RESOLUTION NO. 149-81
A RESOLUTION DETERMINING TO UNDERTAKE PROCEEDINGS
PURSUANT TO SPECIAL ASSESSMENT AND ASSESSMENT BOND
ACTS FOR THE MAKING OF ACQUISITIONS AND IMPROVEMENTS
WITHOUT FURTHER PROCEEDINGS UNDER DIVISION 4 OF THE
STREETS AND HIGHWAYS CODE
THE GATEWAY ASSESSMENT DISTRICT
RESOLVED, by the City Council of the City of South San Francisco, County of
San Mateo, California, that
WHEREAS, a written petition for undertaking proceedings pursuant to special
assessment and assessment bond acts, and to assess the cost thereof upon the
properties benefited, and waiving proceedings under Division 4 of the Streets and
Highways Code, signed by the owners of more than 60% in area of the properties
proposed to be assessed, has been filed with the City Clerk for the making of the
acquisitions and improvements described on Exhibit "A" attached hereto and made a
part hereof;
WHEREAS, the costs and expenses of said acquisitions and improvements are to
be chargeable upon an assessment district, the exterior boundaries of which are the
coterminous exterior boundaries of the composite and consolidated area shown on the
map thereof on file in the .office of said Clerk, to which reference is hereby made
for further particulars;
WHEREAS, said proceedings are in whole or in part for the financing and
improvement of streets and easements initiated, under a contract entered into or
proposed to be entered into between a subdivider and the City of South San.
Francisco pursuant to Section 66462 of the Government Code, and the evidence and
certificate required to be submitted and furnished by Sections 2804.1 and 2804.2
of the Streets and Hi§hways Code have been submitted and furnished;
WHEREAS, the public interest and convenience will be served by the taking of
said proceedings;
NOW, THEREFORE, IT IS HEREBY FOUND, DETERMINED AND ORDERED as follows:
1. That all of the owners of more than 60% in area of the property subject
to assessment for said acquisitions and improvements who appear to be such on the
Assessor's .roll on the day that said petition was filed, or, in the case of
transfers of land or parts thereof subsequent to the date upon which the last
Assessor's roll was prepared, appear to be such on the records in the County
Assessor's office which the County Assessor will use to prepare the next ensuing
Assessor's roll, and including owners as defined in Section 2804.2 of the Streets
and Highways Code, have signed and filed with said Clerk a written petition for
said acquisitions and improvements and a written waiver of investigation
proceedings under Division 4 of the Streets and Highways Code.
2. That the total estimated amount of the proposed assessment for the
portion of said acquisitions and improvements which are improvements of streets and
easements initiated under said contract pursuant to Section 66462 of the Government
Code will not exceed 75% of the estimated fair market value of the land proposed to
·
be assessed therefor after the proposed public improvements have been constructed,
and that there has been strict compliance with the requirements of Sections2804.1
and 2804.2 of the Streets and Highways Code.
3. That the provisions of Division 4 of the Streets and Highways Code,
other than those which relate to the foregoing findings, determinations and orders,
shall not apply to the making of said acquisitions and improvements, and
proceedin§s therefor shall be had. pursuant to the Municipal Improvement Act of 1913
and bonds shall be issued pursuant to the Improvement Bond Act of 1915, without
further proceedings under said Division 4.
I hereby certify that the foregoing resolution was regularly introduced and
adopted by the City Council of the City of South San Francisco at a regular meeting
held on this 16th day of n~mb~r , 1981, by the following vote'
AYES, Councilmembers' Ronald G. Acosta, Mark N. Addiego, Emanuele N. Damonte,
Gus Nicolopulos; Roberta Cerri Teglia
NOES, Councilmembers' None
ABSENT, Councilmembers' None
ATTEST'
City
10/19/81
a) Opening of Gateway Boulevard between East Grand Avenue and Oyster Point
Boulevard and the improvement thereof by clearing, grubbing, excavation,
grading, removal of existing trees, shrubs and structures and the construction'
therein of base, pavement, curbs, gutters, meandering sidewalks, driveways,
street trees, median islands, surface and subsurface storm drainage
facilities, where required~ facilities for channeling, merging, stripin§ and
reflective pavement marking, turning and controlling traffic, where required,
in accordance with the requirements of the City of South San 'Francisco, and
installation of underground cables, pipes and electrical conduit and traffic
signal systems, .where required, landscaping, including sprinkler and
irrigation systems, street signs, street monuments, water mains, valves,
tees, fittings, services and hydrants, where required., sanitary sewer mains,
manholes with manhole frames and covers, cleanouts and laterals, where
required, gas transmission and service facilities, where required,
underground electrical power distribution and service facilities and
underground communication transmission and service facilities, street
lighting facilities, and bus stops and shelters.
b) Widening of East Grand Avenue between Gateway Boulevard and Forbes Boulevard
and the improvement thereof and of East Grand Avenue between Gateway Boulevard
and the Southern Pacific Railroad right-of-way located approximately 900 feet
west of Oateway Boulevard by clearing, grubbing, excavation, grading, removal
of existing trees, shrubs and structures and the resurfacing, repairing and
reconstruction of street improvements, where required, and the construction
of base, pavement, curbs, gutters, sidewalks, driveways, traffic striping,
reflective pavement markings, street signs, landscaping, including irrigation
and sprinkler systems, where required, surface and subsurface storm drainage
facilities, where required,, street lighting facilities, service relocations
to meet the new grade, traffic signal facilities at the intersection of East
Grand Avenue and Gateway Boulevard, the. modification and improvement of the
intersection of East Grand Avenue with Forbes Boulevard and with Harbor Way,
including %he raising of the existing railroad tracks to meet the ~new grade
and the installation of traffic signal facilities and railroad crossing
protection devices and facilities for channeling traffic.
