TRANSPORT A TJON DEJ\1AN"D J\1ANAGEMENT PLAN
.'
APPROVED BY THE PLANNING OOMMISSION OF THe
COCITY OF SOUTH SAN FRANCISCO SUBJECT TO TI-:e
NDITIONS OF APPROVAL
CAsel ~''D1)...1. ~o'-t-o~ 'V~-t:lD7'-\
V~Cj..\-~l."ttlnol.I-oOo 'L'4 H~l)DC - o'LI
~L=5
IY:. ~~
PREPARED FOR:
STUHLMULLER PROPERTY COMPANY
PREPARED BY:
FEHR & PEERS ASSOCIATES, lNe.
APRIL 9, 2001
..f.II\-
! ........ FEHR&PEERS ASSOOATES, INC
" J Transportation Consultants
255 Nonh Market Street
Sulte 20C
San Jose. CA 9511C
405178-1700
Fax 40F 278-17J 7
","",,~'. ferlranrlpeerc. .con:
,{.!",r,,! -'} 'h-t~).1
..~\...;; ',:;:>'\.~.
-.....-..- _.-""
J.~;"'.,, () ;~~<~. .
~'.'...",:f/\,_,j'~ .~~.t~' ",_;' -","':: \.!:'IO,.f>'~~'~1!..
-..
it.., J
_....M..........._,_....___....~
" } , ')
.;
.3TAO
~l'W
] 80 Ovsler Pomt Boulevard TranSpOrlaCion Demand Managemelll Plan
Apnl ~OOl
1.lNTRODIJCT10N
Stulunuller Propeny Company is proposing to develop a 102.200-square foot (s.f.) office
building at 180 Oyster Point Boulevard in South San Francisco, California. The proposed
office development is estimated to generate 148 A.M and 141 PM peak-hour trips (the trip
generation table is presented in the Appendix). A Transporzation Demand Management
(TDM) Plan was prepared to identify measures to reduce the number of single-occupant
automobile trips generated by the proposed project and thus reduce the traffic impacts of the
project. The proposed site plan is shown on Figure 1.
A Transportation Demand Management (TDM) Plan is a set of strategies, measures and
incentives to encourage the employees to walk, bicycle, use public transportation, carpool or
use other alternatives to driving alone. TDM measures produce more mobility using existing
transportation systems, boost economic efficiency of the current transportation infrastructure,
improve air quality, save energy, and reduce traffic congestion.
Convenience and cost are the primary factors that affect a person's choice of transportation
mode. Measures that work well for some people or types of businesses do not work as well
for others. Therefore, an effective TDM plan or program provides multiple options and
incentives and is flexible enough to allow customization to meet the varied needs of
individuals and individual employers. This program presents an array of proven strategies
and measures used in the Bay Area under a flexible implementation plan that can meet the
needs of existing and future tenants.
The TDM plan was developed based on guidelines provided by the City of South San
Francisco and the City/County Association of Governments (C/CAG); the local Congestion
Management Agency for San Mateo County. City of South San Francisco draft guidelines for
TDM programs require that all projects obtain a goal of 35 percent alternative mode use.
C/CAG guidelines require developments to implement TDM measures that have the capacity
to mitigate all new peak hour trips.
The transportation facilities serving the site are described in Chapter 2. Chapter 3 presents
the draft City of South San Francisco TDM guidelines, and C/CAG TDM guidelines are
contained in Chapter 4. The transportation demand management measures selected for the
project are presented in Chapter 5. A brief summary is presented in Chapter 6.
Fehr & Peers ASSOCLGleS, lnc.
1
..,.. --
"""c::
Cc::
f-.~
1:::::
t: ~
~-.::::
"':::
~
Q::
-
c
c...
~
..-
c5'
c::::
c.::
-
""
IV N
E >
IV '"
~a::
or.
I
I
J
/'
.,)
--:..-
~;
r
! I
'/.'
, .
I
!
I i
,
jl
)
I
I
: I
I,
III
10
8z ~ ce-
z
Ill:
~>>
-i....z
-' 0<<
~""to.
-,c..~
5~C
I- c..u
III
I
I ,
Ii:
,
,
III (;)
l! ..
. :
I"!
c il i
,
I :
, :! I
( i'
. :
I
r r.
....
-l.--
D.-
'-
C>J
~
...-
,[./ Y.I! L L,. L
'1"" :'Jq1i :
) I(~ I !
~. ~ -iF-:--:-~----'~-:=_:- ;,~~~t~ ~
- , -+,,- - c: ,- -I: ~ -I ~<
:J J ,- - -L=-.:" "- r - -1;- _. CCI %
I~ ,; I: ~
j' _._. ,__,~__,_~_I UJ~
I , I 'I . U-'
RI ' 1 ": - is
.::~t-8- ,--'-1-1 H-o'~
I'---Jdi t I I:.......u
-''F1~rWJ tt .- r- - -\- ~-, O!!J ",-
- ~~~-~ . . . - ~ - -:- ~- ~ .- ~ i
i~~ICL I t I: !ZUoote
- -,~-~ ~ -\ ~- -~
~ ~ ~'H' ' I O~
- ::~-~ -j,----tr 1-1 -"'1\- 0...1-
?, ~. T--r; I ': is
- - r-=i"1- - .. -, - r- - -\ - -1- I ~ III
- - ~_8.:- - .G:r. - i J -:-1- ~
~~ 'H -:~ I I en
- - ~- -' j . - -I - -" >-
-I' ~I ---J:::J I ': I 0
-- ,- -1-=-:" - It- - -r-:tJ-
_ L-li I' _ I .l_\
I
~
Ii
~
"
r
\ 1
11
I i \
, "
\ "
"
w
(.)
ii:
...
o
>
!5
I-
CI)
...
~
z
". ~ '
.~
m
i 1111111111
I
T
~
i .
f
Uli
i'~ II
51: hI
z
<(
..J
c..
w
!:::
CI)
:i
..::;
..:
<.::
C
-- "t;
CJ) :;
...;
'- ~
:l ~
.2> ~
'"
u.. c...
