Loading...
HomeMy WebLinkAboutReso 08-2020 (19-1002)City of South San Francisco P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA City Council Resolution: RES 08-2020 File Number: 19-1002 Enactment Number: RES 08-2020 RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO SUAREZ & MUNOZ CONSTRUCTION OF HAYWARD, CALIFORNIA FOR THE GARDINER PARK RENOVATION PROJECT (PROJECT NO. PK1806) IN AN AMOUNT NOT TO EXCEED $619,400, AUTHORIZING A TOTAL CONSTRUCTION BUDGET OF $681,340, AND AUTHORIZING THE CITY MANAGER TO EXECUTE AGREEMENTS ON BEHALF OF THE CITY. WHEREAS, Gardiner Park is an urban pocket park located in the middle of a residential neighborhood at 135 Gardiner Avenue in South San Francisco with play equipment and rubber surfacing dating to 2006; and WHEREAS, this contract will renovate the existing park by replacing the existing play area equipment, expand the play area footprint, and replace the existing basketball court, and connect or modify existing utilities; and WHEREAS, staff advertised the Notice Inviting Bids for construction of the project on November 25, 2019 and December 2, 2019; and WHEREAS, on December 18, 2019, staff received and opened two (2) sealed bids with the lowest responsive and responsible bid supplied by Suarez & Munoz Construction of Hayward, California; and WHEREAS, pursuant to Public Contract Code §20166, Public Works contracts, if awarded, are ordinarily awarded to the lowest responsible bidder whose bid is responsive to the solicitation; and WHEREAS, the project is included in the City of South San Francisco's Fiscal Year 2018-19 Capital Improvement Program (Project No. pk1806). NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of South San Francisco that the City Council hereby awards a construction contract, a draft of which is attached hereto as Exhibit A, for the Gardiner Park Renovation to Suarez & Munoz Construction of Hayward, California, in an amount not to exceed $619,400 conditioned on the contractor's timely execution of the Project contract and submission of all required documents, including but not limited to, certificates of insurance and endorsement, in accordance with the Project documents. BE IT FURTHER RESOLVED the City Council authorizes a total construction budget of $681,604. BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the agreement and City of South San Francisco Page 1 File Number. 19-1002 Enactment Number. RES 08-2020 any other related documents on behalf of the City upon timely submission by Suarez & Munoz Construction of the signed contract and all other documents, subject to approval by the City Attorney. BE IT FURTHER RESOLVED that the city Council authorizes the City Manager to take any other related actions consistent with the intention of the Resolution. At a meeting of the City Council on 1/8/2020, a motion was made by Councilmember Nicolas, seconded by Councilmember Matsumoto, that this Resolution be approved. The motion passed. Yes: 4 Mayor Garbarino, Councilmember Nagales, Councilmember Nicolas, and Councilmember Matsumoto No: 1 Vice Mayor Addiego Attest by �164 AA4 40J�� sa Govea Acosta, City Clerk City of South San Francisco Page 2 FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-1 of 9 CITY OF SOUTH SAN FRANCISCO GARDINER PARK RENOVATION PROJECT PROJECT NO. PK1806 BID NO. 2634 NOTICE INVITING BIDS PART I - PROPOSAL PROPOSAL FORMS FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS PART II – GENERAL CONDITIONS PART III – SPECIAL PROVISIONS SPECIAL CONDITIONS TECHNICAL SPECIFICATIONS PART IV – PROJECT PLANS To Obtain Bid Package/Bidder’s List Contact BarkerBlue (650) 696-2100 For Technical Questions Contact S. Peter Vorametsanti, PE, CCM Project Executive PeterV@swinerton.com (650) 740-7368 FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-1 of 9 CITY OF SOUTH SAN FRANCISCO ENGINEERING DIVISION FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS TABLE OF CONTENTS Page No. 1. Scope of Work A-1 2. The Contract Documents A-1 3. Equipment - Performance of Work A-2 4. Contract Price A-2 5. Rights of City to Increase Working Days A-2 6. Option of City to Terminate Agreement in Event of Failure to Complete Work A-2 7. Termination of Contract for Convenience A-3 8. Performance by Sureties A-5 9. Hold-Harmless Agreement and Contractor's Insurance A-6 10. Insurance A-6 11. Proof of Carriage of Insurance A-7 12. Provisions Cumulative A-8 13. Form HUD 4010 A-8 14. Federal Minimum Wage Rates A-8 15. Notices A-8 16. Interpretation A-8 Attachment A – Escrow Agreement for Security Deposits in Lieu of Retention Attachment B – HUD Form 4010 Attachment C – Federal Minimum Wage Rates FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-1 of 9 FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS THIS AGREEMENT made and entered into this ____, day of ______, _____, between the CITY OF SOUTH SAN FRANCISCO, a municipal corporation and political subdivision of the State of California, hereinafter called “CITY”, and <Contractor>, Inc., hereinafter called “CONTRACTOR”1. W I T N E S S E T H: WHEREAS, City has taken appropriate proceedings to authorize construction of the public work and improvements herein provided and execution of this contract. WHEREAS, a notice was duly published for bids for the contract for the improvements hereinafter described. WHEREAS, on ____________, notice duly given, the City Council (“Council”) of said City awarded the contract for the construction of the improvements hereinafter described to the Contractor, which Contractor said Council found to be the lowest responsible bidder for said improvements. WHEREAS, City and Contractor desire to enter into this agreement for the construction of said improvements pursuant to the terms, definitions, and conditions set forth in the General Provisions and other Contract Documents. IT IS AGREED as follows: 1. Scope of Work. Contractor shall perform the Work described briefly as follows: The Work consists of the furnishing of all labor, materials, tools, equipment, and services necessary for the construction of the GARDINER PARK RENOVATION PROJECT, Project No. pk1806; in accordance with the Contract Documents. Also included are any such other items or details not mentioned above that are required by the Contract Documents, which are to be constructed or furnished and installed as shown on the plans, as specified herein and as directed by the Engineer. The aforementioned improvements are further described in the "Contract Documents" hereinafter referred to. 2. The Contract Documents. The complete Contract consists of the following documents: (A) Notice Inviting Bids (B) Part I – Submitted Proposal (as accepted) (C) This Agreement, including Contractor’s Payment Bond, Faithful Performance Bond and Guaranty Bond. 1. 1The term "Contractor" as used herein is employed without distinction as to either number or gender and shall include whenever the context shall permit all agents, representatives, employees, servants, subcontractors and business or social invitees. FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-2 of 9 (D) Part II – General Conditions (E) Part III – Special Provisions: Special Conditions and Technical Specifications, including State Standard Specifications dated 2015, sections 10-99, as revised in Revised Standard Specifications (RSS) dated April 20, 2018.. (F) Part IV – Project Plans, approved November 25, 2019. (G) Administrative subsections of the State Standard Specifications dated 2015, as specifically referenced in contract Parts I-IV and as revised in RSS dated April 20, 2018. All rights and obligations of City and Contractor are fully set forth and described in the contract documents. All of the above-named documents are intended to cooperate, so that any work called for in one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The documents comprising the complete contract will hereinafter be referred to as “the Contract Documents.” 3. Equipment - Performance of Work. Contractor shall furnish all tools, equipment, apparatus, facilities, labor, and materials necessary to perform and complete in a good and workmanlike manner the Work of general construction as called for, and for the manner designated in, and in strict conformity with, the plans and specifications for said Work entitled: GARDINER PARK RENOVATION PROJECT Project No. pk1806 Bid No. 2634 The equipment, apparatus, facilities, labor, and materials shall be furnished and said Work performed and completed as required in said plans and specifications under the direction and supervision and subject to the approval of the Engineer of said City or the Engineer’s designated assistant. 4. Contract Price. City shall pay, and Contractor shall accept, in full payment for the Work agreed to be done the sum of __________________________________ ($). Said price is determined by the lump sum price contained in Contractor's bid proposal (“Bid”). The lump sum price and unit prices are set forth in the completed Bid forms attached hereto and made a part hereof as if set forth herein verbatim. In the event work is performed or materials furnished in addition to those set forth in Contractor's bid and the specifications herein, such work and materials will be paid for at the unit prices therein contained. Said amount shall be paid in installments as hereinafter provided. 