HomeMy WebLinkAboutReso 27-1984that:
RESOLUTION NO. 27-84
CITY COUNCIL, CITY OF SOUTH SAN FRANCISCO, STATE OF CALIFORNIA
A RESOLUTION AUTHORIZING EXECUTION
OF AMENDMENT TO AGREEMENT FOR PRO-
FESSIONAL ENGINEERING SERVICES FOR
GATEWAY ASSESSMENT DISTRICT ST-8'~-2'
BE IT RESOLVED by the City Council of the City of South San Francisco
1. Execution of Agreement.
Execution of an Agreement entitled "First Amendment to Agreement for
Professional Engineering Services for The Gateway Assessment District" between
the City of South San Francisco and Wilsey & Ham is hereby authorized, and a
copy of said Agreement is attached hereto as Exhibit "1."
2. Signatures.
The Mayor is authorized to execute said Agreement on behalf of the
City, and the City Clerk attest his signature thereto..
I hereby certify that the foregoing Resolution was regularly introdUced
and adopted by the City Council of the City of South San Francisco at a r~(~lJlar
meeting held on the 14th day of March , 1984, by the following
vote:
AYES:
NOES:
ABSENT:
Councilmembers Mark N. Addiego, Emanuele N. Damonte, Richad A.
Haffey, Gus Nicolopulos; and Roberta Cerri Te.qlia
None
None
ATTEST' /~~Ci ~y C~i e rk~~_~
(13)
Perform special investigative studies and provide cost estimates as
relates to the potential modification of specified roadway
reconstruction on Oyster Point Boulevard to determine the cost
effectiveness of minimizing reconstruction on the North side of this
street.
3. Under "Phase 4: Construction Management", add the following:
(5)
During the course of construction work, provide on-site observation and
monitoring and support engineering and survey services and
coordination to identify and mitigate any encountered special
contaminated or hazardous materials on the Gateway Assessment
District site or affected adjacent City streets in accordance with
constraints imposed by State ac Federal regulatory agencies.
Add the following to Exhibit "A" Scope of Services":
Phase 5: Preliminary Engineering and Survey Services for Gateway' Boulevard
Extension.
(l)
Provide, as apPlicable the services specified under Phase I for the
.proposed extension of Gateway Boulevard from East Grand Avenue,
southward to South Airport Boulevard.
SECTION 2. AMENDED COMPENSATION
Section 6. Compensation under the Basic Agreement is hereby amended as follows:
As'compensation for performance of all the services described for Phases I, 2, 3, t~,
and 5 in Exhibit A as amended herein, the CITY agrees to pay the CONSULTANT
on a time 'and materials basis up to a maximum limit as indicated, below in
accordance with Exhibit B, CONSULTANT'S Standard Fee Schedule. The maximum
compensation to be paid CONSULTANT under this First Amendment to Agreement
is h.e. reby increased from $1,118,210 to $I,~20,320 representing, an increased
compensation of $302,110 to account for additional services to be performed by
CONSULTANT as described in Exhibits D and'E attached hereto and made a part 'of
this Amended Agreement. CITY and CONSULTANT agree that said attached
CONSULTANT'S Standard Fee Schedule shall be 'effective-through December 31,
1984 and may be amended annually thereafter. Such amendment shall be in writing
and shall be signed by the parties hereto.
2of3
'Except as modified by this First Amendment, the Basic Agreement is hereby ratified and
',confirmed:, In witness whereof, the parties to these presents have hereunto caused these
, presents to, be executed in duplicate the day and year first above mentioned;
ATT E5,i~,:~
t City Clerk
APP~VEP_4 FOR FORM:
~~ity' Attorney
CITY OF SOUTH SAN FRANCISCO
BY:
TITLE:
Mayor
WILSEY & HA.~
TITLE: ~¢,~- /~~/~y'
3of 3
EXHIBIT B
WILSEY & HAM
STANDARD FEE SCHEDULE
The compensation of CONSULTANT for work done on the basis of salary cost times
a factor, plus incurred expenses (which may be referred to as "time and materials"
or "standard billing") will be the sum of all the items set forth below:
A. PERSONNEL SERVICES
I.
