Loading...
HomeMy WebLinkAboutReso 41-2019 (19-113)City of South San Francisco P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA ' City Council Resolution: RES 41-2019 File Number: 19-113 Enactment Number: RES 41-2019 RESOLUTION APPROVING ENTITLEMENTS TO CONSTRUCT A TWO-STORY 25,000 SQ. FT. BUILDING (400-450 EAST JAMIE COURT) AND A FIVE -STORY 311,368 GROSS SQ. FT. OFFICE/ R&D BUILDING AND A FIVE -LEVEL PARKING GARAGE ON A 6.45 -ACRE SITE (201 HASKINS WAY) FOR THE PLANNING PROJECT (P17-0096), INCLUDING ZONING MAP AMENDMENT, ZONING TEXT AMENDMENT, USE PERMIT, DESIGN REVIEW, AND PRELIMINARY TRANSPORTATION DEMAND MANAGEMENT PROGRAM. WHEREAS, Alexandria Real Estate (ARE) Equities ("Applicant") has proposed to construct a two-story 25,000 gross sq. ft. building (400-450 East Jamie Court), a five -story 311,368 gross sq. ft. office/ R&D building and a five -level parking garage on a 6.45 -acre site (201 Haskins Way) and seeks approval of a Use Permit (UP18-0001), Design Review (DR19-0004), and Preliminary Transportation Demand Management Program (TDM18-0001), as well as a Zoning Map Amendment (RZ18-0001) to re -zone one parcel at 201 Haskins Way (APN 015-102-230) from MI to Business Technology Park (BTP) and to re -zone one parcel at 400-450 E. Jamie Court (APN 015-102-250) from BC to BTP (collectively referred to as "Phase I"); and, WHEREAS, the proposed Phase 1 is comprised of parcels located within the Mixed -Industrial (MI) and Business Commercial (BC) Zoning Districts; and, WHEREAS, the 400-450 E. Jamie Court parcel is the only parcel in the area zoned BC that is adjacent to the MI and BTP Zoning Districts; and WHEREAS, in conjunction with the Applicant's request, City staff recommends that the City Council adopt a Zoning Map Amendment (RZ18-0001) and Zoning Text Amendment (ZA18-0002) to re -zone six parcels that surround Phase 1 [101 Haskins Way (APN 015-102-210), 151 Haskins Way (APN 015-102-220), 410 E. Grand Avenue (APN 015-102-180), 430 E. Grand Avenue (APN 015-102-160), 451 E. Jamie Court (APN 015-102-240), and a vacant parcel (APN 015-102-290)] (collectively referred to as "Phase 2") to BTP to further consistency with the land use designations set forth in the General Plans; and WHEREAS, Applicant's request for approval of Phase 1 entitlements and re -zoning and the City's adoption of a Zoning Map Amendment and Zoning Text Amendment for Phase 2 (collectively referred to as "Project") is considered a "project" for purposes of the California Environmental Quality Act, Pub. Resources Code §21000, et seq. ("CEQA"); and, City of South San Francisco Page 1 File Number: 19-113 Enactment Number: RES 41-2019 WHEREAS, on March 7, 2019 the Planning Commission for the City of South San Francisco held a lawfully noticed public hearing at which time interested parties had the opportunity to be heard, to review the Project and the Environmental Impact Report (EIR18-0002), as well as supporting documents, at the conclusion of which the Planning Commission recommended that the City Council find that the Environmental Impact Report is the appropriate environmental document and to approve the Project; and, WHEREAS, the City Council held a duly noticed public hearing on March 27, 2019 to consider the entitlements request for a Zoning Map Amendment, Zoning Text Amendment, Use Permit, Design Review and Preliminary Transportation Demand Management Plan and take public testimony; and, WHEREAS, the City Council reviewed and carefully considered the information in the EIR (EIR18-0002), including all comment letters submitted, and by separate resolution certifies the EIR (EIR18-0002) as an objective and accurate document that reflects the independent judgment and analysis of the City in the discussion of the Project's environmental impacts. NOW, THEREFORE, BE IT RESOLVED that based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. ("CEQA") and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan and General Plan EIR; the South San Francisco Municipal Code; the Phase 1 applications; the Phase 1 project plans, as prepared by WRNS, dated September 28, 2018; the Preliminary Transportation Demand Management (TDM) Plan, as prepared by Sylvani Transportation Consulting; the Project's EIR, including the Draft and Final EIR and all appendices thereto; all site plans, and all reports, minutes and public testimony submitted as part of the Planning Commission's duly noticed March 7, 2019 meeting; all site plans, and all reports, minutes, and public testimony submitted as part of the City Council's duly noticed March 27, 2019 meeting and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City Council of the City of South San Francisco hereby finds as follows: SECTION 1 FINDINGS A. General Findings 1. The foregoing recitals are true and correct and made a part of this Resolution. 2. The Exhibits attached to this Resolution, including the Draft Conditions of Approval (Exhibit A), Project Plans for Phase 1 (Exhibit B), and the Preliminary TDM Plan for Phase 1 (Exhibit C) are each incorporated by reference and made a part of this Resolution, as if set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of the Planning Manager, Sailesh Mehra. 4. By Resolution No. , the City Council, exercising its independent judgment and analysis, finds that an EIR was prepared for the Project in accordance with CEQA, which EIR adequately discloses City of South San Francisco Page 2 File Number: 19-113 Enactment Number: RES 41-2019 and analyzes the proposed Project's potentially significant environmental impacts, its growth inducing impacts, and its cumulative impacts, and analyzed alternatives to the Project. For those impacts that could potentially exceed CEQA thresholds of significance, where feasible the City has identified and imposed mitigation measures that avoid or reduce the impact to a level of less -than -significant. The City Council finds that the benefits of approving the Project outweigh the Project's significant and unavoidable impacts. The proposed Project, including the proposed amendments, are consistent and compatible with all elements in the City of South San Francisco General Plan as office/R&D uses in the East of 101 Area and help the City implement several broad General Plan goals, including but not limited to maintaining a balanced land use program that provides opportunities for continued economic growth, and building intensities that reflect South San Francisco's prominent inner bay location and excellent regional access. 6. The proposed Project is consistent with the standards and requirements of the City's Zoning Ordinance (as proposed for amendment) and with the provisions of the East of 101 Area Plan. The development of the Project Site would result in the construction of approximately 336,368 gross sq. ft. of office/ R&D space, and would meet minimum design standards. 7. The Project Site is physically suitable for the type of development and density proposed, as the campus development will benefit from being located in the East of 101 Area Plan, and the size of the office/ R&D campus is appropriate for the location and meets the City's land use and zoning standards. B. Use Permit Phase 1 is allowed within the BTP zoning district and complies with the standards and requirements of the City's Zoning Ordinance and with the design provisions of the East of 101 Area Plan, as proposed for amendment. Phase 1 meets or exceeds all of the general development standards of the BTP Zoning District, with the exception of a request for a parking reduction. The request for a parking reduction is permissible and warranted by the City's Zoning Ordinance because Phase 1 incorporates a robust Transportation Demand Management Program designed to encourage all employees to rely on alternatives forms of transportation. 2. The proposed development of Phase 1 is consistent with the General Plan for the reasons stated in Findings B.1 and B.2 above and is consistent with the East of 101 Area Plan. 3. The proposed office/ R&D use will not be adverse to the public health, safety, or general welfare of the community, nor detrimental to surrounding properties or improvements, for the reasons stated in Finding B.3 above. 4. Phase 1 complies with applicable design and development standards and requirements of the City's Zoning Ordinance, as proposed for amendment, with the exception of parking requirements, for which a reduction is permissible and warranted by the City of South San Francisco Page 3 File Number. 19-113 Zoning Ordinance as discussed below. Enactment Number. RES 41-2019 The exception for the number of parking spaces is allowable under the City's Municipal Code Section 20.330.006(D), and warranted based on the following findings: a. The parking reduction will serve to support and promote the TDM program for Phase 1, which will reduce parking demand for Phase 1. b. Parking demand generated by Phase 1 will not exceed the capacity or have a detrimental impact on the supply of on -street parking in the surrounding area. Phase 1 uses will be adequately served by the proposed on-site parking because the development of Phase 1 will provide approximately 94% of the required parking spaces and is required, through the TDM program, to achieve an alternative mode use of 35%. The site is not anticipated to result in a shortfall of on-site parking or create the need for overflow parking off-site. c. The proposed parking standard of 2.68 spaces per 1,000 sq. ft. for non-residential uses and will be adequate for the proposed use because of the offered alternative solutions for providing and managing parking. The development of Phase 1 is required to implement a TDM Program on an on-going basis over the life of Phase 1 with a required alternative mode shift of 35 percent. The TDM requirements applicable to Phase 1, the fact that similar reduced standards have been accepted and/or successfully applied within several large developments in the City, including other nearby Genentech developments and Applicant -owned campuses such as Merck and Verily, and the studies from the Institute of Transportation Engineers (ITE) all support a reduced parking standard. d. The reduced parking rate reinforces the overall efforts of the City's General Plan and the TDM Ordinance, which encourage reduced parking standards as an effective tool in encouraging use of alternative modes of transportation other than single occupancy vehicles. e. The number of parking spaces provided by the reduced standard will serve all existing, proposed and potential uses as effectively and conveniently as would the standard number of parking spaces required by Chapter 20.230 and Chapter 20.330. As described above, there is ample evidence to support the proposed parking reduction, and there is added concern that an overabundance of parking could have a deleterious effect on the goals and objectives of the City's TDM efforts since such would serve as a disincentive to use of alternative modes of transportation. 5. The design, location, size, and operating characteristics of the proposed Phase 1 are compatible with the existing and reasonably foreseeable future land uses in the vicinity because Phase 1 will promote an office/R&D campus in close proximity to other office and research and development uses with employee -serving amenities and is compatible with nearby industrial uses. 6. The Phase 1 site is physically suitable for the type of development and density proposed, as the development of a high quality research and campus -style project is in keeping with existing City of South San Francisco Page 4 File Number. 19-113 Enactment Number. RES 41-2019 development within the East of 101 Area and the BTP Zoning District, and the EIR indicated that the Phase 1 site has adequate access and utilities and did not identify any other physical constraints that would render the site unsuitable. The Phase 1 includes high quality, innovative design and product type, and maximum provisions for pedestrian and bicycle use in that Phase 1 would complete sidewalks along the site frontage on the east side of Haskins Way and the north side of East Jamie Court and provide adequate bicycle parking and related amenities. Phase 1 provides green building measures over and above the applicable green building compliance threshold required pursuant to Title 15 ("Buildings and Construction") of the South San Francisco Municipal Code. 7. An EIR has been prepared for the Project in compliance with CEQA for the reasons stated in Finding AA above. C. Design Review Phase 1, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because Phase 1 has been designed as a high quality office/ R&D campus -style development, which will provide a pedestrian -friendly campus, on-site amenities, transit connections, and sustainable design. The proposed Phase 1 complies with applicable design and development standards and requirements of the City's Zoning Ordinance for the reasons set forth in Finding C.4 above. 2. Phase 1, including Design Review, is consistent with the General Plan and the applicable provisions of the East of 101 Area Plan, because the proposed office/R&D campus -style development is consistent with the policies and design direction provided in the South San Francisco General Plan for the dual MUCC land use designations by encouraging new office/R&D facilities with campus -serving amenities and connections to transit hubs and, as described in the EIR, is consistent with the design standards and guidelines of the East of 101 Area Plan. 3. Phase 1, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Phase 1 is consistent with Design Guidelines, including the design and development standards outlined in the East of 101 Area Plan. 4. Phase 1 is consistent with the Use Permit for the reasons stated in Findings C.1 -C.7 above. 5. Phase 1 is consistent with the applicable design review criteria in South San Francisco Municipal Code Section 20.480.006 ("Design Review Criteria") because Phase 1 has been evaluated by the Design Review Board on February 20, 2018 and May 15, 2018, and found to be consistent with each of the eight design review criteria included in the "Design Review Criteria" section of the Ordinance as indicated in the Design Review Board Comment Letter dated June 1, 2018. D. Transportation Demand Management Plan City of South San Francisco Page 5 File Number: 19-113 Enactment Number. RES 41-2019 The proposed trip reduction measures contained in the TDM Plan (attached hereto as Exhibit C) are feasible and appropriate for Phase 1, considering the proposed use and the location, size, and hours of operation for Phase 1. Appropriate and feasible measures have been included in the TDM Plan to achieve a projected 35 percent alternative mode usage, as required. The TDM Plan provides incentives for employees to use modes of transportation other than single -occupancy vehicle trips, such as secure bicycle storage, shower facilities, preferential parking for carpools and vanpools, and an employee TDM contact, among others. The TDM Plan also uses a lower parking ratio to increase ridership on BART, Caltrain and other transit services. Further, an employee transit center for shuttle pickup and drop-off linking Phase 1 to nearby transportation lines will help encourage alternative forms of transportation. 2. The proposed performance guarantees will ensure that the target 35 percent alternative mode use established for Phase 1 by Chapter 20.400 will be achieved and maintained. Conditions of approval have been included to require that the Final TDM Plan, which must be submitted for review and approval prior to issuance of a building permit, shall outline the required process for on-going monitoring including annual surveys and triennial reports. SECTION 2 DETERMINATION NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of South San Francisco hereby makes the findings made in this Resolution, and subject to the draft Conditions of Approval attached as Exhibit A, approves the Use Permit, Design Review, and Preliminary TDM Plan entitlements. BE IT FURTHER RESOLVED that the City Council approvals stated herein are conditioned upon the City Council's adoption of the Zoning Map Amendment and Zoning Text Amendment and will become effective upon the effective date of the Zoning Map and Text Amendment ordinance. BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption. At a meeting of the City Council on 3/27/2019, a motion was made by Richard Garbarino, seconded by Mark Nagales, that this Resolution be approved. The motion passed. Yes: 4 Mayor Matsumoto, Vice Mayor Garbarino, Councilmember Addiego, and Councilmember Nagales Absent: 1 Councilmember Nicolas Attest by/&41i� 4NOW/A_ osa Govea Acosta City of South San Francisco Page 6 Page 1 DRAFT CONDITIONS OF APPROVAL P17-0096: RZ18-0001, ZA18-0002, UP18-0001, DR19-0004, TDM18-0001 201 Haskins Way Project (As recommended by Planning Commission on March 7, 2019) Planning Division requirements shall be as follows: GENERAL 1. The applicant shall comply with the Planning Division’s standard Conditions and Limitations for Commercial, Industrial, Mixed-Use and Multi-Family Residential Projects (attached to this document). 2. The project shall be constructed and operated substantially as indicated on the plan set prepared by WRNS, dated September 28, 2018, and approved by the City Council in association with P17-0096 as amended by the conditions of approval. The final plans shall be subject to the review and approval of the City’s Chief Planner. 3. The construction drawings shall comply with the Planning Commission approved plans, as amended by the conditions of approval, including the plans prepared by WRNS, dated September 28, 2018. 4. Prior to issuance of any building or construction permits for the construction of public improvements, the final design for all public improvements shall be reviewed and approved by the City Engineer and Chief Planner. 5. Prior to issuance of any building or construction permits for grading improvements, the applicant shall submit final grading plans for review and approval by the City Engineer and Chief Planner. 6. Applicant shall comply with all permitting requirements of applicable reviewing agencies related to the project, and provide proof of permits and/or approval prior to building permit issuance for these project elements. 7. The proposed rezoning action in connection with the project requires review by the Airport Land Use Commission to determine project consistency with the ALUCP and other regulatory review procedures. Prior to building permit issuance for vertical construction, the applicant shall submit a verification letter to staff that the project has been reviewed and is consistent with the ALUCP and other regulatory review procedures. Provided that the ALUCP makes a finding of consistency subject to conditions, the applicant shall comply with those conditions. CONSTRUCTION Page 2 8. The applicant is responsible for maintaining site security prior to, and throughout the construction process. This includes installation of appropriate fencing, lighting, remote monitors, or on-site security personnel as needed. 9. The applicant is responsible for providing site signage during construction, which contains contact information for questions regarding the construction. 10. During construction, the applicant shall provide parking for construction workers within the project parking structure at 201 Haskins Way when the Chief Building Official and Fire Marshal provide written approval. DESIGN REVIEW / SITE PLANNING 11. All equipment (either roof, building, or ground-mounted) shall be screened from view through the use of integral architectural elements, such as enclosures or roof screens, and landscape screening or shall be incorporated inside the exterior building wall. Equipment enclosures and/or roof screens shall be painted to match the building. Prior to issuance of a building permit the applicant shall submit plans showing utility locations, stand-pipes, equipment enclosures, landscape screens, and/or roof screens for review and approval by the Chief Planner or designee. 12. Prior to issuance of any building or construction permits for landscaping improvements, the applicant shall submit final landscaping and irrigation plans for review and approval by the City’s Landscape Architect. The plans shall include documentation of compliance with SSFMC Section 20.300.007, Landscaping, and the Water Efficient Landscape Ordinance (WELO). Any associated fees for plan review to comply with WELO will be paid by the applicant at time of building permit submittal. 13. Prior to issuance of any building or construction permits, the applicant shall submit interim and final phasing plans and minor modifications to interim and final phasing plans for review and approval by the Chief Planner, City Engineer and Chief Building Official. 14. The applicant shall contact the South San Francisco Scavenger Company to properly size any required trash enclosures and work with staff to locate and design the trash enclosure in accordance with the SSFMC Section 20.300.014, Trash and Refuse Collection Areas. Applicant shall submit an approval letter from South San Francisco Scavenger to the Chief Planner prior to the issuance of building permits. 15. The applicant shall incorporate the recommendations of the Design Review Board from their meeting of May 15, 2018. 16. Landscaped areas in the project area may contain trees defined as protected by the South San Francisco Tree Preservation Ordinance, Title 13, Chapter 13.30. Any removal or pruning of protected trees shall comply with the Tree Preservation Ordinance, and Page 3 applicant shall obtain a permit for any tree removals or alterations of protected trees, and avoid tree roots during trenching for utilities. 17. The applicant shall install three-inch diameter, PVC conduit along the project frontage, in the right-of-way, if any trenching is to take place, for the purpose of future fiber installation. Conduit shall have a pull rope or tape. A #8 stranded trace wire will be installed in the conduit or other trace wire system approved by the City. 18. All landscaping installed within the public right-of-way shall be maintained by the property owner. 19. Prior to receiving certificate of occupancy, the applicant shall install street furniture, trash receptacles, and bicycle racks along the project sidewalk frontages. The Planning Division shall review and approve all street furniture, trash receptacles and bicycle rack options during the Building Permit process. 20. Demolition of any existing structures on site will require demolition permits. 21. Prior to proceeding with exterior construction, the applicant shall provide a full-scale mockup of a section of exterior wall that shows the cladding materials and finishes, windows, trim, and any other architectural features of the building to fully illustrate building fenestration, subject to site inspection and approval by Planning Division staff. 22. After the building permits are approved, but before beginning construction, the owner/applicant shall hold a preconstruction conference with City Planning, Building, and Engineering staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all relevant subcontractors. TRANSPORTATION / PARKING 23. A Parking and Traffic Control Plan for the construction of the project shall be submitted with the application for Building Permit, for review and approval by the Chief Planner and City Engineer. 24. The applicant has prepared and submitted a draft Preliminar y TDM Plan. In accordance with South San Francisco Municipal Code Chapter 20.400, Transportation Demand Management, prior to issuance of a building permit the applicant shall submit a Final TDM Plan for review and approval by the Chief Planner. a) The Final TDM Plan shall include all mandatory elements included in the Ordinance and shall substantially reflect the Preliminary TDM Plan by Sylvani Transportation Consulting. The Plan shall be designed to ultimately achieve a goal of 35% alternative mode usage by employees within the Project. b) The Final TDM Plan shall outline the required process for on-going monitoring, including annual surveys. The initial annual survey will be submitted one (1) year Page 4 after the granting of a certificate of occupancy. The initial annual survey shall either: (1) state that the applicable property has achieved 35% alternative mode usage, providing supporting statistics and analysis to establish attainment of the goal; or (2) state that the applicable property has not achieved the 35%alt ernative mode usage, providing an explanation of how and why the goal has not been reached, and a description of additional measures that will be adopted in the coming year to attain the TDM goal of 35% alternative mode usage. c) The applicant shall be required to reimburse the City for program costs associated with monitoring and enforcing the TDM Program on an annual basis. The annual monitoring fee is $1,667. d) The Final TDM plan shall be subject to review and approval by the San Mateo City/County Association of Governments. 