5. Rights of City to Increase Working Days. If such Work is not completed within the time specified, the Engineer shall have the right to increase the number of working days in the amount it may determine will best serve the interest of the City. If it desires to increase said number of working days, it shall have the further right to charge to Contractor and deduct from the final payment for the Work the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to Contractor and which accrue during the period of such extension, except that the cost of the final service and preparation of the final estimates shall not be included in such charges, provided, however, that no extension of time for the completion of such Work shall be allowed unless at least twenty (20) calendar days prior to the time herein fixed for the completion thereof or the time fixed by the Engineer for such completion as extended, Contractor shall have filed application for extension thereof, in writing with the Engineer. FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-3 of 9 6. Option of City to Terminate Agreement in Event of Failure to Complete Work. If at any time in the opinion of the Engineer, the Contractor has refused or failed to prosecute the Work or any severable part thereof, with such diligence as will insure its work, or any completion within the time specified, or any extensions thereof, or shall have failed to complete said work within such time, or if Contractor should be adjudged a bankrupt, or if Contractor should make a general assignment for the benefit of Contractor's creditors, or if a receiver should be appointed in the event of Contractor's insolvency, or if Contractor, or any Subcontractor, should violate any of the provisions of this Agreement, the Engineer may give written notice to Contractor, and Contractor's sureties of its intention to terminate this Agreement, such notice to contain the reasons for such intention to terminate this Agreement, and unless within five calendar (5) days after the serving of such notice, such violation shall cease and satisfactory arrangements for the correction thereof be made, this Agreement may, at the option of City, upon expiration of said time, cease and terminate. Any excess of cost arising therefrom over and above the contract price will be charged against the Contractor and the Contractor’s sureties who will be liable therefore. In the event of such termination, all money due the Contractor or retained under the terms of this contract shall be forfeited to the City; but such forfeiture will not release the Contractor or the Contractor’s sureties from liability or failure to fulfill the contract. The Contractor and the Contractor’s sureties will be credited with the amount of money so forfeited toward any excess of cost over and above the contract price, arising from the suspension termination of the operations of the contract and the completion of the Work by the City as above provided, and the Contractor will be so credited with any surplus remaining after all just claims for such completion have been paid. In the determination of the question whether there has been any such noncompliance with the contract as to warrant the suspension termination or annulment thereof, the decision of the Engineer shall be binding on all parties to the contract. 7. Termination of Contract for Convenience. The City also reserves the right to terminate the contract at any time upon a determination by the Engineer in the Engineer's sole discretion that termination of the contract is in the best interest of the City. If the City elects to terminate the contract for convenience, the termination of the contract and the total compensation payable to the Contractor shall be governed by the following: (A) The City will issue the Contractor a written notice signed by the Engineer, specifying that the contract is terminated. Upon receipt of said written notice, the Contractor will be relieved of further responsibility for damage to the Work (excluding materials) as specified in Section VII-17, "Contractor's Responsibility for the Work," of the General Conditions and, except as otherwise directed in writing by the Engineer, the Contractor shall: (1) Stop all work under the contract except that specifically directed to be completed prior to acceptance. (2) Perform work the Engineer deems necessary to secure the project for termination. (3) Remove equipment and plant from the site of the Work. (4) Take such action as is necessary to protect materials from damage. (5) Notify all subcontractors and suppliers that the contract is being terminated and that their contracts or orders are not to be further performed unless otherwise authorized in writing by the Engineer. FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-4 of 9 (6) Provide the Engineer with an inventory list of all materials previously produced, purchased or ordered from suppliers for use in the Work and not yet used in the Work, including its storage location, and such other information as the Engineer may request. (7) Dispose of materials not yet used in the Work as directed by the Engineer. It shall be the Contractor's responsibility to provide the City with good title to all materials purchased by the City hereunder, including materials for which partial payment has been made as provided in Section IX-2, “Progress Payments,” of the General Conditions and with bills of sale or other documents of title for such materials. (8) Subject to the prior written approval of the Engineer, settle all outstanding liabilities and all claims arising out of subcontracts or orders for materials terminated hereunder. To the extent directed by the Engineer, the Contractor shall assign to the City all the right, title, and interest of the Contractor under subcontracts or orders for materials terminated hereunder. (9) Furnish the Engineer with the documentation required to be furnished by the Contractor under the provisions of the contract, including, on projects as to which Federal and State funds are involved, all documentation required under the Federal and State requirements included in the contract. (10) Take such other actions as the Engineer may direct. (B) Acceptance of the contract as hereinafter specified shall not relieve the Contractor of responsibility for damage to materials. The Contractor shall continue to be responsible for damage to materials after issuance of the Notice of Termination, except as follows: (1) The Contractor’s responsibility for damage to materials for which partial payment has been made as provided in Section IX-2, “Progress Payments,” of the General Conditions and for materials furnished by the City for use in the Work and unused shall terminate when the Engineer certifies that such materials have been stored in the manner and at the locations the Engineer has directed. (2) The Contractor’s responsibility for damage to materials purchased by the City subsequent to the issuance of the notice that the contract is to be terminated shall terminate when title and delivery of such materials has been taken by the City. (3) When the Engineer determines that the Contractor has completed the Work under the contract directed to be completed prior to termination and such other work as may have been ordered to secure the project for termination, the Contractor will recommend that the Engineer formally accept the contract to the extent performed, and immediately upon and after such acceptance by the Engineer, the Contractor will not be required to perform any further Work thereon and shall be relieved of the Contractor's contractual responsibilities for injury to persons or property which occurs after the formal acceptance of the project by the Engineer. (C) Termination of the contract shall not relieve the surety of its obligation for any just claims arising out of the work performed. (D) The total compensation to be paid to the Contractor shall be determined by the Engineer on the basis of the following: FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-5 of 9 (1) The reasonable cost to the Contractor, without profit, for all work performed under the contract, including mobilization, demobilization and work done to secure the project for termination. In determining the reasonable cost, deductions will be made for the cost of materials to be retained by the Contractor, amounts realized by the sale of materials, and for other appropriate credits against the cost of the work. When, in the opinion of the Engineer, the cost of a contract item of work is excessively high due to costs incurred to remedy or replace defective or rejected work, the reasonable cost to be allowed will be the estimated reasonable cost of performing such work in compliance with the requirements of the plans and specifications and the excessive actual cost shall be disallowed. (2) A reasonable allowance for profit on the cost of the work performed as determined under Subsection (1), provided the Contractor establishes to the satisfaction of the Engineer that it is reasonably probable that the Contractor would have made a profit had the contract been completed and provided further, that the profit allowed shall in no event exceed four (4) percent of said cost. (3) The reasonable cost to the Contractor of handling material returned to the vendor, delivered to the City, or otherwise disposed of as directed by the Engineer. (4) A reasonable allowance for the Contractor’s administrative costs in determining the amount payable due to termination of the contract. (5) A reasonable credit to the City for defective or incomplete work not corrected. All records of the Contractor and subcontractors necessary to determine compensation in accordance with the provisions of this Section 5 shall be open to inspection or audit by representatives of the City at all times after issuance of the Notice of Termination and for a period of three (3) years, thereafter, and such records shall be retained for that period. After acceptance of the Work by the Engineer, the Engineer may make payments on the basis of interim estimates pending issuance of the Final Estimate in accordance with Section IX-7, “Final Payment,” of the General Conditions when, in the Engineer's opinion, the amount thus paid, together with all amounts previously paid or allowed, will not result in total compensation in excess of that to which the Contractor will be entitled. All payments, including payment upon the Final Estimate shall be subject to deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the contract. If this contract is terminated by the City for cause, and it is later determined that the proper basis for a termination for cause did not exist, the termination shall be deemed to have been a termination for convenience and governed by the terms of this contract dealing with such termination. If the contract is terminated by the City for cause or convenience, such termination shall neither act as a waiver by the City of its right to require the Contractor to correct defects in the Work performed by the Contractor nor void any warranties applicable to the Work performed under the contract. The provisions of this Section 5 shall be included in all subcontracts. In the event of conflict between the termination provisions of this Section 8 and any other provision or the contract, this Section 5 shall prevail. FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-6 of 9 8. Performance by Sureties. In the event of any termination as herein before provided, City shall immediately give written notice thereof to Contractor and Contractor's sureties and the sureties shall have the right to take over and perform the Agreement, provided, however, that if the sureties, within five (5) working days after giving them said notice of termination, do not give the City written notice of their intention to take over the performance of the Agreement and do not commence performance thereof within five (5) working days after notice to the City of such election, City may take over the Work and prosecute the same to completion by contract or by any other method it may deem advisable, for the account, and at the expense, of Contractor, and the sureties shall be liable to City for any excess cost or damages occasioned City thereby; and, in such event, City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Work and necessary therefore. Should Contractor contract in an individual capacity, the surety bond shall contain the following provision: “Should Contractor contract in the Contractor’s individual capacity, the death of the Contractor shall not relieve the surety of its obligations.” 