APPENDIX G
NOISE DATA
Traffic Noise Modeling Summary for the Gateway Business Park EIR
October 2009
Existing Traffic Volume, No Existing Traffic Volume with
Project Project
Roadway PM PM
Heavy Peak Peak
Speed Truck Traffic Hour Traffic Hour
(mph) % Volume L,o CNEL Volume L,o CNEL
Ovster Point Boulevard
US 101 to Gateway 35 10 2802 69.4 72.6 3341 70.2 73.4
Gateway to Veterans 35 10 2116 68.2 71.4 2532 69.0 72.2
Gatewav Boulevard
Oyster Point to Project Access 30 10 919 63.6 66.8 1086 64.4 67.6
Project Access to East Grand 30 10 664 62.2 65.4 865 63.4 66.6
Sister Cities Boulevard
Airport to West 30 10 1563 65.9 69.1 1602 66.1 69.3
2035 Traffic Volume, No 2035 Traffic Volume with
Project Project
Roadway PM PM
Heavy Peak Peak
Speed Truck Traffic Hour Traffic Hour
(mph) % Volume L,o CNEL Volume L,o CNEL
Ovster Point Boulevard
US 101 to Gateway 35 10 6271 72.9 76.1 6810 73.3 76.5
Gateway to Veterans 35 10 5796 72.6 75.8 6212 72.9 76.1
Gatewav Boulevard
Oyster Point to Project Access 30 10 1294 65.1 68.3 1461 65.7 68.9
Project Access to East Gra nd 30 10 1031 64.1 67.3 1232 64.9 68.1
Sister Cities Boulevard
Airport to West 30 10 2725 68.4 71.6 2764 68.4 71.6
Notes:
1. Existing and future traffic noise levels are calculated using the Federal Highway Administration's
Traffic Noise Model (TNM 2.5) normalized to a distance of 100 feet from the center of the road.
2. The CNEL is assumed to be equal to the PM peak hour L,q plus a factor of 3.2 dBA which is based on
the ambient noise measurements.
3. Traffic data provided by Crane Transportation Group (24 September 2009) is used as input to the
noise model. The PM peak hour data is used to calculate the CNEL because the volumes are higher
than the AM peak hour.
4. The noise level increase generated by increased traffic is proportional to 10 times the base 10
logarithm of the traffic volume increase
5. The assumed traffic speeds and heavy truck percentages are based on observations during the noise
measurement program.
ROSEN
GOLDBERG
DER&
LEWITZ,INC.
1100 Larkspur Landing Circle #375. Larkspur CA 94939. Tel415 464 0150. Fax 415 464 0155. RGDLacoustics.com
APPENDIX H
TRAFFIC DATA
Traftic modeling sheets are included in a separate folder on tillS CD.
Appendix Table 1
HOME DEPOT TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE VOL VOL VOL VOL
Home Depot 1m 86 181 205
Existing Site Use (-4) (-2) (-20) (-19)
Removed (Levitz)
Total 99 84 161 186
Source: Home Depot Drqft FocI/sed EIR, by Lamphier-Gregory &- Crane Transportation Grol/p, 1005.
Compiled by: Crane Transportation Grollp
Appendix Table 2
LOWE'S TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAl':: HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE VOL VOL VOL VOL
Lmve'g & \Vest 148,749 SQFT & 130 106 243 268
Marina Bldg 6,590 SQFT
Existing Site (-42) (-37) (-108) (-86)
Uses Removed
Net Chrulge 88 69 135 182
Source: Lml'e 's Drqjr FOCI/sed EIR, by Lamphier-Gregory &- Crane Transportation Grollp, 2005.
Compiled by: Crane Transportation Grollp
Appendix Table 3
333 OYSTER POINT TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RATE VOL RUE VOL RUE VOL RUE VOL
R&D 315,444 SQFT * 297 * 61 ** 50 ** 283
TDM Reduction (-59P) (_12)(1) (_10)(1) (_57)(1)
Net New Trios 238 49 40 226
(1) ::w~/o reduction in average trip rates due to City numdated TDtJ program (see Appendix).
* Ln(T) ~ .86 Ln(X)+O.93 (83% in!l7% out)
** Ln(T) ~ .82 Ln(X)+1.09 (15% in!85% out)
T ~ Trips
X ~ Size in 1.000 SQ.FT.
Ln = Natural Log
Trip Rate SOllrce: Trip Generation, 8th Edition, by the Institute of Transp011ation Engineers (ITE) 2008.
Compiled by: Crane Transportation Grollp
9/22/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table ..
180 & 200 OYSTER POINT BLVD. TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
R&D 186,288 SQFT 154 31 25 141
TDM Reduction (-31)<') (-6)<') (-5)'') (-28) ,')
Net New Trips 123 25 20 113
(1) 20~~o reduction in average trip rates due to City mandated TD}.! program.
Trip Rate SOl/ree: Tlip Generation, 8th Edition, by the Institl/te ~rTransportation Engineers (ITE) J008. See Table n:Af-J 1 for tlip
rate details.
Compiled by: Crane Transportation Grollp
AppelUlix Table 5
OYSTER POINT REDEVELOPMENT TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE VOL RUE VOL RATE VOL RUE VOL
R&D 460,000 SQFT * 541(1) * 111 ,I) ** 87(1) ** 491(1)
OtTice 690,000 SQFT *** 466(1} *** 64\1} **** 93\1} **** 454(1}
Gross T ol11 Ll50,ClOO SQFT 1007 175 180 945
TDlvl Reduction (-201)") (-35)''' (-36)") (-189)")
Net New Trips 806 140 144 756
(1) Results based upon fitted curve evaluation of entire L 150,000 SQ.FT. development. Fitted curve applied to entire site as office
and then to entire site as R&D. 60~'o ofR&&D trip generation results for the entire site \vere utilized for the R&D component of
development an 40% of the office trip generation result') for the entire site \vere utilized tll[ the office component of
development.
20~'o reduction in average trip rates due to City mandated TDtI program.
(1)
* Ln(T) ~ .86 Lnex)+O.93 (83% ini17% out)
** Ln(T) ~ .82 Ln(X)+1.09 (15% in!85% out)
*** Ln(T) ~ .80 Ln(X)+1.55 (88% ini12% out)
**** Ln(I) ~ 1.12 (X)+78.81 (17% in/83% out)
T ~ Trips
X ~ Size in 1.000 SQFT.
Ln ~ Natural Log
Ll50,000 SQFT Total
690,000 SQ.FT. R&D
460,000 SQ.FT. OtTice
Trip Rate SOl/ree: Trip Generation, 8th Edition, by the Instih/te ~rTransp0l1ation Engineers (ITE) J008.
Compiled by: Crane Transportation Gro/lp
9/21/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table 6
250-270 EAST GRAND TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE VOL RATE VOL RUE VOL RUE YOL
R&D wiProiect 914.090 SQ.FT. * 740 * 152 ** 120 ** 677
R&D Existing 630,528 SQFT * 538 * 110 ** 88 ** 500
Net Change Due 202 42 32 177
to Project Befl,re
TDM Reduction
TDM Reduction (_40)'1) (_8)'1) (_6)'1) (_35)(1)
Net New Trios 162 34 26 142
(1) 200/0 reduction in average trip rates due to City mandated TDtJ program.
* Ln(T) ~ .86 Lnex)+O.93 (83% in)17% out)
** Ln(T) ~ .82 Ln(X)+UI9 (15% ini85% out)
T ~ Trips
X ~ Size in 1,000 SQ.FT.
Ln ~ Natural Log
Trip Rate SOllrce: Trip Generation, 8th Edition, by the Instihlte ~fTransp0l1ation Engineers (ITE) 2008.
Compiled by: Crane Transportation Gro/lp
9/21/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table 7
213-217 EAST GRAND AVENUE + 328 ROEBLING ROAD
+ 2-t9 EAST GRAND AVENUE (ALL BUILDINGS)
TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
lTSE SIZE RATE VOL RUE VOL RUE VOL RUE VOL
213-217 E. Grand 932,423 SQ.FT* * 790'" * 151'" * 129'" * 733'"
& 328 Roebling
& 249 E. Grand
TDM Reduction (-158)l2) (_30)<2) (-241") (_147)(2)
Existing Site NA (-37) NA (-18) NA (-6) NA (-38)
Uses to be
Removed
Total 595 103 97 548
(1) Results based upon fitted curve evaluation of entire 932.423 SQ.FT. development. Fitted curve applied to entire site as R&D and
then entire site as office. S4.4~/oofR&D trip generation results for entire site \vere utilized for the R&D component of
development and 15.6~~o of the office trip generation results for the entire site \vere utilized for the office component of
development.
(1) 200/'0 reduction in average trip rates due to City mandated TD11 program.
* AM R&D Ln(T) ~ .86 Ln(X)+O.93 (83% in!17% out)
* PM R&D Ln(T) ~ .82 Ln(X)+ 1.09 (15% in/85% out)
* AM Otllce Ln(T) ~ .80 Ln(X)+ 1.55 (88% in/j2% out)
* PM Otlice T ~ 1.12 (X)+ 78.81 (17% in/83% out)
T ~ Trips
X ~ Size in 1.000 SQFT
Ln ~ Natural Log
Trip Rate SOllrce: Trip Generation, 8th Edition, by the Institl/te of Transp011ahon Engineers (ITE) 2008.
Compiled by: Crane Transportation Grollp
CAMPUS DESCRIPTION
8-"4% R&D & 15.6% OFFICE
213-217 E. Grand
328 Roebling
249 E. Grand
Total Campus
291,634 SQFT (Yo R&D = 145,817 SQ.FL Yo Otlice = 145,817 SQ.FT)
105,536 SQFT R&D
535,253 SQFT R&D
932,423 SQFT
9/21/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table 8
494 FORBES TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RATE VOL RUE VOL RUE VOL RUE VOL
R&D 326,020 SQFT * 305 * 63 ** 51 ** 292
TDM Reduction (_61)(1) (_131'1) (_10)(1) (_50)(1)
Total 244 50 41 234
(1) 20% reduction in average trip rates due to City mandated TDlvl program (see Appendix).
* AM Ln(T) ~ .86 Ln(X)+0.93 (83% in/17% out)
** PM Ln(T) ~ .82 Ln(X)+1.09 (15% in/85% out)
T ~ Trips
X ~ Size in 1.000 SQFT
Ln = Natural Log
Trip Rate SOl/ree: TJip Generation, 8th Edition, by the Institl/te of TranspOltation Engineers (ITE) J008.
Compiled by: Crane Transportation Grollp
AppelUlix Table 9
CALTRAIN PARCEL TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE VOL RUE VOL RATE VOL RUE VOL
Commercial 23,960 SQFT .72 17 .54 13 1.14 27 l.23 30
25~'o Safety 4 3 7 8
Factor
Total 21 16 34 38
Trip Rate SOllrce: Trip Generation, 8th Edition, by the Institute qfTransportation Engineer..... (ITE) 2008, for home imprm'ement store.
Compiled by: Crane Transportation Grollp
9/21/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table 10
GENENTECH TRIANGLE TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE VOL RUE VOL RUE YOL RUE VOL
40% Office 248,000 SQ.FT. 0.83'') 206 0.12'') 30 0.12'') 30 0.60'') 149
60% R&D 372,000 SQFT 0.49'') 182 0.10'') 87 0.07'" 26 0.38'') 142
SubtOllll 620,000 SQFT 388 67 56 291
Hotel 350 Rooms * 142 * 102 ** 118 ** 122
Gnmd Tol11 530 169 174 413
(1) Trip rates surveyed for existing Genentech facilities in South San Francisco, Genentech Corporate Facilities tJaster Plan ErR
2008.
* T ~ .78(X)-29.80 (58% in/42% out)
** Ln(T) ~ 120 Ln(X)-1.55 (49% in/51 % out)
T ~ Trips
X = #lUlits
Ln = Natural Log
Trip Rate SOllrce: Trip Generation, 8th Edition, by the Institute qITranspOJ1ation Engineers (ITE) 2008.
Compiled by: Crane Transportation Grollp
AppelUlix Table 11
TERRABA Y PHASE 3 TRIP GENERATION
(2008-2015)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE YOL RATE VOL RUE YOL RUE YOL
OlT1ce 697,000 SQFT * 781 * 106 ** 146 ** 714
TDM Reduction (_156)'1) (_21)'1) (_29)'1) (_143)'1)
Total 625 85 117 571
(1) 20~'o reduction in average trip rates due to City mandated TDtJ program (see Appendix).
* Ln(T) ~ .80 Ln(X)+ 1.55 (88% in/12% out)
** Ln(T) ~ 1.12 (X)+78.81 (17% in/83% out)
T ~ Trips
X ~ Size in 1,000 SQ.FT.
Ln = Natural Log
Tl1p Rate SOllrce: Tl1p Generation, 8th Edition, by the Institllte ~rTranSp0l1ation Engineers (ITE) 1008.
Compiled by: Crane Transportation Grollp
9/21/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Appendix Table 12
OYSTER POINT REDEVELOPMENT TRIP GENERATION
(2016-2035)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUTBOUND
USE SIZE RUE VOL RATE VOL RUE VOL RUE YOL
R&D 460,000 SQ.FT. * 541'') * 111 u, ** 87'" ** 491'')
OtTice 690,000 SQ.FT. *** 466(') *** 64<" **** 91<" **** 454(')
Gross Total 1,150,000 SQFT 1007 175 180 945
TDM Reduction (-201)'" (-35)'" (-36)(" (-189)("
Net New Trips 806 140 144 756
(1) Result') based upon fitted curve evaluation of entire 1,150,000 SQ.FT. development. Fitted Clm'e applied to entire site as office
and then to entire site as R&D. 60% ofR&&D trip generation results for the entire site \vere utilized for the R&D component of
development an 40% of the office trip generation result') for the entire site \vere utilized for the office component of
development.
(2) 20~o reduction in average trip rates due to City mandated TDl.l program.
* Ln(T) ~ .86 Ln(X)+O.93 (83% in/17% out)
** Ln(T) ~ .82 Ln(X)+ 1. 09 (15% in/85% out)
*** Ln(T) ~ .80 Ln(X)+1.55 (88% in/12% out)
**** Ln(T) ~ 1.12 (X)+78.81 (17% in!83% out)
T ~ Trips
X ~ Size in 1.000 SQ.FT.
Ln = Natural Log
1,150,000 SQFT Total
690,000 SQFT R&D
460,000 SQFT OtTice
Tl1p Rate SOllrce: Tl1p Generation, 8th Edition, by the Institllte ~rTranSp0l1ation Engineers (ITE) 1008.
Compiled by: Crane Transportation Grollp
Appendix Table 13
OYSTER POINT REDEVELOPMENT
RESTAURANT/HOTEL/RETAIL
(IN ADDITION TO 1,150,000 SQ.FT. OFFICE/R&D
TRIP GENERATION)
(2016-2035)
Al\I PEAK HOUR TRIPS Pl\I PEAK HOUR TRIPS
INBOUND OUTBOUND INBOUND OUfBOUND
USE SIZE RUE VOL RUE VOL RUE YOL RATE VOL
Hotel 350 Rooms * 142* * 102 ** 118 ** 122
Qual1tv Restaunmt 20,000 SQFT .61 12 .20 4 502 100 2.47 50
Specialty Retail 20,000 SQ.FT. .72 14 .48 10 *** 31 *** 39
* T ~ .78(X)-29.80 (58% in/42% out)
** Ln(T) ~ l.20 Ln(X)-1.55 (49% in/51 % out)
*** T ~ 2.40(X)+ 21.48 (44% in/56% out)
T ~ Trips
X ~ Size in 1.000 SQFT
Ln ~ Natural Log
Trip Rate SOllrce: Trip Generation, 8th Edition. by the Institute of Transp011ation Engineers (ITE) 2008.
Compiled by: Crane Transportation Grollp
9/22/09 Gateway Bllsilless Park 1Iaster Plan Draft EIR
Draft
GATEWAY BUSINESS PARK
TRANSPORTATION DEMAND
MANAGEMENT PROGRAM
!II'.......
..., .
~;_.. ...' ", ..,_.. ~ ,___ - .L '. ...
I.
"
"i
111-1
c.
Prepared for:
Chamberlin Associates
Prepared by:
Fehr & Peers
SF08-0393
September 2008
11>
F E H R & PEE RS
TRANSPORTATION CONSULTANTS
TABLE OF CONTENTS
1. I ntrod uction ........................................................................................................................................................ 1
Executive Summary........................................................................................................................ ..................... 1
Background..................................................................................................................... ..................................... 1
Purpose....................................................................................................................... ........................................ 1
Project Description................................................................................................................... ............................ 1
Regulatory Setting....................................................................................................................... ........................ 3
2. Existing Transportation System ...................................................................................................................... 5
Transit Service....................................................................................................................... .............................. 5
Bicycle Facilities.................................................................................................................... .............................. 8
Pedestrian Facilities............................................................................................................................................ 8
3. Transportation Demand Management Program............................................................................................. 9
Mode Share Assumptions................................................................................................................................. 13
Required Measures........................................................................................................................................... 13
Additional City of South San Francisco Measures ............................................................................................ 17
Phasing....................................................................................................................... ....................................... 19
Enforcement and Financing............................................................................................................................... 19
4. Compliance with Guidelines and Effectiveness........................................................................................... 20
City of South San Francisco Guidelines............................................................................................................ 20
City/County Association of Governments of San Mateo County Guidelines..................................................... 20
APPENDICES
Appendix A: TDM Program Additional Information and Brochures
Appendix B: TDM Program Provision Assumptions
Appendix C: Project Trip Generation and Employee Estimates
Appendix D: City of South San Francisco Travel Demand Management Requirements
Appendix E: City/County Association of Governments of San Mateo County Transportation Demand Management
Measures
LIST OF FIGURES
Figure 1 Site Location Context Map .......................................................................................................................... 2
Figure 2 Project Site Plan .............................................................................................................................. ............4
Figure 3 Existing Transit Routes and Bicycle Facilities ............................................................................................. 6
Figure 4 Proposed TOM Site Plan.......................................................................................................................... .12
Figure 5 Proposed Pedestrian Circulation Plan ......................................................................................................15
LIST OF TABLES
Table 1 Gateway Business Park Transportation Demand Program Measures ........................................................ 9
Table 2 Compliance with Guidelines and TDM Program Effectiveness .................................................................21
Table B1 TDM Program Quantity Assumptions ...................................................................................................... 35
Table C1 Project Trip Generation Estimates ........................................................................................................... 37
Table C2 Project Employee Estimates ....................................................................................................................37
Table E1 City/County Association of Governments of San Mateo County Transportation Demand Management
Measures...................................................................................................................... ....................................44
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
1. INTRODUCTION
EXECUTIVE SUMMARY
This report presents a Transportation Oemand Management (TOM) program for the proposed Gateway Business
Park located at the intersection of Oyster Point and Gateway Boulevards in South San Francisco, California. The
report identifies TOM measures that will exceed the amount needed to achieve 35 percent alternative mode use
for the Park's employees, as required by the City of South San Francisco (SSF). The TOM Program also satisfies
the City/County Association of Governments of San Mateo County (C/CAG) requirement, mitigating all new peak-
hour trips based on the C/CAG trip credit guidelines.
BACKGROUND
With the Gateway Business Park Master Plan, Chamberlin Associates has proposed a re-envisioning of a
successful, yet underutilized, corporate campus location. The new vision for this 22.6-acre site provides for the
phased and incremental replacement of low-scale buildings with a modern, energy-efficient, higher density
development that prioritizes the pedestrian and provides significant open space opportunities. The higher density
development also represents the highest and best use of this campus in this high-demand life sciences
employment cluster. The new Business Park, at build-out, would provide approximately 1,200,000 square feet of
office and research and development space, replacing the existing 284,000 square feet. This report presents a
TOM Program to identify measures to reduce the number of single-occupant automobile trips and the total traffic
impact generated by the proposed project.
PURPOSE
The purpose of this TOM Program is to develop a set of strategies, measures, and incentives to encourage future
employees of Gateway Business Park to walk, bicycle, use public transportation, carpool, or use other
alternatives to driving alone when traveling to and from work. In general, TOM supports more mobility by using
existing transportation systems, boosts economic efficiency of the current transportation infrastructure, improves
air quality, saves energy, and reduces traffic congestion.
Convenience and cost are the primary factors that affect a person's choice of transportation mode. Measures that
work well for some people or types of businesses do not work as well for others. Therefore, an effective TOM
Program needs to provide multiple options and incentives that are flexible enough to allow customization to meet
the varied needs of individual employees and employers. This program presents an array of proven strategies
and measures used in the Bay Area under a flexible implementation plan that can meet the needs of the future
tenants of Gateway Business Park.
