1. INTRODUCTION
Malcolm Properties, Inc. is proposing to develop a 155,000-square foot (s.f.) office building
located at 200 Oyster Point Boulevard in South San Francisco, California. The proposed site
plan is shown on Figure 1. The proposed office development is estimated to generate 264
AM and 253 PM peak-hour trips (the trip generation table is presented in the Appendix). A
Transportation Demand Management (TDM) Plan was prepared to identify measures to
reduce the number of single-occupant automobile trips generated by the proposed project and
thus reduce its traffic impacts.
A Transportation Demand Management (TDM) Plan is a set of strategies, measures and
incentives to encourage the employees to walk, bicycle, use public transportation, carpool or
use other alternatives to driving alone. TDM measures produce more mobility using existing
transportation systems, boost economic efficiency of the current transportation infrastructure,
improve air quality, save energy, and reduce traffic congestion.
Convenience and cost are the primary factors that affect a person's choice of transportation
mode. Measures that work well for some people or types of businesses do not work as well
for others. Therefore, an effective TDM plan or program provides multiple options and
incentives and is flexible enough to allow customization to meet the varied needs of
individuals and individual employers. This program presents an array of proven strategies
and measures used in the Bay Area under a flexible implementation plan that can meet the
needs of existing and future tenants.
The TDM plan was developed based on guidelines provided by the City of South San
Francisco and the City/County Association of Governments (C/CAG), the local Congestion
Management Agency for San Mateo County. City of South San Francisco guidelines for
TDM programs require that all projects that generate greater than 100 peak-hour trips obtain
a goal of 28 percent alternative mode use. According to City policy, developments that
request a floor area ratio (FAR) bonus are required to provide a higher percent alternative
mode use. The office building development is requesting aFAR bonus and therefore the
alternative mode use required is 35 percent. C/CAG guidelines require developments to
implement TDM measures that have the capacity to mitigate all new peak-hour trips.
The transportation facilities serving the site are described in Chapter 2. Chapter 3 presents
the draft: City of South San Francisco TDM guidelines, and C/CAG TDM guidelines are
contained in Chapter 4. The transportation demand management measures selected for the
200 Oyster Point Boulevard TDM Plan are presented in Chapter 5. A brief summary is
presented in Chapter 6.
Fehr & Peers Associates, Inc.
1
~2;
S~
~~
\::S~
;;. l:::
~<<l
;::: ;;.
~~
-
s::
~
:...
~
~
a
<::::>
<::::>
"-l
d
II
'~\I i
.. I.
:1 Ii
Iii
I I i
I ~
[ I
II I
I I
[ I
,I !
~:
I
I,
. \
I'
I
I'
I
I '~
-J
Q)
h
Z
o
Q:.
Q:: ,
~
I ~
I 0
,\
\1
,./
, I'
~
-~ :~/
, I,
I
'V
" I
ni..1 .
\\\
\
I
::
,y::3.
'i
,I
\,
==>
---' ,
.~-
~ .
~ i
I
I
;1
'~I
.I
~'
, " " ',' "
. .'
-=->>
~
Q)
1i
8z ~ ce-
o
Z
z
....... <(
"" ..J
Q.
W
!::
UJ
\3
..:;
",'
~
.S!
T"" <.)
C
C>> '"
'"
.... ~
::J t:
.2l '"
'"
u. Q.,
~
:....
..::
r1:
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
2. EXISTING TRANSPORTATION SYSTEM
The proposed 155,000-square foot office building is located at 200 Oyster Point Boulevard in
South San Francisco, California. The site location is shown on Figure 2.
The existing transportation facilities that support alternative (non-automobile) mode use
includes those that provide transit, bicycle, and pedestrian access to the site. These facilities
are described in detail below.
Transit (Bus and Commuter Rail) Service
San Mateo County Transit District (SamTrans) operates bus service in San Mateo County.
Commuter rail service (CaITrain) is provided from San Francisco to Gilroy by the Peninsula
Corridor Joint Powers Board. Bay Area Rapid Transit (BART) is provided near the project
site. The existing transit facilities near the site are shown on Figure 3 and described in detail
below:
CalTrain provides frequent train service between San Jose and San Francisco seven days a
week. During commute hours, CalTrain provides extended service to Morgan Hill and
Gilroy. The South San Francisco station at Dubuque Avenue and Grand Avenue is located in
the vicinity of the project site. The following CalTrain shuttle buses provide service to office
buildings nearby: Utah-Grand Area Shuttle-Oyster Point Employer and Gateway Area
Shuttle. The Utah-Grand Area Shuttle-Oyster Point Employer shuttle serves nearby
developments on Eccles Avenue. The Gateway Area shuttle serves nearby developments
along Gateway Boulevard and operates along Oyster Point Boulevard past the project site.
Bay Area Rapid Transit (BART) provides rail service between the East Bay (Richmond,
Pittsburg, Pleasanton, and Fremont) and San Francisco. The closest existing station to the
project site is the Glen Park BART station. Three BART shuttles, Utah-Grand Area, .oyster
Point Area, and Gateway Area, run identical routes as the CalTrain shuttles. The BART
extension to San Francisco International Airport (SFO) will add new stations in South San
Francisco, San Bruno, and Millbrae. The South San Francisco station will be located between
EI Camino Real and Mission Road approximately one half mile north of Kaiser medical
center. The San Bruno station will be on Huntington Avenue behind the Tanforan shopping
center and north of 1-380. Both stations are located two to three miles from the project site.
The BART-SFO Extension Project is scheduled for completion in 2002.
Sam Trans Route 34 provides bus service between Tanforan Shopping Center and Geneva
Avenue in San Francisco. Route 34 operates along Airport Boulevard and stops at Airport
Boulevard/Linden Avenue in the vicinity of the project site. Route 34 provides three
northbound trips and three southbound trips between 10:00 am and 4:00 pm on weekdays.
No weekend service is provided.
Fehr & Peers Associates, Inc,
3
200 Oyster Point Boulevard TDM
November 2001
Oyster Cove
Marina
.'
"C
>
in
V>
C
1Il
~
Forbes Blvd.
