Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Appendix AQ
Appendix AQ Air Quality and Greenhouse Gas Emissions Analysis 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Research & Development 128.74 1000sqft 1.48 128,737.00 0 Unenclosed Parking with Elevator 84.28 1000sqft 1.48 84,280.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 129.77 0.014CH4 Intensity (lb/MWhr) 0.003N2O Intensity (lb/MWhr) Forbes Blvd Office and R&D San Mateo County, Summer CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 1 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer Project Characteristics - Per Peninsula Clean Energy Factors Land Use - Lot size is 2.96 Construction Phase - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Demolition - Grading - Project site size Vehicle Trips - Per project traffic analysis Energy Use - Construction Off-road Equipment Mitigation - Energy Mitigation - Per current requirements Water Mitigation - per 2016 standards Waste Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea_Nonresidential_Exterior 64,370.00 64,354.00 tblArchitecturalCoating ConstArea_Nonresidential_Interior 193,109.00 193,062.00 tblAreaCoating Area_Nonresidential_Exterior 64370 64354 tblAreaCoating Area_Nonresidential_Interior 193109 193062 tblConstructionPhase NumDays 10.00 88.00 tblConstructionPhase NumDays 220.00 282.00 tblConstructionPhase NumDays 20.00 45.00 tblConstructionPhase NumDays 6.00 20.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 2 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 2.0 Emissions Summary tblConstructionPhase NumDays 10.00 44.00 tblConstructionPhase NumDays 3.00 21.00 tblGrading AcresOfGrading 10.00 2.96 tblGrading AcresOfGrading 31.50 2.96 tblLandUse LotAcreage 2.96 1.48 tblLandUse LotAcreage 1.93 1.48 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 6.00 tblProjectCharacteristics CH4IntensityFactor 0.029 0.014 tblProjectCharacteristics CO2IntensityFactor 641.35 129.77 tblProjectCharacteristics N2OIntensityFactor 0.006 0.003 tblVehicleTrips ST_TR 1.64 0.00 tblVehicleTrips ST_TR 1.90 0.00 tblVehicleTrips SU_TR 0.76 0.00 tblVehicleTrips SU_TR 1.11 0.00 tblVehicleTrips WD_TR 11.42 0.00 tblVehicleTrips WD_TR 8.11 6.84 tblWater IndoorWaterUseRate 31,650,339.38 31,635,588.56 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 3 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 2.6304 27.7229 21.2586 0.0413 6.3269 1.3385 7.5809 3.3664 1.2477 4.5201 0.0000 4,129.309 5 4,129.309 5 1.0123 0.0000 4,153.210 1 2021 4.4350 34.1863 30.9277 0.0639 6.3269 1.5515 7.4785 3.3664 1.5068 4.4259 0.0000 6,053.099 0 6,053.099 0 1.0118 0.0000 6,074.202 3 2022 15.9785 31.3717 30.4564 0.0636 0.8688 1.3441 2.2129 0.2358 1.3054 1.5412 0.0000 6,019.554 1 6,019.554 1 0.8235 0.0000 6,040.141 2 Maximum 15.9785 34.1863 30.9277 0.0639 6.3269 1.5515 7.5809 3.3664 1.5068 4.5201 0.0000 6,053.099 0 6,053.099 0 1.0123 0.0000 6,074.202 3 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 2.6304 27.7229 21.2586 0.0413 6.3269 1.3385 7.5809 3.3664 1.2477 4.5201 0.0000 4,129.309 5 4,129.309 5 1.0123 0.0000 4,153.210 1 2021 4.4350 34.1863 30.9277 0.0639 6.3269 1.5515 7.4785 3.3664 1.5068 4.4259 0.0000 6,053.099 0 6,053.099 0 1.0118 0.0000 6,074.202 3 2022 15.9785 31.3717 30.4564 0.0636 0.8688 1.3441 2.2129 0.2358 1.3054 1.5412 0.0000 6,019.554 1 6,019.554 1 0.8235 0.0000 6,040.141 2 Maximum 15.9785 34.1863 30.9277 0.0639 6.3269 1.5515 7.5809 3.3664 1.5068 4.5201 0.0000 6,053.099 0 6,053.099 0 1.0123 0.0000 6,074.202 3 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 4 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 5 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Energy 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Mobile 0.9690 2.3648 9.9807 0.0411 4.6897 0.0252 4.7150 1.2560 0.0235 1.2795 4,167.261 4 4,167.261 4 0.1407 4,170.778 1 Total 4.2273 3.2208 10.7212 0.0462 4.6897 0.0904 4.7801 1.2560 0.0886 1.3446 5,194.299 4 5,194.299 4 0.1605 0.0188 5,203.922 0 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Energy 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Mobile 0.9690 2.3648 9.9807 0.0411 4.6897 0.0252 4.7150 1.2560 0.0235 1.2795 4,167.261 4 4,167.261 4 0.1407 4,170.778 1 Total 4.2070 3.0356 10.5657 0.0451 4.6897 0.0763 4.7660 1.2560 0.0745 1.3306 4,972.095 8 4,972.095 8 0.1562 0.0148 4,980.397 9 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 6 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 9/1/2020 11/2/2020 5 45 2 Site Preparation Site Preparation 11/20/2020 12/18/2020 5 21 3 Grading Grading 12/19/2020 1/15/2021 5 20 4 Building Construction Building Construction 2/1/2021 3/1/2022 5 282 5 Paving Paving 3/2/2022 5/2/2022 5 44 6 Architectural Coating Architectural Coating 5/3/2022 9/1/2022 5 88 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.48 5.75 1.45 2.40 0.00 15.57 0.29 0.00 15.88 1.05 0.00 4.28 4.28 2.65 21.67 4.30 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 193,062; Non-Residential Outdoor: 64,354; Striped Parking Area: 5,057 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 2.96 Acres of Grading (Grading Phase): 2.96 Acres of Paving: 1.48 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 7 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 2 6.00 158 0.38 Demolition Rubber Tired Dozers 1 8.00 247 0.40 Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37 Site Preparation Excavators 1 6.00 158 0.38 Site Preparation Graders 1 8.00 187 0.41 Site Preparation Scrapers 1 8.00 367 0.48 Site Preparation Tractors/Loaders/Backhoes 2 7.00 97 0.37 Grading Excavators 3 6.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37 Building Construction Air Compressors 4 6.00 78 0.48 Building Construction Cranes 2 8.00 231 0.29 Building Construction Forklifts 1 7.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Welders 6 8.00 46 0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Paving Equipment 1 8.00 132 0.36 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48 Architectural Coating Forklifts 1 6.00 89 0.20 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 8 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.1484 0.0000 2.1484 0.3253 0.0000 0.3253 0.0000 0.0000 Off-Road 2.4937 24.5653 19.5590 0.0319 1.3278 1.3278 1.2374 1.2374 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Total 2.4937 24.5653 19.5590 0.0319 2.1484 1.3278 3.4762 0.3253 1.2374 1.5627 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 7 18.00 0.00 447.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Site Preparation 5 13.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 15 77.00 35.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 2 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 9 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0872 3.1283 1.3272 8.1100e- 003 0.1725 9.8700e- 003 0.1823 0.0472 9.4400e- 003 0.0566 918.7378 918.7378 0.1138 921.5824 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Total 0.1367 3.1576 1.6997 9.4900e- 003 0.3203 0.0108 0.3311 0.0864 0.0103 0.0967 1,056.819 2 1,056.819 2 0.1165 1,059.730 6 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.1484 0.0000 2.1484 0.3253 0.0000 0.3253 0.0000 0.0000 Off-Road 2.4937 24.5653 19.5590 0.0319 1.3278 1.3278 1.2374 1.2374 0.0000 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Total 2.4937 24.5653 19.5590 0.0319 2.1484 1.3278 3.4762 0.3253 1.2374 1.5627 0.0000 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 10 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0872 3.1283 1.3272 8.1100e- 003 0.1725 9.8700e- 003 0.1823 0.0472 9.4400e- 003 0.0566 918.7378 918.7378 0.1138 921.5824 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Total 0.1367 3.1576 1.6997 9.4900e- 003 0.3203 0.0108 0.3311 0.0864 0.0103 0.0967 1,056.819 2 1,056.819 2 0.1165 1,059.730 6 Mitigated Construction Off-Site 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.1495 0.0000 0.1495 0.0161 0.0000 0.0161 0.0000 0.0000 Off-Road 2.0191 23.5711 15.7134 0.0311 0.9812 0.9812 0.9027 0.9027 3,011.1675 3,011.1675 0.9739 3,035.514 3 Total 2.0191 23.5711 15.7134 0.0311 0.1495 0.9812 1.1307 0.0161 0.9027 0.9188 3,011.167 5 3,011.167 5 0.9739 3,035.514 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 11 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0212 0.2690 1.0000e- 003 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 99.7255 99.7255 1.9300e- 003 99.7737 Total 0.0357 0.0212 0.2690 1.0000e- 003 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 99.7255 99.7255 1.9300e- 003 99.7737 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.1495 0.0000 0.1495 0.0161 0.0000 0.0161 0.0000 0.0000 Off-Road 2.0191 23.5711 15.7134 0.0311 0.9812 0.9812 0.9027 0.9027 0.0000 3,011.1675 3,011.167 5 0.9739 3,035.514 3 Total 2.0191 23.5711 15.7134 0.0311 0.1495 0.9812 1.1307 0.0161 0.9027 0.9188 0.0000 3,011.167 5 3,011.167 5 0.9739 3,035.514 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 12 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0357 0.0212 0.2690 1.0000e- 003 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 99.7255 99.7255 1.9300e- 003 99.7737 Total 0.0357 0.0212 0.2690 1.0000e- 003 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 99.7255 99.7255 1.9300e- 003 99.7737 Mitigated Construction Off-Site 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.4732 26.7702 