Former PUC Sites B and C
1
FIRST ADMINISTRATIVE AMENDMENT TO DEVELOPMENT AGREEMENT
FORMER PUC SITES B AND C
This FIRST ADMINISTRATIVE AMENDMENT TO THE DEVELOPMENT
AGREEMENT FOR FORMER PUC SITES B AND C (the “First Administrative Amendment”)
is entered into this ____ day of ________, 2022, by and between the City of South San Francisco,
a California municipal corporation (“City”), and SSF PUC Housing Partners, LLC, a Delaware
limited liability company (“SSF”). SSF is individually referred to as a “Developer”. Developer
and City are, from time to time, referred to individually in this Agreement as a “Party” and
collectively as the “Parties.”
R E C I T A L S
This First Administrative Amendment is entered into upon the basis of the following facts,
understandings and intentions of the parties:
A. City and Developer are parties to that certain Development Agreement dated
January 10, 2020 (“Development Agreement”) to facilitate the development of (a) certain
publicly-accessible open space improvements on (1) an approximately 3,286 square foot portion
and an approximately 8,550 sf portion of existing City-owned property (“City Open Space
Properties”), and (2) an approximately 33,981 square feet (“sf”) portion of BART-owned property
(“BART Open Space Property”); (b) portions of the Oak Avenue Phase 1 Extension on (1) an
approximately 14,270 sf portion of City-owned property (“City ROW Property”), (2) an
approximately 7,296 sf portion of BART-owned property (“BART ROW Property”), and (3) an
approximately 14,350 sf portion of Kaiser-owned property (“Kaiser ROW Property”); and (c)
certain access easements necessary to construct and operate the Project as defined in the Project
Approvals, all within the City of South San Francisco, County of San Mateo, State of California
(the “Site”).
I. Pursuant to Section 7.2 of the Development Agreement, the City Manager is
authorized to approve an Administrative Agreement Amendment to the Development Agreement.
NOW, THEREFORE, in consideration of the mutual covenants and promises contained herein
and other valuable consideration and pursuant to Section 7.2 of the Development Agreement, the
Parties hereto agree to the following:
1. Defined Terms. All capitalized terms used herein shall have the meanings given in
the Master Development Agreement, except as expressly otherwise defined in this First
Amendment.
2. Enumeration of Specific Amendments. The Development Agreement is hereby
modified to incorporate the following amendments. In this Section 2, for clarity, where the
amendment revises existing text, double underline text indicates new text; strikeout text indicates
a deletion.
2
2.1 Amendments to Section 3.4 Regarding Off-Site Improvements and
Maintenance. Section 3.4 of the Development Agreement is hereby amended as follows:
3.4(a) Oak Avenue Extension. Based on the 35% drawings of Oak Avenue Phase
2 Extension provided by City to Developer, the Developer shall undertake desi gn
of Oak Avenue Phase 1 Extension and continue to advance design and approval
(with BART, Caltrans, etc.) of Oak Avenue Phase 2 Extension concurrent with
relevant design progress, but only so far as necessary that reviewing departments
can ensure a future design for Oak Avenue Phase 2 Extension is physically feasible.
Developer shall design and construct Oak Avenue Phase 1 Extension at its own cost
as described in the Project Approvals; provided, however, the City shall not impose
requirements that will cause the cost (including actual and reasonable soft and hard
costs of design (including design of Oak Avenue Phase 2 Extension), permitting
and construction, but excluding any Developer mark up or project management fee)
of Oak Avenue Phase 1 Extension (“Oak Avenue Phase 1 Costs”) to exceed
FIFTEEN MILLION EIGHT HUNDRED AND FIFTY THOUSAND DOLLARS
($15,850,000) (“Maximum Oak Avenue Phase 1 Costs”), and shall cooperate
with the Developer to ensure any other governmental agencies’ requirements do
not cause the cost to exceed the Maximum Oak Avenue Phase 1 Costs (including,
but not limited to, expediting review and approvals of design modification and
value engineering if necessary). City and Developer shall have the mutual right to
approve the final design, cost and any change orders that will cause the Oak Avenue
Phase 1 Costs to exceed TEN MILLION THREE HUNDRED AND FIFTY
THOUSAND DOLLARS ($10,350,000) for the Oak Avenue Phase 1 Extension
(“Maximum Oak Avenue Fair Share Contribution”). Developer shall also pay
the City, prior to the deadline set forth in the Schedule of Performance in the PSA,
FIVE MILLION FIVE HUNDRED THOUSAND DOLLARS ($5,500,000) for
final design (beyond 35% level) and construction costs for Oak Avenue Phase II
Extension connecting Oak Avenue from Antoinette Lane to El Camino Real (“Oak
Avenue Phase II Extension Payment”) and Developer shall cooperate with City
and provide any necessary easements to allow construction of Oak Avenue Phase
