Loading...
HomeMy WebLinkAbout* Draft 200 Oyster Point Blvd. TDM Plan 12-01-2001 DRAFT 200 OYSTER POINT BOULEVARD TRANSPORTATION DEMAND MANAGEMENT PLAN PREPARED FOR: MALCOLM PROPERTIES, INC. "'.." PREPARED BY: FEHR & PEERS ASSOCIATES, INC. DECEMBER 2001 ....."'-... "'"'~ fP~:~:::!:-~~Ul~~ Suite 200 San]ose, CA 95110 +08278-1700 Fax +08 278-1717 -www.febrandpeers.com 200 Oyster Point Boulevard Transportation Demand Management Plan . December 2001 1. INTRODUCTION Malcolm Properties, Inc. is proposing to develop a 155,000-square foot (s.f.) office building located at 200 Oyster Point Boulevard in South San Francisco, California. The proposed site plan is shown on Figure 1. The proposed office development is estimated to generate 264 AM and 253 PM peak-hour trips (the trip generation table is presented in the Appendix). A Transportation Demand Management (TDM) Plan was prepared to identify measures to reduce the number of single-occupant automobile trips generated by the proposed project and thus reduce its traffic impacts. A Transportation Demand Management (TDM) Plan is a set of strategies, measures and incentives to encourage the employees to walk, bicycle, use public transportation, carpool or use other alternatives to driving alone. TDM measures produce more mobility using existing transportation systems, boost economic efficiency of the current transportation infrastructure, improve air quality, save energy, and reduce traffic congestion. Convenience and cost are the primary factors that affect a person's choice of transportation mode. Measures that work well for some people or types of businesses do not work as well for others. Therefore, an effective TDM plan or program provides multiple options and incentives and is flexible enough to allow customization to meet the varied needs of individuals and individual employers. This program presents an array of proven strategies and measures used in the Bay Area under a flexible implementation plan that can meet the needs of existing and future tenants. The TDM plan was developed based on guidelines provided by the City of South San Francisco and the City/County Association of Governments (C/CAG), the local Congestion Management Agency for San Mateo County. City of South San Francisco guidelines for TDM programs require that all projects that generate greater than 100 peak-hour trips obtain a goal of 28 percent alternative mode use. According to City policy, developments that request a floor area ratio (FAR) bonus are required to provide a higher percent alternative mode use. The office building development is requesting aFAR bonus and therefore the alternative mode use required is 35 percent. C/CAG guidelines require developments to implement TDM measures that have the capacity to mitigate all new peak-hour trips. The transportation facilities serving the site are described in Chapter 2. Chapter 3 presents the draft: City of South San Francisco TDM guidelines, and C/CAG TDM guidelines are contained in Chapter 4. The transportation demand management measures selected for the 200 Oyster Point Boulevard TDM Plan are presented in Chapter 5. A brief summary is presented in Chapter 6. Fehr & Peers Associates, Inc. 1 ~2; S~ ~~ \::S~ ;;. l::: ~<<l ;::: ;;. ~~ - s:: ~ :... ~ ~ a <::::> <::::> "-l d II '~\I i .. I. :1 Ii Iii I I i I ~ [ I II I I I [ I ,I ! ~: I I, . \ I' I I' I I '~ -J Q) h Z o Q:. Q:: , ~ I ~ I 0 ,\ \1 ,./ , I' ~ -~ :~/ , I, I 'V " I ni..1 . \\\ \ I :: ,y::3. 'i ,I \, ==> ---' , .~- ~ . ~ i I I ;1 '~I .I ~' , " " ',' " . .' -=->> ~ Q) 1i 8z ~ ce- o Z z ....... <( "" ..J Q. W !:: UJ \3 ..:; ",' ~ .S! T"" <.) C C>> '" '" .... ~ ::J t: .2l '" '" u. Q., ~ :.... ..:: r1: 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 2. EXISTING TRANSPORTATION SYSTEM The proposed 155,000-square foot office building is located at 200 Oyster Point Boulevard in South San Francisco, California. The site location is shown on Figure 2. The existing transportation facilities that support alternative (non-automobile) mode use includes those that provide transit, bicycle, and pedestrian access to the site. These facilities are described in detail below. Transit (Bus and Commuter Rail) Service San Mateo County Transit District (SamTrans) operates bus service in San Mateo County. Commuter rail service (CaITrain) is provided from San Francisco to Gilroy by the Peninsula Corridor Joint Powers Board. Bay Area Rapid Transit (BART) is provided near the project site. The existing transit facilities near the site are shown on Figure 3 and described in detail below: CalTrain provides frequent train service between San Jose and San Francisco seven days a week. During commute hours, CalTrain provides extended service to Morgan Hill and Gilroy. The South San Francisco station at Dubuque Avenue and Grand Avenue is located in the vicinity of the project site. The following CalTrain shuttle buses provide service to office buildings nearby: Utah-Grand Area Shuttle-Oyster Point Employer and Gateway Area Shuttle. The Utah-Grand Area Shuttle-Oyster Point Employer shuttle serves nearby developments on Eccles Avenue. The Gateway Area