17.2881 0.0322 1.2531 1.2531 1.1529 1.1529 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Total 2.4732 26.7702 17.2881 0.0322 6.1790 1.2531 7.4322 3.3272 1.1529 4.4800 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 13 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Total 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.4732 26.7702 17.2881 0.0322 1.2531 1.2531 1.1529 1.1529 0.0000 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Total 2.4732 26.7702 17.2881 0.0322 6.1790 1.2531 7.4322 3.3272 1.1529 4.4800 0.0000 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 14 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Total 0.0495 0.0293 0.3725 1.3800e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 138.0814 138.0814 2.6700e- 003 138.1481 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.3427 25.0587 17.1220 0.0322 1.1507 1.1507 1.0587 1.0587 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Total 2.3427 25.0587 17.1220 0.0322 6.1790 1.1507 7.3298 3.3272 1.0587 4.3859 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 15 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0462 0.0263 0.3449 1.3300e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 133.1587 133.1587 2.4000e- 003 133.2187 Total 0.0462 0.0263 0.3449 1.3300e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 133.1587 133.1587 2.4000e- 003 133.2187 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.3427 25.0587 17.1220 0.0322 1.1507 1.1507 1.0587 1.0587 0.0000 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Total 2.3427 25.0587 17.1220 0.0322 6.1790 1.1507 7.3298 3.3272 1.0587 4.3859 0.0000 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 16 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0462 0.0263 0.3449 1.3300e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 133.1587 133.1587 2.4000e- 003 133.2187 Total 0.0462 0.0263 0.3449 1.3300e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 133.1587 133.1587 2.4000e- 003 133.2187 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Total 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 17 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1092 3.5945 1.5016 9.2300e- 003 0.2362 8.1800e- 003 0.2444 0.0680 7.8200e- 003 0.0758 1,017.103 0 1,017.103 0 0.0864 1,019.263 6 Worker 0.1974 0.1126 1.4755 5.7100e- 003 0.6325 3.6900e- 003 0.6362 0.1678 3.4000e- 003 0.1712 569.6232 569.6232 0.0103 569.8800 Total 0.3066 3.7071 2.9771 0.0149 0.8688 0.0119 0.8807 0.2358 0.0112 0.2470 1,586.726 3 1,586.726 3 0.0967 1,589.143 6 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 0.0000 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Total 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 0.0000 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 18 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1092 3.5945 1.5016 9.2300e- 003 0.2362 8.1800e- 003 0.2444 0.0680 7.8200e- 003 0.0758 1,017.103 0 1,017.103 0 0.0864 1,019.263 6 Worker 0.1974 0.1126 1.4755 5.7100e- 003 0.6325 3.6900e- 003 0.6362 0.1678 3.4000e- 003 0.1712 569.6232 569.6232 0.0103 569.8800 Total 0.3066 3.7071 2.9771 0.0149 0.8688 0.0119 0.8807 0.2358 0.0112 0.2470 1,586.726 3 1,586.726 3 0.0967 1,589.143 6 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Total 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 19 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1026 3.3821 1.5020 9.0900e- 003 0.2363 7.2100e- 003 0.2435 0.0680 6.8900e- 003 0.0749 1,004.003 4 1,004.003 4 0.0859 1,006.151 3 Worker 0.1860 0.1016 1.3765 5.5000e- 003 0.6325 3.6200e- 003 0.6362 0.1678 3.3300e- 003 0.1711 548.7407 548.7407 9.2800e- 003 548.9727 Total 0.2886 3.4838 2.8785 0.0146 0.8688 0.0108 0.8796 0.2358 0.0102 0.2460 1,552.744 1 1,552.744 1 0.0952 1,555.124 0 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 0.0000 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Total 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 0.0000 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 20 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1026 3.3821 1.5020 9.0900e- 003 0.2363 7.2100e- 003 0.2435 0.0680 6.8900e- 003 0.0749 1,004.003 4 1,004.003 4 0.0859 1,006.151 3 Worker 0.1860 0.1016 1.3765 5.5000e- 003 0.6325 3.6200e- 003 0.6362 0.1678 3.3300e- 003 0.1711 548.7407 548.7407 9.2800e- 003 548.9727 Total 0.2886 3.4838 2.8785 0.0146 0.8688 0.0108 0.8796 0.2358 0.0102 0.2460 1,552.744 1 1,552.744 1 0.0952 1,555.124 0 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 21 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Total 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 0.0000 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 0.0000 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 22 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Total 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 15.6525 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2897 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 392.4712 392.4712 0.0542 393.8270 Total 15.9423 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 392.4712 392.4712 0.0542 393.8270 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 23 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Total 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 15.6525 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2897 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 0.0000 392.4712 392.4712 0.0542 393.8270 Total 15.9423 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 0.0000 392.4712 392.4712 0.0542 393.8270 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 24 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Total 0.0362 0.0198 0.2682 1.0700e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 106.8975 106.8975 1.8100e- 003 106.9427 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 25 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.9690 2.3648 9.9807 0.0411 4.6897 0.0252 4.7150 1.2560 0.0235 1.2795 4,167.261 4 4,167.261 4 0.1407 4,170.778 1 Unmitigated 0.9690 2.3648 9.9807 0.0411 4.6897 0.0252 4.7150 1.2560 0.0235 1.2795 4,167.261 4 4,167.261 4 0.1407 4,170.778 1 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Office Park 0.00 0.00 0.00 Research & Development 880.56 0.00 0.00 1,576,360 1,576,360 Unenclosed Parking with Elevator 0.00 0.00 0.00 Total 880.56 0.00 0.00 1,576,360 1,576,360 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Office Park 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Research & Development 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Unenclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 26 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 NaturalGas Unmitigated 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 5.1 Mitigation Measures Energy Exceed Title 24 Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Office Park 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Research & Development 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Unenclosed Parking with Elevator 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 27 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Research & Development 8729.43 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Research & Development 6.8407 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 28 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Unmitigated 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.3774 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 2.7848 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.9800e- 003 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Total 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 29 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 8.1 Mitigation Measures Waste Institute Recycling and Composting Services Apply Water Conservation Strategy 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.3774 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 2.7848 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.9800e- 003 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Total 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 30 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 31 of 31 Forbes Blvd Office and R&D - San Mateo County, Summer 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Research & Development 128.74 1000sqft 1.48 128,737.00 0 Unenclosed Parking with Elevator 84.28 1000sqft 1.48 84,280.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 129.77 0.014CH4 Intensity (lb/MWhr) 0.003N2O Intensity (lb/MWhr) Forbes Blvd Office and R&D San Mateo County, Winter CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 1 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter Project Characteristics - Per Peninsula Clean Energy Factors Land Use - Lot size is 2.96 Construction Phase - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Demolition - Grading - Project site size Vehicle Trips - Per project traffic analysis Energy Use - Construction Off-road Equipment Mitigation - Energy Mitigation - Per current requirements Water Mitigation - per 2016 standards Waste Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea_Nonresidential_Exterior 64,370.00 64,354.00 tblArchitecturalCoating ConstArea_Nonresidential_Interior 193,109.00 193,062.00 tblAreaCoating Area_Nonresidential_Exterior 64370 64354 tblAreaCoating Area_Nonresidential_Interior 193109 193062 tblConstructionPhase NumDays 10.00 88.00 tblConstructionPhase NumDays 220.00 282.00 tblConstructionPhase NumDays 20.00 45.00 tblConstructionPhase NumDays 6.00 20.