Final Report
180 Oyster Point
Transportation Demand
Management Plan
Prepared for:
Stuhlmuller Property Company
Prepared by:
Fehr & Peers
July 2005
~~- 0\'-. \.
TABLE OF CONTENTS
Chaoter
Paae
1 - INTRODUCTION... ................ ............. ...... ....... ....... ...... ....... ........ ................ ...... ................ 1
2 - EXISTING TRANSPORTATION SYSTEM .......................................................................3
Transit (Bus and Commuter Rail) Service................................................................... 3
Existing Pedestrian and Bicycle Facilities................................................................... 3
3 - CITY OF SOUTH SAN FRANCISCO TRANSPORTATION
DEMAND MANAGEMENT PLAN GUiDELINES.............................................................. 6
4 - CITY/COUNTY ASSOCIA TEION OF GOVERNMENT (C/CAG)
TRANSPORTATION DEMAND MANAGEMENT PLAN GUIDELINES .........................12
5 - TRANSPORTATION DEMAND MANAGEMENT PLAN ................................................18
On-Site Measures..................................................................................................... 18
Shuttle Measures...................................................................................................... 19
Subsidized Programs................................................................................................ 19
6- SU MMARY AN D CONCLUSIONS ............ ..... ............................ ......... ....... ...... ....... ........ 22
Appendix
SJ05-780
LIST OF FIGURES
Fiaure Paae
1. Site Plan..................................................................................................................... 2
2. Site Location............................................................................................................... 4
3. Transit Facilities.......................................................................................................... 5
LIST OF TABLES
Table Paae
1. City of South San Francisco - East of Highway 101
Standard Base TOM Requirements............................................................................ 6
2. City of South San Francisco - East of 101
Additional TOM Options/Aggressive Mitigation Measures .......................................... 9
3. C/CAG TOM Measures..... ........................................................................................ 13
4. 180 Oyster Point Boulevard Transportation Demand Management Program ........... 20
SJ05-780
180 Oystel POlllt TOM
July 2005
--
1. INTRODUCTION
Stuhmuller Property Company is proposing to develop a 70,000-square foot (s.f.) R&O building at 180 Oyster
Point Boulevard in South San Francisco, California. The proposed site plan is shown on Figure 1. The proposed
development is estimated to generate 109 AM peak-hour trips and 104 PM peak-hour trips (the trip generation
table is presented in the Appendix). A Transportation Demand Management (TOM) Plan was prepared to identify
measures to reduce the number of single-occupant automobile trips generated by the proposed project and thus
reduce its traffic impacts.
A Transportation Oemand Management (TOM) Plan is a set of strategies, measures and incentives to encourage
the employees to walk, bicycle, use public transportation, carpool or use other alternatives to driving alone. TOM
measures produce more mobility using existing transportation systems, boost economic efficiency of the current
transportation infrastructure, improve air quality, save energy, and reduce traffic congestion.
Convenience and cost are the primary factors that affect a person's choice of transportation mode. Measures that
work well for some people or types of businesses do not work as well for others. Therefore, an effective TOM plan
or program provides multiple options and incentives and is flexible enough to allow customization to meet the
varied needs of individuals and individual employers. This program presents an array of proven strategies and
measures used in the Bay Area under a flexible implementation plan that can meet the needs of existing and
future tenants.
The TOM plan was developed based on guidelines provided by the City of South San Francisco and the
City/County Association of Governments (C/CAG), the local Congestion Management Agency for San Mateo
County. City of South San Francisco guidelines for TOM programs require that all projects that generate greater
than 100 daily trips obtain a goal of 28 percent alternative mode use. The City/County Association of
Governments (C/CAG), the local Congestion Management Agency for San Mateo County, requires developments
that generate 100 or more peak-hour trips to implement TOM measures that have the capacity to mitigate all new
peak-hour trips.
The transportation facilities serving the site are described in Chapter 2. Chapter 3 presents the draft City of South
San Francisco TOM guidelines and C/CAG TOM guidelines are contained in Chapter 4. The transportation
demand management measures selected for the 180 Oyster Point Boulevard TOM Plan are presented in Chapter
5. A brief summary is presented in Chapter 6.
If
1
flIlR& PIIIt\
~g
E--<"1
~~
~~
......
;:s
Cl
l:Cl
....
l::
~
:...
~
&
<:::>
00
......
nu_
S!SU- un
I ii' II
II to
~ II un II
~ !!n~1I1I11
I~
I~~
~~
~8
lJ
Z
5
....J
~i
H: ~!
o ~li
.- ~ '
Z ..
-~
0'"
c..~
01:::."
UJ
.-
U')
>-
o
ce-
z
<C
..J
Q.
W
I-
U)
ti
~
.. tl ~
<:l
Ilij 'ij
'r"" c
111 J ~ ~
~
1 9 ~ ~
C) ~
u::: ~
~ 0 ~
~ ...
