HomeMy WebLinkAboutAppendix GEO
Appendix GEO
Geotechnical Report
Prepared for Aralon Properties
PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED OFFICE BUILDING AND
PARKING STRUCTURE
493 FORBES BOULEVARD
SOUTH SAN FRANCISCO, CALIFORNIA
UNAUTHORIZED USE OR COPYING OF THIS DOCUMENT IS STRICTLY
PROHIBITED BY ANYONE OTHER THAN THE CLIENT FOR THE SPECIFIC
PROJECT
May 10, 2019
Project No. 19-1674
May 10, 2019
Project No. 19-1674
Mr. Colum Regan
Aralon Properties
482 Bryant Street
San Francisco, California 94107
Subject: Preliminary Geotechnical Investigation Report
Proposed Office Building and Parking Structure
493 Forbes Boulevard
South San Francisco, California
Dear Mr. Regan,
We are pleased to present our preliminary geotechnical investigation report for the
proposed office building and parking structure to be constructed at 493 Forbes Boulevard
in South San Francisco, California. Our preliminary geotechnical investigation was
performed in accordance with our proposal dated March 18, 2019.
The subject property is located on the northern side of Forbes Boulevard west of its
intersection with Allerton Avenue. The site is a relatively level, trapezoidal-shaped,
2.255-acre lot with maximum plan dimensions of about 215 by 425 feet. The northern
perimeter of the site is bordered by a relatively steep slope down to the railroad tracks.
The steepest portion of the slope is approximately 1.5:1 (horizontal:vertical) at the
northeastern corner of the site with approximately 7 feet of elevation change. The project
site is currently occupied by a one-story, 53,000-square-foot commercial building
surrounded by asphalt and concrete pavements. Current plans are to demolish the
existing building and construct a four-story, at-grade office building at the front of the
site and a three-story parking structure at the rear of the site.
From a geotechnical standpoint, we preliminarily conclude the site can be developed as
planned. The primary geotechnical concerns are: (1) foundation settlement due to
compression of the underlying clay soils, (2) the potential for up to about one inch and 1-
1/2 inches of seismically-induced settlement due to liquefaction beneath the proposed
office building and parking garage, respectively, and 3) providing adequate vertical and
lateral support for the proposed new structures.
We preliminarily conclude the proposed new parking structure may be supported on a
shallow foundation system, such as spread footings, bearing on improved soil. The
Mr. Colum Regan
Aralon Properties
May 10, 2019
Page 2
proposed new office building may be supported on a stiffened foundation system, such as
a conventional reinforced concrete mat or interconnected continuous footings (i.e., a
stiffened grid). If it is determined that the estimated total settlement (static plus seismic)
can be tolerated by the structure, the office building may also be supported by a shallow
foundation system on improved soil.
This report presents preliminary conclusions and recommendations regarding
geotechnical aspects of the project. A final geotechnical investigation, potentially
including additional CPTs and shear wave velocity measurements, should be performed
to develop final geotechnical conclusions and recommendations for the project.
We appreciate the opportunity to provide our services to you on this project. If you have
any questions, please call.
Sincerely,
ROCKRIDGE GEOTECHNICAL, INC.
Tessa E. Williams, P.E. Craig S. Shields, P.E., G.E.
Project Engineer Principal Geotechnical Engineer
Enclosure
TABLE OF CONTENTS
1.0 INTRODUCTION ...............................................................................................................1
2.0 SCOPE OF SERVICES .......................................................................................................1
3.0 FIELD INVESTIGATION ..................................................................................................2
4.0 SUBSURFACE CONDITIONS ..........................................................................................3
4.1 Groundwater Conditions ..........................................................................................4
5.0 SEISMIC CONSIDERATIONS ..........................................................................................4
5.1 Regional Seismicity .................................................................................................4
5.2 Geologic Hazards .....................................................................................................7
5.2.1 Ground Shaking ...........................................................................................7
5.2.2 Liquefaction and Associated Hazards ..........................................................7
5.2.3 Cyclic Densification.....................................................................................9
5.2.4 Fault Rupture ...............................................................................................9
6.0 PRELIMINARY CONCLUSIONS AND RECOMMENDATIONS ................................10
6.1 Foundations and Settlement ...................................................................................10
6.1.1 Mat Foundation ..........................................................................................11
6.1.2 Spread Footings on Improved Ground .......................................................12
6.2 Floor Slabs ............................................................................................................14
6.3 Seismic Design.......................................................................................................15
7.0 ADDITIONAL GEOTECHNICAL SERVICES ...............................................................16
REFERENCES
FIGURES
APPENDIX A – Cone Penetration Test Results
LIST OF FIGURES
Figure 1 Site Location Map
Figure 2 Site Plan
Figure 3 Regional Geologic Map
Figure 4 Regional Fault Map
APPENDIX A
Figures A-1 Cone Penetration Test Results
through A-4
19-1674 1 May 10, 2019
PRELIMINARY GEOTECHNICAL INVESTIGATION
PROPOSED OFFICE BUILDING AND PARKING STRUCTURE
493 FORBES BOULEVARD
South San Francisco, California
1.0 INTRODUCTION
This report presents the results of the preliminary geotechnical investigation performed by
Rockridge Geotechnical to support the due diligence evaluation of the property located at 493
Forbes Boulevard in South San Francisco, California. The subject property is located on the
northern side of Forbes Boulevard west of its intersection with Allerton Avenue, as shown on the
Site Location Map (Figure 1).
