RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO
SUAREZ & MUNOZ CONSTRUCTION OF HAYWARD,
CALIFORNIA FOR THE GARDINER PARK RENOVATION
PROJECT (PROJECT NO. PK1806) IN AN AMOUNT NOT TO
EXCEED $619,400, AUTHORIZING A TOTAL CONSTRUCTION
BUDGET OF $681,340, AND AUTHORIZING THE CITY
MANAGER TO EXECUTE AGREEMENTS ON BEHALF OF THE
CITY.
WHEREAS, Gardiner Park is an urban pocket park located in the middle of a residential neighborhood
at 135 Gardiner Avenue in South San Francisco with play equipment and rubber surfacing dating to
2006; and
WHEREAS, this contract will renovate the existing park by replacing the existing play area equipment,
expand the play area footprint, and replace the existing basketball court, and connect or modify existing
utilities; and
WHEREAS, staff advertised the Notice Inviting Bids for construction of the project on November 25,
2019 and December 2, 2019; and
WHEREAS, on December 18, 2019, staff received and opened two (2) sealed bids with the lowest
responsive and responsible bid supplied by Suarez & Munoz Construction of Hayward, California; and
WHEREAS, pursuant to Public Contract Code §20166, Public Works contracts, if awarded, are
ordinarily awarded to the lowest responsible bidder whose bid is responsive to the solicitation; and
WHEREAS, the project is included in the City of South San Francisco's Fiscal Year 2018-19 Capital
Improvement Program (Project No. pk1806).
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of South San Francisco that
the City Council hereby awards a construction contract, a draft of which is attached hereto as Exhibit A,
for the Gardiner Park Renovation to Suarez & Munoz Construction of Hayward, California, in an
amount not to exceed $619,400 conditioned on the contractor's timely execution of the Project contract
and submission of all required documents, including but not limited to, certificates of insurance and
endorsement, in accordance with the Project documents.
BE IT FURTHER RESOLVED the City Council authorizes a total construction budget of $681,604.
BE IT FURTHER RESOLVED that the City Manager is hereby authorized to execute the agreement and
City of South San Francisco Page 1
File Number. 19-1002
Enactment Number. RES 08-2020
any other related documents on behalf of the City upon timely submission by Suarez & Munoz
Construction of the signed contract and all other documents, subject to approval by the City Attorney.
BE IT FURTHER RESOLVED that the city Council authorizes the City Manager to take any other
related actions consistent with the intention of the Resolution.
At a meeting of the City Council on 1/8/2020, a motion was made by Councilmember Nicolas, seconded by
Councilmember Matsumoto, that this Resolution be approved. The motion passed.
Yes: 4 Mayor Garbarino, Councilmember Nagales, Councilmember Nicolas, and
Councilmember Matsumoto
No: 1 Vice Mayor Addiego
Attest by �164 AA4 40J��
sa Govea Acosta, City Clerk
City of South San Francisco Page 2
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-1 of 9
CITY OF SOUTH SAN FRANCISCO
GARDINER PARK RENOVATION PROJECT
PROJECT NO. PK1806
BID NO. 2634
NOTICE INVITING BIDS
PART I - PROPOSAL
PROPOSAL FORMS
FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS
PART II – GENERAL CONDITIONS
PART III – SPECIAL PROVISIONS
SPECIAL CONDITIONS
TECHNICAL SPECIFICATIONS
PART IV – PROJECT PLANS
To Obtain Bid Package/Bidder’s List
Contact BarkerBlue
(650) 696-2100
For Technical Questions
Contact
S. Peter Vorametsanti, PE, CCM Project Executive
PeterV@swinerton.com (650) 740-7368
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-1 of 9
CITY OF SOUTH SAN FRANCISCO
ENGINEERING DIVISION
FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS
TABLE OF CONTENTS
Page No.
1. Scope of Work A-1
2. The Contract Documents A-1
3. Equipment - Performance of Work A-2
4. Contract Price A-2
5. Rights of City to Increase Working Days A-2
6. Option of City to Terminate Agreement in Event
of Failure to Complete Work A-2
7. Termination of Contract for Convenience A-3
8. Performance by Sureties A-5
9. Hold-Harmless Agreement and Contractor's Insurance A-6
10. Insurance A-6
11. Proof of Carriage of Insurance A-7
12. Provisions Cumulative A-8
13. Form HUD 4010 A-8
14. Federal Minimum Wage Rates A-8
15. Notices A-8
16. Interpretation A-8
Attachment A – Escrow Agreement for Security Deposits in Lieu of Retention
Attachment B – HUD Form 4010
Attachment C – Federal Minimum Wage Rates
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-1 of 9
FORM OF AGREEMENT FOR PUBLIC IMPROVEMENTS
THIS AGREEMENT made and entered into this ____, day of ______, _____, between the CITY
OF SOUTH SAN FRANCISCO, a municipal corporation and political subdivision of the State of
California, hereinafter called “CITY”, and <Contractor>, Inc., hereinafter called “CONTRACTOR”1.
W I T N E S S E T H:
WHEREAS, City has taken appropriate proceedings to authorize construction of the public work
and improvements herein provided and execution of this contract.
WHEREAS, a notice was duly published for bids for the contract for the improvements
hereinafter described.
WHEREAS, on ____________, notice duly given, the City Council (“Council”) of said City
awarded the contract for the construction of the improvements hereinafter described to the Contractor,
which Contractor said Council found to be the lowest responsible bidder for said improvements.
WHEREAS, City and Contractor desire to enter into this agreement for the construction of said
improvements pursuant to the terms, definitions, and conditions set forth in the General Provisions and
other Contract Documents.
IT IS AGREED as follows:
1. Scope of Work. Contractor shall perform the Work described briefly as follows:
The Work consists of the furnishing of all labor, materials, tools, equipment, and services necessary for
the construction of the GARDINER PARK RENOVATION PROJECT, Project No. pk1806; in
accordance with the Contract Documents.
Also included are any such other items or details not mentioned above that are required by the
Contract Documents, which are to be constructed or furnished and installed as shown on the plans, as
specified herein and as directed by the Engineer.
The aforementioned improvements are further described in the "Contract Documents" hereinafter
referred to.
2. The Contract Documents. The complete Contract consists of the following documents:
(A) Notice Inviting Bids
(B) Part I – Submitted Proposal (as accepted)
(C) This Agreement, including Contractor’s Payment Bond, Faithful Performance
Bond and Guaranty Bond.
1. 1The term "Contractor" as used herein is employed without distinction as to either number or gender and shall
include whenever the context shall permit all agents, representatives, employees, servants, subcontractors and
business or social invitees.
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-2 of 9
(D) Part II – General Conditions
(E) Part III – Special Provisions: Special Conditions and Technical Specifications,
including State Standard Specifications dated 2015, sections 10-99, as revised in Revised
Standard Specifications (RSS) dated April 20, 2018..
(F) Part IV – Project Plans, approved November 25, 2019.
(G) Administrative subsections of the State Standard Specifications dated 2015, as
specifically referenced in contract Parts I-IV and as revised in RSS dated April 20, 2018.
All rights and obligations of City and Contractor are fully set forth and described in the contract
documents.
All of the above-named documents are intended to cooperate, so that any work called for in one
and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said
documents. The documents comprising the complete contract will hereinafter be referred to as “the
Contract Documents.”
3. Equipment - Performance of Work. Contractor shall furnish all tools, equipment,
apparatus, facilities, labor, and materials necessary to perform and complete in a good and workmanlike
manner the Work of general construction as called for, and for the manner designated in, and in strict
conformity with, the plans and specifications for said Work entitled:
GARDINER PARK RENOVATION PROJECT
Project No. pk1806
Bid No. 2634
The equipment, apparatus, facilities, labor, and materials shall be furnished and said Work
performed and completed as required in said plans and specifications under the direction and supervision
and subject to the approval of the Engineer of said City or the Engineer’s designated assistant.
4. Contract Price. City shall pay, and Contractor shall accept, in full payment for the Work
agreed to be done the sum of __________________________________ ($). Said price is determined by
the lump sum price contained in Contractor's bid proposal (“Bid”). The lump sum price and unit prices
are set forth in the completed Bid forms attached hereto and made a part hereof as if set forth herein
verbatim. In the event work is performed or materials furnished in addition to those set forth in
Contractor's bid and the specifications herein, such work and materials will be paid for at the unit prices
therein contained. Said amount shall be paid in installments as hereinafter provided.
5. Rights of City to Increase Working Days. If such Work is not completed within the time
specified, the Engineer shall have the right to increase the number of working days in the amount it may
determine will best serve the interest of the City. If it desires to increase said number of working days, it
shall have the further right to charge to Contractor and deduct from the final payment for the Work the
actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly
chargeable to Contractor and which accrue during the period of such extension, except that the cost of the
final service and preparation of the final estimates shall not be included in such charges, provided,
however, that no extension of time for the completion of such Work shall be allowed unless at least
twenty (20) calendar days prior to the time herein fixed for the completion thereof or the time fixed by the
Engineer for such completion as extended, Contractor shall have filed application for extension thereof, in
writing with the Engineer.
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-3 of 9
6. Option of City to Terminate Agreement in Event of Failure to Complete Work. If at any
time in the opinion of the Engineer, the Contractor has refused or failed to prosecute the Work or any
severable part thereof, with such diligence as will insure its work, or any completion within the time
specified, or any extensions thereof, or shall have failed to complete said work within such time, or if
Contractor should be adjudged a bankrupt, or if Contractor should make a general assignment for the
benefit of Contractor's creditors, or if a receiver should be appointed in the event of Contractor's
insolvency, or if Contractor, or any Subcontractor, should violate any of the provisions of this Agreement,
the Engineer may give written notice to Contractor, and Contractor's sureties of its intention to terminate
this Agreement, such notice to contain the reasons for such intention to terminate this Agreement, and
unless within five calendar (5) days after the serving of such notice, such violation shall cease and
satisfactory arrangements for the correction thereof be made, this Agreement may, at the option of City,
upon expiration of said time, cease and terminate. Any excess of cost arising therefrom over and above
the contract price will be charged against the Contractor and the Contractor’s sureties who will be liable
therefore. In the event of such termination, all money due the Contractor or retained under the terms of
this contract shall be forfeited to the City; but such forfeiture will not release the Contractor or the
Contractor’s sureties from liability or failure to fulfill the contract. The Contractor and the Contractor’s
sureties will be credited with the amount of money so forfeited toward any excess of cost over and above
the contract price, arising from the suspension termination of the operations of the contract and the
completion of the Work by the City as above provided, and the Contractor will be so credited with any
surplus remaining after all just claims for such completion have been paid.
In the determination of the question whether there has been any such noncompliance with the
contract as to warrant the suspension termination or annulment thereof, the decision of the Engineer shall
be binding on all parties to the contract.
7. Termination of Contract for Convenience. The City also reserves the right to terminate
the contract at any time upon a determination by the Engineer in the Engineer's sole discretion that
termination of the contract is in the best interest of the City. If the City elects to terminate the contract for
convenience, the termination of the contract and the total compensation payable to the Contractor shall be
governed by the following:
(A) The City will issue the Contractor a written notice signed by the Engineer,
specifying that the contract is terminated. Upon receipt of said written notice, the Contractor will be
relieved of further responsibility for damage to the Work (excluding materials) as specified in Section
VII-17, "Contractor's Responsibility for the Work," of the General Conditions and, except as otherwise
directed in writing by the Engineer, the Contractor shall:
(1) Stop all work under the contract except that specifically directed to be completed prior to
acceptance.
(2) Perform work the Engineer deems necessary to secure the project for termination.
(3) Remove equipment and plant from the site of the Work.
(4) Take such action as is necessary to protect materials from damage.
(5) Notify all subcontractors and suppliers that the contract is being terminated and that their
contracts or orders are not to be further performed unless otherwise authorized in writing by the
Engineer.
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-4 of 9
(6) Provide the Engineer with an inventory list of all materials previously produced,
purchased or ordered from suppliers for use in the Work and not yet used in the Work, including
its storage location, and such other information as the Engineer may request.
(7) Dispose of materials not yet used in the Work as directed by the Engineer. It shall be the
Contractor's responsibility to provide the City with good title to all materials purchased by the
City hereunder, including materials for which partial payment has been made as provided in
Section IX-2, “Progress Payments,” of the General Conditions and with bills of sale or other
documents of title for such materials.