~
..:::
'"
k
l80 OYSler Poilll Boulevard TransporIation DemallG Managemem Plan
April200J
2. EX1STING TRANSPORTAT10N SVSTE1\1
The proposed 1 02.206-square foot office building is located at 180 Oyster Point Boulevard in
South San Francisco, California. The site location is shown on Figure 2.
The existing transportation facilities that support alternative (non-automobile) mode use
includes those that provide transit, bicycle, and pedestrian access to the site. These facilities
are described in detail below.
Transit (Bus and Commuter Rail) Service
San Mateo County Transit District (SamTrans) operates bus service in San Mateo County.
Commuter rail service (CalTrain) is provided from San Francisco to Gilroy by the Peninsula
Corridor Joint Powers Board. Bay Area Rapid Transit (BART) is provided near the project
site. The existing transit facilities near the site are shown on Figure 3 and described in detail
below:
CalTrain provides frequent train service between San .lose and San Francisco seven days a
week. During commute hours, CalTrain provides extended service to Morgan Hill and
Gilroy. The South San Francisco station at Dubuque Avenue and Grand Avenue is located in
the vicinity of the project site. The following CalTrain shuttle buses provide service to office
buildings nearby: Utah-Grand Area Shuttle-Oyster Point Employer and Gateway Area
Shuttle. The Utah-Grand Area Shuttle-Oyster Point Employer shuttle serves nearby
developments on Eccles A venue. The Gateway Area shuttle serves nearby developments
along Gateway Boulevard and operates along Oyster Point Boulevard past the project site.
Bay Area Rapid Transit (BART) provides rail service between the East Bay (Richmond,
Pittsburg, Pleasanton, and Fremont) and San Francisco. The closest station to the project site
is the Glen Park BART station. Three BART shuttles, Utah-Grand Area, Oyster Point Area,
and Gateway Area, TUn identical routes as the CalTrain shuttles.
Sam Trans Route 34 provides bus service between Tanforan Shopping Center and Geneva
A venue in San Francisco. Route 34 operates along Airport Boulevard and stops at Airport
Boulevard/Linden A venue in the vicinity of the project site. Route 34 provides three
northbound trips and three southbound trips between 10:00 am and 4:00 pm on weekdays.
No weekend service is provided.
SamTrans Route 292 provides bus service between the Hillsdale Shopping Center and the
Transbay Terminal in downtown San Francisco. This bus route operates along Airport
Boulevard and stops at Airport BoulevardlBaden Avenue in the vicinity of the project site.
The hours of operation are 5:00 am to 2:00 am on weekdays and weekends. Commute and
midday headways are 30 minutes apart on weekdays and weekends. Headways are 60
minutes during the evenings.
Fehr & Peers Associales, lnc.
3
]80 Oysler Poinl Boulevard TDM
Apri1200]
Oyster Cove
Marina
~
z
co
IJl
c:
III
Qj
~
Forbes Blvd.
,., ..,1
Project Site
CD
N
Key:
Not to Scale
Figure 2
SITE LOCA liON
fP
33&'2'()~
Fehr & Peers Associates, lnc.
180 OYsIer Point Boulevard TDM
April 2001
FX, KX, MX,
NX,PX,RX,TX
Oyster Cove
Manna
Ovster point Blvd.
I' II II I \.d:;r.;m,,}.';;
=/i>o
}"
.,
<
e
.............
'.
4.
FX, KX, MX,
NX,PX,RX.,TX
Key:
c::s:s Project Site
11I1111I CalTrain
.. II II Utah-Grand CalTrain Shuttle
CD
N
"'i". i W':':' Gateway CalTrain/BART Shuttle
'''''@)'''
~,-", ..I1i'(
,..,~ -".
Samtrans Bus Route
Not to Scale
Figure 3
TRANSIT FACILITIES
11>
335-'7..0'
Feh,. & Peers AssociaTes, lnc.
l80 Oysler Poilll Boulevard TranSlJOrWlion Demand Manageme11l Plan
April200l
Existing Pedestrian and Bicycle Facilities
Pedestrian facilities comprise sidewalks, crosswalks, and pedesnian signals. Near the site.
sidewalks are located on both sides of Oyster Point Boulevard. Crosswalks and pedestrian
signals are provided at nearby signalized study intersections.
Bicycle facilities comprise bike paths (Class I), bike lanes (Class II), and bike routes (Class
III). Bike paths are paved trails that are separated from road\vays. Bike lanes are lanes on
roadways designated for use by bicycles by striping, pavement legends, and signs. Bike
routes are roadwavs that are desi!mated for bicvcle use bv signs onlv and mav or mav not
"" - .,,' ......... . ., -'
include additional pavement width for cyclists. In the vicinity of the site, bike lanes are
provided on Airport Boulevard, Oyster Point Boulevard, and Sister Cities Boulevard.
Fehr & Peers Associaces. lnc.
6
l80 Oysrer Point Boulevard Transporwllon Demand Management Plan
. April 200l .
3. CITY OF SOVTH SAN FRANCISCO TRA.NSPORTATlON DEl\1.AND
J\1.ANAGEJ\1ENT PLAN GUIDELINES
The City of South San Francisco is developing guidelines that require new projects to
achieve a goal of 35 percent alternative mode use. Table 1 presents the standard base TDM
measures for the City of South San Francisco and their estimated percent mitigation, or
alternative mode use. Additional TDM measures are presented in Table 2.
Table 1
CITY OF SAN FRA1'JCISCO - EAST OF HIGHWAY 10]
Standard Base TDM Requirements
Developer Developer as Tenant or Percent
, Measure/ Program Implemented Employer Implements Mitigation
: Planning/Design Measures 1.0% to 3.0%
'--.-.Bulfcfmg-Tayoli"i-.-----......-- ......---.-.--.--...-...........- ...--.--.-----X-------....---------------------.--.---.. -------.-....- .....-..------
:..-...~..BulI.dlng... s'etbaclZs'..- ... ...-.".-.--...-.-.... ..-.-..-----......--.-. .---..-X---.---.-..~--_...-~.--.---.-.-......-_.-_...----.-----.----...-..-...-.....--..'..
