Loading...
HomeMy WebLinkAboutReso 95-2019 (19-625)City of South San Francisco P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA City Council Resolution: RES 95-2019 File Number: 19-625 Enactment Number: RES 95-2019 RESOLUTION APPROVING THE GRANT OF TWO EASEMENTS FOR PUBLIC UTILITY PURPOSES FOR THE ELECTRIC VEHICLE CHARGE NETWORK PROGRAM AT THE CORPORATION YARD AND MILLER AVENUE PARKING GARAGE, TO BE GRANTED BY THE CITY OF SOUTH SAN FRANCISCO TO PACIFIC GAS & ELECTRIC COMPANY, FOR THE INSTALLATION AND MAINTENANCE OF THE ELECTRIC VEHICLE CHARGING EQUIPMENT, AND AUTHORIZE THE CITY MANAGER TO EXECUTE EASEMENT DEEDS. WHEREAS, the Electric Vehicle Charging Stations Project (pfl903) will install electric vehicle (EV) charging stations at various City locations for both internal fleet and public facing use; and WHEREAS, Pacific Gas & Electric Company ("PG&E") manages the Electric Vehicle Charge Network ("EVCN") program which pays for, owns, maintains, and coordinates construction of the EV infrastructure from the transformer to the parking spaces; and WHEREAS, PG&E also pays for a portion of the charging equipment costs; and WHEREAS, the City of South San Francisco has entered into an agreement with PG&E to participate in the EVCN; and WHEREAS, the City of South San Francisco plans to install 34 Electric Vehicle (`BV") chargers at the Corporation Yard through the EVCN program; and WHEREAS, the City of South San Francisco plans to install 10 EV chargers at the Miller Avenue Parking Garage through the EVCN program; and WHEREAS, to participate in the EVCN program and install the chargers, the City must grant PG&E an easement at both locations to access the equipment for proper maintenance to keep the equipment in safe working condition; and WHEREAS, the properties located at the Corporation Yard and Miller Avenue Parking Garage ("Properties"), are owned by the City of South San Francisco ("City"); and WHEREAS, the Properties do not currently include a dedicated utility easement to accommodate the location of the EV chargers; and City of South San Francisco Page 1 File Number: 19-625 Enactment Number. RES 95-2019 WHEREAS, PG&E requests a grant of a public utility easement at each location to accommodate and maintain the EV chargers and associated equipment; and WHEREAS, the general locations of the proposed easements are shown on Exhibit A to this resolution; and WHEREAS, exact locations for the public utility easements on the Property will be submitted for approval by the City once construction has been completed; and WHEREAS, the City Manager will retain authority to authorize the final exact locations of the easements for filing with the San Mateo County Recorder, based on the as -built engineering plans; and WHEREAS, California Government Code section 65402 requires that, as a precondition to any disposition of real property, the City's Planning Commission must determine that the location, purpose and extent of the proposed disposition conforms with the City's General Plan; and WHEREAS, on July 18, 2019, the Planning Commission determined that the location, purpose, and extent of the proposed grant of the proposed easements for Pacific Gas & Electric's EV chargers is in conformity with the City's adopted General Plan in accordance with Government Code section 65402. THEREFORE, BE IT RESOLVED that the City Council of the City of South San Francisco hereby approves the grant of two proposed easements for public utility purposes for the Electric Vehicle Charge Network Program at the Corporation Yard and Miller Avenue Parking Garage, by the City of South San Francisco to Pacific Gas & Electric Company, for installation and maintenance of the electric vehicle charging equipment. BE IT FURTHER RESOLVED that the City Council of the City of South San Francisco hereby authorizes the City Manager to