Loading...
HomeMy WebLinkAboutPC Meeting 03-14-11 (Reso 2701-2011) - Oyster Point - CEQA RESOLUTION NO.2701-2011 PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA A RESOLUTION MAKING FINDINGS AND RECOMMENDING THAT THE CITY COUNCIL CERTIFY AN ENVIRONMENTAL IMPACT REPORT INCLUDING A STATEMENT OF OVERRIDING CONSIDERATIONS AND MITIGATION MONITORING AND REPORTING PROGRAM FOR THE OYSTER POINT SPECIFIC PLAN AND PHASE I PROJECT WHEREAS, Oyster Point Ventures, LLC (“OPV”), a joint venture between Shorenstein Properties and SKS Investments LLC, owns property commonly known as the Oyster Point Business Park, and located at the terminus of Oyster Point Boulevard; and the City of South San Francisco (“City”) owns property commonly known as the Oyster Point Marina Property, adjacent to the Oyster Point Business Park; and WHEREAS, OPV and the City (collectively, “the Parties”) desire to redevelop the Oyster Point Business Park and the Oyster Point Marina Property (collectively, “Project Site”) with an office/R&D life sciences campus, commercial, hotel, recreational, and public open space uses; and WHEREAS, to this end, OPV has submitted an application seeking approval of a General Plan Amendment, Redevelopment Plan Amendment, Zoning Text Amendment (to adopt the Oyster Point Specific Plan), Zoning Map Amendment (to rezone), a Phase 1 Precise Plan, Design Review, a Preliminary Transportation Demand Management (“TDM”) Plan, a Development Agreement, and a Disposition and Development Agreement which would adopt the “Oyster Point Specific Plan” and collectively authorize the phased removal and replacement of certain existing buildings on the Project Site, and phased construction of an office/R&D development at an FAR of 1.25 up to a total of 2,254,230 square feet on the western portion of the Project Site, including a “Phase I” development consisting of grading and refuse relocation for the initial 508,000 square feet office/R&D in three buildings of up to ten stories and a parking structure, and public amenities including creation of waterfront open space, a promenade along the realigned Oyster Point and Marina Boulevards, construction of a flexible-use recreation area, grading and site preparation of the future hotel parcel, as well as realignment, reconfiguration, replacement, and improvement to existing roadways and infrastructure to facilitate the development, subject to the terms of the Project entitlements including the proposed Development Agreement (“Project”); and, WHEREAS, in accordance with the California Environmental Quality Act (Pub. Resources Code, § 21000 et seq. [“CEQA”]) the City determined that an Environmental Impact Report (“EIR”) was required to evaluate the impacts of the proposed Project; and WHEREAS, the City issued a Notice of Preparation was issued on February 24, 2010; and WHEREAS, the City prepared a Draft EIR, which was circulated for 45-day public/agency review period from January 25, 2011 through March 10, 2011; and WHEREAS, Notices of the Availability of the Draft EIR were published in the San Mateo Times, mailed to property owners within a 300-foot radius of the site, noticed to local agencies and cities, and circulated through the State Clearinghouse; and WHEREAS, the Planning Commission held a duly noticed meeting during the review period on February 17, 2011 to take public testimony on the Draft EIR; and WHEREAS, the City prepared written responses to comments received on the Draft EIR and prepared a Final EIR for circulation, which consists of the Draft EIR (incorporated by reference), all comments received on the Draft EIR, written responses to comments received on the Draft EIR, and revisions to the Draft EIR; and WHEREAS, the Draft Environmental Impact Report reviewed and analyzed the potential environmental impacts of the Project, including environmental impacts in the areas of Aesthetics, including the visual character of the proposed Project, including light and glare; Air Quality, including construction dust; Biological Resources; Cultural Resources; Geology & Soils, including ground shaking, soil stability, landslides, lateral spreading, liquefaction and expansive soils; Greenhouse Gas Emissions and climate change related impacts; Hazards/Hazardous Materials; Hydrology and Water Quality; Land Use and Planning; Noise; Population, Public Services, and Recreation; Transportation and Circulation; Utilities; and cumulative impacts of the Project, growth-inducing impacts of the Project, as well as potential Project Alternatives; WHEREAS, where feasible, mitigation measures have been incorporated into the Project to reduce identified impacts to a level of less than significant; and WHEREAS, no feasible mitigation exists for certain significant and unavoidable air quality, greenhouse gas, noise, and transportation impacts that would reduce the impacts to a less-than- significant level. NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which includes without limitation, CEQA and the CEQA Guidelines, 14 California Code of Regulations § 15000, et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco General Plan Update and General Plan Update EIR; the Redevelopment Plan for the Downtown/Central Redevelopment Project Area and the related EIR; the South San Francisco Municipal Code; the Project applications; the Oyster Point Specific Plan and Phase I Precise Plan, as prepared by Perkins + Will, dated February 23, 2011; the Oyster Point Specific Plan Appendix & Design Guidelines, prepared by Perkins + Will, dated February 23, 2011; the Preliminary Transportation Demand Management Plan, as prepared by HDR, dated February 23, 2011; the Oyster Point Specific Plan and Phase I Project EIR, including the Draft and Final EIR and all appendices thereto; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission's duly noticed meetings on February 3, 2011, February 17, 2011, March 3, 2011, and March 14, 2011; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2) (“Record”), the City of South San Francisco City Council hereby finds as follows: 1. The foregoing Recitals are true and correct and made a part of this Ordinance. 2. The exhibits and attachments, including the Environmental Impact Report including the Draft EIR and Final EIR (attached as Exhibit A), the CEQA Findings including Statement of Overriding Considerations (attached as Exhibit B), and the Mitigation Monitoring and Reporting Program (attached as Exhibit C), are each incorporated by reference and made a part of this Resolution, as if set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of Chief Planner, Susy Kalkin. 4. Based on the Planning Commission’s independent judgment and analysis, the Planning Commission recommends that the City Council make the findings regarding the Project's significant and unavoidable impacts, potentially significant impacts, and less than significant impacts; makes the findings regarding the proposed mitigation measures, and the Project alternatives; and adopts the Statement of Overriding Considerations, finding that the benefits of the Project outweigh the Project’s significant and unavoidable environmental impacts, for the reasons, and as further set forth in Exhibit B, attached hereto and incorporated by reference. BE IT FURTHER RESOLVED that the Planning Commission of the City of South San Francisco hereby recommends that the City Council certify EIR09-0001 attached as Exhibit A, and adopt the Mitigation Monitoring and Reporting Program, attached as Exhibit C. BE IT FURTHER RESOLVED that the Resolution shall become effective immediately upon its passage and adoption. * * * * * * * I hereby certify that the foregoing resolution was adopted by the Planning Commission of the City of South San Francisco at a special meeting of the Planning Commission, held on the14th day of March, 2011 by the following vote: AYES: Commissioner Giusti, Commissioner Ochsenhirt, Commissioner Prouty, Commissioner Sim, Vice Chairperson Zemke and Chairperson Gupta NOES: None ABSTAIN: Commissioner Martin ABSENT: None ATTEST: Commission Secretary Susy Kalkin Secretary to the Planning Commission Exhibit A Environmental Impact Report [Draft Environmental Impact Report Previously Circulated; Final Environmetnal Impact Report Attached] Exhibit B CEQA Findings Including Statement of Overriding Considerations Exhibit C Mitigation Monitoring and Reporting Program