II as described in this sentence to the extent such necessary easement do not conflict
with Project or frustrate the purpose of this Agreement. Developer shall provide
City copies of and shall consult with City regarding all bids received and change
orders for Oak Avenue Phase 1 Extension. Developer shall complete construction
of Oak Avenue Phase 1 Extension in a manner consistent with the approved plans
no later than as set forth in the Schedule of Performance set forth as Exhibit C to
the PSA and incorporated herein by reference. With the City’s cooperation, the
Developer shall be responsible for and shall use good faith and commercially
reasonable efforts to design, implement and construct the Project, including Oak
Avenue Phase 1 Extension such that the City’s future construction of Oak Avenue
Phase 2 Extension at a later date is feasible. Developer shall not be responsible for
the costs for completing designs of Oak Avenue Phase 2 Extension (beyond the
initial feasibility determinations described herein) nor any costs of constructing
Oak Avenue Phase 2 Extension. If the Oak Avenue Phase 1 Costs exceed the
Maximum Oak Avenue Fair Share Contribution, the City will, upon submission of
an invoice with substantiating cost invoices from the contractor that are reasonably
3
acceptable to the City, reimburse the Developer for the Oak Avenue Phase 1 Costs
incurred that exceed the Maximum Oak Avenue Fair Share Contribution, in an
amount not to exceed FIVE MILLION FIVE HUNDRED THOUSAND
DOLLARS ($5,500,000). The City shall have the right to pay the amount in excess
of the Maximum Oak Avenue Fair Share Contribution, up to an amount not to
exceed FIVE MILLION FIVE HUNDRED THOUSAND DOLLARS
($5,500,000), in ten equal annual payments over the period of 10 years from the
date of acceptance of Oak Avenue Phase 1 Extension by the City. Any outstanding
balance due after two years from the date of acceptance of Oak Avenue Phase 1
Extension shall accrue interest at the Local Agency Investment Fund Rate in effect
as of two years from the date of acceptance of Oak Avenue Phase 1 Extension.
3.4(c) Mission Road Pedestrian Trail Connection. Developer shall pay to the City
TWO HUNDRED THOUSAND ($200,000) for costs associated with a proposed
pedestrian trail connecting Mission Road to the Centennial Trail in the general
vicinity of the intersection of Sequoia Avenue and Mission Road (“Mission Road
Pedestrian Trail Connection”), no later than issuance of the certificate of occupancy
for Building B1 or Building C1, whichever comes first. The Developer shall not
be responsible for any other costs associated with the Mission Road Pedestrian
Train Connection (including but not limited to design, permitting, construction or
maintenance).
3.4(d) Pedestrian Bridge Connection to Centennial Trail. Developer shall design
and construct a pedestrian bridge and pathway connecting the Kaiser property to
Centennial Trail as shown on Sheets T-3, L1.0, L2.0, L7.0, L8.0, L9.0 of the
Entitlement Resubmittal -3 Entitlements Comment Response) September 17, 2019
as amended by replacement sheets dated November 5, 2019 and described in the
Project Approvals (“Centennial Trail Bridge”) at the same time as the construction
of the Centennial Trail improvements required in the Project Approvals. The City
shall not impose requirements that will cause the cost (including actual and
reasonable soft and hard costs of design (including design of Centennial Trail
Bridge), permitting and construction, but excluding any Developer mark up or
project management fee) of the Centennial Trail Bridge (“Centennial Trail Bridge
Costs”) to exceed ONE MILLION FIVE HUNDRED THOUSAND DOLLARS
($1,500,000) (“Maximum Centennial Trail Bridge Cost”) and shall cooperate with
the Developer to ensure any other governmental agencies’ requirements do not
cause the cost to exceed the Maximum Centennial Trail Bridge Cost (including, but
not limited to, expediting review and approvals of design modification and value
engineering if necessary). The design of the Centennial Trail Bridge shall include
a pathway width of no more than ten feet and the total width of the bridge shall not
exceed twenty feet, and shall be subject to approval by the City Manager, which
approval shall not be unreasonably withheld or delayed. With the Developer’s
cooperation, the City shall secure control or ownership of any properties necessary
for the Developer to construct and maintain the Centennial Trail Bridge, as
provided in (f), below. Notwithstanding the Maximum Centennial Trail Bridge
Cost, the City may, in its sole discretion, require architectural design enhancements
to the Centennial Trail Bridge design and construction provided that the City shall
4
pay for all Centennial Trail Bridge Costs related to such architectural design
enhancements to the extent that such costs would exceed the Maximum Centennial
Trail Bridge Cost.
