HomeMy WebLinkAboutReso 4462-1966RESOLUTION NO. 4462 A RESOLUTION APPROVING CHANGE ORDER NO. 12 AND DENYING OTHER CLAIMS CABOT, CABOT & FORBES INDUSTRIAL PARK UNIT NO. i RESOLVED, by the City Councml of the City of South San Francisco, California, that WHEREAS, this Council has heretofore awarded a contract for the construction of improvements to Baldwin Warren Company, Inc., in proceedings conducted pursuant to Resolution of Intention No. 3939 adopted May 18, 1964; WHEREAS, said Contractor has filed claims with this City totalling $234,697.07 for alleged extra work and damages in connectmon with said contract, and samd claims have been care- fully analyzed by the Engineer of Work and the City Engineer, and a report of said analyses submitted to this Council; NOW, THEREFORE, IT IS ORDERED, as follows: 1. That said claim, to the extent of and in the amounts set forth in Change Order No. 12, prepared and approved by Wilsey, Ham & Blair, Engineer of Work, in form a copy of which is hereto attached and incorporated herein by reference, is hereby allowed and approved and payment thereof authorized to be made to said Contractor; subject, however, to the express conditmon that the total amount thereof, to-wit: $9,585.61, be tendered to said Contractor in full satisfaction of the items claimsdas extras and set forth on page 2 of said Change Order, but without prejudice to any position which the Con- tractor may have or may allege in connection with the other items of his claim. 2. That the items identified mn said claim, as follows, to-wit: 8. 3.7 9. 3.8 26. 3.33 Pumping on the East side of Swift Company's Ramp during rainy period and preparing drainage for this location. Work sheet attached, as requested by letter from Wilsey, Ham & Blair dated December 29, 1965. $2,925.00 Reworking material that had been flooded because the water could not drain on Allerton. Work sheet at- tached, as requested by letter from Wilsey, Ham & Blair dated December 29, 1965. $1,710.00 Additional work and pumping required when Gradall hit exist- ing sewer line which was not indicated on the plans near Man- holes 21 and 47. $ 414.00 are approved in principle but subject to the providing by said Contractor of an itemized statement of the precise amount thereof in form satisfactory to Wilsey, Ham & Blair, Engineer of Work. 3. That all other items set forth in said claim are hereby denied. I hereby certify that the foregoing resolution was regularly intro- duced and adopted by the City Council of the City of South San Francisco at a regular meeting held on the 16th day of ~ay, 1966, by the following vote: AYES, COUNCIU. tEN NOES, " ABSENT, " Frank J. Bertucellt, Patrick E. Ahem, Emilio Cortest, Andrew Rocca and Guido J. Rozzi None None ATTEST: ~ C~pany ) I nc. '~'" "' ;~gt0T. You are hereby dir~ted to mak ~ i~ ~s or do the following described w0r~' not included in the plans and sp ~is not effective until approved by "Owner." ~owing change, and work affected thereby, are subject to all contract stipulations of the "Owner" are not prejudiced; and ires against the "Owner" which are incidental to or as a consequence of this ~ done, estimate of quantities, and prices to be paid. Segregate ~een ~unt. Unless otherwise stated, rates for rental equipment cover only such time 1~ made ~or idle time. · r , ~ ~e Engine ~ is th~ n~ accumuJated increase or ~;~a~ ;rom th~ or;~inaJ quand~ in ~h= En (See attached sheet.) ;at conm~t ? By rea$°Wot th;. Subm~d bY: Estimated Cost: Decrease $ the time of completion will be adjusted as follows: i near Approval Recommended A pprovt~.:..:Owner :.~ Tide?~ ! I~. Nash Wilsey, Ham & Blair Date Date Date Dec. We the undersigned ~contractor, have given careful consideration to the change proposed and hereby agree, if this pcopO~l .i~. proved, that we will 'Provide all equipment, furnish all materials, except as may otherwise be noted above, and perf6rm n~essa~ for the work a~ve specified, and will accept as full pay ment therefor the prices shown a~ve. Accepted, Date ;:~ ~' Contractor Baldwin ~arren C~pany, Inc. ' If the acceptance of this order, ~ ~t~ti~ is .O~ect~,~he r~uire~nts of t~.,~ifi~ti~ pr~ing p~est with~'~ '~ '~~ ." ~/ILSEY, HA~ & BLAIR~ CONTRACT CHANGE ORDER NO. [2 I. *Addl~al costs 15" VoC.P. Sewer ~avement~ removal, and replacenmnl~ 2. due to c c~nt roi LeS° Simplification of swift & Co. retaining wall LeS, Credit 3. Revise Inlet Sra. 0+15 E. Grand and place rock subbase under sidewalk along E. Grand Ave. Break wall of storm drain and encase junction of storm drain and sanitary sewer Sta. /++78. E. Grand Ave. Hove Storm Hanhole No. 10 Pumping Low Area of Track "C" ® Open Eccles & Forbes to traffic and barricade open · paving cut for safety to accommodate Oeveiopment Heeting Increase depth Catch Basin No. 13 by 1.6/+ feet and ~atch Basin No. 15 by 0.9 feet; total increases 0.66 C.Y. Offset Catch Basin No. 33 around 18" H20 line itional t~rk required on on L~Se LeS° LoSo LoS. L.Se LeS° f7,k33.08 (-3 " ,, 210,72 132.00 3.07.00 ] I! 'I ;