HomeMy WebLinkAboutReso 117-2023 (23-543)• City of South San Francisco
City Council
• Resolution: RES 117-2023
P.O. Box 711 (City Hall, 400
Grand Avenue)
South San Francisco, CA
File Number: 23-543 Enactment Number: RES 117-2023
RESOLUTION ADOPTING A PROPOSED LIST OF
PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY SB
1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF
2017.
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to
address the significant multi -modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the
residents of the City are aware of the projects proposed for funding in the South San Francisco community
and which projects have been completed each fiscal year; and
WHEREAS, the City of South San Francisco must adopt by resolution a list of projects proposed
to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by_
SB 1, which must include a description and the location of each proposed project, a proposed schedule for
the project's completion, and the estimated useful life of the improvement; and
WHEREAS, the City will receive an estimated $1,606,044 in RMRA funding in fiscal year
2023-24 from SB 1; and
WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and will enable
the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing
and replacing aging bridges, and increasing access and mobility options for the traveling public that would
not have otherwise been possible without SBI; and
WHEREAS, the City has undergone a robust public process to ensure public input into the SSF
community's transportation priorities. The project list is a result of collaboration among various departments
summarizing the needed improvements and the priority of implementation of these projects; and
WHEREAS, the City used a Pavement Management System to determine the City's pavement
rehabilitation projects included as part of the SB 1 project list to ensure revenues are being used on the most
high-priority and cost-effective projects that also meet the community's priorities for transportation
investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate roads throughout
the City; and
City of South San Francisco
File Number: 23-543
Enactment Number: RES 117-2023
WHEREAS, the 2022 California Statewide Local Streets and Roads Needs Assessment found that
the City's streets and roads are in an "good" condition and this revenue will help us increase the overall
quality of the City's road system and over the next decade will bring SSF streets and roads into a
"excellent" condition; and
WHEREAS, the SB 1 project list and overall investment in the City's local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and
using cutting-edge technology, materials, and practices, will have significant positive co -benefits statewide.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of South San Francisco,
as follows:
1. The foregoing recitals are true and correct.
2. The following list of newly proposed projects will be funded in -part or solely with fiscal year
2023-24 Road Maintenance and Rehabilitation Account revenues:
PMP 2024 Surface Seal Project (Area 5)
Project Description: This project will consist of local street surface seal treatment consisting of
localized pavement failure repairs, failed concrete curb, gutter, valley gutter replacement, crack seal,
surface seal pavement surface treatment and replacing all existing striping and pavement markings.
Useful life elements include concrete repairs, localized pavement repairs and pavement surface
treatment. Design & construction of street surface seal project as part of the Pavement Management
Program (PMP) that will cycle through Areas 1 - 5, one area each year providing new surface seal of
streets with new thermoplastic striping, legends, and crosswalks; 2024 will cycle through Area 5.
Project Location: Surface Seal of Area 5 which includes Avalon Park, Brentwood, Francisco Terrace,