J.
~ ..s::
~
180 Oy'tel HUll! TOH
.July ;2r ,I)')
---
2. EXISTING TRANSPORTATION SYSTEM
The proposed 70,000-square foot R&D building is located at 180 Oyster Point Boulevard in South San Francisco,
California. The site location is shown on Figure 2.
The existing transportation facilities, that support alternative (non-automobile) mode use, include those that
provide transit, bicycle, and pedestrian access to the site. These facilities are described in detail below.
TRANSIT {BUS AND COMMUTER RAIL} SERVICE
San Mateo County Transit District (SamTrans) operates bus service in San Mateo County. Commuter rail service
(CaITrain) is provided from San Francisco to Gilroy by the Peninsula Corridor Joint Powers Board. Bay Area
Rapid Transit (BART) shuttle service is provided adjacent to the project site. The existing transit facilities in the
vicinity of the site are shown on Figure 3 and described in detail below:
CalTrain provides frequent train service between San Jose and San Francisco seven days a week. During
commute hours, CalTrain provides extended service to Morgan Hill and Gilroy. The South San Francisco CalTrain
station at Dubuque Avenue and Grand Avenue is the closest station to the project site. The following CalTrain
shuttle buses provide service to office buildings nearby: Oyster Point Area Shuttle and Gateway Area Shuttle. The
Oyster Point Area shuttle serves nearby developments on Eccles Avenue. The Gateway Area shuttle serves
nearby developments along Gateway Boulevard and operates along Oyster Point Boulevard past the project site.
Bay Area Rapid Transit (BART) provides rail service between the East Bay (Richmond, Pittsburg, Pleasanton,
and Fremont) and Millbrae. The closest station to the project site is the South San Francisco BART station
located between EI Camino Real and Mission Road approximately one half mile northwest of Kaiser medical
center. Two BART shuttles, Oyster Point Area and Gateway Area, run similar routes as the CalTrain shuttles and
are available to BART passengers free of charge.
SamTrans Route 292 provides bus service between the Hillsdale Shopping Center and the Transbay Terminal in
downtown San Francisco. This bus route operates along Airport Boulevard and stops at Airport Boulevard/Baden
Avenue near the project site. The hours of operation are 5:00 am to 2:00 am on weekdays and weekends.
Commute and midday headways are 30 minutes apart on weekdays and weekends. Headways are 60 minutes
during the evenings.
EXISTING PEDESTRIAN AND BICYCLE FACILITIES
Pedestrian facilities comprise sidewalks, crosswalks, and pedestrian signals. Near the site, sidewalks are located
on both sides of Oyster Point Boulevard. Crosswalks and pedestrian signals are provided at nearby signalized
study intersections.
Bicycle facilities comprise bike paths (Class I), bike lanes (Class II), and bike routes (Class III). Bike paths are
paved trails that are separated from roadways. Bike lanes are lanes on roadways designated for use by bicycles
by striping, pavement legends, and signs. Bike routes are roadways that are designated for bicycle use by signs
only and mayor may not include additional pavement width for cyclists. Near the project site, bike lanes are
provided on Airport Boulevard, Oyster Point Boulevard, and Sister Cities Boulevard.
If
3
flIIR& PIIIt\
180 Oyster Point Boulevard TDM
July 2005
Oyster Cove
Marina
Forbes Blvd
Key:
CJ
Project Site
CD
N
Not to Scale
Figure 2
SITE LOCATION
iF
SJ05-780
Fehr & Peers Associates, Inc.
180 Oyster Point Boulevard TDM
July 2005
FX, KX, MX,
NX,PX,RX
Oyster Cove
Marina
-0-
>
Ui
11l
C
~
~
>
II II II II II
Forbes Blvd.
II _.
II
FX, KX, MX,
NX,PX,RX
Key:
CJ Project Site
fftHfH CalTrain
.. .. .. Gateway CalTrain/BART Shuttle
Oyster Point CalTrain/BART Shuttle
CD
N
@
Samtrans Bus Route
Not to Scale
Figure 3
TRANSIT FACILITIES
fP
SJO!H80
Fehr & Peers Associates, Inc.
180 Oystcl P()fflt TO^ 1
July 2005
---
3. CITY OF SOUTH SAN FRANCISCO TRANSPORTATION
DEMAND MANAGEMENT PLAN GUIDELINES
The City of South San Francisco has guidelines that require new development projects to achieve a minimum
goal of 28 percent alternative mode use. Development projects requesting FAR bonuses must achieve higher
alternative mode usage percentages ranging from 30 to 45. Table 1 presents the City of South San Francisco
standard base transportation demand management (TDM) measures and their estimated percent mitigation, or
alternative mode use. Additional TDM measures are presented in Table 2.