If&WMill
Project Site
CD
N
Key:
Not to Scale
Figure 2
SITE LOCATION
fP
422.12-01
Fehr & Peers Associates, lnc,
200 Oyster Point Boulevard TDM
November 2001
FX, KX, MX,
NX,PX,RX,TX
.~
.
.-,j.
,,",'\
4~,,~'1~07~"
.j!i
"f'.
-43:-
"",
"tf.
ijlilJ!'lW;\wu~ ,.
Forbes Blvd.
.. ... ... ..
FX, KX, MX,
NX,PX,RX,TX
Key:
l\':'''''~iJ Project Site
11I11I11 CalTrain
"",I34\"*'i,
.~!;;,"';.,
Gateway CalTrain/BART Shuttle
Samtrans Bus Route
CD
N
II II II Utah-Grand CalTrain Shuttle
Not to Scale
Figure 3
TRANSIT FACILITIES
fP
Fehr & Peers Associates, Inc.
422.13-01
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
SamTrans Route 292 provides bus service between the Hillsdale Shopping Center and the
Transbay Terminal in downtown San Francisco. This bus route operates along Airport
Boulevard and stops at Airport Boulevard/Baden Avenue in the vicinity of the project site.
The hours of operation are 5:00 am to 2:00 am on weekdays and weekends. Commute and
midday headways are 30 minutes apart on weekdays and weekends. Headways are 60
minutes during the evenings.
Existing Pedestrian and Bicycle Facilities
Pedestrian facilities comprise sidewalks, crosswalks, and pedestrian signals. Near the site,
sidewalks are located on both sides of Oyster Point Boulevard. Crosswalks and pedestrian
signals are provided at nearby signalized study intersections.
Bicycle facilities comprise bike paths (Class I), bike lanes (Class II), and bike routes (Class
III). Bike paths are paved trails that are separated from roadways. Bike lanes are lanes on
roadways designated for use by bicycles by striping, pavement legends, and signs. Bike
routes are roadways that are designated for bicycle use by signs only and mayor may not
include additional pavement width for cyclists. In the vicinity of the site, bike lanes are
provided on Airport Boulevard, Oyster Point Boulevard, and Sister Cities Boulevard.
Fehr & Peers Associates, Inc,
6
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
3. CITY OF SOUTH SAN FRANCISCO TRANSPORTATION DEMAND
MANAGEMENT PLAN GUIDELINES
The City of South San Francisco has guidelines that require new development projects to
achieve a minimum goal of 28 percent alternative mode use. Development projects
requesting FAR bonuses must achieve higher alternative mode usage percentages ranging
from 30 to 45. Table I presents the City of South San Francisco standard base transportation
demand management (TDM) measures and their estimated percent mitigation, or alternative
mode use. Additional TDM measures are presented in Table 2.
Table 1
~easure/Program
Planning/Design ~easures
:Bulidlngiayoutmmmm, 'm,'" m , , , , " . ,. .m mm.
I BuHdmgsethaCks .
"Bulidlngwlnngm., "
'Pa.ssengerlOadlngzones ..
I, TrallsitDesign Elemellts
! street Design .,.." " ..
Parking Design ~easures
.. "PreferentlalpaficmgT6%mm:m
(carpool and vanpool)
"Paridi1iconflguratlon' ,
Pedestrian ~easures
... "'MlnlmlZewaiidngdlstance ,.. ,.
Pedestrian/trail connections
Intemal pedestrian access
Bicycle Design ~easures
Sliowers}ClotllesioClcers ...m mmm. .. .,. . ..mm' X
. . .. ..Blc.ycTe..iia'ikhig....(s"iiort...+...long...teiTIiY.... . on n. ......,............. ..... ... -.....X.......
Information Board / Kiosks X
Transportation Coordinator
Implementation
'.CCRs"""""""'."""."'"
Designated employer contact in leases
(each tenant)
Carpool Programs
Ridematching services
Van pool Programs
CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101
Standard Base TD~ Requirements
Developer Developer as Tenant or
,Implemented Employer Implements
Percent
~itigation
1.0% to 3.0%
..........n ............
X
.. .......... ..... .n on. .... ....... ....... .'on . . .............. ............. .., .. ..... ..._ '" ............ ...... ........ ........_.. ...._... .... .._........... _. _u ...._.. _. ..." ...~...._. .
X
X
..................; ..................-........-.........-.... .
X
,mm ..ml
0.5% to 0.5%
.. ......................... ...............
X
5.0% to 10.0%
..-..-.............................................
X
......................... ...........................................
X
...... ............................... .........
X
X
X
X
0.5% to 1.0% I
I
! . I
I
2.0% to 2.5% I
X
............... ........................................................................0..... ,
I
X
1.0% to 1.0%
X
X
X
2.0% to 2.0%
X
2.0% to 2.0%
...m "j(
0.5% to 0.5%
X
X
7
X
j(
X
'Ridematchmgservlces .
Transit Programs
Free trial rides
traIls it riders guide
'X
Fehr & Peers Associates, Inc,
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 1 (cont.)
~easurefProgram
Parking Programs
. ,. Preferentialpai-kmg (reglstratlon; mgmt:y
Pedestrian Programs
. Walking' club lI'v1:entorGroup
Bicycle Programs
Blcycledders'gulde
Rldematchingservices
Promotional Programs
New Tenant and employee orientation
packets
Flyers,posters;brodlures,emalfs
Transportatlonfarrs' ,
Spare the Aii.(june.....6dober) ,
RicleshareWeek(6dober)
Newsletter articles
Trip planning assistance- routes and maps
Kick-Off Event (at 50% occupancy)
Guaranteed ride home
~onitoring and Evaluation
CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101
Standard Base TD~ Requirements
Developer Developer as Tenant or
Implemented Employer Implements
Percent
~itigation
x
I
6.5% to 0.5% I
1.6% to 1.0% I
I
x
x
Xd
x
X
4.0% to 6.0%
X
x
X
d.....X
X
X
X
X
X
X
X
X
..d.. ....,.. dXd
dW X
X
. Ai1lluaI Report
Fines for noncompliance
X
X
X
X
I
I
I
!