The site is a relatively level, trapezoidal-shaped, 2.255-acre lot with maximum plan dimensions
of about 215 by 425 feet. The northern perimeter of the site is bordered by a relatively steep
slope down to the railroad tracks. The steepest portion of the slope is approximately 1.5:1
(horizontal:vertical) at the northeastern corner of the site with approximately 7 feet of elevation
change. The project site is currently occupied by a one-story, 53,000-square-foot commercial
building surrounded by asphalt and concrete pavements.
Current plans are to demolish the existing building and construct a four-story, at-grade office
building at the front of the site and a three-story parking structure at the rear of the site.
Structural design loads were not available at the time this report was prepared. Based on our
experience with similar buildings, we estimate the average building pressures will be on the
order of approximately 400 and 525 psf for the proposed office building and parking garage,
respectively.
2.0 SCOPE OF SERVICES
Our preliminary investigation was performed in accordance with our proposal dated March 18,
2019. Our scope of work consisted of evaluating subsurface conditions at the site by reviewing
published geologic maps and previous geotechnical reports in the site vicinity, performing four
19-1674 2 May 10, 2019
cone penetration tests (CPTs), and performing engineering analyses to develop preliminary
conclusions and recommendations regarding:
• the most appropriate foundation type(s) for the proposed buildings
• preliminary design criteria for the recommended foundation type(s)
• estimates of foundation settlement
• design groundwater level
• site seismicity and seismic hazards, including the potential for liquefaction and lateral
spreading, and total and differential settlement resulting from liquefaction and/or cyclic
densification
• 2016 California Building Code site class and design spectral response acceleration
parameters.
3.0 FIELD INVESTIGATION
Our subsurface investigation consisted of performing four CPTs. Prior to advancing the CPTs,
we obtained a drilling permit from San Mateo County Environmental Health Services Division
(SMCEHS), contacted Underground Service Alert (USA) to notify them of our work, as required
by law, and retained a private utility locator, Precision Locating, LLC, to confirm the CPT
locations were clear of existing utility lines.
Gregg Drilling and Testing, Inc. (Gregg) of Martinez, California performed the four CPTs,
designated as CPT-1 through CPT-4, on April 4, 2019. The CPTs each were advanced until
practical refusal was met at depths ranging from 21 to 81 feet bgs by hydraulically pushing an
approximately 1.7-inch-diameter cone-tipped probe with a projected area of 15 square
centimeters into the ground using a 30-ton truck rig. The cone-tipped probe measured tip
resistance and the friction sleeve behind the cone tip measured frictional resistance. Electrical
strain gauges within the cone continuously measured soil parameters for the entire depth
advanced. Soil data, including tip resistance, frictional resistance, and pore water pressure, were
recorded by a computer while the test was conducted. Accumulated data were processed by a
computer to provide engineering information such as the soil behavior types, approximate
strength characteristics, and the liquefaction potential of the soil encountered. The CPT logs
19-1674 3 May 10, 2019
showing tip resistance, friction ratio, and pore water pressure by depth, as well as correlated soil
behavior type (Robertson, 2010), are presented in Appendix A on Figures A-1 through A-4.
Upon completion, the CPTs were backfilled with cement grout in accordance with SMCEHS
grouting guidelines.
4.0 SUBSURFACE CONDITIONS
A regional geologic map of the site and vicinity (Figure 3) indicates most of the site is underlain
by early Pleistocene-age alluvium (Qoa). The regional geologic map also indicates the
northeastern corner of the site is underlain by hillslope deposits (Qsl) and localized areas near the
center and southwestern corner of the site are underlain by artificial fill (af). The results of our
CPTs indicate the site is generally underlain by heterogeneous alluvial sediments that consist
predominantly of medium stiff to hard clays and silts interbedded with discontinuous dense to
very dense granular (sand and/or gravel) layers to the maximum depth explored of about 81 feet
bgs. The dense to very dense granular layers were encountered at varying depths in each CPT
and range in thickness from less than one foot to up to about six feet.
Within the generally stiff soil profile, we encountered several 1- to 3-foot-thick layers of soft to
medium stiff fine-grained soil at the location of CPT-3 in the northwestern corner of the site.
The soft to medium stiff layers were encountered between depths of about 11 and 16 feet bgs.
Based on the results of our CPTs, we conclude these layers are normally consolidated to lightly
over-consolidated. Normally consolidated fine-grained deposits have an in-situ stress state close
to that of their maximum past pressure and are highly compressible under new loads, compared
to over-consolidated deposits.
Each of the four CPTs was advanced to refusal in dense soil and/or bedrock at depths ranging
from 21 to 25 feet bgs at the northern perimeter of the site and depths of 59 to 81 feet bgs at the
southern perimeter of the site.
19-1674 4 May 10, 2019
4.1 Groundwater Conditions
To estimate the groundwater level at the site, we reviewed information on the State of California
Water Resources Control Board GeoTracker website (http://geotracker.swrcb.ca.gov). The
closest site with historic groundwater data on the GeoTracker website is 477 Forbes Boulevard
located directly west of the site. Between October 1999 and August 2011, groundwater was
measured in multiple monitoring wells. The highest (i.e., shallowest) groundwater levels were
measured at depths ranging from approximately 8.2 to 10.1 feet bgs. Based on the groundwater-
level data, we preliminarily conclude a design groundwater depth of about eight feet bgs should
be used for this project.
5.0 SEISMIC CONSIDERATIONS
Because the project site is in a seismically active region, we evaluated the potential for
earthquake-induced geologic hazards, including ground shaking, ground surface rupture,
liquefaction,1 lateral spreading,2 and cyclic densification3. The results of our evaluation
regarding seismic considerations for the project site are presented in the following sections.