TABLE 1
CITY OF SOUTH SAN FRANCISCO - EAST OF HIGHWAY 101
STANDARD BASE TDM REQUIREMENTS
MeasurelProgram
PlanninglDesign Measures
Building layout
Building setbacks
Building wiring
Passenger loading zones
Transit Design Elements
Street Design
Parking Design Measures
Preferential parking 10% min.
(carpool and van pool)
Parking configuration
Pedestrian Measures
Minimize walking distance
Pedestrian/trail connections
Internal pedestrian access
Bicycle Design Measures
Showers/Clothes lockers
Bicycle parking (short + long term)
Information Board / Kiosks
Transportation Coordinator
Implementation
CCRs
Designated employer contact in leases
(each tenant)
Developer Developer as Tenant or
Implemented Employer Implements Percent Mitigation
1.0% to 3.0%
X
X
X
X
0.5% to 0.5%
X
5.0% to 10.0%
X X
X
0.5% to 1.0%
X
X
X
2.0% to 2.5%
X X
X
X X
1.0%
X X
X X
X X
If
6
FIll R & P II It \
l~A"HIl"~"'lIO~ ~1I"\1I\!"'1"
18U Oystel p()'17! TO~,1
July 200'1
--
TABLE 1 (CONT.)
CITY OF SOUTH SAN FRANCISCO - EAST OF HIGHWAY 101
STANDARD BASE TDM REQUIREMENTS
Developer Developer as Tenant or
Measure/Program Implemented Employer Implements Percent Mitigation
Carpool Programs 2.0%
Ridematching services X
Van pool Programs 2.0%
Ridematching services X
Transit Programs 0.5%
Free trial rides X
Transit riders guide X X
Parking Programs
Preferential parking (registration, mgmt.) X X
Pedestrian Programs 0.5%
Walking Club I Mentor Group X
Bicycle Programs 1.0%
Bicycle riders guide X X
Ridematching services X
Promotional Programs 4.0% to 6.0%
New Tenant and employee orientation X
packets
Flyers, posters, brochures, emails X X
Transportation fairs X X
Spare the Air (June - October) X X
Rideshare Week (October) X X
Newsletter articles X
Trip planning assistance- routes and maps X
Kick-Off Event (at 50% occupancy) X X
Guaranteed ride home X X
If
7
flllll & PIIIt\
180 Oystf'1 PU/llt TO^1
July 20()5
--
TABLE 1 (CONT.)
CITY OF SOUTH SAN FRANCISCO - EAST OF HIGHWAY 101
STANDARD BASE TDM REQUIREMENTS
Measure/Program
Monitoring and Evaluation
Annual Report
Fines for noncompliance
Developer Implemented
Developer as Tenant or
Employer Implements
Percent Mitigation
x
X
X
X
Standard Base Range
20.0% to 30.0%
Note: Standard TOM Goal for all projects is 28%.
Source: City of South San Francisco
Hoyt Company
If
8
ft IIR & PIIIt\
180 Oystcl POint TW.1
July 2005
---
TABLE 2
CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101
ADDITIONAL TOM OPTIONS/AGGRESSIVE MITIGATION MEASURES
Developer as Tenant
Developer or Employer
Measure/Program Implemented Implements Percent Mitigation
Transit Design Elements 1.0% to 5.0%
land dedication for transit facilities X
Transit passenger shelter/ bus stop X
Bus/rail station subsidy (for construction) X
Parking Design Measures 5.0%
Shared parking w/existing development X
Reduced parking on site X
Off-street parking restrictions X
Electric vehicle parking (charging stations) X
Bicycle Design Measures 2.0%
Bicycle trail connections X
Onsite Amenities 1.5% to 5.0%
Cafeteria with hot food services X X
Valet services (dry cleaning)
ATM X X
Exercise facilities X X
Convenience retail (sundries) X X
Childcare X X
Post office/stamps X X
Onsite transit pass sales X X
Carpool Programs 2.0% to 5.0%
Mentor group X X
Alternative commute subsidies X X
Transportation Management Association X X 1.0% to 3.0%
Participation
Van pool Programs 2.0% to 5.0%
Mentor group X X
Alternative commute subsidies X X
If
9
flIIR& PIIRS
n'''HOIII'''ln~ ((I"VIlIA"'',.
180 Oys!el POll)! TOM
July 2005
--
TABLE 2 (CONT.)
CITY OF SOUTH SAN FRANCISCO - EAST OF HIGHWAY 101
ADDITIONAL TDM OPTIONS/AGGRESSIVE MITIGATION MEASURES
Developer as Tenant
Developer or Employer
Measure/Program Implemented Implements Percent Mitigation
Transit Programs 1.0% to 10.0%
Transit subsidies X X
On-site pass outlet X X
Transit field trips X
Subscription bus services X X
Shuttle programs (frequency and route X X
coverage)
Increased frequency for off peak hours X X
Increased frequency for peak hours X X
Additional route coverage during peak X X
hours
Additional route coverage during midday X X
period
Parking Programs 5.0% to 10.0%
Reduced parking fees for X X
carpoolJEV/vanpools
Paid off-site parking at park & ride lots I X X
transit stations
Paid parking X X
Off-site parking - park and ride shuttles X X
Parking cash out X
Pedestrian Programs 2.0% to 5.0%
Alternative commute subsidies X X
Bicycle Programs 0.5% to 5.0%
Complimentary bikes (recreational use) X X
Campus bikes X X
Bicycle riders guides X X
Bicycle Club I Mentor Group X X
Alternative commute subsidies X X
If
10
FIIIIl & PIIIt\
1BU Oystel POlllt TOA1
July 200'1
~
TABLE 2 (CONT.)