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 2 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 2.0 Emissions Summary tblConstructionPhase NumDays 10.00 44.00 tblConstructionPhase NumDays 3.00 21.00 tblGrading AcresOfGrading 10.00 2.96 tblGrading AcresOfGrading 31.50 2.96 tblLandUse LotAcreage 2.96 1.48 tblLandUse LotAcreage 1.93 1.48 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 6.00 tblProjectCharacteristics CH4IntensityFactor 0.029 0.014 tblProjectCharacteristics CO2IntensityFactor 641.35 129.77 tblProjectCharacteristics N2OIntensityFactor 0.006 0.003 tblVehicleTrips ST_TR 1.64 0.00 tblVehicleTrips ST_TR 1.90 0.00 tblVehicleTrips SU_TR 0.76 0.00 tblVehicleTrips SU_TR 1.11 0.00 tblVehicleTrips WD_TR 11.42 0.00 tblVehicleTrips WD_TR 8.11 6.84 tblWater IndoorWaterUseRate 31,650,339.38 31,635,588.56 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 3 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 2.1 Overall Construction (Maximum Daily Emission) ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 2.6377 27.8274 21.2749 0.0412 6.3269 1.3388 7.5809 3.3664 1.2479 4.5201 0.0000 4,111.0410 4,111.0410 1.0122 0.0000 4,134.960 5 2021 4.4640 34.2627 31.0051 0.0634 6.3269 1.5519 7.4785 3.3664 1.5072 4.4259 0.0000 6,000.381 8 6,000.381 8 1.0117 0.0000 6,021.518 9 2022 15.9829 31.4408 30.5268 0.0631 0.8688 1.3445 2.2133 0.2358 1.3058 1.5416 0.0000 5,968.444 3 5,968.444 3 0.8247 0.0000 5,989.061 1 Maximum 15.9829 34.2627 31.0051 0.0634 6.3269 1.5519 7.5809 3.3664 1.5072 4.5201 0.0000 6,000.381 8 6,000.381 8 1.0122 0.0000 6,021.518 9 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year lb/day lb/day 2020 2.6377 27.8274 21.2749 0.0412 6.3269 1.3388 7.5809 3.3664 1.2479 4.5201 0.0000 4,111.0410 4,111.0410 1.0122 0.0000 4,134.960 5 2021 4.4640 34.2627 31.0051 0.0634 6.3269 1.5519 7.4785 3.3664 1.5072 4.4259 0.0000 6,000.381 8 6,000.381 8 1.0117 0.0000 6,021.518 9 2022 15.9829 31.4408 30.5268 0.0631 0.8688 1.3445 2.2133 0.2358 1.3058 1.5416 0.0000 5,968.444 3 5,968.444 3 0.8247 0.0000 5,989.0611 Maximum 15.9829 34.2627 31.0051 0.0634 6.3269 1.5519 7.5809 3.3664 1.5072 4.5201 0.0000 6,000.381 8 6,000.381 8 1.0122 0.0000 6,021.518 9 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 4 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 5 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Energy 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Mobile 0.8844 2.5342 10.2348 0.0392 4.6897 0.0253 4.7150 1.2560 0.0235 1.2795 3,972.800 4 3,972.800 4 0.1438 3,976.395 0 Total 4.1427 3.3902 10.9753 0.0443 4.6897 0.0904 4.7801 1.2560 0.0886 1.3447 4,999.838 4 4,999.838 4 0.1636 0.0188 5,009.538 9 Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Area 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Energy 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Mobile 0.8844 2.5342 10.2348 0.0392 4.6897 0.0253 4.7150 1.2560 0.0235 1.2795 3,972.800 4 3,972.800 4 0.1438 3,976.395 0 Total 4.1223 3.2050 10.8198 0.0432 4.6897 0.0763 4.7661 1.2560 0.0745 1.3306 4,777.634 8 4,777.634 8 0.1593 0.0148 4,786.014 9 Mitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 6 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 9/1/2020 11/2/2020 5 45 2 Site Preparation Site Preparation 11/20/2020 12/18/2020 5 21 3 Grading Grading 12/19/2020 1/15/2021 5 20 4 Building Construction Building Construction 2/1/2021 3/1/2022 5 282 5 Paving Paving 3/2/2022 5/2/2022 5 44 6 Architectural Coating Architectural Coating 5/3/2022 9/1/2022 5 88 OffRoad Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.49 5.46 1.42 2.51 0.00 15.57 0.29 0.00 15.88 1.05 0.00 4.44 4.44 2.60 21.67 4.46 Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 193,062; Non-Residential Outdoor: 64,354; Striped Parking Area: 5,057 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 2.96 Acres of Grading (Grading Phase): 2.96 Acres of Paving: 1.48 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 7 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 2 6.00 158 0.38 Demolition Rubber Tired Dozers 1 8.00 247 0.40 Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37 Site Preparation Excavators 1 6.00 158 0.38 Site Preparation Graders 1 8.00 187 0.41 Site Preparation Scrapers 1 8.00 367 0.48 Site Preparation Tractors/Loaders/Backhoes 2 7.00 97 0.37 Grading Excavators 3 6.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37 Building Construction Air Compressors 4 6.00 78 0.48 Building Construction Cranes 2 8.00 231 0.29 Building Construction Forklifts 1 7.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Welders 6 8.00 46 0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Paving Equipment 1 8.00 132 0.36 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48 Architectural Coating Forklifts 1 6.00 89 0.20 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 8 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.1484 0.0000 2.1484 0.3253 0.0000 0.3253 0.0000 0.0000 Off-Road 2.4937 24.5653 19.5590 0.0319 1.3278 1.3278 1.2374 1.2374 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Total 2.4937 24.5653 19.5590 0.0319 2.1484 1.3278 3.4762 0.3253 1.2374 1.5627 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 7 18.00 0.00 447.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Site Preparation 5 13.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 15 77.00 35.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 2 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 9 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0890 3.2260 1.3553 8.0300e- 003 0.1725 0.0101 0.1826 0.0472 9.6800e- 003 0.0569 908.9756 908.9756 0.1147 911.8422 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Total 0.1441 3.2622 1.7159 9.3300e- 003 0.3203 0.0110 0.3314 0.0864 0.0105 0.0969 1,038.550 7 1,038.550 7 0.1172 1,041.480 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 2.1484 0.0000 2.1484 0.3253 0.0000 0.3253 0.0000 0.0000 Off-Road 2.4937 24.5653 19.5590 0.0319 1.3278 1.3278 1.2374 1.2374 0.0000 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Total 2.4937 24.5653 19.5590 0.0319 2.1484 1.3278 3.4762 0.3253 1.2374 1.5627 0.0000 3,072.490 3 3,072.490 3 0.8396 3,093.479 5 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 10 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0890 3.2260 1.3553 8.0300e- 003 0.1725 0.0101 0.1826 0.0472 9.6800e- 003 0.0569 908.9756 908.9756 0.1147 911.8422 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Total 0.1441 3.2622 1.7159 9.3300e- 003 0.3203 0.0110 0.3314 0.0864 0.0105 0.0969 1,038.550 7 1,038.550 7 0.1172 1,041.480 9 Mitigated Construction Off-Site 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.1495 0.0000 0.1495 0.0161 0.0000 0.0161 0.0000 0.0000 Off-Road 2.0191 23.5711 15.7134 0.0311 0.9812 0.9812 0.9027 0.9027 3,011.1675 3,011.1675 0.9739 3,035.514 3 Total 2.0191 23.5711 15.7134 0.0311 0.1495 0.9812 1.1307 0.0161 0.9027 0.9188 3,011.167 5 3,011.167 5 0.9739 3,035.514 3 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 11 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0398 0.0261 0.2605 9.4000e- 004 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 93.5820 93.5820 1.8400e- 003 93.6280 Total 0.0398 0.0261 0.2605 9.4000e- 004 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 93.5820 93.5820 1.8400e- 003 93.6280 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 0.1495 0.0000 0.1495 0.0161 0.0000 0.0161 0.0000 0.0000 Off-Road 2.0191 23.5711 15.7134 0.0311 0.9812 0.9812 0.9027 0.9027 0.0000 3,011.1675 3,011.1675 0.9739 3,035.514 3 Total 2.0191 23.5711 15.7134 0.0311 0.1495 0.9812 1.1307 0.0161 0.9027 0.9188 0.0000 3,011.167 5 3,011.167 5 0.9739 3,035.514 3 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 12 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0398 0.0261 0.2605 9.4000e- 004 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 93.5820 93.5820 1.8400e- 003 93.6280 Total 0.0398 0.0261 0.2605 9.4000e- 004 0.1068 6.4000e- 004 0.1074 0.0283 5.9000e- 004 0.0289 93.5820 93.5820 1.8400e- 003 93.6280 Mitigated Construction Off-Site 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.4732 26.7702 17.2881 0.0322 1.2531 1.2531 1.1529 1.1529 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Total 2.4732 26.7702 17.2881 0.0322 6.1790 1.2531 7.4322 3.3272 1.1529 4.4800 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 13 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Total 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.4732 26.7702 17.2881 0.0322 1.2531 1.2531 1.1529 1.1529 0.0000 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Total 2.4732 26.7702 17.2881 0.0322 6.1790 1.2531 7.4322 3.3272 1.1529 4.4800 0.0000 3,121.672 5 3,121.672 5 1.0096 3,146.912 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 14 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Total 0.0550 0.0362 0.3607 1.3000e- 003 0.1479 8.9000e- 004 0.1488 0.0392 8.2000e- 004 0.0400 129.5751 129.5751 2.5500e- 003 129.6388 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.3427 25.0587 17.1220 0.0322 1.1507 1.1507 1.0587 1.0587 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Total 