HomeMy WebLinkAboutReso 1466-1949RESOLUTION NO. 1466
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SOUTH SAN
FRANCISCO PROVIDING FOR THE IMPROVEMENT OF CHESTNUT AVENUE
BE~EEN COMMERCIAL AVENUE AND EL CAMINO REAL.
RESOLVED by the City Council of the City of South San Francisco, that public interest and
convenience require the following improvement work to be done in said city:
The construction of pavement twenty-four (24) feet in width, consisting of a five (5~inch
crusher run base and an asphaltic concrete wearing surface two and one-half (2~) inches in thickness on Chest-
nut Avenue between the southerly line of Commerical Avenue and the easterly line of E1 Camino Real, and the
alteration of the bridge over ColmaCreek in the City of South San Francisco.
All said work shall be done at the location shown upon the plans and specifications submitted
this day by the Works Engineer of the City of South San Francisco for said work, which plans and specifica-
tions are hereby adopted for said work.
All said work shall be done and the materials used in connection therewith shall be furnished
under the direction and to the satisfaction of the Works Engineer of said city.
Said City Council of the City of South San Francisco hereby ascertains that the general prevail-
ing rates for legal holiday and overtime work applicable to said work to be done, as follows:
CLASSIFICATIONS
HOURLY WAGE RATE
Carpenter
Cement Finisher
Asphalt Plant Engineer
Box men or mixer box operator
(Concrete or asphalt plant)
Compressor
Concrete Mixers (over one yard)
Fireman in Hot Plant
Mechanical Finishers (Concrete or asphalt)
(Airports, highway or street work)
Pavement breakers,~Emsco Type
Power shovels and/or other excavating equipment with shovel type controls up
to and including one yard
LeTourneau pulls (Jeeps, Terra Corbras, La Plant Choate, and similar types of
equipment~
Rollers
Screen Man
Spreader ~achines (Barber Green, Jeager, etc.) (Engineer and screen man used in
operation)
Tractors
Tractor-type shovel loader (scale not to apply when used as blade or bulldozer)
LABORERS
GROUP NO. 1
Header Board, Gribb~zs$,Lagging Blasters-Powdermen Drillers, High Scalers,
Sand Blasters, ~agon Drill, Jackhammer pipe layers, Banders
$ 2.16
2.15
2.225
1.925
1.875
2.175
1.875
2.225
2.275
2. 525
2.375
2.225
2.275
2.225
2.225
2.375
GROUP NO. 3
General Laborers, landscape laborers and gardeners, bridge laborers, construc-
tion laborers, all clean up work of debris, grounds and buildings, watchman,
flagman, guards, wrecking laborers, maintenance and repair trackmen, street
car and railroa~ construction laborers, asphalt shovelers, concrete laborers,
(wet or dry)
PLUMBERS
Plumbers, Steamfitters, Welders, Caulkers, Pipe fitting of all description
(December 23rd)
2.50
Bricklayer
Laborers
.Holidays,
~aterial Teamsters
OVERTIME
2 times regular rate
1~ times regular rate except Saturday, Sunday
2 times regular rate
l~ times regular rate
The Clerk is hereby directed to publish by two (2) insertions in The Enterprise, a newspaper of
general circulation, published and circulated in the City of South San Francisco, a notice calling for sealed
proposals or bids for doing said work, which notice shall be substantially in the following form:
NOTICE INVITING SEALED PROPOSALS FOR THE IMPROVEMENT
OF CHEST~.~T AVENUE BET%~EEN COmmERCIAL AVON!rE AND EL
CAMINO REAL IN T~E CITY OF SOUTH SAN FRANCISCO
Notice is hereby given that sealed proposals or bids ~11 be received on the 18th day of July,
19h9, until the hour of 8 o'clock p.m., for doing the following work in saim City of South San Francisco.
The construction of pavement twenty-four (2&) feet in width, consisting of a five (5) iach crushe
run base and an asphaltic concrete'wearing surface two and one-half (2½) inches in thickness on ~hestnut Avenue
between the southerly line of Commercial Avenue and the easterly line of'E1 Cam~no Real, and the alterations of
the bridge overColma Creek in the City of South San Francisco.
All said work shall be done at the location shown upon plans heretofore adopted by the City Counc
of the City of South San Francisco for said work,and strictly in accordance with the plans and specifications
adopte~ ~or said work on the 18th day oz July, 19~9. All such work and the materials usec in connection t~ere~
s~a&£ ~e ~u~.nz~n~ under the direction ant to the satisfaction of the works engineer of said city.
