Genentech Master Plan Update, Draft EIR Page 16-1
16
Public Services
This chapter of the EIR evaluates the potential impacts of the Master Plan Update (the Project) related to the
provision of public services, including police protection, fire protection and emergency services, and
recreation services. The chapter describes the existing public services within and near the Project Area, and
evaluates the potential for impacts on the demand for services that could result from the Project. Buildout of
the Master Plan Update would not develop any new residential uses within the Project Area, and therefore
would not create any direct demand for or result in any direct impacts to libraries, schools, or other public
services. Although the Project may result in limited indirect effects (e.g., a limited number of inter-district
school transfers and/or occasional use of a library by future employees), these indirect effects are not
considered significant and libraries, schools and related community services are not further discussed, as no
analysis is required.
Some of the information presented in this chapter draws from the prior analyses conducted for the 2007
MEIR and the 2012 SMEIR. Updated or additional information regarding environmental and Project-related
public services was taken from the following sources:
● 2017 Municipal Services Assessment, prepared for 2017 Oyster Point Specific Plan Update,
November 2017 (Appendix 16)1
● General Plan of the City of South San Francisco
● East of 101 Area Plan of the City of South San Francisco
● Subsequent EIR for the Community Civic Campus Project, December 2017
● BCDC Permit #s 18-74(A) and 18-74(B) as amended through December 2009, and Permit #MO5-9 as
of 2006
Environmental Setting
Police Services
Police services within the Project Area are provided by the South San Francisco Police Department (SSFPD).
SSFPD is divided into two Divisions: Operations and Services. The Operations Division includes Patrol, Criminal
Investigations, Downtown Bike Patrol, K-9, Neighborhood Response Team, SWAT/Hostage Negotiations and
Traffic/Motors. The Services Division includes Communications, Community Relations, Property/Evidence,
Records, Planning and Recruiting. Each Division is commanded by a Captain.
The SSFPD operates out of one main station, located at 33 Arroyo Drive. A new police headquarters that will
replace the current SSFPD station is proposed as part of the City’s Community Civic Campus project. In July
1 Although this Municipal Services Assessment (MSA) was prepared for a separate project, and that project’s EIR was not
certified and the project was not approved, the MSA includes current citywide services information that is relevant to this
analysis
Chapter 16: Public Services
Page 16-2 Genentech Master Plan Update, Draft EIR
2018, City Council selected a Master Plan that will serve as the basis for schematic design, and the complete
design process is expected to be complete by the summer/fall of 2019. Construction is estimated in years
2020 to 2022. The Community Civic Campus is to be located at the northeast corner of El Camino Real and
Chestnut, and will include a Police Station, a Fire Station (as part of Phase II), and a combined Library and
Parks & Recreation Community Center, with parking and landscaping improvements.2
Implementing Policy 8.5.I-1 of the General Plan Health and Safety Element seeks to maintain a target ratio of
1.5 officers per 1,000 residents to ensure rapid and timely response to all emergencies. As of fiscal year 2016-
17, the officer-to-population ratio for the SSFPD was approximately 1.03 officers per 1,000 population. In
2016, the SSFPD response times to Priority 1 (emergency) calls averaged 3:59 minutes, and to non-
emergency calls averaged 6:03 minutes. These response times are considered acceptable (there is no
standard against which they are measured, nor is there any obligated standard to measure against).3
Fire Protection and Emergency Services
Fire prevention, Municipal Code enforcement, fire suppression, emergency medical services (advanced life
support and nonemergency basic life support and ambulance transportation), urban search and rescue,
hazardous materials services, public education, disaster preparedness, and marine search and rescue services
are provided by the South San Francisco Fire Department (SSFFD).
The SSFFD has five fire stations located throughout South San Francisco. Station #62 is the closest station to
the Project Area, located within a mile away at 249 Harbor Way. Station #62 provides all first response
services to the East of US 101 area, and provides first response to any emergency in the Project Area.
The SSF General Plan Health and Safety Element does not identify a personnel-to-service population target
ratio. The SSFFD staffing consists of emergency response, fire prevention and administrative personnel, with
87 total full-time equivalent and approximately 6 hourly and contract employees. There are a minimum of 20
on-duty emergency response personnel staffing each of three shifts.