CITY OF SOUTH SAN FRANCISCO - EAST OF HIGHWAY 101
ADDITIONAL TOM OPTIONS/AGGRESSIVE MITIGATION MEASURES
Promotional Programs
Van pool Week (February )
Bike to Work Day (May)
Earth Day (April)
Telecommunicating
1'1.0%
Alternative Work Schedule
x
X
X
Site amenities
only
Site amenities
only
X
X
X
X
1.0% to 2.0%
X
Aggressive Range
25.0% to 63.0%
Note: No one project is expected to achieve 63% TOM. This would require substantial subsidies for all alternative modes of transportation. It
is more likely that a developer will provide financial incentives for a single mode such as transit or bicycling.
Source: City of South San Francisco
Hoyt Company
If
11
f1I1R & PHI(\
UAIlUO/lU,IIOIlll (iJ"'\'!tl.l,Il'\
180 OY'(PI POI/It TOle!
July 2{j(}5
--
4. CITY/COUNTY ASSOCIATION OF GOVERNMENT (C/CAG)
TRANSPORTATION DEMAND MANAGEMENT PLAN
GUIDELINES
C/CAG is the Congestion Management Agency for San Mateo County that develops the Congestion Management
Program (CMP). As part of the land use element of the CMP, all projects that generate 100 or more net new trips
during the AM or PM peak hour are required to mitigate the impacts of all new generated trips. One option to
mitigate these trips is to implement TDM programs that have the capacity to' fully reduce the demand for new
peak hour trips. Other options include reducing the scope of project, building adequate roadway and/or transit
improvements, and payment of traffic mitigation fees which are used to mitigate impacts of the project's traffic on
the CMP roadway network.
C/CAG has identified acceptable TDM measures with equivalent numbers of peak-hour trips that will be reduced
with implementation of each measure. Measures can be mixed and matched so that the total number of mitigated
trips is equal to or greater than the new peak-hour trips generated by the project (109 AM peak-hour trips for the
office development). These programs, once implemented, must be on-going for the occupied life of the
development. Programs may be substituted, with prior approval of C/CAG, as long as the number of reduced trips
is not reduced.
The C/CAG list of approved TDM measures, the number of mitigated peak-hour trips associated with each, and
the rationale used to determine the number of mitigated trips are presented in Table 3.
If
12
FiliI< & PIIIt\
1 M A lI\r 0 ~'J, 110'11 .; 0 "\IJ 11A'" \
180 OystC'r POI/It TOM
.July 200'1
~
TABLE 3
C/CAG TDM MEASURES
Transportation Demand Management
Measure
Secure bicycle storage.
Showers and changing rooms.
Operation of a dedicated shuttle service
during the peak period to a rail station or
an urban residential area. Alternatively the
development could buy into a shuttle
consortium.
Charging employees for parking.
Subsidizing transit tickets for employees.
Subsidizing pedestrians/bicyclists who
commute to work.
Creation of preferential parking for
carpoolers.
Number of Trips Credited
One peak-hour trip will be credited for every
3 new bike lockers/racks installed and
maintained. Lockers/racks must be installed
within 100 feet of the building.
Ten peak-hour trips will be credited for
each new combination shower and
changing room installed. An additional 5
peak hour trips will be credited when
installed in combination with at least 5 bike
lockers.
One peak-hour trip will be credited for each
peak-hour round trip seat on the shuttle.
Increases to two trips if a Guaranteed Ride
Home Program is also in place.
Five additional trips will be credited if the
shuttle stops at a child care facility enroute
to/from the worksite
Two peak-hour trip will be credited for each
parking spot charged out at $20 per month
for one year. Money shall be used for TOM
measures such as shuttles or subsidized
transit tickets.
One peak-hour trip will be credited for each
transit pass that is subsidized at least $20
per month for one year.
One additional trip will be credited if the
subsidy is increased to $75 for parents
using transit to take a child to childcare
enroute.
One peak hour trip will be credited for each
employee that is subsidized at least $20
per month for one year.
Two peak-hour trips will be credited for
each parking spot reserved.
Rationale
Experience has shown that
bicycle commuters will on
average use this mode one-
third of the time, especially
during warmer summer months.