PROJECT DESCRIPTION
The project site is located at the intersection of Oyster Point and Gateway Boulevards in South San Francisco,
CA, as shown on Figure 1. Office and research and development (R&O) tenants would occupy the Business
Park.
fp
1
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
~
&
~
w
~
<(
o
zW
a
f-
f-
a
z
~
~
v
.c
~
~
"'
~Z'
" ~
2"0
ro ~
0~
"
f- C
0:: ~
<( 0;
"' 0
"
I i
:~ "
;,g ;1
C
III
V1
a
u
V>
'u ?O'
:i5a:l
~
u-
i::i
z
w
Cl
w
~
.
80
'0.5 't
t:-i:;a
~ Eo::
1::2::"<:(
Sl.s:
+-
~
8,
o
Ii.
1':
v
E
v
01
ro
c
ro
:;;
'C
C
ro
E
v
c
c
o
1;;
1::
o
0,
~
c
ro
,::
~
i;;
ll,
~
~
v
c
.~
~
In
~
v
1;;
Cl
z
o
~
()
o
...J
I-
()
W
..,
o
c:::
ll.
W
0::
:J
Cl
ii:
v; ,
;o::~
.,
'"-'c
'"-'"
P-~
~
~
m
~
i
om
o~
g~
~o
~tt
ce-
cZ~
.,
;o::~
:r:~
'"-'~
~~
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
The proposed project will provide approximately 3,100 total parking spaces. The floor area ratio (FAR) of the
proposed project will be 1.25. A site plan for the proposed project is shown on Figure 2.
The proposed project is estimated to generate 1,640 AM peak hour trips, 1,500 PM peak hour trips, and 11,130
daily trips from an estimated 4,080 employees.'
REGULATORY SETTING
The TDM Program is based on guidelines provided by SSF' and C/CAG', the local Congestion Management
Agency for San Mateo County.
City of South San Francisco Guidelines
The SSF guidelines for TDM Programs require that all projects that generate greater than 100 daily trips obtain a
required alternative mode use goal of 28 percent, based on a list of 15 required TDM Program measures. This
alternative mode use goal is required to be monitored and reported to SSF through annual surveys of employee
travel habits. More stringent alternative mode use goals are required for projects that seek densities above set
FAR thresholds, based on land use.
The proposed project is located within the Gateway Specific Plan District. The maximum allowable FAR in this
district is 1.25, and the proposed project is seeking this maximum. This FAR, in exceeding the citywide office
park TDM threshold of 1.0 FAR, requires an alternative mode use share of 35 percent per SSF guidelines.
City/County Association of Governments of San Mateo County Guidelines
C/CAG guidelines require developments that generate 100 or more net new peak hour trips to implement TDM
measures that have the capacity to mitigate all new peak hour trips, based on C/CAG programmatic trip credits.
, See Appendix C for proposed project trip generation and employee estimates.
, City of South San Francisco, Municipal Code, Chapter 20.120, 2006.
, City/County Association of Governments of San Mateo County, Revised C/CAG Guidelines for the
Implementation ofthe Land Use Component of the Congestion Management Program, 2004.
fp
3
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
z '"
E w
~ c( 0::
w 8,
~ ...J :J
<( e ll. Cl
0 ll, ii:
(fJ 1': W
~ 20 ~ !::
f- E
f- ~ III
0 Ol
2 ~ l-
e
~ ()
:;; W
'C ..,
e
~ ~
E
~
c ll.
VI e
- 0
<: ~
'"
E 1::
0
'" 0,
iii ~
e
'" ~
"t:l '" ~ ,::
'" e :; '"
VI 0 U i;;
0 E
Co E ~ ll,
0 0 en ~
~
~ '" U ~
D- Ol Ol e
..... e ~ e .~
0 ~ '" ~
e (;; In
"t:l :; ~ .0: ~
<: In U ll,
'" 8@@~
Cl ~
'" 1;;
..J Cl
ce- cZ ~
~~
:r:~
t...I-l~
"""~
v; ~
0::,,;,
U-<c
U-<~
c....~
N
~
m
~
i
om
oo~
009
NO
~oo
~~
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
2. EXISTING TRANSPORTATION SYSTEM
....
This chapter describes the existing transportation system in the project vicinity, including the transit services and
facilities, bicycle facilities, and pedestrian facilities.
TRANSIT SERVICE
The project site is not directly served by rail or bus transit services; however, three transit agencies (Caltrain,
BART, and SamTrans) provide commuter rail and bus service near the project site. Pedestrian accessibility to
BART and Caltrain stations is poor and inconvenient and no SamTrans bus service exists east of US-101 in
South San Francisco. The project site must rely on supplementary shuttle services to connect employees on
campus with BART and Caltrain stations. Because no direct connection exists to serve employees who use
SamTrans, these employees must connect with existing Caltrain or BART stations to ride shuttles to and from
work. The existing transit services are shown on Figure 3 and described in detail below.
Rail Service
Caltrain and BART provide rail transportation services to a variety of regional destinations such as San Francisco,
Oakland, and San Jose. BART service frequencies average about once every 15 minutes during the AM (6;00-
9;00 AM) and PM (4;00 - 7;00 PM) commute periods and about once every 20 minutes during off-peak periods.
Caltrain frequencies vary between 20, 35, and 40 minutes in the northbound direction during the AM commute
period (6;00 - 9;00 AM). During the PM commute period (4;00 - 7;00 PM), southbound frequencies vary between
20 and 40 minutes. Less frequent service, about once every hour, is provided during off-peak periods.
Caltrain
The current South San Francisco Caltrain Station
is located underneath the interchange of East
Grand Avenue and US-101 approximately 1.1
miles from the project site. Only local and some i,
limited (skip-stop) trains stop at this station,
approximately every twenty minutes to an hour.
There are no plans to have express (Baby Bullet) service stops at this
station now or in the future. In the near future, Caltrain and the City of
South San Francisco plan on moving the South San Francisco Caltrain
station several hundred feet to the south to greatly improve pedestrian,
bike, transit/shuttle accessibility, as well as passenger waiting area and
platform amenities. A new pedestrian underpass at this station is planned.
cal,e
BART
In addition to Caltrain, South San Francisco
employees have access to BART, a regional, rail
ra pid tra nsit service provided by the Bay Area Ra pid
Transit District (BART). The South San Francisco
BART Station is located approximately 3.7 miles from
the project site. In 2003, BART completed its South San Francisco BART
station near EI Camino Real and the Kaiser Permanente Medical Facility on
the west side of the City of South San Francisco.
. f j
1';,-:>
~:
fp
5
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
E III '"
c ~ W w
~ w 8, () 0::
0: ~ 0 :J
<( Ii. ~ Cl
~ 0
1;; ~ (fJ 1': ii:
~ 20 ~ W
::;; >- E
~ ~ >- ~ III
~ 0 01
"- ~ 2 ~ I-
m c
.. ~ '0 ~ III
. ~ 0 :;;
c .. ~ ~ Z
"E .... c ~ 'C
" . \\ .~ <( c ~
I ~" " ~ .~ ~
~.~ \:\ co .~ " i E
" ~ , ~ I-
" 0 . .;; ;;:
, .fa. '''''. ~ .0 C
" ~
, ~ 0; ~ E c Cl
I . - ,I m ~ 0
. . ~ ~ z
o ~ '. (9 0
-. I 1:: i=
, \ V 0 III
I \ u ff3</) 0,
~ ~ ><
c
\ ~
(fJ ,:: w
I
.r, ~
t: ~
fi ll,
~
~
~
c
.~
~
In
~
~
m
(9
..~~..<:!-,.
't
~ ~
ro ~ 0,
u "- .~ 0
~ 1i5
.8 LL Q) E
Q) J!1 U ~ Q)
" E
u u ."
.~ " ~ ~
u co ~ .--..-..
Q) iii 'C Q; (fJ
(fJ OJ Q) LL OJ
Q) ~ c ~ Q) c
E .~ .0 0 .a .0
c ~ 0, ~
~ ~ 'x 0 'x
~ ~
(fJ ,:: w D: LL W
. I
. I
. I . 0
. I
. I
.
.
"
.
~
d
"'r
,
,.
~
.
.
~ c
~ 0
[L ~ ~
~ 0 (fJ
~ ~ 0:: .~
.~ 4:: ~ .g
:::l C (I] ro
co ro ~ U
>>0:::: croO)"(ij
~Q)b::~~E~
,10 Iii r ~ i
"
c
.
a:
..
0;
c
.
'"
~
'5
,;'
~ /"oj
.- ~
\~
. -
......
v; ~
o::~
U-<c
U-<~
c....~
ce- cZ i
~~
:r:~
~
~
m
~
i
om
oo~
009
NO
~oo
~~
t...I-l~
"""~
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Shuttle Service
As shown in Figure 3, the East of 101 Area relies on supplementary shuttle services to connect employees with
the BART and Caltrain stations. Shuttle services are operated by the Peninsula Traffic Congestion Relief Alliance
and include the Gateway Area and Oyster Point Shuttles. No SamTrans bus service exists east of US-101 in
South San Francisco. Because no direct connection exists to serve employees who use SamTrans, these
travelers must connect with existing Caltrain or BART stations to ride shuttles to and from the East of 101 Area.
Appendix A includes timetables for these shuttle services.
Ovster Point BART Shuttle
The Oyster Point BART Shuttle provides service between the South
San Francisco BART station and the Oyster Point area office buildings
with eight shuttles from/to the station, approximately every 24 minutes
in the morning (6:32 AM - 9:17 AM) and nine shuttles, approximately
every 27 minutes in the evening (3:36 PM - 7:09 PM). The closest
shuttle stop locations are at 1120 Veterans Boulevard, approximately
0.1 miles from the project site, and at the intersection of Oyster Point
Boulevard and Eccles Avenue, approximately 0.2 miles from the
project site. Currently there are limited sidewalks from the project site
to both shuttle stops. However, there is a new crosswalk planned
across Oyster Point Boulevard at the Veterans Boulevard crossing,
and new sidewalks planned along Oyster Point Boulevard in
conjunction with the 180 and 200 Oyster Point Boulevard developments.
Ovster Point Caltrain Shuttle
The Oyster Point Caltrain Shuttle provides service between the South San Francisco Caltrain station and the
Oyster Point area office buildings every 28 minutes in the morning (5:44 AM - 9:29 AM) and approximately every
34 minutes in the evening (3:14 PM - 7:00 PM). Shuttle stops are shared with the Oyster Point BART Shuttle, as
outlined above.
Gatewav Area Caltrain Shuttle
The Gateway Area Caltrain Shuttle provides service between the South San
Francisco Caltrain Station and the Gateway area office buildings with nine
shuttles, approximately every 20 minutes in the morning (7:07 AM - 9:25 AM) and
eight shuttles, approximately every 45 minutes in the evening (3:21 PM - 6:05
PM). The closest shuttle stop location is at 700 Gateway Boulevard, directly in
front of the project site.
fp
7
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Bus Service
SamTrans is the transit authority for San Mateo County that provides both local and
regional bus service, primarily to San Mateo County locations. SamTrans does not
provide direct service to the project site or areas east of Highway 101. The closest
bus stop is located at the intersection of Airport Boulevard/Baden Avenue,
approximately 1.3 miles from the project site.
SamTrans Route 292 provides bus service between the Hillsdale Shopping Center,
in San Mateo, and the Transbay Terminal, in downtown San Francisco. This bus
route operates along Airport Boulevard, within South San Francisco, and stops at
Airport Boulevard/Baden Avenue. The hours of operation are 5:00 AM to 2:00 AM on weekdays and weekends.
Buses run approximately every 25 minutes.
Taxi Service
The Downtown Dasher Taxi Service provides free taxi vouchers between
South San Francisco job sites east of Highway 101 and the downtown
area of South San Francisco in the middle of the day (11 :00 AM - 2:00 PM). The Downtown Dasher is operated
by Peninsula Yellow Cab of South San Francisco and managed by the Alliance. Employees who wish to use the
service need employer-provided vouchers and trip reservations before 10:00 AM. Currently there is no cost to
employers for providing the Downtown Dasher service. Appendix A includes a brochure with more information on
this program.
BICYCLE FACILITIES
Near the project site, bike lanes are provided on Sister Cities Boulevard, Oyster
Point Boulevard, Gateway Boulevard, and East Grand Avenue, as shown on
Figure 3. Gateway Boulevard and Airport Boulevard are also designated as
bicycle routes. The San Francisco Bay Trail, part of a planned 400-mile system of trails encircling the Bay, is
located close to the project site and provides access to the Oyster Point Marina.
Bicycle facilities include bike paths (Class I), bike lanes (Class II), and bike
routes (Class III). Bike paths are paved trails that are separated from
roadways. Bike lanes are lanes on roadways designated for use by bicycles
with striping, pavement legends, and signs. Bike routes are roadways that are
designated for bicycle use by signs only and mayor may not include additional
pavement width for cyclists.
PEDESTRIAN FACILITIES
Pedestrian facilities include sidewalks, crosswalks, trails, and pedestrian signals.
Near the project site, sidewalks are located on both sides of Oyster Point
Boulevard. Limited crosswalks are provided at nearby signalized intersections. A
segment of the San Francisco Bay Trail is located to the north of the project site,
approximately 0.2 miles away, and hugs the Bay shoreline, as shown on Figure
3. The Bay Trail is a public pedestrian and bicycle trail that is planned to extend
around the entire San Francisco Bay. Currently, there are gaps in the trail to the
north, above Brisbane, and just south of South San Francisco.
fp
8
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
3. TRANSPORTATION DEMAND MANAGEMENT PROGRAM
The TOM Program elements for the Gateway Business Park TOM Program include on-site amenities that
encourage the use of alternative modes of travel, participation in associations that promote commute alternatives
to the single-occupant vehicle, and parking measures. The menu of strategies includes appropriate TOM
measures that will satisfy SSF and C/CAG guidelines. Table 1 summarizes the TOM measures, which are
described in detail below. Figure 4 presents a summary of the proposed general locations for the site design
features. Final locations for TOM measures will be determined with building tenants.
TABLE 1
GAT~AY BUSINESS PARK TRANSPORTATION DEMAND PROGRAM MEASURES
City of South San
TOM Measu re Description Francisco
Municipal Code
Required Site Design Features
Secure Bicycle Storage Bicycle storage VYiIl be provided on-site as racks, cages, lockers, or 20 120040 (A. B)
inside, at discretion of Landlord.
Direct Route to Transit A well-lit path or sidewalk will be provided on site to the most direct 20120040 (E)
route to the nearest transit or shuttle stop from the building.
Free CarpoollVanpool Free parking spaces VYiIl be provided for carpools and vanpools. 20 120040 (F, I<)
Parking
Passenger Loading A loading zone for van pool and carpool rides will be provided near the 20120040 (I)
Zones building entrances.
Pedestrian Lighted paths and sidewalks will be provided between the buildings, 20120040 (E, J)
Connections parking areas, and Gateway and Oyster Point Boulevards.
Preferential Carpool Preferential parking spaces will be provided for carpools. 20120040 (K)
Parking
Preferential Vanpool Preferential parking spaces will be provided for van pools. 20 120040 (I<)
Parking
Showers/Clothes Six shower facilities with clothing lockers will be provided throughout the 20120040 (M)
Lockers campus, VYith shower access available to all employees.
Shuttle Program The tenants will be able to use the Oyster Point BART Shuttle to/from 20120040 (N)
the South San Francisco BART Station, and the Gateway Area Caltrain
and Oyster Point Caltrain Shuttles to/from the South San Francisco
Caltrain Station.
Information Boards and The building lobbies, employee break rooms, or other common areas 20120040 (H)
Kiosks will include permanent displays of commute alternative information.
Required Supporting Features
Designated Employer The tenants of the building will designate an individual TOM Coordinator 20120040 (D)
Contact - ErC (TOM (or may share a coordinator with other tenants).
Coordinators)
fp
9
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Carpool/Vanpool The TOM Coordinator will provide ride-matching services for carpool 20120040 (C)
Matching Services and vanpool users through 511.org and/or an internal program.
Guaranteed Ride Employees VYiIl be able to utilize the Alliance's free guaranteed ride 20120040 (G)
Home Program home program for emergencies via taxicabs or rental cars.
Promotional Programs The TOM Coordinator will provide new employee orientation packets, 20120040 (L)
(Quarterly) flyers, posters, email, and educational programs on a quarterly basis.
This may include a lunchtime transportation options fair with the Alliance
and transportation providers participating.
Transportation Options Shuttle maps and schedules will be posted on campus and on the 20120040 (L)
for Visitors (Maps and tenant v....ebsites for visitor use, if available. The TOM Coordinator will
Schedules): On-site offer on-site assistance to visitors.
Assistance
Transportation The tenants will join the Peninsula Traffic Congestion Relief Alliance. 20120040 (0)
Management
Association
Participation (Alliance)
Biannual Employee The TOM Coordinator will administer a biannual survey to determine 20120040 (0)
Commute Survey alternative transportation mode use and opportunities to TOM strategy
adjustments.
New Employee Transportation options will be outlined in the tenant's employee 20120040 (L)
Orientation Packet handbook, or on an intra net site, etc.
Commute Alternatives Brochure racks will be provided in public spaces within each building. 20120040 (L)
Brochure Rack (Maps
and Schedules)
Spare the Air The TOM Coordinator will promote this program to combat air pollution 20120040 (L)
Promotion in the San Francisco Bay Area (when some transit agencies will
sponsor free transit rides).
Rideshare Week The TOM Coordinator will promote carpooling and van pooling as an 20120040 (L)
Promotion alternative form of transportation during a Rideshare Promotion Week.
Additional Site Design Features
Land Dedication for Land will be dedicated for transit/bus shelters to protect employees from 20.120.050 (E)
Transit/Bus Shelter South San Francisco winds.
Bicycle Connections Bicycle connections VYiIl be provided to bicycle parking areas from 20.120.050 (B)
bicycle routes.
Additional Supporting Features
Subsidized Transit The tenants will subsidize transit tickets by offering pre-tax payroll 20.120.050 (A)
Tickets deductions for Commuter Checks or directly providing Commuter
Checks as an employee benefit.
On-Site Amenities Employees VYiIl be made avvare of services that can be provided on-site, 20.120.050 (F)
(from e-Concierge) for example: dry cleaning, groceries, prescriptions, and catering,
through e-Concierge or other similar services.
On-Site and Nearby Open space will be provided for on-site recreation opportunities. The 20.120.050 (J)
Open Space Bay Trail recreation opportunities are also easily accessed from the
campus.
On-Site Transit Sales Transit ticket sales will be provided on-site via Commuter Check direct 20.120.050 (F)
deposit
fp
10
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Nearby Amenity: Employees can use nearby YMCA childcare center. 20.120.050 (F)
Childcare Center
Nearby Amenity: Cafe Existing off-site Specialties Cafe 20.120.050 (F)
Telecommuting The tenants will provide opportunities and the ability for their employees 20.120.050 (H)
to work off-site Vvtlen feasible.
Downtown Dasher The tenants will be able to use the free Downto'vVl1 Dasher lunchtime 20.120.050 (J)
taxi service.
Video Conferencing Conference rooms on campus (at least one per building) will support 20.120.050 (J)
Centers video conferencing.
Motorcycle Parking Dedicated motorcycle parking spaces will be provided in the garages. 20.120.050 (J)
Flextime Tenants will allow employees to v....ork a varied work schedule Vvtlere 20.120.050 (J)
feasible.
Develop Transportation Each tenant will develop an action plan with the Alliance. 20.120.050 (J)
Action Plan v.ith the
Transportation
Management
Association
Connections to Future Tenants will be able to use shuttles with connections to a future ferry 20.120.050 (J)
Ferry Service service.
Source: City of South San Francisco, 2008, City/County Association of Governments San Mateo County 2004, and Fehr
& Peers, 2008.
fp
11
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
~
w
~
<(
o
(fJ
2a
f-
f-
a
2
ro
v
.< v
C> C> C
c
"- is c v
0 " 0
ro :;;
1i5 0 C> C>
'C ~ D- c c
v c :;; " " ~ 'u "
'" v c
'5 0 0 0 0 ~ ~ :;;
v ~ ~ U "' "- "- u D-
C> u (fJ v c c c 0 ~
ro ro 'C c 0 ~ ~ '" c v
0 '" c ~ ~ 0 u
v 0 0 "
v v v ~ '8 " v
0 0 E 0 u
U U '" ~ 0 "
" " '5 "- v "- "- v
u u ~ 0 ~ " :;; :;; ~ 'C <5
i1i i1i (fJ ii: i1i E 0 0 (fJ :> :;;
" " " " " " " " " "
. @B@)e<8~
@@ * {&> .