shuttle serves nearby developments along Gateway Boulevard and operates along Oyster Point Boulevard past the project site. Bay Area Rapid Transit (BART) provides rail service between the East Bay (Richmond, Pittsburg, Pleasanton, and Fremont) and San Francisco. The closest existing station to the project site is the Glen Park BART station. Three BART shuttles, Utah-Grand Area, .oyster Point Area, and Gateway Area, run identical routes as the CalTrain shuttles. The BART extension to San Francisco International Airport (SFO) will add new stations in South San Francisco, San Bruno, and Millbrae. The South San Francisco station will be located between EI Camino Real and Mission Road approximately one half mile north of Kaiser medical center. The San Bruno station will be on Huntington Avenue behind the Tanforan shopping center and north of 1-380. Both stations are located two to three miles from the project site. The BART-SFO Extension Project is scheduled for completion in 2002. Sam Trans Route 34 provides bus service between Tanforan Shopping Center and Geneva Avenue in San Francisco. Route 34 operates along Airport Boulevard and stops at Airport Boulevard/Linden Avenue in the vicinity of the project site. Route 34 provides three northbound trips and three southbound trips between 10:00 am and 4:00 pm on weekdays. No weekend service is provided. Fehr & Peers Associates, Inc, 3 200 Oyster Point Boulevard TDM November 2001 Oyster Cove Marina .' "C > in V> C 1Il ~ Forbes Blvd. If&WMill Project Site CD N Key: Not to Scale Figure 2 SITE LOCATION fP 422.12-01 Fehr & Peers Associates, lnc, 200 Oyster Point Boulevard TDM November 2001 FX, KX, MX, NX,PX,RX,TX .~ . .-,j. ,,",'\ 4~,,~'1~07~" .j!i "f'. -43:- "", "tf. ijlilJ!'lW;\wu~ ,. Forbes Blvd. .. ... ... .. FX, KX, MX, NX,PX,RX,TX Key: l\':'''''~iJ Project Site 11I11I11 CalTrain "",I34\"*'i, .~!;;,"';., Gateway CalTrain/BART Shuttle Samtrans Bus Route CD N II II II Utah-Grand CalTrain Shuttle Not to Scale Figure 3 TRANSIT FACILITIES fP Fehr & Peers Associates, Inc. 422.13-01 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 SamTrans Route 292 provides bus service between the Hillsdale Shopping Center and the Transbay Terminal in downtown San Francisco. This bus route operates along Airport Boulevard and stops at Airport Boulevard/Baden Avenue in the vicinity of the project site. The hours of operation are 5:00 am to 2:00 am on weekdays and weekends. Commute and midday headways are 30 minutes apart on weekdays and weekends. Headways are 60 minutes during the evenings. Existing Pedestrian and Bicycle Facilities Pedestrian facilities comprise sidewalks, crosswalks, and pedestrian signals. Near the site, sidewalks are located on both sides of Oyster Point Boulevard. Crosswalks and pedestrian signals are provided at nearby signalized study intersections. Bicycle facilities comprise bike paths (Class I), bike lanes (Class II), and bike routes (Class III). Bike paths are paved trails that are separated from roadways. Bike lanes are lanes on roadways designated for use by bicycles by striping, pavement legends, and signs. Bike routes are roadways that are designated for bicycle use by signs only and mayor may not include additional pavement width for cyclists. In the vicinity of the site, bike lanes are provided on Airport Boulevard, Oyster Point Boulevard, and Sister Cities Boulevard. Fehr & Peers Associates, Inc, 6 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 3. CITY OF SOUTH SAN FRANCISCO TRANSPORTATION DEMAND MANAGEMENT PLAN GUIDELINES The City of South San Francisco has guidelines that require new development projects to achieve a minimum goal of 28 percent alternative mode use. Development projects requesting FAR bonuses must achieve higher alternative mode usage percentages ranging from 30 to 45. Table I presents the City of South San Francisco standard base transportation demand management (TDM) measures and their estimated percent mitigation, or alternative mode use. Additional TDM measures are presented in Table 2. Table 1 ~easure/Program Planning/Design ~easures :Bulidlngiayoutmmmm, 'm,'" m , , , , " . ,. .m mm. I BuHdmgsethaCks . "Bulidlngwlnngm., " 'Pa.ssengerlOadlngzones .. I, TrallsitDesign Elemellts ! street Design .,.." " .. Parking Design ~easures .. "PreferentlalpaficmgT6%mm:m (carpool and vanpool) "Paridi1iconflguratlon' , Pedestrian ~easures ... "'MlnlmlZewaiidngdlstance ,.. ,. Pedestrian/trail connections Intemal pedestrian access Bicycle Design ~easures Sliowers}ClotllesioClcers ...m mmm. .. .,. . ..mm' X . . .. ..Blc.ycTe..iia'ikhig....(s"iiort...+...long...teiTIiY.... . on n. ......,............. ..... ... -.....X....... Information Board / Kiosks X Transportation Coordinator Implementation '.CCRs"""""""'."""."'" Designated employer contact in leases (each tenant) Carpool Programs Ridematching services Van pool Programs CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101 Standard Base TD~ Requirements Developer Developer as Tenant or ,Implemented Employer Implements Percent ~itigation 1.0% to 3.0% ..........n ............ X .. .......... ..... .n on. .... ....... ....... .'on . . .............. ............. .., .. ..... ..._ '" ............ ...... ........ ........_.. ...._... .... .._........... _. _u ...._.. _. ..." ...~...._. . X X ..................; ..................-........-.........-.... . X ,mm ..ml 0.5% to 0.5% .. ......................... ............... X 5.0% to 10.0% ..-..-............................................. X ......................... ........................................... X ...... ............................... ......... X X X X 0.5% to 1.0% I I ! . I I 2.0% to 2.5% I X ............... ........................................................................0..... , I X 1.0% to 1.0% X X X 2.0% to 2.0% X 2.0% to 2.0% ...m "j( 0.5% to 0.5% X X 7 X j( X 'Ridematchmgservlces . Transit Programs Free trial rides traIls it riders guide 'X Fehr & Peers Associates, Inc, 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 1 (cont.) ~easurefProgram Parking Programs . ,. Preferentialpai-kmg (reglstratlon; mgmt:y Pedestrian Programs . Walking' club lI'v1:entorGroup Bicycle Programs Blcycledders'gulde Rldematchingservices Promotional Programs New Tenant and employee orientation packets Flyers,posters;brodlures,emalfs Transportatlonfarrs' , Spare the Aii.(june.....6dober) , RicleshareWeek(6dober) Newsletter articles Trip planning assistance- routes and maps Kick-Off Event (at 50% occupancy) Guaranteed ride home ~onitoring and Evaluation CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101 Standard Base TD~ Requirements Developer Developer as Tenant or Implemented Employer Implements Percent ~itigation x I 6.5% to 0.5% I 1.6% to 1.0% I I x x Xd x X 4.0% to 6.0% X x X d.....X X X X X X X X X ..d.. ....,.. dXd dW X X . Ai1lluaI Report Fines for noncompliance X X X X I I I ! 20.0% to 30.0% i Standard Base Range Note: Standard TDM Goal for all projects is 28%, Source: City of South San Francisco Hoyt Company FellI' & Peers Associates, Jnc, 8 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 2 CITY OF SAN FRANCISCO - EAST OF IDGHW AY 101 Additional TDM Options/Aggressive Mitigation Measures Developer as Tenant Developer or Employer Percent Measure/Program Implemented Implements Mitigation Transit Design Elements 1.0% to 5.0% I, ......,....f~~44~4~~~!~?~fo.~,....~,~~s.it..f~~lli!1~s.,.,.,'...,'...',','.'..'.'....,....'"..'......,..,....,....,.,...,..,.,.,...,......,',.............,~......,'.'.........".............,.'......,.,...',....'"..,',......',.....,..,......"...,....,.,..,..,........"..,.,.,'...."............,..,....".......,.....,.,...--"..,., I ,Transit passenger shelter/ bus stoP." , , ' X . i , , ,', . : - '-BuS7rajrsiation-subsIdy-(for'constrUct[onf-------X-----~---------------,--, ,---.----------,--,. Parking Design Measures 5.0% to 5.0% .,. '...' Sharedparkmgw7exlstmgdeveTopment-- ---------)[------ ---,---- --- --------------,--- "'---- - . -Reducetfr;arklrlg on-sIte---- -"',.,'-----------------X--------------------------- '" ,.. '5ft=streeTpark{ng-res-iiTctlons ,-,-','.. .----------: ----X-----.-----------------------',.,' .. 'Electrlc'-vehICIepai:i<Ing' (chargmg-stat{onsT---------5C-- Bicycle Design Measures ......... B'icycleU'tralf"c'onne"ctloiis'" ......... ..........................-......... .... ..... .... ................. "x"'" Onsite Amenities "'CafeieTiawlthhotfoocl services . . V alet s-ervlc'es (dry-Cieanmgj ArM 'Ex'erc'lse""fa'cll1tl'es" . . .... .. ._....~....._.. 'Convenlenceretal1(sunclIies) Childcare Postofflceistamps Onsite transit pass sales Carpool Programs Mentor group X X Ahemativecommute suhsidles- ... - ... -X --- ...., ..- - ..x- Transportation Management Association X X Participation Vanpool Programs -- -----,- -::~j 2.0% to 2.0% I , " - - __.__, ,I 1.5% to 5.0% X X I ---I I -X "5( . ......... ............ X X '.X X 'X X X X X X 2.0% to 5.0% 1.0% to 3.0% 2.0% to 5.0% Mentor group Alternative commute subsidies Transit Programs Transit subsidies On=site pass outlet Transitfieidtrips ". Subscription bus services Shuttle programs (frequency and route coverage) Increased frequency for off peak hours fnci:eased frequency for peak hours . Additional route coverage during peak hours X X X X 1.0% to 10.0% X X X X X X X X 'X X X X X Fehr & Peers Associates, Inc, 9 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 2 (cont.) Measure/Program Additional route coverage during midday period Parking Programs Reduced parking fees for carpool/EV /vanpools m m Paldoff~sltepark1ngatpark&ri.delots7"'" transit stations Paid parking . '6H~sltepark1ng"~'park"andrldeshutlfes Parking cash out Pedestrian Programs . '. Afternatlvecommutesubsldi.es Bicycle Programs .,."Cornpfillientarybi.kes(recreatlonaiuse)" .' "Calnpusbi.kes' ,m,' ..,.."'.mmm'.'...,...,.",.."...".......,..,'."..m,..., ""mm Bicycle riders guides BIcycleClubTMentor Group ...-.... -AItemailv"e"'c'oiiimute''''subs'lcHe"s ....... ............. ..-..- ........ ..... ". ....~... Promotional Programs .. mYanpooiWeek(February)' X X BIke to 'Work: Day (May) .mmmmm, ""..m. ,mm ,..mmm .. ',..,.,.,"xm.".'..m mmxm,.m..m.mm" Earth"'O"ay --(Ai)!I!)' "",,^' m', ~-_.'--'~--"-" ...'.-'.H'-"._'x-..~_.._.""'