Loading...
HomeMy WebLinkAboutReso 59-2023 (22-32)Page A-1 of 9 DRAFT AGREEMENT FOR PUBLIC IMPROVEMENTS THIS AGREEMENT made and entered into this ____, day of ______, _____, between the CITY OF SOUTH SAN FRANCISCO, a municipal corporation and political subdivision of the State of California, hereinafter called “CITY”, and MCGUIRE AND HESTER Inc., hereinafter called “CONTRACTOR”1. W I T N E S S E T H: WHEREAS, City has taken appropriate proceedings to authorize construction of the public work and improvements herein provided and execution of this contract. WHEREAS, a notice was duly published for bids for the contract for the improvements hereinafter described. WHEREAS, on ____________, notice duly given, the City Council (“Council”) of said City awarded the contract for the construction of the improvements hereinafter described to the Contractor, which Contractor said Council found to be the lowest responsible bidder for said improvements. WHEREAS, City and Contractor desire to enter into this agreement for the construction of said improvements pursuant to the terms, definitions, and conditions set forth in the General Provisions and other Contract Documents. IT IS AGREED as follows: 1. Scope of Work. Contractor shall perform the Work described briefly as follows: The Work consists of the furnishing of all labor, materials, tools, equipment, and services necessary for the construction of the EL CAMINO REAL GRAND BOULEVARD III OBAG PROJECT; in accordance with the Contract Documents. Also included are any such other items or details not mentioned above that are required by the Contract Documents, which are to be constructed or furnished and installed as shown on the plans, as specified herein and as directed by the Engineer. The aforementioned improvements are further described in the "Contract Documents" hereinafter referred to. 2. The Contract Documents. The complete Contract consists of the following documents: (A) Notice Inviting Bids (B) Part I – Submitted Proposal (as accepted) (C) This Agreement, including Contractor’s Payment Bond, Faithful Performance Bond and Guaranty Bond. 1.1The term "Contractor" as used herein is employed without distinction as to either number or gender and shall include whenever the context shall permit all agents, representatives, employees, servants, subcontractors and business or social invitees. Page A-2 of 9 (D) Part II – General Conditions (E) Part III – Special Provisions: Special Conditions and Technical Specifications, including State Standard Specifications dated 2018, sections 10-99, as revised in Revised Standard Specifications (RSS) dated October 15, 2021 (F) Part IV – Project Plans, dated November 2022 including referenced City standard details as are current on November 29, 2022. (G) Administrative subsections of the State Standard Specifications dated 2018, as specifically referenced in contract Parts I-IV and as revised in RSS dated October 15, 2021 All rights and obligations of City and Contractor are fully set forth and described in the contract documents. All of the above-named documents are intended to cooperate, so that any work called for in one and not mentioned in the other, or vice versa, is to be executed the same as if mentioned in all said documents. The documents comprising the complete contract will hereinafter be referred to as “the Contract Documents.” 3. Equipment - Performance of Work. Contractor shall furnish all tools, equipment, apparatus, facilities, labor, and materials necessary to perform and complete in a good and workmanlike manner the Work of general construction as called for, and for the manner designated in, and in strict conformity with, the plans and specifications for said Work entitled: EL CAMINO REAL GRAND BOULEVARD III OBAG PROJECT The equipment, apparatus, facilities, labor, and materials shall be furnished and said Work performed and completed as required in said plans and specifications under the direction and supervision and subject to the approval of the Engineer of said City or the Engineer’s designated assistant. 4. Contract Price. City shall pay, and Contractor shall accept, in full payment for the Work agreed to be done the sum of THREE MILLION TWO HUNDRED FIFETY SEVEN THOUSAND FIVE HUNDERD FIFETY SEVEN DOLLARS ($3,257,557.00). Said price is determined by the lump sum price contained in Contractor's bid proposal (“Bid”). The lump sum price and unit prices are set forth in the completed Bid forms attached hereto and made a part hereof as if set forth herein verbatim. In the event work is performed or materials furnished in addition to those set forth in Contractor's bid and the specifications herein, such work and materials will be paid for at the unit prices therein contained. Said amount shall be paid in installments as hereinafter provided. 5. Rights of City to Increase Working Days. If such Work is not completed within the time specified, the Engineer shall have the right to increase the number of working days in the amount it may determine will best serve the interest of the City. If it desires to increase said number of working days, it shall have the further right to charge to Contractor and deduct from the final payment for the Work the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to Contractor and which accrue during the period of such extension, except that the cost of the final service and preparation of the final estimates shall not be included in such charges, provided, however, that no extension of time for the completion of such Work shall be allowed unless at least twenty (20) calendar days prior to the time herein fixed for the completion thereof or the time fixed by the Engineer for such completion as extended, Contractor shall have filed application for extension thereof, in writing with the Engineer. Page A-3 of 9 6. Option of City to Terminate Agreement in Event of Failure to Complete Work. If at any time in the opinion of the Engineer, the Contractor has refused or failed to prosecute the Work or any severable part thereof, with such diligence as will insure its work, or any completion within the time specified, or any extensions thereof, or shall have failed to complete said work within such time, or if Contractor should be adjudged a bankrupt, or if Contractor should make a general assignment for the benefit of Contractor's creditors, or if a receiver should be appointed in the event of Contractor's insolvency, or if Contractor, or any Subcontractor, should violate any of the provisions of this Agreement, the Engineer may give written notice to Contractor, and Contractor's sureties of its intention to terminate this Agreement, such notice to contain the reasons for such intention to terminate this Agreement, and unless within five calendar (5) days after the serving of such notice, such violation shall cease and satisfactory arrangements for the correction thereof be made, this Agreement may, at the option of City, upon expiration of said time, cease and terminate. Any excess of cost arising therefrom over and above the contract price will be charged against the Contractor and the Contractor’s sureties who will be liable therefore. In the event of such termination, all money due the Contractor or retained under the terms of this contract shall be forfeited to the City; but such forfeiture will not release the Contractor or the Contractor’s sureties from liability or failure to fulfill the contract. The Contractor and the Contractor’s sureties will be credited with the amount of money so forfeited toward any excess of cost over and above the contract price, arising from the suspension termination of the operations of the contract and the completion of the Work by the City as above provided, and the Contractor will be so credited with any surplus remaining after all just claims for such completion have been paid. In the determination of the question whether there has been any such noncompliance with the contract as to warrant the suspension termination or annulment thereof, the decision of the Engineer shall be binding on all parties to the contract. 7. Termination of Contract for Convenience. The City also reserves the right to terminate the contract at any time upon a determination by the Engineer in the Engineer's sole discretion that termination of the contract is in the best interest of the City. If the City elects to terminate the contract for convenience, the termination of the contract and the total compensation payable to the Contractor shall be governed by the following: (A) The City will issue the Contractor a written notice signed by the Engineer, specifying that the contract is terminated. Upon receipt of said written notice, the Contractor will be relieved of further responsibility for damage to the Work (excluding materials) as specified in Section VII-17, "Contractor's Responsibility for the Work," of the General Conditions and, except as otherwise directed in writing by the Engineer, the Contractor shall: (1) Stop all work under the contract except that specifically directed to be completed prior to acceptance. (2) Perform work the Engineer deems necessary to secure the project for termination. (3) Remove equipment and plant from the site of the Work. (4) Take such action as is necessary to protect materials from damage. (5) Notify all subcontractors and suppliers that the contract is being terminated and that their contracts or orders are not to be further performed unless otherwise authorized in writing by the Engineer. Page A-4 of 9 (6) Provide the Engineer with an inventory list of all materials previously produced, purchased or ordered from suppliers for use in the Work and not yet used in the Work, including its storage location, and such other information as the Engineer may request. (7) Dispose of materials not yet used in the Work as directed by the Engineer. It shall be the Contractor's responsibility to provide the City with good title to all materials purchased by the City hereunder, including materials for which partial payment has been made as provided in Section IX-2, “Progress Payments,” of the General Conditions and with bills of sale or other documents of title for such materials. (8) Subject to the prior written approval of the Engineer, settle all outstanding liabilities and all claims arising out of subcontracts or orders for materials terminated hereunder. To the extent directed by the Engineer, the Contractor shall assign to the City all the right, title, and interest of the Contractor under subcontracts or orders for materials terminated hereunder. (9) Furnish the Engineer with the documentation required to be furnished by the Contractor under the provisions of the contract, including, on projects as to which Federal and State funds are involved, all documentation required under the Federal and State requirements included in the contract. (10) Take such other actions as the Engineer may direct. (B) Acceptance of the contract as hereinafter specified shall not relieve the Contractor of responsibility for damage to materials. The Contractor shall continue to be responsible for damage to materials after issuance of the Notice of Termination, except as follows: (1) The Contractor’s responsibility for damage to materials for which partial payment has been made as provided in Section IX-2, “Progress Payments,” of the General Conditions and for materials furnished by the City for use