Loading...
HomeMy WebLinkAboutReso 118-1982RESOLUTION NO. 118-82 A RESOLUTION AMENDING RESOLUTION OF INTENTION TO MAKE ACQUISITIONS AND IMPROVEMENTS THE GATEWAY ASSESSMENT DISTRICT NO. ST-82-2 RESOLVED, by the City Council of the City of South San Francisco, County of San Mateo, California, that WHEREAS, this Council, on July 7, 1982, adopted Resolution No. 74-82, A Resolution of Intention to Make Acquisitions and Improvements; and WHEREAS, it appears that the public interest, convenience and necessity require that certain improvements be added to the proposed project; NOW, THEREFORE, IT IS HEREBY ORDERED that the description of acquisitions and improvements in said Resolution No. 74-82, as set forth in Exhibit "A" thereto be and the same is hereby amended to read as set forth in Amended Exhibit "A", attached hereto and made a part hereof by reference. I hereby certify that the foregoing resolution was regularly introduced and adopted by the City Council of the City of South San Francisco at a regular meeting held on this 6th day of October , 1982, by the following vote: AYES- NOES- Councilmembers Ronald G. Acosta, Mark N. Addiego, Emanuele N. Damonte, Gus Nicolopulos; and Roberta Cerri Teglia None ABSENT' None ATTEST- A® B~ Ce De E. Opening of Gateway Boulevard between East Grand Avenue and Oyster Point Boulevard and the improvement thereof by clearing, grubbing, excavation, grading, removal of existing trees, shrubs and structures and the construction therein of base, pavement, curbs, §utters, sidewalks, driveways, street trees, median islands, surface and subsurface storm drainage facilities, where required, facilities for channeling, merging, striping and reflective pavement marking, turning and controlling traffic, where required, in accordance with the requirements of the City of South San Francisco, and installation of under§round cables, pipes and electrical conduit and traffic signal systems, where required, landscaping, includln}] ~prinklcr and irri~atlon systems, street signs, street monuments, water mains, valves, tees, fittings, services and hydrants, where required, sanitary sewer mains, manholes with manhole frames and covers, cleanouts and laterals, where required, gas transmission and service facilities, where' required, underground electrical power distribution and service facilities and underground communication transmission and service facilities, street lighting facilities, and bus stops and shelters. Widening-of East Grand Avenue between Gateway Boulevard and Forbes Boulevard and the improvement thereof and of East Grand Avenue between Gateway Boulevard and the Southern Pacific Railroad right-of-way located approximately 900 feet west of Gateway Boulevard by clearing, grubbing, excavation, grading, removal of existing trees, shrubs and structures and the construction of base, pavement, curbs, gutters, sidewalks, driveways, traffic striping, reflective pavement markings, street signs, landscaping, .including irrigation and sprinkler system, where required, surface and subsurface storm drainage facilities, where required, street lighting facilities, the modification and improvement of the intersection of East Grand Avenue with Forbes Boulevard and with Harbor Way, including the raising of the existing railroad tracks to meet the new grade and the installation of traffic signal facilities and railroad crossing protection devices and facilities for channeling traffic. Improvement of Harbor Way between East Grand Avenue and Mitchell Avenue by the reconstruction of existing curbs, gutters, sidewalks and driveways, pavement recon- struction and asphalt resurfacing, striping and reflective pavement marking and surface and subsurface storm drainage facilities, traffic signs, as required; and street lighting facilities. Improvement of Forbes Boulevard between East Grand Avenue and the existing railroad drill track crossing located approximately 1,000 feet northeasterly of East Grand Avenue by the removal of paving between existing islands as required, the relocation of street lighting facilities, the construction of new curbs, striping, markers and other traffic control devices, as required, and landscaping, including sprinkler and irrigation systems, as required. Widening of Oyster Point Boulevard between a point approximately 500 feet easterly of Gateway Boulevard and Dubuque Avenue and improvement thereof by-the removal of existing curb, gutter and sidewalks, where required, and clearing, grubbing, excavation and grading and the construction of pavement, curbs, gutters, sidewalks, median islands, landscaping, including sprinkler and irrigation systems, where required, traffic signal facilities at the intersection of Gateway Boulevard and Oyster Point Boulevard, and the modification of the intersection of Oyster Point Boulevard with Dubuque Boulevard, the installation of railroad crossing protection devices, traffic signal facilities, curbs, gutters, sidewalks, street lighting facilities, service relocations, signing, striping and surface and subsurface storm drainage facilities, as required, and construction of transition improvements to conform with the existing portion of Oyster Point Boulevard. Exhibit A Gateway Assessment District No. ST-82-2 (i) F. Improvement of the existing earth channel located along the westerly side of Industrial Way, which commences at the intersection of East Grand Avenue and Industrial Way and extends northeasterly