Loading...
HomeMy WebLinkAboutReso 122-2025 (25-857)City of South San Francisco City Council Resolution: RES 122-2025 P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA File Number: 25-857 Enactment Number: RES 122-2025 RESOLUTION AUTHORIZING BUDGET AMENDMENT NUMBER 26.014 TO TRANSFER $521,016.90 FROM THE RIGHT OF WAY INFRASTRUCTURE ASSESSMENT AND UPGRADES PROJECT TO THE TRAFFIC SIGNAL SAFETY IMPROVEMENT PROJECT, TO INCREASE THE CONSTRUCTION CONTRACT AND CONTINGENCY FOR BAY AREA LIGHTWORKS, AND TO CLOSE CIP PROJECT TR2302. WHEREAS, the City of South San Francisco established the Right of Way Infrastructure Assessment and Upgrades Project CIP Project (tr2302) to complete a paused sidewalk and infrastructure inventory and to implement signal backplate upgrades; and WHEREAS, the sidewalk inventory was completed by Precision Emprise LLC dba Precision Concrete to the satisfaction of staff, and $521,016.90 remains in available budget, consisting of $520,000 in Measure A and $1,016.90 in Traffic Impact Fees; and WHEREAS, the Traffic Signal Safety Improvement Project CIP Project (tr2403), funded by a $1,527,120 HSIP grant and $500,000 in Traffic Impact Fees, was established to improve signal safety through a new signal, timing changes, and backplate installations; and WHEREAS, an assessment conducted under tr2403 identified more than 120 corroded or obsolete signal heads, along with deteriorated illuminated street name signs and mounting hardware, which must be replaced to complete the project safely; and WHEREAS, the reallocation of funds from tr2302 to tr2403 is appropriate and aligned with the original intent of both projects; and WHEREAS, the construction contract with Bay Area Lightworks, Inc. for tr2403 currently totals $1,080,000 with a 15% contingency of $162,000; and WHEREAS, the revised scope necessitates increasing the construction contract by $473,651.73 and the contingency by $47,365.17, resulting in a revised contract amount of $1,553,651.73 and a total contingency of $209,365.17; and WHEREAS, Budget Amendment Number 26.014 has been prepared to reflect this transfer; and WHEREAS, all defined tasks under tr2302 have been completed, and the project is now recommended for closure. City of South San Francisco File Number: 25-857 Enactment Number: RES 122-2025 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of South San Francisco: 1. Authorizes Budget Amendment Number 26.014 to transfer $5211016.90 from tr2302 to tr2403; 2. Increases the construction contract with Bay Area Lightworks, Inc. by $473,651.73 and increases the construction contingency by $47,365.17, for revised amounts of $1,553,651.73 and $209,365.17, respectively; 3. Authorizes closure of tr2302; and 4. Authorizes the City Manager or designee to take all actions necessary to implement this resolution consistent with its intent and purpose. At a meeting of the City Council on 8/27/2025, a motion was made by Councilmember Nicolas, seconded by Councilmember Nagales, that this Resolution be approved. The motion passed. Yes: 5 Mayor Flores, Vice Mayor Addiego, Councilmember Nagales, Councilmember Coleman, and Councilmember Nicolas Attest by k L sa Govea Acosta, City Clerk City of South San Francisco