9. Hold-Harmless Agreement and Contractor's Insurance. Contractor agrees to, and shall, hold City, its elective and appointive boards, officers, agents, and employees harmless from any liability for damage or claims for damage for personal injury, including death, as well as from claims for property damage which may arise from Contractor's or any of Subcontractor's operations under this Agreement, whether such operations be by Contractor or by any Subcontractor or Subcontractors, or by any one or more persons directly or indirectly employed by, or acting as agent for, Contractor or any Subcontractor or Subcontractors. Contractor agrees to, and shall, defend City and its elective and appointive boards, officers, agents, and employees from any suits or actions at law or in equity for damages caused, or alleged to have been caused, by reason of any of the aforesaid operations, provided as follows: (A) The City does not, and shall not, waive any rights against Contractor which it may have by reason of the aforesaid hold-harmless agreement, because of the acceptance by City, or the deposit with City by Contractor, of any of the insurance policies hereinafter described in Paragraph 15, “Insurance” hereof. (B) That the aforesaid hold-harmless agreement by Contractor shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of Contractor or any Subcontractor, regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. 10. Insurance. The Contractor shall take out and maintain during the life of this Agreement the following policies of insurance: (A) Workers' Compensation and Employers' Liability Insurance providing full statutory coverage. In signing this Agreement, the Contractor makes the following certification, required by Section 1861 of the California Labor Code: "I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract". FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-7 of 9 (B) Comprehensive General Liability Insurance. Public Liability Insurance (includes premises, elevator - if applicable, products, completed operations, personal injury and contractual): (1) Bodily Injury Liability: $ 500,000 each person $1,000,000 each occurrence (2) Property Damage Liability [includes XCU (explosion, collapse, and underground damage); water damage and broad form property damage or third party liability]: $ 500,000 per occurrence (C) Comprehensive Automobile Liability Insurance (includes owned, non-owned, and hired vehicles): (1) Bodily Injury Liability: $ 500,000 per person $1,000,000 each occurrence (2) Property Damage Liability: $ 500,000 each occurrence (D) It is agreed that the insurance required by Subsections B and C, in an aggregate amount of not less than ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000), shall be extended to include as additional insured the City of South San Francisco, its elective and appointive boards, commissions, officers, agents, employees, with respect to operations performed by the Contractor, as described herein. Evidence of this insurance described above shall be provided to City upon execution of this Agreement and shall be subject to approval of the City Attorney as to form, amount, and carrier. The policy of insurance shall also contain a provision indicating that such insurance shall not be reduced or cancelled except upon thirty (30) calendar days written notice to City. In addition, the following endorsement shall be made on said policy of insurance: "The following are named as additional insured on the above policies: The City of South San Francisco, its elective and appointive boards, officers, agents, and employees." "Notwithstanding any other provision in this policy, the insurance afforded hereunder to the City of South San Francisco shall be primary as to any other insurance or re-insurance covering or available to the City of South San Francisco, and such other insurance or reinsurance shall not be required to contribute to any liability or loss until and unless the approximate limit of liability afforded hereunder is exhausted." The above requirements that the City be named as additional insured, that the insurance shall be primary to any other, and that the insurance not be cancelled without notice, shall be provided in the form of an endorsement signed by an authorized representative of the insurance company providing coverage, who shall declare his or her authority to sign on behalf of the insurer. 11. Proof of Carriage of Insurance. Contractor shall furnish City through the Engineer, concurrently with the execution hereof, with satisfactory proof of carriage of the insurance required and FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-8 of 9 that each carrier shall give City at least thirty (30) calendar days prior notice of the cancellation or change of any policy during the effective period of this contract. Further, if the Contractor’s insurance policy includes a self-insured retention that must be paid by a named insured as a precondition of the insurer’s liability, or which has the effect of providing that payments of the self-insured retention by others, including additional insureds or insurers do not serve to satisfy the self-insured retention, such provisions must be modified by special endorsement so as to not apply to the additional insured coverage required by this agreement so as to not prevent any of the parties to this agreement from satisfying or paying the self- insured retention required to be paid as a precondition to the insurer’s liability. Additionally, the certificates of insurance must note whether the policy does or does not include any self-insured retention and also must disclose the deductible. 12. Provisions Cumulative. The provisions of this Agreement are cumulative, and in addition to and not in limitation of, any other rights or remedies available to City. 13. Form HUD-4010 For HUD-4010 is included in this Agreement as Attachment B. Comply with its provisions. 14. Federal Minimum Wage Rates – For a Federal-aid contract, federal minimum wage rates apply and are included in the Agreement as Attachment C. 15. Notices. All notices shall be in writing and delivered in person or transmitted by certified mail, postage prepaid. Notices required to be given to City shall be addressed as follows: City Clerk City Hall, 400 Grand Avenue South San Francisco, California 94080 Notices required to be given to Contractor shall be addressed as follows: _________________________________________________________________________ _________________________________________________________________________ Notices required to be given sureties of Contractor shall be addressed as follows: _________________________________________________________________________ Notices required to be given to the Escrow Agent of Contractor, if any, shall be addressed as follows: _________________________________________________________________________ 16. Interpretation. As used herein, any gender includes each other gender, the singular includes the plural, and vice versa. FED-AID AGREEMENT TEMPLATE MAY 2017 Page A-9 of 9 IN WITNESS WHEREOF, two (2) identical counterparts of this Agreement, consisting of twelve (12) pages (being pages A-1 through A-12), each of which counterparts shall for all purposes be deemed an original of said Agreement, have been duly executed by the parties hereinabove named, on the day and year first hereinabove written. ATTEST: CITY: City of South San Francisco, a municipal corporation _______________________________ By: _____________________________ City Clerk Mike Futrell, City Manager CONTRACTOR:_______________________ __________________________________ ATTEST: By:_______________________________ (If Contractor is an individual, so state. _____________________________ If Contractor is a Corporation, a corporate seal or signatures of the President or Vice President and the Secretary Treasurer are required). FED-AID AGREEMENT TEMPLATE MAY 2017 ATTACHMENT A ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION THIS ESCROW AGREEMENT is made and entered into by and between the City of South San Francisco whose address is 400 Grand Ave., P.O. Box 711, South San Francisco, CA 94083, hereinafter referred to as "City," and ________________________________________,whose address is ___________________________________________________________, hereinafter called “Contractor” and ______________________________________________________________,whose address is ___________________________________________________________, hereinafter called “Escrow Agent.” For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows: 1. Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for __________________ in the amount of _______________dollars ($_____) dated ___________ (hereinafter referred to as the “Contract”). Alternately, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 working days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of _______________, and shall designate the Contractor as the beneficial owner. 2. The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. 3. When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly. 4. Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent. 5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. 6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor. 7. The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven day’s written notice to the Escrow Agent from the Owner of the default, FED-AID AGREEMENT TEMPLATE MAY 2017 the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner. 8. Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. 9. Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this Agreement, and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above. 