execute easement deeds, in substantially the same form as the document that is attached hereto as Exhibit B, on behalf of the City in order to effectuate the grant of the foregoing easements, subject to review and approval as to form by the City Attorney, and take any other action necessary to accomplish the intent of this resolution. At a meeting of the City Council on 7/24/2019, a motion was made by Mark Addiego, seconded by Buenaflor Nicolas, that this Resolution be approved. The motion passed. Yes: 5 Mayor Matsumoto, Vice Mayor Garbarino, Councilmember Addiego, Councilmember Nagales, and Councilmember Nicolas Attest b ltl�_Lo�_ Rosa Govea Acosta City of South San Francisco Page 2 Applicant: SECTION TOWNSHIP RANGE PLAT MAP REFERENCES MERIDIAN DATESCALE CITY OF: DRAWING NO.AUTHORIZDIVISIONPG&E COUNTY OF: F.B.: DR.BY: CH.BY: BOUNDARIES OR LINES UNLESS OTHERWISE SHOWN ALL COURSES EXTEND TO OR ALONG 55 M 3510’ P.U.E. PERNORTH CANAL STREET SOUTH CANAL STREET COLMA CREEK RIGHT OF WAY MAGNOLIA AVENUE014-051-100 SOUTH SAN FRANCISCO LANDS OF CITY OF LEGEND ELECTRIC METER ELECTRIC TRANSFORMER SUBJECT PROPERTY LINE WIDE PG&E U/G ELECTRIC EASEMENT APPROXIMATE CENTERLINE OF10’ (SE/SW/ 21) E-04-07(E) 5W MDB&M 02/14/19 DAN9 SJL-1571931415664 SCALE NOT TO San Mateo South San Francisco 3S Peninsula MCBS CITY OF SOUTH SAN FRANCISCO PARCEL A 55-M-35 EXHIBIT A Corporation Yard 87654321910REVDESCRIPTIONDATECHECKED BY:DRAWN BY:PROJECT NO:IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESSTHEY ARE ACTING UNDER THE DIRECTION OF A LICENSEDPROFESSIONAL ENGINEER, TO ALTER THIS DOCUMENT.SHEET NUMBERSHEET TITLE0 07/03/19 ISSUED FOR PERMITBP/EMGV19-5332PG&E ACCEPTANCE STAMPPACIFIC GAS AND ELECTRIC COMPANYP.O. BOX 997300SACRAMENTO, CA 95899-7300PG&E PROJECT # 31422530MILLER AVE GARAGE329 MILLER AVE. SOUTH SAN FRANCISCO, CACUPERTINO ELECTRIC INC1132 N 7TH STSAN JOSE, CA 95112THESE DRAWINGS AND SPECIFICATIONSHAVE BEEN PREPARED BY CUPERTINO ELECTRIC INCFOR THEIR EXCLUSIVE USE IN ACCORDANCE WITHSEC. 6737.3 OF THE PROFESSIONAL ENGINEERS ACTOF THE STATE OF CALIFORNIAELECTRICAL PLAN - ROOFE1.0ELECTRICAL PLAN - ROOF1. CONDUIT ROUTING IS DIAGRAMMATICALLY SHOWN ON PLANS AND AREONLY APPROXIMATIONS. THE EXACT LOCATION AND ROUTING PATHSSHALL BE FIELD VERIFIED AND INSTALLED PER JURISDICTIONALREQUIREMENTS.2. ALL ELECTRICAL WORK AND RELATED ACTIVITIES PERFORMED ONSITESHALL BE DONE IN ACCORDANCE WITH CALIFORNIA ELECTRICAL CODE(CEC) STANDARDS BEING ENFORCED BY ALL APPLICABLEJURISDICTIONAL REQUIREMENTS AT TIME OF CONSTRUCTION.3. SECONDARY CONDUITS AND WIRING ARE SHOWN IN THIS DRAWING SETFOR REFERENCE ONLY AND ARE NOT PART OF THIS PERMIT SCOPE.THIS WORK WILL BE COMPLETED BY PG&E UNDER CPUC REGULATIONS.PM#314156654. ALL EQUIPMENT, FEEDERS AND DEVICES PROVIDED UNDER THIS SCOPEOF WORK IS NEW AND SHOWN IN BOLD UNLESS OTHERWISE NOTED.5. POWER CONDUITS: NO MORE THAN THE EQUIVALENT OF FOUR 90DEGREE BENDS (360 DEGREES TOTAL) BETWEEN PULL POINTS PER CEC358. PROVIDE PULL BOXES WITH MINIMUM SIZE REQUIREMENTS PER CEC314.6. CONTACT YOUR LOCAL PG&E INSPECTOR AND COORDINATOR TODETERMINE ANY ADDITIONAL PAD AND/OR BARRICADE REQUIREMENTS16' 12' 8' 4' 016'32'1/16"=1'-0"DUAL PORTCHARGERMOUNTED ONEXISTING 6" HIGHCURB2S1.02R1.0EV SYMBOL4S1.0TYPICAL 3' STANDARDWHEEL STOP5S1.0MAIN SWITCHBOARD MSB-EV 400A208/120V 3Φ4W DISTRIBUTIONPANEL MOUNTED ON EXISTING 6"HIGH CONCRETE SLAB(1) 1-1/4" PVC 40 CONDUIT FROM 400A208/120V 3Φ4W DISTRIBUTION PANEL TOELECTRIC VEHICLE CHARGERS.SINGLE PORT CHARGERMOUNTED ON EXISTING 6"HIGH CURB1S1.01R1.0(5) 1-1/4" PVC 40 CONDUITFROM 400A 208/120V3Φ4W DISTRIBUTIONPANEL TO ELECTRICVEHICLE CHARGERS.VAN ACCESSIBLESIGN7C2.1TYPICAL 6'ACCESSIBLEWHEEL STOP5S1.02R1.0SERVICE WORKINGCLEARANCE REQUIRED 4'-0"PROTECTIVEBOLLARD8S1.0BOND NEW GROUNDING ELECTRODE SYSTEM WITH#6AWG TO EXISTING BUILDING ELECTRODE SYSTEMPER CEC 250. VERIFY INFIELD