Loading...
HomeMy WebLinkAbout03_Project_Description 751 Gateway Boulevard Project 3-1 September 2020 ICF 662.19 Chapter 3 Project Description 3.1 Overview The project sponsor, 701 Gateway Center LLC, proposes to redevelop a 7.4-acre, irregularly shaped site within the City of South San Francisco’s (City’s) Gateway Specific Plan planning area with a research and development (R&D) facility and office building. The project site is in an area referred to as the Gateway Campus (consisting of eight buildings at 601, 611, and 651 Gateway Boulevard; 681 to 685 Gateway Boulevard; 701 Gateway Boulevard; 801 Gateway Boulevard; and 901 to 951 Gateway Boulevard). The project site is bounded by a commercial and office building (901 Gateway Boulevard) and a surface parking lot to the north, Gateway Boulevard to the east, a surface parking lot to the south, and commercial and office buildings to the west. The 7.4-acre project site (Assessor’s Parcel Numbers 015-024-290 and 015-024-360) currently consists of an existing six-story, approximately 170,235-square-foot office building at 701 Gateway Boulevard and a surface parking lot with approximately 558 parking spaces. The project proposes to construct a new building, referred to as 751 Gateway Boulevard, on the site of an existing surface parking lot in the northern portion of the project site. The proposed project would maintain the existing zoning designation of Zone IV under the Gateway Specific Plan District (GSPD). The existing zoning allows for development at a maximum floor area ratio (FAR) of 1.25, or a maximum of 402,930 square feet, within the project site. The building at 701 Gateway Boulevard is approximately 170,235 square feet. Based on the zoning, 232,695 square feet of unrealized FAR remains available for the project site, a portion of which the proposed project would utilize. The total proposed FAR for the site, including both the existing building at 701 Gateway Boulevard and the proposed building at 751 Gateway Boulevard, would be 1.18. The proposed project involves construction of a 148-foot-tall, seven-story building with approximately 208,800 square feet of space (60 percent R&D uses and 40 percent office uses). The new building would be constructed on the existing surface parking lot. The existing office building at 701 Gateway Boulevard would remain. The ground floor of the proposed building would include a “through lobby” with access from the north and south; the lobby would include an amenity space for tenants. An entry plaza and landscaped visitor lot would be constructed north of the proposed building. An entrance and screened service yard would be constructed south of the proposed building. The proposed project would improve pedestrian connections between the nearby Gateway Campus buildings at 701, 901, 951, and 801 Gateway Boulevard by creating a pedestrian hub central to the campus. The proposed project would also include surface parking lots with a total of 418 parking spaces on-site (including approximately 42 parking spaces in a lot north of the proposed building) for use of the tenants on-site and within the City of South San Francisco Project Description 751 Gateway Boulevard Project 3-2 September 2020 ICF 662.19 Gateway Campus. Construction of the proposed project, if the related entitlements are approved by the City, would begin in 2020 and occur over approximately 18 months, with an anticipated completion date in 2021.1 3.1.1 Project Objectives The project sponsor identified the following objectives for the project: • Create state-of-the-art R&D facilities consistent with the South San Francisco General Plan (General Plan) designation for the site as well as General Plan goals and policies. • Develop a building that is aesthetically compatible with the surrounding vicinity, with height, massing and design treatment that is compatible with other recent development in the East of 101 Area. • Promote the City’s ongoing development of the “East of 101 Area” into a nationally recognized biotechnology and R&D center to attract other life science uses. • Further the City’s policies for developing the East of 101 Area with new opportunities for continued evolution from manufacturing and warehousing/distribution to biotechnology and R&D. • Redevelop underutilized parcels within the project site at a higher density to build on the synergy of R&D development and to take advantage of opportunities offered in the East of 101 Area to create a vibrant, attractive and efficiently-designed R&D campus. • Develop an R&D campus with a high level of design quality, as called for in the design policies and guidelines of the East of 101 Area Plan. • Build a project that creates quality jobs for the City. • Provide sufficient space for tenants to employ key scientific and business personnel in proximity to each other to foster efficient collaboration and productivity. • Capitalize on the project’s proximity to the new Caltrain station to provide transit-oriented employment opportunities, encourage employees to commute using public transit, and reduce VMT and air emissions by reducing single-occupancy vehicle trips. • Enhance the visual quality of development around the existing Gateway Campus by providing a high-quality, modern building and functional and attractive landscape areas. The project will take advantage of and enhance access to the Caltrain station by upgrading the pedestrian and bicycle connections within and to the Gateway campus. 1 Subsequent to the preparation of this draft EIR, the project sponsor indicated that construction of the proposed project could begin in 2021 and end in 2022, which is a delay of approximately six months compared with the construction schedule analyzed in Chapter 4, Environmental Setting, Impacts, and Mitigation. The anticipated buildout year for the project assumed in the EIR analysis is 2021. Equipment and vehicle emission factors decline as a function of time due to increasingly stringent air emission standards. Therefore, if construction of the project were to extend to 2022, the air quality and greenhouse gas analyses in this draft EIR would likely be conservative, as actual emissions would likely be lower in 2022 than what was assumed for the project analysis. In addition, this potential change to the project schedule would not result in any changes to the environmental analysis for any of the environmental topic sections because the overall duration of construction and construction intensity would remain the same. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-3 September 2020 ICF 662.19 • Promote alternatives to automobile transportation to further the City’s transportation objectives by emphasizing linkages, transportation demand management (TDM), pedestrian access, and ease of movement between buildings. • Enhance vehicular, bicycle, and pedestrian circulation and access in the area surrounding the project site. • Build a project that is viable in the East of 101 Area, based on market conditions and project service requirements for the area. • Incorporate flexibility for office and R&D uses to ensure that the project is responsive to tenant demands, based on market conditions. • Maximize positive fiscal impacts for the City through the creation of jobs, enhancement of property values, and generation of property taxes and development fees. 3.1.2 Project Location The project site is located in the City of South San Francisco. The City is located south of the City of Brisbane and north of the City of San Bruno. The City is built on the bay plain and on the northern foothills of the Coastal Range. The City is located along major transportation routes, including U.S. 101, Interstate 380, Interstate 280, and the Union Pacific Railroad. Figure 3-1, shows the location of the project site and the regional vicinity. The project site is within the City’s Gateway Specific Plan area, within the East of 101 area. The Gateway Specific Plan area consists of approximately 23 acres of land and is bounded by Oyster Point Boulevard to the north, Eccles Avenue to the east, East Grand Avenue to the south, and the Caltrain right-of-way to the west. 3.2 Existing Setting The project site is located in the Gateway Campus, an area with primarily commercial and office uses. As shown in Figure 3-2, the project site is bounded by a commercial and office building (901 Gateway Boulevard) and a surface parking lot to the north, Gateway Boulevard to the east, a surface parking lot to the south, and commercial and office buildings to the west. The project site is served by Gateway Boulevard as the primary arterial road, fed by Oyster Point Boulevard (running east to west) to the north and East Grand Avenue (running east to west) to the south. In addition, the project site is approximately 0.5 mile north of the South San Francisco Caltrain station and approximately 0.2 mile east of U.S. 101. San Francisco International Airport (SFO) is approximately 2 miles south of the project site. 3.2.1 Regional Setting The City of South San Francisco encompasses approximately 4,298 acres and is largely composed of single-use areas, with industry in the eastern and southeastern portions of the City and single-family homes to the north and west. Much of the City is already urbanized, and the amount of vacant land is limited. Growth in the City typically occurs mostly in the form of redevelopment and intensification. 101 82 380 280 Oyster Point Blvd Gateway Blv d Forbes Blvd E Gr a n d A v e Sister Cit i e s B l v d Eccles AveSouth San Francisco Brisbane San Bruno San Francisco International Airport San Francisco Bay Miles .5 10 Project Site ALAMEDA CONTRA COSTA MARIN SAN MATEO SANTA CLARA 280 80 580 680 880 SAN FRANCISCO P acic Ocean 101 Project Location Figure 3-1 Project Location 751 Gateway Boulevard ProjectGraphics…00406.17 (12-30-19) AB Gateway Boulevard901 GatewayBoulevard Oyster Point Boulevard 951GatewayBoulevard 801GatewayBoulevard 701GatewayBoulevard Project Site Caltrain Right-of-Way751GatewayBoulevard APN 015-024-290 APN 015-024-360 101 Corporate D ri v e Industrial WayImage Source: Google, 2019 Boundary Source: RMW Architecture & Interiors, 2019 Feet 0 200 400 Note: APN – assessor’s parcel number Graphics … 00662.19 (1-16-20) ABFigure 3-2 Existing Project Site 751 Gateway Boulevard Project City of South San Francisco Project Description 751 Gateway Boulevard Project 3-6 September 2020 ICF 662.19 3.2.2 Surrounding Land Uses The project site is within an area comprised of numerous business parks near the intersection of Gateway Boulevard and Oyster Point Boulevard, as shown in Figure 3-2. The project site is within the Gateway Campus, which includes eight buildings at 601, 611, and 651 Gateway Boulevard; 681 to 685 Gateway Boulevard, 701 Gateway Boulevard, 801 Gateway Boulevard, and 901 to 951 Gateway Boulevard. The Gateway Campus is composed of three- to 16-story buildings, consisting of approximately 1.4 million square feet of office, R&D, childcare, and amenity uses and approximately 4,330 parking spaces. North of the project site across Oyster Point Boulevard is the Cove at Oyster Point, which is composed of four- to six-story buildings consisting of office and biotechnology uses. South of the project site across an unnamed street that connects Poletti Way to Gateway Boulevard is the Genentech Campus, which is composed of three- to six-story office and R&D buildings. The Genentech Campus also includes a five-story parking garage and amenities such as retail uses and childcare uses. The Caltrain right-of-way is located along the western boundary of the Gateway Campus. Oyster Point Park is approximately 0.7 mile east of the project site and the Bay Trail is approximately 0.2 mile north of the project site. 3.2.3 Site Setting The 7.4-acre project site (assessor’s parcel numbers 015-024-290 and 015-024-360) consists of a six-story, approximately 170,235-square-foot office building at 701 Gateway Boulevard and surface parking lots with approximately 558 parking spaces. The existing building at 701 Gateway Boulevard was constructed in 1998. Approximately 450 employees work at the existing office building at 701 Gateway Boulevard. Approximately 19 percent of the project site is covered with pervious surfaces, and 81 percent of the project site is covered with impervious surfaces. A summary of the existing characteristics of the project site is provided in Table 3-1. Table 3-1. Summary of Existing Site Characteristics Feature Existing Project Site Assessor’s Parcel Numbers 015-024-290 and 015-024-360 Lot size 7.4 acres (approximately 322,344 square feet) General Plan land use/zoning Business Commercial (BC)/Gateway Specific Plan District Existing uses at 701 Gateway Boulevard 170,235 square feet of office space Building height Approximately 97 feet Number of stories 6 Existing FAR1 0.53 Vehicle parking 558 spaces Source: 701 Gateway Center LLC, 2019 Notes: 1 Floor area ratio (FAR) is the relationship between the total amount of usable floor area that a building has, or has been permitted for the building, and the total area of the lot on which the building stands. A higher FAR number is more likely to indicate a dense or urban construction. The South San Francisco Municipal Code Sections 20.040.008 and 20.40.009, allow certain areas to be excluded from the calculation of square feet of Floor Area and FAR. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-7 September 2020 ICF 662.19 3.2.3.1 Existing Land Use and Zoning Designations The project site is identified in the 1999 General Plan as Business Commercial (BC). The BC land use designation allows for a mix of business and professional offices, visitor service establishments, and retail establishments. More specifically, the General Plan describes the permitted uses for the site as administrative, financial, business, and professional uses; medical and public offices; R&D facilities; and visitor-oriented and regional commercial uses. The land use designation was created to encourage the type of commercial and hotel growth that is currently occurring along South Airport, Gateway, and Oyster Point Boulevards as well as the South Spruce corridor within the City. The base maximum permitted FAR in the BC land use designation is 0.5, but increases may be permitted up to a total FAR of 1.0 for uses such as R&D facilities, or for development meeting specific TDM, off-site improvement, or specific design standards. A FAR of up to 1.25 is permitted in the Gateway Business Park Master Plan area and in certain portions of the Oyster Point Specific Plan area for projects that include a TDM program. In addition, the General Plan provides that the zoning ordinance can provide specific exceptions to FAR limitations for uses with low employment densities, such as research facilities, or low peak-hour traffic generation. The City of South San Francisco is organized into several geographic areas, referred to as planning areas. The project site is in the Gateway Specific Plan Area, which includes a variety of commercial and R&D land uses, and is zoned GSPD. The GSPD is divided into five zones and the project site is located in Zone IV. The maximum number of buildings allowed within the GSPD is 50, with a maximum height of 250 feet.2 The maximum surface area covered by structures (lot coverage) is limited to 50 percent, and development is permitted up to a maximum FAR of 1.25, or a maximum of 402,930 square feet, within the project site. Figure 3-3 illustrates the existing General Plan land use and zoning designations of the project site and surrounding area. East of 101 Area Plan Designation The project site is designated as Gateway Specific Plan Area in the East of 101 Area Plan.3 The City interprets the East of 101 Area Plan as a design-level document. Per policy IM-5, the Gateway Specific Plan is not affected by the land use regulations of the East of 101 Area Plan. Development standards and density determinations, including FAR, are established in the General Plan, which was updated after the adoption of, and takes precedence over, the East of 101 Area Plan. Moreover, when East of 101 Area Plan policies are in conflict with or inconsistent with the General Plan, the General Plan policies supersede requirements outlined in the East of 101 Area Plan. Applicable design-level policies of the East of 101 Area Plan include all policies of the Design Element; Land Use Element policies LU-8a (Gateway Specific Plan uses), and LU-8b (Gateway Specific Plan FAR). Policy LU-8a provides that the uses allowed in the Gateway Specific Plan Area are those specified in the Gateway Specific Plan. Policy LU-8b provides that the maximum FAR in the Gateway Specific Plan Area is that specified in the Gateway Specific Plan. 2 Building heights east of U.S. 101 are allowed the maximum height limits permissible under Federal Aviation Regulations Part 77. General Plan Figure 2-2 establishes a 261-foot height limit for the project site, whereas Exhibit IV-13 of the 2012 SFO Comprehensive Airport Land Use Compatibility Plan establishes a 300-foot height limit for the project site. 3 The land use entitlements of the Gateway Specific Plan are not affected by the East of 101 Area Plan and supersede any standards or entitlements set forth in the East of 101 Area Plan. However, development within the project site would be required to conform with other policies of the East of 101 Area Plan, such as design guidelines. Project Site Oyster Point Boulevard Gateway BoulevardBC (GSPD) BTP (BTP) BC (FC) BC (BWCSPD) Feet 0 200 400 Source: City of South San Francisco Zoning Search, 2019 Legend General Plan Land Use (Zoning Designation) Note: General Plan Land Use is indicated in ALL CAPS and zoning designation is indicated in parentheses in ALL CAPS. BC - Business Commercial GSPD - Gateway Specic Plan District FC - Freeway Commercial BWCSPD - Bay West Cove Specic Plan District BTP - Business and Technology Park BC (GSPD) BC (FC) BC (BWCSPD) BTP (BTP) Figure 3-3 Existing General Plan Land Use and Zoning Designations 751 Gateway Boulevard ProjectGraphics…00406.17 (1-16-20) AB City of South San Francisco Project Description 751 Gateway Boulevard Project 3-9 September 2020 ICF 662.19 Height Limits In general, height limitations or restrictions in the East of 101 Area are defined by the SFO sphere of influence.4 Development on the project site is limited to 300 feet in height by elevation according to the Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport prepared in 2012,5 but may be restricted based on notification and consultation with the Federal Aviation Administration (FAA) under Part 77.9 of the Code of Federal Regulations (CFR). The Gateway Specific Plan and GSPD establish a 250-foot height limit within the GSPD. 3.2.3.2 Existing Parking, Circulation, and Access The project site contains two driveways on Gateway Boulevard, one driveway from the existing internal access drive immediately south of the building at 951 Gateway Boulevard, and one driveway on an unnamed street that connects Poletti Way to Gateway Boulevard, as shown in Figure 3-2. Vehicles access the building at 701 Gateway Boulevard via the two driveways on Gateway Boulevard and travel to either the 376-space semi-circular parking lot in the northern portion of the project site, the rectangular parking lots in the southern portion of the project site that include a total of 170 spaces, or the 18 spaces immediately west of the building at 701 Gateway Boulevard. In total, there are approximately 558 surface parking spaces on the site. On- street parking is not permitted on the streets surrounding the project site. In addition, there is a loading dock on the southeast side of the existing building at 701 Gateway Boulevard. The Gateway Campus, excluding 801 Gateway Boulevard and 901- 951 Gateway Boulevard, currently has a total of 3,457 parking spaces, which provides a parking ratio of 3.19 spaces per 1,000 gross square feet. Of these spaces, in addition to the 558 spaces that serve the project site (office) (3.25 spaces/1,000 gross square feet), there are 369 spaces that serve 681-685 Gateway Boulevard (lab) (2.55 spaces/1,000 gross square feet), 711 spaces that serve 601 Gateway Boulevard (office) (3.29 spaces/1,000 gross square feet), 857 spaces that serve 611 Gateway Boulevard (office) (3.29 spaces/1, 000 gross square feet), and 956 spaces that serve 651 Gateway Boulevard (office) (3.29 spaces/1,000 gross square feet). The project site is served by a Class II bicycle lane along a segment of Oyster Point Boulevard north of the project site.6 Pedestrian access is provided by a sidewalk along Gateway Boulevard adjacent to the project site. 4 City of South San Francisco Zoning Ordinance, 2017.20.110.003(A). 