'----Bul]cling-wrrmg-.-.-.--. .,... ..--..-...-.----...---..---.-------..--.-- X ----------.----.------..-------.---.........-...--..--......- ....... ------- ,
.--Pa-ssenge.iioadmgzoi1es--------.---.-------y----------.-..----.---,---.......-'-----.---------'--------,
i Transit Design Elements 0.5% to 0.5%
1--.-.--.---------.-------.-...--.--..-...-. ..... ..-----..--.--.-.-..--...-...-.-.-....---.-.--.---.--.--.-------.......---..-...--.-.------------------------..-.-......-.--
i Street Design X
! Parking Design Measures 5.0% to ] 0.0%
I --.--.- ---..------ .__.___.____._......_.._.____..___..__._..._u._..___..__,..--.-..--...--.------.-.-.-----.--..-..-....--..----...-... ...- ----.-....-.-..------..-.-..---..----.-.-..---.-...----......-.--
i Preferential parking 10% min. X X
II (carpool and vanpool)
,..._, .-..Parkm.g..-config-urat).on......--.....--.-...---.----......--...--..--..-.----- "".R-H'XR'-" ..,_._.__..______,__._._H.'.
Pedestrian Measures
0.5%
to 1.0%
I!.~~~~~~~~~~i'dlstan~~~=~_~==.~_=~--.=_.==~_:=~~----==:==.=_.=::=:=.__::-~:.~:_-:==::_:.::.:_:__.~~:==:==
I Pedestrianl trail connections X
I -....-.internafp.edesrrlai1-access-.-------.-----.----.')C----.------..--.--..--.---.-----.------------------.-----"-...-.
Bicycle Design Measures 2.0% to 2.5%
; .----si1"o\\'.ers7-C.ioihes-}o.ckers--..-....-.-.--.--.--- ..-.....-.-.._..~r---.-_-_.X.--....-..---_._-__-H.- -.-.-..X....H.-.P...---...------.---.--------.--.---.-.-.--.--.-.----
I... .. . . .. I
1;- ;:~~~:~~~~~::-:~~~~:ngtermT----~---------;..----..---_.---------
Transportation Coordinator 1.0% to 1.0%
.. inlpJementatlon ....-..----- X....... ... .... )(
IT~ X X
. .....Deslgnaledempio-yercontact"lilTeases---------- ..--X-.---..---.----.....---. X
(each tenant)
Carpool Programs
Ridematchingser.'lces
Vanpool Programs
2.0c}o
to 2.0%
X
2.0% to 2.0% I
Ridematching services
Transit Programs
...Free rnalrides
Transit riders guide
Fehr & Peers ASSOCIaleS, lnc.
X
0.5% to 0.5%
x
x
'"
l80 Ovsler Point Boulevard TranspOnallO/l Demand Management Plan
April 200]
Table 1 (coot.)
I' Measure/ Program
Parking Programs
Preferential parking (registration, mgmt.)
:....:Pede'sirIan'Programs '
Walking Club / Mentor Group
, ....Bi.c~lcle..Prog-rams".,._....".,._...._,..
Bicycle riders guide
Ridematchmg sen;;ces _ -_.__.,--,-"-_.
CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101
Standard Base TDM Requirements
Developer De,reloper as Tenant or
Implemented Employer Implements
Percent
Mitigation
x
x
o:5%'to' 0,5%
x
."'Too/;;-.---t-o'--.r:oo;;;-'.
x
X
..--X
4.0% to 6.0%
x
X
.._-" X
X
X
X
.._....,.'.1
x
X
..-x
X
X
X
X
-..x.
.1:
x
Annual Report
.-- F ill es fo;: DODcolnpIlance
X
.....y
X
Standard Base Range 20.0% to 30.0%
Not~: Stondard TDM Goal for oj] pro.1ects 1S 3S'}". Therefore. all proJects \\~J] hove to choose additIOnal measures from the aggressive '
TDM list In order to achieve the 35% requirement.
i Source: City of South San Francisco
Hoyt Company
Fehr & Peers Associales, lnc.
Ii
J 80 Ovster Point Boulevard Transporzalion Demand Management Plan
April200l
Table 2
CITY OF SAN FRI\NC1SCO - EAST OF HlGHW A Y ] 0]
Additional TDM Options/Aggressive Mitigation Measures
Developer as Tenant
Developer or Emplo~'er Percent
Measure/ Program Implemented lmplements Mitigation
, Transit Design Elements 1.0% to 5.0%
I.--._._.__._-_._--~_.._-----...~..._---..__..._._..._-.---_______._.._._...._..____.__.._.__.___.____.._.___._...__._________.__.....,_,.._____.____,___..____
: Land dedication for transit facilities X .
t-.---------------.--.--.....-.'----.---..--.--.-.-----___.__ __....._._____.________ _..__
. Transit passenger shelter/ bus stop X
----Bu-sTialJ"statlc;i1-su-bs](Jy(forconstrucnon)---..----X---'--'--.-.- .------ .-..- .. ........--.---.----- .....----...------
Parking Design Measures' 5.0% to 5.0% I
. ....................-..---.- .... .--..-. ---...-..---....---.-..---.--..--.--.-...--------.--.------------..--.-.--..-..-,...-.- -..---.------...---.--.-.-.---.---.._.__._..___.______.-.---.-.......,--.---.-.----.1
Shared parking wi existing development X I
,- .---.---.----..-....--..-...-.....--..-...-.--.-..--.-.--.-.-..-.--......--.-....-..-.-..--...-.-.--.-.-------..--.-------..-.....--.--......---..-...-.--.-.....---.--.--..--.---...---..-.....-----.-......-....-..-..--.--.---1
: Reduced parking on site X . ,
!-'--Offstreetparkln'!iiestrictrons'. .--.-----.-.----....---.---.5C----------- -- .. .. ....- ... - ..-- --------..---. --.--
..........ETectTlc.';e'iiic.le'p.arklil"g..(.cliarg-ing-s.taiTons.f'----...-.---X ...--...--.....--.----.....-----..-.....-.---.---..--------..----~-~_.---~.-.._..~-..-_....
Bicycle Design Measures 2.0% to 2.0%
i--BJCyCie-tral[co-ill1ectrons'----------.---------.----X----------,-.- ----------------------,------_.-
, Onsite Amenities 1.5% to 5.0%
'-Cafeterrci- with-ilot7oocfsen;Jces---.-----.------------r---------- ..X-------...-'------------.--.--:
--\lciletserv]c-es.(~;'cj.eanlngf------.---.----.---------.------.-------.---------------.---.---..--..-.