_..,-'~~._.._.,--_...._....._--x-.^'ww_.~ Telecommunicating Site amenities X only Site amenities i only CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101 Additional TDM Options/Aggressive Mitigation Measures Developer as Tenant or Employer Implements X Developer Implemented X Percent Mitigation 5.0% to 10.0% X X ..............w..x.................................................... .......X...'.. X X ... .................j{ ...... ...................... .........................j(. X I I X X X X .........h................. X X m .m......m .., .,.,.,..... Xm X X .. mmmmX 2,0% to 5.0% 0.5% to 5.0% mm m mm I I I 1.0% to 1.0% I .,..."....",.".........,.,.........,...,.....,.,."..,',...,",.,..,...'.'1 m...mmmmm....m.'m m m I I .-.'-~~'~"-..^'...I i I 1.0% to 2.0% I Alternative Work Schedule X , Aggressive Range . 25.0% to 63.0% Note: No one project is expected to achieve 63% TDM, This would require substantial subsidies for all alternative modes of transportation, It is more likely that a developer will provide financial incentives for a single mode such as transit or bicycling, Source: City of South San Francisco Hoyt Company I, Fehr & Peers Associates, Inc, 10 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 4. CITy/COUNTY ASSOCIATION OF GOVERNMENTS (C/CAG) TRANSPORTATION DEMAND MANAGEMENT PLAN GUIDELINES The City/County Association of Governments of San Mateo County (C/CAG) is the Congestion Management Agency for San Mateo County. C/CAG oversees the Congestion Management Program (CMP). As part of the land use element of the CMP, all projects that generate 100 or more net new trips during the AM or PM peak hour are required to mitigate the impacts of all new generated trips. One of the five possible ways to mitigate these trips is to implement TDM programs that have the capacity to fully reduce the demand for new peak hour trips. C/CAG has identified acceptable TDM measures with equivalent numbers of peak-hour trips that will be reduced with implementation of each measure. Measures can be mixed and matched so that the total number of mitigated trips is equal to or greater than the new peak- hour trips generated by the project (264 peak-hour trips for the subject office development). These programs, once implemented, must be on-going for the occupied life of the development. Programs may be substituted, with prior approval of C/CAG, as long as the number of reduced trips is not reduced. The C/CAG list of approved TDM measures, the number of mitigated peak-hour trips associated with each, and the rationale used to determine the number of mitigated trips are presented in Table 3. Fehr & Peers Associates, Jnc, lJ 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 3 C/CAG Approved Transportation Demand Management Measures Transportation Demand I Management Measure 'I Bicycle lock"" ,nd nick... Showers~ and diingi.ngrooms."" ,. Operatlono{adedi.catedshuttle service during the peak period to a rail station or an urban residential area. ... Chargi.ng employees for parking. I subsldi.ii.ngti-ansltti.ckei:sfor , employees. 'CreatiOl1 o{preferel1tlaI pafkil1g ! for carpoolers. "'Creatlonofpreferentlafparki.ng for vanpoolers. i I-ImPlementatiOn of, v,",pooi I program. I I I Number of Trips Credited One peak-hour trip will be credited for every 3 new bike lockers/racks installed and maintained. Rationale Experience has shown that bicycle commuters will on average use this mode one-third of the time, especially during warmer summer months. .m'~-Two peak- hour-tripswlll b'e"---'-"-TwoT;i.c'ycIi.Sts'cansequeiii:i.iify"-"; credited for each new combination use one shower/changing room shower and changing room during the peak commute time. installed. One peak~hourtrlpw1iibecredii:ed for each peak-hour round trip seat on the shuttle. Increases to two trips if a Guaranteed Ride Home Program is also in place. Five additional trips will be credited if the shuttle stops at a child care facility emoute to/from the worksite One'peak~hour"trip"'wm"he'credli:ed' for each parking spot charged out at $20 per month for one year. .... "One'peak~h'ourtrip-wlTIhe'credlted- for each transit pass that is subsidized at least $20 per month for one year. One additional trip will be credited if the subsidy is increased to $ 7 5 for parents using transit to take a child to childcare emoute. .'.'-..Twopeak~hourtrips.wmb.e'...- credited for each parking spot reserved. .. YieidsaoI1e~i:o~onerai:i o (one seat in a shuttle equals one auto trip reduced); utilization increases when a guaranteed ride home program is also made available. .Yieldsaone~i:o~onerai:io(one I parking spot charged out equals one auto trip reduced). YIeids"'a'on'e~i:'c;~one"ratio'(one' transit pass equals one auto trip reduced). '" YIelds' a"i:Wo~to~one"ratlo(one''''''- reserved parking spot equals a minimuin of two auto trips reduced. Yiefdsa'seven~i:o~onerai:io(one reserved parking spot equals a minimum of seven auto trips reduced). ..... Sevel1peak~hourtnpsw1iibe ...... .. .... . The average van capaCltyls credited for each vanpool arranged seven. by a specific program operated at the site of the development. Increases to ten trips if a Guaranteed Ride Home Program is also in place. .. .""Sevenpeak~hourtripswlifhe credited for each parking spot reserved. Fehr & Peers Associates, Inc, 12 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 3 (cont.) C/CAG Approved Transportation Demand Management Measures Transportation Demand Management Measure Operation of a commute assistance center, offering on site, , one stop shopping for transit and commute alternatives information, preferably staffed with a live person to assist building tenants with trip planning. "lmplementa1:ion ofaparking cash out program. i Inlplementa1:10I1 of ramp " , metering. I 1I1s1:aHatloI1ofhlghbaI1dwld1:h connections in employees' homes to the Internet to facilitate home- telecommuting. 