Loading...
HomeMy WebLinkAboutReso 19-1924RESOLUTION OF AWARD OF CONTRACT TO EATON AND SMITH FOR SEWER IMPROVEMENT. Whereas, sealed proposals have been invited for the construction of a sewer system in San Bruno Road, Butler Road and the Northern portion of the City of South San Francisco in the City of South San Francisco by the installation of a sewer system as per plans and specifications filed July 21st., 1924, and whereas said bids have been opened in the due course of business and it has been found that Eaton and Smith are the lowest responsible bidder; Now be it resolved by the Board of Trustees of the City-of South San Francisco that the contract for the doing of the aforesaid work be and the same is hereby awarded to Eaton and Smith at the orices soecified in their proposal on filel'selecting the vitrified pipe in the alternate, and that all other bids:be rejected and all certified checks and bonds returned to th~ respective bidders to-wit:~ PIPE SEWERS ALTE~ATE IALL VITRIFIED) SECTION NO. SIZE LENGTH. UNIT PRICE TOTAL PER LIi~.FT. 19 lS" 606 $2.50 $1515.00 20 18,, 552 3.50 1932.00 21 25" 120 1.90 228.00 22 10" 33 1.45 47.85 23 12" 453 2.50 1132.50 24 10" 67 1.45 97.15 25 12" 40 2.25 90.00 26 10" 44 1.25 55.00 27 ltl" 40 , 2.75 110.00 28 12" §~ 1.60 88.00 29 10" 38 2.10 79.80 TOTAL $ 5375.30 SECTION NO. PIPE SEWER ALTERNATE SIZE LENGTH (ALL CONCRETE PIPE) UNIT PRICE PER LIN. FT. TOTAL 19 18" 606 $2.50 20 18" 552 3.50 21 15" 120 1.90 22 10" 33 1.45 23 12" 453 2°50 24 10" 67 1.45 2§ 12" 40 2.25 26 10" 44 1.25 27 15" 40 2.75 28 12" 55 1.60 29 10" 38 2.10 TO TAL S1515.00 $1932,00 228.00 47.85 $11S2.50 97.15 90.00 55.00 110.00 88.00 79.80 5375.30 MONOLITHIC SEWER (NO ALTERNATE) SECTION NO. SIZE LENGTH UNIT PRICE TOTAL PER LIi~.FT. 15 Type A 24~x~36 650 $ 9.10 $5915.00 (without ~iling) 15 Type A 24 x~36 676 8.75 5915.00 (without piling 17 Type B 24 x ~6 860 7.60 6536.00 18 Type B 24 x 56 506 8.10 2478.60 1Sa Type C 24 x ~6 194 17.50 3395.00 TOTAL $242~9.60 For furnishing and driving piles, complete including all incidental work at 75~ per lineal foot of pi~e below cut off and 40~ per lineal foot of pile above cut off. 4 Manholes on Monolithic Sewer @ $ 75.00 each .... $300.00 4 Manholes on Pipe sewers 7 Catch-basins, complete @ $100.00 each .... $400.00 @ $110.00 each....$770.00 TOTAL..$1470.00 I hereby certify that the foregoing resolution was duly and regularly passed this 18th day of August, 1924, by the following vote: Ayes, Trustees: C.Blank, ~.A.¢unningham, A.J.Eschelbach, H.M~Caffrey, H.F.McNellis. Noes, Trustees: None Absent Trustees: l~one Attest:- H.~.McNellis ~resident of the Board of T~ustee~ of the City of South San ~rancisco. Daniel McSweeney, City Clerk.