Response time is defined as the time that elapses between the moment a call is received by dispatch and the
moment when the first unit assigned to the call arrives at the scene. The goal is to arrive at emergency
incidents within seven minutes after a 911 call is received, including a 4-minute travel time. Response time
goals are generally met system-wide, but the 2017 Municipal Assessment notes that SSFFD is actively looking
for an additional or alternative site for Station #62 in the East of 101 area because this station’s location in
the southwesterly portion of East of 101 makes it difficult to meet response goals in the northern and eastern
parts of the East of 101 Area.4
Water Supply for Fire Fighting
Delivery of water to Genentech buildings for use in fire protection relies on the on-Campus domestic water
distribution system. Additionally, several buildings within the Genentech Campus have additional water
storage tanks and/or fire pumps installed for local pressure control.
Genentech First Alert
Genentech’s private First Alert Team provides fire response services for emergencies, including medical,
chemical and fire emergencies within the Genentech Campus. Emergency call phones are located throughout
2 http://www.measurewssfcivic.com/
3 2017 Oyster Point Specific Plan Update, Municipal Services Assessment (MSA)- Draft Existing Conditions and Needs
assessment Report, prepared for City of South San Francisco by Michael Baker International, November 2017, page 8
4 2017 Oyster Point Specific Plan Update MSA, page 7
Chapter 16: Public Services
Genentech Master Plan Update, Draft EIR Page 16-3
the Genentech Campus and calls are routed to the Control Room Operator, who notifies the First Alert Team.
If needed, the Control Room Operator also notifies outside emergency personnel such as the SSFPD.
Recreation
The South San Francisco Parks and Recreation Department manages parks and recreation centers within the
city boundaries. According to the Municipal Services Assessment, there is an estimated 251 acres of parks
and open space in the city. Community parks, neighborhood parks, mini-parks, specialty parks and linear
parks collectively provide approximately 1.9 acres of developed parkland per 1,000 residents. Combined with
open space and common green areas, there are approximately 3.9 acres of parks and open space per 1,000
residents. This ratio of parks and open space per 1,000 residents is greater than the General Plan standard of
3.0 acres per 1,000 residents. If jointly used school sites are included in the total park and open space
calculations, the total parks and open space ratio increases to 5.4 acres per 1,000 residents.5
The nearest existing parks to the Project Area are the Jack Drago mini-park (located over a mile from the
Project site) and the nearby Oyster Point Marina Park, which includes an open space/special use facility with
walking trails, benches, picnic areas and marina-related services. All other park facilities are located west of
US 101.
The Bay Trail connects the Genentech Campus to the broader San Francisco Bay regional park system. The
Bay Trail is located within the generally 100-foot wide shoreline band around much of the San Francisco Bay,
and is with the jurisdiction of the Bay Conservation and Development Commission (BCDC). Within the
Campus, the Bay Trail traverses the entire Campus shoreline, providing panoramic views of the Bay and
short-range views of natural vegetation.
Regulatory Setting
Federal
There are no federal regulations related to public services applicable to the proposed Project.
State
The California Fire Code contains regulations relating to construction and maintenance of buildings and the
use of premises. Topics addressed in the Code include fire department access, fire hydrants, automatic
sprinkler systems, fire alarm systems, fire and explosion hazards safety, hazardous materials storage and use,
provisions intended to protect and assist fire responders, industrial processes, and other general and
specialized fire safety requirements for new and existing buildings and premises. The Code also contains
specialized technical regulations related to fire and life safety.
Local
The City’s General Plan contains implementing policies regarding public services. Applicable policies include
the following:
Police
The Health and Safety Element of the General Plan includes the following applicable Implementing Policy:
● Policy 8.5-I-1: Ensure adequate police staff to provide rapid and timely response to all emergencies
and maintain the capability to have minimum average response times.
5 2017 Oyster Point Specific Plan Update MSA, page 11
Chapter 16: Public Services
Page 16-4 Genentech Master Plan Update, Draft EIR
● Actions that could be taken to ensure rapid and timely response to all emergencies include
maintaining a law enforcement standard of 1.5 police officers per 1,000 residents;
Fire and Emergency Services
The Health and Safety Element of the General Plan includes the following applicable Guiding Policies:
● Policy 8.4-G-1: Minimize the risk to life and property from fire hazards in South San Francisco
● Policy 8.4-G-2: Provide fire protection that is responsive to citizens’ needs.
The Health and Safety Element of the General Plan includes the following applicable Implementing Policies:
● Policy 8.4-I-2: Explore incentives or programs as part of the comprehensive fire hazard management
program to encourage private landowners to reduce fire hazards on their property.
● Policy 8.4-I-4: Require site design features, fire retardant building materials, and adequate access as
conditions for approval of development or improvements to reduce the risk of fire within the City.
City of South San Francisco Municipal Code
The City has adopted the California Fire Code as Chapter 15.24 of its Municipal Code.