1I1s1:aHa1:l()I1"o{vldeoc()I1fereI1clI1g centers that are available for use by the tenants of facility. ImpIemeI11:a1:10I1(){acompressed work week program. Number of Trips Credited One peak-hour trip will be credited for each feature added to the information center; and an additional one peak-hour trip will be credited for each hour the center is staffed with a live person, up to 20 trips per each 200 tenants. Possible features may include: · Transit information brochure rack . Computer kiosk connected to the Internet . Telephone (with commute and transit information numbers) . Desk and chairs (for personalized trip planning) . On-site transit ticket sales · Implementation of flexible work hour schedules that allow transit riders to be 15-30 minutes late or early (due to problems with transit or vanpool). 'One'peak-=hour'trip'will be-creCITiecr-"Yle[dsa'()I1e~1:o~-one-ra1:1o '( one for each parking spot where the cashed out parking spot equals employee is offered a cash one auto trip reduces). payment in return for not using parking at the employment site. . Threehundfe'cl"peak=hour trlps'wilf' be credited if the local jurisdiction in cooperation with Caltrans, installs and turns on ramp metering lights during the peak hours at the highway entrance ramp closest to the development. Onepeak=hourtrlpwlHbecrecllied "Yleldsaone=1:o=oI1era1:1o.'" for each connection installed. " '" TweI11:Ypeak=hourtrlpswlifhe' credited for a center installed at the facility. ' , 'Onepeak=hourtrlpwlHhecredlted for every 5 employees that are offered the opportunity to work four compressed days per week. Rationale This is based on staff s best estimate. Short of there being major disincentives to driving, having an on-site TDM program offering commute assistance is fundamental to an effective TDM program. " " ThIS IS a very dJ.fficuh an'dcos1:iy measure to iinplement and the reward must be significant. AssumeS1:ha1:1:herewlifheoI1e'" , teleconference per day that includes twenty people. " 'Thew()rkweekwlilhe' 'j compressed into 4 days; therefore , the individual will not be : commuting on the 5th day. Fehr & Peers Associates, Inc, 13 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 3 (cont.) I, C/CAG Approved Transportation Demand Management Measures I Transportation Demand I Management Measure II Provision of assistance to employees so they can live close to work. I I", ,',,',"'.._ ..._,_" '..._,.. ,,',' '.._.__,,__,_ _m_'_..'..,____.."_ .._ : Conduct a local-based hiring ! program by registering with and using the Alliance Job Link Program. " Impiementatlonofaprogramthat gives preference to hiring local residents at the new development site. Provision of on-site amenities/ accommodations that encourage people to stay on site during the work day, making it easier for workers to leave their automobiles at home. Provlslonofdilld care services as a part of the development ll5eveioperJPropeiiYownermaymm..i i join an employer group to expand I available child care within 5 miles of the job site or may provide this service independently. Number of Trips Credited If an employer develops and offers a program to help employees find acceptable residences within five miles of the employment site, a credit of one trip will be given for each slot in the program. One-peak:hour-tnp wilfbecre"dlied---fhls"ls"basedon"staff'sbest--' for every 2 job listings posted with estimate. this program. m "Onepeak~hourtrlpwmbecredltecr for each employment opportunity reserved for employees recruited and hired from within five miles of the employment site. 'Oiie"peak~hour"trlpwlilbe"cre(Hted for each feature added to the job site. Possible features may include: . banking · grocery shopping · clothes cleaning · exercise facilities . child care center One trip will be credited for every two child care slots at the job site. This amount increases to one trip for each slot if the child care service accepts multiple age groups (infants = 0-2 yrs, preschool = 3&4 yrs, school-age = 5 - 13 yrs). Rationale This assumes that a five mile trip will generally not involve travel on the freeways. , 'Thlsassumesi:haTafivemlletrlp will generally not involve travel on the freeways. This IS basedonstafPsEesi'" estimate. ThlslsbasedonstaWsbest" estimate. , I ,," mml I -------1 'One-trlp-wllfbe"'crecHted"[o'r-eacli .."", -"'''fhls1s''1)ased''on''sta:Wsl)est new child