191,043 in
CDBG and $250,000 in RDA for first time
homebuyer loans. Negotiated for 8 inclusionary
housing units at 206 Grand Avenue.
Five- Year CP
Accomplishments
- Created a new First Time
Homebuyer Program and
placed 1 family in a below
market rate unit
- City adopted a first time
homebuyer prograrr[
- City adopted a 20%
inclusionary housing
ordinance
- City has negotiated for a
total of 16 inclusionary
housing units
Program Activity
Rental Acquisition
and Rehabilitation
Willow Gardens
Downtown Affordable
Housing Program
2002.2003 Objectives
Five-year objective is to acquire and rehabilitate
64 units at Willow Gardens to convert into
affordable rental units. The goal for the year was
to purchase 1-2 buildings as they become
available.
Establish housing fund to provide affordable rental
housing through the acquisition and rehabilitation
of dilapidated housing stock. Goal during fiscal
year 02-03 is to purchase and rehabilitate an
unoccupied Single Room Occupancy Hotel or a 4-
6 unit apartment building in or near the downtown.
2002-2003 AccomPlishments
Purchased four four-plex building (16 units
total).
The City negotiated with several property owners
to purchase housing in or near the downtown.
Efforts to purchase units during 2002-2003 were
not successful.
Five-Year CP
Accomplishments
- The City has acquired and
rehabihtated 7 four-plex
building (28 units total) in
the Willow Gardens
Neighborhood.
- Neighborhood concept
design and Supplemental
EIR complete.
- Willow Gardens
neighborhood added to the
E1 Camino Redevelopment
Project Area.
The City has not purchased
additional housing in the
downtown..
Program Activity
Rental Acquisition
and Rehabilitation
-Continued-
339-341 Commercial
Avenue
2002-2003 Objectives
No action listed for 2002-2003.
2002-2003 AccOmplishments
Four low-income families continue to occupy four
affordable housing units.
109 Longford Avenue
Grand Hotel
No action listed for 2002-2003
No action listed for 2002-2003
- New family from Shelter Network's Bridges
Program for homeless families moved into the
unit. The family consists of a single mother with
three children.
Previous occupant family successfully moved
into regular rental housing.
No action listed for 2002-2003
Metropolitan Hotel No action listed for 2002-2003
No action listed for 2002-2003
B. Priority:
Program Activity
New Rental Housing
Construction
Chestnut Creek
(Mission/Chestnut)
Greenridge
Increase the supply of affordable rental housing by constructing new rental units.
2002-2003 Objectives 2002,2003 Accomplishments
Construction of 40 new affordable rental
apartment units for seniors. Project scheduled to be
completed by Fall 2002.
No action listed for 2002-2003
Completed construction of 40 affordable housing
units for seniors. Tenants moved into the new
units in April 2003.
No action listed for 2002-2003
905 Linden Avenue No action listed for 2002-2003
No action listed for 2002-2003
Five-Year CP
ACcomplishments
Purchased 2 duplexes (4
units total), relocated eligible
tenants, completed lead-paint
hazard reduction, completed
rehabilitation, and occupied
units with Iow-income
families.
Purchased blighted home and
completed rehabilitation.
Three families from Shelter
Network's Bridges program
for homeless have occupied
the housing unit.
Assisted with $1.2 million
rehabilitation of a 16-unit
SRO hotel and 8-unit
apartment building.
Completed in 1999.
Completed a multi-million
dollar rehabilitation of 65
SRO units in the
downtown.
Five. Year CP
Accomplishments
Completed the development
and occupancy of 40 new
affordable units for seniors.
Completed development and
occupancy of 33 affordable
housing units.
Acquired and land banked for
future housing development.
C. Priority: Provide service-enriched shelter and transitional housing for homeless people and families.
Program Activity 2002-2003 Objectives 2002-2003 Accomplishments
Shelter Network -
Family Crossroads and
Maple Street
Provide transitional housing to 10 homeless
families at Family Crossroads and 10 individuals
at the Maple Street shelter.
Provided transitional housing to a total of 42
households. Five (5) families received housing at
Family Crossroads and 37 individuals received
housing at the Maple Street shelter.
Center for Domestic
Violence Prevention
Provide shelter and services to 5 battered women
and their families.
Provided shelter and services to 14 women and
children.
Samaritan House - Safe
Harbor (North County
Homeless Shelter)
Provide continued support to the North County
Homeless Shelter located in South San Francisco.
The goal is to serve 90 South San Francisco
residents.
Provided $7,000 in Redevelopment Agency
funding for continued shelter operation. Eighty-
one South San Francisco residents were served in
2002-03.
Human Investment
Project
Provide shared housing referrals to 80 households. Provided referrals to 86 households looking for
shared housing.
Five-Year CP
Accomplishments
Over the past four years,
Shelter Network has
provided transitional housing
to 174 South San Francisco
clients
To date, the Center for
Domestic Violence
Prevention has provided
transitional housing to 57
South San Francisco battered
women and children.
Contributed to the
construction of and operation
of an emergency 90-bed
winter shelter in South San
Francisco. Eighty-one South
San Francisco residents were
served in 2002-03.
HIP has provided referrals to
437 households seeking
shared housing.
D. Priority: Provide housing opportunities for elderly and disabled people
Program Activity 2002-2003 Objectives 2002-2003 Accomplishments
Center for Independence
of the Disabled (CID)
Housing Accessibility
Program
Provide housing accessibility modifications to the
homes of 30 people with disabilities.
Provided accessibility modifications to the homes
of 31 households.
Five-Year CP
Accomplishments
CID has provided housing
accessibility modifications to
the homes of 148 disabled
and elderly people.
H. Non-Housing Community Development Activities
A. Priority: Provide core public service activities to improve the quality of life for low-income residents and provide
preventive assistance to families at risk of becoming homeless.
Program Activity 2002-2003 Objectives
Childcare
Child Care
Coordinating Council
Provide emergency childcare for up to 10 children
from families in crisis.
City-Sponsored Child
Care
Friends to Parents
Provide fee assistance to 15-30 families for
childcare.
Provide affordable childcare to 62 children
SSFUSD - Children's
Center
Provide activities for 90 children.
Senior Services
Second Harvest-
Food Bank - Brown
Bag
City-Sponsored Adtfit
Day Care
Provide 300-400 households of seniors and
disabled residents with food.
Provide day care to 50 seniors.
General Social
Services
North Peninsula
Neighborhood
Services Center
The Tooth Mobile
Project READ
Provide social services for 450 households (1,200
people) with immediate needs.
On site dental services for students of the Families
on Track program. 250 individuals will be served.
Train volunteer tutors to provide free tutoring in
reading to 25-50 adults.
Satike Counseling
Provide substance abuse counseling
2002-2003 Accomplishments
Provided childcare for 5 children for extended
periods of time.
Provided childcare fee assistance to 18 families.
Provided childcare for 61 children.
Center provided childcare for 100 children and
CDBG funds were used for field trips and
supplies.
Provided 279 senior and disabled households with
food on a monthly basis.
Provided day care to 47 seniors.
Five-Year CP
A ccotnplishments
Over the past four years
CCCC has provided
extended childcare for 27
low-income families.
To date the City's program
has provided childcare fee
assistance to 102 families.
Friends to Parents has
provided childcare for 436
children
The SSFUSD Children's
Center leveraged City funds
to provide childcare for 465
households.
Over the past four years
Second Harvest has provided
1,204 senior and disabled
households with food.
In three years, the City's
progran~ has provided day
care for 293 frail and elderly
residents.
Provided social services to 758 clients.
Provided services to 246 students
Tutored 44 adults in reading.