(8) Subject to the prior written approval of the Engineer, settle all outstanding liabilities and
all claims arising out of subcontracts or orders for materials terminated hereunder. To the extent
directed by the Engineer, the Contractor shall assign to the City all the right, title, and interest of
the Contractor under subcontracts or orders for materials terminated hereunder.
(9) Furnish the Engineer with the documentation required to be furnished by the Contractor
under the provisions of the contract, including, on projects as to which Federal and State funds
are involved, all documentation required under the Federal and State requirements included in the
contract.
(10) Take such other actions as the Engineer may direct.
(B) Acceptance of the contract as hereinafter specified shall not relieve the
Contractor of responsibility for damage to materials. The Contractor shall continue to be responsible for
damage to materials after issuance of the Notice of Termination, except as follows:
(1) The Contractor’s responsibility for damage to materials for which partial payment has
been made as provided in Section IX-2, “Progress Payments,” of the General Conditions and for
materials furnished by the City for use in the Work and unused shall terminate when the Engineer
certifies that such materials have been stored in the manner and at the locations the Engineer has
directed.
(2) The Contractor’s responsibility for damage to materials purchased by the City subsequent
to the issuance of the notice that the contract is to be terminated shall terminate when title and
delivery of such materials has been taken by the City.
(3) When the Engineer determines that the Contractor has completed the Work under the
contract directed to be completed prior to termination and such other work as may have been
ordered to secure the project for termination, the Contractor will recommend that the Engineer
formally accept the contract to the extent performed, and immediately upon and after such
acceptance by the Engineer, the Contractor will not be required to perform any further Work
thereon and shall be relieved of the Contractor's contractual responsibilities for injury to persons
or property which occurs after the formal acceptance of the project by the Engineer.
(C) Termination of the contract shall not relieve the surety of its obligation for any
just claims arising out of the work performed.
(D) The total compensation to be paid to the Contractor shall be determined by the
Engineer on the basis of the following:
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-5 of 9
(1) The reasonable cost to the Contractor, without profit, for all work performed under the
contract, including mobilization, demobilization and work done to secure the project for
termination. In determining the reasonable cost, deductions will be made for the cost of materials
to be retained by the Contractor, amounts realized by the sale of materials, and for other
appropriate credits against the cost of the work. When, in the opinion of the Engineer, the cost of
a contract item of work is excessively high due to costs incurred to remedy or replace defective or
rejected work, the reasonable cost to be allowed will be the estimated reasonable cost of
performing such work in compliance with the requirements of the plans and specifications and the
excessive actual cost shall be disallowed.
(2) A reasonable allowance for profit on the cost of the work performed as determined under
Subsection (1), provided the Contractor establishes to the satisfaction of the Engineer that it is
reasonably probable that the Contractor would have made a profit had the contract been
completed and provided further, that the profit allowed shall in no event exceed four (4) percent
of said cost.
(3) The reasonable cost to the Contractor of handling material returned to the vendor,
delivered to the City, or otherwise disposed of as directed by the Engineer.
(4) A reasonable allowance for the Contractor’s administrative costs in determining the
amount payable due to termination of the contract.
(5) A reasonable credit to the City for defective or incomplete work not corrected.
All records of the Contractor and subcontractors necessary to determine compensation in
accordance with the provisions of this Section 5 shall be open to inspection or audit by representatives of
the City at all times after issuance of the Notice of Termination and for a period of three (3) years,
thereafter, and such records shall be retained for that period.
After acceptance of the Work by the Engineer, the Engineer may make payments on the basis of
interim estimates pending issuance of the Final Estimate in accordance with Section IX-7, “Final
Payment,” of the General Conditions when, in the Engineer's opinion, the amount thus paid, together with
all amounts previously paid or allowed, will not result in total compensation in excess of that to which the
Contractor will be entitled. All payments, including payment upon the Final Estimate shall be subject to
deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the
contract.
If this contract is terminated by the City for cause, and it is later determined that the proper basis
for a termination for cause did not exist, the termination shall be deemed to have been a termination for
convenience and governed by the terms of this contract dealing with such termination.
If the contract is terminated by the City for cause or convenience, such termination shall neither
act as a waiver by the City of its right to require the Contractor to correct defects in the Work performed
by the Contractor nor void any warranties applicable to the Work performed under the contract.
The provisions of this Section 5 shall be included in all subcontracts.
In the event of conflict between the termination provisions of this Section 8 and any other
provision or the contract, this Section 5 shall prevail.
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-6 of 9
8. Performance by Sureties. In the event of any termination as herein before provided, City
shall immediately give written notice thereof to Contractor and Contractor's sureties and the sureties shall
have the right to take over and perform the Agreement, provided, however, that if the sureties, within five
(5) working days after giving them said notice of termination, do not give the City written notice of their
intention to take over the performance of the Agreement and do not commence performance thereof
within five (5) working days after notice to the City of such election, City may take over the Work and
prosecute the same to completion by contract or by any other method it may deem advisable, for the
account, and at the expense, of Contractor, and the sureties shall be liable to City for any excess cost or
damages occasioned City thereby; and, in such event, City may, without liability for so doing, take
possession of and utilize in completing the Work such materials, appliances, plant, and other property
belonging to Contractor as may be on the site of the Work and necessary therefore. Should Contractor
contract in an individual capacity, the surety bond shall contain the following provision: “Should
Contractor contract in the Contractor’s individual capacity, the death of the Contractor shall not relieve
the surety of its obligations.”
9. Hold-Harmless Agreement and Contractor's Insurance. Contractor agrees to, and shall,
hold City, its elective and appointive boards, officers, agents, and employees harmless from any liability
for damage or claims for damage for personal injury, including death, as well as from claims for property
damage which may arise from Contractor's or any of Subcontractor's operations under this Agreement,
whether such operations be by Contractor or by any Subcontractor or Subcontractors, or by any one or
more persons directly or indirectly employed by, or acting as agent for, Contractor or any Subcontractor
or Subcontractors. Contractor agrees to, and shall, defend City and its elective and appointive boards,
officers, agents, and employees from any suits or actions at law or in equity for damages caused, or
alleged to have been caused, by reason of any of the aforesaid operations, provided as follows:
(A) The City does not, and shall not, waive any rights against Contractor which it may have
by reason of the aforesaid hold-harmless agreement, because of the acceptance by City, or the
deposit with City by Contractor, of any of the insurance policies hereinafter described in
Paragraph 15, “Insurance” hereof.
(B) That the aforesaid hold-harmless agreement by Contractor shall apply to all damages and
claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of
the aforesaid operations of Contractor or any Subcontractor, regardless of whether or not such
insurance policies shall have been determined to be applicable to any of such damages or claims
for damages.
10. Insurance. The Contractor shall take out and maintain during the life of this Agreement
the following policies of insurance:
(A) Workers' Compensation and Employers' Liability Insurance providing full
statutory coverage.
In signing this Agreement, the Contractor makes the following certification, required by
Section 1861 of the California Labor Code:
"I am aware of the provisions of Section 3700 of the California Labor Code which
require every employer to be insured against liability for Workers' Compensation
or to undertake self-insurance in accordance with the provisions of that Code, and
I will comply with such provisions before commencing the performance of the
work of this contract".
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-7 of 9
(B) Comprehensive General Liability Insurance.
Public Liability Insurance (includes premises, elevator - if applicable, products,
completed operations, personal injury and contractual):
(1) Bodily Injury Liability:
$ 500,000 each person $1,000,000 each occurrence
(2) Property Damage Liability [includes XCU (explosion, collapse, and underground
damage); water damage and broad form property damage or third party liability]:
$ 500,000 per occurrence
(C) Comprehensive Automobile Liability Insurance (includes owned, non-owned,
and hired vehicles):
(1) Bodily Injury Liability:
$ 500,000 per person $1,000,000 each occurrence
(2) Property Damage Liability:
$ 500,000 each occurrence
(D) It is agreed that the insurance required by Subsections B and C, in an aggregate
amount of not less than ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000), shall
be extended to include as additional insured the City of South San Francisco, its elective and appointive
boards, commissions, officers, agents, employees, with respect to operations performed by the Contractor,
as described herein. Evidence of this insurance described above shall be provided to City upon execution
of this Agreement and shall be subject to approval of the City Attorney as to form, amount, and carrier.
The policy of insurance shall also contain a provision indicating that such insurance shall not be reduced
or cancelled except upon thirty (30) calendar days written notice to City. In addition, the following
endorsement shall be made on said policy of insurance:
"The following are named as additional insured on the above policies: The City of South
San Francisco, its elective and appointive boards, officers, agents, and employees."
"Notwithstanding any other provision in this policy, the insurance afforded hereunder to
the City of South San Francisco shall be primary as to any other insurance or re-insurance
covering or available to the City of South San Francisco, and such other insurance or
reinsurance shall not be required to contribute to any liability or loss until and unless the
approximate limit of liability afforded hereunder is exhausted."
The above requirements that the City be named as additional insured, that the insurance
shall be primary to any other, and that the insurance not be cancelled without notice, shall be provided in
the form of an endorsement signed by an authorized representative of the insurance company providing
coverage, who shall declare his or her authority to sign on behalf of the insurer.
11. Proof of Carriage of Insurance. Contractor shall furnish City through the Engineer,
concurrently with the execution hereof, with satisfactory proof of carriage of the insurance required and
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-8 of 9
that each carrier shall give City at least thirty (30) calendar days prior notice of the cancellation or change
of any policy during the effective period of this contract. Further, if the Contractor’s insurance policy
includes a self-insured retention that must be paid by a named insured as a precondition of the insurer’s
liability, or which has the effect of providing that payments of the self-insured retention by others,
including additional insureds or insurers do not serve to satisfy the self-insured retention, such provisions
must be modified by special endorsement so as to not apply to the additional insured coverage required by
this agreement so as to not prevent any of the parties to this agreement from satisfying or paying the self-
insured retention required to be paid as a precondition to the insurer’s liability. Additionally, the
certificates of insurance must note whether the policy does or does not include any self-insured retention
and also must disclose the deductible.
12. Provisions Cumulative. The provisions of this Agreement are cumulative, and in addition
to and not in limitation of, any other rights or remedies available to City.
13. Form HUD-4010 For HUD-4010 is included in this Agreement as Attachment B.
Comply with its provisions.
14. Federal Minimum Wage Rates – For a Federal-aid contract, federal minimum wage rates
apply and are included in the Agreement as Attachment C.
15. Notices. All notices shall be in writing and delivered in person or transmitted by certified
mail, postage prepaid.
Notices required to be given to City shall be addressed as follows:
City Clerk
City Hall, 400 Grand Avenue
South San Francisco, California 94080
Notices required to be given to Contractor shall be addressed as follows:
_________________________________________________________________________
_________________________________________________________________________
Notices required to be given sureties of Contractor shall be addressed as follows:
_________________________________________________________________________
Notices required to be given to the Escrow Agent of Contractor, if any, shall be addressed as
follows:
_________________________________________________________________________
16. Interpretation. As used herein, any gender includes each other gender, the singular
includes the plural, and vice versa.
FED-AID AGREEMENT TEMPLATE
MAY 2017
Page A-9 of 9
IN WITNESS WHEREOF, two (2) identical counterparts of this Agreement, consisting of twelve
(12) pages (being pages A-1 through A-12), each of which counterparts shall for all purposes be deemed
an original of said Agreement, have been duly executed by the parties hereinabove named, on the day and
year first hereinabove written.
ATTEST: CITY: City of South San Francisco,
a municipal corporation
_______________________________ By: _____________________________
City Clerk Mike Futrell, City Manager
CONTRACTOR:_______________________
__________________________________
ATTEST: By:_______________________________
(If Contractor is an individual, so state.
_____________________________ If Contractor is a Corporation, a corporate seal
or signatures of the President or Vice President
and the Secretary Treasurer are required).
FED-AID AGREEMENT TEMPLATE
MAY 2017
ATTACHMENT A
ESCROW AGREEMENT FOR
SECURITY DEPOSITS IN LIEU OF RETENTION
THIS ESCROW AGREEMENT is made and entered into by and between the City of South
San Francisco whose address is 400 Grand Ave., P.O. Box 711, South San Francisco, CA 94083,
hereinafter referred to as "City," and ________________________________________,whose address
is ___________________________________________________________, hereinafter called
“Contractor” and ______________________________________________________________,whose
address is ___________________________________________________________, hereinafter called
“Escrow Agent.”