5 City/County Association of Governments of San Mateo County. 2012. Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport. Exhibit IV-14, p. IV-45. 6 A Class II bicycle lane is a striped bicycle lane separated from traffic. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-10 September 2020 ICF 662.19 3.2.3.3 Existing Landscaping and Site Conditions Landscaping on the project site is limited to trees and ornamental landscaping features such as parking and building buffers. The project site contains approximately 227 trees, including 35 protected trees.7,8 The project site, which is approximately 34 to 21 feet above mean sea level, slopes gently from west to east, toward Gateway Boulevard.9 3.2.3.4 Existing Utility Infrastructure Potable Water10 The project site is served by the California Water Service Company, which purchases most of its water from the San Francisco Public Utilities Commission. There is a 12-inch water main in Gateway Boulevard. There is a 12-inch lateral that serves the 701 Gateway Boulevard building and a 4-inch service line that connects to the lateral. In addition, there is an existing 8-inch fire water main that serves the 701 Gateway Boulevard building and connects to the 12-inch lateral and loops around the buildings located at 701, 801, and 901 Gateway Boulevard. Stormwater11 There are several storm drains located around the perimeter of the northern surface parking lot. In addition, there is an 18-inch storm drain line in Gateway Boulevard that flows north and a 30-inch storm drainpipe in Gateway Boulevard that flows south. Sanitary Sewer System12 The project site is served by an existing sanitary sewer system. There is an existing pump station located immediately north of the project site at the intersection of Gateway Boulevard and Oyster Point Boulevard. There is a 10-inch sewer main in Gateway Boulevard that runs from the pump station and connects to an 8-inch lateral that serves the 701 Gateway Boulevard building. The 10- inch sewer main also has a 12-inch gravity pipe outfall that continues south in Gateway Boulevard. Natural Gas and Electric The project site is served by the existing natural gas and electric service provided by Pacific Gas and Electric (PG&E). There are underground electrical lines in the eastern portion of the northern surface parking lot. There is a 4-inch natural gas main in Gateway Boulevard. 7 Arborwell. 2020. 701 Gateway Boulevard Tree Inventory & Assessment, 701 Gateway Boulevard, South San Francisco, California. February 12. 8 The City of South San Francisco defines a protected tree as any tree of the following species with a circumference of 75 inches or more when measured 54 inches above natural grade: blue gum (Eucalyptus globulus), black acacia (Acacia melanoxylon), myoporum (Myoporum laetum), sweetgum (Liquidambar styraciflua), glossy privet (Lingustrum lucidum), lombardy poplar (Populus nigra). 9 Langan. 2019. Geotechnical Investigation, 751 Gateway Boulevard, South San Francisco, California. November 7. 10 BKF Engineers. 2020. 701 and 751 Gateway Boulevard, South San Francisco Wet Utilities. March 5, 2020. 11 Ibid. 12 Ibid. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-11 September 2020 ICF 662.19 Telecommunications There are numerous telecommunication providers in the City for DSL, wireless, cable, and fiber optics. Various communication companies (e.g., AT&T, Comcast, CenturyLink/Level3 and Zayo) provide service via underground conduits located in the vicinity of the project site. Refuse and Recycling The project site is served by South San Francisco Scavenger Company and Blue Line Transfer, Inc., which are located approximately 1 mile southeast of the project site. The building at 701 Gateway Boulevard has one off-street loading dock for trash and recycling pickup services. 3.3 Description of the Proposed Project As discussed in detail below, the proposed project would include construction of a building, consisting of R&D and office uses and amenity uses supportive to the proposed uses on the project site and existing uses in the Gateway Campus. The proposed project would also include surface parking, streetscape improvements, and infrastructure for utilities. 3.3.1 Proposed Project Buildout The proposed project would maintain the existing zoning designation of Zone IV under the GSPD. Based on the zoning, 232,695 square feet of unrealized FAR is associated with the project site. The proposed project would use a portion of the unrealized FAR associated with the project site; the proposed total FAR for the site, including both the existing building at 701 Gateway Boulevard and the proposed building at 751 Gateway Boulevard, would be 1.18. 3.3.2 Proposed Project Site Plan The proposed project involves construction of a 148-foot-tall, seven-story building with approximately 208,800 square feet of space (60 percent R&D uses and 40 percent office uses). The new building would be constructed on the existing surface parking lot. The existing office building at 701 Gateway Boulevard would remain. The proposed building would be constructed on the site of an existing surface parking lot in the northern portion of the project site. The proposed project would also include two surface parking lots with a total of 418 parking spaces. Upon project completion, approximately 26 percent of the project site would be covered with pervious surfaces, and 74 percent of the project site would be covered with impervious surfaces. A summary of the proposed project features is provided in Table 3-2. Figure 3-4 illustrates the proposed project site plan. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-12 September 2020 ICF 662.19 Table 3-2. Proposed Project Features Feature Proposed Project Existing uses at 701 Gateway Boulevard (to remain) 170,235 square feet of office space Total proposed new uses at 751 Gateway Boulevard 208,800 square feet R&D 118,000 square feet Office 78,700 square feet Amenity (including café and fitness center) 12,100 square feet Building height 148 feet Number of stories 7 Site FAR1 1.18 Vehicle parking 418 spaces (including nine accessible spaces, 25 electric vehicle charging spaces, and 60 carpool spaces) Short-term bicycle parking spaces 90 spaces Long-term bicycle parking spaces 36 spaces Trees 164 trees (accounting for the 175 existing trees to be removed, 52 existing trees to remain, and additional 112 trees to be planted) Source: 701 Gateway Center LLC, 2019. Notes: 1 Floor area ratio (FAR) is the relationship between the total amount of usable floor area that a building has, or has been permitted for the building, and the total area of the lot on which the building stands. A higher FAR number is more likely to indicate a dense or urban construction. The South San Francisco Municipal Code Sections 20.040.008 and 20.40.009, allow certain areas to be excluded from the calculation of square feet of Floor Area and FAR. 701 GATEWAY BOULEVARD EXISTING TO REMAIN 701 GATEWAY BOULEVARD EXISTING TO REMAIN Source: RMW Architecture & Interiors, 2020 Feet 0 100 200 PARKING LOT EXISTING TO REMAIN PARKING LOT EXISTING TO REMAIN Legend Project Site 751 GATEWAY BOULEVARD 751 GATEWAY BOULEVARD 751 GATEWAY BOULEVARD Figure 3-4 Conceptual Project Site Plan 751 Gateway Boulevard ProjectGraphics…00406.17 (2-21-20) AB City of South San Francisco Project Description 751 Gateway Boulevard Project 3-14 September 2020 ICF 662.19 Figure 3-5 and Figure 3-6 show the interior configuration for the proposed building. The ground floor (floor 1) of the proposed building would include a “through lobby” with access from the north and south in the western portion of the building. The lobby would include an amenity space, including a café, which would be open to the public. In addition, floor 1 would include a fitness center, which would only be open to occupants of the Gateway Campus. Floor 2 would include additional lobby space. Floors 3 through 7 would be used for R&D and office space. Figure 3-7 and Figure 3-8 show the elevations for the proposed building. A service and loading yard would be constructed south of the proposed building (Figure 3-5). The yard would be screened by a 15-foot aluminum wall along Gateway Boulevard that would be similar to the architecture of the proposed building; the screen along the southern and western portion of the yard would be constructed of a perforated aluminum panel. The yard would contain an emergency generator and loading docks. The proposed project would include one diesel 1,250-kilowatt (kW) generator (1,562-kilovolt amps) equipped with a level 3 enclosure. The generator would be required to meet the Bay Area Air Quality Management District’s (BAAQMD’s) permitting requirements for stationary sources. Periodic testing of the generator would be completed; testing is anticipated to consist of one test per week for 30 to 45 minutes per test at a load of 100 percent for up to 50 hours per year maximum, as limited by the BAAQMD. Other than testing, the generator would only operate during emergencies. The proposed project would include an aboveground tank to store diesel fuel for the proposed generator. The proposed project would include two loading docks in the yard, which would accommodate weekly trash and recycling pickups, daily deliveries (e.g., FedEx, postal service), building equipment servicing (e.g., PG&E checking meters), and occupants while moving in/moving out. In addition, all major heating, ventilation, and air conditioning (HVAC) equipment that would serve the proposed building would be located on the roof in a screened enclosure or in the rooftop penthouse for the chiller and boiler. The screened enclosure would comprise aluminum panels as an extension of the building. 3.3.2.1 Project Site Access, Circulation, and Parking The existing access to the project site (two driveways on Gateway Boulevard, one driveway from the internal access drive south of the building at 951 Gateway Boulevard, and one driveway on an unnamed street that connects Poletti Way to Gateway Boulevard) would be retained under the proposed project (Figure 3-4). In addition, the existing internal access drive within the project site, which would curve around the proposed building and the proposed northern surface parking lot, would be retained under the proposed project. The proposed project would include a new shuttle stop/passenger pickup/drop-off zone for employee shuttles along the western portion of the access drive north of the existing building at 701 Gateway Boulevard. Emergency vehicle access to the project site would be provided by Gateway Boulevard and the proposed parking lot to be constructed north of the proposed building would serve as the main point of entry for emergency vehicles. The parking for the proposed project would be provided as part of a master parking plan for the portion of the Gateway Campus consisting of 601 Gateway Boulevard, 611 Gateway Boulevard, 651 Gateway Boulevard, 681–685 Gateway Boulevard, 701 Gateway Boulevard, and 751 Gateway Boulevard. The master parking plan would provide 3,099 parking spaces, which would provide a ratio of 2.4 spaces/1,000 gross square feet for this portion of the Gateway Campus. Of these spaces, 1,916 spaces would serve 601, 611, and 651 Gateway Boulevard (office) in a shared parking                                            OFFICE FUTUREFITNESS LOADING LOADINGAREA SERVICEYARD LOBBYCAFE Figure 3-5 Conceptual Floor Plan (Floor 1) 751 Gateway Boulevard Project Source: RMW Architecture & Interiors, 2020 Graphics … 00662.19 (2-21-20) AB                                                                                           LAB/OFFICE LAB/OFFICE Graphics … 00662.19 (2-21-20) ABFigure 3-6 Conceptual Floor Plan (Floors 3 to 7) 751 Gateway Boulevard Project North Elevation South Elevation 148’-2” 148’-2” Source: RMW Architecture & Interiors, 2019 BACK LIT ART INSTALLATION Figure 3-7 Conceptual Elevations (North and South) 751 Gateway Boulevard ProjectGraphics…00406.17 (1-15-20) AB                                                                                                                                          12.09.19 2075' - 10"20 36 52 68 84 100 117 124 2 130 148 2 218' - 