25. Provide clear signage on site for residential, commercial, and visitor parking areas to help direct vehicle traffic. 26. Once construction of an associated parking structure is complete, construction related parking should prioritize parking within the structure. ENVIRONMENTAL MITIGATION MEASURES / CEQA 27. The applicant shall comply with all applicable mitigation measures outlined in the Mitigation Monitoring and Reporting Program (MMRP) for the Environmental Impact Report EIR18-0002. CLIMATE ACTION PLAN 28. For Commercial Projects: Prior to issuance of any building or construction permits, the developer shall revise the development plans to include the following Climate Action Plan requirements, subject to review and approval by the Chief Planner or designee: a) Electric Vehicle Charging Installations Measure 2.1, Action 5: Require new large- scale nonresidential developments to provide conduit for future electric vehicle charging installations, and encourage the installation of conduits or electric vehicle charging stations for all new development. b) Heat Island Reductions Measure 3.4, Action 1: Encourage the use of high-albedo surfaces and technologies as appropriate, as identified in the voluntary CALGreen standards. c) Alternative Energy Facilities Measure 4.1, Action 2: Require the construction of any new nonresidential conditioned space of 5,000 square feet or more, or the Page 5 conversion of unconditioned space 5,000 square feet or more, to comply with one of the following standards: i. Meet a minimum of 50% of modeled building electricity needs with on-site renewable energy sources. To calculate 50% of building electricity needs for the new conditioned space, the applicant shall calculate building electricity use as part of the Title 24 compliance process. Total electricity use shall include total use for the new conditioned space excluding process energy. ii. Participate in a power purchase agreement to offset a minimum of 50% of modeled building electricity use. Building electricity use shall be calculated using the method identified above. iii. Comply with CALGreen Tier 2 energy efficiency requirements to exceed mandatory energy efficiency requirements by 20% or more. For additions to existing development of 5,000 square feet or more, CALGreen Tier 2 shall be calculated as part of the Title 24 compliance process. Existing building space already permitted shall not be subject to CALGreen Tier 2 requirements. d) Solar Wiring Installation Measure 4.1, Action 3: Require all new development to install conduit to accommodate wiring for solar. e) Water Demand Reduction Measure 6.1, Action 2: Revitalize implementation and enforcement of the Water Efficient Landscape Ordinance by undertaking the following: i. Establishing a variable-speed pump exchange for water features. ii. Restricting hours of irrigation to occur between 3:00 a.m. and two hours after sunrise. iii. Installing irrigation controllers with rain sensors. iv. Landscaping with native, water-efficient plants. v. Installing drip irrigation systems. vi. Reducing impervious surfaces. IMPACT / DEVELOPMENT FEES 29. Prior to issuance of a building permit for non-residential uses, the applicant shall pay any Page 6 applicable childcare fees in accordance with South San Francisco Municipal Code Chapter 20.115. This fee is subject to annual adjustment, and presently is assessed at $0.57 per gross square foot of commercial and retail uses. Based on the plans dated September 28, 2018, the childcare impact fee estimate for the non-residential uses is: Office/R&D: $0.57 x 336,368 GSF= $191,729.76 30. The applicant submitted a complete application on January 22, 2019 and therefore shall pay the Parkland Acquisition Fee and Parkland Construction Fee that was in effect as of that date. The fee shall be paid prior to issuance of the certificate of occupancy, and shall be calculated as follows, per South San Francisco Municipal Code Chapter 8.67: Acquisition Fee: Parkland Acquisition Fee for Non-Residential Development: Total square feet / 1,000 square feet X Average number of employees per 1,000 square feet X 0.0005 (0.5 acres per 1,000 employees) X Average FMV per acre of land X 0.25 Parkland Construction Fee for Non-Residential Development: Total square feet / 1,000 square feet X Average number of employees per 1,000 square feet X 0.0005 (0.5 acres per 1,000 employees) X Average Construction Cost per acre of land X 0.25 31. Upon the date of final inspection or issuance of the certificate of occupancy for the development, whichever is earlier, the applicant shall pay applicable bicycle and pedestrian impact fees in accordance with South San Francisco Municipal Code Chapter 8.68, based on the formulas in Table 8.68.060(a) Bicycle and Pedestrian Improvements Formula. Based on the plans dated September 28, 2018, the bicycle and pedestrian impact fee estimate for the project is: Commercial: Average Daily Trips (ADT)/1,000 sq. ft. x sq. ft. x Cost per ADT 32. Prior to issuance of the first building permit, the applicant shall pay the applicable commercial linkage fee in accordance with South San Francisco Municipal Code Chapter 8.69, based on the current fee for each applicable land use category. Based on the plans dated September 28, 2018 the commercial linkage fee estimate for the project is: (Gross Square Feet Commercial Floor Area - Existing Floor Area) × (Current Fee Amount for Applicable Land use Category) = Commercial Linkage Fee Payment Planning Division Contact: Ryan Wassum, (650) 877-8535 33. The City is in the process of studying whether a community facilities district (“CFD”) and special tax would be appropriate to fund the costs of design, acquisition, and construction Page 7 of transportation improvements and services that would benefit the East of 101 Area, and if so the appropriate rate and method of apportioning the tax. Infrastructure and services that would benefit the East of 101 Area will indirectly benefit the Project, which is located within the East of 101 Area. Because it is anticipated that construction of Phase 1 (as defined in the Project EIR) of the Project will precede the study regarding potential formation of a CFD, the applicant agrees that, in the event the City proceeds with formation of the CFD and levy of a special tax, the applicant will support the formation of the CFD and levy of the special tax, and consent to the formation of a CFD provided that:  The CFD and special tax apply to an area that encompasses the majority of the East of 101 Area and the special tax is levied at the same rate on all office/research and development property within the CFD area.  The annual special tax applicable to the Phase 1 of the Project would not exceed $1.00 per square foot of developed property. Engineering Division requirements shall be as follows: GENERAL 1. The Owner shall coordinate with the Public Works department to ensure any proposed repair to the sewer lateral, sidewalks, curb and/or gutter will be satisfactory to the City and shall obtain an encroachment permit for any work in the public right of way and shall be responsible for all applicable fees and deposits. All work related to these requirements shall be accomplished at the Owner’s expense. 2. The owner shall, at his/her expense, replace any broken sidewalk, curb, and gutter fronting the property. The City of SSF shall be the sole judge of whether any such replacement is necessary. 3. Contractors must have a Class A license for any work in the street (beyond the face of curb). Contractors with a Class A license may perform any and all work associated with building permit requirements. For concrete work between the curb and the building, a Class C-8 license is sufficient. For plumbing work between the curb and the building, a Class C-36 license is sufficient. An exemption may be granted by the City if a relatively minor portion of the work is not covered by the Contractor’s license. For example, if a new sewer cleanout is being installed in the sidewalk by a Contractor with a C-36 (plumbing) license, the same Contractor may remove and reform no more than one (1) panel of the sidewalk without the need for a Class C-8 (concrete) license. PLAN SUBMITTAL 4. The Developer shall submit detailed plans printed to PDF and combined into a single electronic file, with each being stamped and digitally signed by a Professional Engineer registered in the State of California, along with three printed copies. Incorporated within Page 8 the construction plans shall be applicable franchise utility installation plans, stamped and signed and prepared by the proper authority. Plans shall include the following sheets; Cover, Separate Note Sheet, Existing Conditions, Demolition Plan, Grading Plan, Horizontal Plan, Utility Plan(s), City Details, Erosion Control Plan, and Landscape Plans, (landscape plans are for reference only and shall not be reviewed during this submittal). 5. The Developer shall submit a grading plan that should clearly state the amount of cut and fill required to grade the project. The developer shall apply for the grading permit with the Engineering Division and shall submit an application, all documentation, fees, deposits, bonds and all necessary paperwork needed for the application. The developer shall place an initial $30,000 cash deposit with the City for environmental compliance inspection personnel time, which includes, but not limited to, air quality, grading and storm water pollution inspections. 6. Distances between new structures and property lines shall be shown on the plans. 7. For all gravity flow underground pipes (SD and SS), show arrows indicating direction of flow. 8. Include language for undergrounding utilities, and location / distance. 9. The project is responsible for any applicable public right-of-way improvements. 10. All improvements shall be designed by a registered civil engineer and approved by the Engineering Division. 11. The developer shall install the approved, standard East of 101 Light Standard along the property frontages at no cost to the City. The developer shall hire an electrical engineer to design a lighting plan to illuminate the public right-of-way. The East of 101 Light Standard is a Holophane Pechina Light Fixture with a round aluminum pole. The design and installation will be completed on a phase by phase basis. 12. Project driveways shall be the City’s standard detail for a commercial driveway. The grade of each driveway cannot exceed a 12% grade. Unless controlled by a traffic signal, the developer shall install a R1 “STOP” sign at each exit driveway from the project. 13. The Developer shall submit a copy of their General Construction Activity Storm Water Permit Notice of Intent and Storm Water Pollution Prevention Plan (SWPPP), where required by State or Federal regulations, to the Engineering Division for our information. These documents shall be submitted prior to receiving a grading or building permit for the subject project. Page 9 14. The Developer shall submit Traffic and Pedestrian Control Plans for proposed work for the 201 Haskins Way Project or any area of work that will obstruct the existing pedestrian walkways. 15. The Engineering Division reserves the right to include additional conditions during review of the building permit application. PERMITS 16. A Grading Permit is required for grading over 50 cubic yards and if 50 cubic yards or more of soil is exported and/or imported. The Developer shall pay all permit and inspection fees, as well as any deposits and/or bonds required to obtain said permits. The Grading Permit requires several documents to be submitted for the City’s review and approval. The Grading Permit Application, Checklist and Requirements may be found on the City website at http://www.ssf.net/departments/public-works/engineering-division. 17. At the time of Building permit the Developer shall submit a deposit for the following: a. Hauling/Grading Plan Check and Permit Processing. Provide Cubic Yards for deposit amount. b. Improvement Plan Check/Civil Review. Provide cost of improvements for deposit amount. 18. The developer shall place an initial $30,000 cash deposit with the City for environmental compliance inspection personnel time, which includes, but not limited to, air quality, grading and storm water pollution inspections. 19. Refer to the section “Geotech” for deposit regarding grading permit applications. 20. A Hauling Permit shall be required for excavations and off-haul or on-haul, per Engineering requirements; should hauling of earth occurs prior to grading. Otherwise, hauling conditions would be included with the grading permit. Hauling Permit may be found on the City website at http://www.ssf.net/departments/public-works/engineering- division. 21. Developer shall obtain a Demolition Permit to demolish the existing buildings. The demolition permit shall be obtained from the Building Division and the Developer shall pay all fees and deposits for the permit. The developer shall provide letters from all public utilities stating all said utilities have been properly disconnected from the existing buildings. The Developer shall submit a spreadsheet to the City’s Engineering Division of the existing buildings, which are slated for demolition. The spreadsheet will include the square footage and usage of each building for the determination of credits of East of 101 traffic impact fees. Page 10 22. An Encroachment Permit is required for any work to be done within the public right-of- way. The Developer shall pay all permit and inspection fees, as well as any deposits and/or bonds required to obtain said permits. 23. As part of the Encroachment Permit application, the applicant shall submit a deposit of $5,000.00 in order for City Staff and/or the City's Construction Coordination consultant to charge their time in coordinating construction activities related to the project with the City, General Contractor and other affected parties that will need constant communication. If this deposit is depleted, and the project is not complete, the applicant shall replenish the deposit with the same amount as the initial deposit. Once the project has received a Certificate of Occupancy, the City shall reimburse the applicant with the remainder of the deposit. RIGHT-OF-WAY 24. Prior to Building Permit issuance, the Developer shall submit a video survey of the adjacent streets (perimeter of proposed property location) to determine the pre-construction condition of the streets at no cost to the City. The Developer will be responsible to ensure that the condition of the street is in at least existing condition or better after construction is completed. 25. The Developer shall provide all existing and proposed elevations of the connections between all proposed driveways and frontage roads for the 201 Haskins Way Project. These elevations include the pavement connection point, the proposed driveway centerline, top of curb, and bottom of curb. 26. The Developer shall provide tree protection to ensure existing trees are protected during the proposed development. 27. The Developer shall upgrade, where required, adjacent ramps according to ADA standards. 28. The Developer shall ensure that the pavement markings are restored and upgraded to meet current City standards. All pavement markings damaged or altered shall be fully replaced. 29. The Developer shall repave Haskins Way and East Jamie Court with a 2-inch grind and overlay, curb to curb throughout the entire property frontage. 30. Applicant shall provide new sidewalk along the entire frontage along Haskins Way. Also include reconstruction of curb ramps and existing sidewalk that does not meet ADA and Caltrans requirements. 31. The Developer shall ensure the proposed trees and planting locations do not interfere with underground utilities or the joint trench. The Developer will be required to install root barrier measures to prevent the sidewalk from uplift at no cost to the City. 32. All new public improvements required to be constructed to accommodate the development shall be installed at no cost to the City and shall be approved by the City Engineer and constructed to City standards. The work shall be performed in accordance with an Page 11 encroachment permit obtained by the developer from the Engineering Division and shall be accomplished at no cost to the City. All new public improvements shall be completed within one year of obtaining a Building Permit for the proposed development, or prior to occupying structures at the site, whichever comes first. 33. The Developer shall clean, repair or reconstruct, at his expense, as required to conform to City Standards, the existing public improvements including driveways, curbs, gutters, sidewalks and street pavements along the street frontages of the subdivision to the satisfaction of the City Engineer, upon completion of the heavy construction and landscape work at the site. Damage to adjacent property caused by the developer, or his contractors or subcontractors, shall be repaired to the satisfaction of the affected property owner and the City Engineer, at no cost to the City or to the property owner. 34. The Developer shall provide an engineer’s estimate for all work performed with in the public right-of-way. STREET AND DRIVEWAY IMPROVEMENTS 35. Internal driveways shall be a minimum of 15’ wide for one-way travel and 25’ wide of for areas subject to two-way travel. One-way travel lanes within the site shall be clearly posted and marked appropriately. Sufficient clear pavement area shall be provided to permit a minimum of 25’ of maneuvering room at the rear of 90° parking stalls or garages. 36. Due to construction vehicle traffic, the developer shall improve the street fronting their development with new asphalt/slurry seal. The developer will document the condition of the street that fronts the buildings before and after construction and make any necessary repairs to any deterioration on the impacted streets fronting that particular ph ase resulting from the construction process. An improvement plan shall be submitted to the Engineering Division for review and approval. 37. All adjacent sidewalk, curb and gutter shall be rebuilt to City standard at no cost to the City. This may include sidewalk that may not be immediately adjacent to proposed property but is related to the project. (For example, if the project is within the Downtown area plan, new sidewalks shall be a minimum of 10 feet wide consistent to the SSF Downtown Specific Plan.) 38. Developer shall ensure the proposed trees and planting locations do not interfere with underground utilities or the joint trench. The developer will be required to install root barrier measures to prevent the sidewalk from uplift at no cost to the City. STORMWATER 39. The developer shall submit to the City Engineer a storm drainage and hydraulic study for the fully improved subdivision analyzing the impact of the fully improved upstream Page 12 drainage basin on the subject project and evaluating the impact of the developed subdivision on the existing downstream drainage system. The study shall evaluate the capacity of the existing drainage system and recommend any improvements necessary to accommodate runoff from the project and upstream properties. The study shall be submitted to the City Engineer for review and approval. A deposit of $5,000 shall be provided for technical review and submitted at the same time. 40. The Developer shall design, construct and install the storm drainage improvements recommended by the approved storm drainage and hydraulic study at no cost to the city. Minor storm drains shall be designed to accommodate a 10-year design storm. Major trunk lines and pipes draining depressions shall be designed to accommodate a 25-year design storm. Initial time of concentration shall be 5 minutes. Pipes shall be designed for open channel flow conditions and shall not be surcharged. 41. Drainage runoff shall not be allowed to flow across lot lines or across subdivision boundaries onto adjacent private property without an appropriate recorded easement being provided for this purpose. 42. All off-site drainage facilities required by the City Engineer to accommodate the runoff from the subdivision shall be provided by the developer at no cost to the City. 43. All building downspouts shall be connected to rigid pipe roof leaders which shall discharge into an approved drainage device or facility. Lot drainage design shall be approved by the applicant’s soils engineer. 44. Existing on-site drains that are not adequately sized to accommodate run-off from the fully developed property and upstream drainage basin shall be improved as required by the applicants civil engineering consultant’s plans and specifications as approved by the City Engineer. The expense for the installation of these improvements, and all necessary permits shall be borne by the Developer. 45. The on-site storm drainage system shall not be dedicated to the City for ownership or maintenance. The storm drainage system and any storm water pollutions control devices within the subdivision shall be owned, repaired and maintained by the property owner or Homeowner’s Association. 46. The design of new structures shall consider the protection of the existing box culvert. Vice versa, in the protection of the new structure when a repair/replace, is made on the box culvert. No structure shall encroach into the designated easement. 47. Submit proposed or existing grease trap plans to verify compliance with regulations, per SSF Water Quality Control Plant (WQCP). SANITARY SEWER 48. The Developer shall submit a sewer capacity study to determine how the project impacts the system and determine if there is adequate capacity of the sewer lines. Page 13 49. Sanitary Sewer plan shall show all existing and proposed utilities. Be sure to provide minimum horizontal and vertical clearances for all existing and proposed utilities. Also include all existing and proposed manhole, catch basin and pipe invert elevations. 50. The on-site sanitary sewer system shall be designed and installed in accordance with the Uniform Plumbing Code, as amended and adopted by the City, and in accordance with the requirements of the South San Francisco Building Division. 51. The Developer shall install a manhole at the property line and a property sized lateral as it connects into the City sanitary sewer main at no cost to the City. 52. Each on-site sanitary sewer manhole and cleanout shall be accessible to maintenance personnel and equipment via pathway or driveways as appropriate. Each maintenance structure shall be surrounded by a level pad of sufficient size to provide a safe work area. 53. When a sewer lateral must be abandoned, the entire lateral shall be eliminated up to the main. If the connection to the main is not satisfactory to the PW inspector, the connection must be replaced. TRAFFIC 54. Proposed ingress/egress shall not be located too close to an intersection, subject to approval by the Engineering Division. 55. Ingress/egress driveways shall have a minimum width of 25 feet (two way) and 20 feet (one way). 56. At the backup area, draw on plan the turning radius template to show that vehicles can easily maneuver a return to the only egress point. UTILITIES 57. Developer to submit utility coordination documentation to the City, which highlights notification of work to be performed, response(s) from each utility owner (including existing utility plans from each owner), and proposed utility plans. 58. Prior to the filing of any final map, the Developer shall submit letters from each utility company certifying that satisfactory provisions have been made as the location of their facilities and that satisfactory easements have been provided on the full map. 59. All electrical and communication lines, service cabinets, and devices shall be placed underground within the property being developed. Pull boxes, junction structures, vaults, valves, and similar devices shall not be installed within pedestrian walkway areas. 