HomeMy WebLinkAbout13-2025 Reso - PC Meeting 07-17-25 - 932 & 972 El Camino Real (P23-0135)City of South San Francisco
Resolution 13-2025
P.O. Box 711 (City Hall, 400
Grand Avenue)
South San Francisco, CA
File #:25-696
Version:1
Agenda Date: 7/17/2025
Item #: 3b
Resolution making findings and approving entitlements for Design Review, a Conditional Use Permit and
Master Sign Program for the construction of a new fast-food restaurant with drive-through located at 932 and
972 El Camino Real in the T5 Corridor (T5C) Zoning District.
WHEREAS, the applicant has proposed the construction of a new 3,887 square foot In-N-Out Burger
Restaurant with a drive-through and surface parking lot containing 51 parking stalls, landscaping, and
circulation improvements (“Project”) on the properties located at 932 and 972 El Camino Real (APN 014-011-
320 and 014-011-330) of approximately 1.5 acres (referred to as “Project Site”) in the City; and
WHEREAS, the proposed Project is located within the T5 Corridor (T5C) Zoning District and Medium Density
Mixed Use General Plan Land Use Designation; and
WHEREAS, the applicant seeks entitlement approval of a Planning Project (P23-0135), including Design
Review (DR24-0013), Conditional Use Permit (UP24-0001), and Master Sign Program (SIGNS24-0012) for
the Project; and
WHEREAS, approval of the applicant’s proposal is considered a “project” for purposes of the California
Environmental Quality Act, Pub. Resources Code §21000, et seq. (“CEQA”); and
WHEREAS, the City, in conjunction with an environmental consultant, Meridian Consultants, LLC, prepared
an Infill Checklist to provide substantial evidence that the proposed Project qualifies for a Categorical
Exemption under the provision of CEQA, Class 32, Section 15332 as an Infill Development Project; and
WHEREAS, the Design Review Board for the City of South San Francisco considered the Project and
recommended approval to the Planning Commission on November 19, 2024; and
WHEREAS, on July 17, 2025, the Planning Commission for the City of South San Francisco held a lawfully
noticed public hearing to solicit public comment and consider the environmental effects of the Project and
proposed entitlements and take public testimony; and
WHEREAS, the Planning Commission reviewed and carefully considered the information in the Infill
Checklist, and by separate resolution, determined that the Infill Checklist is an objective and accurate document
that reflects the independent judgement and analysis of the City in relation to the Project’s environmental
impacts and finds that the Infill Checklist satisfies the requirements of CEQA. The Project is categorically
exempt under the provision of CEQA, Class 32, Section 15332; and
City of South San Francisco Printed on 7/9/2025Page 1 of 5
powered by Legistar™
File #:25-696 Agenda Date:7/17/2025
Version:1 Item #:
WHEREAS,the Planning Commission has exercised its independent judgment and analysis,and considered all
reports, recommendations, and testimony before making a determination on the Project.
NOW,THEREFORE,BE IT RESOLVED that based on the entirety of the record before it,which includes
without limitation,the California Environmental Quality Act,Public Resources Code §21000,et seq.
(“CEQA”)and the CEQA Guidelines,14 California Code of Regulations §15000,et seq.;the South San
Francisco 2040 General Plan;the South San Francisco Municipal Code;the 2040 General Plan Program EIR
and Statement of Overriding Considerations;the Project applications;the project plan set consisting of:civil
plans prepared by MSL Engineering,Inc.,dated July 1,2025;landscaping plans prepared by Brandon Petrunio
&Associates,Inc.Landscape Architects,dated July 1,2025;photometric plan prepared by RTM Engineering
Consultants,dated stamp received November 1,2024;renderings and elevations prepared by In-N-Out Burger,
dated stamp received November 1,2024;and sign program plans prepared by Signtech,dated stamp received
November 1,2024;the In-N-Out Burger Restaurant Project Infill Checklist,including all appendices thereto,
prepared by Meridian Consultants,dated April 2025;all site plans;all reports,minutes,and public testimony
submitted as part of the Planning Commission’s duly noticed July 17,2025 public hearing;and any other
evidence (within the meaning of Public Resources Code §21080(e)and §21082.2),the Planning Commission of
the City of South San Francisco hereby finds as follows:
SECTION 1 FINDINGS
A. General Findings
1.The foregoing recitals are true and correct and made a part of this Resolution.