2.3427 25.0587 17.1220 0.0322 6.1790 1.1507 7.3298 3.3272 1.0587 4.3859 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 15 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0325 0.3327 1.2500e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 124.9665 124.9665 2.2800e- 003 125.0236 Total 0.0515 0.0325 0.3327 1.2500e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 124.9665 124.9665 2.2800e- 003 125.0236 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Fugitive Dust 6.1790 0.0000 6.1790 3.3272 0.0000 3.3272 0.0000 0.0000 Off-Road 2.3427 25.0587 17.1220 0.0322 1.1507 1.1507 1.0587 1.0587 0.0000 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Total 2.3427 25.0587 17.1220 0.0322 6.1790 1.1507 7.3298 3.3272 1.0587 4.3859 0.0000 3,121.043 4 3,121.043 4 1.0094 3,146.278 6 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 16 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0515 0.0325 0.3327 1.2500e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 124.9665 124.9665 2.2800e- 003 125.0236 Total 0.0515 0.0325 0.3327 1.2500e- 003 0.1479 8.6000e- 004 0.1487 0.0392 7.9000e- 004 0.0400 124.9665 124.9665 2.2800e- 003 125.0236 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Total 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 17 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1152 3.6446 1.6314 9.0800e- 003 0.2362 8.5900e- 003 0.2448 0.0680 8.2100e- 003 0.0762 999.4301 999.4301 0.0883 1,001.636 8 Worker 0.2205 0.1389 1.4231 5.3600e- 003 0.6325 3.6900e- 003 0.6362 0.1678 3.4000e- 003 0.1712 534.5790 534.5790 9.7700e- 003 534.8233 Total 0.3356 3.7836 3.0544 0.0144 0.8688 0.0123 0.8811 0.2358 0.0116 0.2474 1,534.009 1 1,534.009 1 0.0980 1,536.460 1 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 0.0000 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Total 4.1284 30.4792 27.9506 0.0490 1.5396 1.5396 1.4956 1.4956 0.0000 4,466.372 7 4,466.372 7 0.7474 4,485.058 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 18 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1152 3.6446 1.6314 9.0800e- 003 0.2362 8.5900e- 003 0.2448 0.0680 8.2100e- 003 0.0762 999.4301 999.4301 0.0883 1,001.636 8 Worker 0.2205 0.1389 1.4231 5.3600e- 003 0.6325 3.6900e- 003 0.6362 0.1678 3.4000e- 003 0.1712 534.5790 534.5790 9.7700e- 003 534.8233 Total 0.3356 3.7836 3.0544 0.0144 0.8688 0.0123 0.8811 0.2358 0.0116 0.2474 1,534.009 1 1,534.009 1 0.0980 1,536.460 1 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Total 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 19 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1082 3.4276 1.6266 8.9400e- 003 0.2363 7.5800e- 003 0.2438 0.0680 7.2400e- 003 0.0752 986.6064 986.6064 0.0876 988.7959 Worker 0.2087 0.1254 1.3223 5.1600e- 003 0.6325 3.6200e- 003 0.6362 0.1678 3.3300e- 003 0.1711 515.0280 515.0280 8.8000e- 003 515.2480 Total 0.3168 3.5530 2.9489 0.0141 0.8688 0.0112 0.8800 0.2358 0.0106 0.2463 1,501.634 3 1,501.634 3 0.0964 1,504.043 9 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 0.0000 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Total 3.7774 27.8879 27.5779 0.0490 1.3333 1.3333 1.2952 1.2952 0.0000 4,466.810 0 4,466.810 0 0.7283 4,485.017 2 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 20 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.1082 3.4276 1.6266 8.9400e- 003 0.2363 7.5800e- 003 0.2438 0.0680 7.2400e- 003 0.0752 986.6064 986.6064 0.0876 988.7959 Worker 0.2087 0.1254 1.3223 5.1600e- 003 0.6325 3.6200e- 003 0.6362 0.1678 3.3300e- 003 0.1711 515.0280 515.0280 8.8000e- 003 515.2480 Total 0.3168 3.5530 2.9489 0.0141 0.8688 0.0112 0.8800 0.2358 0.0106 0.2463 1,501.634 3 1,501.634 3 0.0964 1,504.043 9 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 21 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Total 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Off-Road 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 0.0000 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.9396 9.2819 12.0746 0.0183 0.4785 0.4785 0.4414 0.4414 0.0000 1,756.824 4 1,756.824 4 0.5571 1,770.751 8 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 22 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Total 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 15.6525 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2897 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 392.4712 392.4712 0.0542 393.8270 Total 15.9423 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 392.4712 392.4712 0.0542 393.8270 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 23 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Total 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Archit. Coating 15.6525 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.2897 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 0.0000 392.4712 392.4712 0.0542 393.8270 Total 15.9423 2.1997 2.6789 4.1200e- 003 0.1341 0.1341 0.1299 0.1299 0.0000 392.4712 392.4712 0.0542 393.8270 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 24 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Total 0.0407 0.0244 0.2576 1.0100e- 003 0.1232 7.0000e- 004 0.1239 0.0327 6.5000e- 004 0.0333 100.3301 100.3301 1.7100e- 003 100.3730 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 25 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 0.8844 2.5342 10.2348 0.0392 4.6897 0.0253 4.7150 1.2560 0.0235 1.2795 3,972.800 4 3,972.800 4 0.1438 3,976.395 0 Unmitigated 0.8844 2.5342 10.2348 0.0392 4.6897 0.0253 4.7150 1.2560 0.0235 1.2795 3,972.800 4 3,972.800 4 0.1438 3,976.395 0 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Office Park 0.00 0.00 0.00 Research & Development 880.56 0.00 0.00 1,576,360 1,576,360 Unenclosed Parking with Elevator 0.00 0.00 0.00 Total 880.56 0.00 0.00 1,576,360 1,576,360 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Office Park 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Research & Development 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Unenclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 26 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day NaturalGas Mitigated 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 NaturalGas Unmitigated 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 5.1 Mitigation Measures Energy Exceed Title 24 Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Office Park 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Research & Development 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Unenclosed Parking with Elevator 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 27 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 6.1 Mitigation Measures Area 6.0 Area Detail 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Research & Development 8729.43 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0941 0.8558 0.7189 5.1300e- 003 0.0650 0.0650 0.0650 0.0650 1,026.991 4 1,026.991 4 0.0197 0.0188 1,033.094 3 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr lb/day lb/day Research & Development 6.8407 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0738 0.6707 0.5634 4.0200e- 003 0.0510 0.0510 0.0510 0.0510 804.7878 804.7878 0.0154 0.0148 809.5702 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 28 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category lb/day lb/day Mitigated 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Unmitigated 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.3774 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 2.7848 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.9800e- 003 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Total 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 29 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 8.1 Mitigation Measures Waste Institute Recycling and Composting Services Apply Water Conservation Strategy 7.1 Mitigation Measures Water 7.0 Water Detail 8.0 Waste Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory lb/day lb/day Architectural Coating 0.3774 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 2.7848 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.9800e- 003 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Total 3.1642 1.9000e- 004 0.0216 0.0000 8.0000e- 005 8.0000e- 005 8.0000e- 005 8.0000e- 005 0.0466 0.0466 1.2000e- 004 0.0496 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 30 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 11.0 Vegetation 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:54 AMPage 31 of 31 Forbes Blvd Office and R&D - San Mateo County, Winter 1.1 Land Usage Land Uses Size Metric Lot Acreage Floor Surface Area Population Research & Development 128.74 1000sqft 1.48 128,737.00 0 Unenclosed Parking with Elevator 84.28 1000sqft 1.48 84,280.00 0 1.2 Other Project Characteristics Urbanization Climate Zone Urban 5 Wind Speed (m/s)Precipitation Freq (Days)2.2 70 1.3 User Entered Comments & Non-Default Data 1.0 Project Characteristics Utility Company Pacific Gas & Electric Company 2030Operational Year CO2 Intensity (lb/MWhr) 129.77 0.014CH4 Intensity (lb/MWhr) 0.003N2O Intensity (lb/MWhr) Forbes Blvd Office and R&D San Mateo County, Annual CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 1 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Project Characteristics - Per Peninsula Clean Energy Factors Land Use - Lot size is 2.96 Construction Phase - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Off-road Equipment - Per construction plans from applicant Demolition - Grading - Project site size Vehicle Trips - Per project traffic analysis Energy Use - Construction Off-road Equipment Mitigation - Energy Mitigation - Per current requirements Water Mitigation - per 2016 standards Waste Mitigation - Table Name Column Name Default Value New Value tblArchitecturalCoating ConstArea_Nonresidential_Exterior 64,370.00 64,354.00 tblArchitecturalCoating ConstArea_Nonresidential_Interior 193,109.00 193,062.00 tblAreaCoating Area_Nonresidential_Exterior 64370 64354 tblAreaCoating Area_Nonresidential_Interior 193109 193062 tblConstructionPhase NumDays 10.00 88.00 tblConstructionPhase NumDays 220.00 282.00 tblConstructionPhase NumDays 20.00 45.00 tblConstructionPhase NumDays 6.00 20.00 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 2 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 2.0 Emissions Summary tblConstructionPhase NumDays 10.00 44.00 tblConstructionPhase NumDays 3.00 21.00 tblGrading AcresOfGrading 10.00 2.96 tblGrading AcresOfGrading 31.50 2.96 tblLandUse LotAcreage 2.96 1.48 tblLandUse LotAcreage 1.93 1.48 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 2.00 1.