care center slot created estimate. either directly by an employer group, by the developer/property owner, or by an outside provider if an agreement has been developed with the developer/property owner that makes the child care accessible to the workers at the development Fehr & Peers Associates, Inc. 14 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Table 3 (cont.) C/CAG Approved Transportation Demand Management Measures I Transportation Demand Management Measure Join the Alliance's guaranteed I ride home program. : Number of Trips Credited One peak-hour trip will be credited for every 2 slots purchased in the program. Rationale Experience has shown that when a guaranteed Ride Home Program is added to an over-all TDM : program, the average rider ship increases by about 50%. , '" "'" , '" "" Fivepeak~hourtrlpswiIicrealtea: ' Experlencehasshowniliat" offering multiple and complementary TDM components can magnify the impact of the overall program. Flvepeak=h"our-tTIps will be---------fhiSTsbasea-oIi-s"taffs-bestM------- credited. estimate. i ""'" """" ",""""'" ,",' '" """"" I Combine any ten of these elements and receive an , additional credit for five peak : hour trips. 1_,,__.., ...."......__....__..__..,............, .....o..., .. ..,.... ...." ..,__....,,_.... I Work with the Alliance to , developlimplement a Transportation Action Plan. Thedevelop..ercanprov{(reacasii......-Peak~hourtrlpreductioIi"credits legacy after the development is will accrue as if the items were complete and designate an entity being directly implemented by the to implement any (or more than developer. one) of tlle previous measures before day one of occupancy. EncouragelnflIideveIopment: "" """""'Twopercentoraffpeak~hourtrlps will be credited for each infill development. I -".. Credits accrue depending "on what _ I the funds are used for. I ""GeneraffyaccepiibieTbM practices (based on research of TDM practices around the nation .. and reported on the Internet), Five peak-hour trips will be "".., " " ""..''''GeneraHyacceptabieTbM'' , credited for an agreement with an practices (based on research of existing development to share TDM practices around the nation , existing parking and reported on the Internet), ,,'" '" 'Fivepeak~hourtr1pswlIibe ""'" """ "'GeneraffyacceptabieTbM '" credited. practices (based on research of TDM practices around the nation , and reported on the Internet). "" "11:iTsiS"bas"edon"staffs"best estimate. Encouragesharedparklng , 'Partlclpate'lii7create/sponsor"a' Transportation Management Association. Coordinate TransportatIon" ..", ""'Fivepeak~hourtrlpswmbe.. Demand Management programs credited. with existing developments/employers. , Foremployerswlthmuitipiejob'" sites, institute a proximate commuting program that allows employees at one location to transfer/trade with employees in another location that is closer to their home. "Pay" for parkinga.tparka.ncfrlde--m.. 6nepea.k~iio-ur'trlpwmhe-credltedyieldsa one~to~oneratlo:-- lots or transit stations. for each spot purchased. .. Source: City/County Association of Governments of San Mateo County's (C/CAG) Revised Guidelinesfor the Implementation of the Land Use Component of the 1999 Congestion Management Program, October 11.2000, 6nepea.k~hourtr1pwiHhecredltea ""VleIasaone~toonera.tlo. "" for each opportunity created. Fehr & Peers Associates, Inc, 15 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 5. TRANSPORTATION DEMAND MANAGEMENT PLAN The Transportation Demand Management (TDM) Plan elements for 200 Oyster Point Boulevard include on-site amenities that encourage the use of alternative modes of travel, require participation in associations that promote commute alternatives to the single-occupant vehicle, and include parking measures. It includes appropriate TDM measures that will satisfy City of South San Francisco and C/CAG guidelines. Table 4 summarizes the TDM measures for the proposed project and identifies how they meet the City's 35 percent alternative mode use goal and C/CAG's trip equivalent guidelines. These TDM measures are described in detail below. On-Site Measures A TDM coordinator will be designated for the site. The coordinator will actively market the TDM Plan to all employees, and will conduct the annual monitoring/reporting process. The coordinator will develop an on-site transportation information center with SamTrans, BART, and CalTrain schedules and maps. The TDM coordinator will provide information via flyers, posters, emails, or brochures and actively market alternative mode use and special programs such as Bike-to-Work Day or Vanpool Week. The TDM coordinator's role also includes managing on-site transit pass sales and the guaranteed ride home program (working with a local taxi service or rental car agencies). Carpools are the most popular alternative commute mode. An in-house matching service, in conjunction with a vigorous marketing campaign, will be used to increase the percentage of employees that share a ride to work via carpools and vanpools. Vanpool and Shuttle Measures CalTrain and BART shuttles provide service from the South San Francisco CalTrain station and Glen Park BART station to nearby office developments in the Oyster Point and Gateway areas. The project sponsor will work with the Peninsula Congestion Relief Alliance to fund 20 shuttle seats. The project sponsor will implement and maintain two vanpools that will provide transportation services to the project site for employees. Vanpools usually are operated by employees that are either picked up or gather at one location to reduce the number of trips to and from work. Fehr & Peers Associates, Inc, 16 ""'" Il) :c <:<I ~ I 'I 1'= 0 .... (,J = .fa' ~ ;$, .... l::' o ~, ..c = lu~ I [ e <:<I l-< ell o l-< ~ ] ~ I -s ~! o = = <:<I =~ 'S "0 ~ = l-< <:<I Q.l 8 .... Il) ~~ o = o .