2.The Exhibits attached to this Resolution,including Conditions of Project Approval (Exhibit A),Project
Plan Set (Exhibit B),and Master Sign Program Plan Set (Exhibit C),are each incorporated by reference
and made a part of this Resolution, as if set forth fully herein.
3.The documents and other material constituting the record for these proceedings are located at the
Planning Division for the City of South San Francisco,315 Maple Avenue,South San Francisco,CA
94080, and in the custody of the Chief Planner.
4.By a separate resolution,the Planning Commission,exercising its independent judgment and analysis,
has found that,the In-N-Out Burger Restaurant Infill Checklist prepared for the Project,is the
appropriate document for the Project and no further environmental analysis would be required,as the
Environmental Checklist concludes that implementation of the Project will not create any new
significant impacts or trigger any new or more severe impacts than were studied in the previously
certified 2040 General Plan Program EIR;that no substantial changes in the projects or circumstances
justifying major revisions to the 2040 General Plan Program EIR have occurred;that no new
information of substantial importance has come to light since the 2040 General Plan Program EIR was
certified that shows new or more severe significant impacts,impacts that are peculiar to the Project or
City of South San Francisco Printed on 7/9/2025Page 2 of 5
powered by Legistar™
File #:25-696 Agenda Date:7/17/2025
Version:1 Item #:
certified that shows new or more severe significant impacts,impacts that are peculiar to the Project or
Project Site,nor shows new,different or more feasible mitigation measures;and that the Project is also
exempt from CEQA as an Infill Development Project.
B. Design Review
1.The Project,including Design Review,is consistent with Title 20 of the South San Francisco Municipal
Code because the Project is an allowed use that has been designed in compliance with all applicable
Zoning requirements and standards.
2.The Project,including Design Review,is consistent with the General Plan because the proposed
restaurant and drive-through is consistent with the policies and design direction provided in the South
San Francisco General Plan Business Medium Density Mixed Use Land Use designation to create an
area intended for a mix of uses serving both surrounding neighborhood and visitors from nearby areas.
3.The Project,including Design Review,is consistent with the applicable design guidelines adopted by
the City Council in that the proposed Project is consistent with the T5C Zoning District development
standards and the Citywide development standards,as evaluated in the Zoning Ordinance Compliance
analysis for the Project.
4.The Project,including Design Review,is consistent with the Conditional Use Permit requirements for
this project,Master Sign Program requirements and drive-through facilities standards included in
SSFMC Chapter 20.350.016.
C. Conditional Use Permit
1.The proposed use is allowed within the applicable zoning district and complies with all other applicable
provisions of this Ordinance and all other titles of the South San Francisco Municipal Code.The Project
Site is located in the T5 Corridor (T5C)Zoning District,in which a limited-service restaurant is
permitted land use by-right and a drive-through facility is allowed with a Conditional Use Permit,and
extended hours of operation are permitted with a Conditional Use Permit.
2.The proposed use is consistent with the General Plan and any applicable specific plan.The General Plan
Land Use designation for the Project Site is Medium Density Mixed Use,which is intended for a broad
range of commercial,office,and residential uses and public spaces serving both surrounding
neighborhoods and visitors from nearby areas.The Project is consistent with the guiding and
implementing policies in the General Plan as it will redevelop a vacant,underutilized site with a high
demand restaurant use along a commercial and transit priority corridor identified for redevelopment.
