HomeMy WebLinkAbout08-07-25 Planning Commision Regular Meeting Agenda Packet with Speaker Card and Public CommentsThursday, August 7, 2025
7:00 PM
City of South San Francisco
P.O. Box 711 (City Hall, 400 Grand Avenue)
South San Francisco, CA
Library Parks & Recreation Building, Council Chambers
901 Civic Campus Way, South San Francisco, CA
Planning Commission
SARAH FUNES-OZTURK, Chairperson
AYSHA PAMUKCU, Vice Chairperson
JOHN BAKER, Commissioner
MICHELE EVANS, Commissioner
NORMAN FARIA, Commissioner
SAM SHIHADEH, Commissioner
ALEX TZANG, Commissioner
Regular Meeting Agenda
1
August 7, 2025Planning Commission Regular Meeting Agenda
How to observe the Meeting (no public comment):
1) Local cable channel: Astound, Channel 26, Comcast, Channel 27, or AT&T, Channel 99
2) https://www.ssf.net/Government/Video-Streaming-City-and-Council-Meetings/Planning-Commission
3) https://www.youtube.com/@CityofSouthSanFrancisco/streams
How to Submit written Public Comment before the meeting: Email: [email protected]
Members of the public are encouraged to submit public comments in writing in advance of the meeting. The
email will be monitored during the meeting.The City encourages the submission of comments by 6:00pm on the
date of the Public Hearing to facilitate inclusion in the meeting record. Written comments received prior to
6:00pm on the day of the meeting will be included as part of the meeting record, but will not be read aloud at
the meeting.
How to provide Public Comment during the meeting:
COMMENTS ARE LIMITED TO THREE (3) MINUTES PER SPEAKER
During a meeting, comments can only be made in person: Complete a Speaker Card located at the entrance to
the Council Chambers. Be sure to indicate the Agenda Item # you wish to address or the topic of your public
comment. When your name is called, please come to the podium, state your name and address (optional) for
the Minutes.
American Disability Act:
The City Clerk will provide materials in appropriate alternative formats to comply with the Americanswith
Disabilities Act. Please send a written request to City Clerk Rosa Govea Acosta at 400 Grand Avenue, South
San Francisco, CA 94080, or email at [email protected]. Include your name, address, phone number, a brief
description of the requested materials, and preferred alternative format service at least 72-hours before the
meeting.
Accommodations: Individuals who require special assistance of a disability-related modification or
accommodation to participate in the meeting, including Interpretation Services, should contact the Office of the
City Clerk by email at [email protected], 72-hours before the meeting.
Page 2 City of South San Francisco Printed on 7/31/2025
2
August 7, 2025Planning Commission Regular Meeting Agenda
CALL TO ORDER
ROLL CALL
PLEDGE OF ALLEGIANCE
AGENDA REVIEW
ANNOUNCEMENTS FROM STAFF
PUBLIC COMMENT
Members of the public may speak on any item not listed on the Agenda, and on any items listed under the
Consent Calendar. Pursuant to the provisions of the Brown Act, no action may be taken on a matter unless it is
written on the agenda, or unless certain emergency or special circumstances exist. Written comments received
prior to 6:00 pm on the day of the meeting will be included as part of the meeting record, but will not be read
aloud.
DISCLOSURE OF EX-PARTE COMMUNICATIONS
This portion of the meeting is reserved for Planning Commissioners to disclose any communications,
including site visits, they have had on current agenda items, or any conflict of interest regarding current
agenda items.
CONSENT CALENDAR
Consideration and approval of minutes from the July 17, 2025 Planning Commission1.
07-17-25 PC Draft MinutesAttachments:
PUBLIC HEARING
Report regarding consideration of an application for a Conditional Use Permit to allow
an indoor volleyball and pickleball facility (Bay Area Sport House) at 147 Beacon
Street in Business Technology Park-High (BTP-H) Zoning District in accordance with
Title 20 of the South San Francisco Municipal Code (SSFMC) and determination that
the project is categorically exempt from California Environmental Quality Act
(CEQA), per Class 1, Section 15301, Existing Facilities. (Victoria Kim, Associate
Planner)
2.
Attachment 1_Findings
Attachment 2_Conditions of Approval
Attachment 3_Project Plans with Business Operation Plan
Attachment 4_Parking Management Plan
Attachment 5_Parking Agreement
Attachments:
Page 3 City of South San Francisco Printed on 7/31/2025
3
August 7, 2025Planning Commission Regular Meeting Agenda
ADMINISTRATIVE BUSINESS
Report regarding an application for Design Review to construct a new multifamily
residential structure consisting of four dwelling units at 227 Armour Avenue in the
Downtown Residential High (DRH) Zoning District in accordance with Title 20 of the
South San Francisco Municipal Code (SSFMC), and determination that the project is
categorically exempt under the provisions of the California Environmental Quality Act
(CEQA) per Class 3, Section 15303, New Construction or Conversion of Small
Structures. (Stephanie Skangos, Senior Planner)
3.
Attachment 1 - Findings and Conditions of Approval
Attachment 2 - Project Plans, dated June 29, 2025
Attachment 3 - Design Review Board (DRB) Comment Letter, dated June 6, 2025
Attachments:
The Commission has adopted a policy that applicants and their representatives have a maximum time limit
of 20 minutes to make a presentation on their project. Non-applicants may speak a maximum of 3 minutes
on any agenda item. Questions from Commissioners to applicants or non-applicants may be answered by
using additional time.
ITEMS FROM THE COMMISSION
ADJOURNMENT
**Any interested party will have 15 calendar days from the date of an action or decision taken by the Planning
Commission to appeal that action or decision to the City Council by filing a written appeal with the City Clerk
as provided under Chapter 20.570 of the South San Francisco Municipal Code. In the event an appeal period
ends on a Saturday, Sunday, or any other day the City is closed, the appeal period shall end at the close of
business on the next consecutive business day. The cost to appeal for applicants, residents, and all others is as
set forth in the City’s Master Fee Schedule.
Page 4 City of South San Francisco Printed on 7/31/2025
4
City of South San Francisco
Legislation Text
P.O. Box 711 (City Hall, 400
Grand Avenue)
South San Francisco, CA
File #:25-806 Agenda Date:8/7/2025
Version:1 Item #:1.
Consideration and approval of minutes from the July 17, 2025 Planning Commission
City of South San Francisco Printed on 7/30/2025Page 1 of 1
powered by Legistar™5
July 17, 2025 Minutes Page 1 of 3
MINUTES
JULY 17, 2025
CITY OF SOUTH SAN FRANCISCO
REGULAR PLANNING COMMISSION
CALL TO ORDER / PLEDGE OF ALLEGIANCE TIME: 7:00 PM
AGENDA REVIEW
No changes
ANNOUNCEMENTS FROM STAFF
None
PUBLIC COMMENTS ON ITEMS NOT ON THE AGENDA
None
CONSENT CALENDAR – Voting Key: (yes, no, abstain)
1. Consideration and approval of minutes from the June 5, 2025 Planning Commission
2. Report regarding a resolution making findings and determining that the conveyance of the
remainder of SFPUC Parcel 21, a property composed of portions of Mission Road and
Antoinette Lane not assigned an Assessor’s Parcel Number, from the City and County of
San Francisco to the City of South San Francisco is in conformance with the South San
Francisco adopted General Plan and in accordance with provisions of State Planning Law
(Govt. Code Section 65402) (Jacob Gilchrist, Director of Capital Projects)
2a. Resolution making findings and determining that the conveyance of the remainder of
SFPUC Parcel 21, a property composed of portions of Mission Road and Antoinette
Lane not assigned an Assessor’s Parcel Number, from the City and County of San
Francisco to the City of South San Francisco is in conformance with the South San
ROLL CALL / CHAIR COMMENTS PRESENT: Chair Funes-Ozturk, Vice Chair Pamukcu
Commissioners: Faria, Shihadeh, Tzang
ABSENT:
Commissioner: Baker, Evans
STAFF PRESENT:
Adena Friedman – Chief Planner, Kimia Mahallati – City Attorney,
Stephanie Skangos – Senior Planner, Tony Rozzi – Deputy ECD Director,
Cynthia Fregoso – Clerk
6
July 17, 2025 Minutes Page 2 of 3
Francisco adopted General Plan and in accordance with provisions of State Planning
Law. (Govt. Code Section 65402)
Motion to approve: Commissioner Tzang,
Second – Commissioner Shihadeh, approved by roll call (4-0-0)
Meeting Video: Planning Commission 07-17-25
PUBLIC HEARING
3. Report regarding applications for Design Review, Conditional Use Permit and Master Sign
Program to construct a new fast-food restaurant with drive-through at 932 and 972 El
Camino Real in the T5 Corridor (T5C) Zoning District in accordance with the Title 20 of the
South San Francisco Municipal Code (SSFMC), and determination that the project qualifies
for a categorical exemption, pursuant to California Environmental Quality Act (CEQA)
Guidelines Section 15332. (Stephanie Skangos, Senior Planner)
Public Hearing Opened 7:09pm
Public Hearing Closed 7:44pm
3a. Resolution making findings and a determination that the In-N-Out Burger Restaurant
Project located at 932 and 972 El Camino Real qualifies for a categorical exemption,
pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15332.
Motion to approve: Commissioner Shihadeh,
Second – Commissioner Tzang, approved by roll call (5-0-0)
3b. Resolution making findings and approving entitlements for Design Review, a
Conditional Use Permit and Master Sign Program for the construction of a new fast-
food restaurant with drive-through located at 932 and 972 El Camino Real in the T5
Corridor (T5C) Zoning District.
Motion to approve the resolution with the included errata and amendment to
Condition of Approval no. 16: Commissioner Faria,
Second – Commissioner Shihadeh, approved by roll call (5-0-0)
4. Report regarding a proposed Development Agreement to extend approved entitlements to
construct a new Office/R&D Campus at 800 Dubuque Avenue in the East of 101 Transit
Core (ETC) Zoning District for a period of ten (10) years in exchange for pre-payment of
Community Benefit Program Fee obligations in accordance with Title 19 and 20 of the South
San Francisco Municipal Code and a recommendation determining consistency of the
proposed action with the adopted Initial Study/Mitigated Negative Declaration (IS/MND)
pursuant to the California Environmental Quality Act. (Tony Rozzi, AICP, Deputy Economic
and Community Development Director)
Public Hearing Opened 8:00 pm
Public Hearing Closed 8:17 pm
7
July 17, 2025 Minutes Page 3 of 3
4a. Resolution making findings and recommending that the City Council approve a proposed
Development Agreement to extend approved entitlements to construct a new Office/R&D
Campus at 800 Dubuque Avenue in the East of 101 Transit Core (ETC) Zoning District for
a period of ten (10) years in exchange for pre-payment of Community Benefit Program Fee
obligations in accordance with Title 19 and 20 of the South San Francisco Municipal
Code and a recommendation determining consistency of the proposed action with the
adopted Initial Study/Mitigated Negative Declaration (IS/MND) pursuant to the California
Environmental Quality Act.
Motion to approve: Commissioner Shihadeh,
Second – Commissioner Faria, approved by roll call (5-0-0)
Meeting Video: Planning Commission 07-17-25
ITEMS FROM THE COMMISSION
None
ADJOURNMENT
Chair Funes-Ozturk adjourned the Planning Commission meeting at 8:21 PM.
Adena Friedman, Chief Planner Sarah Funes-Ozturk , Chairperson or
Aysha Pamukcu, Vice Chairperson
Secretary to the Planning Commission Planning Commission
City of South San Francisco City of South San Francisco
AF/af
8
City of South San Francisco
Legislation Text
P.O. Box 711 (City Hall, 400
Grand Avenue)
South San Francisco, CA
File #:25-768 Agenda Date:8/7/2025
Version:1 Item #:2.
Report regarding consideration of an application for a Conditional Use Permit to allow an indoor volleyball and
pickleball facility (Bay Area Sport House)at 147 Beacon Street in Business Technology Park-High (BTP-H)
Zoning District in accordance with Title 20 of the South San Francisco Municipal Code (SSFMC)and
determination that the project is categorically exempt from California Environmental Quality Act (CEQA),per
Class 1, Section 15301, Existing Facilities.(Victoria Kim, Associate Planner)
MOTION TO ADOPT STAFF RECOMMENDATIONS
1.Move to determine the project is exempt from CEQA.
2.Move to approve the Conditional Use Permit subject to the attached draft Findings and draft
Conditions of Approval.
RECOMMENDATION
Staff recommends that the Planning Commission conduct a public hearing and take the following action:
1.Move to find the Project is exempt from CEQA review per CEQA Guidelines,Class 1,Section 15301,
Existing Facilities.
2.Move to make findings and approve the entitlements request for Project (P24-0133)including the
Conditional Use Permit (UP24-0007), subject to the attached Findings and Conditions of Approval
BACKGROUND/DISCUSSION
In December 2024,the applicant submitted a Conditional Use Permit application to convert an existing
warehouse into a volleyball and pickleball facility (Bay Area Sport House).The proposed project would be at
an existing warehouse structure and proposes two volleyball courts and two pickleball courts.No exterior
modifications are proposed.
Site Overview
The project site is located at 147 Beacon Street,and an existing one-story warehouse building with a mezzanine
will be transformed into the proposed indoor sports and recreation use.The volleyball and pickleball facility
would be approximately 22,700 square feet including the first floor (19,000 sf.)and mezzanine floor (Approx.
3,700 sf.).Nine parking stalls are designated along the north side of the building and seven parking spaces are
adjacent to the west side of the structure with one loading and unloading zone,totaling 16 surface parking
spaces dedicated to the indoor sports facility on site.The main and only access to the property is Beacon Street
from the west.The surrounding land uses are warehousing,manufacturing,catering businesses,offices,an
indoor driving school, and a dog day care center.
Proposed Project
The project is an indoor sports facility with two volleyball courts and two pickleball courts to provide
professional coaching,organized leagues and community events.A maximum of 14 players can play at a time
on each volleyball court and a maximum of four players per pickleball court can play at a time.The current
City of South San Francisco Printed on 7/30/2025Page 1 of 4
powered by Legistar™9
File #:25-768 Agenda Date:8/7/2025
Version:1 Item #:2.
on each volleyball court and a maximum of four players per pickleball court can play at a time.The current
landscaping and building exteriors would remain the same and additional trees and grass are proposed around
the existing parking area (Ref.Attachment 3).The existing lobby,offices and restrooms will remain.
Additionally,a new storage area and athletics pre-area on the first floor and deck lounge and seating area on the
mezzanine floor would be added to the sports facility.An identifying signage for the business is not a part of
the project and will be under a separate permit.
Operation Plan
The proposed volleyball and pickleball facility will be open between 3:00 p.m.to 10:00 p.m.on weekdays and
8:00 a.m.to 10:00 p.m.on weekends.Bay Area Sport House’s operating hours would take place mostly outside
of regular business hours of the adjacent businesses during weekdays and weekends.The estimated maximum
number of occupants would be 36 customers (two volleyball courts x 14 players and two pickleball courts x 4
players)at a time.In total,three employees will be hired,and one person staff will be on duty per shift during
business hours at the project site. Additional private coaches and trainers may also be present.
ZONING CONSISTENCY
Land Use
The subject site is located in the Business Technology Park-High (BTP-H)Zoning District.Pursuant to SSFMC
Section 20.100 (Nonresidential Districts),Indoor Sports and Recreation uses are permitted in the BTP-H
Zoning District subject to the approval of a Conditional Use Permit.The proposed use would be operated
indoors and mainly outside of.The project will not generate noise,traffic,or parking impacts in the
surrounding areas,since it will be operated indoors and primarily outside of normal business hours of the
surrounding businesses.
Parking Requirement
The project property has seven parking spaces on the west side of the building and nine parking spaces in the
north,totaling 16 surface parking spaces.A parking agreement with the adjacent warehouse owner at 131
Beacon Street was signed to use additional 22 off-street parking spaces after business hours (Ref.Attachment
5).According to SSFMC Section 20.330.004,Required On-Site Parking Spaces,a Parking Management and
Monitoring Study is required for commercial recreation uses without a specified parking requirement.A
parking study analysis (Ref.Attachment 4)was submitted to identify sufficient parking capacity and suitability
for the volleyball and pickleball facility.
The parking study analysis includes hourly parking demand surveys of the north,west,and south parking lots
for peak demand hours on Thursday,March 20,2025 and Saturday,March 22,2025 and comparable studies at
similar indoor sports (basketball,volleyball,and soccer)facilities to capture anticipated volumes of parking
demand.The parking study analysis estimated that the project would need 37 parking spaces if all two
volleyball courts and two pickleball courts were fully occupied.During the peak transition period,44 parking
spaces would be in demand and may exceed the available parking spaces by 6 parking stalls.For the transition
period,the existing loading and unloading zone in front of the project building would be used by parents and
drivers to speed loading and unloading athletes and reduce the parking demand.The parking study analysis
concluded that the drop-off and pick-up operation would expect to be reduced by four parking spaces and only
two cars would use on-street parking spaces where there was enough capacity.Therefore,the proposed
volleyball and pickleball facility would not have a significant negative impact on off-site and the provided
parking on the site with the shared parking area would suffice the estimated peak parking demand.
City of South San Francisco Printed on 7/30/2025Page 2 of 4
powered by Legistar™10
File #:25-768 Agenda Date:8/7/2025
Version:1 Item #:2.
GENERAL PLAN CONSISTENCY
The General Plan Land Use designation for the project site is Business Technology Park High in East of 101
sub area.The land use designation is intended for high-density corporate headquarters,research and
development facilities,and office buildings.The proposed Bay Area Sports House would be located in an
existing light industrial area,and the recreation facility will revitalize an underused project site and provide
opportunities to students,athletic trainees and South San Francisco residents.The neighboring land uses are
offices,manufacturing,warehousing,and other industrial uses.The project is providing an additional
recreational facility in the community for the employees and residents,and the indoor sports facility is within
the intent of the adopted General Plan designation.
Policy LU-1.1:Support mixed use activity centers.Support a network of vibrant mixed-use activity centers
located throughout the city.Mixed use centers should include business and services,housing,healthy food,
parks, and other gathering places.
Policy LU-1.7:Create new Lindenville and East of 101 mixed use neighborhoods.Facilitate the construction of
new mixed-use neighborhoods in Lindenville and East of 101 that are well connected to services,transit,
amenities, public buildings, and parks and recreational facilities.
Policy LU-7.7:Affordable spaces for emerging businesses.Support affordable and flexible commercial and
industrial building space for new and emerging businesses.
GOAL PE-2:A resilient and diverse South San Francisco economy supports existing industries while
accommodating emerging growth opportunities.
GOAL PE-7:South San Francisco provides a business climate that supports the success of local entrepreneurs
and existing small, local, minority-owned, and culturally diverse businesses.
GOAL PR-1:South San Francisco equitably provides improved parkland,recreational facilities,and services
for all residents.
ENVIRONMENTAL REVIEW
The project is in an existing structure and has been determined to be categorically exempt from environmental
review under the provision of CEQA guidelines,Class 1,Section 15301,Existing Facilities.The project would
not create any changes to the site conditions. Therefore, no further environmental analysis is required.
CONCLUSION
The proposed indoor sports and recreation use (Bay Area Sports House)would provide a new recreation facility
for athletes of all ages to practice and train.The project is consistent with General Plan and City’s Zoning
Ordinance development standards.Staff recommends that the Planning Commission approve the Conditional
Use Permit (UP24-0007)and make a determination that the project is in compliance with the CEQA
Guidelines, subject to the Findings and Conditions of Approval.
Attachments:
1.Findings
2.Conditions of Approval
3.Project Plans with Business Operation Plan
4.Parking Management Plan
City of South San Francisco Printed on 7/30/2025Page 3 of 4
powered by Legistar™11
File #:25-768 Agenda Date:8/7/2025
Version:1 Item #:2.
5.Parking Agreement
City of South San Francisco Printed on 7/30/2025Page 4 of 4
powered by Legistar™12
FINDINGS OF APPROVAL
P24-0133: UP24-0007
147 BEACON STREET
(As approved by the Planning Commission, August 07, 2025)
As required by the Use Permit Procedures (SSFMC Chapter 20.490), the following findings are made in
support of a Conditional Use Permit to allow an indoor volleyball and pickleball facility (Indoor Sports and
Recreation use) at 147 Beacon Street in Business Technology Park-High (BTP-H) Zoning District in
accordance with Title 20 of the South San Francisco Municipal Code (SSFMC), based on materials
submitted to the City of South San Francisco Planning Division which include, but are not limited to:
Application materials prepared by applicant, submitted June 12, 2025; Use Permit staff report dated August
07, 2025; and Conditions of Approval.
REQUIRED FINDINGS
A. The proposed use is allowed within the applicable zoning district and complies with all other applicable
provisions of this Ordinance and all other titles of the South San Francisco Municipal Code.
Supportive Evidence:
The project site is located within the Business Technology Park-High (BTP-H) Zoning District. Pursuant
to the land use regulations in Sections 20.100.020, Indoor Sports and Recreation uses are permitted in
BTP-H Zoning Districts with a Conditional Use Permit and complies with all other applicable provisions
of the Zoning Ordinance.
B. The proposed use is consistent with the General Plan and any applicable specific plan.
Supportive Evidence:
The project is consistent with the General Plan which designates the site as East of 101 land use and the
indoor volleyball and pickleball facility is meeting the intent of the adopted General Plan Designation.
C. The proposed use will not be adverse to the public health, safety, or general welfare of the community,
nor detrimental to surrounding properties or improvements.
Supportive Evidence:
The project will not adversely impact the public health, safety, or general welfare of the community, or
detrimental to surrounding properties or improvements. The indoor volleyball and pickleball facility will
be operated within an existing warehouse building and no exterior alteration is proposed, except for
identifying signage which would be under a separate sign permit.
D. The proposed use complies with any design or development standards applicable to the zoning district
or the use in question as may be adopted by a resolution of the Planning Commission and/or the City
Council.
Supportive Evidence:
The project complies with design and development standards applicable to the BTP-H Zoning District
and use. No exterior modification is proposed, and the proposed use would be operated within the
existing facility.
13
Findings of Approval
E. The design, location, size, and operating characteristics of the proposed activity would be compatible
with the existing and reasonably foreseeable future land uses in the vicinity.
Supportive Evidence:
The design, location, size, and operating characteristics of the project would be compatible with the
existing and reasonably foreseeable future land uses in the vicinity. The project would be within the
existing structure and no exterior change is proposed.
F. The site is physically suitable for the type, density, and intensity of use being proposed, including access,
utilities, and the absence of physical constraints.
Supportive Evidence:
The site is physically suitable for the type, density, and intensity of the project use, including access,
utilities, and the absence of physical constraints. The access to the project site would remain the same
from Beacon Street and no physical expansion of the existing building is proposed.
G. An environmental determination has been prepared in accordance with the California Environmental
Quality Act.
Supportive Evidence:
In accordance with the California Environmental Quality Act, staff has determined that the proposed
project is Categorically Exempt per the provisions of Section 15301, Class 1, Existing Facilities.
14
CONDITIONS OF APPROVAL
P24-0133: UP24-0007
147 BEACON STREET
(As approved by the Planning Commission on August 07, 2025)
A. Planning Division requirements shall be as follows:
1. The construction drawing shall substantially comply with the approved plans submitted
June 12, 2025, as approved by the Planning Commission for UP 24-0007, as amended by
the Conditions of Approval. The final plans shall be subject to the review and approval of
the Chief Planner.
2. The business shall be operated substantially as outlined in the Business Operation Plan
(Ref. Attachment 3) provided by the applicant as part of this application.
3. The maximum number of volleyball and pickleball players at one time is 36. Expanding
the business to permit larger groups of clients may require a Use Permit Modification at
the determination of the Chief Planner.
4. Hours of operation are:
a) Monday through Friday from 3:00pm to 10:00pm.
b) Saturday and Sunday from 8:00am to 10:00pm.
c) Expanding the hours of operation may require a Use Permit Modification at the
determination of the Chief Planner.
5. No regular special events, tournaments or games are proposed. Expanding the use to
include special events, tournaments or games may require a Special Event Permit or/and
Use Permit Modification if held more than 6 times per year and resulting in spillover
impacts to the surrounding neighborhood. A determination will be at the discretion of the
Chief Planner.
6. The indoor recreation use shall maintain a shared parking agreement with the neighboring
use at 131 Beacon, which allows for the use of 22 parking spaces after business hours. If
this parking agreement ends or is amended, a Use Permit modification may be required.
7. Any exterior business signage will require a sign application pursuant to Chapter 20.360 of
the Zoning Ordinance.
8. All parking areas shall be maintained clear of litter and storage at all the time. No outdoor
storage of materials is allowed, and no work shall be conducted outside of a building.
(Planning Division contact: Victoria Kim at [email protected] or (650) 877-8535)
15
B. Engineering Division requirements shall be as follows:
1. The Applicant may pay the Citywide Transportation Impact Fee (per Res 120-2020) prior
to Building Permit Issuance. Feel free to visit the City’s website for additional
information, https://www.ssf.net/departments/public-works/engineering-
division/development-review, under Development Impact Fees.
2. The owner may be made to comply with Title 14 Chapter 14.14 SEWER LATERAL
CONSTRUCTION, MAINTENANCE AND INSPECTION of the South San Francisco
Municipal Code http://qcode.us/codes/southsanfrancisco/ where the sewer lateral will be
examined and the appropriate requirements will be imposed. Depending on the severity
of the sewer lateral, the cost incurred may be in the range of $5,000 to $20,000. All work
shall be accomplished at the applicant's expense.
3. The building permit application plans shall conform to the standards of the Engineering
Division’s “Building Permit Typical Plan Check Submittals” requirements, copies of
which are available from the Engineering Division or on our website
https://www.ssf.net/departments/public-works/engineering-division/development-review.
4. The Applicant shall submit detailed plans printed to PDF and combined into a single
electronic file, with each being stamped and digitally signed by a Professional Engineer
registered in the State of California, along with three printed copies. Incorporated within
the construction plans shall be applicable franchise utility installation plans, stamped and
signed and prepared by the proper authority. Plans shall include the following sheets;
Cover, Separate Note Sheet, Existing Conditions, Grading Plan, Horizontal Plan,
Utility Plan(s), Detail Sheet(s), Erosion Control Plan, and Landscape Plans (grading,
storm drain, erosion control, and landscape plans are for reference only and shall not be
reviewed during this submittal).
5. At the time of the Building Permit application, plans shall show the lot size and
dimensions, public-right-of way, existing utilities adjacent to the site (such as utility
poles, hydrants, etc.), and easements where applicable.
6. A Grading Permit is required for grading over 50 cubic yards and if 50 cubic yards or more
of soil is exported and/or imported. The Applicant shall pay all permit and inspection fees,
as well as any deposits and/or bonds required to obtain said permits. The Grading Permit
requires several documents to be submitted for the City’s review and approval. The
Grading Permit Application, Checklist and Requirements may be found on the City
website at http://www.ssf.net/departments/public-works/engineering-division.
7. A Hauling Permit shall be required for excavations and off-haul or on-haul, per
Engineering requirements; should hauling of earth occur prior to grading. Otherwise,
hauling conditions would be included with the grading permit. Hauling Permit may be
16
found on the City website at: http://www.ssf.net/departments/public-works/engineering-
division.
8. A soils report/investigation is required for all new homes and as may be required by the
City Engineer or Building Official. The soils report/investigation shall be prepared by a
registered geotechnical engineer and shall include the following information:
a. Identification of any geologic hazards on or adjacent to the site which may impact
the project,
b. Recommendations to mitigate any potential geologic hazards,
c. Recommendations regarding the suitability of the site for the proposed
development,
d. Recommendations for site grading, foundation design parameters, etc.,
e. Depth of groundwater on-site (normal high water).
f. Clarify the purpose of the existing monitoring wells and whether they’re still
active or is abandoned.
g. This site had a history of previous sinkholes, which shall be evaluated.
9. No trees or permanent structures shall be proposed or constructed within any PUE
bordering the interior property lines or within the property itself. Flatwork may be
permissible (per discretion of the City). Note that record map shows a Public Utility
Easement (P.U.E.) at rear of property along the west and partial of the south property lines,
which shall be shown on project site plans.
10. The owner may, at his/her expense, replace any broken sidewalk, curb, and gutter fronting
the property. The City of SSF shall be the sole judge of whether any such replacement is
necessary. All adjacent sidewalk, curb and gutter shall be rebuilt to City standard at the
Owner’s expense.