~ ~B l-< o c.. '" = <:<I l-< Eo-< Q.l .:: .... C'd = ~ ~~ <~ .... 0 ~~ (,J .. Q.l ~ 'E"O ';' ~ {I'J Il) C'd c.. l.Q .~.;: e;<;::~ ;:::I~ ,Z o -< U U = .:; .... <:<I.... eIl'- E11 ~U c.. 'j;;; ~ :~ ,~ '<n 0) '(,) ['E '0) "n "'Cl I-< 0) 0) I-< c..~ .. e. 'c: .tl '0) ,1=1 '0 c .:; .... c.. OJ;;; (,J '" Q.l ~ I-< 1.8 <-0 :'S \D o_ S 0) .8 gp I-< c.. :0 1=1 ~~ 0 .S 1=1 "8 .S g .~ :u b cd '" 0) 0) ''''Cl "'Cl ;0> Q) o 0) I-<UJ c..1l.i ~ .~ ,.- [/) is 0) :5-B '" I-< 8<8 ~a t)~ '~::;E 20 :;E-< ,~ -B i~ ~ 'N ; j: .- '-.. ~.-......_~..........".._._~-_.........._.._~._,,_..__._j , " '" ~ 1=1 .r; ~ Q) ,8 !:-s bJ)Q)~o.>:~ 2 >'0 1:: ~,O) c.._ 0 a'l-< ~ c.. ~..t:I 1.2 ~ s I=l Q)~rJ:l OO)cd"'Cl'.8 !'.g c?l .tl '1:: [ '" Sd~^"8~ OcdcdO)>' I-< 1=1 S .....,0 , c.. 0) 0) a 0.. ~ ~ CI)~ ~;8 ,- is I-< ;:::1'0) 2; ~ ~ ell, 0) ~ 0) 8. ~n~ 3l"g",^a!gb = u "'-<< .......!l-; .,g.s ~ .~~ en rJ:l~ rJJ):;:::::: tl S in^ cd: is '" cd t) gp'l-< 8 bh..l<: .-..8 0..0 (,) aim '" I-< m m ..S ..... c.. 0.. - ''''Cl (,) 1=1 1=1 0.., I-< 0) 0 0 0..' 0 , ',:-'0' '.c '.0 .~ ! 0 ~ i . ,I-< 0 m .j;:l i (,) 1-<' 1::, c.. S d '^'::;E 0: 8.;~ 2 ,~ ,gjo ~: ~ :~ ~ 0 ..s E-< .8. S m I-< OIl o I-< 0.. - C<l 1=1 .S "0 S o ~ '~ '0 'N '" 0) (,) .;; I-< 0) '" OIl 1=1 :.a (,) ~ s 0) "'Cl ~ '~ '0 '00 '0 '00 '::= ~ Q) .~ ..t:I.9< . '" S Il.i g ~ ~ .9<.,g g ..9< 0) "'Cl ~;:::I .tl 0)- '.tl I-< S..t:l 0 "'Cl 0.. , ~ <8 0 '" Z '1:: .S '0"'Cl I-< ~ "'Cl.~ I~ .~ ~ ....... .s ~ 8 '~ ] ~ 8 & ~ ~ o..(,)..I<:~mt;;Cl) '0) 0) m 0) ~ ;:::I 2 '1=1..0 8.'" (,) OIl 0.. ,0 .E cd ~ 'm 0) ,1=1 c.. .0 t i~ -= ~ 0) '0 0.. ';P-.'B . ~ t "'Cl i~ ~ g 'I-< 0 I-< . C<l 0) N ; ~~ 0) '0 ~ ,N ~ S '2'E'" ,08 il -E ',......c [/) =' .:;:: ~..t:I : is p::; '" . I-< ~ E-< , ~ III P::; '1=1 I-<~ ,8. o III , '" ;;0 "'Cl ''0 8 a ,0) :'5'.S .S :~~ ~-d , 0) C C .9 i..t:l m C<l t iE-< U U 0.. m !rlJi 03 a,) j Q) ....... ...... i..i- "'Cl 1=1 ::l'~ 0 0) '~,.E'I:: ~ QI t/.) Q) [/) ~ ,"'Cl 0.. ~ ,~ ~ ~ a t::,~ 8.12 ;:::1:"8 0) ;:::I it5 ''''Cl ofJ 1=1 m OIl m '-g ''c:.s tl <:<l 1=1 ;:::I 1=1 o 0 "'Cl.9 : 0 ;'.p: 0 ~ =-j ~ .~ 1;) a& l:: - ~ >,0 1il'~ t;; [~ ~ N o 'N '" .9< . 4-< .tl "0 ,- 'I-< 00 ;:::I 0..- .,ga.8 , :> '" ~..t:IO) 0) (,) '" 0.. m ~ 1=1 0) I-< 0) I-< (,) :><8.E 0) UJ '" "0 o g. m :> N .S m ..... 1=1 .<; .8 "'Cl 1=1 m d 0) 8 0) '~ - ,- '~ ; J-I o '" 1=1 o , 0.. '" ..... (,) 0) '5' I-< ~ "0 o g. m :> m 4-< o 1=1 .9 ~ d 0) 8 S cd 0) I-< -OIl 13-0 1=1 I-< _ 0.. 0) a o ..t:I 0) ~ I-< '"Cj .~ ~ S ~ ~ I-< OIl cd 0 ;:::I I-< Cl)o.. Il.i (,) m -a ,S -I ~ o <n - '" 0.. '13 <n o - ~ "0 ..... ..0 ;:::I UJ '" Q.l I-< .. 0 ~ ~ ~ ;:::I <:<l.S '" Q.l "'Cl ~ ~ tl ~ ~ 8 ~ 0::;E ~ 613 ,-. 't:l Cl) ::: .S 1= ,0 U '-" 5 e<l ;... ~ o ;... ~ 't:l- ;... = e<l Cl) .. 5 Cl.l Cl) :; ~. o e<l ~ ;; =:;g ....., 't:l o = ~ e<l' ~ 51 - Cl.l ~~ o c c .S c- N~ ;... o Q. '" = e<l ;... E-< Cl.l .~ .c - e<l - = Cl) ::: ;... '" 0 Cl.l ;;J :'2f2- !~ I~ ~ ~ .~ - :;;: Cl.l ,~ ~ ~ ~ ~ ~ 't:l - 0 IV) ~ V) 00 'N = :;g Cl.l Cj ;... Cl.l ~ 't:l .. ~ {,I} Cl.l e<l Q. .Q ~....., 5'''''' ;... :::.'.::E-< Z:;g o -< U U = .S - e<l_ ~....., E~ :;gU Q. 'C E-< = .S - Q. 'C Cj '" Cl.l ~ Cl) ;... ::: '" ~ Cl) :;g :;g ~ E-< V) - <1) "'~ 5 .~ e<l _ l. "tij ~= e ro ~,/:i 't:l OJ) Cl) C N 'N :E~ '" V) .Q..o ::: ;::l rf)rn V) - 'V) V) V) ctl Q. - ....., V) a '.b ..... <1) Q. Q. :'.8 Q) c o is N i ~ 1;'.S . V) :.9< > 't:l . Q. .,/:i <1) <1) ,'.8 ..... ..... gj 5't:l g<8.c~o .c, 't:l ~ 0I);.c <1) ;::l O. I ~ .-;:: 0. ~.~ <1) 't:l V) , <1) o.~o 0. Q) U -u; 1l.rl .C <1) '0 ..0 o '00 ...... :<8 ! ~ <U :'.8 ~ ...... 0. ;::l V) !,g e;- , I <1) I~ ~ <1) 0. 'N N .~ '00 ..... <8 :(/) 0.<1) '.8 ~ t:l ~ ,0 e;- ..c <1) i~ ~ '<1) 0. 'r-- ..... 00 ,<8 tl 'v) ~ ,.9< 15 ,,/:i >::::C i t:l -E .,g ~ , ,~ ("<') .~ e;- 0.<1) .- ~ ClI ,0. '.8 ,V) 00 = 0. :-.8 '.6 mV) !.~~ "s .~ c15 o ..... - u >.ctl a <1) .. CI'J 'Q) <1) U '~ ~ 8::3 o.~ El t) ~ .g, 18.. 8 ,v) 0. ~......- 0 ~-:S j'~ ~ o.t:l ~~ ~ ,- <1) ';::: s V) ,0 ...... '~ 'm ,<1) S = <1) - .>. '= .m <1) = ~ i:.E .c.5 10,8 ?f?- Ill, .... . ...".1 :1 Q. ~I N _I e<l - o E-< ~ Cl) ;:Q e<l E-< 'V) ...... ~ ..... OJ) o ..... 0. <1) -:S ,S ,~ ..9 V) o - .8 V) <1) V) V) m 0. <~ V) = 'ro ,.b <1) '''0 ;'> o ..... 0. - - ...... ~ ..... o V) = o 0. V) '''0 ,~ - - .~ ..... o V) = o 0. V) 't> v5 it) <1) 0 <1) :'~ 0) ,,~ 8 0>'1 8 0._10. <1) 0.1 <1) .c Sic .r' <1).r' ~ ClI ..... o OJ) u 0 = ..... ~ ~ ~ ~ <1).c -:S~ .S 'C: <1)"0 ~ ~ .~ 15 .~ ~ t:: ro ~~ = .S - ro t:: o 0. V) = ro ..... ,f-< ro ..s <1) ~ 0. 