HomeMy WebLinkAbout05.24.2021 SP Minutes @1:00MINUTES
S�,� SPECIAL MEETING
BUDGET STANDING
COMMITTEE
c9z1fo to OF THE
CITY OF SOUTH SAN FRANCISCO
P.O. Box 711 (City Hall, 400 Grand Avenue)
South San Francisco, California 94083
MONDAY, MAY 24, 2021
1:00 P.M.
Teleconference via Zoom
Housing Standing Committee conducted this meeting
in accordance with California Governor Newsom 's
Executive Orders N-25-20 and N-29-20 and COVID-
Call to Order.
Roll Call.
AGENDA REVIEW
No changes
REMOTE PUBLIC COMMENTS
None
MATTERS FOR CONSIDERATION
19 pandemic protocols.
Time: 1:04 p.m.
PRESENT: Councilmember Nicolas and
Mayor Addiego.
Motion to approve the Minutes for the meeting of April 26, 2021.
Motion — Councilmember Nicolas / Second —Mayor Addiego: to approve the minutes. Councilmember
Nicolas submitted a minor correction to the minutes. The motion carried unanimously.
2. Report regarding the City of South San Francisco Operating Budget for Fiscal Year 2021-22.
(Janet Salisbury, Finance Director)
Director Salisbury introduced the item and provided a budget overview, General Fund projections and
General Fund summary for Fiscal Year 2021-22.
In 2017, the City made the strategic shift away from a one-year operating budget cycle to a biennial
operating budget cycle. The current fiscal year (FY) 2020-21 represents the second year of the FY 2019-
21 biennial operating budget, which was adopted by Council on June 26, 2019.
However, with the extraordinary economic downturn stemming from the COVID-19 global pandemic,
significant adjustments were made to both the FY 2019-20 and FY 2020-21 budgets to react to the
dynamically changing conditions. And while the American economy showed sign ofrecovery, bolstered
by the unprecedented stimulus packages from the Federal government as well as the broader availability
of vaccines in the U.S., the economic fundamentals remain uneven and uncertainty persists. As a result,
for FY 2021-22, staff was pursuing an annual budget, as opposed to a biennial budget for the upcoming
FY. The goal was to resume the two-year budget cycle once the economy showed signs of stabilization
and longer-term recovery, as biennial budgeting generally requires a longer commitment of policy
direction and funding levels.
The General Fund is the City's largest and core operational fund, where the bulk of the essential services
delivered by departments such as Economic and Community Development, Fire, Library, Parks and
Recreation, Police, Public Works and City Administration are budgeted.
While the current FY had not yet closed, it was the expectation that with tight controls on departmental
expenditure budgets, the FY would end as expected. To remind the Budget Standing Committee, when
the FY 2020-21 was adopted, the expectation was that the operating shortfall and additional Capital
Improvement Projects (CIP) for FY 2020-21 would be funded through the General Fund surplus of the
prior year (FY 2019-20).
One of the largest unexpected monetary considerations to emerge in the current 2020-21 FY was the
shortfall in property tax in lieu of Vehicle License Fee (VLF). Simply, due to a reduction in the number
of non -basic aid school in the County, there was a shortfall in terms of how much property tax was
available for the VLF due to cities and county. For South San Francisco, the amount due in VLF for FY
2020-21 was $8.6 million. However, the City would only collect $4.9 million this year; the effective VLF
shortfall is approximately $3.7 million. A claim for the VLF shortfall would be filed with the State in
August 2021, but whether the City collects on that claim would be dependent upon appropriation in the
State's budget.
Staff expects that the negative impacts of the $3.7 million in VLF shortfall would largely be curtailed by
stronger revenues in other areas along with tough expenditure controls at the departmental level.
However, final results for the current FY would not be determined until the books were closed and the
accounts audited.
For the upcoming FY 2021-22, the Finance Department projected operating revenues of $108,797,657
(not including carryover purchase orders) and $112,084,085 in operating expenditures, with the net
operating shortfall of $3,290,000 to be funded via the fund balance available from the FY 2019-20
surplus and/or the federal stimulus available through the American Rescue Plan (ARP) Act. While the
funds have not yet been received, South San Francisco's ARP allocation was $12.3 million, with half
available in calendar year 2021, and the other half available in calendar year 2022. Projects to be funded
with the remaining ARP allocations would go to Council as dedicated and separate actions, as was the
case recently for the San Mateo County Strong Restaurant, Brewery & Winery Grant Program and the
establishment of the Economic Mobility Resource Hub.