5.1 Regional Seismicity
The site is located in the Coast Ranges geomorphic province that is characterized by northwest-
southeast trending valleys and ridges. These are controlled by folds and faults that resulted from
the collision of the Farallon and North American plates and subsequent shearing along the San
Andreas fault system. Movements along this plate boundary in the Northern California region
occur along right-lateral strike-slip faults of the San Andreas Fault system.
1 Liquefaction is a phenomenon where loose, saturated, cohesionless soil experiences temporary
reduction in strength during cyclic loading such as that produced by earthquakes.
2 Lateral spreading is a phenomenon in which surficial soil displaces along a shear zone that has
formed within an underlying liquefied layer. Upon reaching mobilization, the surficial blocks are
transported downslope or in the direction of a free face by earthquake and gravitational forces.
3 Cyclic densification is a phenomenon in which non-saturated, cohesionless soil is compacted by
earthquake vibrations, causing ground-surface settlement.
19-1674 5 May 10, 2019
The major active faults in the area are the San Andreas, San Gregorio, Hayward, and Calaveras
faults. These faults and other known Quaternary-aged faults that are believed to be sources of
major earthquakes (i.e., Magnitude>6.0) in the region are shown on Figure 4 as accessed from
the U.S. Geological Survey (USGS) database (USGS, 2010). Known faults within a 50-
kilometer radius of the site, the distance from the site and estimated mean characteristic Moment
magnitude4 [Working Group on California Earthquake Probabilities (WGCEP, 2008) and Cao et
al. (2003)] are summarized in Table 1.
TABLE 1
Regional Faults and Seismicity
Fault Segment
Approximate
Distance from
Site (km)
Direction from
Site
Mean
Characteristic
Moment
Magnitude
N. San Andreas - Peninsula 5.7 West 7.23
N. San Andreas (1906 event) 5.7 West 8.05
San Gregorio Connected 15 West 7.50
N. San Andreas - North Coast 22 Northwest 7.51
Total Hayward 24 Northeast 7.00
Total Hayward-Rodgers Creek 24 Northeast 7.33
Monte Vista-Shannon 27 Southeast 6.50
Total Calaveras 38 East 7.03
Mount Diablo Thrust 39 Northeast 6.70
Green Valley Connected 44 Northeast 6.80
Rodgers Creek 48 North 7.07
In the past 200 years, four major earthquakes (i.e., Magnitude > 6) have been recorded on the
4 Moment magnitude is an energy-based scale and provides a physically meaningful measure of the
size of a faulting event. Moment magnitude is directly related to average slip and fault rupture area.
19-1674 6 May 10, 2019
San Andreas Fault. In 1836, an earthquake with an estimated maximum intensity of VII on the
Modified Mercalli (MM) Intensity Scale occurred east of Monterey Bay on the San Andreas
Fault (Toppozada and Borchardt 1998). The estimated moment magnitude, Mw, for this
earthquake is about 6.25. In 1838, an earthquake occurred on the Peninsula segment of the San
Andreas Fault. Severe shaking occurred with an MM of about VIII-IX, corresponding to an Mw
of about 7.5. The San Francisco Earthquake of 1906 caused the most significant damage in the
history of the Bay Area in terms of loss of lives and property damage. This earthquake created a
surface rupture along the San Andreas Fault from Shelter Cove to San Juan Bautista
approximately 470 kilometers in length. It had a maximum intensity of XI (MM), an Mw of
about 7.9, and was felt 560 kilometers away in Oregon, Nevada, and Los Angeles. The most
recent earthquake to affect the Bay Area was the Loma Prieta Earthquake of October 17, 1989
with an Mw of 6.9. This earthquake occurred in the Santa Cruz Mountains about 82 kilometers
south of the site.
In 1868, an earthquake with an estimated maximum intensity of X on the MM scale occurred on
the southern segment (between San Leandro and Fremont) of the Hayward Fault. The estimated
Mw for the earthquake is 7.0. In 1861, an earthquake of unknown magnitude (probably an Mw of
about 6.5) was reported on the Calaveras Fault. The most recent significant earthquake on this
fault was the 1984 Morgan Hill earthquake (Mw = 6.2).
On August 24, 2014 an earthquake with an estimated maximum intensity of VIII (severe) on the
MM scale occurred on the West Napa fault. This earthquake was the largest earthquake event in
the San Francisco Bay Area since the Loma Prieta Earthquake. The Mw of the 2014 South Napa
Earthquake was 6.0.
The U.S. Geological Survey's 2014 Working Group on California Earthquake Probabilities has
compiled the earthquake fault research for the San Francisco Bay area in order to estimate the
probability of fault segment rupture. They have determined that the overall probability of
moment magnitude 6.7 or greater earthquake occurring in the San Francisco Region during the
next 30 years (starting from 2014) is 72 percent. The highest probabilities are assigned to the
19-1674 7 May 10, 2019
Hayward Fault, Calaveras Fault, and the northern segment of the San Andreas Fault. These
probabilities are 14.3, 7.4, and 6.4 percent, respectively.
5.2 Geologic Hazards
During a major earthquake on a segment of one of the nearby faults, strong to very strong
shaking is expected to occur at the project site. Strong shaking during an earthquake can result
in ground failure such as that associated with soil liquefaction, lateral spreading, and cyclic
densification. We used the results of our CPTs to evaluate the potential of these phenomena
occurring at the project site. The results of our analyses and evaluation are presented in the
following sections.