2"                                                                                                                                          12.09.19 2075' - 10"20 36 52 68 84 100 117 124 2 130 148 2 218' - 2"East Elevation West Elevation 148’-2” 148’-2” Source: RMW Architecture & Interiors, 2019 BACK LIT ART INSTALLATION Figure 3-8 Conceptual Elevations (East and West) 751 Gateway Boulevard ProjectGraphics…00406.17 (1-15-20) AB City of South San Francisco Project Description 751 Gateway Boulevard Project 3-19 September 2020 ICF 662.19 arrangement (2.5 spaces/1,000 gross square feet), 289 spaces would serve 681-685 Gateway Boulevard (lab) (2 spaces/1,000 gross square feet), 434 spaces would serve 701 Gateway Boulevard (office)(2.5 spaces/1,000 gross square feet), and 418 spaces would serve 751 Gateway Boulevard (lab) (2 spaces/1,000 gross square feet). The project site would include a total of 418 parking spaces, including 42 parking spaces in a lot to be constructed north of the proposed building and 376 existing spaces in the rectangular parking lots in the southern portion of the project site. Of the total parking spaces, the proposed project would include nine accessible spaces that would be compliant with the Americans with Disabilities Act (ADA), 25 electric vehicle charging spaces, and 60 carpool spaces. The proposed project would include 90 short-term bicycle parking spaces and 36 long-term bicycle parking spaces. The short-term bicycle parking spaces would be provided near the proposed entry plaza north of the proposed building, between the proposed outdoor amenity space and the service and loading yard south of the proposed building, and along the western side of the internal access drive near the existing building at 701 Gateway Boulevard. The long-term bicycle parking spaces would also be provided between the proposed outdoor amenity space and the service and loading yard. In addition, the proposed fitness center would include showers and clothes locker facilities. A pedestrian walkway, also known as the Gateway pedestrian connection, would be constructed along Gateway Boulevard in the portion of the project site. The approximately 470-foot landscaped walkway would run parallel to the sidewalk and would connect pedestrians from the northern portion of the project site to the proposed building. In addition, pedestrian walkways would be constructed along the existing internal access drive to connect the proposed building to the rest of the Gateway Campus. The proposed project would also include a widened sidewalk and landscaping on the west side of Gateway Boulevard along the project frontage. 3.3.2.2 Site Landscaping and Open Space The proposed project would include an outdoor entry plaza northwest of the proposed building and an outdoor amenity space southwest of the proposed building. Both the entry plaza and the amenity space would include landscaping, outdoor gathering areas, and seating areas. In addition, the project would include new landscaping along the perimeter of the site. The proposed project would include approximately 59,800 square feet of planted landscaped areas (not accounting for the proposed biotreatment areas, discussed below) and approximately 53,700 square feet of hardscape landscaped areas, for a total of 58,100 square feet of landscaped areas. The proposed project would also include three biotreatment areas (e.g., planting areas), one near the entry plaza, one between the lot north of the proposed building and the Gateway pedestrian connection, and one immediately east of the proposed building. The biotreatment areas would total approximately 5,500 square feet. The proposed project would include a total of 164 trees, accounting for the 175 existing trees to be removed (including three heritage trees and one protected tree), the 52 existing trees to remain, and the additional 112 trees to be planted. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-20 September 2020 ICF 662.19 3.3.2.3 Building Design The proposed building would be constructed with contemporary materials and detailing, including white, light-blue, and dark-blue vision glass; solid aluminum panels; perforated aluminum panels; and metal railings and columns. The architectural style, which would include both vertical and horizontal elements (Figure 3-7 and 3-8), would include massing breaks, building openings, and wall planes that would combine architectural and landscaping features. The building construction type, per the California Building Code, would be Type III for the building frame. In addition, an interpretive art installation would be located along the pedestrian entry on Gateway Boulevard (Figure 3-7 [south elevation] and Figure 3-8 [east elevation]). Signage and lighting would be included at site entrances, along walkways, and in parking lots. 3.3.2.4 Employees The proposed project would result in approximately 731 net new employees at the project site.13 Upon project completion, there would be approximately 1,181 total employees on-site (including the 450 employees in the 701 Gateway building who would remain). 3.3.2.5 Infrastructure As discussed above, the project site is serviced by existing water, wastewater, stormwater, natural gas, electric, telecommunications, and waste and recycling services. New on-site facilities would be connected to new services through the installation of new, localized connections. Expansion or an increase in capacity of off-site infrastructure would occur as required by the utility providers. The project could include off-site infrastructure improvements outside of the project site but within the Gateway Campus. Detailed descriptions of the proposed utility infrastructure are provided below. Potable Water14 New water utilities would be placed around the perimeter of the project site and throughout the site. A new 6-inch lateral would connect to the existing 12-inch lateral on the project site. Two new 8-inch laterals for fire needs would be constructed as part of the project. One 8-inch lateral would connect to the existing 12-inch lateral on the project site. The other 8-inch lateral would connect to the 12-inch water main in Gateway Boulevard. Stormwater15 The existing 18-inch storm pipe on the project site would be relocated around the proposed building and service and loading yard. New storm drain collector pipes and biotreatment areas (discussed above) would be constructed within the project site to drain to the existing 18-inch storm drain line in Gateway Boulevard. 