Provided counseling to 64individuals
Provided social services to
4,124 clients.
Provided dental services to
246 students.
In four years Project READ
has trained tutors and
provided tutoring to 183
adults
Counseled 64 individuals
A. Priority: Provide core public service activities to improve the quality of life for low-income residents and provide
preventive assistance to families at risk of becoming homeless - continued.
Program Activity
Battered Women's
Services
Center for Domestic
Violence Prevention
Sor Juana Ines -
Abused Women
Advocacy
Rape Trauma Services
Center
Disabled Services
C.I.D. - Social
Services
ELLIPSE Peninsula
Aids Program
PARCA - Project
REACH
Poplar ReCare
Youth Services
John's Closet
North Peninsula
Family Alternatives
(NPFA)
Boys & Girls Club
2002,2003 Objectives
2002-2003 Accomplishments
(See Housing Activities - Priority C: Shelter and Transitional Housing for the Homeless)
Provide emergency services such as counseling Assisted 229 women and children with emergency
and shelter to 100-200 battered women and their services.
children.
Provide information, resources, and support to
sexual assault survivors. Approximately 50 - 100
individuals will be served.
Provide counseling and assistance to 30 disabled
people.
Provide in-home support services to up to 11
households with HIV/AIDS.
No action listed for 2002-2003
Provided information and services to 676 South San
Francisco individuals.
Counseled and assisted 37 disabled people.
Served 12 households with HIV/AIDS.
No action listed for 2002-2003
No action listed for 2002-2003
No action listed for 2002-2003
Provide new clothing to 150 schoolchildren.
Provided new clothing to 314 children.
Provide parenting skills to monolingual Spanish-
speaking parents; will assist 20 monolingual
Spanish-speaking households (70 parents and
children).
Provided parenting skills and services to 153 clients.
See Priority B: Rehabilitation assistance for non-housing structures
Five-Year CP
Accomplishments
In five years, Sor Juana Ines
has provided shelter and
emergency services to 878
battered women and their
children.
In one year provided services
to 676 individuals.
CID has provided counseling
and assistance to 298
disabled residents.
ELLIPSE has provided
support services to 54 clients
with HIV/AIDS.
Parca-Project Reach has
provided after school
childcare to 26
developmentally disabled
children.
Provided childcare for
15 developmentally
disabled children.
John's Closet has provided
clothing to 961 children
Over the past four years
Family Alternatives has
provided parenting skills to
497 monolingual Spanish-
speaking clients.
B. Priority: Rehabilitation assistance for non-housing structures including public, commercial, and historic buildings.
Program Activity
SSFUSD - Families on
Track
City Sponsored
Commercial Facade
Improvement Program
ADA Playground
Renovation
Community Learning
Center
Boys & Girls Club
Community Gatepath
(formerly Poplar Re-
Care Center)
Rehabilitation
North Peninsula
Neighborhood Services
Center Office Remodel
South San Francisco
Unified School District
Historic Rehabilitation
2002-2003 Objectives
Acquisition and installation of a modular unit to
expand existing facility. Approximately serving
160-260 Households.
Provide fmancial and technical assistance to
property owners undertaking exterior business
improvements, which can include signs, awnings
and exterior painting. These improvements help
owners increase the use of their commercial
buildings and improve the appearance of the
Historic Downtown district. Goal: to assist 5-8
businesses
Remove outdated playground equipment and
replace with new accessible equipment including
disabled access ramps and new playground
surfacing at various city locations.
No action listed for 2002-03.
Provide fimding from previous years to renovate
the restroom at the Boys & Girls Club. Project
had been delayed due to BART construction.
No action listed for 2002-03.
No action listed for 2002-03.
No action listed for 2002-03.
No action listed for 2002-2003
2002-2003 Accomplishments
Project postponed until next fiscal year.
City completed 1 facade improvement and 2 sign
installations, benefiting a total of 3 businesses.
Completed replacement of playground equipment
with new accessible equipment including the
addition of disabled access ramps and new
playground surfacing at various city locations.
No action listed for 2002-03.
Completed renovation ofrestrooms at Boys &
Girls Club
No action listed for 2002-03.
No action listed for 2002-03.
No action listed for 2002-03.
No action listed for 2002-2003
Five-Year CP
Accomplishments
Project postponed until next
fiscal year.
City completed 17 facade
improvements, 2 awning
installation, and 10 sign
improvements, benefiting a
total of 33 businesses.
Completed ADA
accessibility of playground
with new equipment and
ramps at various playgrounds
throughout the City
Completed rehabilitation of
and a gynmasium to open the
Community Learning Center.
Funded rehabilitation of new
site with $1.5 million Section
108 Loan Guarantee.
Completed renovations of
restrooms at Boys & Girls
Club, including ADA
accessibility.
Remodel Center to improve
services for South San
Francisco residents served at
the Center.
Remodeled Community
Agency's office for
accessibility and to provide
better client services.
Installed emergency £zre exit
door to a portable classroom.
Completed renovation of
Historical Society Museum.
III. Lead-Based Paint Abatement
Program Activity
2002-2003 Objectives
Lead-Based Paint
Abatement Program
Continued to apply federal regulations into
abatement procedures to reduce lead-based paint
hazards in rehabilitation projects. Collaborate
with the County of San Mateo and other county
jurisdictions to coordinate educational.
2002-2003 Accomplishments
Continue to collaborate with the County of San
Mateo and other jurisdictions in the county to
implement new federal lead-based paint
regulations for housing. Actions included offering
training to contractors, performing outreach, and
cooperating and sharing information with other
entitlement jurisdictions.
Five-Year CP
Accomplishments
Screened projects for lead-
based paint hazards and
performed necessary risk
reduction. Cooperated and
coordinated with the County
of San Mateo and other
jurisdictions to prepared and
implemented a lead-based
paint Transition Plan to meet
new federal regulations.
IV. Fair Housing -
Program Activity
Project Sentinel
La Raza Centro Legal
Fair Housing Brochure
Actions to Affirmatively Further Fair Housing
2002-2003 Objectives
Provide fair housing counseling and advocacy
casework for 12 households and respond to 140
telephone inquiries from residents requesting fair
housing information.
Provide 200 households with services including
information and referral, legal advice and
counseling, and legal representation.
2002-2003 Accomplishments
Provided case management for 13 households and
responded to 140 phone inquiries.
Provided legal advice, information and counseling
to 154 households.
No action planned.
Brochure availability continues
Five- Year CP
Accomplishments
Over the past two years
Project Sentinel has provided
case management for 61
households and responded to
602 phone inquiries.
La Raza Centro Legal has
provided legal advice,
information and counseling
to 714 households.
Prepared and distributed fair
housing brochures to City
residents.
7. Discussion: Noise Analysis Report for Sister Cities Boulevard and sound wall design
StaffReport
DATE:
TO:
FROM:
SUBJECT:
September 24, 2003
Honorable Mayor and City Council
Assistant City Manager
Reconsideration of a Request from C/CAG to Support Assembly Bill 1546
RECOMMENDATION
C/CAG recommends that the City Council adopt a resolution supporting Assembly Bill (AB)
1546.
BACKGROUND/DISCUS SION
The City Couhcil will recall that at the regular meeting of April 9, 2003, Richard Napier requested
Council's support of AB 1546, however, the City Council took no action on the item.
