Loading...
HomeMy WebLinkAboutReso 115-2022 (22-371)Exhibit A - Land Use Element Proposed Amendments 2 2-1 LAND USE This element of the General Plan outlines the framework that has guided land use decision-making, provides the General Plan land use classification system, and outlines citywide land use policies. Policies for each of the 14 individual sub-areas that comprise the General Plan Planning Area are in Chapter 3: Planning Sub- Areas. Looking towards the bay from the western hillside. A wide variety of uses cover the city, from single-family residential neighborhoods in the west side of the city to tall office buildings in the East of 101 area. 2: LAND USE 2-7 Table 2.2-1: Standards for Density and Development Intensity Land Use Designation Minimum Required FAR Residential Density (units/net acre)Maximum Permitted FAR1 Maximum Permitted with Incentives and Bonuses Units/Net Acre FAR (See Table 2.2-2) Residential2,3 Low Density -up to 8.0 0.5 10.0 - Medium Density -8.1-18.0 1.0 22.5 - High Density -18.1-30.0 -37.5 - Downtown Downtown Residential - Low Density -5.1-15.0 0.7 15.0 - Medium Density -15.1-25.0 1.25 31.3 - High Density -20.1-40.0 -50.03 - Downtown Transit Core 2.0 80.1-100.0 6.0 180.0 8.0 Grand Avenue Core 1.5 14.1-60.0 3.0 80.0/100.0 4.0 Linden Neighborhood Center 2.0 40.1-60.0 3.0 80.0 - Downtown Residential Core -40.1-80.0 3.0 100.0/125.04 3.254 Office --1.0 -2.55 Commercial Transit Office/R&D Core 1.5 -1.5-2.5 -3.5 Community Commercial --0.5 -- Business Commercial6 --0.5 -1.05 Hotel --1.2 -2.0 Coastal Commercial6 ----- Retail --0.5 -1.0 Office --1.0 -1.6 Hotel --1.6 -2.2 Mixed Use El Camino Real Mixed Use7 0.68 up to 60.09 2.510 up to 80.09 3.510 El Camino Real Mixed Use North, High Intensity 0.611 up to 80 2.0 up to 110 up to 3.0 El Camino Real Mixed Use North, Medium Intensity 0.611 up to 40 1.5 up to 60 up to 2.5 Industrial Business and Technology Park --0.5 -1.012 Mixed Industrial --0.4 -0.613 Business Commercial6 --0.5 -10.86 SOUTH SAN FRANCISCO GENERAL PLAN 2-8 2015; Resolution 31-2018, adopted February 28, 2018. 1 Including garages for residential development, but excluding parking structures for non-residential development, except for El Camino Real Mixed Use. 2 20 percent density bonus is available for development within ¼-mile of a fixed-guideway transit (CalTrain or BART station or City-designated ferry terminal). 3 25 percent bonus is available for projects with affordable housing, housing for elderly residents with specific amenities designed for residents, or housing that meets community design standards that may be specified in the Zoning Ordinance. 4 For qualifying affordable senior housing projects. 5 Required parking must be structured. 6 See Table 2.2-2. The Gateway Business Park Master Plan and the Oyster Point Specific Plan are permitted to develop up to a FAR of 1.25 with a TDM and the Gateway Business Park Master Plan is allowed to develop additional density to the extent such density would otherwise be available on immediately adjacent property that is (a) subject to a FAR limitation of 1.25 or less; (b) part of the same research and development campus; and (c) deed-restricted to preclude development of the transferred FAR.. 7 Frontage of a site along El Camino Real and other Arterial/Collector streets in the corridor is required to be devoted to active uses. Residential not permitted at ground level along El Camino Real except on the east side of El Camino Real between First Street and West Orange Avenue, subject to conditional use permit approval. 8 For sites larger than 20,000 square feet, the minimum FAR for all uses, exclusive of substantially above-grade structured parking, shall be 0.6, of which a minimum 0.3 FAR shall be active uses. The requirement for a minimum 0.3 FAR of active uses does not apply to projects where 30% of the units are restricted and affordable to low- or low-moderate-income households. 9 Included within FAR limit. 10 Includes residential and substantially above grade parking structures. Excludes surface parking. 11 A minimum 0.3 FAR of the required 0.6 shall be active uses. The requirement for a minimum 0.3 FAR of active uses does not apply to projects where 30% of the units are restricted and affordable to low- or low- moderate-income households. 12 Permitted for research and development uses with low employment intensity, or other uses providing structured parking. 13 Permitted for uses with low employment intensity, such as wholesaling, warehousing, and distribution. Amended by Resolution 19-2010, adopted February 10, 2010; Resolution 31, 2010, adopted March 24, 2010; Resolution 47-2011, adopted March 23, 2011; Resolutions */-2011 and 99-2011, adopted July 27, 2011; Resolution 15-2015, adopted January 11, 2: LAND USE 2-13 Table 2.2-2: Standards for Density and Development Intensity Land Use Designation Minimum Floor Area Ratio (FAR) Base Floor Area Ratio (FAR) Incentive-based FAR Bonuses Available Total Maximum FAR Maximum Attainable FAR with Transportation Demand Management (TDM) Program Other Specified Design Standards1 Downtown Transit Core 2.0 6.0 8.01 Grand Avenue Core 1.5 3.0 4.01 Linden Neighborhood Center 2.0 3.0 - Downtown Residential Core -3.0 3.258 Office -1.0 1.3 0.2 2.5 Transit Office/R&D Core 1.5 1.5-2.5 3.51 Business Commercial2 -0.5 0.4 0.1 1.0 El Camino Real Mixed Use3 0.64 2.55 0.5 0.5 3.55 El Camino Real Mixed Use North, High Intensity 0.66 2.0 0.5 0.5 3.0 El Camino Real Mixed Use North, Medium Intensity 0.66 1.5 0.5 0.5 2.5 Business & Technology Park -0.5 0.4 0.1 1.0 Hotels7 -1.2 0.6 0.2 2.0 Costal Commercial2 - Retail -0.5 0.4 0.1 1.0 Office -1.0 0.5 0.1 1.6 Hotel -1.6 0.4 0.2 2.21 Discretionary; based on criteria established in the Zoning Ordinance and upon conditional use permit approval. 2 The Gateway Business Park Master Plan and the Oyster Point Specific Plan are permitted to develop up to a FAR of 1.25 with a TDM, and the Gateway Business Park Master Plan is allowed to develop additional density to the extent such density would otherwise be available on immediately adjacent property that is (a) subject to a FAR limitation of 1.25 or less; (b) part of the same research and development campus; and (c) deed-restricted to preclude development of the transferred FAR. 3 Frontage of a site along El Camino Real and other Arterial/Collector streets in the corridor is required to be devoted to active uses. Residential not permitted at ground floor level along El Camino Real, except on the east side of El Camino Real between First Street and West Orange Avenue, subject to conditional use permit approval. 4 For sites larger than 20,000 square feet, the minimum FAR for all uses, exclusive of substantially above-grade structured parking, shall be 0.6, of which a minimum 0.3 FAR shall be active uses. The requirement for a minimum 0.3 FAR of active uses does not apply to projects where 30% of the units are restricted and affordable to low- or low-moderate-income households. 5 Includes residential and substantially above-grade parking structures. Excludes surface parking. 6 A minimum 0.3 FAR of the required 0.6 shall be active uses. The requirement for a minimum 0.3 FAR of active uses does not apply to projects where 30% of the units are restricted and affordable to low- or low-moderate-income households. 7 The Hotel FAR listed for Base, Maximum Attainable FAR with TDM, Other Specified Design Standards, and Total Maximum FAR is applicable for all hotels located in all General Plan designated areas that permit hotel uses.8 For qualifying affordable senior housing projects.Amended by Resolutions 19-2010, adopted February 10, 2010; Resolution 31, 2010, adopted March 24, 2010; Resolution 47-2011, adopted March 23, 2011; and Resolution 15-2015, adopted January 11, 2015. 2: LAND USE 2-21 bicycle underpass, this area will be well connected to the Downtown, providing an opportunity for a significant number of workers to easily access downtown amenities. Taller buildings are suitable here in conformance with the FAA height limitations. The area would lend itself to corporate office, hotels, and other major facilities due to its high visibility from US 101 and proximity to San Francisco International Airport, Downtown San Francisco and the various employment centers on the Peninsula. Along the extension of Grand Avenue to the east beyond the rail tracks undercrossing, limited retail and services may be feasible in the long run and to provide amenities for nearby employees. The allowable development intensity in the area would be 1.5 to 2.5 floor area ratio (FAR). A FAR up to 3.5 may be al- lowed if specific criteria are met. Community Commercial This category includes shopping centers, such as Westborough, and major com- mercial districts, such as El Camino Real, and regional centers along South Air- port Boulevard. Retail and department stores, eating and drinking establishments, commercial recreation, service stations, automobile sales and repair services, fi- nancial, business and personal services, motels, educational and social services are permitted. An “R” designation on the General Plan Diagram indicates that the site is reserved for region-serving commercial uses. The maximum Floor Area Ratio is 0.5. Office uses are encouraged on the second and upper floors. Business Commercial This category is intended for business and professional offices, and visitor service establishments, and retail. Permitted uses include for administrative, financial, business, professional, medical and public offices, research and development fa- cilites, and visitor-oriented and regional commercial activities. Regional commer- cial centers, restaurants and related services are permitted subject to appropriate standards. This category is intended for the emerging commercial and hotel district along South Airport, Gatewa y, and Oyster Point boulevards, and South Spruce corridor. The maximum Floor Area Ratio is 0.5, but increases may be permit- ted up to a total FAR of 1.0 for uses such as research and development facilities, or for development meeting specific transportation demand management (TDM), off-site improvement, or specific design standards. The Gateway Business Park Master Plan area, comprising several parcels on 22.6 acres at the southeast corner SOUTH SAN FRANCISCO GENERAL PLAN 2-22 of Gateway Boulevard and Oyster Point Boulevard, is permitted to develop up to a FAR of 1.25 and is allowed to develop additional density in limited circumstances as provided in Tables 2.2-1 and 2.2-2. Maximum FAR for hotel developments shall be 1.2, with increases to a maximum total FAR of 2.0 for development meeting specified criteria. The Oyster Point Specific Plan regulates uses and development intensities within the Specific Plan District. (Amended by Resolution 19, 2010 adopted February 10, 2010 and Resolution 47-2011, adopted March 23, 2011) Coastal Commercial Business/professional services, office, convenience sales, restaurants, public mar-ketplace, personal/repair services, limited retail, research and development facili-ties, hotel/motel with a coastal orientation, recreational facilities, and marinas. Max-imum FAR is 0.5 for retail, recreation facilities, research and development facilities, marinas, and eating and drinking establishments, 1.0 for offices, and 1.6 for hotels. All development will be subject to design review by the Planning Commission. Uses and development intensities at Oyster Point will be regulated by the Oyster Point Specific/Master Plan. (Amended by Resolution 47-2011, adopted March 23, 2011) MIXED USE El Camino Real Mixed Use This designation is intended to accommodate high-intensity active uses and mixed-use development in the South El Camino Real area. Retail and department stores; eating and drinking establishments; hotels; commercial recreation; financial, busi-ness, and personal services; residential; educational and social services; and office uses are permitted. The frontage of a site along El Camino Real and other Arterial/Collector streets in the corridor is required to be devoted to active uses—uses that are accessible to the general public and generate walk-in pedestrian clientele and contribute to a high level of pedestrian activity. Uses that generate pedestrian activity include retail shops, restaurants, bars, theaters and the performing arts, commercial recreation and entertainment, personal and convenience services, hotels, banks, travel agencies, child care services, libraries, museums and galleries. For sites larger than 20,000 square feet, the minimum FAR for all uses, exclusive of substantially above-grade structured parking, shall be 0.6, of which a minimum 0.3 FAR shall be active uses. The requirement for a minimum 0.3 FAR of active uses GATEWAY BUSINESS PARK Master Plan South San Francis c o, CA May 20 13 Prepared for: (81 B10Med Realty Prepared by: KEH KAY ASSOCIATES Master Planning, Urban Design, & land:icape Architectu1 e 1045 San <,,o me Slreet -S1ud 1o :t2 1 San Francisco, CA. 9411 1 1415)%6-4472 'l..i nkaysfcom Collaborators: City of South San Francisco Fehr & Peers Traffic Consultants BKF Engineers Surveyors Planners FLAD Architects GNU Group Signage Consultants Treadwell & Rollo Geotechnical Engineers Exhibit C - Master Plan Modifications The creation of this new working campus has many benefits for a wide array of stake holders. •The City of South San Francisco will experience the benefits of eco­ nomic development, maximize potential redevelopment revenues and strengthen the City's employment-base. The City will also further cement its reputation as a world leader in the concentration of life sci­ ence / biotechnology research and development. •Corporations that will occupy the campus will benefit from modern, efficient and flexible facilities within a high quality environment that will significantly contribute to their potential for long term success and their ability to recruit and retain talented employees in an increasingly competitive local and global market. Bird's Eye View over Existing Site Looking Northeast Introduction •Employees will benefit from an enjoyable and attractive workplace that provides an environment in which both the internal building and external open space systems foster connectivity and community to enable more opportunity to share ideas and collaborate. •The owner and developer of this property will benefit from its long term investment, beginning with the creation of the original business park to its transformation into an asset capable of keeping pace with opportu­ nities and demands of the current and future markets. Master Plan Goals and Objectiv s The following is a summary of the primary goals and objectives that shape the intent of this site's redevelopment: •Utilize the site's existing zoning potential by increasing use from the existing 284,000 square feet (approx .29 FAR) to up to the site's per­ mitted 1.25 FAR capacity, and develop additional density in limited circumstances as provided in Section 2.2. •Form a cohesive working campus environment that is capable of accommodating one or multiple tenants with a meaningful and clear organization of buildings, structured parking and network of high qual­ ity pedestrian circulation and open spaces. •Emphasize the pedestrian environment with well designed and useful landscape spaces that respond to the unique challenges of the South San Francisco micro-climate. •Encourage high quality architecture, landscape architecture and sus­ tainable design elements. •Connect to and foster the use of various modes of transit such as Caltrain, BART and future Ferry service. •Allow for the incremental and phased redevelopment of the existing buildings while maintaining a functioning working environment for those areas of the site not yet being redeveloped. GATEWAY BUSINESS PARK MASTER PLAN Ill 10 II.Development Program & Development Standards 2.1 Existing Development Program and Use 2.2 Propos.ed Devel opment Program The 22.6 acre site is comprised of 4 legal parcels. The existing develop­ ment model consists of 6 single-story buildings (Buildings 700 through 1,000 Gateway Boulevard) associated surface parking and landscape comprising an aggregate of approximately 284,000 square feet of use operating for various purposes including Research and Development, Office, Light Distribution and Day Care. Aerial View of Existing Development With Parcel Lines -Looking South GATEWAY BUSINFSS PARK MASTER PLAN The Master Plan proposes to densify the development site to achieve up to the permitted 1.25 FAR capacity by tl1e phased incremental rede­ velopment of the e,xisting buildings with new buildings and associated parking structures. Notwithstanding any other provisions of this Master Plan, the development of density exceeding 1.25 FAR is allowed to the extent such density would otherwise be available on immediately adjacent property that is (a) subject to a FAR limitation of 1.25 or less; (b) part of the same research and development campus; and (c) deed- restricted to preclude development of the transferred FAR. Aerial View of Proposed Redevelopment -Looking South II.Development Program & Development Standards 2.3 Development Standards This development standards table outlines the allowable uses, building limitations, setbacks and off street parking requirements proposed for this Master Plan area and their relationship to the existing governing municipal code. D eve opmen t St d d an ar s Existing Municipal Code Gateway Specific Plan District Permitted Uses Per Section 20.57.200 fu!lli!ing Limi!ations Per Section 20.57.210 Building Coverage (1) ,... or< than 50% of site area Building Height =or< than 250' Gross Floor Area Ratio (1) = or< than 1.25 Setbacks Per Section 20.57.220 Buildings 40' from any property line on any street Off Street Parkina Der Section 20.57.240 Proposed Gateway Business Park Master Plan Per Section 20.57.200 The Gateway Business Park Master Plan retains building limitations per municipal pode with the following conditions: v\, Building coverage and gross floor area ratio limitations shall apply only to aggregate calculations for the site's permitted 1.25 FAR within the total 22.6 acres. Individual building developments within the Gateway Business Park shall be allowed to exceed these limitations during the phased incremental redevelopment. Additional density is allowed as set forth in Section 2.2. !The Gateway Business Park Master Plan retains setbacks per municipal �ode with the following conditions: A. O' from all property lines not adjacent to a street. The current anticipated range of total parking provided for the Master Plan at ultimate buildout is between a parking ratio of 2.0 to 2.83 per 1,000 SF. Parking ratios will vary for new development projects within the 22.6 acre site during its phased incremental redevelopment. Total parking counts for the campus during phased redevelopment shall be an aggregate of new structured [parking, below grade parking, new interim surface parking (if necessary), and existing surface parking. Notes: (1)Per 20.57.210 Building Limitations, parking garages are excluded from building coverage and gross floor area ratio site calculations. GATEWAY BUSINESS PARK MASTER PLAN 11 Site Key Plan Date GOP 4 PRECISE PLAN 4S PS44N GATEWAY BLVDOYSTER POINT BLVD GOP 1 GOP 2 GOP 3 OP 180 OP 200 B5W B5E PS 5 PS 2 PS 3 AMENITY RAILROAD SPURS650 California St 17th Floor San Francisco, CA 94108 Description of Package PRECISE PLAN APN #015-023-200 APN #015-023-320 06/08/2020 GATEWAY OF PACIFIC 09/17/2021 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN PRECISE PLAN - MODIFICATIONS APPLICATION REQUIREMENTS CHECKLIST SHEET NUMBER(S) C4-201 A4-100 N/A A4-301 & A4-302 N/A A4-200 TO A-206 N/A L4-100 TO L4-102 C4-401 TO C4-402 C4-601 TO C4-602 W4-100 TO W4-104 A4-300 TO A4-302 G4-002 C4-101 L4-404 SITE PLAN EXISTING EXISTING EXISTING EXISTING ELEVATION DRAWINGS FLOOR PLANS LANDSCAPE PLAN PROPOSED PROPOSED PROPOSED PROPOSED GRADING & DRAINAGE PLAN SIGNAGE & LIGHTING PROGRAM EXISTING PHOTOS (SITE & SURROUNDING PROPERTIES) ANY APPLICABLE TENTATIVE, FINAL OR PARCEL MAPS COLOR RENDERINGS OF ALL ELEVATIONS PROJECT INFORMATION GOP 4 (B4) 900 GATEWAY BLVD. SOUTH SAN FRANCISCO,CA 94080 APN 015-023-200 (PARCEL D) APN 015-023-320 (PARCEL D) GSPD - GATEWAY SPECIFIC PLAN DISTRICT approx. 