Ilr,-.~.-!S!B~-----_~~=.-~:~_--~--:-~-_:-~.~:~::.=::-:~-.::~=_.=~.-_=~::~:~=:~==:~_.:=:=~:_::~:-_--=--:.~_.-:~._.~~.-_.=__.-~=~::~-::-==...~-.:--..
Exercise facilities X X
1.._.........._....__..............._..._........_.._.--..-...-.--.-..----...---...-----...--.-.----.---...-.-..--..-....-..-..-.-~--.-.-.-....--.--.--..-...-..-...-...-..---...-..-....---..---..--..........--....-....- .. .....-....-.--.-.-.-...---.-.-...--.......-.....--.....
Convenience retail (sundries) X X
!-.......chi.jdcare....--.........--.--.--....--...-.----..... . ....---......--.--..--......-......--.-- ...-..-..----.X-.---. .--------..-- .- .x-.
Post office! stamps X X
Onsiterransltpasssales - --- --- -. _m-_------X- - _ X . ..-------... ---------
; Carpool Programs
I
2.0% to 5.0%
Mentor group
AIierrla.tj'>e...c.oTmnut-e....sliEs{cB.es ... "'n ........... ...~
, Transportation Management Association
, Participation
: Vanpool Programs
Ii
Mentor group
Alternative commute subsidies
X
X
-)C
X
1.0% to 3.0%
X
X
2.0% to 5.0%
X I
X .....1
1.0% to 10.0%
Transit Programs
Transli. subsidies-
Onsite pass outlet
Transit field trips
SubscriptIon 1Jussei\;ices- .. ........------------..------X-
Shuttle programs (frequency and route X
coverage)
.. .... . Increasedfrequ enc);foroHpeakhour~~--------------X--------
Iilcreasedfrequenc),.for peakhouTs----
Additional route coverage during peak
hours
X
X
X
X
X
.------x-----
X
X
X
X
Fehr & Peers Assuciales, lnc.
9
180 Oysler Point Boulevard Transpor/alion Demand Management Plan
April200l
Table 2 (cont.)
Measure/ Program
Additional route coverage during midday
period
Parking Programs
Reduced parkmgfeesfoT
carpoollEV /vanpools
Pal d'offslte'parkmgatpark &.
transit stations
Paid parking
. .oHsJieparkmg=parkand. TIde shunles'
Parking cash. out.
Pedestrian Programs 2.0% to 5,0%
'-..ATiernanve-comrriute-'s'ub-s'idies-- .-.-..---..-----X---------.--.-.--.)(...-.. .......-----.---------------'-
. Bicycle Programs 0.5% to 5.0%
..-.Con1plm1en'iar5iTilk"e-s'ire-creaiionafuseY'. --...-...-..-... X ..._......._.....__._...._...m._.m ...X..-----..-.-----.-...-..-....-...--.....--.....
. .... ..Camp.u.s...blkes....-...........m............. ...... .m................m.............._._._. ............- ....X............. ..........m ....5(.-.....-..--.....-.......-.-.....--......-.. ......-.......-.-1
......~i~~.~I~...gf~Es7.~~~~i~;:.Group........-.-..--...--..--.........--.....~...--.--. . 'X~" :: ..::'~:-::: .:: :~:.:-.~:...=. ...= : :.::. =11('
.........Aliernatlve.Commute...subsidies-...... ....m...................-..-.-..-X ..-..............---
Promotional Programs 1.0% to 1.0%
,I..-~~~!~?-~~~!<D~~f~~~.t:==~:.=~.:::====~-~============~i===--=.:==.='=':::=~~:=,
---Eiiih-Day-i'AprlIr' ...... ..---.--.--,----.--- .---X----.--..- --.-----SC-----.-..--..------.-.-----
Telecommunicating Site amenitIes X 1.0% to 2.0%
only
Alternative '\lork Schedule Site amenities X
only
CITY OF SA.~ FRA.~CISCO - EAST OF HIGHWAY] 0]
Additional TDM Options/Aggressive Mitigation Measures
Developer as Tenant
or Employer
Implements
X
Developer
Implemented
X
Percent
Mitigation
5.0% to ]0.0%
...x
X
X
X
x
.........X
,
........)
Aggressive Range 25.0% to 63.0%
Note: No one prolect IS expected to achieve 63% TDM. TIm would reqUlre substamial subsIdies for all altemanve mories of
transportation. ltlS more likely that a developer will provide fmancial incentives for a single mode such as transit or bicycling.
Source: City of South San Francisco
Hoyt Company
Fehr & Peers Assocrales, lnc.
]0
l80 Oysler Point Boulevard Transporcalion Demand Management Plan.
April 200l
4. CITy/COUNTY ASSOCIAT10N OF GOVERNJ\1ENT (C/CAG)
TRANSPORT A TJON DEJ\1AND l\1ANAGEJ\1ENT PLAN GUIDELINES
C/CAG is the Congestion Management Agency for San Mateo County that develops the
Congestion Management Program (CMP). As part of the land use element of the CMP, all
projects that generate 100 or more net new trips during the AM or PM peak hour are required
to mitigate the impacts of all new generated nips. One of the five possible ways to mitigate
these trips is to implement TDM programs that have the capacity to fully reduce the demand
for new peak hour trips.
C/CAG has identified acceptable TDM measures with equivalent numbers of peak-hour trips
that will be reduced with implementation of each measure. Measures can be mixed and
matched so that the total number of mitigated nips is equal to or greater than the new peak-
hour trips generated by the project (l48 AM peak-hour trips for the office development)
These programs, once implemented, must be on-going for the occupied life of the
development. Programs may be substituted, \\lith prior approval of C/CAG, as long as the
number ofreduced trips is not reduced.
The C/CAG list of approved TDM measures, the number of mitigated peak-hour trips
associated with each, and the rationale used to determine the number of mitigated trips are
presented in Table 3.
Fehr & Peers Associazes, lnc
11
l80 Oysler Poinl Boulevard Transponalion Demand Mallagemem Plan.