10. The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows: On behalf of Owner: On behalf of Contractor: __________________________________ __________________________________ Title Title __________________________________ __________________________________ Name Name __________________________________ __________________________________ Signature Signature __________________________________ __________________________________ Address Address On behalf of Escrow Agent: __________________________________ Title __________________________________ Name __________________________________ Signature __________________________________ Address At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement. FED-AID AGREEMENT TEMPLATE MAY 2017 IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above. Owner: Contractor: __________________________________ __________________________________ Title Title __________________________________ __________________________________ Name Name __________________________________ __________________________________ Signature Signature Approved as to form: Attest: _____________________________________ __________________________________ City Attorney Date City Clerk FED-AID AGREEMENT TEMPLATE MAY 2017 ATTACHMENT B HUD FORM 4010 Federal Labor Standards Provisions U.S. Department of Housing and Urban Development Office of Labor Relations Previous editions are obsolete Page 1 of 5 form HUD-4010 (06/2009) ref. Handbook 1344.1 Applicability The Project or Program to which the construction work covered by this contract pertains is being assisted by the United States of America and the following Federal Labor Standards Provisions are included in this Contract pursuant to the provisions applicable to such Federal assistance. A. 1. (i) Minimum Wages. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under Section l(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of 29 CFR 5.5(a)(1)(iv); also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs, which cover the particular weekly period, are deemed to be c onstructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer’s payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under 29 CFR 5.5(a)(1)(ii) and the Davis-Bacon poster (WH- 1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible, place where it can be easily seen by the workers. (ii) (a) Any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. HUD shall approve an additional classification and wage rate and fringe benefits therefor only when the following criteria have been met: (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; and (2) The classification is utilized in the area by the construction industry; and (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (b) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and HUD or its designee agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by HUD or its designee to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, D.C. 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise HUD or its designee or will n otify HUD or its designee within the 30-day period that additional time is necessary. (Approved by the Office of Management and Budget under OMB control number 1215- 0140.) (c) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and HUD or its designee do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), HUD or its designee shall refer the questions, including the views of all interested parties and the recommendation of HUD or its designee, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise HUD or its designee or will notify HUD or its designee within the 30-day period that additional time is necessary. (Approved by the Office of Management and Budget under OMB Control Number 1215-0140.) (d) The wage rate (including fringe benefits where appropriate) determined pursuant to subparagraphs (1)(ii)(b) or (c) of this paragraph, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part Previous editions are obsolete Page 2 of 5 form HUD-4010 (06/2009) ref. Handbook 1344.1 of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis- Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. (Approved by the Office of Management and Budget under OMB Control Number 1215-0140.) 2. Withholding. HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the contractor under this contract or any other Federal contract with the same prime contractor, or any other Federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract In the event of failure to pay any laborer or mechanic, including any apprentice, trainee or helper, employed or working on the site of the work, all or p art of the wages required by the contract, HUD or its designee may, after written notice to the contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. HUD or its designee may, after written notice to the contractor, disburse such amounts withheld for and on account of the contractor or subcontractor to the respective employees to whom they are due. The Comptroller General shall make such disbursements in the case of direct Davis-Bacon Act contracts. 3. (i) Payrolls and basic records. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in Section l(b)(2)(B) of the Davis-bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5 (a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in Section l(b)(2)(B) of the Davis- Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (Approved by the Office of Management and Budget under OMB Control Numbers 1215-0140 and 1215-0017.) (ii) (a) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to HUD or its designee if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant sponsor, or owner, as the case may be, for transmission to HUD or its designee. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i) except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to HUD or its designee if the agency is a party to the contract, but if the agency is not such a party, the contractor will submit the payrolls to the applicant sponsor, or owner, as the case may be, for transmission to HUD or its designee, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this subparagraph for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to HUD or its designee. (Approved by the Office of Management and Budget under OMB Control Number 1215-0149.) (b) Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (1) That the payroll for the payroll period contains the information required to be provided under 29 CFR 5.5 (a)(3)(ii), the appropriate information is being maintained under 29 CFR 5.5(a)(3)(i), and that such information is correct and complete; Previous editions are obsolete Page 3 of 5 form HUD-4010 (06/2009) ref. Handbook 1344.1 (2) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR Part 3; (3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (c) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the “Statement of Compliance” required by subparagraph A.3.(ii)(b). (d) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of Title 31 of the United States Code. (iii) The contractor or subcontractor shall make the records required under subparagraph A.3.(i) available for inspection, copying, or transcription by authorized representatives of HUD or its designee or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, HUD or its designee may, after written notice to the contractor, sponsor, applicant or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4. Apprentices and Trainees. (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the contractor’s or subcontractor’s registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant ‘,to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by Previous editions are obsolete Page 4 of 5 form HUD-4010 (06/2009) ref. Handbook 1344.1 the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (iii) Equal employment opportunity. The utilization of apprentices, trainees and journeymen under 29 CFR Part 5 shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR Part 30. 5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR Part 3 which are incorporated by reference in this contract 6. Subcontracts. The contractor or subcontractor will insert in any subcontracts the clauses contained in subparagraphs 1 through 11 in this paragraph A and such other clauses as HUD or its designee may by appropriate instructions require, and a copy of the applicable prevailing wage decision, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in this paragraph. 7. Contract termination; debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 8. Compliance with Davis-Bacon and Related Act Requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are herein incorporated by reference in this contract 9. Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and HUD or its designee, the U.S. Department of Labor, or the employees or their representatives. 10. (i) Certification of Eligibility. By entering into this contract the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor’s firm is a person or firm ineligible to be awarded Government contracts by virtue of Section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1) or to be awarded HUD contracts or participate in HUD programs pursuant to 24 CFR Part 24. (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of Section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1) or to be awarded HUD contracts or participate in HUD programs pursuant to 24 CFR Part 24. (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. Additionally, U.S. Criminal Code, Section 1 01 0, Title 18, U.S.C., “Federal Housing Administration transactions”, provides in part: “Whoever, for the purpose of . . . influencing in any way the action of such Administration..... makes, utters or publishes any statement knowing the same to be false..... shall be fined not more than $5,000 or imprisoned not more than two years, or both.” 11. Complaints, Proceedings, or Testimony by Employees. No laborer or mechanic to whom the wage, salary, or other labor standards provisions of this Contract are applicable shall be discharged or in any other manner discriminated against by the Contractor or any subcontractor because such employee has filed any complaint or instituted or caused to be instituted any proceeding or has testified or is about to testify in any proceeding under or relating to the labor standards applicable under this Contract to his employer. B. Contract Work Hours and Safety Standards Act. The provisions of this paragraph B are applicable where the amount of the prime contract exceeds $100,000. As used in this paragraph, the terms “laborers” and “mechanics” include watchmen and guards. (1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which the individual is employed on such work to work in excess of 40 hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of 40 hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in subparagraph (1) of this paragraph, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in subparagraph (1) of this paragraph, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of 40 hours without payment of the overtime wages required by the clause set forth in sub paragraph (1) of this paragraph. Previous editions are obsolete Page 5 of 5 form HUD-4010 (06/2009) ref. Handbook 1344.1 (3) Withholding for unpaid wages and liquidated damages. HUD or its designee shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contract, or any other Federally-assisted contract subject to the Contract Work Hours and Safety Standards Act which is held by the same prime contractor such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in subparagraph (2) of this paragraph. (4) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in subparagraph (1) through (4) of this paragraph and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in subparagraphs (1) through (4) of this paragraph. C. Health and Safety. The provisions of this paragraph C are applicable where the amount of the prime contract exceeds $100,000. (1) No laborer or mechanic shall be required to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health and safety as determined under construction safety and health standards promulgated by the Secretary of Labor by regulation. (2) The Contractor shall comply with all regulations issued by the Secretary of Labor pursuant to Title 29 Part 1926 and failure to comply may result in imposition of sanctions pursuant to the Contract Work Hours and Safety Standards Act, (Public Law 91-54, 83 Stat 96). 