20.0% to 30.0% i
Standard Base Range
Note: Standard TDM Goal for all projects is 28%,
Source: City of South San Francisco
Hoyt Company
FellI' & Peers Associates, Jnc,
8
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 2
CITY OF SAN FRANCISCO - EAST OF IDGHW AY 101
Additional TDM Options/Aggressive Mitigation Measures
Developer as Tenant
Developer or Employer Percent
Measure/Program Implemented Implements Mitigation
Transit Design Elements 1.0% to 5.0%
I, ......,....f~~44~4~~~!~?~fo.~,....~,~~s.it..f~~lli!1~s.,.,.,'...,'...',','.'..'.'....,....'"..'......,..,....,....,.,...,..,.,.,...,......,',.............,~......,'.'.........".............,.'......,.,...',....'"..,',......',.....,..,......"...,....,.,..,..,........"..,.,.,'...."............,..,....".......,.....,.,...--"..,.,
I ,Transit passenger shelter/ bus stoP." , , ' X . i , , ,', .
: - '-BuS7rajrsiation-subsIdy-(for'constrUct[onf-------X-----~---------------,--, ,---.----------,--,.
Parking Design Measures 5.0% to 5.0%
.,. '...' Sharedparkmgw7exlstmgdeveTopment-- ---------)[------ ---,---- --- --------------,--- "'----
- . -Reducetfr;arklrlg on-sIte---- -"',.,'-----------------X--------------------------- '"
,.. '5ft=streeTpark{ng-res-iiTctlons ,-,-','.. .----------: ----X-----.-----------------------',.,'
.. 'Electrlc'-vehICIepai:i<Ing' (chargmg-stat{onsT---------5C--
Bicycle Design Measures
......... B'icycleU'tralf"c'onne"ctloiis'" ......... ..........................-......... .... ..... .... ................. "x"'"
Onsite Amenities
"'CafeieTiawlthhotfoocl services
. . V alet s-ervlc'es (dry-Cieanmgj
ArM
'Ex'erc'lse""fa'cll1tl'es" . . .... .. ._....~....._..
'Convenlenceretal1(sunclIies)
Childcare
Postofflceistamps
Onsite transit pass sales
Carpool Programs
Mentor group X X
Ahemativecommute suhsidles- ... - ... -X --- ...., ..- - ..x-
Transportation Management Association X X
Participation
Vanpool Programs
-- -----,- -::~j
2.0% to 2.0% I
, " - - __.__, ,I
1.5% to 5.0%
X
X
I
---I
I
-X
"5(
. ......... ............
X
X
'.X
X
'X
X
X
X
X
X
2.0% to 5.0%
1.0% to 3.0%
2.0% to 5.0%
Mentor group
Alternative commute subsidies
Transit Programs
Transit subsidies
On=site pass outlet
Transitfieidtrips ".
Subscription bus services
Shuttle programs (frequency and route
coverage)
Increased frequency for off peak hours
fnci:eased frequency for peak hours
. Additional route coverage during peak
hours
X
X
X
X
1.0% to 10.0%
X
X
X
X
X
X
X
X
'X
X
X
X
X
Fehr & Peers Associates, Inc,
9
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 2 (cont.)
Measure/Program
Additional route coverage during midday
period
Parking Programs
Reduced parking fees for
carpool/EV /vanpools
m m Paldoff~sltepark1ngatpark&ri.delots7"'"
transit stations
Paid parking
. '6H~sltepark1ng"~'park"andrldeshutlfes
Parking cash out
Pedestrian Programs
. '. Afternatlvecommutesubsldi.es
Bicycle Programs
.,."Cornpfillientarybi.kes(recreatlonaiuse)"
.' "Calnpusbi.kes' ,m,' ..,.."'.mmm'.'...,...,.",.."...".......,..,'."..m,..., ""mm
Bicycle riders guides
BIcycleClubTMentor Group
...-.... -AItemailv"e"'c'oiiimute''''subs'lcHe"s ....... ............. ..-..- ........ ..... ". ....~...
Promotional Programs
.. mYanpooiWeek(February)' X X
BIke to 'Work: Day (May) .mmmmm, ""..m. ,mm ,..mmm .. ',..,.,.,"xm.".'..m mmxm,.m..m.mm"
Earth"'O"ay --(Ai)!I!)' "",,^' m', ~-_.'--'~--"-" ...'.-'.H'-"._'x-..~_.._.""'_..,-'~~._.._.,--_...._....._--x-.^'ww_.~
Telecommunicating Site amenities X
only
Site amenities i
only
CITY OF SAN FRANCISCO - EAST OF HIGHWAY 101
Additional TDM Options/Aggressive Mitigation Measures
Developer as Tenant
or Employer
Implements
X
Developer
Implemented
X
Percent
Mitigation
5.0% to 10.0%
X
X
..............w..x.................................................... .......X...'..
X X
... .................j{ ...... ...................... .........................j(.
X
I
I
X
X
X
X
.........h.................
X
X
m .m......m .., .,.,.,..... Xm
X
X
.. mmmmX
2,0% to 5.0%
0.5% to 5.0%
mm m mm I
I
I
1.0% to 1.0% I
.,..."....",.".........,.,.........,...,.....,.,."..,',...,",.,..,...'.'1
m...mmmmm....m.'m m m I
I
.-.'-~~'~"-..^'...I
i
I
1.0% to 2.0% I
Alternative Work Schedule
X
,
Aggressive Range . 25.0% to 63.0%
Note: No one project is expected to achieve 63% TDM, This would require substantial subsidies for all alternative modes of
transportation, It is more likely that a developer will provide financial incentives for a single mode such as transit or bicycling,
Source: City of South San Francisco
Hoyt Company
I,
Fehr & Peers Associates, Inc,
10
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
4. CITy/COUNTY ASSOCIATION OF GOVERNMENTS (C/CAG)
TRANSPORTATION DEMAND MANAGEMENT PLAN GUIDELINES
The City/County Association of Governments of San Mateo County (C/CAG) is the
Congestion Management Agency for San Mateo County. C/CAG oversees the Congestion
Management Program (CMP). As part of the land use element of the CMP, all projects that
generate 100 or more net new trips during the AM or PM peak hour are required to mitigate
the impacts of all new generated trips. One of the five possible ways to mitigate these trips is
to implement TDM programs that have the capacity to fully reduce the demand for new peak
hour trips.