South San Francisco was well positioned to recover economically from COVID-19, with a large
industrial base anchored by the world's largest biotechnology research center. It was expected that the
negative economic impact of COVID-19 would linger throughout FY 2021-22, as businesses recover,
restaurants reopen, air travel (both domestic and international) improved, and hotel occupancy increases.
Property Tax, which remained the City's largest revenue component, was projected to be $41.1 million in
FY 2021-22. Property tax revenues have increased at an annual rate of 6% per year over the last seven
SPECIAL BUDGET STANDING COMMITTEE MEETING MAY 24, 2021
MINUTES PAGE 2
years, redolent of a booming economy and a high rate of development. However, included in the property
tax figures are the property tax in lieu of VLF. While projecting a 6% growth rate in secured and
unsecured property taxes, the overall growth in property tax projections was tempered by the risk of
further reductions of non -basic aid schools, resulting in additional VLF shortfalls such as those we have
seen in the current FY.
Sales Tax revenue (without Measure W proceeds) was expected to increase to $19.4 million or about 5%
as the economy recovers from the acute effects of the pandemic. The sales tax forecast was provided by
the City's sales tax consultant as the best estimate available at this time.
Transient Occupancy Tax (TOT) revenue grew by 22% from March 2019 to March 2020 but was the
hardest hit revenue source due to COVID-19. While the domestic leisure travel showed sign of recovery,
the City's TOT revenue, which was highly dependent on business travel, remained beleaguered. It was
widely recognized that there was a race between widespread vaccination and mutations, and it was
expected that high levels of global immunizations may be a necessary threshold for business/international
travel to resume to pre-COVID levels. When setting the FY 2020-21 budget a year ago, the original TOT
projection was $7.9 million—a dramatic decline from the $17 million actually collected in the non-
COVID fiscal year of 2018-19. However, by mid -year review, it was evident that the local hotel industry
would not recover as shelter -in-place mandates were re -instated throughout much of California in the last
quarter of 2020. As a result, TOT revenue projections for the current year, FY 2020-21, was further
reduced to $5.9 million. Based upon the actual collections to date, staff expected to be right on track and
meet that further reduced forecast of $5.9 million. Given the current trend of monthly TOT collections,
staff was projecting about a 20% recovery in the local hotel industry, and thereby proposing a TOT
projection of $7.1 million. Staff expected to adjust that projection at mid -year should additional signs of
recovery in the hotel sector emerge.
Licenses and Permit revenue had increased year -over -year since 2015. For FY 2021-22, staff was
projecting revenues of $16.5 million, indicative of the robust rate of development expected especially
East of 101.
Charges for Services revenues, second only to TOT, had suffered the most because of the pandemic.
While revenue projections were further reduced by almost $1 million from $8 to $7 million as part of the
mid -year review, the expectation was that actual revenue collections may fall short, largely due to the
limited programming in Parks and Recreation. For FY 2021-22, staff projected recovery to pre-COVID
levels of $9.3 million considering nominal increases in overall charges as well as the expectation of pent-
up demand for recreation activities in the coming year.
In FY 2021-22 the City's General Fund, with projected revenues of $108,797,568, net of any carryover
purchase orders, and $112,084,085 in expenditures, required an additional $3,290,000 to achieve a
balanced budget. Staff recommended applying the balance from the FY 2019-20 budget surplus still
remaining as fund balance in the General Fund. Any ARP monies that were allocated as General Fund
support could then "reimburse" the General Fund at a later time once final determinations were made by
Council related to the appropriation of ARP funded projects.
Mayor Addiego queried the 10% drop for the Public Works Department. Director Salisbury stated the
10% drop was attributed to the Measure A Free Shuttle revenue source $1,000,000 appropriation that was
not in the current budget.
SPECIAL BUDGET STANDING COMMITTEE MEETING MAY 24, 2021
MINUTES PAGE 3
Director Salisbury advised there were three positions that were being requested in the FY 2021-22
budget. The City Manager's Office requested the addition of one (1) full-time equivalent hourly staff
member to provide additional administrative and programmatic support. The Economic & Community
Development Department (ECD) requested the addition of one (1) hourly staff member to provide
additional programmatic support. The employee would support ECD in such efforts as the establishment
of the Economic Mobility Hub and other mission -critical projects. The Finance Department requested the
addition of a Financial Analyst II to provide vital support necessary to implement a new Enterprise
Resource Planning platform.
