HomeMy WebLinkAboutPC Meeting 11-19-20 (Reso 2870-2020) - 499 Forbes 2 RESOLUTION NO. 2870-2020
PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO
STATE OF CALIFORNIA
RESOLUTION MAKING FINDINGS AND APPROVING PLANNING PROJECT P19-
0001, INCLUDING USE PERMIT UP19-0003, DESIGN REVIEW DR19-0032, AND
PRELIMINARY TRANSPORTATION DEMAND MANAGEMENT PROGRAM TDM19-
0005, FOR THE CONSTRUCTION OF A NEW OFFICE / R&D BUILDING AND
PARKING STRUCTURE IN THE BUSINESS AND TECHNOLOGY PARK (BTP)
ZONING DISTRICT AT 499 FORBES BOULEVARD.
WHEREAS, Aralon Properties (“Applicant”) has proposed to construct a five-story, 128,737
square-foot office / R&D building approximately 85 feet in height, and a five-story parking
structure on a 2.96-acre site on 499 Forbes Boulevard (herein referred to as “Project”); and,
WHEREAS, the proposed Project is located within the Business and Technology Park (BTP)
Zoning District; and,
WHEREAS, Applicant seeks approval of a Conditional Use Permit (UP19-0011), Design Review
(DR19-0032), and Preliminary Transportation Demand Management Program (TDM19-0005) for
the Project; and,
WHEREAS, approval of the applicant’s proposal is considered a “project” for purposes of the
California Environmental Quality Act, Pub. Resources Code §21000, et seq. (“CEQA”); and,
WHEREAS, on November 19, 2020 the Planning Commission for the City of South San Francisco
held a lawfully noticed public hearing to solicit public comment and consider the Environmental
Impact Report (EIR19-0003) (“EIR”) and the proposed entitlements, take public testimony, and
approve the Project; and,
WHEREAS, the Planning Commission reviewed and carefully considered the information in the
EIR, and by separate resolution, considered the Project’s environmental impacts and certified the
EIR including adoption of a Statement of Overriding Considerations and a Mitigation Monitoring
and Reporting Program; and
WHEREAS, the Planning Commission reviewed and carefully considered the requested
entitlements at the duly noticed public hearing on November 19, 2020, and all related testimony
and evidence presented in the record and during the hearing.
NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which
includes without limitation, the California Environmental Quality Act, Public Resources Code
§21000, et seq. (“CEQA”) and the CEQA Guidelines, 14 California Code of Regulations §15000,
et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco
Municipal Code; the Project applications; the 499 Forbes Boulevard Project Plan, as prepared by
Woods-Bagot Architecture, dated October 23, 2020; the Preliminary Transportation Demand
Management Plan, as prepared by TDM Specialists, Inc., dated June 26, 2019; the 499 Forbes
Boulevard Project EIR, including the Draft and Final EIR and all appendices thereto; all site plans;
and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2),
the Planning Commission of the City of South San Francisco hereby finds as follows:
SECTION 1 FINDINGS
A. General Findings
1. The foregoing recitals are true and correct and made a part of this Resolution.
2. The Exhibits attached to this Resolution, including Conditions of Project Approval (Exhibit
A), Preliminary TDM Plan (Exhibit B), and the Project Plans (Exhibit C) are each
incorporated by reference and made a part of this Resolution, as if set forth fully herein.
3. The documents and other material constituting the record for these proceedings are located
at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South
San Francisco, CA 94080, and in the custody of the Planning Manager, Sailesh Mehra.
4. By Resolution No. ________, the Planning Commission, exercising its independent
judgment and analysis, has found that an EIR was prepared for the Project in accordance
with CEQA, in which the EIR adequately discloses and analyzes the proposed Project’s
potentially significant environmental impacts, its growth inducing impacts, and its
cumulative impacts, and analyzed alternatives to the Project. For those impacts that could
potentially exceed CEQA thresholds of significance, where feasible the City has identified
and imposed mitigation measures that avoid or reduce the impact to a level of less-than-
significant. The Planning Commission has further found that the benefits of approving the
Project outweigh the Project’s significant and unavoidable impacts.
5. The proposed Project is consistent and compatible with all elements in the City of South
San Francisco General Plan as office/R&D uses in the East of 101 Area help the City
implement several broad General Plan goals, including but not limited to: maintaining a
balanced land use program that provides opportunities for continued economic growth, and
building intensities that reflect South San Francisco’s prominent inner bay location and
excellent regional access.
6. The proposed Project is consistent with the standards and requirements of the City's Zoning
Ordinance and with the provisions of the East of 101 Area Plan. The development of the
Project Site would result in the construction of approximately 128,737 gross sq. ft. of
office/ R&D space, and would meet minimum design standards.
7. The site is physically suitable for the type of development and density proposed, as the
campus development will benefit from being located in the East of 101 Area plan, and the
size of the office/ R&D campus is appropriate for the location and meets the City’s land
use and zoning standards.
B. Use Permit
1. The proposed Project is consistent with the standards and requirements of the City’s Zoning
Ordinance and with the design provisions of the East of 101 Area Plan. The Project meets
or exceeds all of the general development standards of the BTP Zoning District, with the
exception of a request for a parking reduction. The request for a parking reduction is
permissible and warranted by the City’s Zoning Ordinance because the Project incorporates
a robust Transportation Demand Management Program designed to encourage all
employees to rely on alternatives forms of transportation.
2. The proposed Project is consistent with the General Plan for the reasons stated in Findings
A.5 through A.7 above and is consistent with the East of 101 Area Plan.
3. The proposed office/ R&D use will not be adverse to the public health, safety, or general
welfare of the community, nor detrimental to surrounding properties or improvements, for
the reasons stated in Finding A.7 above.
