Loading...
HomeMy WebLinkAboutPP-00-020 611-681 Gateway TDM ?POO~O:2-D Table 4 Vehicle Trip Generation l DAILY AM PEAK PM PEAK HOUR HOUR Land Use Size Rate I Trips I Rate Trips I Rate I Trips I Project /611 Gateway 265,081 Sq. Ft 10.24 2,714 1.45 , 384 1.38 366 681 Gateway 124,425 Sq. Ft. 10.24 1,274 1.45 180 1.38 172 Total 389,506 Sq. Ft. 3,988 564 Source: Institute of Transportation Engineers, Trip Generation, 6th Edition, 1997. Rates reduced by seven percent to account for observed rates of transit use at existing buildings. The proposed project would also include a small amount (12,000 square feet) of support retail. Assuming that half of the trips to and from the support retail would be intercepted from the tenants in the existing and proposed Gateway office b!Jildings, the support retail would have no net additional traffic generation. Impact 1: The Project would generate more than 100 net new trips during the A.M. and P.M. peak hours. The San Mateo City/County Association of Governments (C/CAG) Agency Guidelines for the Implementation of the 1999 Congestion Management Program (UC/CAG Guidelines") specify that local jurisdictions must ensure that the developer and/or tenants will mitigate all new peak hour trips (including the first 100 trips) projected to be generated by the development. Mitigation 1: The Project sponsor shall implement a Transportation Demand Management (TOM) program using programs acceptable to C/CAG. These programs, once implemented, must be on-going for the occupied life of the development. The C/CAG Guidelines specify the number of trips that may be credited for each TOM measure. Table 5 outlines a program that would include elements to account for credits for the 564 trips generated by the Project. In this program, it is assumed that the 611 and 681 Gateway projects will house approximately 1,300 employees. 611 and 681 Gateway Traffic Study 3-2 CCS June g, 2000 538 I I I I I I I I I - II - II II II - - - II I I I Table 5 Recommended Transportation Demand Management Measures and C/CAG Guidelines Trip Credits I I TOM Measure Number of Trips Recommended Total Trip Credits Credited Quantity Bicycle lockers and 1/3 per bike locker/rack 65 (5% of 1,300 21 racks potential employees) Showers and changing 2 trips per facility 13 (one per floor 26 rooms excluding ground floors) Operation of a shuttle 2/3 trips per round trip Implement Guaranteed 130 service to rail stations shuttle seat; one trip Ride Home. Fund per seat with existing Gateway Guaranteed Ride shuttles to provide 130 Home program additional round trip seats. Subsidize transit tickets 1 trip per transit pass Subsidize 130 monthly 130 for employees subsidized at $20 per transit passes (10% of month 1,300 employees) .. Preferential parking for 1 trip per reserved 88 reserved parking 88 car and vanpoolers parking spot places (5% of 1,750 space garage) Implement a vanpool 7 trips per vanpool, 10 Implement Guaranteed 50 program trips with Guaranteed Ride Home. Implement Ride Home program 5 vanpools. Operate commute 1 trip per feature, plus Implement Commute 8 assistance center one trip per hour Assistance Center in staffed one of the two new buildings, including transit information, computer kiosk with links to transit and rideshare information, and on-site transit ticket sales. Staff for 4 hours per day. Installation of highband 1 trip per connection Coordinate with tenants 65 width connections to to install connections employees' homes. for 5% of 1,300 employees. Install a video 20 trips per center Install one video 40 conference center conference center in each of 2 buildings Coordinate TOM 5 trips Coordinate with 5 programs with existing existing Gateway developments/ buildings and tenants employers Combine 10 elements 5 trips 5 TOTAL 568 I I I I I I I I I I I I I I 611 and 681 Gateway Traffic Study 3-3 CCS June g, 2000