AB 1546 has been sponsored by C/CAG and will authorize the C/CAG Board to levy an assessment
of up to four dollars on the motor vehicle registration fee to support two types of programs that
address the impacts of automobiles. The first program is to deal with traffic congestion. The funding
will be used for a wide range of transportation services throughout the County. Some of these
projects could include more shuttle services, implementing intelligent transportation systems, and
enhancements to our transit network. The second program is to address the storm water pollution
that is directly the result of automobiles. The copper residue from brake pads and the condensation
of mercury fi:om vehicle exhaust are major sources of pollution in storm drains and ultimately in the
Bay, the Ocean, and local streams and creeks. Funding from this bill will be available to support
Countywide efforts to manage storm water pollution and also to provide grants to the cities and the
County for its locally managed programs. This bill has the potential to raise nearly $3 million dollars
per year for these programs.
On September 10, 2003, C/CAG representatives once again approached the City Council requesting a
letter of support for AB 1546. It should be noted that 95% (5% C/CAG administrative fee) of the
fees collected from vehicles registered in South San Francisco are utilized in the City for the
aforementioned programs. The fee would terminate on January 1, 2009.
Respectfully submitted,
Approved:
Michael A. Wilson
City Manager
RESOLUTION NO.
CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A RESOLUTION SUPPORTING ASSEMBLY BILL AB 1546 TO
SUPPORT PROGRAMS THAT ADDRESS THE. IMPACT OF
AUTOMOBILES
WHEREAS, AB 1546 has been sponsored by C/CAG and will authorize the C/CAG Board
to levy an assessment of up to four dollars on the motor vehicle registration fee to support two types
of programs that address the impact of automobiles; and
WHEREAS, the first program is to deal with traffic congestion; and
WHEREAS, the funding will be used for a wide range of transportation services throughout
the County; and
WHEREAS, the second program is to address the storm water pollution that is directly the
result of automobiles; and
WHEREAS, funding from this bill will be available to support Countywide efforts to manage
storm water pollution and also to provide grants to the cities and the County for its locally managed
storm water programs; and
WHEREAS, this bill has the potential to raise nearly $3 millf0n dollars per year for these
programs.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of South San
Francisco that the City Council hereby supports Assembly Bill AB '1546.
I hereby certify that the foregoing Resolution was regularly introduced and adopted by the
City Council of the City of South San Francisco at a meeting held on the __
day of ,2003 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ATTEST:
City Clerk
S:\Cun'ent Reso's\9-24.assembly,bill1546.res.doc
CONGESTIO!~ ~ PILOT
T~ ac~vit~s f-u:~d by th: pmg~m sho~Id b: b~'~ ~
nm~w thc fee for ~noth= fo= yeau.
the ~s~m= of the, f~c by ~c C~/C~ Asso~m/oa of
=~am=es mM h'~d. ge: m~s~: b= dev~ol~ ~ approved by th~ C~ty/Coumy
AB 1546 Assembly Bill - AMENDEr
BILL NUMBER: AB 1546 AMENDED
BILL TEXT
AMENDED IN SENATE AUGUST 18, 2003
AMENDED IN SENATE JULY 22, 2003
AMENDED IN SENATE JUNE 24, 2003
AMENDED IN ASSEMBLY APRIL 22, 2003
INTRODUCED BY Assembly Member Simitian
(Coauthors: Assembly Members Mullin and Yee)
FEBRUARY 21, 2003
An ac% rclatin~ tc local ~cvcrnmcnt. An
act to add Chapter 2.65 (commencing with Section 65089.11) to
Division 1 of Title 7 of the Government Code, and to add Section
9250.5 to the Vehicle Code, relating to local government.
Page 1 of 3
LEGISLATIVE COUNSEL'S DIGEST
AB 1546, as amended, Simitian. Local governments: vehicle fee
for congestion and stormwater management programs.
Existing law provides for the imposition by air districts and
other local agencies of fees on the registration of motor vehicles in
certain areas of the state that are in addition to the basic vehicle
registration fee collected by the Department of Motor Vehicles.
This bill wcu!d state thc !ntcnt cf the Lcgis!aturc tc c~p!crc thc
c~ncc~ cf a~IcT,~ng thc ~cvcrnin~ body of a city, ccunty, city and
county, or jcint Fcwcrz m££c¢izti~n actin~ ~r ~n a~£cciati~n cf
gcvcrnmontu tc imFcrc an annual fcc cn motor vchic!cs rc~i£tcrcd
within thc j~rir~ic~i~n fe~ a F~rcgram for thc m~nz~cmcnt cf traffic
ccngc£ticn, £tcrmwatcr pc!!uticn, and cthcr aut~mcbi!c-rc!atcd impact
ab,utcmcnt a~tiviticr.
This bill would authorize the City/County Association of
Governments of San Mateo County to impose an annual fee of up to $4
on motor vehicles registered within San Mateo County for a program
for the management of traffic congestion and stormwater pollution
within that county. The bill would require the City/County
Association of Governments of San Mateo County to have an independent
audit performed on the program and to provide its findings to the
Legislature. The bill would require a program with performance
measures and a budget before the fee may be imposed. The bill would
require the Department of Motor Vehicles, if requested, to collect
the fee and distribute the proceeds, after deduction of specified
administrative costs, to the association. The bill would require
that the fees collected may only be used to pay for programs bearing
a relationship or benefit to the motor vehicles paying the fee, and
would require the board of the association to make a specified
finding of fact by a 2/3 vote. The fee would terminate on January 1,
2009.
Vote: majority. Appropriation: no. Fiscal committee: no.
State-mandated local program: no.
THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:
$ZCTI~N !. I~ iv tho in~ent cf the Lcgi£1atu~c tc oxFlcrc thc
SECTION 1. Chapter 2.65 (commencing with Section 65089.11) is
added to Division 1 of Title 7 of the Government Code, to read:
http://www, leginfo.ca.gov/pub/bill/asm/ab_l 501 - 155 O/ab_1546_bi11_20030818_amended_sen.html 9/12/03
AB 1546 Assembly Bill - AMENDEr Page 2 of 3
CHAPTER 2.65. MANAGEMENT OF TRAFFIC CONGESTION AND STORMWATER
POLLUTION IN SAN MATEO COUNTY
65089.11. (a) The City/County Association of Governments of San
Mateo County, which has been formed by the resolutions of the board
of supervisors within San Mateo County and a majority of the city
councils within the county that represent a majority of the
population in the incorporated area of San Mateo County, may impose a
fee of up to four dollars ($4) on motor vehicles registered within
San Mateo County. The City/County Association of Governments of San
Mateo County may impose the fee only if the board of the association
adopts a resolution providing for both the fee and a corresponding
program for the management of traffic congestion and stormwater
pollution within San Mateo County as set forth in Sections 65089.12
to 65089.15, inclusive. Adoption by the board requires a vote of
approval by board members representing two-thirds of the population
of San Mateo County.
(b) A fee imposed pursuant to this section shall not become
operative until July 1, 2004, pursuant to the resolution adopted by
the board in subdivision (a).
(c) The fee shall terminate on January 1, 2009, unless
reauthorized by the Legislature.
65089.12. (a) The fees distributed to the City/County Association
of Governments of San Mateo County pursuant to Section 9250.5 of the
Vehicle Code shall be used for purposes of congestion management and
stormwater pollution prevention as specified in its adopted
congestion management program, pursuant to Section 65089, and its
approved National Pollutant Discharge Elimination System permit
issued pursuant to the federal Clean Water Act (33 U.S.C. Sec. 1251
et seq.).
(b) (1) The fees collected may be used to pay for those programs
with a relationship or benefit to the motor vehicles that are paying
the fee.
(2) Prior to imposing the fee, the board of the association shall
make a finding of fact by a 2/3 vote that those programs bear a
relationship or benefit to the motor vehicles that will pay the fee.
