Loading...
HomeMy WebLinkAboutReso 50-1979 RESOLUTION NO 50;,79 ..... ,' · CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO' STATE OF CALIFORNIA A RESOLUTION AUTHORIZING EXECUTION OF AMENDMENT TO AGREEMENT BETWEEN THE CITY OF SOUTH SAN FRANCISCO AND THE STATE OF-CALIFORNIA (EL CAMINO REAL WI DENING) - BE IT RESOLVED .by the City CoUncil of the City of South San Francisco that: 1. EXecution: Execution of the Amendment to Agreement between the City of South San Francisco and the State of California, acting by and through its Business and Transportation Agency, Department of Transportation (04-SM-82 20.8/22.1 04210-199121, Arroyo Drive to Hickey Boulevard, District Agreement No. SM-41-3374), a copy of which is attached hereto as Exhibit "A", is hereby authorized. 2. Signatures.. The Mayor is authorized to execute said Agreement on behalf of the City, and the City Clerk' to attest his signature thereto. May AYES- NOES' ABSENT' I hereby certify that the foregeing Resolution was regularly introduced and adopted by the City Council of the City of South San Francisco at a regular .... meeting held on the 16th day of , 1979, by the following vote: Councilmen Ronald G. Acosta, William A. Borba, Emanuele N. Damonte, Terry J. Mirrii Councilwoman Roberta .Cerri Teglia None None 'EXHIBIT "A" TO RESOLUTION NO. 50-79 ADOPTED May 16, 1979 04-SM-82 20.8/22.1 04210-199121 Arroyo Dr. to Hickey Blvd. Dist. Agmt.. No. 4-0686-C Document No. SM-41-3374 3 5 6 ? 8 9 12 13 16 17 ~8 19 PLE-els /4CD802 THIS AND AMENDMENT TO AGREEMENT THIS AMENDMENT TO AGREEMENT, MADE AND ENTERED INTO ON DAY OF , 1979, BY AND BETWEEN CITY OF SOUTH SAN FRANCISCO, a body politic and a municipal corporation of the State of California, hereinafter referred to as "CITY" STATE OF CALIFORNIA, acting by and through its Business and Transportation Agency, Department of Transportation, hereinafter referred to as "STATE". WITNESSETH: WHEREAS, the parties hereto entered into an Agreement, Document File No. SM-41-3374, which provides for widening Route 82 (El Camino Real) between Arroyo Drive and Hickey Boulevard (referred to as "PROJECT") and for constructing sidewalks, curbs and gutters, landscaping, and installing continuous lighting and traffic control signal systems · (referred to as "IMPROVEMENTS"). . 4CD802 3 4 7 8 9 11 12 ~3 15 z6 17 18 19 20 WHEREAS, bids for PROJECT and IMPROVEMENTS were opened March 28, 1979. The low bid was 12 percent over the Engineer's Estimate and almost all the increase over the Engineers Estimate occurred in those items for which CITY is paying the matching share; and WHEREAS, the preliminary engineering effort required for IMPROVEMENTS was comparable to that for PROJECT: and WHEREAS, STATE's standardized rates for preliminary engineering are applicable only to projects whose total cost is under $2,000,000; and WHEREAS, the lowest bid received by STATE for PROJECT and IMPROVEMENTS was in the range of $3,200,000; and WHEREAS, Agreement No. SM-41-3374 required that CITY pay a rate of 8 % of the construction cost of IMPROVEMENTS for preliminary engineering; and WHEREAS, it has been determined that a rate of 5.67% of the construction cost of IMPROVEMENTS for preliminary engineering would be a more equitable rate for CITY to pay; and * * * * * * * 22 · . , , , , . 