5.2.1 Ground Shaking
The seismicity of the site is governed by the activity of the San Andreas, San Gregorio and
Hayward faults, although ground shaking from future earthquakes on other faults will also be felt
at the site. The intensity of earthquake ground motion at the site will depend upon the
characteristics of the generating fault, distance to the earthquake epicenter, and magnitude and
duration of the earthquake. We judge that strong to very strong ground shaking could occur at
the site during a large earthquake on one of the nearby faults.
5.2.2 Liquefaction and Associated Hazards
Strong shaking during an earthquake can result in ground failure such as that associated with soil
liquefaction and lateral spreading. Soil susceptible to liquefaction includes loose to medium
dense sand and gravel, low-plasticity silt, and some low-plasticity clay deposits. Flow failure,
lateral spreading, differential settlement, loss of bearing strength, ground fissures and sand boils
are evidence of excess pore pressure generation and liquefaction.
Liquefaction susceptibility was assessed using the software CLiq v2.2.1.14 (GeoLogismiki,
2016). CLiq uses measured field CPT data and assesses liquefaction potential given a user-
defined earthquake magnitude and peak ground acceleration (PGA). Our liquefaction analyses
19-1674 8 May 10, 2019
were performed using the methodology proposed by Boulanger and Idriss (2014). We also used
the relationship proposed by Zhang, Robertson, and Brachman (2002) to estimate post-
liquefaction volumetric strains and corresponding ground surface settlement; this relationship is
an extension of the work by Ishihara and Yoshimine (1992).
Our preliminary analyses were performed using a “during earthquake” groundwater depth of
eight feet bgs. In accordance with the 2016 CBC, we used a peak ground acceleration of 0.73
times gravity (g) in our liquefaction evaluation; this peak ground acceleration is consistent with
the Maximum Considered Earthquake Geometric Mean (MCEG) peak ground acceleration
adjusted for site effects (PGAM). We also used a moment magnitude 8.05 earthquake, which is
consistent with the mean characteristic moment magnitude for the San Andreas Fault, as
presented in Table 1.
Our liquefaction analyses indicate there are thin layers of potentially liquefiable soil between
depths of approximately 8 and 38 feet bgs. The localized potentially liquefiable layers the site
are generally less than four feet thick and a majority of the material identified as potentially
liquefiable in the liquefaction analyses generally consists of silty and sandy clay, as well as silty
sand to sandy silt. We preliminarily estimate total and differential ground settlement resulting
from post-earthquake reconsolidation following an MCE event with PGAM of 0.73g will be on
the order of about one inch and 3/4 inch across a horizontal distance of 30 feet, respectively,
beneath the proposed new office building. We preliminarily estimate total and differential
ground settlement results from post-earthquake reconsolidation beneath the proposed parking
garage will be on the order of 1-1/2 inches and one inch across a horizontal distance of 30 feet,
respectively.
Our preliminary analysis indicate the potentially liquefiable layers are sufficiently thin and/or
have a sufficient amount of plastic fines such that the potential for surface manifestations from
liquefaction, such as sand boils, and loss of bearing capacity for shallow foundations are low.
Lateral spreading occurs when a continuous layer of soil liquefies at depth and the soil layers
above move toward an unsupported face, such as a shoreline slope, or in the direction of a
19-1674 9 May 10, 2019
regional slope or gradient. Because of the presence of potentially liquefiable soils and the
topographic conditions, liquefaction-induced lateral spreading may be a concern for this site.
Potential lateral spread displacements are difficult to estimate, as they depend on numerous
factors, such as the geometry and continuity of the liquefiable layers beneath the site, the
topography and the stratigraphy of the subsurface materials adjacent to the site, and the presence,
geometry and integrity of structural systems. Based on our analyses, we preliminarily conclude
the risk of lateral spreading to occur during a major seismic event is low, but should be further
evaluated during the final investigation.
5.2.3 Cyclic Densification
Cyclic densification (also referred to as differential compaction) of non-saturated sand (sand
above groundwater table) can occur during an earthquake, resulting in settlement of the ground
surface and overlying improvements. The site is blanketed by material with a soil behavior type
of loose to medium dense sand and silty sand, and medium stiff to very stiff silty clay. We
preliminarily conclude the potential for cyclic densification to occur at the site is low.
Additional borings and laboratory testing should be performed during the final investigation to
further evaluate the potential for settlement due to cyclic densification at the site.
5.2.4 Fault Rupture
Historically, ground surface displacements closely follow the trace of geologically young faults.
The site is not within an Earthquake Fault Zone, as defined by the Alquist-Priolo Earthquake
Fault Zoning Act, and no known active or potentially active faults exist on the site. We therefore
conclude the risk of fault offset at the site from a known active fault is very low. In a seismically
active area, the remote possibility exists for future faulting in areas where no faults previously
existed; however, we conclude the risk of surface faulting and consequent secondary ground
failure from previously unknown faults is also very low.
19-1674 10 May 10, 2019
6.0 PRELIMINARY CONCLUSIONS AND RECOMMENDATIONS
Based on the results of our preliminary engineering analyses using the data from our CPTs, we
conclude there are no major geotechnical or geological issues that would preclude development
of the site as proposed. The primary geotechnical concerns are: (1) foundation settlement due to
compression of the underlying clay soils, (2) the potential for up to about one inch and 1-1/2
inches of seismically-induced settlement due to liquefaction beneath the proposed office building
and parking garage, respectively, and 3) providing adequate vertical and lateral support for the
proposed new structures. These and other issues are discussed in this section.