For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
1. Pursuant to Section 22300 of the Public Contract Code of the State of California,
Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings
required to be withheld by Owner pursuant to the Construction Contract entered into between the
Owner and Contractor for __________________ in the amount of _______________dollars ($_____)
dated ___________ (hereinafter referred to as the “Contract”). Alternately, on written request of the
Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent.
When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent
shall notify the Owner within 10 working days of the deposit. The market value of the securities at
the time of the substitution shall be at least equal to the cash amount then required to be withheld as
retention under the terms of the Contract between the Owner and Contractor. Securities shall be held
in the name of _______________, and shall designate the Contractor as the beneficial owner.
2. The Owner shall make progress payments to the Contractor for those funds which
otherwise would be withheld from progress payments pursuant to the Contract provisions, provided
that the Escrow Agent holds securities in the form and amount specified above.
3. When the Owner makes payment of retentions earned directly to the Escrow Agent,
the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow
created under this contract is terminated. The Contractor may direct the investment of the payments
into securities. All terms and conditions of this agreement and the rights and responsibilities of the
parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
4. Contractor shall be responsible for paying all fees for the expenses incurred by
Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses
and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
5. The interest earned on the securities or the money market accounts held in escrow
and all interest earned on that interest shall be for the sole account of Contractor and shall be subject
to withdrawal by Contractor at any time and from time to time without notice to the Owner.
6. Contractor shall have the right to withdraw all or any part of the principal in the
Escrow Account only by written notice to Escrow Agent accompanied by written authorization from
the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be
withdrawn by Contractor.
7. The Owner shall have a right to draw upon the securities in the event of default by
the Contractor. Upon seven day’s written notice to the Escrow Agent from the Owner of the default,
FED-AID AGREEMENT TEMPLATE
MAY 2017
the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as
instructed by the Owner.
8. Upon receipt of written notification from the Owner certifying that the Contract is
final and complete, and that the Contractor has complied with all requirements and procedures
applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on
deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately
upon disbursement of all moneys and securities on deposit and payments of fees and charges.
9. Escrow Agent shall rely on the written notifications from the Owner and the
Contractor pursuant to Sections (5) to (8), inclusive, of this Agreement, and the Owner and Contractor
shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and
interest as set forth above.
10. The names of the persons who are authorized to give written notice or to receive
written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing,
and exemplars of their respective signatures are as follows:
On behalf of Owner: On behalf of Contractor:
__________________________________ __________________________________
Title Title
__________________________________ __________________________________
Name Name
__________________________________ __________________________________
Signature Signature
__________________________________ __________________________________
Address Address
On behalf of Escrow Agent:
__________________________________
Title
__________________________________
Name
__________________________________
Signature
__________________________________
Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the
Escrow Agent a fully executed counterpart of this Agreement.
FED-AID AGREEMENT TEMPLATE
MAY 2017
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers
on the date first set forth above.
Owner: Contractor:
__________________________________ __________________________________
Title Title
__________________________________ __________________________________
Name Name
__________________________________ __________________________________
Signature Signature
Approved as to form: Attest:
_____________________________________ __________________________________
City Attorney Date City Clerk
FED-AID AGREEMENT TEMPLATE
MAY 2017
ATTACHMENT B
HUD FORM 4010
Federal Labor Standards Provisions U.S. Department of Housing
and Urban Development
Office of Labor Relations
Previous editions are obsolete
Page 1 of 5
form HUD-4010 (06/2009)
ref. Handbook 1344.1
Applicability
The Project or Program to which the construction work
covered by this contract pertains is being assisted by the
United States of America and the following Federal Labor
Standards Provisions are included in this Contract
pursuant to the provisions applicable to such Federal
assistance.
A. 1. (i) Minimum Wages. All laborers and mechanics
employed or working upon the site of the work, will be paid
unconditionally and not less often than once a week, and
without subsequent deduction or rebate on any account
(except such payroll deductions as are permitted by
regulations issued by the Secretary of Labor under the
Copeland Act (29 CFR Part 3), the full amount of wages
and bona fide fringe benefits (or cash equivalents thereof)
due at time of payment computed at rates not less than
those contained in the wage determination of the
Secretary of Labor which is attached hereto and made a
part hereof, regardless of any contractual relationship
which may be alleged to exist between the contractor and
such laborers and mechanics. Contributions made or
costs reasonably anticipated for bona fide fringe benefits
under Section l(b)(2) of the Davis-Bacon Act on behalf of
laborers or mechanics are considered wages paid to such
laborers or mechanics, subject to the provisions of 29 CFR
5.5(a)(1)(iv); also, regular contributions made or costs
incurred for more than a weekly period (but not less often
than quarterly) under plans, funds, or programs, which
cover the particular weekly period, are deemed to be
c onstructively made or incurred during such weekly period.
Such laborers and mechanics shall be paid the appropriate
wage rate and fringe benefits on the wage determination
for the classification of work actually performed, without
regard to skill, except as provided in 29 CFR 5.5(a)(4).
Laborers or mechanics performing work in more than one
classification may be compensated at the rate specified for
each classification for the time actually worked therein:
Provided, That the employer’s payroll records accurately
set forth the time spent in each classification in which
work is performed. The wage determination (including any
additional classification and wage rates conformed under
29 CFR 5.5(a)(1)(ii) and the Davis-Bacon poster (WH-
1321) shall be posted at all times by the contractor and its
subcontractors at the site of the work in a prominent and
accessible, place where it can be easily seen by the
workers.
(ii) (a) Any class of laborers or mechanics which is not
listed in the wage determination and which is to be
employed under the contract shall be classified in
conformance with the wage determination. HUD shall
approve an additional classification and wage rate and
fringe benefits therefor only when the following criteria
have been met:
(1) The work to be performed by the classification
requested is not performed by a classification in the wage
determination; and
(2) The classification is utilized in the area by the
construction industry; and
(3) The proposed wage rate, including any bona fide
fringe benefits, bears a reasonable relationship to the
wage rates contained in the wage determination.
(b) If the contractor and the laborers and mechanics to be
employed in the classification (if known), or their
representatives, and HUD or its designee agree on the
classification and wage rate (including the amount
designated for fringe benefits where appropriate), a report
of the action taken shall be sent by HUD or its designee to
the Administrator of the Wage and Hour Division,
Employment Standards Administration, U.S. Department of
Labor, Washington, D.C. 20210. The Administrator, or an
authorized representative, will approve, modify, or
disapprove every additional classification action within 30
days of receipt and so advise HUD or its designee or will
n otify HUD or its designee within the 30-day period that
additional time is necessary. (Approved by the Office of
Management and Budget under OMB control number 1215-
0140.)
(c) In the event the contractor, the laborers or mechanics
to be employed in the classification or their
representatives, and HUD or its designee do not agree on
the proposed classification and wage rate (including the
amount designated for fringe benefits, where appropriate),
HUD or its designee shall refer the questions, including
the views of all interested parties and the recommendation
of HUD or its designee, to the Administrator for
determination. The Administrator, or an authorized
representative, will issue a determination within 30 days of
receipt and so advise HUD or its designee or will notify
HUD or its designee within the 30-day period that
additional time is necessary. (Approved by the Office of
Management and Budget under OMB Control Number
1215-0140.)
(d) The wage rate (including fringe benefits where
appropriate) determined pursuant to subparagraphs
(1)(ii)(b) or (c) of this paragraph, shall be paid to all
workers performing work in the classification under this
contract from the first day on which work is performed in
the classification.
(iii) Whenever the minimum wage rate prescribed in the
contract for a class of laborers or mechanics includes a
fringe benefit which is not expressed as an hourly rate, the
contractor shall either pay the benefit as stated in the
wage determination or shall pay another bona fide fringe
benefit or an hourly cash equivalent thereof.
(iv) If the contractor does not make payments to a trustee
or other third person, the contractor may consider as part
Previous editions are obsolete
Page 2 of 5
form HUD-4010 (06/2009)
ref. Handbook 1344.1
of the wages of any laborer or mechanic the amount of any
costs reasonably anticipated in providing bona fide fringe
benefits under a plan or program, Provided, That the
Secretary of Labor has found, upon the written request of
the contractor, that the applicable standards of the Davis-
Bacon Act have been met. The Secretary of Labor may
require the contractor to set aside in a separate account
assets for the meeting of obligations under the plan or
program. (Approved by the Office of Management and
Budget under OMB Control Number 1215-0140.)
2. Withholding. HUD or its designee shall upon its own
action or upon written request of an authorized
representative of the Department of Labor withhold or
cause to be withheld from the contractor under this
contract or any other Federal contract with the same prime
contractor, or any other Federally-assisted contract
subject to Davis-Bacon prevailing wage requirements,
which is held by the same prime contractor so much of the
accrued payments or advances as may be considered
necessary to pay laborers and mechanics, including
apprentices, trainees and helpers, employed by the
contractor or any subcontractor the full amount of wages
required by the contract In the event of failure to pay any
laborer or mechanic, including any apprentice, trainee or
helper, employed or working on the site of the work, all or
p art of the wages required by the contract, HUD or its
designee may, after written notice to the contractor,
sponsor, applicant, or owner, take such action as may be
necessary to cause the suspension of any further
payment, advance, or guarantee of funds until such
violations have ceased. HUD or its designee may, after
written notice to the contractor, disburse such amounts
withheld for and on account of the contractor or
subcontractor to the respective employees to whom they
are due. The Comptroller General shall make such
disbursements in the case of direct Davis-Bacon Act
contracts.
3. (i) Payrolls and basic records. Payrolls and basic
records relating thereto shall be maintained by the
contractor during the course of the work preserved for a
period of three years thereafter for all laborers and
mechanics working at the site of the work. Such records
shall contain the name, address, and social security
number of each such worker, his or her correct
classification, hourly rates of wages paid (including rates
of contributions or costs anticipated for bona fide fringe
benefits or cash equivalents thereof of the types described
in Section l(b)(2)(B) of the Davis-bacon Act), daily and
weekly number of hours worked, deductions made and
actual wages paid. Whenever the Secretary of Labor has
found under 29 CFR 5.5 (a)(1)(iv) that the wages of any
laborer or mechanic include the amount of any costs
reasonably anticipated in providing benefits under a plan
or program described in Section l(b)(2)(B) of the Davis-
Bacon Act, the contractor shall maintain records which
show that the commitment to provide such benefits is
enforceable, that the plan or program is financially
responsible, and that the plan or program has been
communicated in writing to the laborers or mechanics
affected, and records which show the costs anticipated or
the actual cost incurred in providing such benefits.
Contractors employing apprentices or trainees under
approved programs shall maintain written evidence of the
registration of apprenticeship programs and certification of
trainee programs, the registration of the apprentices and
trainees, and the ratios and wage rates prescribed in the
applicable programs. (Approved by the Office of
Management and Budget under OMB Control Numbers
1215-0140 and 1215-0017.)
(ii) (a) The contractor shall submit weekly for each week
in which any contract work is performed a copy of all
payrolls to HUD or its designee if the agency is a party to
the contract, but if the agency is not such a party, the
contractor will submit the payrolls to the applicant
sponsor, or owner, as the case may be, for transmission to
HUD or its designee. The payrolls submitted shall set out
accurately and completely all of the information required
to be maintained under 29 CFR 5.5(a)(3)(i) except that full
social security numbers and home addresses shall not be
included on weekly transmittals. Instead the payrolls shall
only need to include an individually identifying number for
each employee (e.g., the last four digits of the employee’s
social security number). The required weekly payroll
information may be submitted in any form desired.
Optional Form WH-347 is available for this purpose from
the Wage and Hour Division Web site at
http://www.dol.gov/esa/whd/forms/wh347instr.htm or its
successor site. The prime contractor is responsible for
the submission of copies of payrolls by all subcontractors.
Contractors and subcontractors shall maintain the full
social security number and current address of each
covered worker, and shall provide them upon request to
HUD or its designee if the agency is a party to the
contract, but if the agency is not such a party, the
contractor will submit the payrolls to the applicant
sponsor, or owner, as the case may be, for transmission to
HUD or its designee, the contractor, or the Wage and Hour
Division of the Department of Labor for purposes of an
investigation or audit of compliance with prevailing wage
requirements. It is not a violation of this subparagraph for
a prime contractor to require a subcontractor to provide
addresses and social security numbers to the prime
contractor for its own records, without weekly submission
to HUD or its designee. (Approved by the Office of
Management and Budget under OMB Control Number
1215-0149.)