c)
Improvement of Harbor Way between East Grand Avenue and Mitchell Avenue by the
reconstruction of existing curbs, gutters, sidewalks and driveways, pavement
reconstruction and asphalt resurfacing, striping and reflective pavement
marking and surface and subsurface storm drainage facilities, traffic signs,
as required; and street lighting facilities.
d) Improvement of Forbes Boulevard between East Grand Avenue~ and the existing
railroad drill track crossing located approximately 1,000 feet northeasterly
of East Grand Avenue by the removal of existing islands and pavement, as
required, the relocation of street lighting facilities, .the construction of
new curbs, pavement, striping, markers and other traffic control devices, as
required, and landscaping, including sprinkler and irrigation systems, as
required~
EXHIBIT A
The Gateway Assessment District
(Revised)
e) 'Widening of Oyster Point Boulevard between a point approximately 500 feet
easterly of Gateway Boulevard and Dubuque Avenue and improvement thereof by
the removal of existing curb, gutter and sidewalks, where required, and
clearing, grubbing, excavation and grading and the construction of pavement,'
curbs, gutters, sidewalks, median islands, landscaping, including sprinkler
and irrigation systems, where required, traffic signal facilities at the
intersection of Gateway Boulevard and Oyster Point Boulevard, and the
modification of the intersection of OYster Point Boulevard with Dubuque
Boulevard, the installation of railroad crossing protection devices, traffic
signal facilities, curbs, gutters, sidewalks, street 1. i§hting facilities,
service relocations, signing, striping and surface and subsurface storm
drainage facilities, as required, and construction of transition improvements
to conform with the existing portion of Oyster Point Boulevard.
f) Improvement of the existing'earth channel located along the westerly side of
Industrial Way, which commences at the intersection of East Grand Avenue and
Industrial Way and extends northeasterly approximately 1,400 feet, by the
concrete lining thereof in accordance with the requirements therefor of the
City of South San Francisco, and the construction of storm drainage mains in
(1) East Grand Avenue between Harbor Way and Sylvester Street, (2) Harbor Way
between East Grand Avenue and the existing storm drainage main located
approximately 300 feet southerly of East Grand Avenue and '(3) East Grand
Avenue between the'intersection of East Grand Avenue and Industrial Way and
the intersection of Sylvester Street with East Grand Avenue.
g) Construction of a storm drainage'main, with manholes with manhole frames and
covers, catch basins, headwalls and appurtenances, paralleling the existing
storm drainage system commencing at the intersection of East Orand Avenue and
.Sylvester Street and extending south~ ~n~Sylvester Street._approximately
'900 feet to the Southern Pacific Railroad right-of-way, thence extending
across said right-of-way and approximately 200 feet southeasterly to the
westerly boundary of the P.O.&E. Transmission Line right-of-Way, thence
southwesterly along the westerly boundary of said transmission line right-of--
way. to Colma Creek, and the restoration and/or reconstruction of said existing'
storm drainage system, and surface improvements and landscaping, as required.
'h) Improvement of the sanitary sewer facilities in Oyster Point Boulevard between
the intersection of said Boulevard with the Southern Pacific Railroad right-
of-way and a point approximately 500 feet easterly of the intersection of
Gateway Boulevard with Oyster Point Boulevard by replacement of portions of
said facilities, as required, and construction of a Pump station with all
necessary controls' in the vicinity of Gateway Boulevard and Oyster Point
Boulevard, together with a sanitary sewer force main commencing at said pump
station and extending southwesterly in Gateway Boulevard approximately 700~
feet.
EXHIBIT A
The Gateway Assessment District
(Revised)
(ii)
i)
J)
k)
Construction of facilities for channeling, merging, striping, turning and
controlling traffic, and traffic signal facilities, where .required, at the
intersections of Oyster Point Boulevard, Linden Avenue, East Grand Avenue,
Baden Avenue and Produce Avenue with Airport Boulevard, and at the inter-
sections of Interstate 380, Utah Avenue' and Mitchell Avenue with South Air-
port Boulevard in accordance with the Final Environmental Impact Report
for the Gateway Redevelopment Project, dated June 1981.
Undergrounding of existing 'and new electrical power distribution'and ser-
vice facilities and communication transmission and services facilities (1)
on East Grand Avenue between Forbes Boulevard and the Southern Pacific
Railroad right-Of-way, (2) on Oyster Point Boulevard between a point 500
'feet, more or less, easterly of Gateway Boulevard and the Southern Pacific
Railroad right-of-waY and (3) on Indus.trial Way between East Grand Avenue
and Oyster Point Boulevard.
Widening of ~Produce Avenue to two southbound lanes between Colma Creek and
Highway lO1 on-ramp and improvement thereof by removal of existing curb,
gutter and sidewalks, where required, and clearing,' grubbing, excavation
and grading and construction of pavement, curbs,.gutters, sidewalks and
striping and reflective pavement marking as required.
l) Installation of perimeter landscaping, including along both sides of Gateway
Boulevard between East.Grand .Avenue and Oyster Point Boulevard, along the
southwesterly side of Forbes Boulevard between East Grand Avenue and the
point northerlY of East Grand Avenue at which Forbes Boulevard extends be_
yond the assessment district boundary, along the northerly side of East
Grand Avenue between Forbes Boulevard and Industrial Way, along the souther-
ly side of Oyster Point Boulevard between Industrial Way and a point approx-
imately 500 feet easterly of the intersection of Gateway Boulevard with
Oyster Point Boulevard. ~
·
m) Acquisition of all lands, easements and rights-of-way.and all auxiliary work
necessary to complete said improvements.