City of South San Francisco East of 101 Area Plan
The East of 101 Area Plan includes the following:
● Plan Goal 3.3: Regulate growth in the East of 101 Area in accordance with the ability of the Police
Department, Fire Department and other public agencies to provide adequate services.
● Policy PF-1: The City shallow allow development in the East of 101 Area only if adequate water
supply to meet its needs can be provided in a timely manner.
Impacts and Mitigation Measures
Analytic Method
The analysis in this section focuses on whether the Project would necessitate construction of new facilities in
order to provide public services at acceptable service standards, and whether construction of any such new
public service facilities would result in potentially adverse environmental effects.
Thresholds of Significance
Based on the CEQA Guidelines, the Project would have a significant environmental impact if it were to cause:
1. Substantial adverse physical impacts associated with the provision of new or physically altered
governmental facilities, need for new or physically altered governmental facilities, the construction of
which could cause significant environmental impacts, in order to maintain acceptable service ratios,
response times or other performance objectives for any of the public services:
● fire and emergency services
● police services
● parks and other recreational facilities
2. Increased use of existing neighborhood and regional parks or other recreational facilities such that
substantial physical deterioration of the facility would occur or be accelerated; or
Chapter 16: Public Services
Genentech Master Plan Update, Draft EIR Page 16-5
3. Substantial adverse physical impacts associated with the provision of new or physically altered recreation
facilities, or the need for new or physically altered recreation facilities, the construction of which could
cause significant environmental impacts, in order to maintain acceptable service ratios.
Buildout of the Project would not result in development of any new residential use, and would thus not
create an increased demand for, or result in any impacts to libraries or schools. No impacts to library or
school facilities would occur, and no additional analysis is required of these public services.
Police Services
Public Services 1: The Project would increase the number of employees in the Project Area over time,
gradually increasing the demand for police within the Project Area. However, the Project is and will
continue to be adequately served with police service from existing facilities or new facilities to be
constructed per citywide efforts, and impacts related to police services would be less than
significant. (Less than Significant)
The 2017 Municipal Services Assessment (or 2017 MSA) for South San Francisco provides incident rates,
which can be used to estimate the number of incremental Police Department response calls that would result
from buildout of the Project. The Project will result in an additional 4.3 million square feet of office/R&D
building space at full buildout. Based on the MSA’s identified incident rate of .0221 average annual calls per
1,000 square feet of office/R&D uses,6 buildout of the Project could potentially result in approximately 95
more police response calls per year, or approximately 1 additional call every 4 days.
Under CEQA, an increased demand for public services is not a physical environmental impact. Rather,
environmental impacts are those physical effects that may be associated with construction of new facilities
needed to provide adequate services.7 At a limited service demand of approximately 1 additional call every 4
days, the Project does not individually generate demand for a new police station. The Project would have a
less than significant individual impact related to police services because no new police facilities (other than
those already planned at the Community Civic Campus Project, see below) would be required.
Cumulative Effects
As noted in the Setting section above, the SSFPD operates from their main station (currently located at 33
Arroyo Drive), and a replacement police station is expected as part of the City’s Community Civic Campus
project, with construction planned for 2020 to 2022. The SSF Community Civic Campus Project was reviewed
under its own EIR, which was certified by the City Council on December 13, 2017.8 The new Community Civic
Campus project is intended to improve broader citywide (or cumulative) public services to the City. No
physical effects associated with construction of new police facilities needed to serve cumulative service
demands would occur beyond those already considered pursuant to the Community Civic Campus Project
EIR.
Regulatory Requirements
Regulatory Requirement Services 1: Public Safety Impact Fees: Genentech will be required to pay the City of
South San Francisco’s Public Safety Impact Fees as applicable at the time of new construction.
6 Oyster Point Specific Plan Update MSA, Table A-2, Appendix A.
7 This interpretation of CEQA was reaffirmed specifically as it relates to fire stations in the case: City of Hayward v. Board of
Trustees of the California State University (1st Dist., Div. 3 2015) 242 Cal.App.4th 833.
8 Subsequent Environmental Impact Report for the City of South San Francisco Community Civic Campus Project (SCH#
1996032052), certified by SSF City Council December 13, 2017
Chapter 16: Public Services
Page 16-6 Genentech Master Plan Update, Draft EIR
Mitigation Measures
No mitigation measures for the Project are necessary. Required contributions to the City’s Public Safety
Impact Fees represent the Project’s fair share of costs to provide citywide police services resulting from
cumulative development. 9
Fire and Emergency Medical Services
Public Services 2: The Project would increase the number of employees in the Project Area over time,
gradually increasing the demand for fire and emergency medical services within the Project Area.