(b) Each payroll submitted shall be accompanied by a
“Statement of Compliance,” signed by the contractor or
subcontractor or his or her agent who pays or supervises
the payment of the persons employed under the contract
and shall certify the following:
(1) That the payroll for the payroll period contains the
information required to be provided under 29 CFR 5.5
(a)(3)(ii), the appropriate information is being maintained
under 29 CFR 5.5(a)(3)(i), and that such information is
correct and complete;
Previous editions are obsolete
Page 3 of 5
form HUD-4010 (06/2009)
ref. Handbook 1344.1
(2) That each laborer or mechanic (including each helper,
apprentice, and trainee) employed on the contract during
the payroll period has been paid the full weekly wages
earned, without rebate, either directly or indirectly, and
that no deductions have been made either directly or
indirectly from the full wages earned, other than
permissible deductions as set forth in 29 CFR Part 3;
(3) That each laborer or mechanic has been paid not less
than the applicable wage rates and fringe benefits or cash
equivalents for the classification of work performed, as
specified in the applicable wage determination
incorporated into the contract.
(c) The weekly submission of a properly executed
certification set forth on the reverse side of Optional Form
WH-347 shall satisfy the requirement for submission of the
“Statement of Compliance” required by subparagraph
A.3.(ii)(b).
(d) The falsification of any of the above certifications may
subject the contractor or subcontractor to civil or criminal
prosecution under Section 1001 of Title 18 and Section
231 of Title 31 of the United States Code.
(iii) The contractor or subcontractor shall make the
records required under subparagraph A.3.(i) available for
inspection, copying, or transcription by authorized
representatives of HUD or its designee or the Department
of Labor, and shall permit such representatives to
interview employees during working hours on the job. If
the contractor or subcontractor fails to submit the required
records or to make them available, HUD or its designee
may, after written notice to the contractor, sponsor,
applicant or owner, take such action as may be necessary
to cause the suspension of any further payment, advance,
or guarantee of funds. Furthermore, failure to submit the
required records upon request or to make such records
available may be grounds for debarment action pursuant to
29 CFR 5.12.
4. Apprentices and Trainees.
(i) Apprentices. Apprentices will be permitted to work at
less than the predetermined rate for the work they
performed when they are employed pursuant to and
individually registered in a bona fide apprenticeship
program registered with the U.S. Department of Labor,
Employment and Training Administration, Office of
Apprenticeship Training, Employer and Labor Services, or
with a State Apprenticeship Agency recognized by the
Office, or if a person is employed in his or her first 90
days of probationary employment as an apprentice in such
an apprenticeship program, who is not individually
registered in the program, but who has been certified by
the Office of Apprenticeship Training, Employer and Labor
Services or a State Apprenticeship Agency (where
appropriate) to be eligible for probationary employment as
an apprentice. The allowable ratio of apprentices to
journeymen on the job site in any craft classification shall
not be greater than the ratio permitted to the contractor as
to the entire work force under the registered program. Any
worker listed on a payroll at an apprentice wage rate, who
is not registered or otherwise employed as stated above,
shall be paid not less than the applicable wage rate on the
wage determination for the classification of work actually
performed. In addition, any apprentice performing work on
the job site in excess of the ratio permitted under the
registered program shall be paid not less than the
applicable wage rate on the wage determination for the
work actually performed. Where a contractor is performing
construction on a project in a locality other than that in
which its program is registered, the ratios and wage rates
(expressed in percentages of the journeyman’s hourly
rate) specified in the contractor’s or subcontractor’s
registered program shall be observed. Every apprentice
must be paid at not less than the rate specified in the
registered program for the apprentice’s level of progress,
expressed as a percentage of the journeymen hourly rate
specified in the applicable wage determination.
Apprentices shall be paid fringe benefits in accordance
with the provisions of the apprenticeship program. If the
apprenticeship program does not specify fringe benefits,
apprentices must be paid the full amount of fringe benefits
listed on the wage determination for the applicable
classification. If the Administrator determines that a
different practice prevails for the applicable apprentice
classification, fringes shall be paid in accordance with that
determination. In the event the Office of Apprenticeship
Training, Employer and Labor Services, or a State
Apprenticeship Agency recognized by the Office,
withdraws approval of an apprenticeship program, the
contractor will no longer be permitted to utilize
apprentices at less than the applicable predetermined rate
for the work performed until an acceptable program is
approved.
(ii) Trainees. Except as provided in 29 CFR 5.16,
trainees will not be permitted to work at less than the
predetermined rate for the work performed unless they are
employed pursuant ‘,to and individually registered in a
program which has received prior approval, evidenced by
formal certification by the U.S. Department of Labor,
Employment and Training Administration. The ratio of
trainees to journeymen on the job site shall not be greater
than permitted under the plan approved by the
Employment and Training Administration. Every trainee
must be paid at not less than the rate specified in the
approved program for the trainee’s level of progress,
expressed as a percentage of the journeyman hourly rate
specified in the applicable wage determination. Trainees
shall be paid fringe benefits in accordance with the
provisions of the trainee program. If the trainee program
does not mention fringe benefits, trainees shall be paid
the full amount of fringe benefits listed on the wage
determination unless the Administrator of the Wage and
Hour Division determines that there is an apprenticeship
program associated with the corresponding journeyman
wage rate on the wage determination which provides for
less than full fringe benefits for apprentices. Any
employee listed on the payroll at a trainee rate who is not
registered and participating in a training plan approved by
Previous editions are obsolete
Page 4 of 5
form HUD-4010 (06/2009)
ref. Handbook 1344.1
the Employment and Training Administration shall be paid
not less than the applicable wage rate on the wage
determination for the work actually performed. In addition,
any trainee performing work on the job site in excess of
the ratio permitted under the registered program shall be
paid not less than the applicable wage rate on the wage
determination for the work actually performed. In the
event the Employment and Training Administration
withdraws approval of a training program, the contractor
will no longer be permitted to utilize trainees at less than
the applicable predetermined rate for the work performed
until an acceptable program is approved.
(iii) Equal employment opportunity. The utilization of
apprentices, trainees and journeymen under 29 CFR Part 5
shall be in conformity with the equal employment
opportunity requirements of Executive Order 11246, as
amended, and 29 CFR Part 30.
5. Compliance with Copeland Act requirements. The
contractor shall comply with the requirements of 29 CFR
Part 3 which are incorporated by reference in this contract
6. Subcontracts. The contractor or subcontractor will
insert in any subcontracts the clauses contained in
subparagraphs 1 through 11 in this paragraph A and such
other clauses as HUD or its designee may by appropriate
instructions require, and a copy of the applicable
prevailing wage decision, and also a clause requiring the
subcontractors to include these clauses in any lower tier
subcontracts. The prime contractor shall be responsible
for the compliance by any subcontractor or lower tier
subcontractor with all the contract clauses in this
paragraph.
7. Contract termination; debarment. A breach of the
contract clauses in 29 CFR 5.5 may be grounds for
termination of the contract and for debarment as a
contractor and a subcontractor as provided in 29 CFR
5.12.
8. Compliance with Davis-Bacon and Related Act Requirements.
All rulings and interpretations of the Davis-Bacon and
Related Acts contained in 29 CFR Parts 1, 3, and 5 are
herein incorporated by reference in this contract
9. Disputes concerning labor standards. Disputes
arising out of the labor standards provisions of this
contract shall not be subject to the general disputes
clause of this contract. Such disputes shall be resolved in
accordance with the procedures of the Department of
Labor set forth in 29 CFR Parts 5, 6, and 7. Disputes
within the meaning of this clause include disputes between
the contractor (or any of its subcontractors) and HUD or
its designee, the U.S. Department of Labor, or the
employees or their representatives.
10. (i) Certification of Eligibility. By entering into this
contract the contractor certifies that neither it (nor he or
she) nor any person or firm who has an interest in the
contractor’s firm is a person or firm ineligible to be
awarded Government contracts by virtue of Section 3(a) of
the Davis-Bacon Act or 29 CFR 5.12(a)(1) or to be
awarded HUD contracts or participate in HUD programs
pursuant to 24 CFR Part 24.
(ii) No part of this contract shall be subcontracted to any
person or firm ineligible for award of a Government
contract by virtue of Section 3(a) of the Davis-Bacon Act
or 29 CFR 5.12(a)(1) or to be awarded HUD contracts or
participate in HUD programs pursuant to 24 CFR Part 24.
(iii) The penalty for making false statements is prescribed
in the U.S. Criminal Code, 18 U.S.C. 1001. Additionally,
U.S. Criminal Code, Section 1 01 0, Title 18, U.S.C.,
“Federal Housing Administration transactions”, provides in
part: “Whoever, for the purpose of . . . influencing in any
way the action of such Administration..... makes, utters or
publishes any statement knowing the same to be false.....
shall be fined not more than $5,000 or imprisoned not
more than two years, or both.”
11. Complaints, Proceedings, or Testimony by
Employees. No laborer or mechanic to whom the wage,
salary, or other labor standards provisions of this Contract
are applicable shall be discharged or in any other manner
discriminated against by the Contractor or any
subcontractor because such employee has filed any
complaint or instituted or caused to be instituted any
proceeding or has testified or is about to testify in any
proceeding under or relating to the labor standards
applicable under this Contract to his employer.
B. Contract Work Hours and Safety Standards Act. The
provisions of this paragraph B are applicable where the amount of the
prime contract exceeds $100,000. As used in this paragraph, the
terms “laborers” and “mechanics” include watchmen and guards.
(1) Overtime requirements. No contractor or subcontractor
contracting for any part of the contract work which may require or
involve the employment of laborers or mechanics shall require or
permit any such laborer or mechanic in any workweek in which the
individual is employed on such work to work in excess of 40 hours in
such workweek unless such laborer or mechanic receives
compensation at a rate not less than one and one-half times the basic
rate of pay for all hours worked in excess of 40 hours in such
workweek.
(2) Violation; liability for unpaid wages; liquidated
damages. In the event of any violation of the clause set
forth in subparagraph (1) of this paragraph, the contractor
and any subcontractor responsible therefor shall be liable
for the unpaid wages. In addition, such contractor and
subcontractor shall be liable to the United States (in the
case of work done under contract for the District of
Columbia or a territory, to such District or to such
territory), for liquidated damages. Such liquidated
damages shall be computed with respect to each individual
laborer or mechanic, including watchmen and guards,
employed in violation of the clause set forth in
subparagraph (1) of this paragraph, in the sum of $10 for each
calendar day on which such individual was required or permitted to
work in excess of the standard workweek of 40 hours without payment
of the overtime wages required by the clause set forth in sub
paragraph (1) of this paragraph.
Previous editions are obsolete
Page 5 of 5
form HUD-4010 (06/2009)
ref. Handbook 1344.1
(3) Withholding for unpaid wages and liquidated
damages. HUD or its designee shall upon its own action
or upon written request of an authorized representative of
the Department of Labor withhold or cause to be withheld,
from any moneys payable on account of work performed by
the contractor or subcontractor under any such contract or
any other Federal contract with the same prime contract,
or any other Federally-assisted contract subject to the
Contract Work Hours and Safety Standards Act which is
held by the same prime contractor such sums as may be
determined to be necessary to satisfy any liabilities of
such contractor or subcontractor for unpaid wages and
liquidated damages as provided in the clause set forth in
subparagraph (2) of this paragraph.
(4) Subcontracts. The contractor or subcontractor shall
insert in any subcontracts the clauses set forth in
subparagraph (1) through (4) of this paragraph and also a
clause requiring the subcontractors to include these
clauses in any lower tier subcontracts. The prime
contractor shall be responsible for compliance by any
subcontractor or lower tier subcontractor with the clauses
set forth in subparagraphs (1) through (4) of this
paragraph.
C. Health and Safety. The provisions of this paragraph C are
applicable where the amount of the prime contract exceeds $100,000.
(1) No laborer or mechanic shall be required to work in
surroundings or under working conditions which are
unsanitary, hazardous, or dangerous to his health and
safety as determined under construction safety and health
standards promulgated by the Secretary of Labor by
regulation.
(2) The Contractor shall comply with all regulations
issued by the Secretary of Labor pursuant to Title 29 Part
1926 and failure to comply may result in imposition of
sanctions pursuant to the Contract Work Hours and Safety
Standards Act, (Public Law 91-54, 83 Stat 96). 40 USC
3701 et seq.
(3) The contractor shall include the provisions of this
paragraph in every subcontract so that such provisions will
be binding on each subcontractor. The contractor shall
take such action with respect to any subcontractor as the
Secretary of Housing and Urban Development or the
Secretary of Labor shall direct as a means of enforcing
such provisions.