in the Work and unused shall terminate when the Engineer certifies that such materials have been stored in the manner and at the locations the Engineer has directed. (2) The Contractor’s responsibility for damage to materials purchased by the City subsequent to the issuance of the notice that the contract is to be terminated shall terminate when title and delivery of such materials has been taken by the City. (3) When the Engineer determines that the Contractor has completed the Work under the contract directed to be completed prior to termination and such other work as may have been ordered to secure the project for termination, the Contractor will recommend that the Engineer formally accept the contract to the extent performed, and immediately upon and after such acceptance by the Engineer, the Contractor will not be required to perform any further Work thereon and shall be relieved of the Contractor's contractual responsibilities for injury to persons or property which occurs after the formal acceptance of the project by the Engineer. (C) Termination of the contract shall not relieve the surety of its obligation for any just claims arising out of the work performed. (D) The total compensation to be paid to the Contractor shall be determined by the Engineer on the basis of the following: Page A-5 of 9 (1) The reasonable cost to the Contractor, without profit, for all work performed under the contract, including mobilization, demobilization and work done to secure the project for termination. In determining the reasonable cost, deductions will be made for the cost of materials to be retained by the Contractor, amounts realized by the sale of materials, and for other appropriate credits against the cost of the work. When, in the opinion of the Engineer, the cost of a contract item of work is excessively high due to costs incurred to remedy or replace defective or rejected work, the reasonable cost to be allowed will be the estimated reasonable cost of performing such work in compliance with the requirements of the plans and specifications and the excessive actual cost shall be disallowed. (2) A reasonable allowance for profit on the cost of the work performed as determined under Subsection (1), provided the Contractor establishes to the satisfaction of the Engineer that it is reasonably probable that the Contractor would have made a profit had the contract been completed and provided further, that the profit allowed shall in no event exceed four (4) percent of said cost. (3) The reasonable cost to the Contractor of handling material returned to the vendor, delivered to the City, or otherwise disposed of as directed by the Engineer. (4) A reasonable allowance for the Contractor’s administrative costs in determining the amount payable due to termination of the contract. (5) A reasonable credit to the City for defective or incomplete work not corrected. All records of the Contractor and subcontractors necessary to determine compensation in accordance with the provisions of this Section 5 shall be open to inspection or audit by representatives of the City at all times after issuance of the Notice of Termination and for a period of three (3) years, thereafter, and such records shall be retained for that period. After acceptance of the Work by the Engineer, the Engineer may make payments on the basis of interim estimates pending issuance of the Final Estimate in accordance with Section IX-7, “Final Payment,” of the General Conditions when, in the Engineer's opinion, the amount thus paid, together with all amounts previously paid or allowed, will not result in total compensation in excess of that to which the Contractor will be entitled. All payments, including payment upon the Final Estimate shall be subject to deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the contract. If this contract is terminated by the City for cause, and it is later determined that the proper basis for a termination for cause did not exist, the termination shall be deemed to have been a termination for convenience and governed by the terms of this contract dealing with such termination. If the contract is terminated by the City for cause or convenience, such termination shall neither act as a waiver by the City of its right to require the Contractor to correct defects in the Work performed by the Contractor nor void any warranties applicable to the Work performed under the contract. The provisions of this Section 5 shall be included in all subcontracts. In the event of conflict between the termination provisions of this Section 8 and any other provision or the contract, this Section 5 shall prevail. Page A-6 of 9 8. Performance by Sureties. In the event of any termination as herein before provided, City shall immediately give written notice thereof to Contractor and Contractor's sureties and the sureties shall have the right to take over and perform the Agreement, provided, however, that if the sureties, within five (5) working days after giving them said notice of termination, do not give the City written notice of their intention to take over the performance of the Agreement and do not commence performance thereof within five (5) working days after notice to the City of such election, City may take over the Work and prosecute the same to completion by contract or by any other method it may deem advisable, for the account, and at the expense, of Contractor, and the sureties shall be liable to City for any excess cost or damages occasioned City thereby; and, in such event, City may, without liability for so doing, take possession of and utilize in completing the Work such materials, appliances, plant, and other property belonging to Contractor as may be on the site of the Work and necessary therefore. Should Contractor contract in an individual capacity, the surety bond shall contain the following provision: “Should Contractor contract in the Contractor’s individual capacity, the death of the Contractor shall not relieve the surety of its obligations.” 9. Hold-Harmless Agreement and Contractor's Insurance. Contractor agrees to, and shall, hold City, its elective and appointive boards, officers, agents, and employees harmless from any liability for damage or claims for damage for personal injury, including death, as well as from claims for property damage which may arise from Contractor's or any of Subcontractor's operations under this Agreement, whether such operations be by Contractor or by any Subcontractor or Subcontractors, or by any one or more persons directly or indirectly employed by, or acting as agent for, Contractor or any Subcontractor or Subcontractors. Contractor agrees to, and shall, defend City and its elective and appointive boards, officers, agents, and employees from any suits or actions at law or in equity for damages caused, or alleged to have been caused, by reason of any of the aforesaid operations, provided as follows: (A) The City does not, and shall not, waive any rights against Contractor which it may have by reason of the aforesaid hold-harmless agreement, because of the acceptance by City, or the deposit with City by Contractor, of any of the insurance policies hereinafter described in Paragraph 15, “Insurance” hereof. (B) That the aforesaid hold-harmless agreement by Contractor shall apply to all damages and claims for damages of every kind suffered, or alleged to have been suffered, by reason of any of the aforesaid operations of Contractor or any Subcontractor, regardless of whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. 10. Insurance. The Contractor shall take out and maintain during the life of this Agreement the following policies of insurance: (A) Workers' Compensation and Employers' Liability Insurance providing full statutory coverage. In signing this Agreement, the Contractor makes the following certification, required by Section 1861 of the California Labor Code: "I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract". Page A-7 of 9 (B) Comprehensive General Liability Insurance. Public Liability Insurance (includes premises, elevator - if applicable, products, completed operations, personal injury and contractual): (1) Bodily Injury Liability: $ 500,000 each person $1,000,000 each occurrence (2) Property Damage Liability [includes XCU (explosion, collapse, and underground damage); water damage and broad form property damage or third party liability]: $ 500,000 per occurrence (C) Comprehensive Automobile Liability Insurance (includes owned, non-owned, and hired vehicles): (1) Bodily Injury Liability: $ 500,000 per person $1,000,000 each occurrence (2) Property Damage Liability: $ 500,000 each occurrence (D) It is agreed that the insurance required by Subsections B and C, in an aggregate amount of not less than ONE MILLION FIVE HUNDRED THOUSAND DOLLARS ($1,500,000), shall be extended to include as additional insured the City of South San Francisco, its elective and appointive boards, commissions, officers, agents, employees, with respect to operations performed by the Contractor, as described herein. Evidence of this insurance described above shall be provided to City upon execution of this Agreement and shall be subject to approval of the City Attorney as to form, amount, and carrier. The policy of insurance shall also contain a provision indicating that such insurance shall not be reduced or cancelled except upon thirty (30) calendar days written notice to City. In addition, the following endorsement shall be made on said policy of insurance: "The following are named as additional insured on the above policies: The City of South San Francisco, its elective and appointive boards, officers, agents, and employees." "Notwithstanding any other provision in this policy, the insurance afforded hereunder to the City of South San Francisco shall be primary as to any other insurance or re-insurance covering or available to the City of South San Francisco, and such other insurance or reinsurance shall not be required to contribute to any liability or loss until and unless the approximate limit of liability afforded hereunder is exhausted." The above requirements that the City be named as additional insured, that the insurance shall be primary to any other, and that the insurance not be cancelled without notice, shall be provided in the form of an endorsement signed by an authorized representative of the insurance company providing coverage, who shall declare his or her authority to sign on behalf of the insurer. 11. Proof of Carriage of Insurance. Contractor shall furnish City through the Engineer, concurrently with the execution hereof, with satisfactory proof of carriage of the insurance required and Page A-8 of 9 that each carrier shall give City at least thirty (30) calendar days prior notice of the cancellation or change of any policy during the effective period of this contract. Further, if the Contractor’s insurance policy includes a self-insured retention that must be paid by a named insured as a precondition of the insurer’s liability, or which has the effect of providing that payments of the self-insured retention by others, including additional insureds or insurers do not serve to satisfy the self-insured retention, such provisions must be modified by special endorsement so as to not apply to the additional insured coverage required by this agreement so as to not prevent any of the parties to this agreement from satisfying or paying the self- insured retention required to be paid as a precondition to the insurer’s liability. Additionally, the certificates of insurance must note whether the policy does or does not include any self-insured retention and also must disclose the deductible. 