Said city council has ascertained that the general prevailing rates of per diem wages and the
general prevailing rates for legal holidays and overtime work applicable to said work to be done are as follows:
CLASSIFICATION
HO~y WAGE RATE
Carpenter
Cement Finisher
Asphalt Plant Engineer
Box men or mixer box operator (Concrete or asphalt plant)
Qompressor
Concrete Mixers (over one yard)
Fireman in Hot Plant
Mechanical Finishers (Concrete or asphalt)
(Airports, highway or street work)
Pavement breakers, Emsco Type
Po~er shovels and/or other excavating equipment with shovel-type controls, up to
and including one yard
LeTourneau pulls (Jeeps, Terra Corbras, La Plant Choate, and similar types of
equipment)
Rollers
Screen Man
Spreader Machines (Barber Green, Jea~er, etc.) (Engineer and screen man used in
operation)
Tractors
Tractor-type shovel loader (scale ~ot to apply when used as blade or bulldozer)
LABORERS
GROUP NO. 1
Header Board~ Cribbera, Lagging Blasters-Powdermen Drillers, High Scalers,
SandBlasters, '~agon Drill, Jackhammer pipe layers, Banders
$ 2.16
2.15
2.225
1.925
1.875
2.175
1.875
2.225
2.275
2.525
2.375
2.225
2.275
2.225
2.225
2.375
GROUP NO. 3
General Laborers, landscape laborers and gardeners, Bridge laborers, construction
laborers, all clean up work of debris, grounds and buildings, watchman, flagmen,
guards, wrecking laborers, maintenance and repair trackmen, street car and rail-
road construction laborers, asphalt shovelers, concrete laborers, (wet or dry)
Plumbers, steamfitters, welders, caulkers, pipe fitting of all description
(December 23rd)
2.37½
2.5O
between the southerly line off Co~erci~l Avenue and the easterly line of'E1 Cnmtno Real, and the alterations of
the bridge overCo]_ma Creek in the City of South San Francisco.
All said work shall be done at the location shown upon plans heretofore adopted by the City Coun¢
of the City of South San Francisco for said work,.~and strictly in accordance with the plans and specifications
adoptea for said work on the 18th day o~ July, 19a9. All such work. and the materials usea in connection the~'ew~
snail De A~u~.nl~nca under the direction ant to the satisfaction of the w~rks engineer of said city.
Said city council has ascertained that the general prevailing rates of per diem wages and the
general prevailing rates for legal holidays and overtime work applicable to said work to be done are as follows:
CLASSIFICATION
HO~EEy ~AGE RATE
Carpenter
Cement Finisher
Asphalt Plant Engineer
Box men or mixer box operator (Concrete or asphalt plant)
Qompre ssor
Concrete Mixers (over one yard)
Fireman in Hot Plant
Mechanical Finishers (Concrete or asphalt)
(Airports, highway or street work)
Pavement breakers, Erasco Type
Po~er shovels and/or other excavating equipment with shovel-type controls, up to
and including one yard
LeTourneau pulls (Jeeps, Terra Corbras, La Plant Choate, and similar types of
equipment )
Rollers
Screen Man
Spreader Machines (Barber Green, Jea~er, etc. ) (Engineer and screen man used in
operation)
Tractors
Tractor-type shovel loader (scale ~ot to apply when used as blade or bulldozer)
LABOPJ~RS
GROUP NO. 1
Header Board~ Cribbera, Lagging Blasters-Powdermen Drillers, High Scalers,
SandBlasters, ,Vagon Drill, Jackhammer pipe layers, Banders
$ 2.16
2.15
2.225
1.925
1.875
2.175
1.875
2.225
2.275
2.525
2.375
2.225
2.275
2.225
2.225
2.375
GROUP NO. 3
General Laborers, landscape laborers and gardeners, Bridge laborers, construction
laborers, all clean up work of debris, grounds and buildings, watchman, flagmen,
guards, wrecking laborers, maintenance and repair trackmen, street car and rail-
road construction laborers, asphalt shovelers, concrete laborers, (~t or dry)
1.52½
Plumbers, steamfitters, welders, caulkers, pipe fitting of all description
(December 23rd)
2.50
OVERTIME
Bricklayer
Laborers
Holidays
Nmte~al Teamsters
2 times regular rate
1½ times regular rate except Saturday, Sunday
2 times regular rate
l½ times regular rate
The following are to be considered holidays: New Year's Day, Decoration Day, Independence Day,
Labor Day, Admiasion Day, Thanksgiving Day, Christmas Day and Sundays.
It shall be mandatory upon the contractor to whom the contract is awarded, and upon any sub-
contractorunder him, to pay not less than the specified rates to all laborers, workmen and mechanics employed
by them in the execution of the contract. The contractor shall forfeit as a penalty to the ~ity of South San
Francisco Ten Dollars ($10.00) for each laborer, workman or mechanic employed, for each calendar day, or portion
thereof, such laborer, workman or mechanic is paid less than the said sti~lated rates for any work done under
said contract, by him, or by any subcontractor under him. And such contract shall contain a stipulation to this
effect, in accordance with the provisions of Chapter 397 of the Statutes of California, 1931.