(c) The purpose of the Congestion Management Program is to address
motor vehicle congestion.
(d) Only the stormwater pollution prevention programs that
directly address the negative impact on creeks, streams, bays, and
the ocean caused by motor vehicles and the infrastructure supporting
motor vehicle travel are eligible for funding.
(e) Not more than 5 percent of the fees distributed to the
City/County Association of Governments of San Mateo County shall be
used by the association for its administrative costs associated with
the program.
65089.13. Prior to the imposition of the fee by the City/County
Association of Governments of San Mateo County, a specific program
with performance measures and a budget shall first be developed and
adopted by the association at a noticed public hearing.
65089.14. The City/County Association of Governments of San Mateo
County shall have an independent audit performed on the program with
the review and report provided to the board at a noticed public
hearing.
65089.15. The City/County Association of Governments of San Mateo
County shall provide a report to the Legislature on the program by
July 1, 2006.
SEC. 2. Section 9250.5 is added to the Vehicle Code, to read:
9250.5. (a) The department shall, if requested by the City/County
Association of Governments of San Mateo County, collect the fee
imposed pursuant to Section 65089.11 of the Government Code upon the
registration or renewal of registration of any motor vehicle
http://www, leginfo.ca, gov/pub/bill/asrn/ab_1501-1550/ab 1546 bill 20030818 amended sen.html 9/12/03
AB 1546 Assembly Bill - AMENDEr`
registered in the county, except those vehicles that are expressly
exempted under this code from the payment of registration fees.
(b) The City/County Association of Governments of San Mateo County
shall pay for the initial setup and programming costs identified by
the Department of Motor Vehicles through a direct contract with the
department. Any direct contract payment by the City/County
Association of Governments of San Mateo County shall be repaid, with
no restriction on the funds, to the City/County Association of
Governments of San Mateo County as part of the initial revenues
distributed. Regular Department of Motor Vehicles collection costs
shall be in accordance with subdivision (c). These costs shall not
be counted against the five per cent administration cost limit
specified in subdivision (c) of Section 65089.12.
(c) After deducting all costs incurred pursuant to this section,
the department shall distribute the revenues to the City/County
Association of Governments of San Mateo County.
ccx~_cc~t cf zllcwing thc gcvcrning body cf ~ city, county, city and
county, cr jcint Fcwcrg agcncy 2cting 2£ an a~rcciaticn cf
gcvcrnmcntr kc im~c~c a fcc e.n mctcr vuhiclor rcgirtcNc~ within thc
jurisdictions., fcr thc FurFc~c cf funding cc~ngcrticn mznagcmcnt
2ctivitie£, ~t~rm~,&2tcr Fe~l~tie.n F~rcvcnticx~-, 2nd cthcr
kutc~.e~i!c-rcl2~c~ imFx2ct ab~toment activi%ic£.
Page 3 of 3
http ://www.leginfo.ca.gov/pub/bill/asrrdab_ 1501-1550/ab_1546_bi11_20030818_amended_sen.html 9/12/03
StaffReport
DATE:
TO:
FROM:
SUBJECT:
September 24, 2003
The Honorable Mayor and City Council
The Director of Public Works
WET WEATHER PROGRAM (PHASES 1 THROUGH 5)
PROJECT NO. 71-13235-0351, BII) NO. 2323
RECOMMENDATION:
It is recommended that the City Council adopt a resolution for the Wet Weather Program a
reimbursement resolution for the approved $45 million State Revolving Fund (SRF) Loan as
required by the State Water Resources Control Board (SWRCB).
BACKGROUND/DISCUS SION:
The Wet Weather Program consists of improvements to the wastewater collection system and pump
stations to control sewer system overflows. This project is required to comply with the Cease and
Desist Order (CDO) that was issued by the Regional Water Quality Control Board. Compliance is
required by November 1, 2007. The City will use revolving funds to finance the project.
The Wet Weather Project consists of five phases:
Phase 1 - Pump Station Improvements, Parallel Force Mains and Effluent Storage Pond
Phase 2 - Sewer Rehabilitation and Relief Sewers
Phase 3 - Colma Creek Bank Protection at the WQCP
Phase 4 - East of 101 Sewer System Improvements
Phase 5 - South Linden Storm & Sewer Rehabilitation
The city has received a preliminary funding commitment from the State Water Resources Control
Board for $45 million through the State's Revolving Loan Program. Phase 1 of the project will start
construction in October 2003.
Staff Report
To:
Re:
Date:
The Honorable Mayor and City Council
Wet Weather Program (Phases 1 thru 5)
September 24, 2003
Page 2
FUNDING:
Total Project Cost Phases 1 through 5
Approved SRF Loan
City's Share
$48,500,000
$45,000,000
$ 3,5OO,OOO
John Gibbs
Director of Public Works
Approved:
Michael A. Wilson
City Manager
ATTACHMENT: Reimbursement Resolution
RB/JG/ed
REIMBURSEMENT RESOLUTION NO.
CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A REIMBURSEMENT RESOLUTION AUTHORIZING THE WET
WEATHER PROGRAM FOR THE APPROVED $45 MILLION STATE
REVOLVING FUND LOAN AS REQUIRED BY THE STATE WATER
RESOURCES CONTROL BOARD
WHEREAS, the City of South San Francisco (the "Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating to its water and
wastewater system, including certain treatment facilities, pipelines and other infrastructure (the
"Project"); and
WHEREAS, the Agency intends to finance the construction and/or reconstruction of the
Project or portions of the Project with moneys ("Project Funds") provided by the State of California,
acting by and through the State Water Resources Control Board (the "Board"); and
WHEREAS, the Board may fund the Project Funds with proceeds from the sale of
obligations the interest upon which is excluded from gross income for federal income tax purposes
(the "Obligations"); and
WHEREAS, prior to either the issuance of the Obligations or the approval by the Board of
the Project Funds the Agency desires to incur certain capital expenditures (the "Expenditures") with
respect to the Project from available moneys of the Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on and after the
date hereof to pay the Expenditures are available only for a temporary period and it is necessary to
reimburse the Agency for the Expenditures from the proceeds of the Obligations.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of South San
Francisco as follows:
Section 1.
The Agency hereby states its intention and reasonably expects to reimburse
Expenditures paid prior to the issuance of the Obligations or the approval by the
Board of the Project Funds.
Section 2.
The reasonably expected maximum principal amount of the Project Funds is
$45,000,000.
Section 3.
This resolution is being adopted no later than 60 days after the date on which the
Agency will expend moneys for the portion of the Project costs to be reimbursed with
Project Funds.
Section 4.
Section 5.
Section 6.
Section 7.
Each Expenditure by the Agency will be of a type properly chargeable to a capital
account under general federal income tax principles.
To the best of our knowledge, this Agency is not aware of the previous adoption of
official intents by the Agency that have been made as a matter of course for the
purpose of reimbursing expenditures and for which tax-exempt obligations have not
been issued.
This resolution is adopted as official intent of the Agency in order to comply with
Treasury Regulation § 1.150-2 and any other regulations of the Internal Revenue
Service relating to the qualification for reimbursement of Project costs.
All the recitals in this Resolution are true and correct and this Agency so finds,
determines and represents.
I hereby certify that the foregoing Resolution was regularly introduced and adopted by the
City Council of the City of South San Francisco at a meeting held on the
_ day of ,2003 by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
ATTEST:
City Clerk
&\Current Reso's\9-24wet.weather.program.res.doc
DATE:
TO:
FROM:
SUBJECT:
Staff Report
September 24, 2003
The Honorable Mayor and City Council
The Director of Public Works
LINDENVII J,E STORM DRAIN REHABILITATION
RECOMMENDATION:
It is recommended that the City Council, by motion, approve an addendum to the John
Carollo Engineers contract in the amount of $400,000 to design and produce all contract
documents (including environmental) for the Lindenville storm drain rehabilitation.