4. The proposed Project complies with applicable standards and requirements of the City’s
Zoning Ordinance, with the exception of parking requirements, which are permissible
and warranted by the Zoning Ordinance as discussed below.
The exception for the number of parking spaces is allowable under the City’s Municipal
Code Section 20.330.006(D), and warranted based on the following findings:
a. The parking reduction will serve to support and promote the Project’s TDM
program.
b. The Project provides approximately 78% of the required parking spaces and is
required, through the TDM program, to achieve an alternative mode use of 35%.
The site is not anticipated to result in a shortfall of on-site parking or create the
need for overflow parking off-site.
c. The proposed parking standard of 2.5 spaces per 1,000 sq. ft. for non-residential
uses and will be adequate for the proposed use because of the offered alternative
solutions for providing and managing parking. The Project is required to
implement a TDM Program on an on-going basis over the life of the Project with
a required alternative mode shift of 35 percent. The TDM requirements
applicable to the Project, the fact that similar reduced standards have been
accepted and/or successfully applied within several large developments in the
City, including other nearby Genentech developments and ARE-owned campuses
such as Merck and Verily, and the studies from the Institute of Transportation
Engineers (ITE) all support a reduced parking standard.
d. The reduced parking rate reinforces the overall efforts of the City’s General Plan
and the TDM Ordinance, which encourage reduced parking standards as an
effective tool in encouraging use of alternative modes of transportation other than
single occupancy vehicles.
e. The number of parking spaces provided by the reduced standard will serve all
existing, proposed and potential uses as effectively and conveniently as would the
standard number of parking spaces required by Chapter 20.230 and Chapter
20.330. As described above, there is ample evidence to support the proposed
parking reduction, and there is added concern that an overabundance of parking
could have a deleterious effect on the goals and objectives of the City’s TDM
efforts since such would serve as a disincentive to use of alternative modes of
transportation.
5. The design, location, size, and operating characteristics of the proposed Project are
compatible with the existing and reasonably foreseeable future land uses in the vicinity
because the Project will promote an office/R&D campus in close proximity to other office
and research and development uses with employee-serving amenities.
6. The site is physically suitable for the type of development and density proposed, as the
development of a high quality research and campus-style project is in keeping with existing
development within the East of 101 Area and the BTP Zoning District
7. The Project complies with CEQA for the reasons stated in Finding A.4 above.
C. Design Review
1. The Project, including Design Review, is consistent with Title 20 of the South San
Francisco Municipal Code because the Project has been designed as a high quality office/
R&D campus-style development, which will provide a pedestrian-friendly campus, on-site
amenities, bicycle facilities on Forbes Boulevard, construction of a segment of the Rails-
to-Trails, and sustainable design.
2. The Project, including Design Review, is consistent with the General Plan and the East of
101 Area Plan, because the proposed office/R&D campus-style development is consistent
with the policies and design direction provided in the South San Francisco General Plan
for the dual MI/CC land use designations by encouraging new office/R&D facilities with
campus-serving amenities and connections to transit hubs.
3. The Project, including Design Review, is consistent with the applicable design guidelines
adopted by the City Council in that the proposed Project is consistent with Design
Guidelines, including the design and development standards outlined in the East of 101
Area Plan.
4. The Project is consistent with the Use Permit for the reasons stated in
Findings B.1-B.7 above.
5. The Project is consistent with the applicable design review criteria in South San Francisco
Municipal Code Section 20.480.006 (“Design Review Criteria”) because the project has
been evaluated by the Design Review Board on December 17, 2019 and May 19, 2020,
and found to be consistent with each of the eight design review criteria included in the
“Design Review Criteria” section of the Ordinance.
D. Transportation Demand Management Plan
1. The proposed trip reduction measures contained in the TDM Plan (attached hereto as
Exhibit B) are feasible and appropriate for the Project, considering the proposed use and
the project’s location, size, and hours of operation. Appropriate and feasible measures
have been included in the TDM Plan to achieve a projected 35 percent alternative mode
usage, as required. The TDM Plan provides incentives for employees to use modes of
transportation other than single-occupancy vehicle trips, such as secure bicycle storage,
shower facilities, preferential parking for carpools and vanpools, and an employee TDM
contact, among others. The TDM Plan also uses a lower parking ratio to increase ridership
on BART, Caltrain and other transit services. Further, an employee transit center for
shuttle pickup and drop-off linking the Project to nearby transportation lines will help
encourage alternative forms of transportation.
2. The proposed performance guarantees will ensure that the target 35 percent alternative
mode use established for the Project by Chapter 20.230 will be achieved and maintained.
Conditions of approval have been included to require that the Final TDM Plan, which must
be submitted for review and approval prior to issuance of a building permit, shall outline
the required process for on-going monitoring including annual surveys and triennial
reports.
SECTION 2 DETERMINATION
NOW, THEREFORE, BE IT FURTHER RESOLVED that subject to the Conditions of Approval,
attached as Exhibit A to this Resolution, the Planning Commission of the City of South San
Francisco hereby makes the findings contained in this Resolution, and conditionally approves the
Project Plans (attached as Exhibit C), the Conditional Use Permit, the Preliminary TDM Plan
(attached as Exhibit B), and Design Review.
BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its
passage and adoption.
* * * * * * *
I hereby certify that the foregoing resolution was adopted by the Planning Commission of the City
of South San Francisco at a regular meeting held on the 19th day of November, 2020 by the
following vote:
AYES: Chair Wong, Vice-Chair Evans, Commissioner Faria, Commissioner Shihadeh,
Commissioner Murphy, Commissioner Bernardo, Commissioner Tzang
NOES:
ABSTENTIONS:
ABSENT:
RECUSE: Attest_/s/Tony Rozzi________
Secretary to the Planning Commission