12. Provisions Cumulative. The provisions of this Agreement are cumulative, and in addition to and not in limitation of, any other rights or remedies available to City. 13. Form FHWA 1273. For a Federal-aid contract, form FHWA-1273 is included in this Agreement as Attachment B. Comply with its provisions. Interpret the training and promotion section as specified in section 7-1.11A of the State Standard Specifications. 14. Federal Minimum Wage Rates – For a Federal-aid contract, federal minimum wage rates apply and are included in the Agreement as Attachment C. 15. Appendix E of the Title VI Assurances. For a Federal-aid contract, federal nondiscrimination requirements (entitled appendix R of the Title VI Assurances) apply and are incorporated into this Agreement as Attachment D. 16. Notices. All notices shall be in writing and delivered in person or transmitted by certified mail, postage prepaid. Notices required to be given to City shall be addressed as follows: City Clerk City Hall, 400 Grand Avenue South San Francisco, California 94080 Notices required to be given to Contractor shall be addressed as follows: _________________________________________________________________________ _________________________________________________________________________ Notices required to be given sureties of Contractor shall be addressed as follows: _________________________________________________________________________ Notices required to be given to the Escrow Agent of Contractor, if any, shall be addressed as follows: _________________________________________________________________________ 17. Interpretation. As used herein, any gender includes each other gender, the singular includes the plural, and vice versa. Page A-9 of 9 IN WITNESS WHEREOF, two (2) identical counterparts of this Agreement, consisting of twelve (12) pages (being pages A-1 through A-12), each of which counterparts shall for all purposes be deemed an original of said Agreement, have been duly executed by the parties hereinabove named, on the day and year first hereinabove written. CITY OF SOUTH SAN FRANCISCO,CONTRACTOR: A Municipal Corporation ____________________________________ ____________________________________ By:_______________________________ Mike Futrell, City Manager By:_________________________________ (If Contractor is an individual, so state. If Contractor is a Corporation, a corporate seal or signatures of the President or Vice President and the Secretary Treasurer are required). APPROVED AS TO FORM: ____________________________ City Attorney ATTEST: _______________________________ City Clerk ATTACHMENT A ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION THIS ESCROW AGREEMENT is made and entered into by and between the City of South San Francisco whose address is 400 Grand Ave., P.O. Box 711, South San Francisco, CA 94083, hereinafter referred to as "City," and ________________________________________,whose address is ___________________________________________________________, hereinafter called “Contractor” and ______________________________________________________________,whose address is ___________________________________________________________, hereinafter called “Escrow Agent.” For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows: 1. Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for __________________ in the amount of _______________dollars ($_____) dated ___________ (hereinafter referred to as the “Contract”). Alternately, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 working days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of _______________, and shall designate the Contractor as the beneficial owner. 2. The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. 3. When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly. 4. Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent. 5. The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. 6. Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor. 7. The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven day’s written notice to the Escrow Agent from the Owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner. 8. Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. 9. Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this Agreement, and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above. 10. The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows: On behalf of Owner: On behalf of Contractor: __________________________________ __________________________________ Title Title __________________________________ __________________________________ Name Name __________________________________ __________________________________ Signature Signature __________________________________ __________________________________ Address Address On behalf of Escrow Agent: __________________________________ Title __________________________________ Name __________________________________ Signature __________________________________ Address At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement. IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above. Owner: Contractor: __________________________________ __________________________________ Title Title __________________________________ __________________________________ Name Name __________________________________ __________________________________ Signature Signature Approved as to form: Attest: _____________________________________ __________________________________ City Attorney Date City Clerk 1 ATTACHMENT B FORM 1273 2 FHWA 1273-Revised July 5, 2022 REQUIRED CONCTRACT PROVISIONS FEDERAL AID CONSTRUCTION CONTRACTS I.General II.Nondiscrimination III.Non-segregated Facilities IV.Davis-Bacon and Related Act Provisions V.Contract Work Hours and Safety Standards Act Provisions VI.Subletting or Assigning the Contract VII.Safety: Accident Prevention VIII.False Statements Concerning Highway Projects IX.Implementation of Clean Air Act and Federal Water Pollution Control Act X.Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion XI.Certification Regarding Use of Contract Funds for Lobbying XII.Use of United States-Flag Vessels: ATTACHMENTS A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only) I.GENERAL 1.Form FHWA-1273 must be physically incorporated in each construction contract funded under title 23, United States Code, as required in 23 CFR 633.102(b) (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). 23 CFR 633.102(e). The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. 23 CFR 633.102(e). Form FHWA-1273 must be included in all Federal-aid design- build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services) in accordance with 23 CFR 633.102. The design- builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider. Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower-tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 23 CFR 633.102(b). 2.Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. 23 CFR 633.102(d). 3.A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA. 4.Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b). The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors. 23 U.S.C. 101(a). II.NONDISCRIMINATION (23 CFR 230.107(a); 23 CFR Part 230, Subpart A, Appendix A; EO 11246) The provisions of this section related to 23 CFR Part 230, Subpart A, Appendix A are applicable to all Federal-aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts. In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR Part 60, 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633. The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60- 1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3. Note: The U.S. Department of Labor has exclusive authority to determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR Part 60, and 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27; and 23 CFR Parts 200, 230, and 633. The following provision is adopted from 23 CFR Part 230, Subpart A, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements. 3 1.Equal Employment Opportunity: Equal Employment Opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (see 28 CFR Part 35, 29 CFR Part 1630, 29 CFR Parts 1625-1627, 41 CFR Part 60 and 49 CFR Part 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140, shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a.The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. 23 CFR 230.409 (g)(4) & (5). b.The contractor will accept as its operating policy the following statement: "It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, sexual orientation, gender identity, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship, pre- apprenticeship, and/or on-the-job training." 2.EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 3.Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action or are substantially involved in such action, will be made fully cognizant of and will implement the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a.Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official. b.All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c.All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women. d.Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees. e.The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means. 4.Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived. a.The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration. b.In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions. c.The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees. 5.Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age or disability. The following procedures shall be followed: a.The contractor will conduct periodic inspections of project sites to ensure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b.The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices. c.The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons. d.The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action 4 within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal. 6.Training and Promotion: a.The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade or job classification involved. b.Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs (i.e., apprenticeship and on-the-job training programs for the geographical area of contract performance). In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a). c.The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each. d.The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion. 7.Unions: If the contractor relies in whole or in part upon unions as a source of employees, the contractor will use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. 23 CFR 230.409. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below: a.The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment. b.The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability. c.The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information. d.In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability; making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency. 8.Reasonable Accommodation for Applicants / Employees with Disabilities: The contractor must be familiar with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established thereunder. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship. 9.Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, sexual orientation, gender identity, national origin, age, or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a.The contractor shall notify all potential subcontractors, suppliers, and lessors of their EEO obligations under this contract. b.The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations. 10.Assurances Required: a.The requirements of 49 CFR Part 26 and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference. b.The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: (1)Withholding monthly progress payments; (2)Assessing sanctions; (3)Liquidated damages; and/or (4)Disqualifying the contractor from future bidding as non- responsible. c.The Title VI and nondiscrimination provisions of U.S. DOT Order 1050.2A at Appendixes A and E are incorporated by reference. 49 CFR Part 21. 11.Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. a.The records kept by the contractor shall document the following: 5 (1)The number and work hours of minority and non- minority group members and women employed in each work classification on the project; (2)The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women; and (3)The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women. b.The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project indicating the number of minority, women, and non- minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July. III.NONSEGREGATED FACILITIES This provision is applicable to all Federal-aid construction contracts and to all related construction subcontracts of more than $10,000. 41 CFR 60-1.5. As prescribed by 41 CFR 60-1.8, the contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location under the contractor's control where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single-user restrooms and necessary dressing or sleeping areas to assure privacy between sexes. IV.DAVIS-BACON AND RELATED ACT PROVISIONS This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size), in accordance with 29 CFR 5.5. The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. 23 U.S.C. 113. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. 23 U.S.C. 101. Where applicable law requires that projects be treated as a project on a Federal-aid highway, the provisions of this subpart will apply regardless of the location of the project. Examples include: Surface Transportation Block Grant Program projects funded under 23 U.S.C. 133 [excluding recreational trails projects], the Nationally Significant Freight and Highway Projects funded under 23 U.S.C. 117, and National Highway Freight Program projects funded under 23 U.S.C. 167. The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA- 1273 format and FHWA program requirements. 1.Minimum wages (29 CFR 5.5) a.All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis-Bacon poster (WH–1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. b. (1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: (i)The work to be performed by the classification requested is not performed by a classification in the wage determination; and (ii)The classification is utilized in the area by the construction industry; and 6 (iii)The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (2)If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (3)In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (4)The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2.Withholding (29 CFR 5.5) The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally- assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3.Payrolls and basic records (29 CFR 5.5) a.Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis- Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. b. (1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division Web site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency. (2)Each payroll submitted shall be accompanied by a “Statement of Compliance,” signed by the contractor or 7 subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (i)That the payroll for the payroll period contains the information required to be provided under 29 CFR 5.5(a)(3)(ii), the appropriate information is being maintained under 29 CFR 5.5(a)(3)(i), and that such information is correct and complete; (ii)That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; (iii)That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (3)The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 shall satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(2) of this section. (4)The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 231. c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4.Apprentices and trainees (29 CFR 5.5) a.Apprentices (programs of the USDOL). Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. b.Trainees (programs of the USDOL). Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the 8 corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. c.Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. d.Apprentices and Trainees (programs of the U.S. DOT). Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal- aid highway construction programs are not subject to the requirements of paragraph 4 of this Section IV. 23 CFR 230.111(e)(2). The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program. 5.Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract as provided in 29 CFR 5.5. 6.Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. 7.Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 8.Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis- Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract as provided in 29 CFR 5.5. 9.Disputes concerning labor standards. As provided in 29 CFR 5.5, disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10.Certification of eligibility (29 CFR 5.5) a.By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). b.No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). c.The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. V.CONTRACT WORK HOURS AND SAFETY STANDARDS ACT Pursuant to 29 CFR 5.5(b), the following clauses apply to any Federal-aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. 1.Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 29 CFR 5.5. 2.Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph 1 of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph 1 of this section, in the sum currently provided in 29 CFR 5.5(b)(2)* for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph 1 of this section. 29 CFR 5.5. * $27 as of January 23, 2019 (See 84 FR 213-01, 218) as may be adjusted annually by the Department of Labor; pursuant to the Federal Civil Penalties Inflation Adjustment Act of 1990). 9 3.Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 2 of this section. 29 CFR 5.5. 4.Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs 1 through 4 of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs 1 through 4 of this section. 29 CFR 5.5. VI.SUBLETTING OR ASSIGNING THE CONTRACT This provision is applicable to all Federal-aid construction contracts on the National Highway System pursuant to 23 CFR 635.116. 1.The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items may be performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116). a.The term “perform work with its own organization” in paragraph 1 of Section VI refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions: (based on longstanding interpretation) (1)the prime contractor maintains control over the supervision of the day-to-day activities of the leased employees; (2)the prime contractor remains responsible for the quality of the work of the leased employees; (3)the prime contractor retains all power to accept or exclude individual employees from work on the project; and (4)the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements. b."Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components of the overall contract. 23 CFR 635.102. 2.Pursuant to 23 CFR 635.116(a), the contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3.Pursuant to 23 CFR 635.116(c), the contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance of the work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract. 4.No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment of the contract. Written consent will be given only after the contracting agency has assured that each subcontract is evidenced in writing and that it contains all pertinent provisions and requirements of the prime contract. (based on long- standing interpretation of 23 CFR 635.116). 5.The 30-percent self-performance requirement of paragraph (1) is not applicable to design-build contracts; however, contracting agencies may establish their own self-performance requirements. 23 CFR 635.116(d). VII.SAFETY: ACCIDENT PREVENTION This provision is applicable to all Federal-aid construction contracts and to all related subcontracts. 1.In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR Part 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance of the work covered by the contract. 23 CFR 635.108. 2.It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR Part 1926) promulgated by the Secretary of Labor, in accordance with Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 29 CFR 1926.10. 3.Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance 10 with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). VIII.FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS This provision is applicable to all Federal-aid construction contracts and to all related subcontracts. In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal- aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness of these and similar acts, Form FHWA-1022 shall be posted on each Federal-aid highway project (23 CFR Part 635) in one or more places where it is readily available to all persons concerned with the project: 18 U.S.C. 1020 reads as follows: "Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation; or Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal-aid Roads Act approved July 11, 1916, (39 Stat. 355), as amended and supplemented; Shall be fined under this title or imprisoned not more than 5 years or both." IX.IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT (42 U.S.C. 7606; 2 CFR 200.88; EO 11738) This provision is applicable to all Federal-aid construction contracts in excess of $150,000 and to all related subcontracts. 48 CFR 2.101; 2 CFR 200.326. By submission of this bid/proposal or the execution of this contract or subcontract, as appropriate, the bidder, proposer, Federal-aid construction contractor, subcontractor, supplier, or vendor agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251-1387). Violations must be reported to the Federal Highway Administration and the Regional Office of the Environmental Protection Agency. 2 CFR Part 200, Appendix II. The contractor agrees to include or cause to be included the requirements of this Section in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements. 2 CFR 200.326. X.CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more – as defined in 2 CFR Parts 180 and 1200. 2 CFR 180.220 and 1200.220. 