HomeMy WebLinkAboutPC Meeting 05-04-17 (Reso 2802-2017) - 1600 El Camino - Costco RESOLUTION NO. 2802-2017
PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO
STATE OF CALIFORNIA
RESOLUTION MAKING FINDINGS AND ADOPTING THE INITIAL
STUDY/MITIGATED NEGATIVE DECLARATION (ND16-0006) AND APPROVING
ENTITLEMENTS REQUEST (P16-0016, UPM 16-0001 AND DR16-0010) FOR
RELOCATING THE GAS STATION, EXPANDING THE PARKING LOT, AND
CONSTRUCTING ADDITIONS TO THE EXISTING COSTCO WHOLESALE USE AT
1600 EL CAMINO REAL
WHEREAS, the applicant has requested a use permit modification to relocate the existing gas
station, expand the parking lot, and construct additions to the existing Costco Wholesale building
at 1600 El Camino Real (“Project”); and
WHEREAS, the City of South San Francisco (“City”) certified an Environmental Impact Report
(State Clearinghouse # 99032047) and adopted a Statement of Overriding Considerations in
connection with the original project; and
WHEREAS, in accordance with the California Environmental Quality Act, Public Resources
Code, sections 21000, et seq. (“CEQA”), the City prepared an Initial Study/Mitigated Negative
Declaration (“IS/MND”) for the Project with assistance from WRA Inc., attached hereto and
incorporated herein as Exhibit A; and
WHEREAS, the IS/MND was circulated for the required 30-day public comment period on
December 12, 2016, which ended on January 13, 2017, at 4:30 p.m.; and
WHEREAS, one comment letter was received during the comment period from the San Mateo
County Flood Control District (“SMFCD”); a response and revisions to address the comments
were included in the IS/MND attached in Exhibit A; and
WHEREAS, two additional comment letters were received outside of the comment period from
the San Francisco Public Utilities Commission (“SFPUC”) and the Treasure Island Mobile Home
Park; responses to these letters are attached and incorporated herein as Exhibit B; and
WHEREAS, the IS/MND concludes that the following resources could be impacted by the
Project: Air Quality, Biological Resources, Cultural Resources, Geology and Soils, Hazards and
Hazardous Materials, Hydrology and Water Quality, and Noise, but that those potential impacts
would all be reduced to a less than significant level with mitigation; and
WHEREAS, the Project also requires entitlement approval for a Use Permit Modification and
Design Review; and
WHEREAS, on May 4, 2017, the Planning Commission for the City of South San Francisco held
a lawfully noticed public hearing to solicit public comment and consider the IS/MND (ND16-
0006), and related entitlements (P16-0016, UPM 16-0001 and DR16-0010), take public
testimony, and make a determination on the Project.
NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it,
which includes without limitation, the California Environmental Quality Act, Public Resources
Code §21000, et seq. (“CEQA”) and the CEQA Guidelines, 14 California Code of Regulations
§15000, et seq.; the South San Francisco General Plan and General Plan EIR, including all
amendments and updates thereto; the South San Francisco Municipal Code; the Environmental
Impact Report and Statement of Overriding Considerations for the original project approvals,
and the IS/MND prepared by WRA, Inc., and all appendices thereto; all reports, minutes, and
public testimony submitted as part of the Planning Commission’s duly noticed May 4, 2017
meeting and any other evidence (within the meaning of Public Resources Code §21080(e) and
§21082.2), the Planning Commission of the City of South San Francisco hereby finds as follows:
SECTION 1 FINDINGS
General
1. The foregoing recitals are true and correct and made a part of this Resolution.
2. The exhibits and attachments, including the IS/MND (attached as Exhibit A), Additional
Public Comments (Exhibit B), draft Conditions of Approval (Exhibit C), Architectural,
Landscape and Engineering Plans (Exhibit D), Project Narrative (Exhibit E), Colma Creek
Hydraulic and FEMA Analysis (Exhibit F) are incorporated by reference as part of this
Resolution, as if set forth fully herein.
3. The documents and other material constituting the record for these proceedings are
located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South
San Francisco, CA 94080, and in the custody of the Planning Manager, Sailesh Mehra.