For the duration of the wars in which the United States of America is now engaged, payment for
overtime work shall be made in accordance with the executive order of the President of the United States of
America, dated September lO, 1942, if such payment for overtime work is legally subject to and legally controlled
by said order.
Nor bid will be accepted from any contractor who has not been licensed in accordance with the
provisions of Division III, Chapter 9 of the Business and professions Code of the State of California
Notice is farther hereby given that no contractor or ~ubcontractor or agent or representative ther
shall knowingly employ or cause or allow to be employed on the work herein provided for any alien, except in case
of extraordinary emergency caused by fire~ flood or danger to life or property.
The contractor or subcontractor to whom a contract for maid work may be awarded shall forfeit as a
penalty to the City of South San~Francisco Ten Dollars ($10.O0) for each alien knowingly employed in the executio
of such contract, for each calendar day, or portion thereof, during which such alien is permitted or required to
labor in violation of the provisions of Division II, Par~ I, Chapter I, Article ~ of the Labor Code of the State
California. A provision to this effect shall be inserted in such contract.
The contract must be entered into in compliance with and subject to the conditions imposed by Division
II, Part ~, Chapter l, Article 3 of the Labor Code of the State of California.
Such contract shall contain a stipulation to the effect that eight (8) hours shall constitute a legal
da~s work in the~performance of the work herein provided for, and that no contractor or subcontractor who employs,
directs or controls the work of any workman employed on ~public work shall require or permit such workman to labor
more than eight (8) hours during any one calendar day, eXcept in cases of extraordinary emergency caused by fire,
flood or danger to life or property and shall contain the further stipulation which shall provide that the contractor
to ~hom the contract is awarded shall forfeit as a penalty to the City of South San Francisco Ten Dollars ($10.00)
for each workman employed in the execution of such contract by the contractor or by any subcontractor for each calendar
day during which any workman is required or permitted to labor more than eight (8) hours in violation of the provisions
of said Article 3.
The contract to be awarded shall contain a further stipulation that the contractor~, to whom such
contract may be awarded, shall use or supply only such unmanufactured materials, produced in theOnited States, or
substantially from materials produced in the United States, excepting only where such articles, materials or supplies
from which they are manufactured are not mined, produced or manufactured, aa the case may be, in the United States, in
accordance with the provisions of Title l, Division 5, Chapter A, Article i of the Government Code of the State of
California.
Price, fitness and quality being equal, the successful bidder shall, in the performance of his contract
peefer supplies grown, manufactured or produced in the State of California, and shall next prefer supplies partially
manufacutred, grown or produced in this state, as required by Title 1, Division 5, Article 2 of the Government Code of
the State of California.
The successful bidder shall, within ten (10) days after the award, enter into a contract with the City
of South San Francisco for the faithful performance of the work to be done under said award. All sealed proposals or
bids shall be accompanied by a check payable to the City of South San Francisco, certified by a responsible bank for
an amount which shall not be less than ten (10) percent of the aggregate of the proposal, or by a bond for the said
amount and so payable, signed by the bidder and two (2) sureties who shall Justify before any officer competent to
administer an oath in double said amount over and above all statutory exemptions. If the proposal be accepted and the
contract awarded, and if the bidder shall fail and neglect to execute a contract and give the bonds required, the sum
mentioned in said check, or the principal sum of said bond, as the case may be, shall be liquidated damages for such
failure and neglect and shall be for feited to and paid into the treasury of the City of South San Francisco. The
bidder to whom the contract is awarded will be required to execute a bond for the faithful performance of his work in
an amount equal to fifty (50) percent of the amount of the undertaking with at least two (2) responsible sureties in
the ful$ amount of the bond each; and will also be required before entering ~pon the work to furnish a good and
sufficient bond, as required by Title l, Division 5, Chapter 3 of the Government Code of the State of California.
Plans, .specifications and proposal sheets may be obtained at the office of Charles E. ~andlett, said
works engineer City Hall, South San Francisco, California.
Sealed .proposals or bids will be delivered to the City Clerk of the City of South San Francisco, in the
City Hall, South San Francisco, California, on or before 8 o'clock p.m., on Monday, the 18th day of July, 19&9.
Ail sealed proposals or bids will be opened by said City Council on Monday, the 18th day of July, 19~9,
at 8 o'clock p.m.
Said City Council hereby reserves the right, in its discretion, to reject any and all bids and to
award the contract for all said work, or for any portion or portions Zhereof.
By order of the City Council of the City of South San Francisco.
Dated July 5, 19~9.
Daniel J. Hyland
City Clerk
I hereby certify that the foregoing resolution was regularly introduced and adopted by the 8ity Council
of the City of South San Francisco, this 5th day of July, 19&9, by the following vote:
Ayes,
Noes,
Absent,
Councilmen V~ctor Boido, Chas. K. Elder, Leo Ferko, Adolph Sani, Emilio Cortesi
Councilmen None
Councilmen N~ne
Attest:
(sm,.)
DANIEL J. HYLAND
City Clerk