60. The developer shall coordinate with the California Water Service/Westborough Water for all water-related issues. All water mains and services shall be installed to the standards of the California Water Service or the Westborough Water District, as appropriate. GRADING Page 14 61. The entire project site shall be adequately sprinkled with water to prevent dust or sprayed with an effect dust palliative to prevent dust from being blown into the air and carried onto adjacent private and public property. Dust control shall be for seven days a week and 24 hours a day. Should any problems arise from dust, the developer shall hire an environmental inspector at his/her expense to ensure compliance with the grading permit. 62. Haul roads within the City of South San Francisco shall be cleaned daily, or more often, as required by the City Engineer, of all dirt and debris spilled or tracked onto City streets or private driveways. 63. The owner shall hire a licensed land surveyor or civil engineer authorized to practice land surveying to certify that the new foundation forms conform with all setbacks from confirmed property lines and that all easements are verified and in conform ance with the plans. A letter certifying the foundation forms shall be submitted to the Engineering Division for approval. 64. All hauling and grading operation are restricted to between the hours of 8:00 am to 6:00 pm for residential areas and 7:00 am to 6:00 pm for industrial/ commercial areas, Monday through Friday excluding holidays. 65. Unless approved in writing by the City Engineer, no grading excess of 200 cubic yards shall be accomplished between November 1 and May 1 of each year. GEOTECH 66. The developer shall submit a geotechnical report along with a cash deposit of [$5,000] for peer review. The geotechnical report shall also include, but not limited to, design criteria for the subterranean parking areas, footing/foundations of the future structures, etc. 67. The recommendations contained within the geotechnical report shall be included in the Site Grading and Drainage Plan and submitted for review and approval by the City Engineer. The Site Grading and Drainage Plan shall be prepared by the developer’s civil engineer and approved by the project geotechnical engineer. IMPACT FEES 68. Prior to the issuance of a Building Permit for the project, the applicant shall pay the various fees as detailed below; based on information supplied in application (and building areas via County records), an estimate of the impact fees are as follows (impact fees are subject to changed based on information that may be provided by applicant on a later date or at the building permit stage): 201 Haskins Existing (Warehouse) 24,087 SF (to be demolished) Proposed (Office/R&D) 311,368 SF Page 15 400-450 East Jamie Court Existing 157,680 SF (to remain) Proposed (Office R&D) 25,067 SF (addition) A. OYSTER POINT OVERPASS CONTRIBUTION FEE Trip Calculation 201 Haskins Trip Calculation Existing 24,087 gsf Warehouse 108 vehicle trips Proposed 311,368 gsf Office/R&D use @ 12.3 trips per 1000 gsf = 3,830 new vehicle trips Change in vehicle trips = 3,830 – 108 = 3,722 new vehicle trips Contribution Calculation (Based on Dec 2017 CCI) New vehicle trips X $154 X (ENR Latest CCI/6552.16) 3,722 trips X $154 X (12014.72/6552.16) = $1,051,056.95 400-405 East Jamie Ct Trip Calculation Proposed (additional building) 25,067 gsf Office/R&D use @ 12.3 trips per 1000 gsf = 308.32 new vehicle trips Contribution Calculation (Based on Dec 2017 CCI) New vehicle trips X $154 X (ENR Latest CCI/6552.16) 308.32 trips X $154 X (12014.72/6552.16) = $87,067.76 Total = $ 1,051,056.95 + $ 87,067.76 = $ 1,138,124.71 * The new vehicle trip numbers shown above are based on the analysis contained in Resolution 71-1984 establishing the Oyster Point Overpass Contribution Fee. The fee is calculated based on average daily trips per land use category. These numbers do not impact nor alter the trip generation figures contained in any environmental documents prepared for the project. B. EAST OF 101 TRAFFIC IMPACT FEES Page 16 Fee Calculation (effective July 1, 2018) Proposed building area (gsf) x $5.89/gsf 201 Haskins 311,368 gsf x $ 5.89/gsf = $ 1,833,957.52 400-405 East Jamie Ct. 25,067 gsf x $ 5.89/gsf = $ 147,644.63 Total Traffic Impact Fee Estimate* $ 1,833,957.52 + $ 147,644.63 = $ 1,981,602.15 *Subject to change based on the East of 101 traffic impact fee in effect at the time the building permit is issued. C. SEWER SYSTEM CAPACITY STUDY AND IMPROVEMENT FEE Gallons per day calculated = (GSF/1000)*400 = gpd 201 Haskins Existing 9,634.8 gallons per day generated Proposed 124,547.20 gallons per day generated Change 114,912.40 gallons per day generated Gallons per day x $4.73 per gallon = Sewer Impact Fee 114,912.40 gpd x $4.73 per gallon = $ 543,535.65 400-405 East Jamie Ct. Based on proposed addition of 25,067 SF building = 10,026.80 gallons per day generated Gallons per day x $4.73 per gallon = Sewer Impact Fee 10,026.80 gpd x $4.73 per gallon = $ 47,426.76 Total Sewer Impact Fee = $ 543,535.65 + $ 47.426.76 = $ 590,962.44 *Total estimated fees*: Oyster Point Overpass Fee $ 1,138,124.71 East of 101 Traffic Impact Fee $ 1,981,602.15 East of 101 Sewer Improvements Fee $ 590,962.44 Total $ 3,781,829.42 Page 17 Engineering Division Contact: Kelvin Munar, (650) 829-6661 Water Quality Conditions shall be as follows: The following items must be included in the plans or are requirements of the Stormwater and/or Pretreatment programs and must be completed prior to the issuance of a building permit: 1. Storm drains must be protected during construction. Discharge of any demolition/construction debris or water to the storm drain system is prohibited. 2. Do not use gravel bags for erosion control in the street. Drains in street must have inlet and throat protection of a material that is not susceptible to breakage from vehicular traffic. 3. Roof leaders/gutters must NOT be plumbed directly to storm drains; they shall discharge to landscaping first. 4. If fire sprinklers are added/modified, fire sprinkler test drainage must be plumbed to sanitary sewer. 5. Trash enclosure shall be covered, contained and the floor shall slope to a central drain that is connected to the sanitary sewer. 6. Install a condensate drain line connected to the sanitary sewer for rooftop equipment. 7. If laboratories will be installed, a segregated non-pressurized lab waste line must collect all laboratory waste. Install a sample port on the lab waste line outside the building, which will be accessible at all times. 8. Submit specs on the sample port. 9. Any food service establishments must install a grease removal device. The grease removal device must be connected to all wash sinks, mop sinks, and floor sinks and must be upstream of the domestic waste stream. Sizing of the grease removal device must be in accordance with the uniform plumbing code. The minimum size shall be no less than 750 gallons. 10. A water meter for each individual commercial unit shall be installed. 11. Submit facility square footage on plans. Applicant may be required to pay a sewer capacity fee (connection fee) at a later time based on anticipated flow, BOD and TSS calculations if positive net difference and/or discharge type results from previous site use. 12. Site is subject to C.3 requirements of the Municipal Regional Stormwater Permit. 13. Sign and have engineer wet stamp forms for Low Impact Development. 14. Completed required forms for Low Impact Development. Forms must be on 8.5in X 11in paper and signed and wet stamped by a professional engineer. Calculations must be submitted with this package. Page 18 Use updated forms for completing documents, as old forms are no longer sufficient A completed copy must also be emailed to andrew.wemmer @ssf.net 15. Complete required Operation and Maintenance (O&M) agreements. Use updated forms for completing documents, as old forms are no longer sufficient A finished copy must also be emailed to [email protected] Do not sign agreement, as the city will need to review prior to signature, prepare packet and submit with an address to send for signature. 16. Submit flow calculations and related math for LID. 17. The onsite catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay). 18. Landscaping shall meet the following conditions related to reduction of pesticide use on the project site: a) Where feasible, landscaping shall be designed and operated to treat stormwater runoff by incorporating elements that collect, detain, and infiltrate runoff. In areas that provide detention of water, plants that are tolerant of saturated soil conditions and prolonged exposure to water shall be specified. b) Plant materials selected shall be appropriate to site specific characteristics such as soil type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air movement, patterns of land use, ecological consistency and plant interactions to ensure successful establishment. c) Existing native trees, shrubs, and ground cover shall be retained and incorporated into the landscape plan to the maximum extent practicable. d) Proper maintenance of landscaping, with minimal pesticide use, shall be the responsibility of the property owner. e) Integrated pest management (IPM) principles and techniques shall be encouraged as part of the landscaping design to the maximum extent practicable. Examples of IPM principles and techniques include: i. Select plants that are well adapted to soil conditions at the site. ii. Select plants that are well adapted to sun and shade conditions at the site. In making these selections, consider future conditions when plants reach maturity, as well as seasonal changes. iii. Provide irrigation appropriate to the water requirements of the selected plants. iv. Select pest-resistant and disease-resistant plants. Page 19 v. Plant a diversity of species to prevent a potential pest infestation from affecting the entire landscaping plan. vi. Use “insectary” plants in the landscaping to attract and keep beneficial insects. 19. No floatable bark shall be used in landscaping. Only fibrous mulch or pea gravel is allowed. 20. A SWPPP must be submitted. Drawings must note that erosion control shall be in effect all year long. 21. A copy of the state approved NOI must be submitted. Water Quality Contact: Andrew Wemmer - (650) 829-3840 Fire Department Conditions shall be as follows: 1. Install fire access roads which shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other approved driving surface capable of supporting the imposed load of fire apparatus weighing at least 80,000 pounds or as otherwise determined by the fire code official. 2. The minimum clear width of fire department access roads shall be 20 feet. This width may be increased based upon specific department operations and/or apparatus. Alternate designs may be approved on a case-by-case basis. 3. Vertical clearance over required vehicular access roads and driveways shall be a minimum of 13’6”. Vertical clearances shall be increased when in the opinion of the fire code official, vertical clearances are not adequate to provide fire apparatus access. 4. Fire apparatus access roads shall not exceed 10% in grade, unless approval is granted by the fire code official prior to construction. 5. The minimum turning radius shall be determined by the fire code official. 6. Dead-end fire apparatus access roads in excess of 150 feet shall be provided with width and turnaround provisions as determined by the fire code official. 7. Any traffic calming devices and the design thereof shall be approved by the fire code official prior to installation. 8. Fire hydrants located on a public or private street, or onsite, shall have an unobstructed clearance of not less than 30 feet (15 feet either side of hydrant), in accordance with California vehicle code 22514. Marking shall be per California vehicle code 22500.1 Page 20 9. Fire hydrants are required to be located within 50 feet of the Fire Department Connection (FDC) and on the same side of the street. 10. A blue reflective dot shall be placed in the middle of the roadway directly in front of the fire hydrant. 11. Provide fire hydrants; location and number to be determined. 12. Provide fire flow in accordance with California Fire Code Appendix III-A. 13. Provide fire hydrants; location and number to be determined. 14. Provide fire hydrants with an average spacing of 300 feet between hydrants. 15. The fire hydrants shall have a minimum fire flow of 3000 gpm at 20 psi residual pressure for duration of 3 hours. 16. All non-parking space curbs to be painted red to local Fire Code Specifications. 17. All utility shutoffs shall be on the exterior of the building. 18. All buildings shall provide premise identification in accordance with California Fire Code section 505. 19. Provide on the plan the control areas, list of hazardous material and quantities that will be present in the laboratories, include all flammable and combustible materials. 20. Provide an independent study or proof that the Emergency Radio Responder coverage in the building is adequate or install a system that will give emergency responders the adequate level of radio coverage inside the building. 21. Provide Knox key boxes for each building/area with access keys to entry doors, electrical/mechanical rooms, elevators, gates and others to be determined. L or H occupancies will generally require a Knox vault instead of box. 22. This new commercial construction will be assessed an adopted Public Safety Impact Fee. The amount for Office/R & D is $0.13 per square foot for the Police Department and $0.31 per square foot for the Fire Department. Page 21 23. Install fire sprinkler system per NFPA 13/SSFFD requirements under separate fire plan check and permit for overhead and underground. 24. Install a fire alarm system per NFPA 72 and SSFFD requirements under a separate fire plan check and permit. Install exterior listed horn/strobe alarm device, not a bell. 25. Install a fire pump per NFPA 20 and SSFFD requirements under separate fire plan check and permit. 26. Install underground piping for water based fire protection systems per NFPA 24 and SSFFD requirements under separate fire plan check and permit. 27. Install a standpipe system per NFPA 14/SSFFD requirements under separate fire plan check and permit. 28. Install exterior listed horn/strobe alarm device, not a bell. 29. Elevator if provided shall not contain shunt-trips. 30. At least one elevator shall be sized for a gurney the minimum size shall be in accordance with the CFC. 31. Buildings 4 stories or more will require a modified smoke control system. A rational analysis is required before building plans are approved. 32. Provide fire extinguishers throughout the building. 33. All Non parking space curbs to be painted red to local Fire Code Specifications 34. Project must meet all applicable Local (SSF Municipal Code, Chapter 15.24 Fire Code), State and Federal Codes. Fire Contact: Craig Lustenberger - (650) 829-3950 Police Department Conditions shall be as follows: 1. All construction must conform to South San Francisco Municipal Code Chapter 15.48.070 Minimum-security standards for nonresidential buildings, (Ord. 1477 §1C, 2013; Ord. 1166 § 1, 1995). The Police Department reserves the right to make additional security and safety conditions, if necessary, upon receipt of detailed/revised building plans. Page 22 Per South San Francisco Municipal Code 15.48.085 -Additional Security Measures, the following conditions will also be required: 2. Any exterior double door entrances shall only have one exterior handle, which should be on the right door (from a person’s perspective from the outside). This is to prevent the malicious locking/chaining of the doors from the outside. This requirement shall also apply to interior double doors to shared common areas. The interior opening mechanism for the aforementioned doors shall be of a design that prevents the same malicious locking/chaining. 3. The landing at the lowest level of service staircases in the parking garage area shall have some mechanism, such as fencing, to prevent access to and prevent people from loitering or concealing themselves in that area. 4. All exterior doorways, pathways, and parking areas shall be illuminated during darkness by a white light source that has full cut-off and is of pedestrian scale. 5. All interior common and service areas, such as the garage, bicycle storage area, fire escapes, etc, shall be illuminated at all times with a white light source that is controlled by a tamperproof switch or a switch located in an inaccessible location to passers-by. 6. Any exterior bicycle racks installed shall be of an inverted “U” design, or other design that allows two different locking points on each bicycle. 7. The mature height of all shrubbery shall be no higher than two feet, if so, it shall be maintained at a maximum height of two feet, and tree canopies shall be no lower than six feet above grade. 8. Any exterior park benches accessible to public areas shall have a handrail/railing at their midpoint to prevent persons from laying down and sleeping on the benches. 9. Skateboard deterrents shall be installed on edges of raised horizontal surfaces and handrails in public areas. 10. Any exterior electrical outlets accessible to public areas shall be secured to prevent public members from using the outlets, or they shall be on a timer control to prevent their usage during evening hours (7PM until 7AM). 11. The applicant shall install and maintain a camera surveillance system that conforms to the technical specifications of South San Francisco Municipal Code Chapter 8.66.050 Page 23 Minimum technological standards, (Ord. 1515, 2016). The video surveillance cameras will be used as a crime deterrent and assist with the identification and apprehension of criminals if a crime is committed on the property. Enough cameras shall be installed to provide adequate coverage for the intended space. Cameras shall be placed minimally in the following locations:  All entrances/exits of buildings and parking garage (pedestrian & vehicular)  Main lobby of buildings  Loading docks 12. The applicant shall install and maintain a central station silent intrusion alarm (burglary alarm) per South San Francisco Municipal Code Chapter 15.48.070(i)(2)(Q), (Ord. 1477 § 1C, 2013; Ord. 1166 § 1, 1995) 13. The Police Department requires acknowledgement of these comments to include specific locations in the plans where the applicable change requests have been made. 14. The Police Department reserves the right to review and comment upon the submission of revised and updated plans. Fire Contact: Mike Rudis - (650) 877-8900 Page 24 STANDARD CONDITIONS AND LIMITATIONS FOR COMMERCIAL, INDUSTRIAL, MIXED USE, AND MULTI-FAMILY RESIDENTIAL PROJECTS Entitlement and Permit Status 1. Unless the use has commenced or related building permits have been issued within two (2) years of the date this permit is granted, this permit will automatically expire on that date. A one-year permit extension may be granted in accordance with provisions of the SSFMC Chapter 20.450 (Common Procedures). 2. The permit shall not be effective for any purpose until the property owner or a duly authorized representative files an affidavit, prior to the issuance of a building permit, stating that the property owner is aware of, and accepts, all of the conditions of the permit. 3. The permit shall be subject to revocation if the project is not operated in compliance with the conditions of approval. 4. Minor changes or deviations from the conditions of approval of the permit may be approved by the Chief Planner and major changes require approval of the Planning Commission, or final approval body of the City, per SSFMC Chapter 20.450 (Common Procedures). 5. Neither the granting of this permit nor any conditions attached thereto shall authorize, require or permit anything contrary to, or in conflict with any ordinances specifically named therein. 6. Prior to construction, all required building permits shall be obtained from the City’s Building Division. 7. All conditions of the permit shall be completely fulfilled to the satisfaction of the affected City Departments and Planning and Building Divisions prior to occupancy of any building. Any request for temporary power for testing equipment will be issued only upon substantial completion of the development. Lighting, Signs, and Trash Areas 8. All exterior lights shall be installed in such a manner that is consistent with SSFMC Chapter 20.300 (Lot and Development Standards), and there shall be no illumination on adjacent properties or streets which might be considered either objectionable by adjacent property owners or hazardous to motorists. Page 25 9. No additional signs, flags, pennants or banners shall be installed or erected on the site without prior approval, as required by SSFMC Chapter 20.360 (Signs). 10. Adequate trash areas shall be provided as required by SSFMC 20.300 (Lot and Development Standards). 11. Trash handling area must be covered, enclosed and must drain to sanitary sewer. This must be shown on the plans prior to issuance of a permit. If being installed in a food service facility the drain must be connected to a grease interceptor prior to the connection to the sanitary sewer. Landscaping, Construction, & Utilities 12. The construction and permitted use on the property shall be so conducted as to reduce to a minimum any noise vibration or dust resulting from the operation. 13. A plan showing the location of all storm drains and sanitary sewers must be submitted. 14. All sewerage and waste disposal shall be only by means of an approved sanitary system. 15. Prior to any on-site grading, a grading permit shall be obtained from the City Engineer. 16. All existing utility lines, underground cable conduits and structures which are not proposed to be removed shall be shown on the improvement plans and their disposition noted. 17. All landscape areas shall be watered via an automatic irrigation system which shall be maintained in fully operable condition at all times, and which complies with SSFMC Chapter 20.300 (Lot and Development Standards). 18. All planting areas shall be maintained by a qualified professional; the landscape shall be kept on a regular fertilization and maintenance program and shall be maintained weed free. 19. Plant materials shall be selectively pruned by a qualified arborist; no topping or excessive cutting-back shall be permitted. Tree pruning shall allow the natural branching structure to develop. 20. Plant materials shall be replaced when necessary with the same species originally specified unless otherwise approved by the Chief Planner. Page 26 Parking Areas, Screening, & Drainage 21. All ducting for air conditioning, heating, blower systems, accessory mechanisms and all other forms of mechanical or electrical equipment which are placed on or adjacent to the building shall be screened from public view, in accordance with SSFMC Chapter 20.300 (Lot and Development Standards). 22. All parking spaces, driveways, maneuvering aisles, turn-around areas and landscaping areas shall be kept free of debris, litter and weeds at all times. Site, structures, paving, landscaping, light standards, pavement markings and all other facilities shall be permanently maintained. 23. All parking spaces, driveways, maneuvering aisles, and turn-around areas must drain and be plumbed to the sanitary sewer. 24. The onsite stormwater catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay). Public Safety 25. The applicant shall comply with the provisions of Chapter 15.48 of the Municipal Code, “Minimum Building Security Standards” Ordinance revised May 1995. The Police Department reserves the right to make additional security and safety conditions, if necessary, upon receipt of detailed/revised building plans. 26. The applicant shall comply with the provisions of Chapter 15.24 of the Municipal Code, “Fire Code” Ordinance. The Fire Department reserves the right to make additional safety conditions, if necessary, upon receipt of detailed/revised building plans. 