6.1 Foundations and Settlement
We performed preliminary analyses to estimate settlement of the proposed new buildings under
static and seismic loads using assumed average foundation pressures of 400 and 525 psf for the
proposed office building and parking garage, respectively. Settlement estimates for the proposed
new buildings supported on shallow foundation systems bearing on native soil are presented in
Table 2 below.
TABLE 2
Preliminary Settlement Summary
New Buildings Supported on Shallow Foundations
Structure Static
(in)
Seismic
(in)
Total
(in)
Office Building 1.0 1.0 2.0
Parking Garage 1.0 1.5 2.5
Provided the estimated settlements presented in Table 2 can be tolerated from a structural and
architectural standpoint, we preliminarily conclude the proposed office building may be
supported on a stiffened foundation system, such as a conventional reinforced concrete mat or
interconnected continuous footings (i.e., a stiffened grid). If the estimated total settlements are
not acceptable to the project team and/or the stiffened foundation system cannot be economically
designed to limit differential settlement to a value that can be tolerated by the structure, then the
proposed new structure may be supported on spread footings bearing on improved soil provided
the soil improvement extends to a depth that would reduce differential settlement of the structure
19-1674 11 May 10, 2019
under both static and seismic conditions to a tolerable amount. Because it is not practical to
support the parking garage on a mat foundation designed for relatively low bearing pressures, we
conclude the foundation system for the garage should consist of spread footings bearing on
improved ground. Preliminary recommendations for design of a stiffened mat foundation
bearing on firm, native soil and spread footings bearing on improved soil are presented in the
sections below.
6.1.1 Mat Foundation
The mat foundation should be designed to limit the amount of differential settlement to tolerable
levels. To limit total static settlement of the mat to one inch, localized bearing pressures should
not exceed 3,000 psf for dead-plus-live loads. To evaluate the pressure distribution beneath the
mat foundation, we preliminarily recommend a modulus of vertical subgrade reaction (KS) of 20
pounds per cubic inch (pci) be used. This value has been corrected to take into account the mat
widths and may be increased by 1/3 for total load conditions. Once the structural engineer
estimates the distribution of bearing stress on the bottom of the mat, we should review the
distribution and revise the modulus of subgrade reaction, if appropriate.
Lateral loads can be resisted by a combination of passive pressure on the vertical faces of the
mats and friction along the bottom of the foundation. Lateral resistance may be computed using
an equivalent fluid weight of 300 pcf (triangular distribution); the upper foot of soil should be
ignored unless confined by a slab or pavement. Frictional resistance should be computed using a
base friction coefficient of 0.30 where the mat is in contact with the soil. Where a vapor retarder
is placed beneath the mat, a base friction coefficient of 0.20 should be used. The passive
pressure and frictional resistance values include a factor of safety of at least 1.5.
Where water vapor transmission through the mat slab is undesirable, we recommend installing a
water vapor retarder beneath the mat. The vapor retarder may be placed directly on the smooth,
compacted soil subgrade. The retarder should meet the requirements for Class B vapor retarders
stated in ASTM E1745 and should be placed in accordance with the requirements of ASTM
E1643. These requirements include overlapping seams by six inches, taping seams, and sealing
19-1674 12 May 10, 2019
penetrations in the vapor retarder. Concrete mixes with high water/cement (w/c) ratios result in
excess water in the concrete, which increases the cure time and results in excessive vapor
transmission through the slab. Therefore, concrete for the mat foundation should have a low w/c
ratio - less than 0.45. If necessary, workability should be increased by adding plasticizers. In
addition, the mat should be properly cured. Before floor coverings, if any, are placed, the
contractor should check that the concrete surface and the moisture emission levels (if emission
testing is required) meet the manufacturer’s requirements.
6.1.2 Spread Footings on Improved Ground
Spread footings bearing on improved ground may be used to support the proposed new
buildings. We conclude drill displacement sand-cement (DDSC) columns or rammed aggregate
piers (RAPs) to be the most appropriate ground improvement methods for this project.
Descriptions of both ground improvement methods are presented below.
DDSC columns are installed by advancing a continuous flight, hollow-stem auger that mostly
displaces the soil and then pumping a sand-cement mixture into the hole under pressure as the
auger is withdrawn. This system results in low vibration during installation and generate
relatively few drilling spoils (approximately one-half cubic yard per DDSC) for off-haul. DDSC
columns are installed under design-build contracts by specialty contractors.
For preliminary design of spread footings bearing on DDSCs, we recommend assuming ground
improvement elements will extend to depths ranging from approximately 20 to 25 feet bgs,
depending on column loads. The length and spacing of the DDSC columns should be sufficient
to limit total settlement of the parking structure to less than one inch (static plus seismic). The
DDSC columns, if properly designed, should be capable of increasing the allowable dead-plus-
live-load bearing pressure to about 5,000 pounds per square foot (psf). The actual design
allowable bearing pressure should be determined by the design-build ground improvement
contractor, as it will be based on the size and spacing of the ground improvement elements.
A rammed aggregate pier is typically constructed by drilling a 30-inch-diameter shaft and
replacing the excavated soil with compacted aggregate. The aggregate consists of clean, open-
19-1674 13 May 10, 2019
graded crushed rock below the water table and Class 2 aggregate base above the water table.