B ACKGROUND/DIS CUS SION:
The South Linden area has been subject to flooding during heavy storms for some 80 years; causes
are either the creek overflowing or floodgates broken storm drain settlement high tides or a
combination of all. Since the severe flooding of November 2002, Public Works has retained Carollo
Engineers to study the area and together with staff find a solution to the problem (Carollo is retained
by the City of South San Francisco for the Wet Weather Program).
Two solutions are required an immediate to help with this years projected floods (temporary) and a
permanent solution to be constructed beginning May 2004.
The area has been surveyed and the design parameter established. This staff report requests approval
of the addendum to the contract to enable the contract documents to be completed.
FUNDING:
Funding will be included in the State Revolving Loan (Wet Weather Program) with the estimated
costs having been approved by the state as an addition to their previous commitment.
BY: ~'~~ ~?pproved:
John Gibbs Michael A. Wils
Director of Public Works City Manager
ATTACHMENT: Carollo Proposal
SG/ed
September 11, 2003
Mr. John Gibbs
Director of Public Works
City of South San Francisco
400 Grand Avenue
South San Francisco, CA 94083
Subject:
Dear Mr. Gibbs:
Proposal to Provide Professional Engineering Services -
Wet Weather Program Phase 5 - Linden Avenue Stormwater Improvements
Thank you for requesting our proposal to provide final design services for the City of South San Francisco
(City) Wet Weather Program, Phase 5 - Linden Avenue Stormwater Improvements. The following is our
proposed scope of work, schedule, and hours/cost estimate.
UNDERSTANDING
The City wants to address the recurring wet weather flooding problems occurring in the area south of
Colma Creek. Specifically, Linden Avenue between South Canal Street and Victory Avenue has been
identified as the most heavily affected area and needs to be addressed as the highest priority. Deficiencies
in the area's stormwater drainage system and required improvements have been discussed with the City
and include the following:
· Replacing the existing storm drainage pipeline on Linden Avenue (between South Canal Street and
Victory Avenue) with a new storm drainage pipeline.
· Replacing the existing storm drainage pipeline from the low point on Victory Avenue (about 500 feet
west of Linden Avenue) to Linden Avenue.
· Adding an interceptor pipeline along Maple Avenue and South Canal Street, connecting the low
point on Maple Avenue (about 500 feet south of South Canal Street) to the new pump station.
· Adding a pump station near the corner of Linden Avenue and South Canal Street to collect the new
pipeline and interceptor storm drainage flows.
· Adding two forcemains from the new pump station to Colma Creek. The forcemains will discharge to
Colma Creek through a box structure that will be constructed by change order as part of the ongoing
San Mateo County Co[ma Creek Channel Improvements Project.
The estimated construction cost for these improvements is $5.4 million.
SCOPE OF WORK
A detailed Scope of Work is attached. Engineering design services will be provided out of our Walnut
Creek office.
PROJECT TEAM
Our project team will include Mike Britten as Partner in Charge/Project Manager and Elaine Chiu as
Project Engineer. Mike is intimately familiar with the City's Water Quality Control Plant (WQCP) and
V:\ClientS0\So uthSFkLP\LindenStrmWtr [mps\Docs~Letter.doc
2700 YGNACIO VALLEY ROAD, SUITE 300 · WALNUT CREEK, CALIFORNIA 94598 · (925) 932-1710' FAX (925) 930-0208
Mr. John Gibbs
City of South San Francisco
September 11, 2003
Page 2
the City's sewer and stormwater systems, having completed the final design for the 1998 WQCP
Improvements Project. Elaine is also intimately familiar with the City's WQCP, having developed the
Operations and Maintenance Manual for the 1998 WQCP Improvements Project.
Mike will be the primary contact for this project. He will allocate resources as needed to complete the
project and will manage the project scope, schedule, and budget. Elaine will coordinate the preliminary
and final design engineering activities.
SCHEDULE
Our services will be completed according to the following proposed schedule:
Task Completion Date
Notice to Proceed September 29, 2003 (assumed)
Task 1 - Project Management Services Ongoing
Task 3 - Preliminary Engineering November 28, 2003
Task 4 - Final Design
30 Percent Submittal January 2, 2004
90 Percent Submittal January 30, 2004
Final Submittal February 13, 2004
Task 5 - VE Coordination January 30, 2004
Task 7 - Bidding Services
Print Bid Documents February 27, 2004
COST ESTIMATE
The attached table (Exhibit A) provides a breakdown of costs and hours by task and labor classification.
Our labor estimates are based on Carollo Engineer's Fee Schedule dated March 1, 2003, which is attached.
Thank you for the opportunity to provide engineering services for the City. We would be happy to meet
with you to review the proposed scope and estimated costs. We look forward to assisting you in completing
this important project.
Sincerely,
CAROLLO ENGINEERS, P.C~.
Michael J. Britten,' ~.E.
Partner
MJB:jl
Enclosures:
Scope of Work
Labor Cost Estimate
Fee Schedule
Rasumds
Letter.doc
SCOPE OF WORK
The scope of services for the City of South San Francisco Wet Weather Program, Phase 5 - Linden
Avenue Stormwater Improvements includes the following tasks.
TASK 1.0 - PROJECT MANAGEMENT SERVICES
Under Phase 1 of the Wet Weather Program (WWP), Carollo assisted the City in preparing an SRF loan
application for the overall WWP (Phases 1-4). The required support information, including a mitigated
negative declaration, draft revenue program, facility plan, and other planning documents, were submitted
to the State Water Resources Control Board (SWRCB) along with the application. All of the required
support information, including final design documents for review, must be prepared for the Phase 5 loan
application.
1.1 - State Revolving Fund (SRF) Loan assistance. Prepare a separate SRF loan application for the
Phase 5 work and coordinate the preparation of support information as described under the following
tasks. Meet with the SWRCB staff to coordinate the loan application process. One (1) meeting with the
SWRCB is assumed.
1.2. Coordination with environmental impact analysis consultant. Provide technical information and
coordinate with an environmental consultant (Jerry Haag) contracted with the City for preparation of the
amended CEQA documents for Phase 5. It is assumed that a Mitigated Negative Declaration will be
required.
1.3 - Coordination with Section 106 federal requirements. Additional work to fulfill Section 106
federal requirements for Phase 5 of the WWP will be required to obtain loan approval for this phase of the
WWP. It is our understanding that the City will contract directly with a subconsultant (Holman
Associates) to perform the Section 106 work. Carollo's responsibilities for this subtask will consist of the
following:
Answer questions from the subconsultant regarding limits of construction, proposed methods of
construction, and anticipated areas to be disturbed by construction.
} Prepare Area of Potential Effect (APE) paaps for the pump station site and for the pipeline
alignments.
} Prepare written descriptions of the Phase 5 projects.
1.4 - Financing coordination/updates. Coordinate with the financing subconsultant (Bartle Wells
Associates) to prepare for and conduct quarterly update meetings with City staff to discuss the status of
the SRF loan for the WWP, funding, revenue, etc. It is anticipated that two (2) meetings will be held.
They will also be available to answer questions from City staff.
V:\Client80\SouthSP, LP\LMdenStrmWtrlmps\Docs\Scope.doc
Carollo's responsibilities for this subtask will consist of attending meetings, submitting updated cost
estimate information to the subconsultant, and preparing exhibits for the meetings.