April 200l
Table 3
C/CAG Approved Transportation Demand Management Measures
Transportation Demand
Management Measure
Bicycle lockers and racks.
Rationale
Experience has shown that
bicvcle commuters will on
average use this mode one-third
of the time, especially during
warmer summer months.
.'-Sho~;-ers.an(rcllaiiglii-gro-oms~-'....-.--.'-i'\vo.peak~Ii.oUr trips -wHfbe"--..-- .....-...-Two.bicyclislscan.sequentmfi);---
credited for each new combination use one shower/changing room
shower and changing room during the peak commute rime,
installed.
. Operanon-oradedicatedsfiuttle -.-One peak--hour trip will be credited
service during the peak period to for each peak-hour round trip seat
, a rail station or an urban on the shuttle. Increases to TWO
residential area. trips if a Guaranteed Ride Home
Program is also in place.
Number of Trips Credited
One peak-hour trip will be credited
for every 3 new bike lockers/racks
installed and maintained.
'-Yieldsa-one-to-olJ(~ratio{ one -
seat in a shuttle equals one auto
trip reduced): utilization increases
when a guaranteed ride home
program is also made available.
S u bSl diiing'tra-ii"sii't]'cke-ts-' for
employees.
Five additional trips will be
credited if the shuttle stops at a
child care facility emoute to/from
the worksite
.. .One.p-eak~h-our.trlp..\\;)fj-becredlted ......................-----........-...............................m._.
for each parking spot charged out
at $20 per month for one year.
m.One..peilk=hourtrlp..V;;Jjfbe.cre.cllte.ir.
for each transit pass that is
subsidized at least $20 pei month
for one year.
Yields a one-to-one ratio (one
parking spot charged out equals
one auto trip reduced).
mVleTds.il-on-e=to=oneratlo(one
transit pass equals one auto trip
reduced).
iCharglni;emp]o.yee.s-forpilrkh)g.~...'.
One additional trip will be credited
if the subsidy is increased to $75
for parents using transit to take a
child to childcare enroute. I
'.CreaucinoTpreferentlaJparkIDg----two peak-hour trips will be --. YlelctsatWo-to-one-iauo(one----i
! for carpoolers, credited for each parking spot reserved parking spot equals a .
'I' reserved. minimum of TWo auto trips :
re~~~ i
;...-.....-..--.---.........--...---.-----..--.--..---.-:--.------------.---:-------------..-..--.---..-------
Creation of preferential parking Seven peak-hour trips will be Yields a seven-to-one ratio (one
for vanpoolers. credited for each parking spot reserved parking spot equals a
reserved. minimum of seven auto trips
reduced). .
.lnipiementatlon.oravanpool H.-----Seven peak-hour trips wiITbe.---"'.'--.Theavenige van capaciry-{s--'-'-'
program. credited for each vanpool arranged seven.
by a specific program operated at
the site of the development.
Increases to ten trips if a
Guaranteed Ride Home Program is
also in place.
Fehr & Peers Associates. lnc.
12
180 Oysler Poi11l Boulevard Transporlazion Demand Managemenl Plan
April200l
Table 3 (cont.)
C/CAG Approved Transportation Demand Management Measures
Tnnsportation Demand
. Management Measure
'! Operation of a commute
assistance center, offering on site,
one stop shopping for transit and
commute alternatives
information, preferably staffed
with a live person to assist
building tenants with trip
planning.
Rationale
This is based on staff s best
estimate. Short of there being
major disincentives to driving,
having an on-site TDM program
offering commute assistance is
fundamental to an effective TDM
program.
Number of Trips Credited
One peak-hour trip will be credited
for each feature added to the
information center: and an
additional one peak-hour trip will
be credited for each hour the center
is staffed with a live person, up to
20 trips per each 200 tenants.
Possible features may include:
. Transit information brochure
rack
. Computer kiosk connected to
the Internet
. Telephone (with commute and
transit information numbers)
. Desk and chairs (for
personalized trip planning)
. On-site transit ticket sales
. Implementation of flexible
work hour schedules that allow
transit riders to be 15-30
minutes late or early (due to
problems with transit or
vanpool).
1.......--...........--.-......-...----.--..-.-..... ........ ......-...--.......--...........-..-...........-..--.--.----.-...-..---.---..-.---.................--...---...---......---.--.----"....-.-..'.-...--......--
. Implementation of a parking cash One peak-hour trip will be credited Yields a one-to-one ratio (one
, out program. for each parking spot where the cashed out parking spot equals
. employee is offered a cash one auto trip reduces).
payment in return for not using
i parking at the employment site.
iTmpJementii.don'o{rainp----'--.-.u.----TIiTe'e hundred peak-hour trips WiIT-- Thls'ls"ii-very-dYffiCiii't"iiii,fcostly--
: metering. be credited if the local jurisdiction measure to implement and the
in cooperation with Caltrans, reward must be significant.
installs and turns on ramp metering
lights during the peak hours at the
highway entrance ramp closest to
the development.
r....--.-...-.--..---.....-....'..--...'.. ____.___..__._____..___________ --.-~--,-------...,.--...-.--~--...._--_... '''0- --.-...- .__._~._-~-
1 Installation of high band width . One peak-bour trip will be credited Yields a one-to-one ratio.
. connections in employees' homes for each connection installed.
to the Internet to facilitate home-
telecommuting.
....instaHatlon...or,;;de-o-cc;iifei-'enclng--.-fweljryUpeaf~houitrlp-s-wnrbe--'.'----Assumes.thattli.eie--wlir.beone"-.'-."
centers that are available for use credited for a center installed at the teleconference per day that
! by the tenants of facility. facility. includes twenty people.
i-1mplementaii.on'of'-a.compress'e-cr-'----One-peaj(:.hour trip \-Vm.he- credrte.(r.".TIiework~we-ek'wlifbe-..------.-------
i work week program. for every 5 employees that are compressed into 4 days; therefore
. offered the opportUnity to work the individual will not be
four compressed days per week. commuting on the 5th day.
Fehr & Peers Associates. lnc_
l3
] 80 Oysler Point Boulevard :ransporlalion Demand Management Plan
April 200]
Table 3 (cont.)
C/CAG Approved Transportation Demand Management Measures
Transportation Demand
Management Measure
Provision of assistance to
employees so they can live close
to work.