.
.
.
, 'C ~
V V "-
E-oE
ro c ~
~2c
+-' c .Q
c....- +-'
Q)(f)~
U .- Q)
c ~
o 'C ~
u c 0
ro_
ro c
~ ~ 0
+-' :::l ._
C "- ~
IDE">
~ ro ro
L.. u >- .
c...Q)Q>,$
~:5E:~
C L.. 0 E
~ 0 U Q)
c...- 0-
~~v
.~ L...2:'-o
..c 0 c c
I- $ 0 ro
#.u)c~
UI '" '. '.
'~'ii:'>-~:' "',
.- r.......
tn r.....ca. ,
:::::s Q.I "C '- 1
m,t)'l::' ""
~ca::::s. .
'" 2: 0", . 'C
~ a;l .~
Q.I~...CU E
~ 1a~' ~ 2
... C)JQ. <C ~
v
.0
o ~
~c
c ro
o c
._ v
ro~
u~
o:!::
~ "
E III '<t
ro W W
8, 0::
0 Cl :J
Ii. w Cl
c ~ ii:
v
E
v
C> I-
ro
c III
ro
:;; 2:
'C
C C
ro l-
E
v c:::
c
c 0
0 u.
~
1:: III
0 Z
"-
~ 0
c
ro ~
,::
~
:;; ()
ll, 0
~
~ ..J
v
c C
.~ W
~
In I-
~ III
W
v Cl
0;
Cl Cl
::::l
III
. v; ~
o::~
U-<c
'. , U-<~
c..~ ~
w ~
cZ~
~~ i
:r:~ oo~
om
fli?
t...I-l~ ~oo
rrO
'"'"~ o~
moo
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
MODE SHARE ASSUMPTIONS
Based on a review of TOM Programs and employee travel surveys for comparable sites in South San Francisco,
the TOM Program assumes the following composition of the required 35 percent alternative mode share for the
4,080 campus employees:
. Transit: 12.5% (510 employees)
. Carpool: 12% (490 employees)
. Vanpool: 4% (162 employees)
. Bicycle: 2% (82 employees)
. Flextime: 2% (82 employees)
. Walk 1 % (41 employees)
. Telecommute: 1% (41 employees)
. Motorcycle/Scooter: 0.5% (20 employees)
The quantity and distribution of the TOM strategies presented in this chapter reflect this assumption. Should
employee surveys suggest the 35 percent mode share has a different distribution, the allocation of the TOM
strategies, and additional or substitute strategies, may be appropriate.
REQUIRED MEASURES
Site Design Features
Bicvcle Parkina
The Landlord will provide bicycle parking based on tenant needs. Parking provision options include bicycle racks,
bicycle lockers, bicycle cages in the parking garages, or in-office accommodation. Figure 4 includes proposed
bicycle parking locations.
Oirect Route to Transit
Well-lit paths will be provided utilizing the most direct route to the nearest transit or shuttle stop from the different
buildings. These paths are shown in Figure 5.
Free Parkina for Carpools and Vanpools
Free parking will be provided for all carpools and vanpools.
Passenaer Loadina Zones
A passenger loading zone for a carpool or vanpool drop-off will be provided convenient to all buildings. Parking
stalls convenient to building entrances will be time-restricted to allow vehicles to drop-off/pick-up passengers.
See Figure 4 for potential drop-off areas.
fp
13
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Pedestrian Connections
On-site pedestrian facilities will be provided, including on-street sidewalks and lighted paths between the
buildings, parking areas, and Gateway and Oyster Point Boulevards. These connections are shown in Figure 5.
Preferential Carpool and Vanpool Parkina
Ten percent of garage parking spaces will be reserved for carpools and vanpools and will be located in premium
and convenient locations, per City requirements. These preferential spaces will discourage single-occupant
vehicle trips and improve accessibility for those sharing vehicles. Based on the anticipated mode share for the
Business Park, these spaces maybe underused. Therefore, carpool/vanpool spaces may have single occupancy
vehicles allowed after 10 AM, thereby also promoting flextime.
Shower and Locker Facilities
Shower and locker facilities will help promote cycling as an alternative commute option. Shower facilities (men's
and women's) will be provided in three of the campus buildings, assuring all tenants have access. Each shower
facility will include one shower and 8 clothing lockers, available on a first-come, first-served basis.
Shuttle Proaram
In addition to the existing shuttle stop, two new stops are proposed for the Gateway Business Park: one on
Gateway Boulevard and one on Oyster Point Boulevard, as shown in Figure 4. Caltrain and BART shuttles
provide service from the South San Francisco Caltrain and BART stations to the Gateway Business Park.
Information Boards and Kiosks
An information kiosk/board will be located in employee break rooms or other common gathering areas (i.e.,
building lobby). The kiosk will contain information on shuttles, SamTrans, Caltrain, BART, VTA, Downtown
Dasher, e-Concierge online amenities, van pool organizations, bicycle routes, and other transportation options
information. The TDM Coordinator will be in charge of updating information.
Supporting Features
TDM Coordinators
The lease agreement between the owner and tenants will state that the tenants will designate a TDM Coordinator
for the site. The TDM Coordinator will promote the TDM Program, activities, and features to all employees, and
will conduct the monitoring/reporting process. The TDM Coordinator will develop an on-site transportation
information center with SamTrans, BART, and Caltrain schedules and maps. The TDM Coordinator will provide
information via new employee orientation packets, flyers, posters, email, and/or educational programs. The TDM
Coordinator's role will also include actively marketing alternative mode use, administering the carpool and
vanpool matching program, promoting special programs such as Bike-to-Work Day or Carpool Week, and
overseeing the guaranteed ride home program (working with a local taxi service or rental car agencies). The
TDM Coordinator will also conduct biannual employee commute surveys to identify the need for mode specific
promotional material and educational programs.
fp
14
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
E Z '"
w ~ 0 W
~ 8, 0::
<( 0 ~ :J
~~ Ii. Cl
1': ...J ii:
~ ::::l
Z f- E
0 ~ ()
Z 01 c:::
~
e
~ ()
:;;
'C Z
e c(
~
E c:::
~
c l-
e III
0
~ W
1:: C
.; 0 W
, 0,
~ ll.
e
.' ~
I ,::
, ,
'.. , '"
'. i;;
ll,
~
~
~
e
.~
~
In
~
~
1;;
Cl
v; ~
o::~
U-<c
U-<~
c....~
~
~
m
~
i
om
oo~
009
NO
~oo
~~
t...I-l~
"""~
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Carpool/Vanpool Matchinq Services
Carpools in the Bay Area consist of two or more people riding in one vehicle for commute purposes. Vanpools
provide similar commuting benefits as carpools, though a vanpool consists of seven to 15 passengers, including
the driver, and the vehicle is either owned by one of the vanpoolers or leased from a vanpool rental company.
The TDM Coordinator will provide an Internet link to the 511.org Rideshare website to access ride matching
services. The TDM Coordinator will also administer an on-site carpool and vanpool matching service for
employees and maintain a list of available vanpools that provide service between the Gateway Business Park
offices and various points in the Bay Area.
Guaranteed Ride Home
A common reason that employees do not use alternative modes (i.e., carpool, vanpool, or transit) is the inability to
leave work unexpectedly for a family emergency or the fear of being stranded if they need to work late. One TDM
element that allays these fears is the Alliance's Guaranteed Ride Home program. With this program, employees
can use a taxi service, rental car or other means to get home and the employer pays for the service. The lease
agreement will state that the tenants must participate in the Alliance's Guaranteed Ride Home program, which will
be managed by the TDM Coordinator. Employees who wish to use the service will contact the TDM Coordinator
to make the travel arrangements.
Promotional Proqrams
Promotional programs include new employee orientation packets outlining alternative transportation options and
an orientation program, which will explain the importance and benefits of using alternative transportation modes.
Other annual or quarterly events could include commute fair where various transit organizations can set up
marketing booths during lunch and encourage other events like "Bike to Work Day."
Transportation Options for Visitors (Maps and Schedules)' On-site Assistance
Visitors to Gateway Business Park will also be able to use the on-site transportation amenities. Maps and
schedules will be available online and tenant TDM Coordinators will offer on-site assistance.
TMA Membership
Tenants will participate with the Peninsula Traffic Congestion Relief Alliance, with provides ongoing support for
alternative commute programs. The TDM Coordinator will work with the Alliance to create a Transportation Action
Plan for each tenant.
Biannual Emplovee Commute Survev
The TDM Program will be performance-based and the alternative mode use will be monitored annually, beginning
one year after tenant occupancy. The alternative mode use and general perceptions of the TDM Program will
come from statistically valid employee surveys. The TDM Coordinator may use information from the employee
surveys to adjust existing or implement new TDM Program measures. The TDM Coordinator will submit the
annual survey to the SSF Economic Development Director. The TDM Coordinator will also work with SSF
Economic Development staff to document the effectiveness of the TDM Program through triennial reporting.
Independent consultants, retained by the City and paid for by the tenants, will measure, through observation, the
alternative mode use achieved at Gateway Business Park every three years, beginning three years after tenant
occupancy. If the alternative mode use goals are not achieved, the TDM Coordinator will provide an explanation
of how and why the goal has not been reached and a detailed description of additional measures that will be
fp
16
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
adopted to attain the required mode use. The independent consultants will submit the findings of the triennial
survey to the SSF Economic Development Director.
New Emplovee Orientation Packet
Orientation packets will provide information on TDM Program benefits. Packets will include (but not be limited to)
information on carpool/vanpool options, shuttle services, Downtown Dasher, and bicycle options.
Commute Alternatives Brochure Rack (Maps and Schedules)
Brochure racks will be in public spaces in buildings, for example break rooms or lobbies. They will provide
information on transportation options and upcoming events, such as "Bike to Work Day." The TDM Coordinator
will maintain and update the brochure racks with current information.
Spare the Air Promotion
The TDM Coordinator will notify employees of Spare the Air days (as declared for the Bay Area region) and
associated transit promotions. Prizes may be offered for non-SOV travel on these days to encourage
participation.
Rideshare Week Promotion
The TDM Coordinator will promote and encourage ridesharing during a Rideshare Week Promotion. The TDM
Coordinator may offer prizes as incentives for ridesharing.
ADDITIONAL CITY OF SOUTH SAN FRANCISCO MEASURES
Site Design Features
Land Dedication for Transit/Bus Shelter
Shuttle pullout areas and shelters will be provided at campus shuttle stops. Harsh wind conditions in South San
Francisco create uncomfortable waiting conditions; therefore, shelters are necessary to encourage transit
ridership.
Bicvcle Connections
Bicycle connections will be provided to connect bicycle routes to building entrances and bicycle storage facilities.
These connections are shown on Figure 4.
Supporting Features
Subsidized Transit Tickets
The TDM Coordinator will facilitate tenant participation in the Commuter Check program (online), which provides
vouchers that can be redeemed online for transit passes and tickets, vanpool fares, or park and ride lot costs at
BART/Caltrain stations. The Commuter Check credit will be provided tax-free to employees that ride transit to
work in amounts up to $115 per month (amount determined by the IRS (IRS Tax Code Section 132(f) - Qualified
Transportation Fringe)). Tenants may also elect to subsidize fully Commuter Checks as an employee benefit.
fp
17
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
On-site Amenities
Tenants will make employees aware of on-site amenities that may be provided bye-Concierge, or other similar
online service providers. E-Concierge is an online service that provides food, catering, groceries, banking, real
estate, haircut and salon, laundry and dry cleaning, errands, daycare, and many more convenient amenities by
reservationl request on work sites (see htlp:llwww.britanniassfcommute.ora/concierae.html). Appendix A includes
a flyer with more information on this service.
On-site Retail or Childcare
The Landlord or Tenant will provide an on-site retail, restaurant, or childcare establishment, which is still to be
determined.
On-site Open Space
Parking has been consolidated into structures allowing for a "Central Commons" area open space for employees
and visitors to gather and exercise.
On-site Transit Sales
Commuter Checks will be available online through Commuter Check Direct, a service that will deliver the transit
passes directly to the employee's home or office.
Nearbv Childcare Center
The nearby Peninsula Family YMCA childcare center at 559 Gateway Boulevard will provide convenient
childcare. The YMCA center has capacity for 100 infants, toddlers, and preschool children.
Nearbv Cafe and Restaurant
Specialties Cafe, located at 701 Gateway Boulevard, provides breakfast, lunch, and catering options for tenants
and is within walking distance. The Embassy Suites Hotel Two Fifty Restaurant, located at 250 Gateway
Boulevard, provides upscale dining within walking distance.
Telecommutina
Where feasible, tenants will provide the opportunity for their employees to work off-site with the necessary
infrastructure, i.e. Internet access and internal data access.
Downtown Dasher
The Downtown Dasher is a free midday taxi service that operates between the hours of 11 AM and 2 PM. The
reservation-only service offers transportation to two stops in the downtown area of South San Francisco. The
"Downtown Dasher" taxi service requires a voucher and a trip reservation, which can be arranged through the
TDM Coordinator.
fp
18
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Video Conferencinq Centers
The use of live video connections may serve as a substitute for physical meetings, reducing the amount of vehicle
trips to the Business Park. Video connections will be feasible in all campus conference rooms, with computer and
video technology to be provided by the tenants.
Motorcvcle/Scooter Parkinq
Twenty motorcycle parking spaces will be provided in the parking garages. Up to eight motorcycles can park
within a vehicle parking space, making this parking an efficient use of space in the garages.
Flextime
Where feasible, tenants will offer flextime options such as compressed workweeks and alternative work hours. As
noted above, employees arriving after 10 AM will be eligible to park in available carpool and vanpool preferential
parking locations.
Connections to Future Ferrv Service
South San Francisco ferry service is expected to begin in September 2009. Tenants will be able to access the
ferry service via expanded shuttles to/from the ferry terminal.
PHASING
The Gateway Business Park redevelopment will be incremental and phased. As such, the implementation of the
TOM Program will be incremental to reflect the number and nature of employees within each development phase.
The full TOM program will be deployed with full build out. Appendix B presents a set of provision assumptions
associated with each strategy. This includes provision requirements such as carpoollvanpool parking (10% of
parking provisions). These assumptions may be referenced in each phase to determine incremental site design
features as appropriate. Most of the supporting features are existing (requiring only tenant enrollment) or will be
established with each new tenant.
ENFORCEMENT AND FINANCING
Landlord will prepare lease language for all tenants that requires the designation of a TOM Coordinator(s) for the
Business Park (multiple tenants may share one TOM Coordinator), membership in the Alliance, and compliance
with and implementation of the TOM Program. Tenants may implement the TOM Program with different additional
measures, so long as the programmatic credits from the replacement measures meet or exceed the
programmatic credits of the measures identified by this plan, as described in Appendix E. Tenants not meeting
requirements may be subjected to penalties per the lease.
The Gateway Business Park TOM Program will be funded through tenant payments and Alliance grants, which
pay up to 50 percent of bicycle facility and Guaranteed Ride Home Program costs.
fp
19
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
4. COMPLIANCE WITH GUIDELINES AND EFFECTIVENESS
As noted in the Regulatory Setting section of Chapter 1, the TOM Program must comply with SSF and C/CAG
Guidelines. These guidelines and effectiveness standards are described below.
CITY OF SOUTH SAN FRANCISCO GUIDELINES
The SSF Guidelines require the Gateway Business Park TOM Program to achieve a 35 percent alternative mode
use credit. According to the SSF Guidelines, the TOM Program will implement all required and several additional
TOM measures. Based on calculations of C/CAG trip credits, as shown in Table 2, the TOM Program will provide
for 3,941 alternative mode use credit trips, which represents 35.4 percent of the estimated 11,130 total daily
project trips. Assumptions for the TOM Program quantities are included in Appendix B. The TOM Program will
therefore exceed SSF TOM requirements by providing all required measures and exceeding the required 35
percent alternative mode use.
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY GUIDELINES
C/CAG Guidelines require the Gateway Business Park TOM Program to have the capacity to reduce fully the
demand for new peak hour trips. According to C/CAG Guidelines, the amount of "new" peak hour trips' is
calculated based on standard rates developed by the Institute of Transportation Engineers (ITE). Applying ITE
rates, the proposed project is estimated to generate 1,250 new AM peak hour trips, 1,130 new PM peak hour
trips, and 8,420 new daily trips from an estimated 4,080 employees.'
According to C/CAG trip credits, the Gateway Business Park TOM Program will have the capacity to reduce the
demand for peak hour trips by 3,941 trips, as shown in Table 2. This is in excess of the maximum number of AM
or PM peak hour trips calculated using ITE estimates (1,250 and 1,130 trips, respectively). The Gateway
Business Park TOM Program therefore exceeds C/CAG requirements.
· "New" is defined as in excess of existing land use trip generation.
, See Appendix C for project trip generation and employee estimates.
fp
20
FEIIR & PErRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
TABLE 2
COMPLIANCE WITH GUIDELINES AND TOM PROGRAM EFFECTIVENESS
City of South C/CAG C/CAG
TOM Measu re San Francisco Amount Credit Rate Trip
Municioal Code Credits
Required Site Design Features
Bicycle Parking - Long Term (Class I) 20120040 (A) 36 nla nla
Bicycle Parking - Short Term (Class II) 20120040 (B) 26 nla nla
Total Secure Bicycle Storage 20120040 (A. B) 62 .33 20
Direct Route to Transit 20120040 (E) 3 nla nla
Free CarpoollVanpool Parking 20120040 (F, K) 100% nla nla
Passenger Loading Zones 20120040 (I) 6 nla nla
Pedestrian Connections 20120040 (E, J) 6 5 30
Preferential Carpool Parking 20120040 (K) 287 2 574
Preferential Vanpool Parking 20120040 (K) 23 10 230
Showers/Clothes Lockers 20120040 (M) 6 10 60
Additional Credit for Combination with Bicycle Lockers 20120040 (A, B, M) 1 5 5
Shuttle Program 20120040 (N) 510 1 510
Additional Credit for Combination with Guaranteed Ride 20120040 (G, N) 510 1 510
Home Program
Information Boards and Kiosks 20120040 (H) 6 5 30
Required Supporting Features
Carpool/Vanpool Matching Services 20 120040 (C) 23 7 161
Designated Employer Contact - ETC (TOM Coordinator) 20120040 (D) 1 16 16
Guaranteed Ride Home Program 20120040 (G) 1,162 1 1,162
Promotional Programs (Quarterly) 20 120040 (L) 1 1 1
Transportation Options for Visitors (Maps and Schedules); On- 20120040 (L) 1 1 1
site Assistance
Transportation Management Association Participation (Alliance) 20120040 (0) 1 5 5
Biannual Employee Commute Survey 20120040 (0) 1 3 3
New Employee Orientation Packet 20 120040 (L) 1 1 1
Commute Alternatives Brochure Rack (Maps and Schedules) 20120040 (L) 6 1 6
Spare the Air Promotion 20 120040 (L) 1 1 1
Rideshare Week Promotion 20120040 (L) 1 1 1
Subtotal of Required Measures 3,327 trip credits
fp
21
FEIIR & PerRI
,,,.\~f)""'O' ,f)'IUt"'"
Gateway Business Park Transportaflon Demand Management Program
Fmal, September 2008
....
Additional Site Design Features
Land Dedication for Transit Shelter 20.120.050 (E) 3 nla nla
Bicycle Connections 20.120.050 (B) 1 5 5
Additional Supporting Features
Subsidized Transit Tickets 20.120.050 (A) 510 1 510
On-Site Amenities (from E-Concierge) 20.120.050 (F) 7 5 35
On-Site Amenities (to be determined) 20.120.050 (F) 1 5 5
On-Site Open Space 20.120.050 (J) 1 1 1
On-Site Transit Sales 20.120.050 (F) 1 1 1
Nearby Amenity: Childcare Center 20.120.050 (J) 1 1 1
Nearby Amenity: Cafes/Restaurants 20.120.050 (J) 2 1 2
Telecommuting 20.120.050 (H) 41 .33 14
Downtown Dasher 20.120.050 (J) 1 5 5
Video Conferencing Centers 20.120.050 (J) 1 5 5
Motorcycle Parking 20.120.050 (J) 20 nla nla
Flextime 20.120.050 (J) 82 .20 16
Develop Transportation Action Plan with the Transportation 20.120.050 (J) 1 10 10
Management Association
Connections to Future Ferry Service 20.120.050 (J) 1 1 1
Additiona/ Credit for Providing Ten or more TOM Program 20.120.050 (J) 1 5 5
Measures
Subtotal of Additional Measures 614
Total TDM Program Measures 3,941
35% Daily Alternative Mode Use Trip Credit Target 3,893
Source: City/County Association of Governments of San Mateo County. 2004: City of South San Francisco. 2007: and Fehr & Peers. 2008.
fp
22
FEIIR & PerRI
,,,.\~f)""'O' ,f)'IUt"'"
APPENDIX A:
TOM PROGRAM ADDITIONAL INFORMATION AND BROCHURES
23
o
U
en
I- W-
Z ...JU
o ~~
c..<C:J~
~W:::CL1.
w~enz
I-<CI-<C
en ~en
>- <C:::c
o all-
:J
o
en
'"
s:::
I'll
...