27. All fire sprinkler test and/or drain lines shall be connected to the sanitary sewer. Revised March 2013 5 4 S A N FR A NCISC O C AL IFORNI A 94107 415 .489.2224 TEL 415.358.9100 FAX WWW W.RNSSTUDIO.OCM 01 SECOND STREET TH LF ORO STE., 402 HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 Haskins Way, South San Francisco PLANNING SUBMITTAL 09/28/2018 SCALE:PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO DRAWING INDEX, PROJECT DIRECTORY 17016 G-001. DRAWING SHEET INDEX VICINITY MAP GENERAL CIVIL LANDSCAPE ARCHITECTURAL ARCHITECT WRNS STUDIO 501 SECOND STREET, SUITE 402 SAN FRANCISCO, CA 94107 415.489.2242 LANDSCAPE STUDIO 5 508 SAN ANSELMO AVE, SUITE 12 SAN ANSELMO, CA 94960 415.524.8517 CIVIL BKF ENGINEERS 255 SHORELINE DRIVE, SUITE 200 REDWOOD CITY, CA 94065 650.482.6377 PROJECT DIRECTORY OWNER ALEXANDRIA REAL ESTATE 1700 OWENS ST. SAN FRANCISCO, CA 94158 415.554.8844 LOCATION MAP G-000. COVER G-001. DRAWING INDEX, PROJECT DIRECTORY G-002. CONDITIONS OF APPROVAL G-003. CONDITIONS OF APPROVAL G-004. SITE DESIGN CONCEPT G-101. EXISTING SITE PHOTOS G-102. EXISTING SITE PHOTOS G-103. EXISTING SITE PHOTOS G-104. EXISTING SITE PHOTOS G-300 OVERALL SITE PLAN G-301. 201 HASKINS SITE PLAN G-302. 400-450 EAST JAMIE CT SITE PLAN G-303. 201 HASKINS - LOT COVERAGE / OPEN LANDSCAPE CALCULATION G-305. 400-450 EAST JAMIE CT - LOT COVERAGE / OPEN SPACE CALCULATION G-306. 201 HASKINS SITE CIRCULATION G-307. 400-450 EAST JAMIE COURT SITE CIRCULATION G-308. SITE SECTION EAST G-309. SITE SECTION WEST AND CENTER G-310 SHADOW STUDIES - PHASE 1 G-311 SHADOW STUDIES - PHASE 2 G-312 WIND STUDIES G-313 WIND SAFETY & SHADOW NARRATIVE G-401. RENDERINGS G-402. RENDERINGS G-403. VIGNETTES G-404 400-450 EAST JAMIE CT - RENDERINGS G-405 LANDSCAPE RENDERINGS A-101. 201 HASKINS FLOOR PLANS - LEVELS 1 & 2 A-102. 201 HASKINS FLOOR PLANS - LEVELS 3 & 4,5 A-103. 201 HASKINS FLOOR PLAN - ROOF A-104. 201 HASKINS GARAGE PLAN - LEVEL 1 & 2,3,4 A-105. 201 HASKINS GARAGE PLAN - LEVEL 5 & ROOF A-106. 400-450 EAST JAMIE CT - 1ST & 2ND FLOOR PLAN A-107. 400-450 EAST JAMIE CT - ROOF PLAN A-301. 201 HASKINS - BUILDING ELEVATIONS - NORTH & EAST A-302. 201 HASKINS - BUILDING ELEVATIONS - SOUTH & WEST A-303. MATERIALS AND PRECEDENTS A-304. 201 HASKINS - GARAGE ELEVATIONS - NORTH & EAST A-305. 201 HASKINS - GARAGE ELEVATIONS - SOUTH & WEST A-306. 400-450 EAST JAMIE CT ELEVATIONS A-331. BUILDING SECTIONS A-332. GARAGE SECTIONS A-333. 400-450 EAST JAMIE CT - BUILDING SECTIONS STANDARD LOT STANDARDS MIN. LOT SIZE ( SQ.FT.) MIN. LOT WIDTH (FT) BUILDING FORM AND LOCATION MAX. HEIGHT (FT.) MAIN BUILDING ACCESSORY BUILDING MIN. YARDS (FT.) FRONT INTERIOR SIDE STREET SIDE REAR MAX. LOT COVERAGE ( % OF LOT) MAX. FLOOR AREA RATIO (FAR) MAX. FLOOR AREA RATIO WITH INCENTIVES PROGRAM ADDITIONAL STANDARDS MIN. AMOUNT OF LANDSCAPING PARKING STANDARDS VEHICULAR PARKING VEHICULAR CALCULATION BICYCLE PARKING SSFMC 20.330.008 LEED V4 CALGREEN 5.106.4.1.2 PROPOSED STRUCTURES OFFICE / LAB PARKING STRUCTURE SITE / F.A.R. CALCULATIONS SITE AREA ADDRESS APN BUILDING GROSS SF ALLOWABLE DEDUCTION PER 20.040.008 (B) FLOOR AREA PER 20.040.008 (A) ACTUAL F.A.R. LOT COVERAGE MI 10,000 ; 43,560 EAST OF 101 50 65 20 20 10 10 10 60 .40 .60 10% VARIES BTP 10,000 ; 43,560 EAST OF 101 50 N/A 20 20 0 10 0 60 .50 1.0 15% 1:350 (2.86/1000) 311,368 / 350 = 890 REQUIRED BTP 280,765 362.96 80'-3" 20 20 61'-9 1/2" 10 12 43 1.0 1.0 16% 1:373 (2.68/1000) 903 PROVIDED CURRENT PROPOSED ZONING PROPOSED PROJECT TABLE 20.110.003 DEVELOPMENT STANDARDS NOTES: 1. MAX. HEIGHTS EAST OF 101 - UNLESS STIPULATED IN A SPECIAL PLAN, BLDG. HEIGHTS EAST OF 101 ARE ALLOWED TO BE MAX HEIGHT LIMITS UNDER FEDERAL REQUIREMENTS PART 77. 2. AN INCREASE IN FAR FROM .5 TO 1.0 BASED ON TABLE 20.110.005 (C) .4 INCREASE FOR SPECIFIED TDM REDUCTION STANDARDS (200.400 ) AND .1 INCREASE FOR HIGH QUALITY INNOVATIVE DESIGN. 3. 1327 STALLS ARE BEING PROVIDED AS AN OVERALL CAMPUS STRATEGY BETWEEN 400-450 EAST JAMIE CT & 201 HASKINS. FLOOR AREA FOR THE CAMPUS IS TOTAL 495,315 . FOR AN OVERALL PARKING RATIO OF 2.68 495,315/1000 = 495.315 1327/495.315=2.68/1000(1/373) 4. LONG-TERM BICYCLE SPACES ARE PROVIDED PER BASED ON HIGHEST REQUIREMENT 5. SEE SHEET G-301 & G-302 FOR F.A.R. CALCULATIONS ZONING ANALYSIS REMARKS SEE C2.0 SEE NOTE #1 SEE G-303 SEE NOTE #2 SEE G-303 SEE NOTE #3 SEE NOTE #4 SEE NOTE #5 PROJECT NARRATIVE PROJECT OVERVIEW WRNS STUDIO IS PLEASED TO SUBMIT THIS PLANNING APPLICATION ON BEHALF OF ALEXANDRIA REAL ESTATE EQUITIES PARTNERS FOR THE 201 HASKINS WAY/400-450 EAST JAMIE COURT PROJECT. THE PROPOSED PROJECT CONSISTS OF A “HIGH QUALITY, INNOVATIVE DESIGN” FOR A FIVE STORY OFFICE/LABORATORY BUILDING WITH AN FAR OF 280,765 SF AND A FIVE TIER 657 STALL PARKING GARAGE LOCATED AT 201 HASKINS WAY AND AN APPROXIMATELY 25,000 SF ADDITION TO THE EXISTING BUILDING LOCATED AT 400 EAST JAMIE COURT. SITE & ZONING OVERVIEW - 201 HASKINS: 201 HASKINS IS A 6.45 NET ACRE (280,765 SF) SITE THAT SITS AT THE NORTH EAST CORNER OF THE INTERSECTION OF HASKINS WAY AND EAST JAMIE COURT IN SOUTH SAN FRANCISCO, CALIFORNIA WITH A GENERAL PLAN DESIGNATION OF MIXED INDUSTRIAL (MI). THE PROPERTY IS ABUTTED BY THREE PROPERTIES TO THE NORTH; 151 HASKINS, 410 EAST GRAND AVE AND 430 EAST GRAND AVENUE AND ONE PROPERTY TO THE EAST, 451 EAST JAMIE COURT. ALL OF THE PROPERTIES ADJACENT TO THE SUBJECT PROPERTY ARE ALSO ZONED MI. THE PROPERTY IS CURRENTLY OCCUPIED BY YRC FREIGHT AN LTL TRUCKING COMPANY WHICH UTILIZES A ONE STORY BUILDING OF APPROXIMATELY 24,087 SF. THE ONE STORY BUILDING WILL BE DEMOLISHED AS A PART OF THE PROJECT. THE PROPOSED PROJECT WOULD CHANGE THE EXISTING GENERAL PLAN DESIGNATION FROM MI TO BUSINESS TECHNOLOGY PARK (BTP). A SUMMARY OF THE DEVELOPMENT STANDARDS APPEARS IN THE ADJACENT ZONING ANALYSIS. SITE & ZONING OVERVIEW - 400-450 EAST JAMIE COURT : 400-450 EAST JAMIE COURT IS A 6.13 NET ACRE (267,023 SF) SITE THAT SITS AT THE SOUTH EAST CORNER OF THE INTERSECTION OF HASKINS WAY AND EAST JAMIE COURT IN SOUTH SAN FRANCISCO, CALIFORNIA WITH A GENERAL PLAN DESIGNATION OF BUSINESS COMMERCIAL (BC). THE PROPERTY IS ABUTTED TO THE EAST BY 500 EAST JAMIE COURT WHICH HAS A ZONING DESIGNATION MI. THE PROPERTY IS CURRENTLY OCCUPIED BY TWO, THREE STORY BUILDINGS WITH A TOTAL OF 157,680 SF (85,287 SF + 72,393 SF) AND A BELOW GRADE GARAGE WITH 140 PARKING STALLS. THE PROPOSED PROJECT WOULD CHANGE THE EXISTING GENERAL PLAN DESIGNATION FROM BC TO BUSINESS TECHNOLOGY PARK (BTP). A SUMMARY OF THE DEVELOPMENT STANDARDS APPEARS IN THE ADJACENT ZONING ANALYSIS. FAR BONUS THE PROJECT IS SEEKING AN INCREASE IN FAR FROM .5 TO 1.0 BASED ON TABLE 20.110.003 (C) OF THE SOUTH SAN FRANCISCO MUNICIPAL CODE. THIS INCLUDES A .4 INCREASE FOR SPECIFIED TRIP REDUCTION (20.400 TDM) AND A .1 INCREASE FOR HIGH QUALITY INNOVATIVE DESIGN. PARKING STRATEGY: THE PROPOSED PROJECT REQUIRES 1416 PARKING STALLS AT A RATIO OF 1:350 OR 2.86/1000. THE 201 HASKINS, 400-450 EAST JAMIE COURT PROJECT IS PROPOSING TO PROVIDE PARKING IN AN OVERALL CAMPUS STRATEGY BETWEEN THE TWO SITES WITH A TOTAL OF 1327 STALLS BEING PROVIDED. THIS INCLUDES 903 STALLS ON THE 201 HASKINS SITE AND 424 STALLS ON THE 400-450 EAST JAMIE COURT. THE 1327 STALLS EQUATES TO A PARING RATIO OF 1:373 OR 2.68/1000. THESE NUMBERS WERE CALCULATED AS FOLLOWS AND AS DETAILED IN THE ZONING ANALYSIS PROVIDED IN THE ADJACENT DEVELOPMENT STANDARDS TABLES: BUILDING SF: 201 HASKINS 311,368 SF + 400-450 EJC 183,947 SF = 495,315 SF PARKING CALCULATION: 495,315 SF/1327 STALLS = 1/373 (1000/373 =2.68) BICYCLE PARKING BICYCLE PARKING IS PROVIDED TO MEET BOTH THE SHORT TERM REQUIREMENTS UNDER SECTION 20.330.008 OF SSFMC AS WELL AS THE LONG TERM REQUIREMENTS UNDER SECTION CALGREEN SECTION 5.106.4.1.2: SHORT TERM: 10% OF VEHICULAR PARKING 890 X 0.10 = 89 LONG TERM: 5% OF VEHICULAR PARKING 890 X 0.05 = 45 SUSTAINABILITY GOALS THE PROPOSED PROJECT HAS THE POTENTIAL TO ACHIEVE HIGH LEVELS OF SUSTAINABILITY. WE ARE PROPOSING SEVERAL DESIGN STRATEGIES WHICH ARE FOCUSED ON ENHANCING RESOURCE EFFICIENCY AND ENSURING GOOD INDOOR ENVIRONMENTAL QUALITY AS WELL AS STRATEGIES THAT WILL REDUCE ENERGY CONSUMPTION, WATER CONSUMPTION AND WASTE. WE ARE ALSO INCORPORATING ELEMENTS INTO THE PROJECT THAT WILL ENCOURAGE TRANSIT OPTIONS SUCH AS BICYCLING AS VIABLE TRANSPORTATION MODES AND DECREASE THE NEED TO DRIVE. LEED GOALS: THE PROJECT TEAM IS DESIGNING TO A LEED GOLD CERTIFICATION. WHILE AMBITIOUS FOR A PROJECT OF THIS SIZE, WE REALIZE IT WILL BE A VALUABLE ASSET TO THE CITY OF SOUTH SAN FRANCISCO. KEY TARGET CREDITS WILL BE IN THE AREA OF AN IMPROVED SITE, INCREASED ENERGY EFFICIENCY, THOUGHTFUL WATER MANAGEMENT AND GOOD INDOOR ENVIRONMENTAL QUALITY. THIS PROJECT COULD SET AN EXCELLENT EXAMPLE AS THE AREA DEVELOPS INTO HIGHER INTENSITY LAB/OFFICE BUILDINGS. WELL GOALS: THE WELL BUILDING STANDARD IS REVOLUTIONIZING THE WAY PEOPLE THINK ABOUT BUILDINGS; EXPLORING HOW DESIGN, OPERATIONS AND BEHAVIORS WITHIN THE PLACES WE LIVE, WORK AND PLAY CAN BE OPTIMIZED TO ADVANCE HUMAN HEALTH AND WELL BEING. THE 201 HASKINS PROJECT IS SEEKING WELL CERTIFICATION. PROVIDED: 48 LONG TERM (45 REQ'D); 94 SHORT TERM (89 REQ'D) LONG TERM 1:25 VEHICULAR SPACES (890/25 = 36) ; SHORT TERM 10% OF VEHICULAR PKG (890*0.10 = 89) 5% OF BUILDING OCCUPANTS (891 X .05 = 45) 5% VEHICULAR SPACES (890 X .05 = 45) 311,368 GSF (280,765 NSF) 229,729 GSF (229,729 NSF) 280.765 (6.45 ACRES) 201 HASKINS WAY, SOUTH SAN FRANCISCO, CA 94080 015-102-230 311,368 SF 30,603 SF 280,765 NSF (311,368 GSF) 1.0 126,361 SF (SEE SHEET G-303) STANDARD LOT STANDARDS MIN. LOT SIZE ( SQ.FT.) MIN. LOT WIDTH (FT) BUILDING FORM AND LOCATION MAX. HEIGHT (FT.) MAIN BUILDING ACCESSORY BUILDING MIN. YARDS (FT.) FRONT INTERIOR SIDE STREET SIDE REAR MAX. LOT COVERAGE ( % OF LOT) MAX. FLOOR AREA RATIO (FAR) MAX. FLOOR AREA RATIO WITH INCENTIVES PROGRAM ADDITIONAL STANDARDS MIN. AMOUNT OF LANDSCAPING PARKING STANDARDS VEHICULAR PARKING VEHICULAR CALCULATION BICYCLE PARKING SSFMC 20.330.008 LEED V4 CALGREEN 5.106.4.1.2 PROPOSED STRUCTURES OFFICE / LAB PARKING STRUCTURE SITE / F.A.R. CALCULATIONS SITE AREA ADDRESS APN BUILDING GROSS SF ALLOWABLE DEDUCTION PER 20.040.008 (B) FLOOR AREA PER 20.040.008 (A) ACTUAL F.A.R. LOT COVERAGE BC 10,000 ; 43,560 EAST OF 101 50 50 20 20 0,10 ALONG R 10 0,10 ALONG R 50 .5 1.0 15% VARIES BTP 10,000 ; 43,560 EAST OF 101 50 50 20 20 0,10 ALONG R 10 0,10 ALONG R 50 .5 1.0 15% 1:350 (2.86/1000) 183,947 / 350 = 526 REQUIRED BTP 280,765 362.96 80'-3" 20 20 61'-9 1/2" 10 12 25.5 1.0 1.0 25.3% 1:373 (2.68/1000) 424 PROVIDED CURRENT PROPOSED ZONING PROPOSED PROJECT TABLE 20.110.003 DEVELOPMENT STANDARDS REMARKS SEE C2.0 SEE NOTE #1 SEE G-305 SEE NOTE #2 SEE G-305 SEE NOTE #3 SEE NOTE #4 SEE NOTE #5 LONG TERM 1:25 VEHICULAR SPACES (424/25 = 17) 5% OF BUILDING OCCUPANTS (730 X .05 = 37) 5% VEHICULAR SPACES (424 X .05 = 22) 25,000 GSF 267,023 (6.13 ACRES) 400 EAST JAMIE CT, SOUTH SAN FRANCISCO, CA 94080 015-102-250 182,747 SF 4,662 SF 178,085 NSF (182,747 GSF) 0.67 63,570 SF (SEE SHEET G-305) 201 HASKINS 400-450 EAST JAMIE CT. LIGHTING EL - 101 PHOTOMETRIC PLAN - SITE EL - 102 PHOTOMETRIC PLAN - LEVEL 4 / LOWER ROOF EL - 103 PHOTOMETRIC PLAN - LEVEL P5 EL - 104 CUTSHEETS EL - 105 CUTSHEETS EL - 106 FIXTURE SCHEDULE C1.0A 201 HASKINS - EXISTING CONDITIONS PLAN C1.0B 400-450 EAST JAMIE COURT - EXISTING CONDITIONS PLAN C2.0A 201 HASKINS - PROPOSED GRADING & DRAINAGE PLAN C2.0B 400-450 EAST JAMIE COURT - GRADING AND DRAINAGE PLAN C3.0A 201 HASKINS - PROPOSED STORMWATER PLAN C3.0B 400-450 EAST JAMIE COURT - STORMWOATER MANAGEMENT PLAN L-001. MATERIAL & PLANT SCHEDULE L-002. ILLUSTRATIVE PLAN L-002A ILLUSTRATIVE PLAN L-002B. ILLUSTRATIVE PLAN L-002C. ILLUSTRATIVE PLAN L-002D. ILLUSTRATIVE PLAN L-003. TREE DISPOSITION PLAN L-004. PHOTOGRAPHIC IMAGERY L-005. PLANTING PHOTOGRAPHIC IMAGERY L-100. LAYOUT PLAN L-200. PLANTING PLAN SCALE:PROJECT #:APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCOCONDITIONS OF APPROVAL17016G-002.AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #:APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCOCONDITIONS OF APPROVAL17016G-003.AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SITE DESIGN DESIGN CONCEPT IN DEVELOPING THE SITING STRATEGY FOR 201 HASKINS CONSIDERATION HAS BEEN GIVEN NOT ONLY TO THE PARAMETERS OF THE CURRENT PROJECT BUT ALSO TO THOSE OF FUTURE DEVELOPMENT. ULTIMATELY, THE GOALS OF THIS PHASED DEVELOPMENT ARE: 1. CREATE A VISUAL LINK FROM EAST GRAND AVE. TO THE NORTH THROUGH THE PROJECT SITE CULMINATING IN AN EXISTING PUBLIC ACCESS TO THE BAY TRAIL BETWEEN TWO EXISTING BUILDINGS AT 400 AND 450 EAST JAMIE COURT. 2. CREATE A STRONG PEDESTRIAN LINK FROM THE INTERSECTION OF EAST GRAND AVE AND HASKINS WAY TO THE BAY TRAIL ACCESS AT THE SOUTHERN TERMINUS OF HASKINS. 3. CREATE A “CAMPUS” WITH TWO EXISTING BUILDINGS LOCATED AT 400 AND 450 EAST JAMIE COURT, AND; 4. TAKE ADVANTAGE OF THE SPECTACULAR VIEWS OF THE BAY AND SFO TO THE SOUTH. TO ACHIEVE THESE GOALS THE BUILDINGS ARE SET WITH THEIR LONG (EAST-WEST) AXIS PARALLEL TO EAST GRAND AND EAST JAMIE CT. CREATING A HORIZONTAL STRIATION OF THE SITE. A SERIES OF MEANDERING PATHS AND PLANTINGS RUN AGAINST THE GRAIN AND WILL EVENTUALLY FORM LINKS BETWEEN EAST GRAND AND THE BAY. PHASE 1 PHASE 1 STANDS ALONE AS A PROJECT WHILE LAYING THE FOUNDATION FOR FUTURE DEVELOPMENT. THE LAB/OFFICE BUILDING HAS BEEN SITUATED ALONG THE SOUTHERN PROPERTY LINE TO BE IN CLOSE PROXIMITY WITH THE BUILDINGS ACROSS EAST JAMIE COURT. A CENTRAL ATRIUM SPACE THAT IS ON AXIS WITH THE PUBLIC ACCESS TO THE BAY TRAIL BETWEEN THE EXISTING BUILDINGS AT 400-450 EAST JAMIE COURT FORMS THE HUB OF THE NEW PROJECT. THE GARAGE MASSING IS INTENTIONALLY PULLED BACK FROM HASKINS WAY TO THE EASTERN PORTION OF THE SITE. THIS ALLOWS FOR THE FORMATION OF BOTH A PUBLIC PLAZA AND WALKWAY ALONG HASKINS WAY AND A CENTRAL SPINE ALONG THE GARAGE’S WEST EDGE. THIS CENTRAL SPINE, ON AXIS WITH THE SPLIT BETWEEN THE BUILDINGS AT 400-450 EAST JAMIE COURT RUNS THROUGH THE BUILDING’S THREE-STORY ATRIUM LINKING THE PROPOSED PROJECT WITH THE WATER’S EDGE. THE LAB/OFFICE BUILDING IS EXTENDED FURTHER TO THE WEST THAN 400 EAST JAMIE COURT TO OPEN UP VIEWS TO THE BAY. PHASE 2 PHASE 2 COMPLETES THE SITE PLANNING STRATEGIES GENERATED IN PHASE 1 BY STRENGTHENING AND COMPLETING THE CENTRAL VISUAL SPINE AND THE PEDESTRIAN LINK FROM EAST GRAND AVE. TO THE BAY. THE CENTRAL SPINE IS COMPLETED BY CREATING A “FRONT DOOR” ALONG EAST GRAND AVENUE WHICH LEADS DIRECTLY INTO A THREE STORY ATRIUM SPACE. THIS CAMPUS ENTRY BEGINS THE SEQUENCE OF INTERNAL AND EXTERNAL SPACES THAT CULMINATES AT THE PLAZA OVERLOOKING THE BAY AT 400-450 EAST JAMIE COURT. SIMILARLY, THE PEDESTRIAN WAY ALONG HASKINS WAY IS STRENGTHENED BY THE ADDITION OF A SECOND PLAZA SPACE AT THE INTERSECTION OF EAST GRAND AVE AND HASKINS WAY AND IS LINKED TO THE FIRST BY A PATHWAY THAT INCREASES AND DECREASES IN WIDTH TO CREATE A DYNAMIC WALKING EXPERIENCE. THE PLAZA WALKWAY SEQUENCE MIRRORS THE INTERNAL AND EXTERNAL SEQUENCE OF THE CENTRAL SPINE. PHASE I: SITE CONCEPT DIAGRAM PHASE I: DIAGRAMMATIC SITE PLANPHASING DIAGRAM PHASE II: SITE CONCEPT DIAGRAM PHASE II: DIAGRAMMATIC SITE PLAN E. JAMIE COURTHASKINS WAYE. GRAND AVE SAN FRANCISCO BAY E. JAMIE COURTHASKINS WAYE. GRAND AVE SAN FRANCISCO BAY SAN FRANCISCO BAY E. JAMIE COURTHASKINS WAYE. GRAND AVE SAN FRANCISCO BAY E. JAMIE COURTHASKINS WAYE. GRAND AVE SCALE:PROJECT #: APRIL 13, 2018 NTS HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO SITE DESIGN CONCEPT 17016 G-004 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 EXISTING SITE PHOTOS HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO Aerial View Looking Southeast 1. West Side of Haskins Way Across From Subject Property 3. 151 Haskins Way 2. Subject Property from Haskins Way 1 2 4 6 5 3 SCALE:PROJECT #: NTS17016 G-101 FEBRUARY 7TH,2018APRIL 13,2018AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 EXISTING SITE PHOTOS HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO Aerial View Looking Southeast 4.West Side of Haskins Way, Facing Southeast 6. View From 400 E Jamie Ct. , Facing Northwest 5. View from Southend of Haskins Way, Facing East 1 4 6 5 2 3 SCALE:PROJECT #: NTS17016 G-102 FEBRUARY 7TH,2018FEBRUARY7TH, 2018APRIL 13,2018AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO Aerial View Looking Northwest 1. 451 E Jamie Court 3. South Side of E Jamie Court Across From Subject Property 2. Subject Property from E Jamie Court 1 3 4 6 5 2 SCALE:PROJECT #: 1" = 20'-0" EXISTING SITE PHOTOS 17016 G-103 FEBRUARY 7TH,2018APRIL 13,2018AUGUST 3RD, 2018AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO Aerial View Looking Northwest 4. Southeast Corner @ SF Bay Trail, Adjacent to Blue Line Transfer Dumping 6. Southwest Corner @ SF Bay Trail 5. View from South Stairs @ SF Bay Trail 1 2 3 4 6 5 2 SCALE:PROJECT #: NTS EXISTING SITE PHOTOS 17016 G-104 FEBRUARY 7TH,2018FEBRUARY7TH, 2018APRIL 13,2018AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 YDHY DH Y DH UP LOA DI NG DOCK TRASHSERVICE B.C.D.C TRAIL UP LOA DI NG DOCK TRASHSERVICE B.C.D.C TRAIL UPUP A C A BA L ACA BA L ACA BA L ACA BA L ALALALALALALALALALALALAL MEL QUI MEL QUI MEL QUI MEL QUI MEL QUI MEL QUI ALALALALALA C A BA L ALALALALALVANVANVAN LOADING WASTE PROCESSING LOADING WASTE PROCESSING UTILITY YARD MAIN ELEC PROPERTY LINE, TYP. 10' SEWER EASEMENT, S.C.D. E. JAMIE COURTHASKINS WAY(N) OFFICE BUILDING 3 STORY ENTRY COURT / ATRIUM (5 STORY WING)(3 STORY WING)TYP.18'-0"TYP.25'-0"TYP. 8'-6" T Y P .1 8 '-0 " EDGE OF BUILDING ABOVE, TYP. RAMP UP ACCESSIBLE PATH OF TRAVEL, TYP. 151 HASKINS WAY (E) 1 STORY BUILDING 401 E GRAND AVE. (E) 1 STORY BUILDING 430 E GRAND AVE. (E) 2 STORY BUILDING 451 E JAMIE COURT(E) 2 STORY BUILDINGEDGE OF (E) CURB EDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. CONCRETE SIDEWALK, S.L.D. 5 STORY PARKING STRUCTURE 720 STALLS REAR YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 23 SIDE YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 A CTUAL SETBACK 28'-4 "ACTUAL SETBACK10'-0"UP ACTUAL SETBACK61'-9 1/2"UTILITY TRANSFORMER PAD14 15 16 18 9 36 27 21 17 10 37 241618 20 10 28 25 17178 17 20 14 ELEC (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 85,287 GSF (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 72,393 GSF (N) 2-STORY BUILDING 25,067 GSF EDGE OF BUILDING ABOVE, TYP. (N) CROSSWALK VOID VAN24'-0"SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING PROPERTY LINE SETBACK LINE EDGE OF BUILDING ABOVE ACCESSIBLE PATH OF TRAVEL PEDESTRIAN PATH OF TRAVEL LEGEND SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO OVERALL SITE PLAN 17016 G-300 0'15' 30' 60'120' YDH Y DH Y DH MEL QUI MEL QUI MEL QUI MEL QUIVANVANVAN LOADING WASTE PROCESSING LOADINGWASTE PROCESSING UTILITY YARD MECHANICAL PROPERTY LINE, TYP. 10' SEWER EASEMENT, S.C.D. E. JAMIE COURTHASKINS WAY(N) OFFICE BUILDING 3 STORY ENTRY COURT / ATRIUM (5 STORY WING)(3 STORY WING)TYP.18'-0"TYP.25'-0"TYP. 8'-6" T Y P .1 8 '-0 " EDGE OF BUILDING ABOVE, TYP. RAMP UP ACCESSIBLE PATH OF TRAVEL, TYP. 151 HASKINS WAY (E) 1 STORY BUILDING 401 E GRAND AVE. (E) 1 STORY BUILDING 430 E GRAND AVE. (E) 2 STORY BUILDING 451 E JAMIE COURT(E) 2 STORY BUILDINGEDGE OF (E) CURB EDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. CONCRETE SIDEWALK, S.L.D. 5 STORY PARKING STRUCTURE 720 STALLS REAR YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 SIDE YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 A CTUAL SETBACK 2 8'-4"ACTUAL SETBACK10'-0"UP ACTUAL SETBACK61'-9 1/2"UTILITY TRANSFORMER PAD(N) CROSSWALK VOID VAN14 15 16 18 9 36 27 21 17 10 37 241618 20 10 28 25 17178 17 20 1424'-0"SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING PROPERTY LINE SETBACK LINE EDGE OF BUILDING ABOVE ACCESSIBLE PATH OF TRAVEL PEDESTRIAN PATH OF TRAVEL LEGEND SITE / F.A.R. CALCULATIONS ZONING: APN:015-102-230 EXISTING PROPOSED MI BTP F.A.R. CALCULATIONS (TABLE 20.110.003) ALLOWABLE EXISTING (MI): ALLOWABLE PROPOSED (BTP): .40 .50 INCREASED F.A.R.:SEE NOTE #1 BUILDING AREA CALCULATIONS (REF. 20.040.008) BUILDING GROSS SF ALLOWABLE DEDUCTION PER 20.040.008 (B) 311,368 SF 30,603 SF ADDRESS:201 HASKINS WAY, SOUTH SAN FRANCISCO, CA 94080 SITE AREA:280,765 SF (6.45 ACRES) NOTES: 1. AN INCREASE IN FAR FROM .5 TO 1.0 BASED ON TABLE 20.110.003 (C), A .4 INCREASE FOR SPECIFIED TRIP REDUCTION STANDARDS (20.400 TDM) AND .1 INCREASE FOR HIGH QUALITY, INNOVATIVE DESIGN (SUBJECT TO PLANNING COMMISSION APPROVAL)FLOOR AREA PER 20.040.008 (A)280,765 NET SF ACTUAL FAR 1.0 SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO 201 HASKINS SITE PLAN 17016 G-301. 0'15' 30' 60'120' Y DH Y DH A C A B A L A CA BA L A CA BA L A CA B A L ALALALALALALALALALALALAL MEL QUI MEL QUI MEL QUI MEL QUI MEL QUI MEL QUI ALALALALALA CA B AL ALALALALAL E. JAMIE COURTHASKINS WAY(E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 27,634 SF BUILDING FOOTPRINT 85,287 GSF BUILDING EDGE OF (E) CURB PORTE COCHERE CONCRETE SIDEWALK, S.L.D. (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 24,852 SF BUILDING FOOTPRINT 72,393 GSF BUILDING OL OL LP (N) 2-STORY BUILDING 11,084 SF BUILDING FOOTPRINT 25,000 GSF BUILDING PROPERTY LINE, TYP. EDGE OF (E) CURB PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. 1 8 5'-9 "53'-0"EDGE OF BUILDING ABOVE, TYP. (N) CROSSWALK 37 241618 20 10 28 25 17178 17 20 14 SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING PROPERTY LINE SETBACK LINE EDGE OF BUILDING ABOVE ACCESSIBLE PATH OF TRAVEL PEDESTRIAN PATH OF TRAVEL LEGEND SITE / F.A.R. CALCULATIONS ZONING: APN:015-102-250 EXISTING PROPOSED BC BTP F.A.R. CALCULATIONS (TABLE 20.110.003) ALLOWABLE EXISTING (BC): ALLOWABLE PROPOSED (BTP): .50 .50 INCREASED F.A.R.:1.0 (SEE NOTE #1) BUILDING AREA CALCULATIONS (REF. 20.040.008) BUILDING GROSS SF ALLOWABLE DEDUCTION PER 20.040.008 (B) 182,747 SF 4,662 SF ADDRESS:400-450 EAST JAMIE COURT, SOUTH SAN FRANCISCO, CA 94080 SITE AREA:267,023 SF (6.13 ACRES) NOTES: 1. AN INCREASE IN FAR FROM .5 TO 1.0 BASED ON TABLE 20.110.003 (C), A .4 INCREASE FOR SPECIFIED TRIP REDUCTION STANDARDS (20.400 TDM) AND .1 INCREASE FOR HIGH QUALITY, INNOVATIVE DESIGN (SUBJECT TO PLANNING COMMISSION APPROVAL)FLOOR AREA PER 20.040.008 (A)178,085 NET SF ACTUAL FAR 0.67 SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT SITE PLAN 17016 G-302. 0'15' 30' 60'120' VANPROPERTY LINE, TYP. 10' SEWER EASEMENT, S.C.D. E. JAMIE COURTHASKINS WAY(N) 5-STORY LAB / OFFICE BUILDING 81,048 SF BUILDING FOOTPRINT 311,368 GSF BUILDING TYP.18'-0"TYP.25'-0"TYP. 8'-6" T Y P .1 8 '-0 " EDGE OF BUILDING ABOVE, TYP. ACCESSIBLE PATH OF TRAVEL, TYP. 151 HASKINS WAY (E) 1 STORY BUILDING 401 E GRAND AVE. (E) 1 STORY BUILDING 430 E GRAND AVE. (E) 2 STORY BUILDING 451 E JAMIE COURT (E) 2 STORY BUILDING EDGE OF (E) CURB EDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. CONCRETE SIDEWALK, S.L.D. (N) 5-STORY PARKING STRUCTURE REAR YARD SETBACK NOT REQUIRED 45,313 SF GARAGE FOOTPRINT 229,729 GSF GARAGE OL OL OL OL P OL OL OL OL OL OL OL P P OL OL OL OL P OL OL LP LP LP LP LP OL24'-0"SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING LOT COVERAGE / OPEN LANDSCAPE CALCULATION LOT COVERAGE: TOTAL SITE AREA:280,765 SF (100%) LAB/OFFICE BLDG. GARAGE TOTAL 81,048 SF 45,313 SF 126,361 SF ACTUAL % OF SITE COVERAGE 126,361 / 280,765 = 45% PAVING COVERAGE (P) VEHICULAR PAVING (LP) LANDSCAPE PEDESTRIAN PAVING 98,169 SF 11,735 SF TOTAL ACTUAL % SITE COVERAGE 109,904 SF 109,904 SF / 280,765 SF = 39.1% OPEN AREA (OL) OPEN SPACE LANDSCAPING ACTUAL % SITE COVERAGE 44,375 SF 44,375 SF / 280,765 SF = 15.8% SETBACKS:SEE SHEET G-300 MINIMUM REQUIRED 15% MAXIMUM LOT COVERAGE 60% LEGEND OL - OPEN SPACE LANDSCAPE LP - LANDSCAPE / PED. PAVING P - VEHICULAR PAVING SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO 201 HASKINS -LOT COVERAGE / OPEN LANDSCAPE CALCULATION 17016 G-303. PROPERTY LINE, TYP. E. JAMIE COURTHASKINS WAYEDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. OL OL LP B.C.D.C TRAIL SAN FRANCISCO BAY OL P LP OL OL OL OL OL OL OL OL OL OL OL OL OL P P P P LP LP LP LINE OF BASEMENT WALL BELOW LINE OF BASEMENT WALL BELOW LP OL OL OL EDGE OF BUILDING ABOVE, TYP. OL (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 27,634 SF BUILDING FOOTPRINT 85,287 GSF BUILDING (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 24,852 SF BUILDING FOOTPRINT 72,393 GSF BUILDING (N) 2-STORY BUILDING 11,084 SF BUILDING FOOTPRINT 25,000 GSF BUILDING SHORT TERM BICYCLE PARKING SHORT TERM BICYCLE PARKING LOT COVERAGE / OPEN LANDSCAPE CALCULATION LOT COVERAGE: TOTAL SITE AREA:267,023 SF (100%) (E) LAB/OFFICE BLDG. (N) OFFICE BLDG. TOTAL 52,486 SF 11,084.02 SF 63,570.02 SF ACTUAL % OF SITE COVERAGE 68,131 / 267,023 = 23.8% PAVING COVERAGE (P) VEHICULAR PAVING (LP) LANDSCAPE PEDESTRIAN PAVING 98,804 SF 38,713 SF TOTAL ACTUAL % SITE COVERAGE 137,517 SF 137,517 SF / 267,023 SF = 51.5% OPEN AREA (OL) OPEN SPACE LANDSCAPING ACTUAL % SITE COVERAGE 66,026.21 SF 66,026.21 SF / 267,023 SF = 24.7% SETBACKS:SEE SHEET G-300 LEGEND OL - OPEN SPACE LANDSCAPE LP - LANDSCAPE / PED. PAVING P - VEHICULAR PAVING SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT -LOT COVERAGE / OPEN SPACE CALCULATION 17016 G-305. YDHY DH Y DHVANVANVAN LOADING WASTE PROCESSING LOADING WASTE PROCESSING UTILITY YARD ELECTRICAL PROPERTY LINE, TYP. 10' SEWER EASEMENT, S.C.D. E. JAMIE COURTHASKINS WAY(N) OFFICE BUILDING 3 STORY ENTRY COURT / ATRIUM (5 STORY WING)(3 STORY WING)TYP.18'-0"TYP.25'-0"TYP. 8'-6" T Y P .1 8 '-0 " EDGE OF BUILDING ABOVE, TYP. RAMP UP ACCESSIBLE PATH OF TRAVEL, TYP. 151 HASKINS WAY (E) 1 STORY BUILDING 401 E GRAND AVE. (E) 1 STORY BUILDING 430 E GRAND AVE. (E) 2 STORY BUILDING 451 E JAMIE COURT(E) 2 STORY BUILDINGEDGE OF (E) CURB EDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. CONCRETE SIDEWALK, S.L.D. 5 STORY PARKING STRUCTURE 720 STALLS RAMP UP UP REAR YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 20 21 22 25 1 0 33 24 21 23 SIDE YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 ACTUAL SETBACK 2 8 '-4 "ACTUAL SETBACK10'-0"UP ACTUAL SETBACK61'-9 1/2"PEDESTRIAN PATH OF TRAVEL, TYP.UTILITY TRANSFORMER PAD150'-0" S S VOID EIE24'-0"LEGEND VISITOR/ EMPLOYEE ROUTE FIRE TRUCK ROUTE SERVICE/ FIRE TRUCK ROUTE ENTRY SERVICE POINTS PEDESTRIAN ZONE SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS SITE CIRCULATION 17016 G-306. 