Orange Park, Park Haven, and Southwood neighborhoods.
STREET NAME
BEGIN
END
Memorial Dr
W Orange Ave
North End
W Orange Ave
El Camino Real
Memorial Dr
A St
W Orange Ave
South End
A St
W Orange Ave
2nd St
A St
2nd St
North End
B St
W Orange Ave
South End
B St
W Orange Ave
North End
C St
W Orange Ave
South End
C St
W Orange Ave
North End
1 St St
El Camino Real
East End
2nd St
El Camino Real
East End
Westborough Blvd
W Orange Ave
El Camino Real
W Orange Ave
Westborough Ave
El Camino Real
Fairway Dr
W Orange Ave
Ponderosa Rd
Southwood Dr
W Orange Ave
Ponderosa Rd
Hillcrest Ct
W Orange Ave
East End
Southwood Dr
W Orange Ave
El Camino Real
City of South San Francisco
File Number: 23-543
Knoll Cir
Southwood Dr
Hill Ave
Haven Ave
Bryce Ave
Lassen St
Carlsbad Ct
Rainier Ave
Ponderosa Rd
Comerwood Ct
Alida Way
Country Club Dr
Northwood Dr
Hazelwood Dr
Wildwood Dr
Briarwood Dr
Rosewood Dr
Ravenwood Dr
Maywood Dr
Sherwood Wy
Greenwood Dr
Brentwood Dr
Manor Dr
Rockwood Dr
Pinehurst Wy
Mosswood Way
Kenwood Way
Yellowstone Dr
Almanor Ave
Tahoe Ct
Shasta Ct
Yosemite Dr
Valverde Dr
Valverde Dr
Mariposa Dr
Valencia Dr
Avalon Dr
Avalon Dr
Dana Ct
Constitution Way
Taylor Dr
Castile Way
Dorado Way
City of South San Francisco
Fairway Dr
West End
Southwood Dr
West End
West End
North End
West End
Lassen St
Valencia Dr
Ponderosa Rd
Ponderosa Rd
Alida Way
Hazelwood Dr
Northwood Dr
Briarwood Dr
Hazelwood Dr
Northwood Dr
North End
Northwood Dr
Wildwood Dr
Rosewood Dr
Wildwood Dr
Springwood Dr
Springwood Dr
Rosewood Dr
Hazelwood Dr
Hazelwood Dr
Hazelwood Dr
West End
Valverde Dr
South End
West End
Almanor Ave
Yellowstone Dr
Avalon Dr
Valverde Dr
Valverde Dr
JSB
Dorado Way
Avalon Dr
Avalon Dr
West End
West End
Avalon Dr
Enactment Number: RES 117-2023
Dr
W Orange Ave
Fairway Dr
Fairway Dr
Haven Ave
Ponderosa Rd
Haven Ave
Haven Ave
El Camino Real
South End
Northwood Dr
El Camino Real
Hazelwood Dr
El Camino Real
Maywood Dr
Rosewood Dr
Rockwood Dr
Rockwood Dr
Brentwood Dr
Rockwood Dr
Wildwood Dr
Rockwood Dr
El Camino Real
Rockwood Dr
Brentwood Dr
Rockwood Dr
Brentwood Dr
Brentwood Dr
Almanor Ave
Yosemite Dr
Almanor Ave
Yosemite Dr
Mariposa Dr
Avalon Dr
Alta Vista Dr
Yosemite Dr
Avalon Dr
Dorado Way
Constitution Way
South End
Taylor Dr
Constitution Way
Dorado Way
SSF / SMC Line
File Number: 23-543 Enactment Number: RES 117-2023
Pisa Ct
Constitution Way
North End
Blondin Way
North End
SSF / SMC Line
Rosa Flora Cir
Blondin Way
Blondin Way
Zamora Dr
Valverde Dr
East End
Granada Dr
Valverde Dr
Avalon Dr
Corrido Way
Valverde Dr
Mira Vista Way
Alta Vista Dr
Valverde Dr
SSF / SMC Line
Mira Vista Way
Granada Dr
Alta Vista Dr
De Nardi Way
North End
Alta Vista Dr
Alpine Ct
North End
Alta Vista Dr
Adas Way
North End
Alta Vista Dr
Dianne Ct
West End
Conmur St
Alhambra Rd
Ponderosa Rd
Granada Dr
Conmur St
Granada Dr
Northwood Dr
El Cortez Ave
North End
Francisco Dr
Ramona Ave
Wilms Ave
Francisco Dr
Portola Ave
Ramona Ave
Francisco Dr
Sonora Ave
Ramona Ave
Francisco Dr
Francisco Dr
El Camino Real
Wilms Ave
Terrace Dr
Francisco Dr
S Spruce Ave
S Spruce Ave
El Camino Real
Huntington Ave
Huntington Ave
S Spruce Ave
SSF / SB Line
Noor Ave
El Camino Real
Huntington Ave
Junipero Serra Blvd
Westborough Ave
Avalon Dr
Estimated Project Schedule: Preconstruction 8/2023 - 3/2024
Construction 4/2024 - 10/2024
Estimated Project Useful Life: 5 to 10 years
BE IT RESOLVED that this resolution shall be effective immediately upon its adoption.
At a meeting of the City Council on 7/12/2023, a motion was made by Vice Mayor Nagales,
seconded by Councilmember Coleman, that this Resolution be approved. The motion passed.
Yes: 4 Mayor Nicolas, Vice Mayor Nagales, Councilmember Addiego, and
Councilmember Coleman
Absent: 1 Councilmember Flores
Attest by 21-�ZL'�� R
Rosa 16ovea Acosta, City Clerk
City of South San Francisco