In conclusion, staff advised that the City remained financially strong, with a AAA -rated credit rating. The
breadth and depth of the economic downturn associated with COVID-19, however, continued to make a
sustained impact on the City's finances. Staff recommended a conservative budget approach with
minimal reliance on city reserves to preserve the City's ability to respond over time if the economic
downturn deepens further as well as to fund critical infrastructure projects necessary throughout the City.
3. Report regarding proposed Capital Improvement Program for fiscal year 2021-22. (Eunejune
Kim, Director of Public Works/City Engineer and Matthew Ruble, Principal Engineer)
The following individuals provided public comment:
• Alan Perez, community member
• Daniel Perez, community member
• Olga Perez, community member
Principal Engineer Ruble introduced the item and provided an update regarding the proposed Capital
Improvement Program (CIP) for FY 2021-22. The FY 2021-22 CIP included 150 projects: 9 new
projects, 33 potential projects and 108 continuing projects. The FY 2021-22 CIP budget was
approximately $120,000,000 and was comprised of six (6) project types: Public Facilities, Parks, Storm
Drains, Sanitary Sewer, Streets and Traffic.
Principal Engineer Ruble gave a brief overview and identified the proposed new projects and additional
appropriation request for continuing projects.
New project (pf2201) City Hall Fire Alarm and Electrical Modernization — project would upgrade City
Hall electrical service to support additional holiday decoration plans / EV charging station installation -
$100,000.
New project (pf2202) Grand Library History Room Renovation — project would plan and scope
renovation to support ADA access - $50,000. Mayor Addiego was concerned of the small space and
suggested looking into building a History Room in the new library. It was concluded for staff to revisit
the item to the Budget Standing Committee at a later date.
New project (pf2203) Terrabay Gymnasium — project would replace the HVAC at the Terrabay
Gymnasium - $600,000.
New project (sd2201) Francisco Terrace Flood Protection Levy — construct a flood wall behind the
Francisco Terrace neighborhood to minimize flooding during storm events - $120,000.
New project (sd2202) Colma Creek Pedestrian Bridge Replacement — replace existing pedestrian bridge
with new bridge at a higher elevation to alleviate impacts caused by current alignment impeding flow
SPECIAL BUDGET STANDING COMMITTEE MEETING MAY 24, 2021
MINUTES PAGE 4
during storm events - $250,000.
New project (ss2201) Country Club Park Sewer Master Plan — district level study of sewer service
expansion into the Country Club neighborhood; connecting to the existing sanitary sewer system. The
project includes topographic and utility surveys, sewer modeling, and analysis - $210,000.
New project (tr2201) Grand Avenue Off -Ramp Realignment —project to conduct preliminary studies and
feasibility to realign the US 101 northbound Grand Avenue Off -Ramp, eliminating vehicle pedestrian
conflicts of the current configuration - $750,000.
New project (tr2202) Highway Safety Improvement Program (HSIP) Curb Ramp Improvements—project
improves pedestrian crossing facilities, bringing the existing non -ADA compliant curb ramps up to
current standards and replacing old and faded crosswalks with high -visibility, thermoplastic striping at
six (6) non -signalized intersections along Olive Avenue, Linden Avenue, and Walnut Avenue - $324,000.
New project (tr2203) E101 Transit Shelter and Bullbout Grant from MTC — project would add 11 new
on -street bus/shuttle stops, upgrade two existing stops, and enhance sidewalks and crosswalks in a
growing employment center that generally lacks bus stop facilities. The upgrades improve safe access to
jobs, reduce travel times for Commute.org and Genenteh shuttles, and provide the necessary
infrastructure to extend bus service via the Reimagine SamTrans project - $55,056.
In conclusion, staff would amend the FY 2021-22 CIP based upon direction received from the Budget
Standing Committee, and will present the revised CIP at the June 15, 2021 City Council Study Session.
City Manager Futrell advised the next Budget Standing Committee meeting was scheduled for June 9,
2021 to hear the proposed five (5) year Sewer Rate Plan and Stormwater Rate Plans.
ADJOURNMENT
Being no further business Mayor Addiego adjourned the meeting at 2:18 p.m.
Submitted by:
cl
GabrieKkodnijg'u'ez`_�_�
Deputy City Clerk
Approved by:
a
Mark Xddiego
Mayor
Approved by the Budget Standing Committee: Y / 1 q / Love
SPECIAL BUDGET STANDING COMMITTEE MEETING MAY 24, 2021
MINUTES PAGE 5