10 to 1 ratio based on cost to
build and the likelihood that
bicycle utilization will increase.
Yields a one-to-one ratio (one
seat in a shuttle equals one
auto trip reduced); utilization
increases when a guaranteed
ride home program is also
made available.
Yields a two-to-one ratio.
Yields a one-to-one ratio (one
transit pass equals one auto
trip reduced).
Yields a two-to-one ratio (One
pedestrian/bicycle equals one
auto trip reduced).
Yields a two-to-one ratio (one
reserved parking spot equals a
minimum of two auto trips
reduced).
If
flIIR& PIIIt\
13
180 OYS!CI PO/llt TOM
.July 200'1
--
TABLE 3 (CONT.)
C/CAG TOM MEASURES
Transportation Demand Management
Measure
Creation of preferential parking for
vanpoolers.
Implementation of a vanpool program.
Operation of a commute assistance center,
offering on site, one stop shopping for
transit and commute alternatives
information, preferably staffed with a live
person to assist building tenants with trip
planning.
Survey employees to examine use and
best practices.
Implementation of a parking cash out
program.
Implementation of ramp metering.
Number of Trips Credited
Seven peak-hour trips will be credited for
each parking spot reserved.
Seven peak-hour trips will be credited for
each vanpool arranged by a specific
program operated at the site of the
development. Increases to ten trips if a
Guaranteed Ride Home Program is also in
place.
One peak-hour trip will be credited for each
feature added to the information center;
and an additional one peak-hour trip will be
credited for each hour the center is staffed
with a live person, up to 20 trips per each
200 tenants. Possible features may include:
Transit information brochure rack
Computer kiosk connected to the Internet
Telephone (with commute and transit
information numbers)
Desk and chairs (for personalized trip
planning)
On-site transit ticket sales
Implementation of flexible work hour
schedules that allow transit riders to be 15-
30 minutes late or early (due to problems
with transit or vanpool).
Three peak hour trips will be credited for a
survey developed to be administered twice
yearly.
One peak-hour trip will be credited for each
parking spot where the employee is offered
a cash payment in return for not using
parking at the employment site.
Three hundred peak-hour trips will be
credited if the local jurisdiction in
cooperation with Caltrans, installs and turns
on ramp metering lights during the peak
hours at the highway entrance ramp closest
to the development.
Rationale
Yields a seven-to-one ratio
(one reserved parking spot
equals a minimum of seven
auto trips reduced).
The average van capacity is
seven.
This is based on staffs best
estimate. Short of there being
major disincentives to driving,
having an on-site TDM program
offering commute assistance is
fundamental to an effective
TDM program.
This is based on staffs best
estimate with the goal of finding
best practices to achieve the
mode shift goal.
Yields a one-to-one ratio (one
cashed out parking spot equals
one auto trip reduces).
This is a very difficult and costly
measure to implement and the
reward must be significant.
If
14
ft IIIl & PI lit \
l~Ur:\J'OMa,'ro'- ((I""UI14I11'\
180 Oystel POIllt TOM
July 2()1)5
--
TABLE 3 (CONT.)
C/CAG TOM MEASURES
Transportation Demand Management
Measure
Installation of high bandwidth connections
in employees' homes to the Internet to
facilitate home-telecommuting.
Installation of video conferencing centers
that are available for use by the tenants of
facility.
Implementation of a compressed work
week program.
Flextime: Implementation of an alternative
hours workweek program.
Provision of assistance to employees so
they can live close to work.
Implementation of a program that gives
preference to hiring local residents at the
new development site.
Provision of on-site amenitiesl
accommodations that encourage people to
stay on site during the work day, making it
easier for workers to leave their
automobiles at home.
Provide use of motor vehicles to
employees who use alternate commute
methods so they can have access to
vehicles during breaks for personal use.
Number of Trips Credited
One peak-hour trip will be credited for every
three connections installed. This measure
is not available as credit for a residential
development.
Five peak-hour trips will be credited for a
center installed at the facility.
One peak-ho.ur trip will be credited for every
5 employees that are offered the
opportunity to work four compressed days
per week.
One peak hour trip will be credited for each
employee that is offered the opportunity to
work staggered work hours. Those hours
can be a set shift set by the employer or
can be individually determined by the
employee.
If an employer develops and offers a
program to help employees find acceptable
residences within five miles of the
employment site, a credit of one trip will be
given for each slot in the program.
One peak-hour trip will be credited for each
employment opportunity reserved for
employees recruited and hired from within
five miles of the employment site.
One peak-hour trip will be credited for each
feature added to the job site. Possible
features may include:
banking
grocery shopping
clothes cleaning
exercise facilities
child care center
Five peak hour trips will be credited for
each vehicle provided.
Rationale
Yields a one-to-three ratio.
This is based on staffs best
estimate.
The work week will be
compressed into 4 days;
therefore the individual will not
be commuting on the 5th day.
This is based on staffs best
estimate.
