Loading...
HomeMy WebLinkAboutReso 81-1978WMAMcE:JLC:rva 6/29/78 20c RESOLUTION NO. 8~ -78 -- A RESOLUTION ORDERING CHANGES AND MODIFICATIONS AND CALLING FOR SEALED PROPOSALS AND FIXING LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK WITHIN TIME SPECIFIED GELLERT BOULEVARD EXTENSION PROJECT ASSESSMENT DISTRICT PHASE II -- STREET IMPROVEMENTS PROJECT NO. ST.77-5A RESOLVED, by the City Council of the CitY of South San Francisco, California, that WHEREAS,. the said Council did, on the 4th day of May, 1977,. adopt its Resolution of Intention No. 52-77 to order, among other things, the construction of base, pavement, wearing surface, curbs, gutters, sidewalks, street lighting facilities, divider section, water mains, hydrants, services, fire alarm systems, sanitary sewer mains, manholes, wye branches, laterals, traffic signalization facilities, storm'drainage pipes, catch basins, and underground utility duct systems, together with appurtenances to any of the-above, all as more particularly described and set forth in said Resolution of Intention, as amended; and WHEREAS, a Petition and Consent executed by all of the 'owner~ o£ all of the property within the a~sessment district has been filed with the City Clerk requesting that the acquisitions to be made and the work to be done pursuant to said Resolution of Intention be changed and modified so that construction Phase II thereof conforms to those certain plans and specifications entitled," Phase II Street Improvement Plans, Pro~ect No. ST 77-5A, Gellert Boulevard Extension Project Assessment District", dated July, 1978; NOW, THEREFORE, IT IS FOUND, DETERMINED and ORDERED as follows: 1. The acquisitions to be made and the work to be done pursuant to Resolution of Intention No. 52-77, as amended, and the plans and specifications therefor are hereby'changed and modified to conform, for construction Phase'II, thereof, to those certain plans and specifications entitled, "Phase II Street Improvement Plans, Project No. ST 77-5A, Gellert Boulevard Extension Project Assessment District", prepared by Theodore V. Tronoff, Civil Engineer & Surveyor, Inc., dated July, 1978, and on file in the office of the City Clerk. 2. The maps and descriptions of the acquisitions to be made pursuant to said Resolution of Intention are hereby ordered changed and modified to conform to said plans hereinabove mentioned. 3. All of said changes and modifications shall be made by the Engineer~either on the face of the report.or by filing an amendment thereto. 4. The City Clerk is hereby directed to publish once a week for two weeks in the Enterprise Jburnal, a newspaper published and circulated in said City, a Notice Inviting Sealed Proposals or Bids for the construction of said improvements, and referring to the plans and specifications on file in the office of said City Clerk, the first publication of which notice shall be at least fourtegn days prior to the time fixed for opening bids. -2- 5. Ail proposals or bids shall be accompanied by cash, a cashier's or certified check payable to the order of the City Clerk amounting to ten percent of the bid, or by a bond in said amount and payable to said Clerk signed by the bidder and a cOrporate surety or by the bidder and two sureties who · shall justify before any officer competent to administer an oath, in'double said amount and over and above all statutory exemptions. The amount so posted shall be forfeited to said Clerk in Case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to him, enter into a contract with the City. 6. Pursuant to Section 1773 of the Labor Code of the State of California, the City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for holidays and overtime work for each craft, classification, or type of workman required to execute the contract. A copy of said prevailing rate of per diem wages is on file in the office of the.City~Clerk, to which reference is hereby made for further particulars. Said prevailing rate of per diem wages will be made available to any interested party upon request', and a copy thereof shall be posted at the job site. 7. It is hereby determined that in the event the contractor, contracting owners included, does not complete the work within the time limit specified in the proposed contract or within such further time as this Council shall have authorized, the contractor or contracting owners, as the case may be, shall pay to the City -3- liquidated damages in the amount of THREE HUNDRED DOLLARS ($300.00) per day for each and every day's delay in finishing the work beyond the completion date specified in said contract. Additional provisions with regard to said time of completion and liquidated damages are set forth in the specifications, which provisions are hereby referred to and incorporated herein by reference. 8. Said sealed proposals or bids shall be delivered to the City Clerk on'or before 2:00 o'clock P.M. on the 31st day of July, 1978, said time being not less than fourteen daYs from the time of first publication of said notice. Bids will be publiclY opened, examined and declared on. said day and hour. I hereby certify that the foregoing resolution was regularly introduced and adopted by the City Council of the City of South San Francisco at a regular meeting held this 5th day of Ju~¥ , 1978, by the following vote: AYES, NOES, ABSENT, COUNCILMEMBERS COUNCILMEMBERS COUNCILMEMBERS Rona~d G. Acosta, William A. Borba, Emanuele N. , ,, Damonte, Terry J. Mirri, and Roberta Cerri Tegl'ia None None ABSTAIN, COUNCILMEMBERS None ATTEST: -4-