11. An Encroachment Permit is required for any work to be done within the public right-of-
way and /or easements. The Applicant shall pay all permit and inspection fees, as well as
any deposits and/or bonds required to obtain said permits.
12. Contractors must have a Class A-Engineering license for any work in the street (beyond
the face of curb). Contractors with a Class A license may perform any and all work
associated with building permit requirements. For concrete work between the curb and the
building, a Class C-8 license is sufficient. For plumbing work between the curb and the
building, a Class C-36 license is sufficient. An exemption may be granted by the City if a
relatively minor portion of the work is not covered by the Contractor’s license. For
example, if a new sewer cleanout is being installed in the sidewalk by a Contractor with a
C-36 (plumbing) license, the same Contractor may remove and reform no more than one
(1) panel of the sidewalk without the need for a Class C-8 (concrete) license.
13. The Engineering Division reserves the right to revise or include additional conditions
during the building permit application plan review.
17
(Engineering Division contact: Kelvin Munar at [email protected] or (650) 829-6652)
18
C. Building Division requirements shall be as follows:
1. Provide correct classification and use of new occupancy per 2022 California Building
Code chapter 3 from S occupancy to A occupancy.
2. Provide correct count of occupancy load per 2022 California Building Code chapter 10
and number of restroom fixtures per 2022 California Plumbing Code.
3. Provide fire protection system per 2022 California Existing Building Code section 1011.
4. Provide calculation for the size and distance of exits per 2022 California Building Code.
5. Provide project to comply with 2022 California Building Code 11B for the path of travel
to public way (sidewalk).
6. Provide emergency lights per 2022 California Building Code chapter10.
7. Provide at least one ADA accessible all gender restroom at mezzanine with accessible
Stairs per2022 California Building Code.
(Building Division contact: Gary Lam at [email protected] or (650) 829-6670)
19
D. Fire Department requirements shall be as follows:
1. Projects shall be designed and constructed in compliance with established regulations as
adopted by the City of South San Francisco affecting or related to structures, processes,
premises, and safeguards in effect at the time of building permit application.
a. The proposed project proposes to change the occupancy and use of the building
and shall obtain building permits for this scope of work in accordance with
adopted codes and standards.
2. Fire service features for buildings, structures and premises shall comply with all City
adopted building standards in effect at the time of building permit application.
a. The proposed project shall install automatic fire sprinklers throughout the
building in accordance with adopted codes and standards.
3. Permit(s) shall be required as set forth in adopted California Building Code (CBC)
Section 105 and California Fire Code (CFC) Sections 105.5 and 105.6. Submittal
documents consisting of construction documents, statement of special inspection,
geotechnical report, referenced documents, and other data shall be submitted
electronically with each permit application. The construction documents shall be
prepared by a registered design professional. Where special conditions exist, the code
official is authorized to require additional construction documents to be prepared by a
registered design professional.
4. Construction documents shall be to scale (graphic scale required on all plan sheets),
dimensioned and drawn on suitable electronic media. Construction documents shall be of
sufficient clarity to indicate the location, nature and extent of the work proposed and
show in detail that it will conform to the provisions of adopted codes and relevant laws,
ordinances, rules, and regulations, as determined by the fire code official.
5. Shop/construction drawings for the fire protection system(s) and other hazardous
operations regulated by the fire department shall be submitted directly to the Fire
Department to indicate conformance with adopted codes and standards. The construction
documents shall be approved prior to the start of system installation.
6. The construction documents submitted with the application for permit shall be
accompanied by a site plan showing to scale the size and location of new construction
and existing structures on the site, distances from lot lines, the established street grades
and the proposed finished grades and it shall be drawn in accordance with an accurate
boundary line survey. In the case of demolition, the site plan shall show construction to
be demolished and the location and size of existing structure and construction that are to
remain on the site or plot.
20
7. Prior to issuance of building permits, design documents for proposed fire service features,
such as fire apparatus access road(s), access to building opening(s) and roof(s), premise
identification, key boxes, fire protection water supplies, fire department connection
location(s), and fire command center location(s) shall be submitted to the fire department
for review and approval.
8. Prior to issuance of building permits, the owner or owner’s authorized agent shall be
responsible for the development, implementation, and maintenance of an approved
written site safety plan approved by the fire code official in accordance with CBC & CFC
Chapter 33.
9. Prior to issuance of building permits, in accordance with CFC Section 105.6 the fire code
official shall have the authority to require fire construction permit documents and
calculations for all fire protection and life safety systems and to require permits be issued
for the installation, rehabilitation or modification of any fire protection and life safety
systems. Construction documents for fire protection and life safety systems shall be
submitted for review and approval prior to system installation. Only the following fire
construction permits are approved for deferred submittal: (1) Automatic fire
extinguishing systems, (2) Emergency responder communication coverage system
(ERCCS), and (3) Fire alarm and detection systems and related equipment.
(Fire Department contact: Ian Hardage at [email protected] or (650) 829-6645)
21
E. Police Department requirements shall be as follows:
All construction must conform to South San Francisco Municipal Code Chapter 15.48.070
Minimum security standards for non-residential buildings.
15.48.085 Additional Security Measures May Be Required
Per South San Francisco Municipal Code 15.48.085 - Additional Security Measures, the
following conditions will also be required:
1. Any exterior double door entrances shall only have one exterior handle, which should be
on the right door (from a person's perspective from the outside). This is to prevent the
malicious locking/chaining of the doors from the outside. This requirement shall also
apply to interior double doors to shared common areas.
2. The hardware design of any double doorways shall prevent any doors from being secured
in a closed position to either another door or a fixed object within four feet of any door by
means of a rope, cable, chain, or similar item. This is to prevent malicious prevention of
egress and/or ingress by building occupants or first responders. Pay particular attention to
all glass doorways. See possible samples below.
Acceptable:
Unacceptable:
3. The landing at the lowest level of service staircases, such as those in the garage area or
fire escapes, shall have some mechanism, such as fencing and/or a gate, to prevent access
to those areas where a person could conceal themselves and/or loiter in said area. The
fencing and/or gate shall be at least six feet tall and constructed in a manner that makes it
difficult to climb. The fencing and/or gate shall be roughly flush with the lowest step to
22
provide maximum access restriction to the area to the side or underneath the stairs. Please
see below examples.
4. Any exterior bicycle racks installed shall be of an inverted "U" design, or other design
that allows two different locking points on each bicycle.
5. Any publicly accessible benches shall be of a design that prevents persons from lying on
them, such as a center railing.
6. Any publicly accessible power outlets shall be of a design that prevents their access or
use during those hours the business is normally closed. If physical locking covers are
used, they must be made of metal, not plastic, and locks must be installed prior to
inspection.
7. Any publicly accessible raised edge surfaces, such as retaining walls, concrete benches,
handrails, or railings, shall be of a design that prevents or discourages skateboard use on
those surfaces.
8. The mature height of all shrubbery shall be no higher than three feet, if so, it shall be
maintained at a maximum height of three feet, and tree canopies shall be no lower than
six feet above grade.
9. The applicant shall install and maintain a camera surveillance system that conforms to the
minimum technical specifications of South San Francisco Municipal Code Chapter
8.66.050 Minimum technological standards, (Ord. 1515, 2016). The video surveillance
cameras will be used as a crime deterrent and assist with the identification and
apprehension of criminals if a crime is committed on the property. Enough cameras shall
be installed to provide adequate coverage for the intended space. Cameras shall be placed
minimally in the following locations:
All exterior entrances/exits
Front lobby
Common areas
Loading docks
10. The Police Department requires acknowledgment of these comments to include specific
locations in the plans where the applicable change requests have been made.
23
11. The Police Department reserves the right to review and comment upon the submission of
revised and updated plans.
(Police Department contact: Sean Curmi at [email protected] or (650) 77-8927)
24
25
26
27
28
29
30
31
32
33
34
35
36
CARLSBAD
CLOVIS
IRVINE
LOS ANGELES
PALM SPRINGS
POINT RICHMOND
RIVERSIDE
ROSEVILLE
SAN LUIS OBISPO
3210 El Camino Real, Suite 100, Irvine, California 92602 949.553.0666 www.lsa.net
MEMORANDUM
DATE: July 14, 2025
TO: Jason Chan, Chief Executive Officer, ECMO PRN, LLC
FROM: Arthur Black, Principal Transportation Planner, LSA
SUBJECT: 147 Beacon Street Parking Management Plan
LSA is pleased to present this Parking Management Plan for the proposed Bay Area Sportshouse
(project) at 147 Beacon Street in South San Francisco, California. Bay Area Sportshouse is a privately
owned facility that provides volleyball instruction and training to school-aged athletes from ages 8
to 17 and provides pickleball courts for public matches. In a letter dated March 10, 2025, the City of
South San Francisco (City) requested a Parking Management and Monitoring Study to identify
whether sufficient on-site parking is available to satisfy the parking demand generated by the
project.
PROJECT DESCRIPTION
The project site is an industrial area surrounded by warehouses and business parks. The current
General Plan land use is designed as Business Technology Park High and the zoning is Business
Technology Park-High (BTP-H). BTP-H being classified as a Non-Residential Zoning District allows for
the use of Indoor Sports and Recreation with the approval of a Conditional Use Permit. Access to the
project site is provided by Beacon Street, which is designated as an Industrial roadway in the City
General Plan Mobility and Access Element. Figure 1 illustrates the project site.
The existing facility at 147 Beacon Street is a warehouse building. The project proposes to occupy
the warehouse building for the use of two volleyball courts and two pickleball courts.
As stated previously, the project is a facility that provides volleyball instruction and training to
school-aged athletes. As a result, most of the athletes are transported to and from the facility rather
than driving themselves and parking. Although the operator is not currently identified, it is
anticipated that the project could operate 8:00 a.m. to 10:00 p.m. seven days a week with the
majority of customers being on site from approximately 3:00 p.m. to 10:00 p.m. on weekdays and
8:00 a.m. to 8:00 p.m. on weekends.
The pickleball courts are open for public sessions for pickup matches or through scheduled
reservations; therefore, the courts would be open throughout the day. For the purpose of this
analysis, it was assumed that the pickleball courts would operate daily between 7:00 a.m. to 10:00
p.m.
37
£¤101
§¨¦380
A
I
R
P
O
R
T
B
O
U
L
E
V
A
R
D
P:\2025\20252269\GIS\ArcPro\Bay Area Sportshouse.aprx (4/7/2025)
FIGURE 1
Bay Area Sportshouse
Parking Management and Monitoring Study
6 $ 1
0 $ 7 ( 2
& 2 8 1 7 <
Z[
xx
xx
xx
xxxx
xx
xx
xxxx
xx
]^
]^
]^]^
]^
]^
]^
Project Vicinity
0 1000 2000
FEET
SOURCE: Google Earth, March 2024.
LEGEND
Project Location
Regional and Project Location
38
3
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
CITY OF SOUTH SAN FRANCISCO PARKING REQUIREMENTS
Pursuant to South San Francisco Municipal Code (SSMC) Section 20.330.004 for Required Parking
Spaces, all Commercial Entertainment and Recreation (All Subclassifications), uses are subjected to a
Parking Management and Monitoring Study required pursuant to Section 20.330.004(E). Based on
SSMC Section 20.330.004(E), a Parking Management and Monitoring Study shall include:
1. Total square footage of all uses within existing and proposed development and the square
footage devoted to each type of use.
2. Parking demand estimates using parking generation studies from professionally recognized
and/or comparable studies from development(s) similar to the proposed use(s).
3. Survey of existing on-street and on-site parking within proximity of the project site.
4. Management procedures for peak demand periods, including the potential of shared parking,
remote parking, wayfinding signage, attendants, or valet, and the anticipated effects on vehicle
queues and on-street parking.
5. Description of other characteristics of the project that could result in reduced or increased
parking demand, such as staggered work shifts, telecommuting, employee per square foot or
customer/visitor trips compared to the accepted industry standard for that use.
6. For "Freight/Truck Terminal and Warehouse" and "Parcel Hub" uses, a description of the type of
freight to be distributed and radius of delivery map.
7. Occupancy surveys if requested by the City (not to exceed once every three years).
ANTCIPATED PEAK PARKING DEMAND
Project Peak Parking Demand
Volleyball Courts
Based on the typical operations of a volleyball facility that offers instruction and training to school-
aged athletes (and consistent with similar volleyball uses), there would be a maximum of 14 people
per court and one staff member present during operations, or a maximum of 29 people during full
operations of both volleyball courts. For a conservative analysis, it is assumed that every student is
dropped off individually without carpooling. Therefore, it is calculated that there would be a peak
parking demand of 29 parking spaces during the peak sessions. However, during transition periods
between the training sessions, parking demand may exceed 29 due to the simultaneous drop-off
and pick-up of student athletes. As such, a further analysis of peak parking demand was analyzed.
The Institute of Transportation Engineers (ITE) Parking Generation Manual, 6th Edition (2023), does
not provide parking rates for youth sports clubs. As such, the parking demand for the facility was
based on surveys of similar facilities. A previous parking analysis for a volleyball club published data
(RK Engineering for City of Garden Grove, 2011, provided in Attachment A) collected at three
operating facilities in California. Table A displays the parking survey results.
39
4
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
Table A: Average Surveyed Volleyball Courts Peak Parking Demand Rate
Location Address Size
(sf) Courts Peak Parking
Demand
Parking
Ratio
(per TSF)
Parking
Ratio
(per court)
South Coast Soccer City 540 Maple Ave.,
Torrance, CA 73,000 7 156 2.14 22.29
Saddleback Volleyball Club 26923 Fuerte Dr.,
Lake Forest, CA 51,000 9 144 2.82 16.00
Upland Sports Arena 1721 West 11th St.,
Upland, CA 66,000 5 107 1.62 21.40
Average 2.19 19.90
Source: Next Level Sports Complex Observed Parking Demand Study (RK Engineering for City of Garden Grove, 2011).
sf = square feet
TSF = thousand square feet (or thousand-square-foot)
As shown in Table B, based on the average parking demand for similar facilities using a per court
ratio, the proposed two court facility would require 40 parking spaces. Therefore, for a conservative
analysis, it is estimated that there would be a peak parking demand of 40 parking spaces during the
transition period between sessions. A weekend survey of similar volleyball facilities was also
conducted for the same three facilities. However, the average parking demand for all three facilities
was lower than that of the weekday. Therefore, a weekend parking analysis was determined to not
be necessary.
Table B: Project Volleyball Courts Peak Parking Generation Summary
Land Use Size Unit Parking
Peak Period Parking Demand Rates1
Volleyball Facility courts 19.90
Peak Period Parking Demand
Volleyball Facility 2 courts 40
Source: Compiled by LSA (2025).
1 Parking rates referenced Next Level Sports Complex Observed Parking Demand Study (RK Engineering for City of
Garden Grove, 2011).
Pickleball Courts
The ITE Parking Generation Manual, 6th Edition (2023), does not provide parking rates for pickleball
courts. As such, the parking demand for the facility was based on surveys of similar facilities. Table C
shows the two operating pickleball facilities that were surveyed in California and their
corresponding peak parking ratios. The trip generation surveys conducted are shown in
Attachment B.
40
5
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
Table C: Average Surveyed Pickleball Courts Peak Parking Demand Rate
Location Address Courts Peak Parking
Demand
Parking Ratio
(per court)
Tustin Pickleball Courts 1302 Service Road, Tustin, CA 10 37 3.70
Newport Beach Country Club
Pickleball Courts
11 Clubhouse Drive Newport
Beach, CA 92660 31 93 3.00
Average 3.35
Source: LSA (2023).
1 Parking rates based on the Tustin Pickleball Court Trip Generation Count, November 2023 and Newport Beach
Country Club Pickleball Courts, November 2023.
As shown in Table D, based on the average parking demand for similar facilities, using a per court
ratio, the proposed two-court facility would require seven parking spaces.
Table D: Project Pickleball Courts Peak Parking Generation Summary
Land Use Size Unit Parking
Peak Period Parking Demand Rates1
Pickleball Courts courts 3.35
Peak Period Parking Demand
Pickleball Courts 2 courts 7
Source: LSA (2025).
Adjacent Warehouse Peak Parking Demand
Because of the shared use parking with the adjacent warehouse, a shared parking demand analysis
was also conducted during the overlapping hours of operation between the project and the peak
parking of the adjacent warehouse. The parking generation for the adjacent warehouse is developed
using rates from the latest edition of the ITE Parking Generation (6th Edition). Table E summarizes
the parking generation from the adjacent warehouse. As shown in Table E, the adjacent warehouse
is estimated to have a peak parking demand of seven parking spaces during the warehouse’s peak
period. ITE Parking Generation also provides data showing that weekend parking rates for
warehousing are far lower.
Table E: Adjacent Warehouse Parking Generation Summary
Land Use Size Unit Parking
Peak Period Parking Demand Rates1
Warehousing TSF 0.370
Peak Period Parking Demand
Warehousing 18.5 TSF 7
Source: LSA (2025).
1 Parking rates referenced from the ITE Parking Generation Manual, 6th Edition (2023).
Land Use Code 150 – Warehousing
TSF = thousand square feet (or thousand-square-foot)
41
6
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
PARKING SUPPLY
Project Parking Supply
The proposed project would have 16 off-street parking spaces within 147 Beacon Street. Out of the
16 parking spaces, 9 parking spaces are along the north side of the building and 7 parking spaces are
along the west side of building perpendicular to Beacon Street.
Adjacent Warehouse Parking Supply
In addition to the 16 off-street parking spaces, the proposed project has a parking agreement with
the adjacent warehouse owners at 127–131 Beacon Street to implement shared parking. An
additional 22 off-street parking spaces are available adjacent to the warehouse. As such, there
would be a total of 38 off-street parking spaces available to the proposed project between the
project site and the adjacent warehouse.
PARKING SURVEYS
As required by SSMC Section 20.330.004(E), parking surveys were conducted on a typical weekday
on Thursday, March 20, 2025, and on Saturday, March 22, 2025. These surveys are included in
Attachment B.
Weekday Parking Survey
Based on the weekday parking survey conducted, there was a peak occupancy of one parking space
on the adjacent warehouse lot between 2:00 p.m. and 10:00 p.m. The northern portion of Beacon
Street had a peak occupancy of eight parking spaces (47 percent utilization) during this time. The
western portion of Beacon Street (i.e., nearest the project site) had a peak occupancy of 12 parking
spaces (57 percent utilization). The southern portion of Beacon Street had a peak occupancy of 14
parking spaces (70 percent utilization). In total, a maximum of approximately 60 percent of the on-
street parking is currently occupied during the afternoon.
Weekend Parking Survey
On the surveyed Saturday, only one vehicle was parked on the adjacent warehouse lot between
8:00 a.m. and 5:00 p.m. On-street parking demand on Beacon Street was much lower than on
weekdays. The northern portion had a peak occupancy of five parking spaces (29 percent
utilization), the western portion had a peak occupancy of seven parking spaces (33 percent
utilization), and the southern portion had a peak occupancy of three parking spaces (15 percent
utilization). In total, only 25 percent of the on-street parking was occupied at the peak of weekend
demand.
SHARED PARKING SUPPLY VERSUS DEMAND
Since the proposed project will coordinate with the adjacent warehouse owners to use the
neighboring parking lot, a combined parking demand and supply analysis was conducted for both
properties, which have a total of 38 off-street parking spaces. Based on the surveys of parking
demand of other similar facilities, the proposed project is anticipated to have a peak parking
demand of 40 parking spaces for the volleyball courts, 7 parking spaces for the pickleball courts, and
42
7
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
7 parking spaces for the adjacent warehouse. However, it is anticipated that the peak parking for
each of the land uses would take place at different times of the day. As such, a time-of-day
distribution of each for each of the land uses was applied to more accurately estimate peak parking
of both sites. Table F summarizes the peak parking demand of the volleyball courts, the pickleball
courts, and the adjacent warehouse.
Table F: Peak Parking Demand of the Proposed Project and Adjacent Warehouse
Time
Volleyball
(Peak Parking Demand: 40)
Pickleball
(Peak Parking Demand: 7)
Warehousing
(Peak Parking Demand: 7) Total
Demand Percentage
of Peak1
Actual
Demand
Percentage
of Peak2
Actual
Demand
Percentage
of Peak3
Actual
Demand
3:00 p.m. 16% 7 32% 3 100% 7 17
4:00 p.m. 16% 7 69% 5 91% 7 19
5:00 p.m. 78% 32 74% 6 74% 6 44
6:00 p.m. 83% 34 61% 5 47% 4 43
7:00 p.m. 91% 37 19% 2 26% 2 41
8:00 p.m. 92% 37 1% 1 20% 2 40
9:00 p.m. 100% 40 0% 0 17% 2 42
10:00 p.m. 67% 27 0% 0 1% 1 28
Source: LSA (2025).
1 Time-of-day distribution for parking demand based on the surveys conducted in Next Level Sports Complex Observed Parking
Demand Study (RK Engineering for City of Garden Grove, 2011).
2 Time-of-day distribution for parking demand based on the Tustin Pickleball Court Trip Generation Count, November 2023 and
Newport Beach Country Club Pickleball Courts, November 2023.
3 Time-of-day distribution for parking demand referenced for the ITE Parking Generation Manual, 6th Edition (2023).
Based on the peak parking demand of the proposed project and adjacent warehouse, it is
anticipated that there would be a peak demand of 44 parking spaces during the transition period
between the classes. During this transition period, the parking demand may exceed the available
parking spaces by 6 parking spaces.
However, the project site has a designated space for loading and unloading immediately in front of
the building entrance. It is anticipated that this loading and unloading area would be used by
parents dropping off and picking up athletes. Use of the loading and unloading area would
significantly improve the speed of loading and unloading of athletes and the peak number of
vehicles waiting to pick-up/drop students would be reduced. Given the improved efficiency of the
drop-off/pickup operation, the total parking demand is expected to be reduced by four parking
spaces (i.e., 10 percent). As such, it is anticipated at during the brief transition period between
classes, there would be only two vehicles using on-street parking spaces. The parking surveys
showed that on-street parking has sufficient capacity to absorb this demand.
In the event the loading/unloading zone is underutilized and a parking shortfall is observed, the
facility operators could schedule a 10-minute to 15-minute gap between classes. With sufficient
time between classes, the parking demand peak would be reduced as the overlap between drop-off
and pickup is minimized.
43
8
7/14/25 (P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx)
SUMMARY AND CONCLUSION
The City has requested Bay Area Sportshouse at 147 Beacon Street in South San Francisco, California
to complete a Parking Management Plan to identify whether sufficient on-site parking is available to
satisfy the parking demand generated by the project. The project is an existing warehouse building
that is proposed to house two pickleball courts and a volleyball instruction facility with two courts.
The volleyball facility could operate between 8:00 a.m. and 10:00 p.m. seven days a week. Based on
survey data of other volleyball facilities, the peak hours are anticipated between approximately
3:00 p.m. to 10:00 p.m. on weekdays and 8:00 a.m. to 8:00 p.m. on weekends. The pickleball courts
are anticipated to be open for public sessions throughout the day and assumed to operate daily
between 7:00 a.m. to 10:00 p.m. To maximize the use of existing parking spaces, the project would
coordinate with the owner of the adjacent warehouse (127–131 Beacon Street) to share parking
supply.
Parking demand for this facility was estimated using surveys of similar facilities in California.
Considering typical operations, a peak demand of 29 parking spaces is anticipated during full
operation of both volleyball courts. During the brief transition period between classes, peak demand
would be 40 parking spaces. Surveys showed that parking demand during the weekend is lower than
on weekdays. Based on surveys of pickleball facilities, it was estimated that the project’s pickleball
courts would have a peak demand of seven parking spaces. Parking demand for the adjacent
warehouse building would peak at seven parking spaces if it were fully utilized as a warehouse
building.
These three uses would not experience their peak parking demand at the same time. Applying
parking variation by time of day, and accounting for the increased efficiency resulting from the
loading zone, shows that a maximum demand for 40 parking spaces would be anticipated during the
transition period between volleyball classes.
The project site has 16 off-street parking spaces and the adjacent warehouse has 22 parking spaces
for a total of 38 parking spaces available to the proposed project. Surveys of on-street parking
demand showed that 60 percent are occupied on a weekday and 25 percent are occupied on a
weekend. The on-street parking areas would be able to absorb the demand for two additional
vehicles during the brief transition period between volleyball classes.
In the event the loading/unloading zone is underutilized, and a parking shortfall is observed, the
facility operators could schedule a 10-minute to 15-minute gap between classes. With sufficient
time between classes, the parking demand peak would be reduced as the overlap between drop-off
and pick-up is minimized.
Attachments: A: Next Level Sports Complex Observed Parking Demand Study (RK Engineering for
City of Garden Grove, 2011)
B: Pickleball Court Trip Generation Surveys
C: Beacon Street Parking Survey Data
44
147 BEACON STREET PARKING MANAGEMENT PLAN
JULY 2025
BAY AREA SPORTSHOUSE
SOUTH SAN FRANCISCO, CALIFORNIA
P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx (07/14/25)
ATTACHMENT A
NEXT LEVEL SPORTS COMPLEX
OBSERVED PARKING DEMAND STUDY
45
46
47
48
RK:mn/RK9122.doc 2
JN:2273-2011-01
facility. For private coaching, clinics and club sports, participation will be from 5-15
participants per court. There will be no more than thirty-five (35) total players, coaches,
officials, etc. on each court at any one time. Additionally, the facility will only offer seating
necessary to support the athletes. Spectator seating will be very limited. The sports
complex is designed so that most parents/guardians will be able to conveniently drop-off
and pick-up athletes to/from the complex without having to park.
It should be noted that Radio Shack is currently occupying 20,000 square feet of building
space and has 60 parking stalls designated until their lease ends in January of 2013.
Next Level Sports Complex will occupy the entire building (120,800 square feet) by January
of 2013. This space will be utilized by Next Level Sports Complex for support activities like
office space, team conference rooms, storage, etc. For the purpose of this analysis, the
projected peak parking demand for the initial 100,800 S.F. of building space (Scenario 1
January 2012 – January 2013) and the future 120,800 S.F. of building space (Scenario 2
January 2013 – Future) was included in order to determine the future peak parking
demand rate for the site during both occupancy conditions.
City of Garden Grove Municipal Parking Code
Due to the unique land use, the City of Garden Grove Municipal Parking Code does not
have a requirement for multi-sport training facilities. Therefore, the City of Garden Grove
Municipal Parking Code (Section 9.16.040.180 Parking Management) allows a parking
study to be conducted in order to determine the appropriate parking rate for the project.
RK conducted a total of six (6) parking surveys at three (3) similar training facilities in order
to generate realistic parking demand rates based on the existing demand at these three (3)
existing sites. Based upon these observed parking demand surveys, RK has been able to
establish a peak parking demand rate for the specific type of use planned for the proposed
Next Level Sports Complex in Garden Grove. It should be noted that an independent data
collection company was hired to conduct the observed parking counts at each location.
The peak parking demand rate data would be applied to the proposed
Next Level Sports Complex development in order to determine whether the provided
on-site parking at the new facility would be able to accommodate the anticipated peak
parking demand.
49
RK:mn/RK9122.doc 3
JN:2273-2011-01
Observed Parking Study Parameters
RK has conducted a total of six (6) weekday and weekend parking surveys at the three (3)
indoor multi-sport locations listed below:
1. South Coast Soccer City: (73,000 S.F. / 7 Indoor Soccer Fields)
540 Maple Avenue, Torrance CA
a. 1 Weekday Survey on Wednesday, August 24, 2011
1. 11:00AM – 10:30PM at 30 minute intervals
b. 1 Weekend Survey on Saturday, August 20, 2011
2. 10:00AM - 8:30PM at 30 minute intervals
2. Saddleback Valley Volleyball Club: (51,000 S.F / 9 Indoor Volleyball Courts.)
26923 Fuerte Drive, Lake Forest, CA
a. 1 Weekday Survey on Wednesday, August 24, 2011
1. 11:00AM – 10:00PM at 30 minute intervals
b. 1 Weekend Survey on Saturday, August 20, 2011
2. 9:00AM – 8:00PM at 30 minute intervals
3. Upland Sports Arena: (66,000 S.F. / 2 Indoor Soccer Fields & 3 Volleyball Courts)
1721 West 11th Street, Upland, CA
a. 1 Weekday Survey on Wednesday, August 24, 2011
1. 9:00AM – Midnight at 30 minute intervals
b. 1 Weekend Survey on Saturday, August 20, 2011
2. 9:00AM – 8:00PM at 30 minute intervals
The parking survey time frames were conducted in order to coincide with the hours of
operation at each of the indoor multi-use facilities for both weekend and weekday
activities. It should be noted that the month of August represents a peak utilization month
for these facilities. During the month of August these indoor training facilities host sports
camps and tournaments when school is not in session. Due to summer vacation,
enrollment is at its highest levels.