1.5 - Hazardous material sampling. Due to the proximity of the project site to Olympian Oil Company,
petroleum hydrocarbon contamination in the soil and/or groundwater may exist. Soil and groundwater
sampling at the soil boring sites will be conducted by a subconsultant, Bonkowski & Associates, to test for
the presence of hazardous materials.
1.6 - Facility plan update. Prepare a Facility Plan for SRF approval based on the existing Master Plan.
TASK 2.0 - PERMITTING
It is assumed that permitting will be conducted by the City.
TASK 3.0 - PRELIMINARY ENGINEERING AND DATA ACQUISITION
3.1 - Develop design criteria. Develop the design criteria for the following improvements to Linden
Avenue, Victory Avenue, and South Canal Street identified in the Storm Drainage System Master Plan:
Replacing the existing storm drainage pipeline on Linden Avenue (between South Canal Street
and Victory Avenue) with a new storm drainage pipeline.
· Replacing the existing storm drainage pipeline from the low point on Victory Avenue about 500
feet west of Linden Avenue) to Linden Avenue.
Adding an interceptor pipeline along Maple Avenue and South Canal Street, connecting the low
point on Maple Avenue (about 500 feet south of South Canal Street) to the new pm-np station.
· Adding a pump station near the comer of Linden Avenue and South Canal Street to collect the
new pipeline and interceptor storm drainage flows.
· Adding two forcemains from the new pump station to Colma Creek. The forcemains will
discharge to Colma Creek through a box structure that will be constructed by change order as
part of the ongoing San Mateo County Colma Creek Channel Improvements Project.
3.2 - Evaluate pump station location. Finalize the site location for pump station and identify
constructability issues.
3.3 - Identify street improvements. Identify existing street features (manholes, gutters, storm drain
inlets, interceptor drain pipes, pavement grading, etc.) that will be incorporated into the new system and
determine new features that need to be added.
3.4 - Review background information. Obtain and review available background information provided by
the City, including storm drainage system maps, utility maps, property maps, and geotechnical data.
V:\ClientS0\SouthS ~LP\LindenStrmWtdmps\Docs\Scope.doc
3.5. Field surveying. Obtain supplemental information on existing street features, including invert
elevations of manholes, interceptors, etc. Field surveying will be conducted by a subconsultant, Hydmet.
3.6 - Utility search. Obtain locations of sewer, water, electrical, and telecommunications systems based
on available utility drawings.
3.7 - Geotectmical field investigation. Conduct soil borings at the pump station and pipeline sites to
determine subsurface soil conditions and to provide recommendations for building foundation design
criteria (including special pile foundation recommendations) and pipeline trench foundation design.
Geotechnical field investigation will be conducted by a subconsultant, DCM JoyaI.
TASK 4.0 - FINAL DESIGN
4.1 - Prepare final design documents. Final design drawings and specifications will be prepared for the
elements discussed in Task 3.0, Preliminary Engineering and Data Acquisition. It is assumed that Carollo's
front-end specifications will be used on the project. Design progress submittals will be made at the 30
percent and 90 percent design stages. Three (3) copies of half-size drawings and specifications will be
submitted for City review.
TASK 5.0 - VALUE ENGINEERING COORDINATION
Coordination with City's value engineering (VE) subconsultant to have 90 percent design drawings and
specifications reviewed, incorporate VE recommendations into the final design drawings and
specifications.
TASK 6.0 - MEETING ATTENDANCE
6.1 - Progress meetings. Attend five progress meetings. Prepare agenda and meeting notes. The purpose
of the meetings will be to update the status of design, budget, and schedule and discuss design issues. The
meeting notes will serve as progress reports for the City.
6.2 - Presentation to City Council. Attend one City Council meeting to present a description of the final
project. Prepare graphics materials for the presentation and handouts for the Council Members.
TASK 7.0 - BIDDING SERVICES
7.1 - Print Bid Documents. Print thirty (30) sets of plans and specifications for the bidding process. Costs
for more than 30 sets will be provided at additional cost.
7.2- Answer questions from bidders.
7.3- Attend pre.bid meeting and prepare meeting notes.
V:\ClientSO\SouthS F\LP\LindenStrmWtrlmps\Docs\Scope.doc 3
7.4- Prepare addenda and distribute to bidders.
7.5- Attend bid opening and review bids.
7.6- Bid award deliverables.
7.7- Conformed drawings and specifications. Prepare conformed drawings and specifications (updated
design drawings and specifications to include revisions contained in the addendum~. Three (3) sets of
half-size drawings and specifications will be provided to the City.
TASK 8.0 - PROJECT CERTIFICATION
Prepare a project certification report and conduct facility field testing for SRF reqmrements.
DELIVERABLES
Progress Meeting Notes
30% Design Submittal
90% Design Submittal
Final Bid Documents (Drawings and Specifications)
Addenda
Bid Results Summary
Draft Revenue Program
Final Revenue Program
SRF Loan Application
Number of Copies
3
3
3
30
30
3
10
10
3
SERVICES NOT INCLUDED INTHIS SCOPE
1. Preparation of amended CEQA documents for Phase 5 and any related studies (e.g. a hazardous
materials, characterization study), it is assumed that the City will contract with an environmental
consultant to perform tl~is work.
2. Design of additional project elements beyond the items listed under Task 3.
3. Construction support and inspection services (to be included under a separate task order if desired by
the City).
4. Acquisition of any necessary permits. It is anticipated that the following permits may be required:
BCDC, San Mateo County Flood Control District, and Air Quality Management District. It is assumed
that permit acquisition will be conducted by the City.
V:\Client80\SouthSF\LP\LindenStrmWtrtmps\Docs\Scope.doc 4
5. Additional copies of final drawings and specifications beyond the thirty (30) sets.
6. Property acquisition or condemnation proceedings.
V:\Client80\SouthS F~LP\LindenStrmWtrlmps\Docs\Scope.d°c 5
Carollo Labor Hour Estimate:
Task Task Description
1.0 Project Management Services
1.1 SRF loan assistance
1.2 Environmental Impact Analysis Coordination
1.3 Coordination pertaining to Section 106 federal requirements
1.4 Financing coordination/updates
1.5 Hazardous Material Sampling Coordination
1.6 Facility Plan
2.0 Permitting
3.0 Preliminary Engineering
4.0 Final Design
5.0 Coordination with City's VE subconsultant
6.0 Meeting attendance
7.0 Bidding services
8.0 Project Certification Report
Budget Estimate:
Exhibit A
LABOR COST ESTIMATE
SOUTH SAN FRANCISCO WET WEATHER PROGRAM
Phase 5 - Linden Avenue Stormwater Improvements
Total =
16 8 32
8 8 40
4 8 8 24
16 8 16
2 4
16 32 96 24
by city
8 16 96
21 64 448 277
8 16 8 4
30 24 24 4
8 32 40 16
8 16 4O
143 234 852 349
Labor Costs
Classification Hours
Partner in Charge (PIC) 143
Project Manager (PM) lEVI) 234
Project Engineer (PE) (EIII) 852
Engineer (E) (EIII) 349
Structural Engineer (SE) lEV) 169
Electrical Engineer lEE) lEV) 229
Drafting (D) (ET VI) 945
Word Processing (W P) 195
Labor Totals = 3,116
S_.~E
24
24
8 8 24
149 213 853
169
8 20
229 945
4
4
24
4
107
4
12
20
8
195
Rate
$ 189.00
$ 159.00
$ 131.oo
$ 97.00
$ 159.oo
$ 159.00
$ 89.00
$ 68.00
Total
Amonn~.