C/CAG has identified acceptable TDM measures with equivalent numbers of peak-hour trips
that will be reduced with implementation of each measure. Measures can be mixed and
matched so that the total number of mitigated trips is equal to or greater than the new peak-
hour trips generated by the project (264 peak-hour trips for the subject office development).
These programs, once implemented, must be on-going for the occupied life of the
development. Programs may be substituted, with prior approval of C/CAG, as long as the
number of reduced trips is not reduced.
The C/CAG list of approved TDM measures, the number of mitigated peak-hour trips
associated with each, and the rationale used to determine the number of mitigated trips are
presented in Table 3.
Fehr & Peers Associates, Jnc,
lJ
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 3
C/CAG Approved Transportation Demand Management Measures
Transportation Demand
I Management Measure
'I Bicycle lock"" ,nd nick...
Showers~ and diingi.ngrooms.""
,. Operatlono{adedi.catedshuttle
service during the peak period to
a rail station or an urban
residential area.
... Chargi.ng employees for parking.
I subsldi.ii.ngti-ansltti.ckei:sfor
, employees.
'CreatiOl1 o{preferel1tlaI pafkil1g
! for carpoolers.
"'Creatlonofpreferentlafparki.ng
for vanpoolers.
i
I-ImPlementatiOn of, v,",pooi
I program.
I
I
I
Number of Trips Credited
One peak-hour trip will be credited
for every 3 new bike lockers/racks
installed and maintained.
Rationale
Experience has shown that
bicycle commuters will on
average use this mode one-third
of the time, especially during
warmer summer months.
.m'~-Two peak- hour-tripswlll b'e"---'-"-TwoT;i.c'ycIi.Sts'cansequeiii:i.iify"-";
credited for each new combination use one shower/changing room
shower and changing room during the peak commute time.
installed.
One peak~hourtrlpw1iibecredii:ed
for each peak-hour round trip seat
on the shuttle. Increases to two
trips if a Guaranteed Ride Home
Program is also in place.
Five additional trips will be
credited if the shuttle stops at a
child care facility emoute to/from
the worksite
One'peak~hour"trip"'wm"he'credli:ed'
for each parking spot charged out
at $20 per month for one year.
.... "One'peak~h'ourtrip-wlTIhe'credlted-
for each transit pass that is
subsidized at least $20 per month
for one year.
One additional trip will be credited
if the subsidy is increased to $ 7 5
for parents using transit to take a
child to childcare emoute.
.'.'-..Twopeak~hourtrips.wmb.e'...-
credited for each parking spot
reserved.
.. YieidsaoI1e~i:o~onerai:i o (one
seat in a shuttle equals one auto
trip reduced); utilization increases
when a guaranteed ride home
program is also made available.
.Yieldsaone~i:o~onerai:io(one
I parking spot charged out equals
one auto trip reduced).
YIeids"'a'on'e~i:'c;~one"ratio'(one'
transit pass equals one auto trip
reduced).
'" YIelds' a"i:Wo~to~one"ratlo(one''''''-
reserved parking spot equals a
minimuin of two auto trips
reduced.
Yiefdsa'seven~i:o~onerai:io(one
reserved parking spot equals a
minimum of seven auto trips
reduced).
..... Sevel1peak~hourtnpsw1iibe ...... .. .... . The average van capaCltyls
credited for each vanpool arranged seven.
by a specific program operated at
the site of the development.
Increases to ten trips if a
Guaranteed Ride Home Program is
also in place.
.. .""Sevenpeak~hourtripswlifhe
credited for each parking spot
reserved.
Fehr & Peers Associates, Inc,
12
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 3 (cont.)
C/CAG Approved Transportation Demand Management Measures
Transportation Demand
Management Measure
Operation of a commute
assistance center, offering on site,
, one stop shopping for transit and
commute alternatives
information, preferably staffed
with a live person to assist
building tenants with trip
planning.
"lmplementa1:ion ofaparking cash
out program.
i Inlplementa1:10I1 of ramp "
, metering.
I
1I1s1:aHatloI1ofhlghbaI1dwld1:h
connections in employees' homes
to the Internet to facilitate home-
telecommuting.
1I1s1:aHa1:l()I1"o{vldeoc()I1fereI1clI1g
centers that are available for use
by the tenants of facility.
ImpIemeI11:a1:10I1(){acompressed
work week program.
Number of Trips Credited
One peak-hour trip will be credited
for each feature added to the
information center; and an
additional one peak-hour trip will
be credited for each hour the center
is staffed with a live person, up to
20 trips per each 200 tenants.
Possible features may include:
· Transit information brochure
rack
. Computer kiosk connected to
the Internet
. Telephone (with commute and
transit information numbers)
. Desk and chairs (for
personalized trip planning)
. On-site transit ticket sales
· Implementation of flexible
work hour schedules that allow
transit riders to be 15-30
minutes late or early (due to
problems with transit or
vanpool).
'One'peak-=hour'trip'will be-creCITiecr-"Yle[dsa'()I1e~1:o~-one-ra1:1o '( one
for each parking spot where the cashed out parking spot equals
employee is offered a cash one auto trip reduces).
payment in return for not using
parking at the employment site.
. Threehundfe'cl"peak=hour trlps'wilf'
be credited if the local jurisdiction
in cooperation with Caltrans,
installs and turns on ramp metering
lights during the peak hours at the
highway entrance ramp closest to
the development.
Onepeak=hourtrlpwlHbecrecllied "Yleldsaone=1:o=oI1era1:1o.'"
for each connection installed.
" '" TweI11:Ypeak=hourtrlpswlifhe'
credited for a center installed at the
facility. '
, 'Onepeak=hourtrlpwlHhecredlted
for every 5 employees that are
offered the opportunity to work
four compressed days per week.
Rationale
This is based on staff s best
estimate. Short of there being
major disincentives to driving,
having an on-site TDM program
offering commute assistance is
fundamental to an effective TDM
program.
" " ThIS IS a very dJ.fficuh an'dcos1:iy
measure to iinplement and the
reward must be significant.