1" = 30'-0"1 SITE PLAN 0'15' 30' 60' 120' SEPTEMBER 28TH, 2018 Y DH Y DH UP L OADIN G DOCK TRA SHSERVICE B .C.D .C TRAIL UP L OADIN G DOCK TRA SHSERVICE B .C.D .C TRAIL UPUP ALALALALALALALALALALALAL ALALALALALALALALALAL LEGEND VISITOR/ EMPLOYEE ROUTE FIRE TRUCK ROUTE SERVICE/ FIRE TRUCK ROUTE ENTRY SERVICE POINTS PEDESTRIAN ZONE E. JAMIE COURTHASKINS WAY(E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 85,287 GSF EDGE OF (E) CURB PORTE COCHERE CONCRETE SIDEWALK, S.L.D. (E) 3-STORY LAB / OFFICE BUILDING OVER PARKING GARAGE 72,393 GSF OL OL LP (N) 2-STORY BUILDING 25,067 GSF PROPERTY LINE, TYP. EDGE OF (E) CURB PLANTED AREA, TYP., S.L.D.ASPHALT PAVING, U.N.O. 185 '-9 "53'-0"S S SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE COURT SITE CIRCULATION 17016 G-307. 0'15' 30'60'120' AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO SITE SECTION EAST 17016 G-308 3/32" = 1'-0" 3/32" = 1'-0"1 SITE SECTION - EAST AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #:1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO SITE SECTION WEST AND CENTER 17016 G-309 APRIL 13TH, 2018 1" = 20'-0"1 SITE SECTION - CENTER 3/32" = 1'-0"2 SITE SECTION - WEST AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #: AUGUST 27TH, 2018HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO SHADOW STUDY -PHASE 1 17016 G-310. MARCH 21 - 9:00AM MARCH 21 - 12:00PM MARCH 21 - 3:00PM MARCH 21 - 6:00PM JUNE 21 - 9:00AM JUNE 21 - 12:00PM JUNE 21 - 3:00PM JUNE 21 - 6:00PM SEPTEMBER 21 - 9:00AM SEPTEMBER 21 - 12:00PM SEPTEMBER 21 - 3:00PM SEPTEMBER 21 - 6:00PM DECEMBER 21 - 9:00AM DECEMBER 21 - 12:00PM DECEMBER 21 - 3:00PM DECEMBER 21 -6:00PM (SUNSET AT 4:54PM) SEPTEMBER 28TH, 2018 SCALE:PROJECT #: AUGUST 27TH, 2018HASKINS BIOTECH CAMPUS -SOUTH SAN FRANCISCO SHADOW STUDY -PHASE 2 17016 G-311. MARCH 21 - 9:00AM MARCH 21 - 12:00PM MARCH 21 - 3:00PM MARCH 21 - 6:00PM JUNE 21 - 9:00AM JUNE 21 - 12:00PM JUNE 21 - 3:00PM JUNE 21 - 6:00PM SEPTEMBER 21 - 9:00AM SEPTEMBER 21 - 12:00PM SEPTEMBER 21 - 3:00PM SEPTEMBER 21 - 6:00PM DECEMBER 21 - 9:00AM DECEMBER 21 - 12:00PM DECEMBER 21 - 3:00PM DECEMBER 21 -6:00PM (SUNSET AT 4:54PM) MARCH 21 - 9:00AM MARCH 21 - 12:00PM MARCH 21 - 3:00PM MARCH 21 - 6:00PM JUNE 21 - 9:00AM JUNE 21 - 12:00PM JUNE 21 - 3:00PM JUNE 21 - 6:00PM SEPTEMBER 21 - 9:00AM SEPTEMBER 21 - 12:00PM SEPTEMBER 21 - 3:00PM SEPTEMBER 21 - 6:00PM DECEMBER 21 - 9:00AM DECEMBER 21 - 12:00PM DECEMBER 21 - 3:00PM DECEMBER 21 -6:00PM (SUNSET AT 4:54PM) SEPTEMBER 28TH, 2018 SCALE:PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO WIND STUDIES 17016 G-312 SEPTEMBER 28TH, 2018 SCALE:PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO WIND SAFETY & SHADOW NARRATIVE 17016 G-313 WIND SAFETY PURSUANT TO SECTION 20.480.006(A)(6) OF THE CITY’S MUNICIPAL CODE, OPEN SPACE, PEDESTRIAN WALKS, AND OTHER AMENITIES (SIGNS, ILLUMINATION, AND LANDSCAPING) SHALL BE DESIGNED TO ENHANCE THE ENVIRONMENTAL QUALITY OF THE SITE, ACHIEVE A SAFE, EFFICIENT, AND HARMONIOUS DEVELOPMENT. SIMILARLY, PER SECTION 20.480.006(A)(8) OF THE MUNICIPAL CODE, COMPONENTS CONSIDERED IN DESIGN REVIEW SHALL INCLUDE SAFETY. AS SUCH, ONE SUCH COMPONENT THAT MAY BE CONSIDERED IN THE DESIGN REVIEW PROCESS IS WIND SAFETY FOR PEDESTRIANS AND PEOPLE IN OUTDOOR SETTINGS. WINDS CAN BE RELATIVELY STRONG AND TURBULENT GUSTS MAY AFFECT A PEDESTRIAN’S BALANCE AND FOOTING. WIND GUSTS ARE USUALLY RARE EVENTS, BUT ARE GIVEN SPECIAL ATTENTION DUE TO THEIR POTENTIAL SAFETY IMPACT ON PEDESTRIANS. TO CONSIDER MUNICIPAL CODE REQUIREMENTS REGARDING WIND SAFETY, ROWAN WILLIAMS DAVIES & IRWIN INC. (RWDI) PREPARED A SCREENING-LEVEL WIND ANALYSIS TO PROVIDE A QUALITATIVE EVALUATION OF THE POTENTIAL WIND CONDITIONS UNDER THE PROPOSED DEVELOPMENT. THIS ASSESSMENT WAS BASED ON LONG-TERM METEOROLOGICAL DATA FOR THE SOUTH SAN FRANCISCO AREA, PROJECT DESIGN INFORMATION, THE PROPRIETARY WINDESTIMATOR MODELING TOOL, AND OTHER KNOWLEDGE OF WIND FLOWS AROUND BUILDINGS. FOR THE WIND SAFETY CRITERION, RWDI CONSIDERED WHETHER GUST WIND SPEEDS WOULD EXCEED 56 MILES PER HOUR FOR 0.1 PERCENT OF THE TIME, OR 9 HOURS ON AN ANNUAL BASIS. THE CITY DOES NOT CONSIDER EXCEEDANCES OF THE WIND SAFETY CONDITION TO BE A SIGNIFICANT IMPACT FOR CEQA PURPOSES. HOWEVER, THE RESULTS OF THIS ASSESSMENT ARE SUMMARIZED IN RESPONSE TO THE NOP COMMENT AND CEQA GUIDELINES SECTION 15128. POTENTIAL CONCEPTUAL WIND CONTROL DESIGN FEATURES WOULD BE CONSIDERED ON AN AS-NEEDED BASIS DURING THE CITY DESIGN REVIEW PROCESS IN ACCORDANCE WITH THE MUNICIPAL CODE. IMPACT AE-4: THE PROPOSED PROJECT WOULD NOT ALTER WIND CONDITIONS IN A MANNER THAT WOULD SUBSTANTIALLY, ADVERSELY AFFECT PUBLIC SAFETY. (LESS THAN SIGNIFICANT) BASED ON LONG-TERM WIND DATA RECORDED AT SAN FRANCISCO INTERNATIONAL AIRPORT BETWEEN 1948 AND 2015, FOUR PRIMARY WIND DIRECTIONS HAVE THE GREATEST FREQUENCY OCCURRENCE AND MAKE UP THE MAJORITY OF THE STRONG WINDS THAT OCCUR. THESE WIND DIRECTIONS ARE WEST-NORTHWEST, WEST, NORTHWEST, AND WEST-SOUTHWEST. THE DIRECTION AND SPEED OF WIND CURRENTS CAN BE ALTERED BY NATURAL FEATURES OF THE LAND OR BY BUILDINGS AND STRUCTURES. GROUPS OF BUILDINGS CLUSTERED TOGETHER TEND TO ACT AS OBSTACLES THAT REDUCE WIND SPEEDS. TALL BUILDINGS THAT STAND ALONE OR ARE MUCH TALLER THAN THE SURROUNDING BUILDINGS CAN INTERCEPT AND REDIRECT STRONG WINDS AT HIGH ELEVATIONS AND REDIRECT THEM DOWN TO GROUND LEVEL. IN ADDITION, WIDE BUILDING AXES PERPENDICULAR TO PREVAILING WINDS WILL INTERCEPT MORE WIND AND CAUSE STRONGER GROUND-LEVEL WIND THAN BUILDINGS ORIENTED WITH A NARROW AXIS PERPENDICULAR TO PREVAILING WINDS. LASTLY, BUILDINGS WITH MORE SIMPLE, SLAB BUILDING SHAPES CAN CAUSE STRONGER WINDS THAN ARTICULATED, COMPLEX BUILDING SHAPES. THE EXISTING BUILDINGS ON SITE ARE LOW (BETWEEN ONE TO THREE STORIES) AND SURROUNDED BY DENSE BUILDINGS OF SIMILAR HEIGHT TO THE WEST AND NORTHWEST DIRECTIONS WHERE THE PREVAILING WINDS COME FROM. AS A RESULT, THE EXISTING CONDITIONS ON AND AROUND THE PROJECT SITE ARE GENERALLY APPROPRIATE FOR THE EXISTING USES AND DO NOT EXCEED THE WIND SAFETY CRITERION. PHASE 1 DEVELOPMENT THE PHASE 1 SITE PLAN FEATURES THE ELONGATED 201 HASKINS WAY BUILDING AND PARKING GARAGE, WHICH WOULD HAVE THEIR LONGER AXES IN AN EAST-WEST DIRECTION, REDUCING EXPOSURE TO PREVAILING WEST AND WEST-NORTHWEST WINDS. THE ENTRANCES TO THE 201 HASKINS WAY BUILDING WOULD ALSO BE RECESSED AND PROTECTED BY LARGE FRAMES EXTRUDING FROM THE MAIN FAÇADE. IN ADDITION, THE PROPOSED LANDSCAPING WOULD LIKELY REDUCE THE WIND ACTIVITY ON AND AROUND THE 201 HASKINS WAY PARCEL. HOWEVER, DUE TO THE LOCAL WIND CLIMATE AND THE INCREASED BUILDING MASSING ON THE SITE, THE FUTURE WIND SPEEDS ON THE SITE ARE EXPECTED TO BE HIGHER THAN THOSE THAT CURRENTLY EXIST, PARTICULARLY AROUND THE SOUTHWEST CORNERS OF THE PROPOSED AND EXISTING BUILDINGS, AND IN EXPOSED GAPS BETWEEN BUILDINGS. IN PARTICULAR, THE PROPOSED 201 HASKINS WAY BUILDING WOULD HAVE A FIVE-STORY, 99-FOOT-TALL WING ON THE WEST END. WIND SPEEDS AT THE SOUTHWEST CORNER OF THIS BUILDING MIGHT BE ELEVATED, BUT WOULD NOT EXCEED THE WIND SAFETY CRITERION. HOWEVER, CONCEPTUAL WIND CONTROL DESIGN FEATURES COULD BE CONSIDERED TO FURTHER REDUCE WIND SPEEDS, SUCH AS PROTECTING SIDEWALKS WITH ADDITIONAL TREES AND CANOPIES OR TRELLISES AROUND WEST FACADES AND BUILDING CORNERS; INCREASING THE DISTANCE BETWEEN THE SOUTHWEST CORNER OF THE 201 HASKINS WAY BUILDING AND THE PROPOSED SIDEWALK; CHAMFERING THE SOUTHWEST AND NORTHWEST BUILDING CORNERS; ADDING A SETBACK ON THE FIVE-STORY WING TO PROVIDE A LOW PODIUM ALONG THE WEST AND NORTH FACADES; OR FLIPPING THE TALLER WEST WING WITH THE LOWER EAST WING. ANOTHER POTENTIAL WINDY AREA IS THE OPEN AREA BETWEEN THE PROPOSED 201 HASKINS WAY BUILDING AND THE PARKING GARAGE. WIND SPEEDS AT WEST END OF THE GAP BETWEEN THE TWO BUILDINGS MIGHT BE ELEVATED, BUT WOULD NOT EXCEED THE WIND SAFETY CRITERION. CONCEPTUAL WIND CONTROL DESIGN FEATURES TO PROPOSED WALKWAYS IN THIS AREA COULD INCLUDE SCREENS, FENCES, OR DENSE LANDSCAPING, IF FEASIBLE. THE ROOF ABOVE THE CENTER CORE OF THE PROPOSED 201 HASKINS WAY BUILDING WOULD BE USED AS A GREEN ROOF AND AMENITY SPACE. THIS SPACE WOULD NOT BE ALIGNED WITH THE PREVAILING WINDS AND THE FUTURE WIND CONDITIONS WOULD NOT EXCEED THE SAFETY CRITERION. HOWEVER, DUE TO THE INCREASED ELEVATION, WIND SPEEDS IN THESE AREAS ARE LIKELY HIGHER THAN GROUND LEVEL. CONCEPTUAL WIND CONTROL DESIGN FEATURES COULD INCLUDE TALL GUARDRAILS OR PLANTERS. IN ADDITION, THE WIND CONDITIONS AT THE CENTRAL PLAZA ARE EXPECTED TO NOT EXCEED THE WIND SAFETY CRITERION. HOWEVER, TO FURTHER REDUCE WIND SPEEDS, LANDSCAPING COULD BE PLACED ON THE WEST SIDE OF THE PLAZA, RATHER THAN THE EAST SIDE AS PROPOSED. THE PROPOSED TWO-STORY BUILDING ADDITION ON THE NORTH SIDE OF THE EXISTING THREE-STORY 400 EAST JAMIE COURT BUILDING WOULD REDUCE EXPOSURE OF THE EXISTING BUILDING TO THE NORTHWEST WINDS. IT WOULD ALSO PROTECT THE EXISTING CENTRAL PLAZA. IN ADDITION, THE EXISTING AND PROPOSED LANDSCAPING WOULD REDUCE THE WIND ACTIVITY ON AND AROUND THE 400-450 EAST JAMIE COURT PARCEL. PROJECT BUILDOUT SIMILAR TO THE PHASE 1 SITE PLAN, THE CONCEPTUAL PHASE 2 SITE PLAN FOR PROJECT BUILDOUT WOULD FEATURE THE EAST GRAND BUILDING, WHICH WOULD HAVE ITS LONGER AXES IN AN EAST-WEST DIRECTION. IN ADDITION, THE PHASE 1 PARKING GARAGE, UNDER THE CONCEPTUAL PHASE 2 SITE PLAN, WOULD BE EXPANDED FURTHER TO THE EAST. THIS DESIGN WOULD CONTINUE THE EAST-WEST AXES OF THE GARAGE. WIND FLOWS AROUND THE PROPOSED PHASE 1 BUILDINGS ARE NOT EXPECTED TO BE ALTERED BY THE EAST GRAND BUILDING OR THE EXPANDED PARKING GARAGE, AND NEW WIND CONDITIONS WOULD NOT EXCEED WIND SAFETY CRITERION. THE CONCEPTUAL EAST GRAND BUILDING WOULD HAVE THREE LEVELS ON THE WEST WING AND FIVE LEVELS ON THE EAST WING. THE LOWER WEST WING OF THE CONCEPTUAL EAST GRAND BUILDING W OULD NOT REDIRECT THE WEST-NORTHWEST WIND FLOWS AS MUCH AS THE 201 HASKINS WAY BUILDING, AND WOULD NOT EXCEED GENERATE GROUND-LEVEL WINDS THAT WOULD EXCEED THE WIND SAFETY CRITERION. THE ROOF ABOVE THE CENTER CORE OF THE PROPOSED EAST GRAND BUILDING WOULD BE USED AS A GREEN ROOF AND AMENITY SPACE. THE FUTURE WIND CONDITIONS WOULD NOT EXCEED THE WIND SAFETY CRITERION. AS WITH THE 201 HASKINS WAY BUILDING (SEE PHASE 1, ABOVE), WIND SPEEDS ON THIS AMENITY WOULD BE HIGHER THAN GROUND LEVEL. IN ADDITION, THE FIVE-LEVEL EAST WING FAÇADE MIGHT DEFLECT THE PREVAILING WEST AND WEST-NORTHWEST WINDS DOWN THE AMENITY SPACE. THEREFORE, IN ADDITION TO GUARD RAILS OR PLANTERS, CONCEPTUAL HORIZONTAL WIND CONTROL DESIGN FEATURES, SUCH AS TRELLISES, MAY ALSO BE CONSIDERED DURING DESIGN REVIEW. IF PHASE 2 DESIGN DIFFERS FROM CONCEPTUAL PLAN, SUBSEQUENT DESIGN REVIEW WOULD CONSIDER WIND SAFETY OF THAT DESIGN. SHADOW PER SECTION 20.480.006(A)(8) OF THE CITY MUNICIPAL CODE, COMPONENTS CONSIDERED IN DESIGN REVIEW SHALL INCLUDE BUT NOT BE LIMITED TO EXTERIOR DESIGN, MATERIALS, TEXTURES, COLORS, MEANS OF ILLUMINATION, LANDSCAPING, IRRIGATION, HEIGHT, SHADOW PATTERNS, PARKING, ACCESS, SECURITY, SAFETY, AND OTHER USUAL ON-SITE DEVELOPMENT ELEMENTS. THE CITY DOES NOT CONSIDER ALTERATION OF SHADOW PATTERNS TO BE A SIGNIFICANT IMPACT FOR CEQA PURPOSES. HOWEVER, CHANGES TO SHADOW PATTERNS AS A RESULT OF THE PROPOSED PROJECT ARE SUMMARIZED QUALITATIVELY IN RESPONSE TO THE NOP COMMENT AND PURSUANT TO CEQA GUIDELINES SECTION 15128. IMPACT AE-5: THE PROPOSED PROJECT WOULD NOT CREATE NEW SHADOW IN A MANNER THAT WOULD SUBSTANTIALLY, ADVERSELY AFFECT THE USE OF PUBLIC OPEN SPACE. (LESS THAN SIGNIFICANT) THIS DISCUSSION ANALYZES WHETHER BUILDINGS ASSOCIATED W ITH THE PROPOSED PROJECT WOULD SHADE OPEN SPACES AND PEDESTRIAN AREAS IN A MANNER THAT WOULD SUBSTANTIALLY AFFECT OUTDOOR ACTIVITIES. THIS DISCUSSION CONSIDERS THE FOLLOWING GENERAL CHARACTERISTICS: OPEN SPACE USAGE; TIME OF DAY AND/OR TIME OF YEAR; PHYSICAL LAYOUT OF THE AFFECTED FACILITIES; DURATION, SIZE, SHAPE, AND LOCATION OF THE SHADOW; AND PROPORTION OF OPEN SPACE AFFECTED. SHADOW DIAGRAMS WERE PREPARED BY WRNS AND ARE THE PRIMARY SOURCES OF THE INFORMATION PRESENTED IN THIS SECTION. THE SHADOW DIAGRAMS ARE A TOOL THAT PLOT THE POTENTIAL REACH OF PROJECT SHADOW OVER THE COURSE OF A YEAR (FROM ONE HOUR AFTER SUNRISE UNTIL ONE HOUR BEFORE SUNSET FOR THE SPRING AND FALL EQUINOXES AND THE SUMMER AND SPRING SOLSTICES) RELATIVE TO THE LOCATION OF NEARBY OPEN SPACES. THE SHADOW DIAGRAMS ACCOUNT FOR TOPOGRAPHICAL VARIATION AND SHADOWS CAST BY EXISTING BUILDINGS. THE PROJECT SITE AND VICINITY IS PRIMARILY CHARACTERIZED BY INDUSTRIAL AND OFFICE/R&D USES WITH A SUBSTANTIAL EXISTING DAYTIME EMPLOYEE POPULATION. THERE ARE NO CITY PARKS LOCATED WITHIN ONE MILE OF THE PROJECT SITE. THE PROJECT SITE, PARTICULARLY THE 400-450 EAST JAMIE COURT PARCEL, IS ADJACENT TO THE BAY TRAIL TO THE SOUTH. OTHER EXISTING PEDESTRIAN AREAS INCLUDE PUBLIC SIDEWALKS. THESE PUBLIC AREAS IN THE PROJECT VICINITY ARE SHADOWED BY EXISTING BUILDINGS THROUGHOUT THE DAY AS WELL AS THROUGHOUT THE YEAR. IN GENERAL, THESE AREAS ARE SHADOWED IN THE EARLY MORNING AND THE LATE AFTERNOON, AND RECEIVE THE GREATEST AMOUNT OF SUNLIGHT DURING THE MIDDLE OF THE DAY. PHASE 1 DEVELOPMENT THE BAY TRAIL, LOCATED TO THE SOUTH OF THE PROJECT SITE, IS PRIMARILY AFFECTED BY SHADOWS FROM THE EXISTING 400-450 EAST JAMIE COURT BUILDINGS. THE PROPOSED NEW 25,000-SQ.-FT. BUILDING ADDITION TO BE CONSTRUCTED IN PHASE 1 WOULD BE NORTH OF THE EXISTING 400 EAST JAMIE COURT BUILDING, AND WOULD NOT EXCEED THE HEIGHT OF THE EXISTING STRUCTURE. THEREFORE, THIS PROPOSED BUILDING ADDITION WOULD NOT CONTRIBUTE SUBSTANTIAL NEW SHADOWS TO THE BAY TRAIL. DUE TO THE MODERATE HEIGHT AND RELATIVELY FAR DISTANCE OF OTHER PROPOSED PROJECT BUILDINGS, NO OTHER PROPOSED STRUCTURES WOULD CONTRIBUTE SUBSTANTIALLY TO SHADOWS ON THE BAY TRAIL. THE REMAINING OPEN SPACES IN THE PROJECT VICINITY ARE PUBLIC SIDEWALKS. EACH OF THESE AREAS EXPERIENCE EXISTING SHADOW FROM EXISTING ONE-TO TWO-STORY LIGHT INDUSTRIAL BUILDINGS, IN ADDITION TO EXISTING TREES. DURING PHASE 1, THE PROPOSED PROJECT WOULD INVOLVE CONSTRUCTION OF NEW OFFICE/R&D BUILDINGS UP TO FIVE STORIES TALL ON THE 201 HASKINS WAY PARCEL, WHICH WOULD EXCEED THE AVERAGE HEIGHT OF EXISTING STRUCTURES IN THE PROJECT VICINITY. SHADOWS PRODUCED FROM THE PROPOSED 201 HASKINS WAY BUILDING AND PARKING GARAGE WOULD PRIMARILY OCCUR ON PROPOSED NEW PUBLIC SIDEWALKS ON HASKINS WAY IN THE EARLY MORNING HOURS THROUGHOUT THE YEAR AND EAST JAMIE COURT IN THE LATE AFTERNOON HOUR IN SUMMER. SHADOWS PRODUCED FROM THE PROPOSED 201 HASKINS WAY BUILDING WOULD BE TYPICAL OF A MID- RISE BUILDING, AND WOULD NOT PRODUCE SHADOWS AT A SUBSTANTIAL DISTANCE FROM THE PROJECT SITE. THEREFORE, THE PROPOSED PROJECT WOULD NOT CONTRIBUTE SUBSTANTIAL NEW SHADOWS TO EXISTING SIDEWALKS AND OTHER PEDESTRIAN AREAS. A COMMENT ON THE NOTICE OF PREPARATION (NOP) INQUIRED AS TO THE PROPOSED PROJECT’S SHADOW IMPACT ON NEARBY EXISTING BUILDING ROOFTOPS, AND WHETHER NEW SHADOWS MAY IMPACT THE ABILITY TO INSTALL AND OPERATE ROOFTOP PHOTOVOLTAIC SOLAR SYSTEMS. ROOFTOP PHOTOVOLTAIC SOLAR SYSTEMS ARE THE MOST EFFECTIVE AND EFFICIENT DURING PEAK DAYTIME HOURS. AS ILLUSTRATED IN THE SHADOW STUDY, THE PROPOSED PROJECT BUILDINGS WOULD NOT CREATE NEW SHADOWS ON EXISTING BUILDING ROOFTOPS IN THE PROJECT VICINITY BETWEEN THE HOURS OF 9 A.M. AND 3 P.M., WHEN ROOFTOP PHOTOVOLTAIC SOLAR SYSTEMS WOULD BE IN PEAK USE. THEREFORE, THE PROPOSED PROJECT WOULD NOT CONTRIBUTE SUBSTANTIAL NEW SHADOWS TO EXISTING ROOFTOPS OR PROSPECTIVE ROOFTOPS IN THE PROJECT VICINITY. AS SHOWN ON FIGURE 3.4, P. 3.XX, NEW SIDEWALKS WITH STREET TREES AND LANDSCAPING BUFFERS WOULD BE CONSTRUCTED ALONG PORTIONS OF HASKINS WAY AND EAST JAMIE COURT DURING PHASE 1 DEVELOPMENT. AN OUTDOOR EATING AREA LOCATED ALONG HASKINS WAY FRONTING THE 201 HASKINS WAY PARCEL WOULD ALSO BE USED AS PEDESTRIAN ACCESS THROUGH THE NORTHWEST FRONTAGE OF THE 201 HASKINS WAY PARCEL. IN ADDITION, A NEW CENTRAL PLAZA WOULD BE CONSTRUCTED ON THE 201 HASKINS WAY PARCEL DURING PHASE 1 DEVELOPMENT WITH LANDSCAPING, SEATING AREAS, AND A BASKETBALL COURT TO PROVIDE OUTDOOR RECREATION SPACE FOR DAYTIME OFFICE WORKERS. THE PROPOSED OFFICE/R&D BUILDINGS WOULD CAST SHADOWS ON THESE NEW OUTDOOR AMENITIES, BUT THE MAJORITY OF SHADOWS WOULD BE PRESENT DURING THE EARLY MORNING AND LATER AFTERNOON HOURS WHEN OUTDOOR AMENITIES ARE LESS LIKELY TO BE IN USE. THEREFORE, THE PROPOSED PROJECT WOULD NOT CONTRIBUTE SUBSTANTIAL NEW SHADOWS TO PROPOSED OPEN SPACES. PROJECT BUILDOUT AS DISCUSSED ABOVE, THE BAY TRAIL, SOUTH OF THE PROJECT SITE, IS PRIMARILY AFFECTED BY SHADOWS FROM THE EXISTING 400-450 EAST JAMIE COURT BUILDINGS IN THE SUMMER MONTHS IN THE LATE AFTERNOON. DURING PROJECT BUILDOUT, WITH THE CONCEPTUAL PHASE 2 DEVELOPMENT PLAN, ADDITIONAL OFFICE/R&D USE ON THE 400-450 EAST JAMIE COURT PARCEL WOULD BE CONSTRUCTED IN A MANNER CONSISTENT WITH THE CHARACTER OF THE EXISTING INDUSTRIAL AND OFFICE/R&D USES IN THE PROJECT VICINITY. NEW PHASE 2 DEVELOPMENT ON THE 400-450 EAST JAMIE COURT MAY CHANGE SHADOW PATTERNS IN THE VICINITY, INCLUDING THE BAY TRAIL. SITE-SPECIFIC, PROJECT-LEVEL DESIGN OF PHASE 2 IS NOT CURRENTLY PROPOSED AND WOULD BE SUBJECT TO A SEPARATE PLAN DESIGN REVIEW. THAT DESIGN REVIEW PROCESS WOULD INCLUDE CONSIDERATION OF SHADOW PATTERNS. UNDER THE CONCEPTUAL PHASE 2 PLAN, PROJECT BUILDOUT WOULD INVOLVE CONSTRUCTION OF ANOTHER OFFICE/R&D BUILDING UP TO FIVE STORIES TALL (THE CONCEPTUAL EAST GRAND BUILDING), WHICH WOULD EXCEED THE AVERAGE HEIGHT OF EXISTING STRUCTURES IN THE PROJECT VICINITY. CONCEPTUAL PHASE 2 DEVELOPMENT WOULD ALSO INVOLVE EXPANSION OF THE FIVE-STORY PHASE 1 PARKING GARAGE TO THE EAST. SHADOWS PRODUCED FROM THE CONCEPTUAL EAST GRAND BUILDING AND EXPANDED PARKING GARAGE WOULD PRIMARILY OCCUR ON PROPOSED NEW PUBLIC SIDEWALKS ON HASKINS WAY AND EAST GRAND AVENUE IN THE EARLY MORNING HOURS THROUGHOUT THE YEAR AND EAST GRAND AVENUE IN THE AFTERNOON HOURS IN FALL, WINTER, AND SPRING. SHADOWS PRODUCED FROM PROPOSED OFFICE BUILDINGS WOULD BE TYPICAL OF A MID-RISE BUILDING, AND WOULD NOT PRODUCE SHADOWS AT A SUBSTANTIAL DISTANCE FROM THE PROJECT SITE. DUE TO THE MODERATE HEIGHT AND RELATIVELY FAR DISTANCE OF THE CONCEPTUAL PHASE 2 BUILDINGS, THESE STRUCTURES WOULD NOT CONTRIBUTE SUBSTANTIALLY TO SHADOWS ON THE BAY TRAIL. THEREFORE, THE PROPOSED PROJECT WOULD NOT CONTRIBUTE SUBSTANTIAL NEW SHADOWS TO EXISTING SIDEWALKS AND OTHER PEDESTRIAN AREAS. AS SHOWN ON FIGURE 3.4, P. 3.XX, NEW SIDEWALKS WITH STREET TREES AND LANDSCAPING BUFFERS WOULD BE CONSTRUCTED ALONG EAST JAMIE COURT, HASKINS WAY, AND EAST GRAND AVENUE AT PROJECT BUILDOUT (PORTIONS OF HASKINS WAY AND EAST JAMIE COURT DURING PHASE 1 DEVELOPMENT, AND THE REMAINING AREAS DURING PHASE 2 DEVELOPMENT, AS DEPICTED IN THE CONCEPTUAL PLAN). THE CONCEPTUAL EAST GRAND BUILDING WOULD CAST SHADOWS ON THE PROPOSED PHASE 1 CENTRAL PLAZA AND OUTDOOR EATING AREA AMENITIES, BUT THE MAJORITY OF SHADOWS WOULD BE PRESENT DURING THE EARLY MORNING AND LATER AFTERNOON HOURS WHEN OUTDOOR AMENITIES ARE LESS LIKELY TO BE IN USE. THEREFORE, THE PROPOSED PROJECT WOULD NOT CONTRIBUTE SUBSTANTIAL NEW ADVERSE SHADOWS TO PROPOSED OPEN SPACES. SEPTEMBER 28TH, 2018 3/64" = 1'-0"2 SOUTH - RENDERED 3/64" = 1'-0"1 NORTHWEST - RENDERED SCALE:PROJECT #: NTS HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO RENDERINGS 17016 G-401 2 SOUTH - RENDERED 1 NORTHWEST - RENDERED APRIL 13TH, 2018SEPTEMBER 28TH, 2018 3/64" = 1'-0"2 PHASE 2- RENDERED 3/64" = 1'-0"1 PHASE 1 - RENDERED RENDERINGS SCALE:PROJECT #: NTS HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 17016 G-402 2 PHASE 2- RENDERED 1 PHASE 1 - RENDERED APRIL 13TH, 2018SEPTEMBER 28TH, 2018 1 VIEWS FROM SOUTH WEST 2 VIEWS FROM SOUTH EAST 3 VIEWS FROM NORTH WEST CORNER 4 VIEWS FROM SOUTH WEST CORNER 5 LOBBY VIEW 6 OVERALL VIEW FROM SOUTH SCALE:PROJECT #: DECEMBER 6TH, 2017 - HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO VIGNETTES 17016 A-002 SCALE:PROJECT #: HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO VIGNETTES 17016 G-403. APRIL 13TH, 2018AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 2 RENDERING - NE CORNER1RENDERING - NW CORNER SCALE: -PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT RENDERINGS 17016 G-404. 3 RENDERING - NORTH ELEVATION AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 LANDSCAPE RENDERINGS G-405 NTS 1 VIEW FROM GARAGE PLAZA 2 VIEW FROM NORTH PLAZA 3 VIEW FROM EJC PLAZA 4 VIEW FROM ROOF DECK SEPTEMBER 28TH, 2018 2 3 4 5 6 7 8 9 15 16 17 18 19 20 E C B A D 10 12 13 141112.8 13.1 3 STORY ENTRY COURT / ATRIUM PORTE COCHERE 33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"27'-6"66'-0"27'-6"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"30'-0"30'-0"30'-0"30'-0"120'-0"UP 5'-6" 11'-0" 407 SF DOMESTIC WATER 385 SF FIRE PUMP ? ? 991 SF MAIN ELECTRICAL 2,050 SF UTILITY YARD 1,420 SF WASTE PROCESSING 96 SF MPOE19 SF DATA RISER 212 SF ELEC 287 SF ELEC 1,450 SF LOADING 1,046 SF WASTE PROCESSING 97 SF DATA RISER 1 A-302. 2 A-331. 3 A-331. 21 SF DATA RISER 1 A-331. 11.1 11.2 11.31 5'-0" 1,861 SF LOADING 2 3 4 5 6 7 8 9 15 16 17 18 19 20 E C B A D 10 12 13 141112.8 13.1 OPEN TO BELOW OPEN TO BELOW 33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"27'-6"66'-0"27'-6"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"30'-0"30'-0"30'-0"30'-0"120'-0"5'-6" 11'-0" 16 SF DATA RISER 168 SF ELEV VEST 103 SF ELEV VEST 21 SF DATA RISER 20 SF DATA RISER 280 SF ELEC 1 A-302. 2 A-331. 3 A-331. 280 SF ELEC 20 SF DATA RISER 1 A-331. 11.1 11.2 11.31 SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS FLOOR PLANS - LEVELS 1 & 2 17016 A-101. 1" = 20'-0"1 FLOOR PLAN - LEVEL 1 1" = 20'-0"2 FLOOR PLAN - LEVEL 2 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 UP UP T 2 3 4 5 6 7 8 9 15 16 17 18 19 20 E C B A D 10 12 13 1411 1 A-301. 12.8 13.1 OPEN TO BELOW OPEN TO BELOW 33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"27'-6"66'-0"27'-6"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"30'-0"30'-0"30'-0"30'-0"120'-0"5'-6" 11'-0" 16 SF DATA RISER 168 SF ELEV VESTIBULE 20 SF DATA RISER 28 SF DATA RISER 272 SF ELEC 21 SF DATA RISER TERRACE 1 A-302. 2 A-331. 3 A-331. 280 SF ELEC 1 A-331. 11.1 11.2 11.31 5'-0" 103 SF ELEV VESTIBULE 2 3 4 5 6 7 8 9 15 16 17 18 19 20 E C B A D 10 12 13 1411 1 A-301. 12.8 13.1 MECHANICAL ENCLOSURE ROOF PARAPET STAIR AND ELEVATOR PENTHOUSE 33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"27'-6"66'-0"27'-6"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"30'-0"30'-0"30'-0"30'-0"120'-0"SKYLIGHT ELEVATOR PENTHOUSE 5'-6" 11'-0" EXTENSIVE GREEN ROOF 16 SF DATA RISER 168 SF ELEV VESTIBULE 20 SF DATA RISER 280 SF ELEC 1 A-302. EXTENSIVE GREEN ROOF ROOF TERRACE 2 A-331. 3 A-331. 1 A-331. 11.1 11.2 11.31 5'-0" SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS FLOOR PLANS - LEVELS 3 & 4,5 17016 A-102. 1" = 20'-0"1 FLOOR PLAN - LEVEL 3 1" = 20'-0"2 FLOOR PLAN - LEVEL 4 (5 SIM.) AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 2 3 4 5 6 7 8 9 15 16 17 18 19 20 E C B A D 10 12 13 1411 1 A-301. 12.8 13.1 MECHANICAL ENCLOSURE ROOF PARAPET MECHANICAL ENCLOSURE ROOF PARAPET STAIR AND ELEVATOR PENTHOUSE 33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"27'-6"66'-0"27'-6"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"33'-0"30'-0"30'-0"30'-0"30'-0"120'-0"ELEVATOR PENTHOUSE 5'-6" 11'-0" 1 A-302. SKYLIGHT EXTENSIVE GREEN ROOF EXTENSIVE GREEN ROOF ROOF TERRACE 2 A-331. 