6.35 ACRES HOTEL, MULTI-STORY OFFICE, R&D FLEX, LIGHT MANUFACTURING, WAREHOUSE PROJECT ADDRESS: ASSESSOR PARCEL NUMBER: ZONING DESIGNATION LOT SIZE: ADJACENT USES: PARKING STRUCTURE 4 (PS4) TBD PROJECT DESCRIPTION GOP4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN THIS PROJECT SEEKS TO MODIFY THE GOP 4 PRECISE PLAN TO TAKE ADVANTAGE OF THE ADDITIONAL SQUARE FOOTAGE THAT COULD BE BUILT UNDER THE 1.0 FAR APPLICABLE TO THE ADJACENT RAIL SPURS BY TRANSFERRING THAT DENSITY TO GOP 4. THE FAR AT GOP 4 WOULD BE INCREASED FROM .82 TO 1.25. THE DENSITY TRANSFER PROJECT WILL ADD FOUR FLOORS TO THE GOP 4 NORTH BUILDING, AND 2.5 FLOORS TO THE GOP 4 PARKING GARAGE. CHANGES FROM APPROVED PLANS ARE NOTED IN THIS PLAN SET. NO APPROVALS OR MODIFICATIONS ARE SOUGHT WITH RESPECT TO UNMARKED DATA. Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 4:39:26 PM20189-07 FLAD FLAD02/28/2020 PROJECT DATA G4-001 GATEWAY OF PACIFIC SHEET INDEX - PRECISE PLAN A4-400 SITE CROSS SECTIONS A4-321 PARKING STRUCTURE 4 EXTERIOR WALL SECTIONS A4-320 PARKING STRUCTURE 4 EXTERIOR ELEVATIONS A4-308 LOADING/SERVICE A4-307 B4 EXTERIOR WALL SECTION A4-306 B4 EXTERIOR WALL SECTION A4-305 B4 EXTERIOR WALL SECTION A4-303 B4 EXTERIOR WALL SECTION A4-303 B4 SOUTH - EXTERIOR ELEVATIONS A4-302 B4 NORTH - EXTERIOR ELEVATIONS A4-301 B4 NORTH - EXTERIOR ELEVATIONS A4-300E GOP 4 RENDERING A4-300D GOP 4 RENDERING A4-300C GOP 4 RENDERING A4-300B GOP 4 RENDERING A4-300A GOP 4&5 SITE RENDERING A4-300 OVERALL ELEVATIONS A4-228 PS4 - EIGHT (ROOF) LEVEL FLOOR PLAN A4-227 PS4 - SEVENTH LEVEL FLOOR PLAN A4-226 PS4 - SIXTH LEVEL FLOOR PLAN A4-225 PS4 - FIFTH LEVEL FLOOR PLAN A4-224 PS4 - FOURTH LEVEL FLOOR PLAN A4-223 PS4 - THIRD LEVEL FLOOR PLAN A4-222 PS4 - SECOND LEVEL FLOOR PLAN A4-221 PS4 - GROUND LEVEL FLOOR PLAN A4-210 B4 - ROOF LEVEL NORTH BUILDING A4-209 B4 - PENTHOUSE LEVEL NORTH BUILDING A4-208 B4 - LEVEL 09 FLOOR PLAN NORTH BUILDING A4-207 B4 - LEVEL 08 FLOOR PLAN NORTH BUILDING A4-206 B4 - LEVEL 07 FLOOR PLAN NORTH BLDG -ROOF PLAN LEVEL SOUTH BLDG A4-205 B4 - LEVEL 06 FLOOR PLAN NORTH BLDG -PENTHOUSE LEVEL SOUTH BLDG A4-204 B4 - LEVEL 05 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-203 B4 - LEVEL 04 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-202 B4 - LEVEL 03 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-201 B4 - LEVEL 02 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-200 B4 - LEVEL 01 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-100 SITE PLAN C4-602 PRELIMINARY STORMWATER CONTROL PLAN C4-601 PRELIMINARY STORMWATER CONTROL PLAN C4-502 PRELIMINARY UTILITY PLAN C4-501 PRELIMINARY UTILITY PLAN C4-402 CONCEPTUAL GRADING PLAN C4-401 CONCEPTUAL GRADING PLAN C4-302 PROPOSED SITE PLAN C4-301 PROPOSED SITE PLAN C4-202 EXISTING CONDITIONS C4-201 EXISTING CONDITIONS C4-101 BOUNDARY PLAN L4-502 SITE SECTION ENLARGEMENT L4-501 SITE SECTIONS L4-404 SITE FURNISHING PALETTE L4-402 SITE FURNISHING PALETTE L4-401 SITE FURNISHINGS L4-303 PLANTING PALETTE L4-302 PLANTING ZONES L4-301 PLANTING ZONES L4-203 PAVING PALETTE L4-202 PAVING PLAN L4-201 PAVING PLAN L4-104 VIEW OF CENTRAL SQUARE L4-103 VIEW OF DINING DECK & GARDEN L4-102 PROPOSED SITE PLAN L4-101 PROPOSED SITE PLAN L4-100 SITE CONTEXT PLAN W4-110 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-109 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-108 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-107 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-106 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-105 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-104 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-103 PHASE 4 SIGN ELEVATION (PRELIMINARY) W4-102 PHASE 4 SIGN VISIBILITY (PRELIMINARY) W4-101 PHASE 4 SQUARE FOOTAGE (PRELIMINARY) W4-100 PHASE 4 SIGN LOCATION PLAN (PRELIMINARY) G4-004 PROPOSED PRECISE PLAN EXTENTS G4-003 GOP 1,2,3,4 & 5 INTEGRATED CAMPUS G4-002 EXISTING SITE PHOTOS G4-001 PROJECT DATA G4-000 COVER SHEET Rev Date Description 153862240.1 GOP 4 DENSITY TRANSFER PROJECT GOP 1 Parcel C GOP 2 Parcel B GOP 3 Parcel A GOP 4 Parcel D GOP Master Plan (1-4) Lot Square Footage, after most recent LLA 284,584 (6.53 acres) 237,986 (5.46 acres) 185,262 (4.25 acres) 276,639a (6.35 acres) 984,471 As Built or Entitled – Before GOP 4 Density Transfer Project Building Floor Area 479,116 371,648 302,722 225,621b 1,379,107 Building Floor Area that counts towards FAR 427,104 312,130 265,734 225,621 1,230,589 FAR 1.50 1.31 1.43 0.82 1.25 After Implementation of the GOP 4 Density Transfer Project, Which Proposes to Transfer 120,221 SF from the Rail Spurs to GOP 4 Building Floor Area 479,116 371,648 302,722 345,842 1,499,328 Building Floor Area that counts towards FAR 427,104 312,130 265,734 345,842 1,350,810 FAR 1.50 1.31 1.43 1.25 1.37 Notes Floor Area is calculated pursuant to Municipal Code § 20.040.008. Floor Area Ratio (FAR) is calculated pursuant to Municipal Code § 20.040.009. a. The GOP 4 parcel was 276,422 SF when BMR first applied for the GOP 4 Precise Plan. Pursuant to a Lot Line Adjustment subsequently approved by the City, the GOP 4 parcel is now 276,639 SF. b. The approved plan set for GOP 4 shows 226,000 SF of Floor Area. However, subsequent calculations that took into account the exact square footage of GOP 1 – 3 revealed that only 225,261 SF of Floor Area (a difference of 379 square feet) is available to be built at GOP 4 under the 1.25 FAR currently applicable to the entire GOP Master Plan site. GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 DRAFTDRAFT Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/17/2020 1:21:29 PM20189-01 FLAD FLAD02/28/2020 GOP 1,2,3,4 & 5 INTEGRATED CAMPUS G4-003 GATEWAY OF PACIFIC Rev Date Description GOP 5E APN 015-071-330 PS 4 APN 015-023-200 RAIL SPUR-1 APN 015-071-220 RAIL SPUR-2 APN 015-071-999 GOP 4N APN 015-023-200 GOP 4S APN 015-023-200 GOP 5W APN 015-071-330 PS 5 APN 015-071-330 AMENITY APN 015-023-470 GOP 1 APN 015-023-470 GOP 2 APN 015-023-450 PS 2 APN 015-023-450 GOP 3 APN 015-023-290 PS 3 APN 015-023-290 OYSTER POINT BLVD GATEWAY BLVDECCLES AVENUEVETERANS BLVD N 0’55’110’220’ 1”=110’ @ 24x36 1”=220’ @ 12x18 06/08/2006/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/25/2020 2:11:33 PM20189-01 FLAD FLAD02/28/2020 PROPOSED PRECISE PLAN EXTENTS G4-004 GATEWAY OF PACIFIC Rev Date Description PRECISE PLAN AREASCREENED SERVICE UTILITY YARD SCREENED SERVICE UTILITY YARD GOP 5E APN 015-071-330 PS 4 APN 015-023-200 RAIL SPUR-1 APN 015-071-220 RAIL SPUR-2 APN 015-071-999 GOP 4N APN 015-023-200 GOP 4S APN 015-023-200 GOP 5W APN 015-071-330 PS 5 APN 015-071-330 AMENITY APN 015-023-470 GOP 1 APN 015-023-470 GOP 2 APN 015-023-450 PS 2 APN 015-023-450 GOP 3 APN 015-023-290 PS 3 APN 015-023-290 OYSTER POINT BLVD GATEWAY BLVDECCLES AVENUEVETERANS BLVD N 0’55’110’220’ 1”=110’ @ 24x36 1”=220’ @ 12x18 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/1/2021 1:26:35 PM20189-07 - GATEWAY OF PACIFIC Rev Date Description C4-101 BOUNDARY PLAN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 1/10/20204:41:47PMJJ KA GATEWAY OF PACIFIC Rev Date Description Know what's R N 20189-07 09/17/2021 Precise Plan Modifications GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN Phase 4 South San Francisco, CA 94080 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 C4-200 BOUNDARY PLAN EN JJ Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/11/2020 2:20:32 PM20189-01 Checker Author02/28/20 24X36 SAMPLE X4-YYY GATEWAY OF PACIFIC Rev Date Description CMG CMG GOP 1 BLDG 180 BLDG 200 OYSTER POINT BLVD SITE CONTEXT PLANGATEWAY BOULEVARDGOP 4 - N GOP 4 - S AMNTY. BLDG. GOP 4 - PS PARK STREETGOP 3GOP 2GOP 2-PSGOP 3-PSL4-100 GOP 4 - PRECISE PLAN BOUNDARY GOP 5 - E GOP 5 - W GOP 5 - PS OYSTER POINT ACCESS AREA CENTRAL SQUARE 50,134 SQ FT.1.15 ACRES ENTRY PLAZA DROP-OFF 12,278 SQ FT..28 ACRES PERIPHERAL LANDSCAPE 87,860 SQ FT.2 ACRES 1608040200 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/11/2020 2:20:32 PM20189-01 Checker Author02/28/20 24X36 SAMPLE X4-YYY GATEWAY OF PACIFIC Rev Date Description CMG CMG GOP 4 - N BLDG 180 BLDG 200 GOP 4 - S PARK STREET (PRIVATE DRIVE)AMENITY BUILDING GOP-1 GOP 2 - PS GOP 4 - PS L4-101 PROPOSED SITE PLANSEE SHEET L4.102GOP 5 - E L4-501/502 4 2 1 10 9 8 7 13 14 12 11 6 3 5 1 3 4 5 5 6 14 6 7 8 9 10 11 11 14 13 12 12 12 12 2 Entry Drop-Off Plaza Entry Plaza Park Street Landscape - CIP Concrete retaining walls with landscape buffer planting. - Stormwater treatment areas integrated at base of wall. Garden Deck/Dining Area Stage/Seating/Sculpture Platform - Removable bollards with a curb-less transition to the plaza and building entry plaza. - Concrete unit pavers with seat benches and accent tree groupings. - Vehicular access with drop-off and turn around area. Central Square Dining Pavilion Custom Wood Seating Element Loading Dock Garage Entry/ Exit Groves Utility/Infrastructure Yard Parcel Boundary Garden Edges Emergency Vehicle Access LEGEND - 20’-26’ wide per city standards with mountable curb at Park Street. - City standard fire truck hammerhead turn around at central square. - Wood seating platform with movable seating, potential fire pit, accent lighting and under-story planting. - The nexus of the campus, connecting the existing campus with the proposed four and five phases. Campus circulation connections to building entry/exit points and amenities spaces are included, along with native and adapted plantings with areas for various campus program. These include, outdoor corporate events, al fresco dining, lounge seating, outdoor meeting spaces, along with opportunities for food and beverage vendors. -Metal trellis with accent lighting and lounge seating -Potential food and beverage kiosk -Wood decking with movable and fixed seating elements, accent lighting and native and adapted under-story plantings. -A continuation of the phase one landscape incorporating storm-water gardens and tree bosques. -A variety of tree types help to define the edges of the central square and accent architectural facades. Under-story plantings consist of native and adapted plantings that help to define the outdoor rooms and give seasonal interest, along with providing habitat for local fauna. 8040 20100 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/11/2020 2:20:32 PM20189-01 Checker Author02/28/20 24X36 SAMPLE X4-YYY GATEWAY OF PACIFIC Rev Date Description CMG CMG 4 2 2 1 1 3 3 4 5 5 Entry/Exit Access Drive Surface Parking Lot Peripheral Landscape Fire Truck Turnaround Garage Entry/ Exit LEGEND 8040 20100SEE SHEET L4.101PROPOSED SITE PLAN L4-102 GOP 4 - PS OYSTER POINT BLVD BLDG 200 Parcel Boundary 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 BUILDING 4S 5-STORIES 112,937 GFA PARKING STRUCTURE 8 LEVELS BUILDING 4N 9-STORIES 232,905 GFA MECHANICAL PENTHOUSE STAIR ENCLOSURE STAIR ENCLOSURE MECHANICAL PENTHOUSE SERVICE YARD SERVICE YARD SERVICE YARD Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:39:09 PM20189-07 FLAD FLAD09/17/2021 ARCHITECTURAL SITE PLAN A4-100 GATEWAY OF PACIFIC 1" = 30'-0"11 SSIITTEE PPLLAANN SITE DATA 0' 15'30'60' PLAN NORTH TOTAL PARCEL AREAS A,B,C&D: 984,471 SF TOTAL PARCEL AREAS E&F (RAIL SPURS): 120,221 SF ALLOWABLE FAR FLOOR AREA (PARCELS A,B,C&D @1.25):1,230,589 SF ALLOWABLE FAR FLOOR AREA (PARCELS E&F @1.0): 120,221 SF TOTAL ALLOWABLE FAR FLOOR AREA (PARCELS A,B,C,D,E&F):1,350,810 GFA* TOTAL GOP FAR FLOOR AREA BUILT TO DATE (PHASES 1,2 &3):1,004,968 GFA* TOTAL REMAINING GOP4 FAR FLOOR AREA: 345,842 GFA* BUILDING NORTH: 232,905 GFA* BUILDING SOUTH: 112,937 GFA* FAR SHOWN:1.25 PARKING REQUIRED 772 CARS * GFA = GROSS FLOOR AREA (COUNTING TOWARDS FAR) Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 SITE PLAN A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS LOBBY LOBBY LOADING AREA LOADING AREA RESTROOMS OPEN ABOVE EXTERIOR SERVICE YARD EXTERIOR SERVICE YARD RESTROOMS OPEN ABOVE DROP OFF ACCESS DRIVEWAY PARK STREET (PRIVATE ACCESS)41' - 8"32' - 0"41' - 8"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0"115' - 4"220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4 " Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:04 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 01 FLOOR PLAN A4-200 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0011 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 LANDS OFBM R - RAILROAD SPUR LP(DN. 2018-061652)A4-301 1 A4-302 2 A4-302 1 A4-3034A4-3033A4-3031A4-3032DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS 77..33SS 55..77SS LOBBY LOBBY LOADING AREA LOADING AREA RESTROOMS OPEN ABOVE EXTERIOR SERVICE YARD EXTERIOR SERVICE YARD RESTROOMS OPEN ABOVE DROP OFF ACCESS DRIVEWAY PARK STREET (PRIVATE ACCESS)21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"A4-301 2 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 225' - 9"1 2 1' - 6" 1 1 9' - 8" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"234' - 9"118' - 6"4 1' - 8 " 3 2' - 0" 4 1' - 8" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:34 PM20189-07 FLAD FLAD09/17/2021 B4 -LEVEL 01 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-200 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0011 FFLLOOOORR PPLLAANNSS NNOORRTTHH AANNDD SSOOUUTTHH BBUUIILLDDIINNGGSS Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 B4 - LEVEL 01 FLOOR PLANS NORTH AND SOUTH BUILDINGS NORTH BUILDING SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 A4-301 1 A4-302 2 A4-302 1 A4-3034A4-3033A4-3031A4-3032DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS 77..33SS 55..77SS RESTROOMS 21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"RESTROOMS OPEN TO BELOW A4-301 2 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"4 1' - 8" 3 2' - 0 " 4 1' - 8" 1 3 0' - 1"225' - 9"249' - 8" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 4:02:00 PM20189-07 FLAD FLAD09/17/2021 B4 -LEVEL 05 FLOOR PLANS NORTH AND SOUTH BUILDINGS A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANNSS NNOORRTTHH AANNDD SSOOUUTTHH BBUUIILLDDIINNGGSS Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 B4 - LEVEL 05 FLOOR PLANS NORTH AND SOUTH BUILDINGS NORTH BUILDING SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 A4-301 1 A4-302 2 A4-302 1 A4-3034A4-3033A4-3031A4-3032DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS 77..33SS 55..77SS RESTROOMS OPEN TO BELOW A4-301 2 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"4 1' - 8" 3 2' - 0 " 4 1' - 8 " 1 3 0' - 1"225' - 9"249' - 8" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:43 PM20189-07 09/17/2021 B4 -LEVEL 06 FLOOR PLAN NORTH BUILDING PENTHOUSE LEVEL SOUTH BUILDING A4-205 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 66 FFLLOOOORR PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG PPEENNTTHHOOUUSSEE LLEEVVEELL SSOOUUTTHH BBUUIILLDDIINNGG Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-205 B4 - LEVEL 06 FLOOR PLAN NORTH BUILDING PENTHOUSE LEVEL SOUTH BUILDING NORTH BUILDING SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 A4-301 1 A4-302 2 A4-302 1 RESTROOMS A4-301 2 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"235' - 9" 66NN DDSS CCSS BBSS AASS Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:44 PM20189-07 Checker Author09/17/2021 B4 -LEVEL 07 FLOOR PLAN NORTH BUILDING A4-206 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0077 FFLLOOOORR PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG Rev Date Description A4-301 1 A4-302 2 A4-302 1 A4-3034A4-3033A4-3031A4-3032DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS 77..33SS 55..77SS RESTROOMS OPEN TO BELOW A4-301 2 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:41:36 PM20189-07 09/17/2021 B4 -LEVEL 06 FLOOR PLAN NORTH BUILDING PENTHOUSE LEVEL SOUTH BUILDING A4-205 GATEWAY OF PACIFIC Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-206 B4 - LEVEL 07 FLOOR PLAN NORTH BUILDING NORTH BUILDING PENTHOUSE ROOF STAIR ENCLOSURE DRAFT A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 RESTROOMS A4-301 2 A4-302 2 A4-301 1 A4-302 1 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"236' - 1" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:44 PM20189-07 Checker Author09/17/2021 B4 -LEVEL 08 FLOOR PLAN NORTH BUILDING A4-207 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0088 FFLLOOOORR PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-207 B4 - LEVEL 08 FLOOR PLANS NORTH BUILDING NORTH BUILDING OUTLINE OF SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 RESTROOMS A4-301 2 A4-302 2 A4-301 1 A4-302 1 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"236' - 1" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:45 PM20189-07 09/17/2021 B4 -LEVEL 09 FLOOR PLAN NORTH BUILDING A4-208 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0099 FFLLOOOORR PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-208 B4 - LEVEL 09 FLOOR PLANS NORTH BUILDING NORTH BUILDING OUTLINE OF SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS RESTROOMS RESTROOMS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4" Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:09 AM20189-01 FLAD FLAD02/28/2020 B4 -LEVEL 05 FLOOR PLAN A4-204 GATEWAY OF PACIFIC 1" = 20'-0"11 LLEEVVEELL 0055 FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 