13 The estimated number of employees is based on data provided by the project applicant; it assumes 60 percent of the proposed square footage (approximately 118,000 square feet) is R&D space and 40 percent of the proposed square footage (approximately 78,700 square feet) is office space. The average square footage per R&D employee is assumed to be 350, and the average square footage per office employee is assumed to be 200. The estimated number of employees associated with the proposed fitness center and café is accounted for in the estimate of the number of employees associated with the proposed R&D and office uses. 14 BKF. 2020. 701 and 751 Gateway Boulevard, South San Francisco Wet Utilities. March 5. 15 Ibid. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-21 September 2020 ICF 662.19 Sanitary Sewer System16,17 The 12-inch gravity pipe outfall in Gateway Boulevard may need to be upsized as part of the proposed project. A new 8-inch lateral would be constructed on the project site to serve the proposed building. In addition, the existing 8-inch lateral that serves the 701 Gateway Boulevard building would need to be replaced with a 10-inch lateral. Natural Gas and Electric Electrical service and natural gas service would continue to be provided by PG&E. The proposed building would connect to the PG&E grid. Specifically, the project would construct 4-inch electrical conduits to connect to the existing electricity lines in Gateway Boulevard. In addition, the project would construct a 4-inch natural gas lateral to connect to a new natural gas meter that would connect to the existing 4-inch natural gas line in Gateway Boulevard. Telecommunications The project site would continue to be served by the existing telecommunication providers. The project would construct 3- to 4-inch communication conduits to connect to the existing communication lines in Gateway Boulevard. Refuse and Recycling The project site would continue to be served by the South San Francisco Scavenger Company and Blue Line Transfer Inc. Trash processing and loading areas at the proposed building would be on the south side of the building. Loading docks would be in the service and loading yard south of the proposed building and away from automobile and pedestrian circulation areas. Mechanical Equipment The proposed heating, ventilation, and air conditioning (HVAC) systems and mechanical equipment for the project would include two chillers and three boilers to serve the heating and cooling needs in the building, which would be located in a rooftop penthouse. Nine pumps would also be located in the penthouse. Four air-handling units, two cooling towers and six large exhaust fans would also be located on the roof behind a screen. 3.3.2.6 Sustainability The proposed project would be designed to enhance resource efficiency and ensure good indoor environmental quality, as well as reduce energy consumption, water consumption, and waste generation. Examples of the proposed sustainability measures include low-flow shower heads, aerators, and toilets; Energy Star–rated appliances; electric vehicle charging spaces; and a waste diversion program that would separate compost, bottles/cans, paper and cardboard, and landfill materials. Proposed design elements, such as connectivity with employee shuttles (via the new shuttle stop along the western portion of the access drive north of the existing building at 701 Gateway Boulevard) and bicycle parking, would encourage alternative transportation modes. The 16 Ibid. 17 BKF. 2020. 751 Gateway Blvd – Sanitary Sewer Analyses. March 27. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-22 September 2020 ICF 662.19 project would be designed to meet the standards of the South San Francisco Municipal Code and CALGreen building requirements. In addition, the project would be designed to meet LEED Gold certification as well as International WELL and Fitwel Building Institute Standards. 18,19 The proposed project would include construction of rooftop solar photovoltaic panel–ready connectivity to allow for the potential future installation of solar panels. The proposed project would also be designed to conserve resources and protect water quality through the management of stormwater runoff as part of green infrastructure through low-impact development (LID). This approach implements engineered controls to allow stormwater filtering, storage, and flood control. Biotreatment areas would be located adjacent to the proposed building. 3.3.2.7 Construction Construction of the project is scheduled to commence with site preparation in 2020 and end in winter 2021, lasting approximately 18 months, if the related entitlements are approved by the City. The project would include the following construction stages: (1) site preparation and demolition, (2) foundation installation, (3) building structure construction, (4) exterior and roof buildout, (5) interior buildout, and (6) commissioning and final inspections. The hours of construction would be stipulated by the Building Division, and the project contractor would be required to comply with Section 8.32.050 of the South San Francisco Municipal Code (the South San Francisco Noise Ordinance), which includes regulations related to noise generated by construction. Project construction would typically occur Monday through Friday, between 7:00 a.m. and 5:00 p.m., although some work is anticipated to occur on Saturdays between 9:00 a.m. and 8:00 p.m. or on Sundays between 10:00 a.m. and 6:00 p.m. Approximately 15 instances of nighttime construction work would occur for concrete pours. Nighttime construction would begin approximately at 4:00 a.m. and be completed by 5:00 p.m. Construction is not anticipated to occur on major legal holidays. Construction materials and equipment would be staged entirely on-site, in areas where construction is not occurring. Construction workers would park on the project site or use existing parking within the Gateway Campus. No temporary road closures that would affect the public right-of-way would be required during project construction. However, temporary sidewalk rerouting on Gateway Boulevard is expected to occur. Roadway traffic control would be used as needed during construction. The proposed building would be constructed on a mat slab foundation. Piles would not be required. Demolition of the existing surface parking lot would generate approximately 300 cubic yards of concrete and asphalt waste. The proposed project would require grading or disturbing an area of approximately 149,000 square feet during construction. The proposed project would excavate 18 The proposed project would be designed to meet WELL tenant-ready standards, but may not formally certify. The WELL standards are performance-based building standards for measuring and monitoring features within the built environment that may affect human health through air, water, light, and other concepts. The standards provide ways for buildings to be designed to improve human comfort and enhance health and wellness within the built environment. 