'u '-2 m ~d ~ .9 '.:;;: - po .~i ..... U ~ 0 = ~ 8..-< l~ 5! .g, S i o <1) ,~ Mi o.ctl <1) a It=: :::8 - = <1) S = V) ~..8 ~ ctl ro ~ c:: ~ (IJ cd clj'- Q) Q) :::E',g ;... S = a ~ = .S 0. ~ .~ E a ~ ~ ""'" .....c ~ o-eJJ o..;S = gp V) OU :E2 ...... = V) ;... ~ ~ V) e<l ~ E-<-<~A.. '''''l ("<') 't5<1) ,.....113 S '"", ~ .<8 is OJ) o 0 1"0 fa m.S :c.l:: 0 '(1),/:i .15 ~ "0 o 00 ;~ = _..... "> ,'.;j ~ 51 0 0 : ~ Q) 0 0 ro..... , 01) o,5b 01) 0...... ..... 0 .'v.; = 0.:,'''''' ~ 9<1 0. 01) 0. . <1) ,...., = V) ..... ' . <:j V) 1"O:sl Cd' <1) _ ctl U~ I.~ 0 .ClI...... ,..,"0...... ""u ,~u '(1):::..... " V) ..0:;:$ ..... " ro .....ro lu..oV v..... 8.. ~ .ro <1) fai~ ~ fal<1) <1) ("<') t ~ -:S - : 0. o;:J - ,~ -:S 00 's:..... g. V) ..... g ,..0 "0 N "ro fr\O ~ fr'V) o 0 ,~~ ro.<1) = ctll= g - Im"O u1;; "0 uIE V) "0 "V ..c <1) ..... l.c E ....., V) ,g ~ ~ ;::= ~ tS:= c..s tB :.S :.0 ...... u "0 ...... Uo "0 ,- gj ~ ' ~..9 <1)' ~ - <1).:-::l V) .c ~ it) >"~ u ..Q'~ 1 ~ N ..... 0" 10- =,(1) = g.......'o ~ V) 1'5' @ af.'5' 0 <1) ~_ =0 ..... ...........OI).....=m 00 o.OJ)~O'=~;:::8 ~ 0" "O.S 0"0 ~ 0 ..... ......-..-4 !(l)~~~~~.:~: u ..... "VI~ a E1 0 0. <:j u ....., .g, &~. 0. 0. S 8"_ !3 .g,<8 8 V) (1)180 g ..... g g 8 (1) ~8 ~!~fr's ~g.'S ~& t=: ~ ~it=: 13 ~ ~ ~ ~ t=: ~' , V) ..... '(1) :0 '0 fr m 'U ..... ,<8 01) I.S ~ ro ,0. :] ~ (1) ..... l~ '(1) ..... 'A.. V) ..... <1) o o g. ro ,.. ..... <8 OJ) ,S ~ ..... m 0. 3 - = <1) ..... ~ o ..... A.. V) ,~ 'U ro ..... <1) U '>, u ,05 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 Subsidized Programs One of the most-common reasons that employees do not want to use an alternative mode (i.e. carpool, vanpool, or transit) is the inability to leave work unexpectedly for a family emergency or the fear of being stranded if they need to work late. One element that allays these fears is a Guaranteed Ride Home (GRH) program. With this program, employees can use a taxi service, rental car or another selected mode to get home and the employer pays for the service. The project will fund 10 slots in the Peninsula Congestion Relief Alliance's GRH program. The transportation coordinator will manage the GRH program. The employee contacts the transportation coordinator when they need a ride home and the transportation coordinator then makes the travel arrangements. The project sponsor or tenant will also join the Peninsula Congestion Relief Alliance program which provides ongoing support for alternative commute programs. The sponsor will subsidize transit tickets for fifteen employees to utilize public transit to the project site. Parking Measures The project sponsor has used the reduced parking ratio of 2.83 spaces per 1,000 square feet as well as provided forty carpool and six vanpool spaces located near the building entrance. These measures discourage the single-occupant vehicle trip and improve accessibility for those sharing vehicles. Five bicycle racks that can accommodate 25 bicycles will be installed to secure bicycles and further encourage riding to work. Fehr & Peers Associates. Inc, 19 200 Oyster Point Boulevard Transportation Demand Management Plan December 2001 6. SUMMARY AND CONCLUSIONS This report presents the TDM Plan for the proposed office development located at 200 Oyster Point Boulevard in South San Francisco, California. The report identifies TDM measures that contribute to a goal of 35 percent alternative mode use according to South San Francisco guidelines. The TDM Plan also satisfies C/CAG guidelines that requires developments to implement TDM measures with the capacity to mitigate all new peak-hour trips. The TDM Plan has been tailored to utilize the measures that are most compatible for the proj ect: - TDM coordinator will actively market the TDM plan. - The project is located in close proximity to the South San Francisco CalTrain Station, providing convenient access to CalTrain. The TDM Plan promotes transit usage by funding seats to a CalTrain and/or BART shuttle. - The office development is proposing bicycle racks, and designated carpool and vanpool parking spaces. These physical attributes promote alternative commute options. - The project sponsor will participate in the local TDM association, Peninsula Congestion Relief Alliance. This will maximize the effectiveness ofthis TDM plan. The site plan has a reduced number of parking spaces. The TDM plan meets the specific requirements set forth by C/CAG and the City of South San Francisco. The proposed project is projected to generate 264 new peak-hour trips. The TDM Plan is expected to mitigate 265 peak-hour trips through the use of C/CAG approved TDM measures. The TDM Plan is also projected to achieve a 41.5 percent alternative mode use according to City of South San Francisco guidelines. Fehr & Peers Associates, Inc. 20 I Table A-I Trip Generation Estimates I Daily AM Peak-Hour Trips I PM Peak-Hour Trips Use Size (s.C.) Rate! I Trips Rate I In lOut I Total I Rate! I In lOut Total i ; ; Proposed Office I 155,000 I 11.99 1,858 1.71 1232 i 32 264 1.63 43 ; 210 253 I ; ; ! Notes: I Rates expressed as trips per 1,000 gross square feet.