AssumeS1:ha1:1:herewlifheoI1e'" ,
teleconference per day that
includes twenty people.
" 'Thew()rkweekwlilhe' 'j
compressed into 4 days; therefore ,
the individual will not be :
commuting on the 5th day.
Fehr & Peers Associates, Inc,
13
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 3 (cont.)
I, C/CAG Approved Transportation Demand Management Measures
I Transportation Demand
I Management Measure
II Provision of assistance to
employees so they can live close
to work.
I
I", ,',,',"'.._ ..._,_" '..._,.. ,,',' '.._.__,,__,_ _m_'_..'..,____.."_ .._
: Conduct a local-based hiring
! program by registering with and
using the Alliance Job Link
Program.
" Impiementatlonofaprogramthat
gives preference to hiring local
residents at the new development
site.
Provision of on-site amenities/
accommodations that encourage
people to stay on site during the
work day, making it easier for
workers to leave their
automobiles at home.
Provlslonofdilld care services as
a part of the development
ll5eveioperJPropeiiYownermaymm..i
i join an employer group to expand I
available child care within 5
miles of the job site or may
provide this service
independently.
Number of Trips Credited
If an employer develops and offers
a program to help employees find
acceptable residences within five
miles of the employment site, a
credit of one trip will be given for
each slot in the program.
One-peak:hour-tnp wilfbecre"dlied---fhls"ls"basedon"staff'sbest--'
for every 2 job listings posted with estimate.
this program.
m "Onepeak~hourtrlpwmbecredltecr
for each employment opportunity
reserved for employees recruited
and hired from within five miles of
the employment site.
'Oiie"peak~hour"trlpwlilbe"cre(Hted
for each feature added to the job
site. Possible features may
include:
. banking
· grocery shopping
· clothes cleaning
· exercise facilities
. child care center
One trip will be credited for every
two child care slots at the job site.
This amount increases to one trip
for each slot if the child care
service accepts multiple age groups
(infants = 0-2 yrs, preschool = 3&4
yrs, school-age = 5 - 13 yrs).
Rationale
This assumes that a five mile trip
will generally not involve travel
on the freeways.
, 'Thlsassumesi:haTafivemlletrlp
will generally not involve travel
on the freeways.
This IS basedonstafPsEesi'"
estimate.
ThlslsbasedonstaWsbest"
estimate.
, I
,," mml
I
-------1
'One-trlp-wllfbe"'crecHted"[o'r-eacli .."", -"'''fhls1s''1)ased''on''sta:Wsl)est
new child care center slot created estimate.
either directly by an employer
group, by the developer/property
owner, or by an outside provider if
an agreement has been developed
with the developer/property owner
that makes the child care accessible
to the workers at the development
Fehr & Peers Associates, Inc.
14
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Table 3 (cont.)
C/CAG Approved Transportation Demand Management Measures
I Transportation Demand
Management Measure
Join the Alliance's guaranteed
I ride home program.
:
Number of Trips Credited
One peak-hour trip will be credited
for every 2 slots purchased in the
program.
Rationale
Experience has shown that when
a guaranteed Ride Home Program
is added to an over-all TDM
: program, the average rider ship
increases by about 50%.
, '" "'" , '" "" Fivepeak~hourtrlpswiIicrealtea: ' Experlencehasshowniliat"
offering multiple and
complementary TDM
components can magnify the
impact of the overall program.
Flvepeak=h"our-tTIps will be---------fhiSTsbasea-oIi-s"taffs-bestM-------
credited. estimate.
i ""'" """" ",""""'" ,",' '" """""
I Combine any ten of these
elements and receive an
, additional credit for five peak
: hour trips.
1_,,__.., ...."......__....__..__..,............, .....o..., .. ..,.... ...." ..,__....,,_....
I Work with the Alliance to
, developlimplement a
Transportation Action Plan.
Thedevelop..ercanprov{(reacasii......-Peak~hourtrlpreductioIi"credits
legacy after the development is will accrue as if the items were
complete and designate an entity being directly implemented by the
to implement any (or more than developer.
one) of tlle previous measures
before day one of occupancy.
EncouragelnflIideveIopment:
"" """""'Twopercentoraffpeak~hourtrlps
will be credited for each infill
development.
I
-".. Credits accrue depending "on what _ I
the funds are used for. I
""GeneraffyaccepiibieTbM
practices (based on research of
TDM practices around the nation
.. and reported on the Internet),
Five peak-hour trips will be "".., " " ""..''''GeneraHyacceptabieTbM'' ,
credited for an agreement with an practices (based on research of
existing development to share TDM practices around the nation
, existing parking and reported on the Internet),
,,'" '" 'Fivepeak~hourtr1pswlIibe ""'" """ "'GeneraffyacceptabieTbM '"
credited. practices (based on research of
TDM practices around the nation
, and reported on the Internet).
"" "11:iTsiS"bas"edon"staffs"best
estimate.
Encouragesharedparklng ,
'Partlclpate'lii7create/sponsor"a'
Transportation Management
Association.
Coordinate TransportatIon" ..", ""'Fivepeak~hourtrlpswmbe..
Demand Management programs credited.
with existing
developments/employers.
, Foremployerswlthmuitipiejob'"
sites, institute a proximate
commuting program that allows
employees at one location to
transfer/trade with employees in
another location that is closer to
their home.
"Pay" for parkinga.tparka.ncfrlde--m.. 6nepea.k~iio-ur'trlpwmhe-credltedyieldsa one~to~oneratlo:--
lots or transit stations. for each spot purchased.
.. Source: City/County Association of Governments of San Mateo County's (C/CAG) Revised Guidelinesfor the Implementation of the
Land Use Component of the 1999 Congestion Management Program, October 11.2000,
6nepea.k~hourtr1pwiHhecredltea ""VleIasaone~toonera.tlo. ""
for each opportunity created.