This assumes that a five mile
trip will generally not involve
travel on the freeways.
This assumes that a five mile
trip will generally not involve
travel on the freeways.
This is based on staffs best
estimate.
This is based on staffs best
estimate.
If
15
flllR & PIIIt\
1~~'HOlllAlIO'" ({)IBU\I.....f..
180 Oystcl PUIIl! TOf,1
July 2005
---
TABLE 3 (CONT.)
C/CAG TOM MEASURES
Transportation Demand Management
Measure
Provide use of bicycles to employees who
use alternate commute methods so they
can have access to bicycles during breaks
for personal use.
Provision of child care services as a part of
the development.
Developer/Property owner may join an
employer group to expand available child
care within 5 miles of the job site or may
provide this service independently.
Join the Alliance's guaranteed ride home
program.
Combine any ten of these elements and
receive an additional credit for five peak
hour trips.
Work with the Alliance to
develop/implement a Transportation Action
Plan.
The developer can provide a cash legacy
after the development is complete and
designate an entity to implement any (or
more than one) of the previous measures
before day one of occupancy.
Number of Trips Credited
One peak hour trip will be credited for every
four bicycles provided.
One trip will be credited for every two child
care slots at the job site. This amount
increases to one trip for each slot if the
child care service accepts multiple age
groups (infants = 0-2 yrs, preschool = 3&4
yrs, school-age = 5 to 13 yrs).
One trip will be credited for each new child
care center slot created either directly by an
employer group, by the developer/property
owner, or by an outside provider if an
agreement has been developed with the
developer/property owner that makes the
child care accessible to the workers at the
development
Two peak hour trips will be credited for
every 2 slots purchased in the program.
Five peak-hour trips will credited.
Ten peak-hour trips will be credited.
Peak-hour trip reduction credits will accrue
as if the items were being directly
implemented by the developer.
Rationale
This is based on staffs best
estimate.
This is based on staffs best
estimate.
This is based on staffs best
estimate.
Experience has shown that
when a guaranteed Ride Home
Program is added to an over-all
TDM program, the average
rider ship increases by about
50%.
Experience has shown that
offering multiple and
complementary TDM
components can magnify the
impact of the overall program.
This is based on staffs best
estimate.
Credits accrue depending on
what the funds are used for.
If
16
flllR & PIIIt\
'.'''HUla-rlOI'll ((I"VI\IA\I\
1[J0 Oystel POIII! TOld
July 2005
---
TABLE 3 (CONT.)
C/CAG TDM MEASURES
Transportation Demand Management
Measure
Encourage infill development.
Number of Trips Credited
Two percent of all peak-hour trips will be
credited for each infill development.
Encourage shared parking
Five peak-hour trips will be credited for an
agreement with an existing development to
share existing parking.
Participate in/create/sponsor a
Transportation Management Association.
Five peak-hour trips will be credited.
Coordinate Transportation Demand
Management programs with existing
developments/employers.
For employers with multiple job sites,
institute a proximate commuting program
that allows employees at one location to
transfer/trade with employees in another
location that is closer to their home.
Pay for parking at park and ride lots or
transit stations.
Five peak-hour trips will be credited.
One peak-hour trip will be credited for each
opportunity created.
One peak-hour trip will be credited for each
spot purchased.
Yields a one-to-one ratio.
Source:
Rationale
Generally acceptable TDM
practices (based on research of
TDM practices around the
nation and reported on the
Internet).
Generally acceptable TDM
practices (based on research of
TDM practices around the
nation and reported on the
Internet).
Generally acceptable TDM
practices (based on research of
TDM practices around the
nation and reported on the
Internet).
This is based on staffs best
estimate.
Yields a one-to one ratio.
City/County Association of Governments of San Mateo County's (C/CAG) Revised Guidelines for the Implementation of the Land
Use Component of the 1999 Congestion Management Program. September 21, 2004.
If
17
fillR& PIIR\
UAll"O_1,l,l/0!ll ,-{)IHUl","I~
ISO (lystt:1 Pnlllt TOM
July 2UU'1
--
5. TRANSPORTATION DEMAND MANAGEMENT PLAN
The Transportation Demand Management (TDM) Plan elements for 180 Oyster Point Boulevard include on-site
amenities that encourage the use of alternative modes of travel, require participation in associations that promote
commute alternatives to the single-occupant vehicle, and include parking measures. It includes appropriate TDM
measures that will satisfy City of South San Francisco and City/County Association of Governments guidelines.
Table 4 summarizes the TDM measures for the proposed project and identifies how they meet the City's 28
percent alternative mode use goal and C/CAG's trip equivalent guidelines. These TDM measures are described in
detail below.