The aggregate is compacted in approximately 12-inch-thck lifts using a modified hydraulic
hammer mounted on an excavator. Rammed aggregate piers develop vertical support through a
combination of frictional resistance along the shaft of the pier and improvement of the
surrounding soil matrix, allowing use of significantly larger bearing capacities than feasible in
unimproved soil. Rammed aggregate piers can also be designed to resist transient uplift loads by
installing steel rods in the center of the pier; the rods are attached to a flat steel plate at the base
of the of the footings. Installation of RAPs generate significantly more spoils than DDSCs so
any cost comparison should consider the cost of off-site disposal of spoils.
For preliminary design of spread footings bearing on RAPs, we recommend assuming ground
improvement elements will extend to depths of approximately 20 to 25 feet bgs, depending on
column loads. The length and spacing of the RAPs columns should be sufficient to limit total
settlement of the parking structure to less than one inch (static plus seismic). The RAPs, if
properly designed, should be capable of increasing the allowable dead-plus-live-load bearing
pressure to about 7,000 pounds per square foot (psf). The actual design allowable bearing
pressure should be determined by the design-build ground improvement contractor, as it will be
based on the size and spacing of the ground improvement elements.
For footings supported on improved ground, lateral loads may be resisted by a combination of
passive pressure on the vertical faces of the footings and friction between the bottoms of the
footings and the supporting soil. To compute passive resistance for sustained loading, we
recommend using an equivalent fluid weight of 300 pcf (triangular distribution). The upper foot
of soil should be ignored for lateral resistance unless confined by a slab or pavement. The
recommended passive pressures include a factor of safety of at least 1.5 and may be used in
combination with the frictional resistance without reduction. Allowable frictional resistance
along the base of the footings should be calculated based on parameters provided by the design-
build ground improvement contractor.
19-1674 14 May 10, 2019
6.2 Floor Slabs
Slab-on-grade floors may be used for the proposed structures supported on spread footings
bearing on improved soil, provided the potential for up to about 3/4 inch of differential
settlement between the footings and the floor slab following a major earthquake is acceptable to
the project team. If the potential for this differential settlement is not acceptable, the floor slab
should be designed to span between ground improvement elements.
A capillary moisture break and vapor retarder are generally not required below parking garage
slabs because there is sufficient air circulation to limit condensation of moisture on the slab
surface. Where a capillary moisture break/vapor retarder is not used, we recommend six inches
of Class 2 aggregate base compacted to at least 95 percent relative compaction be placed beneath
the parking garage slab. To reduce the potential for excessive moisture in the electrical room,
storage rooms, and other rooms with little ventilation, we recommend installing a capillary
moisture break and water vapor retarder beneath the slab to reduce water vapor transmission
through the slab.
A capillary moisture break consists of at least four inches of clean, free-draining gravel or
crushed rock. The vapor retarder should meet the requirements for Class B vapor retarders stated
in ASTM E1745. The vapor retarder should be placed in accordance with the requirements of
ASTM E1643. These requirements include overlapping seams by six inches, taping seams, and
sealing penetrations in the vapor retarder. The particle size of the capillary break material and
sand (if used) should meet the gradation requirements presented in Table 3.
19-1674 15 May 10, 2019
TABLE 3
Gradation Requirements for Capillary Moisture Break
Sieve Size Percentage Passing Sieve
1 inch 90 – 100
3/4 inch 30 – 100
1/2 inch 5 – 25
3/8 inch 0 – 6
Concrete mixes with high water/cement (w/c) ratios result in excess water in the concrete,
which increases the cure time and results in excessive vapor transmission through the slab.
Therefore, concrete for the floor slabs should have a w/c ratio less than 0.45. If necessary,
workability should be increased by adding plasticizers. In addition, the slab should be properly
cured. Before floor coverings are placed, the contractor should check that the concrete surface
and the moisture emission levels (if emission testing is required) meet the manufacturer’s
requirement.
6.3 Seismic Design
We understand the proposed buildings will be designed using the seismic provisions in the 2016
CBC. The latitude and longitude of the site are 37.6576° and -122.3894°, respectively. As
discussed in Section 5.2.2, the site is underlain by thin potentially liquefiable soil layers.
Although the CBC calls for a Site Class F designation for sites underlain by potentially
liquefiable soil, we conclude a Site Class C or D designation is more appropriate because the
potentially liquefiable layers are thin and therefore, the site will not incur significant nonlinear
behavior during strong ground shaking.
Based on shear wave velocity correlations, we estimate the average shear wave velocity in the
upper 30 meters (Vs,30) to be on the order of about 1,100 to 1,200 feet per second, which
corresponds to Site Class D and Site Class C soil conditions, respectively. To determine which
site class should be used for design of the proposed structures, we recommend shear wave
velocity measurements be collected during the final investigation. If shear wave velocity
19-1674 16 May 10, 2019
measurements are not collected during the final investigation, we recommend Site Class D be
used for design. In accordance with the 2016 CBC, we recommend the following for Site Class
D:
• SS = 1.85 g, S1 = 0.86 g
• SMS = 1.85 g, SM1 = 1.24 g
• SDS = 1.23 g, SD1 = 0.86 g
• PGAM = 0.73 g
• Seismic Design Category E for Risk Categories I, II, and III.
If shear wave velocity measurements confirm Site Class C may be used for design of one or both
of the structures, we recommend the following in accordance with the 2016 CBC:
• SS = 1.85 g, S1 = 0.86 g
• SMS = 1.85 g, SM1 = 1.12 g
• SDS = 1.23 g, SD1 = 0.74 g
• PGAM = 0.73 g
• Seismic Design Category D for Risk Categories I, II, and III.