40 USC 3701 et seq. (3) The contractor shall include the provisions of this paragraph in every subcontract so that such provisions will be binding on each subcontractor. The contractor shall take such action with respect to any subcontractor as the Secretary of Housing and Urban Development or the Secretary of Labor shall direct as a means of enforcing such provisions. ATTACHMENT C FEDERAL MINIMUM WAGE RATES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 1/111 "General Decision Number: CA20190018 12/06/2019 Superseded General Decision Number: CA20180029 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California. BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 2/111 will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/04/2019 1 02/01/2019 2 02/15/2019 3 02/22/2019 4 05/03/2019 5 07/26/2019 6 11/08/2019 7 11/15/2019 8 11/22/2019 9 11/29/2019 10 12/06/2019 ASBE0016-004 01/01/2019 AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TOULMNE COUNTIES AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA CLARA COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 3/111 and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 28.20 9.27 Area 2......................$ 36.53 9.27 ---------------------------------------------------------------- ASBE0016-008 08/01/2019 AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 71.16 23.39 Area 2......................$ 54.26 23.30 ---------------------------------------------------------------- BOIL0549-001 10/01/2016 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: REMAINING COUNTIES Rates Fringes BOILERMAKER Area 1......................$ 43.28 37.91 Area 2......................$ 39.68 35.71 ---------------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 4/111 BRCA0003-001 08/01/2019 Rates Fringes MARBLE FINISHER..................$ 35.41 16.45 ---------------------------------------------------------------- BRCA0003-003 08/01/2019 Rates Fringes MARBLE MASON.....................$ 49.42 27.86 ---------------------------------------------------------------- BRCA0003-005 05/01/2019 Rates Fringes BRICKLAYER ( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 41.88 22.19 ( 7) San Francisco, San Mateo.......................$ 42.34 25.83 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 44.16 21.71 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 39.66 20.76 (16) Monterey, Santa Cruz...$ 39.51 23.49 ---------------------------------------------------------------- BRCA0003-008 07/01/2019 Rates Fringes TERRAZZO FINISHER................$ 37.58 17.33 TERRAZZO WORKER/SETTER...........$ 48.53 26.84 ---------------------------------------------------------------- BRCA0003-011 04/01/2019 AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 5/111 AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne AREA 3: Fresno, Kings, Madera, Mariposa, Merced Rates Fringes TILE FINISHER Area 1......................$ 29.94 16.38 Area 2......................$ 25.60 14.30 Area 3......................$ 26.58 15.65 Tile Layer Area 1......................$ 49.90 19.16 Area 2......................$ 42.67 16.81 Area 3......................$ 40.27 18.58 ---------------------------------------------------------------- CARP0022-001 07/01/2019 San Francisco County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79 ---------------------------------------------------------------- CARP0034-001 07/01/2019 Rates Fringes Diver Assistant Tender, ROV Tender/Technician...........$ 49.75 33.40 Diver standby...............$ 55.73 33.40 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 6/111 Diver Tender................$ 54.73 33.40 Diver wet...................$ 99.27 33.40 Manifold Operator (mixed gas)........................$ 59.73 33.40 Manifold Operator (Standby).$ 54.73 33.40 DEPTH PAY (Surface Diving): 050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot SATURATION DIVING: The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours. DIVING IN ENCLOSURES: Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. ---------------------------------------------------------------- CARP0034-003 07/01/2019 Rates Fringes Piledriver.......................$ 50.75 33.40 ---------------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 7/111 CARP0035-007 07/01/2017 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties Rates Fringes Modular Furniture Installer Area 1 Installer I................$ 25.61 20.42 Installer II...............$ 22.18 20.42 Lead Installer.............$ 29.06 20.92 Master Installer...........$ 33.28 20.92 Area 2 Installer I................$ 22.96 20.42 Installer II...............$ 20.01 20.42 Lead Installer.............$ 25.93 20.92 Master Installer...........$ 29.56 20.92 Area 3 Installer I................$ 22.01 20.42 Installer II...............$ 19.24 20.42 Lead Installer.............$ 24.81 20.92 Master Installer...........$ 31.83 20.92 ---------------------------------------------------------------- CARP0035-008 08/01/2018 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: San Joaquin AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 8/111 Rates Fringes Drywall Installers/Lathers: Area 1......................$ 48.40 29.76 Area 2......................$ 42.52 29.76 Area 3......................$ 41.02 29.15 Area 4......................$ 41.67 29.76 Drywall Stocker/Scrapper Area 1......................$ 24.20 17.29 Area 2......................$ 21.26 17.29 Area 3......................$ 20.51 16.88 Area 4......................$ 20.84 17.29 ---------------------------------------------------------------- CARP0152-001 07/01/2019 Contra Costa County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79 ---------------------------------------------------------------- CARP0152-002 07/01/2019 San Joaquin County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 9/111 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79 ---------------------------------------------------------------- CARP0152-004 07/01/2019 Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79 ---------------------------------------------------------------- CARP0217-001 07/01/2019 San Mateo County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 10/111 ---------------------------------------------------------------- CARP0405-001 07/01/2019 Santa Clara County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79 ---------------------------------------------------------------- CARP0405-002 07/01/2019 San Benito County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.68 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79 ---------------------------------------------------------------- CARP0505-001 07/01/2019 Santa Cruz County Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 11/111 Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79 ---------------------------------------------------------------- CARP0605-001 07/01/2019 Monterey County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 44.77 30.20 Journeyman Carpenter........$ 44.62 30.20 Millwright..................$ 47.12 31.79 ---------------------------------------------------------------- CARP0701-001 07/01/2019 Fresno and Madera Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 12/111 Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79 ---------------------------------------------------------------- CARP0713-001 07/01/2019 Alameda County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 50.65 30.20 Journeyman Carpenter........$ 50.50 30.20 Millwright..................$ 50.60 31.79 ---------------------------------------------------------------- CARP1109-001 07/01/2019 Kings County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 50.50 30.20 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 43.42 30.20 Journeyman Carpenter........$ 43.27 30.20 Millwright..................$ 45.77 31.79 ---------------------------------------------------------------- ELEC0006-004 12/01/2018 SAN FRANCISCO COUNTY 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 13/111 Rates Fringes Sound & Communications Installer...................$ 40.52 3%+19.05 Technician..................$ 46.60 3%+19.05 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0006-007 06/01/2019 SAN FRANCISCO COUNTY Rates Fringes ELECTRICIAN......................$ 74.50 3%+33.715 ---------------------------------------------------------------- ELEC0100-002 03/01/2019 FRESNO, KINGS, AND MADERA COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 14/111 Rates Fringes ELECTRICIAN......................$ 38.75 23.06 ---------------------------------------------------------------- ELEC0100-005 12/01/2018 FRESNO, KINGS, MADERA Rates Fringes Communications System Installer...................$ 33.59 19.55 Technician..................$ 38.63 19.71 SCOPE OF WORK Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 15/111 D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply: 1. The project involves new or major remodel building trades construction. 2. The conductors for the fire alarm system are installed in conduit. ---------------------------------------------------------------- ELEC0234-001 12/24/2018 MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes ELECTRICIAN Zone A......................$ 49.30 25.58 Zone B......................$ 54.23 25.73 Zone A: All of Santa Cruz, Monterey, and San Benito Counties 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 16/111 within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line Zone B: Any area outside of Zone A ---------------------------------------------------------------- ELEC0234-003 12/01/2018 MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES Rates Fringes Sound & Communications Installer...................