ON-SITE MEASURES
TOM Coordinator
The lease agreement between the owner and tenant will state that the tenant will designate a TDM coordinator for
the site. The coordinator will promote the TDM Plan, activities, and features to all employees, and will conduct the
annual monitoring/reporting process. The coordinator will develop an on-site transportation information center with
SamTrans, BART, and CalTrain schedules and maps. The TDM coordinator will provide information via flyers,
posters, emails, or brochures and actively market alternative mode use and special programs such as Bike-to-
Work Day or Carpool Week. The TDM coordinator's role also includes managing on-site transit pass sales and
the guaranteed ride home program (working with a local taxi service or rental car agencies).
Carpools are the most popular alternative commute mode. Either RIDES 1, the Peninsula Traffic Congestion Relief
Alliance (Alliance), or an in-house matching service will be used to provide the carpool matching service and
increase the percentage of employees that share a ride to work via carpools.
On-Site Amenities
On-site amenities will be provided to promote the use of alternative modes by reducing employee reliance on the
single-occupant automobile.
According to city guidelines, 10 percent of vehicles spaces shall be reserved for carpools and van pools and shall
be located in premium and convenient locations. The proposed parking supply is 200 spaces. Therefore, a
minimum of 20 carpool and vanpool spaces are required. The site plan will be designed to provide 15 carpool
spaces and 5 vanpool spaces near the building entrance. These measures discourage the single-occupant
vehicle trip and improve accessibility for those sharing vehicles.
The project sponsor will provide three bicycle racks that can accommodate 15 bicycles. The bicycle racks shall be
located within 100 feet of a main entrance to the building. The project sponsor will provide indoor secured storage
for 10 bicycles near the main entrance to the building.
Improvements by the tenant(s) will include showers and lockers.
1. RIDES for Bay Area Commuters. Inc. is a nonprofit corporation dedicated to alternatives to driving alone.
If
18
FIIIR& PIIIt\
1 ~ l" \f I') M '.. II I') III (0 Ii \ lJlIA II I \
180 Oystel PnllJt TOf,1
July 2U05
---
Design Measures
The current site plan incorporates a reduced parking ratio. This limits the number of available parking spaces to
further encourage carpool/van pool or transit use.
The site plan includes pedestrian connections that direct pedestrians to sidewalks on the south side of Oyster
Point Boulevard. A proposed paved walkway bisects the project site improving pedestrian flow. Lighting and
landscaping shall be provided that enhances pedestrian safety.
The project sponsor will provide a passenger loading zone for carpool and vanpool drop-off near the main building
entrance. One designated parking stall near the entrance will be time-restricted to allow vehicles to drop-off/pick-
up passengers.
SHUTTLE MEASURES
CalTrain and BART shuttles provide service from the South San Francisco CalTrain station and BART station to
nearby office developments in the Oyster Point and Gateway areas. The lease agreement shall state that the
future tenant(s) coordinate with the Alliance to help fund their shuttle program and to identify on-site shuttle stops.
SUBSIDIZED PROGRAMS
One of the most-common reasons that employees do not use alternative modes (i.e. carpool, vanpool, or transit)
is the inability to leave work unexpectedly for a family emergency or the fear of being stranded if they need to
work late. One element that allays these fears is a Guaranteed Ride Home (GRH) program. With this program,
employees can use a taxi service, rental car or another means to get home and the employer pays for the service.
The lease agreement will state that the tenant(s) also participate in the Alliance's GRH program. The
transportation coordinator will manage the GRH program. The employee contacts the transportation coordinator
when they need a ride home and the transportation coordinator makes the travel arrangements.
The tenant(s) will also join the Alliance program which provides ongoing support for alternative commute
programs and work with the alliance to develop/implement a Transportation Action Plan.
If
19
FIIIR& PIIIt\
'_""HO.'A,'IOilll (OIl\'jl'.III\
180 O/Stf'l P()fllt TOM
July 2uns
---
TABLE 4
180 OYSTER POINT BOULEVARD TRANSPORTATION DEMAND MANAGEMENT PROGRAM
City of South
San Francisco C/CAG
Percent Trip Number of
Alternative
TDM Measure Description Mode Use Mitigation Mitigated
Credit Trips
On-Site Measures
TDM Coordinator
TOM Coordinator Per the lease agreement, the future tenant(s) 1%
will designate a coordinator to monitor the
TOM plan for the site.
Promotional Programs The future tenant(s) will provide promotional 2% One trip for 3
programs. Promotion programs include: new each feature (3 features
tenant & employee orientation packets; flyers, to information are
posters, email; transportation fairs; trip center (Le. assumed)
planning assistance; guaranteed ride home. brochure rack,
on-site transit
sales,
quarterly
programs).
Ride matching services TOM coordinator will organize employees to 2%
share rides to work
On-Site Amenities
Preferential Parking for Ten percent (10%) of the required spaces 8% Two trips per 45
Carpools and Van pools shall be designated carpool and vanpool carpool space.
spaces. The site plan will designate 15 Seven trips
carpool spaces and 5 vanpool spaces near per vanpool
the building entrance. space.