MECHANICAL PENTHOUSE EXTERIOR ROOF AREA A4-301 2 A4-302 2 A4-301 1 A4-302 1 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"236' - 1" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:45 PM20189-07 FLAD FLAD09/17/2021 B4 -PENTHOUSE FLOOR PLAN NORTH BUILDING A4-209 GATEWAY OF PACIFIC 1" = 20'-0"11 PPEENNTTHHOOUUSSEE LLEEVVEELL FFLLOOOORR PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-209 B4 - LEVEL 1 PENTHOUSE FLOOR PLAN NORTH BUILDING NORTH BUILDING OUTLINE OF SOUTH BUILDING A4-301 3 A4-301 2 A4-301 1 A4-3024A4-3023A4-3021A4-3022DDSS CCSS BBSS AASS 11SS 22SS 33SS 44SS 55SS 66SS 77SS 88SS 99SS 1100SS 1111SS 1122SS DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 66NN 77NN 88NN 99NN 1100NN 1111NN 1122NN55..77NN 77..33NN 77..33SS 55..77SS41' - 8"32' - 0"41' - 8"115' - 4"21' - 0" 21' - 0" 21' - 0" 21' - 0" 15' - 9" 5' - 3" 10' - 6" 5' - 3" 15' - 9" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 220' - 6"21' - 0"21' - 0"21' - 0"21' - 0"15' - 9"5' - 3"10' - 6"5' - 3"15' - 9"21' - 0"21' - 0"21' - 0"21' - 0"220' - 6"4 1' - 8 " 3 2' - 0 " 4 1' - 8 " 1 1 5' - 4 " MECHANICAL PENTHOUSE EXTERIOR ROOF AREA EXTERIOR ROOF AREA MECHANICAL PENTHOUSE Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 2/27/2020 11:08:11 AM20189-01 FLAD FLAD02/28/2020 B4 -PENTHOUSE FLOOR PLAN A4-205 GATEWAY OF PACIFIC 1" = 20'-0"11 PPEENNTTHHOOUUSSEE LLEEVVEELL FFLLOOOORR PPLLAANN Rev Date Description 06/08/20 PENTHOUSE ROOF STAIR ENCLOSURE A4-301 2 A4-302 2 A4-301 1 A4-302 1 DDNN CCNN BBNN AANN 11NN 22NN 33NN 44NN 55NN 77NN 88NN 99NN 1100NN 1111NN 1122NN 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0" 21' - 0"41' - 8"32' - 0"41' - 8"123' - 1"236' - 1" 66NN Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Modifications N GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 9/17/2021 3:34:46 PM20189-07 FLAD FLAD09/17/2021 B4 -ROOF PLAN NORTH BUILDING A4-211 GATEWAY OF PACIFIC 1" = 20'-0"11 RROOOOFF PPLLAANN NNOORRTTHH BBUUIILLDDIINNGG Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-211 B4 - ROOF PLAN NORTH BUILDING NORTH BUILDING OUTLINE OF SOUTH BUILDING 1 2 A4-320 2 1 A4-330 1 A4-330 A4-320 1 CC BB 3 AA 4 A4-321 1 A4-321 2 2 A4-330 - 5 6 7 8 9 10 11 12 13 14 15 16 17 A.2 A.5 B.6 21 22 B.4 B.1 A.6 A.4 A.1 B.7 B.5 B.3 B.2 A.3 RAMP UPVVEV-VA EV-A AMB3 A4-330 3 A4-330 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 GOP 4 PRECISE PLAN 2/14/2020 10:30:07 AM19309 Checker Author02/28/2020 GROUND LEVEL FLOOR PLAN Gateway of Pacific SCALE:1/16" = 1'-0"1 GROUND LEVEL FLOOR PLAN Rev Date Description Project Key Plan N GROUND LEVEL FLOOR PLAN PS4 - GROUND LEVEL FLOOR PLAN A4-221 06/08/20 PA4-321 1 1 PA4-331 1 PA4-331 PA4-321 2 PA4-322 1 PA4-322 2 3 PA4-331 3 PA4-331 RAMP UPVVEV-VA EV-A AMBSTAIR 01 ELEV 01 STAIR 02 ELEV 02 2 PA4-331 2 PA4-331 ELEC. ROOM BIKE ROOM RAMP DN A.7 A.8 A.9A.9 A.10A.10 A.11 A.12A.12 A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27 A.28 A.29 A.30 A.31 A.32 A.33 A.34 A.35 A.36 A.37 A.38 A.39 A.40 A.4110' - 3"10' - 9"15' - 0"126' - 0"16' - 9"13' - 11 3/8"12' - 6 1/8"12' - 6 1/8"12' - 6 1/8"11' - 6 1/8"126' - 0"14' - 10"14' - 10"14' - 10"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"9' - 8"8' - 8"18' - 4"18' - 4"8' - 8"9' - 8"18' - 4" 282' - 10"16' - 9"10' - 3"21' - 6"21' - 0"21' - 0"16' - 3"2' - 4"27' - 2"SHEET NOTE 1. FLOOR ELEVATIONS SHOWN ARE TO THE TOP OF STRUCTURAL SLAB UNLESS OTHERWISE NOTED. 2. SEE SHEET TO FOR STRIPING, SIGNS AND GRAPHIC INFORMATION. 3. COORDINATE STRUCTURAL WITH SPRINKLER DESIGN AND LAYOUT. PROVIDE SLEEVE LOCATION(S) AS NECESSARY. 4. PROVIDE MEDIUM BROOM FINISH OVER CONCRETE WHERE ELASTOMERIC CATING OCCURS. 5. ALL EXPOSED EXTERIOR SURFACES AND ALL INTERIOR SURFACES (WALLS, COLUMNS, BEAMS AND SOFFITS) TO BE PAINTED, COLOR TO BE SELECTD BY ARCHITECT. 6. SEE SHEET FOR DOOR SCHEDULE AND DETAILS. 7. SEE SHEET FOR WALL TYPE SCHEDULE. Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/8/2021 3:58:48 PM19309 Checker Author01/20/15 GROUND LEVEL FLOOR PLAN PA4-221 Gateway of Pacific SCALE:1/16" = 1'-0"1 GROUND LEVEL FLOOR PLAN Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-320 A4-320 A4-321 A4-321 3 3 4 2 A4-320 A4-320 A4-321A4-321 1 2 33 09/17/2021 20198-07 CMG CMG 1 2 A4-320 2 1 A4-330 1 A4-330 A4-320 1 CC BB 3 AA 4 A4-321 1 A4-321 2 2 A4-330 2 A4-330 - 5 6 7 8 9 10 11 12 13 14 15 16 17 A.2 A.5 B.6 21 22 B.4 B.1 A.6 A.4 A.1 B.7 B.5 B.3 B.2 A.3 RAMP UPRAMP DN 3 A4-330 3 A4-330 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 GOP 4 PRECISE PLAN 2/14/2020 10:30:12 AM19309 Checker Author02/28/2020 FIFTH LEVEL FLOOR PLAN Gateway of Pacific SCALE:1/16" = 1'-0"1 FIFTH LEVEL FLOOR PLAN Rev Date Description Project Key Plan N FIFTH LEVEL FLOOR PLANPS4 - FIFTH LEVEL FLOOR PLAN A4-225 06/08/20 UP UP PA4-321 1 1 PA4-331 1 PA4-331 PA4-321 2 PA4-322 1 PA4-322 2 3 PA4-331 3 PA4-331 STAIR 01 ELEV 01 ELEV 02 2 PA4-331 2 PA4-331 RAMP UPRAMP DN RAMP DN A.7 A.8 A.9A.9 A.10A.10 A.11 A.12A.12 A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27 A.28 A.29 A.30 A.31 A.32 A.33 A.34 A.35 A.36 A.37 A.38 A.39 A.40 A.4110' - 3"10' - 9"15' - 0"126' - 0"16' - 9"13' - 11 3/8"12' - 6 1/8"12' - 6 1/8"12' - 6 1/8"11' - 6 1/8"126' - 0"14' - 10"14' - 10"14' - 10"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"9' - 8"8' - 8"18' - 4"18' - 4"8' - 8"9' - 8"18' - 4" 282' - 10"16' - 9"10' - 3"21' - 6"21' - 0"21' - 0"16' - 3"2' - 4"27' - 2"Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/8/2021 3:58:53 PM19309 Checker Author01/10/20 SIXTH LEVEL FLOOR PLAN PA4-226 Gateway of Pacific SCALE:1/16" = 1'-0"1 SIXTH LEVEL FLOOR PLAN Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-226 PS4 - SIXTH LEVEL FLOOR PLAN A4-320 A4-320 A4-321 A4-321 3 3 4 2 A4-320 A4-320 A4-321A4-321 1 2 33 CMG CMG 1 2 A4-320 2 1 A4-330 1 A4-330 A4-320 1 CC BB 3 AA 4 A4-321 1 A4-321 2 2 A4-330 2 A4-330 - 5 6 7 8 9 10 11 12 13 14 15 16 17 A.2 A.5 B.6 21 22 B.4 B.1 A.6 A.4 A.1 B.7 B.5 B.3 B.2 A.3 RAMP UPRAMP DN 3 A4-330 3 A4-330 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 GOP 4 PRECISE PLAN 2/14/2020 10:30:12 AM19309 Checker Author02/28/2020 FIFTH LEVEL FLOOR PLAN Gateway of Pacific SCALE:1/16" = 1'-0"1 FIFTH LEVEL FLOOR PLAN Rev Date Description Project Key Plan N FIFTH LEVEL FLOOR PLANPS4 - FIFTH LEVEL FLOOR PLAN A4-225 06/08/20 UP PA4-321 1 1 PA4-331 1 PA4-331 PA4-321 2 PA4-322 1 PA4-322 2 3 PA4-331 3 PA4-331 2 PA4-331 2 PA4-331 RAMP UPRAMP DN RAMP DN A.7 A.8 A.9A.9 A.10A.10 A.11 A.12 A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27 A.28 A.29 A.30 A.31 A.32 A.33 A.34 A.35 A.36 A.37 A.38 A.39 A.40 A.4110' - 3"10' - 9"15' - 0"126' - 0"16' - 9"13' - 11 3/8"12' - 6 1/8"12' - 6 1/8"12' - 6 1/8"11' - 6 1/8"126' - 0"14' - 10"14' - 10"14' - 10"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"9' - 8"8' - 8"18' - 4"18' - 4"8' - 8"9' - 8"18' - 4" 282' - 10"16' - 9"10' - 3"21' - 6"21' - 0"21' - 0"16' - 3"2' - 4"27' - 2"Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/8/2021 3:58:53 PM19309 Checker Author09/02/21 SEVENTH LEVEL FLOOR PLAN PA4-227 Gateway of Pacific SCALE:1/16" = 1'-0"1 SEVENTH LEVEL FLOOR PLAN Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-227 PS4 - SEVENTH LEVEL FLOOR PLAN A4-320 A4-320 A4-321 A4-321 3 3 4 2 A4-320 A4-320 A4-321A4-321 1 2 33 CMG CMG 1 2 A4-320 2 1 A4-330 1 A4-330 A4-320 1 CC BB 3 AA 4 A4-321 1 A4-321 2 2 A4-330 2 A4-330 - 5 6 7 8 9 10 11 12 13 14 15 16 17 A.2 A.5 B.6 21 22 B.4 B.1 A.6 A.4 A.1 B.7 B.5 B.3 B.2 A.3 RAMP DN 3 A4-330 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 GOP 4 PRECISE PLAN 2/14/2020 10:30:13 AM19309 Checker Author02/28/2020 SIXTH (ROOF) LEVEL FLOOR PLAN Gateway of Pacific SCALE:1/16" = 1'-0"1 SIXTH (ROOF) LEVEL FLOOR PLAN Rev Date Description Project Key Plan N SIXTH (ROOF) LEVEL FLOOR PLAN PS4 - SIXTH (ROOF) LEVEL FLOOR PLAN A4-226 06/08/20 UP PA4-321 1 1 PA4-331 1 PA4-331 PA4-321 2 PA4-322 1 PA4-322 2 3 PA4-331 3 PA4-331 2 PA4-331 2 PA4-331 RAMP DN RAMP DN A.7 A.8 A.9A.9 A.10A.10 A.11 A.12 A.13 A.14 A.15 A.16 A.17 A.18 A.19 A.20 A.21 A.22 A.23 A.24 A.25 A.26 A.27 A.28 A.29 A.30 A.31 A.32 A.33 A.34 A.35 A.36 A.37 A.38 A.39 A.40 A.41 OPEN TO BELOW10' - 3"10' - 9"15' - 0"126' - 0"16' - 9"13' - 11 3/8"12' - 6 1/8"12' - 6 1/8"12' - 6 1/8"11' - 6 1/8"126' - 0"14' - 10"14' - 10"14' - 10"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"18' - 4"9' - 8"8' - 8"18' - 4"18' - 4"8' - 8"9' - 8"18' - 4" 282' - 10"16' - 9"10' - 3"21' - 6"21' - 0"21' - 0"16' - 3"2' - 4"27' - 2"Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/8/2021 3:58:54 PM19309 Checker Author03/17/20 EIGHTH (ROOF) LEVEL FLOOR PLAN PA4-228 Gateway of Pacific SCALE:1/16" = 1'-0"1 EIGHTH (ROOF) LEVEL PLAN Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-228 PS4 - EIGHTH (ROOF) LEVEL FLOOR PLAN A4-320 A4-320 A4-321 A4-321 3 3 4 2 A4-320 A4-320 A4-321A4-321 1 2 33 CMG CMG Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:40:41 AM20189-01 FLAD FLAD02/28/2020 OVERALL ELEVATION A4-300 GATEWAY OF PACIFIC Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 BUILDING GOP 4 NORTH BUILDING GOP 4 NORTH BUILDING GOP 4 SOUTH PARKING STRUCTURE Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 1:34:03 PM20189-01 FLAD FLAD02/28/2020 GOP 4&5 RENDERING A4-300A GATEWAY OF PACIFIC Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 GOP 4&5 SITE RENDERING Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:40:42 AM20189-01 FLAD FLAD02/28/2020 GOP 4 RENDERING A4-300C GATEWAY OF PACIFIC LOW IRON GLASS EXTERIOR WOOD PLANK METAL COLUMN COVER HIGH PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FIN Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-300B Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:40:42 AM20189-01 FLAD FLAD02/28/2020 GOP 4 RENDERING A4-300C GATEWAY OF PACIFIC LOW IRON GLASS EXTERIOR WOOD PLANK METAL COLUMN COVER HIGH PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FIN Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-300C Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:40:42 AM20189-01 FLAD FLAD02/28/2020 GOP 4 RENDERING A4-300C GATEWAY OF PACIFIC LOW IRON GLASS EXTERIOR WOOD PLANK METAL COLUMN COVER HIGH PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FIN Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-300D Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:40:42 AM20189-01 FLAD FLAD02/28/2020 GOP 4 RENDERING A4-300C GATEWAY OF PACIFIC LOW IRON GLASS EXTERIOR WOOD PLANK METAL COLUMN COVER HIGH PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FIN Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-300E Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/12/2020 3:25:34 PM20189-01 FLAD FLAD02/28/2020 B4 NORTH -EXTERIOR ELEVATIONS A4-301 GATEWAY OF PACIFIC Rev Date Description HIGH-PERFORMANCE SOLAR GLASS - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED LOW IRON GLASS GFRC PANEL METAL FIN SHADOW BOX SPANDREL - LOW IRON OVERHEAD COILING DOOR METAL COLUMN COVER CLEAR GLASS GUARDRAIL CLEAR GLASS GUARDRAIL METAL COLUMN COVER REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED GFRC PANEL METAL FINS SHADOW BOX SPANDREL - TINTED CLEAR GLASS GUARDRAIL METAL COLUMN COVER LOW IRON GLASS CLEAR GLASS GUARDRAIL METAL COLUMN COVER SHADOW BOX SPANDREL - TINTED METAL FINS REVOLVING DOOR LOW IRON GLASS SHADOW BOX SPANDREL - LOW IRON HIGH-PERFORMANCE SOLAR GLASS - TINTED ENLARGED LOADING DOCK VIEW - 1/A4-307 06/08/20 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/12/2020 3:25:34 PM20189-01 FLAD FLAD02/28/2020 B4 NORTH -EXTERIOR ELEVATIONS A4-301 GATEWAY OF PACIFIC Rev Date Description HIGH-PERFORMANCE SOLAR GLASS - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED LOW IRON GLASS GFRC PANEL METAL FIN SHADOW BOX SPANDREL - LOW IRON OVERHEAD COILING DOOR METAL COLUMN COVER CLEAR GLASS GUARDRAIL CLEAR GLASS GUARDRAIL METAL COLUMN COVER REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED GFRC PANEL METAL FINS SHADOW BOX SPANDREL - TINTED CLEAR GLASS GUARDRAIL METAL COLUMN COVER LOW IRON GLASS CLEAR GLASS GUARDRAIL METAL COLUMN COVER SHADOW BOX SPANDREL - TINTED METAL FINS REVOLVING DOOR LOW IRON GLASS SHADOW BOX SPANDREL - LOW IRON HIGH-PERFORMANCE SOLAR GLASS - TINTED ENLARGED LOADING DOCK VIEW - 1/A4-307 06/08/20 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 198’ - 0” Level 7 - GOP 4 214’ - 0”Level 8 - GOP 4 230’ - 0” Level 9 - GOP 4 246’ - 0” PENTHOUSE - GOP 4 262’ - 0” T.O. PARAPET - GOP 4 HIGH-PERFORMANCE SOLAR GLASS - TINTED CLEAR GLASS GUARDRAIL REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 198’ - 0” Level 7 - GOP 4 214’ - 0”Level 8 - GOP 4 230’ - 0” Level 9 - GOP 4 246’ - 0” PENTHOUSE - GOP 4 262’ - 0” T.O. PARAPET - GOP 4 HIGH-PERFORMANCE SOLAR GLASS - TINTED CLEAR GLASS GUARDRAIL REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON 12 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/12/2020 3:25:34 PM20189-01 FLAD FLAD02/28/2020 B4 NORTH -EXTERIOR ELEVATIONS A4-301 GATEWAY OF PACIFIC Rev Date Description HIGH-PERFORMANCE SOLAR GLASS - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED LOW IRON GLASS GFRC PANEL METAL FIN SHADOW BOX SPANDREL - LOW IRON OVERHEAD COILING DOOR METAL COLUMN COVER CLEAR GLASS GUARDRAIL CLEAR GLASS GUARDRAIL METAL COLUMN COVER REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED HIGH-PERFORMANCE SOLAR GLASS - TINTED GFRC PANEL METAL FINS SHADOW BOX SPANDREL - TINTED CLEAR GLASS GUARDRAIL METAL COLUMN COVER LOW IRON GLASS CLEAR GLASS GUARDRAIL METAL COLUMN COVER SHADOW BOX SPANDREL - TINTED METAL FINS REVOLVING DOOR LOW IRON GLASS SHADOW BOX SPANDREL - LOW IRON HIGH-PERFORMANCE SOLAR GLASS - TINTED ENLARGED LOADING DOCK VIEW - 1/A4-307 06/08/20 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 198’ - 0” Level 7 - GOP 4 214’ - 0”Level 8 - GOP 4 230’ - 0” Level 9 - GOP 4 246’ - 0” PENTHOUSE - GOP 4 262’ - 0” T.O. PARAPET - GOP 4 HIGH-PERFORMANCE SOLAR GLASS - TINTEDLOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 198’ - 0” Level 7 - GOP 4 214’ - 0”Level 8 - GOP 4 230’ - 0” Level 9 - GOP 4 246’ - 0” PENTHOUSE - GOP 4 262’ - 0” T.O. PARAPET - GOP 4 HIGH-PERFORMANCE SOLAR GLASS - TINTED METAL COLUMN COVER LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-302 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLANDRAFT 2/12/2020 3:25:40 PM20189-01 FLAD FLAD02/28/2020 B4 SOUTH -EXTERIOR ELEVATIONS A4-302 GATEWAY OF PACIFIC Rev Date Description HIGH-PERFORMANCE SOLAR GLASS - TINTED CLEAR GLASS GUARDRAIL METAL COLUMN COVER REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON METAL COLUMN COVER LOW IRON GLASS CLEAR GLASS GUARDRAIL SHADOW BOX SPANDREL - TINTED GFRC PANEL HIGH-PERFORMANCE SOLAR GLASS - TINTED METAL FINS REVOLVING DOOR LOW IRON GLASS HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FINS METAL COLUMN COVER CLEAR GLASS GUARDRAIL SHADOW BOX SPANDREL - LOW IRON GFRC PANEL OVERHEAD COILING DOOR METAL FINS SHADOW BOX SPANDREL - LOW IRON CLEAR GLASS GUARDRAIL METAL COLUMN COVER HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED ENLARGED LOADING DOCK VIEW - 2/A4-307 06/08/20 REVOLVING DOOR LOW IRON GLASS HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FINS METAL COLUMN COVER CLEAR GLASS GUARDRAIL SHADOW BOX SPANDREL - LOW IRON 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 GFRC PANEL OVERHEAD COILING DOOR METAL FINS SHADOW BOX SPANDREL - LOW IRON CLEAR GLASS GUARDRAIL METAL COLUMN COVER HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0”Level 5 - GOP 4 182 - 0” Level 6- GOP 4 REVOLVING DOOR LOW IRON GLASS HIGH-PERFORMANCE SOLAR GLASS - TINTED SHADOW BOX SPANDREL - TINTED METAL FINS METAL COLUMN COVER CLEAR GLASS GUARDRAIL SHADOW BOX SPANDREL - LOW IRON 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0” Level 5 - GOP 4 182 - 0” Level 6- GOP 4 HIGH-PERFORMANCE SOLAR GLASS - TINTED CLEAR GLASS GUARDRAIL METAL COLUMN COVER REVOLVING DOOR LOW IRON GLASS METAL FINS SHADOW BOX SPANDREL - TINTED SHADOW BOX SPANDREL - LOW IRON 100’ - 0” Level 1 - GOP 4 118’ - 0” Level 2 - GOP 4 134 - 0” Level 3 - GOP 4 150 - 0” Level 4 - GOP 4 166’ - 0” Level 5 - GOP 4 182 - 0” Level 6- GOP 4 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 A4-303 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 39' - 0"Level 1 - GOP 4 77' - 2"FOURTH LEVEL PLAN 97' - 6"SIXTH LEVEL FLOOR PLAN 67' - 0"THIRD LEVEL - PS4 56' - 10"SECOND LEVEL - PS4 45' - 6"GROUND LEVEL - PS4 87' - 6"FIFTH LEVEL - PS4 107' - 8"LEVEL 7 - PS 4 117' - 10"LEVEL 8 - PS 4 EXTRUDED METAL SLATS TO MATCH GOP PARKING STRUCTURE 2&3 PRECISE PLAN METAL SCREEN TO MATCH GOP PARKING STRUCTURE 2&3 PRECISE PLAN PARKING GARAGE FACADE AT ELEVATORS AND STAIRS (GLASS CURTAINWALL) TO MATCH GOP PARKING STRUCTURE 2&3 PRECISE PLAN 77' - 2"FOURTH LEVEL PLAN 97' - 6"SIXTH LEVEL FLOOR PLAN 67' - 0"THIRD LEVEL - PS4 56' - 10"SECOND LEVEL - PS4 45' - 6"GROUND LEVEL - PS4 87' - 6"FIFTH LEVEL - PS4 107' - 8"LEVEL 7 - PS 4 117' - 10"LEVEL 8 - PS 4 77' - 2"FOURTH LEVEL PLAN 97' - 6"SIXTH LEVEL FLOOR PLAN 67' - 0"THIRD LEVEL - PS4 56' - 10"SECOND LEVEL - PS4 45' - 6"GROUND LEVEL - PS4 87' - 6"FIFTH LEVEL - PS4 107' - 8"LEVEL 7 - PS 4 117' - 10"LEVEL 8 - PS 4 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345 678 12345 678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan N GOP 4 PRECISE PLAN 9/13/2021 9:04:31 PM20189-07 FLAD FLAD02/28/2020 PARKING STRUCTURE 4 EXTERIOR WALL SECTIONS A4-321 GATEWAY OF PACIFIC 3/16" = 1'-0"11 PPSS44 --WWAALLLL SSEECCTTIIOONN 1" = 20'-0"33 PPSS44 --LLOONNGGIITTUUDDIINNAALL SSEECCTTIIOONN 1" = 20'-0"44 PPSS44 --CCRROOSSSS SSEECCTTIIOONN Rev Date Description GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 Project Title Drawn By Rev. No. Checked By Date Project Phase Project Number Sheet Title Sheet Number G 1 Project Key Plan Stamps & Approvals H F E D C B A 2345678 12345678 NOT FOR CONSTRUCTION 601 Gateway Boulevard, Suite 1145 South San Francisco, CA 94080 Precise Plan Phase 4 South San Francisco, CA 94080 N GOP 4 PRECISE PLAN 2/26/2020 8:41:00 AM20189-01 FLAD FLAD02/28/2020 SITE CROSS SECTION A4-400 GATEWAY OF PACIFIC Rev Date Description 06/08/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 SITE CROSS SECTIONS GOP 3PARKING STRUCTUREGOP 2PARKING STRUCTUREGOP 3GOP 2SOUTHGOP 2NORTHAMENITY BUILDINGGATEWAY BLVDPARK AVENUEOYSTER POINT BLVD ECCL ES A V E N U E PHASE 2 PHASE 3 PHASE 1 PHASE 2 PHASE 4 GOP 1 NORTH GOP 4A NORTH GOP 4 PARKING STRUCTURE GOP 5 PARKING STRUCTURE GOP 4B SOUTH GOP 5E EAST GOP 5W WEST GOP 1 SOUTH B.02 : Primary Entry Identification B.03 : Secondary Entry Identification B.04 : Tenant ID Freestanding B.05 : Occupant Branding Identification TEN.02 : Tenant ID (Eyebrow) DIR.02 : Vehicular Directional DIR.03 : Pedestrian Directional/Directory R.01-.09 : Regulatory (stop, HC, fire, code...) TEN.01 : Tenant ID @ Building Skyline PHASE 5 W4-100 PHASE 4SIGN LOCATION PLAN(PRELIMINARY) JP JP 07/23/20 GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 W4-102 PHASE 4SIGN VISIBILITY(PRELIMINARY) JP JP 07/23/20 Letter Visibility For Building Mounted Tenant Identification Many factors such as design composition, contrast, lighting, site lines, etc. contribute to optimal legibility for building mounted tenant ientification using logos and type. The main requirement for optimal legibility is determining the correct letter/logo size that will properly communicate the identity message to the probable viewing locations. 