3 A-331. 1 A-331. 11.1 11.2 11.31 ELEVATOR PENTHOUSE STAIR AND ELEVATOR PENTHOUSE ELEVATOR CONTROL ROOM 5'-0" SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS FLOOR PLAN - ROOF 17016 A-103. 1" = 20'-0"1 FLOOR PLAN - ROOF AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 UP PARKING CALCULATIONS PARKING COUNTS PROPOSED PARKING*:1:350 (2.86/1000) = 903 STALLS PARKING STRUCTURE SURFACE PARKING 720 STALLS (709 STANDARD, 8 ADA, 3 VAN) 183 STALLS (175 STANDARD, 7 ADA, 1 VAN) REQUIRED PARKING:1:350 (2.86/1000) = 903 STALLS *THE PLANNING COMMISSION MAY APPROVE A CONDITIONAL USE PERMIT (CUP) TO REDUCE ON-SITE PARKING REQUIREMENTS IF IT FINDS THAT SPECIAL CONDITIONS EXIST THAT WILL REDUCE DEMAND AT THE PROJECT SITE INCLUDING: 1. PROXIMITY TO TRANSIT SERVICE 2. TRANSPORTATION CHARACTERISTICS OF PERSONS WORKING OR VISITING THE SITE. 3. THE APPLICANT HAS A TDM PROGRAM. ADA PARKING PER CBC TABLE 11B-208.2 501-1000, PROVIDE 2% = 19 REQUIRED, 19 PROVIDED IN PROJECT VAN STALLS PER CBC TABLE 11B-208.2.4 1:6 OF ADA = 4 REQUIRED, 4 PROVIDED IN PROJECT CAL GREEN CAV PARKING PER CBC TABLE 5.106.5.2 PROVIDE 8% = 73 REQUIRED, 73 PROVIDED IN PROJECT EV PARKING PER CBC TABLE 5.106.5.3.3 PROVIDE 6% = 55 REQUIRED, 55 PROVIDED IN PROJECT G-1 G-2 G-3 G-D G-E G-F G-G G-H G-I G-J G-K G-L G-M G-N G-O G-PG-A G-QG-B G-RG-C 2 A-304. 1 A-304. 1 A-305. 2 A-305. 1 A-332. 2 A-332. RAMP UP RAMP DOWN 10 24 23 10 29 34 2 5 '-0 "25'-0"63'-0"63'-0"1 8 '-0 "19'-0"17'-0"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"19'-0"27'-0"18'-0" 305'-0"126'-0"TRUNCATED DOMES BOLLARD TRUNCATED DOMES (149 STALLS) +11'-2" +11'-2" +11'-2"+11'-2"+11'-2"+11'-2" +11'-2"+11'-2" +11'-2" +11'-2" +11'-2"69'-0"65'-0"5 8 4 2 5% 5.0% G-1 G-2 G-3 G-D G-E G-F G-G G-H G-I G-J G-K G-L G-M G-N G-O G-PG-A G-QG-B G-RG-C 2 A-304. 1 A-304. 1 A-305. 2 A-305. 1 A-332. 2 A-332. RAMP UPVOID 21 25 10 27 30 ELEC CAV CAV CAV CAV CAV CAV CAV CAV CAV CAV 7 63'-0"63'-0"19'-0"17'-0"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"19'-0"27'-0"18'-0" 1 8 '-0 " 2 5 '-0 "25'-0"25'-0"126'-0"305'-0" OFFICE VANVANVAN63'-9 1/2"63'-9 1/2"LINE OF 2ND FLOOR ABOVE TRUNCATED DOMES BOLLARD TRUNCATED DOMES EVEV CAVCAV CAV (166 STALLS) +3'-0 1/4" 26 2 2 CAVCAV CAV CAVCAVEV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV EV 16 RAMP DN 5.0%5.0% EV EV SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS GARAGE PLAN - LEVEL 1 & 2,3,4 17016 A-104. 1/16" = 1'-0"2 PARKING GARAGE PLAN - LEVEL P2 (P3-P4 SIMILAR) 1/16" = 1'-0"1 PARKING GARAGE PLAN - LEVEL P1 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 PARKING CALCULATIONS PARKING COUNTS PROPOSED PARKING*:1:350 (2.86/1000) = 890 STALLS PARKING STRUCTURE SURFACE PARKING 687 STALLS (675 STANDARD, 10 ADA, 2 VAN) 203 STALLS (197 STANDARD, 5 ADA, 1 VAN) REQUIRED PARKING:1:350 (2.86/1000) = 890 STALLS BICYCLE PARKING (SEE G.001) SHORT TERM SSFMC 20.330.08 LONG TERM CAL GREEN 5.10.6.4.1.2 10% OF VEHICULAR STALL 890 x 0.10 = 89 5% OF VECHICULAR STALL 890 x 0.05 = 45 PARKING CALCULATIONS PARKING COUNTS PROPOSED PARKING*:1:350 (2.86/1000) = 903 STALLS PARKING STRUCTURE SURFACE PARKING 720 STALLS (709 STANDARD, 8 ADA, 3 VAN) 183 STALLS (175 STANDARD, 7 ADA, 1 VAN) REQUIRED PARKING:1:350 (2.86/1000) = 903 STALLS *THE PLANNING COMMISSION MAY APPROVE A CONDITIONAL USE PERMIT (CUP) TO REDUCE ON-SITE PARKING REQUIREMENTS IF IT FINDS THAT SPECIAL CONDITIONS EXIST THAT WILL REDUCE DEMAND AT THE PROJECT SITE INCLUDING: 1. PROXIMITY TO TRANSIT SERVICE 2. TRANSPORTATION CHARACTERISTICS OF PERSONS WORKING OR VISITING THE SITE. 3. THE APPLICANT HAS A TDM PROGRAM. ADA PARKING PER CBC TABLE 11B-208.2 501-1000, PROVIDE 2% = 19 REQUIRED, 19 PROVIDED IN PROJECT VAN STALLS PER CBC TABLE 11B-208.2.4 1:6 OF ADA = 4 REQUIRED, 4 PROVIDED IN PROJECT CAL GREEN CAV PARKING PER CBC TABLE 5.106.5.2 PROVIDE 8% = 73 REQUIRED, 73 PROVIDED IN PROJECT EV PARKING PER CBC TABLE 5.106.5.3.3 PROVIDE 6% = 55 REQUIRED, 55 PROVIDED IN PROJECT G-1 G-2 G-3 G-D G-E G-F G-G G-H G-I G-J G-K G-L G-M G-N G-O G-PG-A G-QG-B G-RG-C 2 A-304. 1 A-304. 1 A-305. 2 A-305. 1 A-332. 2 A-332. RAMP DOWN 10 24 24 10 3463'-0"63'-0"1 8 '-0 "19'-0"17'-0"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"20'-6"19'-0"27'-0"18'-0"126'-0"305'-0" TRUNCATED DOMES BOLLARD TRUNCATED DOMES (106 STALLS) PLANTER BOX PV STRUCTURE EMBED PLATE 5 2 30 9 61/8" / 12"1 /8 " / 1 2 "1/8" / 12"1/8" / 12"1/8" / 12"1/8" / 12"1/8" / 12"5% SCALE:PROJECT #: APRIL 13TH, 2018 As indicated HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 201 HASKINS GARAGE PLAN - LEVEL 5 & ROOF 17016 A-105. 1/16" = 1'-0"1 PARKING GARAGE PLAN - LEVEL P5 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 PARKING CALCULATIONS PARKING COUNTS PROPOSED PARKING*:1:350 (2.86/1000) = 890 STALLS PARKING STRUCTURE SURFACE PARKING 687 STALLS (675 STANDARD, 10 ADA, 2 VAN) 203 STALLS (197 STANDARD, 5 ADA, 1 VAN) REQUIRED PARKING:1:350 (2.86/1000) = 890 STALLS BICYCLE PARKING (SEE G.001) SHORT TERM SSFMC 20.330.08 LONG TERM CAL GREEN 5.10.6.4.1.2 10% OF VEHICULAR STALL 890 x 0.10 = 89 5% OF VECHICULAR STALL 890 x 0.05 = 45 L OADI N G D O C K T RASHSERVICELOADING D O C K T RASHSERVICE WH E-1 E-2 E-3 E-A E-B E-C E-D E-E E-F E-G 30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"DN UP NEW ADDITION EXISTING 400 EJC 180'-0"60'-0"E-1 E-2 E-3 E-A E-B E-C E-D E-E E-F E-G 30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"30'-0"EXISTING 400 EJC DN MECH WELL 60'-0"180'-0" 22'-4" NEW ADDITION SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT - 1ST & 2ND FLOOR PLAN 17016 A-106. 1" = 20'-0"1 FLOOR PLAN - LEVEL 1 1" = 20'-0"2 FLOOR PLAN - LEVEL 2 EXISTING 400 EJCEXISTING 400 EJC SEPTEMBER 28TH, 2018 E-1 E-2 E-3 E-A E-B E-C E-D E-E E-F E-G 30'-0"30'-0"60'-0"30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 180'-0" MECH WELL EXISTING 400 EJC NEW ADDITION SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT - ROOF PLAN 17016 A-107. 1" = 20'-0"1 FLOOR PLAN - ROOF EXISTING 400 EJC SEPTEMBER 28TH, 2018 1" = 20'-0"1 NORTH ELEVATION - RENDERED 1" = 20'-0"2 EAST ELEVATION - RENDERED BUILDING DESIGN BUILDING OVERVIEW THE PROPOSED PROJECT IS FOR A LABORATORY/OFFICE BUILDING OF APPROXIMATELY 311,000 GSF (280,765 SF FAR 1.0) ORGANIZED ON FIVE FLOORS WITH PLATES RANGING FROM 42,000 GSF TO 80,000 GSF. IT IS DESIGNED TO BE BOTH PEDESTRIAN ORIENTATED, LINKING TO THE EXISTING BUILDINGS ACROSS EAST JAMIE COURT, AND TO TAKE ADVANTAGE OF THE VIEWS OF THE BAY TO THE SOUTH. BUILDING MASSING THE MASSING OF 201 HASKINS HAS BEEN DESIGNED TO TAKE ADVANTAGE OF AND AUGMENT THE PARTICULAR CONDITIONS OF THE SITE. THE BUILDING HAS BEEN SITUATED WITH ITS LONG AXIS ALONG EAST JAMIE COURT AND HAS BEEN SPLIT INTO TWO DISTINCT MASSES BY A THREE STORY CENTRAL ATRIUM THAT ALIGNS WITH THE OPEN SPACE BETWEEN BETWEEN THE BUILDINGS AT 400-450 EAST JAMIE COURT. PUBLIC SPACES (CONFERENCE ROOMS, OPEN AREA, ETC) ARE EXPECTED TO OCCUPY A “BRIDGE” ELEMENT THAT CROSSES THE ATRIUM AT THE 3RD FLOOR AND WILL SEE THROUGH THE ATRIUM TO THE BAY BEYOND. THE BUILDING VOLUME VARIES ON EITHER SIDE OF THE ATRIUM FROM THREE STORIES EAST OF THE ATRIUM TO FIVE STORIES ON THE ATRIUM’S WEST SIDE AND ARE ARTICULATED TO HIGHLIGHT PARTICULAR CONDITIONS OF THE SITE. THE TALLER FIVE STORY VOLUME IS AS FAR TO THE WEST AS POSSIBLE (BEYOND THE WEST EDGE OF 400 EAST JAMIE COURT) TO TAKE UTMOST ADVANTAGE OF THE VIEWS TO THE BAY. THE SOUTHERN FACADE IS PUNCTUATED BY A THREE STORY “OCULUS” THAT PEERS OUT FROM BEHIND THE EXISTING BUILDINGS TO THE SOUTH, WHILE A RECESSED SPACE RUNS ALONG ITS LENGTH AT THE SECOND FLOOR HIGHLIGHTING THE SEPARATION BETWEEN THE BASE AND THE FLOORS ABOVE. THE FAÇADE IS FURTHER ARTICULATED BY HORIZONTAL SUNSHADES THAT ADD THREE DIMENSIONALITY TO THE GLAZING SYSTEM. A SMALLER OPENING SIMILAR TO THE “OCULUS” OCCURS IN THE THREE-STORY VOLUME AT THE EAST END. THE EAST AND WEST FACADES ARE ARTICULATED BY A DEEP SET (4’) PRECAST CONCRETE “GRILLE” THAT CREATES A PLAY OF SHADOW LIGHT WHILE ALSO BEING HIGHLY PERFORMATIVE BY REDUCING GLARE FROM THOSE SUN EXPOSURES. THE GROUND FLOOR ON EITHER SIDE OF THE ATRIUM IS SET BACK CREATING A DEEP SHADOW LINE TO AUGMENT THE PEDESTRIAN EXPERIENCE ALONG EAST JAMIE COURT. MATERIALS THE PROPOSED MATERIALS HAVE BEEN SELECTED TO AUGMENT THE MASSING DECISIONS AND COMPLEMENT THE NATURE OF THE SITE; THESE CONSIST PRIMARILY OF LIMESTONE, PRECAST CONCRETE, ALUMINUM AND GLASS. THE GROUND PLANE AROUND THE BUILDING CONSISTS OF A RIP RAP STONE MEANT TO EVOKE THE ROCKINESS OF THE NEARBY SHORE. THIS STONE IS UTILIZED IN A MORE REFINED AND MODERN WAY ON THE BUILDING’S GROUND FLOOR AS IF THE STONE WERE ROLLING UP THE BUILDING FROM THE GROUND, DISTINGUISHING THE BASE OF THE BUILDING FROM THE UPPER FLOORS. TO CONTRAST THE STONE OF THE BASE, THE UPPER PORTION OF THE BUILDING HAS A PRECAST CONCRETE FRAME WITHIN WHICH A CURTAIN WALL OF GREY SOLAR GLASS SITS. THE STONE REAPPEARS IN THE UPPER PORTION OF THE BUILDING TO HIGHLIGHT THE “OCULUS”. THE ATRIUM SPACE UTILIZES A SMART-TINTING GLASS FROM HALIO THAT CAN CHANGE FROM CLEAR (TO HIGHLIGHT THE CENTRAL SPINE) TO ALMOST BLACK WHEN THE SPACE MAY BE USED FOR “ALL HANDS” OR OTHER TYPES OF MEETINGS. MATERIALS 01 LIMESTONE CLADDING 02 STOREFRONT WINDOW SYSTEM (TYPE A) 03 WINDOW SYSTEM (TYPE B) 04 UNITIZED PRECAST FACADE WITH INTEGRATED ALUMINUM WINDOW SYSTEM 05 UNITIZED PRECAST FACADE ELEMENTS 06 ALUMINUM CURTAINWALL SYSTEM WITH SHADOWBOX AT SLAB EDGES 07 PAINTED CHEVRON (1/2 PERFORATED) METAL SCREEN ON PAINTED METAL FRAMING 08 INTEGRATED HORIZONTAL SUNSHADES 09 UPWARD ACTING COILING DOOR 10 HM DOOR & FRAME - PTD 11 ALUMINUM PANEL - PTD TO MATCH STOREFRONT 07 07 7 06 060505 05 05 05 04 03 02 02 02 01 10 09 01 100901 SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO BUILDING ELEVATIONS (NORTH & EAST) 17016 A-301 07 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 1" = 20'-0"1 SOUTH ELEVATION - RENDERED 1" = 20'-0"2 WEST ELEVATION - RENDERED BUILDING DESIGN BUILDING OVERVIEW THE PROPOSED PROJECT IS FOR A LABORATORY/OFFICE BUILDING OF APPROXIMATELY 311,000 GSF (280,765 SF FAR 1.0) ORGANIZED ON FIVE FLOORS WITH PLATES RANGING FROM 42,000 GSF TO 80,000 GSF. IT IS DESIGNED TO BE BOTH PEDESTRIAN ORIENTATED, LINKING TO THE EXISTING BUILDINGS ACROSS EAST JAMIE COURT, AND TO TAKE ADVANTAGE OF THE VIEWS OF THE BAY TO THE SOUTH. BUILDING MASSING THE MASSING OF 201 HASKINS HAS BEEN DESIGNED TO TAKE ADVANTAGE OF AND AUGMENT THE PARTICULAR CONDITIONS OF THE SITE. THE BUILDING HAS BEEN SITUATED WITH ITS LONG AXIS ALONG EAST JAMIE COURT AND HAS BEEN SPLIT INTO TWO DISTINCT MASSES BY A THREE STORY CENTRAL ATRIUM THAT ALIGNS WITH THE OPEN SPACE BETWEEN BETWEEN THE BUILDINGS AT 400-450 EAST JAMIE COURT. PUBLIC SPACES (CONFERENCE ROOMS, OPEN AREA, ETC) ARE EXPECTED TO OCCUPY A “BRIDGE” ELEMENT THAT CROSSES THE ATRIUM AT THE 3RD FLOOR AND WILL SEE THROUGH THE ATRIUM TO THE BAY BEYOND. THE BUILDING VOLUME VARIES ON EITHER SIDE OF THE ATRIUM FROM THREE STORIES EAST OF THE ATRIUM TO FIVE STORIES ON THE ATRIUM’S WEST SIDE AND ARE ARTICULATED TO HIGHLIGHT PARTICULAR CONDITIONS OF THE SITE. THE TALLER FIVE STORY VOLUME IS AS FAR TO THE WEST AS POSSIBLE (BEYOND THE WEST EDGE OF 400 EAST JAMIE COURT) TO TAKE UTMOST ADVANTAGE OF THE VIEWS TO THE BAY. THE SOUTHERN FACADE IS PUNCTUATED BY A THREE STORY “OCULUS” THAT PEERS OUT FROM BEHIND THE EXISTING BUILDINGS TO THE SOUTH, WHILE A RECESSED SPACE RUNS ALONG ITS LENGTH AT THE SECOND FLOOR HIGHLIGHTING THE SEPARATION BETWEEN THE BASE AND THE FLOORS ABOVE. THE FAÇADE IS FURTHER ARTICULATED BY HORIZONTAL SUNSHADES THAT ADD THREE DIMENSIONALITY TO THE GLAZING SYSTEM. A SMALLER OPENING SIMILAR TO THE “OCULUS” OCCURS IN THE THREE-STORY VOLUME AT THE EAST END. THE EAST AND WEST FACADES ARE ARTICULATED BY A DEEP SET (4’) PRECAST CONCRETE “GRILLE” THAT CREATES A PLAY OF SHADOW LIGHT WHILE ALSO BEING HIGHLY PERFORMATIVE BY REDUCING GLARE FROM THOSE SUN EXPOSURES. THE GROUND FLOOR ON EITHER SIDE OF THE ATRIUM IS SET BACK CREATING A DEEP SHADOW LINE TO AUGMENT THE PEDESTRIAN EXPERIENCE ALONG EAST JAMIE COURT. MATERIALS THE PROPOSED MATERIALS HAVE BEEN SELECTED TO AUGMENT THE MASSING DECISIONS AND COMPLEMENT THE NATURE OF THE SITE; THESE CONSIST PRIMARILY OF LIMESTONE, PRECAST CONCRETE, ALUMINUM AND GLASS. THE GROUND PLANE AROUND THE BUILDING CONSISTS OF A RIP RAP STONE MEANT TO EVOKE THE ROCKINESS OF THE NEARBY SHORE. THIS STONE IS UTILIZED IN A MORE REFINED AND MODERN WAY ON THE BUILDING’S GROUND FLOOR AS IF THE STONE WERE ROLLING UP THE BUILDING FROM THE GROUND, DISTINGUISHING THE BASE OF THE BUILDING FROM THE UPPER FLOORS. TO CONTRAST THE STONE OF THE BASE, THE UPPER PORTION OF THE BUILDING HAS A PRECAST CONCRETE FRAME WITHIN WHICH A CURTAIN WALL OF GREY SOLAR GLASS SITS. THE STONE REAPPEARS IN THE UPPER PORTION OF THE BUILDING TO HIGHLIGHT THE “OCULUS”. THE ATRIUM SPACE UTILIZES A SMART-TINTING GLASS FROM HALIO THAT CAN CHANGE FROM CLEAR (TO HIGHLIGHT THE CENTRAL SPINE) TO ALMOST BLACK WHEN THE SPACE MAY BE USED FOR “ALL HANDS” OR OTHER TYPES OF MEETINGS. MATERIALS 01 LIMESTONE CLADDING 02 STOREFRONT WINDOW SYSTEM (TYPE A) 03 WINDOW SYSTEM (TYPE B) 04 UNITIZED PRECAST FACADE WITH INTEGRATED ALUMINUM WINDOW SYSTEM 05 UNITIZED PRECAST FACADE ELEMENTS 06 ALUMINUM CURTAINWALL SYSTEM WITH SHADOWBOX AT SLAB EDGES 07 PAINTED CHEVRON (1/2 PERFORATED) METAL SCREEN ON PAINTED METAL FRAMING 08 INTEGRATED HORIZONTAL SUNSHADES 09 UPWARD ACTING COILING DOOR 10 HM DOOR & FRAME - PTD 11 ALUMINUM PANEL - PTD TO MATCH STOREFRONT 011110 03 07 07 07 06 060505 05 05 04 02 0202 01 01 08 08 BUILDING ELEVATIONS (SOUTH & WEST) SCALE:PROJECT #: APRIL 13TH, 2018 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 17016 A-302 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 ALUMINUM PANEL -WARM GREY MORIN - CHEVRON MECHANICAL SCREEN MORIN - CHEVRON MECHANICAL SCREEN ALUMINUM PANEL - POSATE SILVER JERUSALEM LIMESTONE TECHLAM - BLAZE - SNOW NATURAL STONE BASE: JERUSALEM LIMESTONE PRECAST CONCRETE BOARD FORM CONCRETE VISION GLASS - LOBBY VISION GLASS - LOBBY DARK GLASS - SOLAR GREY 1 MATERIALS - SAMPLES PRECAST & GLASS RIP RAP GLASS AND SUNSHADES ARCHITECTURAL METAL MESH 2 MATERIALS - PRECEDENTS SCALE:PROJECT #: APRIL 13TH , 2018 - HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO MATERIALS BOARD 17016 A-303. 1110 15 7 16 12 5 13 1 43 3 82 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 3/32" = 1'-0"1 NORTH ELEVATION - GARAGE 3/32" = 1'-0"2 EAST ELEVATION - GARAGE MATERIALS 12 STAINLESS STEEL METAL MESH ON METAL FRAMING (TYPE A) 13 TECHLAM (BLAZE-SNOW NATURAL) PORCELAIN TILE CLADDING 14 PRECAST CONCRETE 15 BOARD FORM CONCRETE 16 ALUMINUM PANEL 17 GALVANIZED STEEL GUARDRAIL 12 13 1417 15 1616 13 SCALE:PROJECT #: APRIL 13TH, 2018 3/32" = 1'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO GARAGE ELEVATIONS (NORTH & EAST) 17016 A-304 GARAGE DESIGN GARAGE OVERVIEW A FIVE TIER CONCRETE STRUCTURED PARKING GARAGE OF APPROXIMATELY 199,500 SQUARE FEET WILL OCCUPY THE NORTH-EAST PORTION OF THE SITE AND WILL PROVIDE 720 PARKING STALLS (APPROXIMATELY 130 STALLS PER TIER). GARAGE MASSING CONCEIVED OF AS SINGULAR VOLUME, THE GARAGE MASSING IS PULLED BACK AS FAR AS POSSIBLE FROM HASKINS WAY ALLOWING FOR THE DEVELOPMENT OF A PUBLIC PLAZA ALONG HASKINS AS WELL AS A CENTRAL OPEN “SPINE” THAT CONNECTS THE GARAGE TO THE LAB/OFFICE BUILDING ATRIUM LOBBY SPACE. THE GARAGE MASSING EMULATES THAT OF THE LAB/OFFICE BUILDING BY CREATING A STRONG BASE WITH A LIGHTER “FABRIC” ON THE LEVELS ABOVE. THE WEST FAÇADE OF THE GARAGE IS ANGLED TO BOTH FORM A BACKDROP TO THE CENTRAL OPEN SPACE AS WELL AS TO WORK WITH THE GEOMETRIES OF THE ATRIUM SPACE. PRIMARY VEHICULAR ACCESS TO THE GARAGE IS ALONG THE NORTH SIDE, WITH ENTRIES AT THE NORTH-WEST AND NORTH-EAST CORNERS. MATERIALS THE PRIMARY MATERIALS FOR THE GARAGE CONSIST OF CONCRETE, STAINLESS STEEL MESH AND ALUMINUM PANELS. IN ORDER TO TIE THE GARAGE AND OFFICE BUILDING TOGETHER, THE GARAGE HAS A STRONG HEAVY BASE OF CAST IN PLACE CONCRETE THAT HAS A SERIES OF OPENINGS ALLOWING PEDESTRIAN ACCESS TO THE CENTRAL OPEN SPACE. THE CAST-IN-PLACE CONCRETE WALLS FORM A RHYTHM OF OPEN AND CLOSED THAT EMULATES THE STONE BASE OF THE LAB/OFFICE BUILDING. ABOVE THE BASE, THE GARAGE IS CLAD IN A WOVEN STAINLESS STEEL MESH. THE MESH IS DRAPED OVER A SERIES OF TUBES TO CREATE A PLEATED EFFECT (NOT UNLIKE A ROMAN SHADE) THAT SOFTENS THE MASSING OF THE GARAGE AND CREATES PATTERNS OF SHADOW AND VARYING DENSITY OF MATERIAL. SOLID ALUMINUM PANELS START ON THE VERTICAL SURFACE AND TURN HORIZONTALLY TO FORM CANOPIES DEMARCATING THE VEHICULAR ENTRIES. AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 3/32" = 1'-0"1 SOUTH ELEVATION - GARAGE 3/32" = 1'-0"2 WEST ELEVATION - GARAGE MATERIALS 12 STAINLESS STEEL METAL MESH ON METAL FRAMING (TYPE A) 13 TECHLAM (BLAZE-SNOW NATURAL) PORCELAIN TILE CLADDING 14 PRECAST CONCRETE 15 BOARD FORM CONCRETE 16 ALUMINUM PANEL 17 GALVANIZED STEEL GUARDRAIL 12 15 14 13 12 1517 14 17 13 SCALE:PROJECT #: APRIL 13TH, 2018 3/32" = 1'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO GARAGE ELEVATIONS (SOUTH & WEST) 17016 A-305 GARAGE DESIGN GARAGE OVERVIEW A FIVE TIER CONCRETE STRUCTURED PARKING GARAGE OF APPROXIMATELY 199,500 SQUARE FEET WILL OCCUPY THE NORTH-EAST PORTION OF THE SITE AND WILL PROVIDE 720 PARKING STALLS (APPROXIMATELY 130 STALLS PER TIER). GARAGE MASSING CONCEIVED OF AS SINGULAR VOLUME, THE GARAGE MASSING IS PULLED BACK AS FAR AS POSSIBLE FROM HASKINS WAY ALLOWING FOR THE DEVELOPMENT OF A PUBLIC PLAZA ALONG HASKINS AS WELL AS A CENTRAL OPEN “SPINE” THAT CONNECTS THE GARAGE TO THE LAB/OFFICE BUILDING ATRIUM LOBBY SPACE. THE GARAGE MASSING EMULATES THAT OF THE LAB/OFFICE BUILDING BY CREATING A STRONG BASE WITH A LIGHTER “FABRIC” ON THE LEVELS ABOVE. THE WEST FAÇADE OF THE GARAGE IS ANGLED TO BOTH FORM A BACKDROP TO THE CENTRAL OPEN SPACE AS WELL AS TO WORK WITH THE GEOMETRIES OF THE ATRIUM SPACE. PRIMARY VEHICULAR ACCESS TO THE GARAGE IS ALONG THE NORTH SIDE, WITH ENTRIES AT THE NORTH-WEST AND NORTH-EAST CORNERS. MATERIALS THE PRIMARY MATERIALS FOR THE GARAGE CONSIST OF CONCRETE, STAINLESS STEEL MESH AND ALUMINUM PANELS. IN ORDER TO TIE THE GARAGE AND OFFICE BUILDING TOGETHER, THE GARAGE HAS A STRONG HEAVY BASE OF CAST IN PLACE CONCRETE THAT HAS A SERIES OF OPENINGS ALLOWING PEDESTRIAN ACCESS TO THE CENTRAL OPEN SPACE. THE CAST-IN-PLACE CONCRETE WALLS FORM A RHYTHM OF OPEN AND CLOSED THAT EMULATES THE STONE BASE OF THE LAB/OFFICE BUILDING. ABOVE THE BASE, THE GARAGE IS CLAD IN A WOVEN STAINLESS STEEL MESH. THE MESH IS DRAPED OVER A SERIES OF TUBES TO CREATE A PLEATED EFFECT (NOT UNLIKE A ROMAN SHADE) THAT SOFTENS THE MASSING OF THE GARAGE AND CREATES PATTERNS OF SHADOW AND VARYING DENSITY OF MATERIAL. SOLID ALUMINUM PANELS START ON THE VERTICAL SURFACE AND TURN HORIZONTALLY TO FORM CANOPIES DEMARCATING THE VEHICULAR ENTRIES. AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 E-C E-B E-A FF LEVEL 3 32’-0” FF LEVEL 2 16’-0” FF LEVEL 1 0’-0” FF GARAGE (E) -11’-6” E-DE-EE-FE-GE-H E-3 E-2 E-1 FF LEVEL 3 32’-0” FF LEVEL 2 16’-0” FF LEVEL 1 0’-0” FF GARAGE (E) -11’-6” E-1 E-2 E-3 FF LEVEL 3 32’-0” FF LEVEL 2 16’-0” FF LEVEL 1 0’-0” FF GARAGE (E) -11’-6” MATERIALS 02 STOREFRONT WINDOW SYSTEM ( TYPE A ) 05 UNITIZED PRECAST FACADE ELEMENTS 06 ALUMINUM CURTAIN WALL SYSTEM WITH SHADOWBOX ELEMENTS AT SLAB EDGES 16 ALUMINUM PANEL 15 BOARD FORM CONCRETE 18 ALUMINUM PANEL (PERFORATED) 16 1816 06 06061606 15020205 16 06 18 05 16050202 1/16" = 1'-0"1 NORTH ELEVATION - RENDERED 1/16" = 1'-0"2 EAST ELEVATION - RENDERED 1/16" = 1'-0"3 WEST ELEVATION - RENDERED SCALE: 1/16” = 1’-0”PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT ELEVATIONS 17016 A-306. AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 1" = 20'-0"1 BUILDING SECTION - LONGITUDINAL 1" = 20'-0"2 BUILDING SECTION - TRANSVERSE WEST 1" = 20'-0"3 BUILDING SECTION - TRANSVERSE EAST OFFICE OFFICE OFFICE OFFICEOFFICE OFFICE OFFICELAB/ LAB/ LAB/ LAB/ LAB/ LAB/ LAB/ OFFICE OFFICE OFFICELAB/ LAB/ LAB/ LAB/ LAB/ LAB/ LAB/ LAB/OFFICE OFFICE OFFICE OFFICE OFFICE LOBBY BOH BOHLOADING SCALE:PROJECT #: 1" = 20'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO BUILDING SECTIONS 17016 A-331 APRIL 13TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #: HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO GARAGE SECTIONS 17016 A-332 APRIL 13TH, 2018 3/32” = 1’ -0 “ 2 GARAGE SECTION - TRANSVERSE 3/32” = 1’ -0 “ 1 GARAGE SECTION - LONGITUDINAL AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SCALE:PROJECT #: APRIL 13TH, 2018HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO 400-450 EAST JAMIE CT - BUILDING SECTIONS 17016 A-333. 1/16" = 1'-0" 1/16" = 1'-0"2 BUILDING SECTION - LONGITUDINAL 1/16" = 1'-0"1 BUILDING SECTION - TRANSVERSE 1/16" = 1'-0"3 BUILDING SECTION - ATRIUM AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 L-300 2 FIREPIT L-300 1 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 2 L-300 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 3 L-300 FIREPIT AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 4 L-300 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 1"=30' SEPTEMBER 28TH, 2018 YDHY DH Y DH LE2 LE2 LE1LE1 LE1 LE1 LE1 LE1 LE1 LE2 LE2 LE2 LE2 LE2A LE1 LE1 LE1 LE1 LE1 LE6 MH: 1.5' LE1 LE1 LE1 LE1 LE1 LE1 LE4 LE1 LE1 LE3 LE1 LE1 LE3 LE3 LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE6 MH: 1.5' LE4 LE1 LE4 LE3 LE3 LE3 LE1 LE9 LE9LE9 LE3 LE3 LE3 LE3 LE1 LE1 LE1 LE1 LE1 LE1 LE3 LE3 LE3 LE3 LE1 LE3 LE3 LE3 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE4 LE1 LE2 LE1 LE1 LE3 LE3 LE3 LE3 LE3 LE3 LE3LE3 LE3 LE3 LE3 LE3 LE3 LE1LE1LE1LE1 LE3 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE11 LE12 LE3 LE7A LE7A LE7A LE7A LE7A LE7A LE10 LE10 LE10 LE10 LE10 LE10 LE10 LE10 LE10 LE7 LE7A LE7A LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 LE7 G-C G-1 1.1 0.8 1.5 16.3 1.2 15.6 1.4 9.7 2.6 4.9 5.4 2.4 10.7 1.4 16.2 1.1 15.6 1.4 9.7 2.5 4.9 5.4 2.4 10.7 1.4 16.8 0.60.81.21.62.02.22.01.71.41.10.90.80.91.21.51.92.12.22.01.61.31.00.80.81.01.31.62.02.22.11.91.51.20.90.80.91.11.41.82.12.22.11.71.41.10.90.80.91.21.51.92.22.22.01.61.31.00.90.91.01.41.72.02.22.01.71.31.00.7 0.60.91.41.82.12.32.21.91.61.21.00.91.01.31.72.02.32.32.11.81.41.10.91.01.11.41.82.12.32.32.01.71.31.11.01.01.21.62.02.22.32.21.91.61.21.01.01.11.31.72.12.32.32.11.81.41.11.01.01.21.61.92.22.32.21.91.51.10.8 0.70.91.31.51.71.81.81.61.51.21.11.01.11.31.61.71.81.91.81.61.41.21.01.01.21.41.61.81.91.91.71.61.31.11.01.11.31.51.71.81.91.81.71.51.21.11.01.11.41.61.71.91.91.81.61.41.21.11.11.21.51.71.81.91.81.71.41.10.8 0.60.80.91.01.21.21.21.21.11.11.01.01.01.11.21.21.31.31.31.21.11.01.01.01.11.21.21.31.31.31.31.21.11.01.01.01.11.21.21.31.31.31.21.21.11.01.01.01.11.21.31.31.31.31.21.11.11.01.01.11.21.31.41.41.41.31.31.31.4 0.40.50.60.60.70.70.80.80.80.90.90.80.80.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.91.01.01.01.01.01.11.21.51.82.22.52.62.52.21.71.31.01.01.11.41.82.12.42.42.11.71.31.00.91.01.21.62.02.32.42.32.01.51.21.01.01.21.51.92.32.52.42.11.71.31.11.01.11.41.82.22.42.52.31.91.51.21.01.01.21.62.02.32.52.32.01.51.20.90.80.80.91.11.41.82.12.42.42.11.71.41.00.70.50.40.30.20.10.10.00.0 0.30.40.50.50.50.60.60.60.70.70.70.70.80.80.80.80.80.80.80.80.90.90.90.90.90.90.90.90.90.80.80.90.90.90.90.90.90.90.90.90.80.80.80.90.90.90.90.90.90.90.90.80.80.80.80.80.80.80.80.80.80.80.80.80.90.91.01.21.41.72.02.22.42.32.11.71.41.11.11.21.41.82.02.22.22.01.71.41.11.01.11.31.72.02.22.32.12.01.61.31.11.11.31.61.92.22.32.32.11.81.51.21.21.21.51.92.12.32.42.22.01.71.31.21.21.41.72.02.22.32.22.01.61.31.11.01.01.11.31.61.82.12.22.22.01.81.51.21.00.70.50.30.20.10.10.10.0 0.20.30.30.40.40.40.50.50.50.60.60.60.70.70.70.80.80.80.80.80.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.80.80.80.80.80.80.80.70.70.70.70.70.70.80.80.91.01.21.41.51.71.81.71.61.51.41.21.11.21.31.51.51.61.61.51.51.31.11.11.11.31.41.51.71.81.71.61.51.41.21.21.41.61.71.92.02.01.91.81.61.41.41.41.61.81.92.02.01.91.81.71.51.41.41.51.71.81.92.01.91.71.51.31.21.21.21.31.41.51.61.61.71.71.51.51.51.51.31.00.70.40.20.10.10.10.0 0.20.20.20.30.40.40.40.40.50.50.50.50.60.60.70.80.80.80.80.80.