It should be noted that the facilities analyzed in the observed parking analysis have uses
like a pro-shop, snack bar / food services, office space, conference rooms, etc. These uses
are considered to be ancillary and therefore accommodate the users within the facility. The
observed parking demand counts took into account all uses within each facility.
50
RK:mn/RK9122.doc 4
JN:2273-2011-01
Visitors attending the facilities during peak operating hours may park in the adjacent
parking lots if the parking lot of the sports complex is perceived to be occupied.
Additionally, it is also common for visitors attending adjacent buildings to park in the
sports complex parking lot and visit other uses. Due to the possible sharing of parking
spaces, special care was taken to ensure that only vehicles parked specifically to visit the
indoor sports complex were counted regardless of where they parked. Therefore, in order
to determine an accurate parking demand, parking counts were conducted for all vehicles
parking in the surrounding area that were specifically visiting the sports complex.
The parameters of the observed parking surveys are as follows:
1. Some of the indoor sports facilities are located adjacent to other land uses with
shared parking conditions and, as a consequence, special care was taken to ensure
that only vehicles parked specifically to visit the sports facilities were counted.
2. Appendix A shows the actual parking survey taken at each location. Table 1
contains a detailed account of each indoor sports complex and its approximate
square footage. The parking demand shown in Table 1 represents the peak
demand at each location during the peak weekend and weekday periods. Satellite
images of all locations analyzed are included in Appendix C.
51
RK:mn/RK9122.doc 5
JN:2273-2011-01
Findings
The findings of the study are as follows:
1. Table 1 shows each indoor training complex address, square footage and peak
parking demand for activities that are similar to what is expected at the proposed
Next Level Sports Complex in Garden Grove. The peak parking demand figures
shown in Table 1 are based upon the parking survey shown in Appendix A.
2. Due to the fact that Radio Shack is planning to continue to occupy approximately
20,000 S.F. of building space until January of 2013, two (2) scenarios have been
analyzed for the proposed development:
a. Scenario 1 (January 2012 – January 2013) projects the peak parking demand
rate based on 100,800 square feet of building space.
b. Scenario 2 (January 2013 – Future) projects the peak parking demand rate
based on 120,800 square feet of building space.
Following is a summary of the peak parking counts that occurred during the parking survey
when there were similar activities as expected at the proposed Next Level Sports Complex in
Garden Grove.
Saturday, August 20th & Wednesday, August 24th Observed Parking Counts
c. The peak weekday parking demand that occurred at any of the sites was 156
parking spaces. The weekday peak hour is 9:00 PM.
d. The peak weekend parking demand that occurred at any of the sites was 144
parking spaces. The weekend peak hour was 2:30 PM.
Table 2 shows the calculated peak parking rates for similar activities expected at the
Next Level Sports Complex in Garden Grove based upon the observed parking survey.
Saturday, August 20th & Wednesday, August 24th Observed Parking Demand
Rates
a. The peak weekend and weekday parking rate calculated was 2.82 parking
spaces per 1,000 square feet of building area.
b. The average peak weekday and weekend parking rate plus 10% increase to
calculate the worse case scenario for all locations analyzed are 2.41
parking spaces per 1,000 square feet of building area.
52
RK:mn/RK9122.doc 6
JN:2273-2011-01
c. In order to be conservative, a “Worse Case Scenario” the peak parking
demand rate plus 10% was calculated. Therefore, as shown in Table 2 and
Table 3 the peak parking demand rate of 3.11 spaces per thousand square
feet of building area represents the most intense parking rate.
Table 3 represents the calculated parking demand for the proposed
Next Level Sports Complex in Garden Grove. Exhibit A shows the location of the
proposed development and Exhibit B shows the proposed site plan.
Saturday, August 20th & Wednesday, August 24th Observed Parking Counts
a. The weekend peak parking rate that was used to calculate the
required number of spaces for the proposed development is
3.11 parking spaces per 1,000 S.F. of building area. This rate was
calculated using the peak parking rate generated in Table 2 and
adding an additional 10% to this figure. This rate was based upon
the activities expected to occur at the Garden Grove facility.
b. Scenario 1: The calculated peak parking demand for the proposed
development would be 313 parking spaces. The site proposes to
provide 360 parking spaces. This results in a surplus of 47 parking
spaces during the peak parking period.
c. Scenario 2: The calculated peak parking demand for the proposed
development would be 376 parking spaces. The site proposes to
provide 420 parking spaces. This results in a surplus of 44 parking
spaces during the peak parking period.
Due to the unique use, the City of Garden Grove Municipal Code allows for a parking
demand analysis to be conducted in order to determine the appropriate parking rate.
RK has conducted an extensive parking survey of three (3) indoor sports complex
facilities. During many hours of these surveys, typical high use activities
(i.e. tournaments, soccer games, basketball games, volleyball games, etc.) occurred.
The peak demand plus ten (10) percent that occurred at the highest observed location
(Saddleback Volleyball Club was used to establish the parking demand rate for the
Next Level Sports Complex in Garden Grove. This rate (3.11 per thousand square feet
of building area) represents a worse case scenario and is the most intense observed
parking rate for the proposed Next Level Sports Complex.
53
RK:mn/RK9122.doc 7
JN:2273-2011-01
Conclusions
Taking into account the data collected during this analysis, RK would make the following
recommendations:
1. The purpose of this parking study is to seek relief from the City of Garden Grove
Municipal Parking Code as it pertains to indoor multi-use training facilities. The
proposed Next Level Sports Complex in the City of Garden Grove primary use is for
training on skills and techniques in volleyball, basketball and individual team
practices. Activities are proposed to be offered through the Garden Grove Park and
Recreation programs along with physical education programs. Due to this unique
use, the Municipal Parking Code allows a parking study to be conducted in order to
determine the appropriate parking rate for the project.
2. The site provides for a total of 420 parking stalls which includes 42 parking stalls on
Brady Street. The City of Garden Grove will allow parking on Brady Street.
2. Scenario 1 (January 2012 – January 2013): The site is projected to have a peak
parking demand of 313 parking spaces based on the peak parking rates generated
in this study. The site will provide 360 parking spaces, thereby resulting in 47
surplus parking spaces during peak times.
3. Scenario 2 (January 2013 - Future): The site is projected to have a peak parking
demand of 376 parking spaces based on the peak parking rates generated in this
study. The site will provide 420 parking spaces, thereby resulting in 44 surplus
parking spaces during peak times.
4. Next Level Sports Complex is proposing to “ramp up” the number of volleyball
courts and basketball courts during its initial start-up period (January 2012 –
January 2013). It should be noted that this was not taken into account during the
parking analysis. The observed parking rate assumes a worse case scenario by
calculating the parking rate as if the facility was fully operational at all times.
5. By taking into account the projected worse case scenario, parking appears to be
sufficient to accommodate the parking demands at the proposed Next Level Sports
Complex in Garden Grove based upon planned operations for typical weekday and
weekend conditions.
54
55
56
57
58
59
60
61
62
Next Level Sports Complex 12821 Knott Street, Garden Grove 100.800
313 Parking Spaces
360 Parking Spaces
47 Parking Spaces
Next Level Sports Complex 12821 Knott Street, Garden Grove 120.800
376 Parking Spaces
420 Parking Spaces
44 Parking Spaces
Total Parking Provided On-site
Parking Surplus
1 Existing tennant (Radio Shack) will continue to ccupy 20,000 S.F. of the building until January 2013. At this time,
Next Level Sports Complex will Occupy the entire building (120,800 S.F.). Therefore, the peak parking demand
was calculated for both occupancy scenarios.
2 The parking rate was calculated by taking the peak parking rate calculated for the highest demand site (Saddleback
Volleyball Club) listed in Table 2 and increasing the rate by an additional 10% to project the worse case scenario.
Project Size
(Square Feet)
Table 3
Parking Demand for the Proposed Next Level Sports Complex
(Jan 2012 - Jan 2013)1
Location Name
3.11
Parking Rate2
Scenario 1
Address Project Size
(Square Feet)
Parking Rate2
3.11
Total Parking Required Based upon the Parking Survey
Total Parking Required Based upon the Parking Survey
Total Parking Provided On-site
Parking Surplus
Parking Demand for the Proposed Next Level Sports Complex
(January 2013 - Future)1
Scenario 2
Location Name Address
j:/rktables/RK9122TB.xls
JN:2273-2011-01
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
147 BEACON STREET PARKING MANAGEMENT PLAN
JULY 2025
BAY AREA SPORTSHOUSE
SOUTH SAN FRANCISCO, CALIFORNIA
P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx (07/14/25)
ATTACHMENT B
PICKLEBALL COURT TRIP GENERATION SURVEYS
83
City:
Location:
Date:
Count Type:
Net Cars on Site (Ent - Exit) 1.5 Hours
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0 0
0:15 0 0 0 0:15 0 0 0 0
0:30 0 0 0 0:30 0 0 0 0
0:45 0 0 0 0:45 0 0 0 0
1:00 0 0 0 1:00 0 0 0 0
1:15 0 0 0 1:15 0 0 0 0
1:30 0 0 0 1:30 0 0 0 0
1:45 0 0 0 1:45 0 0 0 0
2:00 0 0 0 2:00 0 0 0 0
2:15 0 0 0 2:15 0 0 0 0
2:30 0 0 0 2:30 0 0 0 0
2:45 0 0 0 2:45 0 0 0 0
3:00 0 0 0 3:00 0 0 0 0
3:15 0 0 0 3:15 0 0 0 0
3:30 0 0 0 3:30 0 0 0 0
3:45 0 0 0 3:45 0 0 0 0
4:00 0 0 0 4:00 0 0 0 0
4:15 0 0 0 4:15 0 0 0 0
4:30 0 0 0 4:30 0 0 0 0
4:45 0 0 0 4:45 0 0 0 0
5:00 0 0 0 5:00 0 0 0 0
5:15 0 0 0 5:15 0 0 0 0
5:30 0 0 0 5:30 0 0 0 0
5:45 0 0 0 5:45 0 0 0 0
6:00 3 0 3 6:00 0 0 0 3
6:15 4 0 4 6:15 0 0 0 4 6:15 - 7:45 37
6:30 6 1 6 6:30 1 1 1 5 Parking Rate = 37/10 = 3.7 per court
6:45 12 2 14 6:45 3 2 4 10
7:00 9 0 9 7:00 2 0 2 8
7:15 7 1 8 7:15 1 1 2 7
7:30 7 0 7 7:30 3 0 3 4
7:45 6 0 6 7:45 3 0 4 3
8:00 9 1 10 8:00 5 1 6 4
8:15 9 0 9 8:15 7 0 8 2
8:30 10 0 10 8:30 9 0 9 1
8:45 12 1 12 8:45 6 1 7 6
9:00 11 0 11 9:00 10 0 10 1
9:15 9 0 9 9:15 12 0 12 -3
9:30 10 1 11 9:30 7 1 8 3
9:45 7 0 8 9:45 6 0 6 1
10:00 8 1 10 10:00 7 1 9 1
10:15 7 0 7 10:15 9 0 9 -2
10:30 6 0 6 10:30 11 0 11 -5
10:45 5 0 5 10:45 7 0 7 -2
11:00 4 0 4 11:00 8 0 8 -4
11:15 3 0 3 11:15 7 0 7 -5
11:30 3 0 3 11:30 8 0 9 -6
11:45 3 0 3 11:45 7 0 7 -5
Exiting
Tustin
Tustin Pickleball Courts
Average
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 84
City:
Location:
Date:
Count Type:
Net Cars on Site (Ent - Exit) 1.5 Hours
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Tustin
Tustin Pickleball Courts
Average
Trip Generation Count
Entering
12:00 4 0 4 12:00 7 0 7 -3
12:15 2 0 2 12:15 4 0 5 -2
12:30 2 0 2 12:30 6 0 6 -4
12:45 1 0 1 12:45 4 0 4 -3
13:00 1 0 1 13:00 3 0 3 -2
13:15 1 0 1 13:15 4 0 4 -3
13:30 0 0 0 13:30 2 0 2 -2
13:45 2 0 2 13:45 2 0 2 0
14:00 2 0 2 14:00 2 0 2 0
14:15 1 0 1 14:15 2 0 2 -2
14:30 0 0 0 14:30 3 0 3 -3
14:45 4 0 4 14:45 0 0 0 4
15:00 3 0 3 15:00 2 0 2 2
15:15 0 0 0 15:15 0 0 0 0
15:30 3 0 3 15:30 1 0 1 2
15:45 2 0 2 15:45 1 0 1 2
16:00 3 0 3 16:00 0 0 0 3
16:15 2 0 2 16:15 0 0 0 2
16:30 3 0 3 16:30 4 0 4 -1
16:45 2 0 2 16:45 2 0 2 0
17:00 1 0 1 17:00 3 0 3 -2
17:15 1 0 1 17:15 2 0 2 -2
17:30 1 0 1 17:30 2 0 2 -1
17:45 1 0 1 17:45 4 0 4 -3
18:00 0 0 0 18:00 3 0 3 -3
18:15 0 0 0 18:15 6 0 6 -5
18:30 0 0 0 18:30 2 0 2 -2
18:45 0 0 0 18:45 0 0 0 0
19:00 0 0 0 19:00 0 0 0 0
19:15 0 0 0 19:15 0 0 0 0
19:30 0 0 0 19:30 0 0 0 0
19:45 0 0 0 19:45 0 0 0 0
20:00 0 0 0 20:00 0 0 0 0
20:15 0 0 0 20:15 0 0 0 0
20:30 0 0 0 20:30 0 0 0 0
20:45 0 0 0 20:45 0 0 0 0
21:00 0 0 0 21:00 0 0 0 0
21:15 0 0 0 21:15 0 0 0 0
21:30 0 0 0 21:30 0 0 0 0
21:45 0 0 0 21:45 0 0 0 0
22:00 0 0 0 22:00 0 0 0 0
22:15 0 0 0 22:15 0 0 0 0
22:30 0 0 0 22:30 0 0 0 0
22:45 0 0 0 22:45 0 0 0 0
23:00 0 0 0 23:00 0 0 0 0
23:15 0 0 0 23:15 0 0 0 0
23:30 0 0 0 23:30 0 0 0 0
23:45 0 0 0 23:45 0 0 0 0
TOTAL 211 10 221 211 10 221
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 85
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 0 0 0 6:00 0 0 0
6:15 0 0 0 6:15 0 0 0
6:30 3 0 3 6:30 0 0 0
6:45 15 2 17 6:45 0 0 0
7:00 10 0 10 7:00 0 0 0
7:15 3 1 4 7:15 0 1 1
7:30 5 0 5 7:30 2 1 3
7:45 5 1 6 7:45 3 0 3
8:00 7 0 7 8:00 3 0 3
8:15 10 0 10 8:15 8 1 9
8:30 9 0 9 8:30 10 1 11
8:45 13 1 14 8:45 5 1 6
9:00 12 0 12 9:00 11 0 11
9:15 6 0 6 9:15 11 0 11
9:30 10 2 12 9:30 6 1 7
9:45 8 1 9 9:45 5 0 5
10:00 6 0 6 10:00 10 0 10
10:15 6 0 6 10:15 6 1 7
10:30 5 0 5 10:30 6 0 6
10:45 6 0 6 10:45 9 1 10
11:00 5 0 5 11:00 6 0 6
11:15 3 0 3 11:15 8 0 8
11:30 4 1 5 11:30 10 0 10
11:45 3 0 3 11:45 7 0 7
Exiting
Wednesday, November 1, 2023
Tustin
Tustin Pickleball Courts
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 86
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Wednesday, November 1, 2023
Tustin
Tustin Pickleball Courts
Trip Generation Count
Entering
12:00 4 0 4 12:00 7 0 7
12:15 2 0 2 12:15 9 1 10
12:30 2 0 2 12:30 5 0 5
12:45 2 0 2 12:45 5 0 5
13:00 3 0 3 13:00 2 0 2
13:15 0 0 0 13:15 7 0 7
13:30 0 0 0 13:30 0 0 0
13:45 0 0 0 13:45 0 0 0
14:00 1 0 1 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 3 0 3
14:45 4 0 4 14:45 0 0 0
15:00 5 0 5 15:00 0 0 0
15:15 0 0 0 15:15 0 0 0
15:30 3 0 3 15:30 0 0 0
15:45 3 0 3 15:45 0 0 0
16:00 4 0 4 16:00 0 0 0
16:15 4 0 4 16:15 0 0 0
16:30 2 0 2 16:30 5 0 5
16:45 4 0 4 16:45 3 0 3
17:00 0 0 0 17:00 2 0 2
17:15 0 0 0 17:15 2 0 2
17:30 1 0 1 17:30 3 0 3
17:45 1 0 1 17:45 6 0 6
18:00 0 0 0 18:00 4 0 4
18:15 1 0 1 18:15 8 0 8
18:30 0 0 0 18:30 3 0 3
18:45 0 0 0 18:45 0 0 0
19:00 0 0 0 19:00 0 0 0
19:15 0 0 0 19:15 0 0 0
19:30 0 0 0 19:30 0 0 0
19:45 0 0 0 19:45 0 0 0
20:00 0 0 0 20:00 0 0 0
20:15 0 0 0 20:15 0 0 0
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 200 9 209 200 9 209
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 87
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 0 0 0 6:00 0 0 0
6:15 0 0 0 6:15 0 0 0
6:30 2 0 2 6:30 2 0 2
6:45 15 3 18 6:45 1 0 1
7:00 6 0 6 7:00 1 0 1
7:15 5 0 5 7:15 1 0 1
7:30 6 0 6 7:30 1 2 3
7:45 6 0 6 7:45 2 0 2
8:00 12 2 14 8:00 7 0 7
8:15 8 0 8 8:15 6 1 7
8:30 11 0 11 8:30 9 0 9
8:45 11 1 12 8:45 1 0 1
9:00 9 1 10 9:00 8 1 9
9:15 13 0 13 9:15 11 1 12
9:30 10 1 11 9:30 6 0 6
9:45 8 0 8 9:45 6 0 6
10:00 10 2 12 10:00 5 1 6
10:15 9 0 9 10:15 10 1 11
10:30 6 0 6 10:30 17 0 17
10:45 3 0 3 10:45 10 1 11
11:00 3 0 3 11:00 8 0 8
11:15 2 0 2 11:15 8 1 9
11:30 3 0 3 11:30 8 1 9
11:45 0 0 0 11:45 5 0 5
Exiting
Tustin
Tustin Pickleball Courts
Thursday, November 2, 2023
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 88
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Tustin
Tustin Pickleball Courts
Thursday, November 2, 2023
Trip Generation Count
Entering
12:00 5 0 5 12:00 5 0 5
12:15 1 0 1 12:15 4 0 4
12:30 3 0 3 12:30 7 0 7
12:45 1 0 1 12:45 5 0 5
13:00 1 0 1 13:00 5 0 5
13:15 1 0 1 13:15 3 0 3
13:30 0 0 0 13:30 3 0 3
13:45 3 0 3 13:45 0 0 0
14:00 0 0 0 14:00 0 0 0
14:15 1 0 1 14:15 5 0 5
14:30 0 0 0 14:30 2 0 2
14:45 7 0 7 14:45 0 0 0
15:00 5 0 5 15:00 1 0 1
15:15 0 0 0 15:15 1 0 1
15:30 7 0 7 15:30 0 0 0
15:45 3 0 3 15:45 2 0 2
16:00 2 0 2 16:00 0 0 0
16:15 0 0 0 16:15 0 0 0
16:30 5 0 5 16:30 4 0 4
16:45 0 0 0 16:45 2 0 2
17:00 1 0 1 17:00 4 0 4
17:15 2 0 2 17:15 5 0 5
17:30 1 0 1 17:30 3 0 3
17:45 1 0 1 17:45 2 0 2
18:00 0 0 0 18:00 3 0 3
18:15 0 0 0 18:15 5 0 5
18:30 0 0 0 18:30 4 0 4
18:45 0 0 0 18:45 0 0 0
19:00 0 0 0 19:00 0 0 0
19:15 0 0 0 19:15 0 0 0
19:30 0 0 0 19:30 0 0 0
19:45 0 0 0 19:45 0 0 0
20:00 0 0 0 20:00 0 0 0
20:15 0 0 0 20:15 0 0 0
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 208 10 218 208 10 218
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 89
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 8 0 8 6:00 0 0 0
6:15 12 0 12 6:15 0 0 0
6:30 12 2 14 6:30 0 0 0
6:45 7 0 7 6:45 7 0 7
7:00 12 0 12 7:00 4 0 4
7:15 14 2 16 7:15 1 1 2
7:30 10 0 10 7:30 7 0 7
7:45 7 0 7 7:45 5 1 6
8:00 8 0 8 8:00 6 0 6
8:15 9 1 10 8:15 8 0 8
8:30 9 1 10 8:30 8 0 8
8:45 11 0 11 8:45 12 1 13
9:00 11 0 11 9:00 10 1 11
9:15 8 0 8 9:15 15 0 15
9:30 10 0 10 9:30 9 1 10
9:45 6 0 6 9:45 7 0 7
10:00 9 2 11 10:00 7 0 7
10:15 6 0 6 10:15 10 1 11
10:30 7 1 8 10:30 9 0 9
10:45 6 0 6 10:45 2 2 4
11:00 4 0 4 11:00 11 0 11
11:15 3 0 3 11:15 6 0 6
11:30 1 0 1 11:30 7 0 7
11:45 5 0 5 11:45 10 1 11
Exiting
Tustin
Tustin Pickleball Courts
Tuesday, November 7, 2023
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 90
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Tustin
Tustin Pickleball Courts
Tuesday, November 7, 2023
Trip Generation Count
Entering
12:00 2 0 2 12:00 9 0 9
12:15 3 1 4 12:15 0 0 0
12:30 2 0 2 12:30 7 0 7
12:45 0 0 0 12:45 3 0 3
13:00 0 0 0 13:00 2 0 2
13:15 2 0 2 13:15 2 1 3
13:30 0 0 0 13:30 3 0 3
13:45 3 0 3 13:45 5 0 5
14:00 4 0 4 14:00 5 0 5
14:15 1 0 1 14:15 2 0 2
14:30 0 0 0 14:30 5 0 5
14:45 2 0 2 14:45 0 0 0
15:00 0 0 0 15:00 4 0 4
15:15 0 0 0 15:15 0 0 0
15:30 0 0 0 15:30 3 0 3
15:45 1 0 1 15:45 0 0 0
16:00 2 1 3 16:00 0 0 0
16:15 2 0 2 16:15 0 0 0
16:30 2 0 2 16:30 2 0 2
16:45 2 0 2 16:45 2 0 2
17:00 2 0 2 17:00 2 0 2
17:15 0 0 0 17:15 0 1 1
17:30 0 0 0 17:30 0 0 0
17:45 1 0 1 17:45 3 0 3
18:00 0 0 0 18:00 2 0 2
18:15 0 0 0 18:15 4 0 4
18:30 0 0 0 18:30 0 0 0
18:45 0 0 0 18:45 0 0 0
19:00 0 0 0 19:00 0 0 0
19:15 0 0 0 19:15 0 0 0
19:30 0 0 0 19:30 0 0 0
19:45 0 0 0 19:45 0 0 0
20:00 0 0 0 20:00 0 0 0
20:15 0 0 0 20:15 0 0 0
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 226 11 237 226 11 237
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 91
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total Net Cars on site (Ent - Exit)1.5 Hours
0:00 0 0 0 0 0 0 0 0
0:15 0 0 0 0 0 0 0 0
0:30 0 0 0 0 0 0 0 0
0:45 0 0 0 0 0 0 0 0
1:00 0 0 0 0 0 0 0 0
1:15 0 0 0 0 0 0 0 0
1:30 0 0 0 0 0 0 0 0
1:45 0 0 0 0 0 0 0 0
2:00 0 0 0 0 0 0 0 0
2:15 0 0 0 0 0 0 0 0
2:30 0 0 0 0 0 0 0 0
2:45 0 0 0 0 0 0 0 0
3:00 0 0 0 0 0 0 0 0
3:15 0 0 0 0 0 0 0 0
3:30 0 0 0 0 0 0 0 0
3:45 0 0 0 0 0 0 0 0
4:00 0 0 0 0 0 0 0 0
4:15 0 0 0 0 0 0 0 0
4:30 0 0 0 0 0 0 0 0
4:45 0 0 0 0 0 0 0 0
5:00 0 0 0 0 0 0 0 0
5:15 0 0 0 0 0 0 0 0
5:30 0 0 0 0 0 0 0 0
5:45 0 0 0 0 0 0 0 0
6:00 0 0 0 0 0 0 0 0
6:15 0 0 0 0 0 0 0 0
6:30 0 0 0 0 0 0 0 0
6:45 0 0 0 0 0 0 0 0
7:00 0 0 0 0 0 0 0 0
7:15 0 0 0 0 0 0 0 0
7:30 0 0 0 0 0 0 0 0
7:45 31 1 31 0 0 0 0 31 7:45 - 9:15 93
8:00 25 0 25 0 0 0 0 25 Parking Rate = 93/31 = 3.0 per court
8:15 10 2 12 0 0 0 0 11
8:30 8 0 8 0 0 0 0 8
8:45 7 0 7 0 0 0 0 6
9:00 12 1 13 0 2 0 2 11
9:15 32 1 33 0 8 0 8 25
9:30 12 0 12 0 19 1 20 -8
9:45 4 0 4 0 10 1 11 -7
10:00 1 0 2 0 9 0 10 -8
10:15 3 0 3 0 7 0 7 -4
10:30 0 0 0 0 7 0 7 -7
10:45 8 0 8 0 10 0 10 -2
11:00 8 0 9 0 31 1 31 -23
11:15 2 0 2 0 17 0 17 -15
11:30 1 0 1 0 7 0 7 -6
11:45 0 0 0 0 3 0 3 -3
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Average
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 92
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total Net Cars on site (Ent - Exit)1.5 Hours
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Average
Trip Generation Count
Entering
12:00 0 0 0 1 5 0 6 -6
12:15 1 0 1 1 6 1 7 -5
12:30 1 0 2 1 7 0 8 -6
12:45 0 0 0 1 2 0 2 -2
13:00 1 0 1 1 6 0 6 -5
13:15 1 0 1 1 2 0 2 -1
13:30 1 0 1 1 2 0 2 -1
13:45 1 0 1 1 2 0 2 -1
14:00 1 0 1 1 0 0 0 1
14:15 0 0 0 1 1 0 1 -1
14:30 1 0 1 1 1 0 1 0
14:45 4 0 4 1 1 0 1 4
15:00 9 1 10 1 0 0 0 10
15:15 9 0 9 1 0 0 0 9
15:30 4 0 4 1 0 0 1 3
15:45 5 0 5 1 2 0 2 3
16:00 9 1 10 1 3 0 3 7 69
16:15 14 0 14 1 0 0 0 14
16:30 19 2 21 1 2 0 2 19
16:45 29 2 31 1 10 1 11 20
17:00 13 0 13 1 6 0 6 7
17:15 8 0 8 1 5 0 5 3
17:30 6 0 6 1 4 0 4 2
17:45 1 0 1 1 5 0 6 -4
18:00 0 0 0 1 11 1 11 -11
18:15 1 0 1 1 12 1 12 -11
18:30 3 0 3 1 22 1 23 -21
18:45 0 0 0 1 15 1 15 -15
19:00 0 0 0 1 16 1 17 -17
19:15 0 0 0 1 11 0 11 -11
19:30 0 0 0 1 7 0 7 -7
19:45 0 0 0 1 6 0 6 -6
20:00 0 0 0 1 6 0 6 -6
20:15 0 0 0 1 1 0 1 -1
20:30 0 0 0 1 0 0 0 0
20:45 0 0 0 1 0 0 0 0
21:00 0 0 0 1 0 0 0 0
21:15 0 0 0 1 0 0 0 0
21:30 0 0 0 1 0 0 0 0
21:45 0 0 0 1 0 0 0 0
22:00 0 0 0 1 0 0 0 0
22:15 0 0 0 1 0 0 0 0
22:30 0 0 0 1 0 0 0 0
22:45 0 0 0 1 0 0 0 0
23:00 0 0 0 1 0 0 0 0
23:15 0 0 0 1 0 0 0 0
23:30 0 0 0 1 0 0 0 0
23:45 0 0 0 1 0 0 0 0
TOTAL 310 12 321 310 12 321
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 93
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 0 0 0 6:00 0 0 0
6:15 0 0 0 6:15 0 0 0
6:30 0 0 0 6:30 0 0 0
6:45 0 0 0 6:45 0 0 0
7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0
7:45 39 0 39 7:45 0 0 0
8:00 16 0 16 8:00 0 0 0
8:15 8 1 9 8:15 0 0 0
8:30 11 0 11 8:30 0 0 0
8:45 10 0 10 8:45 0 0 0
9:00 16 1 17 9:00 1 0 1
9:15 29 2 31 9:15 12 0 12
9:30 5 0 5 9:30 11 0 11
9:45 5 0 5 9:45 14 3 17
10:00 0 1 1 10:00 7 0 7
10:15 5 0 5 10:15 10 0 10
10:30 0 0 0 10:30 10 0 10
10:45 12 0 12 10:45 5 0 5
11:00 6 0 6 11:00 27 0 27
11:15 3 0 3 11:15 29 0 29
11:30 3 0 3 11:30 10 1 11
11:45 0 0 0 11:45 7 0 7
Exiting
Wednesday, November 1, 2023
Tustin
Newport Beach Country Club Pickleball Courts
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 94
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Wednesday, November 1, 2023
Tustin
Newport Beach Country Club Pickleball Courts
Trip Generation Count
Entering
12:00 0 0 0 12:00 3 0 3
12:15 1 0 1 12:15 3 1 4
12:30 0 0 0 12:30 4 1 5
12:45 1 0 1 12:45 2 0 2
13:00 2 0 2 13:00 6 0 6
13:15 1 0 1 13:15 2 0 2
13:30 3 0 3 13:30 1 0 1
13:45 2 0 2 13:45 2 0 2
14:00 3 0 3 14:00 0 0 0
14:15 1 0 1 14:15 3 0 3
14:30 3 0 3 14:30 1 0 1
14:45 7 0 7 14:45 1 0 1
15:00 5 1 6 15:00 0 0 0
15:15 7 0 7 15:15 0 0 0
15:30 5 0 5 15:30 0 0 0
15:45 9 0 9 15:45 2 0 2
16:00 10 1 11 16:00 3 0 3
16:15 10 0 10 16:15 0 0 0
16:30 27 3 30 16:30 5 0 5
16:45 21 2 23 16:45 10 1 11
17:00 6 0 6 17:00 5 0 5
17:15 6 0 6 17:15 6 0 6
17:30 5 0 5 17:30 5 0 5
17:45 3 0 3 17:45 6 1 7
18:00 0 1 1 18:00 13 1 14
18:15 2 0 2 18:15 8 1 9
18:30 7 0 7 18:30 21 0 21
18:45 0 0 0 18:45 11 1 12
19:00 0 0 0 19:00 17 1 18
19:15 0 0 0 19:15 16 0 16
19:30 0 0 0 19:30 4 1 5
19:45 0 0 0 19:45 3 0 3
20:00 0 0 0 20:00 9 0 9
20:15 0 0 0 20:15 0 0 0
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 315 13 328 315 13 328
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 95
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 0 0 0 6:00 0 0 0
6:15 0 0 0 6:15 0 0 0
6:30 0 0 0 6:30 0 0 0
6:45 0 0 0 6:45 0 0 0
7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0
7:45 22 2 24 7:45 0 0 0