1000 ft viewing distance = minimum required 43“ letter height 500 ft viewing distance = minimum required 22” letter height Major tenants will size and display their logo / name after considering the viewing distance, the allowable square footage, and the visual impact on the surrounding environment. Letter Visibility For Building Mounted Tenant Identification Daylight letter visibility, white on dark background Daylight letter visibility, dark on light background with day/night vinyl faces Night letter visibility will show internally illuminated White faces. ABC CompanyABC Company 1000 ft500 ft 500 ft GOP 4North GOP 4 GOP 5 South West GOP 5East PS 4 PS 5 500 ft1000 ft 1000 ftGOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 ABC COMPANY TEN.01 : Tenant ID @ Building Skyline This sign type is located at the building roofline but not above the roofline. The purpose of this sign is to identify the major building occupants from a greater viewing distance. Tenant logo use is acceptable. Exact location along bldg. top to be determined with selected tenant. This sign type is approximately 225 Square Feet and should be taken into consideration as an Allowable Modification to the master program as a unifying wayfinding sign for the campus during Phase 4 and subsequent phases. QTY : 1 Sign Per Elevation GOP 4 NORTH / NORTH ELEVATION Fabricated aluminum individual channel letters/logos with face lit or halo lit warm white illumination, letters/logos are concealed mounted to building facade without exposed rails or attachments ABC COMPANY W4-103 PHASE 4SIGN ELEVATION(PRELIMINARY) JP JP 07/23/20 BUILDING TOP SIGNAGE LIMIT 2 PER TOWER LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE 225' - 0" ( North Tower ) 225 +- TOTAL SQ FT - NORTH ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N GOP 4S GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 TEN.01 : Tenant ID @ Building Skyline This sign type is located at the building roofline but not above the roofline. The purpose of this sign is to identify the major building occupants from a greater viewing distance. Tenant logo use is acceptable. Exact location along bldg. top to be determined with selected tenant. This sign type is approximately 120 Square Feet and should be taken into consideration as an Allowable Modification to the master program as a unifying wayfinding sign for the campus during Phase 4 and subsequent phases. QTY : 1 Sign Per Elevation GOP 4 NORTH / EAST ELEVATION GOP 4 NORTH / WEST ELEVATION Fabricated aluminum individual channel letters/logos with face lit or halo lit warm white illumination, letters/logos are concealed mounted to building facade without exposed rails or attachments ABC COMPANY ABC COMPANY ABC COMPANY ABC COMPANY W4-104 PHASE 4SIGN ELEVATION(PRELIMINARY) JP JP 07/23/20 120' - 0" ( North Tower ) 120 +- TOTAL SQ FT - EAST ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N GOP 4S GOP 4N GOP 4S BUILDING TOP SIGNAGE LIMIT 2 PER TOWER LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE 120' - 0" ( North Tower ) 120 +- TOTAL SQ FT - EAST ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 ABC COMPANY Fabricated aluminum individual channel letters/logos with face lit or halo lit warm white illumination, letters/logos are concealed mounted to building facade without exposed rails or attachments TEN.01 : Tenant ID @ Building Skyline This sign type is located at the building roofline but not above the roofline. The purpose of this sign is to identify the major building occupants from a greater viewing distance. Tenant logo use is acceptable. Exact location along bldg. top to be determined with selected tenant. This sign type is approximately 225 Square Feet and should be taken into consideration as an Allowable Modification to the master program as a unifying wayfinding sign for the campus during Phase 4 and subsequent phases. QTY : 1 Sign Per Elevation GOP 4 NORTH / SOUTH ELEVATION ABC COMPANY W4-105 PHASE 4SIGN ELEVATION(PRELIMINARY) JP JP 07/23/20 BUILDING TOP SIGNAGE LIMIT 2 PER TOWER LETTERS/LOGOS NOT ALLOWED ABOVE ROOF LINE 225' - 0" ( North Tower ) 225 +- TOTAL SQ FT - SOUTH ELEVATION / 1 SQ. FT. PER LINEAR FT. OF BUILDING FRONTAGE ALLOWED PER SSF SIGN ORDINANCE - TABLE 20.360.008 GOP 4N GOP 4S GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 TEN.02 : Tenant ID (Eyebrow) This sign type is located at the base of the building. The purpose of this sign is to identify the major building occupants. Tenant logo use is acceptable. Exact location along bldg. base to determined This sign type is approximately 22 Square Feet and should be taken into consideration as an Allowable Modification to the master program as a unifying wayfinding sign for the campus during Phase 4 and subsequent phases. QTY : 1 / 2 Signs Per Elevation (dependent on final tenant occupancy) GOP 4 NORTH / EAST ELEVATION GOP 4 NORTH / WEST ELEVATION Materials: Brushed Stainless Steel or similar materials that match architectural finishes. Square Footage: Overall area of Tenant Eyebrow Signage not to exceed 22 sq. feet. ABC COMPANY ABC COMPANY ABC COMPANY ABC COMPANY W4-106 PHASE 4SIGN ELEVATION(PRELIMINARY) JP JP 07/23/20 EYEBROW SIGNAGE LETTERS/LOGOS NOT TO EXCEED 22 TOTAL SQ FT. 120' - 0" ( North Tower ) 120' - 0" ( North Tower ) GOP 4N GOP 4S GOP 4N GOP 4S LETTERS/LOGOS NOT TO EXCEED 22 TOTAL SQ FT. GOP 4 DENSITY TRANSFER PROJECT MODIFICATION TO PRECISE PLAN 09/17/2021 Precise Plan Modifications 20198-07 CONDITIONS OF APPROVAL P21-0084: GPA21-0003, ZA21-0001, MPM21-0001, SPA21-0001, PPM21-0001 and DAA22-0002 GATEWAY OF PACIFIC – PHASE 4 DENSITY TRANSFER PROJECT (Recommended by City Staff on June 2, 2022) The Applicant/Project shall conform to all the conditions of approval identified in City Council Resolution 44 -2013 and Planning Commission Resolution 2859-2020, as modified and supplemented below. A. PLANNING DIVISION 1. Condition A.1 is modified such that, in lieu of the plan set dated June 8, 2020, the project shall be constructed and operated substantially as indicated on the plan set prepared by Flad Architects dated September 17, 2021 and approved by the City Council in association with P21-0084 as amended by the conditions of approval. The final plans shall be subject to the review and approval of the City’s Chief Planner. 2. Condition A.2 is modified such that, in addition to addressing Design Review Board comments from 2020, the applicant also shall address Design Review Board comments from 2021. Prior to the issuance of any building or construction permits for the project, the applicant shall revise the development plans to address all Design Review Board comments, subject to review and approval by the Chief Planner or designee. The Design Review Board comments are those set forth in the Design Review Board Comment Letter dated May 11, 2020 regarding 850-900 Gateway and Design Review Board Recommendations dated October 29, 2021 regarding 900 Gateway Boulevard. 3. Condition A.3 is modified such that, in addition to complying with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2020 Addendum / 2009 EIR for the Gateway of Pacific Phase 4 Revised Project (Exhibit E-1), the project also shall comply with the Gateway of the Pacific 4 Density Transfer Project Supplemental EIR Mitigation and Monitoring Program (Exhibit E-2), which imposes additional mitigation applicable to the expansion approved for the GOP 4 Density Transfer Project. The Applicant/Project shall comply with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2022 Supplemental EIR / 2009 EIR for the Gateway of Pacific Phase 4 Density Transfer Project including constructing any improvements required by such measures. 4. Condition A.4 is modified such that in lieu of complying with the Second Amendment, the applicant shall comply with all terms and conditions specified in the Second Amended and Restated Development Agreement, as amended by the First, Second and Third Amendments to that Agreement. 5. Prior to issuance of a building permit fo r the expansion square footage in the GOP 4 North building, the applicant shall implement a density transfer as permitted by section 2.2 of the amended Master Plan. The applicant shall do so by recording a covenant or deed, in a form acceptable to the City Attorney, on adjacent property that restricts development on that adjacent property. The restriction shall reduce the allowed intensity of development on that adjacent property by the number of square feet (up to 120,221 square feet) by which GOP 4 will cause the GOP Master Plan site to exceed 1.25 FAR. 6. The applicant shall construct a multi-use path and crossings in accordance with Mitigation Measure 3.1 -1 of the 2022 Supplemental EIR. The crossing shall be constructed at the northern and southern ends of the multi-use path, at Forbes Boulevard and Oyster Point Boulevard, in the configuration determined necessary by the City Engineer for bicycle access from those streets to the multi-use path. The applicant shall construct such improvements prior to the issuance of first occupancy permit , or within a reasonable timeframe acceptable to the City upon such time as public agencies have granted all necessary approvals for the construction and the applicant has been given the right to construct on any land owned by others that is necessary for said construction. 7. Prior to the issuance of any building or construction permits for the expansion square footage in the GOP 4 North building, the applicant shall file Form 7460-1 with the Federal Aviation Administration (FAA) and provide an FAA “Determination of No Hazard” to the Chief Planner. 8. The applicant shall comply with the real estate disclosure requirements outlined in Policy IP-1 of the Comprehensive Airport Land Use Compatibility Plan for the Environs of San Francisco International Airport, which states as follows: IP-1 AIRPORT INFLUENCE AREA A – REAL ESTATE DISCLOSURE AREA. Within Area A, the real estate disclosure requirements of state law apply. Section 11010 of the Business and Professions Code requires people offering subdivided property for sale or lease to disclose the presence of all existing and planned airports within two miles of the property. The law requires that, if the property is within an “airport influence area” designated by the airport land use commission, the following statement must be included in the notice of intention to offer the property for sale: NOTICE OF AIRPORT IN VICINITY. This property is presently located in the vicinity of an airport, within what is known as an airport influence area. For that reason, the property may be subject to some of the annoyances or inconveniences associated with proximity to airport operations (for example: noise, vibration, or odors). Individual sensitivities to those annoyances can vary from person to person. You may wish to consider what airport annoyances, if any, are associated with the property before you complete your purchase and determine whether they are acceptable to you. B. FIRE PREVENTION Permits 1. New and existing buildings shall be provided with approved illuminated or other approved means of address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numerals or alphabetic letters. Numbers shall not be spelled out. Character size and stroke shall be in accordance with CFC Section 505.1.1 through 505.1.2. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response in accordance with this code and CFC Section 505.1.3. Where access is by means of a private road and the building cannot be viewed from the public way or when determined by the fire code official, a monument, pole, or other approved illuminated sign or other approved means shall be used to identify the structure(s). Address identification shall be maintained. 2. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises on which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction, in accordance with CFC Section 507, Appendices B & C. a. Fire-flow requirements for buildings or portions of buildings and facilities shall be determined by adopted CFC Appendix B. b. Fire hydrant systems shall comply with adopted CFC Section 507.5.1 through 507.5.8 and Appendix C. 3. Fire apparatus access roads shall be provided and maintained in accordance with CFC Section 503 and Appendix D. a. Approved fire apparatus access roads shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the jurisdiction. The fire apparatus access road shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. i. Developer shall provide a site plan exhibit indicating compliance with these requirements to the fire department prior to approval. ii. Traffic calming measures (bollards, speed bumps, humps, undulations, etc.) are not approved as a part of this review and require specific approval from the Fire Department. iii. Should a security gate be planned to serve the facility, the gate design shall be submitted directly to the Fire Department for fire permit review. The gate shall be equipped with a Knox Company key operated electric gate release switch. During a power failure, gate shall release for manual operation OR be equipped with standby power or connected to the building emergency panel. In addition to sending the request to exit signal to the gate operator, the magnetic detection loop (when activated) shall prohibit the gate from closing upon fire apparatus. b. Commercial and industrial developments with buildings or facilities exceeding 30 feet or three stories in height or 62,000 square feet shall have not fewer than two means of fire apparatus access for each structure. Where two fire apparatus access roads are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the lot or area to be served, measured in a straight line between accesses. c. Where the vertical distance between the grade-plane and the highest roof surface exceeds 30-feet , approved aerial fire apparatus access roads shall be provided in accordance with CFC D105. For purposes of this requirement, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet, exclusive of shoulders, in the immediate vicinity of the building or portion thereof. One or more of the required access routes meeting this condition shall be located not less than 15-feet and not greater than 30-feet from the building and shall be positioned parallel to one entire long-side of the building or as approved by the fire code official. The side of the building on which the aerial fire apparatus access road is positioned shall be approved by the fire code official. Overhead utility and power lines shall not be located over the aerial fire apparatus access road or between the aerial fire apparatus road and the building. There shall be no architectural features, projections or obstructions that would limit the articulation of the aerial apparatus. d. Required Fire Department access roads shall be signed “No Parking – Fire Lane” per current Fire Department standards and California Vehicle Code (CVC) Section 22500. e. A Fire Department key box shall be provided on the front of each structure for access to fire protection equipment within the building 4. The provisions of the adopted CFC shall specify where fire protection and life safety systems are required and shall apply to the design, installation, inspection, operation, testing and maintenance of all fire protection systems. a. Approved automatic fire sprinkler systems in new buildings and structures shall be provided in the locations described in adopted CFC Sections 903.2.1 through 903.2.20. Approved automatic fire sprinkler systems in existing buildings and structures shall be provided in locations described in adopted CFC Section 903.6. i. Structure(s) will be required to be protected by an automatic fire sprinkler system. 1. If required Fire Department Connection (FDC) for the sprinkler and/or standpipe systems shall be located on the addressed street side of the structure or facing approved fire apparatus access roadway fully visible and recognizable from the street, and within 100 feet an approved fire hydrant. b. Structure(s) will be required to install a standpipe system in the building. i. Not less than one standpipe shall be provided for use during construction. Such standpipes shall be installed prior to construction exceeding 40 feet in height above the lowest level of fire department vehicle access. Such standpipes shall be provided with fire department hose connections at floor- level locations adjacent to stairways as construction progresses, such standpipes shall be extended to within one floor of the highest point of construction having secured decking or flooring. 