'E
I'll
'"
"C1ll
e:;
I'll 0
1Il-
...
III III
>.e:
00
"C..:;::
E.E
0).;:
Ol-
e: e:
... ._ 0
.E := (J
0-
=,!!!
o (J
-e:
III I'll
.c:e:
.......;,;
.;0:...
III e: ,-
III I'll III
I'll .c:.c:
ll. _-
III 00
;: ....... It- Q)
.... Q)U)(J
::::J .;0: e: ,-
.c: 0 C:
en "C:;:: III
::::J ~ III
0'- III
".e::;::
> I'll-
~ ~.E
>Olll
~
o
..,...
..-
--
~ ~
00
Q,-=
~ "
~'<
~
5 , :
,.: i!i :;
~ ~ ::
.;;: .:'i p
~11ii
(I)
Ol
e:
"C
...
I'll
o
.c
III CO
(JO
'-0
C:N
III .
enN
>.C:-
I'll I'll
"C::::J
';: l:
U-I'll
I'"
>.Ill
I'll >
"C:.;:;
e: (J
oo!!
:2:-
w
-0
."
t)
(5 c
C 0 t5 c
Q) ~ "L::.Q
E.o W 10
Q) 0 0'- to
Ol (f) 0
co (/) ........ 0...
o (/) c <( "00 (/)
~ c ~ ~>- ~~
() -r' ........ (/) C t.'::::: t.':::::
~ en .~ ~ ~ is ;.;.
~ ~ 0 ~ ~ 8 ~~ ~ ~
OJ ........"'cro ""'0Q)00
Q) Eaoo ..c::C <{oEao
ro ~ cuOl'- C W Ef ~ .~ c ~ ~ ~ ~ ~
if)@O..c>-"WLL (')Q) ~ ~ 0 ~ ~
co 0 3 "L:: ~ ~ ~ if) x _ ,,(')
ro .~ 0 ~ .Q 0 :J 0... co cO co 4-
OU::<(fJ(fJ(fJ(fJ::J>m(fJO
"C
III
...
::::J
C"
III
...
1L
::<
D-
Q
U
Qj
'"
Q)
.Y
'"
(f) S
~oIl
Q) "
" '"
Q) E
(') .<::
(f)
:J
o
C>-
o
o
",
to
Q)
C>-
o Q)
D= Co
" -,=-"
g ~
Q)
.<::
(fJ
m
::<
<(
'"
Q)
I
'"
.~ Q)
<( 0
" "
'" '"
(fJ (fJ
............... ..
Ollle:
0.. .-
'<l'1Il 0
.~Q.
.
o
o
CD
....
,
'<:tco
..... CO
",It)
<(O~
OcOO
ft.....1t)
I.I.C"')~
i..:_..
o It) e:
"C....O
_ '<:t.-
~~-
Q) .. I'll
>....E
Q) Q) ....
-.cEO
- ...
:;::J'::
..c:zQ)
en Q).!:!
e: >
o ....
..c: Q)
0. en
~
-
-
:J
..c:
en
....
,
....
,
It)
Q) ....
e: 0
-....
0....
I It)
~ I
E Q)
o e:
... .-
e:-
_ e:
Q)a
- ....
~a
E
o
u
-
,()
1<0>
ld
..
e:
o
'<:to.
co ....
Mill
..
III
>-
a
III
e:
I'll
....
,Sl-o
III >
>iii
~.
.... -
.... ...
SUeJ8j8^ 0.
....
ell
..
~ 1/1
<Il >-
a
iL
III
ell
.c
....
o
u.
-
'"
0;
o
~
"C::
Cl <1;
_ u
:c - 0
>-..... c:
~a2\O
o~cc\C
~ os ~ ~
..... V"l V'I fJ'
>.
.c
"C
III
Ol
I'll
e:
I'll
:2:
~i=:::
0000
obcb
00 00
'" '"
, ,
00
'" '"
"''''
c..:u..:
~
o
~
P^IS \lOdJ!\!
'"
'0 :J
C C
~ ~
CJ<(
lJ)
'"
w
>-
o
-'
ll,
:;;
w
~
'"
..:
ll,
w
c
w
~
I-
:J
J:
lJ)
D
>
iii
c
'0
D-
2:G
~"B
Ow
I-
'"
..:
In
o
U
lJ)
U
z
..:
'"
"-
z
..:
lJ)
J:
I-
:J
o
lJ)
lJ)
I-
'"
..:
ll,
w
c
w
-'
1=
:J
J:
lJ)
'"
'"
in
o
in
"'
'"
"'
"'
N
.0
o
.0
o
,.
'"
"'
N
'"
"'
"'
i0
o
i0
....
~
.;;
....
'"
0;
N
'"
0;
N
'"
00
....
'"
'"
....
~
....
"'
"'
0;
N
~
'"
~ ~
~ ~
~168
~ lJ) ~
;:; J::.(3
'S'S16
.r:o~
lJ)lJ),,-
'"
'"
in
;::
in
'"
'"
"'
'"
N
.0
;::
.0
~
'"
'"
N
'"
'"
"'
i0
;::
i0
c
'0
D-
O;
1;;
>-
o
'"
00
'"
lJ)
'"
w
>-
o
-'
ll,
:;;
W
I-
..:
lJ)
w
>
ii:
'"
..:
w
-'
1=
:J
J:
lJ)
"'
'"
in
N
in
....
'"
"'
....
N
.0
N
.0
N
,.
'"
....
N
'"
....
"'
i0
N
i0
c
'0
D-
O;
1;;
>-
o
o
o
'"
c
'0
D-
O;
1;;
>-
o
-
-'0
'S >
0iii
.
o
~
'"
.
o
o
in
"'
,.
00
"'
60
o
o
60
o
'"
'"
00
o
'"
"'
'"
in
'0
>
iii
~
~c
ro
0;
V
>
o
N
;::
....
'"
in
'"
in
'"
'"
"'
'"
N
.0
'"
.0
'"
,.
'"
'"
N
'"
'"
"'
i0
'"
i0
.
N
~
'"
.
N
o
in
....
,.
00
....
60
N
o
60
N
'"
'"
o
'"
....
'"
in
D
>
iii
c
'0
D-
V :G
(;)(3
>-u
Ow
'"
'"
in
'"
in
~
'"
'"
.0
'"
.0
'"
,.
'"
'"
'"
c;
'"
'"
i0
~
~
.0
5
"-
5
"t::-ci
~ >
<(OJ
.
'"
~
'"
.
'"
o
in
'"
,.
00
'"
60
'"
o
60
'"
'"
'"
N
'"
'"
'"
in
c
'0
D-
O;
1;;
>-
o
'"
00
'"
"'
in
00
in
'"
'"
'"
'"
'"
.0
00
.0
00
,.
'"
'"
'"
'"
'"
o
'"
00
i0
d
c
.8
~
u
~
~
.0
5
"-
.
"'
~
'"
.
"'
o
in
o
'"
00
o
N
60
"'
o
60
"'
'"
'"
'"
'"
o
"'
in
c
'0
D-
O;
1;;
>-
o
o
o
'"
N
"'
in
'"
in
'"
'"
'"
'"
'"
.0
'"
.0
'"
,.
'"
'"
'"
'"
'"
o
'"
'"
i0
'N
~
'"
-
~
~
u
u
W
.
....
~
'"
.
....
o
in
N
'"
00
N
N
60
....
o
60
....
'"
'"
"'
'"
N
"'
in
c
'0
D-
O;
1;;
>-
o
- .
-'0
:;2::
0",
'"
"'
in
o
N
in
"'
'"
'"
"'
'"
.0
o
N
.0
o
'"
'"
"'
'"
'"
"'
o
'"
o
N
i0
~
~
u
u
W
o
"'
"'
.
'"
~
'"
.
'"
o
in
'"
'"
00
'"
N
60
'"
o
60
'"
'"
'"
....
'"
'"
"'
in
~
~
.0
5
"-
c
o
t .
~~
<(OJ
'"
"'
in
N
in
'"
'"
'"
'"
'"
.0
N
.0
~
'"
'"
'"
'"
'"
o
'"
N
i0
D
>
iii
~
~c
ro
0;
V
>
o
N
-
;:
'"
in
'"
'"
00
'"
N
60
;::
60
:;:
'"
'"
'"
'"
"'
in
d
c
.8
~
u
-
~
~
.0
5
"-
.
'"
'"
....
I-
'"
..:
In
o
U
lJ)
U
z
..:
'"
"-
z
..:
lJ)
J:
I-
:J
o
lJ)
I-
..:
lJ)
w
>
ii:
'"
..:
w
~
I-
:J
J:
lJ)
.
'"
'"
in
~
'"
"'
.0
'"
'"
.0
'"
'"
"'
"'
'"
N
'"
'"
'"
i0
I-
~ '"
~ ..:
";: m
c'i:l68
Q)(f.)(I)c
;:; J::.(3 0
'5'516~
J::O...._
(f.)(f.)LL(I)
.
N
,.
'"
.
N
in
....
'"
00
....
N
60
N
60
N
'"
'"
o
N
'"
....
"'
in
'N
~
'"
-
~
~
u
u
W
,~
~~
om
-
,~
~~
0<
-
'M
~~
om
'~
~~
0<
'N
~~
Om
'M
~~
0<
a..~
Om
-
'N
~~
0<
a..~
0<
.
'"
,.
'"
~
~
~
o
.
'"
in
-
~
~
~
o
-
00
'"
00
M
m
~
o
00
N
60
M
~
~
o
'"
60
N
~
~
o
'"
'"
'"
N
~
~
o
N
'"
~
~
o
-
00
"'
in
1
~
o
~
~
u
u
W
o
"'
"'
ro
~
:;;
0;
6-
"-
E
~
.8
E
~
1l
....
o
o
N
'"
<5
c
~
~
o
'0
~
~
'5
~
(fJ
0;
.0
E
~
u
~
o
D
~
~
s:
~
'"
~_l,
c
o
~
1i5
I-
'"
~
....
o
o
N
'"
-
0;
.0
E
~
u
~
o
D
~
~
s:
~
'"
.8
E
~
1l
<5
c
~
~
o
'0
~
~
'5
~
(fJ
.5:
~.!
~:c
~ ==
--.....~
a
1
u
o
()
f/l
:J .-
o ()
>.~
f/l ~
Q)LL
-'" c
'" '"
-CI)
Q)
:;::;J::
- -
:J :J
J:: 0
f/lCl)
.~ Q)
",J::
~ -
.. c
'" Q)
~ ~
J::-
I-~
.
c E
" rg
0 i"
w 2 ro
9 '"
~ ~ u E'
" <Ii a.
:E:
'" E '0;
:E: " :;<
u "" >.
w (j)
>- -"
z .~ 1i)
w g
Z ""
w ro .2
'" U c-
Q) '"
oS '"
'"
c ""
0 0
Q) J!1
.,; Q) '"
~ C
? -
.,; '" Q) ~
> . 1J
a; w .;:
w .e ~ '"
~ 0 u
1= '0 ~ "
~ -" vi
" ~ .~
:E: Q)
'" g '"
> ~ '"
'" 0 Q) '"
i!i oS a.
Q)
>- c 1J
'" 0 i'i'
'" Q) 6
~ ~
'" 1J
>. c
'" '"
a.~
'" oS
Q; c
",0
c:;<
Q) '"
'"
'" Q;
'" "'
D- o
o
(.)
.!!?
(.)
c:
~
l(
c:
Cti
CI)
:S
::J
o
CI)
~
~
~
Cti
(.!)
t
.S
~
.......
-
a
'"
Q)
~
'"
>.
~
Q)
-
'"
CJ
'U
C
'"
C
o
:;::;
'"
ii5
c
'"
~
..
'"
()
Q)
d~ii
85 ~co
0)- C a.. (/)
c.!:Q ..... c 0 1....- ID
.~ ~ .- Q) ~ <( 50
'U:I:'<(Et::
(/) :J m Q) 0 C a..
..c Q) en a. C\::l +-'
C)(/).;;::m(/)..9:!c
.~ Q) ...... C C () 0
'U..c>.mctl
~l-m::2:~""'"""')
"Q []J '>. ~ 0
Q) vi Q) ,.,'1;1 'U
o lo... ~ m ..l::; 'U "C
._:J :J (/) C .....
::::: 0 >. .-:J 0
OJ::"QOOLL()
J::
()
Q)
-
~ c
Q) Q)
>.c
o Q)
(iCl
E
Q)
Cl
C
'j:
,.Q
o
-
t-
o
o
N
"'
'C
a.
<t
Q)
>
13
~
w
II::
Q
.-
-
IV
E
..
Q
-
II::
-
"'
'"
'"
'"
"'
.!: I'- ~
~OOo
.. "'
uN'"
~q->:
o . C
.~Oo
'0 CD >-
~CD~
o .-
EQi::i
~o.~
:;00 ~
~ . E
::::i""'-
'"
c
.~
Q)
I
II::
.-
IV
..
==
IV
c.:l
t"-cnO..- '"
'<t '<t lD lD 0
0000 ,:.:
lDt"-COcn ;;
'<t'<t'<t'<t
u-.iu-.iu-.iu-.i '"
tDcocno '"
'<t '<t '<t lD 0
-<i-<i-<i-<i "'
COO..-N .,
'<tlDlDlD 0
r0r0r0r0 "
t"-cno..- "'
lDlDOO ~
0i0ir0r0 '"
N "
~~ ~
;::
t"-'<to- ..
NN"-'<t U
OJ OJ oP;:>> 0
0
"'0"'0"'0"'0 1JI
iiiiiiiiiiii '0
..c..c..c..c Iii
uuuu Ii:
Q)Q)Q)Q)
1::1::1::1:: "
Q)Q)Q)Q) ..
eeee (f)
Q)Q)Q)Q)
(9(9(9(9 en
H03.LN3N38
o
()
en
()
z
<(
a:
u.
z
<(
en
~ 3711nH
cocnO..-C"?O -+ ~ "'
'<t'<tlDlDlDO ., 0
iriiriiriiriirit-.: '" ,:.:
O..-NC"?lDC\I ;:: "'
-+ 0
lDlDlDlDlDO '" in
u-.iu-.iu-.iu-.iu-.icD
cocnO..-C"?O -+ '" "'
'<t'<tlDlDlDO '" 0
-<i-<i-<i-<i-<iLc:i '" .0
C"?'<tlDtDCOLC) -+ en "'
00000..-
-<i-<i-<i-<i-<i~ "' ~
~ "
t"-COcnONO'l -+ "' ~
000..-..-..- "' <:'J
r0r0r0r0r0Crj ~ co
"
~
..
U
0 0
0 ci 0
>-.!!! lJI
>->- >-roo Z 'u
~~gj~~ffi z "
..
Q)Q) Q)+-'''' ~ Ii:
+-' +-' O)+-' ro L1.
~~"~~(9 fij "
I- ..
D 0 (f)
8~=~o(f)
o :::llDO . en
C"?tDaJtD..-(I.)
),VM3.LV8 NIVI::J.L
S
..-NC"?'<ttD C") -i 0 "'
C"?C"?C"?C"?C"?'<t ., '"
00000cD '" in
..-NC"?'<ttD C") -i '" "'
C"?C"?C"?C"?C"?'<t .... '"
u-.iu-.iu-.iu-.iu-.iLc:i '" .0
cnO..-N'<t..- -i '" "'
NC"?C"?C"?C"?'<t '" '"
-<i-<i-<i-<i-<i~ '" "
"
~
..
U
0 ci 0
0 0
>-.!!! Z lJI
>->- >-roo 'u
roroC"?ro5fij Z "
;;: ..
~~co~2... Ii:
+-' +-' O)+-' ro L1. a:
ro ro e ro (9 c I- "
(9(9::o(90(lJ ..
0..-=..-0(1.) (f)
00 :::llDO . en
C"?tDaJtD..-(I.)
),VM3.LVE> NIVI::J.L
nHS
'<ttDt"-co :;;:
NNNN
0000 '"
..- C"? '<t lD .,
NNNN '"
u-.iu-.iu-.iu-.i ,;;
N'<tlDtD .,
NNNN '"
-<i-<i-<i-<i '"
N "
~~ ~
>- ;::
0 t"-'<to- ..
NN"-'<t U
a: OJ OJ oP;:>> 0
...J 0
"'0"'0"'0"'0 1JI
~ iiiiiiiiiiii '0
..c..c..c..c Iii
W uuuu Ii:
en Q)Q)Q)Q)
0 1::1::1::1:: "
Q)Q)Q)Q) ..
""" eeee (f)
Q)Q)Q)Q)
Z (9(9(9(9 en
<(
en H03.LN3N38
0 3711
I-
. 31na3H::>S NOONl::I3l..:1V
"WO:)"U!eJlle:)"MNWIle alqel!eAe S! uoqewJoJu! alnpaLj:)s aU!I-uQ LSZ:17.099.00S. ~
le U!eJlleJ lie:) JO JOleU!pJOo:) alnwwo:) mOApeluo:) aseald 'alqBlawq
U!BJlIBJ alaldwo:) B JO.::l "UMOLlS am sdOlS aj:j.lnLls pUB sdOlS U!BJlIBJ liB lON
., 0 lo-i LC)cnO..-NC"?lDtD t"-tDr--co
'" ,. '<t'<tlDlDlDlDlDlD '<tlDLDlD
'" "' ci06:i6:i6:i6:i6:i6:i6:i ci06:i6:i6:i
" " N
~ ~ ~~
~
.. "ffi'<t"--
U UN~'<t
0 0 80l0l0l
0
ci 0 .!!! >- lJ)"'O~"'O
lJI
Z 'u oro>->->- >>>> .oiiiaJiii
" C5rororoC"?roro "
Z I" ~2~~~co~~ (lJ..c-..c-..c-
;;: ...uuu
LL L1. ro +-' +-' +-' O)+-' +-' L1.Q)Q)Q)
a: " c(9rororoeroro c1::1::1::
I- .. (lJ0(9(9(9::o(9(9 (lJQ)Q)Q)
(f) (1.)0..-0..-=..-0 (l.)eee
.0000 :::llDO Q)Q)Q)
(f) (I.)..-cot"-tDaJtDC"? en (9 (9 (9
NIVI::J.L ),VM3.lVE> H03.LN3N38
3711nHS
o
()
en
()
z
<(
a:
u.
z
<(
en
:2
o
a:
u.
;;; "' OONC"?'<tlDtDCOcn t"- tD t"- co
N
'" Oi C\IC"?C"?C"?C"?C"?C"?C"? C\IC"?C"?C"?
Cricricricricricricricri Cricricricri
.... "' t"-..-NC"?'<tlDt"-CO t"-tDt"-co
'" 0 0..-..-..-..-..-..-..- 0"-"-"-
'" Oi Cricricricricricricricri Cricricricri
LC)cnO..-NC"?lDtD t"-tDt"-co
'<t'<tlDlDlDlDlDlD '<tlDlDlD
ci06:i6:i6:i6:i6:i6:i6:i ci06:i6:i6:i
N "' t"-..-NC"?'<tlDt"-CO t"-tDt"-co
N C\IC"?C"?C"?C"?C"?C"?C"? C\IC"?C"?C"?
'" iO ci06:i6:i6:i6:i6:i6:i6:i ci06:i6:i6:i
.... "' t"-..-NC"?'<tlDt"-CO t"-tDt"-co
~ 0 0"-"-"-"-"-"-"- 0..-..-..-
'" iO ci06:i6:i6:i6:i6:i6:i6:i ci06:i6:i6:i
C")t"-cocnO..-C"?'<t C")NC"?'<t
'<t'<t'<t'<tlDlDlDlD '<tlDlDlD
t-.:t--.:t--.:t--.:t--.:t--.:t--.:t--.: t-.:t--.:t--.:t--.:
~ "' t"-..-NC"?'<tlDt"-CO t"-tDt"-co
~ N C\IC"?C"?C"?C"?C"?C"?C"? C\IC"?C"?C"?