7.0 ADDITIONAL GEOTECHNICAL SERVICES
The preliminary conclusions and recommendations presented within are based on a preliminary
field investigation and not intended for final design. Prior to final design, we should be retained
to provide a final geotechnical report based on a supplemental field investigation. Additional
borings and CPTs will be required to further evaluate the subsurface conditions beneath the site
and develop final foundation design recommendations. Once our final report has been
completed, the design team has selected a foundation system, and prior to construction, we
should review the project plans and specifications to check their conformance with the intent of
our final recommendations. During construction, we should observe site preparation, foundation
installation, and the placement and compaction of fill. These observations will allow us to
19-1674 17 May 10, 2019
compare the actual with the anticipated soil conditions and to check if the contractor's work
conforms with the geotechnical aspects of the plans and specifications.
19-1674 18 May 10, 2019
REFERENCES
California Building Code (2016).
California Division of Mines and Geology (1996), Probabilistic seismic hazard assessment for
the State of California, DMG Open-File Report 96-08.
Cao, T., Bryant, W. A., Rowshandel, B., Branum D. and Wills, C. J. (2003). “The Revised 2002
California Probabilistic Seismic Hazard Maps”
Ishihara, K. (1985), “Stability of Natural Deposits During Earthquakes.”
Robertson, P.K. (2009), “Performance based earthquake design using the CPT”, Keynote
Lecture, International Conference on Performance-based Design in Earthquake Geotechnical
Engineering – from case history to practice, IS-Tokyo, June 2009.
Robertson, P.K. (2009), “Interpretation of Cone Penetration Tests - A Unified Approach”,
Canadian Geotechnical Journal, Vol. 46, No. 11, pp 1337-1355.
Toppozada, T.R. and Borchardt G. (1998). “Re-evaluation of the 1936 “Hayward Fault” and the
1838 San Andreas Fault Earthquakes.” Bulletin of Seismological Society of America, 88(1),
140-159.
U.S. Geological Survey, (2008), The Uniform California Earthquake Rupture Forecast, Version
2 (UCERF 2): prepared by the 2007 Working Group on California Earthquake Probabilities, U.S.
Geological Survey Open File Report 2007-1437.
Zhang, G., Robertson. P.K., Brachman, R., (2002), “Estimating Liquefaction Induced Ground
Settlements from the CPT”, Canadian Geotechnical Journal, 39: pp 1168-1180.
FIGURES
Project No. FigureDate1ROCKRIDGEGEOTECHNICALSITESITE LOCATION MAPBase map: Google Map, 2018.04/24/1919-1674493 FORBES BOULEVARDSouth San Francisco, California0 0.6 MilesApproximate scale0.3
0Approximate scale50 Feet04/26/1919-16742South San Francisco, CaliforniaSITE PLANDateProject No.FigureROCKRIDGEGEOTECHNICAL493 FORBES BOULEVARDEXPLANATIONApproximate location of cone penetration test byRockridge Geotechnical Inc., April 4, 2019Approximate depth of refusal in dense sand or rockProject limitsCPT-1Reference: Base map from a drawing titled "ALTA/NSPS LandTitle Survey", by Butler Armsden, dated February 4, 2018.CPT-1CPT-2CPT-3CPT-421'59'81'21'25'
REGIONAL GEOLOGIC MAP
ROCKRIDGE
GEOTECHNICAL
Approximate scale
800
Project No. FigureDate 3
0 1600 Feet
04/26/19 19-1674
493 FORBES BOULEVARD
South San Francisco, California
Base map: Google Earth with U.S. Geological Survey (USGS), San Mateo, 2018.
Geologic contact:
dashed where approximate and dottedwhere concealed, queried where uncertin
SITE
EXPLANATION
QoaQoa
afaf
QslQsl
Artificial Fill
Mud deposits (late Holocene)
Alluvium (Holocene)
Alluvium (early Pleistocene)
Hillslope Deposits (Quaternary)
Franciscan Complex melange (Eocene, Paleocene,
and (or) Late Cretaceous)
Franciscan Complex sedimentary rocks
(Early Cretaceous and (or) Late Jurassic)
Franciscan Complex volcanic rocks
(Early Cretaceous and (or) Late Jurassic)
Great Valley complex serpentinite (Jurassic)
af
Qhym
Qha
Qsl
Qoa
fsr
KJfs
KJfv
Jsp
QslQsl
Project No. FigureDate
Base Map: U.S. Geological Survey (USGS), National Seismic Hazards Maps - Fault Sources, 2008.