5. The following are a list of typical fire construction deferred plan submittal items that are required by the Fire Department - additional items may be called out based on subsequent construction permit reviews. The applicant shall provide and meet these requirements. a. Private Underground Fire Mains & Fire Hydrants b. Standpipe System c. Fire Sprinkler System d. Fire Alarm/Fire Sprinkler Monitoring System e. Fire Pump (to be determined) f. Smoke Control Systems (to be determined) g. Emergency Responder Radio System (to be determined) h. Gates and barricades across fire apparatus access roads (to be determined) 2013 and 2020 Adopted Conditions of Approval RESOLUTION NO. 2859-2020 PLANNING COMMISSION, CITY OF SOUTH SAN FRANCISCO STATE OF CALIFORNIA RESOLUTION MAKING FINDINGS AND APPROVING A PRECISE PLAN AND DESIGN REVIEW FOR THE DEVELOPMENT OF PHASE 4 OF THE GATEWAY BUSINESS PARK MASTER PLAN PROJECT AT 850-900 GATEWAY BOULEVARD IN THE GATEWAY SPECIFIC PLAN DISTRICT. WHEREAS , in 2010 the City of South San Francisco (“City”) adopted (1) Resolution No. 18-2010 certifying the 2009 Environmental Impact Report (“2009 EIR”) (State Clearinghouse No. 2008062059), (2) Resolution No. 19-2010 approving a general plan amendment and transportation demand management (TDM) program, (3) Ordinance No. 1422-2010 amending Chapters 20.57 and 20.120 of the Zoning Ordinance, and (4) Ordinance No. 1423-2010 approving a development agreement with Chamberlin Associates, for the construction of five to six R&D/ Office buildings, two to four parking structures, and related improvements on an approximately 22.6-acre site located at 700-1000 Gateway Boulevard; and WHEREAS, in 2013 the City adopted (1) Resolution No. 43-2013 making findings and relying on the previously certified 2009 EIR and incorporating such EIR by reference, (2) Resolution No. 44- 2013 approving modifications to the Gateway Business Park Master Plan, a new Phase 1 Precise Plan, and modifications to the TDM program, and (3) Ordinance No. 1471-2013 adopting a First Amended and Restated Development Agreement with Gateway of Pacific LP (“BioMed Realty”); and WHEREAS, in 2018 the City adopted Resolution No. 1559-2018 adopting a Second Amended and Restated Development Agreement with BMR Gateway of Pacific I LP (formerly BMR-700 Gateway LP), BMR Gateway of Pacific II LP (formerly BMR-750, 800, 850 Gateway LP), BMR Gateway of Pacific III LP (formerly BMR-900 Gateway LP), and BMR Gateway of Pacific IV LP (formerly BMR-1000 Gateway LP) (“BioMed Realty”); and WHEREAS, in 2018 the Planning Commission of the City of South San Francisco adopted Resolution No. 2834-2018 determining that the Gateway of Pacific Phase 2-3 Precise Plans Project was fully within the scope of environmental analysis in the 2009 EIR and that the 2018 Addendum to the EIR was the appropriate environmental document for the Project; and WHEREAS, BioMed Realty (“Owner” or “Applicant”) submitted an application requesting approval of a Precise Plan and Design Review to construct Phase 4 of the Gateway Business Park Master Plan (“Project”); and WHEREAS, approval of the Applicant’s proposal is considered a “project” for purposes of the California Environmental Quality Act, Pub. Resources Code § 21000, et seq. (“CEQA”) and the Planning Commission has considered the environmental impacts by separate resolution; and WHEREAS, the applicant seeks approval of Precise Plan (PP20-0001) and Design Review (DR20-0013) for the Project; and WHEREAS, the Planning Commission held a properly noticed public hearing on August 6, 2020, to solicit public comment and take public testimony, at which time interested parties had the opportunity to be heard, to consider the Precise Plan and Design Review; and WHEREAS, the Planning Commission exercised its independent judgment and analysis, and considered all reports, recommendations and testimony before making a determination on the Project. NOW THEREFORE, based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA) and the CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan, and General Plan Environmental Impact Report; the South San Francisco Municipal Code; 2009 EIR, and associated Mitigation Monitoring and Reporting Programs; 2018 Addendum to the 2009 EIR; the Project applications; the BMR GOP Phase 4 Precise Plan, as prepared by Flad Architects, dated June 8, 2020; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s duly noticed August 6, 2020 meeting; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the Planning Commission of the City of South San Francisco hereby finds as follows: A. General Findings 1. The foregoing recitals are true and correct and made a part of this Resolution. 2. The Exhibits attached to this Resolution, including the Conditions of Project Approval (Exhibit A) and the Precise Plan (attached as Exhibit B) are each incorporated by reference as if they were each set forth fully herein. 3. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of the Planning Manager. B. Gateway Precise Plan 1. The Phase 4 Precise Plan is compatible with the intent and purpose of the Gateway Specific Plan because the overall Master Plan promotes campus-style uses, such as biotechnology, high- technology and research and development uses, and the proposed buildings in Phase 4 will form a working campus environment and include high quality pedestrian circulation and open spaces. 2. The proposed development and/or construction standards of the Phase 4 Precise Plan are designed to achieve compliance with the development and/or construction standards of the Gateway Specific Plan because the site layout and overall architecture will help shape the urban character of the East of 101 Area, the overall Master Plan FAR of 1.25 is consistent with the Gateway Specific Plan and the proposed building heights will be below the 250-foot maximum allowable height limit. The Precise Plan includes high quality architecture that continues the aesthetic of Phases 1-3, and the Phase 4 Precise Plan has been designed appropriately to allow for incremental development while maintaining a functioning working environment for those areas on the site that have not yet been developed. 3. The Phase 4 Precise Plan is consistent with the first amendment to the second amended and restated development agreement because it clarifies and obligates several Project features and mitigation measures including transportation impact fees, public improvements in the East of 101 area, Fire Department obligations, phasing, provision for child care, park in-lieu fees, and TDM reporting and monitoring requirements. 4. The Phase 4 Precise Plan is consistent with the City of South San Francisco General Plan. The 1999 General Plan includes policies and programs that are designed to encourage the development of high technology campuses in the East of 101 Area, allow for employee-serving vendor services, preparation of a TDM plan and traffic improvement plan to reduce congestion impacts, and provision of a framework for requiring future circulation system improvements as they are needed to prevent deficient levels of service from being reached. The Precise Plan consists of a high technology campus, allows for employee serving vendor services, and will be in keeping with the previously approved TDM plan and traffic improvement plans. C. Design Review 1. The Project, including Design Review, is consistent with Title 20 of the South San Francisco Municipal Code because the Project has been designed as a high quality, energy efficient, contemporary, office/life science campus which will provide open spaces and a pedestrian- friendly environment with extensive landscaping and sustainability elements incorporated. 2. The Project, including Design Review, is consistent with the General Plan and the Gateway Specific Plan because the proposed research and development buildings and campus are consistent with the policies and design direction provided in the South San Francisco General Plan for the Business Commercial land use designation by encouraging the development of high technology campuses in the East of 101 Area. 3. The Project, including Design Review, is consistent with the applicable design guidelines adopted by the City Council in that the proposed Project is consistent with the Gateway Specific Plan District Standards included in Chapter 20.220. 4. The Project is consistent with the Master Plan and Precise Plan, as proposed for modification, for the reasons stated in Section B above. 5. The Project is consistent with the applicable design review criteria in Section 20.480.006 (“Design Review Criteria”) because the project has been evaluated against, and found to be consistent with, each of the eight design review criteria included in the “Design Review Criteria” section of the Ordinance. NOW, THEREFORE, BE IT FURTHER RESOLVED, that subject to the Conditions of Approval, attached as Exhibit A to this resolution, the Planning Commission of the City of South San Francisco hereby makes the findings contained in this Resolution, and approves the Precise Plan (attached as Exhibit B) and Design Review. BE IT FURTHER RESOLVED that this Resolution shall become effective immediately upon its passage and adoption. * * * * * * * I hereby certify that the foregoing resolution was adopted by the Planning Commission of the City of South San Francisco at a regular meeting held on the 6th day of August, 2020 by the following vote: AYES: Chair Wong, Vice-Chair Evans, Commissioner Faria, Commissioner Shihadeh, Commissioner Murphy, Commissioner Bernardo, Commissioner Tzang NOES: ABSTENTIONS: ABSENT: RECUSE: Attest_/s/Sailesh Mehra__________ Secretary to the Planning Commission CONDITIONS OF APPROVAL P12-0061: PP20-0001 and DR20-0013 GATEWAY OF PACIFIC – PHASE 4 PRECISE PLAN (Adopted by Planning Commission on August 6, 2020) The Applicant/Project shall conform to all the conditions of approval identified in City Council Resolution 44-2013, as well as the additional conditions contained herein. A. PLANNING DIVISION 1. The project shall be constructed and operated substantially as indicated on the plan set prepared by Flad Architects dated June 8, 2020, and approved by the Planning Commission in association with DR20-0013 as amended by the conditions of approval. The final plans shall be subject to the review and approval of the City’s Chief Planner. 2. Prior to the issuance of any building or construction permits for the project, the applicant shall revise the development plans to address the Design Review Board comments, subject to review and approval by the Chief Planner or designee. 3. The Applicant/Project shall comply with all applicable mitigation measures outlined in the adopted Mitigation Monitoring and Reporting Program for the 2020 Addendum / 2009 EIR for the Gateway of Pacific Phase 4 Revised Project. 4. The applicant shall comply with all terms and conditions specified in the Second Amendment to the Second Amended and Restated Development Agreement (DAA20- 0003). 5. The applicant is responsible for maintaining site security prior to, and throughout the construction process. This includes installation of appropriate fencing, lighting, remote monitors, or on-site security personnel as needed. 6. The applicant is responsible for providing site signage during construction, which contains contact information for questions regarding the construction. 7. During construction, the applicant shall provide parking for construction workers within a Gateway Business Park Master Plan parking structure when the Chief Building Official and Fire Marshal provide written approval. 8. Prior to issuance of certificate of occupancy, the applicant shall submit final landscaping and irrigation plans demonstrating compliance with the State’s Model Water Efficiency Landscaping Ordinance (MWELO), if applicable. a. Projects with a new aggregate landscape of 501 – 2,499 sq. ft. may comply with the prescriptive measures contained in Appendix D of the MWELO. b. Projects with a new aggregate landscape of 2,500 sq. ft. or greater must comply with the performance measures required by the MWELO. c. For all projects subject to the provisions of the MWELO, the applicant shall submit a Certificate of Completion to the City, upon completion of the installation of the landscaping and irrigation system. 9. The applicant shall contact the South San Francisco Scavenger Company to properly size any required trash enclosures and work with staff to locate and design the trash enclosure in accordance with the SSFMC Section 20.300.014, Trash and Refuse Collection Areas. Applicant shall submit an approval letter from South San Francisco Scavenger to the Chief Planner prior to the issuance of building permits. 10. After the building permits are approved, but before beginning construction, the owner/applicant shall hold a preconstruction conference with City Planning, Building, and Engineering staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all relevant subcontractors. 11. A Parking and Traffic Control Plan for the construction of the project shall be submitted with the application for Building Permit, for review and approval by the Chief Planner and City Engineer. 12. The Entitled Project included an approved draft Preliminary TDM Plan. In accordance with South San Francisco Municipal Code Chapter 20.400, Transportation Demand Management, prior to issuance of a building permit the applicant shall submit a Final TDM Plan that incorporates revisions based on the Revised Project for review and approval by the Chief Planner. B. ENGINEERING DIVISION Permits 1. At the time of each permit submittal, the Applicant shall submit a deposit for each of the following permit reviews and processing: a. Building Permit plan check and civil review. Provide cost of on-site improvements for deposit amount calculation. b. Hauling/Grading plan check and permit processing. Provide Cubic Yards for deposit amount calculation. c. Public Improvement plan check and permit processing. Provide cost of ROW improvements for deposit amount calculation. 2. A Grading Permit is required for grading over 50 cubic yards and if 50 cubic yards or more of soil is exported and/or imported. The Applicant shall pay all permit and inspection fees, as well as any deposits and/or bonds required to obtain said permits. The Grading Permit requires several documents to be submitted for the City’s review and approval. The Grading Permit Application, Checklist and Requirements may be found on the City website at http://www.ssf.net/departments/public-works/engineering-division. 3. A Hauling Permit shall be required for excavations and off-haul or on-haul, per Engineering requirements; should hauling of earth occur prior to grading. Otherwise, hauling conditions would be included with the grading permit. Hauling Permit may be found on the City website at: http://www.ssf.net/departments/public-works/engineering- division. 4. The Applicant shall obtain a Demolition Permit to demolish the existing concrete pad. The demolition permit shall be obtained from the Building Division and the Applicant shall pay all fees and deposits for the permit. The Applicant shall provide letters from all public utilities stating all said utilities have been properly disconnected from the existing buildings. 5. The Applicant shall submit a copy of their General Construction Activity Storm Water Permit Notice of Intent and Storm Water Pollution Prevention Plan (SWPPP), where required by State or Federal regulations, to the Engineering Division for our information. These documents shall be submitted prior to receiving a grading or building permit for the subject project. 6. The City of South San Francisco is mandated by the State of California to divert sixty-five percent (65%) of all solid waste from landfills either by reusing or recycling. To help meet this goal, a city ordinance requires completion of a Waste Management Plan (“WMP”) for covered building projects identifying how at least sixty-five percent (65%) of non-inert project waste materials and one hundred percent (100%) of inert materials (“65/100”) will be diverted from the landfill through recycling and salvage. The Contractor shall submit a WMP application and fee prior to the issuance of a building or grading permit. 7. A Public Improvement Permit is required for any work proposed within the public right- of-way. The Applicant shall pay all permit, plan check, and inspection fees, as well as, any deposits and/or bonds required to obtain said permits. Applicant shall submit separate ROW improvement plans. An engineer’s cost estimate for only the scope of work within the ROW is required to determine the bond. Plan Submittal 8. Along with the building permit and grading permit submittals, Applicant shall submit separate Right-of-Way (ROW) improvement plans for the Public Improvement Permit Application. An engineer’s cost estimate for the scope of work shown on the approved ROW improvement plans is required to determine the performance and payment bond amount. The submittal of the bonds is required prior to the execution of the Subdivision Improvement Agreement. 9. Improvement plans shall be printed to PDF and combined into a single electronic file, with each being stamped and digitally signed by a Professional Engineer registered in the State of California. Incorporated within the construction plans shall be applicable franchise utility installation plans, stamped and signed and prepared by the proper authority. Plans shall include the following sheets: Cover, Separate Note Sheet, Existing Conditions, Demolition Plan, Grading Plan, Horizontal Plan, Striping and Signage Plan, Utility Plan(s), Details, Erosion Control Plan, and Landscape Plans, (grading, storm drain, erosion control, and landscape plans are for reference only and shall not be reviewed during this submittal). 10. Prior to building permit issuance, the Applicant shall obtain a grading permit with the Engineering Division and shall submit an application, all documentation, fees, deposits, bonds and all necessary paperwork needed for the grading permit. The Applicant shall submit a grading plan that clearly states the amount of cut and fill required to grade the project. The Grading Plans shall include the following plans: Cover, Notes, Existing Conditions, Grading Plans, Storm Drain Plans, Stormwater Control Plan, and Erosion Control Plan. 11. Prior to building permit issuance, the Applicant shall obtain a Public Improvement Permit for all proposed work within the City ROW and shall submit an application, all documentation, fees, deposits, bonds and all necessary paperwork needed for the Public Improvement Permit. The Public Improvement Plans shall include only the scope of work within the City ROW (with reference to the on-site plans) consisting of the following plans: Civil Plans, Landscape Plans, and Joint Trench Plans. 12. The Applicant shall submit a copy of their General Construction Activity Storm Water Permit Notice of Intent and Storm Water Pollution Prevention Plan (SWPPP), where required by State or Federal regulations, to the Engineering Division for our information. These documents shall be submitted prior to receiving a grading or building permit for the subject project. 13. All improvements shall be designed by a registered civil engineer and approved by the Engineering Division. 14. The Engineering Division reserves the right to include additional conditions during review of the building permit, grading permit, or public improvement permit, as needed to ensure compliance with applicable laws and regulations, or other conditions of approval. Mapping 15. Prior to Building Permit issuance, all applicable mapping shall be recorded with the San Mateo County Clerk Recorder’s Office. 16. Applicant shall submit all documents required for review of any mapping application. 