'" ,:.: t-.:t-..:t-..:t-..:t-..:t-..:t-..:t--.: t-.:t--.:t--.:t--.:
.... "' t"-..-NC"?'<tlDt"-CO t"-tDt"-co
0 0 0"-"-"-"-"-"-"- 0"-"-"-
'" ,:.: t-.:t--.:t--.:t--.:t--.:t--.:t--.:t--.: t-.:t--.:t--.:t--.:
>-
0 " " ~
a: .~ ~
...J iii .-'
~ "ffi'<t"--'<t
U UN~N
0 0 8OJOlOJ
ci 0 .~ >>
en lJI lJ)"'O~"'O
0 Z 'u 0" >> >> >> >> >> .oiiiaJiii
z " ffi~rororoC"?roro ffi..c-..c-..c-
""" ..
~ Ii: ... 555C055 ...uuu
Z L1. 10 222 0)2 2 L1.Q)Q)Q)
" c(9rororoeroro c1::1::1::
<( I- .. (lJ0 (9(9(9::0(9 (9 (lJQ)Q)Q)
en (f) (1.)0..-0..-=..-0 (l.)eee
en .0000 :::llDO Q)Q)Q)
:2 (I.)..-cot"-tDaJtDC"? en (9 (9 (9
0 NIVI::J.L },VM3.LV8 H03.lN3N38
a: 3711nHS
u.
. 31na3H::>S ~NINl::IOV\l
Oyster Point Blvd.
SOUTH SAN FRANCISCO
CALTRAIN
ST A llON
BUILDING 54
. BUILDING 4
Forbes Blvd.
. BUILDING 10,11,12
. 8UILDING 24
I ~~U!ilmJ
:to .I::to..l:
.!!
~
f
~
....
.
South San Francisco
_ BART
l!!l Station
Oyster Blvd.
~
~
u
"
III
Bldg. 54
.
681
Gateway
Boulevard
Genenlech
. Bldg, 24
'1O~
'-,
E. Grand Ave.
EMERGENCY RIDE HOME
PROGRAM
Are you ready to improve recruitment and retention rates, reduce
parking congestion, and attract employees from a wider area, while
providing a subsidized, low cost benefit to your employees?
Do it all with the Alliance's
Emergency Ride Home Program
Most employees choose to drive their own personal vehicle to work
because they don't want to be stranded at work should an
emergency arise. With the Emergency Ride Home program,
employees are given the assurance that, in the case of an
emergency, they will be provided with a free taxi ride or a 24-hour
car rental.
We pay 75% of the ride!
The participating employer pays the remaining 25%. Historically,
program costs remain very low because emergencies are
infrequent. The Alliance can help you design easy administration
policies that prevent program abuse.
A
Employer cost of one Emergency Ride Home: average $12
Trusting your employer will be there for you in an emergency:
Priceless
PENINSULA
TRAFFiC
CONGESTION
RELIEF
ALLIANCE
The Alliance does all the work.
If you have any questions or are unsure if your company
could benefit from this or other no to low cost commute
programs, contact us at 650-588-8170 or via email at
[email protected].
1150 Bayhill Drive
Suite 107,
San Bruno, CA
94066
P:6So-SBB-B170
F:6S0-SBB-BI71
OS your job located in on East of Hi9hwoy 101 business park
in South San Francisco? Do you utilize public transportation
or have limited options for travel to Downtown South San
Francisco during the lunch hour2 Why not try the "Downtown
Dasher" taxi service?
This FREE service picks you up between the hours of 11 a.m. and
2 p.m. from your workplace, and drops you off at one of two
drop-off locations in the downtown area of South San Francisco.
All that is required to take advantage of this service is a
"Downtown Dasher" taxi voucher and a trip reservation.
Contact Karen Sumner, Territory Manager with the ALLIANCE at
650-588-8170 or [email protected] to get your vouchers.
Once you receive the voucher, call 650-588-2131 by 10 a.m.
the morning of the trip to make a reservation. A return reser-
vation is made as well. Once the taxi arrives, the driver collects
the appropriate portion of the voucher and you're off. Just sit
back and enioy the ride. It's that si mple.
Visit Downtown South San Francisco and enjoy
numerous restaurants and shops.
Receive discounts from these downtown merchants. Just show
them your Downtown Dasher Voucher and mention this ad.
MERCHANT
ADDRESS
Bacchanal Restaurant
Cecelia's Restaurant &
Pizzeria
Galli's Sanitary Bakery
Hot Shots Gourmet Coffee
and Tea
Makin' Waves Salon
265 G rand Ave.
113 Grand Ave.
324 G rand Ave.
219 Grand Ave.
341 Baden Ave.
Morning Brew Coffee Co.
Western States Bank
713 Linden Ave., Ste. A
225 G rand Ave.
Downtown Dosher is a joint program of the Peninsula
TraFFic Congesfion RelieF Alliance, the City of South
Son Francisco and the South Son Francisco Chamber
of Commerce.
.
I'ENfNSCLA
TRAFFIC
CONCESTION
RELIEF
ALLIANCE
The program is supported in part with grants From
the Transportation Fund For Clean Air, the City/
County Association of Governments of Son Mateo
County, the Son Mateo County Transportation
Authority and the South Son Francisco Economic Redevelopment Department.
I ] ')() IbyhiJl L>I"" ~llit.... 107
.s:1Il Bruno, c:'\ 9'j(){,{:i
DISCOUNT
Hors d'euvres and beverages at Happy Hour Prices
10% off one purchased meal
10% off any purchase
50% off all drinks (up to a $5 value)
10% off retail purchase
Buy one specialty coffee at regular price, and get one
of e ual/lesser value FREE
Free Checking - No Monthly Service Charge
LEGEND
o BACCHANAL RESTAURANT
e CECELlA'S RESTAURANT & PIZZERIA
a GALLI'S SANITARY BAKERY
o HOT SHOTS GOURMET COFFEE AND TEA
9 MAKIN' WAVES SALON
(:) MORNING BREW COFFEE CO.
Q WESTERN STATES BANK
TAXI DROP-OFFS
.,.1:.
~7 GRAND AVE, & LINDEN AVE,
~t 733 AIRPORT AVE.
Bicycle and Pedestrian
Safety Program
Attention Bicycle Commuters
Get A Free One Hour Bike And Pedestrian
Safety Workshop At Your Jobsite
This Fun, Energizing Workshop Includes:
. Tips on including Bicycling as a safe, stress relieving
commute mode
. Coverage of Traffic Laws for Bicyclists, Pedestrians,
and Motorists around Bicyclists and Pedestrians
. Basic Bicycle Maintenance Tips
. Free bicycle related Door Prizes
Ask Your Employer To Give Us A Call,
And The ALLIANCE Will Do The Rest!!!
If you would like more information on the Bicycle and Pedestrian
Safety Program, please call The ALLIANCE at 650-588-8170,
visit our website at www.commute.orq , or e-mail us at
[email protected]
Rev 2
A
PENINSULA
TRM'FIC
CONGESTION
REUEF
ALLIANCE
1150 Bayhill Drive
San Bruno. CA
94066
P: 650-588-8170
F: 650-588-B 171
Belmont. Brisbane. Burlingame' Calma. Daly City' E. Palo Alto' Foster City' Half Moon Bay'
Millbrae. Pacifica. Redwood City' San Bruno. San Carlos. San Mateo. S. San Francisco
\Velcome to the Britannia Commuter Resources \Veb Site
HOlliE'
Cmpool &: Van pool
Transit
Eicydt's
Shuttles
COllllllutf'R"sOI\l'ct's
t"-Concit"rge SE'ITi('t"s
Emergency RidE' HOlliE'
COlltilC't
V,l.V.-r1.Vrl
ElllcrgclIq!
.
RIDE HOME
click for details
I.........
..........
mmmmn
e
SF Bay Area
Britannia South San
Francisco e-Concierge and
Personal Services
COlllllluters wIthout personal vehicles eml find a
eomprehE'llSin> list of providers ",110 rfln deliver,
perfonu, or offer on-demand and on-site snppoltmg
st:'rnC'E's.
e-CollC'iel'ge Services iuC'Iude food, C'atenllg, groceries,
ballkmg, real estate, hail' rut and salon, laundry and
dry (' leaulllg, errands, dayc[\l'E' and many more
COllyenIenCE' vendors.
FOOD. DRINK AND SlTNDRY SERYICES
. Deli/Cafe
Sperialt}-Dil'f'ct.com
httv: l/sDf'dalv,-sdirect.cOln/hOlne
stores.as])
. Groceries delivered
Safeway
httv: l/shoD.safew,aY.cOlll
. Organic Groceries delivered
Planet Organics
httD:/ hnn\'.vlanetonmnirs.c0111
. Pizza delivered
Di Napoli Pizzeria & Ristorante
httv:/ /www.dinavoliDizza.cOl11
. Sluulry Itenls delivered
Anchor Phal111aC~'
httD:/ hnn\'.allch011)hall11ac".c0111
CONCIERGE SERYICES
. Courier/Delivery
Now DeliYel~' Sel'\ices
32.5 Maple A"ellllE'
South San Francisco. CA 9-+080
(650) 5;)3-9990
. FillH De,'eloplllg
PmvleTie .C0111
hit!': Ilpmvletie.rol11
. Floral SelTice
A Bed of Flowers
hit,,: IlmnLabedoftlowers.biz
http://www.britanniass1.conullute . org/ conci erge .html
Page I 01'2
PERSONAL SERnCES
. Alterations and Tailorlllg
PIllvleTie .C01U
httD:/ /mullletie.conl
. Chiropractic
Bod~' Techniques
htt;p: / /www.bo(htechlliques.conl
. Daycare
Sitter City
httv: / /www.sittercih'.c01U
. Dental Sel"ices
Ollsite Dental (nlObile senice)
httv: / /www.ollsitedentaLc01U
. Dry Cle<lnlllg and Laundry
PmvleTie .C0111
hltp: I Ipmpletie.rOl11
Wright Cleallel~
httD: / /dyw.ssf.net/c0111Vany info.
Dlm?id=012.'U22.10
. Eyeglass Repair
PmvleTie .C01U
httD: /l1ml1)letie.cOlll
. Haircut, barbershop
Ollsite haircuts (lllObile senice)
httv: / /www.om;itehaircuts.conl
. Massage
hllillite Massage
httv:/ /sallfl'allCiscoba"al'ea.
infillitelllassa ge .conl
. Nail SalOlI
MDM hltel11atiollal Mobile Spa
Senice
httv: / /WWW.lllobilesDallow.c0111
. Shoe and PIu'se Repair
PluvleTie .C0111
httv: /l1nUl)letie.c0111
AlTTO SERnCES
. Car Wash
Siteler Wash
httD:/ /www.sitelel'wash.c0111
. Oil change
OfficeLllue.conl
hit,,: II oft1relube.rol11
7/18/2008
\Velcome to the Britannia Commuter Resources \Veb Site
~..\nastatsia 's
httD: / I <lllastasiastlol'alshoD.COlll
. Party Plallulllg
SF Concierge OnlinE'
httv: / /www.sfronriel'2:eonliuE'.C0111
. Phal"lllacyjpl'escl'iptioll delh-el'ed
~-\.n('hol' Phal1l1(\c:,-
httv:/ hnvw.<luchol1)hm.ulaCY.cOlll
. RIUIUillg Errands
2BllSY-J.E11'ands.r0111
httv:/ !www.2bllsv.....elTands.cOlll
. Video/DVD Rentals
Blockbuster
httv:/lwww.blockbustE'l'.COlll
Nettlix
httv: Ilwww.netllix.cOlll
r.ntallluil South SUI FranCIsco ('OUllllllt.. OphOllS I ('onmet
th.. w..bm,lskl' I Updlted- l\L1H:h. ::::008
http://www.britanniass1.conullute . org/ conci erge .html
Page 2 01'2
'c'
BANKING AND REAL ESTATE
::::00-
SERVICES
. Notary Service
Finish line. hIe, - (lllobile senice)
(866) 33-J.-6-J.'""-J.
httv:/ /www.flsignill2:.COlll/
notaI'\'senirE'l'ecnlE'st.aSDX
. Real Estate Serdces
Dan MrLecUl. South San Fl'cUll'isro
Real Estate, Coldwell Banker
(-1-1:)) 8.)0-';"613
hU.p: / /www.thel'eisnoplare
likehOllle.C'Olll
OTHER SERnCES
. Shipping
lTnited States Postal Senire
httD:/ /WWW.llSDs.rom
FedEx
httD:/ /www.fedex.cOlll
FPS
httD:/ /WWW.llDs.com
7/18/2008
APPENDIX B:
TOM PROGRAM PROVISION ASSUMPTIONS
34
TABLE B1
TOM PROGRAM QUANTITY ASSUMPTIONS
TDM Measu re Provision Assumptions
Required Site Design Features
Bicycle Parking - Long Term (Class I) Provided within a secure area or allovved in offices
Bicycle Parking - ShortTerm (Class II) One bike rack per buildinQ
Total Secure Bicycle Storage One space per 50 vehicle spaces (as reauired)
Passenger Loading Zones Convenient to entrances of all buildings
Carpool/ vanpool parking must be provided at 10% of total
Preferential Carpool Parking parking provision (assume 10% requirement less van pool
spaces)
Carpool/ vanpool parking must be provided at 10% of total
Preferential Vanpool Parking parking provision (assume 18 vans vvith 7 passengers per
van)
Showers/Clothes Lockers 2 showers per every other building; 8 lockers per shoVv'er
Shuttle Program 12.5% transit mode share
Information Boards and Kiosks One per building
Required Supporting Features
Designated Employer Contact - ErC (TDM Coordinator) One per tenant or shared (one for the campus); assume 5
staff hours per 200 emplovees
Guaranteed Ride Home Program All carpool, vanpool. and transit riders are eligible
Rideshare/ Van pool Matching 18 vanpools (4% mode share)
Commute Alternatives Brochure Rack (Maps and Schedules) One to two per building
Additional Site Design Features
Land Dedication for Transit Shelter Three shuttle stops
Additional Supporting Features
Subsidized Transit Tickets 12.5% transit mode share
On-Site Amenities (from E-Concierge) Seven features available
Telecommuting 1 % mode share
Motorcycle Parking 0.5% mode share
Flextime 2% mode share
Source: Fehr & Peers. 2008.
35
APPENDIX C:
PROJECT TRIP GENERATION AND EMPLOYEE ESTIMATES
36
The project trip generation and employee estimates, shown in Tables A1 and A2, are based on information from
Trip Generation fh Edition (Institute of Transportation Engineers, 2003)
TABLE C1
PROJECT TRIP GENERATION ESTIMATES
Vehicle Trip Generation Rates
ITE AM Peak Hour PM Peak Hour Daily
Land Use Code Unit Total In Out Total In Out Total
Office 710 ksf 1.55 88% 12% 1,49 17% 83% 1101
Research and Development 760 ksf 1.24 83% 17% 108 15% 85% 8.11
Vehicle Trip Generation Estimates
AM Peak Hour PM Peak Hour Daily
Land Use Amount Unit Total In Out Total In Out Total
Office 480 ksf 744 655 89 715 122 593 5,285
Research and Development 720 ksf 893 741 152 778 117 661 5,839
Subtotal New Trips 1,637 1,396 241 1,493 239 1,254 11,124
Deduction for Existing Office Square Footage -219 -193 -26 -211 -36 -175 -1,558
Deduction for Existin9 R & D Square Footage -175 -146 -30 -153 -23 -130 -1,148
Total Net Trips 1,243 1,057 185 1,129 180 949 8,418
Source: Institute of Transportation En9ineers, 2003 and Fehr & Peers, 2008.
TABLE C2
PROJECT EMPLOYEE ESTIMATES
Land Use ITE Code Amount Unit Employees Per ksf Employees
Office 710 480 ksf 4 1,920
Research and Development 760 720 ksf 3 2,160
Total 4,080
Source: Institute of Transportation En9ineers, 2003 and Fehr & Peers, 2008.
37
APPENDIX D:
CITY OF SOUTH SAN FRANCISCO TRAVEL DEMAND MANAGEMENT
REQUIREMENTS
38
The City of South San Francisco list of required and additional TDM measures, presented below, were taken from
the City of South San Francisco Municipal Code Chapter 20.120 (2001)
Required Measures
All non-residential developments shall implement the following measures:
A Bicycle Parking, Long-Term. The applicant shall determine the appropriate number of bicycle spaces
based on the required alternative mode use and subject to review and approval by the Chief Planner.
Bicycle parking shall be located within 75 feet of a main entrance to the building and all long-term spaces
must be covered. Long-term bicycle parking shall be achieved by providing one or more of the following
measures:
1. Parking in a locked, controlled access room or area enclosed by a fence with a locked gate.
2. Lockers.
3. Parking within view or within 100 feet of an attendant or security guard.
4. Parking in an area that is monitored by a security camera.
5. Providing fixed stationary objects that allow the bicycle frame and both wheels to be locked with a
bicycle-locking device or a bicyclist supplying only a lock and six-foot cable.
B. Bicycle Parking, Short Term. The applicant shall determine the appropriate number of bicycle spaces
based on the required alternative mode use and subject to review and approval by the Chief Planner. If
more than 10 short-term spaces are required at least 50 percent must be covered. Bicycle parking shall
be located within 100 feet of a main entrance to the building. Security shall be achieved by using one or
more of the same methods used for securing long-term bicycle parking.
C. Carpool and Vanpool Ridematching Services. The Designated Employer Contact shall be responsible
for matching potential carpoolers and vanpoolers by administering a carpool/vanpool matching
application. The application shall match employees who may be able to carpool or vanpool.
D. Designated Employer Contact. Each applicant shall designate or require tenants to designate an
employee as the official contact for the TDM Program. The City shall be provided with a current name
and phone number of the Designated Employer Contact The Designated Employer Contact shall
administer carpool and vanpool ridematching services, the promotional programs, update information on
the information boards/kiosks, and be the official contact for the administration of the annual survey and
Triennial report.
E. Direct Route to Transit. A well-lighted path or sidewalk shall be provided utilizing the most direct route
to the nearest transit or shuttle stop from the building.
F. Free parking for Carpools and Vanpools. The preferential parking spaces shall be provided free of
charge.
G. Guaranteed Ride Home. Carpool, vanpool, and transit riders shall be provided with guaranteed rides
home in emergencies. Rides shall be provided either by a transportation service provider (taxi or rental
car) or an informal policy using company vehicles and/or designated employees.
H. Information Boards/Kiosks. The Designated Employer Contact shall display in a permanent location
the following information: transit routes and schedules; carpooling and vanpooling information; bicycle
lanes, routes and paths and facility information; and alternative commute subsidy information.
I. Passenger Loading Zones. Passenger loading zones for carpool and vanpool drop-off shall be located
near the main building entrance.
39
J. Pedestrian Connections. Safe, convenient pedestrian connections shall be provided from the project to
surrounding external streets and, if applicable, trails. Lighting, landscaping, and building orientation
should be designed to enhance pedestrian safety.
K. Preferential Carpool and Vanpool Parking. Ten Percent of vehicle spaces shall be reserved for
carpools or vanpools, with a minimum of one space required. Such spaces shall be provided in premium
and convenient locations.
L. Promotional Programs. The following promotional programs shall be promoted and organized by the
Designated Employer Contact: new tenant and employee orientation packets on transportation
alternatives; flyers, posters, brochures, and emails on commute alternatives; transportation fairs; Spare
the Air (June - October); Rideshare Week (October); trip planning assistance-routes and maps.
M. Shower/Clothes lockers. Shower and clothes locker facilities shall be provided free of charge.
N. Shuttle Program. Establish a Shuttle Program or participate in an existing program, approved by the
Chief Planner, and subject to any fees for the existing program.
O. Transportation Management Association (TMA). The applicant shall participate or require tenant to
participate in a local TMA The Peninsula Congestion Relief Alliance (Alliance) or a similar organization
approved by the Chief Planner that provides ongoing support for alternative commute programs.
Additional Measures
The Chief Planner and the Planning Commission shall determine the appropriateness of each Additional
Measure chosen by the applicant:
A Alternative Commute Subsidies/Parking Cash Out. Employees shall be provided with a subsidy,
determined by the applicant and subject to review by the Chief Planner if they use transit or commute by
other alternative modes.
B. Bicycle Connections. If a site is abutting a bicycle path, lane or route, a bicycle connection shall be
provided close to an entrance to the building on the site.
C. Compressed Work Week. The applicant shall allow employees or require their tenants to allow
employees to adjust their workweek schedule in order to complete the basic work requirement of five
eight-hour workdays by adjusting their schedule to reduce vehicle trips to the worksite.
D. Flextime. The applicant shall provide or require their tenants to provide employees with staggered work
hours involving a shift in the set work hours of all employees at the workplace or flexible work hours
involving individually determined work hours.