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.80.80.80.80.80.70.70.70.60.70.70.70.70.80.80.91.01.01.11.11.21.21.31.31.21.11.01.01.11.11.11.11.11.11.11.01.00.91.01.01.11.21.21.31.31.31.31.31.21.31.41.51.61.61.71.71.71.71.61.51.51.51.61.71.71.71.81.71.71.61.61.51.51.61.61.71.71.71.61.51.41.31.21.41.41.41.41.41.31.21.21.11.11.21.41.71.81.40.90.50.30.20.10.10.0 0.10.20.30.40.50.60.60.60.60.50.50.50.60.70.81.01.01.11.21.11.11.11.01.01.01.01.11.11.21.21.21.21.11.11.01.01.01.11.11.11.21.21.21.11.11.11.01.01.01.11.11.11.21.11.11.00.90.80.70.70.80.80.90.90.90.91.01.00.90.90.80.80.80.91.01.11.11.00.90.90.80.80.80.80.80.80.80.80.80.80.80.80.90.90.91.01.11.21.21.21.21.21.31.41.41.51.51.51.51.61.51.51.51.51.61.61.61.61.61.61.61.61.61.51.51.61.61.51.61.51.51.41.31.31.21.51.61.61.51.31.11.00.80.80.81.01.52.02.21.81.81.00.50.10.10.10.0 0.30.50.91.21.31.41.20.90.70.50.50.60.81.11.31.51.61.71.61.51.41.21.11.11.21.41.51.61.71.71.61.51.31.11.01.11.21.41.51.71.71.71.51.41.21.11.11.11.31.51.61.71.71.51.41.21.00.90.91.11.51.61.61.71.71.61.51.20.90.70.70.70.81.01.21.21.10.90.70.70.70.70.70.70.70.70.70.70.60.60.70.70.70.91.11.21.21.11.11.11.11.31.41.61.71.81.81.71.71.61.51.51.51.61.71.81.91.91.81.71.61.61.51.51.61.71.71.81.81.81.61.51.31.11.71.91.81.61.31.00.80.70.70.70.90.81.01.52.02.21.81.00.10.10.10.0 0.41.02.33.73.63.73.52.01.00.60.50.60.81.21.61.92.12.22.01.81.51.21.01.01.21.51.92.12.32.22.01.71.41.11.01.11.31.62.02.22.32.11.91.61.31.11.01.11.41.82.02.22.22.01.71.31.00.91.22.23.73.93.74.33.83.73.82.41.10.60.50.50.61.01.31.51.20.80.60.50.50.60.60.70.70.60.60.50.50.50.50.50.60.81.21.31.31.10.90.91.01.31.51.82.02.22.22.01.91.61.41.41.51.71.92.12.32.32.12.01.81.51.41.41.61.82.02.22.32.21.91.71.41.11.72.22.01.61.20.90.70.50.50.60.80.81.01.52.12.52.01.10.50.30.00.0 0.51.65.29.87.98.88.93.81.30.60.50.60.81.21.62.02.42.52.21.81.41.10.90.91.11.51.92.32.52.42.11.71.31.00.91.01.21.62.02.42.52.32.01.61.21.00.91.01.41.72.12.42.42.11.71.31.01.01.53.99.18.67.310.47.97.89.74.91.40.50.30.20.21.21.71.81.50.90.50.40.50.60.80.90.90.80.70.50.50.40.40.50.61.01.51.81.71.20.90.80.91.11.62.12.42.72.62.42.01.61.41.31.41.62.12.42.72.82.52.21.81.41.31.31.51.92.32.62.82.62.31.81.41.21.82.52.21.61.10.80.60.40.40.50.71.11.61.81.91.81.40.80.10.10.00.0 1.31.92.21.60.90.50.40.61.01.41.61.71.51.20.90.80.60.60.60.81.31.92.22.11.41.00.91.01.42.02.32.73.02.92.72.42.01.61.51.72.12.42.83.03.12.92.52.21.81.61.61.92.32.62.93.12.92.62.31.81.42.02.82.41.81.20.80.60.50.50.60.81.11.31.31.00.60.30.10.10.00.00.0 1.42.02.31.71.00.50.50.91.42.22.62.72.42.01.61.31.21.01.01.11.72.32.72.11.30.90.91.01.41.92.22.62.92.82.52.31.91.61.51.62.02.32.62.93.02.72.42.11.71.51.61.82.22.52.83.02.82.42.11.81.41.92.82.41.81.20.80.60.50.60.91.11.21.10.90.60.40.20.10.10.00.00.0 1.41.92.11.60.90.50.61.11.92.83.13.13.02.62.32.11.91.81.81.82.12.42.51.81.20.80.80.91.11.52.02.32.62.52.31.91.51.31.21.31.62.02.32.62.62.42.11.71.31.21.21.41.82.22.52.72.52.21.81.31.11.72.42.21.61.10.80.60.60.91.41.51.41.00.60.40.30.20.10.10.00.00.0 0.91.31.71.71.30.80.60.71.42.43.13.02.82.62.42.32.32.52.62.52.52.52.42.21.51.00.80.80.91.11.41.61.82.02.01.81.61.41.21.11.21.41.71.82.02.01.91.71.51.31.21.21.31.61.81.92.11.91.71.41.21.01.62.11.91.51.10.80.70.71.11.82.01.71.52.02.21.81.00.50.00.00.00.0 1.01.51.71.61.10.70.60.81.52.42.72.52.11.81.81.92.02.32.62.82.92.82.51.91.30.90.80.80.91.01.11.21.31.41.41.31.21.11.11.01.11.21.31.31.41.41.41.31.21.11.01.01.11.21.31.41.41.31.21.10.90.81.41.71.61.41.10.80.70.71.31.31.51.81.82.12.52.01.10.50.00.00.0 1.21.82.01.71.10.60.60.91.62.32.42.01.41.11.11.21.41.72.22.63.02.92.61.81.20.90.80.80.90.91.01.01.01.01.01.01.00.90.90.90.91.01.01.01.01.01.01.01.00.90.90.90.91.01.01.01.00.90.90.80.70.81.11.31.31.21.00.80.70.81.21.31.51.81.31.92.21.71.00.40.00.00.0 1.32.02.21.81.10.60.61.11.82.32.11.71.00.70.70.70.81.11.52.22.93.02.61.71.10.80.80.80.90.90.91.00.90.90.90.90.90.80.80.80.80.80.90.90.90.90.90.90.90.80.80.80.80.90.90.90.90.80.80.70.60.71.01.11.11.11.00.80.70.81.21.21.31.60.90.51.81.40.80.40.10.00.0 1.42.12.51.91.10.60.71.32.12.32.01.40.80.50.50.50.60.81.21.92.63.02.51.50.90.80.90.91.01.01.01.00.90.80.80.80.80.80.80.80.80.80.80.90.90.90.90.80.80.80.80.80.80.80.80.80.80.80.70.60.60.70.91.01.11.10.90.80.80.81.11.21.31.30.80.40.20.10.10.00.00.00.0 1.31.92.11.61.00.60.91.62.42.32.01.20.70.40.40.40.50.71.22.02.52.72.01.20.90.90.91.11.31.31.31.10.90.90.90.90.90.90.80.80.90.90.90.90.90.90.90.90.90.90.80.80.90.90.90.90.90.80.80.70.70.71.01.11.21.11.00.80.80.81.11.21.31.30.80.40.20.10.10.00.00.00.0 0.71.11.51.71.30.90.71.01.72.42.31.81.00.60.40.30.40.50.81.42.12.52.41.61.10.80.91.01.31.61.71.61.31.01.11.11.01.01.00.90.91.01.01.01.11.11.11.11.01.01.00.90.91.01.01.01.11.11.00.90.80.80.81.21.41.41.31.10.90.80.81.21.21.31.51.41.71.80.90.50.00.00.00.0 0.71.01.21.21.00.80.81.11.82.12.01.40.80.50.40.30.40.50.91.62.32.52.11.40.90.90.91.21.62.12.32.11.51.51.61.51.41.31.21.11.11.11.21.41.51.61.61.51.41.31.21.11.11.21.31.41.51.61.51.31.11.00.91.51.81.71.41.10.90.80.91.21.31.31.41.52.02.21.00.50.00.00.00.0 0.81.11.21.10.90.70.81.21.71.81.71.10.60.40.30.30.40.61.11.92.42.51.91.20.80.91.01.41.92.52.82.51.92.12.32.22.01.81.51.21.21.21.51.82.02.22.32.11.91.61.31.21.21.41.71.92.12.32.11.91.61.31.01.62.22.01.61.20.90.91.01.21.31.31.41.52.12.52.01.10.50.00.00.0 1.01.41.51.31.00.81.01.51.91.71.50.90.60.40.30.30.40.71.21.92.42.51.71.00.80.91.11.62.32.83.22.02.32.62.82.72.42.01.61.31.31.31.62.02.42.72.72.52.21.71.41.31.31.51.82.32.62.82.62.31.81.41.21.82.62.31.71.31.01.01.01.01.21.21.31.31.92.21.71.00.40.00.00.0 1.21.82.01.71.21.01.42.02.22.01.40.90.60.40.40.40.50.81.31.92.22.01.30.80.81.01.31.82.53.23.52.42.93.33.63.43.02.62.11.71.61.72.12.63.03.43.43.12.72.31.81.61.61.92.42.93.33.53.32.82.41.91.52.02.92.51.91.41.21.01.01.01.11.21.31.11.61.81.40.80.40.00.00.0 1.42.12.42.01.31.21.92.62.62.21.50.90.70.50.50.50.60.91.41.71.91.51.00.80.81.01.41.82.52.92.82.02.32.73.02.92.52.11.81.51.41.51.82.12.52.82.92.62.21.91.61.41.51.72.02.32.72.92.82.31.91.61.31.92.82.41.91.51.41.01.01.01.11.20.91.11.41.40.10.00.00.00.00.0 1.52.22.62.21.51.42.13.03.12.61.91.20.90.80.70.70.81.21.61.71.61.20.90.80.91.11.41.82.22.51.81.72.12.42.62.62.31.91.51.31.21.31.51.92.32.52.52.32.01.71.31.21.21.41.82.12.42.62.42.11.71.31.11.72.42.21.71.61.71.01.01.51.10.80.91.11.41.40.10.00.00.00.00.0 0.91.52.22.52.11.61.62.23.13.43.02.41.91.51.31.11.11.21.62.02.11.71.10.80.80.91.11.41.61.82.01.41.41.61.81.91.91.71.61.41.21.11.21.41.51.71.91.91.71.61.41.21.11.21.31.51.61.81.91.81.61.41.21.01.62.01.91.71.61.51.01.01.01.01.11.11.41.71.81.81.00.50.00.00.0 0.81.42.12.42.11.61.52.02.83.23.22.62.32.12.01.91.91.92.22.52.51.81.10.80.81.01.11.31.41.51.51.11.01.11.21.31.31.31.21.11.01.01.01.11.21.21.31.31.21.21.11.01.01.01.11.21.21.31.31.21.11.00.90.91.41.61.61.51.62.21.01.01.01.01.11.52.12.22.22.01.10.50.00.00.0 0.81.42.12.42.21.61.31.51.92.32.62.52.42.32.42.52.52.62.93.02.81.81.10.80.91.01.21.31.31.31.20.90.80.80.91.01.01.01.00.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.90.80.80.80.81.11.31.31.31.51.91.01.01.00.81.11.11.61.81.40.80.40.00.00.00.0 0.81.32.22.52.31.61.11.01.21.41.61.71.82.02.42.82.82.93.13.02.51.61.00.80.91.11.31.41.41.31.00.70.70.80.80.90.90.90.90.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.70.70.70.81.01.11.21.21.31.61.01.11.30.80.40.50.91.40.10.10.00.00.00.00.0 0.81.42.22.82.61.71.00.70.70.80.81.01.11.31.62.12.42.92.92.82.21.40.90.80.91.11.51.71.61.30.80.60.60.70.80.80.80.90.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.80.70.60.70.91.01.11.11.11.21.31.01.11.10.70.40.30.20.10.10.10.00.00.00.00.0 0.50.71.22.12.62.51.71.00.60.50.50.50.60.70.81.01.41.92.52.72.51.81.20.90.80.91.31.72.01.91.40.70.70.80.80.90.90.90.90.90.90.90.80.90.90.90.80.80.80.80.90.90.90.80.90.90.90.90.90.90.80.80.70.81.01.21.21.21.21.11.10.91.11.00.80.50.30.20.10.10.10.00.00.00.0 0.50.71.22.02.52.51.81.10.70.50.50.60.60.70.70.91.11.72.42.62.31.51.00.80.81.01.41.92.32.21.00.80.80.91.01.11.11.21.11.11.01.00.91.01.01.01.01.01.01.01.01.01.01.01.01.01.11.11.11.11.11.00.90.91.31.51.51.41.21.11.10.60.60.60.80.51.41.71.81.40.90.50.00.00.0 17.113.80.60.71.11.92.42.61.91.20.80.70.80.91.01.11.01.01.21.82.42.72.11.30.90.80.81.11.62.22.62.30.91.01.11.21.41.61.71.71.51.41.31.11.11.11.21.31.41.51.51.41.41.31.21.11.21.31.41.51.71.71.61.41.31.11.72.01.91.61.21.11.10.80.50.60.81.01.52.02.21.81.00.50.00.00.0 16.313.75.00.70.71.01.82.52.72.11.31.01.01.31.61.81.71.41.11.31.82.32.41.91.20.90.80.91.11.72.42.71.91.01.11.31.61.92.22.42.32.11.81.51.21.21.21.51.81.92.12.12.01.81.61.31.21.31.51.82.12.32.42.32.01.81.41.92.42.21.71.21.01.00.80.50.71.01.01.52.12.52.01.10.50.00.00.0 17.714.55.01.51.51.00.81.01.72.52.92.41.51.11.21.62.02.32.11.71.31.31.61.92.01.51.00.90.91.11.62.02.52.61.21.11.21.41.72.22.62.82.72.41.91.61.31.31.31.62.02.32.52.52.32.01.71.31.21.31.62.12.52.93.12.92.62.21.72.02.82.51.81.31.11.10.70.70.70.81.01.31.92.21.71.00.40.00.00.0 0.10.10.20.51.52.96.811.89.410.310.54.51.81.31.11.11.21.21.11.21.11.01.11.21.21.31.41.41.51.61.61.51.51.41.41.41.41.41.41.31.31.31.21.21.11.01.01.11.11.11.11.11.01.23.54.93.91.21.81.10.70.70.70.60.611.19.33.92.62.31.91.20.80.91.52.22.62.21.41.11.21.72.12.31.91.61.31.31.62.02.22.22.32.42.32.12.12.22.32.21.01.11.31.72.32.93.43.73.63.22.62.01.61.41.41.61.82.12.32.32.11.91.61.41.31.41.82.32.93.33.63.33.02.52.02.33.22.82.11.51.21.11.00.90.70.70.71.11.61.81.40.80.40.00.00.0 0.20.20.30.51.72.95.17.36.46.66.33.41.91.72.02.32.52.52.21.81.51.41.62.02.42.72.92.72.62.52.52.72.92.92.62.32.12.02.22.52.72.72.42.01.61.41.41.62.02.32.52.42.01.61.20.81.12.113.29.71.72.33.02.30.91.00.83.63.42.62.62.72.31.50.90.81.21.92.11.91.61.61.51.61.61.61.31.21.11.21.51.92.22.52.62.62.42.22.12.01.91.70.91.01.11.31.72.12.62.82.72.41.91.61.31.21.11.01.01.01.11.11.00.91.01.01.11.21.41.82.22.42.72.52.32.01.82.23.12.72.11.61.31.11.31.01.30.90.50.70.50.30.20.10.10.00.00.0 0.20.30.40.51.92.63.13.23.02.92.61.91.61.71.92.12.32.32.11.81.61.51.72.02.32.52.62.62.52.52.52.62.72.72.52.32.12.12.22.32.52.52.32.01.71.51.51.71.92.12.32.21.91.61.20.80.60.50.40.40.30.40.54.61.44.54.62.92.02.12.52.72.31.71.41.62.22.93.33.22.62.01.61.31.11.00.90.90.91.01.21.61.92.02.22.22.01.91.81.61.51.20.80.80.91.21.61.92.22.42.42.11.81.51.21.01.01.01.11.11.21.21.21.11.00.90.91.01.31.92.52.83.12.92.62.21.72.22.82.72.21.71.41.41.31.31.51.20.70.90.70.50.30.20.10.10.00.0 0.30.40.50.62.02.62.52.21.81.61.51.31.31.41.51.61.81.71.71.61.51.41.51.71.82.02.12.02.12.12.12.12.22.12.01.91.91.81.91.81.91.91.81.61.51.41.41.51.51.61.71.61.41.31.10.90.70.60.60.60.70.70.81.31.72.02.13.51.91.92.32.52.31.71.51.72.22.62.82.72.31.81.41.10.90.70.70.70.80.91.01.21.41.41.51.61.51.41.31.31.21.00.70.80.91.11.21.41.61.71.71.51.41.31.11.11.11.21.31.51.61.71.61.41.31.21.01.01.21.62.12.42.42.52.32.01.72.32.82.82.52.11.71.51.41.31.21.21.31.31.10.70.40.20.10.10.00.0 0.40.50.60.72.22.72.52.01.61.41.21.11.11.11.11.21.31.31.21.21.21.21.31.31.41.41.51.51.51.61.61.51.61.51.51.51.41.41.41.41.41.41.31.21.21.11.11.11.11.11.11.11.00.90.80.80.70.60.70.91.21.52.02.32.42.32.11.91.71.82.12.12.01.71.51.71.92.02.12.01.71.41.20.90.80.70.70.70.70.80.80.91.01.01.01.01.01.01.01.00.90.80.60.70.70.81.01.11.21.21.21.21.21.11.11.11.21.41.72.02.12.32.22.01.71.31.11.01.11.31.51.81.91.91.81.81.82.52.93.02.92.52.11.81.31.11.01.21.51.71.61.00.50.20.10.10.00.0 0.40.50.70.82.22.72.42.01.61.31.21.11.01.00.90.90.90.90.90.91.01.01.01.01.01.01.01.01.11.11.11.11.11.11.11.11.11.11.01.01.00.90.90.90.90.90.90.90.80.80.80.70.70.70.70.60.60.60.70.91.11.51.82.02.22.22.12.01.91.92.01.91.81.61.51.51.51.41.41.31.21.00.90.80.70.70.80.80.80.80.70.80.80.80.80.80.80.80.80.70.70.60.50.60.60.70.80.91.01.01.11.11.11.21.21.21.31.51.92.32.62.82.72.21.81.41.11.01.11.21.31.51.51.51.51.61.92.52.93.13.12.72.21.71.21.00.91.11.72.12.01.20.60.20.10.10.00.0 0.40.50.70.82.12.52.31.91.61.41.21.01.00.90.80.80.80.80.70.70.70.70.70.70.70.70.80.80.80.80.80.80.80.80.80.80.80.80.70.70.70.70.70.60.60.60.60.60.60.60.60.50.50.50.50.50.50.60.70.81.01.31.41.61.81.91.92.02.12.12.12.11.91.81.61.41.21.11.00.90.80.80.80.90.90.91.33.13.61.21.41.41.30.80.80.80.80.60.60.60.60.50.40.50.50.60.70.80.91.01.01.11.11.11.11.21.31.51.82.12.42.62.32.01.61.31.01.01.01.11.11.21.31.31.31.41.72.22.52.72.62.21.81.41.10.80.81.21.82.32.31.40.60.20.10.10.00.0 0.50.60.70.91.92.32.32.11.91.71.41.21.00.90.70.60.60.60.50.40.40.40.40.40.40.40.40.40.40.40.40.40.50.50.40.40.40.40.40.40.40.40.40.40.40.30.30.30.30.30.30.30.30.30.30.40.40.50.60.70.80.91.11.31.61.92.12.32.52.62.62.52.32.11.81.51.21.00.91.01.01.01.13.53.92.21.74.54.91.45.711.14.51.44.84.61.30.91.31.50.70.70.70.70.50.60.60.70.80.91.01.11.21.31.31.31.31.31.21.00.70.80.60.50.50.50.71.01.62.02.01.20.60.20.10.10.00.0 0.50.60.71.11.82.22.42.42.32.11.81.51.10.90.70.50.50.40.30.30.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.30.30.40.40.50.60.70.91.21.62.12.63.03.23.43.43.23.02.72.21.81.61.31.12.35.25.11.10.30.30.40.30.20.20.20.20.20.20.60.40.50.71.813.510.31.22.34.23.70.91.21.82.10.91.01.31.61.61.61.71.71.61.51.41.00.80.60.50.40.40.40.50.81.31.61.61.00.50.20.10.00.00.0 0.50.60.81.11.62.12.52.72.72.62.21.71.20.90.60.50.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.20.60.71.21.72.53.33.74.04.24.34.03.83.42.62.56.76.92.20.50.30.30.20.20.20.20.10.10.10.10.10.10.10.10.10.10.10.10.10.20.20.10.10.20.52.814.07.11.21.96.67.12.72.12.22.32.52.52.11.71.10.50.40.30.30.40.50.81.11.21.10.70.40.20.10.00.00.0 0.50.60.81.11.52.02.42.72.92.82.41.92.73.64.24.44.74.84.54.23.72.81.91.30.10.10.10.10.10.10.10.10.20.20.30.40.50.61.01.51.82.22.52.84.24.94.23.81.60.20.30.30.30.40.60.91.21.20.90.60.30.20.10.00.00.0 0.60.70.91.01.21.41.41.31.21.21.41.82.73.64.34.54.84.84.54.33.82.81.91.21.33.24.54.13.91.50.20.30.30.30.40.71.21.51.51.00.60.30.10.10.00.00.0 0.30.70.80.90.90.91.01.11.11.21.32.43.01.62.43.33.84.14.34.34.23.93.42.61.71.10.20.20.20.30.40.81.01.21.41.41.61.10.50.30.00.00.0 0.20.91.11.21.11.01.11.21.31.31.73.44.91.31.92.63.03.33.43.53.33.12.72.11.40.20.20.20.30.50.91.01.41.41.62.21.40.70.30.00.0 0.21.21.61.51.21.01.11.41.61.71.93.54.70.91.31.72.12.22.32.32.32.11.81.41.00.30.20.20.30.50.91.01.41.41.61.60.60.30.10.00.0 0.31.52.01.81.31.11.11.62.02.22.03.01.40.50.20.30.50.91.61.61.61.61.40.60.30.10.00.0 0.41.72.22.01.51.11.21.82.22.41.91.63.51.00.30.30.40.81.41.81.81.20.60.30.10.10.00.0 0.41.82.32.01.51.11.21.72.12.31.71.02.50.80.20.30.40.81.41.81.81.20.60.30.10.10.00.0 0.41.62.11.81.41.11.11.61.92.01.40.82.50.80.20.30.40.81.52.02.11.40.70.30.10.10.00.0 0.21.41.71.61.21.01.11.31.41.51.10.73.31.00.30.30.50.91.62.12.22.31.50.70.30.10.00.0 0.21.01.31.31.10.91.01.11.21.10.90.71.60.60.20.30.40.91.62.12.21.50.70.30.10.10.00.0 0.20.70.91.00.90.91.01.11.21.21.31.42.30.80.20.30.40.81.52.02.11.40.70.30.10.10.00.0 0.20.50.60.70.70.80.91.31.51.72.54.03.61.10.30.20.40.71.31.71.81.20.70.30.10.10.00.0 0.20.40.50.50.60.70.91.51.92.22.73.84.11.00.30.20.40.71.31.61.71.30.70.30.10.10.00.0 0.20.30.40.40.50.71.01.62.12.42.01.57.10.90.30.30.40.71.31.81.91.40.80.30.10.10.00.0 0.20.20.30.40.50.61.01.62.12.31.70.95.91.90.50.30.40.71.31.92.21.60.80.30.10.10.00.0 0.20.20.30.30.40.60.91.52.02.11.50.90.611.31.20.30.40.71.31.92.31.70.80.30.10.00.00.0 0.10.20.30.30.40.60.91.41.71.81.30.80.111.11.50.50.40.51.11.71.91.40.70.30.10.00.00.0 0.20.20.30.30.40.60.91.41.71.71.30.80.11.27.31.30.40.50.81.21.41.00.50.20.10.00.00.0 0.20.20.30.40.50.60.91.51.92.01.40.80.10.212.21.30.40.40.60.70.80.60.40.20.10.00.00.0 0.20.30.40.40.50.71.01.62.12.31.60.90.00.13.13.70.90.40.41.81.91.40.80.30.10.00.0 0.10.20.40.50.50.60.81.11.72.32.51.80.91.31.62.02.22.32.42.42.42.52.52.42.52.52.42.52.52.42.42.42.32.22.01.61.20.00.10.39.01.10.71.31.92.21.60.80.30.00.00.0 0.10.20.50.60.70.70.81.11.62.12.31.60.91.92.53.03.33.53.63.63.63.63.63.63.63.63.63.63.63.63.63.63.53.33.02.51.91.40.00.00.17.31.80.71.31.92.31.70.80.30.00.00.0 0.10.30.70.90.90.90.91.11.51.91.91.40.82.02.63.33.94.24.44.54.64.54.64.64.54.64.64.54.64.64.54.64.54.44.23.93.32.62.00.00.00.10.94.10.41.11.71.91.40.70.30.00.00.0 0.10.21.01.31.31.11.01.11.51.61.71.30.81.92.53.23.84.44.74.84.95.04.95.05.04.95.05.04.95.05.04.95.04.94.84.74.43.83.22.50.00.00.11.54.50.40.81.21.41.00.50.20.00.00.0 0.20.21.41.71.61.21.01.11.51.81.81.30.82.22.93.43.94.44.64.74.84.84.84.94.84.84.84.84.84.84.94.84.84.84.74.64.43.93.42.92.20.00.00.110.11.50.30.60.70.80.60.40.20.00.00.0 0.30.31.72.01.81.31.01.11.62.02.11.50.80.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.01.32.02.73.13.43.83.94.04.24.14.14.24.14.14.14.14.14.14.14.14.14.24.03.93.83.43.12.72.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.09.50.90.40.40.40.40.40.20.10.00.00.0 0.30.41.92.31.91.41.11.21.72.12.31.60.80.30.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.716.418.118.518.218.618.518.217.82.01.52.02.32.62.82.92.93.03.03.03.13.03.03.13.13.03.03.13.03.03.02.92.92.82.62.32.01.50.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.01.20.40.10.00.00.00.00.00.00.00.00.0 0.30.41.82.21.91.41.01.11.62.02.11.40.70.30.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.31.11.01.41.51.71.91.91.92.02.02.02.02.02.02.02.02.02.02.02.02.02.01.91.91.91.71.51.31.00.70.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.00.00.00.00.00.00.00.00.0 0.20.31.61.91.71.20.91.01.31.71.71.20.60.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.00.00.00.00.00.00.00.00.30.50.60.80.91.01.11.21.21.21.21.21.21.21.21.21.21.21.21.21.21.21.21.21.21.11.00.90.80.60.40.30.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.20.21.31.61.41.10.90.91.01.11.10.80.40.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.20.30.40.50.50.60.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.70.60.50.50.40.30.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.20.91.11.10.90.80.70.70.70.60.50.30.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.20.20.30.30.30.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.40.30.30.30.20.20.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.20.60.70.80.70.60.60.50.40.40.30.20.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.10.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.20.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.20.40.50.60.50.50.50.40.30.20.20.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.20.30.40.40.40.40.40.30.20.20.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.10.20.30.30.30.30.30.20.20.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 0.10.10.20.20.20.20.20.20.20.10.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.0 MEL QUI MEL QUI MEL QUI MEL QUIVANVANVANPROPERTY LINE, TYP. 10' SEWER EASEMENT, S.C.D. E. JAMIE COURTHASKINS WAYTYP.18'-0"TYP.25'-0"TYP. 8'-6" T Y P .1 8 '-0 " EDGE OF BUILDING ABOVE, TYP. VOID 151 HASKINS WAY (E) 1 STORY BUILDING 401 E GRAND AVE. (E) 1 STORY BUILDING 430 E GRAND AVE. (E) 2 STORY BUILDING 451 E JAMIE COURT(E) 2 STORY BUILDINGEDGE OF (E) CURB EDGE OF (E) CURB PORTE COCHERE PLANTED AREA, TYP., S.L.D. ASPHALT PAVING, U.N.O. CONCRETE SIDEWALK, C.L.D. 5 STORY PROPOSED PARKING STRUCTURE 720 STALLS RAMP UP U P REAR YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 14 15 16 18 1 0 21 17 SIDE YARD SETBACK NOT REQUIRED PER TABLE 20.110.003 SETBACK 2 0 '-0 "SETBACK10'-0"UP PEDESTRIAN PATH OF TRAVEL, TYP. EDGE OF BUILDING ABOVE RAMP UP ASSUMED PROPERTY LINE G-R G-1 G-3 G-R A 20 A 1 (N) CROSSWALK (SCD)PUBLIC WAY WIDTH43'PU BLI C W AY WI DT H 49' BACKFLOW PREVENTER VANOFFICE LOADING WASTE PROCESSING ELEC (3 STORY WING) (N) OFFICE BUILDING (5 STORY WING) LOADING WASTE PROCESSING UTILITY YARD ELECTRICAL DOMESTIC WATER FIRE PUMP 3 STORY ENTRY COURT / ATRIUM RAMP UP 33 27 SOIL / OIL INTERCEPTOR 6 3 RAMP UP SCALE:PROJECT #: APRIL 13TH, 2018 1" = 30'-0" HASKINS BIOTECH CAMPUS - SOUTH SAN FRANCISCO Unnamed 17016 L-002G AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018 AUGUST 3RD, 2018SEPTEMBER 28TH, 2018   Prepared by: Silvani Transportation Consulting  Oakland, CA                              PRELIMINARY TDM PLAN For 201 Haskins Way Project ARE-San Francisco No. 65, LLC January 30, 2019      Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    2 | Page    Introduction & Project Description  The proposed 201 Haskins Way Project (project) site encompasses approximately 18.2 acres on  eight parcels of privately owned light industrial and research and development (R&D) land in the  City of South San Francisco’s (City) East of 101 Area.  The proposed project would involve  redevelopment of existing light industrial uses into office/R&D uses and intensifying the  buildout of existing office/R&D to create an integrated life sciences campus.      The proposed project would involve rezoning seven parcels from the Mixed Industrial district to  a Business Technology Park district and one parcel from the Business Commercial district to the  BTP district. The project would allow development at a floor area ratio of 1.0 or a total of  approximately 634,796 square feet (SF)1 of new BTP office use.      Project Phasing  For purposes of environmental review and land use entitlements, it is assumed that the  additional office/R&D space would be built out in two phases.   Phase 1 project area includes  two parcels: 201 Haskins Way and 400‐450 East Jamie Court; the Phase 2 project area includes  additional development at 400‐450 East Jamie Court, in additional to the development of six  other parcels.      Alexandria Real Estate Equities (ARE) has submitted an application for Phase 1.  Currently, there  is no site‐specific development program proposed for the Phase 2 area.  The City would initiate  rezoning of all Phase 2 parcels with exception for 400‐450 East Grand Avenue, rezoning of which  is included in Alexandria’s Phase 1 development application.  It is uncertain when or if Phase 2  development would occur or whether it would occur as a single redevelopment of all Phase 2  area parcels or as separate redevelopments of one or more Phase 2 area parcels. Phase 1 would include demolition of approximately 24,075 gross SF of light industrial space at  201 Haskins Way and development of a new 280,765 SF (311,369 gross SF) office/R&D building,  a new five‐story parking garage, and a new surface parking lot adjacent to the parking structure.  Phase 1 development would also include construction of an addition to one of the existing  office/R&D buildings at 400‐450 East Jamie Court of approximately 25,000 gross SF (the  property at 400‐450 East Jamie Court currently is developed with two existing buildings totaling  approximately 152,000 SF (approximately 157,000 gross SF)).     The Phase 1 project may be occupied by a single tenant or multiple tenants and may employ as  many as 723 net new employees.  ARE estimates that construction of the Phase 1 project will be  completed in 2021 and occupied in mid‐to‐late2021.                                                                   1 Unless otherwise stated, the Phase 1 Project square footage referenced in this TDM Plan are based on Floor Area  (“square feet of Floor Area”) as calculated pursuant to South San Francisco Municipal Code Section 20.40.008,  which allows certain areas to be excluded from the calculation of Floor Area.    Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    3 | Page    The new Phase 1 campus is designed to provide opportunities for collaboration and integration.   The existing buildings located at 400‐450 East Jamie Court are both three stories with a one‐ story underground parking garage.  The buildings are oriented around an open‐air central entry  court that also provides pedestrian access to the San Francisco Bay Trail and magnificent views  of the bay.  The expansion at 400‐450 East Jamie Court of approximately 25,000 gross SF will be  developed as a two‐story addition to the north side of the 400 East Jamie Court building –  bringing the complex closer to the East Jamie Court street edge.      The proposed Phase 1 building to be developed at 201 Haskins Way is designed as a five‐story  wing and a three‐story wing around an interior entranceway and atrium space that will house a  campus eatery and common conference facilities.  The Phase 1 project seeks to create  opportunities for natural and seamless linkages throughout the Phase 1 campus. The interior of  the 201 Haskins Way site features a courtyard space linking the surface parking area with the  enclosed garage and provides access into the atrium space within the building, then to East  Jamie Court via a newly designed pedestrian crossing, and then to the Bay Trail.    One of the featured designs and functional elements of the project is the creation of a Central  Plaza for 201 Haskins Way and 400‐450 East Jamie Court within the atrium complex, which  would serve as a transit hub with its pedestrian connector between the surface parking lot, the  parking garage, and the office/R&D building at 201 Haskins Way.      This hub will not only facilitate and encourage the use of multi‐modal transportation options; it  will be a key place‐making element for the new Phase 1 campus.  The hub will maximize  opportunities for pedestrian, bicycle, shuttles and shared rides, as well as become a natural  setting where people want to gather.     The project is consistent with the City of South San Francisco’s policies of promoting alternatives  to automobile transportation to further the City’s transportation objectives by emphasizing  linkages, TDM, and pedestrian access and ease of movement between buildings.    