64
84
72
40
6
192
164
2,132
40
98
152
72
3,116
27,027
37,206
111,612
33,853
26,871
36,411
84,105
13,260
370,345
Subconsultants
Finance/Revenue Program (Barge Wells)
Surveying/Hydrology (Hydmet- Jack Humphrey)
Geotechnicat (DCM Joyal)
Environmental investigation (BonkowskJ & Assoc)
Subtotal
Fee on Subconsultatnts (10%)
Other DJrecl Costs
Printing
PECE*
Mileage
Subtotal
Fee on ODC's (lO%)
3,116
8
* Project Equipment Communication Expense
Subconsugants Total =
hrs @ 6.00/hr
trips @ 70 mi/trip x $0.36/mi.=
ODCs Total
Total Proiect =
$
$
$
$
$
$
10,000
20,000
20,000
57,000
~,700
62,700
7,000
18,696
2O2
25,898
2,590
28,487
461,532
h:\client\southsf_wco\6399a.10\contract~esginPr2.xls 9/12/2003 4:12 PM
CAROLLO ENGINEERS, PC
FEE SCHEDULE
As of March 1, 2003
Northern California
Engineers/Scientists
Assistant Professional
Professional
Project Professional
Lead Project Professional
Senior Professional
Technicians
Technicians
Senior Technicians
Support Staff
Word Processing / Clerical
Project Equipment Communication Expense
(PECE) Per DL Hour
Other
Direct Expenses
Travel and Subsistence
Mileage
Subconsultant
Other Direct Cost
Expert Witness
Hourlv Rate
$ 97.00
131.00
159.00
174.00
189.00
69.00
108.00
68.00
6.00
at cost
.36/mile
cost + 10%
cost + 10%
Rate x 2.0
This fee schedule is subject to annual revisions due to labor adjustments.
H:~KMAN UAL\FEE~Standard~NCAL03.doc
Michael J. Britten
Education
BS Civil Engineering,
Arizona State
University, 1974
Registration
Civil, CaJifornia
Professional
Affiliations
Water Environment
Federation
American Society of
Civil Engineers
American Water
Workx Association
Mr.Britten is a with Carollo
partaker
Engineers and has ~0 years of
experience in master planning, design, and
construction management of wastewater
facilities. His experience includes:
Construction Management
· Partner-in-charge for the Daly City
Tertiary Recycled Water Facilities project.
Carollo completed the design services and
is currently providing construction
management services for the $6-million
project.
· Project manager for third-party
construction management services for the
$29-million Salinas Valley Reclamation
Project. The project consisted of a full
California Title 22 unrestricted use
reclamation facility, an irrigation water
storage basin, and a two-mile, 3 I-inch
irrigation water supply pipeline. The
project provides growers in the Salinas
Valley with 30 mgd of irrigation water for
crops. Work included maintaining excellent
communications with the MRWPCA staff,
the contractor, the crop growers, and the
wastewater treatment plant staff.
Wastewater Treatment
· Project manager for planning,
permitting and design services for the
South San Francisco/San Bruno Water
Quality Control Plant Improvement Project.
The $42 million project consisted of
expanding the existing capacity from 9 mgd
to 13 mgd average dry weather flow and
providing for wet weather treatment
capacity of 62 mgd. Key elements of the
project included adding one 110-foot-
diameter secondary clarifier, a RAS
pumping system, and a bar screen for wet
weather flow.
· Partner-in-charge for the City of
Burlingame, California, wastewater
treatment plant improvements project. The
project, totaling about $8 million, will
include replacement of the aeration system,
new blowers, and a sludge dewatering
building. Carollo design the project and
will be serving as construction managers.
- Partner-in-charge/project manager for
the City of Turlock, California,
nitrification facilities design project. This
$8.1 million project included evaluation of
alternatives to expand the trickling
filter/activated sludge process to permit
nitrification. The plant will be expanded to
15.5 mgd by constructing two new
aeration basins. In addition, the design
converts three existing aeration basins
from floating covers to fine bubble
aeration. The project also includes the
addition of four new 400-hp centrifugal
blowers to supply air to the existing
aeration basins.
· Project manager for master planning,
final design, and construction management
services for the Sewer Authority Mid-
Coastside wastewater treatment plant in
Half Moon Bay, California. This project,
totaling $17 million, consists of an
expansion of the plant to 4 mgd by adding
activated sludge, sludge thickening and
dewatering, two 55-foot-diameter
anaerobic digesters, a new chlorine contact
tank, and hypochlorite/bisulfite
disinfection system. The project involves a
major retrofit of the existing plant and
includes providing for full odor control.
Work included a desk-top capacity study,
full-scale capacity stress testing, and
assisting SAM in obtaining a permit from
the Coastal Development Commission.
· Project manager for the design of the
$36 million Union Sanitary District
Wastewater Treatment Plant Upgrade
Project in Union City. The project,
consisting of activated sludge processes,
an 88-foot- diameter anaerobic digester,
and sludge thickening facilities, increased
plant capacity to 30 mgd. Responsibilities
included obtaining State Revolving Fund
loans, negotiations with Pacific Gas and
Electric to relocate high voltage lines, and
obtaining permits from the Bay Area Air
Quality Management District
· Project manager for the design and
construction management services for the
$24 million East Bay Municipal Utility
District wastewater treatment plant 11-
million-gallon wet weather storage basin
Michael J. Britten Pa~e ~
project. The project consists of an ! 1-million-gallon
storage basin, 120-mgd flow diversion facilities, and
an 80-mgd submersible pump station. Constructed
on a congested site near the base of the San
Francisco-Oakland Bay Bridge, this project required
that over 2,000 piles be driven in poor soils and
insitu soil cement shoring systems be used.
Responsibilities included overseeing the
construction manager and coordinating with the
design team. The project received the Design Honor
Award by the California Consulting Engineers
Council in 1992.
· Project manager for the design of a $16 million
plant expansion for the North San Mateo County
Sanitation District in Daly City, California. The
project provides 2.8 million gallons of flow
equalization storage basins and new primary
sedimentation basins to expand the activated sludge
plant from 8 mgd to 10.3 mgd. The equalization
basins also provide wet weather flow storage. The
project also included a new chlorine contact tank
and chlorination/dechlorination system
improvements. Because of severe space limitations,
the primary sedimentation basins and equalization
basins were buried 50 feet underground and covered
with a baseball park. An activated carbon scrubber
provides odor control for exhaust air. The project
received the Engineering and Research Award by
the California Water Pollution Control Association,
San Francisco Section in 1992.
· Project manager for the addition of a 140-foot-
diameter secondary clarifier and a new PAS pump
station for the City of Turlock, California. The
project also included evaluation of the trickling
filters for future treatment capacity.
· Project enghaeer for design of a $5 million WAS
thickening facility and modifications to the primary
sedimemation basin influent channels and
prechlorination system for EBMUD's main
wastewater treatment plant.
· Project/construction manager for the City of
Sunnyvale's $12.5 million multi-project wastewater
plant expansion, including construction of a 30-mgd
pump station, primary clarifiers, a dissolved air
flotation thickener, a cogeneration system, and dual
media filter. As an extension of the City's staff,
administrated five construction contracts and three
design contracts. Responsible for design review and
working closely with the design f'mn to minimize
conflicts. Work also included obtaining local
building permits and a permit from the Bay
Conservation and Development Commission.
· Project engineer for design of a $4.5 million,
3.3-mgd oxidation ditch wastewater plant for the
City of Magna, Utah. This project included a
chlorine contact tank and chlorination facilities.