E. land Dedication for Transit/Bus Shelter. Where appropriate, land shall be dedicated for transit or a
bus shelter shall be provided based on the proximity to a transit route.
F. Onsite Amenities. One or more of the following amenities shall be implemented: ATM, day care,
cafeteria, limited food service establishment, dry cleaners, exercise facilities, convenience retail, post
office, on-site transit pass sales.
G. Paid Parking at Prevalent Market Rates. Parking shall be provided at a cost equal to the prevalent
market rate, as determined by the City based on a surveyor parking in North San Mateo County.
H. Telecommuting. The applicant shall provide or require tenants to provide opportunities and the ability to
work off-site.
40
I. Reduced Parking. In accordance with General Plan Policy 4.3-1-8, reduced parking, consistent with
projected trip reduction identified in the preliminary TDM plan, may be permitted subject to approval by
the Planning Commission.
J. Other Measures. Additional measures not listed in this Chapter, such as an in-lieu fee that would be
negotiated in a Development Agreement with the City, may be implemented as determined by the Chief
Planner and approved by the Planning Commission. Once the Planning Commission approves the
Preliminary TDM Plan, the Chief Planner may recommend additional measures either as part of the Final
TDM Plan or as part of the Triennial Review process.
41
APPENDIX E:
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO
COUNTY TRANSPORTATION DEMAND MANAGEMENT MEASURES
42
The City/County Association of Governments of San Mateo County list of approved TDM measures, the number
of mitigated peak-hour trips associated with each, and the rationale used to determine the number of mitigated
trips, presented in Table C, were taken from the Revised Guidelines for the Implementation of the Land Use
Component of the Congestion Management Program (City/County Association of Governments in San Mateo
County, 2004).
TABLE E1
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY TRANSPORTATION DEMAND
MANAGEMENT MEASURES
Transportation Demand Management
Measu re Num ber of Trips Credited Rationale
Secure bicycle storage. One peak-hour trip will be credited for every 3 Experience has shown that
new bike lockers/racks installed and bicycle commuters will. on
maintained. Lockers/racks must be installed average, use this mode one-third
within 100 feet of the building. of the time, especially during
warmer summer months.
ShoVv'ers and changing rooms. Ten peak-hour trips Vvill be credited for each 10 to 1 ratio based on cost to
new combination shower and changing room build and the likelihood that
installed. An additional 5 peak hour trips will bicycle utilization Vvill increase.
be credited when installed in combination with
at least 5 bike lockers.
Operation of a dedicated shuttle service One peak-hour trip will be credited for each Yields a one-to-one ratio (one
during the peak period to a rail station or peak-hour trip seat on the shuttle. Increases seat in a shuttle equals one auto
an urban residential area. Alternatively to two trips if a Guaranteed Ride Home trip reduced); utilization
the development could buy into a shuttle Program is also in place. increases when a guaranteed
consortium. ride home program is also made
Five additional trips vvill be credited if the available.
shuttle stops at a childcare facility en route
to/from the v....orksite.
Charging employees for parking. Tv....o peak-hour trips will be credited for each Yields a two-to-one ratio.
parking spot charged out at $20 per month for
one year. Money shall be used for TDM
measures such as sh uttles or subsidized
transit tickets.
Subsidizing transit tickets for employees. One peak-hour trip will be credited for each Yields a one-to-one ratio (one
transit pass that is subsidized at least $20 per transit pass equals one auto trip
month for one year. reduced).
One additional trip ""II be credited if the
subsidy is increased to $75 for parents using
transit to take a child to childcare en route.
Subsidizing pedestria ns/bicyclists who One peak hour trip vvill be credited for each Yields a two-to-one ratio (One
commute to work. employee that is subsidized at least $20 per pedestrian/bicycle equals one
month for one year. auto trip reduced.)
Creation of preferential parking for Tv....o peak-hour trips will be credited for each Yields a two-to-one ratio (one
carpoolers. parking spot reserved. reserved parking spot equals a
minimum of two auto trips
reduced).
Source: City/County Association of Governments of San Mateo County, 2004 and Fehr & Peers, 2008.
43
TABLE E1 (CONTINUED)
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY TRANSPORTATION DEMAND
MANAGEMENT MEASURES
Transportation Demand Management
Measu re Num ber of Trips Credited Rationale
Creation of preferential parking for Seven peak-hour trips will be credited for Yields a seven-to-one ratio
vanpoolers. each parking spot reserved. (one reserved parking spot
equals a minimum of seven
auto trips reduced).
Implementation of a vanpool program. Seven peak-hour trips will be credited for The average van capacity is
each van pool arranged by a specific program seven.
operated at the site of the development.
Increases to ten trips if a Guaranteed Ride
Home Program is also in place.
Operation of a commute assistance center, One peak-hour trip will be credited for each This is based on staff's best
offering on-site, one stop shopping for feature added to the information center; and estimate. Short of there being
transit and commute alternatives an additional one peak-hour trip will be major disincentives to driving,
information, preferably staffed with a live credited for each hour the center is staffed having an on-site TOM
person to assist building tenants with trip with a live person, up to 20 trips per each 200 Program offering commute
planning. tenants. Possible features may include: assistance is fundamental to
Transit information brochure rack an effective TOM Program.
Computer kiosk connected to the Internet
Telephone (v.ith commute and transit
information numbers)
Desk and chairs (for personalized trip
planning)
On-site transit ticket sales
Implementation of flexible work hour
schedules that allow transit riders to be 15-30
minutes late or early (due to problems with
transit or vanpool.
Survey employees to examine use and Three peak hour trips will be credited for a This is based on staff's best
best practices. survey developed to be administered t\^lice esti mate with the goal of
yearly. finding best practices to
achieve the mode shift goal.
Implementation of a parking cash out One peak-hour trip will be credited for each Yields a one-to-one ratio (one
program. parking spot where the employee is offered a cashed out parking spot
cash payment in return for not using parking equals one auto trip reduced).
at the employment site.
Implementation of ramp metering. Three hundred peak-hour trips will be credited This is a very difficult and
if the local jurisdiction, in cooperation with costly measure to implement
Caltrans, installs and turns on ramp metering and the reward must be
lights during the peak hours at the highway significant.
entrance ramp closest to the development.
Source: City/County Association of Governments of San Mateo County, 2004 and Fehr & Peers, 2008.
44
TABLE E1 (CONTINUED)
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY TRANSPORTATION DEMAND
MANAGEMENT MEASURES
Transportation Demand Management
Measu re Num ber of Trips Credited Rationale
Installation of high bandwidth connections One peak-hour trip will be credited for every Yields a one-to-three ratio.
in employees' homes to the I nternet to three connections installed. This measure is
facilitate home telecommuting. not available as credit for a residential
development.
Installation of video conferencing centers Five peak-hour trips will be credited for a This is based on staffs best
that are available for use by the tenants of center installed at the facility. estimate.
the facility.
I mplementation of a compressed workweek One peak-hour trip Vvill be credited for every 5 The workvveek v.ill be
program. employees that are offered the opportunity to compressed into 4 days;
work four compressed days per week. therefore the individual vvill not
be commuting on the 5th day.
Flextime: Implementation of an alternative One peak hour trip vvill be credited for each This is based on staff's best
hours VvOrkVveek program. employee that is offered the opportunity to estimate.
work staggered work hours. Those hours can
be a set shift, set by the employer, or can be
individually determined by the employee.
Provision of assistance to employees so If an employer develops and offers a program This assumes that a five-mile
they can live close to work. to help employees find acceptable residences trip will generally not involve
within five miles of the employment site, a travel on the freeways.
credit of one trip will be given for each slot in
the program.
I mplementation of a program that gives One peak-hour trip will be credited for each This assumes that a five-mile
preference to hiring local residents at the employment opportunity reserved for trip will generally not involve
new development site. employees recruited and hired from vvithin five travel on the freeways.
miles of the employment site.
Provision of on-site amenities! One peak-hour trip will be credited for each This is based on staff's best
accommodations that encourage people to feature added to the job site. Possible estimate.
stay on-site during the VvOrkday, making it features may include:
easier for workers to leave their banking
automobiles at home. grocery shopping
clothes cleaning
exercise facilities
child care center
Provide use of motor vehicles to Five peak hour trips will be credited for each This is based on staff's best
employees who use alternate commute vehicle provided. esti mate.
methods so they can have access to
vehicles during breaks for personal use.
Source: City/County Association of Governments of San Mateo County, 2004 and Fehr & Peers, 2008.
45
TABLE E1 (CONTINUED)
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY TRANSPORTATION DEMAND
MANAGEMENT MEASURES
Transportation Demand Management
Measu re Num ber of Trips Credited Rationale
Provide use of bicycles to employees who One peak hour trip will be credited for every This is based on staff's best
use alternative commute methods so they four bicycles provided. esti mate.
can have access to bicycles during breaks
for personal use.
Provision of childcare services as a part of One trip will be credited for every two This is based on staff's best
the development childcare slots at the job site. This amount esti mate.
increases from one trip for each slot if the
childcare service accepts multiple age
groups (infants = 0-2 yrs, preschool = 3&4
yrs, school age = 5 to 13 yrs).
Developer/Property owner may join an One trip will be credited for each new This is based on staff's best
employer group to expand available childcare center slot created either directly estimate.
childcare within 5 miles of the job site or by an employer group, by the
may provide this service independently. developer/property owner, or by an outside
provider if an agreement has been
developed v.ith the developer/property
owner that makes the child care accessible
to the IM)rkers at the development.
Join the Alliance's guaranteed ride home Two peak hour trips will be credited for Experience has shown that
program. every 2 slots purchased in the program. when a guaranteed Ride Home
Program is added to an overall
TDM Program, the average
ridership increases by about
50%.
Combine any ten of these elements and Five peak-hour trips will be credited. Experience has shown that
receive an additional credit for five peak offering multiple and
hour trips. complementary TDM
components can magnify the
impact of the overall program.
Work with the alliance to Ten peak-hour trips will be credited. This is based on staff's best
develop/implement a Transportation Action esti mate.
Plan.
The developer can provide a cash legacy Peak-hour trip reduction credits will accrue Credits accrue depending on
after the development is complete and as if the items were being directly what the funds are used for.
designate an entity to implement any (or implemented by the developer.
more than one) of the previous measures
before day one of occupancy.
Source: City/County Association of Governments of San Mateo County, 2004 and Fehr & Peers, 2008.
46
TABLE E1 (CONTINUED)
CITY/COUNTY ASSOCIATION OF GOVERNMENTS OF SAN MATEO COUNTY TRANSPORTATION DEMAND
MANAGEMENT MEASURES
Transportation Demand Management
Measu re Num ber of Trips Credited Rationale
Encourage infill development. Two percent of all peak-hour trips will be Generally acceptable TDM
credited for each infill development. practices (based on research of
TOM practices around the nation
and reported on the Internet).
Encourage shared parking. Five peak-hour trips will be credited for an Generally acceptable TDM
agreement vvith an existing development to practices (based on research of
share existing parking. TOM practices around the nation
and reported on the Internet).
Participate in/create/sponsor a Five peak-hour trips will be credited. Generally acceptable TDM
Transportation Management Association. practices (based on research of
TOM practices around the nation
and reported on the Internet).
Coordinate Transportation Demand Five peak-hour trips will be credited. This is based on staffs best
Management programs \^lith existing estimate.
developments/employers.
For employers with multiple job sites, One peak-hour trip vvill be credited for each Yields a one-to-one ratio.
institute a proximate commuting program opportunity created.
that alloVv'S employees at one location to
transfer/trade vvith employees in another
location that is closer to home.
Pay for parking at park and ride lots or One peak-hour trip vvill be credited for each Yields a one-to-one ratio.
transit stations. spot purchased.
Source: City/County Association of Governments of San Mateo County, 2004 and Fehr & Peers, 2008.
47
APPENDIX I
WATER SUPPLY ASSESSl\IENT
California Water Sen'ice Company
'Vater Supply Assessment for
Gateway Business Parl{ Project
South San Francisco, California
JanuaJ~' 8. 2009
Introduction
TIle City of South San Francisco (City) has requested Califomia Water Service Company (Cal
Water) prepare a Water Supply Assessment (WSA) in accordance with California SB 610
requirements for the Gateway Business Park de\'elopment project. TIle 22.6 acre project is
located at 900, 850, 1000, 800, 750 and 700 Gateway Boulevard in South San Francisco. TIle
area is bounded to the n0l1h by Oyster Point Boulevard, to the south by 670 Gateway Boulevard,
to the east by adjacent properties along Eccles A \'enue and the west by Gateway Boulevard. TIle
attached Figure I shows the location and proposed de\'elopment plan on the property. The
proposed project includes demolition of six existing commercial onice buildings with
approximately 284,000 square feet and replacement with six new research and development
buildings of approximately 1,230,570 square feet that will be part of a life science campus. The
proposed net increase in commercial onice space is ~946,570 square feet.
TIlis project is not specifically covered in Cal Water's 2006 South San Francisco (SSF) District
Urban Water Management Plan (UWMP), which was adopted on December 15, 2006: therefore,
its water requirements and how they would be met are addressed in this Water Supply
Assessment (WSA). TIle SSF District UW!\IP document provides historic and forecasted water
demand and supply data and analyses and can be referenced for more detailed infollllation on
those topics. Cal Water updates its Urban Water l\Ianagement Plans every three years.
Senate Bills 610 (Chapter 643, Statutes of2001) (SB 610) and Senate Bill 221 (Chapter 642,
Statutes of2001) (SB 221) amended state law, etJective January I, 2002, to impro\'e the link
between infollllation on water supply availability and land use development decisions made by
cities and counties. SB 61O/SB 221 are companion measures that require detailed infollllation
regarding water supply availability be provided to local public agency decision-makers prior to
approval of development projects that meet or exceed any of the following criteria:
I. A residential development of more than 500 dwelling units.
2. A shopping center or business establishment employing more than 1,000 persons or
having more than 500,000 square feet.
3. A commercial onice building employing more than 1,000 persons or having more than
250,lJOO square feet oft100r space.
4. A hotel or motel with more than 500 rooms.
5. An industrial, manut:~cturing or processing plant or industrial park planned to house more
than 1,000 persons occupying more than 40 acres of land or having more than 650,000
square feet oft100r area.
6. A mixed-used project that includes one or more ofthe projects specified above.
7. A project that would demand an amount of water equivalent to, or greater than the
amount of water required by a 500 dwelling unit project.
Since the proposed Gateway Business Park development project exceeds the second criteria, a
SB 610 WSA and a SB 221 verification document are required.
A SB 610 WSA must address the adequacy of the water supply to meet the estimated demands of
the proposed Gateway Business Park project over the next 20 years in addition to those of Cal
\Vater's existing customers and other anticipated future users under normal, single dry year and
multiple dry year conditions. (Water Code sI0911(a).) SB 610 and SB221 require that the
infol1llation developed to address the adequacy of water supply question be included in the
administrative record that serves as the evidentiary basis for an approval action by the local
public agency.
Both state bills recognize local control and decision-making regarding the availability of water
for projects and the approval of projects. Under SB 610, water supply assessments must be
furnished to local governments for inclusion in any required California Environmental Quality
Act (CEQA) documents. Water Code 10910 (a) requires that 'my city or county that determines
that a project. as defined in Section 10912, is subject to CEQA shall comply with the
requirements ofthis pati ofthe water code. Under SB 221, approval by a city or county of celiain
residential subdivisions requires an atlil1llative written verification of sutlicient water supply. An
SB 221 verification document is required for tentative tract map approvaL
In a letter dated September 12, 2008, the finll of BKF on behalf ofthe City of South San
FratlCisco requested that Cal Water prepare a SB 610 water supply assessment. Cal Water
submitted a Draft WSA for the proposed development to the City for review on November 12,
2008 or approximately 60 days later. (Water Code 1091O(g) requires the water supplier to
prepare the assessment within 90 days of request.)
As referenced, Cal Water adopted its Clll1'ent SSF District UWl\IP for the District on December
15,2006. Per Section 1091O(c) (3) of the Water Code, this water supply assessment is based on
information contained in the UWl\IP and from other sources cited here.
Following is a description of the proposed Gateway Business Pat'k development project its
projected water demands, and a description and assessment of the proposed water supply to meet
those and all other forecasted demands in the SSF District in accordance with the requirements
ofSB 610.
Proiect DescIilltion
TIle proposed development plan is shown in Table I.
2
Table 1 I
Gateway Business Park Development Plan
Building Net A rea
No. Stories Phasing Implementation Floor Area Increase
Sequence Year SQ ft SQ ft
900 6 1 2011 186,100 136,100
850 6 2 2013 173,700 154,428
1000 6 3 2014 245,000 182,890
800 5 4 2016-2017 175,000 129,600
750 5 5 2018 192,000 139,867
700 5 6 2020 258,770 203,685
Total 1,230,570 946,570
It is assumed that the implementation year in Table I is the same year as occupancy and use of
the building 'Uld therefore the year in which full water demand occurs.
"'ater Demand Forecast: Gateway Business ParI. Deyelopment
For the period from July 2007 ~ June 2008 (I year or 365 days), the total intemalmetered water
use for the five existing buildings (700, 1000, 750, 800 and 850) was 3.392,180 gallons for an
area of 234,0 13 square feet. TIlerefore, overall average daily water use was 0.04 gallons/day/sq
t1
TIle existing building at 700 Gateway Blvd is nearly all otl'ice space use. The building area is
55,098 square feet and annual water use from July 2007 ~ June 2008 was 722, 568 gallons or
0.036 gallons/day/ft2
TIle existing building at 800 Gateway Blvd is nearly all biotechnology research and de\'elopment
laboratory space use. TIle building area is 45,400 square feet and annual water use trom July
2007 ~ June 2008 was \'039,720 gallons or 0.063 gallons/day!tl'.
For the July 2007 ~ June 2008 period, total landscape inigation water use was 7,219,192 gallons
for an area of250,l43 square feet. TIlerefore, a\'erage daily inigation water use was: 0.079
gallons/day!tl'.
For the proposed development project it is assumed that water usage rates for new otl'ice space
and new R&D laboratories will remain the same.
TIle existing landscaped area, mainly grass, is 295,100 square feet. TIle proposed build out
landscaped area will be mainly drought tolerant plantings. TIle landscaped area is expected to
increase by 88,500 square feet to a total area of 383.500 square feet. TIlis is an increase in area of
30%. TIle landscape architect estimates a reduction in ilTigation rate of at least 1/3 due to
conversion from grass to drought tolerant plants. Hence, in the WSA it is assumed that there is
no change in total quantity of water use for ilTigation due to proposed project.
Approximately, 40% of the proposed new building space will be used for otlices and the
remaining 60% of space for biotechnology research 'Uld development laboratories.
3
It is assumed that use ofthe new \'230,570 square feet will be the same as the existing
development. TIlerefore, the only change in water demand will be that due to the net increase in
building space.
TIle estimated increase in water demand due to the proposed project is:
0.036 gallons/day/sq tl x 946,570 sq tl x OAO + 0.063 gallons/day/sq tl x 946,570 sq tl x 0.60 =
13,631 + 35,780 = 49AII gallons/dav.
SSF DislIict
TIle South San Francisco District is located in nOl1hern San ]'vIateo County approximately six
miles south ofthe Citv of San Francisco. TIle district serws the conullunities of South San
Francisco, Colma, a small portion of Daly City, and an unincolvorated area of San Mateo County
known as BroadmooL which lies between Colma 'Uld Daly City.
Figure 2 is a map showing the District's service areas.
Figure 2: South San Francisco DistIict
BG 1
B'i~
Cal Water designates customer classifications as follows:
. Single Family Residential
. Multit:~mily Residential
4
. Commercial
. Industrial
. GO\'el1l1nent
. Other
TIle residential sector of C\VS water service customers includes permanent single and
multifamily residents.
A variety of land uses exist in the South San Francisco service area. Within the City of South
San Francisco, 28 percent of the land is residential, 21 percent industrial, seven-percent
commercial, II percent is vacant and agricultural land and the balance is for public and utility
use. In the City of Colma, approximately 77 percent ofthe land is used for cemeteries. TIle
balance ofthe land is for residential, commercial, and public use. TIle Broadmoor area is
primarily residentiaL
Although the South San Francisco District is predominantly sUI1'0l11lded by communities ser\'ed
by other water companies, a few pockets of growih ,md several areas of redevelopment remain.