10 Miles
Approximate scale
0 5
4
ROCKRIDGE
GEOTECHNICAL
REGIONAL FAULT MAP
SITE
EXPLANATION
Strike slip
Thrust (Reverse)
Normal
04/24/19 19-1674
493 FORBES BOULEVARD
South San Francisco, California
Point Reyes Fault
Sa
n
A
n
d
r
e
a
s
F
a
u
l
t
San Gr
egor
i
o Faul
t
M
o
n
te
Vista-S
ha
nno
n Fa
ultWest
Napa
M
ou
n
t
Diablo T
hrust Gr
e
e
n
v
ill
e
Fa
u
ltGreat
Val
l
ey 05Gr
eat
Val
l
ey 4bCal
averas Faul
tGreen Vall
eyHa
yw
a
r
d
-
R
o
d
g
e
r
s
C
r
e
e
k
F
a
u
l
t
Haywar
d-Rodger
s
C
r
eek Fau
l
t
APPENDIX A
Cone Penetration Test Results
A-1CPT-1Total depth: 21.16 ft, Date: 4/4/2019Groundwater not measuredCone Operator: Gregg Drilling Inc.Approximate Ground Surface Elevation: 42.5 feetCone resistance qtTip resistance (tsf)4003002001000Depth (ft)212019181716151413121110987654321Cone resistance qtPore pressure uPressure (psi)20100Depth (ft)212019181716151413121110987654321Pore pressure uFriction ratioRf (%)1086420Depth (ft)212019181716151413121110987654321Friction ratioSBT IndexIc SBT4321Depth (ft)212019181716151413121110987654321SBT IndexSoil Behaviour TypeSBT (Robertson, 2010)181614121086420Depth (ft)2120191817161514131211109876543210Soil Behaviour TypeSand & silty sandSilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltVery dense/stiff soilSand & silty sandProject No. FigureDateSBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty clay5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to clayey sand9. Very stiff fine grainedCONE PENETRATION TEST RESULTSROCKRIDGEGEOTECHNICAL04/26/1919-1674493 FORBES BOULEVARDSouth San Francisco, California
CPT-2A-2Total depth: 59.38 ft, Date: 4/4/2019Groundwater not measuredCone Operator: Gregg Drilling Inc.Approximate Ground Surface Elevation: 41.0 feetCone resistance qtTip resistance (tsf)4003002001000Depth (ft)5856545250484644424038363432302826242220181614121086420Cone resistance qtPore pressure uPressure (psi)2001000Depth (ft)5856545250484644424038363432302826242220181614121086420Pore pressure uFriction ratioRf (%)1086420Depth (ft)5856545250484644424038363432302826242220181614121086420Friction ratioSBT IndexIc SBT4321Depth (ft)5856545250484644424038363432302826242220181614121086420SBT IndexSoil Behaviour TypeSBT (Robertson, 2010)181614121086420Depth (ft)5856545250484644424038363432302826242220181614121086420Soil Behaviour TypeSand & silty sandSilty sand & sandy siltClay & silty clayClay & silty claySilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltSilty sand & sandy siltVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilSand & silty sandVery dense/stiff soilClay & silty clayVery dense/stiff soilClay & silty clayVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilClay & silty clayVery dense/stiff soilClay & silty clayClayVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilSand & silty sandProject No. FigureDateSBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty clay5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to clayey sand9. Very stiff fine grainedCONE PENETRATION TEST RESULTSROCKRIDGEGEOTECHNICAL04/26/1919-1674493 FORBES BOULEVARDSouth San Francisco, California
CPT-3A-3Total depth: 24.77 ft, Date: 4/4/2019Groundwater not measuredCone Operator: Gregg Drilling Inc.Approximate Ground Surface Elevation: 43.7 feetCone resistance qtTip resistance (tsf)4003002001000Depth (ft)242322212019181716151413121110987654321Cone resistance qtPore pressure uPressure (psi)5Depth (ft)242322212019181716151413121110987654321Pore pressure uFriction ratioRf (%)1086420Depth (ft)242322212019181716151413121110987654321Friction ratioSBT IndexIc SBT4321Depth (ft)242322212019181716151413121110987654321SBT IndexSoil Behaviour TypeSBT (Robertson, 2010)181614121086420Depth (ft)2423222120191817161514131211109876543210Soil Behaviour TypeSand & silty sandSilty sand & sandy siltClay & silty claySilty sand & sandy siltClay & silty claySilty sand & sandy siltClayClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty clayClayClay & silty clayVery dense/stiff soilSilty sand & sandy siltSandProject No. FigureDateSBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty clay5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to clayey sand9. Very stiff fine grainedCONE PENETRATION TEST RESULTSROCKRIDGEGEOTECHNICAL04/26/1919-1674493 FORBES BOULEVARDSouth San Francisco, California
CPT-4A-4Total depth: 81.36 ft, Date: 4/4/2019Groundwater not measuredCone Operator: Gregg Drilling Inc.Approximate Ground Surface Elevation: 42.8 feetCone resistance qtTip resistance (tsf)4003002001000Depth (ft)80757065605550454035302520151050Cone resistance qtPore pressure uPressure (psi)4002000Depth (ft)80757065605550454035302520151050Pore pressure uFriction ratioRf (%)1086420Depth (ft)80757065605550454035302520151050Friction ratioSBT IndexIc SBT4321Depth (ft)80757065605550454035302520151050SBT IndexSoil Behaviour TypeSBT (Robertson, 2010)181614121086420Depth (ft)80757065605550454035302520151050Soil Behaviour TypeSand & silty sandClay & silty clayVery dense/stiff soilSilty sand & sandy siltVery dense/stiff soilClay & silty clayVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilClay & silty clayClay & silty clayVery dense/stiff soilSilty sand & sandy siltVery dense/stiff soilVery dense/stiff soilSilty sand & sandy siltClay & silty clayClay & silty claySilty sand & sandy siltVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilSilty sand & sandy siltVery dense/stiff soilClay & silty clayVery dense/stiff soilClay & silty clayVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilVery dense/stiff soilProject No. FigureDateSBT legend1. Sensitive fine grained2. Organic material3. Clay to silty clay4. Clayey silt to silty clay5. Silty sand to sandy silt6. Clean sand to silty sand7. Gravely sand to sand8. Very stiff sand to clayey sand9. Very stiff fine grainedCONE PENETRATION TEST RESULTSROCKRIDGEGEOTECHNICAL04/26/1919-1674493 FORBES BOULEVARDSouth San Francisco, California