ATTACHMENT C
FEDERAL MINIMUM WAGE RATES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 1/111
"General Decision Number: CA20190018 12/06/2019
Superseded General Decision Number: CA20180029
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and
Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings,
Madera, Mariposa, Merced, Monterey, San Benito, San Francisco,
San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and
Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not
include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does
not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage
of $10.60 for calendar year 2019 applies to all contracts
subject to the Davis-Bacon Act for which the contract is
awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor
must pay all workers in any classification listed on this wage
determination at least $10.60 per hour (or the applicable wage
rate listed on this wage determination, if it is higher) for
all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a
classification considered necessary for performance of work on
the contract does not appear on this wage determination, the
contractor must pay workers in that classification at least the
wage rate determined through the conformance process set forth
in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is
higher than the conformed wage rate). The EO minimum wage rate
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 2/111
will be adjusted annually. Please note that this EO applies to
the above-mentioned types of contracts entered into by the
federal government that are subject to the Davis-Bacon Act
itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor
requirements and worker protections under the EO is available
at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 02/01/2019
2 02/15/2019
3 02/22/2019
4 05/03/2019
5 07/26/2019
6 11/08/2019
7 11/15/2019
8 11/22/2019
9 11/29/2019
10 12/06/2019
ASBE0016-004 01/01/2019
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,
MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &
TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA
CLARA COUNTIES
Rates Fringes
Asbestos Removal
worker/hazardous material
handler (Includes
preparation, wetting,
stripping, removal,
scrapping, vacuuming, bagging
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 3/111
and disposing of all
insulation materials from
mechanical systems, whether
they contain asbestos or not)
Area 1......................$ 28.20 9.27
Area 2......................$ 36.53 9.27
----------------------------------------------------------------
ASBE0016-008 08/01/2019
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN
FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE
Rates Fringes
Asbestos Workers/Insulator
(Includes the application of
all insulating materials,
Protective Coverings,
Coatings, and Finishes to all
types of mechanical systems)
Area 1......................$ 71.16 23.39
Area 2......................$ 54.26 23.30
----------------------------------------------------------------
BOIL0549-001 10/01/2016
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: REMAINING COUNTIES
Rates Fringes
BOILERMAKER
Area 1......................$ 43.28 37.91
Area 2......................$ 39.68 35.71
----------------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 4/111
BRCA0003-001 08/01/2019
Rates Fringes
MARBLE FINISHER..................$ 35.41 16.45
----------------------------------------------------------------
BRCA0003-003 08/01/2019
Rates Fringes
MARBLE MASON.....................$ 49.42 27.86
----------------------------------------------------------------
BRCA0003-005 05/01/2019
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings,
Madera, Mariposa, Merced....$ 41.88 22.19
( 7) San Francisco, San
Mateo.......................$ 42.34 25.83
( 8) Alameda, Contra
Costa, San Benito, Santa
Clara.......................$ 44.16 21.71
( 9) Calaveras, San
Joaquin, Stanislaus,
Toulumne....................$ 39.66 20.76
(16) Monterey, Santa Cruz...$ 39.51 23.49
----------------------------------------------------------------
BRCA0003-008 07/01/2019
Rates Fringes
TERRAZZO FINISHER................$ 37.58 17.33
TERRAZZO WORKER/SETTER...........$ 48.53 26.84
----------------------------------------------------------------
BRCA0003-011 04/01/2019
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San
Francisco, San Mateo, Santa Clara, Santa Cruz
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 5/111
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne
AREA 3: Fresno, Kings, Madera, Mariposa, Merced
Rates Fringes
TILE FINISHER
Area 1......................$ 29.94 16.38
Area 2......................$ 25.60 14.30
Area 3......................$ 26.58 15.65
Tile Layer
Area 1......................$ 49.90 19.16
Area 2......................$ 42.67 16.81
Area 3......................$ 40.27 18.58
----------------------------------------------------------------
CARP0022-001 07/01/2019
San Francisco County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
----------------------------------------------------------------
CARP0034-001 07/01/2019
Rates Fringes
Diver
Assistant Tender, ROV
Tender/Technician...........$ 49.75 33.40
Diver standby...............$ 55.73 33.40
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 6/111
Diver Tender................$ 54.73 33.40
Diver wet...................$ 99.27 33.40
Manifold Operator (mixed
gas)........................$ 59.73 33.40
Manifold Operator (Standby).$ 54.73 33.40
DEPTH PAY (Surface Diving):
050 to 100 ft $2.00 per foot
101 to 150 ft $3.00 per foot
151 to 220 ft $4.00 per foot
221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The
saturation diving rate applies when divers are under
pressure continuously until work task and decompression are
complete. The diver rate shall be paid for all saturation
hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels,
or other enclosures where there is no vertical ascent, the
following premium shall be paid: Distance traveled from
entrance 26 feet to 300 feet: $1.00 per foot. When it is
necessary for a diver to enter any pipe, tunnel or other
enclosure less than 48"" in height, the premium will be
$1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications
within the diving crew (except dive supervisor) in a shift
are paid in the classification with the highest rate for
that shift.
----------------------------------------------------------------
CARP0034-003 07/01/2019
Rates Fringes
Piledriver.......................$ 50.75 33.40
----------------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 7/111
CARP0035-007 07/01/2017
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San
Joaquin, Stanislaus, Tuolumne Counties
Rates Fringes
Modular Furniture Installer
Area 1
Installer I................$ 25.61 20.42
Installer II...............$ 22.18 20.42
Lead Installer.............$ 29.06 20.92
Master Installer...........$ 33.28 20.92
Area 2
Installer I................$ 22.96 20.42
Installer II...............$ 20.01 20.42
Lead Installer.............$ 25.93 20.92
Master Installer...........$ 29.56 20.92
Area 3
Installer I................$ 22.01 20.42
Installer II...............$ 19.24 20.42
Lead Installer.............$ 24.81 20.92
Master Installer...........$ 31.83 20.92
----------------------------------------------------------------
CARP0035-008 08/01/2018
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa
Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: San Joaquin
AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced,
Stanislaus, Tuolumne Counties
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 8/111
Rates Fringes
Drywall Installers/Lathers:
Area 1......................$ 48.40 29.76
Area 2......................$ 42.52 29.76
Area 3......................$ 41.02 29.15
Area 4......................$ 41.67 29.76
Drywall Stocker/Scrapper
Area 1......................$ 24.20 17.29
Area 2......................$ 21.26 17.29
Area 3......................$ 20.51 16.88
Area 4......................$ 20.84 17.29
----------------------------------------------------------------
CARP0152-001 07/01/2019
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
----------------------------------------------------------------
CARP0152-002 07/01/2019
San Joaquin County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 9/111
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
----------------------------------------------------------------
CARP0152-004 07/01/2019
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 43.27 30.20
Millwright..................$ 45.77 31.79
----------------------------------------------------------------
CARP0217-001 07/01/2019
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 10/111
----------------------------------------------------------------
CARP0405-001 07/01/2019
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
----------------------------------------------------------------
CARP0405-002 07/01/2019
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.68 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
----------------------------------------------------------------
CARP0505-001 07/01/2019
Santa Cruz County
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 11/111
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
----------------------------------------------------------------
CARP0605-001 07/01/2019
Monterey County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 44.77 30.20
Journeyman Carpenter........$ 44.62 30.20
Millwright..................$ 47.12 31.79
----------------------------------------------------------------
CARP0701-001 07/01/2019
Fresno and Madera Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 12/111
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 43.27 30.20
Millwright..................$ 45.77 31.79
----------------------------------------------------------------
CARP0713-001 07/01/2019
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 50.65 30.20
Journeyman Carpenter........$ 50.50 30.20
Millwright..................$ 50.60 31.79
----------------------------------------------------------------
CARP1109-001 07/01/2019
Kings County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 50.50 30.20
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 43.42 30.20
Journeyman Carpenter........$ 43.27 30.20
Millwright..................$ 45.77 31.79
----------------------------------------------------------------
ELEC0006-004 12/01/2018
SAN FRANCISCO COUNTY
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 13/111
Rates Fringes
Sound & Communications
Installer...................$ 40.52 3%+19.05
Technician..................$ 46.60 3%+19.05
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0006-007 06/01/2019
SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 74.50 3%+33.715
----------------------------------------------------------------
ELEC0100-002 03/01/2019
FRESNO, KINGS, AND MADERA COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 14/111
Rates Fringes
ELECTRICIAN......................$ 38.75 23.06
----------------------------------------------------------------
ELEC0100-005 12/01/2018
FRESNO, KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 33.59 19.55
Technician..................$ 38.63 19.71
SCOPE OF WORK
Includes the installation testing, service and maintenance,
of the following systems which utilize the transmission
and/or transference of voice, sound, vision and digital for
commercial, education, security and entertainment purposes
for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system,
radio page, school intercom and sound, burglar alarms, and
low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems,
Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clock systems,
Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide,
B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and
surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave
transmission systems, CATV and CCTV
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 15/111
D. SECURITY SYSTEMS Perimeter security systems Vibration
sensor systems Card access systems Access control systems,
Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE
INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and
Data Acquisition) PCM (Pulse Code Modulation) Inventory
Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control
Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding
Ladder-Rack for the purpose of the above listed systems).
Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCADA (Supervisory Control and Data Acquisition)
when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at
the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades
construction.
2. The conductors for the fire alarm system are installed in
conduit.
----------------------------------------------------------------
ELEC0234-001 12/24/2018
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
ELECTRICIAN
Zone A......................$ 49.30 25.58
Zone B......................$ 54.23 25.73
Zone A: All of Santa Cruz, Monterey, and San Benito Counties
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 16/111
within 25 air miles of Highway 1 and Dolan Road in Moss
Landing, and an area extending 5 miles east and west of
Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
----------------------------------------------------------------
ELEC0234-003 12/01/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 40.02 19.75
Technician..................$ 46.02 19.75
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0302-001 02/25/2019
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 17/111
CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 60.48 26.06
ELECTRICIAN......................$ 53.76 25.86
----------------------------------------------------------------
ELEC0302-003 12/01/2018
CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 38.42 19.70
Technician..................$ 44.18 19.88
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 18/111
* ELEC0332-001 06/01/2019
SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 78.60 38.564
ELECTRICIAN......................$ 68.52 38.256
FOOTNOTES: Work under compressed air or where gas masks are
required, orwork on ladders, scaffolds, stacks, ""Bosun's
chairs,"" or other structures and where the workers are not
protected by permanent guard rails at a distance of 40 to
60 ft. from the ground or supporting structures: to be paid
one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
----------------------------------------------------------------
ELEC0332-003 12/01/2018
SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 40.02 19.75
Technician..................$ 46.02 19.93
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 19/111
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0595-001 06/01/2019
ALAMEDA COUNTY
Rates Fringes
CABLE SPLICER....................$ 65.90 3%+36.82
ELECTRICIAN......................$ 57.30 3%+36.82
----------------------------------------------------------------
ELEC0595-002 06/01/2019
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 43.99 7.75%+24.83
ELECTRICIAN
(1) Tunnel work.............$ 40.16 7.75%+24.83
(2) All other work.........$ 38.25 7.75%+24.83
----------------------------------------------------------------
ELEC0595-006 12/01/2018
ALAMEDA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 40.02 3%+18.96
Technician..................$ 46.02 3%+18.96
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 20/111
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0595-008 12/01/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System
Installer...................$ 33.59 3%+18.86
Technician..................$ 38.63 3%+18.86
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 21/111
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0617-001 06/01/2019
SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 63.00 37.68
----------------------------------------------------------------
ELEC0617-003 12/01/2018
SAN MATEO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 40.02 19.93
Technician..................$ 46.02 19.93
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 22/111
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC0684-001 06/01/2019
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 40.25 3%+22.83
CABLE SPLICER = 110% of Journeyman Electrician
----------------------------------------------------------------
ELEC0684-004 12/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System
Installer...................$ 33.59 19.56
Technician..................$ 38.63 19.71
SCOPE OF WORK: Including any data system whose only function
is to transmit or receive information; excluding all other
data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 23/111
in raceways (including wire and cable pulling) and when
performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are
installed in conduit; excluding installation of raceway
systems, line voltage work, industrial work, life-safety
systems (all buildings having floors located more than 75'
above the lowest floor level having building access);
excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for
which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside
electrician.