17. Prior to the approval of any Permits, the Applicant shall enter into an Improvement Agreement and Encroachment and Maintenance Agreement with the City. These agreements shall be approved by City Council prior to execution. The Improvement Agreement shall require the Applicant to ensure the faithful performance of the design, construction, installation and inspection of all public improvements as reviewed and approved by the Engineering Division at no cost to the City and shall be secured by good and sufficient payment, performance, and one (1) year warranty bonds or cash deposit adequate to cover all of the costs, inspections and administrative expenses of completing such improvements in the event of a default. The value of the bonds or cash deposit shall include 110% of the cost of construction based on prevailing wage rates. The value of the warranty bond or cash deposit shall be equivalent to 10% of the value of the performance security. The Encroachment and Maintenance Agreement shall require the Applicant to maintain any street furniture that serves the property and all landscape within the project frontage at no cost to the City. The Encroachment and Maintenance Agreement shall be recorded with the San Mateo County Recorder and may be transferred to the property owner. 18. Applicant shall pay for all Engineering Division deposits and fees for any mapping application prior to review. 19. The applicant shall clearly show all existing easements on the improvement plans. Right-of-Way 20. All new public improvements required to accommodate the development shall be installed at no cost to the City and shall be approved by the City Engineer and constructed to City Standards. All new public improvements shall be completed prior to Final Occupancy of the project or prior any Temporary Occupancy as approved by the City Engineer. 21. Prior to Building Permit issuance, the Applicant shall enter into an Improvement Agreement and Encroachment and Maintenance Agreement with the City. These agreements shall be approved by City Council prior to execution. The Subdivision Improvement Agreement shall require the Applicant to install all proposed public improvements as reviewed and approved by the Engineering Division at no cost to the City. The Encroachment and Maintenance Agreement shall require the Applicant to maintain any street furniture that serves the property and all landscape within the project frontage at no cost to the City. The Encroachment and Maintenance Agreement shall be recorded with the San Mateo County Recorder and may be transferred to the property owner or Homeowner’s Association. 22. Prior to Building Permit issuance, the Applicant shall submit a video survey of the adjacent streets (perimeter of proposed property location) to determine the pre-construction condition of the streets at no cost to the City. The Applicant will be responsible to ensure that the condition of the streets and striping is in at least existing condition or better after construction is completed. 23. Applicant shall construct a new ADA accessible driveway entrance along the Oyster Point Boulevard entrance to the project site. 24. The Applicant shall rehabilitate the pavement on Oyster Point Boulevard from the eastern property line of GOP 1 to eastern most limits of the driveway access off of Oyster Point Boulevard for GOP 4. Pavement rehabilitation shall include the repair of any failed pavement areas as determined in the field by the City Inspector and a 2 inch grind and overlay of the street from the lip of gutter to lip of gutter and restriping the lane lines and crosswalks. 25. Applicant shall ensure that any pavement markings impacted during construction are restored and upgraded to meet City standards current to the time of Encroachment Permit approval. 26. Existing driveway approaches or portions of approaches along the property frontage that will not serve the new development or do not serve any other access shall be removed and replaced with new curb, gutter, and sidewalk. Where new work is required, monolithic curbs, gutter, curb ramps, commercial driveway approaches and 4’ wide (minimum) sidewalks are to be constructed to current City standards and to the satisfaction of the City Engineer. 27. Upon completion of construction and landscape work at the site, the Applicant shall clean, repair or reconstruct, at their expense, as required to conform to City Standards, all public improvements including driveways, curbs, gutters, sidewalks and street pavements along the street frontages of the proposed project along Gateway Blvd to the satisfaction of the City Engineer. Damage to adjacent property caused by the Applicant, or their contractors or subcontractors, shall be repaired to the satisfaction of the affected property owner and the City Engineer, at no cost to the City or to the property owner. 28. Applicant shall ensure the proposed trees and planting locations do not interfere with underground utilities or the joint trench. The Applicant will be required to install root barrier measures to prevent the sidewalk from uplift at no cost to the City. 29. Prior to public improvement permit issuance, the Applicant shall provide an engineer’s estimate for all work performed with in the public right-of-way and submit a bond equal to 110% of the estimate. 30. Prior to the issuance of the Encroachment Permit, the Applicant shall submit Traffic and Pedestrian Control Plans for proposed work on Oyster Point Boulevard and/or any area of work that will obstruct the existing pedestrian walkways. 31. For any work within the sidewalk and/or obstructing pedestrian routes shall provide pedestrian routing plans along with traffic control plans. Temporary lane or sidewalk closures shall be approved by the City Engineer and by the Construction Coordination Committee (if within the CCC influence area). For any work affecting the sidewalks or pedestrian routes greater than 2 days in duration, the adjacent parking lane or adjacent travel lane shall be closed and temporary vehicle barriers placed to provide a protected pedestrian corridor. Temporary ramps shall be constructed to connect the pedestrian route from the sidewalk to the street if no ramp or driveway is available to serve that purpose. 32. No foundation or retaining wall support shall extend into the City Right-of-Way without express approval from the Engineering Department. Applicant shall design any bioretention area or flow-through planters adjacent to the property line such that the facility and all foundations do not encroach within the City Right-of-Way or into an adjacent parcel. Stormwater 33. The Applicant shall submit to the City Engineer a storm drainage and hydraulic study for the fully improved development analyzing existing conditions and post-development conditions. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. The study shall be submitted to the City Engineer for review and approval. 34. The Applicant shall design and construct, any on-site and off-site storm drainage improvements along said storm drain system as recommended by the approved storm drainage and hydraulic study at no cost to the city. 35. The development shall not increase peak runoff based on a 25-year design storm. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. The proposed storm drain system and runoff reduction information shall be included in the hydraulic study. 36. On-site storm drainage facilities shall be designed to accommodate runoff from a 10-year design storm. Initial time of concentration shall be 10 minutes. Precipitation shall be based on NOAA data for the site. On-site storm drain pipes shall be designed for open channel flow conditions and not be surcharged. 37. Drainage runoff shall not be allowed to flow across lot lines or across subdivision boundaries onto adjacent private property without an appropriate recorded easement being provided for this purpose. 38. The private storm drain lines collecting stormwater from the bioretention areas in the adjacent railroad spur property shall not be allowed without an appropriate recorded easement for this purpose 39. All building downspouts shall be connected to rigid pipe roof leaders which shall discharge into an approved drainage device or facility that meets the C3 stormwater treatment requirements of Municipal Regional Permit. 40. The on-site private storm drainage system shall not be dedicated to the City for ownership or maintenance. The private storm drainage system and any storm water pollutions control devices within the subdivision shall be owned, repaired, and maintained by the property owner or Homeowner’s Association. Sanitary Sewer 41. The Applicant shall submit a sewer capacity study to determine how the project impacts and capacity of the sanitary sewer system and recommend any improvements necessary to accommodate the flows from the development project. The study shall include an analysis of the sanitary sewer main on Oyster Point Boulevard. Sanitary sewer mains shall not flow more than 2/3 full at peak wet weather flow. Please be sure to include all supporting calculations. 42. The Applicant shall design and construct, any on-site and off-site sanitary sewer improvements as recommended by the approved sewer capacity study at no cost to the city. 43. Applicant shall abandon all existing Sanitary Sewer Laterals serving the property to City Standards. 44. The Applicant shall install the new sewer laterals to City Standards including a cleanout in the sidewalk and a new wye connection or taptite connection at the main. Lateral sizes of 8-inch or larger require a manhole connection at the City sewer main. 45. The on-site sanitary sewer laterals shall not be dedicated to the City for maintenance. The sanitary sewer facilities within the subdivision shall be repaired and maintained by the property owner or Homeowner’s Association. 46. Each on-site sanitary sewer manhole and cleanout shall be accessible to maintenance personnel and equipment via pathway or driveways as appropriate. Each maintenance structure shall be surrounded by a level pad of sufficient size to provide a safe work area. Utilities 47. All electrical and communication lines serving the property, shall be placed underground within the property being developed and to the nearest overhead facility or underground utility vault. Pull boxes, junction structures, vaults, valves, and similar devices shall not be installed within public pedestrian walkway areas. 48. The Applicant shall coordinate with the California Water Service for all water-related issues. All water mains and services shall be installed to the standards of the California Water Service. 49. The Applicant shall install fire hydrants at the locations specified by the Fire Marshal. Installation shall be in accordance with City Standards as administered by the Fire Marshall. On-site Improvements 50. The Applicant shall submit a construction access plan that clearly identifies all areas of proposed access during the proposed development. 51. Prior to receiving a Certificate of Occupancy form the Building Division, the Applicant shall require its Civil Engineer to inspect the finished grading surrounding the building and to certify that it conforms to the approved site plan and that there is positive drainage away from the exterior of the building. The Applicant shall make any modifications to the grading, drainage, or other improvements required by the project engineer to conform to intent of his plans. 52. All common areas are to be landscaped and irrigated and shall meet the requirements of the City’s Water Efficiency Landscape Ordinance (WELO). Submit landscape, drainage and grading plans for review and approval by the Engineering Division. 53. The Applicant shall submit a proposed workplan and intended methodologies to ensure any existing structures on or along the development’s property line are protected during proposed activities. Grading 54. The Applicant shall provide documentation from a qualified environmental consultant of compliance with Mitigation Measures IV.G-2.2, IV.G-2.3, IV.G-3.4, IV.G-3.5, IV.G-4.2, and IV.G-4.3 as required by the Gateway Business Park Master Plan MMRP. 55. The recommendations contained within the geotechnical report shall be included in the Site Grading and Drainage Plan. The Site Grading and Drainage Plan shall be prepared by the Applicant’s civil engineer and approved by the project geotechnical engineer. 56. The entire project site shall be adequately sprinkled with water to prevent dust or sprayed with an effect dust palliative to prevent dust from being blown into the air and carried onto adjacent private and public property. Dust control shall be for seven days a week and 24 hours a day. Should any problems arise from dust, the Applicant shall hire an environmental inspector at his/her expense to ensure compliance with the grading permit. 57. Haul roads within the City of South San Francisco shall be cleaned daily, or more often, as required by the City Engineer, of all dirt and debris spilled or tracked onto City streets or private driveways. 58. The Applicant shall submit a winterization plan for all undeveloped areas within the site to control silt and stormwater runoff from entering adjacent public or private property. This plan shall be submitted to the City Engineer for review and approval prior to September 1 of each year. The approved plan shall be implemented prior to November 1 of each year. 59. Prior to placing any foundation concrete, the Applicant shall hire a licensed land surveyor or civil engineer authorized to practice land surveying to certify that the new foundation forms conform with all setbacks from confirmed property lines as shown on the Plans. A letter certifying the foundation forms shall be submitted to the Engineering Division for approval. 60. The applicant is required by ordinance to provide for public safety and the protection of public and private property in the vicinity of the land to be graded from the impacts of the proposed grading work. 61. All hauling and grading operations are restricted to between the hours of 8:00 a.m. to 6:00 p.m. for residential areas and 7:00 a.m. to 6:00 p.m. for industrial/commercial areas, Monday through Friday, excluding holidays, unless approved by the Chief Building Official. 62. Unless approved in writing by the City Engineer, no grading in excess of 200 cubic yards shall be accomplished between November 1 and May 1 of each year. C. FIRE PREVENTION DIVISION 1. Install underground piping for water based fire protection systems per NFPA 24 and SSFFD requirements under separate fire plan check and permit. 2. Private fire service mains and appurtenances shall be installed in accordance with NFPA 24 as amended in Chapter 80. 3. Install a fire pump per NFPA 20 and SSFFD requirements under separate fire plan check and permit. 4. Fire department connections shall be installed in accordance with the NFPA standard applicable to the system design and shall comply with Sections 912.2 through 912.7. 5. Provide fire extinguishers in accordance with CFC Section 906. 6. Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. 7. Exterior doors and openings required by this California Fire Code or the California Building Code shall be maintained readily accessible for emergency access by the fire department. An approved access walkway leading from fire apparatus access roads to exterior openings shall be provided when required by the fire code official. 8. All buildings four or more stories in height and all buildings classified as high-rise buildings by the California Building Code and Group I-2 occupancies having occupied floors located more than 75 feet (22,860mm) above the lowest level of fire department vehicle access, a fire command center for fire department operations shall be provided and shall comply with Sections 508.1.1 through 508.1.7. 9. The location and accessibility of the fire command center shall be approved by the fire code official. The fire command center shall be located adjacent to an approved fire apparatus access road and be accessible directly from the exterior of the building. 10. The fire command center shall be not less than 200 square feet (19 m2) in area with a minimum dimension of 10 feet (3048 mm). 11. Provide an independent study or proof that the Emergency Radio Responder coverage in the building is adequate or install an Emergency Responder Radio Coverage system in accordance with Section 510 of the California Fire Code under separate fire plan check and permit. 12. Emergency power systems and standby power systems required by this code or the California Building Code shall comply with Sections 604.1.1 through 604.1.8. 13. Provide fire flow in accordance with California Fire Code Appendix B. 14. Fire hydrants located on a public or private street, or onsite, shall have an unobstructed clearance of not less than 30 feet (15 feet either side of hydrant), in accordance with California vehicle code 22514. Marking shall be per California vehicle code 22500.1. 15. A hydrant is required to be located within 100 feet of the Fire Department Connection (FDC) and on the same side of the street. 16. A blue reflective dot shall be placed in the middle of the roadway directly in front of each fire hydrant. 17. All buildings shall provide premise identification in accordance with CFC Section 505.1 and South San Francisco Municipal Code Section 15.48.050(h), 15.48.060 (e) and 15.48.070(h). 18. Provide Knox key boxes for each building/area with access keys to entry doors, electrical/mechanical rooms, elevators, gates and others to be determined. L or H occupancies will generally require a Knox vault instead of box. Provide Knox Key Switch for any electronic gates. 19. Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. Approved signs required to identify fire protection equipment and equipment location shall be constructed of durable materials, permanently installed and readily visible. D. WATER QUALITY CONTROL DIVISION 1. Storm drains must be protected during construction. Discharge of any demolition/construction debris or water to the storm drain system is prohibited. 2. Do not use gravel bags for erosion control in the street or drive aisles. Drains in street must have inlet and throat protection of a material that is not susceptible to breakage from vehicular traffic. 3. No floatable bark shall be used in landscaping. Only fibrous mulch or pea gravel is allowed. 