8:00 37 0 37 8:00 0 0 0
8:15 8 1 9 8:15 1 0 1
8:30 2 0 2 8:30 0 0 0
8:45 7 0 7 8:45 0 0 0
9:00 13 1 14 9:00 2 0 2
9:15 33 1 34 9:15 4 0 4
9:30 26 0 26 9:30 33 2 35
9:45 2 1 3 9:45 8 0 8
10:00 3 0 3 10:00 11 0 11
10:15 1 0 1 10:15 4 0 4
10:30 0 0 0 10:30 4 1 5
10:45 2 0 2 10:45 8 0 8
11:00 7 1 8 11:00 43 1 44
11:15 2 0 2 11:15 16 1 17
11:30 1 0 1 11:30 1 0 1
11:45 0 0 0 11:45 1 1 2
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Thursday, November 2, 2023
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 96
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Thursday, November 2, 2023
Trip Generation Count
Entering
12:00 0 0 0 12:00 9 1 10
12:15 3 0 3 12:15 6 0 6
12:30 3 1 4 12:30 7 0 7
12:45 0 0 0 12:45 1 0 1
13:00 0 0 0 13:00 7 0 7
13:15 0 0 0 13:15 1 0 1
13:30 1 0 1 13:30 1 0 1
13:45 0 0 0 13:45 2 0 2
14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0
14:30 0 0 0 14:30 1 0 1
14:45 3 0 3 14:45 0 0 0
15:00 9 0 9 15:00 0 0 0
15:15 4 0 4 15:15 0 0 0
15:30 2 0 2 15:30 0 0 0
15:45 4 0 4 15:45 2 0 2
16:00 12 1 13 16:00 5 0 5
16:15 15 1 16 16:15 1 0 1
16:30 11 0 11 16:30 0 0 0
16:45 43 2 45 16:45 3 0 3
17:00 21 0 21 17:00 5 1 6
17:15 6 0 6 17:15 4 0 4
17:30 5 0 5 17:30 1 0 1
17:45 1 0 1 17:45 1 0 1
18:00 0 0 0 18:00 14 1 15
18:15 0 0 0 18:15 16 1 17
18:30 1 0 1 18:30 19 1 20
18:45 0 0 0 18:45 23 1 24
19:00 0 0 0 19:00 13 0 13
19:15 0 0 0 19:15 15 0 15
19:30 0 0 0 19:30 9 0 9
19:45 0 0 0 19:45 8 0 8
20:00 0 0 0 20:00 0 0 0
20:15 0 0 0 20:15 0 0 0
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 310 12 322 310 12 322
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 97
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
0:00 0 0 0 0:00 0 0 0
0:15 0 0 0 0:15 0 0 0
0:30 0 0 0 0:30 0 0 0
0:45 0 0 0 0:45 0 0 0
1:00 0 0 0 1:00 0 0 0
1:15 0 0 0 1:15 0 0 0
1:30 0 0 0 1:30 0 0 0
1:45 0 0 0 1:45 0 0 0
2:00 0 0 0 2:00 0 0 0
2:15 0 0 0 2:15 0 0 0
2:30 0 0 0 2:30 0 0 0
2:45 0 0 0 2:45 0 0 0
3:00 0 0 0 3:00 0 0 0
3:15 0 0 0 3:15 0 0 0
3:30 0 0 0 3:30 0 0 0
3:45 0 0 0 3:45 0 0 0
4:00 0 0 0 4:00 0 0 0
4:15 0 0 0 4:15 0 0 0
4:30 0 0 0 4:30 0 0 0
4:45 0 0 0 4:45 0 0 0
5:00 0 0 0 5:00 0 0 0
5:15 0 0 0 5:15 0 0 0
5:30 0 0 0 5:30 0 0 0
5:45 0 0 0 5:45 0 0 0
6:00 0 0 0 6:00 0 0 0
6:15 0 0 0 6:15 0 0 0
6:30 0 0 0 6:30 0 0 0
6:45 0 0 0 6:45 0 0 0
7:00 0 0 0 7:00 0 0 0
7:15 0 0 0 7:15 0 0 0
7:30 0 0 0 7:30 0 0 0
7:45 31 0 31 7:45 0 0 0
8:00 21 0 21 8:00 0 0 0
8:15 14 3 17 8:15 0 0 0
8:30 10 1 11 8:30 0 0 0
8:45 3 0 3 8:45 1 0 1
9:00 8 0 8 9:00 2 0 2
9:15 35 0 35 9:15 9 0 9
9:30 4 0 4 9:30 14 0 14
9:45 4 0 4 9:45 8 0 8
10:00 1 0 1 10:00 10 1 11
10:15 3 0 3 10:15 7 0 7
10:30 1 0 1 10:30 7 0 7
10:45 11 0 11 10:45 16 1 17
11:00 12 0 12 11:00 22 1 23
11:15 1 0 1 11:15 5 0 5
11:30 0 0 0 11:30 9 0 9
11:45 1 0 1 11:45 1 0 1
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Tuesday, November 7, 2023
Trip Generation Count
Entering
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 98
City:
Location:
Date:
Count Type:
Non-Carpool
Trip
Carpool
Trip Total
Non-Carpool
Trip
Carpool
Trip Total
Exiting
Tustin
Newport Beach Country Club Pickleball Courts
Tuesday, November 7, 2023
Trip Generation Count
Entering
12:00 0 0 0 12:00 4 0 4
12:15 0 0 0 12:15 9 1 10
12:30 1 0 1 12:30 11 0 11
12:45 0 0 0 12:45 3 0 3
13:00 0 0 0 13:00 4 0 4
13:15 2 0 2 13:15 2 0 2
13:30 0 0 0 13:30 4 0 4
13:45 0 0 0 13:45 1 0 1
14:00 0 0 0 14:00 0 0 0
14:15 0 0 0 14:15 0 0 0
14:30 1 0 1 14:30 1 0 1
14:45 3 0 3 14:45 1 0 1
15:00 14 1 15 15:00 0 0 0
15:15 17 0 17 15:15 0 0 0
15:30 5 0 5 15:30 1 1 2
15:45 1 0 1 15:45 1 0 1
16:00 6 0 6 16:00 2 0 2
16:15 16 0 16 16:15 0 0 0
16:30 19 2 21 16:30 1 0 1
16:45 23 3 26 16:45 18 1 19
17:00 12 0 12 17:00 7 0 7
17:15 13 0 13 17:15 6 0 6
17:30 9 0 9 17:30 6 0 6
17:45 0 0 0 17:45 9 0 9
18:00 0 0 0 18:00 5 0 5
18:15 2 0 2 18:15 11 0 11
18:30 0 0 0 18:30 27 2 29
18:45 0 0 0 18:45 10 0 10
19:00 0 0 0 19:00 18 2 20
19:15 0 0 0 19:15 3 0 3
19:30 0 0 0 19:30 8 0 8
19:45 0 0 0 19:45 8 0 8
20:00 0 0 0 20:00 8 0 8
20:15 0 0 0 20:15 4 0 4
20:30 0 0 0 20:30 0 0 0
20:45 0 0 0 20:45 0 0 0
21:00 0 0 0 21:00 0 0 0
21:15 0 0 0 21:15 0 0 0
21:30 0 0 0 21:30 0 0 0
21:45 0 0 0 21:45 0 0 0
22:00 0 0 0 22:00 0 0 0
22:15 0 0 0 22:15 0 0 0
22:30 0 0 0 22:30 0 0 0
22:45 0 0 0 22:45 0 0 0
23:00 0 0 0 23:00 0 0 0
23:15 0 0 0 23:15 0 0 0
23:30 0 0 0 23:30 0 0 0
23:45 0 0 0 23:45 0 0 0
TOTAL 304 10 314 304 10 314
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
(951) 268-6268 99
147 BEACON STREET PARKING MANAGEMENT PLAN
JULY 2025
BAY AREA SPORTSHOUSE
SOUTH SAN FRANCISCO, CALIFORNIA
P:\2025\20252269\Memo\Bay Area Sportshouse Parking Management Plan2.docx (07/14/25)
ATTACHMENT C
BEACON STREET PARKING SURVEY DATA
100
South San Francisco
147 Beacon St., South San Francisco, CA 94080
127-131 Beacon St., South San Francisco, CA 94080
Beacon Street
Thursday, March 20th, 2025
Inventory 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
Regular 14 5 5 5 3 2 2 2 2 2
Reserved 1 0 0 0 0 0 0 0 0 0
Loading 1 0 0 0 0 0 0 0 0 0
Subtotal 16 5 5 5 3 2 2 2 2 2
Total Occupancy 16 5 5 5 3 2 2 2 2 2
Total Percent 31%31%31%19%13%13%13%13%13%
Inventory 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
Regular 22 1 1 1 0 0 0 0 0 0
-----------
Subtotal 22 1 1 1 0 0 0 0 0 0
Total Occupancy 22 1 1 1 0 0 0 0 0 0
Total Percent 5%5%5%0%0%0%0%0%0%
Inventory 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
North Side - 4 Hr 9a-6p 10 6 5 5 4 4 0 0 0 0
South Side - 4 Hr 9a-6p 7 2 3 2 2 1 1 1 0 0
Subtotal 17 8 8 7 6 5 1 1 0 0
Total Occupancy 17 8 8 7 6 5 1 1 0 0
Total Percent 47%47%41%35%29%6%6%0%0%
Inventory 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
East Side - 4 Hr 9a-6p 8 3 3 3 3 3 4 3 2 2
East Side - Loading 1 0 0 0 0 0 0 0 0 0
West Side - 4 Hr 9a-6p 12 9 7 7 4 5 3 1 0 0
Subtotal 21 12 10 10 7 8 7 4 2 2
Total Occupancy 21 12 10 10 7 8 7 4 2 2
Total Percent 57%48%48%33%38%33%19%10%10%
Inventory 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM
North Side - 4 Hr 9a-6p 8 6 6 3 3 2 2 1 1 1
South Side - 4 Hr 9a-6p 12 8 9 5 5 4 2 2 2 2
Subtotal 20 14 15 8 8 6 4 3 3 3
Total Occupancy 20 14 15 8 8 6 4 3 3 3
Total Percent 70%75%40%40%30%20%15%15%15%
147 Beacon St.
127-131 Beacon St.
Beacon St.
(North)
Beacon St.
(West)
Beacon St.
(South)
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 101
South San Francisco
147 Beacon St., South San Francisco, CA 94080
127-131 Beacon St., South San Francisco, CA 94080
Beacon Street
Saturday, March 22nd, 2025
Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM
Regular 14 2 2 2 2 2 2 2 2 2 2
Reserved 1 0 0 0 0 0 0 0 0 0 0
Loading 1 0 0 0 0 0 0 0 0 0 0
Subtotal 16 2 2 2 2 2 2 2 2 2 2
Total Occupancy 16 2 2 2 2 2 2 2 2 2 2
Total Percent 13%13%13%13%13%13%13%13%13%13%
Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM
Regular 22 0 1 1 1 1 1 1 1 1 1
------------
Subtotal 22 0 1 1 1 1 1 1 1 1 1
Total Occupancy 22 0 1 1 1 1 1 1 1 1 1
Total Percent 0%5%5%5%5%5%5%5%5%5%
Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM
North Side - 4 Hr 9a-6p 10 1 2 3 2 2 2 2 2 2 4
South Side - 4 Hr 9a-6p 7 2 3 2 1 2 1 2 1 1 0
Subtotal 17 3 5 5 3 4 3 4 3 3 4
Total Occupancy 17 3 5 5 3 4 3 4 3 3 4
Total Percent 18%29%29%18%24%18%24%18%18%24%
Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM
East Side - 4 Hr 9a-6p 8 2 2 3 3 3 3 2 3 3 3
East Side - Loading 1 0 0 0 0 0 0 0 0 0 0
West Side - 4 Hr 9a-6p 12 0 2 4 4 3 3 1 1 2 3
Subtotal 21 2 4 7 7 6 6 3 4 5 6
Total Occupancy 21 2 4 7 7 6 6 3 4 5 6
Total Percent 10%19%33%33%29%29%14%19%24%29%
Inventory 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM
North Side - 4 Hr 9a-6p 8 1 1 1 1 2 1 0 1 2 0
South Side - 4 Hr 9a-6p 12 1 1 1 1 1 0 2 1 1 0
Subtotal 20 2 2 2 2 3 1 2 2 3 0
Total Occupancy 20 2 2 2 2 3 1 2 2 3 0
Total Percent 10%10%10%10%15%5%10%10%15%0%
147 Beacon St.
127-131 Beacon St.
Beacon St.
(North)
Beacon St.
(West)
Beacon St.
(South)
Counts Unlimited, Inc.
PO Box 1178
Corona, CA 92878
951-268-6268 102
103
City of South San Francisco
Legislation Text
P.O. Box 711 (City Hall, 400
Grand Avenue)
South San Francisco, CA
File #:25-693 Agenda Date:8/7/2025
Version:1 Item #:3.
Report regarding an application for Design Review to construct a new multifamily residential structure
consisting of four dwelling units at 227 Armour Avenue in the Downtown Residential High (DRH)Zoning
District in accordance with Title 20 of the South San Francisco Municipal Code (SSFMC),and determination
that the project is categorically exempt under the provisions of the California Environmental Quality Act
(CEQA)per Class 3,Section 15303,New Construction or Conversion of Small Structures.(Stephanie Skangos,
Senior Planner)
MOTIONS FOR THE COMMISSION TO ADOPT STAFF RECOMMENDATION:
(1)Move to determine the project is exempt from CEQA.
(2)Move to approve the Design Review entitlement,subject to the attached draft Findings and draft
Conditions of Approval.
RECOMMENDATION
Staff recommends that the Planning Commission take the following actions:
1.Make a determination that the Project is categorically exempt under the provisions of the California
Environmental Quality Act (CEQA),Class 3,Section 15303,New Construction or Conversion of Small
Structures; and,
2.Approve the Design Review for Planning Project P24-0004,DR24-0017,subject to the attached draft
Findings and draft Conditions of Approval.
BACKGROUND/DISCUSSION
Site Overview
The project site is located at 227 Armour Avenue in the Downtown Residential High (DRH)Zoning District.
The site is 7,863 square feet in size and is a through lot with street frontages on both Armour Avenue and 9th
Lane.There is an existing one-story residential building with two existing dwelling units (duplex)facing 9th
Lane and an existing one-story residential building with one existing dwelling unit facing Armour Avenue.The
surrounding area is developed with residential units.
Proposal
The applicant is proposing the construction of a new three-story residential building,approximately 4,645
square feet in size,facing Armour Avenue,and attached to the existing one-story,one-unit residential building.
The new building will consist of four dwelling units,resulting in a total of seven units on the project site,and
an attached two-car garage.The new units will be two-bedroom units with private balconies,ranging in size
from 725 square feet to 840 square feet.Two units will be located on the second story,and two units will be
located on the third story.All four units will be accessed from a front-entry patio and internal stairway facing
Armour Avenue.The attached two-garage will be located on the ground floor;long-term bicycle parking,trash
and refuse collection bins,and a utility room will also be located on the ground floor.The proposal also
includes new landscaping,as well as improvements to an existing paved area adjacent to the existing one-unitCity of South San Francisco Printed on 7/30/2025Page 1 of 4
powered by Legistar™104
File #:25-693 Agenda Date:8/7/2025
Version:1 Item #:3.
includes new landscaping,as well as improvements to an existing paved area adjacent to the existing one-unit
residential building to serve as a common usable open space area for the four new units and three existing units
on-site.
ZONING CONSISTENCY ANALYSIS
Proposed Use
The project site is located within the Downtown Residential High (DRH)Zoning District.Per South San
Francisco Municipal Code (SSFMC)Section 20.080.002 (“Use Regulations -Downtown Residential Zoning
Districts”),multifamily residential is permitted by-right and subject to the development standards outlined in
SSFMC Table 20.080.003 (“Development Standards -Downtown Residential Zoning Districts”).As noted in
Table 1 below,the proposed project complies with all applicable development standards,and the addition of
new units brings the project site into compliance with minimum density requirements.
Table 1. Project Compliance with DRH Development Standards
Site and Building Design Standards
SSFMC Chapter 20.310 (“Site and Building Design Standards”)prescribes general Citywide site and building
design standards to be used in conjunction with the applicable base zoning district requirements and design
standards,as well as specific design standards for residential development based on type -single-family,duplex
and/or multifamily.The general standards contain requirements for building entrances,building materials and
textures,and architectural integrity;while the specific residential standards focus on wall planes,roofline,entry
protection,building articulation,windows,and open space design.The design of the project meets these general
standards, as well as applicable design standards for residential development of this size.
Downtown Residential Districts - Development Standards
SSFMC Section 20.080.004 (“Downtown Residential Districts,Supplemental Standards”)outlines additional
standards applicable to projects located within a downtown residential zoning district,including the DRH
District.The project has been designed to comply with all applicable required development standards for the
City of South San Francisco Printed on 7/30/2025Page 2 of 4
powered by Legistar™105
File #:25-693 Agenda Date:8/7/2025
Version:1 Item #:3.
District.The project has been designed to comply with all applicable required development standards for the
DRH District.
Parking Requirements
Vehicle Parking
The project site is located within a Transit Station Area,as the site is located within a half-mile of the South San
Francisco Caltrain Station and along a transit corridor with a fixed route bus service.Per SSFMC Section
20.330.004 (“Required Parking Spaces”),and in accordance with California Assembly Bill (AB)2097,no off-
street parking is required for any use located within a Transit Station Area.Therefore,the proposed project does
not require parking.However,the project does include a new two-car garage on the first story,as well as ample
driveway space to allow for two additional parking spaces on-site.
Bicycle Parking
SSFMC Section 20.330.007 (“Bicycle Parking”)establishes the requirements for short-term and long-term
bicycle parking.The minimum number of on-site short-term and long-term bicycle parking spaces are based on
the use and size of the project.Short-term bicycle parking is not required for residential developments of less
than eight units;however,long-term bicycle parking is required for residential developments of four units or
more at the following rate:
·Long-term Bicycle Parking:A minimum of one bicycle parking space shall be provided for every four
units for multifamily and group residential projects.
Per these requirements,the project is required to provide a total of one long-term bicycle parking space on site.
The project includes two long-term bicycle parking spaces within the two-car garage on the first story of the
building, exceeding the minimum requirement.
GENERAL PLAN CONSISTENCY ANALYSIS
The General Plan Land Use designation for the project site is Medium-High Density Residential,which is
intended for a mix of residential development,including townhouses,condominiums and apartment buildings.
The increase in units brings the project site into compliance with the minimum density required for this site and
surrounding area.
DESIGN REVIEW BOARD
The Design Review Board (DRB)reviewed the proposal on May 20,2025.Overall,the DRB liked the
proposed design concept for the new residential building but had concerns about the roof integration of the
existing one-unit building with the new building and accessibility of the proposed usable common open space
area for the existing units,as well as some recommendations for the design of the unit balconies and proposed
landscaping/planting palette.Revised plans in response to the DRB comments have been submitted and the
revision addresses all comments.The DRB comment letter is included as Attachment 3 to this staff report,and
the revised plans are included as Attachment 2.
ENVIRONMENTAL REVIEW
The proposed project has been determined to be categorically exempt under the provisions of CEQA,Class 3,
Section 15303,New Construction or Conversion of Small Structures.The project site is an existing developed
property surrounded by existing residential units,and commercial and industrial buildings.The proposal
includes the construction of a new multifamily residential structure consisting of no more than six dwelling
units on a legal parcel in an urbanized area. Thus, the exemption under Section 15303 applies.
City of South San Francisco Printed on 7/30/2025Page 3 of 4
powered by Legistar™106
File #:25-693 Agenda Date:8/7/2025
Version:1 Item #:3.
IMPACT FEES
The proposed project is subject to the City’s impact and development fees,which are used to offset the impacts
of new development on City services and infrastructure.The Conditions of Approval (Attachment 1)list out the
relevant impact fees:
·Parks and Recreation Impact Fee
·Childcare Impact Fee
·Library Impact Fee
·Public Safety Impact Fee
·Citywide Transportation Fee
CONCLUSION
The proposed project is located within a medium-high density residential area surrounded by existing
residential units,and multifamily residential is a permitted use by-right at the project site.The proposed project
complies with all applicable General Plan goals and policies and Zoning Code requirements,including bringing
the project site into compliance with minimum density requirements.Additionally,the project meets all
applicable development, site and design standards.
For these reasons, staff recommends that the Planning Commission take the following actions:
1.Make a determination that the Project is categorically exempt under the provisions of the California
Environmental Quality Act (CEQA),Class 3,Section 15303,New Construction or Conversion of Small
Structures; and,
2.Approve the Design Review for Planning Project P24-0004,DR24-0017,based on the attached
Findings and subject to the Conditions of Approval.
Attachments
1.Findings and Conditions of Approval
2.Project Plans, dated June 29, 2025
3.Design Review Board (DRB) Comment Letter, dated June 6, 2025
City of South San Francisco Printed on 7/30/2025Page 4 of 4
powered by Legistar™107
FINDINGS OF APPROVAL
P24-0004: DR24-0017
227 ARMOUR AVENUE
(As recommended by City Staff on August 7, 2025)
As required by the Design Review Procedures (SSFMC Chapter 20.480), the following findings are
made in support of a Design Review Permit to construct one new residential building consisting of four
units at 227 Armour Avenue in the Downtown Residential High (DRH) Zoning District in accordance
with Title 20 of the South San Francisco Municipal Code (SSFMC), based on public testimony and
materials submitted to the South San Francisco Planning Commission which include, but are not limited
to: Application materials submitted May 29, 2024; project plans dated June 29, 2025; Planning
Commission staff report dated August 7, 2025; and Planning Commission hearing of August 7, 2025.
1. Design Review
A. The Project is consistent with the applicable standards and requirements of the Zoning Ordinance
because, as submitted and modified through the Design Review Process, this project meets or
complies with the applicable standards included in Chapter 20.080 (Downtown Residential
Districts) and Chapter 20.310 (Site and Building Design Standards).
B. The Project is consistent with the General Plan because it is consistent with the policies and design
direction provided in the South San Francisco General Plan for the Medium-High Density
Residential land use designation.
C. The Project is consistent with the applicable design guidelines adopted by the City Council in that
the proposed Project is consistent with the DRH Zoning District development standards and the
Citywide development standards for residential development, as evaluated in the Zoning
Ordinance Compliance analysis for the Project.
D. The Project is consistent with other planning or zoning approval that the project requires for the
reasons stated above.
108
CONDITIONS OF APPROVAL
P24-0004: DR24-0017
227 ARMOUR AVENUE
(As recommended by City Staff on August 7, 2025)
PLANNING DIVISION CONDITIONS
Introduction
The term “applicant”, “developer”, “project owner” or “project sponsor” used hereinafter shall have the
same meaning: the applicant for the 227 Armour Avenue project or the property / project owner if different
from applicant.
GENERAL
1. The project shall be constructed and operated substantially as indicated on the plan set prepared
by Andrea Costanzo, dated June 29, 2025, and approved by the Planning Commission in
association with P24-0004, as amended by the conditions of approval. The final plans shall be
subject to the review and approval of the City’s Chief Planner.
2. The construction drawings shall comply with the Planning Commission approved plans, as
amended by the conditions of approval, including the plans prepared by Andrea Costanzo, dated
June 29, 2025.
3. The permit shall be subject to revocation if the project is not operated in compliance with the
conditions of approval.
4. Neither the granting of this permit nor any conditions attached thereto shall authorize, require or
permit anything contrary to, or in conflict with any ordinances specifically named therein.
5. Prior to construction, all required building permits shall be obtained from the City’s Building
Division.
6. Demolition of any existing structures on site will require demolition permits.
7. All conditions of the permit shall be completely fulfilled to the satisfaction of the affected City
Departments and Planning and Building Divisions prior to occupancy of any building.
109
Conditions of Approval
Page 3 of 24
8. The applicant shall submit a checklist showing compliance with Conditions of Approval with the
building permit plans and application.
9. Prior to issuance of any building or construction permits for the construction of public
improvements, the final design for all public improvements shall be reviewed and approved by the
City Engineer, Fire Marshal, and Chief Planner.
10. Prior to issuance of any building or construction permits for grading improvements, the applicant
shall submit final grading plans for review and approval by the City Engineer, Fire Marshal, and
Chief Planner.
11. Any modification to the approved plans shall be subject to SSFMC Section 20.450.012
(“Modification”), whereby the Chief Planner may approve minor changes. All exterior design
modifications, including any and all utilities, shall be presented to the Chief Planner for a
determination.
12. Unless the use has commenced or related building permits have been issued within two (2) years
of the date this permit is granted, this permit will automatically expire on that date, A one-year
permit extension may be granted in accordance with provisions of the SSFMC Chapter 20.450
(“Common Procedures”).
13. The permit shall not be effective for any purpose until the property owner or a duly authorized
representative files a signed acceptance form, prior to the issuance of a building permit, stating
that the property owner is aware of, and accepts, all of the conditions of the permit.