LOCATION ANDROUTING. WHERE EXPOSED TO PHYSICAL DAMAGE,INSTALL IN 1/2" IMC.3E2.1SEE DETAIL 1 THIS SHEET* AC CONDUCTOR: 6 FEET IS ADDED TO HORIZONTAL RUN LENGTH TOACCOUNT FOR VERTICAL DEPTH AND INSTALLATION LOSSES.BRANCH CIRCUIT LENGTHSAC PANELEV CHARGERPORTLINEARPATHLENGTH (FT)*ESTIMATEDLENGTH(FT)*WIRESIZEMSB-EV13642#6MSB-EV23642#6MSB-EV35359#6MSB-EV45359#6MSB-EV57177#6MSB-EV67177#6MSB-EV78995#6MSB-EV88995#6MSB-EV9106112#6MSB-EV102531#6SERVICE WORKINGCLEARANCE REQUIRED 4'-0"SERVICE WORKINGCLEARANCE REQUIRED 4'-0"18'-0"12'-0"5'-0"EV CHARGING ONLYTEXT PER CBC11B-812.9 (TYP)PAINT STRIPING WITH WHITEREFLECTORIZED PAINTVAN ACCESSIBLE EVCSREGULATED BY CBC 11B-812EVCS NOTREGULATED BYCBC 11B-812 (TYP)EXISTING PARKINGLINE (TYP)EXISTING CONCRETEPARKING LOT (TYP)(1) 4" CONDUIT VIA VERTICALCONDUIT PENETRATIONS FROMUTILITY TRANSFORMER OUTSIDEBUILDING ON THE GROUND FLOOR(SEE NOTE 3)BOUNDING JUMPER TOEXISTING SEVICE GROUNDINGELECTRODE SYSTEM INEQUIPMENT AREA3S1.0DETAIL 1SCALE : 1" = 5'-0"Miller Parking Garage Distribution and EV Charging Easement (Rev.10/17) RECORDING REQUESTED BY AND RETURN TO: PACIFIC GAS AND ELECTRIC COMPANY 245 Market Street, N10A, Room 1015 P.O. Box 770000 San Francisco, California 94177 Location: City/Uninc______________________ Recording Fee $_____________________________ Document Transfer Tax $ __________ [ ] This is a conveyance where the consideration and Value is less than $100.00 (R&T 11911). [ ] Computed on Full Value of Property Conveyed, or [ ] Computed on Full Value Less Liens & Encumbrances Remaining at Time of Sale [ ] Exempt from the fee per GC 27388.1 (a) (2); This document is subject to Documentary Transfer Tax Signature of declarant or agent determining tax (SPACE ABOVE FOR RECORDER'S USE ONLY) LD#EASEMENT DEED CITY OF SOUTH SAN FRANCISCO, a municipal corporation, hereinafter called Grantor, hereby grants to PACIFIC GAS AND ELECTRIC COMPANY, a California corporation, hereinafter called Grantee, the right from time to time to construct, reconstruct, install, inspect, maintain, replace, remove, and use facilities of the type hereinafter specified, together with a right of way therefor, within the easement area as hereinafter set forth, and also ingress thereto and egress therefrom, over and across the lands of Grantor situate in the City of South San Francisco , County of San Mateo , State of California, described as follows: (APN 014-051-100) Parcel A as shown upon the Parcel Map filed for record November 15, 1984 in Book 55 of Parcel Maps at Page 35, San Mateo County Records. Said facilities and easement area are described as follows: Such underground conduits, pipes, manholes, service boxes, wires, cables, and electrical conductors; aboveground marker posts, risers, and service pedestals; underground and aboveground switches, fuses, terminals, and transformers with associated concrete pads; electric vehicle charging supply equipment, bo llards and/or curbs or other associated safety equipment, associated signage; and fixtures and appurtenances necessary to any and all thereof, as Grantee deems necessary for the distribution of electric energy and communication pu rposes located within the strips of land of the uniform width of 10 feet, lying 5 feet on each side of the alignment of the facilities as initially installed hereunder. The approximate location of said facilities are shown upon Grantee’s Drawing Number SJL-15719 attached hereto and made a part hereof. EXHIBIT B Distribution and EV Charging Easement (Rev.10/17) Grantee agrees that on receiving a request in writing, it will at Grantor’s expense, survey, prepare and record a “Notice of Final Description” referring to this instrument and setting forth a description of said strip(s) of land. Grantor further grants to Grantee the right, from time to time, to trim or to cut down any and all trees and brush now or