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 1.00 2.00 tblOffRoadEquipment OffRoadEquipmentUnitAmount 3.00 6.00 tblProjectCharacteristics CH4IntensityFactor 0.029 0.014 tblProjectCharacteristics CO2IntensityFactor 641.35 129.77 tblProjectCharacteristics N2OIntensityFactor 0.006 0.003 tblVehicleTrips ST_TR 1.64 0.00 tblVehicleTrips ST_TR 1.90 0.00 tblVehicleTrips SU_TR 0.76 0.00 tblVehicleTrips SU_TR 1.11 0.00 tblVehicleTrips WD_TR 11.42 0.00 tblVehicleTrips WD_TR 8.11 6.84 tblWater IndoorWaterUseRate 31,650,339.38 31,635,588.56 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 3 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 2.1 Overall Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2020 0.0921 0.9940 0.7251 1.4100e- 003 0.0872 0.0461 0.1333 0.0249 0.0428 0.0676 0.0000 126.8910 126.8910 0.0329 0.0000 127.7146 2021 0.5455 4.2482 3.8038 7.8100e- 003 0.1356 0.1925 0.3281 0.0459 0.1867 0.2325 0.0000 670.7490 670.7490 0.0970 0.0000 673.1734 2022 0.8099 0.9625 1.0390 1.9800e- 003 0.0253 0.0447 0.0700 6.8500e- 003 0.0429 0.0497 0.0000 170.6921 170.6921 0.0291 0.0000 171.4191 Maximum 0.8099 4.2482 3.8038 7.8100e- 003 0.1356 0.1925 0.3281 0.0459 0.1867 0.2325 0.0000 670.7490 670.7490 0.0970 0.0000 673.1734 Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Year tons/yr MT/yr 2020 0.0921 0.9940 0.7251 1.4100e- 003 0.0872 0.0461 0.1333 0.0249 0.0428 0.0676 0.0000 126.8908 126.8908 0.0329 0.0000 127.7145 2021 0.5455 4.2482 3.8038 7.8100e- 003 0.1356 0.1925 0.3281 0.0459 0.1867 0.2325 0.0000 670.7484 670.7484 0.0970 0.0000 673.1728 2022 0.8099 0.9625 1.0390 1.9800e- 003 0.0253 0.0447 0.0700 6.8500e- 003 0.0429 0.0497 0.0000 170.6919 170.6919 0.0291 0.0000 171.4189 Maximum 0.8099 4.2482 3.8038 7.8100e- 003 0.1356 0.1925 0.3281 0.0459 0.1867 0.2325 0.0000 670.7484 670.7484 0.0970 0.0000 673.1728 Mitigated Construction CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 4 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter)Maximum Mitigated ROG + NOX (tons/quarter) 1 9-1-2020 11-30-2020 0.7851 0.7851 2 12-1-2020 2-28-2021 0.8356 0.8356 3 3-1-2021 5-31-2021 1.2702 1.2702 4 6-1-2021 8-31-2021 1.2690 1.2690 5 9-1-2021 11-30-2021 1.2575 1.2575 6 12-1-2021 2-28-2022 1.1775 1.1775 7 3-1-2022 5-31-2022 0.4288 0.4288 8 6-1-2022 8-31-2022 0.5979 0.5979 9 9-1-2022 9-30-2022 0.0065 0.0065 Highest 1.2702 1.2702 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 5 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Energy 0.0172 0.1562 0.1312 9.4000e- 004 0.0119 0.0119 0.0119 0.0119 0.0000 236.9424 236.9424 0.0105 4.6600e- 003 238.5942 Mobile 0.1143 0.3210 1.2758 5.1100e- 003 0.5847 3.2800e- 003 0.5880 0.1572 3.0500e- 003 0.1602 0.0000 469.6583 469.6583 0.0167 0.0000 470.0747 Waste 0.0000 0.0000 0.0000 0.0000 13.1437 0.0000 13.1437 0.7768 0.0000 32.5629 Water 0.0000 0.0000 0.0000 0.0000 13.6661 15.1647 28.8308 1.4053 0.0335 73.9439 Total 0.7088 0.4772 1.4089 6.0500e- 003 0.5847 0.0152 0.5998 0.1572 0.0149 0.1721 26.8098 721.7692 748.5790 2.2092 0.0382 815.1797 Unmitigated Operational CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 6 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 2.2 Overall Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Area 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Energy 0.0135 0.1224 0.1028 7.3000e- 004 9.3000e- 003 9.3000e- 003 9.3000e- 003 9.3000e- 003 0.0000 197.4033 197.4033 9.4800e- 003 3.9300e- 003 198.8102 Mobile 0.1143 0.3210 1.2758 5.1100e- 003 0.5847 3.2800e- 003 0.5880 0.1572 3.0500e- 003 0.1602 0.0000 469.6583 469.6583 0.0167 0.0000 470.0747 Waste 0.0000 0.0000 0.0000 0.0000 9.8578 0.0000 9.8578 0.5826 0.0000 24.4222 Water 0.0000 0.0000 0.0000 0.0000 10.9329 12.4207 23.3536 1.1243 0.0268 59.4468 Total 0.7050 0.4434 1.3805 5.8400e- 003 0.5847 0.0126 0.5973 0.1572 0.0124 0.1695 20.7907 679.4861 700.2768 1.7330 0.0307 752.7579 Mitigated Operational 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio-CO2 Total CO2 CH4 N20 CO2e Percent Reduction 0.52 7.08 2.02 3.47 0.00 16.95 0.43 0.00 17.21 1.49 22.45 5.86 6.45 21.56 19.45 7.66 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 7 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 Demolition Demolition 9/1/2020 11/2/2020 5 45 2 Site Preparation Site Preparation 11/20/2020 12/18/2020 5 21 3 Grading Grading 12/19/2020 1/15/2021 5 20 4 Building Construction Building Construction 2/1/2021 3/1/2022 5 282 5 Paving Paving 3/2/2022 5/2/2022 5 44 6 Architectural Coating Architectural Coating 5/3/2022 9/1/2022 5 88 OffRoad Equipment Residential Indoor: 0; Residential Outdoor: 0; Non-Residential Indoor: 193,062; Non-Residential Outdoor: 64,354; Striped Parking Area: 5,057 (Architectural Coating ±sqft) Acres of Grading (Site Preparation Phase): 2.96 Acres of Grading (Grading Phase): 2.96 Acres of Paving: 1.48 CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 8 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Phase Name Offroad Equipment Type Amount Usage Hours Horse Power Load Factor Demolition Concrete/Industrial Saws 1 8.00 81 0.73 Demolition Excavators 2 6.00 158 0.38 Demolition Rubber Tired Dozers 1 8.00 247 0.40 Demolition Tractors/Loaders/Backhoes 3 8.00 97 0.37 Site Preparation Excavators 1 6.00 158 0.38 Site Preparation Graders 1 8.00 187 0.41 Site Preparation Scrapers 1 8.00 367 0.48 Site Preparation Tractors/Loaders/Backhoes 2 7.00 97 0.37 Grading Excavators 3 6.00 158 0.38 Grading Graders 1 8.00 187 0.41 Grading Rubber Tired Dozers 1 8.00 247 0.40 Grading Tractors/Loaders/Backhoes 2 7.00 97 0.37 Building Construction Air Compressors 4 6.00 78 0.48 Building Construction Cranes 2 8.00 231 0.29 Building Construction Forklifts 1 7.00 89 0.20 Building Construction Generator Sets 1 8.00 84 0.74 Building Construction Tractors/Loaders/Backhoes 1 6.00 97 0.37 Building Construction Welders 6 8.00 46 0.45 Paving Cement and Mortar Mixers 1 8.00 9 0.56 Paving Pavers 1 8.00 130 0.42 Paving Paving Equipment 1 8.00 132 0.36 Paving Rollers 1 8.00 80 0.38 Paving Tractors/Loaders/Backhoes 2 8.00 97 0.37 Architectural Coating Air Compressors 1 6.00 78 0.48 Architectural Coating Forklifts 1 6.00 89 0.20 Trips and VMT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 9 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0483 0.0000 0.0483 7.3200e- 003 0.0000 7.3200e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0561 0.5527 0.4401 7.2000e- 004 0.0299 0.0299 0.0278 0.0278 0.0000 62.7146 62.7146 0.0171 0.0000 63.1430 Total 0.0561 0.5527 0.4401 7.2000e- 004 0.0483 0.0299 0.0782 7.3200e- 003 0.0278 0.0352 0.0000 62.7146 62.7146 0.0171 0.0000 63.1430 Unmitigated Construction On-Site 3.1 Mitigation Measures Construction Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 7 18.00 0.00 447.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Site Preparation 5 13.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Grading 7 18.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Building Construction 15 77.00 35.