----------------------------------------------------------------
ELEC1245-001 01/01/2019
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 56.79 17.41
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment)...........$ 45.36 16.24
(3) Groundman...............$ 34.68 15.86
(4) Powderman...............$ 49.55 3%+17.65
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day
and day after Thanksgiving, Christmas Day
----------------------------------------------------------------
ELEV0008-001 01/01/2019
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 24/111
Rates Fringes
ELEVATOR MECHANIC................$ 67.56 34.125+a+b
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly
rate as vacation pay credit for employees with more than 5
years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day,
Labor Day, Veterans Day, Thanksgiving Day, Friday after
Thanksgiving, and Christmas Day.
----------------------------------------------------------------
ENGI0003-001 06/24/2019
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1
RATES.
SEE AREA DEFINITIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 49.02 30.74
GROUP 2.....................$ 47.49 30.74
GROUP 3.....................$ 46.01 30.74
GROUP 4.....................$ 44.63 30.74
GROUP 5.....................$ 43.36 30.74
GROUP 6.....................$ 42.04 30.74
GROUP 7.....................$ 40.90 30.74
GROUP 8.....................$ 39.76 30.74
GROUP 8-A...................$ 37.55 30.74
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 50.65 30.74
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 25/111
Oiler......................$ 36.63 30.39
Truck crane oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 48.14 30.74
Oiler......................$ 36.36 30.39
Truck crane oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 46.40 30.74
Hydraulic..................$ 38.32 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 43.36 30.74
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 45.89 30.39
Oiler......................$ 36.63 30.39
Truck crane oiler..........$ 39.20 30.39
GROUP 2
Lifting devices............$ 44.07 30.39
Oiler......................$ 36.36 30.39
Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Lifting devices............$ 42.39 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Lifting devices............$ 40.62 30.39
GROUP 5
Lifting devices............$ 39.32 30.39
GROUP 6
Lifting devices............$ 37.98 30.39
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 46.30 30.39
Oiler......................$ 36.63 30.39
Truck Crane Oiler..........$ 39.20 30.39
GROUP 2
Cranes.....................$ 43.79 30.39
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 26/111
Oiler......................$ 36.36 30.39
Truck Crane Oiler..........$ 38.98 30.39
GROUP 3
Cranes.....................$ 42.05 30.39
Hydraulic..................$ 38.32 30.39
Oiler......................$ 36.14 30.39
Truck Crane Oiler..........$ 38.71 30.39
GROUP 4
Cranes.....................$ 39.01 30.39
GROUP 5
Cranes.....................$ 35.13 30.39
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:
GROUP 1....................$ 40.77 30.39
GROUP 1-A..................$ 43.24 30.39
GROUP 2....................$ 39.51 30.39
GROUP 3....................$ 38.18 30.39
GROUP 4....................$ 37.04 30.39
GROUP 5....................$ 35.90 30.39
UNDERGROUND:
GROUP 1....................$ 40.67 30.39
GROUP 1-A..................$ 43.14 30.39
GROUP 2....................$ 39.41 30.39
GROUP 3....................$ 38.08 30.39
GROUP 4....................$ 36.94 30.39
GROUP 5....................$ 35.80 30.39
FOOTNOTE: Work suspended by ropes or cables, or work on a
Yo-Yo Cat: $.60 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work);
Hydraulic excavator, 7 cu. yds. and over; Power shovels,
over 7 cu. yds.
GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu.
yds. up to 7 cu. yds.; Licensed construction work boat
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 27/111
operator, on site; Power blade operator (finish); Power
shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.
GROUP 3: Asphalt milling machine; Cable backhoe; Combination
backhoe and loader over 3/4 cu. yds.; Continuous flight tie
back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply;
Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2
cu. yds.; Loader 4 cu. yds. and over; Long reach excavator;
Multiple engine scraper (when used as push pull); Power
shovels, up to and including 1 cu. yd.; Pre-stress wire
wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom;
Combination backhoe and loader up to and including 3/4 cu.
yd.; Concrete batch plant (wet or dry); Dozer and/or push
cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar;
Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer
(mobile and grease rack); Mechanical finishers or spreader
machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing
and screening plants; Power blade support; Roller operator,
asphalt; Rubber-tired scraper, self-loading (paddle-wheels,
etc.); Rubber- tired earthmoving equipment (scrapers); Slip
form paver (concrete); Small tractor with drag; Soil
stabilizer (P & H or equal); Spider plow and spider puller;
Tubex pile rig; Unlicensed constuction work boat operator,
on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar Pugmill
equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 28/111
slusher and motor operator; Concrete conveyor or concrete
pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling
equipment, Watson 2000, Texoma 700 or similar; Drilling and
boring machinery, horizontal (not to apply to waterliners,
wagon drills or jackhammers); Concrete mixer/all; Person
and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types);
Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in
tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper;
Boom- type backfilling machine; Assistant plant engineer;
Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete
saw (self-propelled unit on streets, highways, airports and
canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft.
m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader,
Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler,
truck mounted equipment; Pavement breaker, truck-mounted,
with compressor combination; Paving fabric installation
and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
A-frame truck, non-rotating - under 15 tons; Cary lift or
similar; Combination slurry mixer and/or cleaner; Drilling
equipment, 20 ft. and under m.r.c.; Firetender (hot plant);
Grouting machine operator; Highline cableway signalperson;
Stationary belt loader (Kolman or similar); Lift slab
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 29/111
machine (Vagtborg and similar types); Maginnes internal
full slab vibrator; Material hoist (1 drum); Mechanical
trench shield; Pavement breaker with or without compressor
combination); Pipe cleaning machine (tractor propelled and
supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing
mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson;
Slip-form pumps (lifting device for concrete forms); Tie
spacer; Tower mobile; Trenching machine, maximum digging
capacity up to and including 5 ft. depth; Truck- type loader
GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire
tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken
seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self-
propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar;
Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson;
Tar pot firetender; Tugger hoist, single drum; Vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743
series or smaller, and similar (without attachments); Mini
excavator under 25 H.P. (backhoe-trencher); Tub grinder
wood chipper
----------------------------------------------------------
ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over
100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type
lifting device, over 100 tons
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 30/111
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and
including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu.
yd.; Cranes 45 tons and under; Self-propelled boom-type
lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar
(boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar
(boom truck) - under 15 tons;
-----------------------------------------------------------
PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting
device over 100 tons; Truck crane or crawler, land or barge
mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu.
yds.; Self-propelled boom-type lifting device over 45 tons;
Truck crane or crawler, land or barge mounted, over 45 tons
up to and including 100 tons; Fundex F-12 hydraulic pile rig
GROUP 3: Derrick barge pedestal mounted under 45 tons; Self-
propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler,
land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer;
Forklift, 10 tons and over; Heavy-duty repairperson/welder
GROUP 5: Deck engineer
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 31/111
GROUP 6: Deckhand; Fire tender
-------------------------------------------------------------
STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self-
propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100
tons; Self-propelled boom-type lifting device over 45 tons
to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type
lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty
repair person/welder
GROUP 5: Boom cat
--------------------------------------------------------------
--
TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more
GROUP 1: Heading shield operator; Heavy-duty repairperson;
Mucking machine (rubber tired, rail or track type); Raised
bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete
pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine
operator; Motorman
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 32/111
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and
compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
-----------------------------------------------------------
AREA DESCRIPTIONS:
POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND
UNDERGROUND [These areas do not apply to Piledrivers and
Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,
MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,
STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern Part
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:
Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:
Area 1: Remainder
Area 2: Southwestern part
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 33/111
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
----------------------------------------------------------------
ENGI0003-008 07/01/2017
Rates Fringes
Dredging: (DREDGING:
CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 44.77 31.25
(2) Dredge Dozer; Heavy
duty repairman.............$ 39.81 31.25
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 38.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 35.39 31.25
AREA 2:
(1) Leverman...............$ 46.77 31.25
(2) Dredge Dozer; Heavy
duty repairman.............$ 41.81 31.25
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 40.69 31.25
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 37.39 31.25
AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 34/111
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2
AS NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:
Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border
with Shasta County
Area 2: Remainder
MADERA COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Except Eastern part
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 35/111
Area 2: Eastern part
MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of
Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:
Area 1: All but the Western border with Mendocino & Trinity
Counties
Area 2: Remainder
TRINITY COUNTY:
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 36/111
Area 1: East Central part and the Northeastern border with
Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
----------------------------------------------------------------
ENGI0003-019 07/26/2017
SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 34.05 28.73
AREA 2.....................$ 36.05 28.73
GROUP 2
AREA 1.....................$ 30.45 28.73
AREA 2.....................$ 32.45 28.73
GROUP 3
AREA 1.....................$ 25.84 28.73
AREA 2.....................$ 27.84 28.73
GROUP DESCRIPTIONS:
GROUP 1: Landscape Finish Grade Operator: All finish grade
work regardless of equipment used, and all equipment with a
rating more than 65 HP.
GROUP 2: Landscape Operator up to 65 HP: All equipment with
a manufacturer's rating of 65 HP or less except equipment
covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long
as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 37/111
to 65 HP.
GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.
AREA DESCRIPTIONS:
AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,
NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,
SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,
SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS
NOTED BELOW:
ALPINE COUNTY:
Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:
Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:
Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:
Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:
Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 38/111
GLENN COUNTY:
Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:
Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:
Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:
Area 1: Western part along the Southern portion of border
with Shasta County
Area 2: Remainder
MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part
MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:
Area 1: Central and Southeastern parts
Area 2: Remainder
MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:
Area 1: All but the Northern portion along the border of
Sierra County
Area 2: Remainder
PLACER COUNTY:
Area 1: All but the Central portion
Area 2: Remainder
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 39/111
PLUMAS COUNTY:
Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:
Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:
Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:
Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:
Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:
Area 1: All but the Western border with mendocino & Trinity
Counties
Area 2: Remainder
TRINITY COUNTY:
Area 1: East Central part and the Northeaster border with
Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:
Area 1: Remainder
Area 2: Eastern Part
----------------------------------------------------------------
IRON0377-002 01/01/2019
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 40/111
Rates Fringes
Ironworkers:
Fence Erector...............$ 32.58 23.41
Ornamental, Reinforcing
and Structural..............$ 39.00 32.05
PREMIUM PAY:
$6.00 additional per hour at the following locations:
China Lake Naval Test Station, Chocolate Mountains Naval
Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training
Center-Goldstone, San Clemente Island, San Nicholas Island,
Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine
Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB
$4.00 additional per hour at the following locations:
Army Defense Language Institute - Monterey, Fallon Air Base,
Naval Post Graduate School - Monterey, Yermo Marine Corps
Logistics Center
$2.00 additional per hour at the following locations:
Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock
----------------------------------------------------------------
LABO0067-002 07/01/2019
AREA ""A"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND
SANTA CLARA COUNTIES
AREA ""B"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,
MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND
TUOLUMNE COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 41/111
Rates Fringes
Asbestos Removal Laborer
All Counties................$ 24.00 11.30
LABORER (Lead Removal)
Area A......................$ 31.81 24.61
Area B......................$ 30.81 24.61
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial
site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or
from pipes, boilers and mechanical systems only if they are
being scrapped; encapsulation, enclosure and disposal of
asbestos-containing materials by hand or with equipment or
machinery; scaffolding; fabrication of temporary wooden
barriers; and assembly of decontamination stations.