hereafter within said easement area , and shall have the further right, from time to time, to trim and cut down trees and brush along each side of said easement area which now or hereafter in the opinion of Grantee may interfere with or be a hazard to the facilities installed hereunder, or as Grantee deems necessary to comply with applicable state or federal regulations. Grantor shall n ot erect or construct any building or other structure or drill or operate any well within said easement area. Grantor further grants to Grantee the right to assign to another public utility as defined in Section 216 of the California Public Utilities Code the right to install, inspect, maintain, replace, remove and use communications facilities within said easement area (including ingress thereto and egress therefrom). In the event upon termination of the electric vehicle charging station contract as set forth in said terms and conditions, Grantee shall upon written demand therefor execute and deliver to Grantor a good and sufficient quitclaim of said easement and right of way or such portion thereof conveyed in this document, at Grantor’s expense. The pr ovisions hereof shall inure to the benefit of and bind the successors and assigns of the respective parties hereto. In exercising its easement rights hereunder, Grantee shall not unreasonably interfere with, disrupt, or materially adversely affect Grantor ’s business operations or access rights at the property owned by Grantor. Dated : __________________, _______. _________________________________ CITY OF SOUTH SAN FRANCISCO, a municipal corporation, ________________________________ By __________________________________ By I hereby certify that a resolution was adopted on the ____ day of _________, 20____, by the _____________________________________ authorizing the foregoing grant of easement. By__________________________________ Distribution and EV Charging Easement (Rev.10/17) State of California County of ) On __________________________, before me, Notary Public, Insert name personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. (Seal) Signature of Notary Public CAPACITY CLAIMED BY SIGNER [ ] Individual(s) signing for oneself/themselves [ ] Corporate Officer(s) of the above named corporation(s) [ ] Trustee(s) of the above named Trust(s) [ ] Partner(s) of the above named Partnership(s) [ ] Attorney(s)-in-Fact of the above named Principal(s) [ ] Other A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. Distribution and EV Charging Easement (Rev.10/17) Attach to LD 2303 -05- Area1, Peninsula Division Land Service Office : San Jose Line of Business: Electric Charging Station (95), Electric Distribution (43) Business Doc Type: Easements MTRSQ: 23.03.05.21.32 FERC License Number(s): N/A PG&E Drawing Number(s): SJL -15719 PLAT NO. E -04-07 LD of any affected documents: N/A LD of any Cross -referenced documents: N/A TYPE OF INTEREST: 4, 86 SBE Parcel Number: N/A (For Quitclaims, % being quitclaimed): N/A Order # or PM #: 31415664 -0070 JCN: N/A County: San Mateo Utility Notice Numbers: N/A 851 Approval Application No. N/A Decision N/A Prepared By: MCBS Checked By: DAN9 Approved By: N/A Revised by: N/A) Applicant: SECTION TOWNSHIP RANGE PLAT MAP REFERENCES MERIDIAN DATESCALE CITY OF: DRAWING NO.AUTHORIZDIVISIONPG&E COUNTY OF: F.B.: DR.BY: CH.BY: BOUNDARIES OR LINES UNLESS OTHERWISE SHOWN ALL COURSES EXTEND TO OR ALONG 55 M 3510’ P.U.E. PERNORTH CANAL STREET SOUTH CANAL STREET COLMA CREEK RIGHT OF WAY MAGNOLIA AVENUE014-051-100 SOUTH SAN FRANCISCO LANDS OF CITY OF LEGEND ELECTRIC METER ELECTRIC TRANSFORMER SUBJECT PROPERTY LINE WIDE PG&E U/G ELECTRIC EASEMENT APPROXIMATE CENTERLINE OF10’ (SE/SW/ 21) E-04-07(E) 5W MDB&M 02/14/19 DAN9 SJL-1571931415664 SCALE NOT TO San Mateo South San Francisco 3S Peninsula MCBS CITY OF SOUTH SAN FRANCISCO PARCEL A 55-M-35