1.Instructions for Certification – First Tier Participants: a.By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b.The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. 2 CFR 180.320. c.The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default. 2 CFR 180.325. d.The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if any time the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. 2 CFR 180.345 and 180.350. e.The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180, Subpart I, 180.900-180.1020, and 1200. “First Tier Covered Transactions” refers to any covered transaction between a recipient or subrecipient of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant 11 who has entered into a covered transaction with a recipient or subrecipient of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). f.The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. 2 CFR 180.330. g.The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. 2 CFR 180.220 and 180.300. h.A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. 2 CFR 180.300; 180.320, and 180.325. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. 2 CFR 180.335. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the System for Award Management website (https://www.sam.gov/). 2 CFR 180.300, 180.320, and 180.325. i.Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j.Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. 2 CFR 180.325. * * * * * 2.Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – First Tier Participants: a.The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals: (1)Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency, 2 CFR 180.335;. (2)Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property, 2 CFR 180.800; (3)Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification, 2 CFR 180.700 and 180.800; and (4)Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. 2 CFR 180.335(d). (5)Are not a corporation that has been convicted of a felony violation under any Federal law within the two-year period preceding this proposal (USDOT Order 4200.6 implementing appropriations act requirements); and (6)Are not a corporation with any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability (USDOT Order 4200.6 implementing appropriations act requirements). b.Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant should attach an explanation to this proposal. 2 CFR 180.335 and 180.340. 3.Instructions for Certification - Lower Tier Participants: (Applicable to all subcontracts, purchase orders, and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200). 2 CFR 180.220 and 1200.220. a.By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below. b.The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. c.The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. 2 CFR 180.365. d.The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180, Subpart I, 180.900 – 180.1020, and 1200. You may contact the person to which this proposal is 12 submitted for assistance in obtaining a copy of those regulations. “First Tier Covered Transactions” refers to any covered transaction between a recipient or subrecipient of Federal funds and a participant (such as the prime or general contract). “Lower Tier Covered Transactions” refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). “First Tier Participant” refers to the participant who has entered into a covered transaction with a recipient or subrecipient of Federal funds (such as the prime or general contractor). “Lower Tier Participant” refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e.The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. 2 CFR 1200.220 and 1200.332. f.The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion-Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. 2 CFR 180.220 and 1200.220. g.A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the System for Award Management website (https://www.sam.gov/), which is compiled by the General Services Administration. 2 CFR 180.300, 180.320, 180.330, and 180.335. h.Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. i.Except for transactions authorized under paragraph e of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 2 CFR 180.325. * * * * * Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion--Lower Tier Participants: 1.The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals: (a)is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency, 2 CFR 180.355; (b)is a corporation that has been convicted of a felony violation under any Federal law within the two-year period preceding this proposal (USDOT Order 4200.6 implementing appropriations act requirements); and (c)is a corporation with any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. (USDOT Order 4200.6 implementing appropriations act requirements) 2.Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant should attach an explanation to this proposal. * * * * * XI.CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal-aid construction contracts and to all related subcontracts which exceed $100,000. 49 CFR Part 20, App. A. 1.The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a.No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b.If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 2.This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3.The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier 13 subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly. XII.USE OF UNITED STATES-FLAG VESSELS: This provision is applicable to all Federal-aid construction contracts, design-build contracts, subcontracts, lower-tier subcontracts, purchase orders, lease agreements, or any other covered transaction. 46 CFR Part 381. This requirement applies to material or equipment that is acquired for a specific Federal-aid highway project. 46 CFR 381.7. It is not applicable to goods or materials that come into inventories independent of an FHWA funded-contract. When oceanic shipments (or shipments across the Great Lakes) are necessary for materials or equipment acquired for a specific Federal-aid construction project, the bidder, proposer, contractor, subcontractor, or vendor agrees: 1.To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment, material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels. 46 CFR 381.7. 2.To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, ‘on-board’ commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (b)(1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of- lading) and to the Office of Cargo and Commercial Sealift (MAR- 620), Maritime Administration, Washington, DC 20590. (MARAD requires copies of the ocean carrier's (master) bills of lading, certified onboard, dated, with rates and charges. These bills of lading may contain business sensitive information and therefore may be submitted directly to MARAD by the Ocean Transportation Intermediary on behalf of the contractor). 46 CFR 381.7. 1 ATTACHMENT C FEDERAL MINIMUM WAGE RATES "General Decision Number: CA20230018 01/13/2023 Superseded General Decision Number: CA20220018 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California. BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). ______________________________________________________________ |If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |______________________________|_____________________________| |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. | |______________________________|_____________________________| The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2023 1 01/13/2023 ASBE0016-004 01/01/2021 AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TOULMNE COUNTIES AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANSICO, SAN MATEO & SANTA CLARA COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 30.45 10.60 Area 2......................$ 36.53 9.27 ---------------------------------------------------------------- ASBE0016-008 08/01/2022 AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANSICO, SAN MATEO, SANTA CLARA, & SANTA CRUZ AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAU, & TUOLUMNE Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 81.16 23.57 Area 2......................$ 62.51 23.57 ---------------------------------------------------------------- BOIL0549-001 01/01/2021 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: REMAINING COUNTIES Rates Fringes BOILERMAKER Area 1......................$ 49.62 41.27 Area 2......................$ 45.60 38.99 ---------------------------------------------------------------- BRCA0003-001 08/01/2022 Rates Fringes MARBLE FINISHER..................$ 39.20 18.31 ---------------------------------------------------------------- BRCA0003-003 08/01/2022 Rates Fringes MARBLE MASON.....................$ 56.98 28.54 ---------------------------------------------------------------- BRCA0003-005 05/01/2022 Rates Fringes BRICKLAYER ( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 47.88 23.29 ( 7) San Francisco, San Mateo.......................$ 53.69 26.03 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 53.61 23.81 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 45.12 21.55 (16) Monterey, Santa Cruz...$ 50.78 25.42 ---------------------------------------------------------------- BRCA0003-008 07/01/2022 Rates Fringes TERRAZZO FINISHER................$ 41.93 18.98 TERRAZZO WORKER/SETTER...........$ 56.84 27.53 ---------------------------------------------------------------- BRCA0003-011 04/01/2019 AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne AREA 3: Fresno, Kings, Madera, Mariposa, Merced Rates Fringes TILE FINISHER Area 1......................$ 29.94 16.38 Area 2......................$ 25.60 14.30 Area 3......................$ 26.58 15.65 Tile Layer Area 1......................$ 49.90 19.16 Area 2......................$ 42.67 16.81 Area 3......................$ 40.27 18.58 ---------------------------------------------------------------- CARP0022-001 07/01/2021 San Francisco County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP0034-001 07/01/2021 Rates Fringes Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet...................$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69 DEPTH PAY (Surface Diving): 050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot SATURATION DIVING: The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours. DIVING IN ENCLOSURES: Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. ---------------------------------------------------------------- CARP0034-003 07/01/2021 Rates Fringes Piledriver.......................$ 54.10 34.69 ---------------------------------------------------------------- CARP0035-007 07/01/2020 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties Rates Fringes Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03 ---------------------------------------------------------------- CARP0035-008 08/01/2020 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: San Joaquin AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties Rates Fringes Drywall Installers/Lathers: Area 1......................$ 52.65 31.26 Area 2......................$ 46.77 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 2......................