Transit Demand Management (TDM) Applicability     Phase 1 and Phase 2 of the proposed project would incorporate a TDM plan pursuant to the  City’s Municipal Code Chapter 20.400, Transportation Demand Management, which contains the  City’s TDM requirements. The TDM requirements apply to all nonresidential development  expected to generate 100 or more average daily trips.   The minimum requirements are to  achieve 28 percent alternative mode usage (compared to solo driving) with additional density  bonuses allowed for higher use of alternative modes. In order to achieve a FAR of 1.0, as  required for development of the project, the TDM plan implemented in connection with the  project must achieve 35 percent alternative mode usage.      Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    4 | Page    Given that ARE has submitted an application only for Phase 1 area development, this TDM plan is limited  to the Phase 1 project, including the existing facilities located at 400‐450 East Jamie Court.   Development of Phase 2 would require subsequent project‐level site design and permitting, including  preparation of a TDM plan pursuant to the City’s TDM Ordinance.   TDM Goals    TDM works by managing demand of existing transportation resources and infrastructure.  It    does this in several ways:  1. Converting trips to more efficient modes of transportation such as transit, carpools and  other shared rides, which reduces individual vehicle trips, lessens roadway congestion,  improves total travel time and reduces demand for parking facilities.  Environmental  footprint.  2. Converts trips to non‐vehicular modes such as bicycling and walking, which eliminates  vehicular trips, lessens roadway congestion, improves total travel time and reduces demand  for parking facilities.  These active transportation modes also improve health.  3. Encourages use of ‘clean’ vehicles when possible by using compressed natural gas,  electric/hybrid vehicles for trips, which reduces environmental impacts of trips.   4. Eliminates trips entirely through compressed work weeks, telecommuting, etc.  The TDM measures and programs proposed in this Plan support the above TDM goals and will  meet a proposed goal of 35 percent of peak hour trips being made by non‐single occupant  vehicle modes for Phase 1.  As proposed, the 35 percent mode split target would be  implemented upon occupancy of the Phase 1 project site.  The annual and triennial reporting requirements for the Phase 1 project will evaluate this TDM  Plan for compliance with the 35 percent minimum alternative mode usage as required under the  City’s TDM Ordinance.    Ultimately, ARE will strive to reach a goal of 40 percent, which demonstrates ARE’s commitment  to TDM for the project site.    The existing TDM requirement for 400‐450 East Jamie Court is a 28 percent alternative mode  split.  The 2017 alternative mode split goal for 400‐450 East Jamie Court’s current work force is  over 50 percent.    This TDM Plan commits to a permanent 35 percent alternative mode split for the Phase 1  project which includes 400‐450 East Jamie Court.  Because the eventual tenant(s) of the Phase 1  project are likely to be similar in nature to the existing tenant mix, ARE anticipates that the  expanded Phase 1 campus site will continue to achieve or exceed this TDM goal.  However,  because it is also likely a new tenant(s) will come from an SOV‐oriented environment, we  recognize that it may take time to shift behavior to reach the higher aspirational mode split  target.      Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    5 | Page    Current Alternative Mode Use at 400‐450 East Jamie Court (2017):  Carpool   10%  BART    11%  SamTrans  1%  Caltrain   10%  Ferry    5%  Bike    9%  Walk    1%  Lyft/Uber  6%    Total                   53%    Achieving the proposed alternative mode split targets consistently will require a sustained commitment  by both Alexandria Real Estate Equities and future tenants; these efforts are outlined in the TDM  measures described in the next section.  These measures are based on   current commute patterns,  transportation services, traffic, customer preferences, and technology.  Over time, the specific TDM  measures that are implemented at the Phase 1 project may change; therefore; this TDM Plan should be  utilized as a ‘living document’ that can be amended to include new services and technologies as they  emerge as well to address new commuter patterns and preferences.    TDM Measures  The purpose of the following TDM measures is to achieve three basic goals: (1) convert single‐ occupant vehicle trips to an alternative mode of transportation (e.g., transit, carpools or  vanpools, bicycling); (2) provide technological solutions (e.g., compressed natural gas,  electric/hybrid vehicles, or other zero emission vehicles); and (3) eliminate trips (e.g.,  compressed work weeks, telecommute), consistent with the requirements of the City’s TDM  ordinance.   ARE has organized the various TDM measures proposed for the Phase 1 project into four  categories:  infrastructure; programs and services; marketing/information; and lease and  reporting requirements.  Responsibility for implementing each measure is further described  below.  Infrastructure  Programs & Services  Marketing &  Information Regarding  Project Site TDM  Measures  Leasing & Reporting   Central Plaza  Transit Hub  connections to all   Shuttles (to local  trains, ferries,  BART)   Onboarding for  new hires   Pre‐move in   On‐site Employee  Transportation  Coordinator  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    6 | Page                                     Infrastructure  Primary responsibility:  Alexandria Real Estate Equities  Central Plaza Transit Hub  A Central Plaza transit ‘hub’ which physically and visually ‘connects’ the Phase 1 campus will be  created in front of the new office/R&D building located at 201 Haskins Way and in front of the  existing office/R&D buildings located at 400‐450 East Jamie Court.  This hub will provide safe  and direct access to all alternative modes from each property; it will be a central gathering place  with people‐friendly amenities such as real‐time information about all modes offered; seating;  protection from weather; appropriate lighting for early morning/late night; outdoor heaters and  security.   The hub will have facilities that separate various modes: large shuttles from casual  carpooling/other individual ride‐share vehicles; bicycle parking, etc.  This will help ensure safe  and efficient operations for each mode and avoid conflicts.  The centralization of all these  facilities will help make all alternative modes ubiquitous at this new campus.  An important  element for the hub will be its flexibility to accommodate an ever‐changing array of services.   For example, in the not‐too‐distant future, we may see autonomous shuttles or transportation  alternative modes   Intra‐Campus  Walkability   Connections to  area bike trails  and paths   Secure Bike  Parking   Sufficient Parking  supply   Designated  parking and  charging facilities  for carpools,  carshares, electric  and other  technologically  advanced vehicles   On‐Site Amenities  to support trip  reduction, and an  interconnected  campus (to be  determined in  consultation with  tenant(s))     Shuttles to local  destinations   Carpooling and  Vanpooling   Guaranteed Ride  Home   Transit subsidies  and/or pre‐tax  payroll programs   Mobile Services  that support trip  reduction such as  nail salons and  food services  surveys, program  orientations and  introductions for  employees   Pre‐move in  planning and  promotion with  tenants   Ongoing  marketing of  programs on‐site:   lobbies, transit  hub   Ongoing  marketing of  programs through  tenant website, e‐ communications   Annual  promotional  events for campus  employees   Inclusion of TDM  Measures in  leases    Annual survey   Annual reporting  to City   Triennial reporting  demonstrating  TDM plan efficacy  or description of  additional trip  reduction  measures  pursuant to TDM  ordinance (Ch.  20.400 of the  City’s Municipal  Code)  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    7 | Page    network companies (TNCs) (e.g., Lyft, Uber, etc.) , and over the lifetime of this project, there will  be new products and services not even dreamed of yet.  This is why it’s important the transit  hub be designed with the ability to provide ‘separate’ facilities as necessary to new or emerging  technologies.    Intra‐Campus Walkability  A new, three‐story atrium located in the office/R&D building at 201 Haskins Way will become  the heart of the Phase 1 campus with a pedestrian spine running through it, connecting the  properties located at 400‐450 East Jamie Court with 201 Haskins Way. Four small plazas will  encourage spontaneous encounters along the pedestrian pathway.  The atrium will also become  the alternative transportation hub.  The pedestrian spine for the campus starts at the garage elevator and stair core; crosses East  Jamie Court and ends at the shore of the San Francisco Bay. A new mid‐block crosswalk on East  Jamie Court will connect the atrium of the 201 Haskins Way Building to the existing 400‐450 East  Jamie Court buildings and the vehicular entrance to 400‐450 East Jamie Court will be configured  to support this pedestrian‐priority element.    Connections to Area Bikeways  The project is serviced by existing bikeways including:  1) A Class 1 facility along the San  Francisco Bay Trail 2) A mix of Class II and Class III bikeways running from East Grand Avenue,  Utah Avenue and Seaport Boulevard all the way to the South San Francisco Caltrain Station, and  3) A mix of Class II and Class III bikeways running close to the site north through the Genentech  campus reaching the South San Francisco Ferry Landing.      Secure Bicycle Parking  The Phase 1 project would include bicycle parking in accordance with the state’s Title 24 Green  Building Standards (CALGreen) Section 5.106.4.1.2, and would meet Leadership in Energy and  Environmental Design Version 4 (LEED v4) bicycle parking standards. Both LEED and CalGreen  require bicycle parking spaces for the new Phase 1 campus, which will be provided in a secure  room off the main lobby of the office/R&D building at 201 Haskins Way and will be accessible  from the exterior.  Because a growth in biking is anticipated as improved facilities at Caltrain and  other transit modes become available over time, the secure indoor bicycling parking facility will  be designed to be able to expand to over 100 bicycle spaces as demand requires.  The 400‐450  East Jamie Court buildings currently include bicycle storage for approximately 30 bicycles.     In addition to this protected, secure parking, the central atrium will provide parking for bicycles  from bike‐share programs such as Limebike and Ford Go Bike, to make it easy for people to  bicycle to the campus from the South San Francisco Caltrain station, the ferry terminal and other  locations.     On Site Amenities  Amenities within the Phase 1 project are conceptual at this time, but would include a dedicated  space that would be used as a café for employees and showers and clothes locker facilities.  Alexandria Real Estate Equities will work with future tenants to determine an appropriate mix of  other services which can be provided via mobile operations on a regularly scheduled basis.  For  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    8 | Page    example, food trucks and other mobile businesses such as dental screening, may be desired.   Space may also be provided in common areas on a regular schedule for manicures/pedicures  and other personal services.  The goal of these common, on‐site amenities is to further reduce  the number of daytime trips to and from the Phase 1 project site, and to further support  employees’ use of alternative commute modes.     Parking  The proposed project requires 1,416 parking stalls at a ratio of 1:345 (2.9/1000).  Phase 1 of the  two‐site campus proposes 1,327 parking spaces as part of an overall campus strategy. This  includes 903 stalls at 201 Haskins Way and 424 stalls at 400‐450 East Jamie Court.  As shown in  the table below, the provided 1,327 stalls equate to (i) a parking ratio of 1:345 or 2.9/1,000 as  calculated utilizing square feet of floor area as defined under Section 20.40.008 of the City’s  Municipal Code and (ii) a parking ratio of 1:372 or 2.69/1,000 utilizing gross square feet.    Calculation of Total Building Square Footage and Parking Ratios:   Square Feet of Floor Area  (SSF Municipal Code  § 20.40.008)  Gross Square Feet  201 Haskins Way 280, 765 311,368  400‐450 East Jamie Court  ± 177,000 ± 182,000  Total Square Footage 457,765 SF 493,368 gross SF Parking Ratio     2.9/1,000    457,765 SF/1,327 stalls = 345;  (1,000/345 =2.9)    2.69/1,000    493,368 SF/1,327 stalls = 372;  (1,000/372 =2.69)       201 Haskins:  903 Total Spaces:   813 Standard, 3 ADA Van, 14 Standard ADA, 18 Clean Air Vehicle  (CAV), 50 Standard Electric Vehicle (EV), 1 ADA Van EV, 2 Standard ADA EV, 2 Ambulatory EV  400‐450 East Jamie Court:  424 Total Spaces:   382 Standard, 2 ADA Van, 6 Standard ADA, 23  Standard EV, 1 ADA Van EV, 1 Standard ADA EV, 1 Ambulatory EV, 8 CAV  In total, approximately one hundred and sixty spaces, or 12 percent of spaces provided in the  Phase 1 development, would be provided for electric vehicles, carpool, van pool, and other  shared vehicles. These spaces will be located closest to building entrances for maximum  convenience for those who carpool.  The ‘hub’ may also accommodate casual carpools at the end  of the day with signage for employees heading in different directions.  Ride‐share in its many  forms will be supported both by specific programs and by marketing efforts (as described in  detail in the Programs section).    Programs & Services   Primary Responsibility:  Tenant unless otherwise noted  Shuttles  Alexandria Real Estate Equities currently participates in the commute.org shuttle system on  behalf of 400‐450 East Jamie Court, which provides tenants with last mile shuttle service from  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    9 | Page    the South San Francisco BART station, Millbrae Caltrain station, and Oyster Point Ferry terminal.   Alexandria will continue to support this or an equivalent shuttle network to these transit hubs.   In addition, Alexandria may participate in area‐wide pilot and/or permanent programs which  offer new services to commuters living in areas currently not served by existing programs.  For  example, there may be a sizeable number of employees who live within a 7 to 10‐mile radius of  the project area, who are currently not candidates for public transit.  Alexandria is currently  exploring cooperative ways to serve markets such as this one with other employers and  developers in the area.  Another market proposed for a potential pilot is longer distance  commuters, particularly from the north Bay Area.     Providing mid‐day service via a regularly scheduled shuttle or a reservation‐based shared ride  service to Downtown South San Francisco for lunch and errands, to SFO Airport and other  nearby locations is the third area under exploration for a potential pilot with others in the East  of 101 Area.    Carpooling and Vanpooling  New carpooling apps such as Scoop and Waze have fundamentally changed carpooling.   Technology makes it possible for carpooling to be done in advance or more dynamically, one trip  at a time.  This eliminates the barriers of employees having to commit to commuting at the  same time, with the same people, every day (or on a regular basis).  It enables commuters to use  carpooling in just one direction and to travel to different destinations as needed.  The flexibility  provided by carpooling apps has greatly expanded the total number of potential carpoolers.    Many employers either fully or partially subsidize employees’ carpooling.  The carpooling apps  provide employers with clean, clear accounting and metrics.  Measuring the number of  carpoolers, frequency, origins, and other important data points is also much easier and more  accurate for employers and employees to track.  This data will also inform the promotion of  carpooling to new audiences.   Guaranteed Ride Home  Alexandria participates in the County‐wide Guaranteed Ride Home program through its  affiliation with commute.org.  This program covers those who bike, walk, carpool or use transit  who may need to leave early or work late, due to an unexpected circumstance.  In addition,  Scoop and Waze provide a Guaranteed Ride Home element in their respective programs.    Subsidies and Pre‐Tax Payroll Deductions for Alternative Modes  Offering employees the option of paying for transit and other modes with pre‐tax dollars is  another important incentive to use transit, particularly for employees for whom transit is not  otherwise subsidized.  In effect, pre‐tax payroll deductions for alternative modes discounts the  cost of a transit pass by 20‐30percent for the end user.  While this deduction may change with  future tax law revisions, as long as it is in effect, Alexandria will require its tenants to provide  this benefit.  Some employers fully subsidize and further incentivize employees’ transportation  costs; in this case, the pre‐tax benefit isn’t necessary.    Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    10 | Page    Mobile and On Site Services  Offering employees services at the Phase 1 project site for which they may need a car either  during the day, or on their way to or from work, is another way to decrease vehicle trips and/or  incentivize the use of alternative transportation modes.  To this end, ARE will work with its  tenant(s) at the Phase 1 project site to determine which types of services are most desired:   from food trucks to services such as dental screenings, hair and nails, and other such personal  and business services.  These may be provided via a mobile operation such as a food truck, or  on‐site, such as a manicurist using a space inside one of the buildings to provide services on  certain days.      Marketing & Information   Primary Responsibility:  Alexandria for campus‐wide Transit Screens, permanent lobby kiosks;    liaison with tenant’s Employee Transportation Coordinator; liaison with commute.org and other    transportation organizations providing services to sites.  Primary Responsibility:  Tenant(s) for providing information, transit schedules, links to apps and  specific programs; publishing regular newsletters/communications; providing information on  website for employees and visitors; including transportation resources in company events such  as benefits fairs; providing new hires with transportation information and resources during  onboarding process; promoting new campaigns and programs  New Hires and Move In  Tenants will include information about all the transportation programs and services available to  employees, with links to apps, websites, the employee transportation coordinator and others to  answer questions, assist in commute planning, and use specific programs.  The information  provided shall include the total spectrum of programs, eligibility, and enrollment procedures.    This information will periodically be re‐distributed to all employees.    Alexandria will work with tenant(s) during the pre‐occupancy stage to educate the tenant about  area‐wide programs; learn about tenant‐specific programs and policies; establish who the  Employee Transportation Coordinator shall be; conduct a pre‐move‐in survey of employees to  assess commute patterns and coordinate demonstrations of transportation services (such as a  demo ride to the BART or Caltrain station, so employees learn where bus stops are and what the  routes are before actually using the service).  Alexandria will also assist tenants in commute  planning for their employees during the pre‐move in phase.    Ongoing Marketing In High Traffic Lobbies and Other Areas  Alexandria will install Transit Screens, or the equivalent, to display information about alternative  transportation programs and services, real‐time transit and rideshare information, communicate  special messages, and keep employees well informed about transportation programs and  choices.  It will be the tenant’s responsibility to keep this information up to date by posting the  most current schedules, special promotions, new programs available, etc.  These digital bulletin  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    11 | Page    boards will be placed in high traffic areas such as lobbies and at the transit center, so the  visibility of the scope of services and choices becomes ‘ubiquitous’.    Tenant Websites and Employee Communications  Tenants will be required to include a section on their respective websites that provides  information regarding the how employees and visitors may access the Phase 1 project and   encourages travel by alternative transit modes.  Programs, links to schedules and services  should also be available at the websites.    Tenants will also be required to include information and promotion of programs and services in  their regularly scheduled communications to employees through emails, newsletters, fliers, or  other marketing communications vehicles.  The Employee Transportation Coordinator will be  listed in all marketing communications as a contact for questions or more information.    Copies of these shall be sent to the Alexandria representative as well as to employees.    Special Events  Tenant will be responsible for inviting transportation partners, agencies and providers to  employee events such as its annual benefits fair.  The Employee Transportation Coordinator will  also have a table and be available during these events.  A minimum of one such event shall be  held annually.  Alexandria will be responsible for hosting an Appreciation Day lunch (or other type of event)  annually, to which transportation partners, agencies and providers will also be invited.    Leases & Reporting  Primary Responsibility:  Alexandria to include TDM requirements in all leases  Primary Responsibility:  Tenant(s) for furnishing Alexandria with copies of marketing materials,  programs, communications about events, changes to programs, changes to the Employee  Transportation Coordinator position, conducting the annual survey and keeping Alexandria  informed about its transportation programs and outcomes.    Leases  Alexandria will include in all leases for this project the mandatory TDM measures required of all  tenants; the alternative mode split target; dates and process for conducting an annual survey;  and reporting forms that summarize compliance with the TDM Plan and document utilization of  programs and services and marketing activities.  Leases will also include the specific  appointment of an Employee Transportation Coordinator and the requirement for ongoing  communications and cooperation between Alexandria’s property managers and the Employee  Transportation Coordinator.  It will be the tenant’s responsibility to make sure these  requirements are met and to communicate proactively with Alexandria.  Lastly, leases will include the City’s mandated penalties and procedures should tenant(s) fail to  meet the alternative mode share targets.  Proposed TDM Plan for 201 Haskins Way Project    January 30, 2019    12 | Page    Annual Surveys and Reports  Efficacy of the TDM Plan is subject to monitoring and enforcement through an annual commuter  survey, annual summary report, and a triennial report.   The City will coordinate with the ARE and tenant(s) to complete an annual survey which will  determine the tenant(s)’s mode split for that calendar year and determine the Phase 1 project’s  compliance with the TDM plan.  This survey, along with the any required compliance reports,  parking lot occupancy counts and other data points will be used to illustrate the efforts and  effectiveness of the TDM programs and services.  Employer data will be shared with Alexandria  and used as the basis for the annual report to the City.   The City will coordinate with ARE and tenants to produce a triennial report that demonstrates  TDM plan efficacy as required under the City’s TDM Ordinance.  The triennial report will be  submitted to the City every three years on the anniversary date of the granting of the certificate  of occupancy for 201 Haskins Way.