3.4(f) Acquisition of Off-Site Property Rights and Developer Deposit. With the
Developer’s cooperation and assistance in terms of preparing property descriptions
and engineering drawings, the City shall be responsible for securing the rights or
ownership for all of the following the City shall attempt to acquire by negotiated
purchase, or in its sole and absolute discretion, elect to acquire the following
property interests by exercise of its power of eminent domain:
(i) the BART ROW Property, the Kaiser ROW Property necessary and other
property interests necessary to complete Oak Avenue Phase 1 Extension as such
property interests are shown on Sheets X-0, X-1, X-1.1, X-2, X-3, X-4, and X-5 of
the Entitlement Resubmittal -3 Entitlements Comment Response) September 17,
2019 as amended by replacement sheets dated November 5, 2019 and described in
the Project Approvals (“Oak Avenue ROW Properties”).
(ii) any properties necessary for the Developer to construct and maintain all of the
Off-Site Improvements, including all park and open space and trail improvements
as required under this Agreement (“Off-Site Property Rights Agreements”).
Developer shall upon written request from the City, pay the City up to a maximum
of FIVE HUNDRED THOUSAND ($500,000) (“Maximum Off-Site Acquisitions
Deposit Amount”) for actual costs (including appraisals, title fees, preparation of
property conveyance documents, litigation expenses, etc.) incurred by the City to
acquire the Oak Avenue ROW Properties and Off-Site Property Rights Agreements
hereunder. Developer shall make an initial payment to the City of TWO
HUNDRED AND FIFTY THOUSAND ($250,000) not later than sixty days after
Close of Escrow (as defined in the PSA) and shall make further deposits upon
written request from the City up to the Maximum Off-Site Acquisitions Deposit
Amount. City will retain the amounts paid in a separate line item account (“Off-
Site Property Acquisition Deposit Account”) and shall only use such funds for
actual costs incurred to acquire the properties provided herein. City shall provide
Developer quarterly reports showing the amount of funds used from the Off-Site
Property Acquisition Deposit Account and property interests acquired. Any
unused funds remaining in the Off-Site Property Acquisition Deposit Account at
the commencement of construction of Oak Avenue Phase 1 Extension shall be
refunded to the Developer. However, notwithstanding any provision in this
Agreement to the contrary, the City shall not have any obligation to acquire the Oak
Avenue ROW Properties or the properties necessary for the Developer to construct
and maintain all of the Off-Site Improvements. If the City is unable to acquire said
property rights, Developer will have the option not to construct the Oak Ave Phase
I Extension or Off-Site Improvements.
5
3. Interpretation. The Development Agreement shall be construed as having been
modified by this First Amendment. Except as expressly modified by this First Amendment, the
Development Agreement remains unmodified, and is in full force and effect. In the case of conflict
between the provisions hereof and the terms of the Development Agreement, the provisions hereof
shall control.
4. Effective Date and Recordation. The "Effective Date" of this First Amendment
shall be the later of the dates on which the City and Developer execute this First Amendment,
which shall then be recorded in the official records of San Mateo County.
[Remainder of Page Intentionally Left Blank]
6
IN WITNESS WHEREOF, City and Developers have executed this First Administrative
Amendment as of the date first written above.
CITY
CITY OF SOUTH SAN FRANCISCO,
a municipal corporation
By:________________________
Name: Mike Futrell
City Manager
ATTEST:
By:
City Clerk
APPROVED AS TO FORM:
By:
City Attorney
7
DEVELOPER
SSF PUC HOUSING PARTNERS, LLC,
a Delaware limited liability company
By: _______________________
Name:
Title:
[Notary Acknowledgment Required]
A notary public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA )
COUNTY OF )
On _________________________ before me _________________________________________ (insert
name and title of the officer) personally appeared
______________________________________________________________, who proved to me on the
basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument
and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and
that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the
person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature ______________________________ (Seal)
A notary public or other officer completing this certificate verifies only the identity of the
individual who signed the document to which this certificate is attached, and not the
truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA )
COUNTY OF )
On _________________________ before me _________________________________________ (insert
name and title of the officer) personally appeared
______________________________________________________________, who proved to me on the
basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument
and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and
that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the
person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature ______________________________ (Seal)