Loading...
HomeMy WebLinkAboutReso 90-2021 (21-157)City of South San Francisco P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA City Council Resolution: RES 90-2021 File Number: 21-157 Enactment Number: RES 90-2021 RESOLUTION ADOPTING A PROPOSED LIST OF PROJECTS FOR FISCAL YEAR 2021-22 FUNDED BY SBI: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017. WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of South San Francisco must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $1,311,019 in RMRA funding in fiscal year 2021-22 from SB 1; and WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB l; and WHEREAS, the City has undergone a robust review process to ensure public input into our community's transportation priorities. The project list is a result of collaboration among various departments summarizing the needed improvements and the priority of implementation of these projects; and WHEREAS, the City used a Pavement Management System to determine the City's pavement rehabilitation projects included as part of the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate roads, and add active transportation infrastructure throughout the City; and City of South San Francisco Page 1 File Number. 21-157 Enactment Number: RES 90-2021 WHEREAS, the 2018 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "good" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "excellent" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, BE IT RESOLVED, by the City of South San Francisco, State of California, as follows: 1. The foregoing recitals are true and correct. 2. The following list of newly proposed projects will be funded in -part or solely with fiscal year 2021-22 Road Maintenance and Rehabilitation Account revenues: South Linden Ave and Scott St Grade Separation Project (st1004) Project Description: This project will consist of a roadway and pedestrian grade separation of the Caltrain commuter railroad. Useful life elements include: ADA curb ramps, traffic signal modifications, pedestrian improvements, roadway grade separation, and pedestrian grade separation. Project Location: South Linden Avenue and Scott Street Estimated Project Schedule: Pre -Construction 04/2016 - 04/2028 Estimated Project Useful Life: 50 to 100 years 2020 Pavement Rehabilitation Project (st2104) Project Description: This project will consist of approximately 2.25 centerline miles of local street rehabilitation consisting of pavement base failure repairs; cold mill of pavement surface and placement of Hot Mix Asphalt (HMA) overlay (various depths); addition of ADA compliant curb ramps; replacing failed concrete curb & gutter; replacing and adding new HMA speed cushions for traffic calming; and replacing all existing striping and pavement markings. Useful life elements include: concrete repairs, ADA curb ramps, pavement repairs and pavement surface mill and overlay. Project Location: The project will cover streets in the following neighborhoods: Avalon, Baden, Buri -Buri, Brentwood, Paradise Valley, Serra Highlands, and Sunshine Gardens neighborhoods. City streets included in this pavement rehabilitation project include sections of: Alta Mesa Drive, Ash Avenue, Camaritas Avenue, Cuesta Drive, Escanyo Drive, Hazelwood Drive, Northwood Drive, Southwood Center, Emerald Court, Forestview Drive, Iris Court, and Sunnyside Drive. City of South San Francisco Page 2 File Number: 21-157 Estimated Project Schedule: Construction 04/2021 - 08/2021 Estimated Project Useful Life: 5 to 25 years 2021 Pavement Rehabilitation Project (st2106) Enactment Number: RES 90-2021 Project Description: This project will consist of approximately 1.28 centerline miles of local street resurfacing and approximately 1.31 centerline miles of local street rehabilitation consisting of pavement base failure repairs; crack seal with asphalt rubberized cape seal; cold mill of pavement surface and placement of Rubberized Hot Mix Asphalt (RHMA) overlay (various depths); addition of ADA compliant curb ramps; replacing failed concrete curb & gutter; replacing failed concrete valley gutter; replacing damaged storm and sewer manhole frame and covers; replacing HMA speed cushions for traffic calming, and replacing all existing striping and pavement markings. Useful life elements include: concrete repairs, ADA curb ramps, pavement repairs, rubberized cape seal surface treatment and RHMA pavement surface mill and overlay. Project Location: The project will cover streets in the following neighborhoods: Downtown and Old Downtown neighborhoods. City streets included in this pavement rehabilitation project include sections of. First Lane, Second Lane, Third Lane, Fourth Lane, Magnolia Avenue, Maple Avenue, Orange Avenue, Pine Terrace and Railroad Avenue. Estimated Project Schedule: Pre -Construction 04/2021 - 06/2021, Construction 06/2021 - 10/2021 Estimated Project Useful Life: 5 to 25 years 2022 West of 101 Pavement Rehabilitation Project (st2107) Project Description: This project will consist of approximately 14.7 centerline miles of local street rehabilitation consisting of pavement base failure repairs; cold mill of pavement surface and placement of Hot Mix Asphalt (HMA) overlay (various depths); addition of ADA compliant curb ramps; replacing failed concrete curb & gutter; replacing damaged storm and sewer manhole frame and covers; replacing HMA speed cushions for traffic calming; and replacing all existing striping and pavement markings. Useful life elements include: concrete repairs, ADA curb ramps, pavement repairs and HMA pavement surface mill and overlay. Project Location: The project will cover streets in majority of neighborhoods West of 101. City streets tentatively included in this pavement rehabilitation project include sections of Second Lane, Airport Boulevard, Avalon Drive, Bourbon Court, Browning Way, C Street, Callan Boulevard, Canal Street, Carter Drive, Chestnut Avenue, Dollar Avenue, Duhallow Way, El Cortez Avenue, Elm Court, Erin Place, Gellert Boulevard, Hickey Boulevard, Junipero Serra Boulevard, Keats Avenue, Linden Avenue, Memorial Drive, Myrtle Avenue, Park Way, Produce Avenue, Radburn Drive, Ridge Court, Ridgeview Court, Ryan Way, San Mateo Avenue, Shaw Road, Spruce Avenue, Stonegate Drive, Tamarack Lane, Tanforan Avenue, Victory Avenue, Vista Court, and Westborough Boulevard. City of South San Francisco Page 3 File Number. 21-157 Enactment Number., RES 90-2021 Estimated Project Schedule: Pre -Construction 04/2021- 02/2022, Construction 03/2022 - 10/2022 Estimated Project Useful Life: 5 to 25 years 3. The following previously proposed and adopted projects may also utilize Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues: Grand Boulevard Project Phase 3 (Arroyo Drive to Kaiser Way) (st1807) Project Description: This project will improve El Camino Real between Arroyo Drive and Kaiser Way by installing enhanced pedestrian crossings, with corner curb bulbouts and median refuges, expanded bus stop/ waiting areas, and a new landscaped median. Useful life elements include enhanced pedestrian crossings, with corner curb bulbouts and median refuges, expanded bus stop/ waiting areas, and a new landscaped median. Project Location: El Camino Real between Arroyo Drive and Kaiser Way Estimated Proiect Schedule: Pre -Construction 07/2017-12/2021, Construction 01/2022-11/2022 Estimated Project Useful Life: 10 to 30 years At a meeting of the City Council on 5/12/2021, a motion was made by Vice Mayor Nagales, seconded by Councilmember Nicolas, that this Resolution be approved. The motion passed. Yes: 5 Mayor Addiego, Vice Mayor Nagales, Councilmember Nicolas, Councilmember Coleman, and Councilmember Flores Attest by A6'7� Rosa Go a Acosta, City Clerk City of South San Francisco Page 4