14. Prior to scheduling a Final Inspection with the Planning Division, the applicant must submit a
Planning Final Inspection Request form, which states that the project has been built according to
approved plans, and any revisions have been approved by the Planning Division.
CONSTRUCTION
15. The applicant is responsible for maintaining site security prior to, and throughout the construction
process. This includes installation of appropriate fencing, lighting, remote monitors, or on-site
security personnel as needed.
16. The applicant is responsible for providing site signage during construction, which contains contact
information for questions regarding the construction.
DESIGN REVIEW / SITE PLANNING
110
Conditions of Approval
Page 4 of 24
17. All equipment (either roof, building, or ground-mounted) shall be screened from view through the
use of integral architectural elements, such as enclosures or roof screens, and landscape screening
or shall be incorporated inside the exterior building wall. Equipment enclosures and/or roof
screens shall be painted to match the building. Prior to issuance of a building permit the applicant
shall submit plans showing utility locations, stand-pipes, equipment enclosures, landscape screens,
and/or roof screens for review and approval by the Chief Planner or designee.
18. Prior to issuance of any building or construction permits for landscaping improvements, the
applicant shall submit final landscaping and irrigation plans for review and approval by the City’s
Chief Planner. The plans shall include documentation of compliance with SSFMC Section
20.300.008 (“Landscaping”).
19. Plant materials shall be replaced when necessary with the same species originally specified unless
otherwise approved by the Chief Planner.
20. All landscape areas shall be watered via an automatic irrigation system, which shall be maintained
in fully operable condition at all times, and which complies with SSFMC Chapter 20.300 (“Lot
and Development Standards”).
21. All landscaping installed within the public right-of-way by the property owner shall be maintained
by the property owner.
22. Prior to issuance of certificate of occupancy, the applicant shall submit final landscaping and
irrigation plans demonstrating compliance with the State’s Model Water Efficiency Landscaping
Ordinance (MWELO), if applicable (See SSFMC Section 20.300.008, and the City’s WELO
Document Verification package).
a. Projects with a new aggregate landscape of 501 – 2,499 sq. ft. may comply with the
prescriptive measures contained in Appendix D of the MWELO.
b. Projects with a new aggregate landscape of 2,500 sq. ft. or greater must comply with the
performance measures required by the MWELO.
c. For all projects subject to the provisions of the MWELO, the applicant shall submit a
Certificate of Completion to the City, upon completion of the installation of the
landscaping and irrigation system.
23. The applicant shall contact the South San Francisco Scavenger Company to properly size any
required trash enclosures and work with staff to locate and design the trash enclosure in accordance
with the SSFMC Section 20.300.014 (“Trash and Refuse Collection Areas”). Applicant shall
111
Conditions of Approval
Page 5 of 24
submit an approval letter from South San Francisco Scavenger to the Chief Planner prior to the
issuance of building permits.
24. The applicant shall incorporate the recommendations of the Design Review Board (DRB) from
their meeting of May 20, 2025 and included in the DRB Comment Letter, dated June 6, 2025, in
the building permit plans and application.
25. Landscaped areas in the project area may contain trees defined as protected by the South San
Francisco Tree Preservation Ordinance, Title 13, Chapter 13.30. Any removal or pruning of
protected trees shall comply with the Tree Preservation Ordinance, and applicant shall obtain a
permit for any tree removals or alterations of protected trees, and avoid tree roots during trenching
for utilities.
26. Windows for multi-family residential development must meet the requirements of SSFMC
20.310.004 (D) (“Windows”): Trim at least two inches in width and one inch in depth must be
provided around all windows, or windows must be recessed at least three inches from the plane of
the surrounding exterior wall.
TRANSPORTATION / PARKING
27. Residential parking spaces shall be assigned to units, to minimize conflict within the parking area.
28. Any tandem parking spaces shall be assigned to the same unit.
29. Residential parking areas shall be secure, with access provided via key card or fob.
IMPACT / DEVELOPMENT FEES
**Fees are subject to annual adjustment and will be calculated based on the fee in effect at the time
that the payment of the fee is due. The fees included in these Conditions of Approval are estimates,
based on the fees in place at the time of project approval. Estimates are subject to change, based on
final plans submitted for building permits. Credits for existing uses will be calculated and applied
to applicable fees.**
30. PARKS AND RECREATION FEES: Prior to the date of final inspection or the date the certificate
of occupancy is issued, whichever occurs first, the applicant shall pay the Parkland Acquisition
Fee and Parkland Construction Fee in accordance with South San Francisco Municipal Code
Chapter 8.67. The fee is subject to annual adjustment. Based on the plans reviewed and approved
by the Planning Commission on July 17, 2025, the Parks and Recreation Impact Fee estimate for
the project is:
112
Conditions of Approval
Page 6 of 24
Residential (2-4 Units): $30,078.34 x 4 units = $120,313.36
31. CHILDCARE FEE: Prior to the date of final inspection or the date the certificate of occupancy is
issued, whichever occurs first, the applicant shall pay any applicable Childcare Fees in accordance
with South San Francisco Municipal Code Chapter 8.77. This fee is subject to annual adjustment.
Based on the plans approved by the Planning Commission on July 17, 2025, the Childcare Impact
Fee estimate for the project is:
Residential (18+ du/ac): $3,105.46 x 4 units = $12,421.84
32. LIBRARY IMPACT FEE: Prior to the date of final inspection or the date the certificate of
occupancy is issued, whichever occurs first, the applicant shall pay applicable Library Impact Fees
in accordance with South San Francisco Municipal Code Chapter 8.74. Based on the plans
approved by the Planning Commission on July 17, 2025, the Library Impact Fee for the project is:
Residential (18+ du/ac): $621.09 x 4 units = $2,484.36
33. PUBLIC SAFEY IMPACT FEE: Prior to the date of final inspection or the date the certificate of
occupancy is issued, whichever occurs first, the applicant shall pay applicable Public Safety Impact
Fees in accordance with South San Francisco Municipal Code Chapter 8.75. Based on the plans
approved by the Planning Commission on July 17, 2025, the Public Safety Impact Fee for the
project is:
Residential (18+ du/ac): $1,242.33 x 4 units = $4,969.32
34. CITYWIDE TRANSPORTATION FEE: Prior to the date of final inspection or the date the
certificate of occupancy is issued, whichever occurs first, the applicant shall pay applicable
transportation impact fees in accordance with South San Francisco Municipal Code Chapter 8.73.
The fee is subject to annual adjustment. Based on the plans reviewed and approved by the Planning
Commission on July 17, 2025, the Citywide Transportation Fee estimate for the project is:
Residential (Multi-Family): $4,658.54 x 4 units = $18,634.16
For questions regarding Planning Division COAs, please contact Stephanie Skangos at
[email protected]
BUILDING DIVISION CONDITIONS
1. This project shall comply with the 2022 California Building Code Chapter 11A and 11B.
113
Conditions of Approval
Page 7 of 24
2. This project shall comply with the 2022 California Building Code Chapter 11A, first floor unit on
accessible route to sidewalk.
3. This project shall comply with the all-electric REACH Code per the South San Francisco
Municipal Code.
4. There may be an issue with the proposed mixed-pitch roof.
5. There may be other comments generated by the Building Division and/or other City departments
that will also require your attention and response.
For questions concerning Building Division COAs, please contact Gary Lam at [email protected]
or (650) 829-6669.
ENGINEERING DIVISION CONDITIONS
Permits
1. At the time of each permit submittal, the Applicant shall submit a deposit for each of the following
permit reviews and processing:
a. Building Permit plan check and civil review. Provide an engineer’s estimate or opinion of
probable cost of on-site improvements for deposit amount calculation.
b. Hauling/Grading plan check and permit processing. Provide Cubic Yards for deposit
amount calculation.
c. Encroachment for Public Improvements plan check and permit processing. Provide an
engineer’s estimate or opinion of probable cost of ROW improvements for fees and
deposits amount calculation.
2. A Grading Permit is required for grading over 50 cubic yards and if 50 cubic yards or more of soil
is exported and/or imported. The Applicant shall pay all permit and inspection fees, as well as any
deposits and/or bonds required to obtain said permits. The Grading Permit requires several
documents to be submitted for the City’s review and approval. The Grading Permit Application,
Checklist and Requirements may be found on the City website at
http://www.ssf.net/departments/public-works/engineering-division.
3. A Hauling Permit shall be required for excavations and off-haul or on-haul, per Engineering
114
Conditions of Approval
Page 8 of 24
requirements; should hauling of earth occur prior to grading. Otherwise, hauling conditions would
be included with the grading permit. Hauling Permit may be found on the City website at:
http://www.ssf.net/departments/public-works/engineering-division.
4. The City of South San Francisco is mandated by the State of California to divert sixty-five percent
(65%) of all solid waste from landfills either by reusing or recycling. To help meet this goal, a city
ordinance requires completion of a Waste Management Plan (“WMP”) for covered building
projects identifying how at least sixty-five percent (65%) of non-inert project waste materials and
one hundred percent (100%) of inert materials (“65/100”) will be diverted from the landfill through
recycling and salvage. The Contractor shall submit a WMP application and fee payment prior to
the issuance of a building or grading permit.
5. An Encroachment Permit is required for any work proposed within the public right-of-way. The
Applicant shall pay all permit, plan check, and inspection fees, as well as, any deposits and/or
bonds required to obtain said permits.
6. Prior to the issuance of a building permit, the Applicant shall submit written evidence from the
County or State Regulators in charge, indicating that the site is cleared of hazardous materials and
hazardous groundwater to a level that poses no impacts to human health. The Applicant shall
also confirm that any existing groundwater monitoring wells on the project site have been properly
closed and/or relocated as necessary as approved by the County or State Regulators in charge.
Plan Submittal
7. The Applicant shall submit detailed plans printed to PDF and combined into a single electronic
file, with each being stamped and digitally signed by a Professional Engineer registered in the
State of California. Incorporated within the construction plans shall be applicable franchise utility
installation plans, stamped and signed and prepared by the proper authority. Plans shall include
the following sheets;
Cover, Separate Note Sheet, Existing Conditions, Demolition Plan, Grading Plan, Horizontal
Plan, Striping and Signage Plan, Utility Plan(s), Detail Sheet(s), Erosion Control Plan, and
Landscape Plans, (grading, storm drain, erosion control, and landscape plans are for reference
only and shall not be reviewed during this submittal).
8. Prior to building permit issuance, the Applicant shall obtain a grading permit with the Engineering
Division and shall submit an application, all documentation, fees, deposits, bonds and all necessary
paperwork needed for the grading permit. The Applicant shall submit a grading plan that clearly
states the amount of cut and fill required to grade the project. The Grading Plans shall include the
following plans:
115
Conditions of Approval
Page 9 of 24
Cover, Notes, Existing Conditions, Grading Plans, Storm Drain Plans, Stormwater Control
Plan, and Erosion Control Plan.
9. Prior to building permit issuance, the Applicant shall obtain an Encroachment Permit for all
proposed work within the City ROW and shall submit an application, all documentation, fees,
deposits, bonds and all necessary paperwork needed for the Encroachment Permit. Applicant shall
prepare and submit a separate Public Improvement Plan set that shall include only the scope of
work within the City ROW (with reference to the on-site plans) consisting of the following plans:
Civil Plans, Landscape Plans, and Joint Trench Plans.
An engineer’s cost estimate for the scope of work shown on the approved Public Improvement
Plans is required to determine the performance and payment bond amount. The submittal of the
bonds is required prior to the execution of the Subdivision Improvement Agreement.
10. All improvements shall be designed by a registered civil engineer and approved by the Engineering
Division.
11. The Engineering Division reserves the right to include additional conditions during review of the
building permit, grading permit, or encroachment permit.
Mapping and Agreements
12. Prior to the approval of any Permits, the Applicant shall enter into an Improvement Agreement
and Encroachment and Maintenance Agreement with the City. These agreements shall be approved
by the City Attorney and City Engineer prior to execution.
a. The Improvement Agreement shall require the Applicant to ensure the faithful performance
of the design, construction, installation and inspection of all public improvements as
reviewed and approved by the Engineering Division at no cost to the City and shall be
secured by good and sufficient payment, performance, and one (1) year warranty bonds or
cash deposit adequate to cover all of the costs, inspections and administrative expenses of
completing such improvements in the event of a default. The value of the bonds or cash
deposit shall include 110% of the cost of construction based on prevailing wage rates. The
value of the warranty bond or cash deposit shall be equivalent to 10% of the value of the
performance security.
b. The Encroachment and Maintenance Agreement shall require the Applicant to maintain
any street furniture that serves the property and all landscape within the project frontage at
no cost to the City. The Encroachment and Maintenance Agreement shall be recorded with
the San Mateo County Recorder and may be transferred to the property owner.
116
Conditions of Approval
Page 10 of 24
13. Applicant shall pay for all Engineering Division deposits and fees required for any mapping
application prior to review.
Right-of-Way
14. Prior to building permit issuance and prior to any work within the City Right-of-Way, the
Applicant shall obtain an Encroachment Permit from the Engineering Division. All new public
improvements required to accommodate the development shall be installed at no cost to the City
and shall be approved by the City Engineer and constructed to City Standards. All new public
improvements shall be completed prior to Final Occupancy of the project or prior to any
Temporary Occupancy as approved by the City Engineer.
15. Prior to Building Permit issuance, the Applicant shall submit a video survey of the adjacent streets
(perimeter of proposed property location) to determine the pre-construction condition of the streets
at no cost to the City. The Applicant will be responsible to ensure that the condition of the streets
and striping is in at least existing condition or better after construction is completed.
16. The Applicant shall construct a new driveway apron to serve the project site and reconstruct the
existing sidewalk along the project frontage on the Public right-of-way on Armour Avenue.
17. The Applicant shall coordinate with SF Scavenger to develop a plan for collecting trash/recycling
bins from the project site that is acceptable to the City. Trash bins shall not be stored on the
public right-of-way. On trash/recycling collection days, bins may be placed along the street curb
and gutter in front of the project site but removed from the public right-of-way immediately after
collection by SF Scavenger. The placement of bins on collection days shall be in a manner that
minimizes the impact to on-street public parking as approved by the City. The Applicant and SF
Scavenger shall consider the use of shared bins for the tenants to reduce the number of bins to be
staged on the street on collection days.
18. Prior to Building Permit issuance, the Applicant shall submit a video survey of the adjacent streets
(perimeter of proposed property location) to determine the pre-construction condition of the streets
at no cost to the City. The Applicant will be responsible to ensure that the condition of the streets
and striping is in at least existing condition or better after construction is completed.
19. Applicant shall ensure that any pavement markings impacted during construction are restored and
upgraded to meet current City standards current to the time of Encroachment Permit approval.
20. Upon completion of construction and landscape work at the site, the Applicant shall clean, repair
or reconstruct, at their expense, as required to conform to City Standards, all public improvements
including driveways, curbs, gutters, sidewalks and street pavements along the street frontages of
117
Conditions of Approval
Page 11 of 24
the subdivision to the satisfaction of the City Engineer.
21. The Applicant shall install landscaping/street trees with irrigation system along the parkway strip
along the project frontage on Armour Avenue. The landscape plan shall be approved by the City
Parks and Recreation department.
22. The Applicant shall be responsible for maintaining all street trees and landscaped irrigation
systems installed within the Public right-of-way.
23. Prior to the issuance of an Encroachment Permit, the Applicant shall provide an engineer’s
estimate for all work performed with in the public right-of-way and submit a bond equal to 110%
of the estimate.
24. Prior to the issuance of an Encroachment Permit, the Applicant shall submit Traffic and Pedestrian
Control Plans for proposed work on Armour Avenue, and/or any area of work that will obstruct
the existing pedestrian walkways.
25. No private foundation or private retaining wall support shall extend into the City Right-of-Way
without express approval from the Engineering Department. Applicant shall design any
bioretention area or flow-through planters adjacent to the property line such that the facility and
all foundations do not encroach within the City Right-of-Way or into an adjacent parcel.
26. The project shall not include any permanent structural supports (retaining walls, tiebacks, etc.)
within the ROW. City Engineer approval is required for any temporary structural supports within
the ROW. Any temporary structural supports shall be removed after construction.
27. Any work within the public sidewalk and/or obstructing pedestrian routes shall require pedestrian
routing plans along with traffic control plans. Temporary lane or sidewalk closures shall be
approved by the City Engineer and by the Construction Coordination Committee (if within the
CCC influence area). For any work affecting the sidewalks or pedestrian routes greater than 2 days
in duration, the adjacent parking lane or adjacent travel lane shall be closed and temporary vehicle
barriers placed to provide a protected pedestrian corridor. Temporary ramps shall be constructed
to connect the pedestrian route from the sidewalk to the street if no ramp or driveway is available
to serve that purpose.
28. Prior to the issuance of a building permit, the Applicant shall coordinate with Scavenger and
submit all garbage related plans.
Stormwater
29. The Applicant shall submit to the City Engineer a hydraulic study for the fully improved
118
Conditions of Approval
Page 12 of 24
development comparing existing predevelopment conditions and post-development conditions.
The study shall confirm that the post development condition will meet the goal of not increasing
peak stormwater runoff from the project site based on a 25-year, 5-minute design storm. Methods
for not increasing peak stormwater flow shall include stormwater storage on-site if necessary. The
study shall also evaluate the capacity of each new storm drain installed as part of the development.
Precipitation shall be based on NOAA Atlas 14 data for the site.
30. On-site storm drainage conveyance systems shall be designed to accommodate the 10-year design
storm. Precipitation used for the hydraulic analysis shall be based on NOAA Atlas 14 data for the
project site. Storm duration shall be equal to the time of concentration with an initial minimum of
10 minutes.
31. Hydraulic Grade lines shall not be less than 1 foot from the ground surface.
32. Runoff Coefficients used for hydraulic calculations shall be as follows:
a. Pervious areas—0.35
b. Impervious areas—0.95
33. Drainage runoff shall not be allowed to flow across lot lines or across subdivision boundaries onto
adjacent private property without an appropriate recorded easement being provided for this
purpose.
34. All off-site upgrades to drainage facilities required by the City Engineer to accommodate the runoff
from the subdivision shall be provided by the Applicant at no cost to the City.
35. All building downspouts shall be connected to rigid pipe roof leaders which shall discharge into
an approved drainage device or facility that meets the C3 stormwater treatment requirements of
the Municipal Regional Permit (MRP)3.0.
36. All storm drainage runoff shall be discharged into a pipe system or concrete gutter. Runoff shall
not be surface drained into surrounding private property or public streets.
37. Existing on-site drains that are not adequately sized to accommodate run-off from the fully
developed property and upstream drainage basin shall be improved as required by the Applicant’s
civil engineering consultant’s plans and specifications as approved by the City Engineer. These
on-site improvements shall be installed at no cost to the City.
38. The on-site storm drainage system shall not be dedicated to the City for ownership or maintenance.
The storm drainage system and any storm water pollutions control devices within the subdivision
119
Conditions of Approval
Page 13 of 24
shall be owned, repaired, and maintained by the property owner or Homeowner’s Association.
Sanitary Sewer
39. Applicant shall video inspect the sanitary sewer mains along the project frontage to the nearest
manholes upstream and downstream of the project point of connection both prior to construction
and post construction. The video must be submitted to City Engineering for review as part of the
improvement plans submittal and shall confirm the number of existing sewer laterals serving the
site.
40. The Applicant shall relocate the existing sanitary sewer lateral serving the existing residence on
the property. The existing sanitary sewer lateral (up to the public sewer main on Armour Ave,)
shall be abandoned to City Standards. The new relocated private sewer lateral serving the existing
residence on the project site shall not be located under the footprint of the proposed new 4-unit
apartment building.
41. The Applicant shall construct a new sewer lateral to serve the new 4-unit apartment building. Said
new sewer lateral shall be separate from the sewer lateral serving the existing residence.
42. The Applicant shall abandon all existing private sewer laterals from the project site connected to
the sanitary sewer system. The number of sewer laterals to be abandoned shall be shown on the
plans and shall be confirmed by the review of a video inspection of the private sanitary sewer
main.
43. The Applicant shall install new sewer laterals to City Engineering Division Standards.
44. Sanitary Sewer plan shall show all existing and proposed utilities. Be sure to provide minimum
horizontal and vertical clearances for all existing and proposed utilities. Also include all existing
and proposed manhole, catch basin and pipe invert elevations.
45. All utility crossings shall be potholed, verified and shown on the plans prior to the building permit
submittal.
46. The on-site sanitary sewer system/plumbing shall be designed and installed in accordance with the
Uniform Plumbing Code, as amended and adopted by the City, and in accordance with the
requirements of the South San Francisco Building Division.
47. Each on-site sanitary sewer manhole and cleanout shall be accessible to maintenance personnel
and equipment via pathway or driveways as appropriate. Each maintenance structure shall be
surrounded by a level pad of sufficient size to provide a safe work area.
120
Conditions of Approval
Page 14 of 24
48. The on-site sanitary sewer system up to the public sanitary sewer manhole connection shall not be
dedicated to the City for maintenance. The sanitary sewer facilities within the subdivision shall be
repaired and maintained by the property owner Homeowner’s Association.
Dry Utilities
49. All new electrical and communication lines serving the property shall be placed underground
within the property being developed and to the nearest overhead facility or underground utility
vault. Pull boxes, junction structures, vaults, valves, and similar devices shall not be installed
within pedestrian walkway areas.
Domestic Water
50. The Applicant shall be responsible to coordinate with California Water Service (Calwater) to
determine if their existing public water distribution system has the capacity to serve the
development. Any off-site water system improvements that may be needed, as determined by
Calwater, will be the responsibility of the Applicant at the Applicant’s expense.
51. The Applicant shall coordinate with the California Water Service (Calwater) for all water-related
issues. All on-site private water mains and services shall be installed to the standards of Calwater
at the expense of the applicant.
52. The Applicant shall install fire hydrants at the locations specified by the Fire Marshal. Installation
shall be in accordance with City Standards as administered by the Fire Marshal.
On-site Improvements
53. Internal driveways shall be a minimum of 15-feet wide for one-way travel and 25-feet wide for
areas subject to two-way travel. One-way travel lanes within the site shall be clearly posted and
marked appropriately.
54. The Applicant shall submit a construction access plan that clearly identifies all areas of proposed
access during the proposed development.
55. Prior to receiving a Certificate of Occupancy form the Building Division, the Applicant shall
require its Civil Engineer to inspect the finished grading surrounding the building and to certify
that it conforms to the approved site plan and that there is positive drainage away from the exterior
of the building. The Applicant shall make any modifications to the grading, drainage, or other
improvements required by the project engineer to conform to intent of his plans.
56. The Applicant shall submit a proposed workplan and intended methodologies to ensure any
existing structures on or along the development’s property line are protected during proposed
activities.
121
Conditions of Approval
Page 15 of 24
57. All common areas are to be landscaped and irrigated and shall meet the requirements of the City’s
Water Efficiency Landscape Ordinance (WELO). Submit landscape, drainage and grading plans
for review and approval by the Engineering Division.
58. Any monument signs to be installed for the project shall be located completely on private property
and shall not encroach into the City’s right-of-way. The Developer shall ensure that placement of
the monument signs do not obstruct clear lines of sight for vehicles entering or exiting the site.
Grading
59. The recommendations contained within the geotechnical report shall be included in the Site Grading
and Drainage Plan. The Site Grading and Drainage Plan shall be prepared by the developer’s civil
engineer and approved by the project geotechnical engineer.
60. During grading operations, the entire project site shall be adequately sprinkled with water to prevent
dust or sprayed with an effect dust palliative to prevent dust from being blown into the air and
carried onto adjacent private and public property. Dust control shall be for seven days a week and
24 hours a day. Should any problems arise from dust, the developer shall hire an environmental
inspector at his/her expense to ensure compliance with the grading permit.
61. Haul roads within the City of South San Francisco shall be cleaned daily, or more often, as required
by the City Engineer, of all dirt and debris spilled or tracked onto City streets or private driveways.
62. The Applicant shall submit a winterization plan for all undeveloped areas within the site to control
silt and stormwater runoff from entering adjacent public or private property. This plan shall be
submitted to the City Engineer for review and approval prior to September 1 of each year. The
approved plan shall be implemented prior to November 1 of each year.
63. Prior to placing any foundation concrete, the Applicant shall hire a licensed land surveyor or civil
engineer authorized to practice land surveying to certify that the new foundation forms conform
with all setbacks from confirmed property lines as shown on the Plans. A letter certifying the
foundation forms shall be submitted to the Engineering Division for approval.
64. The applicant is required by ordinance to provide for public safety and the protection of public and
private property in the vicinity of the land to be graded from the impacts of the proposed grading
work.
65. All hauling and grading operations are restricted to between the hours of 8:00 a.m. to 6:00 p.m. for
residential areas and 7:00 a.m. to 6:00 p.m. for industrial/commercial areas, Monday through
Friday, excluding holidays.
122
Conditions of Approval
Page 16 of 24
66. Unless approved in writing by the City Engineer, no grading in excess of 200 cubic yards shall be
accomplished between November 1 and May 1 of each year.
Engineering Impact Fees
67. The Applicant shall pay the following Fees prior to receiving a Building Permit for the subject
project:
a. The Citywide Transportation Impact Fee per the formula established by Resolution 120-
2020.
For questions concerning Engineering COAs, please contact Anthony Schaffer at
[email protected].
FIRE DEPARTMENT CONDITIONS
1. Projects shall be designed in compliance with established regulations adopted by the City of South
San Francisco affecting or related to structures, processes, premises, and safeguards in effect at the
time of building permit application.
2. Fire service features for buildings, structures and premises shall comply with all City adopted
building standards in effect at the time of the building permit application.
3. Permit(s) shall be required as set forth in adopted California Building Code (CBC) Section 105
and California Fire Code (CFC) Sections 105.5 and 105.6. Submittal documents consisting of
construction documents, statement of special inspection, geotechnical report, referenced
documents, and other data shall be submitted electronically with each permit application. The
construction documents shall be prepared by a registered design professional. Where special
conditions exist, the fire code official is authorized to require additional construction documents
to be prepared by a registered design professional.
4. Construction documents shall be to scale (graphic scale required on all plan sheets), dimensioned
and drawn on suitable electronic media. Construction documents shall be of sufficient clarity to
indicate the location, nature and extent of the work proposed and show in detail that it will conform
to the provisions of adopted codes and relevant laws, ordinances, rules, and regulations, as
determined by the fire code official.
5. Shop/construction drawings for the fire protection system(s) and other hazardous operations
regulated by the fire department shall be submitted directly to the Fire Department to indicate
123
Conditions of Approval
Page 17 of 24
conformance with adopted codes and standards. The construction documents shall be approved
prior to the start of system installation.
6. The construction documents submitted with the application for permit shall be accompanied by a
site plan showing to scale the size and location of new construction and existing structures on the
site, distances from lot lines, the established street grades and the proposed finished grades and it
shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the
site plan shall show construction to be demolished and the location and size of existing structure
and construction that are to remain on the site or plot.
7. Where fire apparatus access roads or a water supply for fire protection are required to be installed,
such protection shall be installed and made serviceable prior to and during the time of construction.
a. Prior to submitting building permits a fire department access and water supply for
firefighting site plan shall be submitted for review and approval directly to the Fire
Department.
b. The plan shall indicate the location of fire protection equipment, including standpipes, fire
department connections and fire hydrants.
8. An approved water supply capable of supplying the required fire flow for fire protection shall be
provided to premises on which facilities, buildings or portions of buildings are hereafter
constructed or moved into or within the jurisdiction, in accordance with CFC Section 507,
Appendices B & C.
a. Fire hydrant systems shall comply with adopted CFC Section 507.5.1 through 507.5.8 and
Appendix C. A new public fire hydrant shall be required for this project and shall be
installed prior to bringing combustible construction material to the site.
9. Prior to issuance of building permits, in accordance with CFC Section 105.6 the fire code official
shall have the authority to require fire construction permit documents and calculations for all fire
protection and life safety systems and to require permits be issued for the installation, rehabilitation
or modification of any fire protection and life safety systems. Construction documents for fire
protection and life safety systems shall be submitted for review and approval prior to system
installation. Only the following fire construction permits are approved for deferred submittal: (1)
Automatic fire extinguishing systems, (2) Emergency responder communication coverage system
(ERCCS), and (3) Fire alarm and detection systems and related equipment.