$ 40.02 19.75 Technician..................$ 46.02 19.75 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0302-001 02/25/2019 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 17/111 CONTRA COSTA COUNTY Rates Fringes CABLE SPLICER....................$ 60.48 26.06 ELECTRICIAN......................$ 53.76 25.86 ---------------------------------------------------------------- ELEC0302-003 12/01/2018 CONTRA COSTA COUNTY Rates Fringes Sound & Communications Installer...................$ 38.42 19.70 Technician..................$ 44.18 19.88 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 18/111 * ELEC0332-001 06/01/2019 SANTA CLARA COUNTY Rates Fringes CABLE SPLICER....................$ 78.60 38.564 ELECTRICIAN......................$ 68.52 38.256 FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay. Work on structures of 60 ft. or over (as described above): to be paid twice the straight-time rate of pay. ---------------------------------------------------------------- ELEC0332-003 12/01/2018 SANTA CLARA COUNTY Rates Fringes Sound & Communications Installer...................$ 40.02 19.75 Technician..................$ 46.02 19.93 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 19/111 above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0595-001 06/01/2019 ALAMEDA COUNTY Rates Fringes CABLE SPLICER....................$ 65.90 3%+36.82 ELECTRICIAN......................$ 57.30 3%+36.82 ---------------------------------------------------------------- ELEC0595-002 06/01/2019 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes CABLE SPLICER....................$ 43.99 7.75%+24.83 ELECTRICIAN (1) Tunnel work.............$ 40.16 7.75%+24.83 (2) All other work.........$ 38.25 7.75%+24.83 ---------------------------------------------------------------- ELEC0595-006 12/01/2018 ALAMEDA COUNTY Rates Fringes Sound & Communications Installer...................$ 40.02 3%+18.96 Technician..................$ 46.02 3%+18.96 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 20/111 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0595-008 12/01/2018 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes Communications System Installer...................$ 33.59 3%+18.86 Technician..................$ 38.63 3%+18.86 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 21/111 jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0617-001 06/01/2019 SAN MATEO COUNTY Rates Fringes ELECTRICIAN......................$ 63.00 37.68 ---------------------------------------------------------------- ELEC0617-003 12/01/2018 SAN MATEO COUNTY Rates Fringes Sound & Communications Installer...................$ 40.02 19.93 Technician..................$ 46.02 19.93 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 22/111 jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0684-001 06/01/2019 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes ELECTRICIAN......................$ 40.25 3%+22.83 CABLE SPLICER = 110% of Journeyman Electrician ---------------------------------------------------------------- ELEC0684-004 12/01/2018 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes Communications System Installer...................$ 33.59 19.56 Technician..................$ 38.63 19.71 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 23/111 in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC1245-001 01/01/2019 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 56.79 17.41 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 45.36 16.24 (3) Groundman...............$ 34.68 15.86 (4) Powderman...............$ 49.55 3%+17.65 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- ELEV0008-001 01/01/2019 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 24/111 Rates Fringes ELEVATOR MECHANIC................$ 67.56 34.125+a+b FOOTNOTE: PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0003-001 06/24/2019 ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DEFINITIONS BELOW Rates Fringes OPERATOR: Power Equipment (AREA 1:) GROUP 1.....................$ 49.02 30.74 GROUP 2.....................$ 47.49 30.74 GROUP 3.....................$ 46.01 30.74 GROUP 4.....................$ 44.63 30.74 GROUP 5.....................$ 43.36 30.74 GROUP 6.....................$ 42.04 30.74 GROUP 7.....................$ 40.90 30.74 GROUP 8.....................$ 39.76 30.74 GROUP 8-A...................$ 37.55 30.74 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.....................$ 50.65 30.74 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 25/111 Oiler......................$ 36.63 30.39 Truck crane oiler..........$ 39.20 30.39 GROUP 2 Cranes.....................$ 48.14 30.74 Oiler......................$ 36.36 30.39 Truck crane oiler..........$ 38.98 30.39 GROUP 3 Cranes.....................$ 46.40 30.74 Hydraulic..................$ 38.32 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39 GROUP 4 Cranes.....................$ 43.36 30.74 OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices............$ 45.89 30.39 Oiler......................$ 36.63 30.39 Truck crane oiler..........$ 39.20 30.39 GROUP 2 Lifting devices............$ 44.07 30.39 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39 GROUP 3 Lifting devices............$ 42.39 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39 GROUP 4 Lifting devices............$ 40.62 30.39 GROUP 5 Lifting devices............$ 39.32 30.39 GROUP 6 Lifting devices............$ 37.98 30.39 OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes.....................$ 46.30 30.39 Oiler......................$ 36.63 30.39 Truck Crane Oiler..........$ 39.20 30.39 GROUP 2 Cranes.....................$ 43.79 30.39 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 26/111 Oiler......................$ 36.36 30.39 Truck Crane Oiler..........$ 38.98 30.39 GROUP 3 Cranes.....................$ 42.05 30.39 Hydraulic..................$ 38.32 30.39 Oiler......................$ 36.14 30.39 Truck Crane Oiler..........$ 38.71 30.39 GROUP 4 Cranes.....................$ 39.01 30.39 GROUP 5 Cranes.....................$ 35.13 30.39 OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1....................$ 40.77 30.39 GROUP 1-A..................$ 43.24 30.39 GROUP 2....................$ 39.51 30.39 GROUP 3....................$ 38.18 30.39 GROUP 4....................$ 37.04 30.39 GROUP 5....................$ 35.90 30.39 UNDERGROUND: GROUP 1....................$ 40.67 30.39 GROUP 1-A..................$ 43.14 30.39 GROUP 2....................$ 39.41 30.39 GROUP 3....................$ 38.08 30.39 GROUP 4....................$ 36.94 30.39 GROUP 5....................$ 35.80 30.39 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 27/111 operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 28/111 slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 29/111 machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 30/111 GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- PILEDRIVERS GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 31/111 GROUP 6: Deckhand; Fire tender ------------------------------------------------------------- STEEL ERECTORS GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder GROUP 5: Boom cat -------------------------------------------------------------- -- TUNNEL AND UNDERGROUND WORK GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator GROUP 3: Drill doctor; Mine or shaft hoist GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 32/111 GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE AREA 2 -NOTED BELOW THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern Part FRESNO COUNTY: Area 1: Remainder Area 2: Eastern Part MADERA COUNTY: Area 1: Remainder Area 2: Eastern Part MARIPOSA COUNTY: Area 1: Remainder Area 2: Eastern Part MONTEREY COUNTY: Area 1: Remainder Area 2: Southwestern part 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 33/111 TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- ENGI0003-008 07/01/2017 Rates Fringes Dredging: (DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING:) AREA 1: (1) Leverman...............$ 44.77 31.25 (2) Dredge Dozer; Heavy duty repairman.............$ 39.81 31.25 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 38.69 31.25 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 35.39 31.25 AREA 2: (1) Leverman...............$ 46.77 31.25 (2) Dredge Dozer; Heavy duty repairman.............$ 41.81 31.25 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 40.69 31.25 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 37.39 31.25 AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 34/111 AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY: Area 1: Remainder Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY: Area 1: Except Eastern part Area 2: Eastern part MARIPOSA COUNTY Area 1: Except Eastern part 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 35/111 Area 2: Eastern part MONTERREY COUNTY Area 1: Except Southwestern part Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: Al but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Remainder TEHAMA COUNTY: Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 36/111 Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder TUOLUMNE COUNTY: Area 1: Except Eastern part Area 2: Eastern part ---------------------------------------------------------------- ENGI0003-019 07/26/2017 SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1.....................$ 34.05 28.73 AREA 2.....................$ 36.05 28.73 GROUP 2 AREA 1.....................$ 30.45 28.73 AREA 2.....................$ 32.45 28.73 GROUP 3 AREA 1.....................$ 25.84 28.73 AREA 2.....................$ 27.84 28.73 GROUP DESCRIPTIONS: GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP. GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 37/111 to 65 HP. GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP. AREA DESCRIPTIONS: AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2 - MODOC COUNTY THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Except Eastern part Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder DEL NORTE COUNTY: Area 1: Extreme Southwestern corner Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY Area 1: Except Eastern part Area 2: Eastern part 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 38/111 GLENN COUNTY: Area 1: Eastern part Area 2: Remainder HUMBOLDT COUNTY: Area 1: Except Eastern and Southwestern parts Area 2: Remainder LAKE COUNTY: Area 1: Southern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY Area 1: Remainder Area 2: Eastern part MARIPOSA COUNTY Area 1: Remainder Area 2: Eastern part MENDOCINO COUNTY: Area 1: Central and Southeastern parts Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 39/111 PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Reaminder TEHAMA COUNTY: Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder TULARE COUNTY; Area 1: Remainder Area 2: Eastern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- IRON0377-002 01/01/2019 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 40/111 Rates Fringes Ironworkers: Fence Erector...............