$ 23.39 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22 ---------------------------------------------------------------- CARP0152-001 07/01/2020 Contra Costa County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0152-002 07/01/2020 San Joaquin County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 ---------------------------------------------------------------- CARP0152-004 07/01/2020 Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- CARP0217-001 07/01/2021 San Mateo County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP0405-001 07/01/2021 Santa Clara County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP0405-002 07/01/2021 San Benito County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08 ---------------------------------------------------------------- CARP0505-001 07/01/2021 Santa Cruz County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08 ---------------------------------------------------------------- CARP0605-001 07/01/2021 Monterey County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08 ---------------------------------------------------------------- CARP0701-001 07/01/2021 Fresno and Madera Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08 ---------------------------------------------------------------- CARP0713-001 07/01/2021 Alameda County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP1109-001 07/01/2021 Kings County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08 ---------------------------------------------------------------- ELEC0006-004 12/01/2021 SAN FRANCISCO COUNTY Rates Fringes Sound & Communications Installer...................$ 48.43 3%+23.15 Technician..................$ 55.69 3%+23.15 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0006-007 06/01/2022 SAN FRANCISCO COUNTY Rates Fringes ELECTRICIAN......................$ 83.25 3%+40.065 ---------------------------------------------------------------- ELEC0100-002 09/01/2022 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes ELECTRICIAN......................$ 43.00 26.84 ---------------------------------------------------------------- ELEC0100-005 12/01/2022 FRESNO, KINGS, MADERA Rates Fringes Communications System Installer...................$ 38.24 23.80 Technician..................$ 47.80 24.08 SCOPE OF WORK Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply: 1. The project involves new or major remodel building trades construction. 2. The conductors for the fire alarm system are installed in conduit. ---------------------------------------------------------------- ELEC0234-001 12/26/2022 MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes ELECTRICIAN Zone A......................$ 60.91 29.43 Zone B......................$ 67.00 29.61 Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line Zone B: Any area outside of Zone A ---------------------------------------------------------------- ELEC0234-003 12/01/2021 MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES Rates Fringes Sound & Communications Installer...................$ 47.93 24.09 Technician..................$ 55.12 24.30 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0302-001 03/01/2021 CONTRA COSTA COUNTY Rates Fringes CABLE SPLICER....................$ 63.86 29.17 ELECTRICIAN......................$ 56.76 28.95 ---------------------------------------------------------------- ELEC0302-003 12/01/2021 CONTRA COSTA COUNTY Rates Fringes Sound & Communications Installer...................$ 43.71 23.96 Technician..................$ 50.27 24.16 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0332-001 06/01/2022 SANTA CLARA COUNTY Rates Fringes CABLE SPLICER....................$ 92.20 42.316 ELECTRICIAN......................$ 80.17 41.955 FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay. Work on structures of 60 ft. or over (as described above): to be paid twice the straight-time rate of pay. ---------------------------------------------------------------- ELEC0332-003 12/01/2022 SANTA CLARA COUNTY Rates Fringes Sound & Communications Installer...................$ 51.18 25.435 Technician..................$ 58.86 25.666 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0595-001 06/01/2021 ALAMEDA COUNTY Rates Fringes CABLE SPLICER....................$ 72.80 3%+39.94 ELECTRICIAN......................$ 63.30 3%+39.94 ---------------------------------------------------------------- ELEC0595-002 06/01/2021 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes CABLE SPLICER....................$ 50.70 7.75%+25.58 ELECTRICIAN (1) Tunnel work.............$ 44.25 7.75%+25.58 (2) All other work.........$ 42.25 7.75%+25.58 ---------------------------------------------------------------- ELEC0595-006 12/01/2021 ALAMEDA COUNTY Rates Fringes Sound & Communications Installer...................$ 47.93 3%+22.65 Technician..................$ 55.12 3%+22.65 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0595-008 12/01/2021 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes Communications System Installer...................$ 38.24 3%+22.65 Technician..................$ 43.98 3%+22.65 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0617-001 06/01/2022 SAN MATEO COUNTY Rates Fringes ELECTRICIAN......................$ 74.00 43.76 ---------------------------------------------------------------- ELEC0617-003 12/01/2022 SAN MATEO COUNTY Rates Fringes Sound & Communications Installer...................$ 51.18 25.44 Technician..................$ 58.86 25.67 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0684-001 06/01/2022 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes ELECTRICIAN......................$ 44.25 3%+26.63 CABLE SPLICER = 110% of Journeyman Electrician ---------------------------------------------------------------- ELEC0684-004 12/01/2021 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes Communications System Installer...................$ 38.24 23.80 Technician..................$ 43.98 23.97 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC1245-001 06/01/2022 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 64.40 22.58 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment).............$ 50.00 21.30 (3) Groundman...............$ 38.23 20.89 (4) Powderman...............$ 51.87 18.79 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- * ELEV0008-001 01/01/2023 Rates Fringes ELEVATOR MECHANIC................$ 77.61 37.335+a+b FOOTNOTE: a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ---------------------------------------------------------------- ENGI0003-001 06/28/2021 ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DEFINITIONS BELOW Rates Fringes OPERATOR: Power Equipment (AREA 1:) GROUP 1.....................$ 53.92 31.54 GROUP 2.....................$ 52.39 31.54 GROUP 3.....................$ 50.91 31.54 GROUP 4.....................$ 49.53 31.54 GROUP 5.....................$ 48.26 31.54 GROUP 6.....................$ 46.94 31.54 GROUP 7.....................$ 45.80 31.54 GROUP 8.....................$ 44.66 31.54 GROUP 8-A...................$ 42.45 31.54 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.....................$ 52.30 31.15 Oiler......................$ 43.79 31.15 Truck crane oiler..........$ 46.08 31.15 GROUP 2 Cranes.....................$ 50.54 31.15 Oiler......................$ 42.83 31.15 Truck crane oiler..........$ 45.07 31.15 GROUP 3 Cranes.....................$ 48.80 31.15 Hydraulic..................$ 44.44 31.15 Oiler......................$ 42.55 31.15 Truck crane oiler..........$ 44.83 31.15 GROUP 4 Cranes.....................$ 45.76 31.15 OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices............$ 52.64 31.15 Oiler......................$ 43.38 31.15 Truck Crane Oiler..........$ 45.66 31.15 GROUP 2 Lifting devices............$ 50.82 31.15 Oiler......................$ 43.11 31.15 Truck Crane Oiler..........$ 45.41 31.15 GROUP 3 Lifting devices............$ 49.14 31.15 Oiler......................$ 42.89 31.15 Truck Crane Oiler..........$ 45.12 31.15 GROUP 4 Lifting devices............$ 47.37 31.15 GROUP 5 Lifting devices............$ 44.73 31.15 GROUP 6 Lifting devices............$ 42.50 31.15 OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes.....................$ 53.27 31.15 Oiler......................$ 43.72 31.15 Truck Crane Oiler..........$ 45.95 31.15 GROUP 2 Cranes.....................$ 51.50 31.15 Oiler......................$ 43.45 31.15 Truck Crane Oiler..........$ 45.73 31.15 GROUP 3 Cranes.....................$ 50.02 31.15 Hydraulic..................$ 45.07 31.15 Oiler......................$ 43.23 31.15 Truck Crane Oiler..........$ 45.46 31.15 GROUP 4 Cranes.....................$ 48.00 31.15 GROUP 5 Cranes.....................$ 46.70 31.15 OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1....................$ 47.52 31.15 GROUP 1-A..................$ 49.99 31.15 GROUP 2....................$ 46.26 31.15 GROUP 3....................$ 44.93 31.15 GROUP 4....................$ 43.79 31.15 GROUP 5....................$ 42.65 31.15 UNDERGROUND: GROUP 1....................$ 47.42 31.15 GROUP 1-A..................$ 49.89 31.15 GROUP 2....................$ 46.16 31.15 GROUP 3....................$ 44.83 31.15 GROUP 4....................$ 43.69 31.15 GROUP 5....................$ 42.55 31.15 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- PILEDRIVERS GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer GROUP 6: Deckhand; Fire tender ------------------------------------------------------------- STEEL ERECTORS GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder GROUP 5: Boom cat -------------------------------------------------------------- -- TUNNEL AND UNDERGROUND WORK GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator GROUP 3: Drill doctor; Mine or shaft hoist GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE AREA 2 -NOTED BELOW THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern Part FRESNO COUNTY: Area 1: Remainder Area 2: Eastern Part MADERA COUNTY: Area 1: Remainder Area 2: Eastern Part MARIPOSA COUNTY: Area 1: Remainder Area 2: Eastern Part MONTEREY COUNTY: Area 1: Remainder Area 2: Southwestern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- ENGI0003-008 08/01/2022 Rates Fringes Dredging: (DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING:) AREA 1: (1) Leverman...............$ 55.15 35.46 (2) Dredge Dozer; Heavy duty repairman.............$ 50.19 35.46 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 49.07 35.46 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 45.77 35.46 AREA 2: (1) Leverman...............$ 57.15 35.46 (2) Dredge Dozer; Heavy duty repairman.............$ 52.19 35.46 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 51.07 35.46 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 47.77 35.46 AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY: Area 1: Remainder Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY: Area 1: Except Eastern part Area 2: Eastern part MARIPOSA COUNTY Area 1: Except Eastern part Area 2: Eastern part MONTERREY COUNTY Area 1: Except Southwestern part Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: Al but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Remainder TEHAMA COUNTY: Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder TUOLUMNE COUNTY: Area 1: Except Eastern part Area 2: Eastern part ---------------------------------------------------------------- ENGI0003-019 06/29/2020 SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1.....................$ 39.95 30.28 AREA 2.....................$ 41.95 30.28 GROUP 2 AREA 1.....................$ 36.35 30.28 AREA 2.....................$ 38.35 30.28 GROUP 3 AREA 1.....................