However, the Project is and will continue to be adequately served with fire and emergency medical
service from existing facilities or new facilities to be constructed per citywide efforts, and impacts
related to fire and emergency medical services would be less than significant. (Less than Significant)
The 2017 MSA provides incident rates that can be used to estimate the number of incremental fire and
emergency response calls that would result from buildout of the Project. Based on an additional 4.3 million sf
of building space at full buildout of the Project and the MSA incident rate of .0338 average annual calls per
1,000 sf of Office/R&D,10 full buildout of the Project would result in approximately 145 more
firefighter/emergency response calls per year, or approximately one call every two or three days. This limited
service demand would not individually generate the need for a new fire station to serve the Project.
Additionally, Genentech’s private First Alert Team provides supplemental fire response services for
emergencies (including medical, chemical and fire emergencies) within the Genentech Campus. Emergency
call phones are located throughout the Genentech Campus and calls are routed to the Control Room
Operator, who notifies the First Alert Team. If needed, the Control Room Operator also notifies outside
emergency personnel such as the SSFFD.
Cumulative Effects
Fire Station #62 serves the entire East of 101 Area from its location at 249 Harbor Boulevard. The 2017 Oyster
Point MSA indicates that areas at the northerly and easterly portions of the East of 101 Area, including the
easterly portions of the Project Area, are outside of a four-minute travel time from Fire Station #62.
Cumulative development in the East of 101 Area (including the Project) is expected to necessitate relocation
of Fire Station #62 to provide better response times to the entire East of 101 Area. A relocated Fire Station
#62 could provide SSFFD with the ability to modify existing deployment to better support response time
performance, which may be affected by traffic congestion or incident complexity. A relocated Fire Station
would likely be similar in size as compared to the existing approximately 7,600 square foot Station #62, but
would likely need to be configured to accommodate three apparatus bays and the ability to support an on-
duty crew of seven personnel to meet modern operational and housing needs. Such a configuration would
provide the opportunity to reconfigure existing fire company or ambulance deployment, which may include
relocated or new personnel. Although there are no finalized plans for construction of a new fire station at
this time, preliminary City planning efforts indicate that a new fire station site would need to be
approximately ½ acre in size and more centrally located in the East of 101 Area than the current Station #62
site. It is reasonable to conclude that construction of such a new fire station would occur on a relatively small
industrial infill site and would not be expected to result in individually significant environmental effects.
9 Pursuant to Anderson First Coalition v. City of Anderson (2005) [130 Cal.App.4th 1173], the appellate court held that paying
a “fair-share fee” is permissible as effective mitigation if the fees are “part of a reasonable plan of actual mitigation that the
relevant agency commits itself to implementing.”
10 Oyster Point Specific Plan Update MSA, Michael Baker International, December 2017
Chapter 16: Public Services
Genentech Master Plan Update, Draft EIR Page 16-7
Regulatory Requirements
Regulatory Requirement Services 2A - Compliance with Fire Code: Individual projects pursuant to the
Master Plan Update will be required to comply with the City’s Fire Code (Chapter 15.24 of the
Municipal Code), and the City Fire Marshall’s code requirements regarding on-site access for
emergency vehicles.
Regulatory Requirement Services 1 - Public Safety Impact Fees: Genentech will be required to pay the City
of South San Francisco’s Public Safety Impact Fees as applicable at the time of new construction.
Mitigation Measures
No Project-specific mitigation measures needed beyond payment of Public Safety Impact Fees. For
cumulative environmental effects, it is unlikely that construction of a new fire station to be located on a small
industrial infill site in the central portion of the East of 101 Area would result in any significant environmental
effects requiring mitigation.
Pursuant to CEQA Guidelines Section 15131, the economic effects of a project shall not be treated as
significant effects on the environment. However, “economic or social information may be included in an EIR
or may be presented in whatever form the lead agency desires.” In this case, the need for a new or relocated
fire station to improve fire protection service and provide better response times to serve cumulative
development throughout the entire East of 101 Area is unlikely to result in either direct or indirect
environmental effects. The limiting factors involved in developing a new or relocated fire station are primarily
economic, only.