10. The provisions of the adopted CFC shall specify where fire protection and life safety systems are
required and shall apply to the design, installation, inspection, operation, testing and maintenance
124
Conditions of Approval
Page 18 of 24
of all fire protection systems.
a. Approved automatic fire sprinkler systems in new buildings and structures, buildings
changing use or occupancy, or as otherwise determined by the fire code official shall be
provided in the locations described in adopted CFC Sections 903.2.
i. Fire Department Connection (FDC) for the sprinkler and/or standpipe systems shall
be located on the street side of the structure or facing approved fire apparatus access
roadway fully visible and recognizable from the street, and within 100 feet an
approved fire hydrant.
ii. An approved, specifically engineered automatic sprinkler system shall be provided
in buildings where EV charging, EV Ready or EV Capable vehicle parking are
proposed. The remainder areas in the building shall comply with design
requirements under NFPA 13 and in accordance with CFC.
11. The following is a list of submittal items that are required by the Fire Department prior to approval
of this planning application and shall be submitted directly to the Fire Department. Additional
items may be called out based on subsequent reviews:
a. Fire apparatus access site plan and fire protection water supply.
For questions concerning Fire Department COAs, please contact Ian Hardage at
[email protected] or (650) 829-6645.
PARKS DIVISION CONDITIONS
1. A permit to remove the existing Magnolia tree shall be required prior to its removal. Permit
applications can be found online under the Parks Division page.
2. The existing Magnolia shall be replaced with Quercus wislizeni at a 36” box size.
3. New trees within the right-of-way shall require irrigation from the residential property and ensure
watering to maturity. Tree death from lack of irrigation and subsequent tree replacement shall be
the responsibility of the property owner.
4. Irrigation that runs under the sidewalk to the proposed trees and within tree wells shall be
documented and submitted to the City to avoid future conflicts.
125
Conditions of Approval
Page 19 of 24
5. Tree planting details shall conform to Parks Division standards. Tree stakes shall be dependent on
tree size when it arrives on the project site.
For questions concerning Parks Division COAs, please contact Joshua Richardson at
[email protected].
POLICE DEPARTMENT CONDITIONS
1. All construction must conform to South San Francisco Municipal Code Chapter 15.48.050
Minimum security standards for multi-family dwellings. (Ord. 1166 § 1, 1995; Ord. 1477 §
IA, 2013)
a. § 15.48.050 Minimum security standards for multiple-family dwellings.
(a) Exterior doors shall comply with the following:
(1) Exterior doors (excluding individual unit-entry doors) and doors
leading from garage areas into multiple dwelling buildings, and
doors leading into stairwells below the sixth-floor level, shall have
self-locking (deadlatch) devices, allowing egress from the building
or into the garage area, or stairwell, but requiring a key to be used
to gain access to the interior of the building from the outside or
garage area or into the hall-ways from the stairwell.
(2) Exterior doors (excluding individual unit-entry doors) and doors
leading from the garage areas into multiple dwelling buildings and
doors leading into stairwells, shall be equipped with self-closing
devices, if not already required by other regulations, ordinances or
codes.
(b) Hinged entrance doors to individual motel, hotel and multiple-family
dwelling units, shall comply with the following:
(1) All wood doors shall be of solid core with a minimum thickness
of one and three- fourths inches.
(2) Hinged entrance doors to individual units shall have deadbolts
with one-inch minimum throw and hardened steel inserts in
addition to door dead latches with one-half inch minimum throw.
126
Conditions of Approval
Page 20 of 24
Strike plates shall be secured to wooden jambs with at least two
and one-half inch wood screws. (Refer to Section
15.48.060(a)(l)(H).)
(3) An interviewer or peephole shall be provided in each individual unit
entrance door and shall allow for one hundred eighty degree vision.
(4) Doors swinging out shall have nonremovable hinge pins or hinge
studs to prevent removal of the door.
(5) Door closers may be provided on each individual unit entrance
door, and are encouraged in hotel and motel projects.
(6) In-swinging exterior doors shall have rabbited jambs.
(7) Jambs for all entry doors shall be constructed or protected to prevent
violation of the function of the strike and shall meet the framing
requirements of Section 15.48.060(a)(l}(H).
(c) Sliding patio-type doors opening onto patios or balconies which are
accessible from the outside shall comply with the following (this includes
accessibility from adjacent balconies):
(1) The movable section of a single sliding patio door(s) shall be adjusted in
such a manner that the vertical play is taken up to prevent lifting with a pry
tool to defeat the locking mechanism.
(2) Deadlocks shall be provided on all sliding patio doors. Mounting screws
for lock case shall be inaccessible from the outside. Lock or hook bolts
shall be of hardened material or have hardened steel inserts and shall be
capable of withstanding a force of eight hundred pounds applied in a
horizontal direction. The lock or hook bolts shall engage the strike
sufficiently to prevent its being disengaged by any movement of the door
within the space or clearances provided for installation and operation.
The strike area shall be reinforced to maintain effectiveness of bolt
strength.
(3) In addition to the primary locking device, auxiliary or secondary
locking devices shall be provided on all accessible sliding glass
doors.
127
Conditions of Approval
Page 21 of 24
(4) Double sliding patio doors shall be locked at the meeting rail and meet
the locking requirements of subsection (c)(2) of this section.
(d) Windows.
(1) A window, skylight or other natural light source forming a part of the
enclosure of a dwelling unit shall be constructed, installed and secured
as set forth in subsection (d)(2) of this section, when such window,
skylight or light source is not more than twelve feet above the ground
of a street, roadway, yard, court, passageway, roadway, corridor,
balcony, patio, breezeway, a portion of the building which is available
for use by the public or other tenants, or similar area. A window
enclosing a private garage with an interior opening leading directly to a
dwelling unit shall also comply with subsection (d)(2) of this section.
(2) Window Protection.
i. Windows shall be so constructed that when a window is locked it
cannot be lifted from the frame and the sliding portion of a window
shall be on the inside track. The vertical play shall be taken up to
prevent lifting of the movable section to defeat the locking
mechanism.
ii. Window locking devices shall be capable of withstanding a force
of four hundred pounds applied in any direction.
iii. Louvered windows shall not be used.
iv. Accessible windows that open should be equipped with secondary
locking devices.
(e) Garages. Those multiple-family dwelling complexes providing individual
enclosed garage spaces shall meet the same requirements for garages as single-
family dwellings as required by Section 15.48.060(c). Floor to ceiling demising
walls shall separate individual garage areas having their own entrance.
(f) If community laundry rooms are provided, laundry room doors shall be
equipped with a window to allow visibility into the interior of the room. The
laundry room shall be kept locked and the lock shall be keyed so that unit
128
Conditions of Approval
Page 22 of 24
keys can open the lock. The light switch shall be controlled by a switch that
is not readily accessible.
(g) Keying Requirements. Upon occupancy by the owner or proprietor, each
single unit in a tract or commercial development, constructed under the same
general plan, shall have locks using combinations which are interchange free
from locks used in all other separate dwellings, proprietorships or similar
distinct occupancies.
(h) Numbering of Buildings. There shall be positioned at each entrance of a
multiple-family dwelling complex an illustrated diagrammatic representation
of the complex which shows the location of the viewer and the unit
designations within the complex. The illuminated diagrammatic
representation shall be protected by the use of vandal-resistant covers. In
addition, each individual unit within the complex shall display a prominent
identification number not less than two inches in height, which is easily visible
to approaching vehicular and pedestrian traffic. The numerals shall be of
contrasting color to the background to which they are attached.
(Ord. 1166 § 1, 1995; Ord. 1477 § IA, 2013)
2. The Police Department reserves the right to review and comment upon the submission
of revised and updated plans.
For questions concerning Police Department COAs, please contact Sean Curmi at
[email protected] or (650) 877-8927.
WATER QUALITY CONTROL DIVISION CONDITIONS
The following items must be included in the plans or are requirements of the Water Quality
Control Stormwater and/or Pretreatment Programs and must be completed prior to the
issuance of a building permit:
1. Storm drains must be protected during construction. Discharge of any
demolition/construction debris or water to the storm drain system is prohibited.
2. Do not use gravel bags for erosion control in the street or drive aisles. Drains in street
must have inlet and throat protection of a material that is not susceptible to breakage from
vehicular traffic.
129
Conditions of Approval
Page 23 of 24
3. No floatable bark shall be used in landscaping. Only fibrous mulch or pea gravel is
allowed.
4. As site falls in a Moderate Trash Generation area per South San Francisco’s Trash
Generation Map (http://www.flowstobay.org/content/municipal-trash-generation-
maps), determined by the Water Quality Control Division:
a. Regional Water Quality Control Board-approved full trash capture
devices must be installed to treat the stormwater drainage from the site.
b. At a minimum, a device must be installed before the onsite drainage enters
the City’s public stormwater system (i.e. trash capture must take place no
farther downstream than the last private stormwater drainage structure on
the site).
c. An Operation & Maintenance Agreement (template attached) will be
required to be recorded with San Mateo County, ensuring the device(s) will
be properly maintained.
d. A full trash capture system is any single device or series of devices that
traps all particles retained by a 5 mm mesh screen and has a design
treatment capacity of not less than the peak flow rate resulting from a one-
year, one-hour storm in the sub-drainage area or designed to carry at least
the same flow as the storm drain connected to the inlet.
5. Roof leaders/gutters must NOT be plumbed directly to storm drains; they shall discharge
to stormwater treatment devices or landscaping first.
6. Fire sprinkler test drainage must be plumbed to sanitary sewer and be clearly shown on
plans.
7. If located outside building, trash enclosure shall be covered (roof, canopy) and contained
(wall/fence). Floor shall slope to a central drain that discharges to the sanitary sewer system.
Details of trash enclosure shall be clearly provided on plans.
8. Install a condensate drain line connected to the sanitary sewer for rooftop equipment and
clearly show on plans.
9. Applicant will be required to pay a Sewer Capacity Fee (connection fee) based on SSF
City Council-approved EDU calculation (involving anticipated flow, BOD and TSS
calculations and including credits for previous site use). Based on the information
130
Conditions of Approval
Page 24 of 24
received, the estimated Sewer Capacity Fee will be $24,276.00, payable with the
Building Permit.
10. Elevator sump drainage (if applicable) shall be connected to an oil/water separator prior to
connection to the sanitary sewer.
11. Drains in parking garage (if applicable) must be plumbed through an oil/water separator and then
into the sanitary sewer system and clearly shown on plans.
12. Wherever feasible, install landscaping that minimizes irrigation runoff, promotes surface
infiltration, minimizes use of pesticides and fertilizers and incorporates appropriate
sustainable landscaping programs (such as Bay-Friendly Landscaping).
For questions concerning Water Quality Control Division COAs, contact Andrew Wemmer at
[email protected] or (650) 829-3840.
131
227 ARMOUR AVENUE
SOUTH SAN FRANCISCO, CA
APN# 012-143-070
(N)4-UNIT APARTMENT
PROJECT INFORMATION
VICINITY MAP
OWNER: ROSA & PEDRO DIAZ
ADDRESS:227 ARMOUR AVENUE
SOUTH SAN FRANCISCO, CA
APN# 012-143-070
LOT AREA:7,863 SQ.FT.
(E)UNIT A FIRST FLR.: 1,098.6 SQ.FT.
SECOND FLR.: 276 SQ.FT.
TOTAL: 1,374.6 SQ.FT.
(E)UNIT B FIRST FLR. : 623.4 +113.4 = 736.8 SQ.FT.
SECOND FLR.: 216 SQ.FT.
TOTAL : 952.8 SQ.FT.
(E)ADU 451.7 SQ.FT.
(N)4-UNIT BUILDING:
FIRST FLOOR:
(N)GARAGE 1,515 SQ.FT.
(N)ENTRY 213.2 SQ.FT.
SECOND FLOOR :
UNIT 1 840 SQ.SF.
UNIT 2 725 SQ.FT.
THIRD FLOOR:
UNIT 3 840 SQ.FT.
UNIT 4 725 SQ.FT.
COMMON SPACE PROPOSES: 455.65 SQ.FT
PRIVATE SPACE :
UNIT 1: 140.2 SQ.FT.
UNIT 2: 118.7 SQ.FT.
UNIT 3: 140.2 SQ.FT
UNIT 4: 118.7 SQ.FT.
MAX. FLOOR AREA ALLOWED N/A
LOT COVERAGE ALLOWED 90%(6,299 SQ.FT.)
(N)LOT COVERAGE 58% (4,059.6 SQ.FT.)
ZONING DRH
OCCUPANCY GROUP R-3/U
CONSTRUCTION TYPE V-B
(N)NUMBER OF STORIES 3
(N)FIRE SPRINKLERS YES
INDEX OF DRAWINGS
SCOPE OF WORK
the 2022 California Energy Code, 2022 Green Building Standards Code,
Code,2022 California Plumbing Code, 2022 California Electrical Code,
2022 Editions of the California Building Code,2022 California Mechanical
All work shall be in compliance with the City of South San Francisco Municipal and the
2022 California Residential Code , 2022 Fire Code
A-1. COVER SHEET, PROJECT DATA, INDEX
TOPOGRAPHIC SURVEY
L1. LANDSCAPE PLAN
L2. LANDSCAPE PLAN
C1. GRADING AND DRAINAGE PLAN
A-2 SITE PLAN
A-3. (N)FIRST FLOOR PLAN
A-4. (N) SECOND FLOOR PLAN
A-5. (N) THIRD FLOOR PLAN
A-6. (N) FOURTH FLOOR PLAN
A-7. ROOF PLAN
A-8. ELEVATIONS
A-9. ELEVATIONS
A-10 PHOTOS
A-11. PHOTOS
+THIS PROJECT PROPOSES 4 UNITS IN 3 STORES
(UNIT 1: 840 SQ.FT. + UNIT 2: 725 SQ.FT. + UNIT 3 :840
SQ.FT. + UNIT 4: 725 SQ.FT. + NEW GARAGE ON THE
FIRST FLOOR " 1,515 SQ.FT.
Sheet:
A-1
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
COVER SHEET & PROJECT DATA
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
3D Rendering
NTS
06-29-25 PERMIT
132
13
3
49
4
8
4
8
47
46
4
5
41
41
47
48
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
N 15°33'00" E 140.73'
S 15°33'00" W 121.37'
15.76'
26.27'
63.04'
N 56°34'14" W
GATE
WOOD PRIV
ACY FENCE
ON WOOD RE
TAIN
IN
G WALL
HB
HB
SAPL
IN
GBU
SH
UTIL
IT
Y
DROP L
INE
WOOD PORCH
WOOD
STE
PS
CONCRETE SIDEWALK
1'Ø MA
GNO
LIA T
R
EE
6"Ø METAL PIPE
WOOD
SHED
2-ST
ORY
HOUSE
TOP EL
:
61
.8±
2-STORY
HOUSE
TOP EL: 71.1±
UTIL
IT
Y
DROP LINE
49.6
48.5
48.9
48.7
48.3
48.2
48.3
48.5
45.8
46.5
47.3
47.4
47.4
42.6
42.7
42.3
42.2
41.4
41.6
41
.2
40
.8
40.9
40.6 40
.5
40.5
40
.8
40.9
41.2
41
.5
41.7
27.4
4
'
19.79'
26.56'
19.81'
WATER
METER
CLEANOUT
CLEA
NOUT
WATE
R
METE
R
5'-9"
5'-7"
21'-6"
9'-10"
9'-9"
6'-0"
PROPOSED 4-UNIT APARTMENT
5'
(N)DRIVEWAY
3'-2"
6'-2"
8'-3"
ARMOUR AVE
4:12
EXISTING SPOT
PROPOSED SPOT
3068
Up
garage
entry
utility
HV
AC.
HVAC.
HV
AC.
HV
AC.
WH
WH
WH
WH INTO CONCRETE
FILLED WITH
CONCRETE
2' EMBEDMENT3'-0" HIGH AND
4" Ø STEEL TUBE
2nd. FLOOR ABOVE
PROJECTION OF
2668
entry patio
WH
BW 42.8
+
+
47.32%SLOPE
BW 42.8
+
+TW 42.8
TW 44.3+
20'-0"
FFE 45.8
6'-0"
+47.3
ENTRY PA
TIO
135 SF
BENCH
BENCH
8'-9"10'-0"
6'-0"
5'-0"
+OR -42.3+
HANDRAIL / GUARDRAIL
2'-0"
3'-0"
3'-9 1/2"
INTEGRAL COLOR CONCRETE
SLIGHTLY DARKER THAN STUCCO W/ A WASH FINISH
RETAINING WALL W/ STUCCO
FINISH TO MATCH BUILDING; TYP.; SEE C-1 2'-9"
2'-0"
TW 44.3+
12'-3"
3'-0"
REMOVE EXISTING CHAINLINK FENCE AND WOOD RETAINING WALL
15'-0"
FRONT YARD
REMOVE EXISTING 1' DIAMETER MAGNOLIA AND REPLACE IT WITH TWO NEW OAKS,
SEE PLANTING PLAN ON L2
1'-6"
5'-9"
1'-6"
3'-8"
2'-10"
SEE GRADING & DRAINAGE PLAN C-1 FOR RETAINING WALLS; TYP.
RETAINING WALL W/ STUCCO FINISH TO MATCH BUILDING; TYP.
COMMON AREA
PATIO
4'-3"
DECORATIVE GRAVEL
PATIO W/ FURNITURE
STEEL
EDGING
CONC WALK
STEEL
EDGING
3'-0"
HANDRAIL/GUARDRAIL
FFE
48.1
3'-6"
7'-5"
3'-0"
6'-0"
5'-0"
2'-0"
6"
6"
3'-6"
TW46.5
+
+TW
47.5
LAYOUT PLAN
Scale: 1/4" = 1'-0"1
Date: APR 24, 2024
115 ROYAL COACHMAN LNKALAMA, WA 98625 TEL. 650.515.0655 WA LIC. #1611CA LIC. #4161ID LIC. # LA-16912
W. E. S.
LANDSCAPE
ARCHITECTURE
Drawn by: WES
L1
Scale: PER DRAWING
Drawing
North:
W E
S
4 UNIT APARTMENT
227 ARMOUR AVE
S. SAN FRANCISCO, CA
LAYOUT NOTES
1. ALL DIMENSIONS ARE TO FINISHED FACE OF WALL OR SURFACE UNLESS OTHERWISE SPECIFIED.
2. DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS ARE POSSIBLE. FIELD VERIFY ALL DIMENSIONS PRIOR TO LAYOUT. REPORT SIGNIFICANT DISCREPANCIES TO LANDSCAPE ARCHIECT IMMEDIATELY.
3. FOR IRRIGATION AND LIGHTING PURPOSES, PROVIDE SLEEVES TO ALL PLANTING AREAS. SLEEVING TO BE 3" to 6” DIA. SCHED. 40 PVC AND TO EXTEND FROM/TO ALL PLANTING AREAS, UNDER PATIOS, WALKS, AND
DRIVEWAY AS REQ'D, AND THROUGH WALLS AS NECESSARY. REVIEW EXTENT OF SLEEVING WITH LANDSCAPE ARCHIECT PRIOR TO POURING CONCRETE AND LAYING BASE COURSES.
GENERAL NOTES
UTILITIES: PRIOR TO COMMECING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING ANY UTILITY COMPANIES INVOLVED. THE UTILITY COMPANIES ARE MEMBERS OF THE UNDERGROUND SERVICE ALERT
(U.S.A.) ON-CALL PROGRAM. THE CONTRACTOR SHALL NOTIFY U.S.A. 48 HOURS IN ADVANCE OF PERFORMING
EXCAVATION WORK BY CALLING (800) 642-2444. EXCAVATION IS DEFINED AS BEING EIGHTEEN INCHES OR MORE IN DEPTH BELOW EXISTING SURFACE.
DESIGN INTENT: THESE DRAWINGS REPRESENT THE DESIGN INTENT TO BE IMPLEMENTED ON THE SITE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING THE LANDSCAPE ARCHIECT FOR ANY ADDITIONAL CLARIFICATION
OR DETAILS NECESSARY TO ACCOMMODATE SITE CONDITIONS OR ARCHITECTURAL DETAILS AND FOR CLARIFICATION
OF INTENT.CONTRACTORS JOB SITE CONDITIONS: CONTRACTOR IS RESPONSIBLE FOR SITE CONDITIONS DURING THE
CONSTRUCTION OF THIS PROJECT, INCLUDING THE SAFETY OF ALL PEOPLE AND PROPERTY.
42.25+
45.8
44.3
42.8
47.3+
3'-0"
SIDEWALKPL
6'-0"
8'-9"
FFE 45.8
WALL/STEP LIGHT; TYP.
PATIO WIDTH
FA
C
E
O
F
B
U
I
L
D
I
N
G
SECTION-ELEVATION AT ENTRY STEPS
Scale: 1/4" = 1'-0"3
3
A1
3A1
LEGEND
DECORATIVE GRAVEL, TYP.
473 SF NON-PAVED AREA
473 SF PAVED AREA
LANDSCAPE AREA; TYP.
PAVING IN STREET-FACING YARD
946 SF TOTAL FRONT YARD AREA
PROPOSED USABLE OPEN SPACE - THERE IS 574SF OF PRIVATE DECK USABLE OPEN SPACE AND THE COMMON AREA PATIO PROVIDES THE
BALANCE PLUS EXTRA OF THE 600SF REQUIRED.
46
45
41
41
47
48
E
E
E
E
E
E
E
E
E
26.27'
15.76'
63.04'
N 56°34'14" W
WOOD PR
IVAC
Y FEN
CE
ON WO
OD RET
AINING WAL
L
CONCRETE SIDEWALK
CONCRETE SIDEWALK
1'Ø MAG
NOLIA TREE
OVE
RHEA
D
UTILITY
LINES
6"Ø MET
AL PIPE
2-ST
ORY
HOUSE
TOP EL
: 61.8±
48.5
48.3
48.5
45.8
46.5
47.3
47.4
47.4
42.642.7
42.3
42.2
41.4
41.6
41.2
40.8
40.9
40.8
40.941.2
41.4
41.5
41.7
WATER
METER
CLEANOUT
PROPOSED 4-UNIT APARTMENT
5'
(N)DRIVEWAY
3'-2"
ARMOU
R AVE
4:12
3068
Up
garage
entry
utility
HVAC.
HVAC.
HVAC.
HVAC.
WH WH
WH
WH INTO CONCRETE
FILLED WITH
CONCRETE
2' EMBEDMENT3'-0" HIGH AND4" Ø STEEL TUBE
2668
entry patio
6'-0"
ENTRY PATIO
BENCH
6'-0"
HANDRAIL
DECORATIVE GRAVEL PATIO W/ FURNITURE
INTEGRAL COLOR CONCRETE SLIGHTLY DARKER THAN STUCCO W/ A WASH FINISH
3'-4 3/4"
3'-8 1/8"
2'-10"
6"
8'-9"
STEEL
EDGING; TYP.
12'-3"
15'-0"
STREET-FACING PAVING
Scale: 3/32" = 1'-0"2
LANDSCAPE
LAYOUT PLAN
Rev.Issue Date
Seal:
11-12-24
Adressing comments
from Economic & Com. Development
6/28/2024
7
3-4-25
Adressing comments
from Planning 1/21/25, Engineering 1/22/25, and Parks
2
2
2
3 Adressing comments
from Design Review 6/6/25 7-17-25
3
134
Adressing comments
from Planning 1/21/25, Engineering 1/22/25, and Parks
11-12-24
Adressing comments
from Economic & Com. Development
6/28/2024
(E)8:12
(E)8:12
(E)8:12
(E)8:12
(E)4:12
(E)4:12
(N)8:12
CRICKET
49
48
48
49
4
8
48
47
46
4
5
41
41
42
47
48
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
N 1
5
°3
3'0
0" E 14
0.7
3'
S 15
°3
3
'00" W 121
.37
'
N 1
5°3
3'00" E 1
48.7
9'
N 15
°3
3
'00" E 11
6.53'
N 15°3
3'00" E 108.47'
N 74°27'00" W
60.00'
15.00'
25.00'
25.00'
52.54'
26.27'
15.76'
26.27'
63.04'
N 56°34'14" W
LANDS OF
DIAZ 2020 TRUST
LOT 37, 38 & PORTION 39
APN: 012-143-070
7863± SQ. FT.
227 ARMOUR AVENUE
LANDS OF BERRILL
LOT 36
APN: 012-143-060
231 ARMOUR AVENUE
LANDS OF LI
PORTION LOT 39
APN: 012-143-080
225 ARMOUR AVENUE
26.27'
0.08'±
0.08'±
BASIS OF BEARINGS
FOUN
D IRON PIPE
(OPEN
)
NO RE
C
ORD
GA
TE
GA
TE
GATE
GAT
E
WOOD PRIVACY FENCE
ON
WO
OD RETAINING WALL
CONCRETE SIDEWALK
S.N.F.
(NEW CONCRETE
)
11.75'
4.85'
WOOD UTILITY POLE
FOUND BOLT & TAG
LS #7735
(NO RECORD)
19
'-0
"
CHAIN
L
IN
K F
E
NCE
WO
OD G
ATE
WOOD P
RIV
AC
Y F
EN
CE
CHAIN
L
IN
K F
EN
CE
SAT
EL
LIT
E
DIS
H ON
WO
OD P
OLE
CONCRETE
ST
EPS
BUSH
BU
SH
UTIL
IT
Y
DROP LIN
E
OVE
R
HEAD
UTIL
IT
Y LIN
ES
9'-0"
0.6
'±
HB
UTIL
IT
Y
DROP LIN
E
CON
CRETE
ST
EP
S
UT
ILITY
MET
E
R
ROOF OV
ER
HA
N
G
HB
HB
SAP
LIN
GBU
SH
UTILIT
Y
DROP
LINE
WOOD PORCH
WOO
D
STE
P
S
CONCRETE SIDEWALK
1'Ø MAGNOLIA TREE
OVERHEAD
UTIL
I
T
Y L
I
NES
CON
CRETE
CURB & GUTT
ER
6"Ø METAL
PIPE
WO
OD
SH
E
D
WO
OD
SH
ED
2-STORY
HOU
S
E
TOP
EL: 61
.8±
2-STORY
HOU
S
E
TO
P EL: 71.1±
TOP
EL: 69.9
±
TOP
E
L:
7
1.0±
UTIL
ITY
DROP LIN
E
47.1
47
.3
49.1
48.5
48.4
48.1
47
.7
47.2
47
.6
48.0 48.0
47.6
48
.1
47
.9
49.0
49.5
49.2
49.6
49
.6
48.5
48.9
48.7
48.3
48.2
48.1
48.3
48.5
45.8
46.5
47.3
47.4
47
.
4
42
.
2
42.642.7
42.3
42.2
41.4
41.6
41.2
40
.8
40.9
40
.
6 40.5
40.5
40
.8
40.9
41
.2
41
.
4
41
.5
41.8 41
.
7
41
.7
41
.9
41
.
9
27.4
4
'
19.79'
26.5
6'
19.81'
WATER
METER
CLEANOUT
CLEANOU
T
WATER
METE
R
8'-9"'%%P
DOOR
FF:5
1.70
DO
O
R
FF:51
.70
DOO
R
FF:5
1.8
9
DOO
R
FF
:51
.84
48.7
48.9
48
.9
48.6
48.8
48
.4
5'-9"
13'-7"
8'-9"
5'-7"
GASEGEGEGEG
EGEG
EGEG
EGEG
EGEG
(E)GAS METER
GASEGEG
EGEG
EGEG
EGEG
EGEG
EGEG
(N)GAS METER
PANEL
(N)200 AMP SERVICE
9'-9"
(N)8:12
PROPOSED 4-UNIT APARTMENT
5'
(N)DRIVEWAY
3'-2"
6'-2"
8'-3"
ARMOUR AVE
9TH LANE
CONCRET
E
DRIVE
W
AY
CONCR
ET
E
DRIVE
WA
Y
4:12
EXISTING SPOT
PROPOSED SPOT
3068
Up
garage
entry
utility
HVAC.
HVAC.
HVAC.
HVAC.
WH
WH
WH
WH INTO CONCRETE
FILLED WITH
CONCRETE
2' EMBEDMENT3'-0" HIGH AND
4" Ø STEEL TUBE
2nd. FLOOR ABOVE
PROJECTION OF
2668
entry patio
WH
921 SF
92
SF
234
SF
37
SF
28
SF
33SF70SF
94SF
220SF
11
SF
272
SF
7'-5"
3'-0"
3'-6"
6'-0"
ENTRY PATIO
BENCH
6'-0"
HANDRAIL
DECORATIVE
GRAVEL PATIO W/ FURNITURE
INTEGRAL COLOR CONCRETE SLIGHTLY DARKER THAN
STUCCO W/ A WASH FINISH
RETAINING WALL W/ STUCCO FINISH TO MATCH
BUILDING, TYP.; SEE C-1
3'-4 3/4"
3'-8 1/8"
2'-10"
6"
8'-9"
STEEL
EDGING; TYP.