TIle average annual services for calendar year 2004 were 16,137. Single t:~mily residential
services represented 85.5 percent commercial services 11.6 percent and all other services 2.90
percent
SSF DislIict ,,' atel' Demand
Total district demand is projected by multiplying the number of services for each customer class
by the demand per service for that class. TIlis method accounts for the significant ditJerences
between the demand per service associated with each customer class and the ditJerent growih
rates for each class.
Two growih pattel1ls were considered in the SSF UW~IP: I) 5-year a\'erage service connection
growth rate, and 2) 10-year average selTice connection grO\vih rate.
TIle growih rate for the five-year period 2000 to 2004 is 0.51 percent/year. The grO\vih rate for
the ten-year period 1996 to 2005 is 0.87 percent/year. Each customer class, such as residential,
commercial and other uses, grows at a ditJerent rate. TIlerefore, the use of short-term or long-
tel1n grO\vih rates in developing total annual service connections is done on the basis of customer
class.
TIle 10-year average growih pattel1l is service connections ,vas used in the UWMP for making
demand projections because it is more representative of actual growih in the South San Francisco
District
TIle SSF UWMP develops three demand scenarios: low, a\'erage and high. Since the low and
high scenarios are not consistent with the record of demand growih, the average was used by Cal
Water in making projections.
In sunllnary, the SSF District's average demand per service by class is combined with the 10-
year rate of growth in services by class to atTi\'e at the most probable demand through the year
5
2028. TIlis demand forecast also assumes that the Company's 10~o ,yater conseryation objective
is achieyed and maintained.
Table 2 shows actual and projected (ayerage) annual water demand for the SSF District to the
vear 2028.
Table 2
Actnal amI Projected Amlllal SSF DislIict "'a tel' Demaml
(Acre-Feet)
Demand
8.420
8,830
9,070
9.370
9,690
\0,030
Year
2005
2008
2013
2018
2023
2028
TIle estimated average annual demand for the SSF District in 2013 is 9,070 acre-feet/year (AFY)
or 8.09 million gallons per day (mgd). TIle 2008 estimated average demand is 8,830 AFY so the
forecasted increase in ayerage day demand ti'om2008 to 2013 (5-year period) is 240 AFY or
214,000 gallons/day. TIle Gateway Business Park project forecasted increase in demand in 2013
is 245.330 net increase in square feet/946,570 x 49.411 gallons per day = 12,806 gallons per
day or ~14 AFY. TIlis represents 6% (12,806/214,000) ofthe projected increase in forecasted
SSF District water demand for that period.
TIle estimated ayerage annual demand for the SSF District in 2028 is IOJJ30 AFY or 8.95 mgd
so the increase in ayerage day demand from 2008 to 2028 (20-year period) is \,200 AFY or \,07
mgd. TIle Gateway Business Park project forecasted net increase in demand in 2028 is 49.4 II
gallons/day or 55.4 AFY. TIlis represents 4.6% (49.4111 \'070JJOO) of the projected increase in
forecasted SSF District water demand for the 20 year period.
With respect to either the 5-year or 20-year forecasts, the Gateway Business Park project does
not represent a significant percentage in the projected increase in District demand. For 2013, it
leayes 94% ofthe projected increase in demand for other projects and general growth within the
District. For 2028, it leaves 95.4% for other projects and general growih. Therefore, for purposes
ofthis WSA, the increases in water demand are assumed to be pari of Cal Water's overall
demand forecast.
SSF DislIict Water Snpply
TIle South San Francisco District water supply is a combination of purchased water and
groundwater ti'om Company owned wells. The projected water supply source and annual
quantity for the next 20 years is summarized in Table 3.
6
Table 3: SSF District Water Supplies
(AFY)
Water Supply Sources 2005 2008 2013 2018 2023 2028
San Francisco Public Utilities COlllmission 8,420 7,296 7,536 7,836 8,156 8,496
Cal Water Groundwater Wells 0 L534 L534 L534 L534 L534
Total 8,'/20 8,830 9,070 9,370 9,690 10,030
Purchasell \" ater
Cal Water purchases treated surface water from the San Francisco Public Utilities Commission
(SFPUC). TIlis supply is predominantly from the Siel1'a Nevada, delivered through the Hetch
Hetchy aqueducts, but also includes treated water produced by the SFPUC from its local
watersheds and t:~cilities in Alameda and San Mateo Counties.
TIle amount of imported water available to SFPUC's retail and wholesale customers is
constrained by hydrology, physical facilities, and the institutional t:~ctors that allocate the water
supply ofthe Tuolumne River. Due to these constraints, the SFPUC is very dependent on
reservoir storage to finn-up its water supplies.
TIle SFPUC meets its retail and wholesale water demands through an integrated regional water
system that includes water from local Bay Area water sources as well as imp011ed water from
Hetch Hetchy reservoir. Local watershed facilities are operated to capture local runofJ as well as
store impolled water. Local reservoirs include: Crystal Springs Reservoir, San Andreas
Reservoir, Pilarcitos Reservoir, Calaveras Reservoir, and San Antonio Resel'Yoir.
TIle Raker Act, which authorized the Hetch Hetchy project, prevents a privately owned utility
such as Cal Water from receiving water from the Hetch Hetchy system, but allows local sources
to be purchased. In addition, the Cal Water is subject to the Supplemental Agreement and l\Iaster
Sales Contract. The water purchased is treated by SFPUC prior to delivery to Califomia Water
Service C01npany.
TIle district takes delivery from SFPUC from eleven metered connections from five SFPUC
transmission lines.
Supplv AssunUlce
In 1984, Cal Water, along with 29 other Bay Area water suppliers, signed a Settlement
Agreement and Master Water Sales Contract (Master Contract) with San Francisco,
supplemented by an individual Water Supply Contract. TIlese contracts, \vhich expire in June
2009, pn1Yide for a 184mgd, expressed on an annual average basis of supply assurance to
SFPUC wholesale customers collectively. Cal Water's supply assurance is 35.39 mgd or 39,642
acre feet per year. Although the l\Iaster Contract and accompanying Water Supply Contract
expire in 2009, the Supply Assurance (which quantified San Francisco's obligation to supply
water to its individual wholesale customers) survives their expiration and continues indefinitely.
7
TIle SFPUC can meet the demands of its retail and wholesale customers in years of average and
alx1\'e awrage precipitation. The Master Contract allows the SFPUC to reduce water deliveries
during droughts, emergencies and for scheduled maintenance activities. The SFPUC and all
wholesale customers adopted an Interim Water ShOliage Allocation Plan in 2000 to address the
allocation of water between San Francisco and wholesale customers in aggregate and among
individual wholesale customers during water shortages of up to 20% of system-wide use. TIlis
plan, which also expires in June 2009, is described in more detail in the SSF UWl\IP.
G-roulld,,'ater
Groundwater is e:-.1racted from Cal Water owned wells the Merced F0I111ation ofthe Colma
Creek Basin, a sub-basin ofthe l\Ierced Valley Gl'Oundwater Basin. Gl'Oundwater supplies ten to
fifteen percent ofthe district's water demand.
Cal Water monitors the groundwater level of its wells. Figure 3 shows the average ground water
level for the South San Francisco District. TIle water level has remained relative constant since
1990 due to the area receiving average to above awrage rainfall and that the wells have been
operating at less than 60% oftotal capacity. The water levels have been rising since 2003 since
the wells have been placed ofl-line as pati of a SFPUC program to demonstrate the feasibility of
a cOl~iunctive use program SFPUC proposes to install wells in the West Basin have Cal WateL
Daly City and San Bmno not pump their wells during periods of abow average precipitation and
thereby "bank" the groundwater or increase the quantity of groundwater basin storage. During
dry periods when SFPUC anticipates reductions in its deli wry of surface supplies, Cal Water,
Daly City and San Bruno would pump their n0I111al amounts plus additional amounts stored to
make up for the surt:~ce supply cutback. Agreements to implement this plan, which has been
demonstrated to be technically feasible, are cmrently being negotiated among the parties.
Fhmre 3: Sonth San Francisco DislIict A yel"a!!e Static GronlHlwater LewIs
District: SO. SAN FRANCISCO For All Years
As Of: 5/1712006
bi
m
"
Q
N
m
m
"
ro
m
m
m
"
ro
~
m
m
"
~
:ll
m
"
N
Sl
"
N
~
m
m
"
~
m
"
g:
m
"
~
Q
Q
Q
"
N
N
Q
Q
"
~
8
"
Q
g
Q
"
ro
~
Q
"
ro
0.00
20.00
40.00
60.00
~
>; 80.00
~
a
~ 100.00
120.00
140.00
160.00
160.00
200.00
220.00
^",
,.
"^- .~ ^ ^ r1\ - M ,',l /'
~ V . 'V~ '\/ '>7\J ' -V' "V
~ Runolng Averag.e
- 8verag.e Stati.c.Level
l
In June 2003, Cal Water entered into an agreement with the SFPUC to conduct a conjunctiw use
8
test program its practicality and potential impact on the regional groundwater basin and Lake
l\Ierced recoyery. TIle conjunctiye use program was for a three year duration. As shown in the
aboye figure, groundwater leye\s rose in 2004 and 2005. In 2008, Cal Water's wells are being
put back into operation.
TIle South San Francisco District has seven actiye wells with a total design capacity of 1,365
GPl\L If operated full-time, these wells could produce 1.97 mgd (2,207 AFY). TIlis production
capacity represents about 20 to 25 percent of the annual demand in the district. A maximum of
1,560 AFY was pumped in 1970 and 1983. Over the past two decades, Cal Water's average
groundwater production has been LOIS AFY, due largely to the ayailability ofSFPUC supplies.
Grolllulwater Basin BOlllularies and Hnlrolo!!y
TIle Wests ide Basin is the largest groundwater basin in the San Francisco Bay hydrologic region.
It is separated from the Lobos Basin to the n011h by a northwest trending bedrock ridge through
the n011heastern pat1 of Golden Gate Pm'k TIle Sml Bruno Mountains bound the basin on the
east. TIle San Andreas Fault and Pacific Oce'ill form its western boundal'\' and its southem limit
is defined by bedrock high that separates it from the San Mateo Plain Groundwater Basin. The
basin opens to the Pacific Ocean on the n011hwest and San Frmlcisco Bay on the southeast'.
Additional infollllation on the basin is given in the DWR Groundwater Bulletin 118, which is
included as Appendix D in the SSF District UWMP.
TIle DWR bulletin proyides information on:
. Sml Francisco Bay Hydrologic Region
. Merced Valley (W estside) Basin
. Smlta Clara Sub-basin
. Groundwater Basin Number: 2-35
. Non-adjudicated Status of Basin
Groundwater l\IaJul!!ement Plan
TIle SSF District obtains groundwater from an un-adjudicated basin: howeyer, Cal Water has
yoluntarily limited the annual production of groundwater from the Westside (Merced Valley)
Basin to 500 million gallons per yem' in response to shared concems raised in a study prepared
for the City of Daly City that focused on local groundwater conditions. A copy ofthe AB 3030
Groundwater Management Plan for the Wests ide Basin is included in Appendix H of the SSF
UWl\IP.
Rendell "'ater
Recycling of wastewater is eyaluated by Cal Water in the SSF UWMP. Use of recycled water for
non-potable uses (e.g., landscape ilTigation) can reduce demands on SFPUC and groundwater
supplies. ClIITently, no recycled water is used in the SSF District. Following is a sunllllary ofthe
potential for future recycling for non-potable uses.
Wastewater Collection
TIle NOl1h San Mateo County Sanitation District (NSl\ICSD) treats wastewater from Cal Water's
South San Francisco seryice area conllllunities of Broadmoor and portions of Colma.
9
Communities also within the NSl\ICSD, but not in Cal Water's service area include Westlake,
West borough County Water District Daly City, and the San Francisco County JaiL Municipal
wastewater is generated in the NSMCSD service area by residential, commercial, and limited
industrial sources. NSl\ICSD owns, operates and maintains its sewer system consisting of gravity
sewers and pumping stations.
South San Francisco and San Bruno own and operate the South San Frmlcisco Water Quality
Control Plant (SSFWQCP). Wastewater from Cal Water's South San Frmlcisco service m'ea
communities of South San Francisco and Colma is treated at the SSFWQCP. Wastewater from
Sml Bruno and a small portion of Daly City is also treated at the SSFWQCP, but these areas are
not within Cal \Vater's service m'ea. TIle sewer system includes gravity lines and force mains that
combine both wastewater and St0I111 water runotJ.
TIle quantity of wastewater generated is proportional to the population and the water use in the
service area. For 2008, it is estimated that 3,300 AFY of wastewater t10\vs from Cal Water's
South San Frmlcisco District. It is projected to increase to 3,700 AFY in 2028.
Potential Water Recvcling in District
TIle NSMWTP hopes to include teliiary treatment in the near future. TIle design improvements
to upgrade the treatment process are approximately 30% complete. TIlis treatment will increase
the possible uses for recycled water. Planned uses for the recycled water include il1'igation of
three golf courses adjacent to the treatment plant and ilTigation of local median strips and athletic
fields. However. the golf courses clll1'ently utilize groundwater resources for irrigation and both
the golf courses and median strips are not located within Cal Water's South San Francisco
service area. In addition, Cal \Vater's service areas in Broadmoor and Colma are residential
communities with no cUI1'ent demand for recycled water. It is anticipated that potential
customers will be served with recycled water from the North San l\Iateo \Vastewater Treatment
Plant in the near future: however. none of these potential customers are located within Cal
\Vater's service area. The cUI1'ent projected recycled water demand for Cal \Vater's service area
serviced by NSMWTP through the year 2030 is 0 acre-feet per year. However. Cal Water will
continue to pariicipate in planning ti)!' future recycled water project(s) with South Sml Francisco,
Sml Bruno, and SFPUC and consider initiating ajoint feasibility study with Daly City to
investigate supplying recycled water to Colma cemeteries.
TIle SSFWQCP will be at capacity in approximately 5 year's and any available space will be used
to increase capacity. Under Clll1'ent conditions the SSFWQCP does not have plans to provide
recycled water at any time in the near future.
Waste\vater Treatment in SSF District Area
TIle wastewater at the North San l\Iateo Wastewater Treatment Plant (NSMWTP) receives
secondm'v treatment. The NSMWTP does not have tertiary treatment. The NSl\IWTP has a
- -
capacity to treat 10.3 MGD average daily t10w but currently receives G.8l\IGD trom the NO/ih
San l\Iateo County Sanitation District service area. Emuent is discharged to an outt:~ll at
TI10111ton Beach via pipeline. Secondary non-public contact treated water is clll1'ently recycled
trom this plant for il1'igation oflmldscaped medians in Westlake. Recycled water trom the
NSMWTP is not available to the SSF District service area.
10
Waste,vater from the South San Francisco Water Quality Control Plant (SSFWQCP) receives
secondary treatment with chlorination and de-chlorination before being discharged to the San
Francisco Bay. TIle SSFWQCP also pl'lwides de-chlorination for chlorinated emuent for
Burlingame, l\Iillbrae, and San Francisco Intemational Airpol1. TIle SSFWQCP has capacity to
treat 13 MGD average daily t10w (instantaneous peak wet weather t10w capacity of 30 mgd) and
cUlTently receiws 10 MGD trom the SSFWQCP service area. The SSFWQCP does not provide
recycled water. A.n assessment of using recycled water trom this plant was made by the finn
CDM in preparing the Cal Water's Water Supply and Facilities Master Plan for the SSF District
and although it was concluded to not be feasible presently, it was recommended that recycling
should be re-evaluated in the future.
Desalinate(I'Vatet"
Desalination by reverse osmosis (RG) of San Francisco Bay water is a longer-tenn potential
supply that could be developed in the future if detennined to be cost-etJective relative to other
sources. Developing a desalination treatment plant requires m'~ior feasibility inwstigations,
environmental studies and considerable coordination with other local and state agencies and
approximately 10 years oflead-time. Cl111'ently, desalinated water is not available.
'Vater Trausfers or Exchau!!es
Cal 'Vater is not pursuing water transfers or exchanges at this time. However, during water
rationing periods, or emergency conditions, Cal 'Vater may consider water transfer entitlements
and or banked water trom neighboring agencies.
Water Supply Reliability
Figure 4 shows the annual rainf:~ll compared to historical awrage. TIle awrage annual raint:~ll
for the district is 19.87 inches. TIle most recent driest war occurred in 1985 when the rainfall for
the district was 90% below average (1.7 inches). This is taken as the Single Dry Yem'. The
Multiple Dry-Water Years used in the following table are based on the most recent and
consecutive lowest annual raint:~ll totals which occUlTed from 1988 mlC11990. This period
coincided with the drought conditions that occUlTed from 1987 to 1992. The Normal Yem' is
taken as 199 L ,vhen the annual rainfall was approximately equal to the awrage raint:~ll totals.
11
120%
100%
80%
60%
! 40%
.~
~
~ 20%
b
~ Wo
5
.
~ -20%
~
b -40%
~
-60%
-80%
-100%
-120%
Figure 4: Summary of SSF DistIict Annual Rainfall & DemaJul Per Service
111111 1 R~il1f~l1 ot~l 19. 7 lllC e~
82.2% 80.2%
00 00
- r- -
- 17.5%
~ l
0.5%
"---' -0.4% "---'
-6.2% ~ "---' -4.3%
- - -
21.20/, 20.70/, 21.60/,
- 3~0/, ",0.
42.20/, ~
46.00/,
-
'--- -
68.00/, 70.90/,
82.80/, ~o.
34 22.3 64 36.2 11.5 17 18.6 58 12.3 10.7 17.6 16.7 19.8 15.7 26.2 25.9 20.0 35.8 15.8 23.3 26.2 190 15.6 13.6 26.0
~
,
~
~
~
~
~
TIle water supply for the South San Francisco District has been reliable during low rainfall
periods.
Table 4 shows that during a single dry year period (1985), in the absence of strong conservation
measures, demand increased by 26.5~o, and during multi-dry years (1988 - 1990), demand
increased between 13% and 15%.
Table 4: SSFDistrict Chan~es in Demand Levels
AFY
A yerag:e/N ormal Sin~le Dry l\Iullir Ie Dry Water Yem's
'Vater Year 'Yater Yeilr Year 1 Year 2 Year 3
6,838 8,649 7,873 7,763 7,782
~-o ofNofmal 126.5% 115.1% 113.5~'D 113.8%
Historical data show that SSF District supplies have always been adequate to meet District
demands irrespective of hydrologic conditions.
Purchase(I'Vater
Cal Water serves the South San Francisco District and two additional districts in the San
Francisco peninsula, Bear Gulch and l\Iid-Peninsula. TIle three districts rely on the San
Francisco Public Utility Commission (SFPUC) as the main water source.
Previously, Cal Water had a contractual agreement with the SFPUC to purchase up to 47,400
AFY (42.32 mgd) of water per year for all three peninsula districts. TIlis amount was set based
on the SFPUC's locally generated supply, since the Raker Act. which authorized the construction
ofthe Hetch-Hetchy Project. excludes investor-owned utilities. like Cal Water, from purchasing
water produced by the Hetch-Hetchy Project. In 1984, Cal Water, along with 29 other Bay Area
12
water suppliers, signed a "Settlement Agreement and l\Iaster Water Sales Contract (Master
Contract)" with San Francisco, supplemented by an individual Water Supply Contract.
TIlese contracts provide for a 206, I 06 AFY (184 mgd annual average basis), Supply Assurance
to the SFPUC's wholesale customers collectively. TIlis allocation was reached through
negotiation in the early 1990s between the SFPUC and Bay Area Water Users Association
(BA WUA), the predecessor organization to BA WSCA. California Water Service Company's
individual Supply Assurance Allocation (SAA) for the three districts is 39,642 AFY (35.39
mgd). The supply from SFPUC is expected to be adequate and reliable through at least the
expiration ofthe 25-yem' contract in 2009. Additionally, the acquisition ofthe Los Trancos
County Water District in July 2005 will allow the transfer of its SAA to Cal Water. Los Trancos
SAA is 123.22 AFY (O.IIMGD), which makes Cal Water's total Supply Assurance Allocation
(SAA) for the three districts equal to 39,765 AFY (35.5 MGD).
Although the l\Iaster Contract. and accompanying Water Supply Contract. expires in 2009, the
Supply Assurmlce (which quantified San Francisco's obligation to supply water to its individual
\vholesale customers) survives their expiration mld continues indefinitely. The Master Contract
provides for the SAA to the SFPUC's wholesale customers subject to reduction in the event of
drought. water shortage, eatlhquake, other acts of God, or rehabilitation and maintenance ofthe
system The l\Iaster Contract does not guat'antee that San Francisco will meet peak daily or
hourly customer demands when their mllmal usage exceeds the Supply Assuratlce. TIle SFPUC's
\vholesale customers have agreed to the allocation of the 184mgd Supply Assurance among each
agency, with each entity's share ofthe Supply Assurance set f011h on a schedule adopted in 1993.