$ 32.58 23.41 Ornamental, Reinforcing and Structural..............$ 39.00 32.05 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-002 07/01/2019 AREA ""A"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES AREA ""B"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 41/111 Rates Fringes Asbestos Removal Laborer All Counties................$ 24.00 11.30 LABORER (Lead Removal) Area A......................$ 31.81 24.61 Area B......................$ 30.81 24.61 ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations. ---------------------------------------------------------------- LABO0073-002 06/25/2018 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 29.54 23.65 Traffic Control Person I....$ 29.84 23.65 Traffic Control Person II...$ 27.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0073-003 07/01/2018 SAN JOAQUIN COUNTY 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 42/111 Rates Fringes LABORER Mason Tender-Brick..........$ 31.20 22.20 ---------------------------------------------------------------- LABO0073-005 06/25/2018 Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 43/111 GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0073-007 06/25/2018 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 44/111 applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 45/111 Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 46/111 thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 47/111 salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0073-009 07/01/2018 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 48/111 LABO0261-003 06/25/2018 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 20.54 23.65 Traffic Control Person I....$ 30.84 23.65 Traffic Control Person II...$ 28.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0261-005 06/25/2018 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 49/111 GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0261-009 06/25/2018 SAN FRANCISCO, AND SAN MATEO COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 50/111 LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 Laborers: (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 51/111 aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 52/111 manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 53/111 GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 54/111 windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0261-011 05/01/2018 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes MASON TENDER, BRICK..............$ 35.37 20.70 FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage: $2.50 per day additional. ---------------------------------------------------------------- LABO0261-014 07/01/2017 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes PLASTER TENDER...................$ 34.70 23.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 06/25/2018 AREA A: SANTA CLARA AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 55/111 Escort Driver, Flag Person Area A.....................$ 30.54 23.65 Area B.....................$ 29.54 23.65 Traffic Control Person I Area A.....................$ 30.84 23.65 Area B.....................$ 29.84 23.65 Traffic Control Person II Area A.....................$ 28.34 23.65 Area B.....................$ 27.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0270-004 06/25/2018 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 56/111 Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0270-005 07/01/2018 MONTEREY AND SAN BENITO COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 31.20 22.20 ---------------------------------------------------------------- LABO0270-007 06/25/2018 MONTEREY, SAN BENITO, AND SANTA CRUZ, COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B) Construction Specialist Group.......................$ 30.40 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 57/111 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 58/111 pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 59/111 of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 60/111 of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 61/111 GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0270-010 06/25/2018 SANTA CLARA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 62/111 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 63/111 whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 64/111 employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 65/111 similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0270-011 07/01/2017 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 66/111 MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 34.70 21.22 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2018 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes LABORER (Brick) Mason Tender-Brick..........$ 31.20 22.20 ---------------------------------------------------------------- LABO0294-002 06/25/2018 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 29.54 23.65 Traffic Control Person I....$ 29.84 23.65 Traffic Control Person II...$ 27.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0294-005 06/25/2018 FRESNO, KINGS, AND MADERA COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 67/111 Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0294-008 06/25/2018 FRESNO, KINGS, AND MADERA COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 68/111 Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 69/111 LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 70/111 Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 71/111 GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 72/111 -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0294-010 07/01/2018 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2017 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 73/111 LABORER (Plaster Tender).........$ 31.02 22.52 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 06/25/2018 ALAMEDA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 30.54 23.65 Traffic Control Person I....$ 30.84 23.65 Traffic Control Person II...$ 28.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0304-003 06/26/2017 ALAMEDA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 36.60 24.83 GROUP 2.....................$ 36.37 24.83 GROUP 3.....................$ 36.12 24.83 GROUP 4.....................$ 35.67 24.83 GROUP 5.....................$ 35.13 24.83 Shotcrete Specialist........$ 37.12 24.83 TUNNEL AND SHAFT CLASSIFICATIONS 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 74/111 GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0304-004 06/25/2018 ALAMEDA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 30.64 23.20 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 75/111 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 76/111 Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 77/111 GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 78/111 shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 79/111 ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0304-005 05/01/2018 ALAMEDA COUNTY Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2017 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 34.70 23.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 06/25/2018 CONTRA COSTA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 80/111 CLOSURE) Escort Driver, Flag Person..$ 30.54 23.65 Traffic Control Person I....$ 30.84 23.65 Traffic Control Person II...$ 28.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0324-006 06/25/2018 CONTRA COSTA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 81/111 slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0324-012 06/25/2018 CONTRA COSTA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 1-g...................$ 30.99 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 82/111 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 83/111 dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 84/111 GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 85/111 GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 86/111 GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters ---------------------------------------------------------------- LABO0324-014 05/01/2018 CONTRA COSTA COUNTY: Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2018 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 37.14 22.32 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 06/25/2018 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 87/111 Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 29.54 23.65 Traffic Control Person I....$ 29.84 23.65 Traffic Control Person II...$ 27.34 23.65 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO1130-003 06/26/2017 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 36.60 24.83 GROUP 2.....................$ 36.37 24.83 GROUP 3.....................$ 36.12 24.83 GROUP 4.....................$ 35.67 24.83 GROUP 5.....................$ 35.13 24.83 Shotcrete Specialist........$ 37.12 24.83 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 88/111 in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO1130-005 07/01/2018 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 31.20 22.20 ---------------------------------------------------------------- LABO1130-007 06/25/2018 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 29.37 23.20 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 89/111 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 90/111 hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 91/111 GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 92/111 construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 93/111 ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO1130-008 07/01/2018 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender.................$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2018 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 32.02 23.00 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2019 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 94/111 Painters:........................