HANDRAIL
FFE
48.2
12'-3"
AEO ZWA5
SAR RUS4
AEO ZWA1
CAM APP1
AEO ZWA 7
ACA COU 18
ERI KAR 13
EXISTING TREE TO BE REMOVED AND REPLACED
WITH TWO OAKS
55
ACA COU8
LAG PAT2
LAG PAT 2
LAG NAT1
CAM APP1
ILE SKY8
ERI KAR30
PLANTING PLAN
Scale: 1/8" = 1'-0"1
Date: APR 24, 2024
115 ROYAL COACHMAN LNKALAMA, WA 98625 TEL. 650.515.0655 WA LIC. #1611CA LIC. #4161ID LIC. # LA-16912
W. E. S.
LANDSCAPE
ARCHITECTURE
Drawn by: WES
L2
PLANTING
PLAN
Rev.Issue Date
Scale: PER DRAWING
Drawing
North:
W E
S
4 UNIT APARTMENT
227 ARMOUR AVE
S. SAN FRANCISCO, CA
Seal:
7
IRRIGATION NOTES
1. AUTOMATIC IRRIGATION SYSTEM CONTROLLERS SHALL COMPLY WITH THE FOLLOWING: A. Controllers shall be weather- or soil moisture-based controllers that automatically adjust irrigation in response to changes in plant watering needs as weather or soil conditions change.
B .Weather-based controllers without integral rain sensors or communication systems that account for rainfall shall have a separate wired or wireless rain sensor which connects or communicates with the
controller(s).2. SYSTEM CRITERIA: SYSTEM TO BE WATER EFFICIENT WITH A DRIP SYSTEM. REVIEW PROPOSED SYSTEM WITH LANDSCAPE ARCHITECT. VALVES MUST BE LOCATED OUT OF
DIRECT SIGHT. REVIEW LOCATIONS WITH LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. ALL PIPES UNDER PAVING SHALL BE BEDDED IN 6” OF CLEAN SAND AROUND PIPE. ALL
PLANTING BED MAINLINES SHALL HAVE 18” OF COVER AND LATERAL LINES SHALL HAVE 12” OF COVER. SYSTEM SHALL PROVIDE COMPLETE AND EFFECTIVE WATER COVERAGE TO ALL PLANTS.
3. POINT OF CONNECTION: LOCATION TO BE DETERMINED. PROVIDE GATE VALVE AT P.O.C. PROVIDE OWNER WITH EQUIPMENT OPERATING MANUAL AT TIME OF INSTALLATION.
4. SLEEVING: PROVIDE SLEEVES AS REQUIRED WHERE CONTROL WIRES OR PIPING PASSES UNDER WALKS, PAVING, WALL, ETC. SIZE OF SLEEVING TO BE ADEQUATE ENOUGH TO ACCOMMODATE RETRIEVAL FOR REPAIR OF WIRING OR PIPING AND SHALL EXTEND 12”
BEYOND EDGES. SLEEVING TO BE MIN. 3” DIA. SCHED. 40 PVC OR HEAVY WALL GALV. PIPE. 5. EQUIPMENT: TO BE REVIEWED AND APPROVED BY LANDSCAPE ARCHITECT. GUARANTEE:
SYSTEM TO BE GUARANTEED FOR A MINIMUM OF ONE YEAR FROM DATE OF INSPECTION/APPROVAL AGAINST DEFECTS OR DAMAGE BY CONTRACTOR. CONTRACTOR NOT RESPONSIBLE FOR DAMAGE TO SYSTEM BY OTHERS, OR IMPROPER USE.
7. AS-BUILT DRAWINGS: CONTRACTOR SHALL PROVIDE LANDSCAPE ARCHITECT AND CLIENT WITH IRRIGATION SYSTEM AS-BUILT DRAWINGS AND PERFORM SITE WALK THROUGH WITH
CLIENT TO REVIEW SYSTEM PRIOR TO FINAL ACCEPTANCE.8. NEW TREES IN ROW WILL REQUIRE IRRIGATION FROM PROPERTY AND ENSURE WATERING TO MATURITY. TREE DEATH FROM LACK OF IRRIGATION AND SUBSEQUENT REPLACEMENT
WILL BE THE RESPONSIBILITY OF PROPERTY OWNER.
PLANTING NOTES
1. PLANT PLACEMENT: THE PLAN IS SCHEMATIC. DO NOT INSTALL PLANTS TOO CLOSE TO EDGES OF PAVING OR UTILITIES. KEEP VALVES AWAY FROM TREES.
2. PLANTING: FINAL GRADING SHALL BE COMPLETE AND BEDS SHALL BE RAKED SMOOTH PRIOR TO SPOTTING AND PLANTING OF PLANTS. ALL PLANTS SHALL BE
PLANTED IN ACCORDANCE WITH THE HIGHEST STANDARDS SET FORTH BY THE
LANDSCAPE INDUSTRY. SEE DETAILS ON SHEET.3. TREE STAKES AND VINE TIES: STAKE ALL TREES AND TIE ALL VINES PER DIRECTION
OF LANDSCAPE ARCHITECT. 4. GROUNDCOVERS: GROUNDCOVER SHALL BE PROVIDED UP TO THE WATERING BASIN
OF ALL TREES AND SHRUBS.
5. MULCH: MULCH SHALL BE ARBOR MULCH, 3” DEEP THROUGHOUT ALL PLANTING BEDS. A 3” DIAMETER BARK FREE AREA IS TO BE MAINTAINED AROUND THE BASE EACH
PLANT. 6. MAINTENANCE PERIOD: CONTRACTOR SHALL MAINTAIN ALL PLANTS IN ACCEPTABLE
CONDITION FROM THE TIME OF ACCEPTANCE OF DELIVERY UNTIL FINAL APPROVAL BY
LANDSCAPE ARCHITECT AND/OR OWNER.7. FINAL APPROVAL: CONTRACTOR SHALL REQUEST FINAL APPROVAL FROM
LANDSCAPE ARCHITECT/OR OWNER UPON COMPLETION OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT A MINIMUM OF TWO WORKING
DAYS PRIOR TO FINAL APPROVAL WALKTHROUGH.
Mulch (3" deep) pulled 2" away from stem
4" high berm for water basin at edge of root ball, if
required
Backfill - 85% imported or native soil and 15%
compost or amendmenmt
Slow release agriform plant tablets;if recommended
1 gal plant - 2 tablets per plant
5 gal plant - 3 tablets per plant15 gal plant - 6 tablets per plant
For plant pit, dig out soil and fill 2 times depth of
root ball and at least 3 times diameter of root
ball.
2
x
t
h
e
w
i
d
t
h
o
f
c
o
n
t
a
i
n
e
r
3 x the width of container
rootball
in can
Mulch (3" deep) pulled 2" away from stem
4" high berm for water basin at edge of root ball, if
required
Backfill - 85% imported or native soil and 15%
compost or amendmenmt
Slow release agriform plant tablets;if recommended
1 gal plant - 2 tablets per plant
5 gal plant - 3 tablets per plant15 gal plant - 6 tablets per plant
For plant pit, dig out soil and fill 2 times depth of
root ball and at least 3 times diameter of root
ball.
2
x
t
h
e
w
i
d
t
h
o
f
c
o
n
t
a
i
n
e
r
3 x the width of container
rootball
in can
SHRUB PLANTING DETAIL
Scale: 1/4" = 1'-0"2
PLANT LIST
ID Qty Botanical Name Common Name Size Remarks
ACA COU 26 Acacia Cognata 'Cousin Itt'Cousin Itt Acacia 5 GAL 2-3'x4-6'; evergreen w/ long narrow leaves
AEO ZWA 14 Aeonium arboreum 'Zwarktop'Black Rose Aeonium 5 GAL 3'x3'; succulent w/ black leaves, yellow summer flowers
CAM APP 1 Camellia sasanqua 'Apple Blossom'Apple Blossom Camellia 24 BX 8'x8' slowly; evergreen
ERI KAR 43 Erigeron karvinskianus Santa Barbara Daisy 1 GAL 1.5'x4'; evergreen w/ yr round pink & white daisies w/ yellow centers
ILE SKY 8 Ilex crenata 'Sky Pencil'Sky Pencil Japanese Holly 15 GAL 7'x2.5'; evergreen
LAG NAT 1 Lagerstroemia indica x faunei 'Natchez'Natchez Crepe Myrtle 36" BOX 25'x15'; standard form; lowest branch 5' high; white flowers
LAG PAT 2 Lagunaria patersonii Primrose Tree 36" BX 25'x20'; olive colored evergreen leaves; pink flowers sum-fall
SAR RUS 6 Sarcococca ruscifolia Fragrant Sweet Box 15 GAL 4'x4' slowly; evergreen
PLANTING GUIDELINES
1. If possible, water the area to be planted to make sure moisture is in the soil before planting. Don’t water the day of, or the day before planting.
2. Water all planting material before planting. Preferably the day before planting.
3. Dig hole 3 times as wide as the root ball of the plant, but not deeper for trees. Plant should fit in the hole with the top of the root ball to 1/4" to 1” higher than the top of the soil.
4. After removing the plant from its container, gently pull the roots apart to encourage the roots to grow outward.
5. Apply ½” of compost to the hole and mix some with the native soil going back into the hole. Mix no more than 1/3 of compost to the native soil. Apply a ¼” of compost on top of root ball after planting.
6. Bury the root ball by pushing soil into the planting hole. Push down the soil firmly with your hands to fill voids in the planting hole.
7. If installing a drip system, make sure there is an emitter on top of the root ball of the plant, or place emitter on the
high side of a plant, an inch above the root ball.
8. Apply 3” of mulch to all planting areas, covering any drip system pipe. Keep mulch a few inches from the base of
the plant.
9. Water plants generously after planting.
PLANTING GUIDELINES
1. If possible, water the area to be planted to make sure moisture is in the soil before planting. Don’t water the day of, or the day before planting.
2. Water all planting material before planting. Preferably the day before planting.
3. Dig hole 3 times as wide as the root ball of the plant, but not deeper for trees. Plant should fit in the hole with the top of the root ball to 1/4" to 1” higher than the top of the soil.
4. After removing the plant from its container, gently pull the roots apart to encourage the roots to grow outward.
5. Apply ½” of compost to the hole and mix some with the native soil going back into the hole. Mix no more than 1/3 of compost to the native soil. Apply a ¼” of compost on top of root ball after planting.
6. Bury the root ball by pushing soil into the planting hole. Push down the soil firmly with your hands to fill voids in the planting hole.
7. If installing a drip system, make sure there is an emitter on top of the root ball of the plant, or place emitter on the
high side of a plant, an inch above the root ball.
8. Apply 3” of mulch to all planting areas, covering any drip system pipe. Keep mulch a few inches from the base of
the plant.
9. Water plants generously after planting.
LANDSCAPE AREA, TYP. 2,012 SQ. FT. = 25.6% OF LOT
LOT LANDSCAPE
COVERAGE
TOTAL LOT AREA IS 7,863 SF. FT.
3-4-252
2
CITY TREE STAKING DETAIL
Scale: 3/8" = 1'-0"3
2
2
3 Adressing comments
from Design Review 6/6/25 7-17-25
3
3
3
3
3
3
135
Adressing comments
from Planning 1/21/25, Engineering 1/22/25, and Parks
2
Date: MAR 4, 2025
115 ROYAL COACHMAN LNKALAMA, WA 98625 TEL. 650.515.0655 WA LIC. #1611CA LIC. #4161ID LIC. # LA-16912
W. E. S.
LANDSCAPE
ARCHITECTURE
Drawn by: WES
L3
UTILITY
PLAN
Rev.Issue Date
Scale: PER DRAWING
Drawing
North:
W E
S
4 UNIT APARTMENT
227 ARMOUR AVE
S. SAN FRANCISCO, CA
Seal:
7
48
48
49
4
8
4
8
47
46
4
5
41
41
42
47
48
N 1
5°
33'00"
E 1
4
0.7
3'
S 15°3
3'00" W 12
1.37'
N 15°3
3'00" E 1
48
.79
'
N 15°3
3'00" E 116
.53
'
N 74°27'00" W
60.00'
15.00'
25.00'
52.54'
26.27'
15.76'
63.04'
N 56°34'14" W
LANDS OF
DIAZ 2020 TRUST
LOT 37, 38 & PORTION 39
APN: 012-143-070
7863± SQ. FT.
227 ARMOUR AVENUE
LANDS OF BERRILL
LOT 36
APN: 012-143-060
231 ARMOUR AVENUE
LANDS OF LI
PORTION LOT 39
APN: 012-143-080
225 ARMOUR AVENUE
26.27'
0.08'±
0.08'±
FOUN
D IRON PIPE
(OPE
N)
NO RE
C
ORD
GA
TE
GATE
GATE
GAT
E
GA
TE
FENCE TR
ANSITION
CHAIN LINK/WOOD
WO
OD PRIVA
CY FENCE
ON WOO
D RETAINING W
ALL
CHAIN LINK FE
NCE
W/ WO
OD SLATS ON
WO
OD RETAINING WALL
CONCRETE SIDEWALK
S.N.F.
(NEW C
ON
C
RETE)
11.75'
4.85'
FOUND BOLT & TAGLS #7735
(NO RECORD)
19'-0"'%%P
CHAIN
L
INK FE
NCE
WOOD G
AT
E
WOOD P
RIV
ACY F
ENCE
CHAIN
L
IN
K F
ENCE
SAT
ELL
ITE
DIS
H
O
N
WOOD
P
OLE
CONCRETE
ST
EP
S
BUSH
BU
SH
UTIL
IT
Y
DROP LIN
E
OVER
HEAD
UTIL
IT
Y LIN
ES
9'-0"'%%P
0.6
'±
HB
UTIL
IT
Y
DROP LIN
E
CONCRETE
ST
EP
S
UTILITY MET
E
R
ROO
F OVE
R
H
AN
G
HB
HB
WO
OD
STEP
S
CON
CRET
E
AC
CESS
HAT
CH
SA
P
LING
SAPLING
BU
SH
BUSH
BUSH
BUSH
PL
AY
]
STR
UCTU
RE
UTIL
IT
Y
DROP LINE
CLOTHESLINE
CLOTHESLINE
POLE
WOOD PORCH
(25.3'±)
WO
OD
ST
EP
S
CON
CRET
E PAT
H
BRICK B
ORDER
CONCRETE
STEPS
CHAIN LINK FENCE
W/ WO
OD
SLA
TS ON
WOOD R
E
T
AINING WALL
CONCRETE SIDEWALK
1'Ø MAGNOLIA TREE
OVERHEAD
UTILITY LINES
CONCRETE
CURB &
GUTT
ER
6"Ø M
ET
A
L PIPE
8"Ø
TR
EE
6"Ø T
REE
6"Ø
L
EMO
N
TREE
1.2'Ø
FIG TREE
CON
C
RE
TE
WOOD
SH
E
D
WO
OD
SHED
2-ST
OR
Y
HO
U
SE
TOP
EL
:
61.8±
2-ST
O
RY
HOUSE
TOP EL:
71
.1±
SINGLE STORY
BUILD
ING
TOP
EL: 62.0±
SIN
GL
E
S
T
OR
Y
BU
ILDING
TOP
EL
: 69
.9±
SIN
GLE S
TO
RY
BUIL
D
IN
G
TO
P E
L
: 71.0±
SIN
GL
E ST
OR
Y
BUILDING
TOP EL: 65.9±
UTILIT
Y
DROP
LINE
TBM (CP-12
)
CUT 'X'
EL: 41.70
47
.1
47
.3
49
.1
48.5
48
.4
48.1
47.7
47.2
47
.6
48.0 48.0
47.6
48.1
47.9
49.0
49.5
49
.2
49.6
49
.6
48.6
48.5
48.9
48.7
48.3
48.2
48.1
48.5
48.6
48.1
48
.2
47.9
48.2
48.3
48
.5
45.8
45
.
7
46
.5
47.3
47
.4
47.4
42
.2
42
.
6
42
.
7
42.3
42.2
41
.4
41.6
41.2
40.8
40.9
41
.2
41.4
41.5
41
.8 41.7
41.7
41
.9
41.9
27.4
4
'
19.79'
26.56'
19.81'
46.49'
(2
6.5'±
)
(21.5
'
±)
(21.5'±
)
(2
6.5'±)
CONCRETE
4'-11 1/2"'%%P
WA
TER
ME
T
ER
CLE
ANOU
T
8'-9"'%%P
DOO
R
FF:5
1.7
0
DOOR
FF:5
1.7
0
DOOR
FF:5
1
.8
9
DOO
R
FF
:51
.84
DOO
R
FF: 48.2±
48
.7
48
.9
48.6
48.8
48
.4
ARMOUR AVE
RIGHT-OF-WAY
9TH LANE
RIGHT-OF-WAY
CO
N
CR
ET
E
DRIVE
WAY
CONCRET
E
DRIVE
WA
Y
EX. GAS METER
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
HB
WOOD UTILITY POLE
UTILITY
DROP LINE
OVERHEAD
UTILITY LINES
HB
UTILITY
DROP LINE
EX
ELECTRICAL METER
HB
HB
OVERHEAD
UTILITY LINES
UTILITYDROP LINE
CLEANOUT
WATER
METER
UTILITYDROP LINE
G
EX. GAS METER
EXISTING UTILITY PLAN
Scale: 1/8" = 1'-0"1
48
48
49
4
8
4
8
47
46
4
5
41
41
42
47
48
N 15°3
3'00" E 140.73'
S 15°3
3'00" W 121.37'
N 15°3
3'00" E 148.79'
N 15°33'00" E 116.53'
N 74°27'00" W
60.00'
15.00'
25.00'
52.54'
26.27'
15.76'
63.04'
N 56°34'14" W
LANDS OF
DIAZ 2020 TRUST
LOT 3
7, 38 & PORTION 39
APN: 012-143-0
70
7863± SQ. FT.
227 ARMOUR AVENUE
LANDS OF BERRILL
LOT 36
APN: 012-1
43-060
231 ARMOUR AVENUE
LANDS OF LI
PORTION LOT 39
APN: 012-143-080
225 ARMOUR AVENUE
26.27'
0.08'±
0.08'±
FO
U
ND IRON PIPE
(OPE
N
)
NO REC
ORD
GA
TE
GATE
GATE
GA
TE
GA
TE
FE
N
CE TR
ANSITIO
N
CHAIN LIN
K/WOOD
WOO
D PRIVACY FE
NCE
ON WOO
D RETAIN
ING WALL
CHAIN LINK FE
N
CE
W/ WOOD S
LA
TS
ON
WOOD RETAINING WALL
CONCRETE SIDEWALK
S.N.F
.
(NEW CON
CRETE)
11.75'
4.85'
FOUND BOLT & TAGLS #7735
(NO RECORD)
19'-0"'%%P
CHAIN LINK FE
N
CE
WOOD
GATE
WOOD PR
IVAC
Y FE
NCE
CHAIN LINK FE
N
CE
SATE
L
L
ITE
DISH
ON
WOOD
PO
LE
CONCRET
E
ST
EP
S
BU
SH
BUSH
UTILITY
DROP LINE
OVE
R
HEA
D
UTILITY
LINES
9'-0"'%%P
0.6'±
HB
UTILITY
DROP LINE
CONCRET
E
ST
E
P
S
UTILITY MET
E
R
ROO
F OVE
RHAN
G
HB
HB
WOOD
STE
P
S
CON
CRET
E
AC
CESS
HATCH
SAPL
I
NG
SAPLING
BU
SH
BUSH
BUSH
BUSH
PLA
Y]
STRUCTURE
UTILITY
DROP LINE
CLO
TH
ESLINE
CLO
TH
ESLINE
POLE
WOOD PORCH
(25.3'±)
WOOD
ST
EP
S
CON
CRET
E
PATH
BRICK BORDER
CONCRETE
STE
P
S
CHAIN LIN
K FE
N
CE
W/ WOOD
SLATS ON
WOOD RETAINING W
ALL
CONCRETE SIDEWALK
1'Ø MAGNOLIA
TR
EE
OVERHEAD
UTILITY
LINES
CONCRETE
CURB & GUTT
E
R
6"Ø MET
AL PIPE
8"Ø TR
EE
6"Ø T
R
EE
6"Ø LE
M
ON
TR
EE
1.2'Ø
FIG TREE
CONCRETE
WOOD
SH
ED
WOOD
SHED
2-ST
ORY
HOUSE
TOP EL
: 61.8±
2-STORY
HOUSE
TOP EL: 71
.1±
SINGLE STORY
BUILD
ING
TOP
EL: 62
.0±
SINGL
E
ST
OR
Y
BU
ILDING
TOP
EL
:
69.9±
SINGLE
ST
ORY
BU
ILD
ING
TOP EL
:
71.0±
SINGL
E ST
OR
Y
BUILDING
TOP EL
: 65.9±
UTILITY
DROP
LINE
TBM (CP-12)
CUT 'X'
EL: 41.70
47
.1
47
.3
49
.1
48
.5
48
.4
48.1
47
.7
47
.2
47
.6
48
.0 48.0
47
.6
48.1
47.9
49.0
49.5
49.2
49.6
49.6
48.6
48.5
48.9
48
.7
48.3
48
.2
48.1
48.5
48.6
48.1
48.2
47.9
48.2
48
.3
48.5
45.8
45.7
46
.
5
47
.3
47.4
47
.
4
42.2
42
.6
42.7
42.3
42
.2
41.4
41
.6
41.2
40.8
40.9
41.2
41.4
41.5
41
.
8 41.7
41.7
41
.9
41.9
27.4
4'
19.79'
26.56'
19.81'
46.49'
(26.5'±)
(21.5'±)
(21.5'±)
(26.5'±)
CONCRETE
4'-11 1/2"'%%P
WATE
R
METE
R
CLEANOUT
8'-9"'%%P
DOO
R
FF:51
.70
DOOR
FF
:
51
.70
DOOR
FF
:
51
.89
DOO
R
FF:51
.84
DOO
R
FF: 48
.2±
48
.7
48
.9
48.6
48
.8
48
.4
ARMOUR AVE
RIGHT-OF-WAY
9TH LANE
RIGHT-OF-WAY
CONCRET
E
DRIVE
WAY
CONCRET
E
DRIVE
W
AY
3068
Up
garage
entry
utility
HVAC.
HVAC.
HVAC.
HVAC.
WH WH
WH
WH INTO CONCRETE
FILLED WITH
CONCRETE
2' EMBEDMENT3'-0" HIGH AND
4" Ø STEEL TUBE
2nd. FLOOR ABOVEPROJECTION OF
2668
entry patio
WH
7'-5"
3'-0"
3'-6"
6'-0"
ENTRY PATIO
BENCH
6'-0"
HANDRAIL
DECORATIVE GRAVEL PATIO W/
FURNITURE
INTEGRAL COLOR CONCRETE
SLIGHTLY DARKER THAN STUCCO W/ A WASH FINISH
RETAINING WALL W/
STUCCO FINISH TO MATCH BUILDING, TYP.; SEE C-1
3'-4 3/4"
3'-8 1/8"
2'-10"
6"
8'-9"
STEEL EDGING;
TYP.
HANDRAIL
FFE48.2
12'-3"
EX. GAS METER
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
HB
UTILITY
DROP LINE
OVERHEAD
UTILITY LINES
HB
UTILITY
DROP LINE
EX
ELECTRICAL METER
HB
HB
EXISTING
OVERHEADUTILITY LINES
UTILITYDROP LINE
EX. CLEANOUT
EX.
WATERMETER
G
EX. GAS METER
WW
G
WOOD UTILITY POLE
E
E
E
GG
GG
GG
(4) NEWWATER
METERS
(4) NEW
ELECTRICALMETERS
(4) NEWGAS
METERS
TO CITY
SEWER
MAINLINE
NEW
CLEANOUT
NEW
CLEANOUT
TO CITY GAS
MAINLINEGAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
W W W W W W W W W TO CITY
WATER
MAINLINE W
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
EX
ELECTRICAL METER
EX. GAS METEREX. GAS METER
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W W W W W W W W
E
GG
PROPOSED UTILITY PLAN
Scale: 1/8" = 1'-0"2
EE
GASGASGASGASGAS GAS LINE
SEWER LINE
WATER LINE
ELECTRICAL LINE
UTILITY LEGEND
GASGASGASGASGAS
WWWWWW
3-4-25
2
3 Adressing comments
from Design Review 6/6/25 7-17-25
136
13
7
(E)8:12
(E)8:12
(E)8:12
(E)8:12
(E)4:12
(E)4:1
2
(N)8:12
(N)8:1
2
CRICK
E
T
49
48
48
49
4
8
4
8
47
46
4
5
41
41
4
7
4
8
A
R
M
O
U
R
A
V
E
N
U
E
9TH L
A
N
E
DIA
Z
2
0
2
0
T
R
U
S
T
9'
(N)S i t e P l a n
SCALE 1/8" = 1'-0"
5'-9"
13'-7"
8'-
9
"
6'
21'-6"
GA
S
(E)GAS METER
GA
S
(E)GAS METER
PANEL
(E)200 AMP SERVICE
9'-
1
0
"
11'-4"
15'-6
"
20'
-
1
"
PROPOSED 4 UNIT APARTMENT
15'
-
4
"
5'
(N)DRIVEWAY
20
'
3'-2"
O.H.
5'-1"
8'-3"
O.H.
5'
8'
IMAGINARY LINE 7'-
2
"
6'-1"
5'
6'-6
"
PROPOSED COMMON USABLE
SPACE (MIN 400 SQ.FT.)
PROPOSED: 455.65 SQ.FT.
85
'
-
5
"
4'-
1
0
"
(N)4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
UP
12'
-
1
"
5'-
1
0
"
4'
BW 42.8
+
+
47.3
2%SLOPE
BW 42.8
+
+TW
42.8
TW 44.3
+
FFE 45.
8
+47.3
ENTRY
P
A
T
I
O
135 SF
BENCH
BENCH +OR -
42.3+
HANDRAIL / GUARDRAIL
TW 44.3
+
10'
-
3
"
9'-2
"
Sheet:
A-2
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
SITE PLAN
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
138
8020 TS.
80
2
0
T
S
.
80
2
0
T
S
.
9090
F
X
.
T
E
M
P
.
6070
T
E
M
P
.
6020
F
X
.
T
E
M
P
.
3068
16080
60
4
0
S
L
.
30
6
8
SCALE 1/4" = 1'-0"
F i r s t F l o o r P l a n SL. = SLIDING WINDOW
CSMNT. = CASEMENT WINDOW
FX. = FIXED WINDOW
D.H.= DOUBLE HUNG WINDOW
AW.= AWNING WINDOW
S.H.= SINGLE HUNG WINDOW
Up
garage
entry
utility
7,75" MAX.
7,7
5
"
M
A
X
.
3' MIN.
CONC.
LANDING
15
'
-
7
"
9'
-
6
"
32
'
-
1
"
4'
57
'
-
1
"
15
'
-
1
1
"
19'-
7
"
19'
40
'
-
7
"
8'-10"
5'-5"
9'-
9
"
14'-4"
3'
-
7
"
3'-7"
5'-
1
"
Up
35'-4"
FLOOR PLANS NOTES
NEW WALL -2x6
1 hr. FIRE RATED INTERIOR WALL
DET. 1/-
NEW WALL -2x4
(2)-76
1
6
F
X
.
T
R
A
N
S
O
M
HVAC.
HVAC.
HVAC.
HVAC.
WHWHWHWH
5'-
1
"
IMAGINARY LINE
5'
5'
1 hr. FIRE RATED INTERIOR WALL
DET. 2/A-7
38'-
7
"
10'-2"8'-6"
22
'
18
'
-
1
"
20 GALS. EACH TRASH & RECYCLING
CONTAINERS (3)FOR EACH UNIT
INTO CONCRETE
FILLED WITH
CONCRETE
2' EMBEDMENT
3'-0" HIGH AND
4" Ø STEEL TUBE
INDIVIDUAL BICYCLE LOCKER
6'
6'
2'
2nd. FLOOR ABOVE
PROJECTION OF
5'-
4
"
19'-7"
26
6
8
3'
A
A-8
entry patio
2'x 6' LONG-TERM BICYCLE PARKING
EACH DWELLING UNIT WILL BE RESPONSIBLE
FRO BRINGING THEIR TRASH AND
RECYCLING CONTAINERS TO THE CURBSIDE
FOR REGULAR COLLECTION
6'-
3
"
8'-
9
"
WH
UP
Sheet:
A-3
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
FIRST FLOOR PLAN
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
139
6070
F
X
.