Rationale
This assumes that a five mile trip
will generally not involve travel
on the freeways.
Number of Trips Credited
If an employer develops and offers
a program to help employees find
acceptable residences within five
miles of the employment site, a
credit of one trip will be given for
i_______________________.__m.__m.__._,_.__._e_~.~ot i.n_~~~ograIE.~______....______.._____.______. .._._ ......___._.____.
! Conduct a local-based hiring One peak-hour trip will be credited This is based on staff s best
! program by registering with and for every 2 job listings posted with estimate.
. using the Alliance Job Link this program.
Program.
'ImPlementatlon-'oTa-program that-mOne peak-hoUr trip will be credited----Yhlsassumes ihiit--afiVeIilllemp-
I gives preference to hiring local for each employment opportUnity will generally not involve travel
: residents at the new development reserved for employees recruited on the freeways.
i site. and hired from within five miles of
I the employment-site.
--.pi-o\;E.lon.ofon-:s]yeamen]nesT-.--..-One-peaI~hour trip'W11Tbe credrted----thls--;s-based...on-staffsb.esy...
accommodations that encourage for each feature added to the job estimate.
people to stay on site during the site. Possible features may
work day, making it easier for include:
workers to leave their . banking
automobiles at home. . grocery shopping
. clothes cleaning
. exercise facilities
. child care center
Provision of child care services as
a part of the development
Developer/Property owner may
join an employer group to expand
available child care within 5
! miles of the job site or may
, provide this service
independently.
~
...-.--.--1
I
One trip will be credited for every
two child care slots at the job site.
This amount increases to one trip
for each slot if the child care
service accepts multiple age groups
(infants = 0-2 yrs, preschool = 3&4
yrs, school-age = 5 to 13 yrs).
One trip will be credited for each
new child care center slot created
either directly by an employer
group, by the developer/property
owner, or by an outside provider if
an agreement has been developed
with the.developer/property owner
that makes the child care accessible
to the workers at the development
Fehr & Peers Associates, lnc.
l4
180 Ovsler Poi/ll Boulevard Tran:fpOnalion Demand Manageme11l Plan
April 20Di
Table 3 (cont.)
Rationale
Experience has shown that when
a guaranteed Ride Home Program
is added to an over-all TDM
program, the average rider ship
increases by about 50%.
~~:~::.::r:;~~~~ei:~se.--.-'----Flve'p.eak=hOui-tr.lPS\\;TIfciedhed.'."--~;l;;~;n~l~~~;I~h:~: tiiirt"'-'.'-'--I!
additional credit for five peak complementary TDM
! hour trips. components can magnify the
I impact of the overall program.
-Workwi'ili-the Alliaric-e-io..------'F]vepeak-hour trips wifn;e'---.---ThISJSbasedon staffs best --,--
; developiimplement a credited. estimate.
: Transponation Action Plan.
:-tbe- deverop'er.can.pro\~ideacash---Pe<ik- hour tripreductlOn credrts--.----.-Crecfilsa-ccrue dependm-g-on'what
legacy after the development is will accrue as if the items were the funds are used for.
, complete and designate an entity being directly implemented by the
, to implement any (or more than developer.
i one) of the previous measures
before day one of occupancy.
-:E-ncouragemfiIr..'l"evelopment:.....-.----..Two-p.erc.em.'of a1fpe'a:k-~11ouitrTps..-.. ....'Gene.rally-accepUihfeIDM:.........-..
will be credited for each infill practices (based on research of
development. TDM practices around the nation I
and reponed on the Internet). I
..Encoura'ge.sh'ared.parkilli.m..----....-..Flve.p-eak=i1-ouitrTps--wm..he.----.---'-.-General1y acce"!itabTe-ffiKiC--.----1
credited for an agreement with an practices (based on research of I
existing development to share TDM practices around the nation !
existing parking and reported on the Internet).
:..-Panlclpate-;n;create/sponso-i-ii.-.---'-...Flvepeak=ho.urtnpswTIfb-e..--.-.------.-Genera:H);-ac-ceptable'IDM:-............--... :
! Transportation Management credited. practices (based on research of I
Association. TDM practices around the nation '
-Coordlnale-transporiinion-----Five peak-hoUT trips will be -..------TIi~sr~~~~ee~ ': ~~i;.~e~:~.-,11
I: Demand Management programs credited. estimate. I
~ with existing I
! developments/employers. ... . . i
For empioyers.wlth multiple job '---Onepeak-hour trip will be credited'lieldsaone-t'oone rii.lo~'--..----1
sites. instimte a proximate for each opportunity created. i
commuting program that allows
employees at one location to
, transfer/trade with employees in
i another location that is closer to
i their home.
i-E);-for'parkmgatpaii< and rIde-one peak-hour trip will be credited - Yieidsa one-=to-one ratici-:-.-----'-
, lots or transit stations. for each spot purchased.
, Source: City/Collnt)' Assoclation of Governments of San Mateo County's (C/CAG) Revised Guidelines for the lmplemencation of the
Land Use Componenc of the 1999 Congeslion Mmwgemenc Program. October 11, 2000,
ClCAG Approved Transportation Demand Management Measures
. Transportation Demand
Management Measure
Join the Alliance' s guaranteed
ride home program.
Number of Trips Credited
One peak-hour trip will be credited
for every 2 slots purchased in the
program.
Fehr & Peers Associales, lnc.
l5
l80 Oysler Poilll Boulevard Trallspol"lalioll Demand Managemelll Pian.
April 200]
5. TRANSPORTA TlON DEMAND l\1ANAGEJVIENT PLAN
The Transponation Demand Management (TDM) Plan elements for the 180 Oyster Point
Boulevard emphasize measures that are parking-oriented, include on-site amenities that
encourag'e the use of altemative modes of travel, and require panicipation in associations that
promote commute alternatives to the single-occupant vehicle,
The Transponation Demand Management plan includes appropriate TDM measures that will
satisfy City of South San Francisco and C/CAG guidelines, Table 4 summarizes the TDM
measures for the proposed project and identifies how they meet the City's 35 percent
alternative mode use goal and C/CAG's trip equivalent guidelines. These TDM measures are
described in detail below.