3.The proposed use will not be adverse to the public health,safety,or general welfare of the community,
nor detrimental to surrounding properties or improvements.The Project Site is surrounded by a mix of
existing commercial,residential,and open space uses,along a major commercial and transit priority
City of South San Francisco Printed on 7/9/2025Page 3 of 5
powered by Legistar™
File #:25-696 Agenda Date:7/17/2025
Version:1 Item #:
existing commercial,residential,and open space uses,along a major commercial and transit priority
corridor.The proposed restaurant and drive-through use is similar to and compatible with the
surrounding area.
4.The Project meets the applicable requirements for redevelopment in the T5C District,as well as the
specific standards for drive-through facilities outlined in SSFMC Section 20.350.016.
5.The design,location,size,and operating characteristics of the proposed activity would be compatible
with the existing and reasonably foreseeable future land uses in the vicinity.The Project Site is
surrounded by a mix of existing commercial,residential and open space uses,and is located in a
General Plan Land Use designation intended for a broad range of uses and along a transit priority
corridor identified for redevelopment.The proposed restaurant and drive-through use is similar to and
compatible with the existing and reasonably foreseeable future land uses in the surrounding area.The
extended hours of operation are consistent with uses on a major commercial corridor,and having
delivery hours outside of operating hours will help separate truck traffic from vehicle,bicycle,and
pedestrian traffic on the site.
6.The site is physically suitable for the type,density,and intensity of use being proposed,including
access,utilities,and the absence of physical constraints.The Project is a redevelopment of an
underutilized 1.5-acre parcel along a major commercial corridor in an urbanized area with access to all
required utilities and public services.
7.An environmental determination has been prepared in accordance with CEQA.The In-N-Out Burger
Restaurant Infill Checklist prepared for the Project concludes that implementation of the Project will not
create any new significant impacts or trigger any new or more severe impacts than were studied in the
previously certified 2040 General Plan Program EIR;that no substantial changes in the projects or
circumstances justifying major revisions to the 2040 General Plan Program EIR have occurred;that no
new information of substantial importance has come to light since the 2040 General Plan Program EIR
was certified that shows new or more severe significant impacts,impacts that are peculiar to the Project
or Project Site,nor shows new,different or more feasible mitigation measures;and that the Project is
also exempt from CEQA as an Infill Development Project.
D. Master Sign Program
1.The proposed signs are compatible in style and character with the building to which the signs are to be
attached,any surrounding structures and any adjoining signage on the site.The proposed signs were
designed in keeping with the architectural design of the new building,using similar materials and
colors, and maintaining the characteristic qualities and style of the In-N-Out signature and brand.
2.The Master Sign Program contains standards for all wayfinding and identification signage for the site.
Any future tenants will be provided with adequate opportunities to construct,erect or maintain a sign
City of South San Francisco Printed on 7/9/2025Page 4 of 5
powered by Legistar™
File #:25-696 Agenda Date:7/17/2025
Version:1 Item #:
for identification; and
3.The Master Sign Program includes the installation of wayfinding and identification signage for the
entire site that will improve both pedestrian and vehicular circulation and emergency vehicle access.
SECTION 2 DETERMINATION
NOW,THEREFORE,BE IT FURTHER RESOLVED that the Planning Commission of the City of South San
Francisco hereby makes the findings contained in this Resolution and approves the entitlements request for 932
and 972 El Camino Real (P23-0135:DR24-0013,UP24-0001 and SIGNS24-0012)subject to the attached
Conditions of Approval.
BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and
adoption.
* * * * * * *
City of South San Francisco Printed on 7/9/2025Page 5 of 5
powered by Legistar™
* * * * * * *
City of South San Francisco Page 4 of 4
Attest:__________________________________
Adena Friedman
Secretary to the Planning Commission
I hereby certify that the foregoing resolution was adopted by the Planning Commission
of the City of South San Francisco at a regular meeting held on the 17th day of July
2025 by the following:
vote:AYES:
NOES:
ABSTENTIONS:
ABSENT:
Chair Funes-Ozturk, Vice-Chair Pamukcu, Faria, Shihadeh, Tzang
_
_____________________________________________________________
Baker, Evans____________________________________