----------------------------------------------------------------
LABO0073-002 06/25/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 29.54 23.65
Traffic Control Person I....$ 29.84 23.65
Traffic Control Person II...$ 27.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0073-003 07/01/2018
SAN JOAQUIN COUNTY
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 42/111
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.20 22.20
----------------------------------------------------------------
LABO0073-005 06/25/2018
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 43/111
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0073-007 06/25/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 44/111
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 45/111
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 46/111
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 47/111
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0073-009 07/01/2018
CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 32.02 23.00
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 48/111
LABO0261-003 06/25/2018
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 20.54 23.65
Traffic Control Person I....$ 30.84 23.65
Traffic Control Person II...$ 28.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0261-005 06/25/2018
SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 49/111
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0261-009 06/25/2018
SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 50/111
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 51/111
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 52/111
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 53/111
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 54/111
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0261-011 05/01/2018
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
MASON TENDER, BRICK..............$ 35.37 20.70
FOOTNOTES: Underground work such as sewers, manholes, catch
basins, sewer pipes, telephone conduits, tunnels and cut
trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
----------------------------------------------------------------
LABO0261-014 07/01/2017
SAN FRANCISCO AND SAN MATEO COUNTIES:
Rates Fringes
PLASTER TENDER...................$ 34.70 23.11
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO0270-003 06/25/2018
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 55/111
Escort Driver, Flag Person
Area A.....................$ 30.54 23.65
Area B.....................$ 29.54 23.65
Traffic Control Person I
Area A.....................$ 30.84 23.65
Area B.....................$ 29.84 23.65
Traffic Control Person II
Area A.....................$ 28.34 23.65
Area B.....................$ 27.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0270-004 06/25/2018
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 56/111
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0270-005 07/01/2018
MONTEREY AND SAN BENITO COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.20 22.20
----------------------------------------------------------------
LABO0270-007 06/25/2018
MONTEREY, SAN BENITO, AND SANTA CRUZ, COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B)
Construction Specialist
Group.......................$ 30.40 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 57/111
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 58/111
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 59/111
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 60/111
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 61/111
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0270-010 06/25/2018
SANTA CLARA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 62/111
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 63/111
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 64/111
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 65/111
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0270-011 07/01/2017
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 66/111
MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 34.70 21.22
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO0294-001 07/01/2018
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick..........$ 31.20 22.20
----------------------------------------------------------------
LABO0294-002 06/25/2018
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 29.54 23.65
Traffic Control Person I....$ 29.84 23.65
Traffic Control Person II...$ 27.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0294-005 06/25/2018
FRESNO, KINGS, AND MADERA COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 67/111
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0294-008 06/25/2018
FRESNO, KINGS, AND MADERA COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 68/111
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 69/111
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 70/111
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 71/111
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 72/111
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0294-010 07/01/2018
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 32.02 23.00
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO0294-011 07/01/2017
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 73/111
LABORER (Plaster Tender).........$ 31.02 22.52
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO0304-002 06/25/2018
ALAMEDA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 30.54 23.65
Traffic Control Person I....$ 30.84 23.65
Traffic Control Person II...$ 28.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0304-003 06/26/2017
ALAMEDA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 36.60 24.83
GROUP 2.....................$ 36.37 24.83
GROUP 3.....................$ 36.12 24.83
GROUP 4.....................$ 35.67 24.83
GROUP 5.....................$ 35.13 24.83
Shotcrete Specialist........$ 37.12 24.83
TUNNEL AND SHAFT CLASSIFICATIONS
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 74/111
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0304-004 06/25/2018
ALAMEDA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 30.64 23.20
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 75/111
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 76/111
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 77/111
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 78/111
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 79/111
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO0304-005 05/01/2018
ALAMEDA COUNTY
Rates Fringes
Brick Tender.....................$ 35.37 20.70
FOOTNOTES: Work on jobs where heat-protective clothing is
required: $2.00 per hour additional. Work at grinders: $.25
per hour additional. Manhole work: $2.00 per day additional.
----------------------------------------------------------------
LABO0304-008 07/01/2017
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 34.70 23.11
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO0324-002 06/25/2018
CONTRA COSTA COUNTY
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 80/111
CLOSURE)
Escort Driver, Flag Person..$ 30.54 23.65
Traffic Control Person I....$ 30.84 23.65
Traffic Control Person II...$ 28.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO0324-006 06/25/2018
CONTRA COSTA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 37.82 24.11
GROUP 2.....................$ 37.59 24.11
GROUP 3.....................$ 37.34 24.11
GROUP 4.....................$ 36.89 24.11
GROUP 5.....................$ 36.35 24.11
Shotcrete Specialist........$ 38.34 24.11
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 81/111
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO0324-012 06/25/2018
CONTRA COSTA COUNTY
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 31.49 23.20
GROUP 1.....................$ 30.79 23.20
GROUP 1-a...................$ 31.01 23.20
GROUP 1-c...................$ 30.84 23.20
GROUP 1-e...................$ 31.34 23.20
GROUP 1-f...................$ 30.37 23.20
GROUP 1-g...................$ 30.99 23.20
GROUP 2.....................$ 30.64 23.20
GROUP 3.....................$ 30.54 23.20
GROUP 4.....................$ 24.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 30.54 23.20
(2) Establishment Warranty
Period......................$ 24.23 23.20
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 30.75 22.31
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 82/111
GROUP 2.....................$ 30.25 22.31
GROUP 3.....................$ 29.66 22.31
GROUP 4.....................$ 29.54 22.31
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 30.79 23.20
GROUP 2.....................$ 30.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 83/111
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 84/111
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade
checking in connection with pipelaying); Caulker; Bander;
Pipewrapper; Conduit layer; Plastic pipe layer; Pressure
pipe tester; No joint pipe and stripping of same, including
repair of voids; Precast manhole setters, cast in place
manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 85/111
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 86/111
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade
checking in connection with pipelaying); Caulker; Bander;
Pipewrapper; Conduit layer; Plastic pipe layer; Pressure
pipe tester; No joint pipe and stripping of same, including
repair of voids; Precast manhole setters, cast in place
manhole form setters
----------------------------------------------------------------
LABO0324-014 05/01/2018
CONTRA COSTA COUNTY:
Rates Fringes
Brick Tender.....................$ 35.37 20.70
FOOTNOTES: Work on jobs where heat-protective clothing is
required: $2.00 per hour additional. Work at grinders: $.25
per hour additional. Manhole work: $2.00 per day additional.
----------------------------------------------------------------
LABO0324-018 07/01/2018
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Plasterer tender.................$ 37.14 22.32
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO1130-002 06/25/2018
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 87/111
Rates Fringes
LABORER (TRAFFIC CONTROL/LANE
CLOSURE)
Escort Driver, Flag Person..$ 29.54 23.65
Traffic Control Person I....$ 29.84 23.65
Traffic Control Person II...$ 27.34 23.65
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash
cushions, construction area and roadside signage.
TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash
cushions.
----------------------------------------------------------------
LABO1130-003 06/26/2017
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:
GROUP 1.....................$ 36.60 24.83
GROUP 2.....................$ 36.37 24.83
GROUP 3.....................$ 36.12 24.83
GROUP 4.....................$ 35.67 24.83
GROUP 5.....................$ 35.13 24.83
Shotcrete Specialist........$ 37.12 24.83
TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete
nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading;
Cherry pickermen - where car is lifted; Concrete finisher
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 88/111
in tunnel; Concrete screedman; Grout pumpman and potman;
Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on
slick line; Sandblaster - potman, Robotic Shotcrete Placer,
Segment Erector, Tunnel Muck Hauler, Steel Form raiser and
setter; Timberman, retimberman (wood or steel or substitute
materials therefore); Tugger (for tunnel laborer work);
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang -
muckers, trackmen; Concrete crew - includes rodding and
spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
----------------------------------------------------------------
LABO1130-005 07/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
LABORER
Mason Tender-Brick..........$ 31.20 22.20
----------------------------------------------------------------
LABO1130-007 06/25/2018
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES
Rates Fringes
LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 30.49 23.20
GROUP 1.....................$ 29.79 23.20
GROUP 1-a...................$ 30.01 23.20
GROUP 1-c...................$ 29.84 23.20
GROUP 1-e...................$ 30.34 23.20
GROUP 1-f...................$ 29.37 23.20
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 89/111
GROUP 2.....................$ 29.64 23.20
GROUP 3.....................$ 29.54 23.20
GROUP 4.....................$ 23.23 23.20
See groups 1-b and 1-d under laborer classifications.
LABORER (GARDENERS,
HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 29.54 23.20
(2) Establishment Warranty
Period......................$ 23.23 23.20
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 29.75 22.31
GROUP 2.....................$ 29.25 22.31
GROUP 3.....................$ 28.66 22.31
GROUP 4.....................$ 28.54 22.31
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 29.79 23.20
GROUP 2.....................$ 29.64 23.20
FOOTNOTES:
Laborers working off or with or from bos'n chairs, swinging
scaffolds, belts shall receive $0.25 per hour above the
applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a
below.
---------------------------------------------------------
LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker;
Chainsaw; Laser beam in connection with laborers' work;
Cast-in- place manhole form setter; Pressure pipelayer;
Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill;
Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker
and similar type tampers; Buggymobile; Caulker, bander,
pipewrapper, conduit layer, plastic pipelayer; Certified
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 90/111
hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2
yd. and under; Concrete pan work; Concrete sander; Concrete
saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter,
aligner, by any method; High pressure blow pipe (1-1/2"" or
over, 100 lbs. pressure/over); Hydro seeder and similar
type; Jackhammer operator; Jacking of pipe over 12 inches;
Jackson and similar type compactor; Kettle tender, pot and
worker applying asphalt, lay-kold, creosote, lime, caustic
and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting,
whaling, bracing, trenchjacking, lagging hammer; Magnesite,
epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder;
Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types
(except as shown in Group 2); Ram set gun and stud gun;
Riprap stonepaver and rock-slinger, including placing of
sacked concrete and/or sand (wet or dry) and gabions and
similar type; Rotary scarifier or multiple head concrete
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and
rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work;
Vibrator; Hazardous waste worker (lead removal); Asbestos
and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143
and similar type drills; Track driller; Jack leg driller;
Wagon driller; Mechanical drillers, all types regardless of
type or method of power; Mechanical pipe layers, all types
regardless of type or method of power; Blaster and powder;
All work of loading, placing and blasting of all powder and
explosives of whatever type regardless of method used for
such loading and placing; High scalers (including drilling
of same); Tree topper; Bit grinder
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 91/111
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above
Group 1 wage rates. ""Sewer cleaner"" means any worker who
handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active,
large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.
GROUP 1-c: Burning and welding in connection with laborers'
work; Synthetic thermoplastics and similar type welding
GROUP 1-d: Maintenance and repair track and road beds. All
employees performing work covered herein shall receive $
.25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to
apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after
the temporary cover has been placed.
GROUP 1-e: Work on and/or in bell hole footings and shafts
thereof, and work on and in deep footings. (A deep footing
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep
footing wage rate would apply to all employees for each and
every day worked on or in the excavation of the footing
from the date of inception.
GROUP 1-f: Wire winding machine in connection with guniting
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry
cement or gypsum; Choke-setter and rigger (clearing work);
Concrete bucket dumper and chute; Concrete chipping and
grinding; Concrete laborer (wet or dry); Driller tender,
chuck tender, nipper; Guinea chaser (stake), grout crew;
High pressure nozzle, adductor; Hydraulic monitor (over 100
lbs. pressure); Loading and unloading, carrying and hauling
of all rods and materials for use in reinforcing concrete
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 92/111
construction; Pittsburgh chipper and similar type brush
shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12
inches
GROUP 3: Construction laborers, including bridge and general
laborer; Dump, load spotter; Flag person; Fire watcher;
Fence erector; Guardrail erector; Gardener, horticultural
and landscape laborer; Jetting; Limber, brush loader and
piler; Pavement marker (button setter); Maintenance, repair
track and road beds; Streetcar and railroad construction
track laborer; Temporary air and water lines, Victaulic or
similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building
including but not limited to: street cleaner; cleaning and
washing windows; brick cleaner (jobsite only); material
cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:
A: at demolition site for the salvage of the material.
B: at the conclusion of a job where the material is to be
salvaged and stocked to be reused on another job.
C: for the cleaning of salvage material at the jobsite or
temporary jobsite yard.
The material cleaner classification should not be used in
the performance of ""form stripping, cleaning and oiling
and moving to the next point of erection"".
--------------------------------------------------------
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 93/111
----------------------------------------------------------
WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash,
windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building
materials)
----------------------------------------------------------------
LABO1130-008 07/01/2018
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 32.02 23.00
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
LABO1130-009 07/01/2018
MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 32.02 23.00
Work on a swing stage scaffold: $1.00 per hour additional.
----------------------------------------------------------------
PAIN0016-001 01/01/2019
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA
CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 94/111
Painters:........................$ 42.67 24.03
PREMIUMS:
EXOTIC MATERIALS - $0.75 additional per hour.
SPRAY WORK: - $0.50 additional per hour.
INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and
processing of goods for sale or service; steel construction
(bridges), stacks, towers, tanks, and similar structures]
HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
----------------------------------------------------------------
PAIN0016-003 01/01/2018
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA
CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 45.16 26.74
AREA 2......................$ 41.03 25.34
----------------------------------------------------------------
PAIN0016-012 01/01/2019
ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,
SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 95/111
SOFT FLOOR LAYER.................$ 48.60 27.43
----------------------------------------------------------------
PAIN0016-015 01/01/2019
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PAINTER
Brush.......................$ 33.68 20.24
FOOTNOTES:
SPRAY/SANDBLAST: $0.50 additional per hour.