TDM Coordinator
A transportation coordinator will be designated for the site. The coordinator will actively
market the TDM Plan to all employees, and will conduct the annual monitoring/reporting
process. The coordinator will develop an on-site transportation infonnation center with
SamTrans, BART, and CalTrain schedules and maps, The coordinator will also conduct
carpool or vanpool matching services. The transportation coordinator's role also includes
managing on-site transit pass sales and the guaranteed ride home program (working with a
local taxi service or rental car agencies). Other responsibilities will be added as the need
arIses.
On-Site Amenities/Parking Design Measures
On-site amenities will be provided to promote the use of altemative modes by reducing
employee reliance on the single-occupant automobile. On-site amenities include providing
bicycle racks or storage lockers and preferential parking spaces for carpools and vanpools.
Parking spaces near building entrances will be designated as reserved carpool and vanpool
parking spaces with signage or pavement striping.
The project sponsor is providing a bicycle storage room for storage of approximately 6
bicycles. Three bike racks, providing storage for a total of 15 bikes, will be also provided.
The proposed project will designate 10 carpool and 10 vanpool spaces near the building
entrance.
The project sponsor has revised the site plan to incorporate a lower parking ratio. This
reduces the number of available parking spaces to further encourage' carpool/vanpool or
transit use.
Fehr & Peers Associales. lnc.
l6
--
--
~
Cll
~
~
~
r..l
:E
co;
~
-:::
c:;
= Jj
~I
=1
co;
.,.. ,
G
1- ~
'"
e .~
IVJ -
... CO;
, <: Ii:
.t" -
10 co;
i 7J:J
~ e.D
:::!:.
- ~ .~ '" :~ .:.<: .'2'2- ;~ ~ co
co; In
<:.> c:: c: c .C c
i: V,; tr. '" 2. 'C 'C c: vi
~ ~ N C c E .~ ..-, ,~ ilr. rrl
CI:
~ .s c E ... E. c E. .s .s .s ,:
-< C c on c
,c:: ~ ... c ;~ !=- ;~ '~ ~ :::!:
- c::' Ie:... ... ~ c::
C e e:... CI: IC C
~ iG .C <l) .C. Ie..;; "r <::;
~ N <l) : V"'. ,V) ClO
~ ,v.; <l) -
<l)
e:... 'v;
....
e
~
,..:
E
:z
...
r..l
~ ~
Qt.- t-
._ I-
:::~
...
iG
,C
-::t
\C
'C
'N
.C
.r-
~I
:EI
ClO
~
-'
c;
-<
e..;;
U
e
::
co; .....
QJ:'
~
.,.. I-
iGU
::..
~
- Vl
.s ~
~~
._ c
l:::,
..~
] ~
,
-"" r<)
~ ~
o..~
:>
<l)
'f; -B
.2- ~
..:: ....
.....2
]]
:~ ;.0
~ ~
o.u
tl.l tl.l
_ J:;.
'0
'- tl.l
. Vl E
~.& ~
~::: .: ~
.Ee"C
c '" ::: .;:
~-5B]
tn ~
~ (i;
'" ...
<l) '"
t> So
=
_ C'C
N
tl.l:f; >-. --
~::.. ~
c..l"E ~ "E
'"
:;]~ ~
E~ ~ 5-
~ ~ I.": "'C
CD: <l) <l) ~
e;~t)S1
Q..j:: ~ tJj
.0 J:;
E
co;
...
00
e
...
0.
-E
.E
'"
.]
'"
N
."C
1=
.E
.:s
....
e
~
e
0.
'"
U
tl.l
'c'
...
0.
:~
'f=:
=
<;;
.'" ....
tl.l ~
~ c..
;....-~ Q)
E
~E
.= tl.l
-"C
.E 'i:
<l)"C
- tl.l
'" tl.l
.9- C
.;! ;a
- -
... o:l
o:l :::
e:... 00
...
:tS
v:
~:'E
it; ....
... -
CD, -
0.52
....:-
o.~
co;
<l)
0.
'N
,V)
~._.,--_.._--, --_.__._._~_."".---~._-,-----~------,..-------
...
:..2
-
co; ,
.....
o
~
v:
~:.~
~ ,......
~:=
>-.0
... -
~.~
<l) '"
tl.l
0.
't-
Vl
.&
8l:::
C'C....
0.., :::
"',C
;:>-.i"'::
~:~
;> C'C
tl.l t
;tr".
...
--
co;
--
--
~
Q
..
~
co;
-
e
c..!
V,; ,
Ei
,-'
. !
,
0.
of
c .-
,. 0
.><: o:l
co; tl.l
t'"
CI:
.><:
o:l
tl.l
0.
....
<1)
0.
u:i ,M
E ,cr,
:~ ~ '~ ~.g ~ <l) ~ go
:E~!B~~!3 e~.s~~~c
~ =:~ 03'5 0...,2 C g C c...
00 ~..~ ell: ~ '~E ~~ \e w
: ~ =: ~.5::: '.52 Il.l co; "C g,
'-0 ;; '''C :9 . E . '0 c.(l l::: 'i: ,~ Vl
~::; ~ oS +-~ E ~ '= 15 j~ 8
u.c,u.oco; ec;~<1),"''''
~ ~ ~ ~ ._ ~ ~ ii3 c I Po. ~
v;_VJ.....:Q) 0)- r::~l"'f")
C :,C ....''';0-0 ::: vi' "',_ ClO
'" ~ 0. .~ ~_ !1 ::: '''C N
~ g ~ = ::g e "'~: 8 0
~ "E ,~ "E ~ .~ ~ 8. 8.,g t;
._ ca ~ ~ c: .-: ~ i ~ ~ ~
.....;; (.) :> 0 e ; 0 (.) tl.l lJl '" tl.l
;;> ,.S2';:'f; '.:::.=.5 >"-,~ ....