Fehr & Peers Associates, Inc,
15
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
5. TRANSPORTATION DEMAND MANAGEMENT PLAN
The Transportation Demand Management (TDM) Plan elements for 200 Oyster Point
Boulevard include on-site amenities that encourage the use of alternative modes of travel,
require participation in associations that promote commute alternatives to the single-occupant
vehicle, and include parking measures. It includes appropriate TDM measures that will
satisfy City of South San Francisco and C/CAG guidelines. Table 4 summarizes the TDM
measures for the proposed project and identifies how they meet the City's 35 percent
alternative mode use goal and C/CAG's trip equivalent guidelines. These TDM measures are
described in detail below.
On-Site Measures
A TDM coordinator will be designated for the site. The coordinator will actively market the
TDM Plan to all employees, and will conduct the annual monitoring/reporting process. The
coordinator will develop an on-site transportation information center with SamTrans, BART,
and CalTrain schedules and maps. The TDM coordinator will provide information via flyers,
posters, emails, or brochures and actively market alternative mode use and special programs
such as Bike-to-Work Day or Vanpool Week. The TDM coordinator's role also includes
managing on-site transit pass sales and the guaranteed ride home program (working with a
local taxi service or rental car agencies).
Carpools are the most popular alternative commute mode. An in-house matching service, in
conjunction with a vigorous marketing campaign, will be used to increase the percentage of
employees that share a ride to work via carpools and vanpools.
Vanpool and Shuttle Measures
CalTrain and BART shuttles provide service from the South San Francisco CalTrain station
and Glen Park BART station to nearby office developments in the Oyster Point and Gateway
areas. The project sponsor will work with the Peninsula Congestion Relief Alliance to fund
20 shuttle seats.
The project sponsor will implement and maintain two vanpools that will provide
transportation services to the project site for employees. Vanpools usually are operated by
employees that are either picked up or gather at one location to reduce the number of trips to
and from work.
Fehr & Peers Associates, Inc,
16
""'"
Il)
:c
<:<I
~
I
'I
1'= 0
.... (,J
= .fa'
~ ;$,
.... l::'
o ~,
..c =
lu~
I
[
e
<:<I
l-<
ell
o
l-<
~
] ~ I
-s ~!
o =
= <:<I
=~
'S "0
~ =
l-< <:<I
Q.l 8
.... Il)
~~
o =
o .~
~B
l-<
o
c..
'"
=
<:<I
l-<
Eo-<
Q.l
.::
....
C'd
= ~
~~
<~
.... 0
~~
(,J
..
Q.l
~
'E"O
';' ~ {I'J
Il) C'd c..
l.Q .~.;:
e;<;::~
;:::I~
,Z
o
-<
U
U
=
.:;
....
<:<I....
eIl'-
E11
~U
c..
'j;;;
~
:~
,~
'<n
0)
'(,)
['E
'0)
"n "'Cl
I-< 0)
0) I-<
c..~
.. e. 'c:
.tl
'0)
,1=1
'0
c
.:;
....
c..
OJ;;;
(,J
'"
Q.l
~
I-<
1.8 <-0
:'S \D
o_
S 0)
.8 gp
I-< c..
:0 1=1
~~ 0
.S 1=1
"8 .S
g .~
:u b
cd '"
0) 0)
''''Cl "'Cl
;0> Q)
o 0)
I-<UJ
c..1l.i
~ .~
,.- [/)
is 0)
:5-B
'" I-<
8<8
~a
t)~
'~::;E
20
:;E-<
,~ -B
i~
~
'N
; j:
.- '-.. ~.-......_~..........".._._~-_.........._.._~._,,_..__._j
, "
'"
~ 1=1 .r;
~ Q) ,8 !:-s
bJ)Q)~o.>:~
2 >'0 1:: ~,O)
c.._ 0 a'l-<
~ c.. ~..t:I 1.2
~ s I=l Q)~rJ:l
OO)cd"'Cl'.8
!'.g c?l .tl '1:: [ '"
Sd~^"8~
OcdcdO)>'
I-< 1=1 S .....,0
, c.. 0) 0) a 0..
~ ~ CI)~ ~;8
,- is I-< ;:::1'0)
2; ~ ~ ell, 0)
~ 0) 8. ~n~
3l"g",^a!gb
= u "'-<< .......!l-;
.,g.s ~ .~~
en rJ:l~ rJJ):;::::::
tl S in^ cd: is
'" cd t) gp'l-<
8 bh..l<: .-..8
0..0 (,) aim
'" I-< m m ..S
..... c.. 0.. - ''''Cl
(,) 1=1 1=1 0.., I-<
0) 0 0 0..' 0 ,
',:-'0' '.c '.0 .~ ! 0 ~ i
. ,I-< 0 m .j;:l i (,) 1-<'
1::, c.. S d '^'::;E 0:
8.;~ 2 ,~ ,gjo ~:
~ :~ ~ 0 ..s E-< .8.
S
m
I-<
OIl
o
I-<
0..
-
C<l
1=1
.S
"0
S
o
~
'~
'0
'N
'"
0)
(,)
.;;
I-<
0)
'"
OIl
1=1
:.a
(,)
~
s
0)
"'Cl
~
'~
'0
'00
'0
'00
'::= ~ Q)
.~ ..t:I.9< . '" S Il.i
g ~ ~ .9<.,g g
..9< 0) "'Cl ~;:::I .tl 0)-
'.tl I-< S..t:l 0 "'Cl 0..
, ~ <8 0 '" Z '1:: .S
'0"'Cl I-< ~ "'Cl.~
I~ .~ ~ ....... .s ~ 8
'~ ] ~ 8 & ~ ~
o..(,)..I<:~mt;;Cl)
'0) 0) m 0) ~ ;:::I 2
'1=1..0 8.'" (,) OIl 0..
,0 .E cd
~
'm 0)
,1=1 c..
.0 t
i~ -= ~
0) '0 0..