$ 31.74 30.28 AREA 2.....................$ 33.74 30.28 GROUP DESCRIPTIONS: GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP. GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP. GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP. AREA DESCRIPTIONS: AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2 - MODOC COUNTY THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Except Eastern part Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder DEL NORTE COUNTY: Area 1: Extreme Southwestern corner Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY Area 1: Except Eastern part Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder HUMBOLDT COUNTY: Area 1: Except Eastern and Southwestern parts Area 2: Remainder LAKE COUNTY: Area 1: Southern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY Area 1: Remainder Area 2: Eastern part MARIPOSA COUNTY Area 1: Remainder Area 2: Eastern part MENDOCINO COUNTY: Area 1: Central and Southeastern parts Area 2: Remainder MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Reaminder TEHAMA COUNTY: Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder TULARE COUNTY; Area 1: Remainder Area 2: Eastern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- * IRON0377-001 01/01/2023 ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES Rates Fringes Ironworkers: Fence Erector...............$ 41.28 25.66 Ornamental, Reinforcing and Structural..............$ 49.88 34.30 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- * IRON0377-003 01/01/2023 SAN FRANCISCO CITY and COUNTY Rates Fringes Ironworkers: Fence Erector...............$ 41.28 25.66 Ornamental, Reinforcing and Structural..............$ 50.38 34.30 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- * IRON0433-005 01/01/2023 REMAINING COUNTIES Rates Fringes IRONWORKER Fence Erector...............$ 41.28 25.66 Ornamental, Reinforcing and Structural..............$ 46.20 34.30 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-002 06/27/2022 AREA ""A"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES AREA ""B"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes Asbestos Removal Laborer All Counties................$ 27.05 13.50 LABORER (Lead Removal) Area A......................$ 35.37 26.95 Area B......................$ 34.37 26.95 ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations. ---------------------------------------------------------------- LABO0073-002 06/28/2021 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 33.48 26.21 Traffic Control Person I....$ 33.78 26.21 Traffic Control Person II...$ 31.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0073-003 07/01/2022 SAN JOAQUIN COUNTY Rates Fringes LABORER Mason Tender-Brick..........$ 35.29 25.21 ---------------------------------------------------------------- LABO0073-005 07/01/2021 Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 42.00 25.71 GROUP 2.....................$ 41.77 25.71 GROUP 3.....................$ 41.52 25.71 GROUP 4.....................$ 41.07 25.71 GROUP 5.....................$ 40.53 25.71 Shotcrete Specialist........$ 42.52 25.71 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0073-007 06/25/2018 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0073-009 07/01/2021 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 35.82 28.45 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-003 06/28/2021 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 34.48 26.21 Traffic Control Person I....$ 34.78 26.21 Traffic Control Person II...$ 32.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0261-005 07/01/2021 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 42.00 25.71 GROUP 2.....................$ 41.77 25.71 GROUP 3.....................$ 41.52 25.71 GROUP 4.....................$ 41.07 25.71 GROUP 5.....................$ 40.53 25.71 Shotcrete Specialist........$ 42.52 25.71 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0261-009 06/25/2018 SAN FRANCISCO, AND SAN MATEO COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 Laborers: (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0261-011 07/01/2021 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes MASON TENDER, BRICK..............$ 34.85 26.32 FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage: $2.50 per day additional. ---------------------------------------------------------------- LABO0261-014 07/01/2022 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes PLASTER TENDER...................$ 40.48 30.23 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 06/28/2021 AREA A: SANTA CLARA AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person Area A.....................$ 34.48 26.21 Area B.....................$ 33.48 26.21 Traffic Control Person I Area A.....................$ 34.78 26.21 Area B.....................$ 33.78 26.21 Traffic Control Person II Area A.....................$ 32.28 26.21 Area B.....................$ 31.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0270-004 07/01/2021 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 42.00 25.71 GROUP 2.....................$ 41.77 25.71 GROUP 3.....................$ 41.52 25.71 GROUP 4.....................$ 41.07 25.71 GROUP 5.....................$ 40.53 25.71 Shotcrete Specialist........$ 42.52 25.71 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0270-005 07/01/2022 MONTEREY AND SAN BENITO COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 35.29 25.21 ---------------------------------------------------------------- LABO0270-007 06/25/2018 MONTEREY, SAN BENITO, AND SANTA CRUZ, COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B) Construction Specialist Group.......................$ 30.40 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0270-010 06/25/2018 SANTA CLARA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0270-011 07/01/2017 MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 34.70 21.22 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2022 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes LABORER (Brick) Mason Tender-Brick..........$ 35.29 25.21 ---------------------------------------------------------------- LABO0294-002 06/28/2021 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 33.48 26.21 Traffic Control Person I....$ 33.78 26.21 Traffic Control Person II...$ 31.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0294-005 07/01/2021 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 42.00 25.71 GROUP 2.....................$ 41.77 25.71 GROUP 3.....................$ 41.52 25.71 GROUP 4.....................$ 41.07 25.71 GROUP 5.....................$ 40.53 25.71 Shotcrete Specialist........$ 42.52 25.71 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0294-008 06/25/2018 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0294-010 07/01/2021 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender.................$ 35.82 28.45 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2021 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 35.82 28.45 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 06/28/2021 ALAMEDA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 34.48 26.21 Traffic Control Person I....$ 34.78 26.21 Traffic Control Person II...$ 32.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0304-003 07/01/2021 ALAMEDA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 42.00 25.71 GROUP 2.....................$ 41.77 25.71 GROUP 3.....................$ 41.52 25.71 GROUP 4.....................$ 41.07 25.71 GROUP 5.....................$ 40.53 25.71 Shotcrete Specialist........$ 42.52 25.71 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0304-004 06/25/2018 ALAMEDA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO0304-005 05/01/2018 ALAMEDA COUNTY Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2017 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 34.70 23.11 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 06/28/2021 CONTRA COSTA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 34.48 26.21 Traffic Control Person I....$ 34.78 26.21 Traffic Control Person II...$ 32.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO0324-006 06/25/2018 CONTRA COSTA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 37.82 24.11 GROUP 2.....................$ 37.59 24.11 GROUP 3.....................$ 37.34 24.11 GROUP 4.....................$ 36.89 24.11 GROUP 5.....................$ 36.35 24.11 Shotcrete Specialist........$ 38.34 24.11 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO0324-012 06/25/2018 CONTRA COSTA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 31.49 23.20 GROUP 1.....................$ 30.79 23.20 GROUP 1-a...................$ 31.01 23.20 GROUP 1-c...................$ 30.84 23.20 GROUP 1-e...................$ 31.34 23.20 GROUP 1-f...................$ 30.37 23.20 GROUP 1-g...................$ 30.99 23.20 GROUP 2.....................$ 30.64 23.20 GROUP 3.....................$ 30.54 23.20 GROUP 4.....................$ 24.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 30.54 23.20 (2) Establishment Warranty Period......................$ 24.23 23.20 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 30.75 22.31 GROUP 2.....................$ 30.25 22.31 GROUP 3.....................$ 29.66 22.31 GROUP 4.....................$ 29.54 22.31 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 30.79 23.20 GROUP 2.....................$ 30.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters ---------------------------------------------------------------- LABO0324-014 05/01/2018 CONTRA COSTA COUNTY: Rates Fringes Brick Tender.....................$ 35.37 20.70 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2021 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 38.28 29.43 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 06/28/2021 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 33.48 26.21 Traffic Control Person I....$ 33.78 26.21 Traffic Control Person II...$ 31.28 26.21 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LABO1130-003 06/26/2017 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 36.60 24.83 GROUP 2.....................$ 36.37 24.83 GROUP 3.....................$ 36.12 24.83 GROUP 4.....................$ 35.67 24.83 GROUP 5.....................$ 35.13 24.83 Shotcrete Specialist........$ 37.12 24.83 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LABO1130-005 07/01/2022 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 35.29 25.21 ---------------------------------------------------------------- LABO1130-007 06/25/2018 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 30.49 23.20 GROUP 1.....................$ 29.79 23.20 GROUP 1-a...................$ 30.01 23.20 GROUP 1-c...................$ 29.84 23.20 GROUP 1-e...................$ 30.34 23.20 GROUP 1-f...................$ 29.37 23.20 GROUP 2.....................$ 29.64 23.20 GROUP 3.....................$ 29.54 23.20 GROUP 4.....................$ 23.23 23.20 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 29.54 23.20 (2) Establishment Warranty Period......................$ 23.23 23.20 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 29.75 22.31 GROUP 2.....................$ 29.25 22.31 GROUP 3.....................$ 28.66 22.31 GROUP 4.....................$ 28.54 22.31 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 29.79 23.20 GROUP 2.....................