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Paving 6 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT Architectural Coating 2 15.00 0.00 0.00 10.80 7.30 20.00 LD_Mix HDT_Mix HHDT CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 10 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 1.9800e- 003 0.0721 0.0301 1.8000e- 004 3.7400e- 003 2.2000e- 004 3.9600e- 003 1.0300e- 003 2.1000e- 004 1.2400e- 003 0.0000 18.6693 18.6693 2.3300e- 003 0.0000 18.7275 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1000e- 003 7.5000e- 004 7.8800e- 003 3.0000e- 005 3.1900e- 003 2.0000e- 005 3.2100e- 003 8.5000e- 004 2.0000e- 005 8.7000e- 004 0.0000 2.6549 2.6549 5.0000e- 005 0.0000 2.6562 Total 3.0800e- 003 0.0729 0.0380 2.1000e- 004 6.9300e- 003 2.4000e- 004 7.1700e- 003 1.8800e- 003 2.3000e- 004 2.1100e- 003 0.0000 21.3242 21.3242 2.3800e- 003 0.0000 21.3837 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0483 0.0000 0.0483 7.3200e- 003 0.0000 7.3200e- 003 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0561 0.5527 0.4401 7.2000e- 004 0.0299 0.0299 0.0278 0.0278 0.0000 62.7145 62.7145 0.0171 0.0000 63.1430 Total 0.0561 0.5527 0.4401 7.2000e- 004 0.0483 0.0299 0.0782 7.3200e- 003 0.0278 0.0352 0.0000 62.7145 62.7145 0.0171 0.0000 63.1430 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 11 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.2 Demolition - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 1.9800e- 003 0.0721 0.0301 1.8000e- 004 3.7400e- 003 2.2000e- 004 3.9600e- 003 1.0300e- 003 2.1000e- 004 1.2400e- 003 0.0000 18.6693 18.6693 2.3300e- 003 0.0000 18.7275 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.1000e- 003 7.5000e- 004 7.8800e- 003 3.0000e- 005 3.1900e- 003 2.0000e- 005 3.2100e- 003 8.5000e- 004 2.0000e- 005 8.7000e- 004 0.0000 2.6549 2.6549 5.0000e- 005 0.0000 2.6562 Total 3.0800e- 003 0.0729 0.0380 2.1000e- 004 6.9300e- 003 2.4000e- 004 7.1700e- 003 1.8800e- 003 2.3000e- 004 2.1100e- 003 0.0000 21.3242 21.3242 2.3800e- 003 0.0000 21.3837 Mitigated Construction Off-Site 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 1.5700e- 003 0.0000 1.5700e- 003 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0212 0.2475 0.1650 3.3000e- 004 0.0103 0.0103 9.4800e- 003 9.4800e- 003 0.0000 28.6827 28.6827 9.2800e- 003 0.0000 28.9146 Total 0.0212 0.2475 0.1650 3.3000e- 004 1.5700e- 003 0.0103 0.0119 1.7000e- 004 9.4800e- 003 9.6500e- 003 0.0000 28.6827 28.6827 9.2800e- 003 0.0000 28.9146 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 12 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.7000e- 004 2.5000e- 004 2.6600e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8948 0.8948 2.0000e- 005 0.0000 0.8952 Total 3.7000e- 004 2.5000e- 004 2.6600e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8948 0.8948 2.0000e- 005 0.0000 0.8952 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 1.5700e- 003 0.0000 1.5700e- 003 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0212 0.2475 0.1650 3.3000e- 004 0.0103 0.0103 9.4800e- 003 9.4800e- 003 0.0000 28.6827 28.6827 9.2800e- 003 0.0000 28.9146 Total 0.0212 0.2475 0.1650 3.3000e- 004 1.5700e- 003 0.0103 0.0119 1.7000e- 004 9.4800e- 003 9.6500e- 003 0.0000 28.6827 28.6827 9.2800e- 003 0.0000 28.9146 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 13 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.3 Site Preparation - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 3.7000e- 004 2.5000e- 004 2.6600e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8948 0.8948 2.0000e- 005 0.0000 0.8952 Total 3.7000e- 004 2.5000e- 004 2.6600e- 003 1.0000e- 005 1.0700e- 003 1.0000e- 005 1.0800e- 003 2.9000e- 004 1.0000e- 005 2.9000e- 004 0.0000 0.8948 0.8948 2.0000e- 005 0.0000 0.8952 Mitigated Construction Off-Site 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0287 0.0000 0.0287 0.0151 0.0000 0.0151 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0111 0.1205 0.0778 1.4000e- 004 5.6400e- 003 5.6400e- 003 5.1900e- 003 5.1900e- 003 0.0000 12.7437 12.7437 4.1200e- 003 0.0000 12.8467 Total 0.0111 0.1205 0.0778 1.4000e- 004 0.0287 5.6400e- 003 0.0343 0.0151 5.1900e- 003 0.0203 0.0000 12.7437 12.7437 4.1200e- 003 0.0000 12.8467 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 14 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.2000e- 004 1.5000e- 004 1.5800e- 003 1.0000e- 005 6.4000e- 004 0.0000 6.4000e- 004 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.5310 0.5310 1.0000e- 005 0.0000 0.5312 Total 2.2000e- 004 1.5000e- 004 1.5800e- 003 1.0000e- 005 6.4000e- 004 0.0000 6.4000e- 004 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.5310 0.5310 1.0000e- 005 0.0000 0.5312 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0287 0.0000 0.0287 0.0151 0.0000 0.0151 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0111 0.1205 0.0778 1.4000e- 004 5.6400e- 003 5.6400e- 003 5.1900e- 003 5.1900e- 003 0.0000 12.7437 12.7437 4.1200e- 003 0.0000 12.8467 Total 0.0111 0.1205 0.0778 1.4000e- 004 0.0287 5.6400e- 003 0.0343 0.0151 5.1900e- 003 0.0203 0.0000 12.7437 12.7437 4.1200e- 003 0.0000 12.8467 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 15 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.4 Grading - 2020 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.2000e- 004 1.5000e- 004 1.5800e- 003 1.0000e- 005 6.4000e- 004 0.0000 6.4000e- 004 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.5310 0.5310 1.0000e- 005 0.0000 0.5312 Total 2.2000e- 004 1.5000e- 004 1.5800e- 003 1.0000e- 005 6.4000e- 004 0.0000 6.4000e- 004 1.7000e- 004 0.0000 1.7000e- 004 0.0000 0.5310 0.5310 1.0000e- 005 0.0000 0.5312 Mitigated Construction Off-Site 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0347 0.0000 0.0347 0.0184 0.0000 0.0184 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0129 0.1378 0.0942 1.8000e- 004 6.3300e- 003 6.3300e- 003 5.8200e- 003 5.8200e- 003 0.0000 15.5725 15.5725 5.0400e- 003 0.0000 15.6984 Total 0.0129 0.1378 0.0942 1.8000e- 004 0.0347 6.3300e- 003 0.0410 0.0184 5.8200e- 003 0.0242 0.0000 15.5725 15.5725 5.0400e- 003 0.0000 15.6984 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 16 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5000e- 004 1.6000e- 004 1.7800e- 003 1.0000e- 005 7.8000e- 004 0.0000 7.8000e- 004 2.1000e- 004 0.0000 2.1000e- 004 0.0000 0.6259 0.6259 1.0000e- 005 0.0000 0.6262 Total 2.5000e- 004 1.6000e- 004 1.7800e- 003 1.0000e- 005 7.8000e- 004 0.0000 7.8000e- 004 2.1000e- 004 0.0000 2.1000e- 004 0.0000 0.6259 0.6259 1.0000e- 005 0.0000 0.6262 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Fugitive Dust 0.0347 0.0000 0.0347 0.0184 0.0000 0.0184 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0129 0.1378 0.0942 1.8000e- 004 6.3300e- 003 6.3300e- 003 5.8200e- 003 5.8200e- 003 0.0000 15.5725 15.5725 5.0400e- 003 0.0000 15.6984 Total 0.0129 0.1378 0.0942 1.8000e- 004 0.0347 6.3300e- 003 0.0410 0.0184 5.8200e- 003 0.0242 0.0000 15.5725 15.5725 5.0400e- 003 0.0000 15.6984 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 17 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.4 Grading - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 2.5000e- 004 1.6000e- 004 1.7800e- 003 1.0000e- 005 7.8000e- 004 0.0000 7.8000e- 004 2.1000e- 004 0.0000 2.1000e- 004 0.0000 0.6259 0.6259 1.0000e- 005 0.0000 0.6262 Total 2.5000e- 004 1.6000e- 004 1.7800e- 003 1.0000e- 005 7.8000e- 004 0.0000 7.8000e- 004 2.1000e- 004 0.0000 2.1000e- 004 0.0000 0.6259 0.6259 1.0000e- 005 0.0000 0.6262 Mitigated Construction Off-Site 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.4954 3.6575 3.3541 5.8800e- 003 0.1848 0.1848 0.1795 0.1795 0.0000 486.2190 486.2190 0.0814 0.0000 488.2532 Total 0.4954 3.6575 3.3541 5.8800e- 003 0.1848 0.1848 0.1795 0.1795 0.0000 486.2190 486.2190 0.0814 0.0000 488.2532 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 18 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0134 0.4374 0.1877 1.1000e- 003 0.0274 1.0000e- 003 0.0284 7.9200e- 003 9.6000e- 004 8.8800e- 003 0.0000 109.9154 109.9154 9.5000e- 003 0.0000 110.1528 Worker 0.0236 0.0153 0.1660 6.5000e- 004 0.0727 4.4000e- 004 0.0732 0.0194 4.1000e- 004 0.0198 0.0000 58.4163 58.4163 1.0600e- 003 0.0000 58.4428 Total 0.0370 0.4527 0.3538 1.7500e- 003 0.1001 1.4400e- 003 0.1016 0.0273 1.3700e- 003 0.0286 0.0000 168.3316 168.3316 0.0106 0.0000 168.5956 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.4954 3.6575 3.3541 5.8800e- 003 0.1848 0.1848 0.1795 0.1795 0.0000 486.2184 486.2184 0.0814 0.0000 488.2527 Total 0.4954 3.6575 3.3541 5.8800e- 003 0.1848 0.1848 0.1795 0.1795 0.0000 486.2184 486.2184 0.0814 0.0000 488.2527 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 19 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.5 Building Construction - 2021 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0134 0.4374 0.1877 1.1000e- 003 0.0274 1.0000e- 003 0.0284 7.9200e- 003 9.6000e- 004 8.8800e- 003 0.0000 109.9154 109.9154 9.5000e- 003 0.0000 110.1528 Worker 0.0236 0.0153 0.1660 6.5000e- 004 0.0727 4.4000e- 004 0.0732 0.0194 4.1000e- 004 0.0198 0.0000 58.4163 58.4163 1.0600e- 003 0.0000 58.4428 Total 0.0370 0.4527 0.3538 1.7500e- 003 0.1001 1.4400e- 003 0.1016 0.0273 1.3700e- 003 0.0286 0.0000 168.3316 168.3316 0.0106 0.0000 168.5956 Mitigated Construction Off-Site 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0793 0.5857 0.5791 1.0300e- 003 0.0280 0.0280 0.0272 0.0272 0.0000 85.0967 85.0967 0.0139 0.0000 85.4435 Total 0.0793 0.5857 0.5791 1.0300e- 003 0.0280 0.0280 0.0272 0.0272 0.0000 85.0967 85.0967 0.0139 0.0000 85.4435 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 20 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 2.2100e- 003 0.0720 0.0328 1.9000e- 004 4.7900e- 003 1.5000e- 004 4.9500e- 003 1.3900e- 003 1.5000e- 004 1.5300e- 003 0.0000 18.9878 18.9878 1.6500e- 003 0.0000 19.0291 Worker 3.8900e- 003 2.4200e- 003 0.0270 1.1000e- 004 0.0127 8.0000e- 005 0.0128 3.3900e- 003 7.0000e- 005 3.4600e- 003 0.0000 9.8489 9.8489 1.7000e- 004 0.0000 9.8531 Total 6.1000e- 003 0.0744 0.0598 3.0000e- 004 0.0175 2.3000e- 004 0.0178 4.7800e- 003 2.2000e- 004 4.9900e- 003 0.0000 28.8368 28.8368 1.8200e- 003 0.0000 28.8822 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0793 0.5856 0.5791 1.0300e- 003 0.0280 0.0280 0.0272 0.0272 0.0000 85.0966 85.0966 0.0139 0.0000 