$ 42.67 24.03 PREMIUMS: EXOTIC MATERIALS - $0.75 additional per hour. SPRAY WORK: - $0.50 additional per hour. INDUSTRIAL PAINTING - $0.25 additional per hour [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK: over 50 feet - $2.00 per hour additional 100 to 180 feet - $4.00 per hour additional Over 180 feet - $6.00 per houir additional ---------------------------------------------------------------- PAIN0016-003 01/01/2018 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes Drywall Finisher/Taper AREA 1......................$ 45.16 26.74 AREA 2......................$ 41.03 25.34 ---------------------------------------------------------------- PAIN0016-012 01/01/2019 ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 95/111 SOFT FLOOR LAYER.................$ 48.60 27.43 ---------------------------------------------------------------- PAIN0016-015 01/01/2019 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PAINTER Brush.......................$ 33.68 20.24 FOOTNOTES: SPRAY/SANDBLAST: $0.50 additional per hour. EXOTIC MATERIALS: $1.00 additional per hour. HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour. ---------------------------------------------------------------- PAIN0016-022 01/01/2019 SAN FRANCISCO COUNTY Rates Fringes PAINTER..........................$ 46.29 24.03 ---------------------------------------------------------------- PAIN0169-001 01/01/2018 FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES: Rates Fringes GLAZIER..........................$ 35.00 26.26 ---------------------------------------------------------------- PAIN0169-005 01/01/2019 ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 96/111 MATEO, SANTA CLARA & SANTA CRUZ COUNTIES Rates Fringes GLAZIER..........................$ 50.03 28.19 ---------------------------------------------------------------- PAIN0294-004 01/01/2019 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes PAINTER Brush, Roller...............$ 30.53 19.11 Drywall Finisher/Taper......$ 34.87 23.68 FOOTNOTE: Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25 additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. ---------------------------------------------------------------- PAIN0294-005 01/01/2018 FRESNO, KINGS & MADERA Rates Fringes SOFT FLOOR LAYER.................$ 31.49 20.48 ---------------------------------------------------------------- PAIN0767-001 01/01/2019 CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes GLAZIER..........................$ 38.47 28.40 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 97/111 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation. ---------------------------------------------------------------- PAIN1176-001 01/01/2017 HIGHWAY IMPR0VEMENT Rates Fringes Parking Lot Striping/Highway Marking: GROUP 1.....................$ 34.41 16.31 GROUP 2.....................$ 29.25 16.31 GROUP 3.....................$ 29.59 16.31 CLASSIFICATIONS GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings GROUP 2: Gamecourt & Playground Installer GROUP 3: Protective Coating, Pavement Sealing ---------------------------------------------------------------- PAIN1237-003 10/01/2018 CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SOFT FLOOR LAYER.................$ 36.81 21.51 ---------------------------------------------------------------- 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 98/111 PLAS0066-002 07/01/2017 ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES: Rates Fringes PLASTERER........................$ 40.51 27.13 ---------------------------------------------------------------- PLAS0300-001 07/01/2018 Rates Fringes PLASTERER AREA 188: Fresno...........$ 32.70 31.68 AREA 224: San Benito, Santa Clara, Santa Cruz.....$ 32.88 31.68 AREA 295: Calaveras & San Joaquin Couonties...........$ 32.70 31.68 AREA 337: Monterey County..$ 32.88 31.68 AREA 429: Mariposa, Merced, Stanislaus, Tuolumne Counties...........$ 32.70 31.68 ---------------------------------------------------------------- PLAS0300-005 07/01/2017 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 33.49 23.67 ---------------------------------------------------------------- PLUM0038-001 07/01/2018 SAN FRANCISCO COUNTY Rates Fringes PLUMBER (Plumber, Steamfitter, Refrigeration Fitter)..........................$ 72.00 41.94 ---------------------------------------------------------------- PLUM0038-005 07/01/2018 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 99/111 SAN FRANCISCO COUNTY Rates Fringes Landscape/Irrigation Fitter (Underground/Utility Fitter).....$ 61.20 30.17 ---------------------------------------------------------------- PLUM0062-001 07/01/2019 MONTEREY AND SANTA CRUZ COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 43.80 34.19 ---------------------------------------------------------------- PLUM0159-001 07/01/2019 CONTRA COSTA COUNTY Rates Fringes Plumber and steamfitter (1) Refrigeration...........$ 56.93 41.04 (2) All other work..........$ 57.82 41.04 ---------------------------------------------------------------- PLUM0246-001 07/01/2019 FRESNO, KINGS & MADERA COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 41.15 33.14 ---------------------------------------------------------------- PLUM0246-004 01/01/2017 FRESNO, MERCED & SAN JOAQUIN COUNIES Rates Fringes PLUMBER (PIPE TRADESMAN).........$ 13.00 10.74 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 100/111 PIPE TRADESMAN SCOPE OF WORK: Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems; Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions; Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman ---------------------------------------------------------------- PLUM0342-001 07/01/2018 ALAMEDA & CONTRA COSTA COUNTIES Rates Fringes PIPEFITTER CONTRA COSTA COUNTY.........$ 58.68 42.40 PLUMBER, PIPEFITTER, STEAMFITTER ALAMEDA COUNTY..............$ 58.68 42.40 ---------------------------------------------------------------- * PLUM0355-004 07/01/2019 ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 101/111 MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES: Rates Fringes Underground Utility Worker /Landscape Fitter...........$ 29.00 15.80 ---------------------------------------------------------------- PLUM0393-001 07/01/2018 SAN BENITO AND SANTA CLARA COUNTIES Rates Fringes PLUMBER/PIPEFITTER...............$ 62.66 41.93 ---------------------------------------------------------------- PLUM0442-001 07/01/2019 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 43.50 30.89 ---------------------------------------------------------------- PLUM0467-001 07/01/2018 SAN MATEO COUNTY Rates Fringes Plumber/Pipefitter/Steamfitter...$ 65.11 35.25 ---------------------------------------------------------------- ROOF0027-002 01/01/2019 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 102/111 ROOFER...........................$ 28.21 14.21 FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off: $2.00 per hour additional. ---------------------------------------------------------------- ROOF0040-002 08/01/2019 SAN FRANCISCO & SAN MATEO COUNTIES: Rates Fringes ROOFER...........................$ 41.88 19.44 ---------------------------------------------------------------- ROOF0081-001 08/01/2018 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Roofer...........................$ 39.40 17.58 ---------------------------------------------------------------- ROOF0081-004 08/01/2018 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes ROOFER...........................$ 39.40 17.58 ---------------------------------------------------------------- ROOF0095-002 08/30/2018 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES: Rates Fringes 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 103/111 ROOFER Journeyman..................$ 42.59 18.89 Kettle person (2 kettles); Bitumastic, Enameler, Coal Tar, Pitch and Mastic worker......................$ 44.59 18.89 ---------------------------------------------------------------- SFCA0483-001 01/01/2019 ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES: Rates Fringes SPRINKLER FITTER (FIRE)..........$ 63.52 31.17 ---------------------------------------------------------------- SFCA0669-011 04/01/2018 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SPRINKLER FITTER.................$ 38.85 21.87 ---------------------------------------------------------------- SHEE0104-001 07/02/2018 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA AREA 2: MONTEREY & SAN BENITO AREA 3: SANTA CRUZ Rates Fringes SHEET METAL WORKER 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 104/111 AREA 1: Mechanical Contracts under $200,000.............$ 51.87 37.91 All Other Work.............$ 59.11 38.51 AREA 2......................$ 48.90 32.70 AREA 3......................$ 51.21 30.26 ---------------------------------------------------------------- SHEE0104-003 07/01/2018 CALAVERAS AND SAN JOAQUIN COUNTIES: Rates Fringes SHEET METAL WORKER...............$ 40.34 32.80 ---------------------------------------------------------------- SHEE0104-005 07/01/2018 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SHEET METAL WORKER (Excluding metal deck and siding)...........$ 38.40 35.69 ---------------------------------------------------------------- SHEE0104-007 07/01/2018 FRESNO, KINGS, AND MADERA COUNTIES: Rates Fringes SHEET METAL WORKER...............$ 38.49 35.65 ---------------------------------------------------------------- SHEE0104-015 07/01/2017 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES: Rates Fringes SHEET METAL WORKER (Metal 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 105/111 Decking and Siding only).........$ 37.53 32.10 ---------------------------------------------------------------- SHEE0104-018 07/01/2018 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes Sheet metal worker (Metal decking and siding only).........$ 39.93 32.70 ---------------------------------------------------------------- TEAM0094-001 07/01/2018 Rates Fringes Truck drivers: GROUP 1.....................$ 31.68 27.86 GROUP 2.....................$ 31.98 27.86 GROUP 3.....................$ 32.28 27.86 GROUP 4.....................$ 32.63 27.86 GROUP 5.....................$ 32.98 27.86 FOOTNOTES: Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 106/111 apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson; Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with self-contained refuse bin; Boom truck - hydro-lift or Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Vacuum Trucks 7500 gals and over 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 107/111 and truck repairman GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 108/111 cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 109/111 wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 110/111 because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. 12/9/2019 beta.SAM.gov https://beta.sam.gov/wage-determination/CA20190018/10/document 111/111 ================================================================ END OF GENERAL DECISION"