';P-.'B
. ~ t "'Cl
i~ ~ g
'I-< 0 I-<
. C<l 0) N
; ~~ 0)
'0 ~
,N ~ S
'2'E'"
,08 il -E
',......c [/) ='
.:;:: ~..t:I
: is p::; '"
. I-< ~ E-<
, ~ III P::;
'1=1 I-<~
,8. o III
, '" ;;0 "'Cl
''0 8 a
,0)
:'5'.S .S
:~~ ~-d
, 0) C C .9
i..t:l m C<l t
iE-< U U 0..
m
!rlJi 03
a,) j Q) ....... ......
i..i- "'Cl 1=1
::l'~ 0 0)
'~,.E'I:: ~
QI t/.) Q) [/)
~ ,"'Cl 0.. ~
,~ ~ ~ a
t::,~ 8.12
;:::1:"8 0) ;:::I
it5 ''''Cl ofJ 1=1
m OIl m
'-g ''c:.s tl
<:<l 1=1 ;:::I 1=1
o 0 "'Cl.9
: 0 ;'.p: 0 ~
=-j ~ .~ 1;)
a& l:: - ~
>,0 1il'~ t;;
[~
~
N
o
'N
'"
.9< . 4-<
.tl "0 ,-
'I-< 00
;:::I 0..-
.,ga.8
, :> '"
~..t:IO)
0) (,) '"
0.. m ~
1=1 0) I-<
0) I-< (,)
:><8.E
0)
UJ
'"
"0
o
g.
m
:>
N
.S
m
.....
1=1
.<;
.8
"'Cl
1=1
m
d
0)
8
0)
'~
-
,-
'~
; J-I
o
'"
1=1
o
, 0..
'"
.....
(,)
0)
'5'
I-<
~
"0
o
g.
m
:>
m
4-<
o
1=1
.9
~
d
0) 8
S cd
0) I-<
-OIl
13-0
1=1 I-<
_ 0..
0)
a
o
..t:I
0)
~
I-<
'"Cj .~
~ S
~ ~
I-< OIl
cd 0
;:::I I-<
Cl)o..
Il.i
(,)
m
-a
,S
-I
~
o
<n
-
'"
0..
'13
<n
o
-
~
"0
.....
..0
;:::I
UJ
'"
Q.l I-<
.. 0
~ ~ ~
;:::I <:<l.S
'" Q.l "'Cl
~ ~ tl
~ ~ 8
~ 0::;E
~ 613
,-.
't:l
Cl)
:::
.S
1=
,0
U
'-"
5
e<l
;...
~
o
;...
~
't:l-
;... =
e<l Cl)
.. 5
Cl.l Cl)
:; ~.
o e<l
~ ;;
=:;g
....., 't:l
o =
~ e<l'
~ 51
- Cl.l
~~
o c
c .S
c-
N~
;...
o
Q.
'"
=
e<l
;...
E-<
Cl.l
.~
.c -
e<l
- = Cl)
::: ;... '"
0 Cl.l ;;J :'2f2- !~ I~ ~ ~ .~
-
:;;: Cl.l ,~ ~ ~ ~ ~ ~
't:l
- 0 IV) ~ V) 00 'N
= :;g
Cl.l
Cj
;...
Cl.l
~
't:l
.. ~ {,I}
Cl.l e<l Q.
.Q ~.....,
5'''''' ;...
:::.'.::E-<
Z:;g
o
-<
U
U
=
.S
-
e<l_
~.....,
E~
:;gU
Q.
'C
E-<
=
.S
-
Q.
'C
Cj
'"
Cl.l
~
Cl)
;...
:::
'"
~
Cl)
:;g
:;g
~
E-<
V)
-
<1)
"'~
5 .~
e<l _
l. "tij
~=
e ro
~,/:i
't:l OJ)
Cl) C
N 'N
:E~
'" V)
.Q..o
::: ;::l
rf)rn
V)
-
'V)
V)
V)
ctl
Q.
-
.....,
V)
a
'.b
.....
<1)
Q.
Q.
:'.8
Q)
c
o
is N
i ~ 1;'.S . V)
:.9< > 't:l . Q.
.,/:i <1) <1) ,'.8
..... ..... gj 5't:l
g<8.c~o
.c, 't:l ~ 0I);.c
<1) ;::l O. I
~ .-;:: 0. ~.~
<1) 't:l V) , <1)
o.~o 0.
Q) U -u; 1l.rl
.C <1)
'0 ..0
o
'00
......
:<8
! ~ <U
:'.8 ~
...... 0.
;::l V)
!,g e;-
, I <1)
I~ ~
<1)
0.
'N
N
.~
'00
.....
<8
:(/)
0.<1)
'.8 ~
t:l ~
,0 e;-
..c <1)
i~ ~
'<1)
0.
'r--
..... 00
,<8 tl
'v) ~
,.9< 15
,,/:i >::::C
i t:l -E
.,g ~
,
,~ ("<')
.~ e;-
0.<1)
.- ~
ClI
,0.
'.8
,V)
00
= 0.
:-.8 '.6
mV)
!.~~
"s .~
c15
o .....
- u
>.ctl
a <1)
..
CI'J 'Q)
<1) U
'~ ~
8::3
o.~
El t)
~ .g,
18.. 8
,v) 0.
~......- 0
~-:S
j'~ ~
o.t:l
~~ ~
,- <1)
';::: s
V)
,0
......
'~
'm
,<1)
S
=
<1)
-
.>.
'=
.m
<1)
=
~ i:.E
.c.5
10,8
?f?-
Ill,
.... .
...".1
:1
Q.
~I
N
_I
e<l
-
o
E-<
~
Cl)
;:Q
e<l
E-<
'V)
......
~
.....
OJ)
o
.....
0.
<1)
-:S
,S
,~
..9
V)
o
-
.8
V)
<1)
V)
V)
m
0.
<~
V)
=
'ro
,.b
<1)
'''0
;'>
o
.....
0.
-
-
......
~
.....
o
V)
=
o
0.
V)
'''0
,~
-
-
.~
.....
o
V)
=
o
0.
V)
't> v5 it)
<1) 0 <1)
:'~ 0) ,,~
8 0>'1 8
0._10.
<1) 0.1 <1)
.c Sic
.r' <1).r'
~
ClI .....
o OJ)
u 0
= .....
~ ~
~ ~
<1).c
-:S~
.S 'C:
<1)"0
~ ~
.~ 15
.~ ~
t:: ro
~~
=
.S
-
ro
t::
o
0.
V)
=
ro
.....
,f-<
ro
..s
<1)
~
0.
'u
'-2
m
~d
~ .9
'.:;;: -
po .~i
..... U
~ 0
= ~
8..-<
l~ 5!