4. After 7/1/19, Demolition Projects must complete a PCBs Screening Assessment Form (attached and available in Building Division). If screening determines the building is an applicable structure, the Protocol for Evaluating PCBs-Containing Materials before Building Demolition shall be followed 5. As site falls in a Moderate Trash Generation area per South San Francisco’s Trash Generation Map (http://www.flowstobay.org/content/municipal-trash-generation-maps), determined by the Water Quality Control Division: - Regional Water Quality Control Board-approved full trash capture devices must be installed to treat the stormwater drainage from the site. - At a minimum, a device must be installed before the onsite drainage enters the City’s public stormwater system (i.e. trash capture must take place no farther downstream than the last private stormwater drainage structure on the site). - An Operation & Maintenance Agreement will be required to be recorded with San Mateo County, ensuring the device(s) will be properly maintained. - A full trash capture system is any single device or series of devices that traps all particles retained by a 5 mm mesh screen and has a design treatment capacity of not less than the peak flow rate resulting from a one-year, one-hour storm in the sub- drainage area or designed to carry at least the same flow as the storm drain connected to the inlet. 6. Roof leaders/gutters must NOT be plumbed directly to storm drains; they shall discharge to stormwater treatment devices or landscaping first. 7. Fire sprinkler test drainage must be plumbed to sanitary sewer and be clearly shown on plans. 8. Trash enclosure shall be covered, contained and the floor shall slope to a central drain that discharges to a grease trap/interceptor and is connected to the sanitary sewer. Details of trash enclosure shall be clearly provided on plans. 9. Install a condensate drain line connected to the sanitary sewer for rooftop equipment and clearly show on plans. 10. If laboratories will be installed, a segregated non-pressurized lab waste line must collect all laboratory waste. Install a sample port on the lab waste line outside the building, which will be accessible at all times. 11. Submit specs on the sample port. 12. If a food service kitchen/ prep area is to be installed, it shall connect to a gravity grease interceptor at least 750 gallons (liquid capacity) in size. Sizing of the grease removal device must be in accordance with the uniform plumbing code. 13. Grease interceptor shall be connected to all non-domestic wastewater sources in the kitchen (wash sinks, mop sinks, floor drains) and shown on plans. 14. A cut sheet of the Grease Interceptor/Trap must be shown on plans. 15. Garbage Disposals in Industrial/Commercial facilities are prohibited by City of South San Francisco Municipal Code. Remove Garbage Disposal(s) from plans. 16. Applicant will be required to pay a Sewer Capacity Fee (connection fee) based on SSF City Council-approved EDU calculation (involving anticipated flow, BOD and TSS calculations and including credits for previous site use). Based on the information received, the estimated Sewer Capacity Fee will be $361,327.42, payable with the Building Permit. 17. Elevator sump drainage (if applicable) shall be connected to an oil/water separator prior to connection to the sanitary sewer. 18. Drains in parking garage (if applicable) must be plumbed through an oil/water separator and then into the sanitary sewer system and clearly shown on plans. 19. Wherever feasible, install landscaping that minimizes irrigation runoff, promotes surface infiltration, minimizes use of pesticides and fertilizers and incorporates appropriate sustainable landscaping programs (such as Bay-Friendly Landscaping). 20. Site is subject to C.3 requirements of the Municipal Regional Stormwater Permit (please see SMCWPPP C.3 Technical Guidance Manual at https://www.flowstobay.org/sites/default/files/C3TG5/SMCWPPP_C3TG%20V.5.0.pdf for guidance). The following items will be required; 21. Completed forms for Low Impact Development (C3-C6 Project Checklist). Forms must be on 8.5in X 11in paper and signed and wet stamped by a professional engineer. Calculations must be submitted with this package. Forms can be found at http://www.flowstobay.org/newdevelopment. A completed copy must also be emailed to andrew.wemmer @ssf.net. 22. Sign and have engineer wet stamp forms for Low Impact Development. 23. Submit flow calculations and related math for LID. 24. Complete Operation and Maintenance (O&M) agreements. Use attached forms for completing documents, as old forms are no longer sufficient. Do not sign agreement, as the city will need to review prior to signature. Prepare packet and submit including a preferred return address for owner signature. Packet should also be mailed or emailed to: Andrew Wemmer City of SSF WQCP 195 Belle Air Road South San Francisco, CA 94080 [email protected] Exhibit Templates can also be found within Chapter 6 the C.3 Technical Guidance at http://www.flowstobay.org/newdevelopment. 25. The onsite catch basins are to be stenciled with the approved San Mateo Countywide Stormwater Logo (No Dumping! Flows to Bay). 26. Landscaping shall meet the following conditions related to reduction of pesticide use on the project site: a. Where feasible, landscaping shall be designed and operated to treat stormwater runoff by incorporating elements that collect, detain, and infiltrate runoff. In areas that provide detention of water, plants that are tolerant of saturated soil conditions and prolonged exposure to water shall be specified. b. Plant materials selected shall be appropriate to site specific characteristics such as soil type, topography, climate, amount and timing of sunlight, prevailing winds, rainfall, air movement, patterns of land use, ecological consistency and plant interactions to ensure successful establishment. c. Existing native trees, shrubs, and ground cover shall be retained and incorporated into the landscape plan to the maximum extent practicable. d. Proper maintenance of landscaping, with minimal pesticide use, shall be the responsibility of the property owner. e. Integrated pest management (IPM) principles and techniques shall be encouraged as part of the landscaping design to the maximum extent practicable. Examples of IPM principles and techniques include: i. Select plants that are well adapted to soil conditions at the site. ii. Select plants that are well adapted to sun and shade conditions at the site. In making these selections, consider future conditions when plants reach maturity, as well as seasonal changes. iii. Provide irrigation appropriate to the water requirements of the selected plants. iv. Select pest-resistant and disease-resistant plants. v. Plant a diversity of species to prevent a potential pest infestation from affecting the entire landscaping plan. vi. Use “insectary” plants in the landscaping to attract and keep beneficial insects. 27. A SWPPP must be submitted (if > 1 acre). Drawings must note that erosion control shall be in effect all year long. 28. A copy of the state approved NOI must be submitted (if > 1 acre). E. POLICE DEPARTMENT 1. The applicant shall install and maintain a system allowing first responders to enter into the building(s) by means of a code to be entered into a keypad or similar input device. A permanent code shall be issued to the Police Department. Physical keys or electronic access cards will not satisfy this requirement. Please note this is separate from the Fire Department’s “Knoxbox” requirement. This access must be provided at two entry points, each on a different sides of the building to allow first responders a tactical advantage when entering. 2. The hardware design of any doorways shall prevent any doors from being secured in a closed position to either another door or a fixed object within four feet of any door by means of a rope, cable, chain, or similar item. This is to prevent malicious prevention of egress and/or ingress by building occupants or first responders. 3. All exterior doorways shall be illuminated during darkness by a white light source that has full cut-off and is of pedestrian scale. 4. All interior common and service areas, such as the garage, bicycle storage area, fire escapes, etc, shall be illuminated at all times with a white light source that is controlled by a tamperproof switch or a switch located in an inaccessible location to passers-by. 5. The landing at the lowest level of service staircases, such as those in the garage area or fire escapes, shall have some mechanism, such as fencing, to prevent access and prevent people from loitering or concealing themselves in that area. 6. Any exterior bicycle racks installed shall be of an inverted “U” design, or other design that allows two different locking points on each bicycle. 7. Any publicly accessible benches shall be of a design that prevents persons from lying on them, such as a center railing. 8. Any publicly accessible power outlets shall be of a design that prevents their access or use during those hours the business is normally closed. 9. Any publicly accessible raised edge surfaces, such as retaining walls, concrete benches, handrails or railings, shall be of a design that prevents or discourages skateboard use on those surfaces. 10. The mature height of all shrubbery shall be no higher than three feet, if so, it shall be maintained at a maximum height of three feet, and tree canopies shall be no lower than six feet above grade. 11. The applicant shall install and maintain a camera surveillance system that conforms to the minimum technical specifications of South San Francisco Municipal Code Chapter 8.66.050 Minimum technological standards, (Ord. 1515, 2016). The video surveillance cameras will be used as a crime deterrent and assist with the identification and apprehension of criminals if a crime is committed on the property. Enough cameras shall be installed to provide adequate coverage for the intended space. Cameras shall be placed minimally in the following locations: • All exterior entrances/exits • Garage area (providing coverage to entire parking area) • Bicycle storage area • Main lobby of building • Lobby of sales/leasing office • Loading docks 12. Any leasing of sales offices within the building shall be alarmed with a central station monitored silent intruder alarm system. 13. All parking lot lighting must conform to South San Francisco Municipal Code Chapter 15.48.080 Exterior security lighting. 14. The Police Department requires acknowledgement of these comments to include specific locations in the plans where the applicable change requests have been made. 3567874.1 ..Title Ordinance adopting a Third Amendment to the Second Amended and Restated Development Agreement (DAA21-0003) between the City of South San Francisco and BMR Gateway of Pacific I LP, BMR Gateway of Pacific II LP, BMR Gateway of Pacific III LP, and BMR Gateway of Pacific IV LP for the Gateway Business Park Master Plan Project to make minor modifications. ..body WHEREAS, the Owners and Applicants are BMR-Gateway of Pacific I LP, formerly known as BMR-700 Gateway LP; BMR-Gateway of Pacific II LP, formerly known as BMR-750, 800, 850 Gateway LP; BMR-Gateway of Pacific III LP, formerly known as BMR-900 Gateway LP; and BMR-Gateway of Pacific IV LP, formerly known as BMR-1000 Gateway LP; all of which are Delaware limited partnerships WHEREAS, BMR – Gateway/Oyster LP, a predecessor of the Owners, received entitlements for the phased removal and replacement of existing buildings on the 22.6-acre project site and construction of five to six new buildings and two to four parking structures, in five phases, to be located at the corner of Gateway and Oyster Point Boulevards (700, 750, 800, 850, 900, and 1000 Gateway Boulevard), in the Gateway Specific Plan Area (“Gateway Business Park Master Plan Project”) including Phase 4 (“GOP 4”); and WHEREAS, on February 10, 2010, after conducting all proceedings and making all findings necessary for the valid adoption and execution of a development agreement for the Property in accordance with Government Code Sections 65864 through 65869.5, the California Environmental Quality Act (“CEQA”), and Chapter 19.60 of the Municipal Code, the City Council adopted Ordinance No. 1423-2010, approving and adopting a development agreement for the property at 700-1000 Gateway Boulevard (“Property”); and WHEREAS, on May 8, 2013, the City Council adopted Ordinance No. 1471-2013 concerning a First Amended and Restated Development Agreement between City and Applicant (“First Amended DA”); and WHEREAS, on June 27, 2018, the City Council adopted Ordinance No. 1599-2018 concerning a Second Amended and Restated Development Agreement between City and BMR Gateway of Pacific I LP, BMR Gateway of Pacific II LP, BMR Gateway of Pacific III LP, and BMR Gateway of Pacific IV LP to allow for minor modifications to the agreement, including acknowledgement of the transfer and assignment of the separate parcels to the respective affiliates, acknowledgement of lot line adjustment between Phases 1 and 2, and confirmation that each property owner holds the compliance burdens, obligations, and responsibilities for its respective parcel of property under the Second Amended and Restated Development Agreement; and WHEREAS, on February 26, 2020 the City adopted Ordinance No. 1595-2020 adopting a First Amendment to the Second Amended and Restated Development Agreement which substituted payment of a fee that will enable the City to build a childcare facility in lieu of having the applicants construct or open a replacement childcare facility on or within one mile of the project site; and WHEREAS, on October 14, 2020, the City adopted Ordinance No. 1606-2020 adopting a Second Amendment to the Second Amended and Restated Development Agreement which extended the duration of the Development Agreement and added parks and recreation fee requirements; and WHEREAS, the City has approved modifications to GOP 4 to allow for a transfer of density from the adjacent property, resulting in an expansion of up to 120,221 square feet configured in four additional floors on the GOP 4 North building (“GOP 4 Density Transfer Project” or “Project”); and WHEREAS, the GOP 4 site is subject to the following plans, regulations and entitlements: (a) the Business Commercial land use designation in the General Plan, (b) the Gateway Specific Plan enacted in 1981 by Ordinance 868-81, (c) the Gateway Specific Plan Zoning District regulations, (d) the Gateway Business Park Master Plan, as revised by City Council Resolution No. 44 -2013 (“GOP Master Plan”), (e) the GOP Phase 4 Precise Plan approved by Planning Commission Resolution No. 2859-2020 (“GOP 4 Precise Plan”), and (f) a Development Agreement as most recently amended by Ordinance 1606-2020 approving the Second Amendment to the Second Amended and Restated Development Agreement Between the City of South San Francisco and certain BMR Gateway of Pacific entities (“GOP Development Agreement”); and technical modifications to all these are required to enable a transfer of density to the GOP 4 site; and WHEREAS, the City Council has granted or indicated an intent to grant all such modifications, pursuant to Resolutions ___ (General Plan amendment and repeal of the Specific Plan), ____ (GOP Master Plan and the GOP 4 Precise Plan amendments) and Ordinance ___ (Gateway Specific Plan Zoning District regulations amendments); and WHEREAS, Applicant submitted an application requesting a Third Amendment to the Second Amended and Restated Development Agreement to address approval of the GOP 4 Density Transfer Project; and WHEREAS, the Airport Land Use Commission has reviewed the proposed legislative enactments associated with the GOP 4 Density Transfer Project and found them consistent with the Airport Land Use Compatibility Plan; and WHEREAS, on June 2, 2022, the Planning Commission for the City of South San Francisco held a lawfully noticed public hearing, solicited public comment, considered the Third Amendment to the Second Amended and Restated Development Agreement, took public testimony, and recommended approval of the Third Amendment to the Second Amended and Restated Development Agreement; and WHEREAS, the Council has considered the GOP 4 Density Transfer Project, including the Third Amendment to the Second Amended and Restated Development Agreement under the California Environmental Quality Act, Pub. Resources Code §21000, et seq. (“CEQA”), as set forth in Resolution [___-2022]; and, WHEREAS, the City Council held a duly noticed public hearing on ____, 2022 to consider the Third Amendment to the Second Amended and Restated Development Agreement, and take public testimony. NOW, THEREFORE, BE IT RESOLVED the City Council of the City of South San Francisco does hereby ordain as follows: SECTION 1. Findings. That based on the entirety of the record before it, which includes without limitation, the California Environmental Quality Act, Public Resources Code §21000, et seq. (“CEQA”) and th e CEQA Guidelines, 14 California Code of Regulations §15000, et seq.; the South San Francisco General Plan, General Plan Environmental Impact Report; the South San Francisco Municipal Code; 2009 EIR, and associated Mitigation Monitoring and Reporting Programs; 2018 Addendum; 2020 Addendum; 2022 Supplemental EIR; the Project applications; the BMR GOP Phase 4 Density Transfer Project Plans, as prepared by Flad Architects, dated June 8, 2020; all site plans, and all reports, minutes, and public testimony submitted as part of the Planning Commission’s duly noticed June 2, 2022 meeting; all site plans, reports, minutes, and public testimony submitted as part of the City Council’s duly noticed public hearing on __, 2022; and any other evidence (within the meaning of Public Resources Code §21080(e) and §21082.2), the City Council of the City of South San Francisco hereby finds as follows: A. The foregoing recitals are true and correct and made a part of this Ordinance. B. The Exhibit attached to this Ordinance, the proposed Third Amendment to the Second Amended and Restated Development Agreement (Exhibit A), is incorporated by reference and made a part of this Ordinance, as if set forth fully herein. C. The documents and other material constituting the record for these proceedings are located at the Planning Division for the City of South San Francisco, 315 Maple Avenue, South San Francisco, CA 94080, and in the custody of Chief Planner. D. The Third Amendment to the Second Amended and Restated Development Agreement, attached hereto as Exhibit A, sets for the duration, property, project criteria, and other required information identified in Government Code section 65865.2. Based on the findings in support of the Project, the City Council finds that the Third Amendment continues to further the previously vested project for a campus-style development of office and R&D buildings and is consistent with the objectives, policies, general land uses and programs specified in the South San Francisco General Plan, the Gateway Specific Plan Zoning District Regulations, the Gateway Business Park Master Plan and all GOP Precise Plans. E. The Third Amendment to the Second Amended and Restated Development Agreement is compatible with the uses authorized in, and the regulations prescribed for the land use district in which the