Bicycle racks & lockers The project sponsor will install 3 bike racks 2.5% One trip for 8
providing storage for 15 bikes. Indoor secured every 3
storage via a controlled access area or racks/lockers.
enclosed area will be provided to
accommodate a minimum of 10 bikes.
Showers/Clothes The future tenant(s) will provide a minimum of N/A Ten trips for 25
Lockers two showers/changing rooms. (percentage each new
included with combination
bike racks & shower and
lockers) changing
room.
Additional 5
trips if
combined with
5 bike lockers.
If
20
flllR & PUIt\
'~411\'OIl!"IlO'" UJIlI'>VLlJ.Il'\
IIW Oystel P()lll! TOM
July 2IJ05
TABLE 4 (CONT.)
180 OYSTER POINT BOULEVARD TRANSPORTATION DEMAND MANAGEMENT PROGRAM
City of South C/CAG
San Francisco Number
Percent of
Alternative Trip Mitigation Mitigated
TDM Measure Description Mode Use Credit Trips
Design Measures
Reduced parking The site plan provides a lower parking ratio 2%
than city code requirements.
Pedestrian Connections The site plan includes a proposed walkway 0.5%
and Direct Route to that directs pedestrians from the site to
Transit sidewalks on the south side of Oyster Point
Boulevard.
Passenger Loading A passenger loading zone for carpool and 1%
Zone vanpool drop-of will be provided near the
main building entrance. One designated
parking space near the entrance will be time-
restricted to accommodate drop-off/pick-ups.
Shuttle Measures
Operation of a Per the lease agreement, the future tenant(s) 8% One trip for each 101
dedicated shuttle will participate in the Peninsula Congestion peak-hour round
service during the peak Alliance funding of CalTrain and BART trip seat on
period to a rail station or shuttles. The Oyster Point CalTrain and BART shuttle.
an urban residential shuttles make 2 round trips per peak period. Increases to two
area trips for
guaranteed ride
home.
Subsidized Programs
Participate in the Per the lease agreement, the future tenant(s) 4% Two trips for 62
Alliance's guaranteed will participate in the Alliance's GRH program. every 2 slots
ride home (GRH) purchased in
program program.
Transportation Per the lease agreement, the future tenant(s) 1% Five trips for 15
Management will participate in a Transportation participation in
Association Participation Management Association (TMA) and develop TMA and ten
a Transportation Action Plan (TAP). trips for creation
of a TAP.
Total 32% 112 Trips
Notes: 1 Funding of shuttle service is based on number of employees and not based on number of shuttle seats purchased. A shuttle
demand of five seats was assumed for the project site.
2 Usage of the GRH program is based on an as-needed basis. The GRH program is assumed to be used six times annually for the
project site.
If
FIIlR & PIIR\
lUIIIHO.',1JON {o"\u\l""'~
---
21
180 Oyslcl POUlt TOU
July 200'1
---
6. SUMMARY AND CONCLUSIONS
This report presents the TOM Plan for the proposed office development located at 180 Oyster Point Boulevard in
South San Francisco, California. The report identifies TOM measures that contribute to a goal of 28 percent
alternative mode use according to South San Francisco guidelines. The TOM plan also satisfies C/CAG
guidelines that requires developments to implement TOM measures with the capacity to mitigate all new peak-
hour trips.
The TOM Plan has been tailored to utilize the measures that are most compatible for the project:
· The future tenant(s) will designate a TOM coordinator to promote the TOM plan.
· The project is located in close proximity to the South San Francisco CalTrain Station, providing
convenient access to CalTrain. The TOM Plan promotes transit usage by requiring the future tenant(s) to
provide funding for the CalTrain and/or BART shuttles.
· The site plan will provide designated carpool and van pool parking spaces and bicycle parking facilities.
Showers will be provided by the future tenant(s). These physical attributes promote alternative commute
options.
· The future tenant(s) will participate in the local TOM association, Peninsula Congestion Relief Alliance.
This will maximize the effectiveness of this TOM plan.
The proposed project is estimated to generate 109 AM and 104 PM new peak-hour trips. The TOM plan is
projected to achieve a 32 percent alternative mode use thus exceeding the 28 percent goal as required by South
San Francisco guidelines. The TOM plan is estimated to mitigate 112 trips through the use of C/CAG TOM
measures, which exceeds the 109 AM peak-hour trips.
If
22
ftlIR& PHR\
l~lll"OAI.,1101rl (OIHUlUIl'\
APPENDIX
TRIP GENERATION ESTIMATES
Table A-1
Trip Generation For 180 Oyster Point
I Daily AM Peak Hour PM Peak Hour I
Land Use Size Rate Trips Rate In Out Total Rate In Out Total
I
Office 70 ksf 11.01 771 1.55 95 14 109 1.49 18 86 104
Notes: Trip generation rates from ITE's Trip Generation, 7th Edition, 2003.
I