EXOTIC MATERIALS: $1.00 additional per hour.
HIGH TIME: Over 50 ft above ground or water level $2.00
additional per hour. 100 to 180 ft above ground or water
level $4.00 additional per hour. Over 180 ft above ground
or water level $6.00 additional per hour.
----------------------------------------------------------------
PAIN0016-022 01/01/2019
SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 46.29 24.03
----------------------------------------------------------------
PAIN0169-001 01/01/2018
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:
Rates Fringes
GLAZIER..........................$ 35.00 26.26
----------------------------------------------------------------
PAIN0169-005 01/01/2019
ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 96/111
MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates Fringes
GLAZIER..........................$ 50.03 28.19
----------------------------------------------------------------
PAIN0294-004 01/01/2019
FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
PAINTER
Brush, Roller...............$ 30.53 19.11
Drywall Finisher/Taper......$ 34.87 23.68
FOOTNOTE:
Spray Painters & Paperhangers recive $1.00 additional per
hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive
$1.50 additional per hour. High Time - over 30 feet (does
not include work from a lift) $0.75 per hour additional.
----------------------------------------------------------------
PAIN0294-005 01/01/2018
FRESNO, KINGS & MADERA
Rates Fringes
SOFT FLOOR LAYER.................$ 31.49 20.48
----------------------------------------------------------------
PAIN0767-001 01/01/2019
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
GLAZIER..........................$ 38.47 28.40
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 97/111
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day,
President's Day, Memorial Day, Independence Day, Labor Day,
Veteran's Day, Thanksgiving Day, and Christmas Day.
Employee rquired to wear a body harness shall receive $1.50
per hour above the basic hourly rate at any elevation.
----------------------------------------------------------------
PAIN1176-001 01/01/2017
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:
GROUP 1.....................$ 34.41 16.31
GROUP 2.....................$ 29.25 16.31
GROUP 3.....................$ 29.59 16.31
CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic
stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
----------------------------------------------------------------
PAIN1237-003 10/01/2018
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE
COUNTIES:
Rates Fringes
SOFT FLOOR LAYER.................$ 36.81 21.51
----------------------------------------------------------------
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 98/111
PLAS0066-002 07/01/2017
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:
Rates Fringes
PLASTERER........................$ 40.51 27.13
----------------------------------------------------------------
PLAS0300-001 07/01/2018
Rates Fringes
PLASTERER
AREA 188: Fresno...........$ 32.70 31.68
AREA 224: San Benito,
Santa Clara, Santa Cruz.....$ 32.88 31.68
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.70 31.68
AREA 337: Monterey County..$ 32.88 31.68
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties...........$ 32.70 31.68
----------------------------------------------------------------
PLAS0300-005 07/01/2017
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 33.49 23.67
----------------------------------------------------------------
PLUM0038-001 07/01/2018
SAN FRANCISCO COUNTY
Rates Fringes
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter)..........................$ 72.00 41.94
----------------------------------------------------------------
PLUM0038-005 07/01/2018
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 99/111
SAN FRANCISCO COUNTY
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 61.20 30.17
----------------------------------------------------------------
PLUM0062-001 07/01/2019
MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 43.80 34.19
----------------------------------------------------------------
PLUM0159-001 07/01/2019
CONTRA COSTA COUNTY
Rates Fringes
Plumber and steamfitter
(1) Refrigeration...........$ 56.93 41.04
(2) All other work..........$ 57.82 41.04
----------------------------------------------------------------
PLUM0246-001 07/01/2019
FRESNO, KINGS & MADERA COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 41.15 33.14
----------------------------------------------------------------
PLUM0246-004 01/01/2017
FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates Fringes
PLUMBER (PIPE TRADESMAN).........$ 13.00 10.74
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 100/111
PIPE TRADESMAN SCOPE OF WORK:
Installation of corrugated metal piping for drainage, as well
as installation of corrugated metal piping for culverts in
connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including
paving over joints, in piping; Temporary piping for dirt
work for building site preparation; Operating jack hammers,
pavement breakers, chipping guns, concrete saws and spades
to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for
all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting
of shrubbery, trees and ground cover, including watering,
mowing, edging, pruning and fertilizing, the breaking of
concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with
lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials
in storage bins in jobsite secure storage area; Demolition
of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job
shacks; Clean-up and sweeping of jobsite; Pipe wrapping and
waterproofing where tar or similar material is applied for
protection of buried piping; Flagman
----------------------------------------------------------------
PLUM0342-001 07/01/2018
ALAMEDA & CONTRA COSTA COUNTIES
Rates Fringes
PIPEFITTER
CONTRA COSTA COUNTY.........$ 58.68 42.40
PLUMBER, PIPEFITTER,
STEAMFITTER
ALAMEDA COUNTY..............$ 58.68 42.40
----------------------------------------------------------------
* PLUM0355-004 07/01/2019
ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 101/111
MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO,
SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:
Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 29.00 15.80
----------------------------------------------------------------
PLUM0393-001 07/01/2018
SAN BENITO AND SANTA CLARA COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 62.66 41.93
----------------------------------------------------------------
PLUM0442-001 07/01/2019
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE
COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 43.50 30.89
----------------------------------------------------------------
PLUM0467-001 07/01/2018
SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 65.11 35.25
----------------------------------------------------------------
ROOF0027-002 01/01/2019
FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 102/111
ROOFER...........................$ 28.21 14.21
FOOTNOTE: Work with pitch, pitch base of pitch impregnated
products or any material containing coal tar pitch, on any
building old or new, where both asphalt and pitchers are
used in the application of a built-up roof or tear off:
$2.00 per hour additional.
----------------------------------------------------------------
ROOF0040-002 08/01/2019
SAN FRANCISCO & SAN MATEO COUNTIES:
Rates Fringes
ROOFER...........................$ 41.88 19.44
----------------------------------------------------------------
ROOF0081-001 08/01/2018
ALAMEDA AND CONTRA COSTA COUNTIES:
Rates Fringes
Roofer...........................$ 39.40 17.58
----------------------------------------------------------------
ROOF0081-004 08/01/2018
CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND
TUOLUMNE COUNTIES:
Rates Fringes
ROOFER...........................$ 39.40 17.58
----------------------------------------------------------------
ROOF0095-002 08/30/2018
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:
Rates Fringes
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 103/111
ROOFER
Journeyman..................$ 42.59 18.89
Kettle person (2 kettles);
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker......................$ 44.59 18.89
----------------------------------------------------------------
SFCA0483-001 01/01/2019
ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA
COUNTIES:
Rates Fringes
SPRINKLER FITTER (FIRE)..........$ 63.52 31.17
----------------------------------------------------------------
SFCA0669-011 04/01/2018
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,
SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE
COUNTIES:
Rates Fringes
SPRINKLER FITTER.................$ 38.85 21.87
----------------------------------------------------------------
SHEE0104-001 07/02/2018
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA
CLARA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes
SHEET METAL WORKER
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 104/111
AREA 1:
Mechanical Contracts
under $200,000.............$ 51.87 37.91
All Other Work.............$ 59.11 38.51
AREA 2......................$ 48.90 32.70
AREA 3......................$ 51.21 30.26
----------------------------------------------------------------
SHEE0104-003 07/01/2018
CALAVERAS AND SAN JOAQUIN COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 40.34 32.80
----------------------------------------------------------------
SHEE0104-005 07/01/2018
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
SHEET METAL WORKER (Excluding
metal deck and siding)...........$ 38.40 35.69
----------------------------------------------------------------
SHEE0104-007 07/01/2018
FRESNO, KINGS, AND MADERA COUNTIES:
Rates Fringes
SHEET METAL WORKER...............$ 38.49 35.65
----------------------------------------------------------------
SHEE0104-015 07/01/2017
ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN
MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
Rates Fringes
SHEET METAL WORKER (Metal
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 105/111
Decking and Siding only).........$ 37.53 32.10
----------------------------------------------------------------
SHEE0104-018 07/01/2018
CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN
JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:
Rates Fringes
Sheet metal worker (Metal
decking and siding only).........$ 39.93 32.70
----------------------------------------------------------------
TEAM0094-001 07/01/2018
Rates Fringes
Truck drivers:
GROUP 1.....................$ 31.68 27.86
GROUP 2.....................$ 31.98 27.86
GROUP 3.....................$ 32.28 27.86
GROUP 4.....................$ 32.63 27.86
GROUP 5.....................$ 32.98 27.86
FOOTNOTES:
Articulated dump truck; Bulk cement spreader (with or without
auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type;
Slurry truck: Use dump truck yardage rate.
Heater planer; Asphalt burner; Scarifier burner; Industrial
lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2-
axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck
(when flat rack truck is used appropriate flat rack shall
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 106/111
apply); Concrete pump machine; Fork lift and lift jitneys;
Fuel and/or grease truck driver or fuel person; Snow buggy;
Steam cleaning; Bus or personhaul driver; Escort or pilot
car driver; Pickup truck; Teamster oiler/greaser and/or
serviceperson; Hook tender (including loading and
unloading); Team driver; Tool room attendant (refineries)
GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.;
Jetting trucks, under 7,000 gals.; Single-unit flat rack
(3-axle unit); Highbed heavy duty transport; Scissor truck;
Rubber-tired muck car (not self-loaded); Rubber-tired truck
jumbo; Winch truck and ""A"" frame drivers; Combination winch
truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers;
Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit
mixers, over 10 yds.; Water trucks, 7,000 gals. and over;
Jetting trucks, 7,000 gals. and over; Vacuum trucks under
7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport
tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar
type self-loading truck; Tire repairperson; Combination
bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive
the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver
and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water
pulls - DW 10's, 20's, 21's and other similar equipment
when pulling Aqua/pak or water tank trailers; Helicopter
pilots (when transporting men and materials); Lowbedk Heavy
Duty Transport up to including 7 axles; DW10's, 20's, 21's
and other similar Cat type, Terra Cobra, LeTourneau Pulls,
Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
miscellaneous trailers; Vacuum Trucks 7500 gals and over
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 107/111
and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low
bed Heavy Duty Transport over 7 axles
----------------------------------------------------------------
WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave
for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any
solicitation was issued) on or after January 1, 2017. If this
contract is covered by the EO, the contractor must provide
employees with 1 hour of paid sick leave for every 30 hours
they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their
own illness, injury or other health-related needs, including
preventive care; to assist a family member (or person who is
like family to the employee) who is ill, injured, or has other
health-related needs, including preventive care; or for reasons
resulting from, or to assist a family member (or person who is
like family to the employee) who is a victim of, domestic
violence, sexual assault, or stalking. Additional information
on contractor requirements and worker protections under the EO
is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
----------------------------------------------------------------
The body of each wage determination lists the classification
and wage rates that have been found to be prevailing for the
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 108/111
cited type(s) of construction in the area covered by the wage
determination. The classifications are listed in alphabetical
order of ""identifiers"" that indicate whether the particular
rate is a union rate (current union negotiated rate for local),
a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed
in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were
prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198
indicates the local union number or district council number
where applicable, i.e., Plumbers Local 0198. The next number,
005 in the example, is an internal number used in processing
the wage determination. 07/01/2014 is the effective date of the
most current negotiated rate, which in this example is July 1,
2014.
Union prevailing wage rates are updated to reflect all rate
changes in the collective bargaining agreement (CBA) governing
this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that
no one rate prevailed for this classification in the survey and
the published rate is derived by computing a weighted average
rate based on all the rates reported in the survey for that
classification. As this weighted average rate includes all
rates reported in the survey, it may include both union and
non-union rates. Example: SULA2012-007 5/13/2014. SU indicates
the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates
the State of Louisiana. 2012 is the year of survey on which
these classifications and rates are based. The next number, 007
in the example, is an internal number used in producing the
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 109/111
wage determination. 5/13/2014 indicates the survey completion
date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a
new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate
that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the
classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union
average rate. OH indicates the state. The next number, 0010 in
the example, is an internal number used in producing the wage
determination. 08/29/2014 indicates the survey completion date
for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of
each year, to reflect a weighted average of the current
negotiated/CBA rate of the union locals from which the rate is
based.
----------------------------------------------------------------
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can
be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 110/111
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
12/9/2019 beta.SAM.gov
https://beta.sam.gov/wage-determination/CA20190018/10/document 111/111
================================================================
END OF GENERAL DECISION"