2.2-times salary cost. Salary cost is defined as total hours worked times the
employee's straight-time rate of pay on an hourly basis plus 37% allowance for
payroll taxes and other-employee benefits. All time spent in connection with
the order by executive, professional, subprofessional, technical, and clerical
employees will be included. The current billings rates is attached herewith as
Exhibit C.
2. overtime premium (overtime hours worked times the difference between
overtime and straight-time pay rates).
B. TRAVEL AND TRANSPORTATION EXPENSES
Reimbursement for actual travel and subsistence expenses paid to or on behalf
of employees on business connected with the Project, plUs a serviCe charge of
10%.
0
Thirty-five cents (35¢) per mile for use of vehicles. A minimum of four dollars
($4.00) per hour will be charged for use of vehicles carrying field survey
equipment or used for field inspection and supervision.
C. OUTSIDE SERVICES
I. Invoice cost of services and expenses charged to CONSULTANT by outside
c0nsul.t?nts, professional, or technical firm~ engaged in connection with the
Order, plus 15% overhead costs.
D. MISCELLANEOUS EXPENSES
le
The invoice cost of materials, supplies, reporduction work, and other services~
including communication expenses, procured by CONSULTANT from. outside
sources, plus a service charge of 10%. All out-of-pocket expenses not included
in Items A, B, and C will be included in this category.
.
a~
Electronic distance measuring
devices used in performing
services for CITY.
VarieS depending on instrument used
-b. Computer use.charges
Varies depending upon program and -
outside service use.
c. Word Processor Varies'depending on machine used.'
EXHIBIT C
WILSEY & HAM
CURRENT BILLING RATES
(Subject to Change)
Clasification
Principal
Program Director
Project Manager
Engineer
Surveyor
Draftsperson
Clerical/Administrative
Hourly Rate
$9~.bo- ,oo.oo
$ ~7.oo - s~.oo
$ 61.00 - 73.00
$ ~2.oo - ,~6.oo
$ ~.oo - ~.oo
$ 23.00 - 3~.oo
$ 23.00 - 39.00
.
2. (i)
(ii)
(iii)
(iv)
(v)
(vi)
3.
EXHIBIT D
COST BASIS
FOR
REQUESTED CONTRACT FEE INCREASE
PROFESSIONAL ENGINEERING SER¥ICES
FOR
THE GATEWAY ASSESSMENT DISTRICT
Original Contract Sum
Fees for services to 12/31/83
$ 863,207.2t~
.Plus current estimate of remaining
fees for contract completion of
basic services under the original
agreement from '1/I/84 to 7/3 l-/$t~.
(See Exhibit E - Paragraph A)
$ 189,900.00
Plus estimated fees for extra
work tasks indicated under this
proposed contract agreement.
(See Exhibit E - Paragraph B)
Subtotal
Less Original Contract Sum
SubtOtal
Requested Fee Increase
$ 367,219.00
$I ,t~20,326.2t~
$I-,118,210.00
$ 302,116.2t,
Revised Contract Sum
$1,118,210.00
$ 302,110.00
$1,~20.320.00
· EXHIBIT E
COST BREAKDOWN
FOR
REQUESTED CONTRACT FEE INCREASES
WILSE¥ & HAM PROFESSIONAL ENGINEERING SERVICES
FOR.
THE GATEWAY ASSESSMENT DISTRICT
Estimated remaining dollar amounts requested for services under the Basic
Contract Agreement (Phases I-4) for work to be performed 1/I/84 to 713118t+:
Phase
l&3
4-1.
Services to be Performed
Design of Produce Ave. Widening $
Resident Engineering (Phase 1)
Office Support for Construction
Activities
Survey Services During Construction
Subtotal Estimated Dollar Amount $
Dollars
21,800.00
92,800.00
60,300.00
15,000.00
189,900.00
Dollar amounts for Phase # services include services associated with Produce
Avenue Widening.
Estimated total fee dollars required for extra work tasks not included under Basic
Contract Agreement:
Contract
Phase
2(11)
3(!2)
Services to be Performed
Assist City Attorney
for Land Acquistion
Realignment of
GateWay BlVd.
Dollars
$ 19,107
146,880
3(13)
(5)
Studies Relating to
Redesign of Oyster
Boulevard
Monitoring & Handling
special materials
Preliminary Engr. & Surveys
EIR Coord. for Gateway Blvd.
Extension
Subtotal Estimated Dollar Amount $
6,232
120,000
75,000
367,219