real property is located. The subject site is physically suitable for the type and intensity of the land use being proposed. The General Plan, as amended in connection with the GOP 4 Density Transfer Project, specifically contemplates the proposed type of project and the suitability of the site for development was analyzed thoroughly in the environmental document prepared for the Project. F. The Third Amendment to the Second Amended and Restated Development Agreement is in conformity with public convenience, general welfare and good land use practice. G. The Third Amendment to the Second Amended and Restated Development Agreement will not be detrimental to the health, safety and general welfare because the amendment promotes flexibility in planning within strict limitations, without increasing overall density. H. The Third Amendment to the Second Amended and Restated Development Agreement will not adversely affect the orderly development of property or the preservation of property valued because the amendment improves the property’s campus-like environment and is consistent with surrounding R&D and office uses. SECTION 2. Approval of Development Agreement A. The City Council of the City of South San Francisco hereby approves the Third Amendment to the Second Amended and Restated Development Agreement with BMR Gateway of Pacific I LP, BMR Gateway of Pacific II LP, BMR Gateway of Pacific III LP, and BMR Gateway of Pacific IV LP, attached hereto as Exhibit A and incorporated herein by reference. B. The City Council further authorizes the City Manager to execute the Third Amendment to the Second Amended and Restated Development Agreement, on behalf of the City, in substantially the form attached as Exhibit A, and to make revisions to such Agreement, subject to the approval of the City Attorney, which do not materially or substantially increase the City’s obligations thereunder. SECTION 3. Severability If any provision of this Ordinance or the application thereof to any person or circumstance is held invalid or unconstitutional, the remainder of this Ordinance, including the application of such part or provision to other persons or circumstances shall not be affected thereby and shall continue in full force and effect. To this end, provisions of this Ordinance are severable. The City Council of the City of South San Francisco hereby declares that it would have passed each section, subsection, subdivision, paragraph, sentence, clause, or phrase hereof irrespective of the fact that any one or more sections, subsections, subdivisions, paragraphs, sentences, clauses, or phrases be held unconstitutional, invalid, or unenforceable. SECTION 4. Publication and Effective Date. Pursuant to the provisions of Government Code Section 36933, a summary of this Ordinance shall be prepared by the City Attorney. At least five (5) days prior to the Council meeting at which this Ordinance is scheduled to be adopted, the City Clerk shall (1) publish the Summary, and (2) post in the City Clerk’s Office a certified copy of this Ordinance. Within fifteen (15) days after the adoption of this Ordinance, the City Clerk shall (1) publish the summary, and (2) post in the City Clerk’s Office a certified copy of the full text of this Ordinance along with the names of those City Council members voting for and against this Ordinance or otherwise voting. This Ordinance shall become effective upon the later of: (a) the effective date of the text changes to the General Plan reference in Resolution ____, (b) the effective date of the repeal of the Gateway Specific Plan enacted in that same Resolution, (c) the effective date of the zoning text amendments enacted in Ordinance ___, (d) the effective date of the GOP Master Plan and GOP 4 Precise Plan amendments adopted in Resolution ___, or (e) thirty (30) days from and after the adoption of this Ordinance.. EXHIBIT A RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: City Clerk City of South San Francisco 400 Grand Avenue P. O. Box 711 South San Francisco, CA 94083 Exempt from recording fees per Government Code §§6103, 27383 ______________________________________________________________________________ Space above this line reserved for recorder’s use APNs: 015-023-290; 015-023-300 015-023-200; 015-023-320; 015-023-430; 015-023-190; 015-023-310 THIRD AMENDMENT TO SECOND AMENDED AND RESTATED DEVELOPMENT AGREEMENT BY AND BETWEEN CITY OF SOUTH SAN FRANCISCO AND BMR GATEWAY OF PACIFIC I LP, BMR GATEWAY OF PACIFIC II LP, BMR GATEWAY OF PACIFIC III LP, AND BMR GATEWAY OF PACIFIC IV LP SOUTH SAN FRANCISCO, CALIFORNIA Gateway Business Park Master Plan Project THIRD AMENDMENT TO SECOND AMENDED AND RESTATED DEVELOPMENT AGREEMENT Gateway Business Park Master Plan Project This THIRD AMENDMENT TO SECOND AMENDED AND RESTATED DEVELOPMENT AGREEMENT FOR THE GATEWAY BUSINESS PARK MASTER PLAN PROJECT is dated __________ ___, 2022 (“Third Amendment”). This Third Amendment is between BMR Gateway of Pacific I LP, formerly known as BMR-700 Gateway LP (“BMR Gateway of Pacific I”); BMR Gateway of Pacific II LP, formerly known as BMR-750, 800, 850 Gateway LP (“BMR Gateway of Pacific II”); BMR Gateway of Pacific III LP, formerly known as BMR-900 Gateway LP (“BMR Gateway of Pacific III”); and BMR Gateway of Pacific IV LP, formerly known as BMR-1000 Gateway LP (“BMR Gateway of Pacific IV”); all of which are Delaware limited partnerships (collectively “Owners” and individually “Owner”), on the one hand, and the CITY OF SOUTH SAN FRANCISCO, a municipal corporation organized and existing under the laws of the State of California (“City”), on the other hand. Each Owner and the City are individually referred to herein as a “Party” and collectively referred to herein as “Parties.” R E C I T A L S A. WHEREAS, Owners and City are parties to that certain Second Amended and Restated Development Agreement (Gateway Business Park Master Plan Project) by and between the Owners and City, dated August 31, 2018, and recorded in the Official Records of San Mateo County on September 7, 2018, as Document Number 2018-070317 (“Development Agreement”); B. WHEREAS, Owners and City entered into a First Amendment to the Development Agreement, dated March 30, 2020, and recorded in the Official Records of San Mateo County on April 10, 2020, as Document Number 2020-032850 ("First Amendment"); C. WHEREAS, Owners and City entered into a Second Amendment to the Development Agreement, dated October 14, 2020, and recorded in the Official Records of San Mateo County on July 19, 2021, as Document Number 2022-107511 (“Second Amendment”); D. WHEREAS, the City has granted the following approvals for the Project, among others: the Gateway Business Park Master Plan, most recently amended by Resolution ____; the Phase 1 Precise Plan approved by City Council Resolution 44-2013, the Phase 2 and Phase 3 Precise Plans approved by Planning Commission Resolution 2835-2018, and the Phase 4 Precise Plan most recently amended by Resolution _____; and the City has certified the Gateway Business Park Master Plan Project Environmental Impact Report (SCH #2008062059), as supplemented by the Gateway of the Pacific 4 Density Transfer Project Supplemental Environmental Impact Report (also SCH #2008062059); and E. WHEREAS, in connection with the City’s amendments to entitlements for development of Phase 4 of the Gateway Business Park Master Plan Project, Owners and City again wish to amend the Development Agreement as set forth in this Third Amendment; F. WHEREAS, all proceedings necessary for the valid adoption and execution of this Second Amendment have taken place in accordance with California Government Code sections 65864 through 65869.5, the California Environmental Quality Act, and Chapter 19.60 of the City’s Municipal Code; G. WHEREAS, the City Council and the City Planning Commission have found that the Development Agreement, as amended by the First Amendment, Second Amendment and this Second Amendment, is consistent with the objectives, policies, general land uses, and programs specified in the South San Francisco General Plan; and H. WHEREAS, on __________ ___, 2022, the City adopted Ordinance Number ____-2022 approving and adopting this Third Amendment, and such ordinance took effect as specified therein. A G R E E M E N T NOW, THEREFORE, the Parties, pursuant to the authority contained in Government Code Sections 65864 through 65869.5 and Chapter 19.60 of the City’s Municipal Code, and in consideration of the mutual covenants and agreements contained herein, agree as follows: 1. Project Description Amendment. Section 3(a) of the Development Agreement is amended as follows: The permitted uses, the density and intensity of uses, the maximum heights, locations and total area of the proposed buildings, the development schedule, the provisions for vehicular access and parking, any reservation or dedication of land, any public improvements, facilities and services, and all environmental impact mitigation measures imposed as approval conditions for the Project shall be exclusively those provided in the Master Plan as amended (Exhibit B), the and Phase 1 Precise Plan approved by City Council Resolution 44-2013, the Phase 2 and Phase 3 Precise Plans approved by Planning Commission Resolution 2835- 2018, the Phase 4 Precise Plan as amended by Resolution ___, the Gateway Business Park Master Plan Project Environmental Impact Report (SCH #2008062059), the Gateway of Pacific 4 Density Transfer Project Supplemental Environmental Impact Report (which describes the GOP 4 Density Transfer Project and which also has SCH#2008062059), this Agreement, and the applicable ordinances in effect as of the 2013 Effective Date, except as modified in this Agreement. The Project is not subject to the Gateway Specific Plan as that Plan has been repealed by City Council Resolution No. _________. The Project will be redeveloped in multiple phases. Each new phase of development will adhere to the governing Municipal Code provisions applicable to the Property as of the 2013 Effective Date (except as modified by this Agreement), as well as the development guidelines set forth in the Gateway Master Plan Development Standards, including the implementation of access, service and parking needs to support each new phase of redevelopment. During each particular redevelopment phase, each Owner will maintain existing access, service and parking needs to support existing improvements located on portions of the Property, yet to be redeveloped during subsequent phases. Plan details for subsequent phases will be submitted to the City for appropriate review and approval, in the form of future Precise Plans. 2. Vesting Provisions Amendment. Section 5 of the Development Agreement is amended as follows: Upon tThe City’s approval of the Master Plan as amended, the Phase 1, 2 and 3 Precise Plans, the Phase 4 Precise Plans as amended, this Agreement, and approval of any future phase Precise Plans amendments thereto each such approval shall be vested in each Owner and its successors and assigns for the term of this Agreement with respect to such Owner’s parcel of Property, provided that the successors and assigns comply with the terms and conditions of all of the foregoing, including, but not limited to, submission of insurance certificates and bonds for the grading of the Property and construction of improvements. 3. Community Facilities District Participation Amendment. Section 11 of the Development Agreement is amended to add the following underlined text: 11. Assessments. Nothing herein shall be construed to relieve the Property from common benefit assessments levied against it and similarly situated properties by the City pursuant to and in accordance with any statutory procedure for the assessment of property to pay for infrastructure and/or services that benefit the Property. Each Owner hereby agrees to participate in the yet to be formed South San Francisco Industrial Area Community Facilities District (IA-CFD) at an annual tax rate equivalent to the lesser of no more than $1.00 per gross project square foot on the Property or such annual tax rate that applies to similarly situated Life Sciences projects in the East of 101 Area. (Each Owner acknowledges that the name of the IA-CFD might change prior to submission to property owners for approval, and that each Owners’ agreement in this paragraph will apply to the community facilities district regardless of name, as long as the rate applicable to each Owner complies with this paragraph.) 4. Transportation Demand Management Plan Amendment. Section 12(c) of the Development Agreement is amended as follows: Transportation Demand Management Plan. Owners of any phases(s) of the Project containing any redeveloped building (other than parking facilities) for which a certificate of occupancy has been issued shall prepare an annual Transportation Demand Management (TDM) report, and submit same to City, to document the effectiveness of the TDM plan in achieving the goal of 35% alternative mode usage by employees within the Project when the Project is built out to a 1.0 FAR or less, or a graduated scale between 35% and 40% alternative mode usage (“Targeted Alternative Mode Usage”) when the Project is built out at between a 1.0 and 1.25 FAR or greater. The Targeted Alternative Mode Usage will be determined as follows: FAR Alternative Mode Usage <1.0 35% 1.01 – 1.12 38% >1.13 – 1.25 40% 5.Fees Applicable to Expansion Square Footage: A new section (g) is added to Section 12 of the Development Agreement as follows: (g)Fees Applicable to Expansion Square Footage Resulting From GOP 4 Density Transfer Project. The following fees shall be applicable to any square footage in excess of 1.25 FAR that is developed pursuant to Section 2.2 of the Master Plan, as that section was amended pursuant to the GOP 4 Density Transfer Project. 1.Citywide Transportation Fees. The Owner of GOP 4 hereby agrees that the Citywide Transportation Fee, as approved and adopted by the City Council through the adoption of Resolution 120-2020 (which took effect on November 23, 2020), shall apply to the additional square footage approved for the GOP 4 Density Transfer Project. Citywide Transportation Fee shall be determined based on the application of the formula in effect as of the time the City issues the respective building permit for Phase 4 North Building and shall be payable prior to the issuance of such building permit. 2.Commercial Linkage Fees. The Owner of GOP 4 hereby agrees that the Commercial Linkage Impact Fee, as approved and adopted by the City Council through the adoption of Ordinance No. 1560-2018 (which took effect on November 1, 2018), shall apply to the additional square footage approved for the GOP 4 Density Transfer Project. Commercial Linkage Impact Fees shall be determined based on the application of the formula in effect as of the time the City issues the respective building permit for Phase 4 North Building and shall be payable prior to the issuance of such building permit. 3.Library Impact Fees. The Owner of GOP 4 hereby agrees that the Library Impact Fee, as approved and adopted by the City Council through the adoption of Resolution No. 121-2020 (which took effect on November 23, 2020), shall apply to the additional square footage approved for the GOP 4 Density Transfer Project. Library Impact Fees shall be determined based on the application of the formula in effect as of the time the City issues the respective building permit for Phase 4 North Building and shall be payable prior to the issuance of such building permit. 6.Exhibit Amendments. The exhibits to the Development Agreement are amended as follows: a.Exhibit B, the Gateway Business Park Master Plan, is amended to incorporate the modifications enacted by Resolution ___. b. Exhibit C, the Gateway Business Park Phase 1 Precise Plan is deleted and is replaced with the phrase “Exhibit C has been deleted.” c. Exhibit D-2, the Gateway Business Park Master Plan Project EIR Mitigation and Monitoring Program, is amended to add the Gateway of Pacific 4 Density Transfer Project Supplemental EIR Mitigation and Monitoring Program, which imposes additional mitigation applicable to the expansion approved for the GOP 4 Density Transfer Project. d. Exhibit E, Applicable City Fees, is amended to add the following text just before the heading “Exhibit E-1”. “Exhibits E-1 and E-2 reference fees and fee estimates for the Project as originally approved at an FAR of 1.25. Additional fees shall be due for any square footage in excess of 1.25 FAR that is developed pursuant to Section 2.2 of the Master Plan in the same proportionate amounts as specified in this Exhibit E for the original square footage. In addition, additional fees shall be due as set forth in Section 12(g) of the Agreement.” 9. Effective Date. Pursuant to Section 19.60.140 of the City’s Municipal Code, notwithstanding the fact that the City Council adopted an ordinance approving this Third Amendment, this Third Amendment shall be effective and shall only create obligations for the Parties from and after the date that the ordinance approving this Third Amendment takes effect. 10. Full Force and Effect. As amended by the First Amendment, the Second Amendment, and this Third Amendment, the Development Agreement shall remain in full force and effect. 11. Counterparts. This Third Amendment may be executed in multiple originals, each of which is deemed an original, and may be signed in counterparts. IN WITNESS WHEREOF this Agreement has been executed by the Parties on the day and year first above written. (Signatures appear on the following pages) CITY: CITY OF SOUTH SAN FRANCISCO By: __________________________ Name: __________________________ Its: City Manager ATTEST: __________________________ City Clerk APPROVED AS TO FORM: __________________________ City Attorney OWNERS: BMR GATEWAY OF PACIFIC I LP By: ___________________________ Name: ___________________________ Its: ___________________________ BMR GATEWAY OF PACIFIC II LP By: ___________________________ Name: ___________________________ Its: ___________________________ BMR GATEWAY OF PACIFIC III LP By: ___________________________ Name: ___________________________ Its: ___________________________ BMR GATEWAY OF PACIFIC IV LP By: ___________________________ Name: ___________________________ Its: ___________________________ A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of _______________________ ) ) County of _____________________ ) On ____________________, before me, ______________________________, a Notary Public, personally appeared ______________________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature______________________________ (Seal) 3558631.1