Under the current development impact fee structure, the City of South San Francisco’s Public Safety Impact
Fees, which are payable at the time of new building permits, do not provide present-day funds in a timely
manner to offset the near-term costs of a new fire station. Furthermore, the aggregate of Public Safety
Impact Fees expected to be paid over time by new cumulative development, including the Project, are not
likely sufficient to fund property acquisition and construction costs associated with a new or relocated fire
station. As noted in the 2017 Oyster Point Municipal Services Assessment, “it is anticipated that the station
[relocated Station #62] will be funded via a special tax district,11 but no such special tax district is currently
established. To provide needed funds for a new and/or relocated fire station, it is anticipated that the City
will need to establish a Community Facilities District (CFD) pursuant to the Mello-Roos Community Facilities
Act of 1982, providing for a special property tax to be levied on those properties in the East of 101 Area
benefitting from a new or relocated fire station. These special taxes can be used to secure bonds issued for
purposes of financing near-term construction of the fire station. Any special taxes levied through a CFD must
be approved by two-thirds of the voters within such a district (i.e., two-thirds of the benefitting property
owners within the East of 101 Area). An updated and increased Public Safety Impact Fee applicable to the
East of 101 Area (or potential in-lieu contributions associated with property dedication) could also offset
costs associated with construction and on-going fire protection and emergency response services needed to
serve new cumulative development.
Recreation
Public Services 3: The Project would increase the number of employees in the Project Area over time,
gradually increasing the demand for recreational space within or near the Project Area. However, the
existing Campus contains substantial public and private open space areas, and the Project includes
plans for increasing open spaces with plazas, pathways, and common open space to serve new
11 Oyster Point Specific Plan Update MSA, Michael Baker International, December 2017, page 57
Chapter 16: Public Services
Page 16-8 Genentech Master Plan Update, Draft EIR
employees. Impacts related to recreational open space would be less than significant. (Less than
Significant)
The Master Plan Update’s Urban Design chapter includes a specific focus on open space and walkability,
intended to strengthen the campus environment within the Project Area. These design elements include
establishing an important outdoor area at the Upper Campus as an identifiable Campus center that connects
the new Employee Center to other locations in the Project Area with pedestrian paths, interconnecting
smaller open spaces within each neighborhood campus with a system of secondary pedestrian paths; and
adding new outdoor spaces that complement each new building. The proposed pedestrian network is
intended to provide a more integrated and walkable campus, and coordination of pedestrian connections
with shuttle-bus stop locations will enhance neighborhood and Campus connectivity. The design of new
pathways is intended to increase the coherence of the Campus with common elements such as trees, paving,
seating and overlooks, and to offer choices for walking between and among neighborhood campuses. The
pedestrian system also includes walkways that are recreational in nature, connecting to the Bay Trail and
Wind Harp via pathways along hillsides and bluffs. This recreational element of the pedestrian network offers
an additional realm of experience, accenting the natural setting and environment of the Campus.
Cumulative
Genentech and the Bay Conservation and Development Commission (BCDC) have entered into several
permits that support on-going use of the Bay Trail by the public, on property within the Genentech Campus
but subject to BCDC jurisdiction. Generally, these permits authorize Genentech to construct, use and
maintain a public access trail (the Bay Trail) within the 100-foot band of BCDC jurisdiction along the Bay
shoreline, inclusive of connecting trails, handicapped access, landscaping, site furnishings (including benches,
garbage cans, picnic areas and BBQ grills), as well as public access parking spaces and public access signs.12
These Bay Trail amenities provide benefits to Genentech employees, but also to the general public seeking
open space and nature-based recreation.
Any changes or additions to the Bay Trail improvements within the Genentech Campus will be subject to
BCDC consideration and approval of amended permit conditions. Through on-site provision of recreational
opportunities, payment of in-lieu fees to support off-site recreational opportunities as required by SSF
Municipal Code, and required BCDC jurisdictional permit approval processes, the Project will not result in
significant environmental impacts related to parks or recreation facilities.
Regulatory Requirements
Regulatory Requirement Services 3 - Parkland Acquisition and Construction Fees: Genentech will be
required to pay Parkland Acquisition and Construction fees pursuant to Chapter 8.67 of the SSF
Municipal Code.
These fees are based on the average fair market value of land and average construction costs for improved
parkland, at a ratio of one-half acre of parkland per one thousand new employees (using the current
employment-based formula provided in SSFMC Section 8.67.060).
Mitigation Measures
No mitigation measures would be required beyond payment of Parkland Acquisition and Construction fees.
The Parkland Acquisition and Construction fees are intended to offset the financial effects related to
increased demand for parks and recreational facilities resulting from cumulative development.
12 BCDC Permit #MOS-9, August 24, 2006, and BCDC Permit Nos. 18-74(A) and 18-74(B) originally issued in January 1975 and
as amended through December 2009 and recorded on January 14, 2010
Chapter 16: Public Services
Genentech Master Plan Update, Draft EIR Page 16-9
Cumulative Effects on Public Services
Cumulative effects related to public services are fully addressed under the topics of police, fire protection
and parks and recreation in Impacts Public Services 1, 2 and 3, above.