.g, S i
o <1)
,~ Mi
o.ctl
<1) a
It=: :::8
-
=
<1)
S = V)
~..8 ~
ctl ro ~
c:: ~ (IJ cd
clj'- Q) Q)
:::E',g ;... S
= a ~ =
.S 0. ~ .~
E a ~ ~
""'" .....c ~
o-eJJ
o..;S = gp
V) OU :E2 ......
= V) ;... ~
~ V) e<l ~
E-<-<~A..
'''''l
("<') 't5<1) ,.....113
S '"", ~ .<8 is OJ)
o 0 1"0 fa m.S
:c.l:: 0 '(1),/:i .15 ~ "0
o 00 ;~ = _..... ">
,'.;j ~ 51 0 0 : ~ Q) 0 0
ro..... , 01) o,5b 01) 0......
..... 0 .'v.; = 0.:,'''''' ~ 9<1 0.
01) 0. . <1) ,...., = V) ..... '
. <:j V) 1"O:sl Cd' <1) _ ctl U~
I.~ 0 .ClI...... ,..,"0...... ""u
,~u '(1):::..... " V) ..0:;:$ ..... " ro
.....ro lu..oV v.....
8.. ~ .ro <1) fai~ ~ fal<1)
<1) ("<') t ~ -:S - : 0. o;:J - ,~
-:S 00 's:..... g. V) ..... g ,..0
"0 N "ro fr\O ~ fr'V)
o 0 ,~~ ro.<1) = ctll=
g - Im"O u1;; "0 uIE V)
"0 "V ..c <1) ..... l.c E ....., V) ,g
~ ~ ;::= ~ tS:= c..s tB :.S :.0
...... u "0 ...... Uo "0 ,-
gj ~ ' ~..9 <1)' ~ - <1).:-::l V)
.c ~ it) >"~ u ..Q'~ 1 ~ N
..... 0" 10- =,(1) = g.......'o
~ V) 1'5' @ af.'5' 0 <1) ~_
=0 ..... ...........OI).....=m
00 o.OJ)~O'=~;:::8
~ 0" "O.S 0"0 ~ 0 .....
......-..-4 !(l)~~~~~.:~:
u ..... "VI~ a E1 0 0. <:j u .....,
.g, &~. 0. 0. S 8"_ !3 .g,<8
8 V) (1)180 g ..... g g 8 (1)
~8 ~!~fr's ~g.'S ~&
t=: ~ ~it=: 13 ~ ~ ~ ~ t=: ~'
, V)
.....
'(1)
:0
'0
fr
m
'U
.....
,<8
01)
I.S
~
ro
,0.
:]
~
(1)
.....
l~
'(1)
.....
'A..
V)
.....
<1)
o
o
g.
ro
,..
.....
<8
OJ)
,S
~
.....
m
0.
3
-
=
<1)
.....
~
o
.....
A..
V)
,~
'U
ro
.....
<1)
U
'>,
u
,05
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
Subsidized Programs
One of the most-common reasons that employees do not want to use an alternative mode (i.e.
carpool, vanpool, or transit) is the inability to leave work unexpectedly for a family
emergency or the fear of being stranded if they need to work late. One element that allays
these fears is a Guaranteed Ride Home (GRH) program. With this program, employees can
use a taxi service, rental car or another selected mode to get home and the employer pays for
the service. The project will fund 10 slots in the Peninsula Congestion Relief Alliance's GRH
program. The transportation coordinator will manage the GRH program. The employee
contacts the transportation coordinator when they need a ride home and the transportation
coordinator then makes the travel arrangements.
The project sponsor or tenant will also join the Peninsula Congestion Relief Alliance
program which provides ongoing support for alternative commute programs. The sponsor
will subsidize transit tickets for fifteen employees to utilize public transit to the project site.
Parking Measures
The project sponsor has used the reduced parking ratio of 2.83 spaces per 1,000 square feet
as well as provided forty carpool and six vanpool spaces located near the building entrance.
These measures discourage the single-occupant vehicle trip and improve accessibility for
those sharing vehicles.
Five bicycle racks that can accommodate 25 bicycles will be installed to secure bicycles and
further encourage riding to work.
Fehr & Peers Associates. Inc,
19
200 Oyster Point Boulevard Transportation Demand Management Plan
December 2001
6. SUMMARY AND CONCLUSIONS
This report presents the TDM Plan for the proposed office development located at 200 Oyster
Point Boulevard in South San Francisco, California. The report identifies TDM measures that
contribute to a goal of 35 percent alternative mode use according to South San Francisco
guidelines. The TDM Plan also satisfies C/CAG guidelines that requires developments to
implement TDM measures with the capacity to mitigate all new peak-hour trips.
The TDM Plan has been tailored to utilize the measures that are most compatible for the
proj ect:
- TDM coordinator will actively market the TDM plan.
- The project is located in close proximity to the South San Francisco CalTrain Station,
providing convenient access to CalTrain. The TDM Plan promotes transit usage by
funding seats to a CalTrain and/or BART shuttle.
- The office development is proposing bicycle racks, and designated carpool and
vanpool parking spaces. These physical attributes promote alternative commute
options.
- The project sponsor will participate in the local TDM association, Peninsula
Congestion Relief Alliance. This will maximize the effectiveness ofthis TDM plan.
The site plan has a reduced number of parking spaces.
The TDM plan meets the specific requirements set forth by C/CAG and the City of South
San Francisco. The proposed project is projected to generate 264 new peak-hour trips. The
TDM Plan is expected to mitigate 265 peak-hour trips through the use of C/CAG approved
TDM measures. The TDM Plan is also projected to achieve a 41.5 percent alternative mode
use according to City of South San Francisco guidelines.
Fehr & Peers Associates, Inc.
20
I Table A-I
Trip Generation Estimates I
Daily AM Peak-Hour Trips I PM Peak-Hour Trips
Use Size (s.C.) Rate! I Trips Rate I In lOut I Total I Rate! I In lOut Total
i ; ;
Proposed Office I 155,000 I 11.99 1,858 1.71 1232 i 32 264 1.63 43 ; 210 253
I ; ; !
Notes: I Rates expressed as trips per 1,000 gross square feet.