Loading...
HomeMy WebLinkAboutReso 81-1990RESOLUTION NO. 81-90 CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA A RESOLUTION DETERMINING TO UNDERTAKE PROCEEDINGS WITHOUT FURTHER ACTION UNDER DIVISION 4 OF THE STREETS AND HIGHWAYS CODE OF CALIFORNIA FOR THE POINTE GRAND BUSINESS PARK ASSESSMENT DISTRICT WHEREAS, a written petition for undertaking proceedings pursuant to special assessment and assessment bond acts, and to assess the cost thereof upon the properties benefited, and waiving proceedings under Division 4 of the Streets and Highways Code of California, signed by the owners of more than 60% in area of the properties proposed to be assessed, has been filed with the City Clerk for the making of the acquisitions and improvements described on Exhibit "A" attached hereto and made a part hereof; WHEREAS, the costs and expenses of the acquisitions and improvements are to be chargeable upon an assessment district, the exterior boundaries of which are the coterminous exterior boundaries of the composite and consolidated area shown on the map thereof on file in the office of the City Clerk, to which reference is hereby made for further particulars; WHEREAS, the public interest and convenience will be served by the taking of the proceedings; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of South San Francisco as follows: 1. Ail of the owners of more than 60% in area of the property subject to assessment for the acquisitions and improvements who appear to be such on the Assessor's roll on the day that the petition was filed, or, in the case of transfers of land or parts thereof subsequent to the date upon which the last Assessor's roll was prepared, appear to be such on the records in the County Assessor's office which the County Assessor will use to prepare the next ensuing Assessor's roll, have signed and filed with the City Clerk a written petition for the acquisitions and improvements and a written waiver of investigation proceedings under Division 4 of the Streets and Highways Code of California. 2. The provisions of Division 4 of the Streets and Highways Code of California, other than those which relate to the foregoing findings, determinations and orders, shall not apply to the making of the acquisitions and improvements, and proceedings therefor shall be had pursuant to the Municipal Improvement Act of 1913 and bonds shall be issued pursuant to the Improvement Bond Act of 1915, without further proceedings under Division 4. I hereby certify that the foregoing Resolution was regularly introduced and adopted by the City Council of the City of South San Francisco at a regular meeting held on the 27th day of June , 1990, by the following vote: AYES: Councilmembers Jack Dra.qo, Gus NicoloDulos, John R. Penna, Roberta Cerri Teglia, and Mayor Richard A. Haffev NOES: None ABSTAIN: None ABSENT: None -2- RESOLUTION NO. 81-90 POINTE GRAND BUSINESS PARK ASSESSMENT DISll~ICT DESCRIPTION OF WORK Within the City of South San Francisco, County of San Mateo, State of California, the construction and acquisition of the public improvements set forth below, including all required demolition and removal of existing improvements, clearing, grubbing, grading, installation of stabilization and erosion control measures, and the construction of all auxiliary work necessary and/or convenient for the accomplishment of such improvements, all as provided in plans and specifications approved by the City of South San Francisco and any other governmental entity or utility with authority to approve all or a portion of such required plans and specifications, together with the acquisition of all required rights-of-way, easements, licenses, franchises, permits, rights of service and use, reports, surveys, ~lans, maps, and diagrams required for the completion of such improvements and the payment of costs of appraisers, consultants, engineers and attorneys required and approved by the City for the conduct of special assessment proceedings and the issuance of special assessment bonds. (A) Installation of a traffic signal with CalTrans type controller at the intersection of the project main entrance driveway and East Grand Avenue. The work shall include the installation of conduit and wiring, new controller and cabinet, signal poles, street lighting, signal poles, other equipment and services necessary for a fully functional traffic signal. (B) Improve East Grand Avenue along the frontage of the north boundary line. The ~mprovements shall include sidewalks, construction of new pavement section as required to provide for four traffic lanes, dedicated left turn lanes into Roebling Road, the main project entrance and commercial driveway entrance, asphaltic concrete overlay, landscaped and irrigated median raised island with curb and gutter, driveway entrances with concrete gutters, curb, gutter, sidewalk, wheelchair ramps, raised pavement markers, traffic signs and striping all within a 100' right-of-way. (c) Installation of a street lighting system consisting of seven lO0-watt high pressure sodium City of South San Francisco standard street lights with 12 foot mast arm, all underground conduit, wiring and pullboxes, as required, to a ).G.&E. connection point. (D) Construction and installation of the Harbor Way Storm Drainage system between the project site and Colma Creek, as required to accommodate runoff from the entire fully developed property. The storm drain system shall include reinforced concrete pipe, manholes, catch basins, special drainage structures, as required, for a fully functional system. (E) Construction of improvements to the existing sanitary sewer system including vitrified clay pipe installation, manholes and all appurtenances necessary and i~cidental items necessary for the installation of the system. (F) Contribution to the construction of the Oyster Point Interchange and Grade Separation {City Project No. ST-86-3), to provide for overcrossing and interchange facilities over Highway 101 and the existing railroad rights of way adjacent thereto, including ramps, structures, bridges, drainage, lighting, signs, striping, curbs, gutters, sidewalks, landscaping, and requi-ed conforming improvements to existing streets and drainage facilities, as required. Y:PTGRAND.)ES EXHIBIT A Page I