· Project engineer for the City of Phoenix,
Arizona, Water Pollution Control Plant 60-mgd
conversion to fine bubble diffusion aeration.
· Project engineer for design of a 12-mgd,
activated sludge secondary treatment facility for the
West County Wastewater District, California.
· Project engineer for the predesign for expansion
of the City of San Diego, California, Point Loma
wastewater plant.
Facility/Master Planning
· Partner-in-charge/project manager for the City of
Turlock recycled water feasibility study. The study
identified potential uses for recycled water
including groundwater recharge and crop/rrigation.
The study also developed the required treatment
facilities for a 20-mgd recycled plant.
· Paxtner-in-charge for the City of Burlingame,
California, Wastewater Treatment Facility Study.
The study evaluated alternatives for upgrading and
expanding the plant to accommodate wet weather
flows. The study included a capacity evaluation and
a reliability audit of the existing facilities.
· Project manager for the wet weather program for
the City of South San Francisco. This included an
infiltration/inflow analyses and development ora
capital improvements program for the collection
system and main pump stations.
· Project manager for the Sewer Authority Mid-
Coastside (SAM) Wet Weather Management
Program. The project included monitoring wet
weather flows and rainfall in Half Moon Bay, E1
Granada, and Montara to evaluate the wet weather
capacity of the intertie pipeline system. The intertie
system conveys wastewater from these communities
to the SAM treatment plant. Carollo prepared a
facility plan that identifies some $8 million in
capital improvements. The recommended
V:\Re~ume\WCO\Britt craM. doc
e rlGi ne e r s
Michael J. Britten Pa~e 3
improvements include wet weather storage basins, a
parallel force main, and increased capacity for a
major pump station.
· Project manager for the $9 million City of Fort
Bragg Water Source Development Project. The
project studied the feasibility of installing a new
river intake and raw water pumping station, new
raw water transmission pipelines and a 1,500-acre-
foot reservoir. Also included in the scope was a
recycled.water feasibility study. These facilities
would allow Fort Bragg eliminate river diversions ~
from the river in the dry season when flows are low
and mum fish bypass flows cannot be
maintained. Pumping would occur only during the
wet season and excess flow would be stored in the
reservoir to satisfy summer demands.
Recycled Water
· Partner-in-charge for design of the City of
Turlock, California, water recycling project. The
$ 5 O-million project will consist of tertiary treatment
facilities to provide 20 mgd of recycled water
meeting Title 22 tertiary requirements. Recycled
water will be distributed to growers via a 60-inch,
six mile long pipeline.
Publications/Presentations
Reddy, S.P., Swanback, S.G., and Britten, M.J.
"Using Computational Fluid Dynamics Analysis to
Increase Disinfection Capacity of Wastewater
Reclamation Plants." Paper presented at the
California Section of the WateKeuse Association
2003 Annual Conference, San Francisco, CA,
February 26-28, 2003.
Petit, J-M., Vanier, S.M., and Britten, M.J. "Use of
High Rate Flocculation/Sedimentation and Cloth
Disk Filtration for Water Reuse." Paper presented at
the Rocky Mountain Section of the American Water
Works Association/Rocky Mountain Water
Environment Association 2002 Annual Conference,
Steamboat Springs. CO, September 15-18, 2002.
Britten, M.J., Bourgeous, K.N., and Petit, J-M.
"Evaluation of Enhanced Flocculation and Cloth
Disk Filter for California Title 22 Reuse." Paper
presented at the 2002 WateReuse Symposium,
Orlando, FL, September 8-11, 2002.
Britten, M.J., and Madden, D. "Adding Nitrification
to An Existing Trickling Filter/Activated Sludge
Process at the City of Tm:lock." Paper presented at
the California Water Environment Association 2001
Annual Conference, Palm Springs, CA, April l 8-20,
2001.
Britten, M.J., and Parlin, L.G. "Interim Capital and
Operational Improvements for Increased Treatment
Reliability at the South San Francisco/San Bruno
Water Quality Control Plant." Paper presented at the
Nevada Water Pollution Control Association
Annual Conference, Reno, NV, March 6-8, 1996.
Br/tten, M.J. "Determining Treatment Capacity at
Sewer Authority Mid-Coastside." Paper presented at
the Water Environment Federation Conference,
Anaheim, CA, October I993.
Britten, M. J. "Design and Construction of the East
Bay Municipal Utility District Wet Weather Storage
Basin." Paper presented at the Water Environment
Federation Wet Weather Specialty Conference,
Indianapolis, IN, 1992.
Britten, M.J. "Put It Under the Park - Design
Features of the Daly City Underground Wastewater
Treatment Facility." Paper presented at the Water
Environment Federation Conference, October 1989.
Britten, M.J. "Odor Control for Sludge Processing."
Paper presented at the 1st Annual Water Pollution
Control Residuals Conference, Los Angeles, CA,
1987.
Elaine Chiu
Education
BS Civil Engineering,
University of
California, Berkeley,
1998
MS Environmental
Engineering,
University of
California, Berkeley,
2000
Registration
Professional Engineer,
California
Professional
Affiliations
California V~ater
Environment
Association
Water Environment
Federation
Ms. Chiu is experienced at planning
and designing water and wastewater
treatment facilities. Project experience
includes:
Wastewater Treatment
· Project engineer for the $8 million
Wastewater Treatment Plant Improvements
Project for the City of Burlingame,
California. Responsibilities include design
ora new aeration system, new blowers, and
a new waste gas flare. Currently project
engineer for the construction management
services provided by Carollo Engineers.
· Project engineer for the City of
Cambria, California, Wastewater
Treatment Plant Biosolids Dewatering
Project preliminary design. Responsibilities
include preparing preliminary design
drawings, preliminary prequalification
specifications, and a cost analysis.
· Project engineer for the City of Atwater,
California, Wastewater Treatment Plant
dechlorination facilities. Responsibilities
include designing a 21,000-gallon contact
basin for dechlorination of plant effluem
with calcium thiosulfate.
· Engineer for the Cities of South San
Francisco and San Bruno, California, $42
million Water Quality Control Plant
Improvement Project. Responsible for
preparation of the operation and
maintenance manual.
Previous Experience
· While with another firm, Ms. Chiu
served as an engineer completing
env/ronmental, civil, and geotechnical
projects for various clients. Analyzed pH
impact on disinfection by-product
formation in the San Francisco Public
Utilities Commission (SFPUC), California,
distribution system. Prepared
recommendations and a conceptual cost
estimate for a pump station upgrade.
Designed the drainage collection system
and utility connections for a San Francisco
Zoo building. Compiled, huput, and
analyzed water quality data for Information
Collection Rule and Lead and Copper Rule
Compliance for the SFPUC. Performed
geotechnical investigations, deep
foundation capacity analysis, and
pavement design reconamendations.
· Environmental engineering student
trainee for the City and County of San
Francisco, California, Southeast Water
Pollution Control Plant. Assisted in
planning and coordinating City
construction and design projects. Prepared
a scope of work for upgrading plant odor
control units. Researched and prepared a
draft protocol for an odor sampling study.
Revised an Odor Control Unit guidance
document. Conducted odor sampling
surveys in nearby residential community.
· Co-op student for the Delta Diablo
Sanitation District, California, Engineering
Department. Assisted in plant evaluation
studies and analysis of disinfection
problem. Coordinated the
interdepartmental implementation of a
plant capacity study. Prepared an
evaluation report of plant chlorination
system. Assisted in developing a protocol
for evaluating trial chlorination equipment.
Performed laboratory analyses of District
wastewater.
v:xR .... xwcoxcu~E.doc ~ cor'oI..I..O,,.,,,,~..,,.,