Use Permit Modification
1. The proposed Project is allowed within the Transit Village-Commercial (TV-C) District,
which allows the Costco warehouse as a conditional use, with the gas station considered to be an
ancillary use. The warehouse and existing fuel facility were approved under Use Permit UP-98-
084, Environmental Impact Report EIR 98-084, and Statement of Overriding Considerations SC
98-084. The Project will not add any new uses, and uses and operations will remain consistent
with the previous land use approvals. The proposed Project complies with all applicable
provisions of the Zoning Ordinance and the Municipal Code.
2. The proposed Project is consistent with the General Plan, as the site is designated as
Community Commercial, and the warehouse and fuel facility are consistent with this
designation. The proposed Project would improve the site’s circulation patterns, landscaping, and
pedestrian access.
3. The proposed Project has been designed to achieve compliance with the development
standards of the Transit Village-Commercial (TV-C) District, since the Project would meet
height, floor area ratio, lot coverage, landscaping, and parking standards. Consequently, the
proposed Project complies with the design and development standards applicable to its zoning
district.
4. The proposed Project will not introduce any new uses to the site, and the existing uses
will continue to operate in a way that will not be adverse to the public health, safety, or general
welfare of the surrounding uses. The new gas station will include additional dispensers and
utilize equipment of the latest technology and safety features in accordance with local, state, and
federal requirements, and all applicable permits will be obtained prior to operation. The parking
lot expansion will include the installation of a box culvert for a portion of Colma Creek, which
will be designed in accordance with the San Mateo County Flood Control District standards for
peak events.
5. The design, location, size, and operating characteristics of the proposed use would be
compatible with the existing and reasonably foreseeable future land uses in the vicinity, because
the site has historically operated as a retail use with a fueling facility, and will include adequate
parking and circulation areas to minimize impacts to the surrounding uses and streets.
6. The site is physically suitable for the type, density, and intensity of use being proposed,
including access, utilities, and the absence of physical constraints in that the existing site
includes an existing retail use and gas station.
7. An environmental determination has been prepared in accordance with the California
Environmental Quality Act and approved by resolution of the Planning Commission.
Design Review
1. The Project is consistent with the applicable standards and requirements of the Zoning
Ordinance because as submitted and modified through the Design Review Process, this Project
meets or complies with the applicable standards included in the Transit Village Plan District
(Chapter 20.250); including:
• The gas station relocation and warehouse expansion will be completed with high quality
exterior building materials that will match existing site architecture and design;
• The Project design has been vetted by the Design Review Board; and
• The Project design increases site landscaping and improves the pedestrian path through
the site.
2. The site is currently designated Community Commercial. The Project is consistent with
the General Plan because the proposed fuel facility relocation and warehouse expansion is
consistent with the policies and design direction provided in the South San Francisco General
Plan for the Community Commercial land use designation.
3. The Project is consistent with the design guidelines adopted by the City Council in that
the proposed use is consistent with the Transit Village District Regulations and Standards
included in Section 20.250.004.
4. The proposed Project is subject to approval of a Use Permit Modification, and those
findings have been made in the above section.
5. The Project is consistent with the applicable design review criteria in Section 20.480.006
(“Design Review Criteria”) because the Project has been evaluated against, and found to be
consistent with, each of the eight design review criteria included in the “Design Review Criteria”
section of the Zoning Ordinance.
SECTION 2 DETERMINATION
NOW, THEREFORE, BE IT FURTHER RESOLVED that the Planning Commission of the City
of South San Francisco hereby makes the findings contained in this Resolution and (1) adopts the
Initial Study/Mitigated Negative Declaration (ND16-0006), attached hereto and incorporated
herein as Exhibit A, and (2) approves the related entitlements request for 1600 El Camino Real
P16-0016, UPM 16-0001 and DR16-0010), subject to the attached Conditions of Approval
(Exhibit C).
BE IT FURTHER RESOLVED that the resolution shall become effective immediately upon its
passage and adoption.
* * * * * * *
I hereby certify that the foregoing resolution was adopted by the Planning Commission of
the City of South San Francisco at a regular meeting held on the 4th day of May, 2017 by the
following vote:
AYES: Chairperson Faria, Vice Chairperson Nagales, Commissioner Wong, Commissioner
Shihadeh, Commissioner Tzang
NOES:
ABSTENTIONS:_______________________________________________________________
ABSENT: Commissioner Ruiz
Attest_/s/Sailesh Mehra__________
Secretary to the Planning Commission