19 The Fitwel standards include evidence-based design and operational strategies that enhance a building’s environment for its occupants. The Fitwel standards have seven health impact categories for evaluating a building, including, but not limited to, access to healthy food, opportunities for physical activity, and promotion of occupant safety. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-23 September 2020 ICF 662.19 approximately 1,850 cubic yards of soil that would be reused as fill on-site, and would import an additional 750 cubic yards of soil to be used as fill on-site. To accommodate utility trenches, the project would require a maximum depth of excavation reaching approximately 9 feet below ground surface. Construction activities for the proposed project would result in an average of up to approximately 13 daily construction truck trips during the most intensive construction stage and a maximum of approximately 110 daily construction worker round trips. A stormwater pollution prevention plan (SWPPP) would be implemented during project construction. Project construction would use water from a metered hydrant (up to 1,600 gallons a day, maximum). No dewatering would be required during project construction. For construction and demolition, 100 percent of all inert solids (building materials) and 65 percent of non-inert solids (all other materials) would be recycled as required by the City under Chapter 15.60 of the South San Francisco Municipal Code. 3.3.3 Transportation Demand Management Plan The proposed project would require submittal of a TDM plan to the Planning Division for review and approval as part of the entitlement process, per the requirements of the South San Francisco Municipal Code and the General Plan. The City’s TDM program is intended to reduce the amount of traffic generated by new development, reduce the share of drive-alone traffic during peak periods, and incentivize the use of alternative modes of transportation. The TDM plan may be refined during the planning review process for project entitlements. The TDM plan lays out policies and strategies to reduce peak-hour travel demand and encourage alternative modes of transportation that reduce single-occupant vehicle use. Although SSFMC Section 20.400 does not call out a specific alternate mode-share (AMS) requirement for the Gateway Specific Plan District, similar zoning districts, as well as General Plan requirements in the East of 101 area, require an AMS of 35–40 percent for development of a FAR of 1.0–1.25. This standard would be applied to the 751 Gateway Boulevard Project, consistent with City requirements and policies to increase AMS and decrease single- occupancy vehicle traffic. . Although the regulatory TDM requirements call for a 35–40 percent AMS, the CEQA analysis assumes a higher and more conservative drive-alone share (AMS of 26 percent), consistent with the City/County Association of Governments of San Mateo County model and analysis for other similar projects within the City and the region. The proposed project would include a flexible TDM plan, which would include the requirements listed below, to achieve an alternative mode use goal20 of 35 percent for the proposed project within the first three years of reporting, with an increase to 40 percent in the fourth year of reporting:21 • Carpool and vanpool ride-matching services • Designated employer contact • Direct route to transit • Guaranteed ride home for emergency situations 20 The alternative mode use goal indicates the percentage of total trips that would use alternative transportation modes rather than single-occupancy vehicle trips. 21 Silvani Transportation Consulting. 2019. Proposed Transportation Management Plan: 751 Gateway Blvd., South San Francisco CA. December. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-24 September 2020 ICF 662.19 • Information boards and kiosks • Passenger loading zones • Pedestrian connections • Promotional programs (e.g., new tenant and employee orientation packets on transportation alternatives) • Showers and clothes lockers • Shuttle program • Transportation Management Association participation • Short- and long-term bicycle parking • Free parking for carpools and vanpools As part of the TDM plan, additional measures may be implemented (e.g., compressed work week, on- site amenities, and telecommuting). To ensure that the measures from the TDM plan would be effective and implemented, the SSFMC requires that the applicant administer an annual commuter survey to monitor the plan and report the results to the City on an annual basis. If the TDM plan requirements are not met, the applicant would be required to adjust its TDM strategies in order to meet the project’s required AMS. 3.3.4 Lead Agency Approvals Table 3-3 lists the anticipated permits and approvals that would be required for the proposed project. City of South San Francisco Project Description 751 Gateway Boulevard Project 3-25 September 2020 ICF 662.19 Table 3-3. Required Permits and Approvals for the Proposed Project Agency Permit/Review Required City of South San Francisco Planning Commission: • Design Review • Precise Plan Approval • TDM Plan Approval • Conditional Use Permit to Authorize a Parking Reduction to 2.5 spaces/1,000 gross square feet in a shared parking format for the 751 Gateway Boulevard portion of the Gateway Campus • EIR Certification, Adoption of CEQA Findings of Fact, Adoption of Mitigation Monitoring and Reporting Program, Adoption of Statement of Overriding Considerations (if required) Engineering Division: • Grading Permit(s) • Encroachment Permit(s) • Site Plan Check • Hauling Permit(s) Building Division: • Building Permit(s) • Certificate of Occupancy Parks and Recreation Department: • Protected Tree Removal Permit Other: • Fire Code Compliance California Regional Water Quality Control Board Clean Water Act Section 402 National Pollutant Discharge Elimination System General Construction Stormwater Permit and Stormwater Pollution Prevention Plan Bay Area Air Quality Management District Stationary source permit for the generator Federal Aviation Administration Notice of Proposed Construction and Alteration and Federal Aviation Administration Determination per Code of Federal Regulations Title 14, Part 77.9