$ 29.64 23.20 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LABO1130-008 07/01/2021 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender.................$ 35.82 28.45 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2021 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 35.82 28.45 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2022 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes Painters:........................$ 46.37 26.33 PREMIUMS: EXOTIC MATERIALS - $1.25 additional per hour. SPRAY WORK: - $0.50 additional per hour. INDUSTRIAL PAINTING - $0.25 additional per hour [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK: over 50 feet - $2.00 per hour additional 100 to 180 feet - $4.00 per hour additional Over 180 feet - $6.00 per houir additional ---------------------------------------------------------------- PAIN0016-003 07/01/2022 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes Drywall Finisher/Taper AREA 1......................$ 57.16 30.24 AREA 2......................$ 53.03 28.84 ---------------------------------------------------------------- PAIN0016-012 07/01/2022 ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes SOFT FLOOR LAYER.................$ 54.25 32.28 ---------------------------------------------------------------- PAIN0016-015 01/01/2021 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PAINTER Brush.......................$ 35.88 21.16 FOOTNOTES: SPRAY/SANDBLAST: $0.50 additional per hour. EXOTIC MATERIALS: $1.25 additional per hour. HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour. ---------------------------------------------------------------- PAIN0016-022 01/01/2022 SAN FRANCISCO COUNTY Rates Fringes PAINTER..........................$ 49.99 26.33 ---------------------------------------------------------------- PAIN0169-001 06/01/2020 FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES: Rates Fringes GLAZIER..........................$ 40.00 26.76 ---------------------------------------------------------------- PAIN0169-005 01/01/2022 ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & SANTA CRUZ COUNTIES Rates Fringes GLAZIER..........................$ 54.77 31.45 ---------------------------------------------------------------- PAIN0294-004 01/01/2021 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes PAINTER Brush, Roller...............$ 31.36 20.33 Drywall Finisher/Taper......$ 40.10 25.00 FOOTNOTE: Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25 additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. ---------------------------------------------------------------- PAIN0294-005 08/01/2022 FRESNO, KINGS & MADERA Rates Fringes SOFT FLOOR LAYER.................$ 37.12 22.10 ---------------------------------------------------------------- PAIN0767-001 01/01/2022 CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes GLAZIER..........................$ 41.78 33.09 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. Employee rquired to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation. ---------------------------------------------------------------- PAIN1176-001 07/01/2022 HIGHWAY IMPR0VEMENT Rates Fringes Parking Lot Striping/Highway Marking: GROUP 1.....................$ 40.83 17.62 GROUP 2.....................$ 34.71 17.62 GROUP 3.....................$ 35.11 17.62 CLASSIFICATIONS GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings GROUP 2: Gamecourt & Playground Installer GROUP 3: Protective Coating, Pavement Sealing ---------------------------------------------------------------- PAIN1237-003 08/01/2022 CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SOFT FLOOR LAYER.................$ 44.72 24.98 ---------------------------------------------------------------- PLAS0066-002 07/01/2019 ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES: Rates Fringes PLASTERER........................$ 42.41 30.73 ---------------------------------------------------------------- PLAS0300-001 07/01/2018 Rates Fringes PLASTERER AREA 188: Fresno...........$ 32.70 31.68 AREA 224: San Benito, Santa Clara, Santa Cruz.....$ 32.88 31.68 AREA 295: Calaveras & San Joaquin Couonties...........$ 32.70 31.68 AREA 337: Monterey County..$ 32.88 31.68 AREA 429: Mariposa, Merced, Stanislaus, Tuolumne Counties...........$ 32.70 31.68 ---------------------------------------------------------------- PLAS0300-005 07/01/2016 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27 ---------------------------------------------------------------- PLUM0038-001 07/01/2022 SAN FRANCISCO COUNTY Rates Fringes PLUMBER (Plumber, Steamfitter, Refrigeration Fitter)..........................$ 82.00 48.18 ---------------------------------------------------------------- PLUM0038-005 07/01/2022 SAN FRANCISCO COUNTY Rates Fringes Landscape/Irrigation Fitter (Underground/Utility Fitter).....$ 69.70 33.15 ---------------------------------------------------------------- PLUM0062-001 07/01/2022 MONTEREY AND SANTA CRUZ COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 48.95 38.65 ---------------------------------------------------------------- PLUM0159-001 07/01/2022 CONTRA COSTA COUNTY Rates Fringes Plumber and steamfitter (1) Refrigeration...........$ 56.93 41.04 (2) All other work..........$ 62.12 45.24 ---------------------------------------------------------------- * PLUM0246-001 01/01/2023 FRESNO, KINGS & MADERA COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 46.95 38.59 ---------------------------------------------------------------- * PLUM0246-004 01/01/2017 FRESNO, MERCED & SAN JOAQUIN COUNIES Rates Fringes PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74 PIPE TRADESMAN SCOPE OF WORK: Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems; Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions; Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman ---------------------------------------------------------------- PLUM0342-001 07/01/2022 ALAMEDA & CONTRA COSTA COUNTIES Rates Fringes PIPEFITTER CONTRA COSTA COUNTY.........$ 72.00 45.70 PLUMBER, PIPEFITTER, STEAMFITTER ALAMEDA COUNTY..............$ 72.00 45.70 ---------------------------------------------------------------- PLUM0355-004 07/01/2022 ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES: Rates Fringes Underground Utility Worker /Landscape Fitter...........$ 32.22 17.55 ---------------------------------------------------------------- PLUM0393-001 07/01/2021 SAN BENITO AND SANTA CLARA COUNTIES Rates Fringes PLUMBER/PIPEFITTER...............$ 68.76 46.63 ---------------------------------------------------------------- * PLUM0442-001 01/01/2023 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 50.75 35.14 ---------------------------------------------------------------- PLUM0467-001 07/01/2021 SAN MATEO COUNTY Rates Fringes Plumber/Pipefitter/Steamfitter...$ 73.10 38.61 ---------------------------------------------------------------- * ROOF0027-002 01/01/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes ROOFER...........................$ 41.31 15.31 FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off: $2.00 per hour additional. ---------------------------------------------------------------- ROOF0040-002 08/01/2022 SAN FRANCISCO & SAN MATEO COUNTIES: Rates Fringes ROOFER...........................$ 49.83 21.14 ---------------------------------------------------------------- ROOF0081-001 08/01/2022 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Roofer...........................$ 50.27 20.66 ---------------------------------------------------------------- ROOF0081-004 08/01/2022 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes ROOFER...........................$ 43.13 19.71 ---------------------------------------------------------------- ROOF0095-002 08/01/2022 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES: Rates Fringes ROOFER Bitumastic, Enameler, Coal Tar, Pitch and Mastic worker......................$ 55.16 20.82 Journeyman..................$ 51.16 20.82 Kettle person (2 kettles)...$ 53.16 20.82 ---------------------------------------------------------------- SFCA0483-001 08/01/2022 ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES: Rates Fringes SPRINKLER FITTER (FIRE)..........$ 73.05 36.39 ---------------------------------------------------------------- * SFCA0669-011 01/01/2023 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SPRINKLER FITTER.................$ 42.30 27.25 ---------------------------------------------------------------- SHEE0104-001 07/01/2020 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA AREA 2: MONTEREY & SAN BENITO AREA 3: SANTA CRUZ Rates Fringes SHEET METAL WORKER AREA 1: Mechanical Contracts under $200,000.............$ 55.92 45.29 All Other Work.............$ 64.06 46.83 AREA 2......................$ 52.90 36.44 AREA 3......................$ 55.16 34.18 ---------------------------------------------------------------- SHEE0104-003 07/01/2021 CALAVERAS AND SAN JOAQUIN COUNTIES: Rates Fringes SHEET METAL WORKER...............$ 44.34 39.22 ---------------------------------------------------------------- SHEE0104-005 07/01/2021 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SHEET METAL WORKER (Excluding metal deck and siding)...........$ 41.28 45.41 ---------------------------------------------------------------- SHEE0104-007 07/01/2021 FRESNO, KINGS, AND MADERA COUNTIES: Rates Fringes SHEET METAL WORKER...............$ 44.07 40.79 ---------------------------------------------------------------- SHEE0104-015 07/01/2020 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES: Rates Fringes SHEET METAL WORKER (Metal Decking and Siding only).........$ 44.45 35.55 ---------------------------------------------------------------- SHEE0104-018 07/01/2020 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes Sheet metal worker (Metal decking and siding only).........$ 44.45 35.55 ---------------------------------------------------------------- TEAM0094-001 07/01/2022 Rates Fringes Truck drivers: GROUP 1.....................$ 36.95 31.14 GROUP 2.....................$ 37.25 31.14 GROUP 3.....................$ 37.55 31.14 GROUP 4.....................$ 37.90 31.14 GROUP 5.....................$ 38.25 31.14 FOOTNOTES: Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson; Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with self-contained refuse bin; Boom truck - hydro-lift or Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information. Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISIO" 2 ATTACHMENT D APPENDIX E OF TITLE VI ASSURANCES 3 Appendix E of the Title VI Assurances (US DOT Order 1050.2A) During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to: Pertinent Nondiscrimination Authorities: Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), prohibits discrimination on the basis of sex; Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CR Part 27; The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), prohibits discrimination on the basis of age); Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms “programs or activities” to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); Titles II and III of the Americans with Disabilities Act, which prohibit discrimination of the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 – 12189) as implemented by Department of Transportation regulations 49 C.F.R. parts 37 and 38; The Federal Aviation Administration’s Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).