(.) >-.. u":::-' !!! Vl II) C ~ ~
tl.l- tl.l = .... .u..... =_ en "'.....0 0"
:.~ t: :.~ 0 ~ 9 ~ ~ _ bD....: ~ tfJ
. e e; 0 .... UJ .... .... 1:1 .= ; = 0
5. ~' c.. gp' 0 <:: 0 CD u =; 0 0
'" ._ "C:;2 ~ _ ~ e '" =, c.. C
~ ~ ~ ;;; ,u ~ u ~ ~ -E.i~ : Q)
0. 0., 0. 0...2:. E ..~ O.S:: c..:.~ o..tl.l ,Q)
C - 0 - o' C1.) i 0 ''':::: - .- ; 0 -
.... c ~_ g .... 00:.... 0 ..s J:: .... VJ 0
0.0, c..o.",o.E i::'~ o..tl.l...
~ ~.tl.l i::.~ ~,~ o.~ .~,~ ~ ~
,f=: ~.t:: ~:f=: ~ :f=: Q: c ~ if=: ~ go
v:
....
.~
'0
g,
.....
'"
:u
...
;<8
CD
. ~
...;.:
<;;
,''-
.E
i::
Q)
&
.Q)
c:::.
___0._____-----.--------.-.-.------.----...,.-.---..-.----.--..----.------.
~
o
''0
e
2-
<;;
>
:~
.~
:J2
...
co;
,l:-
~
<l)
= ==
- 0
~.-= v.:
,'" "', >=
'~ .2- <;;
.~ .,g
,,.c:::. ....
= '"
:"~ ~ ~
!9 0 .
c'~ .S
~'u ~
== 0 .
>'l'~ 0
.::; <( c:
Vl
tl.l
:::
;;;
'"
tl.l
.~
CD
e
Q:
....
00
'v;
tl.l
:0
--
~
'f
<.I
'"
Q,l
Q
.s
~
~ 5
'- .><: '"
o 'f; :0 ";0
(1J I- V) 0..)
00 e '"
E ~ l-. :~
~ 8.~ ~
;... t/j S ~
t.2~Ol-
-0 .~ -; ~ <U N
<l) o' _ 5IJ ~ Il.l
"C 0..<8 0 . ~
'S Q) tIJ E
E .= ~'" tl.l '"
c..r-ca:=.o.,.l~
.~ tr. c;;tE .- =
....Q.)'U;; Ci5_
5 ~ gf"~ ~ '"
e .;!;; c <t: ~
<l) .o'~ ~ ~ <(
ooIC 0 C -
E >. 5. 0. --2 Q:i
.f: Qj '" '" -0 "C
"''';O.><:u~~
~ E ~.~ c c
u "',0'-
>-. x tl.l ... '" o:l
.;! e.><:':::.. c:: _""'....
.0 0.'-. tl.l !::
-< ;-~.t:: U U
"C
.~
o
0.
:.~
5
...
:tE
Q)
,C::
~
,:;2
~
c...
~
'e ~
c... '5
Q)"C
- =
~:::
o e
en
...
tl.l
.><:
u
e
~
~ ~
'"
'" .....
co; u
e.> co;
... ...
iG ~
.,.. u
iG >-.
c: .;!
- 0:.
'"
E .~
].g
~ .tij
o.~
.><: --
C': ce
~-e
.B ~
'"
...
o
.~
~
Vi
."C
~
'"
.;!
''''
.<1)
.'"
'" eIj
''- i::
O'C __
.2 -6 .g
~ (1) C':
.... .~ v;
~ t Ore ~
c 1i
CI:
l80 OYSler Poilll Boulevard Transporcalion Demand Management Dlan
April 200l
Shuttle Bus Service
CalTrain and BART shuttles provide service from the South San Francisco CalTrain station
and Glen Park BART station to nearby developments in the Oyster Point and Gateway areas.
The project sponsor will work with the Peninsula Congestion Relief Alliance to fund 10
shuttle seats.
Guaranteed Ride Home Program
One of the most-common reasons that employees do not \\'ant to use an alternative mode (i.e.
carpool, vanpool, or transit) is the inability to leave work unexpectedly for a family
emergency or the fear of being stranded if they need to work late. One element that allays
these fears is a Guaranteed Ride Home (GRH) program. With this program, employees can
use a taxi service, rental car or another selected mode to get home and the employer pays for
the service. The project will fund 12 slots in the Peninsula Congestion Relief Alliance's GRH
program. The transportation coordinator will manage the GRH program. The employee
contacts the transportation coordinator when they need a ride home and the transportation
coordinator then makes the travel arrangements.
In-House Carpool/VanpooJ Matching Service
Carpools are the most popular alternative commute mode. An in-house matching service, in
conjunction with a vigorous marketing campaign, will be used to increase the percentage of
employees that share a ride to work.
Promotional Programs
The project sponsor will provide information via flyers, posters, emails, or brochures
regarding alternative mode use and special programs such as Bike-to- Work Day or Vanpool
Week.
Fehr & Peers Associales, lnc.
l8
l80 Oysler Point Boulevard Transporwlioll Demand Management Plan
April 200l
6. SUJ\1J\1.ARY AND CONCLUS10NS
This report presents the TDM Plan for the proposed office development located at 1 80 Oyster
Point Boulevard in South San Francisco, California. The report identifies TDM measures that
contribute to a goal of 35 percent alternative mode use according to South San Francisco
guidelines. The TDM Plan also satisfies C/CAG guidelines that requires developments to
implement TDM measures with the capacity to mitigate all new peak-hour trips.
The TDM Plan has been tailored to utilize the measures that are most compatible for the
project:
- The project is located in close proximity to the South San Francisco CalTrain Station,
providing convenient access to CalTrain. The TDM Plan promotes transit usage by
funding seats to a CalTrain or BART shuttle.
- The office development is proposing bicycle racks and a storage room, and
designated carpool and vanpool parking spaces. These physical attributes promote
alternative commute options.
The project sponsor will participate in the local TDM assOclatlOn, Peninsula
Congestion Relief Alliance. This will maximize the effectiveness of this TDM plan.
- The site plan has been revised to reduce the number of parking spaces.
The TDM plan meets the specific requirements set forth by C/CAG and the City of South
San Francisco. The proposed project is projected to generate 148 new peak-hour trips. The
TDM Plan is expected to mitigate 148 peak-hour trips through the use of C/CAG approved
TDM measures. The TDM Plan is also projected to achieve an l8-to-36.5 percent alternative
mode use according to draft City of South San Francisco guidelines.
Fehr & Peers Associales, lnc.