Loading...
HomeMy WebLinkAboutReso 117-2023 (23-543)• City of South San Francisco City Council • Resolution: RES 117-2023 P.O. Box 711 (City Hall, 400 Grand Avenue) South San Francisco, CA File Number: 23-543 Enactment Number: RES 117-2023 RESOLUTION ADOPTING A PROPOSED LIST OF PROJECTS FOR FISCAL YEAR 2023-24 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017. WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City are aware of the projects proposed for funding in the South San Francisco community and which projects have been completed each fiscal year; and WHEREAS, the City of South San Francisco must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by_ SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $1,606,044 in RMRA funding in fiscal year 2023-24 from SB 1; and WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SBI; and WHEREAS, the City has undergone a robust public process to ensure public input into the SSF community's transportation priorities. The project list is a result of collaboration among various departments summarizing the needed improvements and the priority of implementation of these projects; and WHEREAS, the City used a Pavement Management System to determine the City's pavement rehabilitation projects included as part of the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community's priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate roads throughout the City; and City of South San Francisco File Number: 23-543 Enactment Number: RES 117-2023 WHEREAS, the 2022 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "good" condition and this revenue will help us increase the overall quality of the City's road system and over the next decade will bring SSF streets and roads into a "excellent" condition; and WHEREAS, the SB 1 project list and overall investment in the City's local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials, and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of South San Francisco, as follows: 1. The foregoing recitals are true and correct. 2. The following list of newly proposed projects will be funded in -part or solely with fiscal year 2023-24 Road Maintenance and Rehabilitation Account revenues: PMP 2024 Surface Seal Project (Area 5) Project Description: This project will consist of local street surface seal treatment consisting of localized pavement failure repairs, failed concrete curb, gutter, valley gutter replacement, crack seal, surface seal pavement surface treatment and replacing all existing striping and pavement markings. Useful life elements include concrete repairs, localized pavement repairs and pavement surface treatment. Design & construction of street surface seal project as part of the Pavement Management Program (PMP) that will cycle through Areas 1 - 5, one area each year providing new surface seal of streets with new thermoplastic striping, legends, and crosswalks; 2024 will cycle through Area 5. Project Location: Surface Seal of Area 5 which includes Avalon Park, Brentwood, Francisco Terrace, Orange Park, Park Haven, and Southwood neighborhoods. STREET NAME BEGIN END Memorial Dr W Orange Ave North End W Orange Ave El Camino Real Memorial Dr A St W Orange Ave South End A St W Orange Ave 2nd St A St 2nd St North End B St W Orange Ave South End B St W Orange Ave North End C St W Orange Ave South End C St W Orange Ave North End 1 St St El Camino Real East End 2nd St El Camino Real East End Westborough Blvd W Orange Ave El Camino Real W Orange Ave Westborough Ave El Camino Real Fairway Dr W Orange Ave Ponderosa Rd Southwood Dr W Orange Ave Ponderosa Rd Hillcrest Ct W Orange Ave East End Southwood Dr W Orange Ave El Camino Real City of South San Francisco File Number: 23-543 Knoll Cir Southwood Dr Hill Ave Haven Ave Bryce Ave Lassen St Carlsbad Ct Rainier Ave Ponderosa Rd Comerwood Ct Alida Way Country Club Dr Northwood Dr Hazelwood Dr Wildwood Dr Briarwood Dr Rosewood Dr Ravenwood Dr Maywood Dr Sherwood Wy Greenwood Dr Brentwood Dr Manor Dr Rockwood Dr Pinehurst Wy Mosswood Way Kenwood Way Yellowstone Dr Almanor Ave Tahoe Ct Shasta Ct Yosemite Dr Valverde Dr Valverde Dr Mariposa Dr Valencia Dr Avalon Dr Avalon Dr Dana Ct Constitution Way Taylor Dr Castile Way Dorado Way City of South San Francisco Fairway Dr West End Southwood Dr West End West End North End West End Lassen St Valencia Dr Ponderosa Rd Ponderosa Rd Alida Way Hazelwood Dr Northwood Dr Briarwood Dr Hazelwood Dr Northwood Dr North End Northwood Dr Wildwood Dr Rosewood Dr Wildwood Dr Springwood Dr Springwood Dr Rosewood Dr Hazelwood Dr Hazelwood Dr Hazelwood Dr West End Valverde Dr South End West End Almanor Ave Yellowstone Dr Avalon Dr Valverde Dr Valverde Dr JSB Dorado Way Avalon Dr Avalon Dr West End West End Avalon Dr Enactment Number: RES 117-2023 Dr W Orange Ave Fairway Dr Fairway Dr Haven Ave Ponderosa Rd Haven Ave Haven Ave El Camino Real South End Northwood Dr El Camino Real Hazelwood Dr El Camino Real Maywood Dr Rosewood Dr Rockwood Dr Rockwood Dr Brentwood Dr Rockwood Dr Wildwood Dr Rockwood Dr El Camino Real Rockwood Dr Brentwood Dr Rockwood Dr Brentwood Dr Brentwood Dr Almanor Ave Yosemite Dr Almanor Ave Yosemite Dr Mariposa Dr Avalon Dr Alta Vista Dr Yosemite Dr Avalon Dr Dorado Way Constitution Way South End Taylor Dr Constitution Way Dorado Way SSF / SMC Line File Number: 23-543 Enactment Number: RES 117-2023 Pisa Ct Constitution Way North End Blondin Way North End SSF / SMC Line Rosa Flora Cir Blondin Way Blondin Way Zamora Dr Valverde Dr East End Granada Dr Valverde Dr Avalon Dr Corrido Way Valverde Dr Mira Vista Way Alta Vista Dr Valverde Dr SSF / SMC Line Mira Vista Way Granada Dr Alta Vista Dr De Nardi Way North End Alta Vista Dr Alpine Ct North End Alta Vista Dr Adas Way North End Alta Vista Dr Dianne Ct West End Conmur St Alhambra Rd Ponderosa Rd Granada Dr Conmur St Granada Dr Northwood Dr El Cortez Ave North End Francisco Dr Ramona Ave Wilms Ave Francisco Dr Portola Ave Ramona Ave Francisco Dr Sonora Ave Ramona Ave Francisco Dr Francisco Dr El Camino Real Wilms Ave Terrace Dr Francisco Dr S Spruce Ave S Spruce Ave El Camino Real Huntington Ave Huntington Ave S Spruce Ave SSF / SB Line Noor Ave El Camino Real Huntington Ave Junipero Serra Blvd Westborough Ave Avalon Dr Estimated Project Schedule: Preconstruction 8/2023 - 3/2024 Construction 4/2024 - 10/2024 Estimated Project Useful Life: 5 to 10 years BE IT RESOLVED that this resolution shall be effective immediately upon its adoption. At a meeting of the City Council on 7/12/2023, a motion was made by Vice Mayor Nagales, seconded by Councilmember Coleman, that this Resolution be approved. The motion passed. Yes: 4 Mayor Nicolas, Vice Mayor Nagales, Councilmember Addiego, and Councilmember Coleman Absent: 1 Councilmember Flores Attest by 21-�ZL'�� R Rosa 16ovea Acosta, City Clerk City of South San Francisco