TIle SFPUC can meet the water demands of its retail and wholesale customers in wet and normal
years, however: the Master Contract allows the SFPUC to reduce water deliveries during
droughts, emergencies, mld for scheduled maintenance activities. The Interim Water Sh011age
Allocation Plan (IWSAP) between the SFPUC and its wholesale customers adopted in 2000
provides that the SFPUC determines the available water supply in drought yeat's for sh011ages of
up to 20% on an average, system-wide basis.
SFPUC in cooperation with the members ofthe Bay Area Water Supply and Conservation
Agency (BA WSCA) is preparing a Water Supply and Facilities l\laster Plan for the service area.
As a BA WSCA member, Cal Water has been asked to provide 2030 demand projections and to
evaluate potential altemative local supplies.
For the last two years Cal Water worked with the SFPUC mld BA WSCA in the development of
SFPUC's Capital Improvement Plml. This etJ011 has included development of demand
projections. Cal Water has reviewed and concurs with SFPUC and BA WSCA 's projected service
area population, customer water demmld, conservation program levels and estimates of supply
purchases from the SFPUC. TIleir projections are consistent with and are within the range of
values contained in Cal Water's SSF Urban Water Management Plml. Copies ofthese
conCUlTence statements and the associated values are included in Appendix K of the SSF
UWl\IP.
TIle water demand projections were developed as patl of a series oftecllllical studies pel101111ed
in support of the Capital Improvement Progratll for the SFPUC Regional Water System: SFPUC
Wholesale Customer Water Demand Proiections (URS 2004): SFPUC Wholesale Customer
Water Conservation Potential (URS 2004): SFPUC Wholesale Customer Recvcled Water
13
Potential (R}'IC 2004): and SFPUC 2030 Purchase Estimates (URS 2004). These technical
studies are a pat1 of BA WSCA's Decision Suppol1 System }'Iodel (DSS).
Water demand projections obtained tl'om the DSS for the wholesaler were developed using an
""End Use" modeL Two main steps at'e inyolyed in deyeloping atl End Use model: (I)
Establishing base year water demand at the end-use leyel (such as toilets, showers) atld
calibrating the model to initial conditions: and (2) Forecasting future water dematld based on
future demands of existing water seryice accounts and future growth in the number of water
seryice accounts.
Establishing the base-year water dematld at the end-use leyel is accomplished by breaking down
total historical water use for each type of water selyice account (single t:~mily, multibmily,
commercial, irrigation, etc.) to specific end uses (such as toilets, bucets, showers, and
iITigation).
Forecasts of future water demands were made by determining gro\\1h in the number of water
selyice accounts in a wholesale customer seryice area. After rates of change were determined,
they were input into the model atld applied to those accounts and their end water uses. The DSS
model also incorporates the etJects ofthe plumbing and appliance codes on fixtures and
appliances including toilets (1.6 gal/Hush), showerheads (2.5 gal/minute), and washing machines
(lower water use) on existing and future accounts.
'Vater Quality
Historically and presently, Cal water meets all state and federal water quality regulations.
TIle well field in the SSF District has treatment t:~cilities for remoyal of iron and manganese ions
and blending for nitrates and Volatile Organic Compounds (VOCs). The water purchased from
SFPUC has trihalomethatle concentrations that can exceed California drinking water standards.
To reduce this problem, SFPUC has conyel1ed its disinfection system tl'om free chlorine to
chloratllines. Cal Water has also installed ammonia chemical feed equipment at its well field to
accomplish chloratllination of well water. TIle well field is penllitted for use only when pumped
groundwater is blended with SFPUC water. TIle need for back-up supply is the most imp0l1ant
challenge with respect to water quality.
'Vater SuPPlY Proiects
Cal \Vater will continue its annual main replacement program to upgrade and improye the
distribution system of the SSF District. Storage facilities and new booster pumps will be added
as needed to meet the ayerage day and maximum day requirements. Because growth potential is
limited, no major new facilities are clll1'ently planned, only replacement of existing facilities.
Future capital expenditures are planned for drilling atld developing new wells to replace aging
wells cUlTently in operation, which will increase system reliability atld allow Cal Water to pump
the full safe yield of the basin. Based on the recommendations of a Water Supply Master Plan
prepared by the SFPUC, Cal Water will continue to eyaluate opportunities for the development
of additional local water supplies. Cal Water's SSF Water Supply and Facilities Master Plan
includes a capital improyements platl and schedule.
14
"'ater Demand l\Ianagement
Cal Water is a member of the California Urban Water Conservation Council (CUWCC). TIle
CUWCC was created to increase etlicient water use statewide through partnerships among urban
water agencies, public interest organizations, and private entities. The Council's goal is to
integrate urban water conservation Best l\Ianagement Practices (Bl\IP) into the planning and
management of Califomia's water resources. Implementation of water conservation BMPs will
help limit water demand from customers within the SSF District's service area and reduce water
supply requirements.
TIle Department of Water Resources (DWR), water utilities, environmental orgarlizations and
other interested groups collaboratively developed urban BMPs for conserving water and signed a
l\Iemorandum of Understanding Regarding Urban Water Conservation in California (MOU)
(amended March 9, 2005) to implement these Bl\IPs. TIle MOU is administered by the CUWCC.
As a signatory ofthe MOU, Cal Water has agreed to implement the Bl\IPs as defined in Exhibit
I ofthe MOU that are cost beneficial and complete implementation in accordance with the
schedule assigned to each BMP. Table 5 presents the Bl\IPs as defined by the l\IOU.
Table 5 Water Conservation Best Management Practices
No. Bl\IP Name
1 Water survey programs for single-t:'l111ily residential and multi-family
residential connections
2 Residential plumbina retrofit
3 System water audits, leak detection and repair
4 Metering with commodity rates for all new connections and retrofit of
existing connections
5 Large landscape conservation programs arld incentives
6 High-efficiency washing machine rebate programs
7 Public information programs
8 School education programs
9 Conservation prograrlls for commercial. industrial. arld institutional accounts
10 \Vholesale agency assistance prograrlls
11 Conservation pricing
12 Conservation coordinator
13 Water waste prohibition
14 Residential ULFT replacement programs
'Yater Demand Relluctioll
Should there be periods of water supply shortages, Cal Water has in place plans arld measured
for reducing demand. This includes such measures such as mandatory reductions, rationing, and
penalties.
As shown in Table 6, Cal Water has a four-stage water demand reduction plan comprised of
voluntary and mandatory stages. Appnn-al from the CPUC must be obtained prior to
implementation of mandatory restrictions.
15
Table 6: SSF District Water Demand Reduction Plan
Supply Shortage Stage Demand Reduction Goal Type of Program
1vIinimum Stage 1 10% reduction Voluntary
:) - lO~1>
Moderate Stage ::! :w~/o reduction Voluntary or tJandatory*
10-20%
Severe Stage 3 35~~o reduction Mandatory-
20 - 35~~o
Critical Stage 4 50~~o reduction 11mldatory*
35 - 50%
* tJandatory = iVlocations
TIle following summarizes the actions to be taken during periods when demand reduction is
required:
Stage I
. Public information campaign consisting of distribution of literature, speaking
engagements, monthly bill inserts, and conseryation messages printed in local
newspapers (ongoing)
. Educational programs in area schools (ongoing)
Stage 2
. More aggressiye public infol111ation and education programs
. Requests to consumers to reduce yoluntarily water use by 10 to 20 percent or mandatory
reductions will be implemented
. Prior to implementation of mandatory reductions, obtain appnwal from CPUC
. Lobby for passage of drought ordinances by appropriate goyernmental agencies
Stage 3
. Implement mandatory reductions after receiying approyal from CPUC
. Maintain rigorous public infol111ation campaign explaining water shortage conditions.
. Water use restrictions go into dIect: prohibited uses explicitly defined
. Limiting landscape ilTigation by restricting hours ofthe day and or days of the week
during which water for ilTigation can be used
. l\Ionitor production weekly for compliance with necessary reductions
. Installation oft1ow restrictors on the seryice lines of customers who consistently yiolate
water use restrictions
Stage 4
. All of steps taken in prior stages intensified.
. Discontinuance of water seryice for customers consistently yiolating water use
restrictions
. Monitor production daily for compliance with necessary reductions
. More restrictiw conditions or a prohibition of landscape ilTigation
16
Section 357 of the Water Code requires that suppliers that are subject to regulation by the CPUC
shall secure its approyal before imposing water consumption regulations and restrictions required
by water shortages.
'Vater Ri!!hts to the SSF DistJict GrowHlwater Snllllly
Cal Water owns the land on which its wells are located in the SSF District. Under state law, the
use of percolating groundwater in California is govemed by the doctrine of cOl1'elative rights and
reasonable use, which gives the oyerlying propel1y owner a common right to reasonable,
beneficial use of the basin supply on the overlying land.
Desi!!n, Construction amI Ollemtion of Gateway Business Park 'Vater SUllllly Facilities
Cal Water will proyide the deyeloper of Gateway Business Park project with a will serve letter
indicating its intention to serve as the ,yater utility for proyiding water seryice. A complete water
system includes distribution system, meters, etc. As plmllling mld design proceed further, Cal
Water anticipates working closely with the deyeloper, its engineer, the City of South San
Frmlcisco, CA Dept of Public Health and any other agencies that may be inyolyed with the
approyal of required water supply facilities.
Cal Water will reyiew all proposed design drawings and specifications for compliance with state
and Cal Water's standards with respect to pipe sizes, yalves, materials, etc. and connection to its
existing system
Cal Water's SSF District. supported by its engineering, water quality mld customer seryice stall
in San Jose, will be responsible for proyiding ongoing local operations and maintenmlce seryices
ofthe water system.
SB 610 Section 10910 Paragraph (d)(2) requires identification of existing water supply
entitlements, water rights, or water seryice contracts held by the public water system shall be
demonstrated by proyiding infollllation related to all ofthe following:
(A) Written contracts 01' Pl'OOrOr entitlement to an identified watel' slIm,/l'.
Proof of entitlement to use of the wells cited as a major supply source to the District is
demonstrated by Cal Water's ownership ofthe propel1y and the wells mld its legal right
to use the underlying percolated waters.
Proof of entitlement to the use of SFPUC treated water are proyided in the contracts cited
in this document between Cal Water and SFPUC and are ayailable for reyiew.
(B) Copies ora capital olltlal' Pl'OP:ram f(JI' financinp: the delil'en' or a watel' slllmll' sl'stem
that has been adopted bl' the public 1ratel' sl'stem.
Capital costs for design and constrnction of the water distribution system within the
deyelopment site are the responsibility ofthe deyeloper, The deyeloper will also be
responsible for per lot assessment fees in accordance with Califomia Public Utility
Commission (CPUC) rules to coyer the cost ofthe water supply.
Cal Water's SSF District capital improvement program is separate lrom and does not
include mlY ofthe costs associated with the design and construction ofthe water system
for or within Gateway Business Park Howeyer, upon legal transfer of the completed
17
water system extel1lal to the development site to Cal Water by the developer, the water
system will be incorporated into Cal \Vater's capital improvement and maintenance
programs.
TIle SSF District Water Supply and Facilities l\laster Plan provides specific
recommendations for water system facility or capital improvements to the year 2030. It is
Cal \Vater's intention to update this plan and recommended capital impn1\'ements every
five vem's.
Federal, state, and local vermits fiJi' constl'1lction of'necessal'v infi'astl'1lctfll'e associated
11'ith delivering the water sflvvlv,
For any distribution system improvements, the developer will be required to obtain the
necessary building pennits from the City of South Sml Francisco.
It does not appem' that additional storage t:1cilities are needed for this project. Were a
storage tank required, Cal Water would be responsible for its design and construction and
for obtaining a conditional use permit and building pennit. TIle developer would be
responsible for direct reimbursement of those costs to Cal \Vater.
Cal Water is highly experienced in preparing applications and obtaining the necessary permits
that are needed in order to proceed with design, constmction, startup and operation of water
distribution facilities. Cal Water is t:l1niliar with approvals it must obtain from the City of South
Sml Francisco and Calitl)l1lia Dept of Public Health.
CompaIison of SSF DistIict Snpply amI Demaml
Demand and Snlllllv Commllison for a Normal Hvdrolo!!ic Year:
Table 7 presents a supply and demmld comparison for normal hydrologic conditions. It
demonstrates that the combination of existing groundwater and purchased supplies are adequate
to meet forecasted demands for the Gateway Business Pm'k development and those associated
with existing Cal Water customers and all other new developments in the SSF District.
Active wells in the SSF District have total capacity of \,534 AFY. The SSF District has for the
last several years not pumped any groundwater due to Cal Water's pat1icipation in a
demonstration study of for a proposed SFPUC in-lieu groundwater storage program. TIle total
supply capacity of SSF wells is expected to increase slightly over time as new wells are installed.
For the PUlvose of this WSA ,malysis, groundwater supply projections are based on cun'ent well
capacity. Based on historical data and future demand projections, contracted treated water
deliveries from SFPUC m'e expected to increase by about \,200 AF between 2008 mld 2028 or
about 60 AF per year. Therefore, SSF District annual demmld of SFPUC supply in 2028 is 8,496
AFY.
Cal Water has an existing supply agreement with SFPUC for a total Supply Assurance
Allocation (SAA) for its three peninsula districts equal to 39,765 AFY (35.5 MGD). TIle
agreement is due to expire in 2009. It is anticipated by Cal Water that negotiations for and
development of a new 25 year supply agreement will be accomplished prior to the expiration of
the current agreement. Cal Water's l\lid-Peninsula District (Cities of San Mateo mld San Carlos)
2028 projected use ofSFPUC water is 19,300 AFY. Cal Water's Bear Gulch District (Atherton,
18
pOllions of l\Ienlo Park, POl10la Valley, Woodside, and unincorporated areas in San Mateo
County) 2028 projected use of SFPUC water is 12,995 AFY. Hence, total projected SFPUC
supply to be used by all three Cal Water peninsula districts is 8,486 + 19,300 + 12,995 = 40,791
AFY or 1,065 AFY more than the Cl1TI'ent SSA amount. Cal Water is pl<UlIling on negotiating in
its new SSA an increase of at least 1,065 AFY with SFPUC. But it also has plans to conduct in
2009 an integrated local sources supply plan using its recently completed Water Supply and
Facilities Master Plans for all three districts. Included will not only be an integrated assessment
of how to sustainably maximize use oflocal groundwater, but also an identification of the most
cost etJective and easily implemented sources for recycling, achieving higher <Uld maintainable
higher reductions in water demand. Desalination will also be re-ex<uuined.
I1lerefore, Cal Water believes it is justified in projecting it ability to meet its 20 ye<u' demand for
the SSF District with its forecasted increase of SFPUC supplies, local supplies and/or other
improved demand management.
Table 7: SSF District Supply Versus Demand (AFY) for Normal Hydrologic Year
YEAR: C008 cO 13 C018 ~O~3 ~O28
Total Supply 8,830 9,070 9370 9,690 10,030
A.nnual Ave Day Demand - Normal Year 8.830 9,070 9370 9,690 10,030
Differe-nce 0 0 0 0 0
Demand amI Supplv CompaIisoll for a Sill!!le Drv Year:
For a single dry year, Cal Water C<Ul reasonably expect no reduction in SFPUC supplied water
based on previous experience. Therefore the total supply available to the SSF District during a
single dry year is considered to be the same as for a normal hydrologic ye<u'. The same
assumption applies to the amount of groundwater pumped even though Cal \Vater has the pump
capacity to e~1ract more water than its average annual pumpage.
On the basis that Cal \Vater has a well developed water conservation or demand management
program in place and that in 2008 it has been authorized and requested by the Califomia Public
Utilities Commission to increase its <UlIlual expenditures for increased implementation and
etJectiveness of its demand management practices and that its negotiations for increased supply
trom SFUC may result in annual supply amounts equal to the 25 year forecasted average <UlIlual
demand, it is reasonable to expect that Table 8 would not be ditJerent than a nOllual year. Cal
\Vater will require its customers to use the same amount of water as under nOllual hydrologic
conditions. Table 8 ret1ects these assumptions.
Table 8: SSF District Supply Versus Demand (AFY) for One Dry Year
YEAR. 2008 ~O13 C018 2023 2028
Total Supply 8,830 9,070 9,370 9,690 10,030
AJ1l1ual Ave Day Demand - Dry Year 8,830 9,070 9,370 9,690 10,030
DIfference 0 0 0 0 0
Demand amI Supplv ComJlluisoll for l\Iultiple DrY Years:
19
During the first year, it is expected that demand might be the same as shown in Table 8 for a
single dry year, In the second and third years it is expected that demand would be reduced to
90% of normal hydrologic yem' demand (Stage I reductions). In the third and fomlh years of a
dry period, it is expected that demand would be reduced to 80% of nOllnal (Stage 2 reduction). If
necessary Cal \Vater could implement Stage 3 mandatory reductions to achieve 30% or more of
reduction in demmld. During dry year periods, Cal Water will evaluate its prospective supply and
determine whether voluntary or mandatory water use restrictions should be implemented to
achieve demmld reductions.
As previously indicated, SFPUC has advised the utilities it supplies that a 20% reduction is
supply is likely in a multiple year dry period. It is also conservatively assumed here that local
groundwater supplies due to a reduction in basin storage and a lower of static groundwater level
would yield lower output or reduced pumpage. It is assumed that the loss would be about 15% of
nOllnal yield.
Table 9 presents the supply versus demmld comparison for 4th year of a dry period where SFPUC
is 80% of nOllnal and groundwater supply is 85% and demmld is reduced by 20% or is 80% of
nOllnaL
Table 9: SSF District Supply Versus Demand (AFY) for 4 Year of Multiple Dry Year Period
YEAR. 2008 e013 eG18 2023 2028
T ,'tal Supply 7,140 7,330 7,570 7,825 8,100
Annual Aye Day Demand 7,064 7,256 7.496 7,752 8,024
DltIerence +76 +74 +74 +73 +76
Water Supply Assessment Conclusion
Based on:
I. TIle adequacy of quantity of West Basin groundwater supplies and Cal Water Cl11l'ent and
projected use of groundwater pumping from its actiw wells,
2. TIle projected adequacy of future purchased treated surt:~ce supplies (rom SFSPUC,
3. Future Cal Water plans to constmct additional wells to maintain ifnot increase supply
capacity,
4. Proven etJectiveness in implementing demand reduction best mmlagement practices
during single dry year and multiple dry year conditions,
5. TIle prospect of longer term additional local supplies being obtained from the SFPUC's
proposed conjunctive use program for the West Basin, local recycling projects and
possibly a regional desalination treatment plant,
6. Historical records demonstrating the adequacy of SSF District supplies during single and
multiple dry years to meet demands,
7. Analyses of forecasted demand that indicate achieving significant reductions in demand
(20~ (, to 30%) during single and multiple dry years will result in adequacy of supplies,
Cal Water's concludes that for the next 20 wars, the SSF District will haw adequate water
sUIJDlies to meet proiected demands associated with the proposed planned dewlopment for
Gatewav Business Park along with those of all existing customers mld all other mlticipated future
users for nOllnaL single drv vear and multiple drv vear conditions.
20
Cal \Vater schedules preparation of plans, designs and constmction of new wells and related
distribution and storage t:1cilities so as to increase supply capacity ahead of projected demand
growth. This management approach insures adequate supply capacity to accommodate growih
eyen during dry weather periods that might result in temporary cutbacks in surt:1ce water
deliyeries and declines in the groundwater table level, thereby reducing supply. TIle goal for
supply capacity oft:1cilities in SSF District is to accommodate the maximum day demand (1.5
times the ayerage annual day) with sutJicient reserye capacity reserye to pl'lwide for the
temporary loss of its single largest capacity welL
Implementation
Cal Water will proyide the deyeloper of Gateway Business Park with a letter indicating its
intention to proyide water seryice after the proposed development is approved by the City of
South San Francisco. Cal Water will insure that the required water t:1cilities are designed
consistent with the proposed deyelopment plan and will coordinate with the deyeloper, its
engineer, the City of South San Frmlcisco, and the California Dept of Public Health in the
design, constmction and operation of the proposed water distribution system.
Cal Water will insure compliance with state and city standards with respect to pipe sizes, fire
t10ws, equipment materials, yalyes, appurtenances and connection to its system.
Cal Water's SSF District supported by its engineering, water quality mld customers seryice statJ
in San Jose, will be responsible for proyiding ongoing operations and maintenmlce seryices for
the constmcted water t:1cilities.
21
End of "'SA Document