85.4434 Total 0.0793 0.5856 0.5791 1.0300e- 003 0.0280 0.0280 0.0272 0.0272 0.0000 85.0966 85.0966 0.0139 0.0000 85.4434 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 21 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.5 Building Construction - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 2.2100e- 003 0.0720 0.0328 1.9000e- 004 4.7900e- 003 1.5000e- 004 4.9500e- 003 1.3900e- 003 1.5000e- 004 1.5300e- 003 0.0000 18.9878 18.9878 1.6500e- 003 0.0000 19.0291 Worker 3.8900e- 003 2.4200e- 003 0.0270 1.1000e- 004 0.0127 8.0000e- 005 0.0128 3.3900e- 003 7.0000e- 005 3.4600e- 003 0.0000 9.8489 9.8489 1.7000e- 004 0.0000 9.8531 Total 6.1000e- 003 0.0744 0.0598 3.0000e- 004 0.0175 2.3000e- 004 0.0178 4.7800e- 003 2.2000e- 004 4.9900e- 003 0.0000 28.8368 28.8368 1.8200e- 003 0.0000 28.8822 Mitigated Construction Off-Site 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0207 0.2042 0.2656 4.0000e- 004 0.0105 0.0105 9.7100e- 003 9.7100e- 003 0.0000 35.0628 35.0628 0.0111 0.0000 35.3408 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0207 0.2042 0.2656 4.0000e- 004 0.0105 0.0105 9.7100e- 003 9.7100e- 003 0.0000 35.0628 35.0628 0.0111 0.0000 35.3408 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 22 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 4.9000e- 004 5.5200e- 003 2.0000e- 005 2.6000e- 003 2.0000e- 005 2.6100e- 003 6.9000e- 004 1.0000e- 005 7.1000e- 004 0.0000 2.0100 2.0100 3.0000e- 005 0.0000 2.0108 Total 7.9000e- 004 4.9000e- 004 5.5200e- 003 2.0000e- 005 2.6000e- 003 2.0000e- 005 2.6100e- 003 6.9000e- 004 1.0000e- 005 7.1000e- 004 0.0000 2.0100 2.0100 3.0000e- 005 0.0000 2.0108 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Off-Road 0.0207 0.2042 0.2656 4.0000e- 004 0.0105 0.0105 9.7100e- 003 9.7100e- 003 0.0000 35.0628 35.0628 0.0111 0.0000 35.3407 Paving 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0207 0.2042 0.2656 4.0000e- 004 0.0105 0.0105 9.7100e- 003 9.7100e- 003 0.0000 35.0628 35.0628 0.0111 0.0000 35.3407 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 23 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.6 Paving - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 7.9000e- 004 4.9000e- 004 5.5200e- 003 2.0000e- 005 2.6000e- 003 2.0000e- 005 2.6100e- 003 6.9000e- 004 1.0000e- 005 7.1000e- 004 0.0000 2.0100 2.0100 3.0000e- 005 0.0000 2.0108 Total 7.9000e- 004 4.9000e- 004 5.5200e- 003 2.0000e- 005 2.6000e- 003 2.0000e- 005 2.6100e- 003 6.9000e- 004 1.0000e- 005 7.1000e- 004 0.0000 2.0100 2.0100 3.0000e- 005 0.0000 2.0108 Mitigated Construction Off-Site 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.6887 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0128 0.0968 0.1179 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.7200e- 003 5.7200e- 003 0.0000 15.6659 15.6659 2.1600e- 003 0.0000 15.7201 Total 0.7015 0.0968 0.1179 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.7200e- 003 5.7200e- 003 0.0000 15.6659 15.6659 2.1600e- 003 0.0000 15.7201 Unmitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 24 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5900e- 003 9.9000e- 004 0.0110 4.0000e- 005 5.2000e- 003 3.0000e- 005 5.2300e- 003 1.3800e- 003 3.0000e- 005 1.4100e- 003 0.0000 4.0200 4.0200 7.0000e- 005 0.0000 4.0217 Total 1.5900e- 003 9.9000e- 004 0.0110 4.0000e- 005 5.2000e- 003 3.0000e- 005 5.2300e- 003 1.3800e- 003 3.0000e- 005 1.4100e- 003 0.0000 4.0200 4.0200 7.0000e- 005 0.0000 4.0217 Unmitigated Construction Off-Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Archit. Coating 0.6887 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Off-Road 0.0128 0.0968 0.1179 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.7200e- 003 5.7200e- 003 0.0000 15.6659 15.6659 2.1600e- 003 0.0000 15.7200 Total 0.7015 0.0968 0.1179 1.8000e- 004 5.9000e- 003 5.9000e- 003 5.7200e- 003 5.7200e- 003 0.0000 15.6659 15.6659 2.1600e- 003 0.0000 15.7200 Mitigated Construction On-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 25 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 3.7 Architectural Coating - 2022 ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Hauling 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Vendor 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker 1.5900e- 003 9.9000e- 004 0.0110 4.0000e- 005 5.2000e- 003 3.0000e- 005 5.2300e- 003 1.3800e- 003 3.0000e- 005 1.4100e- 003 0.0000 4.0200 4.0200 7.0000e- 005 0.0000 4.0217 Total 1.5900e- 003 9.9000e- 004 0.0110 4.0000e- 005 5.2000e- 003 3.0000e- 005 5.2300e- 003 1.3800e- 003 3.0000e- 005 1.4100e- 003 0.0000 4.0200 4.0200 7.0000e- 005 0.0000 4.0217 Mitigated Construction Off-Site CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 26 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.1143 0.3210 1.2758 5.1100e- 003 0.5847 3.2800e- 003 0.5880 0.1572 3.0500e- 003 0.1602 0.0000 469.6583 469.6583 0.0167 0.0000 470.0747 Unmitigated 0.1143 0.3210 1.2758 5.1100e- 003 0.5847 3.2800e- 003 0.5880 0.1572 3.0500e- 003 0.1602 0.0000 469.6583 469.6583 0.0167 0.0000 470.0747 4.2 Trip Summary Information 4.3 Trip Type Information Average Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Office Park 0.00 0.00 0.00 Research & Development 880.56 0.00 0.00 1,576,360 1,576,360 Unenclosed Parking with Elevator 0.00 0.00 0.00 Total 880.56 0.00 0.00 1,576,360 1,576,360 Miles Trip %Trip Purpose % Land Use H-W or C-W H-S or C-C H-O or C-NW H-W or C-W H-S or C-C H-O or C-NW Primary Diverted Pass-by Office Park 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Research & Development 9.50 7.30 7.30 33.00 48.00 19.00 82 15 3 Unenclosed Parking with Elevator 9.50 7.30 7.30 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 27 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 5.0 Energy Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Electricity Mitigated 0.0000 0.0000 0.0000 0.0000 0.0000 64.1617 64.1617 6.9200e- 003 1.4800e- 003 64.7768 Electricity Unmitigated 0.0000 0.0000 0.0000 0.0000 0.0000 66.9124 66.9124 7.2200e- 003 1.5500e- 003 67.5539 NaturalGas Mitigated 0.0135 0.1224 0.1028 7.3000e- 004 9.3000e- 003 9.3000e- 003 9.3000e- 003 9.3000e- 003 0.0000 133.2416 133.2416 2.5500e- 003 2.4400e- 003 134.0334 NaturalGas Unmitigated 0.0172 0.1562 0.1312 9.4000e- 004 0.0119 0.0119 0.0119 0.0119 0.0000 170.0299 170.0299 3.2600e- 003 3.1200e- 003 171.0403 5.1 Mitigation Measures Energy Exceed Title 24 Land Use LDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Office Park 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Research & Development 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Unenclosed Parking with Elevator 0.448867 0.051210 0.277116 0.145918 0.016779 0.007633 0.027321 0.006813 0.004476 0.002855 0.009510 0.000605 0.000896 Historical Energy Use: N CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 28 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 5.2 Energy by Land Use - NaturalGas NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Research & Development 3.18624e +006 0.0172 0.1562 0.1312 9.4000e- 004 0.0119 0.0119 0.0119 0.0119 0.0000 170.0299 170.0299 3.2600e- 003 3.1200e- 003 171.0403 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0172 0.1562 0.1312 9.4000e- 004 0.0119 0.0119 0.0119 0.0119 0.0000 170.0299 170.0299 3.2600e- 003 3.1200e- 003 171.0403 Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Land Use kBTU/yr tons/yr MT/yr Research & Development 2.49685e +006 0.0135 0.1224 0.1028 7.3000e- 004 9.3000e- 003 9.3000e- 003 9.3000e- 003 9.3000e- 003 0.0000 133.2416 133.2416 2.5500e- 003 2.4400e- 003 134.0334 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0135 0.1224 0.1028 7.3000e- 004 9.3000e- 003 9.3000e- 003 9.3000e- 003 9.3000e- 003 0.0000 133.2416 133.2416 2.5500e- 003 2.4400e- 003 134.0334 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 29 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 6.1 Mitigation Measures Area 6.0 Area Detail 5.3 Energy by Land Use - Electricity Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Research & Development 973252 57.2882 6.1800e- 003 1.3200e- 003 57.8374 Unenclosed Parking with Elevator 163503 9.6242 1.0400e- 003 2.2000e- 004 9.7165 Total 66.9125 7.2200e- 003 1.5400e- 003 67.5539 Unmitigated Electricity Use Total CO2 CH4 N2O CO2e Land Use kWh/yr MT/yr Research & Development 926520 54.5375 5.8800e- 003 1.2600e- 003 55.0603 Unenclosed Parking with Elevator 163503 9.6242 1.0400e- 003 2.2000e- 004 9.7165 Total 64.1617 6.9200e- 003 1.4800e- 003 64.7768 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 30 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category tons/yr MT/yr Mitigated 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Unmitigated 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5082 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.8000e- 004 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Total 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 31 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Apply Water Conservation Strategy 7.1 Mitigation Measures Water 7.0 Water Detail 6.2 Area by SubCategory ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e SubCategory tons/yr MT/yr Architectural Coating 0.0689 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Consumer Products 0.5082 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping 1.8000e- 004 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Total 0.5773 2.0000e- 005 1.9500e- 003 0.0000 1.0000e- 005 1.0000e- 005 1.0000e- 005 1.0000e- 005 0.0000 3.8100e- 003 3.8100e- 003 1.0000e- 005 0.0000 4.0500e- 003 Mitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 32 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Total CO2 CH4 N2O CO2e Category MT/yr Mitigated 23.3536 1.1243 0.0268 59.4468 Unmitigated 28.8308 1.4053 0.0335 73.9439 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Office Park 11.4407 / 7.01206 8.7182 0.3734 8.9200e- 003 20.7100 Research & Development 31.6356 / 0 20.1126 1.0319 0.0246 53.2339 Unenclosed Parking with Elevator 0 / 0 0.0000 0.0000 0.0000 0.0000 Total 28.8308 1.4053 0.0335 73.9439 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 33 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 8.1 Mitigation Measures Waste Institute Recycling and Composting Services 7.2 Water by Land Use Indoor/Out door Use Total CO2 CH4 N2O CO2e Land Use Mgal MT/yr Office Park 9.15258 / 7.01206 7.2635 0.2987 7.1400e- 003 16.8597 Research & Development 25.3085 / 0 16.0901 0.8256 0.0197 42.5871 Unenclosed Parking with Elevator 0 / 0 0.0000 0.0000 0.0000 0.0000 Total 23.3536 1.1243 0.0268 59.4468 Mitigated 8.0 Waste Detail CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 34 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual Total CO2 CH4 N2O CO2e MT/yr Mitigated 9.8578 0.5826 0.0000 24.4222 Unmitigated 13.1437 0.7768 0.0000 32.5629 Category/Year 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Office Park 59.86 12.1510 0.7181 0.0000 30.1037 Research & Development 4.89 0.9926 0.0587 0.0000 2.4592 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 Total 13.1437 0.7768 0.0000 32.5629 Unmitigated CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 35 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 8.2 Waste by Land Use Waste Disposed Total CO2 CH4 N2O CO2e Land Use tons MT/yr Office Park 44.895 9.1133 0.5386 0.0000 22.5778 Research & Development 3.6675 0.7445 0.0440 0.0000 1.8444 Unenclosed Parking with Elevator 0 0.0000 0.0000 0.0000 0.0000 Total 9.8578 0.5826 0.0000 24.4222 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power Load Factor Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power Load Factor Fuel Type Boilers Equipment Type Number Heat Input/Day Heat Input/Year Boiler Rating Fuel Type User Defined Equipment Equipment Type Number CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 36 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual 11.0 Vegetation CalEEMod Version: CalEEMod.2016.3.2 Date: 11/21/2019 8:52 AMPage 37 of 37 Forbes Blvd Office and R&D - San Mateo County, Annual HP: 0 to 100 0.0588 0.0529 Construction Equipment # Hours per Day Horsepower Load Factor Construction Phase Fuel Used (gallons) Rubber Tired Dozer 1 8 247 0.40 Demo 1,880.09 Concrete Saws 1 8 81 0.73 Demo 1,250.90 Tractors/Loaders/Backhoes 3 8 97 0.37 Demo 2,277.77 Excavators 2 6 20 0.30 Demo 190.40 Graders 1 8 187 0.41 Site Prep 680.85 Excavators 1 6 158 0.38 Site Prep 399.88 Tractors/Loaders/Backhoes 2 7 97 0.37 Site Prep 620.06 Scrapers 1 8 367 0.47 Site Prep 1,531.76 Graders 1 8 187 0.41 Grading 648.43 Excavators 3 6 158 0.38 Grading 1,142.52 Rubber Tired Dozer 1 8 247 0.40 Grading 835.59 Tractors/Loaders/Backhoes 2 7 97 0.37 Grading 590.53 Cranes 2 8 231 0.29 Building 15,977.10 Forklifts 1 7 89 0.20 Building 2,064.81 Generator Sets 1 8 84 0.74 Building 8,240.68 Tractors/Loaders/Backhoes 1 6 97 0.37 Building 3,568.51 Welders 6 8 46 0.45 Building 16,465.45 Air Compressors 4 6 78 0.48 Building 14,890.50 Air Compressors 1 6 78 0.48 Arch Coating 1,161.67 Forklifts 1 6 89 0.20 Arch Coating 552.29 Pavers 1 8 130 0.42 Paving 1,015.91 Paving Equipment 1 8 132 0.36 Paving 884.17 Tractors/Loaders/Backhoes 2 8 97 0.37 Pacing 1,484.77 Rollers 1 8 80 0.38 Paving 628.82 Cement and Mixers 1 8 9 0.56 Paving 104.25 Total Fuel Used 79,087.73 (Gallons) Demolition Phase Site Preparation Phase Grading Phase Building Construction Phase Architectural Coating Phase Paving Total Days 399 Forbes R&D Office Last Updated: DATE Compression-Ignition Engine Brake-Specific Fuel Consumption (BSFC) Factors [1]: HP: Greater than 100 Values above are expressed in gallons per horsepower-hour/BSFC. CONSTRUCTION EQUIPMENT Construction Phase Days of Operation 45 21 20 282 88 44 500 1 11/26/2019 12:11 PM MPG [2]Trips Fuel Used (gallons) 24.0 18 364.50 24.0 13 122.85 24.0 18 162.00 24.0 77 9771.30 24.0 6 237.60 24.0 2 39.60 Total 10,697.85 MPG [2]Trips Fuel Used (gallons) 7.4 447 652.38 7.4 0 0.00 7.4 0 0.00 7.4 0 0.00 7.4 0 0.00 7.4 0 0.00 Total 652.38 7.4 0 0.00 7.4 0 0.00 7.4 0 0.00 7.4 35 9736.62 7.4 0 0.00 7.4 0 0.00 Total 8.00 10,697.85 79,748.11 WORKER TRIPS Constuction Phase Trip Length (miles) Demolition 10.8 Site Prep Phase 10.8 Grading Phase 10.8 Building Phase 10.8 Paving Phase 10.8 Architectural Coating Phase 10.8 HAULING AND VENDOR TRIPS Trip Class Trip Length (miles) HAULING TRIPS Demolition 10.8 Site Prep Phase 10.8 Grading Phase 10.8 Building Phase 10.8 Paving Phase 10.8 Architectural Coating Phase 10.8 VENDOR TRIPS Demolition 7.3 Site Prep Phase 7.3 Grading Phase 7.3 Building Phase 7.3 Sources: [1] United States Environmental Protection Agency. 2018. Exhaust and Crankcase Emission Factors for Nonroad Compression-Ignition Engines in MOVES2014b . July 2018. Available at: https://nepis.epa.gov/Exe/ZyPDF.cgi?Dockey=P100UXEN.pdf. [2] United States Department of Transportation, Bureau of Transportation Statistics. 2018. National Transportation Statistics 2018 . Available at: https://www.bts.gov/sites/bts.dot.gov/files/docs/browse-statistical-products-and- data/national-transportation-statistics/223001/ntsentire2018q4.pdf. Paving Phase 7.3 Architectural Coating Phase 7.3 Total Gasoline Consumption (gallons) Total Diesel Consumption (gallons) 2 11/26/2019 12:11 PM OR Annual VMT:700,920 Daily Vehicle Trips: Average Trip Distance: LDA 31.55 LDT1 26.46 LDT2 23.84 MDV 17.05 LHD1 20.45 LHD2 19.12 T6 Public 9.03 T7 Public 5.29 OBUS 8.26 UBUS 5.17 SBUS 7.25 MH 10.72 MCY 38.05 Vehicle Type Percent Fuel Type Annual VMT: VMT Vehicle Trips: VMT Fuel Consumption (Gallons) Gasoline 387,406.90 12277.44099 Gasoline 29,981.15 1132.928621 Gasoline 142,124.85 5962.471959 Gasoline 81,964.88 4806.749889 Diesel 10,568.47 516.893854 Diesel 4,098.28 214.3380264 Diesel 15,204.36 1683.812801 Diesel 22,366.36 4225.755345 Diesel 1,478.94 179.1016084 Diesel 1,239.93 239.6522332 Diesel 3,379.84 466.0072853 Diesel 497.65 46.43974289 Gasoline 609.10 16.00890235 24,195.60 7,572.00 Heavy Heavy Duty (HHD) Other Bus (OBUS) Urban Bus (UBUS) Sources: [1] California Air Resources Board (CARB). 2015. "EMFAC2014 Web Database." December 14, 2015. https://www.arb.ca.gov/emfac/2014/ (accessed March 15, 2019). School Bus (SBUS) Motorhome (MH) Motorcycle (MCY) Total Gasoline Consumption (gallons) Total Diesel Consumption (gallons) Light Duty Truck 2 (LDT2) Medium Duty Vehicle (MDV) Light Heavy Duty 1 (LHD1) Light Heavy Duty 2 (LHD2) Medium Heavy Duty (MHD) 0.001769 0.004822 Fleet Mix Light Duty Auto (LDA) Light Duty Truck 1 (LDT1) 399 Forbes R&D Office Last Updated: 0.000710 0.000869 Light Duty Auto (LDA) Light Duty Truck 1 (LDT1) Light Duty Truck 2 (LDT2) Medium Duty Vehicle (MDV) Light Heavy Duty 1 (LHD1) Light Heavy Duty 2 (LHD2) Medium Heavy Duty (MHD) Heavy Heavy Duty (HHD) Other Bus (OBUS) Urban Bus (UBUS) School Bus (SBUS) Motorhome (MH) Fleet Class Populate one of the following tables (Leave the other blank): Fuel Economy (MPG) [1] Motorcycle (MCY) Annual VMT Daily Vehicle Trips Fleet Mix 0.552712 0.042774 0.202769 0.116939 0.015078 0.005847 0.021692 0.031910 0.002110 3 11/26/2019 12:11 PM 263889 Gasoline vehicles 1576360 Project VMT (CalEEMod output) 6438 Diesel vehicles 1538819 97.6%Gasoline vehicle %37541 2.4%Diesel vehicle % 97.6% 0.4434 Tons per year mobile NOX emissions (annual output in CalEEMod) 0.43 4.16% 0.0180 0.0163 0.3316 27.13 0.01222 458.9 0.0004589 0.0168 265 4.5 CO2E emissions per year from N2O emissions from gasoline + diesel vehicles *Vehicle population source: EMFAC2014 (v1.0.7) Emissions Inventory Region Type: Air District Region: SCAQMD Calendar Year: 2022 Season: Annual Vehicle Classification: EMFAC2011 Categories **Methodology source: EMFAC2011 Frequently Asked Questions https://www.arb.ca.gov/msei/emfac2011-faq.htm ***GWP source: Intergovernmental Panel on Climate Change (IPCC). 2014. AR5 Climate Change 2014 Contrbution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change. Project Code & Title: Salinas Airport Least Project N2O Operational GHG Emission Mobile Calculations Metric tons per year from gasoline + diesel vehicles GWP of N2O*** VMT per Vehicle Type Gasoline vehicle VMT Diesel vehicle VMT CO2E Emissions from N2O Gasoline vehicle % Gasoline vehicle tons per year NOX emissions Percentage to convert NOX emissions to N2O ** Tons per year N2O emissions for gasoline vehicles Metric tons per year N2O emissions for gasoline vehicles grams N2O per gallon of fuel for diesel vehicles** Diesel average miles per gallon* grams per mile N2O for diesel vehicles Sources Vehicle Population Breakdown* Gasoline Vehicles Diesel Vehicles Metric tons per year N2O emissions for diesel vehicles grams per year N2O for diesel vehicles