T
E
M
P
.
10070
F
X
.
T
E
M
P
.
6068
S
L
D
.
T
E
M
P
.
6050
S
L
.
24
6
8
50
6
8
S
L
D
.
T
E
M
P
.
60
4
0
S
L
.
5050 SL.
3068
30
6
8
30
6
0
F
X
.
40
3
0
S
L
.
80
7
0
F
X
.
T
E
M
P
.
50
6
8
2668
2668
26
6
8
40
6
8
40
4
0
S
L
.
30
5
0
C
S
M
N
T
.
2068
26
6
8
26
6
8
70
6
8
24
6
8
3068
5068
30
6
8
TE
M
P
.
24
6
8
P
K
T
.
2468 PKT.
30
2
0
S
L
.
TE
M
P
.
40
2
0
S
L
.
Up
Dn
3'-7"
bedroom
cl
o
s
e
t
deck
laundry
bath
bath
la
u
n
d
r
y
cl
o
s
e
t
bedroom
powder
hall
cl
o
s
e
t
bedroom
bedroom
closet
closet
po
w
d
e
r
living
deck
SCALE 1/4" = 1'-0"
S e c o n d F l o o r P l a n SL. = SLIDING WINDOW
CSMNT. = CASEMENT WINDOW
FX. = FIXED WINDOW
D.H.= DOUBLE HUNG WINDOW
AW.= AWNING WINDOW
S.H.= SINGLE HUNG WINDOW
FLOOR PLANS NOTES
NEW WALL -2x6
1 hr. FIRE RATED EXTERIOR WALL
DET. 1/-
NEW WALL -2x4
1 hr. FIRE RATED INTERIOR WALL
DET. 2/A-7
4:12
h= 9' ceiling
h= 9' ceiling
h= 9' ceiling
UNIT 2
7.
7
5
"
M
A
X
.
SINK W/ DISP.
HOOD VENT TO WALL
GAS RANGE
CAB. ABV.
TYPICAL
REF.
h= 9' ceiling
7.7
5
"
M
A
X
.
living
UNIT 1
h= 9' ceiling
h= 9' ceiling
SINK W/ DISP.
CAB. ABV.
TYPICAL
HOOD VENT TO WALL
GAS RANGE
D/W REF.
7.75" MAX.
3'-8"12'-9"2'-3"2'-7"11'-11"1'-4"5'-1"
14'-11"14'-6"
15
'
-
8
"
14
'
-
3
"
8'
-
7
"
9'
-
4
"
13
'
-
3
"
29
'
-
1
1
"
22
'
-
8
"
18'-
1
0
"
10
'
-
4
"
9'
-
9
"
2'
-
3
"
5'
-
8
"
13
'
-
9
"
4'
20
'
-
1
"
21
'
-
7
"
14'-6"
9'
-
2
"
7'
13'-6"
3'-2"10'-1"
6'-1"
2'
5'-1"
8'-
6
"
2'-8"
2'
-
1
0
"
3'-2"
2'
-
1
0
"
5'-2"3'-
4
"
3'-1"
6'
-
1
"
14'-4"
3'-2"
6'-
1
1
"
8'-5"
5'
-
2
"
3'
2'-2"
2'
-
9
"
2'-11"
5'
2'-11"
3'-5"
5'-10"
7'-8"
3'-8"11
'
-
8
"
3'
-
4
"
7'-1
0
"
3'-
7
"
3'
-
7
"
13
'
-
4
"
4'-4"
2'-
1
1
"
3'-
1
"
6'-4"
IMAGINARY LINE
CSMNT.
3050
5'
6'
42" R
A
I
L
I
N
G
PRIVATE SPACE 118.7 SQ.FT.
4'
PRIVATE SPACE: 140.2 SQ.FT.
5'-1"
26'-
5
"
42" RAILING
42
"
R
A
I
L
I
N
G
Sheet:
A-4
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
SECOND FLOOR PLAN
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
140
6070
F
X
.
T
E
M
P
.
10070
F
X
.
T
E
M
P
.
24
6
8
50
6
8
S
L
D
.
T
E
M
P
.
60
4
0
S
L
.
5050 SL.
3068
30
6
8
30
6
0
F
X
.
40
3
0
S
L
.
80
7
0
F
X
.
T
E
M
P
.
50
6
8
2668
2668
26
6
8
40
6
8
40
4
0
S
L
.
2068
26
6
8
26
6
8
70
6
8
24
6
8
3068
5068
30
6
8
TE
M
P
.
CS
M
N
T
.
CSMNT.
24
6
8
P
K
T
.
2468 PKT.
30
2
0
S
L
.
TE
M
P
.
3050
40
2
0
S
L
.
30
5
0
Dn
3'-7"
bedroom
cl
o
s
e
t
deck
laundry
bath
bath
la
u
n
d
r
y
cl
o
s
e
t
bedroom
powder
hall
cl
o
s
e
t
bedroom
bedroom
closet
closet
po
w
d
e
r
living
SCALE 1/4" = 1'-0"
T h i r d F l o o r P l a n SL. = SLIDING WINDOW
CSMNT. = CASEMENT WINDOW
FX. = FIXED WINDOW
D.H.= DOUBLE HUNG WINDOW
AW.= AWNING WINDOW
S.H.= SINGLE HUNG WINDOW
FLOOR PLANS NOTES
NEW WALL -2x6
1 hr. FIRE RATED EXTERIOR WALL
DET. 1/-
NEW WALL -2x4
1 hr. FIRE RATED INTERIOR WALL
DET. 2/A-7
h= 9' ceiling
UNIT 4
7.
7
5
"
M
A
X
.
SINK W/ DISP.
HOOD VENT TO WALL
GAS RANGE
CAB. ABV.
TYPICAL
REF.living
UNIT 3
h= Vaulted ceiling
h= 9' ceiling
SINK W/ DISP.
CAB. ABV.
TYPICAL
HOOD VENT TO WALL
GAS RANGE
D/W REF.
7.75" MAX.
3'-8"12'-9"2'-3"2'-7"11'-11"1'-4"5'-1"
14'-11"14'-6"
15
'
-
8
"
14
'
-
3
"
8'
-
7
"
9'
-
4
"
13
'
-
3
"
29
'
-
1
1
"
22
'
-
8
"
18'-
1
0
"
10
'
-
4
"
9'-
9
"
2'
-
3
"
5'
-
8
"
13
'
-
9
"
4'
20
'
-
1
"
21
'
-
7
"
14'-6"
9'
-
2
"
7'
13'-6"
3'-2"10'-1"
6'-1"
2'
5'-1"
8'
-
3
"
2'-8"
2'
-
1
0
"
3'-2"
2'
-
1
0
"
5'-2"3'
-
4
"
3'-1"
6'
-
1
"
14'-4"
3'-2"
6'
-
1
1
"
8'-5"
5'
-
2
"
3'
2'-2"
2'
-
9
"
2'-11"
5'
2'-11"
3'-5"
5'-10"
7'-8"
3'-8"
11
'
-
8
"
3'
-
4
"
7'-1
0
"
3'-
7
"
3'
-
7
"
2'-
1
1
"
6'-5"
IMAGINARY LINE
CSMNT.
3050
h= Vaulted ceiling
h= Vaulted ceiling
h= Vaulted ceiling
30
6
8
NEW WALL -2x6
1 hr. FIRE RATED EXTERIOR WALL
DET. 1/-
NEW WALL -2x4
CAB. ABV.
TYPICAL
3'-
1
"
6'
23'-
5
"
42" R
A
I
L
I
N
G
6068
S
L
D
.
T
E
M
P
.
6050
S
L
.
deck
7.7
5
"
M
A
X
.
CAB. ABV.
TYPICAL
3'-
1
"
6'
23'-
5
"
42" R
A
I
L
I
N
G
42
"
H
.
r
a
i
l
i
n
g
42
"
H
.
r
a
i
l
i
n
g
5'-1"
PRIVATE SPACE 118.7 SQ.FT.
PRIVATE SPACE: 140.2 SQ.FT.
13
'
-
4
"
4'-4"
30
5
0
C
S
M
N
T
.
Sheet:
A-5
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
THIRD FLOOR PLAN
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
141
(N)4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
4:12
SCALE 1/4" = 1'-0"
R o o f P l a n
11'-3"
5'
4:12
4:12
UP
Sheet:
A-6
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
ROOF PLAN
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
142
(N)N o r t h E l e v a t i o n
SCALE 1/4" = 1'-0"
4
12
4
12
1" IN DEPTH
WOOD WINDOW TRIM 4" IN WIDTH
COLOR : WHITE
METAL RAILING
COLOR :BLACK
EXTERIOR WALLS:
Finish stucco (7
8" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
EXTERIOR WALLS:
Finish stucco (7
8" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
WINDOWS:
WHITE CLAD
RUN:10" MIN.
RISE:7.75" MAX.
(N)ENTRY DOOR
(E)GRADE = 42.5(E)GRADE = 41.6
F.F.
F.F.
F.F.
TOP OF PLATE
TOP OF RIDGE
10
'
9'
8'
-
1
"
9'
-
1
"
EXTERIOR WALL:
ALL BOARD & BATTEN
SIDING TO BE HARDIE
BOARD SMOOTH
8" HARDBOARD "LAP"
SIDING (TYP.)
W/ 2X4 WOOD TRIM
@DOORS, WINDOWS
& CORNERS O/GRADE "D"
BUILDING PAPER
O/ SHEAR MATERIAL AS
OCCURS
COLOR: WHITE
1'
-
5
"
ELEV.=45.87'
F.S.
ELEV.=43.87'
F.F.
ELEV.=48.2'
LOT FRONTAGE:63'
GARAGE : 18'-6" =29.4%
18'-6"
EXTERIOR WALLS:
Finish stucco (7
8" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
METAL RAILING
COLOR :BLACK
(N)S o u t h E l e v a t i o n
SCALE 1/4" = 1'-0"
1" IN DEPTH
WOOD WINDOW TRIM 4" IN WIDTHCOLOR : WHITE
ELEV.=48.2
F.F.
4
12
4
12
F.F.
TOP OF PLATE
TOP OF RIDGE
F.F.
F.S.
10
'
-
1
0
"
10
'
9'
8'
-
1
"
ELEV.=43.87'
Sheet:
A-7
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
ELEVATIONS
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
143
(N) W e s t E l e v a t i o n
SCALE 1/4" = 1'-0"
8" HARDBOARD "LAP"
SIDING (TYP.)
W/ 2X4 WOOD TRIM
@DOORS, WINDOWS
& CORNERS O/GRADE "D"
BUILDING PAPER
O/ SHEAR MATERIAL AS
OCCURS
COLOR: WHITE
EXTERIOR WALLS:
Finish stucco (78" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
1" IN DEPTH
WOOD WINDOW TRIM 4" IN WIDTH
COLOR : WHITE
(2) LAYERS OF 15# FELT UNDER ROOFING MATERIAL,MIN.
CLASS "B" MIN. COMP.SHINGLES (TYP.)
(N)ROOF:
F.F.
F.F.
TOP OF PLATE
TOP OF RIDGE
9'
10
'
9'
8'-
1
"
EXTERIOR WALL:
ALL BOARD & BATTEN
SIDING TO BE HARDIE
BOARD SMOOTH
33
'
-
4
"
ELEV.=45.87'
F.F.
F.S.
ELEV.=43.87'
F.F.
TOP OF PLATE
TOP OF RIDGE
F.F.
F.S.
10
'
-
1
0
"
10
'
9'
8'
-
1
"
ELEV.=43.87'
S e c t i o n A-A
SCALE 1/4" = 1'-0"
NOTE: SECTION DRAWINGS TO BE USED FOR REFERENCE ONLY -
FOR ACTUAL MEMBER SIZES AND SPACING, PLEASE SEE
STRUCTURAL SHEETS
OVER 4" CRB (TYP)
4" CONC. SLAB W/#4 @4' O.C. E.W.
OVER 2" SAND OVER 6" MIL VISQUEEN
(n)garage
W/ R-19 BATT INSUL.
3/4" PLYWOOD O/
2X JOISTS @16" O.C.
W/ R-19 BATT INSUL.
3/4" PLYWOOD O/
2X JOISTS @16" O.C.
attic
attic
1/2" GYP. BOARD
1/2" GYP. BOARD
W/ R-13 BATT INSUL.
2 X4 STUDS @16" O.C.
W/ R-13 BATT INSUL.
2 X4 STUDS @16" O.C.
COMP. SHINGLE ROOF
OVER 1/2" CDX PLYWD.
PER SW SCHED.
CDX PLYWOOD
NOTES:
-1hr. FIRE-RESISTIVE
CONSTRUCTION ON THE
GARAGE SIDE FOR WALLS,
CELILINGS, POSTS, AND BEAMS
OF GARAGE ADJACENT TO OR
SUPPORTING RESIDENTIAL USES
5/8" MIN. TYPE X GYPSUM
BOARD @ GARAGE SIDE OF WALL,
& STRUCTURES SUPPORTING FLOOR
CEILING ASSEMBLIES USED FOR
SEPARATION
UNIT 1
UNIT 3
UNIT 2
UNIT 4
@WALLS
PROVIDE 5/8" SR. TYPE "X"
@WALLS
PROVIDE 5/8" SR. TYPE "X"
Sheet:
A-8
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
LEFT ELEVATION
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
144
F.F.
ELEV.=48.2
EXTERIOR WALLS:
Finish stucco (7
8" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
EXTERIOR WALLS:
Finish stucco (7
8" min. Three coats
application thickness)
2 layers of grade "D" paper
Wire lathe and a 26 g.a.
corrosion-resistant weep-screed
at foundation plate line.
Weep screed minimum 2 inches to
earth and 2 inches to concrete
COLOR: CREAMY WHITE
(N) E a s t E l e v a t i o n
SCALE 1/4" = 1'-0"
8" HARDBOARD "LAP"
SIDING (TYP.)
W/ 2X4 WOOD TRIM
@DOORS, WINDOWS
& CORNERS O/GRADE "D"
BUILDING PAPER
O/ SHEAR MATERIAL AS
OCCURS
COLOR: WHITE
(2) LAYERS OF 15# FELT UNDER ROOFING MATERIAL,MIN.
CLASS "B" MIN. COMP.SHINGLES (TYP.)
(N)ROOF:
1" IN DEPTH
WOOD WINDOW TRIM 4" IN WIDTH
COLOR : WHITE
F.S.
F.F.
F.F.
F.F.
TOP OF PLATE
TOP OF RIDGE
9'
10
'
9'
7'
-
1
1
"
38
'
-
1
"
AVERAGE GRADE PLANE
30
'
MA
X
.
H
.
PE
R
F
I
R
E
C
O
D
E
12
'
ELEV.=45.87'
ELEV.=43.87'
31
'
ELEV.=42.2'
Sheet:
A-9
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
RIGHT ELEVATION
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
4
U
N
I
T
A
P
A
R
T
M
E
N
T
06-29-25 PERMIT
145
Sheet:
A-10
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
PHOTOS
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
6
U
N
I
T
A
P
A
R
T
M
E
N
T
11/07/23 PERMIT
*227 ARMOUR AVENUE ~ SITE *227 ARMOUR AVENUE ~ SITE 840 LINDEN AVE.
248 ARMOUR AVENUE 252 ARMOUR AVENUE 235 ARMOUR AVENUE
840 LINDEN AVE.
236 ARMOUR AVENUE
146
Sheet:
A-11
Scale as shown
S
O
U
T
H
S
A
N
F
R
A
N
C
I
S
C
O
,
C
A
.
22
7
A
R
M
O
U
R
A
V
E
.
PHOTOS
ISSUED FOR
ANDREA COSTANZO
DATE
ANDREA COSTANZO
Design by:Drawn by:
THE USE OF THIS PLANS AND SPECIFICATIONS SHALL BE
RESTRICTED TO THE ORIGINAL SITE FOR WHICH THEY WERE
PREPARED AND PUBLICATION THEREFORE IS EXPRESSLY LIMIT
TO SUCH USE. RE-USE, REPRODUCTION OR PUBLICATION BY ANY
METHOD, IN WHOLE OR IN PART IS PROHIBITED. TITLE TO THE
PLANS AND SPECIFICATIONS REMAINS WITH THE DESIGNER.
WITHOUT PREJUDICE, VISUAL CONTACT WITH THESE PLANS AND
SPECIFICATIONS SHALL CONSTITUTE PRIMA FACIE EVIDENCE OF
THE ACCEPTANCE OF THESE RESTRICTIONS.
WRITTEN DIMENSIONS SHALL TAKE PREFERENCE OVER SCALE
DIMENSIONS AND SHALL BE VERIFIED ON THE JOB SITE. ANY
DISCREPANCY SHALL BE BROUGHT TO THE ATTENTION OF THE
DESIGNER PRIOR TO THE COMMENCEMENT OF ANY WORK.
6
U
N
I
T
A
P
A
R
T
M
E
N
T
11/07/23 PERMIT
225 ARMOUR AVENUE 227 ARMOUR AVENUE 234 ARMOUR AVENUE 219 ARMOUR AVENUE
147
CITY COUNCIL 2025
EDDIE FLORES, MAYOR (DIST. 5)
MARK ADDIEGO, VICE MAYOR (DIST. 1)
JAMES COLEMAN, MEMBER (DIST. 4)
MARK NAGALES, MEMBER (DIST. 2)
FLOR NICOLAS, MEMBER (DIST. 3)
SHARON RANALS, CITY MANAGER
PLANNING DIVISION
CITY OF SOUTH SAN FRANCISCO PHONE: (650) 877-8535
E-MAIL: [email protected]
400 GRAND AVENUE P.O. BOX 711 SOUTH SAN FRANCISCO, CA 94083
Date: June 6, 2025
Applicant: Andrea Costanzo
Site Address: 227 Armour Ave
Project No.: P24-0004: DR24-0017
Design Review – Incorporate DRB Recommendations
On Tuesday, May 20, 2025, the Design Review Board reviewed your plans to construct a new multi-
family residential structure consisting of four dwelling units at 227 Armour Avenue in the Downtown
Residential High (DRH) Zoning District in accordance with Title 20 of the South San Francisco
Municipal Code, and determination that the project is categorically exempt from CEQA, per CEQA
Guidelines Section 15303, Class 3, New Construction or Conversion of Small Structures.
The Design Review Board has requested that the applicant respond to the Board’s comments and
provided an updated plan set addressing these concerns. Staff will circulate the revised plan set to the
DRB via email.
The Design Review Board provided the following recommendations:
1. The Board liked the proposed design.
2. The Board recommends integrating the roof of the existing attached residential unit with the new
building to avoid potential water issues.
3. Consider removing the slope adjacent to the new building, adding a shed roof and / or
incorporating a cricket to help defer the water.
4. Relocate and / or raise the height of the proposed windows along the rear and left elevations
adjacent to the existing residential unit to avoid interference with the roof.
5. The Board liked the proposed common usable open space area but is concerned with how
residents of the existing residential units off 9th Lane will access this area, as the site and
landscaping plans lack an accessible walkway path between the areas. Consider adding flag
stones or geometric pavers along one of the side yards to create a walkable pathway, but being
mindful that the overall project site needs to meet minimum landscaping requirements.
6. Consider wrapping the front balconies an additional four to five feet around the left elevation to
keep a continuous appearance and allow for more usability of the balconies.
7. The Board recommends reviewing the recommended species of the two required street trees
(Quercus wislizeni) with the Parks Division. This species may grow too tall in the recommented
area and interfere with existing overhead power lines. Crape Myrtle or Arbutus ‘Marina’ may be
better suited for the location.
Docusign Envelope ID: BA8D55BA-EF5D-4379-BDF4-4EAA8144126C
148150
Page 2 of 2
Subject: 227 Armour Ave
8. The Board recommends adding a third tree to the landscaping plan, within the proposed common
usable open space area to help shade the area. Consider Crape Myrtle or Arbutus ‘Marina’.
Please address these recommendations in your resubmittal. If you have any questions regarding this
matter, please feel free to contact the Planning Division at (650) 877-8535.
Sincerely,
__________________________ ____________________________
Stephanie Skangos Adena Friedman
Senior Planner Chief Planner
Docusign Envelope ID: BA8D55BA-EF5D-4379-BDF4-4EAA8144126C
149151
CITY COUNCIL 2025
EDDIE FLORES, MAYOR (DIST. 5)
MARK ADDIEGO, VICE MAYOR (DIST. 1)
JAMES COLEMAN, MEMBER (DIST. 4)
MARK NAGALES, MEMBER (DIST. 2)
FLOR NICOLAS, MEMBER (DIST. 3)
SHARON RANALS, CITY MANAGER
PLANNING DIVISION
CITY OF SOUTH SAN FRANCISCO PHONE: (650) 877-8535
E-MAIL: [email protected]
400 GRAND AVENUE P.O. BOX 711 SOUTH SAN FRANCISCO, CA 94083
Date: June 6, 2025
Applicant: Andrea Costanzo
Site Address: 227 Armour Ave
Project No.: P24-0004: DR24-0017
Design Review – Incorporate DRB Recommendations
On Tuesday, May 20, 2025, the Design Review Board reviewed your plans to construct a new multi-
family residential structure consisting of four dwelling units at 227 Armour Avenue in the Downtown
Residential High (DRH) Zoning District in accordance with Title 20 of the South San Francisco
Municipal Code, and determination that the project is categorically exempt from CEQA, per CEQA
Guidelines Section 15303, Class 3, New Construction or Conversion of Small Structures.
The Design Review Board has requested that the applicant respond to the Board’s comments and
provided an updated plan set addressing these concerns. Staff will circulate the revised plan set to the
DRB via email.
The Design Review Board provided the following recommendations:
1. The Board liked the proposed design.
2. The Board recommends integrating the roof of the existing attached residential unit with the new
building to avoid potential water issues.
3. Consider removing the slope adjacent to the new building, adding a shed roof and / or
incorporating a cricket to help defer the water.
4. Relocate and / or raise the height of the proposed windows along the rear and left elevations
adjacent to the existing residential unit to avoid interference with the roof.
5. The Board liked the proposed common usable open space area but is concerned with how
residents of the existing residential units off 9th Lane will access this area, as the site and
landscaping plans lack an accessible walkway path between the areas. Consider adding flag
stones or geometric pavers along one of the side yards to create a walkable pathway, but being
mindful that the overall project site needs to meet minimum landscaping requirements.
6. Consider wrapping the front balconies an additional four to five feet around the left elevation to
keep a continuous appearance and allow for more usability of the balconies.
7. The Board recommends reviewing the recommended species of the two required street trees
(Quercus wislizeni) with the Parks Division. This species may grow too tall in the recommented
area and interfere with existing overhead power lines. Crape Myrtle or Arbutus ‘Marina’ may be
better suited for the location.
Docusign Envelope ID: BA8D55BA-EF5D-4379-BDF4-4EAA8144126C
148150
Page 2 of 2
Subject: 227 Armour Ave
8. The Board recommends adding a third tree to the landscaping plan, within the proposed common
usable open space area to help shade the area. Consider Crape Myrtle or Arbutus ‘Marina’.
Please address these recommendations in your resubmittal. If you have any questions regarding this
matter, please feel free to contact the Planning Division at (650) 877-8535.
Sincerely,
__________________________ ____________________________
Stephanie Skangos Adena Friedman
Senior Planner Chief Planner
Docusign Envelope ID: BA8D55BA-EF5D-4379-BDF4-4EAA8144126C
149151
Aug 6, 2025
City of South San Francisco
901 Civic Campus Way
South San Francisco, CA 94080
Re: Proposed Housing Development Project at 227 Armour Avenue
To: [email protected], [email protected], [email protected],
[email protected], [email protected], [email protected],
[email protected], [email protected]
Cc: [email protected]; [email protected]; [email protected]; [email protected]
Dear South San Francisco Planning Commission,
The California Housing Defense Fund (“CalHDF”) submits this letter to remind the City of its
obligation to abide by all relevant state laws when evaluating the proposed 4-unit housing
development project at 227 Armour Avenue. These laws include the Housing Accountability
Act (“HAA”), AB 130, and California Environmental Quality Act (“CEQA”) guidelines.
The HAA provides the project legal protections. It requires approval of zoning and general
plan compliant housing development projects unless findings can be made regarding
specific, objective, written health and safety hazards. (Gov. Code, § 65589.5, subds. (d), (j).) The
HAA also bars cities from imposing conditions on the approval of such projects that would
reduce the project’s density (id. at subd. (j)) or render the project infeasible (id. at subd. (d))
unless, again, such written findings are made (ibid.). As a development with at least
two-thirds of its area devoted to residential uses, the project falls within the HAA’s ambit,
and it complies with local zoning code and the City’s general plan. The HAA’s protections
therefore apply, and the City may not reject the project except based on health and safety
standards, as outlined above. Furthermore, if the City rejects the project or impairs its
feasibility, it must conduct “a thorough analysis of the economic, social, and environmental
effects of the action.” (Id. at subd. (b).)
Furthermore, the project is exempt from state environmental review pursuant to section
15303 of the CEQA Guidelines. The project is also eligible for a statutory exemption from
CEQA pursuant to AB 130 (Pub. Res. Code, § 21080.66), which was signed into law on June 30,
2201 Broadway, PH1, Oakland, CA 94612
www.calhdf.org
2025 and effective immediately (Assembly Bill No. 130, 2025-2026 Regular Session, Sec. 74,
available here). Caselaw from the California Court of Appeal affirms that local governments
err, and may be sued, when they improperly refuse to grant a project a CEQA exemption or
streamlined CEQA review to which it is entitled. (Hilltop Group, Inc. v. County of San Diego
(2024) 99 Cal.App.5th 890, 911.)
As you are well aware, California remains in the throes of a statewide crisis-level housing
shortage. New housing such as this is a public benefit; it will increase the city’s tax base ; it
will bring new customers to local businesses; and it will reduce displacement of existing
residents by reducing competition for existing housing. It will also help cut down on
transportation-related greenhouse gas emissions by providing housing in denser, more
urban areas, as opposed to farther-flung regions in the state (and out of state). While no one
project will solve the statewide housing crisis, the proposed development is a step in the
right direction. CalHDF urges the City to approve it, consistent with its obligations under
state law.
CalHDF is a 501(c)(3) non-profit corporation whose mission includes advocating for
increased access to housing for Californians at all income levels, including low-income
households. You may learn more about CalHDF at www.calhdf.org.
Sincerely,
Dylan Casey
CalHDF Executive Director
James M. Lloyd
CalHDF Director of Planning and Investigations
2 of 2
From:Tom Berrill
To:Planning Commission Comments
Cc:SSFPlanning; [email protected]
Subject:227 Armour Ave Questions
Date:Thursday, August 7, 2025 1:09:51 PM
[NOTICE: This message originated outside of City of South San Francisco -- DO NOT
CLICK on links or open attachments unless you are sure the content is safe.]
Hi SSF planning,
I am the owner of the property next door at 231 Armour Ave. It’s great to see the city adding morehousing and there is no doubt it is a nice looking building, but we have many questions after looking atthe plans for 227 Armour Ave.
The plans don’t accurately reflect our current house. (Sidewalk curb cut and driveway added, we
have new retaining wall, etc)
I assume the parking fits within the current codes.
If it is a concern, our staircase windows are directly across from their kitchen and dining room
windows. Privacy concern maybe?
Their kitchen vent is going out the wall in front of our window?
There appears to be some excavation planned along the side of 231 Armour? What’s the elevation
of the path along the property line & will that be landscaped to meet the landscaping requirements
or will it be a walkway? What are the drainage plans for this area as there is no drainage shown on
the plans.
Existing ADU 227A doesn’t match drawings. What's the plan here?
Magnolia tree being removed and 2 new oaks planted. Under pge wires. Will the tree or drip line of
the tree be in front of our property?
Overhang at 227 Armour is shown as less than 5' from 231 building/property line. Is this being
considered how it will affect the daylight into the existing windows at 231 Armour along the
property line.
Thank you,
Tom Berrill