approximately I,#00 feet, in accordance with the requirements therefor of the City of South San Francisco, and the construction of storm drainage mains in East Grand Avenue between Harbor Way and Industrial Way. G. Construction of storm drainage mains, including manholes with manhole frames and covers, catch basins, headwalls and appurtenances, commencing at East Grand Avenue and Sylvester Street and extending to the Southern Pacific Railroad right-of- way, thence extending across said right-of-way to Colma Creek, and/or reconstruc- tion of the existing storm drainage system, and surface improvements and landscaping, as required. H. Improvement of the sanitary sewer facilities in Oyster Point Boulevard between the intersection of said Boulevard with the Southern Pacific Railroad right-of-way and a point approximately 500 feet easterly of t'he intersection of Gateway Boulevard with Oyster Point Boulevard by replacement of portion of said facilities, as required, and construction of a pump station with all necessary controls in the vicinity of Gateway Boulevard and Oyster Point Boulevard, together with a sanitary sewer force main commencing at said pump station and extending southwesterly in Gateway Boulevard approximately 700 feet. Construction of facilities for channeling, merging, striping, turning and controlling traffic, and traffic signal facilities, where required, at the intersections of Oyster Point Boulevard, Linden Avenue, East Grand Avenue, Baden Avenue and Produce Avenue with Airport Boulevard, and at the intersections of Interstate 2t80, Utah Avenue and Mitchell Avenue with South Airport Boulevard in accordance with the Final Environmental Impact Report for the Gateway Redevelopment Project, Dated June 1981. J. Undergrounding of existing and new electrical power distribution and service facilities and communication transmission and services facilities (1) on East Grand Avenue between Forbes Boulevard and the Southern Pacific Railroad right-of-way, (2) on Oyster Point Boulevard between a point 500 feet, more or less, easterly of Gateway Boulevard and the Southern Pacific Railroad right-or-way and (3) on Industrial Way between East Grand Avenue and Oyster Point Boulevard. K. Widening of Produce Avenue to two southbound lanes between Colma Creek and Highway 101 on-ramp and improvement thereof by removal of existing curb, gutter and sidewalks, where required, and clearing, grubbing, excavation and grading and construction of pavement, curbs, gutters, sidewalks and striping and reflective pavement marking as required. L. Installation of perimeter landscaping, including along both sides of Gateway Boulevard between East Grand Avenue and Oyster Point Boulevard, along the southwesterly side of Forbes Boulevard between East Grand Avenue and the point northerly of East Grand Avenue at which Forbes Boulevard extends beyond the Exhibit A Gateway Assessment District No. 5T-82-2 (ii) Me assessment district boundary, along the northerly side of East Grand Avenue between Forbes Boulevard and Industrial Way, along both sides of Industrial Way between East Grand Avenue and Oyster Point Boulevard, and along the southerly side of Oyster Point Boulevard between Industrial Way, and a point approximately 500 feet easterly of the intersection of Gateway Boulevard with Oyster Point Boulevard. Opening of Gateway Boulevard between East Grand Avenue and South Airport Boulevard and the improvement thereof by clearing, grubbing, excavation, grading, removal of existing structures and miscellaneous improvements, and the construction therein of base, pavement, curbs, gutters, sidewalks, driveways, street trees, median islands, surface and subsurface storm drainage facilities, where required, facilities for channeling, merging, striping and reflective pavement marking, turning and controlling traffic, where required, in accordance with the requirements of the City of South-San Francisco, and installation of underground cables, pipes and electrical conduit and traffic signal systems, where required, landscaping, including sprinkler and irrigation systems, street signs, street monuments, water mains, valves, tees, fittings, services and hydrants, where required, sanitary sewer mains, manholes with manhole frames and covers, cleanouts and laterals, where required, gas transmission and service facilities, where required, underground electrical power distribution and service facilities and underground communication transmission and service facilities, street lighting facilities, and bus stops and shelters. N. Construction of a southbound auxiliary lane on Highway 101 between Linden Avenue and Grand Avenue. 0. Proportionate share of improvement to Pump Station No. #, located on Harbor Way. Pe Acquisition of rights of service and use in 6" underground electrical conduit between Gateway Boulevard and Industrial Way located approximately 850 feet north of East Grand Avenue. Qe Acquisition of fire alarm conduit located between the intersection of East Grand Avenue and Gateway Boulevard and a point 150 feet more or less westerly of the intersection of Cypress Street and Baden Avenue. R. Acquisition of passenger drop-off turnout located approximately 1,500 feet north of East Grand Avenue and 100 feet west of Gateway Boulevard. S. Acquisition of all lands, easements and rights-of-way and all auxiliary work necessary to complete said improvements. Exhibit A Gateway Assessment District No. ST-g2-2 (ii~}