23 * · · · * · * 24 · · . . , . , -2- 4¢D802 2 4 7 8 9 11 12 16 WHEREAS, the parties hereto desire to amend said Agreement tO account for the increased construction cost of IMPROVEMENTS and for the lowered rate for ~preliminary engineering. NOW THEREFORE, in consideration of the premises and mutual understakings of the parties hereto, it is hereby agreed as follow: (1) That Section II, Article 1 and Exhibit A of the aforesaid Agreement (Document File No. SM-41-3374) are hereby superceeded and replaced by the following: 18 * * * * * * * 19 22 * * * * * * * 23 * * * * * * * 2h. * * * * * * * 25 * * * * * * qODS02 2 5 6 9 11 12 15 16 17 18 19 21 22 23 25 SECTION I I CITY AGREES 1.) To deposit with STATE, with return of this Agreement upon execution by CITY, the amount of $213,000 (or such portion thereof which will increase CITY's deposit to $213,000) which figure represents STATE's estimate of CITY's share for preliminary engineering, construction engineering and construction costs for the aforesaid IMPROVEMENTS pursuant to this Agreement. A detailed estimate of CITY's share of these costs is shown on Exhibit A-i' which by this reference is hereby made a part of this Agreement. Actual costs to be borne by CITY will be determined upon completion of all work and shall be the sum of following: (a) Construction Cost: CiTY's share (estimated to be $145,000) shall be 50 percent of the cost to · install traffic signals at Hickey Boulevard, 33 1/3 percent of the cost to install traffic signals at the intersection of Route 82 and the Kaiser Hospital entrance road and 100 percent of the cost to construct sidewalks, curbs and gutters, landscaping, and install continuous lighting after expected FAU reimbursement has been deducted. (b) Preliminary Engineering (Not FAU Participating): CITY's share (estimated to be $48,000) shall be 5.67 percent of the CITY's share of construction ~4CD802 -1 2 5 6 ? 8 9 10 11 12 costs of IMPROVEMENTS before expected FAU reimbursement has been deducted. Said percentage includes payment for all applicable overhead charges. (c) Construction Engineering Costs CITY's share (estimated to be $20,000) shall be 14 percent of CITY's share of the construction cost of IMPROVEMENTS after expected FAU reimbursement has been deducted. 'Said percentage includes payment for applicable overhead charges. 16 * * * * * * * 18 * * * * · · * 20 * * * * * * 23 * * * * * * * 2b, · ,'. . , . . . -5- 4CD802 1 (2) All other terms and conditions of said original 2 .Agreement shall remain in full force and effect. 5 6 7 8 9 11 12 16 17 18 19 21 22 25 IN WITNESS WHEREOF, the parties hereto have caused this Amendment to Agreement to be executed by their respective officers, duly authorized, the provisions of which Agreement are effective as of the day, month and year first hereinabove written. STATE OF CALIFORNIA Department of Transportation Transportation District 4 T. R. LAMMERS District Director By Deputy District Director CITY OF SOUTH SAN FRANCISCO By Mayor Attest: City Clerk APPROVED AS TO FORM: City Attorney -6- 04210- 199121 EXHIBIT "A-l" COMPUTATION OF CITY'S SHARE TOTAL COST FAU CITY' S 'SHARE (A) Estimated ConstructionS783,400 $650,400~ $133,000 Cost of IMPROVEM.-~NTS (Except traffic Signals) (B) Estimated Construction 44,900 37,400 7,500 Cost of Traffic Signals at Hickey Blvd. (89,8oo x 50%) (C) Estimated Construction 27,700 23,200 4,500 Cost of Traffic Signals at Kaiser Hospital Rd. (E) 000 x *5.67% = $ 48,000 (D) Estimated Total 856,000 711,000 145,000 . Construction Cost of IMPROVE~LENTS (A,B a C) Preliminary En~ineerin~ 856, (Not FAU Participating) (F) Construction Engineering 145,000 x *14% = $ 20~000 (FAU Participating) TOTAL CITY'S SHARE (D + E + F) $213,000 *The 5.67% and 14% stated herein includes all applicable overhead charges.